II PEKERJAAN PERBAIKAN
1 Penggantian pompa transfer 1,5kw (celup) 2 Unit
2 Pekerjaan Rewirring panel system STP 2 Unit
3
1 2 3 4
D PEKERJAAN LAIN-LAIN
1 Pekerjaan buang sampah limbah 12 Rit
2 pekerjaan pembersihan 1 Ls
4
-
32,901,000.00 32,901,000.00 32,753,000.00
JUMLAH III 32,901,000.00
JASA 10% 3,290,100.00
SUB TOTAL III 36,191,100.00
JUMLAH A 132,445,350.00
-
-
-
41,262,500.00 41,262,500.00 (2,500.00)
8,200,000.00 8,200,000.00 (20,000.00)
41,385,000.00 41,385,000.00 (15,000.00)
11,500,000.00 11,500,000.00 (5,000.00)
JUMLAH I 102,347,500.00
-
-
-
5,547,000.00 5,547,000.00 (3,000.00)
1,296,000.00 1,296,000.00 (4,000.00)
JUMLAH a 6,843,000.00
-
-
2,143,500.00 2,143,500.00 (6,500.00)
1,296,000.00 1,296,000.00 (4,000.00)
JUMLAH b 3,439,500.00
-
-
2,143,500.00 2,143,500.00 (6,500.00)
1,296,000.00 1,296,000.00 (4,000.00)
5
JUMLAH c 3,439,500.00
JUMLAH II 13,722,000.00
-
17,650,000.00 17,650,000.00 2,400,000.00
22,000,000.00 22,000,000.00 2,150,000.00
13,450,000.00 13,450,000.00
2,647,500.00 21,180,000.00 (2,500.00)
24,735,000.00 24,735,000.00 14,985,000.00
JUMLAH B 234,514,200.00
-
-
-
23,085,000.00 23,085,000.00 (15,000.00)
4,664,000.00 4,664,000.00 (1,000.00)
25,750,500.00 25,750,500.00 (49,500.00)
5,383,500.00 5,383,500.00 (16,500.00)
JUMLAH I 58,883,000.00
-
-
2,143,500.00 2,143,500.00 (6,500.00)
1,749,000.00 1,749,000.00 (1,000.00)
JUMLAH a 3,892,500.00
-
2,143,500.00 2,143,500.00 (6,500.00)
1,296,000.00 1,296,000.00 (4,000.00)
JUMLAH b 3,439,500.00
JUMLAH C 66,215,000.00
-
(1,350,000.00)
17,845,000.00 71,380,000.00 16,095,000.00
2,545,000.00 10,180,000.00
20,245,000.00 80,980,000.00
2,985,600.00 11,942,400.00
JUMLAH I 174,482,400.00 #VALUE!
748,500.00 8,982,000.00
1,485,000.00 1,485,000.00
SUB TOTAL D 10,467,000.00
7
233,471,074
0.99700
34,665,000.00
6,645,000.00
36,390,000.00
7,500,000.00
JUMLAH I
5,550,000.00
1,750,000.00
JUMLAH (a)
2,150,000.00
1,750,000.00
JUMLAH (b)
JUMLAH II
SUB TOTAL I + II
148,000.00 233,471,074
JUMLAH III
JASA 10%
SUB TOTAL III
JUMLAH A
41,265,000.00
8,220,000.00
41,400,000.00
11,505,000.00
JUMLAH I
5,550,000.00
1,300,000.00
JUMLAH a
2,150,000.00
1,300,000.00
JUMLAH b
2,150,000.00
1,300,000.00
8
233,471,074
JUMLAH c
JUMLAH II
SUB TOTAL I + II
15,250,000.00
19,850,000.00
2,650,000.00
9,750,000.00
7,500,000.00
12,500,000.00
JUMLAH
JASA 10%
JUMLAH III
JUMLAH B
23,100,000.00
4,665,000.00
25,800,000.00
5,400,000.00
JUMLAH I
2,150,000.00
1,750,000.00
JUMLAH a
2,150,000.00
1,300,000.00
JUMLAH b
JUMLAH II
1,350,000.00
1,750,000.00
JUMLAH III
JASA 10%
JUMLAH III
JUMLAH C
750,000.00 750,000.00
1,632,000.00
JUMLAH D
9
233,471,074
REKAPITULASI
PROYEK : PERBAIKAN PENGOLAHAN AIR LIMBAH (STP) DILINGKUNGAN PERKANTORAN KEMHAN TW. III TA. 201
LOKASI : JL. MERDEKA BARAT 13-14 DAN JLN. TANAH ABANG TIMUR NO. 4-8 JAKARTA
JUMLAH
PPN 10%
TOTAL
DIBULATKAN
TERBILANG : TUJUH RATUS TUJUH PULUH DUA JUTA LIMA RATUS RIBU RUPIAH
Jakarta, 2017
LINDA WIJAYA
Direktur
NTORAN KEMHAN TW. III TA. 2016
132,445,350.00
234,514,200.00
66,215,000.00
258,631,300.00
10,467,000.00
###
702,272,850.00
70,227,285.00 490,000,000.00 mj
772,500,135.00 490,600,000.00 cv.fajar ilham sentosa
772,500,000.00 490,900,000.00 cv indira pertiwi
491,400,000.00 cv. Dagizam sinar persada
RATUS RIBU RUPIAH
491,700,000.00 cv. Semanggijaya
Jakarta, 2017
LINDA WIJAYA
Direktur
JADWAL WAKTU PELAKSANAAN
PROYEK : PERBAIKAN PENGOLAHAN AIR LIMBAH (STP) DILINGKUNGAN PERKANTORAN KEMHAN TW. III TA. 2016
LOKASI : JL. MERDEKA BARAT 13-14 DAN JLN. TANAH ABANG TIMUR NO. 4-8 JAKARTA
A PEMELIHARAAN STP GEDUNG A. YANI ()() ()() ()() ()() ()() ()() ()() ()()
B PEMELIHARAAN STP GEDUNG PANJAITAN ()() ()() ()() ()() ()() ()() ()() ()() ()()
C PEMELIHARAAN STP GEDUNG P. TENDEAN ()() ()() ()() ()() ()() ()() ()() ()() ()()
Jakarta, 2017
LINDA WIJAYA
Direktur
N KE -
I Ket.
12
Jangka Waktu
()() Pelaksanaan 120
(Seratus Dua
Puluh )
()()
()()
Hari
Kalender
DAFTAR ALAT
PROYEK : PERBAIKAN PENGOLAHAN AIR LIMBAH (STP) DILINGKUNGAN PERKANTORAN KEMHAN TW.
TA. 2016
LOKASI : JL. MERDEKA BARAT 13-14 DAN JLN. TANAH ABANG TIMUR NO. 4-8 JAKARTA
4 PERALATAN K3 1 SET
5 WORKSHOP 1 LOT
Jakarta, 2017
LINDA WIJAYA
Direktur
N PERKANTORAN KEMHAN TW. III
8 JAKARTA
KET
MILIK SENDIRI
MILIK SENDIRI
MILIK SENDIRI
MILIK SENDIRI
MILIK SENDIRI
MILIK SENDIRI
, 2017
MAJU JAYA
DA WIJAYA
SPESIFIKASI MATERIAL
PROYEK : PERBAIKAN PENGOLAHAN AIR LIMBAH (STP) DILINGKUNGAN PERKANTORAN KEMHAN TW.
2016
LOKASI : JL. MERDEKA BARAT 13-14 DAN JLN. TANAH ABANG TIMUR NO. 4-8 JAKARTA
MATERIAL MEKANIKAL
Jakarta, 2017
LINDA WIJAYA
Direktur
RKANTORAN KEMHAN TW. III TA.
8 JAKARTA
KETERANGAN.
4