MONTHLY CERTIFICATE
( MC - 09 )
BULAN OKTOBER 2017

S/D TANGGAL 25 OKTOBER 2017

BALAI PELAKSANAAN JALAN NASIONAL WILAYAH XIV PALU

SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH. I


PROVINSI SULAWESI TENGGARA
PEJABAT PEMBUAT KOMITMEN - 06
( KORIDOR BATAS KOTA UNAAHA - RATE RATE - KOLAKA )

NAMA PAKET PEKERJAAN : PEMBANGUNAN JALAN PEMUDA (KOLAKA)


NO.KONTRAK : KU.08.08/SPJN-WIL.I/PPK-06/KLK-RT/11.A
TANGGAL KONTRAK : 17 JANUARI 2017
NILAI KONTRAK : Rp32,755,774,000.00
NOMOR ADDENDUM I : KU.08.10/SPJN-WIL.I/PPK-06/KLK-RT/ADD
TANGGAL ADDENDUM I : 18 MEI 2017
NILAI KONTRAK SETELAH ADDENDUM I : RP 34.963.812.000,00

PT. RESTU AGUNG PERKASA -


PENYEDIA JASA :
PT. BANGUNINDO KARYA LUTAMA - KSO

KONSULTAN PENGAWAS : PT.SURYA PERKASA RAYA

TAHUN ANGGARAN 2017


KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI
H REPUBLIK INDONESIA
AN PEKERJAAN UMUM
T JENDERAL BINA MARGA

Y CERTIFICATE
C - 09 )
OKTOBER 2017

AL 25 OKTOBER 2017

AN NASIONAL WILAYAH XIV PALU

JALAN NASIONAL WILAYAH. I


ULAWESI TENGGARA
BUAT KOMITMEN - 06
UNAAHA - RATE RATE - KOLAKA )

PEMBANGUNAN JALAN PEMUDA (KOLAKA)


KU.08.08/SPJN-WIL.I/PPK-06/KLK-RT/11.A

KU.08.10/SPJN-WIL.I/PPK-06/KLK-RT/ADD.I/93

PT. BANGUNINDO KARYA LUTAMA - KSO

NGGARAN 2017
KONSULTAN SUPERVISI
SERTIFIKAT BULANAN
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH . I - PROVINSI SULAW
PEJABAT PEMBUAT KOMITMEN 06 ( KORIDOR BATAS KOTA UNAAHA - RATE RATE
TAHUN ANGGARAN 2017
NAMA PAKET : PEMBANGUNAN JALAN PEMUDA (KOLAKA)
NO. SERTIFIKAT : 09
TANGGAL SERTIFIKAT : 25 OKT 2017
TAHUN ANGGARAN : 2017 LAMPIRAN

I. UMUM JUMLAH HARGA :

KUANTITAS PENCAPAIAN
MATA
URAIAN PEKERJAAN SAT
PEMB. Kontrak Awal
ADDENDUM
Bulan Lalu Bulan Ini s/d Bulan Ini
01

1.2 Mobilisasi Ls 1.00 1.00 0.700 0.700

1.8 (1) Manajemen dan Keselamatan Lalu Lintas Ls 1.00 1.00 0.700 0.700

1.17 Pengamanan Lingkungan Hidup Ls 1.00 1.00 0.960 0.960

1.21 Manajemen Mutu Ls 1.00 1.00 0.940 0.940


I JUMLAH HARGA SAMPAI DENGAN BULAN INI
II JUMLAH HARGA SAMPAI DENGAN BULAN LALU
III JUMLAH HARGA BULAN INI
IV PENCAPAIAN PEKERJAAN

DISETUJUI OLEH : DIPERIKSA OLEH :


PIHAK PPK 06 PIHAK KONSULTAN SUPERVISI
(KORIDOR BATAS KOTA UNAAHA - PT.SURYA PERKASA RAYA
RATE RATE - KOLAKA )

MUH. HEARDIN. ST ARABU MARSIT, ST


Koordinator Lapangan Inspector
RTIFIKAT BULANAN
SIONAL WILAYAH . I - PROVINSI SULAWESI TENGGARA
RIDOR BATAS KOTA UNAAHA - RATE RATE - KOLAKA )
UN ANGGARAN 2017

: REKAPITULASI

Rp 231,577,250.00

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

169,200,000.00 118,440,000.00

20,380,000.00 14,266,000.00

9,497,250.00 9,117,360.00

32,500,000.00 30,550,000.00
Rp 172,373,360.00
Rp 172,373,360.00
Rp -
(%) 0.542

DIAJUKAN OLEH :
PIHAK KONTRAKTOR PELAKSANA
PT. RESTU AGUNG PERKASA - PT.
BANGUNINDO KARYA LUTAMA , KSO

NURYADIN MERONDA. ST
Site Manager
SERTIFIKAT BULANAN
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH . I - PROVINSI
PEJABAT PEMBUAT KOMITMEN 06 ( KORIDOR BATAS KOTA UNAAHA - RAT
TAHUN ANGGARAN 2017
NAMA PAKET : PEMBANGUNAN JALAN PEMUDA (KOLAKA)
NO. SERTIFIKAT : 09
TANGGAL SERTIFIKAT : 25 OKT 2017
TAHUN ANGGARAN : 2017 LAMPIRAN

II. DRAINASE JUMLAH HAR

KUANTITAS PENCAPAIAN
MATA
URAIAN PEKERJAAN SAT
PEMB. Kontrak Awal ADDENDUM 01 Bulan Lalu Bulan Ini

2.1 Galian untuk Selokan Drainase dan Saluran Air M3 2,069.00 2,121.74 2,121.74 -

2.2. (1) Pasangan Batu dengan Mortar M3 3,292.04 5,147.02 4,074.83 1,072.19
I JUMLAH HARGA SAMPAI DENGAN BULAN INI
II JUMLAH HARGA SAMPAI DENGAN BULAN LALU
III JUMLAH HARGA BULAN INI
IV PENCAPAIAN PEKERJAAN

DISETUJUI OLEH : DIPERIKSA OLEH :


PIHAK PPK 06 PIHAK KONSULTAN SUPERVISI
(KORIDOR BATAS KOTA UNAAHA - RATE PT.SURYA PERKASA RAYA
RATE - KOLAKA )

MUH. HEARDIN. ST ARABU MARSIT, ST


Koordinator Lapangan Inspector
TIFIKAT BULANAN
IONAL WILAYAH . I - PROVINSI SULAWESI TENGGARA
IDOR BATAS KOTA UNAAHA - RATE RATE - KOLAKA )
N ANGGARAN 2017

LAMPIRAN : REKAPITULASI

JUMLAH HARGA : Rp 3,606,766,160.76

PENCAPAIAN
HARGA SATUAN
JUMLAH HARGA (Rp)
s/d Bulan Ini (Rp)

2,121.74 33,045.98 70,115,035.24

5,147.02 687,126.61 3,536,651,125.53


Rp 3,606,766,160.76
Rp 2,870,039,019.40
Rp 736,727,141.36
(%) 11.344

DIAJUKAN OLEH :
PIHAK KONTRAKTOR PELAKSANA
PT. RESTU AGUNG PERKASA - PT.
BANGUNINDO KARYA LUTAMA , KSO

NURYADIN MERONDA. ST
Site Manager
SERTIFIKAT BULANAN
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH . I - PRO
PEJABAT PEMBUAT KOMITMEN 06 ( KORIDOR BATAS KOTA UNAAHA
TAHUN ANGGARAN 2017
NAMA PAKET : PEMBANGUNAN JALAN PEMUDA (KOLAKA)
NO. SERTIFIKAT : 09
TANGGAL SERTIFIKAT : 25 OKT 2017
TAHUN ANGGARAN : 2017

III. PEKERJAAN TANAH

KUANTITAS PENCA
MATA
URAIAN PEKERJAAN SAT
PEMB. Kontrak Awal
ADDENDUM
Bulan Lalu
01

3.1.(1a) Galian Biasa M3 20,335.32 21,489.44 20,334.40

3.2.(1b) Timbunan Biasa dari Galian M3 1,787.34 5,094.31 4,587.61

3.2.(2a) Timbunan Pilihan Dari Sumber Galian M3 10,135.93 8,834.75 8,325.55

3.3. (1) Penyiapan Badan Jalan M2 150.00 150.00 150.00


I JUMLAH HARGA SAMPAI DENGAN BULAN INI
II JUMLAH HARGA SAMPAI DENGAN BULAN LALU
III JUMLAH HARGA BULAN INI
IV PENCAPAIAN PEKERJAAN

DISETUJUI OLEH : DIPERIKSA OLEH :


PIHAK PPK 06 PIHAK KONSULTAN SUPERVISI
(KORIDOR BATAS KOTA UNAAHA - RATE PT.SURYA PERKASA RAYA
RATE - KOLAKA )

MUH. HEARDIN. ST ARABU MARSIT, ST


Koordinator Lapangan Inspector
ERTIFIKAT BULANAN
ASIONAL WILAYAH . I - PROVINSI SULAWESI TENGGARA
ORIDOR BATAS KOTA UNAAHA - RATE RATE - KOLAKA )
HUN ANGGARAN 2017

LAMPIRAN : REKAPITULASI

JUMLAH HARGA : Rp 1,256,447,926.34

PENCAPAIAN
HARGA SATUAN
JUMLAH HARGA (Rp)
Bulan Ini s/d Bulan Ini (Rp)

1,155.04 21,489.44 23,391.62 502,672,744.54

4,587.61 7,245.67 33,240,315.00

509.19 8,834.75 81,089.90 716,408,918.21

150.00 3,030.33 454,549.47


Rp 1,252,776,527.22
Rp 1,184,467,774.81
Rp 68,308,752.41
(%) 3.940

DIAJUKAN OLEH :
PIHAK KONTRAKTOR PELAKSANA
PT. RESTU AGUNG PERKASA - PT.
BANGUNINDO KARYA LUTAMA , KSO

NURYADIN MERONDA. ST
Site Manager
SERTIFIKAT BULANAN
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH . I - PR
PEJABAT PEMBUAT KOMITMEN 06 ( KORIDOR BATAS KOTA UNAAH
TAHUN ANGGARAN 2017
NAMA PAKET : PEMBANGUNAN JALAN PEMUDA (KOLAKA)
NO. SERTIFIKAT : 09
TANGGAL SERTIFIKAT : 25 OKT 2017
TAHUN ANGGARAN : 2017

IV. PELEBARAN PERKERASAN DAN BAHU JALAN

KUANTITAS PENC
MATA
URAIAN PEKERJAAN SAT
PEMB. Kontrak Awal ADDENDUM Bulan Lalu
I JUMLAH HARGA SAMPAI DENGAN BULAN INI
II JUMLAH HARGA SAMPAI DENGAN BULAN LALU
III JUMLAH HARGA BULAN INI
IV PENCAPAIAN PEKERJAAN

DISETUJUI OLEH : DIPERIKSA OLEH :


PIHAK PPK 06 PIHAK KONSULTAN SUPERVISI
(KORIDOR BATAS KOTA UNAAHA - RATE PT.SURYA PERKASA RAYA
RATE - KOLAKA )

MUH. HEARDIN. ST ARABU MARSIT, ST


Koordinator Lapangan Inspector
ERTIFIKAT BULANAN
NASIONAL WILAYAH . I - PROVINSI SULAWESI TENGGARA
ORIDOR BATAS KOTA UNAAHA - RATE RATE - KOLAKA )
AHUN ANGGARAN 2017

LAMPIRAN : REKAPITULASI

JUMLAH HARGA : Rp -

PENCAPAIAN
HARGA SATUAN
JUMLAH HARGA (Rp)
Bulan Ini s/d Bulan Ini (Rp)
Rp -
Rp -
Rp -
(%) -

DIAJUKAN OLEH :
PIHAK KONTRAKTOR PELAKSANA
PT. RESTU AGUNG PERKASA - PT.
BANGUNINDO KARYA LUTAMA , KSO

NURYADIN MERONDA. ST
Site Manager
SERTIFIKAT BULANAN
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH . I - PRO
PEJABAT PEMBUAT KOMITMEN 06 ( KORIDOR BATAS KOTA UNAAH
TAHUN ANGGARAN 2017
NAMA PAKET : PEMBANGUNAN JALAN PEMUDA (KOLAKA)
NO. SERTIFIKAT : 09
TANGGAL SERTIFIKAT : 25 OKT 2017
TAHUN ANGGARAN : 2017

V. PERKERASAN BERBUTIR

KUANTITAS PENC
MATA
URAIAN PEKERJAAN SAT
PEMB. Kontrak Awal
ADDENDUM
Bulan Lalu
01

5.1.(1) Lapis Pondasi Aggregat Klas A M3 9,992.24 10,296.77 10,118.57

5.1.(2) Lapis Pondasi Aggregat Klas B M3 9,754.43 10,036.90 9,858.70


I JUMLAH HARGA SAMPAI DENGAN BULAN INI
II JUMLAH HARGA SAMPAI DENGAN BULAN LALU
III JUMLAH HARGA BULAN INI
IV PENCAPAIAN PEKERJAAN

DISETUJUI OLEH : DIPERIKSA OLEH :


PIHAK PPK 06 PIHAK KONSULTAN SUPERVISI
(KORIDOR BATAS KOTA UNAAHA - RATE PT.SURYA PERKASA RAYA
RATE - KOLAKA )

MUH. HEARDIN. ST ARABU MARSIT, ST


Koordinator Lapangan Inspector
SERTIFIKAT BULANAN
NASIONAL WILAYAH . I - PROVINSI SULAWESI TENGGARA
KORIDOR BATAS KOTA UNAAHA - RATE RATE - KOLAKA )
AHUN ANGGARAN 2017

LAMPIRAN : REKAPITULASI

JUMLAH HARGA : Rp 8,079,347,257.53

PENCAPAIAN
HARGA SATUAN
JUMLAH HARGA (Rp)
Bulan Ini s/d Bulan Ini (Rp)

178.20 10,296.77 407,412.12 4,195,028,958.60

178.20 10,036.90 387,003.97 3,884,318,298.93


Rp 8,079,347,257.53
Rp 6,401,944,941.75
Rp 1,677,402,315.78
(%) 25.411

DIAJUKAN OLEH :
PIHAK KONTRAKTOR PELAKSANA
PT. RESTU AGUNG PERKASA - PT.
BANGUNINDO KARYA LUTAMA , KSO

NURYADIN MERONDA. ST
Site Manager
SERTIFIKAT BULANAN
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH . I - P
PEJABAT PEMBUAT KOMITMEN 06 ( KORIDOR BATAS KOTA UNA
TAHUN ANGGARAN 2017
NAMA PAKET : PEMBANGUNAN JALAN PEMUDA (KOLAKA)
NO. SERTIFIKAT : 09
TANGGAL SERTIFIKAT : 25 OKT 2017
TAHUN ANGGARAN : 2017

VI. PERKERASAN ASPAL

KUANTITAS
MATA PEMB. URAIAN PEKERJAAN SAT
Kontrak Awal ADDENDUM 01

6.1(1)(a) Lapis Resap Pengikat _ Aspal Cair Ltr 43,857.43 43,985.04

6.1(2)(a) Lapis Perekat _ Aspal Cair Ltr 7,739.55 7,762.07

Skh.6.6.3.1.(1a) CBA - Asb. Lawele Lapis Aus ( AC - WC Asb. Lawele ) Ton 4,106.09 4,173.05

Skh.6.6.3.1.(2a) CBA - Asb. Lawele Lapis Antara ( AC - BC Asb. Lawele ) Ton 6,173.37 6,106.61

Skh.6.6.3.1.(4) Aspal Keras Ton 489.71 557.16

Skh.6.6.3.1.(5) Asbuton Lawele Butir Ton 1,441.80 1,109.29

Skh.6.6.3.1.(6) Bahan Anti Pengelupasan Kg 1,813.26 1,251.59


I JUMLAH HARGA SAMPAI DENGAN BULAN INI
II JUMLAH HARGA SAMPAI DENGAN BULAN LALU
III JUMLAH HARGA BULAN INI
IV PENCAPAIAN PEKERJAAN

DISETUJUI OLEH : DIPERIKSA OLEH :


PIHAK PPK 06 PIHAK KONSULTAN SUPERVIS
(KORIDOR BATAS KOTA UNAAHA - RATE RATE - PT.SURYA PERKASA RAYA
KOLAKA )

MUH. HEARDIN. ST ARABU MARSIT, ST


Koordinator Lapangan Inspector
SERTIFIKAT BULANAN
NASIONAL WILAYAH . I - PROVINSI SULAWESI TENGGARA
ORIDOR BATAS KOTA UNAAHA - RATE RATE - KOLAKA )
AHUN ANGGARAN 2017

LAMPIRAN : REKAPITULASI

JUMLAH HARGA : Rp 12,440,368,337.74

PENCAPAIAN
HARGA SATUAN
JUMLAH HARGA (Rp)
Bulan Lalu Bulan Ini s/d Bulan Ini (Rp)

29,949.75 11,360.25 41,310.00 10,220.72 422,217,966.95

3,888.00 3,888.00 10,817.86 42,059,839.68

2,125.77 2,125.77 414,679.75 881,514,369.58

4,544.75 1,281.09 5,825.84 406,174.59 2,366,309,573.13

144.28 161.30 305.57 10,780,288.36 3,294,185,720.73

120.23 744.92 865.15 1,430,072.28 1,237,225,153.53

793.53 458.06 1,251.59 82,500.15 103,256,046.67


Rp 8,346,768,670.27
Rp 3,944,834,801.14
Rp 4,401,933,869.12
(%) 26.252

DIPERIKSA OLEH : DIAJUKAN OLEH :


PIHAK KONSULTAN SUPERVISI PIHAK KONTRAKTOR PELAKSANA
PT.SURYA PERKASA RAYA PT. RESTU AGUNG PERKASA - PT.
BANGUNINDO KARYA LUTAMA , KSO

ARABU MARSIT, ST NURYADIN MERONDA. ST


Site Manager
SERTIFIKAT BULANAN
BALAI PELAKSANAAN JALAN NASIONAL WI
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH . I -
PEJABAT PEMBUAT KOMITMEN 06 ( KORIDOR BATAS KOTA UN
TAHUN ANGGARAN 2017

R E K A P I T U L
NAMA PAKET : PEMBANGUNAN JALAN PEMUDA (KOLAKA)
NO/TANGGAL KONTRAK : KU.08.08/SPJN-WIL.I/PPK-06/KLK-RT/11.A
NILAI KONTRAK : Rp. 32,755,774,000
NO/TGL. AMANDEMEN
ADDENDUM KONTRAK : KU.08.10/SPJN-WIL.I/PPK-06/KLK-RT/ADD.I/93
NILAI ADDENDUM
KONTRAK : Rp. 34.963.812.000,00
NAMA PENYEDIA : PT. RESTU AGUNG PERKASA - PT. BANGUNINDO KARYA LUTAMA , KSO
NAMA KONSULTAN : PT.SURYA PERKASA RAYA

NILAI KONTRAK
NO JENIS PEKERJAAN
(Rp)
I UMUM 231,577,250.00

II DRAINASE 2,330,420,272.97

III PEKERJAAN TANAH 1,311,002,671.32

IV PELEBARAN PERKERASAN DAN BAHU JALAN -

V PERKERASAN BERBUTIR 7,845,963,683.04

VI PERKERASAN ASPAL 12,232,850,162.82

VII STRUKTUR 4,248,086,452.38

VIII PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 1,578,075,962.81

IX PEKERJAAN PEMELIHARAAN RUTIN -

A. JUMLAH 29,777,976,455.34
PPN (10%) 2,977,797,645.53
JUMLAH TERMASUK PPN 32,755,774,100.88
B. DIBULATKAN 32,755,774,000.00
C. MATERIAL ON SITE
D. JUMLAH BRUTO SERTIFIKAT BULAN INI ( B+C)
E. POTONGAN LAIN - LAIN
a. Sertifikat s/d Bulan Lalu
b. Retensi (5% x D)
c. Pengembalian Uang Muka (20% x D)
d. Lain - lain
F. JUMLAH POTONGAN (a + b + c + d)
G. JUMLAH NETTO PADA SERTIFIKAT INI (D - F)
H DIBULATKAN

TERBILANG = LIMA MILIAR EMPAT RATUS LIMA PULUH EMPAT JUTA

KEMAJUAN PEKERJAAN
SAMPAI DENGAN BULAN INI
SAMPAI DENGAN BULAN LALU
DALAM BULAN INI

DISETUJUI OLEH : DIPERIKSA OLEH :


PEJABAT PEMBUAT KOMITMEN 06 KONSULTAN SUPERVISI
(KORIDOR BATAS KOTA UNAAHA -
PT.SURYA PERKASA RAYA
RATE RATE - KOLAKA )

Ir. MUH. SAMTUN BONA. M.Si. Ir. SIRADJUDDIN


NIP. 19591231 199603 1 007 Site Engineer
ERTIFIKAT BULANAN
N JALAN NASIONAL WILAYAH XIV PALU
NASIONAL WILAYAH . I - PROVINSI SULAWESI TENGGARA
KORIDOR BATAS KOTA UNAAHA - RATE RATE - KOLAKA )
AHUN ANGGARAN 2017

A P I T U L A S I
NO. SERTIFIKAT : 09
TANGGAL : 25 OKT 2017
TAHUN ANGGARAN : 2017

NINDO KARYA LUTAMA , KSO

PENCAPAIAN PEKERJAAN
ADDENDUM 01
HARGA BOBOT TERTIMBANG
(Rp) (Rp) (%)
231,577,250.00 172,373,360.00 0.542

3,606,766,160.76 3,606,766,160.76 11.344

1,256,447,926.34 1,252,776,527.22 3.940

- - -

8,079,347,257.53 8,079,347,257.53 25.411

12,440,368,337.74 8,346,768,670.27 26.252

4,670,937,859.51 3,541,918,284.82 11.140

1,509,821,759.57 804,122,108.48 2.529

- - -

31,795,266,551.45 25,804,072,369.07
3,179,526,655.15 2,580,407,236.91
81.157
34,974,793,206.61 28,384,479,605.98
34,974,793,000.00 28,384,479,000.00
-
28,384,479,000.00
NILAI (RP)
15,833,912,250.00
1,419,223,950.00
5,676,895,800.00

22,930,032,000.00 -
5,454,447,000.00
5,454,447,000.00

S LIMA PULUH EMPAT JUTA EMPAT RATUS EMPAT PULUH TUJUH RIBU RUPIAH

(%)
81.157
60.382
20.775

DIAJUKAN OLEH :
KONTRAKTOR PELAKSANA
PT. RESTU AGUNG PERKASA - PT. BANGUNINDO
KARYA LUTAMA , KSO

HUDRI MAJJA. SE
Lead Firm
SERTIFIKAT BULANAN
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH . I - PRO
PEJABAT PEMBUAT KOMITMEN 06 ( KORIDOR BATAS KOTA UNAAH
TAHUN ANGGARAN 2017
NAMA PAKET : PEMBANGUNAN JALAN PEMUDA (KOLAKA)
NO. SERTIFIKAT : 09
TANGGAL SERTIFIKAT : 25 OKT 2017
TAHUN ANGGARAN : 2017

VII. STRUKTUR

KUANTITAS PENCA
MATA
URAIAN PEKERJAAN SAT
PEMB. Kontrak Awal ADDENDUM Bulan Lalu

7.1(6) Beton Mutu Sedang dengan fc'=25 Mpa M3 345.32 323.46 232.32
-
7.1 (7)a Beton Mutu Sedang dengan fc'=20 Mpa M3 78.00 126.10 126.10
-
7.1(8) Beton Mutu Sedang dengan fc'=15 Mpa M3 92.95 96.60 38.60
-
7.1(10) Beton Mutu Sedang dengan fc'=10 Mpa M3 431.99 431.99 98.92
-
7.3(1) Baja Tulangan U 24 Polos Kg 60,500.87 57,403.31 25,857.89
-
7.3(3) Baja Tulangan U 32 Ulir Kg 22,183.51 22,183.51 20,830.31
-
7.9 Pasangan Batu M3 2,609.73 3,113.04 1,542.17
-
7.15.(1) Pembongkaran Pasangan Batu M3 260.41 332.71 332.71
-
7.15.(2) Pembongkaran Pasangan Beton M3 92.43 155.14 155.14
I JUMLAH HARGA SAMPAI DENGAN BULAN INI
II JUMLAH HARGA SAMPAI DENGAN BULAN LALU
III JUMLAH HARGA BULAN INI
IV PENCAPAIAN PEKERJAAN

DISETUJUI OLEH : DIPERIKSA OLEH :


PIHAK PPK 06 PIHAK KONSULTAN SUPERVISI
(KORIDOR BATAS KOTA UNAAHA - RATE PT.SURYA PERKASA RAYA
RATE - KOLAKA )

MUH. HEARDIN. ST ARABU MARSIT, ST


Koordinator Lapangan Inspector
ERTIFIKAT BULANAN
ASIONAL WILAYAH . I - PROVINSI SULAWESI TENGGARA
ORIDOR BATAS KOTA UNAAHA - RATE RATE - KOLAKA )
HUN ANGGARAN 2017

LAMPIRAN : REKAPITULASI

JUMLAH HARGA : Rp 4,670,937,859.51

PENCAPAIAN
HARGA SATUAN
JUMLAH HARGA (Rp)
Bulan Ini s/d Bulan Ini (Rp)

55.20 287.52 1,439,142.22 413,782,171.60

126.10 1,185,823.22 149,532,308.04

38.60 953,935.62 36,821,914.75

98.92 891,403.77 88,177,661.04

25,857.89 12,987.01 335,816,815.57

20,830.31 16,676.34 347,373,376.21

1,182.00 2,724.17 727,349.96 1,981,424,944.21

332.71 296,536.04 98,660,505.83

155.14 582,239.19 90,328,587.56


Rp 3,541,918,284.82
Rp 2,604,996,809.54
Rp 936,921,475.28
(%) 11.140

DIAJUKAN OLEH :
PIHAK KONTRAKTOR PELAKSANA
PT. RESTU AGUNG PERKASA - PT.
BANGUNINDO KARYA LUTAMA , KSO

NURYADIN MERONDA. ST
Site Manager
SERTIFIKAT BULANAN
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH . I - PROVI
PEJABAT PEMBUAT KOMITMEN 06 ( KORIDOR BATAS KOTA UNAAHA -
TAHUN ANGGARAN 2017
NAMA PAKET : PEMBANGUNAN JALAN PEMUDA (KOLAKA)
NO. SERTIFIKAT : 09
TANGGAL SERTIFIKAT : 25 OKT 2017
TAHUN ANGGARAN : 2017

VIII. PENEMBALIAN KONDISI DAN PEKERJAAN MINOR

KUANTITAS
MATA
URAIAN PEKERJAAN SAT
PEMB. Kontrak Awal ADDENDUM

8.4(1) Marka Jalan Termoplastic M3 1,815.45 1,835.40

8.4(3a) Rambu Jalan Tunggal Dengan Permukaan Pemantul . Engg. Grade Buah 44.00 44.00

8.4(10a) Kerb Pra Cetak Jenis 1 ( Peninggi / Mountable) M' 12,330.00 11,680.00
I JUMLAH HARGA SAMPAI DENGAN BULAN INI
II JUMLAH HARGA SAMPAI DENGAN BULAN LALU
III JUMLAH HARGA BULAN INI
IV PENCAPAIAN PEKERJAAN

DISETUJUI OLEH : DIPERIKSA OLEH :


PIHAK PPK 06 PIHAK KONSULTAN SUPERVISI
PT.SURYA PERKASA RAYA
(KORIDOR BATAS KOTA UNAAHA - RATE
RATE - KOLAKA )

MUH. HEARDIN. ST ARABU MARSIT, ST


Koordinator Lapangan Inspector
NAN
AH . I - PROVINSI SULAWESI TENGGARA
KOTA UNAAHA - RATE RATE - KOLAKA )
2017

LAMPIRAN : REKAPITULASI

JUMLAH HARGA : Rp 1,509,821,759.57

PENCAPAIAN
HARGA SATUAN
JUMLAH HARGA (Rp)
Bulan Lalu Bulan Ini s/d Bulan Ini (Rp)

- - 119,205.40 -

- - 495,982.27 -

4,400.00 3,000.00 7,400.00 108,665.15 804,122,108.48


Rp 804,122,108.48
Rp 478,126,660.00
Rp 325,995,448.48
(%) 2.529

KSA OLEH : DIAJUKAN OLEH :


LTAN SUPERVISI PIHAK KONTRAKTOR PELAKSANA
PERKASA RAYA PT. RESTU AGUNG PERKASA - PT.
BANGUNINDO KARYA LUTAMA , KSO

MARSIT, ST NURYADIN MERONDA. ST


Site Manager
SERTIFIKAT BULANAN
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH . I
PEJABAT PEMBUAT KOMITMEN 06 ( KORIDOR BATAS KOTA U
TAHUN ANGGARAN 2017
NAMA PAKET : PEMBANGUNAN JALAN PEMUDA (KOLAKA)
NO. SERTIFIKAT : 09
TANGGAL SERTIFIKAT : 25 OKT 2017
TAHUN ANGGARAN : 2017

IX PEKERJAAN PEMELIHARAAN RUTIN

KUANTITAS
MATA
URAIAN PEKERJAAN SAT
PEMB. Kontrak Awal ADDENDUM

10.1(1) Pemeliharaan Rutin Perkerasan Ls 1.00

10.1(2) Pemeliharaan Rutin Bahu Jalan Ls 1.00

Pemeliharaan Rutin Selokan, Saluran Ais, Galian dan


10.1(3) Ls 1.00
Timbunan

10.1(4) Pemeliharaan Rutin Perlengkapan Jalan Ls 1.00

10.1(5) Pemeliharaan Rutin Jembatan Ls 1.00


I JUMLAH HARGA SAMPAI DENGAN BULAN INI
II JUMLAH HARGA SAMPAI DENGAN BULAN LALU
III JUMLAH HARGA BULAN INI
IV PENCAPAIAN PEKERJAAN

DISETUJUI OLEH : DIPERIKSA OLEH :


PIHAK PPK 06 PIHAK KONSULTAN SUPERVIS
(KORIDOR BATAS KOTA UNAAHA - RATE RATE - KOLAKA ) PT.SURYA PERKASA RAYA

MUH. HEARDIN. ST ARABU MARSIT, ST


Koordinator Lapangan Inspector
SERTIFIKAT BULANAN
N NASIONAL WILAYAH . I - PROVINSI SULAWESI TENGGARA
( KORIDOR BATAS KOTA UNAAHA - RATE RATE - KOLAKA )
TAHUN ANGGARAN 2017

LAMPIRAN : REKAPITULASI

JUMLAH HARGA : Rp -

PENCAPAIAN
HARGA SATUAN
JUMLAH HARGA (Rp)
Bulan Lalu Bulan Ini s/d Bulan Ini (Rp)
Rp -
Rp -
Rp -
(%) -

DIPERIKSA OLEH : DIAJUKAN OLEH :


PIHAK KONSULTAN SUPERVISI PIHAK KONTRAKTOR PELAKSANA
PT.SURYA PERKASA RAYA
PT. RESTU AGUNG PERKASA - PT.
BANGUNINDO KARYA LUTAMA , KSO

ARABU MARSIT, ST NURYADIN MERONDA. ST


Site Manager