Anda di halaman 1dari 14

_( )

/ ^3
1.83
0
25

C
h

3m

_
h

2m

1.81
1.5
15

ka
_1
_2

^2 (45/2)

0.4058585172
0.5887907065

GAYA HORIZONTAL
Akibat tanah dan q
Kedalaman
Ka
(m)
1
0.405858517
2
0.405858517
3
0.405858517
4
0.588790706
5
0.588790706
PointLoad

q
beban merata
1.2
1.2
1.2
1.2
1.2

sat

0
0
0
1.5
1.5

1.83
1.83
1.83
1.81
1.81

Point Load
5
5
5
5
5

(m)

(m)

(m)

4
4
4
4
4

5
5
5
5
5

1
2
3
4
5

PERHITUNGAN JARAK VERTIKAL PEMASANGAN GEOTEXTILE (Sv)


= T ultimate (1/(FSid x FScr x FScd x FSbd))
Tallow
=5.2 ton (1/(1. 1x 3 x 1 x 1))
Tallow
= 1.5757575758

Kedalaman

SF

Tallow

h total

Kedalaman

SF
1
2
3
4
5

Tallow
1.5
1.5
1.5
1.5
1.5

h total

1.5757575758
1.5757575758
1.5757575758
1.5757575758
1.5757575758

Tallow/(FS x h t

0.852714
1.568418
2.589767
3.313568
5.680393

PERHITUNGAN PANJANG GEOTEXTILE TERTANAM


Panjang geotextile di depan bidang longsor (Lr)

Kedalaman

H
1
2
3
4
5

Lr

5
5
5
5
5

25
25
25
15
15

2.5482810432
1.9112107824
1.2741405216
0.767326988
0

Panjang geotextile di belakang bidang longsor (Le)


=

Sv
1.2319543255
0.6697864335
0.4056368602
0.3170313733
0.1849352763

h total
0.852714
1.568418
2.589767
3.313568
5.680393

c
0
0
0
15
15

v
0.83
2.49
4.98
8.22
12.27

CEK EXTERNAL STABILITY


KONTROL GESER
Lapisan
1
1
1
2
2

Sv
1.2319543255
0.6697864335
0.4056368602
0.3170313733
0.1849352763

Sv pembulatan ke bawah
0.3
0.3
0.3
0.1
0.1

Lapisan
1
1
1
2
2

L total
4.5839575651
2.589769623
1.6134199419
0.8131271245
0.0430823565

L pembulatan ke atas
5
5
5
1.5
1.5

DIAGRAM TEGANGAN
h1
q x Ka
h2
h3
H

0.4870302206
2.589767
5.680393
Pa

Jumlah lapisan geotextile


10
10
10
20
20

Pa1
pa2
pa3
pa4

3
3
2
2
Pa total
pa.cos

Pendorong

v = b*L*t
w1
w2

15
3

SF
((+((1+2+..)/))/
( )
pa.sin
tan

1.4610906619
3.1541055235
5.1795344727
3.0906257709
12.8853564291
12.4462985558

=
=

Kontrol Guling

3.3349756468
0.2679491924

1.83
1.81

1.3143552783 > 1

27.45
5.43

beban dari P
H

Pa

Pa1
pa2
pa3
pa4

sin

3
3
2
2

1.4610906619
3.1541055235
5.1795344727
3.0906257709

0.4226182617
0.4226182617
0.2588190451
0.2588190451

Beban dari W
w
27.45
5.43

W1
W2

x
2.5
0.75
Mw total
Mptot + Mw tot

Mpenahan =

-Momen Pendorong
P
P1
P2
P3
P4

cos
1.461090662
3.154105524
5.179534473
3.090625771

X (m)
0.906308
0.906308
0.965926
0.965926

3.5
3
1
0.67
Mtotal pendoronng

SF

PENAHAN
PENDORONG

A.KONTROL DAYA DUKUNG

5.0455864953

Daya dukung tanah dasar


Dengan
o

Dari table 2.1 di dapat harga


Nc
###
N
1
Nq
4

= (0.5 x x L x N ) + (c x Nc) + (.D)Nq


= (0.5 x (1.81 1) x 2 x 1.4 ) + (1.5 x 11) + ( 1.81 x 0 x 4 )
#
= 17.634 ton/m2
Tegangan Max
Didapat pada perhitungan sebelumnya
MD

= 7.504 tm

=
+
= 13.756 ton/m2
SF

=
=
1.28

point load
q

5 t/m'
1.2 t/m'

/ ^3

/ ^3

'
0.83
0.83
0.83
0.81
0.81

v
' x h
0.83
1.66
2.49
3.24
4.05

v
akibat beban tanah diatasnya
0.83
2.49
4.98
8.22
12.27

(v + q ) Ka - 2c
0.8238927899
1.4976179285
2.5082056363
3.2444274911
5.6290298524

X = Mh
4 = m*5
m = 4/5 =

0.8

Mengasumsikan
Z=1
n = Z/ h
n = 1/5 =

0.2

0.8
0.8
0.8
0.8
0.8

0.2
0.4
0.6
0.8
1.0

Sv

/
h
^2
0.028821
0.070800
0.081562
0.069141
0.051363

Tallow/(FS x h total x 1)

1.2319543255
0.6697864335
0.4056368602
0.3170313733
0.1849352763

25
25
25
15
15

SF
1.5
1.5
1.5
1.5
1.5

Le
2.0356765218
0.6785588406
0.3392794203
0.0458001365
0.0430823565

L total
4.5839575651
2.589769623
1.6134199419
0.8131271245
0.0430823565

aman !

pa.sin.

x (m)
mp ( tm )
0.6174835958 5.243515
1.3329825937 6.187943
1.3405621663 6.294884
0.7999128108 11.7106
Mp total
=

Mw(tm )
68.625
4.0725
72.6975
101.989847347

Mpw (tm )
4.6346935449
8.5757732077
5.0030470154
2.0001615783
20.2136753463
>1

SIPP

3.2377845649
8.2484197222
8.4386828197
9.3674602402
29.292347347

>1

OK

Anda mungkin juga menyukai