Anda di halaman 1dari 62
PERATURAN MENTERI PERHUBUNGAN NOMOR : KM. 70 TAHUN 2010 TENTANG STANDAR BIAYA TAHUN 2011 DI LINGKUNGAN KEMENTERIAN PERHUBUNGAN JAKARTA, November 2010 TABEL KOEFISIEN KEMAHALAN STANDAR BIAYA KEMENTERIAN PERHUBUNGAN TAHUN 2011 BERDASARKAN INDEKS KEMAHALAN KONSTRUKS! n Koefisien NO | PIK PROVINS! IKK Kerenalan. Keterangan P |Provinsi Nanggroe Aceh Darussalam 2791) ce | uate ee Om simeuleu=t 3 1 |p fProvinsi Sumatera Utara nasi s.ofthusus Niewe 1.8 dan Gunung puna stole 4.2 m Prownsi Sumatera Barat 211,295] 1,0)Khusus Kepulauan Menta: i vovinst Fliou IKnusus Bengkalis, Indiagir Hil, wv | P |Provinsi Ria 238,249] 44 Dumai, dan Meranti= 1.2 v P |Provinsi Kepulauan Riau 250,978] 41,2|Khusus Natuna dan Anambas= 1,3 ~{_W_[7P_[Provinsi Jambs 219,193] 44 VWil_|_S” [Proving Sumatera Selatan’ 216,145] 4,0) Vit |_P_ |Provinsi Bangka Beiitung 236,040] ml «(1x TF [Prownsi Bengkuly 216,640] 1.0 KO[P [Provnsi Lampang 29 304 i xt P_|Provinsi DKI Jakarta 224,416 4,1 xt_|_P_[Provinsi Jawa Barat 210,254) 1,0] Hr | -PProvns:Banten 210-51 “0 RIP [Prova Jana Tengah 207.553 0 _[_P_[Prouns Yogyakarta 209,400 a XVI | P_[Provinsi Jawa Timur 204,938 1.0) xxvi'| ® |provns Katmantan Barat 238,136 Ee, SWVIT| P| Prova Katmanian Tengah 7a, 50 @ XIX | P_|Provinsi Kalimantan Selatan 224,315} 44 | P [Prownsi Kaimanian Timur 745,505 12 xxat | P [Provins Sulawest Utara arr sepa an iia psoas XRT [Prone Corona TEES ia xxiii| P_ |Provinsi Sulawesi Tengah 224,502 4,1]Khusus Banggai Kepulauan= 1,2 * [XxiV|P_[Provinsi Sulawesi Selatan 215,928) 1,0 XXV | P_|[Provinsi Sulawesi Barat 224,152! 44 _ [RXvI[_P | Provins! Sulawest Tenggara 227,802! 44 XKVIT|P_[Prowns Bah 7.725 10 Pexvill P| Provins: Nusa Tenggara 63 F677 a YXKIK | P_[Provisi Nusa Tenggara Timur 240377 12 70 [PPro Malay 774.573 3 KK P_[Provinsl Malka ara 267 409 13 XXXIT| PProvnsi Papua 507,460 7 [kab Bik Numer 345,002 a7 |b Jayapura 38 260 17 K_|Kab. Jayawijaya 572,628 27 K_|Kab. Merauke 490,696 2.4) K_|Kab. Mimika 410,574] 2,0) [kab Nebr Ha ia [ka Pani 603.959 29 [kab Puneat Jaya 823.948 ag [kab Reputauan Vapen 527483 18 [koa Jayapura 371389 a5 K_|Kab Sarmi 406,039] 41,9) K_|Kab Keerom 382,692) 18] K_|Kab_Yahukimo 555,785] 2.7} PROVINSI KK setisiet Sorry Keterangan Pegunungan Bintan 777262 37 Tolkara 616,055 3. Boven Digoe! 424,36. 2, Mappi 450,13 2 Asmat 550,79: 2, Waropen, 398,34) 1 1 b B. b. i fb Supiori 343,42 ip. Mamberamo Rava 405,55. 3b Mamberamo Tengah 584,98 ib. b ab. ab, af Zi Yalimo 578.17: 2 Lanny Jaya, : 583,40: 2, Nouga. 578,24: 2, Puncak 850.01: 4, b_ Dogiyai 330,71 7, ab _Intan Jaya 603.9 2 ab _Deiyai 608.3 2 1 1. 1 1 alalalalalalalala|\ rovinsi Papua Barat 340.4 ad_ Soran 333.9% fap Manokwari 326.6: ‘a Fak Fak 346.2 (ota Soro 281.5: ‘ab_ Sorong Selatan, 3318 ‘ab_Raja Ampat 364 2 iKab_Teluk Bintuni 350.1 (Kab. Teluk Wondama 328. iKab_Kaimana 337, Kab. Maybrat 369. (Kab_Tambrauw 353,784 Keterangan’ Diolah dari data Kementerian PU dan Kementerian Keuangan berdasarkan sumber data Indeks Kemahalan Konstrukst dari BPS. Koefisien Dasar (Jawa - Bali) = 1 Faktor Pembagi IKK rata-rata Jawa Bali = 208.6 DIREKTORAT JENDERAL PERHUBUNGAN DARAT DIREKTORAT LLAJ FS TRAIAN KEGIATAR REKAPITULAS! PEKERJAAN FASILITAS LALU LINTAS JALAN 1)PERS E PERRSANGAN RAMON VALU UNAS OLIRLANU 45x43 PAKU JALAN (Pani Bula 1e|PENG 8 PEWASANGAN LANL PERINGATAN, NGLGHT) — ANPU PERINGATAN SOLAR CELL (TIANG LENGKUNG) | 17]BENG & PENASANGAN LAMBU PERINGATAN SOLLAR CELL (TIANG LURUS}) | 18]PENG & PENASANGAN ALAT PENGENDALIISYARAT LALU LINTAS 3 (TIGA) PERSIMPANGAN 15]PENG & PENASANGAN ALAT PENGENOALISYAR | 2¢|TMBANGAN PORTABLE 20 TO 23] a a x0 es 3 oa RIPENGA IGAN LPJU KONVENSIONAL a ! 33 |PENGADAAW & BENASANGAN LPJU TENAGA SURYA, Harga Satuan Bahan Uratantkegintan Harga Satwan “umn aby TOTO GA joy 10x ‘Ange dametet 25 mm ula 1" [Best uta 125" = ‘Boul pengikat baja prot Gesain (BbchIng) ] esi anghyy 301303 mm. 83 6o ‘esi pengikat gaWvais a se eal eerie [Bociarpa sipsk ia oe 2767 275. 45.000" as000 196.218 3.908 625, 25.000 6 747 569. S| Lom mixed epory adhesive | Lempengan bes baa prof desain galvanis ‘Mata bor best Minyak cat oma | Bautimur tur aut pengaman — cee Mur Baul post Pembuaten duduxan Box co Panel Solace 50 Wall12 Vol 70-| Pipa pengaman PVC | Pengecatan lang dan paiok pengaman Penyarbung strc (PLN) [Pia gaivans 1.5 [Pipa gatvanie 2° medium Plat stip ukuran 4x30 ram Ramibu Tab No.16 Uk, 60 en Based panel Baia eas erat grade [Semen toga) Seliermnalnabel [Saar [Soa S [ Tearmootaai Tang engin ang tutus Tang seemed 235.725.000] 200 550.000 | ral SO Sg isan LED Coarse 10 Wat’ VoL UbaINVAF ax Sa? —"—— cat daya 180 Wp 36 OC, kabel NYAF ZS mmo i Balrai(Bateai Charger) 3 VALA Deep Cyl PV hapssion 50 AN 12V, abel NYAP 26 min Hap Asp @ Men ‘Lampulsyarat 3 Asp 0.30 om. Harga Satuan Upah Z| 5 Uraianikegiatan Repaiatuxang Kepala tukang bes! Kepala Tukang cat iKepala Tukang kayu A 2 3 4| 5 al 7 a 9 2|Tukang bau HTukang bes! HTukang cat |Tukang las Tukang kay eae Harga Satuan Alat [Rey Uraianikogiatan Vorume Targa Satvan] 7 Alat bantu pengelasan/pemotongan 2|Alat bantu pengecatan “TlAiat bantu pengaspalan per 109 m2 8|Sewakendaraan (bantu pemasangan pipa fa Crane bantu No. URAIAN KEGIATAN, 43 GALIAN TANAH 1 2 Pekerja Mandor 11M3 URUGAN TANAH KEMBALI 4 2 1/M3 URUGAN PRSIR BAYAN PONDAS! Pekera Mandor Pasir Ung Pekera andor ‘epala tukang ‘Tusang Best 13 BETON COR CAMPURAN 1:2: Kerik ‘Semen PC (S0kg/2ak) Pasi Beton ‘Tukarg Kepala Tutang Pekeria Mandor Cor Tang overheadrbuah Beton cor Cor Ting trusuan Beton cor Cor patok pengamarvouah 1 12 PEKERJAAN CAT BES! 4 4 Cat beet at menie besi Mnyak cat was tangan Kertas am Tukang cat Kepala tuxang cat Pekerja Mando: UNIT PEMOTONGAN DAN PENGEBORAN erga} besi Mata bor besi epala tang besi Pekoria andor 100.CM PENGELASAN Kawatias Mesin ls istik dan perlengkapan Alat bantu pengelasan/pemotongan Spare pat epala tukang bes! “Tukang tas Pekerja ANALISA HARGA SATUAN PEKERJAAN voLUMe HARGA SATUAN 0.625 ot 70387,00 0.062 ot 108.286,00 Jumian 0.156 on + 70587,00 0.016 on 108296,00 Jumiah 13 m3 136.000,00 08 oh 70587,00, 0.05 oh 108 286,00 03 oh 95726,00 03 on 53145,00, Jumiah 082 ma 136 106,25 1.382 za 4000.00, 058 ma 153615,00 tor 83145,00 0.41 on 195726,00 6 on 7087.00, 03 on 108 296,00 Jumiah 04876 m2 1142455.69, 02746 m3 1.142.455.69 0,102 m3 114245569 0425 ig 45 000,00, 0.125 xg 35 000,00, 075 Wee 15000,00 0.1 buan 02 lembar 034 on 10,0034 on 02 oh 70587,00 001 on 108 298700 Jumiah 0.001 bua 31.509,00, ©.001 buan 50.000,00, 0.0225 oh 95.728,00, 0.9675 oh 70587.00 0.0068 oh 108 296,00 sumian 08 ks tro10.90 1 at 612281,25 o's 70.000,00, ons 4824750 0.1 oh 95 726,00, 0.05 oh 65.734,00 0.2 eh 70:587,00 Jomian PENGELASAN PER 1 CN = JUMLAH 44116.88 6714.35 50.831,23 nina 1732.74 sa74a.a4 175 500.00, 4235220, 5497.75 2717.80 24 983.50 278011.28 111602.13, 399 168.00 2952.10, 83 145.00, 9572.69 423 $22.00 32 488,00 1.442.455,63 50421225 a13718.31 11659047 1912500 4375.00 11250.00 1500.00 1500.00 26,269.30 325.47 s4n740 1082.05, 8454513, 2150 50.00 2153.84 4754.62 73641 1736.37 13.608,00 61226.13 000,00 4524.75 9572.60 3226.70 ren740 108.627,58 1086.38 1 UNIT PERAKITAN DAN PENYETELAN 1. Pekerja 2. Mandar 3. Alat bantu penyetelan 11M2 PEKERJAAN PENGECATAN ZEBRA CROSSIMARKA JALAN Pekeria 1 2 Tukarg cat 3. Kepalatukang eat 4 Mandoe 5 ‘lat bantu pengecatan 1 M2 BEKESTING PONDASI ‘Papan kay kia lt (Merant) 1 2 Paku 3. Mandor 4 Kopala tukang kayu 5. Tukang kayu 8 Poker 1 M2 BONGKARAN BEKESTING 15 dar Upan Beksing 1 Bongkaran bekesting 2 Bekesting 1 M2 PEKERJAAN GALI TUTUP ASPAL KERAS 1. Pekera 2. Mandor 3. Sewa dil benkut operator 4 Sewa stamper Berkut operator BAHAN DAN UPAH ASPAL TIAP 6 M2 ‘Aspal AC 60-70 ‘Batu pecan 0.51 Solar ‘lat bantu pengaspatan per 100 m2 Tukang Pekera Manor 1. UNIT PEKERJA PEMBUATAN DUDUKAN BOX KONTROL 1. Beton cor 2 Angkor 1. UNIT ONGKOS ANGKUT KE LOKAS! 1. Sewa kendaraan 2 Solar 3 Sop % Peteya 4. RAMBU, DELINEATOR, RPP ‘ hatt® 3rt Per at dapat menganghtt = 35 buah,sehingga 3 0.375 on 70.587,00 0.075 oh 108 296,00, 0.25 7.087'50 Surah 05 oh 7058700 0.225 oh 814500, 0.0025 on 95,726.00, 10,0075 of 108.286,00, 1s $.000,00 oman 1 HP MARKA JALAN UK (2 120 MM) 0.0067 ma 3.800 000.00, 0.0867 kg 43 000.00, 10,0033 on 108 296,00, 0.0167 on 95 728.00, 0.1667 of. 83 145.00 0.0667 oh 7587.00 Jura 1h 9as701 ams 20m 170507,00 toh 108.286,00, 1 ha 401.695.00 than 199 $00.00, umian, 1549 482.50 0.972 m3 131.250,00, 3 ter 4515.00 1s 27431250 0.03 on #3.145,00 08 oh 70.587,00 0.903 oh 108.286,00, umiah GALI DAN TUTUP LUGANG PER M= 0.3800 ma 1.142 455,63 “4 buan 6582.50 Jumiah tha 400.000,00 70 iter 4515.00 ton 83.145,00 aon 70587,00 Jumiah 105 buan longkos angkutunit » ongkos angkut ke loka: jumiahrambu yang dapat diangkut sean 25.4793 8122.20 1771.88 36.364,20 35.203,50 12 707.53, 23032 81222 9000.00 4082, 7686.32 25460.00 1200.60, 957 38 1598 62 1386027, 4708 36 47188.03 943701 $6 622.03 161,174.00 108 296,00 401 825,00, 199 500.00 1850.505,00, 73237.50 9.450,00 13545,00 274312,50 2494.35 4235220 3248.88 41854043, 211 574.24 436.139,14 28250,00 460.383,14 400:000,00 316.050,00, 63,148,90 282 348,00. 4.081.643,00 14420857 a 8. PAGAR PENGAMAN JALAN A nan +3 nt Per dapat mengangkut = 10buah,sehingga 3 t= 30 buat ‘nghos angkuunit = ongkos angkut ke lkasl: jumlah pagar pengaman jalan ‘yang dapat dangkut sehen C. WARNING LIGHT, ALAT PEMBERIISYARAT LALULINTAS, MARKA 0. PAKU JALAN ‘hos = 3 at Perit dapat mengangkut = 200 buah, sehingge 3 t= 600 buah ‘ngkos angkutuni = engkos angkut ke okasi: jum pakujlanan yang dapat dangkut sean 11M PEKERJAAN PEMASANGAN REFLEKTOR/ MATA KUCING 4 Petena 2 Tukang 3. Alot bants pemasangan pipa 11M PEKERJAAN PENGEBORAN DAN PEMASANGAN 1 Peketia 2 Mandor 3 alatbanty 11M PENGGELARAN KABEL 1 Aatpaniu 2 Poxena 3. Mancor 11M PEMASANGAN PIPA PVC 1 Alatbants 2 Pekeris 3 Mandor PEKERJAAN PENGEBORAN DAN PEMASANGAN PAKU MARKA BULAT 1 Pekela| 2, Mander 3. Alatbanu 0,32 on (0,082 oh 02's Otte 003 oh 0018 oh 0,085 ts 0.93 on 10.908 oh 0.14 oh 0,02 oh 16 Jian umlah Jamia Jumlah 36,051.43, 241,000.00 1902.57 7087.00 705.87 23 145,00 495.73 498750 496750, 6.108 10 7087.00 22587 64 108266.00, e435 3858.75 775 : 30073,94 388875 385,08 70587.00 aust 108.296.00, 1626.44 4427,83 3.089.785 70587.00 108 296,00 10.587,00 9682.18 108.296,00 2.16592 27,000.00 27,000.00 39,048,10 3 PENGADAAN & PEMASANGAN RAMBU LALU LINTAS I JALAN UK. 75 X75 CHt ‘Daun ram alam $8 mm 0 tefietive sheeting Pipa galvanis 7 mesuen Prat tp ukuran #50 mm AAngkur et shu usuran 20X30%3 mam Baume (Cat belakang ¢avn rambu Tulup ppa ciameter 2 Pemetangan dan pongeboran Rengelasan c Perakian dan panvetaian Cor pondasi Beton Galgp tanah dan ug kerb ‘Urugan pasie Bawah pendasi Betesting pondas: ‘Onghos angkut ke okasi PENGADAAN & PEMASANGAN RAMBLLALU LINTAS DI JALAN UK. 90 X $0 CM 0 2 13 14 15 ‘Daun rambu alurunaum 2mm, reflexive sheeting Papa galvanss 7 med ‘a sito uxutan 4840 mm) “Angnur Best Su uautan 40K ram Baume Cat petakang caun rambs Tuup pipa cameter 2 Pemotongan can pengetoran Pengelasan Peraktan dan penyeteian or pondasibeton GGatan tanan dan urug eres LUnugan pase 0 bawah pondasi Beresting pondas: (Ongkos angkut ke lots 0.56 ma 790.675,00, am 75,000.00, osm 25.000,00 osm 30,000.09, “bush 3.150,00, 0.88 m2 01.545,13, 1 buah 8500.00, unt 173637 sat en 1088.38 1 nit 3.26420 oat ma 11245563, 0.25 ma 63.575.54 c4 m3 2re011.25, 0.91 m2 ‘5662203 1 bush 14.2057 JUMUAH Dibutatkan (oa) ma 1.020.000,00 am 75,000.00 16m 25,800.00 oem 30,000.00 ‘Bbuan 35.080.00, 0.56 m2 81.545.13, 1 buan '8500.00 1 ut 21.040.50 Maat em 1036.38 Yun 4782500 ones 1.131 36713 025 ma e.575.s6 0.04 ms 23801126 112 mo 4851352 1 yan 1030041 UMA Dibulatkan 437.178.00, 225.000,00, 4+5.000,00, 18,000.00 +12600,00 45665.27 "8500.00 7.136,37 15.546,04 36.364.20 125870,12 15.99188 1.12045 511528.05 1442087 1.040220,95 1.400.000,00 826,200.00 '300.000,00 +40000,00 24,000.00 -280-400,00, 4500527 500,00 21.040,50, 15.540.06 47625.00 124 480,44 15.899.88 3.36045 94.305.15 10300.41 1024317.14 ENCANA ANGGARAN BIAYA PENGADAAN & PEMASANGAN RAMBU LALU LINTAS DI JALAN UK. 43 X 45 CM Fes Saun eambu alumucium 1,8 mm, reflexive sheeting 02 m2 760.675.00 2. Pipagalvans 1° am $7,750.00 3 Pat stp uxuran 4X90 mm 05m 25,000.00 “4 Anghur bes shu uxuran SOXG0X9 mm osm 30.000,00 5 Murpaut 10 mm ‘stan 4.000,00 6 Cat nelakang daun rambu oz me 01 545.13 7 Tutuppipa alameter 1.5° 1 buat 3500.00, 5 Pemotengan aan pengeboran 3 unt + 773807 8 Pengelasan 1a3t em 1086.38 $0. Peraktan dan penyetelan vont 96.36420 11. CorpSadasibeton = oaima 1.142.458.63 42, Galan tana dan uug kembat 025 m3 63,575.54 42. Urugan pasir dibawan pondas) 0.04 m3 27901128 44 Bekosteg pondast 32 m3 5662203 15. Onghoe angel ke lkasi 1 buah 14420557 uma Dibutatkan PENGADAAN & PEMASANGAN RAMBU LALU LINTAS DI JALAN UK. 60 X 60 CM Pe ounrambu alumumum 1mm dp. retekive sheeting 0.36 2 78067500 2. Papagahans 15° am $1750.00 3. Plt snp vuran 4X30 mm oem 225000,00 4A Anghur bes! sky koran 30X3013 mm 06 m 30,000.00, 5 Bawa “aban 3150.00 & Cat pelakang daun rambo 0.36 m2 6545.13, 7 Tuyppipa hamater 1.5" + Baan 3500.00, 8 Pemotongan dan pangeboran 1 nit 7736.37 9. Pengelasan vate 11086:38 40. Peraktan dan penyetelan ont 36 386.20, 11. Cor pondasiteton ont ms 110245563. 42. Galan tanan dan ung kembat 0.25 ma 6357554 13 Urugan passed Bawah pondast oma 27801126, 4 Bekesting pondas: 12 m3 ‘5662203 45. Onghos anghut ke okast bush 4442057 JUMLAH Diputatkan 186 135.00 173 250,00 15.000,00, 18,000.00, 16,000.00, 16:308,03, +3.500,00, 773637 15548 04 36354,20 125870,12 15203.88 4112045, 6241667 44420 57 508 362.33, 700,000.00 281 003,09 473 250.00 1500000, 48000.00, 12600,00, 29386.28, 3 500,00 773637 15546.08 36.364.20 125.670,12 15.895.88, 4112045 6341667 $4420.57 222 917.85 150,000.00 % PENGADAAN & PEWASANGAN RAMBU PENOAHULU PENUNJUK JURUSAN UM. 120% 240 CM 1 Papa Mar Oimete 6° om 41500000 2. Pha titan Dialer om 15850000, 3 Parson 15" sem 7900009 4 Flange Pipa dia 3-110 mm “ah 730000 5. Pate Flange Pipa ia 3-110 mm 26 tah ‘$000.00, Pia Das Ting 400x400» 12mm 1 bua ssscc000 1. Rb Piste Dasa tebal 10mm 4 buah 0 0¢000 8. TutpPipa dia ‘bean ‘seeo,00 8 Tutp Ppa da reg rascooe Ye. Maur Bas ci 14 mm unk Farge Sean 11 Angkurea 18 mm paiang 606m 12, Tun paut Ange 1) Galan Tanah 14. Cor Beton Ponda (60 x60 120 cm) 18, Besieton Da 12m 48. Urugan Pasir Bawan Poncast matte 17. Beating 562205 48, Daun Rambu Plat Am Compostet= 3 5 c0000 49. Loge Departemen Pembungan 17 00.00 2, Beal Sku4dx40x3 00 sono 21, Wlem3 x40 450 mn 11 00,00, 22 Mar Baud Kem dia 12mm "3300.00 2. Murdan Gaus da 6m / Pane ‘20000 24. Rivet! Pave! + 0.c0 25. Baya Pembustan/ Pongelasan oeoee 28. Gahanis Hot Dip 1290000 27. Sowa Crane Kapastas ton 2700 000.06 Droviatan [PENGADAAN & PEWASANGAN RANBU PENOAHULU PENUNJUK JURUSAN PORTAL BENTANG 18 M {Pipa Htam Diameter 12" red 1147900090 2 Piga iam Diameter som 5000000, 3. Pipatitam Dsamater 19 41500003 {Pipa lam Diameter 85 26c000) 5S Flange Poa ca &-t 1200 ' buan 3esco0 00 Flange Pipa da 6-1 101m ® ‘aaes000 1. RB Pia Flange Pipe da -18mm st buan "00000, Rb Plate Flange Pip da 6-16 mn s zre0000 ©. Plat Dasar Tang 88058022 mm 2 bush 955 00000 40. Re Pat Osea tba! 10mm 12000 216 ¢0000, 11, Tap Ppa da 12 2 ean 3000060 12 Tap Ppa cas" 2 ean receoso 13. Tuup Ppa dia 2 1 90000 1 Maur! Baus a 22 mm untuk Flange ered 19 soon 15. Anglor dia 22 mm pajang 70cm 12 ban 00000 18 Tupbaut Ang 42 bush 19 50000 Galan Tanah 36ms aee4s00 {Ger Bolor Ponda (80x80 x200 cm) 2:6 m3 51 70000, {Cor Tang PancangBoion a 20. 0m 91 70090, fen Ben Oa 12mm 146 m 709000, ‘Uugaa Pas Bawah Ponce 0.19 ms maonas Beaising 28 ma sbez203 ‘Daun Rombu Plat Aim Compose t= 3 ved ma 75578080 {ago Desaremen Pernabungan °2tuan ‘760000, esi Sku 40 40 «3 rm coe er ye 00000 Kom 3449x450 6 buan ‘1 0c0.00, tem 340x600 rm 06,00 ‘Mor Baa lem ia 6 mm buan soqc0 ‘ar don Baus a6 en Pane! 36 buan sonaeo Rivet Pane 48 bash + sea00 Baye PemovatanPengelasen 200278 1g 'o.00 ‘Galanis Hot Dip 360278 1g 120,00, Sewa Crane Kapastas 15 ton ene sora Batok Pengaman gia #1206 bush sua Siouiaan ae i e: ie ae 25200000, 340000.00, ‘1500000 2900000, $000.00 #200000, 2220120 0973100, ere 60006 13900.56 wao7nes 230 40000 52080000 4000 600 20 16260 020,00, 1386 000 80 $480 00009 "sa 000.99 1 544 09000, 4458 00000 180.0000, 2820 00000 060.09 #000000 724 000,00, 2436 352.00 228 408000 2407 20099 $2022. 724 76199 1094083070 3400000 11824000000 ‘65 000.00 8.00000, 2.000 00 ‘08 e00 00 19 800,00 9022 740.00 ‘239 96000 ‘07 165,72 43468 e0005: 142.500 000,00 ENCANA ANGGARAN BIAYA ENGAOAAN & PEMASANGAN RAMBU PENDAHULU PENUNJUK JURUSAN UK. 106 X 140 CM ‘Gouna arma 2mm, eee sheeting 147 m2 2 Papa gahanis 7 megim om 4 nghur bes: ku ukuran 30X90%9 me om 5 Gawnur “4 buh © Carbeakang dun rambo sar a 5 Tae sea gamete 2 bush & amuangan dan pengeboren unt §Pengeason 100 em ‘o. Perantan ean penytetan ‘nt 11, Cor goqaas beton i o22ma 12. Gavan tanah dan rug Kemba - 95 ms 13. Urugan pane Bawah pondas 003 ms M4 Benesing pond 224m NE. Ongtoe angi ke kas! 1 bua PENGADAAN & PEMASANGAN RANBU PENDAHULU PENUNJUK JURUSAN UK. 120 150 CM Peer aru akumurium 2 oe dp reekve sheng "a2 m2 2 Peeagowans 7 medium am 3 Prat utran 4X40 mm am 4 Anger bossy URN 30X3029 om cam $ Gam “i buon © Cartestang daunranbu 482 m2 SMe aoa sareter "2 bah 1 Pemetongan dan pengaboran 4 unt 5 Pergeasan 100 em 40. Perla don penyetalan unt 11 Cor ponaasibeton 0.22 ma {2 Govan tanah gan rug kemba 05 m3 13. Ungan psi Dawah ponds 0.08 mo NE Bexestng pondas 226m 15. Ongtos anghut ke kash 1 bush e72 38000 7900.00 2500000 3000009 315009 255,13 359000 Tr83 1086 38 3636620 eases prare aeons resz203 sono st suMLan Dibistan er2ss000 700000 2502000 so000.0e s1s00e s1s55 350000 re 408638 3636620 sess ‘sns795¢ suas Diouiatean 1 2a2.648.50, 60 900.00 "3900000, 254000.00 “46 100,00, wigan ra sobenT se 36306,20 254 30,24 317877 22240'90 2583335, 4420.57 286 980.81 2300.00.00 1 675296,00, 609 090.02 0000.00, 354 09000 see secs 7600.00, seaear st 3636420 wei aeaze aren? 222400 13689335 1442057 31632362 3.350.000. ENCANA ANGGARAN BIAYA PENGADAAH & PEMASANGAN PAGAR PENGAMAN JALAN (—[penggeiran abel eon ass [i [Penanaman pa plading alm ron 47 933,40 fi [ot wap aspal 23h Tirsraze 325 035,60 fea gan wip nah hea =| ——ivoh [SEES Baer 55350 [5 [Pengecoran tang nak. albus 3542125] 7135 848,00 Fa |Pengossran eax pega Spa 116530. aSBL [Set erinal abel z Te6i003 £0400. Fé [Pasang aan set pox a Belen 625.0 51 750.00 FY [Bembustan can box cote ‘a8 ECORI Heo 383.14 ra | Pengecaian tang don palk pangarian sl5ah aoaiscd aes 625 00 Fs [Pengambungan hs PUN ‘ost 3700-60 7700 ec0.03 [zo [ona angwut py perngaian Ke Ora ast pat on $47 000-99 Loma are 575.1] [Deusen 51000 900.09 \GADAAN & PEMASANGAN LAMPU PERINGATAN TENAGA SURYA WARWNG LIGHT SOLAR GEL) TANG LENGHUNG [Lamps Aspak 630m, june $500 060 7190596055) festa Ca So ‘fon aoe 359 75009 Is —Yriang Owerheae ‘une ree 5 ‘503006 09] [a [esnraner ‘un Bre sext 37a" 562 59 [5 antersi vRLA Deep Oe PV Pes 70s 0 7 50006000] [s—[ratcx Pengaman apes 50 oot +500 360.00 [r—atan Tanah Zan seer a1 954.34 fs [Pengeceran Salms Tyas ase 385 47338 fb [pemaeongan © AROS as ess 90 S00 000,00 Loman. 35.8780 83) [owatatar 39,000060,00}. NGADAAN & PEMASANGAN LAMEU PERINGATAN TENAGA SURYA (WARNING LIGHT SOLAR CELL) TANG LUFF f_[tamou 2 Aspek 6 306m ‘owe 500000 5300 00069 [> [soir cer s0 we “un Boas 2 3063 760.00 fs Trieng wars H 30900 400990000 fe[oonweter “un 3747 $53 ere 852 50 [ater VACA Daeg Cpe ilpes 250008 $50 060.09 [z—[eack Pengaran afPes $00 00 i590 260,09 [rata Tanah Talo Saas 121884 04 [s—Jeengecora Behm Ther ase HHS 7339 pIeemasangan EAromodaa: ‘its S300 00 5500960, Loma rata re0.9| [pBulatan "37500000 9) apres eager ENCANA ANGGARAN BIAYA PENGADAAN & PEMASANGAN ALAT PENGENOALIISYARAT LALU LINTAS PERSIMPANGAN 3 KAKI SIMPANG 3) onboor 4 phase 2 pecestan dan boca or Lamu 3 aspek 3 ou Campa? aspek Pemba aus ist 5 Tang ovemeas © Teng iw 7 Armaturboxlonpa 5 Patok renga (nat 3 Termainabe! te Kabel WY 482 Kabel 2, NYY 403 13) Gesibuat 25° 16 Pipa pergaman PVC 15. Penggetarantabe 18 Pemasangan pa PVC 1? Poseurs 1 Gat asea Gai con up tanan bers Bangaseran tang ove Meas + Pengecran tang ls Peagecoran gato gengaran Prasang aan se ermal ade! "Pasay dan set box larou Pasar oan se 1 pesana dan seinng Pengecatantang da plot pengamanan Pengectan sem cross Benyamaungan ss (PLN) Aaya programming pesaat Ramu T201 No T3UK 80x60 em Cesena pane $5 bush 100m 1 out 18 Sot 31884 975.00 276727500, 3.10125 254736280 4.900 000,00 11850000 Moers 18267.50 2533125 81 795,00 1295750 ‘9.00250 4779 2087008 13500009 au sr424 s3421225, a1 7183 853047 427205 4482500, russ 33337500, 7680.22 ‘320000000 1.988 00,00, PENGADAAN & PEMASANGAN ALAT PENGENOALIISYARAT LALU LINTAS PERSIMPANGAN 4 KAKI SIMPANG 4) 1 Koneler& phase 2 pedesinan 2 BorLamps 3 aspee 3 BoxLampu 2 aspek 2 Pebatas aus tstik é boxe Trang ns arok pega (nate) = Terma bate $0 Katey 425 14 Rabel #9, 7 4 12. Best buat 13 Bes pat 125° 14 Plea gangaman PVC 15. Pengglaran habe! 16. Pemarangen ipa PVC 17. Pasar 18 Gab dup ase) 19, Gaon 1sup tanan kes Pengecoan ting ver eed Pengecorn tang us Pengeeaan ptokpengaman ‘eacang dans trina abel Pasang dan set box rou Pasang danse pesawat oon sekiog PPemeustan avdukan box convo! Pengecatan tng Gi ptckgengamanan Penyareborgan isk (PLN) Baya posamning pesawat amt Ta No. 15 UK 60x60 cm basera pane! FRB Abas 12 buat bush 1 buh rang 4 batang 2 ban fon 09m oom 2 batang 2eaneg 0 atarg seo m 20m ‘3m 10m aban 20 bah ‘set tle 31.854375,00, 278727500, 258037600 4310125 2547 56250, #8000000 11580009 sosrrst 2187.50 2533135 1.79500 12057 50 3003250 “412793, 208708 133500090, ansraze sarin aia Tie31 vessaa7 vaaizes 4482500 21482045 teo383.14 7936.32 3.200 000.00 11995,00.00, 708,750.00, JUMLAH Dibutatran 018125, 1942 87.50, 700.0000 11732500,00, 3675,00300, 1519.75.00 183 $90.00, 22591500 200130000 1 e98 64550 ‘602 69675, 94) 15494 25047042 a ten20 tes 37800 Danes 307500, ren 891.92 320000090 4.995,00.00, 2426 25000 ssi 945 08209, 4§2000.00000 » 31.95497500 3329729000 20643 000.00, “0 18125 10190 250,00, 77600 00000 8 30 2954 192675000 450375000 zas915.00, 2503 62500, 2311 3600, se7416.75, 405,000.00 ais74ane 7629008420, as s2279 142 72650, 22 500.00 2452048 tose 3097500 rosesis2 320000000 41895000000, 2635000000, 17267228555 +73000.00000,/ ENCANA ANGGARAN BIAYA PENGADAAN & PEMASANGAN PATOK TIKUNGAN PIPA PLASTIC Detar ipa paste Refektortigh niensty erode us 10129 cat Cox pondas: ton Gaon tnah da uug taba ‘Urugan past Bawah cenaas Betesting been patok thug (Orgies anghut be ona PENGADAAN & PEMASANGAN PATOK TKUNGAW PIPA BES! ‘elinair ates Retexior igh nersy grade 10:29 ca er gondasi baton (Galan ana an ug Kerb ‘Urgen pase Bawah poreas: Bexesnng belo poh thurgan (Ongion argh kona 1 ban oat 0.8 ma 008 ma 08m ‘ban ong 018 ma Oe ma 08 ma ‘scco00 1124560 6857554 ners seezz03 1442087 JUN Dioulsthan 4000.00 7380600 4500000 vrei 5575.54 aon $5622.08 wazas? suman Dreutaoan 2aa76250 16300,00 11020856 1144380 V12048 f asz0782 442087 4200031 146.0000 400000 44721000 18300000 11424555, 1144360 4529782 450.00, RENCANA ANGGARAN BIAYA [PENGADAAN & PEMASANGAN MARKA JALAN [UK e120 mm) por 1. [Thermoplastic O9fkg T 22.275, 00] 20 047,50] 2 [otassbeads Ol 20:000,90] 2000.0] [5JOngkos pengesetan no 7686 32] T8832 Loman zaras 82 buat 30000,00 [PENGADAAN 4 PEWASANGAN MARK JALAN [UK 3120 man] pert i [ooiplas oom Fea] FSG fz [otassbease cx 70;00,00| 2000.00 3 longeos penzatan Gl 7.586 30] 7696.32 omar 32.166 32 Dulakan 32100,09) RENCANA ANGGARAN BIAYA PENGADAAN & PEMASANGAN CERMIN TIKUNGAN 4. Germin areylic.cembung 3 mm 1 uni 3.908625,00 3 908 625,00 2. pipa galvanis 2° medium 44 m3 75600,00 330,000.00 3. Angkur bes! sku ukuran 30x30:3 mm 08 ms 30000,00 18 090,00 ‘4 Tutup pipa diameter 2° "1 buan 500,00 8500.00 5, Besi pengikat gahanis, 4 buah 1308.75 13.308,75 8 Murbaut 10.em 4 buah 400000 16090.00 7. Pemotongan 1 boatang 1736.37 7735.37 8, Pengelasan 4om 1086.38 4345.50 9. Perakitan dan penyetetan 1 unt 363642036 354.20 410. Cor pondasi peton = 0,24 m3 14245563 274.109.35, 11, align tanah dan urug Kembali 03 m3 6357554 1907266 42. Unugan pas di bawah pondasi 0,03 m3 27801128 8340.34 13. Bekesting pondasi 4.15 m3 9662203 65:115.34 14 Ongkos angkut ke lokasi 1 buan 3442057 14420157 JUMLAH 472601808 Dibutatkan 4750.000,00- ENCANA ANGGARAN BIAYA PENGADAAN & PEMASANGAN APILL TENAGA SURYA (TERMASUK COUNTER, SISTEM WIRELESS, RAMBU, & MARKA) Peagacagn Bahan Conte Contoter Peroants Panel Solarcal 60 Wetv'2 ot Battony MF 12 VoUN2 AN Lamps inyarat3 Asp 0 20 om LED Lotal Tang Lengking| arg Lins awn Fengaran Rabu gergan tang 10. Daplay Heung Mande engacoran Tang Lenghing 03 Mt Pengecoran Tang rut 0.1508 engeesran Pack Pergaman 006 Mt enguung 22 Mt Pengecatan martian 1 unt ° Us 32 bum 32 Busn 10 ‘Set "2 patang 6 batang 2 Bah 4 Bush 2 Unt BE 17000000 Bonse2s 6083 750 2425500 18.000 000 345573 1900009" hye ass ey 545 55 per sumuses Dinutatan 17,000000 72765000 72785000 28108000, ‘o.0ce 00 Ba3t 145 1.490.000, 7496285 2000 00 000800 son soe as.473 1524.20 164s 136 toa" 37135 260 98628 658 $wo.000 009. PENGADAAN & PEMASANGAN LPJU KONVENSIONAL Pengadaan Baran 4. Lamp Jalan Mercury 250 vs 1 Unt 3.800.000, 3.800.000 2. Tang lampu jalan Ottagonal tinggi 9 mtr Single Arm 1 Uni 8.500.000 8.500.000 3. Sambungan PLN ua 3.200.000 3.200.000 Pemasangan 1 Pengecoran Tiang 1 Buh i318 sia718 2. Pasang dae salma 1 Sei 30.000 ‘30.000 3. Ongkos anghut ke Lokas: 1 Bua 38.051 36.051 JUMLAH 15.870.770 Dibulatkan 16.000.000 PENGADAAN & PEMASANGAN LPJU SOLAR CELL PEKERJAAN PENGADAAN 4. Lampu Jalan LEO Ceramic 40 Watt 32 Volt, berikut Kabel NYAF 2 1,5:mm* set 7,000,000 2. Tiang lampu jalan Oxtagonal tinggi 9 mit Single Arm + dudukan sclat panel et 8.500.000 3. Box Batera! set 2.300.000 44 Solar Cell daya 150 Wp 36 0C, berihut Kabel NYAF 2x 6 mm" Set 9.800.000 5 Pengisi Gaterai(@atiery Charger) 10 Ani 36V CC, berikut Sun Switch set 3.000.000 € _ Bateraijenis VRLA Deep Cycle PV hap 50 Alt 12V,berikul Kabel NYAF 26 met Set 2.500.000 JUMLAH KONSTRUKSI PEMASANGAN 1) Pengecoran tang bbuan “sare 2. Pasang dan ste! ampu LEO sot ‘30,000, 3 Pemasangan Solar Cell daya 190 Wp 36'V OC, terkut Kabet NYAF 2x 6 mm’ set 35.090 4 Pemasangan Bate‘ai VRLA Deep Cycle PV Kap 5) Ah 12 V beserta Kabel NYAF 2 x8 mm? 4.00. set 35.000 5. Ongkos angkutke Lokasi 41,00 bush 36.051 JUHA 33:549.770, Dibuiathan, 4.000.000 DIREKTORAT LLASDP REKAP KEGIATAN NO. URAIAN KEGIATAN IREKAPITULASI RENCANA ANGGARAN BIAYA PEMBANGUNAN DERMAGA PENYEBERANGAN 1, |PexeRIAAN PERSIAPAN ICONS TRUNSI TRESTLE (60.8 M2} JDUDUKAN TRESTLE / ABUTMENT (1 UAH) [DUDUKAN MOVABLE BRIOGE (1 BUAH) 1. [MOORING DOLPHIN 9 BUAH) . [BREASTING DOLPHIN (5 BUA) |v. ]kONSTRUKS! DUOUKAN HIOROLIK(@ BUA) 1K. JRONSTRUKSI PELINDUNG MB (2 BUAH) x Joatwacim 1x, [KONSTRUKS! DUDUKAN & RUANG KONTROL (1 UAH) iL RUMAH KONTROL 14 m2 | |PEMBUATAN JALAN & LAPANGAN PENETRASI DENGAN KOLAKAN (Le2 150 M2, TEBAL IBANGUNAN MOVALBE BRIDGE (185.6 M2) XxV_]HYORAUUK xvi LAMPU PENERANGAN coy [omen 1,513,248,752.05 489,504,760 14] 1,233,704,414.19 64,290,981.68 430,022,989 60 107,829,120.41] 1,383,470,486.44 5,830,214 000 09] 283,821,304.32| |REKAPITULASI RENCANA ANGGARAN BIAYA PEMBANGUNAN DERMAGA SUNGAI DAN DANAU PEMBUATAN DERMAGA KAYU ULIN TIANG PANCANG 15 Mt (21 M2) "| PEMBUATAN BAIA PONTON 115 Na ee . |PEMBUATAN JEMBATAN DERMAGA KAYU KAMPER (21 M2), JPEKERJAAN TURAP KAYU (TINGGI 4 M)/SIRING 80 M \V. |PEMBUATAN FENDER SUNGA! (FABRICATION) IPEMOUATAN OERMAGA DAN TRESTEL KAYU SES! (21 M2) IPEMBUATANRUANG TUNGGU IPEMBUATAN OERMAGA PENDARATAN SUNGAV/OANAU IPEMBUATAN DERMAGA BETON (c = 2) X. |PEKERJAAN TALUD KAYU/PENAHAN (80 M) 274,742,598 98] £660,105, 100.00 183,748,903.50] 815,931,596 93 4,261,400.00| 274,742,598 98| ~_ 15,239,460.00] 3,013,821,20.93 IREKAPITULASI RENCANA ANGGARAN BIAYA PENGAMANAN ALUR PELAYARAN, Alternat 1. Jurunan 100 x 140em tn, [uxurans 100 x 100 cmt aternaut 2 JUKURAN 109 x 140.cM tu JuKURAN 100 100 0M ae aaa Harga Satuan Alat No. Uraian/kegiatan Volume [iat banty pambesta, basing JAlat bantu cor beton lat bantu beton di laut ~ lat bantu pemotongan tiang pancang _ 7 5 i. 5 3 4 5 |Aiat bantu penutup tiang pancang 6 7 8 9 Is JAiat bantu sepatu tiang pancang Jat bantu pengecatantiang pancang iat bantu pemasangen geotextie lat bantu penyambungan tiang pancang 12 Alat bantu galian tanah 13 [Alot bantu pengelasan/pemotongan 14 |Crane 25 ton 15 |Crane 30 ton 17 |Conerete mixer 48 |Concrete thriller 419 |Concrete pump 20 JOumptruck 21 |Generator set 7,600,000.00- 613,800.00 | 26 |Mesin las lstrik dan perlengkapan 700,000.00 27 |Mesin gas 28 |Mesin las lstrik dan perlengkapan 29 |Motor Grader 30 [Motor Johnson 40 PK 31 |Mobilsasi dan demobilisasi 32 |Mobilisasi/demobilsasi rambu 33 |Meja & mesin gambar + peralatannya 34 |Ponton pancang 35 |Ponton transport 36 |Pompa air 37 [Panel control 38 |Pembersinan lokasi 39 |Sewa diesel hammer 40 |Sewa Bulldozer 41 |Sewa compressor 2,700,000.00" 1'511,800.00 497,100.00 | 45 |Sewa grade 43 |Sewa stamper 45 |Sewa beton 48 |Sewa Asphalt Sprayer —_ 47 |Sewa tandem roler 48 [sews Echosounder 49 |sewa Vibrator Roller 50 | sewa Stamper berikut operator 51 |Sewa hidrolk hammer 82 |Theodolte 53 [Tug boat Waterpass 150,000.00 768,750.00 4,320,000.00 278,600.00 7 1 Hf 1 i 1 i 1 1 1 i i 1 1 1 ‘i 1 1 1 1 1 1 is i 1 25 |Mesin las karbit : 1 1 A 1 1 i a 1 1 1 1 1 1 1 1 1 1 1 1 1 i 1 1 1 Harga Satuan Upah Uraian/kegiatan Jura Gambar Juru ukur Kepala tukang IMandor IMekanik. lOperator Pekeria Pembantu operator |Pembantu surveyor Pembantu tukang Pengawas JSatpam, ISurveyer Tukang Tukang baty HTukang best Tukang cat Tukang kayu Tukang la Tukang las penyambungan tiang pé [Tukang pancang lOperator pancang lOperator alat berat Trial erection Erection Erection |Galvanisasi baja [Sandblasting Sa 2,5 Penyetam [Tukang Aspal 4 HTukang Bongkar cetakan beton / siram 1 HTukang jaga zl Masinis, 4} Penjaga api i 1 Pembantu tukanglas 1_| oh | 1 1 1 1 fl ‘ton Kepala Tukang Las lUpah pemasangan pagar BRC HTukang Gali IKepala Tukang Batu IKepata Tukang Kayy. IKepala Tukang Besi oh Kepala Tukang Cat oh Instalator }Pembantu Instalator HTukang Babat Rumput Kepala Tukang Pasang Pipa/Leding [Tukang Pasang PipalLedi __ 50,000.00 100,000.60 | 50,00000| 708 26.00 | 95,726.00 | 83,134.00 9454 2,000.00 | 2,000,000.00 | 8,250.00 | 90,000.00 65,000.00 | 65,000. 95,726.00 | 65,000.00 _ 63,145.00 | Harga Satuan Bahan fAdatve fAngkur JAngkur diameter 25 mm JAngkur diameter 32 mm JAngkur diameter 50 mm (stainless) JAngkur dudukan engsel MB JAngkur dudukan tiang lstk JAngkur plat landasan catwalk JAngkur portal baja penggartung hidrollk Jaspal AC 60-70 Baja protivplat Bak air fibreglass uk 60x60x70 Balok jangkar 5/10 om Batok kayu Klas | Balok kayu klas Sah Balok pengaman 10x 10 cm _]Belok pengaman 20 x 20 em ‘fpemou 5-10cm Pig. 6m IBatang Kelapa Batu pecan 3/5 [Besi Siku penahan tulangan (pengelasan dim air) Beton isi tiang Ban bekas Batu belah Batu Gunungikalt IBatu pecahispiit 1/2 Batu pecahisplit 2/3 Batu bata merah press mesin IBatu bata merah 20x9.5x4 cm uk. Kecil (proses tangan) ~|Baut 3/8" Panjang 20 cm [Baut 2/8" Panjang 35 cm Baut 5/8" Panjang 20cm IBaut 5/8" Panjang 30 cm IBaut 5/8" Panjang 35 cm [Baut 5/8" Panjang 40 om Baut 5/8" Panjang 45 cm Baut dia 10 mm Baut gia 5 mm esi beton esi beton uli Besi strip Beton bertulang untuk sloof Beton bertulang untuk koiom praktis {Beton bertulang untuk ring balok Beton bertulang untuk meja loket 55. |Bollard/Bolder kapasitas 25 ton ae 5,200. | 7/083,100.00 7,083,100.00 | 7,083, 100.00 | No. Uraianikegiatan 56 _|Boliard/Boider Kapasitas 15 ton 57 |Bollard/Bolder kapasitas 30 ton 58 |Bolardi/Bolder kapasitas 35 ton 59 |oliard/Bolder kapasitas 70 ton ~ 60 _|Bondex 61_|Bubungan seng 62. [Cat anti karat 63 _|Catkilap 64 [Cat menie besi 65 |Catmenie kayu > Cat preimer (marka) ICattembok IConblock/ Paving Block cattesi iCable trench Closet jongkok ICetakan beton Cleat pons Daun rambu aluminium 2 mm dg. Refiektive sheeting Dempul Dokumentasi rambu _|Densopole Densopaste Densotape Dolken dia. 8 cm, pig. 4m ngs: able bridge ngsel pintu dan jendela. ‘ender karet type SMB0O, L 1500 Fender karet type Cell-400 Fender karet type Cell-500 Fender karet type Cell-600 Fender karet type Cell-800 Fender karet type V.260 - 1000L Fender karet ype V.260 - 1500L Fender karet type V.260 - 2000L Fender karet type V.500 - L150 Fender karet type V.500 - 12000 Fender karet type V.500 - L2500 Fender karet type V.600 - L1500 Fim Fibre mesh IGaian tanah biasa IGelagar kayu kamper klas | 10 x 10 em IGelagar kayu ulin 20 x 20 em 4100 |Gapitkalang 10 x 10 cm 4101 _|Gapivkalang 20 x 20 em 102. |Gapit kayu galam D. 6-4 m 103. ]Gapit kayu ulin d. 10-6 m_ 104 |Generator set kapasitas 25 kVA 105 |Geotextiefiter cloth 106 |Grease 407 |crendet 4108 |Hak angin 109 fijuk 110. |iwe 411 [Kamera 7112" [Kabel daniampu Volume NILAI aah 74,400,000.00, buah 28,300,000.00 buah | 32,528.00 buah m2 buah kg kg kg kg kg ~ 8 bh kg__| 18,571.43 | m 65,000.00 | buah 716,500.00) m2 + 209,522.50 buah 235,750.00 m2 1,500,000 00 32,925 00| 12,800.00 | | 207,250.00 | “140,600.00 ~ 168,550.00 | unit__| _~ 27,066,200.00 | buat 28,500.00. 32,000,000.00 30,418,000.00 | 34,763,400 00 24,125,625 00 25,893,750.00_ buah” | 28,840,626 00 | buah “| ~~ 28,679,800 .0 \s 31,587.50 | m3 41,738,800.00" m3] 14,738,800.00 | m3] 14,738,800.00 | 7 1 1 1 4 1 1 1 1 4 1 1 1 1 1 1 1 1 7 1 1 1 1 1 1 1 1 1 1 1 1 . 1 1 1 1 1 1 i 1 1 1 4 1 1 1 1 1 1 1 A 1 Uraianikegiatan Volume NILAL IKaca bening tebal 5 mm 89,040.00 114 _|Kaca reyban tebal § mm os ~_ 132,057.00 | 115 |Karbit ace ees 5 16,050.00 146 |Kawat baja / Binraad 12,000.00 Kawat las / Electrode a a 28,080 00 |awatias cat i ~~ 24,000.00 ung Plastik reared i 1,725.00 Karet seal 54,000.00 Kayu bakar_ i IKayu bulat dia. 10-15cm Panjang 4m — Kayu gal XG Kayu lanan kias Il (Perancah/bekesting) Kayu lanan klas Ill (Perancatvbekisting) Kayu Ki ae Kayu ulin d. 170-6 m Kerkil Kertas amplas IKertas A3 Kertas Aa Kertas kalkir Minyak Aspal ita L Bars/Stek tiang pancang/Tulangan steak Untuk tiang pancangdia16 INon shrink grout (25 kg) |Lampu sorot 1000 wait Lampu TL 20 watt Lem kayu List prof Papan kayu klas | (Kamper Samarinda) IPapan kayu klas ll (Kamper Singkil) Pepan kayu kias Ill (Merant Papen kayu meranti Papan kayu ulin IPapan kayu ulin 4 x 20 cm !Papan lanan Pepan untuk alas Pasir aspaliabu batulscrening Pasir beton Pasir pasang Pasir untuk trotoir Pasir urug Pembangunan ruang tunggu JPembuatan fender (Fabrication) 132,900.00 185,000.00 6,850.00 78,000 09 42,000.09 210,000 09 16,675 00 40,800 09 _ $3,500.60 41864,577 25 999,693 50 48000000 4,000,000.00 “414,200.00 47,800.00 7200.00 ~ 35,460.00 416,250.00 _ 22,500.00 | }00.00 3,456,200.00 | 4,046,000.00 10,606,050.00 | ~10,347,360.00 '5,550,800.00 “2,200.00 | ~ 484,000.00 177,000.00 185,000.00 194,400.00 | 135,000.00 | 7,686,935 00 | 4,26 1,400.0 ee No. 170 171 172 173 174 175, 176 17 178 179 180 181 182 183 184 185 186 187 183 189 190 191 192 193 494 195 196 197 198 199 200 201 202 203 204 208 206 207 208 209 210 2m 212 213 214 216 217 218 220 223, 224 225 226 Uraian/kegiatan Pengadaan plat rambu Pipa baja Pipa GSP D =2,5",t= 3mm Pipa PVC dia, 314 Pipa PVC dia, 4” Pipa railing dia, 25°. Tebal 3 mim Pipa paralon cia. 2 Plat baja Piat Baja strip Plat baja landasan guide roler Mi a Platbaja penghubung MB ke dudukan iB. Piat beugel Tebal § mm _ ie Plat ponton T. 12 mm Marine Piat Profil baja Piamur tembok (5 k9) Piamur kay Plywood Tebal 3 mm Piywood Tebal § mm Portal penggantung hidrolik aa PPPK i Profil baja dan plat penutup trench, angker Profil can piat baja penutup cabl Rabat beton 7 cm kelling bang Rangka plat rambu Rangka ponton L. 70.70.7 Rantai penahan Ring untuk sepatu tiang pancang |Saklar ganda [Saklar tunggal [Sekat ponton T. 10 mm [Sekring kast 1 group Semen PC (SOkg/zak) {Seng bubungan BJLS 20° Serat PolyProphyene Sicap ulin Sirtu SSioof kayu kamper klas | 18x 15 em Sloof kayu galam 4. 10-6 m Sloof kayu ulin d. 10-6 m Sioof kayu ulin 20x 20 em Sotar Spare part Spit Soda Api Tackle electric kapasitas 35 ton/unit Tanah urug Tanah Timbunan Tarikan jendela ae rer Terpal untuk biokir air Tiang kayu ulin 20/20 Panjang 15 M (induk) Tiang kayu ulin 20/20 Panjang 15 M (gapit) Tiang kayu ulin 20/20 Panjang 10 M (induk) Tiny kar un 2020 beta) Tiang kayu ulin 20/20 Panjang § Tiang kayu ulin 15/15 Panjang iM Tiang kayu kamper 18/15 Panjang 8 M (gapit) “Tembar ‘lembar kg a4 set Batang batang tatang balang batang batang batang, ‘413,800.00 288,600.00 41,600.00, -97'200.00 Hi.200.00 | 13,500.00 13,500.00 | 13,500.00 13,500.00. 13,500.00 | 11,812.40 21,025 00 84,500 00 | 115,500.00 150,828,300 00 600,000.00 476,550.00 13,500.00 | 526,596 68 241,300.00 73,100.00 46,300 00 | 12,700.00 | 193,300.00 65,000.00 | 53,300.00 109,675.00 11,738,800.00 6,710.00 53,100.00 185,000 00 | 39,378.00 ~ 327,054,600.00 | "32,500. ~ "5,800.00" 5,700.00 | 300.00 | 6.110,600,00 6 ,334,320.0 4,246,110.00 4,989,540.00 2:111,400.00 2,367,450.00 810,960.00 Uraianikegiatan Fang kayo Kemper Talis Panjang 6 M (nauk) FTiang cambu dan jangkar 16110 em -Tiang pancang pipa beton Pressters di 80cm Tang pancang pipa baja Thinner : anspor material baja dari werkshop ke site ~ Trplek 6mm trench cover 5 Pemadatan lapangan subgrade 9 Lap «Prime Coat AC 80/70 2,5 kgim2 = Pembangunan Ruang Tunggu Rumah kontrol Polypropilene pad (iebal Som) __ Hydraulik Cyinder Type Celis Mounting © Hyccaulk power ur Panel listrik a Piga hydrautk Type Van Pump operation présSure max 140 kgfem2 Alarm Balancer HPemasangan nydraubk cinder, instalosi, pembersinan pipa dan oi: untuk operasional testing dan training Instalasi penerangan Pengadaan pemasangan LPAU (sola cel Type Foot Mounted 25 KW Pengadaan pemasangan LAU (non solar cel) Box Panel penerangan 180mm dts: No. ANALISA HARGA SATUAN PEKERJAAN URAIAN KEGIATAN 4 M3 BETON K-175 TANPA TULANGAN 1 ‘Semen PC (50 kg/zak) Batu Pecah 2/3, Pasir beton| Air Pekerja Mandor Tukany Kepald Tukang Concrete mixer Concrete thier Sewa Compressor 4.M3 K.225 TANPA TULANGAN 1 ‘Semen PC (60 kg/zak) Batu Pecah 2/3, Pasir beton Ar Pekeria Mandor Tukang Kepala Tukang Concrete mixer Concrete thriller Sewa Compressor 0 KG PEMBESIAN Besi beton Kawat baja/Bindraad Pekeria Tukang besi Kepala tukang Mandor Alat bantu pembesian, bekisting 10 M2 BEKISTING ‘Muluiplex 18 mm Paks ‘Angkur plat landasan catwalk Pekerja Mandor Tukang Kepala tukang Konstruksi penyangga begisting Kayu Klas It Alat bantu pembesian, bekisting VOLUME 8.0000 0.6000 0.4500 0.2000 6.0000 © 1000 1.0000 0.3000 1.2500 1.2500 1.2500 10 0000 0.8000 0.4500 02150 © 1000 1.0000 0.3000 1.2500 1.2500 1.2500 110.0000 2.0000 6.0000 3.0000 41,0000 0.1000 1.0000 4.0000 4.0000 0.3000 6.0000 0.1000 5.0000 0.5000 1.0000 0.2820 1.0000 zak m3 m3 oh, oh oh oh jam jam jam zak m3 m3 m3, oh oh oh jam jam jam kg kg oh on on Is lembar kg buah oh oh oh oh s m3 Is HARGA SAT. JUMLAH 65,000.00 520,000.00 189,75000 151,800.00 177,000.00 79,660.00 4,200.00, 840.00 7058700 423,522.00 108,296.00 10,829.60, 83,134.00 83,134.00 95,726.00 28,717.80 55,000.00 68,750.00 55,000.00 68,750.00 100,000.00 ___ 125,000.00 Jumiah T560,993.40 65,000.00 650,000.00 19,750.00 181,800.00 177,000.00 79,650.00 4200.00 903.00 70.587.00 423,522.00 108,296.00 10,829.60, 83,134.00 83,134.00 195,726.00 28,717.80 155,000.00 68,750.00 55,000.00, 68,760.00 100,000.00 __ 125,000.00 Jumiah 189, 05640. 8,750.00 962,500.00 12,000.00 24,000.00 70,587.00 423,522.00 83,145.00 249,435.00 95,726.00 95,726.00 108,296.00 10,829.60 25,000.00. 25,000.00 Jumtah T78t012.60" Jumlahlkg 17,910.13, 285,409.00 —_1,141,636,00 22,500.00 20,000'00 227,100.00 68,130.00 7058700 423,522.00 108,296.00 10,829.60 63,14500 415,725.00 95,726.00 47,863.00 1,823,750.00 _1,823,75000 2,750,00000 775,500.00 25,000.00 _-__ 25,000.00 Jumiah HiT 955.60 Jumlahim2 482,195.56 4.3 PELAT BETON BERTULANG K-225 CATWALK 4) Beton K-25 41,0000 2. Bekisting 33330 3. Pembesian 190.0000, 4 Mandor 0.0300 5 Tukang 0.7500 6 Pekeja 4.0000 7 Alat bantu cor beton 1.0000 1 M3 BETON PENGISI TIANG PANCANG 1 Beton K-25 1.0000 2 Pembesian = 260.8000 3. Mandor 0.0250 4 Tukang 0.0500 5 Tenaga kerja 0.1250 6 Ponton Transport 0.0250 7 Biaya Crawler Crane per Han 0.0250 8 Alat bantu beton di faut 1.0000 41M3 BETON SELIMUT TIANG 1 Beton K-25) 1.9000 2 Bekisting 11.0000 3. Pembesian 200,000, 4 Pekerja 1.0000 5 Mandor 0.0300 6 Tukang 0.7500 7. Alat bantu cor beton 1.0000 4.M3 BETON BERTULANG K-225 BALOK, TIANG RAILLING, CANSTEENS 1 Beton K-25 1.0000 2 Bekisting 42.4000 3. Pembesian 220.0000 4 Pekerja 4.0000 5 Mandor 0.0300 6 Tukang 0.7500 7 Alatbantu cor beton 1.0000 4 M3 BETON BERTULANG K-25 UNTUK BALOK DAN PILE CAP TRESTLE 1 Beton K-25 41.0000 2 Bekisting 4.0000 3 Pembesian 230.0000 4 Angkur plat landasan 0.2500 ‘5 Mandor 0.0250 6 Pekeria 4.0000 7 Alat bantu cor beton 1.0000 1 M3 BETON BERTULANG K-25 UNTUK PELAT STRES 1 Beton K-25 41,0000 2 Bekisting 4.0000 3. Pembesian 200.0000, 4 Angkur plat landasan 0.2500 5 Pekerja 1.0000 6 Alat bantu cor beton 1.0000 m3 1,691,056 49 m2 482,185, kg 17,910.13, oh 108.296 09 oh 83.145, oh 70,887.09 Is 5,000.00, Jumlab m3 1,691,056 49 kg 17,910.13, oh 108,296 c0 oh 83,145.00, oh 70,587 60 hadi 5,000,000 00 hari 2,700,000 09 s 72,000 09, Jumlah m3 1,991,096 «9 m2 "482,195 55. kg 17.910 13 oh 70,587 6 oh 108,296 00 oh 83,145.00 Is 55.000 09 Jumlab m3 1,691,056 <0 m2 482,195 56 kg 17,910.13 oh 70,587.00 oh 108,296.90 oh 183,145.00 Is 55,000.00, Jumlab m3 1,691,056.40, m2 482,195.56 kg 17,910.13 buah 227,100.00 108,296.00 oh 70,587.00 s 55,000.00 Jumiah m3 1,891,056 40 m2 482,195.56 ko 17,910.13 buah 227,100.00 oh 70,587.00 Is 5,000.00 Jumiah 1,691,056 40 1,607,17.80 9,402,923.94 3,248.88 62,358.75 282,348.00 55,000.00 7,108,093.7 1,891,056.40 4,870,960 86 2,707.40 4.18725 8,823.38 125,000.00 67,500.00 72,000.00 642,205.29 1,691,088 40 5,304.151.16 3.582,02520 70,587.00 3,248.88 62,358.75 55,000.00 I0768,427.39 1,691,056 40 5,979,224. 94 3,940.227.72 70,587.00 3,248.88 62,358.75 5,000.00 Thor 703.65 1,691,056 40 1,928,782.24 4,119;328.98 56,775.00,, 2,707.40 70,587.00 55,000.00 a8 2370 1,691,056 40 41,928,782.24 3,882,025 20 56,775.00 70,587.00 55,000.00 84,225.64 4.M3 BETON BERTULANG K-225 UNTUK DOLPHIN, DUDUKAN MB, DUDUKAN TRESTLE, DUDUKAN HIDROLIK, PELINDUNG MB. + Beton K-225 1.0000 m3 1,691,056.40 _1,691,056.40 2 Bekisting 5.0000 m2 482,195.56 2,410,977.80 3. Pembesian 190.0000 kg 17,910.13 3,402,923.94 4 Angkur plat landasan 0.4000 buah 227,100.00 0,840.00 5 Pekeria 1.0000 oh 79,587.09 70,587.00 8 Mandor 0.0300 oh 108,296.09 3,288.88 7 Tukang 0.7500 oh 83,145.00 62,358.75 8 Alat bantu beton di laut 1.0000 is 72,000.00__72,000.00 Jumiah —TH03 99277 PENGANGKUTAN 4 M TIANG PANCANG KE TITIK TIANG PANCANG A. Blaya Crawel Crane per hari 1. Operator alatberat 1.0000 oh 100,000.00 100,000.00 2. Pembantu operator 2.0000 oh 83,145.00 168,290.00 3 OW §,0000 titer 35,460.00 177,300.00 4 Solar 20,0000 iter 671000 1,677,500.00 5 Grease 2.0000 kg 23,9400 -47,88000 6 Crane 1.0000 hari 3,000,000.00__3,000,000.00 Jumlah 168,970.00 8. Biaya ponton Transport por hari 1 Operator alat berat 1.0000 oh 100,000.00 100,000.00 2 Pembantu operator 2.0000 oh 83,145.00 166,290.00 3. Pekerja 10.0000 oh 70,587.00 705,870.00 4 5.0000 fier 35,480.00 177,300.00, 5 Solar 200.0000 iter 6.71000 1,342,000.00 6 Grease 2.0000 kg 2394000 47,880.00 7 Ponton transport 4.0000 hari 5,000,000.09 _,000,000.00 8 Motor Jchnson 40 PK. 0.0080 hari 200,250.00, 4,602.00 Jumlah TT EAO 42.00 Dalam sehari dapat diangkut tiang pancang sepanjang (L1) ‘10 batang x panjang (12 m) = 120.0000 m Biaya transport tiang pancang per meter = (A¥BYL1 105,915.93 PEMANCANGAN 4 TITIK TIANG PANCANG C. Biaya Diesel Hammer ; 1. Operator alt berat 1.0000 oh 100,00000 100,000.00 2 Pembantu operator 2.0000 oh 83,14500 166,290.00 3. Pekerja 3.0000 oh 70:58700 211,761.00 4 OW 4.0000 iter 3546000 141,840.00 5 Solar 200.0000 titer 671000 1.342,000.00 6 Grease 2.0000. kg 23,94000 47,880.00 7 Sewa diesel hammer 1.0000 hai 2,892,000.00_2.592,000.00 Jumiah 4,607,777.00 D. Biaya Ponton Pancang 41. Operator pancang 1.0000 oh 150,000.00 150,000.00" 2. Pembantu operator 2.0000 oh 83,145.00 166,290.00 3. Tukang pancang 10,0000 of 66,600.00 666,000.00 4. Ol 4.0000 iter 35,480.00 141,840.00 5. Solar 100.0000 iter 6.71900 671,000.00 6 Grease 2.0000 kg 23,94000 47,880.00 7. Ponton pancang 4.0000 hari 7,200,000.00 0.09 Jumian -TIANG TEGAK ‘Senan dapat dipancang tiang tegak sepanjang (L2) 2,5 batang x panjang (12 m) 30,0000 m ‘targa pemancangan tiang tegak per meter = (C+D)/L2 + (A*BYL1 560,741.97 THANG MIRING Shari dapat dipancang tang ming sepaniang (13) 2 batang x panjang (12 m) = 24,0000 m Harga pemancangan iangtegek per meter = (C+D)/L2 + (A¥B)/LA 674,448.48 PEMOTONGAN TIANG PANCANG : 1 Oxygen 0.5000 tabung 242,700.00 196,35000 2 Acetaln = 03000 kg 134,550.00 40,365.00 3. Karbi 4.0000 ko 16,050.00 16,050.00 4 Tukang las 0.4500 oh 8314500 37,415.25 5 Mandor 0.1000 oh 108,296.00 10,8260 6 Pekeia 0.7500 oh 70,587.09 52:940.25 7 Mesin as lstrk dan perlengkapan (0.2500 hari 67500009 168,750.00 8 Baya ponion 0.0250 hari 7/540,94209 188,623.55 8 Alat bantu cor beton 41,0000 Is 55,000.00 -.__§5,000.00 Jumiah “706,223.65 PENYAMBUNGAN TIANG PANCANG 1 Kawat las/Electrode 10.0000 kg 28,080.00 260,800.00 2 Plat baja 6.0000 kg 13,500.00, 81,060.00 3 Tukang las 0.3000 oh 83,145.00 24,943.50 4 Mandor 0.0500 oh 108,296.00 5,414.80 S Pekerja 0.6000 oh 79,587.C0 42,362.20 6 Mesin las listrik dan perlengkapan 0.0625 hari 675,000.00 42,187.50 7 Generator set 0.0625 hari 2,040,000.00 127,500.00 8 Alat bantu pemotongan tiang pancang 1.0000 Is 18,500.00 18,500.00 Jumiah 622,698.00 PENUTUP TIANG PANCANG 1 Kawat las/Electrode 3.0000 kg 28,080.00 84,240.00 2 Gesiplat 25.0000 kg 14,100.00 277,500.00 3 Oxigen (0.2000 tabung 272,700.00 54,540.00 4 Tukang las 0.2500 oh 83,145.00 20,786.25 5 Mandor 0.0300 oh. 108,296.00 3,248.88 © Pekeria 0.5000 oh. 70,587.00 35,293.50 7 Mesin las listrik dan perlengkapan 0.0625 hari 675,000.00 -. 42,187.60 8 Generator set 0.0625. hari 2,040,000.00 127,500.00 9 Alat bantu penutup tlang pancang 1.0000 Is 18,500.00. 18,500.00 Jumlah 363,736.13 SEPATU TIANG PANCANG 1 Kawat lasiElectrode 6.0000 kg 28,080.00 168,480.00 2 Besi plat 40,0000 kg 11,100.00 444,000.00 3° Tukang las 0.5000 oh 83,145.00 41,572.50 4 Mandor 0.2000 oh 108,296.00 21,659.20 5 Pekerja 1.0000. oh 70,587.00 70,587.00 6 Mesin las listrik dan perlengkapan 0.2500 hari 675,00000 168,750.00 7 Generator set 0.2500 hari 2,040,000.00 510,000.00 8 Alat bantu sepatu tiang pancang 1.0000 Is 15,000.00 18,000.00 Jumiah To, 08870 PENGECATAN TIANG PANCANG PER M2 1 Catanti karat 0.6200 kg 2 Mandor 0.0050 oh 3. Tukang 0.0300 oh 4 Pekerja 0.3000 oh. 5 Compressor (0.5000 Is 6 Alat bantu pengecatan tiang pancang 1.0000 Is. ERECTION 1 Erection 4.0000 ton’ 2. Erection * 1.0000 kg GALVANISASI BAJA, 1 Galvanisasi 1.0000 kg TRIAL ERECTION 1. Trial Evection 1.0000 kg KONSTRUKSI BAJA UNTUK MB / 1006 1. Baja profll/ plat 110.0000 kg 2. Kawat las / Electrode 15.0000 kg 3. Tukang las 41,0000 oh 4 Mandor (0.5000 oh 5 Pekera 2.0000 oh. 6 Mesin las listrik dan perlengkapan 3.0000 hari 7 Galvanisasi baja 110.0000 kg. 8 Trial Erection 110.0000 kg KONSTRUKSI BAJA UNTUK FRONTAL FRAME, DOLPHIN / KG Baja prof plat 1 41,1000 kg 2. Kawatlas / Electrode 0.1000 kg 3. Tukang las, 0.0200 oh 4 Mandor 0.0100 oh. 5. Pekeria (0.0800 oh. 6 Galvanisasi baja 1.0000 kg 7 Mesin las lstrik dan pertengkapan (0.0200 hari 8 Pengecatan anti karat 0.0100 m2 PEMBUATAN DAN PEMASANGAN FRONTAL FRAME PELINDUNG MB 1) Baja untuk frontal frame 2,200.0000 kg 2. Rantai penahan 4.0000 buah 3. Angkur diameter 25 mm 6.0000 buah 4 Papan kayu Klas | (Kemper Samarinda) 0.3000 m3 8 Mandor 1.0000 ch 6 Pekeria 30000 oh. 7 Crane 3.0000 hari 8 Ponton Pancang 3.0000 hari 9 Pembantu surveyor 22.0000 oh 192,950.00 87,628.00 108,296.00 841.48 83,134.00, 2,494.02, 70,587.00 21,476.10 100,000.00 50,000.00 28,400.00 28,400.00 Jumlah 760,240.60 2,000,000.00 - 2,000,000.00 2,000.00 2,000.00 8250.00 8,250.00 945.00 945.00 13,500.00 1,485,000.00 28,080.00 140,400.00 83,145.00, 83,145.00 108,296.00“ $4,148.00 70,587.00 141,174.00 675,000.00 2,025,000.00 8,250.00 907,500.00 945.00. Jumlah Per kg Per ton 49,403,170.00 13,500.00 14,850.00 28,080.00 2,808.00 83,145.00 1,662.90 108,296.00 1,082.96 70,587.00, 5,646,965 8,250.00 8,250.00 675,000.00 13,500.00 180,240.60, 1602.41 Jumlah TH A0325 49,403.23 ~108,687,097.20 528,596.98 2,114,387.91 35,000.00 240,000.00 5,720,550.00 1,716,165.00 108,296.00 108,296.00 70,887.00 211,761.00 3,000,000.00 _9,000,000.00 7,200,000.00 21,600,000.00 83,145.00 ___1,829,180.00 sumiah Ti5.476,097.17, PEMBUATAN DAN PEMASANGAN FRONTAL FRAME BREASTING DOLPHIN 1) Baja untuk frontal frame 1,700,000 kg 49,403.23 83,985,484.20 2. Rantai penahan 4,000 buah 528,596.98 2,114,387.91 3. Angkur diameter 25 mm. 4.0000 buah 35,000.00 - 140,000.00 4. Papan kayu klas | (Kamper Samarinda) 0.3000 m3 5,720.550.00 —1,716,165.00 5 Mandor 1.0000 oh 108,296.00 108,296.00 6 Pekeria 3.0000 oh 70,58700 211,761.00 7 Crane 5.0000 hari 3,000,000.00 15,000,000 8 Pembantu surveyor 17,0000 oh 83,145.00__1,413,465.00 Jumiah * “704589, 569.11 PENGADAAN DAN PEMASANGAN FENDER TIPE CLL 400, 1. Fender karet type Cell-400 41,0000 buah 26,072,600.00 26,072,600.00 2 Mandor 41.0000 oh 108,296.00 108,296.00 3. Pekeria 3.0000 oh 70587.00 211,761.00 4 Crane 4.0000 hari 3,000,000.00 (000,00, Jumiah 39392,557.00° PENGADAAN DAN PEMASANGAN FENDER TIPE CELL 500 1. Fender karet type Cell-500 1.0000 buah 28.679,800.00 28,879,80000 2 Mandor 1.0000 on 108,296.09 108,296.00, " 3. Pekeria 3.0000 oh 70587.60 211,761.00 4 Crane 1.0000. hari 3,000,000.00__3.000,000.00, Jumiat 37,909,857.00_ PENGADAAN DAN PEMASANGAN FENDER TIPE CELL 600 1. Fender karet type Cell-600 1.0000 buat 30.418,000,00 “ 30.418,00000 2 Mandor 4.0000 oh 108,296.00 108,296.00 3. Pekerja 3.0000 oh 70,587.60 211,761.00 4 Crane 1.0000 hari 3,000,000.00__3,000,000.00 Jumlah T33-736,057.00° PENGADAAN DAN PEMASANGAN FENDER TIPE CELL 800 1. Fender karet type Cell-800 1.0000 buah 34,763,400.00 34,763,400.00 2 Mandor 1.0000 oh 108,296.00 108,296.00 3. Pekeria 4.0000 oh 7087.00 282,348.00 4 Crane 41,0000 hari 3,000,000.00__3,000,000.00 Juma 38.154,044.00 TIMBUNAN BATU UNTUK TALUD 1) Batu gunung/kali 1.1000 m3 175,000.00 192,500.00 2 Mandor 0.1000. oh 108,296.00 10,829.60 : 3 Pekerja (0.5000 oh, 70,587.00 35,293.50 4 Alat bantu timbunan 41,0000 Is 3,400.00, 3,400.00 Jumtah a0 PEMASANGAN GEOTEXTILE 1 Geotextilefiter cloth 41.0000 m2 39,000.00 39,000.00 2 Mandor 0.0200 oh 40829600. 2,165.92 3 Pekeria (0.1800 oh 70,587.00 12,705.68 4° Alat bantu pemasangan gectextie 1.0000 Is. 5,000.00 55,000.00 Jumiah Trt 4.M3 URUGAN TANAH 1) Tanah urug 1.2000 m3 32,0000 39,000.00 2. Mandor 0.0100 oh 108,286.00 1,082.96 3. Pekeria 0.3000 oh. 70,587.00 21,176.10 4 Sewa bulldozer 0.0500 jam 700,000.00 36,000.00 5 Mesin gilas (0.0500 hari 1,084,800.00. 54,240.00, Jumiah TH ‘11M3 PEMBUATAN BLOCK BETON UNTUK BREAKWATER 1 Semen PC (50 kg/zak) 10,0000 2. Pasir beton 0.4000 3. Balu pecah 2/3 0.7500 4 Admixture 3.0000 5 Besi beton 100.0000 6 Kawat baja/Bindraad 2.0000 7 Papan kayu klas Il (Kamper Singkil) 0.0500 8 Balok kayu klas I! 0.0500 9 Paku 0.8000 10 Pekers ; z 6.0000 41 Tukang, 2.0000 42. Juru Gambar 0.3000 13. Concrete mixer 0.5000 14 Concrete thriller 0.5000 18 Sewa Compresor 0.2000 zak m3 m3 liter kg kg m3 m3 kg oh oh oh jam jam iam 65,000.00 177,000.00 189,750.00 19,080.00 8,750.00 . 12,000.00 863,000.00 5,280,450.00 22,500.00 70,887.00 83,134.00 68,750.00 55,000.00 55,000.00 100,000.00 Jumiah 11M3 LAPISAN SUBBASE DAN BASE UNTUK PERKERASAN JALAN / LAP. PARKIR 1) Batu pecah 2/3 1.1000 2 Pasir Urug 0.4000 3. Pekeria 0.1000 4 Mandor 0.0200 5 Dumptruck 0.3000 6 Sewa bulldozer 0.1000 7. Mesin gilas 0.1250 1 M2 PEKERJAAN ASPAL PENETRASI TEBAL 7,5 CM PADAT 1. Aspal AC 60-70 20.0000 2. Batu pecan 23 0.1000 3. Pasir beton 0.0200 4 Kayu bakar 0.0200 5. Sewa tandem roller 0.0030 6 Sewa grader 0.0030 7. Mandor 0.0030 8 Pekeria 0.0360 PEMBUATAN SHOP DRAWING DAN DOKUMENTASI 1. Mesin & meja gambar + peralatannya 41,0000 2 Kamera 1.0000 3. Komputer dan Printer 2.0000 4 Alat tulis 1.0000 5. Bahan Habis 1.0000 6 Kertas A3 4.0000 7 Kertas Aa 12.0000 & Kertas kalir 3.0000 Film 10.0000 10 Album 10.0000 41 Jury gambar 380.0000, m3. m3 oh oh hari jam hari kg m3 m3 m3 hari hari on wnit ani unit Ls Rim Rim rol rol sot oh 188,750.00 135,000.00 70,587.00 108,296.00 4,718,700.00 "700,000.00 1,084,800.00. Jumlah E 5,885.00 189,780.00 177,000.00 41,500.00 343,800.00 1,511,900.00 108,296 00 70,587.00 Jumiah '3,000,000.00 38,200.00 +5,000,000.00 2,000,000.00 1.000,000.00 78,000.00 42,000.00 « 210,000.00 36,000.00 60,000.00 68,750.00 Jumiah 650,000.00 70,800.00 142,312.50 57,240.00 875,000.00 24,000.00 293,150.00 264,022.50 18,000.00 423,522.00 168,268.00 20,625.00 27,500.00 27,500.00 20,000.00 —Ti78.980.00 208,725.00 54,000.00 7,088.70 2,165 92 514,710.00 70,000.00 135,600.00 7392, 25962 117,700.00 18,975 00, 3,540.00, 830,00 4,031.40 4,536.70 324.89 2,541.13, 749,478.12 3,000,000.00 38,200.00 30,000,000.00 2,000,000.00 4,000,000.00 312,000.00 504,000.00 ‘630,000.00 360,000.00 600,000.00 64,569,200.00 “ PENGUKURAN POSITIONING. 1. Waterpass Theodolite Bahan habis pakai Pekeria Juru ukue PENERANGAN DAN KESELAMATAN KERJA 1. Generator set Kabel dan lampu Mekarik Satpam oli Solar PPK 1.2 ASPHALT BETON 1) Balu pecah 2/3 Pasir aspalabu batulscrening ‘Aspal AC 60-70 Mandor ocM, Pekeria Mesin gilas 180.0000 180,000 1.0000 180,000 180.0000 oh 384.0000 hari 1.0000 Is 160.0000 oh '320,0000 oh 41,0000 iter 800.0000 ter 41,0000 Is 0.0500 m3 0.0600 m3 20,0000 kg 0.0500 oh 0.3000 oh 0.2000 hari 113 PEKERJAAN SALURAN TERBUKA PASANGAN BATU KALI Batu belah ‘Semen PC Pasir pasang Pasir urug ‘Sawa Beton Molen ‘Sewa stamper Mandor Tukang batu Pekerja 41M2 PEMBERSIHAN LAPANGAN. + Sewa bulldozer 2 Mandor 3. Kepala tukang 4 Tukang 5. Pembantu tukang 1M PENGUKURAN DAN PEMASANGAN BOWPLANK 1) Mandor 2. Kepala tukang 3. Tukang kayu 4 Pembantu tukang 5 Balok kayu lanan 6 Papan kayu Klas Il (Merant) 7 Paku kayu 1.2600 m3 3.1520 m3 0.3200 m3 0.2100 zak 0.2000 hari 0.1500 hari 0.3000 oh (0.6000 oh 1.8000 oh 0.0050 hari 0.0050 oh (0.0500 oh (0.0500 oh 0.0500 oh 0.0050 oh 41,0000 oh 0.0100 on 0.1000 oh. 0.0040 m3 (0.0200 m3 0.0200 kg 194,600.00 35,028,000.00 278,600.00 5,148,00000 +000 000.00 190000000 7088709 1270868000 15,00009_1% 300,000.00 sh TiaaeT Sera Sattar sou sez 2,040,000.00 “783,360,000.00 1120000000 +200,000.00 7300000 1200000000 5000063 16.00.00000 3460003846000 371000 536800000 £00,00000__600,00000, Suman TaseaaED aD e700 948750 43400009 11,640.00 ssesco —117,70000 azo) sata 7ose70) 287610 1.084300. __ 21696000, Surah Siar 360000 60.1360 65,0000 20888000 185,000.00 * 59,200.00 t3s000c0 28.8000 tesomeo 2480000 fer io000 2388800 tonz36c0 32488 80 4500 49,887.00 7058700__ 12705560 Suntan aaa 700,000.00 3,500.00" ‘omzas00 sei a8 ee7260) «478530 sare 418870 $00000___ 250000 Jumian ise 10320600 sata 0572600 95,7280 ssc a3i as 50,000.00 © 5,000.00 £33500000 7154000 345520000 6,240 re0000____24000 Sariah am 11M3 KUDA-KUDA BENTANG SAMPAI DENGAN 6 M BAHAN KAYU LANAN 1 Mandor 0.3000 oh 108,296.00 32,488.80 2. Kepala tukang 2.0000 oh 95,7260 191,452.00 3. Tukang kay 20.0000 oh 83,145.00 1,662,900.00 4 Pembantu tukang 6.0000 oh 80,000.00 300,000.00 5 Balok kayu lanan 1.2000 m3 5,285,000.00 6,462,000.00 6 Pakukayy 5.6000 kg 12,000.00 67,200.00 7 Besi stip 1.0000 kg 11,100.09, Jumlah 12 RANGKA ATAP KASO S/T DAN RENG 2/3 UNTUK SIRAP BAHAN KAYU LANAN 1 Mandér a‘ - 0.0059 oh. 108,296.00 541.48 2. Kepaia tukang 0.0100 oh. 95,726.00 ., 957.26 3. Tukang kayu 0.1000 oh 83,145.00 8,314.50, 4 Pembantu tukang (0.1000 oh 50,000.00, 5,000.00 5 Balok kayu tanan 00240 m3 5,385,000.00 129,240.00 6 Pakukayu 0.2500 kg 12,000.00 Jumiah 11M BUBUNGAN PADA ATAP SIRAP ULIN . 1 Mandor (0.0060 oh 108,296.00 649.78 2. Kepala tukang (0.0250 oh 95,726.00 2,393.15, 3. Tukang kayu 0.2500 on 83,145.00 20,788.25, 4 Pembantu tukang (0.1260 oh. 50,000.00 6,250.00 - 5 Bubungan seng (0.4000 buah '45,200:00, 18,080.00 6 Paku kayu 0.0600 kg 12,000.00 720.00 7 Papan lanan 0.0040 m3 '5,850,800.00 22,203.20 Jumlah Hare 42 PENUTUP ATAP SIRAP 7 SMX 55 CM DENGAN JARAK RENG 11 SM AS 1 Mandor (0.0080 oh. 108,296.00 866.37 2. Kepala tukang 0.0250 oh 95,726.00 2,393.15, 3. Tukang kayu (0.2500 oh 83,145.00 20,786.25 4 Pembantu tukang 0.1660 oh 50,000.00. 8,900.00 5. Sirap ulin 120.0000 tembar 1,200.00 144,000.00 E 6 Paku sirap 0.2500 kg 12,000.00 3,000.00 : Juma 8,545.77 ‘4M LISTPLANK 2 CM X 20 CM BAHAN KAYU ULIN ' 1 Mandor (0.0050 oh. 108,298.00 541.48 2. Kepata tukang 0.0250 oh 195,728.00 2,383.15 3. Tukang kayu (0.2000 oh. 63,145.00 18,629.00 4 Pembantu tukang 0.1000 oh 0,000.00 5,000.00 5 Papan kayu ulin 0.0108 m3 10,606,050.00 114,545.34, 6 Paku ulin 0.5000 kg 20,900.00 10,450.00 ‘ dumiah 18 8ST 11 M3 KUSEN PINTUIJENDELA, : 1 Mandor 0.3000 oh 108,296.00 32,488.60 2 Kepaia tukang 2.0000 oh 95,726.00 191,452.00 3. Tukang kayu 20.0000 oh 83,145.00 1,662,900.00 4 Pembantu tukang 6.0000 oh 0,000.00 300,000.00 5. Papan kayu klas | 1.2000 m3 5,720,560.00 6,864,660.00 6 Paku 1.2500 kg 22,500.00 28,125.00 7 Angkur 56.0000 buah 7,700.00 -_ 431,200.00 Jumiat F510,625.80 ae 11 M2 DAUN PINTUIJENDELA PANIL KAYU ULIN 1 Mandor Kepala Tukang Tukang Kayu Pembantu Tukang Papan Kayu Uin Lem Kayu 4 M2 PINTUIJENDELA PANIL KAYU LANAN ‘Mandor Kepala Tukang Tukang Kayu Pembantu Tukang Papan Kayu Ulin Lem Kayu 12 PEKERJAAN DINDING PAPAN ULIN 2 CM 1 Mandor Kepala Tukang Tukang Kayu Pembantu Tukang Pagan Kayy Uin Paku Ulin 11 M2 PEKERJAAN DINDING SIRING PAPAN ULIN 3. CM. 1 Mandor Kepala Tukang Tukang Kayu Pembantu Tukang Papan Kayu Ulin Paku Ulin 11M2 PEKERJAAN DINDING SIRING PAPAN LANAN 2. CM Mandor Kopala Tukang Tukang Kayu Pembantu Tukang Papan tanan Paku Ulin 42 JALUSI PAPAN KAYU ULIN ‘Mandor Kepala Tukang Tukang Kayu Pembantu Tukang Papan Kayu Ulin, Paku Ulin 4/M2 LANTAI PAPAN ULIN TEBAL 3. CM 1 Mandor Kepala Tukang Tukang Kayu Pembantu Tukang Papan Kayu Ulin Poku Ulin 13500 0.0170 27000 0 7500 0.0240 0 1000 0.0500 ©2500 25000 1.0000 0.0400 (0.0500 0.4000 0.0020 12500 01250 0.0250 0.2500 © 4000 0.0020 1.2500 01250 9.0750 0.2500 0.4000 0.0020 1.2500 0.1250 0.0250 0.2500 0.0250 0.2000 2.0000 0.5000 0.0500 0.1500 0.0200 0.1250 4.2500 ‘0.4000 0.0350 0.2000 oh oh on oh m3 kg oh ch oh m3 kg on oh on on m3 kg oh oh oh m3 kg oh oh oh oh m3, kg oh oh oh ch m3 kg oh oh oh oh m3 'g 108,296 95,726 83,145 50,000 10,606,050 47,800 Jumlah 108,298 95,728 83,145 50,000 10,606,050 47,800 Jumla 108,298, 95,728 63.145 50,000 10,606,050 22,500 Jumiah 108,296 95,726 83,145 50,000 10,606,050 22,500 dumlah 108,298 95.725 3,145, 50,000 5,550,800 22,500 Jumlan 108,296 95,726 83,145, 0,000 110,606,050 22,500 Jumiat 108,296, 95.726 83.145, 50,000 10,606,050, 22,500 Jumiah 148,199.60 1,627.34 224,491.50 37,500.00 486,666.20 4,780.00, 357,264.68 5,414.80 23,931.50 207,862.50 50,000.00 424,242.00 2,390.00 773,840.80" 43,318.40 191.45 103,931.25, 6,250.00, 285,151.25 5,625.00 TREATISE 43,318.40 191.45 103,931.25, 6,260.00 265,151.25 5,625.00 924,467.35 43,318.40 191.45, 103,931.25 6,250.00 138,770.00 5,625.00 758,086.10 2,707.40 19,145.20, 168,280.00 25,000.00 636,363.00 3,375.00 ——"F57 880.60. 2,165.92 111985.75. 103,931.25 20,000.00 371,211.75, 4'500.00 13,774.67 41M2 LANTAI PAPAN ULINTEBAL 5 CM Mandor Kepala Tukang Tukang Kayu Pembantu Tukang Papan Kayu Ulin Paku Ulin ouson- 4 BUAH TIANG PANCANG DILANCIPKAN 1 Mandor 2. Kepala"Tukang 3. Tukang Kayu 4 Pembantu Tukang MEMBUAT PEN DAN LOBANG 1) Kepala Tukang 2. Tukang Kay PEMANCANGAN 4 M TIANG 15/15 KE DALAM TANAH 1 Tukang. Kepala Tukang Pembantu Tukang Mandor Operator Tiang pancang sewa crane sewa hammer tiang pancang A MTIANG 40/10 Tukang Kepala Tukang Pembantu Tukang ‘Mandor 41M3 RANGKA BAWAH KAYU ULIN Tukang Kepala Tukang Pemiantu Tukang Mandor Balok Kayu Ulin 4M2 PEKERJAAN PERANCAH Tukang Kepala Tukang Pembantu Tukang Mandor Kayu bulat dia. 10-15 om Panjang 4m Papan untuk alas Balok kayu lanan aku kayu 0.0200 0.1250 1.2500 0.4000 0.0570 0.2000 0.0050 0.0250 0.2500 0.1000 0.0600 9.6000 0.0400 0.0040 1.8000 0.0430 0.5000 4.0000 02180 0.2180 ‘0.0400 0.0040 1.8000 0.0430 7.5000 0.7500 5.0000 0.2500 4.1000 1.5000 0.1500, 0.5000 0.0250 48,0000 0.0100 0.0060 4.0000 on oh oh oh kg oh oh oh oh oh on oh on oh ko had ari on oh on oh oh oh m3 on oh oh oh big bh kg 108,296 2,165.92 95,726 11,965.75, 83,145 103,931.25, 50,000 20,000.00 10,806,050 604,544.85 22,500 4,500.00 Jumlah 747,107.77 108,256 541.48, 95,726 2.39.15 83,145 20,786.25 50,000 5,000.00 Jumiah 28,720.88 95,726 5,743.56 83,145 43,887.00 Jumlat TH 0 83,134 3,325 36 95.726 36290 50,000 ‘90,000 00 108,296 4,656.73 83.145 41,572.50 114,000.00 14,000.00, 3,000,000 654,000.00 2,892,000 __565.056.00 dJumlah 972 8834- 83,134 332536 95,726 382.90 50,000 90,000.00 108,298 4,856.73 Jumlah 58 38453 83.134 623,505.00 95,726 71,794.50 0,000 250,000.00 108.296, 27,074.00 6,820.500 “_7,172,550.00 suman e144 923.50" 83,194 124,701.00 95,726 14,358.90 50,000 25,000.00 108.296 2,707.40 41,820,000 87,360,000.00 2,200 22.00 5,385,000 32,310.00 12,000 12,000.00" Jumiat HTE71, 085.30 ee 41M3 RANGKA BAWAH KAYU ULIN 1 Tukang 2 Kepala Tukang 3. Pembantu Tukang 4 Mandor 5. Balok Kayu Ulin, 6 Paku Ulin 113 PEKERJAAN TIANG DAN KUSEN KAYU ULIN 1 Tukang 2. Kepala.Tukang 3. Pembantu Tukang 4 Mandor 5. Balok Kayu Ulin 6 Paku Ulin 7.5000 0.7500 5.0000 0.2500 4.1000 6.0000 30,0000 3.0000 10.0000 10.8000 4.2500 8.0000 1 M2 PENUTUP LANGIT-LANGIT PLYWOOD 60 CM X 120 CM Tukang Kepala Tukang Pembantu Tukang Mandor Paku plywood 6 Plywood tebal § mm 4. M2 RANGKA PLAFOND LANGIT-LANGIT 60 CM X 120. CM 1 Tukang Kepala Tukang Pembantu Tukang Mandor Paku kay Balok kayu lanan 4.M2 MENGECAT KILAT MENIE Tukang cat Kepala Tukang Pembantu Tukang ‘Mandor Minyak cat Cat menie besi 4.2 MENGECAT TEMBOK 2 KALUPLAFOND 4 Tukang cat 2. Kepala Tukang 3. Pembantu Tukang 4 Cattembok 4. M2 MENGGOSOK DAN MENDEMPUL 1) Tukang cat 2. Kepala Tukang 3. Dempul 4 Kertas amplas 0.1500 0.0150 0.1050 0.0050 0.0300 0.3750 0.3000 0.0300 0.2000 0.0100 0.2500 0.0163 0.3400 0.0075 0.2000 0.0100 0.7500 0.1250 0.0200 0.0020 0.1200 0.4000 0.0400 0.0040 0.0800 0.5000 oh oh m3 ko oh oh Iter ko oh oh oh kg oh oh kg Ibe 83,134 95.728 50,000 108,296 6,520,500 20,900 Jumlah 63,134 95,726 50,000, 108,296 6,520,500, 20,900 Jumlah 83,134 95,726 50,000 108,296 12,000 115,500 Jumiany 83,134 95,725 50,000 108,208 12,000 15,385,000 Jumiah 83,145 95,726 50,000 108.296 18,750 11,962 Jumiah 83,145, 95.728 50,000 47,000 Jumiah 83,145, 95,726 32,925 6.850 Jumiah 623,505.00 71,794.50 250,000.00 27,074.00 7,172,580.00 125,400.00, E770,323.50- 2,494,020.00 287,178.00 500,000.00 54,148.00 8,150,625.00 125,400.00 F611 377.00 12,470.10 1,435.89 5,250.00 541.48 24,940.20 2,871.78 10,000.00 1,082.96 3,000.00 87,775.50 7128 704 28,269.30 717.95 10,000.00 1,082.96 14,062.50 4,495.28 Tar 1,662.90 . 191.45 6,000.00, 18,800.00 eee 3,325.80 382.90 2,634.00 3,425.00 3,767.70 11M2 MENGECAT KILAP 2 KALI 1 Tukang cat Kepala Tukang Pembantu Tukang Mander Minyak cat 4.M2 MENGETER KAYU 2 KALI 1 2 3 Pembantu Tukang . Mandar Ter. 41M2 DAUN PINTUJJENDELA KACA MATI § MIM 1 1 M2 PEKERJAAN RANGKA BADAN KAYU LANAN 6 113 PEKERJAAN RANGKA BADAN KAYU ULIN 5 6 Pembantu Tukang Mandor Tukang kayu Kepaia Tukang Papan tanan Fara ray Kaca bering Tebal § mm Pembantu Tukang Mander Turang tayu Kepala Tukang Balok kayu lanan Paku kayu Pembantu Tukang Mandor Tukarg kayu Kepala Tukang Balok kayu lanan Paku ulin DELATASI PER M" womsons ‘Besi sixu L. 100.100.10 Besi beton Kawat las Mesin fas listik dan pertengkapan Tukang Pekeria Mandor PEKERJAAN SPESI 1:2:3 Pembantu Tukang Mandor Tukang batu Kepala Tukang Kenikil ‘Semen PC (50 kg/zak) Pasir pasang 0.1500 0.0150 0.1000 0.0050 0.2500 0.1820 0.1000 0.0060 0.3500 2.0000 0.1000 6.0000 0.6000 0.0280 (0.0500 0.7500 ‘6.0000 0.3000 18.0000 1.8000 4.1000 6.0000 0.3000 48,0000 1.8000 4.1000 3.0000 7.3800 5.0000 0.2500 0.3500 0.0100 4.0000 0.0100 6.0000 0.3000 4.0000 ©.1000 0.8200 8.5000 0.5400 oh on kg liter oh oh oh oh oh oh oh m3 zak m3 63,145 95,726 0,000 108,296 ~ 43,700 18,750 Jumlah 0,000 108,296 5,700 Jumtah 50,000 108,296 83,145 95,726 5,550,800 12,000 89,040 Jumiah 0,000 108,296 83,145.“ 95,728 5,385,000 12,000 Jumiah 50,009 108,298, 83.145 95,728 5,385,000 20,900 Suman 12,500 8,750 24,000 675,000 83,134 70,587 108,296 Jumlah 0,000 108,208, 83.145, 95,728, 185,000 65,000 485,000 Jumiah 12,471.75 1,435.69 5,000.00 541.48 10,925.00 3,600.00 TR 5,000.00 649.78 4,995.00 Tear 100,000.60" 10,829.60 498,870.00 87,435.60 185,422.40 1600.00 66,780.00 889,937.60 300,000.00 32,488.80 1,496,610.00 172,306.80 '5,923,500.00 36,000.00 7960,805.60 300,000.00 32,488.80 1,496,610.00 172,306.80 5,823,500.00- 92,250.00 43,750.00 6,000.00 236,250.00 831.34 70,587.00 1,082.96 T0780 300,000.00 32,486.80 83,145.00 9,572.60 181,700.00 652,500.00 ‘99,900.00 T229, Bey 4.M3 BETON CAMPUR 1:3: 1 Pembantu Tukang Mandor Tukang batu Kepala Tukang Kerik ‘Semen PC (50 kgizak) Pasir pasang PEKERJAAN MEMBONGKAR DAN MENYIAM BEGESTING 1 Pembantutukang 1M3 BETON K.225 BESI 300 KG 1. Pekerjaan Bekesting 2. Pekerjaan Besi Beton 3. Pekerjaan spesi 4 Pexerjaan membongkar dan menyiram begesting 4.M3 BETON K-25 BESI 180 KG 1. Pekerjaan Begesting 2. Pekerjaan Besi Beton 3. Pekerjaan spesi 4 Pekerjaan membongkar dan menyiram begesting KANSTEN. 1. Besi beton K-25, besi 180 kg MERUNCING TIANG RAMBU 1 Mandor 2 Kepala Tukang 3. Tukang kayu 4 Pekeja MENANCAPKAN TIANG RAMBUIMI 1 Mandor 2 Kepala Tukang 3. Tukang kay 4 Pekeria 11M3 UPAH GALIAN TANAH 1 Pekerja 2 Mandor 3 Alal bantu galian tanah 6.0000 0.3000 4.0000 0.1000 1.0160 5.0000 0.5080 4.0000 4.0000 3.0000 1.0900 4.0000 1.0000 1 8000 +0000 4.0000 0.0200 0.0050 0.0250 0.2500 0.1000 0.0050 0.0250 0.2800 0.6000 0.7500 0.0250 1.0000 on oh oh m3 zak m3 oh m2 kg m3 Is m2 kg m3 Is m3 on oh oh oh on oh oh oh ob bh 50,000 108,296 83,145, 95,726 185,000 65,000 185,000 ” Jumiah 0,000 Jumtah 4,821,955.60 1,791,012.60 1,229,306.40 200,000.00 Jumiah 4,821,955.60 41,791,012.80 1,229,306 40 "200,000.00 Jumiah 9.475.085 Jumlah 108,296 95,726 83,145 70,587 Jumlah 108,296 95,728 83,145 70'587 Jumiah ” 70,887 108.296 10,500 Jumlah 300,000.00 32,488.80 83,145.00 9,572.60 187,960.00 325,000.00 93,980.00 Ts a6 4,821,956 5,373,038, 1,229,306 200,000" Hea 29880 4,821,956 223,823 1,229,306 200,000 Tenet 189,501.69 189,501.65 541.48 2,393.15 20,786.25 7,058.70 778.5 541.48 2,393.15- 20,788.25 52,940.25 2,707.40 10'500.00 06,14 43 URUGAN TANAH KEMBALI 1) Mandor 0.0250 oh 108,298, 2,707.40 2 Pekeria 0.7500 bh 70.587 52,940.25 Jumiah eres PEMASANGAN PLAT RAMBUILS 4 Mandor 0.0050 oh 108,296, 541.48 2. Kepala Tukang (0.0250 on 95.726 2,393.15 3. Tukang kayu (0.5000 oh 83,145, 41,872.50 4 Pekerja 0.2500 oh 70.587 __._ 17,846.75 Jumiah $2,153.88 DIREKSIKEET BESERTA PERLENGKAPANNYA (2010) 1) Kantor Konsuitan 40,0000 750,000.00 30,000,000.00 2. Kantor Kontraktor 32.0000 750,000.00 24,000,000.00 3 Gudang 36,0000 600,000.00 21,600,000.00 4 AC1IRPK 4.0000 '3.500,000.00 14,000,000 5. Meja kerja + kursi 8.0000 '375,00000 3,000,000.00, 6 Moja rapat + 8 kursi 1.0000 1,800,609.00 _1,800,000.00 7 MCK 2.0000 2,500,00000 __$,000,000.00 Jumiah F5,400,000.00° ASURANSI 1. Construction all risks 0.0028 34,545,454 545 45 95,000,000.00 2 Asuransi tenaga kerja 0010 34.545 454545 45 34,545.454.55 Jurnlah 55 aS INSTALASI LISTRIK, PENERANGAN DAN AIR KERJA 1 Instalasilistrik 41,0000 Is. 10,000.000.00 10,000,000.00 2 Instalasi air bersih 41,0000 Is. 5,000,000.00_ 5.000.000 00 Jumiah ~¥5,000,000.00° PENGANGKUTAN 1Kg TIANG PANCANG KE TITIK TIANG PANCANG (2010) 1. Biaya crawol crane per hari 0.0208 han 2,700,000 09 56,280.00 2 Biaya ponton transport per hari 0.0208 hari 5,000,000.00 "104,166 67 Jumiah 718041667 HARGANIKG: 160.42 11M COR PONDASI RAMBU CAPURAN 1:2:3 1 Pekeria 6.0000 oh 7058700 423,522.00 2. Mandor 0.3000 oh 108,296.00 32,488.80 3. Tukang Batu 1.0000 oh 83,145.00 83,145.00 4 Kepala Tukang 0.1000 oh 95,726.00 9,572.60 5 Batu Kerkil (0.8300 m3 220,50000 183,015.00 6 Pasir Pasang 0.5400 m3. 185,000.00 99,900.00" 7 Zak Semen 8.5000 zak 65,00000___ $52,500.00 Jumiah 7384 13.4 PASANGAN BATA DIPLESTER DAN ACIAN 1 Bata merah 65.0000 buah 4,000.00 165,000.00 2 Pasir 0.0600 Is 15,000.00 11,100.00 3. Semen 4.0000 m2 65,000.00 65,000.00 4 Mandor 0.0250 m3 108,296.00 2,707.40 5 Tukang 0.2500 oh 83,134.00 20,783.50 6 Pekeria 41,0000 oh 70,587.00. 70,587.00 Jumlah TTT PASANGAN BATA EXPOSED (2010) Bata merah Pasir Semen Mandor Tukang Pekeria PEKERJAAN KAYU KONSTRUKSI ATAP (2010) Kayukls. | Paku » Mandor Tukang Pokeria ‘Alt bantu PEKERJAAN KAYU KONSTRUKSI ATAP (2010) Kayu kis. Paku ‘Mandor Tukang Pekeria Alat bantu 4M3 BETON BO TANPA TULANGAN Air Batu Pecan 2/3 Concrete mixer Kepala tukang Mandor Pasir beton Pekeria Semen PC (50 kg/zak) Tukang 1 M3 URUGAN PASIR DAN PEMADATAN ‘Alat bantu galian tanah Damtruck ‘Mandor Pekerja Pasir urug PEKERJAAN URUGAN DAN PEMADATAN SIRTU ‘Mandor Motor Grader Sewa Bulldozer ‘Sewa Tandem Roller ‘Sewa Vibrator Roller Sir 65.0000 0.0500 05000 0.0280 0.2500 41,0000 1.1000 5.0000 4.0000 10.0000 20.0000 1.0000 0.0072 0.5000 0.2000 1.0000 1.0000 0.2000 0.8000 1.2500 0.0300 0.0250 0.4500 4.0000 4.0000 0.2500 0.0200 0.0200 0.0500 0.3000 1.2000 0.1420 0.0248 0.0840 (2.0800 0.1080 1.2000 buah Is m2 oh oh m3 Is oh oh oh Is m3 's m3 on oh Is ton m3 jam oh m3 oh zak oh oh hari oh oh m3 on hari bari hari jam m3 4,500.00 185,000.00 65,000.00 108,296.00 83,134.00, 70,587.00 Jumtah §,720,850.00 42,000.00, 108,296.00 183,134.00 70,887.00 0,000.00 Jumiah 10,347,360.00 12,000.00 108,296.00 83,134.00 70,587.00 50,000.00 Jumiah 4,200.00 188,750.00 5,000.00 95,726.00 108,296.00 177,000.00 70,887.00 65,000.00 83,134.00 Jumiah 10,500.00 4,715,700.00 108,296.00 70,587.00, 135,000 00 Jumiab 108,296.00 20,200.00 700,000.00 343,800.00 ‘150,000.00 162,000.00 Jumiah 97,500.00 9,250 00 32,500.00 2.70740 20,783.50 70,587.00 3332780 6,292,605.00 60,000.00 108,296.00 831,340.00 1,411,740.00 50,000.00 W753, 987.00 74,500.99 6,000.00 21,659.20 183,134.00 141,174.00 50,000.00 8.68 1840.00 151,800.00 68,750.00 2,871.78 2,707.40 79,650.00 282,348.00 260,000.00 20,783.50 868,750.68 210.00 34,314.00 5414.80 21,176.10 162,000.00 aso 15,378.03, 500.96 44,800.00 27,504.00 16,600.00 194,400.00, 33 RENCANA ANGGARAN BIAYA PENBANGUNAN DERMAGA PENYEBERANGAN, UraianlKegiatan PEKERJAAN PERSIAPAN. Pengukuran Penerangaivkeselamatan kerja Mobi:sasi dan demobilsas Diroks: Keet boserta periengkar Pagar Pengaman Proyek ‘Asuransi DokumentasiAdministrasi/As Bult Drawing nna KONSTRUKSI CAUSEWAY (106.72 M2) Unugan Sin Urugan dan pemadatan tanah Timburan batu Kosong untuk talud = Pasangan batu kosong 40 - 60 xg/unt = Pasangan batu kosong 80 - 120 xgiuna Geotertie Perierasan t= 40m Batu 57 1=30em Bau 35 1=10em Pekeriaan Baton K-225 Beton tantai= 25 em = Beton cansteen = Beton rating post Pekeraan Beton K-175 + Lanza keqjaeibawah lantai Betcn tumbuk untuk trotoar Lapisan pasir LLapssan past t= 10cm dlbawah lantai kerja Lapssan paste eibawah totoar Ratirg GSP 2 5°, 3mm LLapisan permukaan dan agpalt past t=7om ‘Bess sku L 100.100 8 (Hot Dip Galvanized) untuk Deletasi KONSTRUKS! TRESTLE (422,25 M2} Beton berviang K-25 uniuk pat lata: Beton beruiang K-225 untuk balok Beton beruiang K-225 untuk tiang rating Boion bertulang K-225 untuk cansteen Boton bertuiang K-22 untuk pile cap Beton bertuiang K225 untuk pengisitiang ‘Beton beruiang K-25 untuk selmuttiang gancang ‘Beton tumbuk K-175 untuk wait {25 en Pasir untuk toto Lapisan aspal pasir Pipa GSP D=2,5".t=3 mm Tiang Baja D=711 mm, t=14,0 mm emancangan ting pancang Pengecatan ting pancang Penyambungan tang (setiap 12 m) emotongan tang Plat penutup tang Sepatu tang pancang Delatasi Conbioc PVC buangan air @ 6m, 2 sisi ‘Anghur dudukan tang ist Volume 11000 te 11.000 ts 1.000 Is 11000 Is 41.000 m 1.000 Is 11000 Is 119.810 m3 303.900 m3 104.140 m3 280.690 m3 288,500 m2 10.500 m3, 31.500 m3, 131.500 m3 1477 m3 0.490 m3 5.361 m3 1.440 m3 10872 m3 4.280 m3 161.800 mv 791500 m2. 41.000 my 128.650 m3. 56.210 m3. 1.620 m3 4.200 m3 34580 m3. 8.480 m3 3.010 m3 4.550 m3 9.090 m3 403,000 m3 240,000 m2 406.040 ton 388.000 m’ 525.810 m2 40,000 bh 20.000 bh 20.000 bh 20.000 bh 7.000 m, 184.870 m2 7.200 my 41000 bh Harga Satuan 112381,660,00, 818.563,460.00 '375.500,000.00 '45,400,000.00. 200,000.00 96.620,482.05 64569,200.00 Tamia 298,182.99, 223,114.90 175,000.00 178,000.00 39,000.00 132,750.00 132,760.00 7,384,225.86 111801,703.69, 11,201,703.69 1,560,993,40, 1,560,99840, 223,11490 223,11490, 249'375.00 149,478.12 485,345.58, Tamia 7.984225 84 71924237 02 11,801,703.69 11,801,703.68 71824297.02 6.642.205.23 10,768,427.39 1/560,993.40 184,400.00 149,478.12 288,800.00, 14,000,000.00 580,741.87 160,240.60 622,598.00, 706,223.65 669,708.13, 1.440,048.70, 450,751.20 162,500.00 97,200-00 2311200.00 Tamar Per m2 Jumiah 112,981,660.00 £816 563,460.00 375,500,000.00 45,400,000.00 200,000.00 196.630,432.05 64 569.200 00 T513,244,75205 35:725,304.27 67,805,518 11 18,224,500.00 49,120.750.06 11,290,500.00 1,393,875.00 4181.625.00 232,603,113.98, 17,425,953.11 5,778.468.18, 8,367,705.12 2.247,830.50 2,425,705.19 281,128.77 18,411,375.00 11,883,510.54 5.338.601 38 89,508,760.14 1935,212,20264 445 421,362.89 19,118.759.98 49,567,155 51 274,020,116.15 ‘86,325,900 82 32,412,968 44 7,102,519.97 1.767.096 00 60,238,682.26 69,264,000.00, 4,484, 560,000.00 ‘217.567,883.07 85,850,515 69 24,907,920.00 14,126,473.00 13275.922.60 28,800,974.00 3,155,259.10 25,165,375.00 699,840.00, 1,164,800.00 TBI 733,72543 7,848,590.57 vu "1 2 1s 4 DUDUKAN TRESTLE / ABUTMENT (1 UAH) Baton bertulang K-225 untuk pile cap Beton bertulang K-225 plat injak Beton bertulang K-225 plat sayap Beton bertlang K-225 pongisian arg Beton bertuiang K-225 selimut tang Tiang baja O=711 mm. t=14,0 mn Pamancangan tang pancang Pengecatan tiang pancang Penyambungan tang (setiap 6 m) Pemotongan tang Plat penutup tang Sepatstiang , Delatast ce DUDUKAN MOVABLE BRIDGE (1 BUAH}) Beton bertuiang K-225 untuk pile cap Beton bertulang K-225 pengisian tang Eaton bertlang K-225 selimuttiang Tang baja D=711 om, 214.0 mm Pemancangan wang pancang Pengecatan ang pancang Penyambungan tang (set.ap 6 m) Pemotangan tang Plat penutup tang ‘Sepaty tang pancang Plat baja penghubung MB ke duduian M3 Baja untuk wench Bracing baja pengkat tang WF 200 200 8 12 ‘Angke: plat landas catwalk dia 25 mm Baja Trench Angkur ducukan engsel MB MOORING DOLPHIN (3 BUAH) Beton bertulang K:225 untuk ple cap Beton bertulang K-225 pengisian vang ‘Beton bertulang K-225 sebmat tang Tiang baja 0-812 8 mm, t= 140mm Pengangkutan 1 kg tang pancang kettk pancang Pemancaagan tang pancang Pengecatan tang pancang Penyambungan tiang (setiap 6 m) Pematongan tang Plat penutup tang Sepatu tiang Brancing antar ang pancang WF 150 100.7 10(23.65 kgim) Bollara/Bolder kapasitas 70 ton ‘Anghut dudukan tang istic ‘Angkur plat landasan catwalk @REASTING DOLPHIN (5 BUAH) Beton bertulang K-225 untuk pile cap Beton bertulang K-25 untuk pengis tang pancang Beton bertulang K-225 sekmut tang Tiang baja D=812.8 mm, t= 14,0 mm engangkutan 1 kg tang pancang keitk tang Pemancangan tiang pancang Pengecatan ting pancang Penyambungan tang (setap 6) Pemotongan tiang Plat penutup tang Sepatu bang pancang Brancing antar ting pancang WF 150 1007.10(23,86 kg/m) Bollard/bolder kapasitas 25 ton ‘Angkur pat landasan catwalk 19950 m3 7.924,237.02 7.420 m3 7.384.225 84 1360 m3 7386.225.84 4270 m3 6 642,208.29 01450 m3 10769,427.39 43010 ton +4,000,000.00 36.000 m' ‘560,741.97 80.370 m2 160,240.60 6000 bh 622,698.00 3.000 bh 706,223.65 3.000 bn 63,795.13, 3.000 bh 1,440,048.70 65.520 kg 450,751.30 Tamia 8300 m3 7,924237.02 2430 m3 (642,205.29 3780 m3 10,768,427 39 86 760 ton 14,000,000.00 380.000 mv 80,741.97 267 €00 m2 160,240.60 20000 bh 622,698.00 10.000 bn 70622385 10.000 br 653,706.13, 10.000 bh 1,440,048.70, 710.000 kg 13,500.00, 1386.000 kg 1¥3,500.00 41147.700 kg) 1350000 16,000 buah 227,100.00, 2332.800 kg 2.000 unit, 159.130 m3. 7,924,237.02 44.590 m3 6,642,205 29 13380 m3 10,768427.39 52950 ton 14,000,000 00 145390 080 kg) 160.42 576,000 mt 560,742 '505 590 m2. 180,240.60, 6.000 bh 622,698.00 48.000 br 706 223.65 18.000 bh 653,706.13 18.000 bh 1,440(048.70 3173640 kg 43,500.00 3.000 Bh £23,200,000.00 3.000 bh 201,200.09 8.000 bh 227,400.09, Tah Per buah 479.050 m3 7.924237.02 60.340 m2 6£42,205.29 40.110 m3 10,768,427 39, 408.980 ton +4,000,000.00 1441280.000 kg 160.42 160.000 mr 560,741.87 1530 580 m2 160,240.60, 100.000 bh 622,698.00, 50,000 bh 706,223.65 50.000 bn 688796.13 50,000 bn 0,416.67 4154-180 kg 13,500.00 10.000 bh 23,200,000.00 200000 bh 127,100.00 158,088,528.55 54,790,955.73 10 042,547.14 6,435,600.71 4,845,792.33, 162,140,000.00, 20,186,710.80, 12,878,537.02 3,736,188.00 2:118870.95 1/981 388.38 4,320,146.10 661,673,791.17 16,140,568.84 40,708,655.53, 1,214,640,000.00, 201,887, 108.00 42,928,456.74 12,459,960.00 7.082,238.50 6,537,981.30 14 400,487.00 '9,585,000.00 18,306,000.00 15,493,950.00 1,260,983 836 99 96,909,775.12 144,081,558.48, 7741,300000.00 23,322,992.00 322,987,372.80 '81,016,044.95, 22,417,128.00 42.712,02570 11,948, 330.34 25,920,876.60 42,844,140.00 163,600.000.00 '873,600.00 {816,800.00 '952,911,493.66 3,795,105,744.43, '400,790,856.95 648,766,508.71 '5,83,720,000.00 70,788,668.87 097,187,146.87 245,261,057 55, 162,289,800.00 35,911,182.50 39,189,806.50 8,020,833.33 '56,081,430.00 232,000,000.00 4,542,000.00 3 18 16 W 8 19 20 0 = x ees 10 cH 3 4 15 18 7 B 9 ‘Angkur dudukan tang listric Frontal frame U Anchor Siailes Sil 50 mm (for supparing chaine) ‘Supporting chaine 32 mm inc. ADJ Shackle 42 mm (S 25 C) (Hot Dip Gawvanizes) Plate landas # 700 x 300 x 12 ine. anghur e 16 mm (Ho! Dip Galvanizea) Fender ukuran SM800 L= 1.5m KONSTRUKS! OUDUKAN HIDROLIK (2 BUAH) Beton bertlang K-225 untuk pile cap Beton bertulang K-225 pengisian fang 2 Beton bertlang K-225 selmut tang Tiang baja D=711 mm, 14,0 mm Pemancangan tiang pancang Pengecatan tang pancang Penyambungan tiang (setap 6 m) Pematangan tang Plat penutup tang Sepaty tang Brancing antar tang pancang WF 1$0.1007.10(23,65 kgim) ‘Angkur Portal baja penggantung harolk ‘Anker plat landas catwalk dia 25 mm plat baja landasan guide roler MB. .. KONSTRUKS! PELINOUNG MB (2 BUAH) Beton bertulang K-225 untuk ple cap ‘Beton bertulang K-225 pengisian tang Beton bertulang K-225 selimut tang iang baja 0612.8 mm, t= 140mm Pengangkutan 1 kg tang pancang kettik pancang Pemancangan tang pancang engecalantiang pancang Penyambungan tang (seliap 6 m) Pemotongan tang iat penutup tang Sopatu tang pancang Brancing antar tang pancang WF 180.1007 10(23,65 kg/m) Frontal frame Fender ukuran CELL 400 Pemasangan fender CELL 400, Pemasangan frontal fame CATWALK 18 M2 ‘Beton bertulang K-225 untuk pile cap Beton bertuiang K-225 pengisian tang Baton bertulang K-225 selimut tang Baton berulang pelatlantat Tang baja O=711.2mm, t= 140mm Pengangkutan 1 kg tiang pancang ke titktiang Pamancangan tang pancang Pongecatan tang pancang Penyamoungan ting (setiap 6 m) Pemotongan tiang iat penutup tang ‘Sepatu tang pancang Profi baja WF 100 50.57 Profi baja WF 200.1008 12 Profil baja WF 450 250 8.12 Pat baja f=12 mm Plat baja t=8 mm. Bondex Beton bertulang K-225 plat i atas bondex Pipa railing dia. 2.5%, tebal 3 mm 5.000 eh 45,000 set 45.000 set 15.000 set 10060 bh 445540 m3 3650 m3 0530 m3, 69.410 ton 288.000 mr" 1071620 m2 16.000 bh 8.000 bh ‘8000 bn 8.000 eh 58.880 kg +4000 th 4.000 on 1844030 on 17369 "3 4809 3 2159 3 23,700 ton 49648 000 kg 180000 rs 1530 $80 m2 ‘20.000 th 5.000 bh 5.000 bm 5.000 th 300.000 *g 1.000 bn 3.000 bn 3.000 41.000 6.480 m3 1.760 m3, 4640 m3 8.520 m3 11.568 ton 18.487 kg 78.800 mv 42.900 m2 12.000 bh 6.000 bh 6,000 bh 6.000 bh 2128.000 kg 299.500 kg 102.600 kg 100.000 kg 20.000 kg 16.800 m2 2,000 m3 28.000 m2 291,200.00, 104,689,559 11 4.372,680.00 2.000,000.00 357.2100 32,000,000.00 Taman Por buah Tis24 297.02 6.542,205.29 10,768,427.39 141000,000.00 ‘560,741 97 160,240 60, 622/608 00 706,223.65 653,796 13 1440-088 70, 13,500.00, 16,047 500 00, 227,100.00, 13,500 00, Tomar Per bush 7,924,237 02 5,642,205 29, 10.768,427 39 14,000,000 00 160.42 60,741.97 160,240.60, 622,598.60, 706,223.65, 663,796 13 1,480,048 70 1350000, 145,476,897 11 26,072,600 00 28,392,687.00 445,476,897 11 Tamar Per buah 1,924,237.02 6.642,205.29 10,768,427.39 7,104,093.77 46,000,00009 160.42 $60,741 97, 160,240.60 622,698.00 706,223.65, 663,796.13, 1.440,048.70 13,500.00, 13,500.00, 13,500.00, 13,500.00 13.50.00 492,600.00 7,334,225 84 249:375.00 Tomiar 1,456 ,000.00 2 §23,447,795.54 61.70,600.00 99,000,000.00 5,388,150.00 '320,000,000.00 Tari 3a 2,635,413,567.77 907,642,108.27 24,244,049.29 5,707,26652 1971,740,000.00, 161 /499,688 40 a7717.08177 19:963,188.00 5 649,789.20 $,310,269.04 11,520.388.60 7/544,880.00 64,190,000 00 70.900 .800 00 11,394 405.00, T3907 870k 41(484,508,971.55, 197,564,75467 32148.273.53 23,182,118.69 '331,860,000.00 7,963,725 00 100.933.564.00 1245,261,057.55 '24'907.920.00 3531.118.25, 43.318 98065, 7,200.24350 4,050,000 00 145.476 857.11 78,217 800.00 188,177,971.00 145.476 897.14 733,708 41418 '616,852,207.10 51,349,055.89, 111890,281 30 47/660,220.82 60,526 87893 161/962,000.00 2.96562 43,054,983.04 6,874,321.74 7.472376.00 423734190 3,982,776.78 8,640,292.20 28,728,000.00 (083,250.00 4,385, 100.00 11350 000.00 270.0000. 6,763,880.00 14,768,451 88 6,982,500.00 54,280,981. bi xt. x XV. KONSTRUKSI DUOUKAN & RUANG KONTROL (1 BUAH) Beton bertulang K-25 untuk pat lantal ‘Baton bertulang K-225 untuk balok Boton bertulang K-225 plo ca Beton bertuiang K-225 pengisi tang Beton bertuiang K-225 selimut tang Tiang baja D=711 mm, t=14,0 mm. Pemancangan iang pancang engecatan tiang pancang Penyambungen tang Pemotongan tang Sepatu ting Plat penutup ang ‘Baja untuk vench = Rumah kant RUMAH KONTROL 14 m2 Beton K-225 = Beton berulang sloop “Baton berulang kolom Beton bertulang ring balok Pekeriaan dnding “= Pasangan bata diplester dan acian Pekerjaan aap “= Konstruksiatap kayu Kis. I ~ Lisplank 30/200 = Penutup atap zincalume = Bubungan zincalume Pokerjaan kusen ~ Kusen pintu = Kusen jendela = Daun pintu pani kayu lin = Daun jendela pani kayu lanan = Daun jondola kaca mati § mm Pekesiaan penggantung 40 mm 3610 m3 2.090 m3 3.380 m3 41500 m3 0800 m3 6270 ton 26000 mt 26.000 m2 26.790 bn 1.000 bh 11000 bh 41000 bh 990.000 kg 14.440 m2 041s 0617 0540 4250 12331 4.000 2.000 4720 55.178 18.480 1.000 5.060, 1.000 4.000 11.000 11000 m3 m3 m3 m2 m2 m2 m3 m2 m2 nit nit unit vnit wun 's 7,384,225 84 11,801,703 63 7.924237 02 6.542,205.29 10.768.427:39 14,000 000 00 ‘560,741 97 160.240.60, 622,698.00, 705.223.65 1.480.048 70, (663,796.13 176,550.00 2.253,200.00 Taman 7,083,100.00 7,083,160 00 7,083,100 00, 235.177 90 233327 90, 262.213 48 8.75398: 00 149,588 97 108,700.00, 88,400.00 951082580 9510825 60 281.264 66 7131840.80 8609376 5,000,000 00 Tamian PEMBUATAN JALAN & LAPANGAN PENETRAS! DENGAN KOLAKAN (L=2.150 M2, TEBAL = 7.C¥) 2149.40 m2 214.900 m3 644.800 m3 2149-400 m2 2149.40 m2 Lap, Penetasi asphalt belon t=7 em Lap. Base course dari batu pecah 3/5 em t+10 em Lap. Base course daribatu pecab 877 cm, t=30 om Pemadatan lapangan subgrade Lap. Prime coat AC 60770 2.5 kgim2 PEMBANGUNAN MOVALBE BRIOGE (185.6 M2) Konstuksi baja untuk moveable bridge Penggantung hidaulk sinder termasvk angkurny, hand. dian tangga (Hoisting Frame) (#6000 kunt) Gelagar tama (main beam) jembatantemasuk cantiever belok pengangkat, bushing (£8500 kun) Balok meintang (Cross beam) H 8003001830, termasuk pela pengaku t= 12 mm (= 2800 kolunt) Ealoe metiiang bagiandepan (Font bean) #2000 kgf) Blok meintang agian belakang (End beam) +3500 kgm Balok memariang (Longitudinal Beam) H 390x200%12<16 (£1200 iglunity Bok pengangkat (iting beam) H 856xS40x20¢40 (+ $000 kglun’ Gating loti MB, tbal grating 160mm (6m x 10 m) + 15D kg/unt (Hot Dp Galvanized) CChetored pate t= 12 mm, Hot Dip Galvanized (8 m x 191m) (495 kg/ma) Dudukan engsel Movable Bridge (1000 h/unt) Roda penunun (guide ole lengkap dengan shatnya, grease npple dan Kondut embaga (#230 igh Landasan ra panuntun plat 600 x 4800 mm, t= 12 mm ermasu angkurrya (300 kafunit) 112000.000 kg +17000.000 kg 23400,000 kg 200.000 kg $3500.00 kg 15600.000 kg, 000,000 kg 24000.000 kg '5700.000 kg 2000,000 kg 460,000 kg 600.000 kg 149,478.12 992,259.62 92,259.62 168,200.00 29,1000, Tanah 35,000.00 35,000.00, 35,000.00 35,000.00, 35,000.00, 35,000.00, 35,000.00, 36,000.00, 36,000.00 35,0000, 36,000¢0, 36,00000, 26,657 055 28 187,780,000 00 14/579 201.13 4.185.255 60 16,582 079.42 705,223.65 1.440 048.70 653,796.13, 174,784, 500,00 22,536, 208.00 730,022,989.60 95:0825.80 47,554,12900 81,764.64 2,855.36320 ‘889,937 60, 5,000 600 00, T67,829,120.41 321,288 271.13 213236,592.34 1639,609,002.98, 145,589.080.00 62,547,540.00. 7,383,470 406.44 420,000,000.00 595,000.000.00 '819,000,000.00, 70,000,000.00 +22'500,000.00 '46,000,000.00 178,000,000.00 ‘40,000,000 00 199,500,000.00 70,000,000.00 16,100,000.00 21,000,000.90 Sas {Guard ral t= 3 mm, accessories dan postnya da. 6° H= 900 mm pina schd. 40 di galvants, 2 @12 m (30 git) ‘Sackle ia. 145 mm dan shaflenya kompli (320 kg/unit) ‘Joint plate penghubung hidraulk slinder dan iftng bracket termast ‘shatenya (4 550 kglunit) Hook penogantung MB {= 70 mm termasuk shat dan accessories (4 450 kgfunit Sroint plate penghubung iting beam dengan hook penggantung, pelat= 40 mm termasuk shaf-nya (2 B00 kg/unit) soint plate penghubung Ming beam dengan hidrauk sine, polat t= 50 mm termasuk shaft-nya (¢ 750 kgitt) Shaft engser f46, Gia 220 mm, panjang 4320 mm dilapsi harderor ‘material S45C clangkapi greas nipple (+ 100 kg/uni) Pekeaan pentesangan siruktor baja MB (Total : 120000 Ka) _ 2 Engsel movable bridge 33 Transpor material baja dari workshop ke site 4 Postal penggantung hideotk 5 Erecton 6 Tackle elacine kapasitas 35 tonfunit 7 Generator set hapasitas 25 KVA 8 Lampu sore: 160 watt XV, HYDRAULIK 1 Hydraulk Cylinder Type Celvis Mounting @ = 180 mm. 2. Hydrauli power unt Type Foot Mounted 25 KW 3. Panel istrk 5 Preahyerauk Type Van Pump operation pressure max 140 glen? 5 Alarm Balance 6 Pemasangan hydrautk cylinder, istaasi,pembersinan pipa dan ob untuk operasional esting daa waning XVI. LAMP PENERANGAN 1 Instalasi penerangan 2. Pengadaan pemasangan LPJU (solr col) 3 Box Panel penerangan 720,000 kg 35,000.00 25,200.000.00 1¥280,000 ko 135,000.00 44;800,000.00 1100.00 kg 36,000.00 38,500,000.00 900,000 kg 35,000.00 '31,500,000.00 1600.00 kg 35,000.00 36,000,000.00 +1600.000 kg 35,000.00, _$2,600,000.00 200,000 kg 59,000 00 10,000,000.00 +20000.000 1.90009 —_120,000,000.00 2 unit 27,066,20000 '54,192,400.00 85 ton 1,500,00000 —_127,500,000.00 2bh 150,828,300 301,656,600.00 85 ton 2,000,000 _170,000,000.00 Qunit —-—-327,084,60000—_—854,109,200.00 funk 234.215.8000 © -204.215,600.00 4 unit 4,000,000.00 16,000,000.00 ‘Jaman 5,830,214,000.00" 2.000 buan —_2,007,023,70000-4,0"4,047.40000 41000 bush «61257022000 612.870.2200 4,000 buah 45,500,000 00 45,500,000 1.000 set 371,893.02475 -371,603.02475 4.000 set 20,000,000 00 20,000,000.00 41,000 Is 100,000,000.00 _100,000,000.00 ————— ae Tamar BIEL SATS 300,000 m* 29,494.35 8,821,304 92 7,000 bh '35,000,00000 _245,000,000.00 41.000 bh 30,000,000 00 '30,000,000.00, Taran 783,877 308.32 tes, No. 2 3 RENCANA ANGGARAN BIAYA PEMBANGUNAN DERMAGA SUNGAI DAN DANAU Uraian/Kegiatan Volume PEMBUATAN DERMAGA KAYU ULIN TIANG PANCANG 15 M (21 M2) Tang kayu ulin 20/20 panjang 15 M (nduk) “Tiang kayu ulin 20/20 panjang 15 M (Gani) Melancipkan tiang pancang Pemancangaa tang 3 ‘Membuat pen dan lobang Sloot kayu tin 20x 20 em Gelagar kayu ulin 20 x 20 em GapitiKalang 20 x 20 cm Lanta kayu ulin 8/20 em Baut 5/6° Panjang 40 em Baut 516" Panjang 45 em Plat beugel Tebal 5 mm Ba‘ok pengaman 20 x20 PEMBUATAN BAJA PONTON 115 M2 Rangka ponton L 7070.7 ‘Sekat ponton T 10 mm Plat ponton T 12 mm Marine Plat Plat Profil baja U ponton IWF 9.00 9.00 18.00 72,00 12.00 097 ost 170 20.00 0.00 50.00 17.00 0.28 4,251.00 3,700.00 27,321.00 12,185.00 4,743.00 PEMBUATAN JEMBATAN DERMAGA KAYU KAMPER (21 M2) TTiang kayy ulin 20120 panjang 1 M (induk) Tiang kayu ulin 20/20 panjang 15 M (gap) Melancipkan tiang pancang Pemancangan tiang Membuat pen dan lobang Sloot kayu kamper Kas 115 x 15 om Gelagar kayu kamper klas 110 x 1D em GapitKalang 10 x 10 cm Lantai kayu kamper Klas 15/20 em Baut 3/8" Panjang 20 cm Baut 5/8" Panjang 40 cm Plat beugel Tebal 5 mm Balok pengaman 10 x 10 per m3 6.00 6.00 1200 48,00 1200 073 oat 08s 20.00 40.00 $0.00 17.00 013 m3 m3 m3 m3 m3 ton ft m2 bh bh bh kg kg kg kg kg kg kg btg btg MI m3 m3 m3 m2 bh bh bh m3 Harga Satuan 6,110,800.00 6,334,320.00 28,720.88 4,372,993.49 55,630.56 11,738,800.00 11,738,800.00 11,736,800.00 747,107.77 33,200.00 38,800.00 13,500.00 11,738,800.00 Total Per m2 12,700.00 42,700.00 13,500.00 13,500.00 14,800.00 Total Per M2 6,110,600.00 6,334,520.00 28,720.88 1,372,993.49 55,630.56 11,738,800.00 11,738,800.00 11,738,800.00 747 107.77. 12,900.00 33,200.00 13,500.00 11,738,800.00 Total Per M2 Jumiah '54,995,400.00 57,008 880.00 516,975.84 98, 855,531.42 667,566.72 11,410,113.60, 9,508,428,00 19,955,960.00 14,942,155.40 41,660,000.00 1,940,000.00 229,500.00 152,088.00 274,742,598.98 13,082,980.90 53,987,700.00 46, 990,000.00 368,833,500.00 164,497,500.00 25,796,400.00 '660,105,100.00 5,740,044.35 6,063,600,00 '38,005,920.00 244,650.56 65,903,687.62 667,566.72 8,557,585.20 4,754,214.00 9,977,980.00 14,942,155.40 516,000.00 4,860,000.00 229,500.00 4,526,044.00 183,748,903.50 8,749,947.78 IV PEKERJAAN TURAP KAYU (TINGGI 4 M) / SIRING 80 M Kayu galam dia. 10 emx6m Melancipkan tiang pancang Pemancangan kayu galam Sloof kayu galam dia. 10-6 m Gapit kayu galam dia. 6-4 m Papan kayu meranti \V_ PEMBUATAN FENDER SUNGAI (FABRICATION) ~ (Gibuat di pabrik dengan spec tekris) Pembuatan fendeer (Fabrication) Pengadaan tiang pancang 20 x 20, p=15 m (induk) Pengadaan tiang pancang 20 x 20, p=15 m (gap) Melancipkan tiang pancang Pemancangan tiang ‘Membuat pen dan lobang Sloot kayu ulin 20 x 20cm Getagar ayy ulin 20 x20 em GapivKalang 20 x 20 em Lantai kayu ulin $/20 em 10. Baut 5/8" Panjang 40 cm 11. Baut 518° Panjang 45 cm 12 Plat beugel Tebal 5 mm 413. Balck pengaman 20 x 20 per m3 wovousun-S VIL PEMBUATAN RUANG TUNGGU 1 Pembangunan rang tunggu Vill. PEMBUATAN DERMAGA PENDARATAN SUNGAI/DANAU 4 Pengadaan tiang pancang 15 x 15, p=6 m (induk) 2 Pengadaan tiang pancang 15 x 15, p=8 m (gapit) 3. Melancipkan tiang pancang 4 Pemancangan tiang 5 Membuat pen dan lobang 6 7 8 Sloof kayu ulin 15x 15 em Gelagar kayu ulin 10 x 10 cm Gapit/Kalang 10 x 10.¢m 9 Lantai kayu ulin 6/20 om 40 Baut 3/6" Panjang 20 em 11. Baut $18" Panjang 40 cm 12. Plat beugel Tebal § mm 13. Balok pengaman 10 x 10 per m3 42.00 42.00 504.00 70.00 260.00 12.80 1.00 PEMBUATAN DERMAGA DAN TRESTEL KAYU BES! (21 M2) 9.00 9.09 18.00 72.00 12.00 097 ost 1.70 20.00 0.00 50.00 17.00 0.26 200.00 6.00 6.00 12.00 48.00 12.00 073 oat 0.85 20.00 40.00 50,00 17.00 0.13 big bh mi big tg m3 bh bg big bh Mi bh m3 m3 m3 m2 bh bh bh m3 btg bts bh Mi bh m3 m3 m3 m2 oh bh bh m3 132,900.00 28,720.88 1,372,993.49 562,000.00 100,100.00 4,046 000.00 Total Per m2 4,261,400 00 6,110,600 00 6,334,320.00 28,720 88 1,372,992 49 55,630 56 11,738,800.00 11,738,800.00 11,738,800.00 747-1077 33,200.00 38,200.00 13,500.00 11,738,800.00 Total Por M2 1,686,935.00 Total 603,120.00 810,960.00, 28,720.88 4.972,993.49 55,630.56. 11,738,800.00 11,738,800.00 11,738,800.00 747,107.77 12,0000, 33,2000 13,500.00 11,738,800.00 Total 5,581,800.00 1,206,276,98 691,988,719.97 39,340,000.00 26,026,000.00, 51,788,800.00 10,199,144.96 4,261,400.00 4,995,400.00 57,008,880.00 516,975.84 98,858,531.42 667,566.72 11,410,113.60, 9,508,428.00 19,955,960.00 14,942,165.40 41,660,000.00 1,940,000.00 229,500.00 3,052,088.00 774,742,598.98 13,082,980.90 '337,387,000.00 3,618,720.00 4,865,760.00 344,650.56 65,903,687.62 667,566.72 8,557,585.20 4,754,214.00 9,977,980.00 14,942,155.40 516,000.00 41,660,000.00 229,500.00 4,526,044.00 117,563,863.5¢ « werwssest anaes GuaeN= x PEMBUATAN DERMAGA BETON (d= Beton bertulang untuk sloof Beton bertulang untuk kolom praktis Beton bertulang untuk ring balok Beton bertulang meja loket Rabat beton 7 cm keliling bangunan dermaga PEKERJAAN TALUD KAYUIPENAHAN (80 M) Kayuulindia 10-6m Lancipkan tiang pancang Pemancangan kayu ulin Stoot ulin dia. 10- 6m Gapit kayu ulin dia. 10-6 m Papan kayu ulin 4 x 20cm 0.59 075 0.59 0.07 20.60 42.00 42.00 504.00 70.00 260.00 12.80 m3 m3 m3 m3 m3 big bh Mt big big m3 7,083,100 60 7,083,100 00 7,083,100 20 7,083,100 00 52,100.00 Total Per buah 66,000 62 28,720 88 4,372,993 49 '562,000 00 561,800 00 10,347,360 00 Total Per M2 4,179,028.00 9,312,325.00 4,179,029.00 495,817.00 1,073,260.00 15,239,460.00 7,619,730.00 2,772,000.00 1,208,276.96 691,988,719.97 39,340,000.00 +146 ,068,000.00 132,446,208 00 42,672,785.06 aw PENGADAAN DAN PEMASANGAN RAMBU SUNGAI Alternatif 1 UKURAN 100 x 140 em Pembersinan lokasi Mobilisasi/éemobilsasi Galien tanah Urugan tanah Cor pondési rambu camp Daun rambu aluminium 2 mm dgn reflektive sheeting Rangka rambu Tiang rambu pipa besi galvanis d = 75 mm (3") Pondasi rambu dan tiang penyokong Baut dia. 6 mm Pemasangan plat rambu Pengecetan Pekerjaan las-lasan pipa Dokumentasi UKURAN 100 x 100. em Pembersihan lokasi Mobilisasi/demobilisasi Galian tanah Urugan tanah Cor pondasi rambu camp 1:2:3 Daun rambu aluminium 2 mm dgn refiektive sheeting Rangka rambu Tiang rambu pipa besi galvanis d = 75 mm (3") Pondasi rambu dan tiang penyokong Baut dia. 6 mm Pemasangan plat rambu Pengecetan Pekerjaan las-tasan pipa Dokumentasi Volume 1,000 Is 4.000 Is. 0.380 m3 0.480 m3 0.480 m3 4.400 m2 4.800 m 3.600 m 4.750 m 11,000 bh 1.000 ts 3.700 m2 4.000 Is 1.000 Is 4.000 Is 1.000 Is 0.380 m3 0.480 m3. 0.480 m3 4.000 m2 4.000 m 3.500 om 4.7500 m 14,000 bh 4,000 Is 3700 m2 1.900 Is, 1.000 Is RENCANA ANGGARAN BIAYA PENGAMANAN ALUR PELAYARAN Harga sat. 32,400.00 43,000.00 66,147.65 55,647.05 41,500,000.00 50,000.00 50,000.00 50,000.00 5,900.00 62,153.88 160,240 60 95,726.00 © 12,800.00 JUMLAH 32,400.00 43,000.00 66,147.65 55,647.65, 4,384,143.40 41,500,000.00 0,000.00 50,000.00 0,000.00, 5,900.00, 62,153.88 160,240.60 95,726.00 12,800.00 JUMLAH 3,582,605. Jumlah 32,400.00 43,000.00 25,136.11 26,710.87 664,388.83 2,100,000.00 240,000.00 175,000.00 87,500.00 64,900.00 62,153.88 592,890.22 95,726.00 412,800.00, 4,222,605.91 32,400.00 43,000.00 25,136.11 26,710.87 664,386.83 1,500,000.00 200,000.00 475,000.00 87,500.00 164,900.00 62,153.88 592,890.22 95,726.00 12,800.00 eae Alternatif 2 A UKURAN 100 x 140 em + Pembersinan lokasi 2 Mobilisasiidemobilisasi 3. Meruneing tiang bambu 4 Menancapkan tiang rambu 5. Galian tanah 6 Urugan tanah 7 Rangka plat tambu 3/8 cm 8 Tiang rampu dan jangkar 10/10 em 9 Balok jangkar 5/10 cm 40 Daun rambu aluminium 2 mm dgn reflektive sheeting 11. Pemasangan plat rambu 42 Bautdia 10mm 13. Baut dia Smm 14 Pengecetan Dokumentasi Cor pondasi rambu camp 12:3 B_UKURAN 100 x 100 em 1 Pembersinan lokasi 2 Mobiisasiidemobilsasi 3. Meruncing tiang bambu 4 Menancapkan tiang rambu 5. Galian tanah 6 Urugan tanah 7 Rangka plat rambu 3/8 em 8 Trang rambu dan jangkar 10/10 em $ Balok jangkar 5/10 cm 10 Daun rambu aluminium 2 mm dgn reflektive sheeting 11 Pemasangan piat rambu 12. Baut dia 10mm 13. Baut dia. § mm 14 Pengecetan 18. Dokumentasi 16 Cox pondasi rambu camp 1:23 Volume 1.000 4.000 2.000 2.500 0.320 0.480 0.019 0.125 0.050 1.400 1,000 11.000 10.000 3.700 1.000 0.480 1.000 4,000 2,000 2.500 0.320 0.480 0.014 0.125 0.050 1,000 4,000 11.000 8.000 3.700 1,000 0.480 m3 m3 m3 m3 m3 m3 m2 bh bh m2 m3 m3 Harga sat. 32,400.00 43,000.00 30,779.58 66,073.08 66,147.65 55,647.65 2,253,200.00 5,260,900.00 2,318,200.00 1,500,000.00 62,183.88 5,900.00 3,700.00 160,240.60, 12,800.00 4,384,143.40 JUMLAH 32,400.00 43,000.00 30,779.58 66,073.08 66,147.65 55,647.65 2,253,200.00 5,260,900.00 2,318,200 00 1,500,000.00 62,153.88 5,900.00 3,700.00 160,240.60 12,800.00 1,384,143.40 SUMILAH = dumiah 32,400.00 43,000.00 61,559.16 165,182.70 21,167.25 26,710.87 42,810.80 657,612.50 118,780.00 2,100,000.00 62,163.88 64,900.00 37,000.00 592,890 22 12,800.00 664,388.83 4,035,947.38- 32,400.00 43,000.00 61,559.16 165,182.70 21,167.25 28,710.87 31,544.80 657,612.50 118,760.00 41,500,000.00 62,153.88 64,900.00 29,600.00 592,890.22 12,600.00 664,388.83 3,417,281.38 Bie

Anda mungkin juga menyukai