Anda di halaman 1dari 12

LAMPIRAN : BERITA ACARA HAS

NOMOR
TANGGAL
NOMOR KONTRAK
KONTRAKTOR
KONSULTAN

MATA HARGA
PEMBA JENIS PEKERJAAN SAT. SATUAN
(Rp.)
YARAN
1 2 3 4

BAB. 1 - UMUM
1.2 Mobilisasi Ls 1,764,250,000.00
1.8 (1) Manajemen dan Keselamatan Lalu Lintas Ls 38,960,000.00
1.17 Pengamanan Lingkungan Hidup Ls 111,400,000.00
1.21 Manajemen Mutu Ls 188,000,000.00
1.18(3) Relokasi Existing Tiang Listrik PLN - Medium Volt Bh -

Sub Total Bab. 1

BAB. 2 - DRAINASE
2.1.(1) Pek. Galian untuk Selokan Drainase & Sal. Air M3 27,393.30
2.2.(1) Pekerjaan Pasangan Batu Dengan Mortar M3 718,626.95
2.2.(1) Pekerjaan Pasangan Batu Dengan Mortar M3 -

Sub Total Bab. 2

BAB. 3 - PEKERJAAN TANAH


3.1 (1) Galian Biasa M3 26,456.10
3.1 (2) Galian Batu M3 173,496.00
3.1 (2) Galian Batu M3 98,799.42
3.2 (1a) Timbunan Biasa dari Sumber Galian M3 61,226.00
3.2 (1b) Timbunan Biasa dari Galian M3 44,716.10
3.2 (1b) Timbunan Biasa dari Galian M3 0.00
3.2 (2)a Timbunan Pilihan dari Sumber Galian M3 116,899.20
3.3 (1) Penyiapan Badan Jalan M2 2,952.95

Sub Total Bab. 3

BAB. 4 - PELEBARAN PERKERASAN DAN


BAHU JALAN
4.2 (1) Lapis Pondasi Agregat Kelas A M3 395,027.00
4.2 (2b) Lapis Pondasi Agregat Kelas S M3 220,647.83

Sub Total Bab. 4


BAB. 5 - PERKERASAN BERBUTIR
5.1 (1) Lapis Pondasi Agregat Kelas A M3 261,715.50
5.1 (2) Lapis Pondasi Agregat Kelas B M3 242,498.38
5.1 (3) Lapis Pondasi Agregat Kelas S M3 -

Sub Total Bab. 5


1 2 3 4

BAB. 6 - PERKERASAN ASPAL


6.1 (1).a Lapis Resap Pengikat-Aspal Cair Liter 17,478.98
6.1 (2).a Lapis Perekat-Aspal Cair Liter 17,579.95
Skh 5.6.3.1 (1a) CBA-AsbLawele Lapis Aus (AC-WC AsbLawele) Ton 396,898.20
Skh 5.6.3.1 (2a) CBA-AsbLawele Lapis Antara (AC-BC AsbLawele) Ton 387,882.60
Skh 5.6.3.1 (4) Aspal Keras Ton 14,469,308.34
Skh 5.6.3.1 (5) Asbuton Lawele Butir Ton 3,097,687.51
Skh 5.6.3.1 (6) Aditif Anti Pengelupasan Kg 71,394.88

Sub Total Bab. 6

BAB. 7 - STRUKTUR
7.1 (7)a Beton mutu sedang dengan fc' 30 Mpa M3 1,366,359.90
7.3 (1) Baja Tulangan U24 Polos Kg 13,082.91
7.3 (3) Baja Tulangan U32 Ulir Kg 13,082.91
7.9 (1) Pasangan Batu M3 619,810.10

Sub Total Bab. 7

BAB. 8 - PENGEMB. KONDISI DAN PEK. MINOR


8.4(1) Marka Jalan Thermoplastic M2 133,707.53
8.4(3)a Rambu Jalan dengan Permukaan Pantul Buah 775,996.06
Engineering Grade
Patok Pengarah
8.4(5) Buah 161,031.31
8.4(7) Patok Pengaman M 763,689.15
8.4(7) Rel Pengaman ( Relokasi Existing ) M -

Sub Total Bab. 8

BAB. 9 - PEKERJAAN HARIAN

Sub Total Bab. 9

BAB. 10 - PEKERJAAN PEMEL. RUTIN

10.1 (1) Pemeliharaan Rutin Perkerasan Ls 54,000,000.00


10.1 (2) Pemeliharaan Rutin Bahu Jalan Ls 45,000,000.00
10.1 (3) Pemeliharaan Rutin Selokan, Saluran Air, Galian Ls 60,000,000.00
10.1 (4) Pemeliharaan Rutin Perlengkapan Jalan Ls 45,000,000.00
10.1 (5) Pemeliharaan Rutin Jembatan Ls 45,000,000.00

Sub Total Bab. 10


JUMLAH
PPN 10 %
TOTAL
DIBULATKAN
RAN : BERITA ACARA HASIL EVALUASI PERUBAHAN LINGKUP PEKERJAAN (PEKERJAAN TAMBAH/KURANG)
: 05/PPPK/JLN/MYC/IV2016
: 4 APRIL 2016
R KONTRAK : KU.08.08/SPJN-PPK 3/MYC/VIII/282 TANGGAL 03 AGUSTUS 2015
: PT. NUSA KONSTRUKSI ENJINIRING ( TBK )
: PT. WIRA GUNA TANI, JO-WIRANTA BHUANA RAYA

KONTRAK AWAL HARGA USULAN PERUBAHAN LINGKUP PEK

JUMLAH SATUAN JUMLAH


KUANTITAS HARGA (Rp.) KUANTITAS HARGA
(Rp.) (Rp.)
5 6=(4x5) 7 8 9=(8x7)

1.00 1,764,250,000.00 1,764,250,000.00 1.00 1,764,250,000.00


1.00 38,960,000.00 38,960,000.00 1.00 38,960,000.00
1.00 111,400,000.00 111,400,000.00 1.00 111,400,000.00
1.00 188,000,000.00 188,000,000.00 1.00 188,000,000.00
0.00 0.00 17,500,000.00 13.00 227,500,000.00

2,102,610,000.00 2,330,110,000.00

12,281.53 336,431,635.75 27,393.30 16,128.38 441,809,551.85


6,721.84 4,830,495,377.59 718,626.95 6,721.84 4,830,495,377.59
- - 558,952.33 743.82 415,759,922.10

5,166,927,013.34 5,688,064,851.54

25,110.22 (104,130.22)
85,890.55 2,272,328,979.86 26,456.10 383,718.90 10,151,705,590.29
0.00 0.00 173,496.00 0.00 0.00
3,988.06 394,018,014.93 98,799.42 20,235.11 1,999,217,131.64
6,274.02 384,133,148.52 61,226.00 1,385.00 84,798,010.00
2,569.13 114,881,473.99 44,716.10 2,569.13 114,881,473.99
0.00 0.00 7,702.50 35,099.99 270,357,672.98
62,519.38 7,308,465,506.50 116,899.20 45,306.50 5,296,293,604.80
146,114.35 431,468,369.83 2,952.95 133,018.70 392,797,570.17

10,905,295,493.63 18,310,051,053.87

0.00 0.00 395,027.00 0.00 0.00


12,036.31 2,655,785,682.71 220,647.83 12,599.50 2,780,052,334.09

2,655,785,682.71 2,780,052,334.09
49,905.60 13,061,069,056.80 261,715.50 57,090.91 14,941,576,056.11
39,338.49 9,539,520,096.65 242,498.38 46,988.60 11,394,659,378.47
- - ### - -

22,600,589,153.45 26,336,235,434.58
5 6=(4x5) 7 8 9=(8x7)

175,582.00 3,068,994,266.36 17,478.98 187,253.57 3,273,001,404.96


54,775.32 962,947,386.83 17,579.95 43,601.90 766,519,221.91
14,292.57 5,672,695,306.37 396,898.20 13,879.20 5,508,629,497.44
21,686.82 8,411,940,127.33 387,882.60 22,404.14 8,690,176,073.96
1,463.10 21,170,045,032.25 14,469,308.34 1,407.33 20,363,091,706.13
4,153.68 12,866,802,656.54 3,097,687.51 4,164.48 12,900,257,681.64
4,447.77 317,548,005.42 71,394.88 2,773.86 198,039,401.84

52,470,972,781.10 51,699,714,987.88

116.57 159,276,573.54 1,366,359.90 159.26 217,606,477.67


5,298.75 69,323,069.36 13,082.91 5,761.70 75,379,802.55
5,947.72 77,813,485.47 13,082.91 5,945.12 77,779,469.90
4,131.93 2,561,011,946.49 619,810.10 5,147.58 3,190,522,074.56

2,867,425,074.86 3,561,287,824.68

21,440.71 2,866,784,375.55 133,707.53 10,094.05 1,349,650,493.20


178.00 138,127,298.68 775,996.06 178.00 138,127,298.68
602.00 96,940,848.62 161,031.31 - -
1,134.00 866,023,496.10 763,689.15 - -
- - 237,520.00 3,882.59 922,192,776.80

3,967,876,018.95 2,409,970,568.68

0.00 0.00

1.00 54,000,000.00 ### 1.00 54,000,000.00


1.00 45,000,000.00 ### 1.00 45,000,000.00
1.00 60,000,000.00 ### 1.00 60,000,000.00
1.00 45,000,000.00 ### - -
1.00 45,000,000.00 ### - -

249,000,000.00 159,000,000.00
102,986,481,218.04 113,274,487,055.32
10,298,648,121.80 11,327,448,705.53
113,285,129,339.84 124,601,935,760.85
113,285,129,000.00 124,601,935,000.00
TAMBAH/KURANG)

Hal. 1 dari 2
SELISIH VOLUME SELISIH JUMLAH HARGA
TAMBAH KURANG TAMBAH KURANG KET.
(Rp.) (Rp.) Bobot (%)

10 11 12 13 14

- ### - - Tetap 1.56


- ### - - Tetap 0.03
- ### - - Tetap 0.10
- ### - - Tetap 0.17
13.00 - 227,500,000.00 - Bertambah 0.20

227,500,000.00 - Bertambah

3,846.85 - 105,377,916.11 - Bertambah 0.39


- ### - - Tetap 4.26
743.82 - 415,759,922.10 - Bertambah 0.37

521,137,838.21 -

297,828.35 - 7,879,376,610.44 - Bertambah 8.96


- ### - - Tetap
16,247.05 - 1,605,199,116.71 - Bertambah 1.76
- 4,889.02 - 299,335,138.52 Berkurang 0.07
- ### - - Tetap
35,099.99 - 270,357,672.98 - Bertambah 0.24
- 17,212.88 - 2,012,171,901.70 Berkurang 4.68
- 13,095.65 - 38,670,799.67 Berkurang 0.35

9,754,933,400.13 2,350,177,839.89 Bertambah

- ### - - Tetap
563.19 - 124,266,651.38 - Bertambah 2.45

124,266,651.38 - Bertambah
7,185.31 - 1,880,506,999.31 - Bertambah 13.19
7,650.11 - 1,855,139,281.82 - Bertambah 10.06
- ### - -

3,735,646,281.13 0.00
Hal. 2 dari 2
10 11 12 13 14 Bobot (%)

11,671.57 - 204,007,138.60 - Bertambah 2.89


- 11,173.42 - 196,428,164.93 Berkurang 0.68
- 413.37 - 164,065,808.93 Berkurang 4.86
717.32 - 278,235,946.63 - Bertambah 7.67
- 55.77 - 806,953,326.12 Berkurang 17.98
10.80 - 33,455,025.11 - Bertambah 11.39
- 1,673.91 - 119,508,603.58 Berkurang 0.17

515,698,110.34 1,286,955,903.56 Berkurang

42.69 - 58,329,904.13 - Bertambah 0.19


462.95 - 6,056,733.18 - Bertambah 0.07
- 2.60 - 34,015.57 Berkurang 0.07
1,015.65 - 629,510,128.07 - Bertambah 2.82

693,896,765.38 34,015.57 Bertambah

- 11,346.66 - 1,517,133,882.35 Berkurang 1.19


- ### - - Tetap 0.12
- 602.00 - 96,940,848.62 Dihapus
- 1,134.00 - 866,023,496.10 Dihapus
3,882.59 - 922,192,776.80 - Bertambah 0.81

922,192,776.80 2,480,098,227.07 Berkurang

- -

- - Tetap 0.05
- - Tetap 0.04
- - Tetap 0.05
1.00 45,000,000.00 Dihapus
1.00 45,000,000.00 Dihapus
Tetap

- 90,000,000.00 0.14
16,495,271,823.37 6,207,265,986.09 100.04
1,649,527,182.34 620,726,598.61
18,144,799,005.71 6,827,992,584.70
18,144,799,000.00 6,827,992,000.00 Bertambah