Perhitungan Hidrolis Kantong Lumpur (sand trap)

Data Perencanaan :
- Diameter minimum butiran (D) = 0.007 cm
- Specific gravity butiran (Gs) = 2.600 t/m3
- Specific gravity air (Gw) = 1.000 t/m3
- Percepatan gravitasi (g) = 9.810 m/det_
- Viskositas air = 0.009 cm2/det
- Rencana kemiringan dasar saluran (I) = 0.0002506
- Rencana lebar saluran (B) = 12.00 m
- Compartemen = 1.00 bh
- Luas Areal Rencana = 3097.00 m
- Kebutuhan air irigasi di sawah = 0.99 lt/det/ha
- Debit rencana (Q) = 4.711 m3/det
- Debit rencana maksimum (Qm) = 5.654 m3/det
- Debit rencana (Q) tiap Compartemen = 4.711 m3/det
- Talud saluran = 0
- Koefisien Strickler (k) = 60
- Interval pembilasan (T) = 7 hari/sekali
= 604,800 detik
- Volume kantong lumpur = 1,424.68 m3
- Kecepatan endap butiran (W) = 0.005 m/det

2a. Kondisi kantong lumpur penuh


Q hn An Pn Rn v Q' L (m)
(m3/det) (m) (m) (m) (m) (m/det) (m3/det) Perlu Dipakai
(1) (2) (3) (4) (5) (6) (7) (8) (9)
4.711 0.790 9.48 13.58 0.698 0.747 7.085 124.37009
4.711 0.795 9.54 13.59 0.702 0.750 7.157 125.623
4.711 0.800 9.60 13.60 0.706 0.753 7.228 126.880
4.711 0.615 7.38 13.23 0.558 0.644 4.750 83.372 128.00
Keterangan :
Q' >= Q OK !!! 1433.202

2b. Tinjauan terhadap debit maksimum untuk pengembangan


Qm hm Am Pm Rm I Vm Qm'
(m3/det) (m) (m) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7) (8)
5.654 0.680 8.16 13.36 0.61 0.000251 0.684 5.579
5.654 0.690 8.28 7.38 1.12 0.000251 1.026 8.491
5.654 0.700 8.40 7.40 1.14 0.000251 1.034 8.682
5.654 0.701 8.41 7.40 1.14 0.000251 1.034 8.701
Keterangan :
Qm' >= Qm OK !!!
2c. Tinjauan terhadap aliran kritis untuk pembilasan
Qc qc hc Vc Fr Rc Ic
(m3/det) (m3/det/m') (m) (m/det) (m)
(1) (2) (3) (4) (5) (6) (7)
2.356 0.196 0.158 1.244 1.000 0.154 0.0052205
Keterangan :
Akhir NIM 0 Akhir NIM 1 Akhir NIM 2 Akhir NIM 3 Akhir NIM 4 Akhir NIM 5 Akhir NIM 6 Akhir NIM 7 Akhir NIM 8

0.0060 0.0070 0.0080 0.0060 0.0070 0.0080 0.0060 0.0070 0.0080


2.6000 2.6000 2.6000 2.6000 2.6000 2.6000 2.6000 2.6000 2.6000
1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000
9.8100 9.8100 9.8100 9.8100 9.8100 9.8100 9.8100 9.8100 9.8100
0.0090 0.0090 0.0090 0.0090 0.0090 0.0090 0.0090 0.0090 0.0090
0.0016 0.0017 0.0018 0.0016 0.0017 0.0018 0.0016 0.0017 0.0018
10.00 11.00 12.00 10.00 11.00 12.00 10.00 11.00 12.00
2.0000 2.0000 2.0000 2.0000 2.0000 2.0000 2.0000 2.0000 2.0000
5,500.0 6,000.0 6,500.0 5,500.0 6,000.0 6,500.0 5,500.0 6,000.0 6,500.0
1.1000 1.2000 1.3000 1.1000 1.2000 1.3000 1.1000 1.2000 1.3000

0 0 0 0 0 0 0 0 0
50.00 60.00 70.00 50.00 60.00 70.00 50.00 60.00 70.00
7.00 14.00 7.00 14.00 7.00 14.00 7.00 14.00 7.00

2a. Kondisi kantong lumpur penuh


Q hn An Pn Rn v Q' L (m)
(m3/det) (m) (m) (m) (m) (m/det) (m3/det) Perlu Dipakai
(1) (2) (3) (4) (5) (6) (7) (8) (9)
#REF! 0.600 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! 0.700 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! 0.800 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! 0.900 #REF! #REF! #REF! #REF! #REF! #REF! 230.00
Keterangan :
Q' >= Q #REF! -423.2
(9,81.h.I)0.5 > 5/3 0
#DIV/0! > 5/3 #DIV/0! 0
Vol. Kantong Rec. < Vol. Kantong Hitung
0.00 < -423.2 NO OK

2b. Tinjauan terhadap debit maksimum untuk pengembangan


Qm hm Am Pm Rm I Vm Qm'
(m3/det) (m) (m) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7) (8)
#REF! 0.900 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! 0.950 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! 1.000 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! 1.010 #REF! #REF! #REF! #REF! #REF! #REF!
Keterangan :
Qm' >= Qm #REF!

2c. Tinjauan terhadap aliran kritis untuk pembilasan


Qc qc hc Vc Fr Rc Ic
(m3/det) (m3/det/m') (m) (m/det) (m)
(1) (2) (3) (4) (5) (6) (7)
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
Keterangan :

kolom V batas kanan

2d. Tinjauan terhadap debit maksimum untuk pembilasan


Qm hm Am Pm Rm I Vm Q'm
No: (m3/det) (m) (m_) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7) (8)
1 #REF! 0.25 #REF! #REF! #REF! 0.004000 #REF! #REF!
2 #REF! 0.30 #REF! #REF! #REF! 0.004000 #REF! #REF!
Keterangan :
Q'm >= Qm #REF!
diameter yang terbilas (dari Diagram Shields) LLL

2e. Tinjauan terhadap debit normal untuk pembilasan


Qn hn An Pn Rn I Vn Q'n
No: (m3/det) (m) (m_) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7) (8)
#REF! 0.25 #REF! #REF! #REF! 0.004000 #REF! #REF!
#REF! 0.27 #REF! #REF! #REF! 0.004000 #REF! #REF!
Keterangan :
Q'm >= Qm #REF!
diameter yang terbilas (dari Diagram Shields) LLL
w/(1,6.I) <V
#REF! #REF! #REF!

2f. Tinjauan efisiensi pembilasan pada kondisi aliran turbulen


Wo W W/Wo W/Vn
No: (m/det) (m/det)
(1) (2) (3) (4)

1 #REF! #REF! #REF! #REF!


Keterangan :
Efisiensi diperoleh dari Diagram Champ

2g. Perencanaan hidrolis pintu pembilas (flushing gate)


Q N b be B hn a
No: (m3/det) (buah) (m) (m) (m) (m) (m)
(1) (2) (3) (4) (5) (6) (7)
1 #REF! 3 1.2 3.6 #REF! 0.270 0.650
2 #REF! 3 1.2 3.6 #REF! 0.270 0.700
3 #REF! 3 1.2 3.6 #REF! 0.270 0.800
4 #REF! 3 1.2 3.6 #REF! 0.270 0.900
Keterangan :
B = lebar rencana kantong lumpur (m)
a = tinggi bukaan pintu (m)
Qs >= Q #REF!
2h. Perencanaan dimensi saluran pembilas
Qs bs hs As Ps Rs Is Vs
No: (m3/det) (m) (m) (m_) (m) (m) (m/det)
(1) (2) (3) (4) (5) (6) (7) (8)

1 #REF! 4.2 #REF! #REF! #REF! #REF! 0.0050 #REF!


Keterangan :
Saluran pembilas direncanakan berbentuk flume
Q's >= Qs #REF!

III. Bangunan Pengatur dan Bangunan Ukur

Data Perencanaan :

- Debit rencana (Qd) = #REF! m3/det


- Lebar pilar di pintu pengatur (b1) = 0.600 m
- Lebar ambang bangunan ukur (B) = 4.400 m
- Kedalaman air di hilir bangunan ukur (h3) = 1.400 m
- Lebar saluran di hilir bangunan ukur (b 3) = 4.400 m

3a. Perencanaan dimensi pintu pengatur


Q a V B b N C z
No: (m 3
/det) (m) (m/det) (m) (m) (buah) (m)
(1) (2) (3) (4) (5) (6) (7) (8)
1 #REF! 0.8 #REF! 4.5 1.5 3 0.8 0.1
2 #REF! 0.9 #REF! 4.5 1.5 3 0.8 0.1
3 #REF! 1.0 #REF! 4.5 1.5 3 0.8 0.1
4 #REF! 1.1 #REF! 4.5 1.5 3 0.8 0.1

3b. Perencanaan hidrolis bangunan ukur (broad crested weir)


q L h1 z (m) hc P (m) r (m)
(m3/det/m') (m) (m) perlu dipakai (m) perlu dipakai perlu
(1) (2) (3) (4) (5) (6) (7) (8) (9)
#REF! 2.50 #REF! #REF! 0.500 #REF! #REF! 1.500 #REF!
#REF! 3.00 #REF! #REF! 0.450 #REF! #REF! 1.300 #REF!
#REF! 4.35 #REF! #REF! 0.400 #REF! #REF! 0.900 #REF!
Keterangan :
L' < L OK !!!

a (m) Ld (m) He Cd A* A CdA*/A


perlu dipakai perlu dipakai (m) (m_) (m_)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
#REF! 0.400 #REF! 3.500 #REF! #REF! #REF! #REF! #REF!
#REF! 0.400 #REF! 3.500 #REF! #REF! #REF! #REF! #REF!
#REF! 0.400 #REF! 4.000 #REF! #REF! #REF! #REF! #REF!
Keterangan :
Q= #REF! m3/det
Q' >= Q OK !!!
Akhir NIM 9

0.0060
2.6000
1.0000
9.8100
0.0090
0.0016
10.00
2.0000
5,500.0
1.1000

0
50.00
14.00
Fr T
(N/m2)
(9) (10)
#REF! #REF!
#REF! #REF!

10 mm

Fr T
(N/m_)
(9) (10)
#REF! #REF!
#REF! #REF!

10 mm

Efisiensi
Pembilasan (%)
(5)

85

Qs
(m3/det)
(8)
2.894
3.234
3.952
4.715
Q's Fr
(m3/det)
(9) (10)

#REF! #REF!

Q' Ket.
(m3/det)
(9) (10)
4.0340566
4.5383137
5.0425708 Q' >= Q
5.5468279 OK !!!

r (m) L'
dipakai (m)
(10) (11)
0.500 #REF!
0.400 #REF!
0.300 #REF! #REF!

Cv Q'
(m3/det)
(10) (11)
1.012 #REF!
1.015 #REF!
1.019 #REF!
II. Perhitungan Hidrolis Kantong Lumpur (sand trap)

Data Perencanaan :
- Diameter minimum butiran (D) = 0.0060 cm -0.001
- Specific gravity butiran (Gs) = 2.6000 t/m3 0.000
- Specific gravity air (Gw) = 1.0000 t/m3 0.000
- Percepatan gravitasi (g) = 9.8100 m/det2 0.000
- Viskositas air = 0.0090 cm2/det 0.000
- Rencana kemiringan dasar saluran (I) = 0.0016 0.001
- Rencana lebar saluran (B) = 10.0000 m -2.000
- Compartemen = 2.0000 bh 1.000
- Luas Areal Rencana = 5,500.00 ha 2403.000
- Kebutuhan air irigasi di sawah = 1.1000 lt/det/ha 0.111
- Debit rencana (Q) = 9.308 m3/det 4.596
- Debit rencana maksimum (Qm) = 11.169 m3/det 5.516
- Debit rencana (Q) tiap Compartemen = 4.654 m3/det -0.057
- Talud saluran = 0 0.000
- Koefisien Strickler (k) = 50.00 -10.000
- Interval pembilasan (T) = 14.00 hari/sekali 7.000
= 1,209,600 detik 604800.000
- Volume kantong lumpur = 5,629.29 m3 4204.608
- Kecepatan endap butiran (W) = 0.003 m/det -0.001

2a. Kondisi kantong lumpur penuh


Q hn An Pn Rn v Q' L (m)
(m3/det) (m) (m) (m) (m) (m/det) (m3/det) Perlu Dipakai
(1) (2) (3) (4) (5) (6) (7) (8) (9)
4.654 0.680 3.40 6.36 0.535 1.317 4.479 256.829
4.654 0.685 3.43 6.37 0.538 1.322 4.529 259.712
4.654 0.698 3.49 6.40 0.546 1.335 4.661 267.252
4.654 0.00 5.00 0.000 0.000 0.000 0.000 270.00
Keterangan :
Q' >= Q ..ok !!! 13459.141679
(9,81.h.I)0.5 > 5/3 1.08
30.01 > 5/3 ..ok !!! 5.741
Vol. Kantong Rec. < Vol. Kantong Hitung
5,629.29 < 13459.1 ..ok !!!

2b. Tinjauan terhadap debit maksimum untuk pengembangan


Qm hm Am Pm Rm I Vm Qm'
(m3/det) (m) (m) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7) (8)
5.585 0.790 3.95 6.58 0.60 0.0016 1.423 5.622
5.585 0.820 4.10 6.64 0.62 0.0016 1.450 5.946
5.585 0.840 4.20 6.68 0.63 0.0016 1.468 6.165
5.585 0.00 5.00 0.00 0.0016 0.000 0.000
Keterangan :
Qm' >= Qm ..ok !!!

2c. Tinjauan terhadap aliran kritis untuk pembilasan


Qc qc hc Vc Fr Rc Ic
(m /det)
3
(m /det/m')
3
(m) (m/det) (m)
(1) (2) (3) (4) (5) (6) (7)
2.327 0.233 0.177 1.317 1.000 0.171 0.0073239
Keterangan :
II. Perhitungan Hidrolis Kantong Lumpur (sand trap)

Data Perencanaan :
- Diameter minimum butiran (D) = 0.007 cm 0.00000
- Specific gravity butiran (Gs) = 2.600 t/m3 0.00000
- Specific gravity air (Gw) = 1.000 t/m3 0.00000
- Percepatan gravitasi (g) = 9.810 m/det_ 0.00000
- Viskositas air = 0.009 cm2/det 0.00000
- Rencana kemiringan dasar saluran (I) = 0.0003425 0.00009
- Rencana lebar saluran (B) = 12.00 m 0.00000
- Compartemen = 3.00 bh 2.00000
- Luas Areal Rencana = 3097.00 m 0.00000
- Kebutuhan air irigasi di sawah = 0.99 lt/det/ha 0.00000
- Debit rencana (Q) = 4.711 m3/det 0.00000
- Debit rencana maksimum (Qm) = 5.654 m3/det 0.00000
- Debit rencana (Q) tiap Compartemen = 1.570 m3/det -3.14084
- Talud saluran = 0 0.00000
- Koefisien Strickler (k) = 60 0.00000
- Interval pembilasan (T) = 7 hari/sekali 0.00000
= 604,800 detik 0.00000
- Volume kantong lumpur = 1,424.68 m3 0.00000
- Kecepatan endap butiran (W) = 0.005 m/det 0.00000

2a. Kondisi kantong lumpur penuh


Q hn An Pn Rn v Q' L (m)
(m3/det) (m) (m) (m) (m) (m/det) (m3/det) Perlu Dipakai
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1.570 0.770 3.08 5.54 0.556 0.751 2.312 121.77208
1.570 0.780 3.12 5.56 0.561 0.755 2.357 124.121
1.570 0.790 3.16 5.58 0.566 0.760 2.402 126.481
1.570 0.793 3.17 5.59 0.568 0.761 2.415 127.191 141.00
Keterangan :
Q' >= Q OK !!! 2081.753

2b. Tinjauan terhadap debit maksimum untuk pengembangan


Qm hm Am Pm Rm I Vm Qm'
(m3/det) (m) (m) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7) (8)
1.885 0.700 2.80 5.40 0.52 0.000343 0.717 2.007
1.885 0.800 3.20 7.60 0.42 0.000343 0.624 1.996
1.885 0.900 3.60 7.80 0.46 0.000343 0.663 2.387
1.885 1.024 4.10 8.05 0.51 0.000343 0.708 2.899
Keterangan :
Qm' >= Qm OK !!!
2c. Tinjauan terhadap aliran kritis untuk pembilasan
Qc qc hc Vc Fr Rc Ic
(m3/det) (m3/det/m') (m) (m/det) (m)
(1) (2) (3) (4) (5) (6) (7)
0.785 0.065 0.076 0.863 1.000 0.075 0.0065461
Keterangan :
II. Perhitungan Hidrolis Kantong Lumpur (sand trap)

Data Perencanaan :
- Diameter minimum butiran (D) = 0.007
- Specific gravity butiran (Gs) = 2.600
- Specific gravity air (Gw) = 1.000
- Percepatan gravitasi (g) = 9.810
- Viskositas air = 0.009
- Rencana kemiringan dasar saluran (I) = 0.0018
- Rencana lebar saluran (B) = 10.00
- Compartemen = 2.00
- Luas Areal Rencana = 5032.00
- Kebutuhan air irigasi di sawah = 1.02
- Debit rencana (Q) = 7.912
- Debit rencana maksimum (Qm) = 9.494
- Debit rencana (Q) tiap Compartemen = 3.956
- Talud saluran = 0
- Koefisien Strickler (k) = 60
- Interval pembilasan (T) = 7
= 604,800
- Volume kantong lumpur = 2,392.54
- Kecepatan endap butiran (W) = 0.005

2a. Kondisi kantong lumpur penuh


Q hn An Pn Rn v Q'
(m3/det) (m) (m) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.600 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.700 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.800 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Q' >= Q #VALUE!
(9,81.h.I)0.5 > 5/3
26.55 > 5/3 ..ok !!!
Vol. Kantong Rec. < Vol. Kantong Hitung
2,392.54 <0 NO OK

2b. Tinjauan terhadap debit maksimum untuk pengembangan


Qm hm Am Pm Rm I Vm
(m /det)
3
(m) (m) (m) (m) (m/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 0.950 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.000 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.010 #VALUE! #VALUE! #VALUE! = #VALUE!
Keterangan :
Qm' >= Qm #VALUE!

2c. Tinjauan terhadap aliran kritis untuk pembilasan


Qc qc hc Vc Fr Rc Ic
(m /det)
3
(m /det/m')
3
(m) (m/det) (m)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Akhir NIM 1

cm 0.0070
t/m3 2.6000
t/m3 1.0000
m/det2 9.8100
cm2/det 0.0090
0.0017
m 11.00
bh 2.0000
ha 6,000.0
lt/det/ha 1.2000
m3/det
m3/det
m3/det
0
60.00
hari/sekali 14.00
detik
m3
m/det

L (m)
Perlu
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Qm'
(m3/det)
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
II. Perhitungan Hidrolis Kantong Lumpur (sand trap)

Data Perencanaan :
- Diameter minimum butiran (D) = 0.007
- Specific gravity butiran (Gs) = 2.600
- Specific gravity air (Gw) = 1.000
- Percepatan gravitasi (g) = 9.810
- Viskositas air = 0.009
- Rencana kemiringan dasar saluran (I) = 0.0018
- Rencana lebar saluran (B) = 10.00
- Compartemen = 2.00
- Luas Areal Rencana = 5032.00
- Kebutuhan air irigasi di sawah = 1.02
- Debit rencana (Q) = 7.912
- Debit rencana maksimum (Qm) = 9.494
- Debit rencana (Q) tiap Compartemen = 3.956
- Talud saluran = 0
- Koefisien Strickler (k) = 60
- Interval pembilasan (T) = 7
= 604,800
- Volume kantong lumpur = 2,392.54
- Kecepatan endap butiran (W) = 0.005

2a. Kondisi kantong lumpur penuh


Q hn An Pn Rn v Q'
(m3/det) (m) (m) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.600 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.700 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.800 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Q' >= Q #VALUE!
(9,81.h.I)0.5 > 5/3
26.55 > 5/3 ..ok !!!
Vol. Kantong Rec. < Vol. Kantong Hitung
2,392.54 <0 NO OK

2b. Tinjauan terhadap debit maksimum untuk pengembangan


Qm hm Am Pm Rm I Vm
(m /det)
3
(m) (m) (m) (m) (m/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 0.950 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.000 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.010 #VALUE! #VALUE! #VALUE! = #VALUE!
Keterangan :
Qm' >= Qm #VALUE!

2c. Tinjauan terhadap aliran kritis untuk pembilasan


Qc qc hc Vc Fr Rc Ic
(m /det)
3
(m /det/m')
3
(m) (m/det) (m)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Akhir NIM 2

cm 0.0080
t/m3 2.6000
t/m3 1.0000
m/det2 9.8100
cm2/det 0.0090
0.0018
m 12.00
bh 2.0000
ha 6,500.0
lt/det/ha 1.3000
m3/det
m3/det
m3/det
0
70.00
hari/sekali 7.00
detik
m3
m/det

L (m)
Perlu
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Qm'
(m3/det)
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
II. Perhitungan Hidrolis Kantong Lumpur (sand trap)

Data Perencanaan :
- Diameter minimum butiran (D) = 0.007
- Specific gravity butiran (Gs) = 2.600
- Specific gravity air (Gw) = 1.000
- Percepatan gravitasi (g) = 9.810
- Viskositas air = 0.009
- Rencana kemiringan dasar saluran (I) = 0.0018
- Rencana lebar saluran (B) = 10.00
- Compartemen = 2.00
- Luas Areal Rencana = 5032.00
- Kebutuhan air irigasi di sawah = 1.02
- Debit rencana (Q) = 7.912
- Debit rencana maksimum (Qm) = 9.494
- Debit rencana (Q) tiap Compartemen = 3.956
- Talud saluran = 0
- Koefisien Strickler (k) = 60
- Interval pembilasan (T) = 7
= 604,800
- Volume kantong lumpur = 2,392.54
- Kecepatan endap butiran (W) = 0.005

2a. Kondisi kantong lumpur penuh


Q hn An Pn Rn v Q'
(m3/det) (m) (m) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.600 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.700 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.800 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Q' >= Q #VALUE!
(9,81.h.I)0.5 > 5/3
26.55 > 5/3 ..ok !!!
Vol. Kantong Rec. < Vol. Kantong Hitung
2,392.54 <0 NO OK

2b. Tinjauan terhadap debit maksimum untuk pengembangan


Qm hm Am Pm Rm I Vm
(m /det)
3
(m) (m) (m) (m) (m/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 0.950 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.000 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.010 #VALUE! #VALUE! #VALUE! = #VALUE!
Keterangan :
Qm' >= Qm #VALUE!

2c. Tinjauan terhadap aliran kritis untuk pembilasan


Qc qc hc Vc Fr Rc Ic
(m /det)
3
(m /det/m')
3
(m) (m/det) (m)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Akhir NIM 3

cm 0.0060
t/m3 2.6000
t/m3 1.0000
m/det2 9.8100
cm2/det 0.0090
0.0016
m 10.00
bh 2.0000
ha 5,500.0
lt/det/ha 1.1000
m3/det
m3/det
m3/det
0
50.00
hari/sekali 14.00
detik
m3
m/det

L (m)
Perlu
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Qm'
(m3/det)
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
II. Perhitungan Hidrolis Kantong Lumpur (sand trap)

Data Perencanaan :
- Diameter minimum butiran (D) = 0.007
- Specific gravity butiran (Gs) = 2.600
- Specific gravity air (Gw) = 1.000
- Percepatan gravitasi (g) = 9.810
- Viskositas air = 0.009
- Rencana kemiringan dasar saluran (I) = 0.0018
- Rencana lebar saluran (B) = 10.00
- Compartemen = 2.00
- Luas Areal Rencana = 5032.00
- Kebutuhan air irigasi di sawah = 1.02
- Debit rencana (Q) = 7.912
- Debit rencana maksimum (Qm) = 9.494
- Debit rencana (Q) tiap Compartemen = 3.956
- Talud saluran = 0
- Koefisien Strickler (k) = 60
- Interval pembilasan (T) = 7
= 604,800
- Volume kantong lumpur = 2,392.54
- Kecepatan endap butiran (W) = 0.005

2a. Kondisi kantong lumpur penuh


Q hn An Pn Rn v Q'
(m3/det) (m) (m) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.600 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.700 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.800 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Q' >= Q #VALUE!
(9,81.h.I)0.5 > 5/3
26.55 > 5/3 ..ok !!!
Vol. Kantong Rec. < Vol. Kantong Hitung
2,392.54 <0 NO OK

2b. Tinjauan terhadap debit maksimum untuk pengembangan


Qm hm Am Pm Rm I Vm
(m /det)
3
(m) (m) (m) (m) (m/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 0.950 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.000 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.010 #VALUE! #VALUE! #VALUE! = #VALUE!
Keterangan :
Qm' >= Qm #VALUE!

2c. Tinjauan terhadap aliran kritis untuk pembilasan


Qc qc hc Vc Fr Rc Ic
(m /det)
3
(m /det/m')
3
(m) (m/det) (m)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Akhir NIM 4

cm 0.0070
t/m3 2.6000
t/m3 1.0000
m/det2 9.8100
cm2/det 0.0090
0.0017
m 11.00
bh 2.0000
ha 6,000.0
lt/det/ha 1.2000
m3/det
m3/det
m3/det
0
60.00
hari/sekali 7.00
detik
m3
m/det

L (m)
Perlu
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Qm'
(m3/det)
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
II. Perhitungan Hidrolis Kantong Lumpur (sand trap)

Data Perencanaan :
- Diameter minimum butiran (D) = 0.007
- Specific gravity butiran (Gs) = 2.600
- Specific gravity air (Gw) = 1.000
- Percepatan gravitasi (g) = 9.810
- Viskositas air = 0.009
- Rencana kemiringan dasar saluran (I) = 0.0018
- Rencana lebar saluran (B) = 10.00
- Compartemen = 2.00
- Luas Areal Rencana = 5032.00
- Kebutuhan air irigasi di sawah = 1.02
- Debit rencana (Q) = 7.912
- Debit rencana maksimum (Qm) = 9.494
- Debit rencana (Q) tiap Compartemen = 3.956
- Talud saluran = 0
- Koefisien Strickler (k) = 60
- Interval pembilasan (T) = 7
= 604,800
- Volume kantong lumpur = 2,392.54
- Kecepatan endap butiran (W) = 0.005

2a. Kondisi kantong lumpur penuh


Q hn An Pn Rn v Q'
(m3/det) (m) (m) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.600 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.700 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.800 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Q' >= Q #VALUE!
(9,81.h.I)0.5 > 5/3
26.55 > 5/3 ..ok !!!
Vol. Kantong Rec. < Vol. Kantong Hitung
2,392.54 <0 NO OK

2b. Tinjauan terhadap debit maksimum untuk pengembangan


Qm hm Am Pm Rm I Vm
(m /det)
3
(m) (m) (m) (m) (m/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 0.950 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.000 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.010 #VALUE! #VALUE! #VALUE! = #VALUE!
Keterangan :
Qm' >= Qm #VALUE!

2c. Tinjauan terhadap aliran kritis untuk pembilasan


Qc qc hc Vc Fr Rc Ic
(m /det)
3
(m /det/m')
3
(m) (m/det) (m)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Akhir NIM 5

cm 0.0080
t/m3 2.6000
t/m3 1.0000
m/det2 9.8100
cm2/det 0.0090
0.0018
m 12.00
bh 2.0000
ha 6,500.0
lt/det/ha 1.3000
m3/det
m3/det
m3/det
0
70.00
hari/sekali 14.00
detik
m3
m/det

L (m)
Perlu
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Qm'
(m3/det)
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
II. Perhitungan Hidrolis Kantong Lumpur (sand trap)

Data Perencanaan :
- Diameter minimum butiran (D) = 0.007
- Specific gravity butiran (Gs) = 2.600
- Specific gravity air (Gw) = 1.000
- Percepatan gravitasi (g) = 9.810
- Viskositas air = 0.009
- Rencana kemiringan dasar saluran (I) = 0.0018
- Rencana lebar saluran (B) = 10.00
- Compartemen = 2.00
- Luas Areal Rencana = 5032.00
- Kebutuhan air irigasi di sawah = 1.02
- Debit rencana (Q) = 7.912
- Debit rencana maksimum (Qm) = 9.494
- Debit rencana (Q) tiap Compartemen = 3.956
- Talud saluran = 0
- Koefisien Strickler (k) = 60
- Interval pembilasan (T) = 7
= 604,800
- Volume kantong lumpur = 2,392.54
- Kecepatan endap butiran (W) = 0.005

2a. Kondisi kantong lumpur penuh


Q hn An Pn Rn v Q'
(m3/det) (m) (m) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.600 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.700 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.800 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Q' >= Q #VALUE!
(9,81.h.I)0.5 > 5/3
26.55 > 5/3 ..ok !!!
Vol. Kantong Rec. < Vol. Kantong Hitung
2,392.54 <0 NO OK

2b. Tinjauan terhadap debit maksimum untuk pengembangan


Qm hm Am Pm Rm I Vm
(m /det)
3
(m) (m) (m) (m) (m/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 0.950 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.000 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.010 #VALUE! #VALUE! #VALUE! = #VALUE!
Keterangan :
Qm' >= Qm #VALUE!

2c. Tinjauan terhadap aliran kritis untuk pembilasan


Qc qc hc Vc Fr Rc Ic
(m /det)
3
(m /det/m')
3
(m) (m/det) (m)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Akhir NIM 6

cm 0.0060
t/m3 2.6000
t/m3 1.0000
m/det2 9.8100
cm2/det 0.0090
0.0016
m 10.00
bh 2.0000
ha 5,500.0
lt/det/ha 1.1000
m3/det
m3/det
m3/det
0
50.00
hari/sekali 7.00
detik
m3
m/det

L (m)
Perlu
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Qm'
(m3/det)
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
II. Perhitungan Hidrolis Kantong Lumpur (sand trap)

Data Perencanaan :
- Diameter minimum butiran (D) = 0.007
- Specific gravity butiran (Gs) = 2.600
- Specific gravity air (Gw) = 1.000
- Percepatan gravitasi (g) = 9.810
- Viskositas air = 0.009
- Rencana kemiringan dasar saluran (I) = 0.0018
- Rencana lebar saluran (B) = 10.00
- Compartemen = 2.00
- Luas Areal Rencana = 5032.00
- Kebutuhan air irigasi di sawah = 1.02
- Debit rencana (Q) = 7.912
- Debit rencana maksimum (Qm) = 9.494
- Debit rencana (Q) tiap Compartemen = 3.956
- Talud saluran = 0
- Koefisien Strickler (k) = 60
- Interval pembilasan (T) = 7
= 604,800
- Volume kantong lumpur = 2,392.54
- Kecepatan endap butiran (W) = 0.005

2a. Kondisi kantong lumpur penuh


Q hn An Pn Rn v Q'
(m3/det) (m) (m) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.600 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.700 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.800 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Q' >= Q #VALUE!
(9,81.h.I)0.5 > 5/3
26.55 > 5/3 ..ok !!!
Vol. Kantong Rec. < Vol. Kantong Hitung
2,392.54 <0 NO OK

2b. Tinjauan terhadap debit maksimum untuk pengembangan


Qm hm Am Pm Rm I Vm
(m /det)
3
(m) (m) (m) (m) (m/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 0.950 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.000 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.010 #VALUE! #VALUE! #VALUE! = #VALUE!
Keterangan :
Qm' >= Qm #VALUE!

2c. Tinjauan terhadap aliran kritis untuk pembilasan


Qc qc hc Vc Fr Rc Ic
(m /det)
3
(m /det/m')
3
(m) (m/det) (m)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Akhir NIM 7

cm 0.0070
t/m3 2.6000
t/m3 1.0000
m/det2 9.8100
cm2/det 0.0090
0.0017
m 11.00
bh 2.0000
ha 6,000.0
lt/det/ha 1.2000
m3/det
m3/det
m3/det
0
60.00
hari/sekali 14.00
detik
m3
m/det

L (m)
Perlu
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Qm'
(m3/det)
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
II. Perhitungan Hidrolis Kantong Lumpur (sand trap)

Data Perencanaan :
- Diameter minimum butiran (D) = 0.007
- Specific gravity butiran (Gs) = 2.600
- Specific gravity air (Gw) = 1.000
- Percepatan gravitasi (g) = 9.810
- Viskositas air = 0.009
- Rencana kemiringan dasar saluran (I) = 0.0018
- Rencana lebar saluran (B) = 10.00
- Compartemen = 2.00
- Luas Areal Rencana = 5032.00
- Kebutuhan air irigasi di sawah = 1.02
- Debit rencana (Q) = 7.912
- Debit rencana maksimum (Qm) = 9.494
- Debit rencana (Q) tiap Compartemen = 3.956
- Talud saluran = 0
- Koefisien Strickler (k) = 60
- Interval pembilasan (T) = 7
= 604,800
- Volume kantong lumpur = 2,392.54
- Kecepatan endap butiran (W) = 0.005

2a. Kondisi kantong lumpur penuh


Q hn An Pn Rn v Q'
(m3/det) (m) (m) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.600 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.700 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.800 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Q' >= Q #VALUE!
(9,81.h.I)0.5 > 5/3
26.55 > 5/3 ..ok !!!
Vol. Kantong Rec. < Vol. Kantong Hitung
2,392.54 <0 NO OK

2b. Tinjauan terhadap debit maksimum untuk pengembangan


Qm hm Am Pm Rm I Vm
(m /det)
3
(m) (m) (m) (m) (m/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 0.950 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.000 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.010 #VALUE! #VALUE! #VALUE! = #VALUE!
Keterangan :
Qm' >= Qm #VALUE!

2c. Tinjauan terhadap aliran kritis untuk pembilasan


Qc qc hc Vc Fr Rc Ic
(m /det)
3
(m /det/m')
3
(m) (m/det) (m)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Akhir NIM 8

cm 0.0080
t/m3 2.6000
t/m3 1.0000
m/det2 9.8100
cm2/det 0.0090
0.0018
m 12.00
bh 2.0000
ha 6,500.0
lt/det/ha 1.3000
m3/det
m3/det
m3/det
0
70.00
hari/sekali 7.00
detik
m3
m/det

L (m)
Perlu
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Qm'
(m3/det)
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
II. Perhitungan Hidrolis Kantong Lumpur (sand trap)

Data Perencanaan :
- Diameter minimum butiran (D) = 0.007
- Specific gravity butiran (Gs) = 2.600
- Specific gravity air (Gw) = 1.000
- Percepatan gravitasi (g) = 9.810
- Viskositas air = 0.009
- Rencana kemiringan dasar saluran (I) = 0.0018
- Rencana lebar saluran (B) = 10.00
- Compartemen = 2.00
- Luas Areal Rencana = 5032.00
- Kebutuhan air irigasi di sawah = 1.02
- Debit rencana (Q) = 7.912
- Debit rencana maksimum (Qm) = 9.494
- Debit rencana (Q) tiap Compartemen = 3.956
- Talud saluran = 0
- Koefisien Strickler (k) = 60
- Interval pembilasan (T) = 7
= 604,800
- Volume kantong lumpur = 2,392.54
- Kecepatan endap butiran (W) = 0.005

2a. Kondisi kantong lumpur penuh


Q hn An Pn Rn v Q'
(m3/det) (m) (m) (m) (m) (m/det) (m3/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.600 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.700 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.800 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Q' >= Q #VALUE!
(9,81.h.I)0.5 > 5/3
26.55 > 5/3 ..ok !!!
Vol. Kantong Rec. < Vol. Kantong Hitung
2,392.54 <0 NO OK

2b. Tinjauan terhadap debit maksimum untuk pengembangan


Qm hm Am Pm Rm I Vm
(m /det)
3
(m) (m) (m) (m) (m/det)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! 0.900 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 0.950 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.000 #VALUE! #VALUE! #VALUE! = #VALUE!
#VALUE! 1.010 #VALUE! #VALUE! #VALUE! = #VALUE!
Keterangan :
Qm' >= Qm #VALUE!

2c. Tinjauan terhadap aliran kritis untuk pembilasan


Qc qc hc Vc Fr Rc Ic
(m /det)
3
(m /det/m')
3
(m) (m/det) (m)
(1) (2) (3) (4) (5) (6) (7)
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Keterangan :
Akhir NIM 9

cm 0.0060
t/m3 2.6000
t/m3 1.0000
m/det2 9.8100
cm2/det 0.0090
0.0016
m 10.00
bh 2.0000
ha 5,500.0
lt/det/ha 1.1000
m3/det 9.308
m3/det 11.169
m3/det 4.654
0
50.00
hari/sekali 14.00
detik 1,209,600.0
m3 5,629.29
m/det 0.003

L (m)
Perlu
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Qm'
(m3/det)
(8)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Compatibility Report for Tugas kantong lumpur ardi.xls
Run on 10/02/2017 16:34

The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when you save this workbook in
an earlier file format.

Minor loss of fidelity # of occurrences

Some cells or styles in this workbook contain formatting that is not supported 3
by the selected file format. These formats will be converted to the closest
format available.

Anda mungkin juga menyukai