M1
M2
M3
(M2-M3)
(M3-M1)
%
%
16.18
16.91
65.21
70.51
59.16
64.14
6.05
6.37
42.98
47.23
14.08
13.49
13.78
0.9964
32.16
45.05
90.84
82.91
28
28.25
12.89
7.93
4.96
2.60
2.56
0.9963
2.56
23.29
36.07
81.52
73.79
28.5
12.78
7.73
5.05
2.53
Jumlah pukulan
Berat cawan kosong
Cawan + tanah basah
Cawan + tanah kering
Berat air
Berat tanah kering
Kadar air
Kadar air rerata
Batas cair LL (rumus ada di
laporan)
LL rerata (pukulan 20-30)
LL berdasarkan grafik
Flow Index
M1
M2
M3
A=M2-M3
B=M3-M1
%
%
%
1
12
2
21
14.51
16.31
38.14
38.16
29.61
30.29
8.53
7.87
15.1
13.98
56.49
56.29
56.39
14.49
15.94
39.82
40.14
30.77
31.44
9.05
8.7
16.28
15.5
55.59
56.13
55.86
51.60
54.69
54.69
55.5755
2.74
9
55
4
3
41
14.91
14.54
39.4
37.46
30.71
29.34
8.69
8.12
15.8
14.8
55.00
54.86
54.93
58.32
Kadar Air (%)
55.50
55.00
54.93
54.50
54.00
10
15
20
25
30
35
40
56.9534510042
54.93
30
ukulan (N)
35
40
45
M1
M2
M3
A=M2-M3
B=M3-M1
%
%
%
21.41
38.08
34.53
3.55
13.12
27.06
27.14
28.44
20.21
39.56
35.42
4.14
15.21
27.22
LL
55.5755
W1
W2
W3
W0 = W3-W1
W4
W5
W6 = W5-W4
V0 = W6/13.6
V = (W7-W4)/13.6
w = (W2-W3)/(W3-W1)X100
SL = (V0/W0)-(1/G)x100
SL = (w-((V-V0)/W0))x100
SR = W0/V0
VS = (w-SL)xSR
VS = (w-SL)xSR
LS = 100 X (1-(100/(VS+100))^(1/3))
G' = 1/(1/SR-SL/100)
|G-G'|/G x 100
17.40
2.56
0.00
30.96
57.52
48.9
17.94
29.17
148.84
119.67
8.80 cm3
16.11
48.05 %
10.06 %
7.28 %
2.04 %
77.46 %
83.13 %
18.26 %
2.39
6.66 %
G khusus tanah
Berat cawan porselen
Berat raksa pengisi cawan susut
2.56
W4
X
W7 = W4 + X
2.56
29.17
219.15
248.32
B0
WA
WB
WC
Jam
T (menit)
8.08
8.13
8.43
9.43
16.04
8.XX
Saringan
No 200
No 140
No 60
No 40
No 20
No 10
No 40
60.09
20.91
81.00
!!!!!
R1
2
5
30
60
250
1440
13
11
10
9
2.5
0
Jam
T (menit)
8.08
8.13
8.43
9.43
16.04
8.XX
R1
2
5
30
60
250
1440
13
11
10
9
2.5
0
PROPERTIES HIDROMETER
TIPE 125 H
K
Koreksi meniskus
m
Koreksi hidrometer
a
Reagen
(gr)
R2
t Celcius
-1
28.5
-1
28.5
-1
28.5
-1
28.5
-1
28.5
-1
28.5
0.01283 G
1T
1.03
2.5
KADAR AIR
(dari bab 1 dulu)
Basah
Kering
Selisih
w
0.14
M = B0/(1+w)
52.81
B1
8.10
B2 = M-B1
44.71
b6
b5
b4
b3
b2
b1
b0
R2
-1
-1
-1
-1
-1
-1
t Celcius R'=R1+m
28.5
28.5
28.5
28.5
28.5
28.5
L
14
12
11
10
3.5
1
K
14
14.3
14.5
14.7
15.9
16.1
0.01283
0.01283
0.01283
0.01283
0.01283
0.01283
D
0.033945
0.021697
0.00892
0.006351
0.003236
0.001357
2.56
28
R = R1 + R2 P (%)
14 27.30459
12 23.40394
11 21.45361
10 19.50328
3.5 6.826148
1 1.950328
Diameter
Ukuran silinder
Tinggi
V
10.78 cm
91.22359 cm
11.625 cm
1060.474 cm
1
3
5849.5
4334.5
1515
1.43
I
13.87
50.67
43.57
7.1
29.7
24%
30.61 %
4000 gr
16.83 %
591.68
2
6
5944.8
4335.5
1609.3
1.52
II
14.53
52.73
45.27
7.46
30.74
24%
24%
1.15
I
14.24
47.98
41.03
6.95
26.79
26%
26%
1.21
CARA A
Berat penumbuk
Berat silinder
Jumlah lapisan
Tumbukan per lapis
2
6
5944.8
4335.5
1609.3
1.52
4094.6
4334.5
3
25
3
9
5994.7
4336.5
1658.2
1.56
II
14.43
42.51
36.78
5.73
22.35
26%
26%
1.21
I
14.22
39.84
34.06
5.78
19.84
29%
13.78
4
12
6066.7
4337.5
1729.2
1.63
II
14.16
40.59
34.57
6.02
20.41
29%
29%
1.21
I
14.18
50.71
41.79
8.92
27.61
32%
II
20.53
67.53
55.89
11.64
35.36
33%
33%
1.23
5
15
6030.1
4338.5
1691.6
1.60
I
21.2
85.99
68.81
17.18
47.61
36%
1.22
f(x)
= - 15.2575980298x^
R = 0.9072284764
1.20
6
18
5997.4
4339.5
1657.9
1.56
II
14.41
59.22
47.35
11.87
32.94
36%
36%
1.17
I
16.67
86.07
71.48
14.59
54.81
27%
1.18
1.16
II
16.49
105.13
80.36
24.77
63.87
39%
39%
1.13
1.14
1.12
1.10
1.08
1.06
22% 24% 26% 28%
3)
1.24
1.22
f(x)
= - 15.2575980298x^2 + 9.341730475x - 0.2046509246
R = 0.9072284764
1.20
1.18
1.16
1.14
1.12
1.10
1.08
1.06
22% 24% 26% 28% 30% 32% 34% 36% 38% 40%
Diameter
Ukuran silinder
Tinggi
V
Berat silinder
Silinder + basah
Tanah basah
Cawan (W1)
Cawan + basah (W2)
Cawan + kering (W3)
Berat air
Berat kering
Kadar air (%)
Kadar air rerata
Berat volume basah
Berat volume kering
15.37 cm
Kalibrasi
185.4459665 cm
11.54 cm
2140.046453 cm
3856.8
7723.8
3867
16.18
65.21
59.16
6.05
42.98
14.08
13.78
Berat penumbuk
Berat silinder
Jumlah lapisan
Tumbukan per lapis
16.91
70.51
64.14
6.37
47.23
13.49
Tanah Kering
1.81
1.59
3398.6117427123
9.56787 lbs/div
Penetrasi
Arloji
2365
3856.8
3
56
25
50
75
100
125
150
175
200
225
250
275
300
325
350
375
400
425
450
475
500
Penetrasi (inch)
Tekanan (psi)
CBR (%)
mm
0.64
1.27
1.91
2.54
3.18
3.81
4.45
5.08
5.72
6.35
6.99
7.62
8.26
8.89
9.53
10.16
10.80
11.43
12.07
12.70
Beban
inch
0.025
0.05
0.075
0.1
0.125
0.15
0.175
0.2
0.225
0.25
0.275
0.3
0.325
0.35
0.375
0.4
0.425
0.45
0.475
0.5
Arloji
12
19
25
30
34
37
39.5
42
44
45.5
47
48.5
49.8
51
52
53
54
54.9
56
56.5
P1(kg)
Beban
Tekanan
P2 = . X
(lbs)
114.81
181.79
239.20
287.04
325.31
354.01
377.93
401.85
420.99
435.34
449.69
464.04
476.48
487.96
497.53
507.10
516.66
525.28
535.80
540.58
P = P2/3
(F=P2, A=3
inch) - psi
38.27
60.60
79.73
95.68
108.44
118.00
125.98
133.95
140.33
145.11
149.90
154.68
158.83
162.65
165.84
169.03
172.22
175.09
178.60
180.19
Tekanan terkoreksi
Dari grafik (psi)
29.53
64.28
84.61
99.03
110.22
119.36
127.09
Tekanan (psi)
133.78
139.69
144.97
149.75
154.11
158.12
161.84
165.30
168.53
171.57
174.44
177.15
179.72
160.00
140.00
120.00
100.00
80.00
60.00
40.00
20.00
0.00
0.1
0.2
Penetrasi (
0.1
0.2
0.3
Penetrasi (inch)
0.4
0.5
0.6
Kepadatan pasir
Tinggi
Diameter
Volume kerucut
Sandcone + pasir
Sandcone + pasir sisa
Pasir di kerucut
Tanah basah lubang galian
Cawan + basah
Cawan + kering
Cawan
Kadar air
Kadar air rerata
V lubang
Berat volume basah
Berat volume kering
1.44 gms/cc
13.5 cm
16.51 cm
962.89 cm
W1
W2
W4 = W2-W3
W6
W8
W9
W11
w (%)
w (%)
(W7/gms)
g/cm3
g/cm3
89.68
86.61
21.92
4.75
7155.3
4088.7
1341.6
2520.5
92.02
89.08
21.78
4.37
4.56
1166.69
2.16
2.07
JIKA
W3
W5 = gms*V
W7 = W1-W2-W5
W10 = W6/(1+(w/100))
2747.1
1386.56
1680.04
2410.64
Kepadatan pasir
Tinggi
Diameter
Volume silinder
Berat silinder
Berat silinder + tanah
Cawan kosong
Cawan + basah
Cawan + kering
Kadar air
Kadar air rerata
Berat tanah basah
Berat tanah kering
Berat volume basah
Berat volume kering
1.44 gms/cc
13 cm
10 cm
1020.50 cm
984.4 gr
2746.4 gr
W3
W4
W5
w (%)
w (%)
gr
gr
gr/cm3
gr/cm4
20.49
71.5
69.4
4.29
4.37
20.96
80.05
77.53
4.45
1762
1688.16
1.73
1.65