Daftar Isi
Daftar Tabel
vii
Daftar Gambar
xi
BAB 1
PENDAHULUAN
1-1
1.1
Latar Belakang
1-1
1.2
1-2
1.3
Kebijakan
1-3
1.4
Tujuan
1-4
1.5
Sasaran
1-5
1.6
Lingkup Pekerjaan
1-5
1.7
Metodologi Pekerjaan
1-6
1.8
Sistematika Pekerjaan
1-10
BAB 2
2-1
2.1
2-1
2.1.1
2-1
2.1.2
Tinjauan Demografi
2-2
2.1.3
2-6
2.1.3.1
Tingkat Pendidikan
2-6
2.1.3.2
Ketenagakerjaan
2-8
2.1.3.3
Perindustrian
2-9
2.1.4
2-11
2.1.5
2-12
2.1.6
Inflasi
2-12
2.2
Derajat Kesehatan
2-13
2.2.1
2-13
2.2.1.1
2-13
2.2.1.2
2-15
2.2.1.3
2-16
2.2.1.4
2-17
2.2.2
2-17
i
2.2.3
2-24
2.2.4
2-24
2.2.5
2-26
2.2.5.1
Pelayanan Antenatal
2-26
2.2.5.2
2-28
2.3
Tenaga Kesehatan
2-30
2.4
Sarana Kesehatan
2-31
2.4.1
2-31
2.4.2
2-32
2.5
2-33
2.5.1
2-35
2.5.2
Rawat Inap
2-35
2.5.3
Cakupan Pelayanan
2-36
2.5.4
Ketenagaan
2-40
2.5.5
2-40
BAB 3
3-1
3.1
3-1
3.1.1
3-1
3.1.2
3-1
3.1.3
3-1
3.2
3-2
3.2.1
3-2
3.3
3-3
3.4
3-3
3.5
3-4
3.6
3-5
3.6.1
3-5
3.6.2
3-5
3.7
3-7
3.8
3-8
3.9
3-9
3.10
3-9
ii
3.10.1
3-9
3.10.2
3-9
3.11
3-11
3.12
Analisis SWOT
3-12
3.12.1
3-12
3.13
3-18
3.13.1
3-18
3.13.2
3-21
3.13.3
3-22
BAB 4
MASTER PROGRAM
4-1
4.1
Dasar Pemikiran
4-1
4.2
Program Induk
4-2
BAB 5
PROGRAM FUNGSI
5-1
5.1
5-1
5.1.1
Pelayanan Medis
5-1
5.1.2
5-2
5.1.3
5-40
5.1.4
5-47
5.2
5-51
5.3
5-54
5.4
5-54
5.5
5-56
BAB 6
PERENCANAAN ARSITEKTUR
6-1
6.1
Lokasi
6-1
6.2
6-4
6.3
6-4
6.4
Perancangan Tapak
6-5
6.4.1
Pendaerahan Tapak
6-5
6.4.2
6-9
6.4.2.1
6-9
6.4.2.2
6-10
iii
6.4.2.3
6-11
6.4.3
Gubahan Massa
6-13
6.5
Perancangan Bangunan
6-14
6.5.1
Luas bangunan
6-15
6.5.2
6-15
6.5.3
6-15
6.5.4
6-17
6.5.5
Modul Struktur
6-17
6.6
6-20
BAB 7
7-1
7.1
7-1
7.2
7-1
7.2.1
Sistem Mekanikal
7-1
7.2.2
Sistem Elektrikal
7-2
7.2.3
Sistem Plumbing
7-2
7.3
7-2
7.3.1
7-2
7.3.2
Fire Alarm
7-2
7.3.3
Fire Fighting
7-2
7.3.4
7-2
7.4
7-3
7.4.1
7-3
7.4.2
7-3
7.4.3
7-3
7.5
7-4
7.5.1
Kriteria Perencanaan
7-4
7.5.2
7-4
7.5.3
7-5
7.5.4
Aplikasi Sistem
7-5
7.5.5
Pemilihan Unit
7-5
7.6
Sistem Elektrikal
7-6
7.6.1
Konsep Perencanaan
7-6
7.6.2
7-10
iv
7.6.3
7-10
7.7
7-10
7.7.1
Perlindungan Petir
7-10
7.7.2
Tahanan Pengetanahan
7-10
7.8
7-11
7.8.1
Peralatan Utama
7-11
7.8.2
Instalasi
7-11
7.9
7-11
7.9.1
Fungsi
7-11
7.9.2
Komponen Sistem
7-12
7.9.3
Instalasi
7-12
7.10
7-12
7.10.1
Dasar Perencanaan
7-12
7.10.2
Pertimbangan Perencanaan
7-12
7.10.3
7-12
7.10.4
Instalasi
7-13
7.11
7-13
7.11.1
Dasar Perencanaan
7-13
7.11.2
Pusat Kontrol
7-13
7.11.3
7-13
7.11.4
Instalasi
7-14
7.12
7-14
7.12.1
7-14
7.12.2
Pusat Control
7-14
7.12.3
7-15
7.12.4
7-15
7.12.5
Instalasi
7-15
7.12.6
7-15
7.13
Sistem Komputerisasi
7-16
7.13.1
Aplikasi Sistem
7-16
7.13.2
Pusat Kontrol
7-16
7.14
7-17
7.14.1
7-17
7.14.2
Kebutuhan Air
7-17
v
7.14.3
7-17
7.14.4
Penampungan Air
7-17
7.14.5
7-18
7.15
7-18
7.15.1
7-18
7.15.2
System Penyaluran
7-18
7.15.3
Sistem Pengolahan
7-18
7.15.4
7-25
7.16
7-25
7.17
7-26
7.18
Rencana Persampahan
7-27
BAB 8
8-1
8.1.
Dasar Peraturan
8-1
8.2.
8-1
8.3.
Perhitungan Biaya
8-4
8.4.
8-5
8.5.
Strategi Pembangunan
8-6
8.5.1
Persiapan Pembangunan
8-6
8.5.2
Pelaksanaan Pembangunan
8-7
vi