PEKERJAAN
DAFTAR GAMBAR
Ars-01
Ars-02
Ars-03
Ars-04
Ars-05
Ars-06
Ars-07
Ars-000
REVISI
KETERANGAN
SKALA
MENGETAHUI :
PEJABAT PEMBUAT KOMITMEN PEMBINAAN
TEKNIS SATKER PENGEMBANGAN
KAWASAN
PERMUKIMAN KHUSUS
Ir.Manaek Sihombing,M.Si
NIP: 19600911 198902 1001
MENYETUJUI
KONSULTAN MK
Ir.SULIK ANAM, MT
TEAM LEADER
DIRENCANAKAN
KONSULTAN PERENCANA
M.RONI FACHRONI.ST
CHEK POINT
JUDUL GAMBAR :
DAFTAR
GAMBAR
SKALA:
N
BI
NOGAMBAR
AN
JUDUL GAMBAR
LEMBAR :
KODE:
Ars-000 ARS
PEKERJAAN
KETERANGAN
Atap
Atap
4987
4987
Level 2
Level 2
2400
2400
BV
W1
W1
W2
Denah
W2
Denah
4000
4000
Tampak Depan
2
Ars-01
3
Ars-01
1 : 50
A
Tampak Belakang
1 : 50
MENGETAHUI :
Ars-01
Ars-02
1
Ars-07
4000
G2
G2
Atap
Ir.Manaek Sihombing,M.Si
NIP: 19600911 198902 1001
Atap
4987
4987
MENYETUJUI
KONSULTAN MK
2000
1
Ars-02
2
R.Ganti
5 m
Ir.SULIK ANAM, MT
3
Toilet
2 m
Level 2
Level 2
2400
2400
TEAM LEADER
DIRENCANAKAN
Ars-01
2
Ars-02
2000
6
R.Cek Point
7 m
W1
W1
W2
W2
Denah
Denah
3975
4000
2
2
4
Ars-01
1
Tampak Samping
1 : 50
Team Leader
PENANGGUNG JAWAB ARSITEKTUR
25
2
5
Ars-01
M.RONI FACHRONI.ST
CHEK POINT
1 : 50
JUDUL GAMBAR :
DENAH &
TAMPAK
4000
B
2
SKALA:
Ars-01
Denah
1 : 25
KODE:
N
BI
LEMBAR :
Ars-01
AN
Ars-01
4000
KONSULTAN PERENCANA
Atap
4987
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
SATUAN PENGEMBANGAN KAWASAN PERMUKIMAN KHUSUS
JL.CIPAKU V NO 1, KEBAYORAN BARU JAKARTA SELATAN 12170.NO.
TELEPON 021-7395673
PEKERJAAN
G2
BV
BV
BV
Level 2
2400
W1
W2
Denah
0
2750
1250
4000
B
Potongan - 1
1
Ars-02
1 : 30
MENGETAHUI :
G2
G1
Atap
Atap
4987
4987
Ir.Manaek Sihombing,M.Si
NIP: 19600911 198902 1001
W1
G2
G1
MENYETUJUI
KONSULTAN MK
Ir.SULIK ANAM, MT
Level 2
Level 2
2400
2400
TEAM LEADER
DIRENCANAKAN
KONSULTAN PERENCANA
W1
W1
P1
W2
W2
Denah
Denah
CHEK POINT
2000
4000
4000
1
3
Ars-02
POTONGAN
Potongan - 2
1 : 30
1 : 30
SKALA:
N
BI
Ars-02
Potongan -3
JUDUL GAMBAR :
AN
2000
LEMBAR :
KODE:
1 : 30 Ars-02 ARS
TIPE PITU P1
TIPE PITU P2
TIPE BV
TIPE G1
1140
TIPE G2
1200
1080
PEKERJAAN
2100
KETERANGAN
312
1700
2100
2100
600
1550
1350
400
3500
3400
890
790
1080
1140
200
75
790
150
150
890
1200
3500
3400
600
GRILL ALUMUNIUM
GRILL ALUMUNIUM
DOOR SCHEDULE
1 : 30
MENGETAHUI :
PEJABAT PEMBUAT KOMITMEN PEMBINAAN
TEKNIS SATKER PENGEMBANGAN
KAWASAN
PERMUKIMAN KHUSUS
Ars-01
BV
BV
BV
2750
1250
Ir.Manaek Sihombing,M.Si
NIP: 19600911 198902 1001
MENYETUJUI
KONSULTAN MK
Ir.SULIK ANAM, MT
2000
TEAM LEADER
P1
DIRENCANAKAN
KONSULTAN PERENCANA
4000
Ars-01
Team Leader
PENANGGUNG JAWAB ARSITEKTUR
2000
M.RONI FACHRONI.ST
SCHEDULE PINTU
Family
4000
PINTU P1 P1
PINTU P2 P2
Grand total: 2
Type
SCHEDULE JENDELA
Count
1
1
2
Family
Height
GRILL G1 1350
GRILL G2 1500
GRILL G2 1500
BOUVENLI 400
HTT
BOUVENLI 400
HTT
BOUVENLI 400
HTT
Grand total: 6
Type
CHEK POINT
Count
G1
G2
G2
BV
1
1
1
1
BV
BV
JUDUL GAMBAR :
RENCANA DAN
DETAIL KUSEN
SKALA:
LEMBAR :
KODE:
Ars-03
Ars-01
1 : 25
N
BI
AN
Ars-01
4000
P2
PEKERJAAN
2
Ars-07
2750
1250
4
Ars-07
HT.1
2000
KR1
CD1
Ars-07
CD1
MENGETAHUI :
FD1
4000
2000
Ir.Manaek Sihombing,M.Si
NIP: 19600911 198902 1001
MENYETUJUI
KONSULTAN MK
Ir.SULIK ANAM, MT
TEAM LEADER
DIRENCANAKAN
HT.1
KONSULTAN PERENCANA
4000
IR. BAMBANG RIYANTO, MT,IAI
Team Leader
DENAH RENCANA LT
M.RONI FACHRONI.ST
1 : 20
CHEK POINT
JUDUL GAMBAR :
DENAH
RENCANA
LANTAI
SKALA:
N
BI
Ars-04
AN
LEMBAR :
KODE:
1 : 20 Ars-04 ARS
PEKERJAAN
2750
1250
MENGETAHUI :
Ars-01
2000
Ir.Manaek Sihombing,M.Si
NIP: 19600911 198902 1001
MENYETUJUI
KONSULTAN MK
Ir.SULIK ANAM, MT
TEAM LEADER
DIRENCANAKAN
4000
KONSULTAN PERENCANA
Team Leader
PENANGGUNG JAWAB ARSITEKTUR
Ars-05
DENAH PLAFOND
Ars-01
1 : 20
M.RONI FACHRONI.ST
CHEK POINT
JUDUL GAMBAR :
DENAH
RENCANA
PLAFOND
SKALA:
N
BI
AN
Ars-01
CB
4000
2000
LEMBAR :
KODE:
1 : 20 Ars-05 ARS
PEKERJAAN
3
3003
5716
MENGETAHUI :
ATAP SPANDEX
5725
Ars-01
Ir.Manaek Sihombing,M.Si
NIP: 19600911 198902 1001
MENYETUJUI
KONSULTAN MK
Ir.SULIK ANAM, MT
TEAM LEADER
DIRENCANAKAN
KONSULTAN PERENCANA
2
4864
Ars-01
2550
Ars-06
DENAH ATAP
M.RONI FACHRONI.ST
1 : 20
CHEK POINT
JUDUL GAMBAR :
DENAH ATAP
SKALA:
N
BI
AN
Ars-01
LEMBAR :
KODE:
1 : 20 Ars-06 ARS
PEKERJAAN
LEGGEND MATERIAL
NOTASI
NO
KETERANGAN
Level 2
2400
KETERANGAN
W1
HT
LISPLANG ACP
BATU ANDESIT
W2
RIGID BETON 15 CM
KR1
FD1
FD1
TOILET
-0.000
Denah
0
CD1
150
1850
CD1
150
2000
LEGGEND MATERIAL
4
Ars-07
1 : 35
MENGETAHUI :
Section 3
1 : 20
Ir.Manaek Sihombing,M.Si
NIP: 19600911 198902 1001
Ars-07 Ars-07
MENYETUJUI
CD1
150
1100
Level 2
Level 2
2400
2400
KONSULTAN MK
BV
150
150
Ir.SULIK ANAM, MT
TEAM LEADER
DIRENCANAKAN
KONSULTAN PERENCANA
2000
-0.020
KR1
CD1
PENANGGUNG JAWAB ARSITEKTUR
+0.000
TOILET
-0.000
TOILET
-0.000
FD1
Denah
Denah
M.RONI FACHRONI.ST
150
1850
150
150
1100
CHEK POINT
150
2000
1250
JUDUL GAMBAR :
3
Ars-07
Ars-07
DETAIL TOILET
1 : 20
Ars-07
Section 1
1 : 20
DETAIL TOILET
1 : 20
SKALA:
LEMBAR :
KODE:
N
BI
Section 2
AN
Ars-07
CD1
150
1850
W1