Pekerja trampil
Pekerja semi trampil
Pekerja tak trampil
Tukang gali
Tukang Batu, Kayu, Besi
Kep.Tukang
Mandor
Operator terlatih
Pembantu Operator
Mekanik
Pembantu mekanik
Sopir

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

35,000.00
30,000.00
28,000.00
48,000.00
48,000.00
52,000.00
50,000.00
75,000.00
40,000.00
50,000.00
45,000.00
50,000.00

BAHAN

: 1
2
3
4
5
6
7
8
9
###
11
###
###
###
###
###
###
###
###
###
###
###
###
##
####
###
###
###
###
###
###
###
###

Portland Cement ( PC ) 50 Kg
Portland Cement ( PC )
Pasir Beton
Pasir Beton
Pasir pasang
Batu Belah / Kali
Batu Pecah 1 - 2 cm
Batu Pecah 1 - 2 cm
Air kerja
Besi beton
Kawat Bendrat
Paku usuk
Kayu Tahun acuan beton
Kawat Bronjong Pabrikasi 2,7 mm ( 2 x 1 x 0,5 )
Geotextile
Sirtu
Ijuk
Pasir urug
Tanah Urug
Tanah biasa
Tanah Liat
Alat Bantu Kerja
Triplek 3 mm
Triplek 5 mm
Kayu tahun 5/7 cm - 4 m'
Meni besi
Cat Besi
Ampelas
Minyak tiner B
Kuas 3 "
Olie
Solar

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

53,000.00
1,060.00
115,000.00
82.14
86,000.00
127,500.00
195,000.00
88.64
50.00
9,800.00
11,450.00
15,950.00
1,850,000.00
395,750.00
11,508.75
102,000.00
3,187.50
60,000.00
51,000.00
54,000.00
54,000.00
85,000.00
58,500.00
85,000.00
40,000.00
20,500.00
45,000.00
3,500.00
13,500.00
6,000.00
35,300.00
5,200.00

Cilacap
Januari 2008
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN CILACAP

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Zak
/Kg
/m3
/Kg
/m3
/m3
/m3
/Kg
/Lt
/Kg
/Kg
/Kg
/m3
/Unit
/m2
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/lb
/lb
/Batang
/Kg
/Kg
/lb
/lt
/bh
/lt
/lt

Drs. SOEPRIHONO,SH,ST.MM
Pembina Tk. I
NIP. 500 050 124

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

25 SNI. 34 - 02.6.35
1 m3 Pasangan Beton K-225
UPAH
SNI 2002. 6
Pekerja semi trampil
6.0000 Org / hr @ Rp.
Mandor
0.3000 Org / hr @ Rp.
Tukang Batu
1.0000 Org / hr @ Rp.
Kep. Tukang Batu
0.1000 Org / hr @ Rp.
SNI. 34 - 02.6.35.2
BAHAN BETON
Pc
Pasir cor
Split 1 = 2 cm

7.7600
0.6500
0.6500

Zak
m3
m3

@ Rp.
@ Rp.
@ Rp.

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

30,000.00
50,000.00
48,000.00
52,000.00
Jumlah 1

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

180,000.00
15,000.00
48,000.00
5,200.00
248,200.00

53,000.00
115,000.00
195,000.00
Jumlah 2
Jumlah 1 + 2

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

411,280.00
74,750.00
126,750.00
612,780.00
860,980.00

ANALISA HARGA SATUAN PEKERJAAN


WILAYAH A
( Kecamatan : Cilacap Utara, Cilacap Tengah dan Cilacap Selatan )
1

SK. SNI. 91 - 03
Pemberesihan lahan / lokasi per m2
SNI T - 01 - 1991 - 03
UPAH
Pekerja
0.0500 Org / hr @ Rp.
Mandor
0.0050 Org / hr @ Rp.
Tukang Batu
0.0500 Org / hr @ Rp.
Kep. Tukang Batu
0.0050 Org / hr @ Rp.
SK. SNI. 91 - 03
Pemasangan Bouwplang per m'
SNI T - 01 - 1991 - 03
UPAH
Pekerja
0.0500 Org / hr @ Rp.
Mandor
0.0050 Org / hr @ Rp.
Tukang Kayu
0.0500 Org / hr @ Rp.
Kep. Tukang Kayu
0.0500 Org / hr @ Rp.

30,000.00
50,000.00
48,000.00
52,000.00
Jumlah

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

1,500.00
250.00
2,400.00
260.00
4,410.00

30,000.00
50,000.00
48,000.00
52,000.00
Jumlah 1

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

1,500.00
250.00
2,400.00
2,600.00
6,750.00

1,850,000.00
15,950.00
Jumlah 2
Jumlah 1+ 2

= Rp.
= Rp.
= Rp.
= Rp.

7,400.00
319.00
7,719.00
14,469.00

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah 1
= Rp.

22,500.00
1,250.00
23,750.00

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah 1
= Rp.

27,000.00
2,250.00
29,250.00

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah 1
= Rp.

31,500.00
3,350.00
34,850.00

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah 1
= Rp.

30,000.00
1,600.00
31,600.00

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah 1
= Rp.

45,000.00
3,000.00
48,000.00

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah 1
= Rp.

36,000.00
2,250.00
38,250.00

BAHAN
Kayu tahun
Paku

0.0040
0.0200

m3
Kg

@ Rp.
@ Rp.

6.1
1 m3 Galian tanah biasa kedalaman Max 1 m'
SNI DT 91 - 0006 - 2007
UPAH
Pekerja
0.7500 Org / hr @ Rp.
Mandor
0.0250 Org / hr @ Rp.
6.2
1 m3 Galian tanah biasa kedalaman Max 2 m'
SNI DT 91 - 0006 - 2007
UPAH
Pekerja
0.9000 Org / hr @ Rp.
Mandor
0.0450 Org / hr @ Rp.
6.3
1 m3 Galian tanah biasa kedalaman Max 3 m'
SNI DT 91 - 0006 - 2007
UPAH
Pekerja
1.0500 Org / hr @ Rp.
Mandor
0.0670 Org / hr @ Rp.

6.4
1 m3 Galian tanah Keras kedalaman Max 1 m'
SNI DT 91 - 0006 - 2007
UPAH
Pekerja
1.0000 Org / hr @ Rp.
Mandor
0.0320 Org / hr @ Rp.
6.5
1 m3 Galian tanah Cadas kedalaman Max 1 m'
SNI DT 91 - 0006 - 2007
UPAH
Pekerja
1.5000 Org / hr @ Rp.
Mandor
0.0600 Org / hr @ Rp.
6.6
1 m3 Galian tanah lumpur kedalaman Max 1 m'
SNI DT 91 - 0006 - 2007
UPAH
Pekerja
1.2000 Org / hr @ Rp.
Mandor
0.0450 Org / hr @ Rp.

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

10

11

12

6.8
1 m3 Membuang tanah sejauh Max 30 m'
SNI DT 91 - 0006 - 2007
UPAH
Pekerja
0.3300 Org / hr @ Rp.
Mandor
0.0100 Org / hr @ Rp.

6.9
1 m3 Urugan tanah kembali 1/3 dari galian
SNI DT 91 - 0006 - 2007
UPAH
Pekerja
0.2500 Org / hr @ Rp.
Mandor
0.0083 Org / hr @ Rp.

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah 1
= Rp.

9,900.00
500.00
10,400.00

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah 1
= Rp.

7,500.00
416.67
7,916.67

6.10
1 m3 Urugan tanah dari pengadaan dipadatkan ( per 20 cm )
SNI DT 91 - 0006 - 2007
UPAH
Pekerja
0.5000 Org / hr @ Rp.
30,000.00
Mandor
0.0500 Org / hr @ Rp.
50,000.00
Jumlah 1
BAHAN
tanah Biasa
1.1000 m3
@ Rp.
54,000.00
Jumlah 2
Jumlah 1+ 2
6.11
1 m3 Urugan pasir dari pengadaan
SNI DT 91 - 0006 - 2007
UPAH
Pekerja
0.3000 Org / hr @ Rp.
Mandor
0.0100 Org / hr @ Rp.

= Rp.
= Rp.
= Rp.

15,000.00
2,500.00
17,500.00

= Rp.
= Rp.
= Rp.

59,400.00
59,400.00
76,900.00

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah 1
= Rp.

9,000.00
500.00
9,500.00

60,000.00 = Rp.
Jumlah 2
= Rp.
Jumlah 1+ 2
= Rp.

72,000.00
72,000.00
81,500.00

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah 1
= Rp.

4,500.00
750.00
5,250.00

3,187.50 = Rp.
Jumlah 2
= Rp.
Jumlah 1+ 2
= Rp.

19,125.00
19,125.00
24,375.00

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah 1
= Rp.

7,500.00
1,250.00
8,750.00

102,000.00 = Rp.
Jumlah 2
= Rp.
Jumlah 1+ 2
= Rp.

122,400.00
122,400.00
131,150.00

BAHAN
Pasir urug

13

1.2000

m3

@ Rp.

6.14
1 m2 Pasangan lapis Ijuk tebal 10 cm
SNI DT 91 - 0006 - 2007
UPAH
Pekerja
0.1500 Org / hr @ Rp.
Mandor
0.0150 Org / hr @ Rp.
BAHAN
Ijuk

14

6.0000

m3

@ Rp.

6.15
1 m3 Urugan sirtu untuk peninggian lantai
SNI DT 91 - 0006 - 2007
UPAH
Pekerja
0.2500 Org / hr @ Rp.
Mandor
0.0250 Org / hr @ Rp.
BAHAN
Sirtu

15

1.2000

m3

@ Rp.

6.7
1 m2 Sriping ( Pengupasan tanah )
SNI DT 91 - 0006 - 2007
UPAH

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

Pekerja
Mandor

16

17

18

0.0500
0.0050

Org / hr @ Rp.
Org / hr @ Rp.

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah 1
= Rp.
SNI. 35 - 02.6.8,1 1 m3 Langsiran batu belah / kali sejauh Max 150 m'
SNI 03 - 2835 - 2002
UPAH
Pekerja
0.5160 Org / hr @ Rp.
30,000.00 = Rp.
Mandor
0.0500 Org / hr @ Rp.
50,000.00 = Rp.
Jumlah 1
= Rp.

L,4 1 m3 Bongkaran pasangan lama ( BOW )


UPAH
Pekerja
2.0000 Org / hr @ Rp.
Mandor
0.1000 Org / hr @ Rp.

1,500.00
250.00
1,750.00

15,480.00
2,500.00
17,980.00

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah 1
= Rp.

60,000.00
5,000.00
65,000.00

30,000.00
50,000.00
48,000.00
52,000.00
Jumlah

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

45,000.00
3,750.00
36,000.00
3,900.00
88,650.00

127,500.00
1,060.00
86,000.00
Jumlah 2
Jumlah 1+ 2

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

153,000.00
172,780.00
44,720.00
370,500.00
459,150.00

30,000.00
50,000.00
48,000.00
52,000.00
Jumlah

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

6,000.00
750.00
7,200.00
780.00
14,730.00

1,060.00
86,000.00
Jumlah 2
Jumlah 1+ 2
6.19
1 m2 Pasangan beraben tebal 1,5 cm 1 Pc : 5 Psr tebal 15 mm
SNI DT 91 - 0010 - 2007
UPAH
Pekerja
0.1500 Org / hr @ Rp.
30,000.00
Mandor
0.0080 Org / hr @ Rp.
50,000.00
Tukang Batu
0.0750 Org / hr @ Rp.
48,000.00
Kep. Tukang Batu
0.0080 Org / hr @ Rp.
52,000.00
Jumlah
BAHAN
Pc
5.1840
Kg
@ Rp.
1,060.00
Psir Pasang
0.0260 m3
@ Rp.
86,000.00

= Rp.
= Rp.
= Rp.
= Rp.

7,892.76
1,978.00
9,870.76
24,600.76

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

4,500.00
400.00
3,600.00
416.00
8,916.00

= Rp.
= Rp.

5,495.04
2,236.00

6.2
1 m3 Pasangan batu belah / kali 1 PC : 4 PP
SNI DT 91 - 0007 - 2007
UPAH
Pekerja
1.5000 Org / hr @ Rp.
Mandor
0.0750 Org / hr @ Rp.
Tukang Batu
0.7500 Org / hr @ Rp.
Kep. Tukang Batu
0.0750 Org / hr @ Rp.
BAHAN
Batu belah / kali
Pc
Psir Pasang

19

1.2000
163.0000
0.5200

m3
Kg
m3

@ Rp.
@ Rp.
@ Rp.

6.3
1 m2 Plesteran tebal 1,5 cm 1 Pc : 3 Psr
SNI DT 91 - 0010 - 2007
UPAH
Pekerja
0.2000 Org / hr @ Rp.
Mandor
0.0150 Org / hr @ Rp.
Tukang Batu
0.1500 Org / hr @ Rp.
Kep. Tukang Batu
0.0150 Org / hr @ Rp.
BAHAN
Pc
Psir Pasang

20

7.4460
0.0230

Kg
m3

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

@ Rp.
@ Rp.

21

6.26
1 m2 Siaran 1,5 cm 1 Pc : 3 Psr
SNI DT 91 - 0010 - 2007
UPAH
Pekerja
0.3000
Mandor
0.0150
Tukang batu
0.1500
Kep. Tukang Batu
0.0150

Jumlah 2
Jumlah 1+ 2

= Rp.
= Rp.

7,731.04
16,647.04

30,000.00
50,000.00
48,000.00
52,000.00
Jumlah

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

9,000.00
750.00
7,200.00
780.00
17,730.00

@ Rp.
@ Rp.
@ Rp.

127,500.00
1,060.00
86,000.00
Jumlah 2
Jumlah 1+ 2

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

6,720.40
1,032.00
7,752.40
25,482.40

Org / hr @ Rp.
Org / hr @ Rp.
Org / hr @ Rp.
Org / hr @ Rp.

30,000.00
50,000.00
48,000.00
52,000.00
Jumlah

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

6,000.00
500.00
4,800.00
520.00
11,820.00

127,500.00
1,060.00
86,000.00
Jumlah 2
Jumlah 1+ 2

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

3,445.00
3,445.00
15,265.00

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah
= Rp.

135,000.00
4,000.00
139,000.00

Org / hr @ Rp.
Org / hr @ Rp.
Org / hr @ Rp.
Org / hr @ Rp.

BAHAN
Batu belah / kali
Pc
Psir Pasang

22

6.27
1 m2 Acian
SNI DT 91 - 0010 - 2007
UPAH
Pekerja
Mandor
Tukang batu
Kep. Tukang Batu

6.3400
0.0120

0.2000
0.0100
0.1000
0.0100

m3
Kg
m3

BAHAN
Batu belah / kali
Pc
Psir Pasang

23

G,5a
UPAH

3.2500
-

m3
Kg
m3

@ Rp.
@ Rp.
@ Rp.

1 m3 Pasangan Bronjong Pabrikasi dia. 2,7 mm ( 2 x 1 x 0,5 ) m'


Pekerja
Mandor

4.5000
0.0800

Org / hr @ Rp.
Org / hr @ Rp.

Batu belah
Bronjong pabrikasi

3.0000
3.0000

m3
Unit

BAHAN

24

SNI. 35 - 02.6.15
UPAH
Pekerja
Mandor

@ Rp.
@ Rp.

127,500.00
395,750.00
Jumlah 2
Jumlah 1+ 2
1 m3 pas bronjong ( Jlh.1+2 )/3

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

382,500.00
1,187,250.00
1,569,750.00
1,708,750.00
569,583.33

30,000.00 = Rp.
50,000.00 = Rp.
Jumlah
= Rp.

4,500.00
750.00
5,250.00

11,508.75 = Rp.
Jumlah 2
= Rp.
Jumlah 1+ 2
= Rp.

11,508.75
11,508.75
16,758.75

1 m2 Pemasangan lapis Geotextile


0.1500
0.0150

Org / hr @ Rp.
Org / hr @ Rp.

BAHAN
Lapis Geotextile

25

6.32

1.0000

m2

@ Rp.

1 m3 Pasangan Beton bertulang ( 150 Kg besi + Bekisting ) K-175

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

SNI DT 91-0008-2007
UPAH
Pekerja
Mandor
Tukang Batu
Tukang Kayu
Tukang Besi
Kep. Tukang Kayu

5.3000
0.2650
0.2750
1.3000
1.0500
0.2650

Org / hr @ Rp.
Org / hr @ Rp.
Org / hr @ Rp.
Org / hr @ Rp.
Org / hr @ Rp.
Org / hr @ Rp.

30,000.00
50,000.00
48,000.00
48,000.00
48,000.00
52,000.00
Jumlah

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

159,000.00
13,250.00
13,200.00
62,400.00
50,400.00
13,780.00
312,030.00

1,850,000.00
15,950.00
9,800.00
115,000.00
11,450.00
1,060.00
195,000.00
58,500.00
1,850,000.00
40,000.00
Jumlah 2
Jumlah 1+ 2
26 6.5
Membuat 1 m3 beton Fc = 14,5 Mpa ( K 175 ) slump ( 12 2 cm )
SNI DT 91-0008-2007
UPAH
Pekerja
1.6500 Org / hr @ Rp.
30,000.00
Mandor
0.0830 Org / hr @ Rp.
50,000.00
Tukang Batu
0.2750 Org / hr @ Rp.
48,000.00
Kep. Tukang Kayu
0.0280 Org / hr @ Rp.
52,000.00
Jumlah 1
BAHAN BETON
Air
215.0000
Lt
@ Rp.
50.00
Pc
326.0000 Kg
@ Rp.
1,060.00
Pasir cor
760.0000 Kg
@ Rp.
82.14
Split 1 = 2 cm
1,029.0000 Kg
@ Rp.
88.64
Jumlah 2
Jumlah 1 + 2
27## A,7 1 m3 Mengankut tanah 30 m' ( BOW )
UPAH PEKERJA
Biaya yg dicari K = a / 275 x ( L + 75 )
K = 30,000.00 / 275 x ( 30 + 75)

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

592,000.00
51,040.00
1,543,500.00
62,100.00
25,762.50
356,160.00
157,950.00
163,800.00
222,000.00
1,280,000.00
4,454,312.50
4,766,342.50

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

49,500.00
4,150.00
13,200.00
1,456.00
68,306.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

10,750.00
345,560.00
62,428.57
91,206.82
499,195.39
567,501.39

= Rp.

10,690.91

BAHAN
Kayu tahun terentang
Paku
Besi beton
Pasir cor
Bendrat
Pc
Split 1 = 2 cm
Triplek 3 mm
Kayu tahun
Kayu thn 5/7 cm - 4 m'

28

A,079 1 m2 Pengecatan
UPAH
Pekerja
Mandor
Tukang cat
Kep. Tukang Cat

0.3200
3.2000
157.5000
0.5400
2.2500
336.0000
0.8100
2.8000
0.1200
32.0000

m3
Kg
Kg
m3
Kg
Kg
m3
lb
m3
Btng

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

0.2000
0.0100
0.3000
0.0300

Org / hr @ Rp.
Org / hr @ Rp.
Org / hr @ Rp.
Org / hr @ Rp.

30,000.00
50,000.00
48,000.00
52,000.00
Jumlah 1

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

6,000.00
500.00
14,400.00
1,560.00
22,460.00

0.1670
0.2000
0.4000
0.1500
0.0500

Kg
Kg
lb
ltk
Bh

20,500.00
45,000.00
3,500.00
13,500.00
6,000.00
Jumlah 2
Jumlah 1+ 2

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

3,423.50
9,000.00
1,400.00
2,025.00
300.00
16,148.50
38,608.50

BAHAN
Meni besi
Cat Besi
Ampelas
Minyak tiner B
Kuas 3 "

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

29

30

A.054 1 m3 Pasangan batu belah / kali 1 Pc : 4 Psr segi enam + siaran


SNI 01 - 2836 - 2002
UPAH
Pekerja
2.0000 Org / hr @ Rp.
30,000.00
Mandor
0.2000 Org / hr @ Rp.
50,000.00
Tukang Batu
1.0000 Org / hr @ Rp.
48,000.00
Kep. Tukang Batu
0.1000 Org / hr @ Rp.
52,000.00
Jumlah
BAHAN
Batu belah / kali
1.5000 m3
@ Rp.
127,500.00
Pc
3.2600 Zak
@ Rp.
53,000.00
Psir Pasang
0.5200 m3
@ Rp.
86,000.00
Jumlah 2
Jumlah 1+ 2
6.17
10 Kg Pembesian dengan besi polos atau ulir
SNI DT 91-0008-2007
UPAH
Pekerja
0.0700 Org / hr @ Rp.
Mandor
0.0040 Org / hr @ Rp.
Tukang Besi
0.0700 Org / hr @ Rp.
Kep. Tukang Besi
0.0070 Org / hr @ Rp.

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

60,000.00
10,000.00
48,000.00
5,200.00
123,200.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

191,250.00
172,780.00
44,720.00
408,750.00
531,950.00

30,000.00
50,000.00
48,000.00
52,000.00
Jumlah

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

2,100.00
200.00
3,360.00
364.00
6,024.00

9,800.00
11,450.00
Jumlah 2
Jumlah 1+ 2
Untuk 1 Kg besi

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

102,900.00
1,717.50
104,617.50
110,641.50
11,064.15

Jumlah

= Rp.
= Rp.
= Rp.
= Rp.

23,750.00
10,690.91
17,500.00
51,940.91

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

49,500.00
4,150.00
13,200.00
1,456.00
68,306.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

10,750.00
393,260.00
57,335.71
92,802.27
543,397.99
611,703.99

BAHAN
Besi beton
Bendrat

31

32

10.5000
0.1500

Kg
Kg

@ Rp.
@ Rp.

1 m3 Urugan tanah setempat


SNI DT 91 - 0006 - 2007 - 6,1 Galian
A,7 BOW
Langsiran
SNI DT 91 - 0006 - 2007 - 6,10 Pemadatan

6.7
Membuat 1 m3 beton mutu Fc = 19,3 Mpa ( K 225 ) slump ( 12 2 cm )
SNI DT 91-0008-2007
UPAH
Pekerja
1.6500 Org / hr @ Rp.
30,000.00
Mandor
0.0830 Org / hr @ Rp.
50,000.00
Tukang Batu
0.2750 Org / hr @ Rp.
48,000.00
Kep. Tukang Kayu
0.0280 Org / hr @ Rp.
52,000.00
Jumlah 1
BAHAN BETON
Air
215.0000
Lt
@ Rp.
50.00
Pc
371.0000 Kg
@ Rp.
1,060.00
Pasir cor
698.0000 Kg
@ Rp.
82.14
Split 1 = 2 cm
1,047.0000 Kg
@ Rp.
88.64
Jumlah 2
Jumlah 1 + 2

Cilacap
Januari 2008
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN CILACAP

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

Drs. SOEPRIHONO,SH,ST.MM
Pembina Tk. I
NIP. 500 050 124

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

10

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

11

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

12

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

13

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

14

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

15

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

16

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

17

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

18

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

19

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

20

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

21

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

22

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

23

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

24

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

25

Cilacap
Januari 2007
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN CILACAP

Drs. SOEPRIHONO,SH,ST.MM
Pembina Tk. I
NIP. 500 050 124

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

26

Daftar

: Rencana Anggaran Biaya ( RAB )

Kegiatan
Volume
Laokasi
Tahun Anggaran

:
:
:
:

Normalisasi SP. Binangun


2.600 m'
Kec. Nusawungu
2007

NO. URAIAN PEKERJAAN

VOLUME

SAT

ANALIS

HARGA SAT
(Rp.)

PEK.
1

1.00

Ls

Ls

4,200,000.00
125,000.00

PERSIAPAN

Pengukuran MC 0 %, MC 100 %/
Bouwplang

Papan Nama Proyek

1.00

Unit

Ls

Barak kerja (sewa)

1.00

Ls

Ls

750,000.00

Pengeringan

1.00

Ls

Ls

3,000,000.00

Mob. Dan Demob. Alat

1.00

Ls

Ls

3,000,000.00
Jumlah 1

II

PEK. SALURAN P = 2.6OOM'


1

Galian tanah saluran

Pas. Beton K.225

9,662.13

m3

SNI.35.02.6.1

21,200.00

453.75

m3

SNI.34.02.6.35

937,622.50

Pembesian dengan besi polos

45,792.00

kg

SNI.34.02.6.25

18,169.90

4
5

Urugan tanah hasil galian dipadatkan

9,662.13

m3

SNI.35.02.6.10

20,000.00

Urugan tanah dari pengadaan

3,800.90

m3

SNI.34.02.6.42

83,140.00
1,750.00

dipadatkan.
6

Striping (Pengupasan tanah)

3,000.00

m2

SNI 35.02.7.1

Gebalan rumput

2,492.02

m2

LS

2,000.00

Deletasi

25.60

m2

LS

52,142.95
Jumlah 2

III

PEK. SAL.SEK. PEMBUANG P 2.200 M


1

Galian tanah saluran

Urugan tanah setempat :

1,297.60

m3

SNI.35.02.6.1

21,200.00

- Galian tanah

648.80

m3

SNI.35.02.6.1

21,200.00

- Mengangkut tanah > 30 m'

648.80

m3

A,7 BOW

10,690.91

- Pemadatan tanah

648.80

m3

SNI 35.02.6.10

20,000.00
Jumlah 3

IV

PEKERJAAN LAIN-LAIN
1

Administrasi dan Dokumentasi

1.00

unit

Ls

500,000.00

Tes / Uji Bahan dan Beton

1.00

Ls

Ls

3,000,000.00
Jumlah 4
TOTAL
DIBULATKAN

TERBILANG " DUA MILYAR LIMA PULUH DELAPAN JUTA DELAPAN RATUS DELAPAN PULUH DELAPAN RIBU RUPIAH "

Cilacap,
2007.
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN CILACAP

Cilacap,
2007.
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN CILACAP

Drs. SOEPRIHONO, SH,ST,MM.


Pembina Tk. I
NIP. 500 050 124

JUMLAH HARGA
(Rp.)
7

4,200,000.00
125,000.00
750,000.00
3,000,000.00
3,000,000.00
11,075,000.00
204,837,156.00
425,446,209.38
832,036,060.80
193,242,600.00
316,006,826.00
5,250,000.00
4,984,040.00
1,334,859.52
1,983,137,751.70

27,509,120.00
13,754,560.00
6,936,262.41
12,976,000.00
61,175,942.41
500,000.00
3,000,000.00
3,500,000.00
2,058,888,694.10
2,058,888,000.00

ULUH DELAPAN RIBU RUPIAH "

2007.
EKERJAAN UMUM
EN CILACAP

2007.
EKERJAAN UMUM
EN CILACAP

ONO, SH,ST,MM.
na Tk. I
0 050 124

DAFTAR HARGA SATUAN PEKERJAAN


WILAYAH A
( Kecamatan : Cilacap Utara, Cilacap Tengah dan Cilacap Selatan )

NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

33
34
35

URAIAN PEKERJAAN
Pembersihan Lapangan
Pemasangan Bouwplang
Galian tanah biasa dalam Max 1 m'
Galian tanah biasa dalam Max 2 m'
Galian tanah biasa dalam Max 3 m'
Galian tanah keras dalam Max 1 m'
Galian tanah Cadas dalam Max 1 m'
Galian tanah lumpur dalam Max 1 m'
Membuang tanah sejauh Max 30 m'
Urugan tanah kembali
Urugan tanah dr pengadaan dipadatkan
Urugan pasir dr pengadaan
Pasangan lapis Ijuk tebal 10 cm
Urugan sirtu
Sriping ( Pengupasan tanah )
Langsiran bt blh / kali jauh Max 150 m'
Bongkaran pasangan lama
Pas. batu belah / kali 1 Pc : 4 Psr
Pelesteran tebal 1,5 cm 1 Pc : 3 Psr
Pas.beraben tebal 1,5 cm 1 Pc : 5 Psr
Siaran 1,5 cm 1 Pc : 3 Psr
Acian
Bronjong kawat Pabrikasi 2,7 mm( 2x1x0,5 )
Lapis Geotextile
Pas. Btn bertulang ( 150 Kg besi + Bekisting ) K-175
Beton mutu Fc = 14,5 Mpa ( K 175 )
Beton mutu Fc = 19,3 Mpa ( K 225 )
Mengankut tanah lebih dari 30 m'
Pengecatan besi
Pas. batu belah / kali 1 Pc : 4 Psr
segi enam + siaran
Pembesian
a.Galian tanah
b.Ankutan
c.Pemadatan ( Upah Tenaga )
Galian Tanah (mekanik ) Jrk buang 0 m s/d 7 m'
Galian Tanah (mekanik ) Jrk buang 0 m s/d 1 Km
Tanggul dari hasil galian

SAT

ANALIS

m2
m'
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m3
m2
m3
m3
m3
m2
m2
m2
m2
m3
m2
m3
m3
m3
m3
m2

SK. SNI. 91 - 03
SK. SNI. 91 - 03
SNI DT 91-06-07 6.1
SNI DT 91-06-07 6.2
SNI DT 91-06-07 6.3
SNI DT 91-06-07 6.4
SNI DT 91-06-07 6.5
SNI DT 91-06-07 6.6
SNI DT 91-06-07 6.8
SNI DT 91-06-07 6.9
SNI DT 91-06-07 6.10
SNI DT 91-06-07 6.11
SNI DT 91-06-07 6.14
SNI DT 91-06-07 6.15
SNI DT 91-06-07 6.7
SNI. 35 - 02.6.8,1
L,4 ( BOW )
SNI DT 91-07-07 6.2
SNI DT 91-10-07 6.3
SNI DT 91-10-07 6.19
SNI DT 91-10-07 6.26
SNI DT 91-10-07 6.27
G,5a
SNI. 35 - 02.6.15
SNI DT 91-08-07 6.32
SNI DT 91-08-07 6.5
SNI DT 91-08-07 6.7
A,7 ( BOW )
A,079

m3
m3
m3

SNI. A,054
SNI DT 91-08-07 17
SNI DT 91-06-07 6.1
A,7 BOW
SNI DT 91-06-07 6.10

m3
m3
m3

Cilacap

Januari 2008

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN CILACAP

Drs. SOEPRIHONO,SH,ST.MM
Pembina Tk. I
file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

NIP. 500 050 124

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

RJAAN

acap Selatan )

HRG.SAT.
PEK.( Rp. )
4,410.00
14,469.00
23,750.00
29,250.00
34,850.00
31,600.00
48,000.00
38,250.00
10,400.00
7,916.67
76,900.00
81,500.00
24,375.00
131,150.00
1,750.00
17,980.00
65,000.00
459,150.00
24,600.76
16,647.04
25,482.40
15,265.00
569,583.33
16,758.75
4,766,342.50
567,501.39
611,703.99
10,690.91
38,608.50
531,950.00
11,064.15
23,750.00
10,690.91
17,500.00

Januari 2008

INAS PEKERJAAN UMUM


BUPATEN CILACAP

OEPRIHONO,SH,ST.MM
Pembina Tk. I
file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

NIP. 500 050 124

file:///var/www/apps/conversion/tmp/scratch_4/342316612.xls

Anda mungkin juga menyukai