Anda di halaman 1dari 9

^r HARGA JUAL PERDANA

Gitra Maja Raya


An Integrated New Town CLUSTER NAVINA (RE)
Berlaku per : 8 OKTOBER 2016

STANDARD CARA PEMBAYARAN


LUASIM2) CASH TAHAP KPR
12 BULAN 24 BULAN 24 BULAN KPR1 KPR 2 KPR 3
GGN TNH TANPA DP DP 50% = 23 BLN DP 5% = 1 BLN DP 15% = 3 BLN DP 50% = 23 BLN
1BULAN TANPA DP

1 PADMAKA 6X12 27 72 293,333,492 310,759,244 328,184,996 344,158,602 296,237,784 302,046,368 344,158,602

2 KAMALA 7X12 36 84 350,432,690 371,250,367 392,068,145 411,151,108 353,902,219 360,841,478 411,151,108

3 CHANDANA 8X12 41 36 411,205,825 435,633,894 460,061,962 482,454,359 415,277,170 423,419,859 482,454,359

Harga dan ketentuan diatas dapat be m bah sewaktu - waktu Ian pa pemberiiahuan teriebih dahulu /YO/ns/2016 - TANGGAL 4 OKTOBER 201S
-Harga sudah termasuk PPN & Biaya Surat (BBN, BPHTB, AJB)
-Untuk cara bayar KPR: Perhitungan Down Payment (DP) diambil dari Harga pengikatan drkurangi Biaya Surat

\SI RENCEMBANGX
HARGA JUAL PERDANA
ClTRA MAJA RAYA CLUSTER NAVINA (RE)
An Integrated New Town
KETENTUAN CARA BAYAR :
Uang Tanda Jadi (UTJ) Rp. 5 JUTA
ng menyeOabkan tarif PPM berubah.
1 CASK KERAS (1 BULAN) embefl pada saat pembayaran angs
S KPR: dibayarkan bersamaai

2CASHBERTAHAP12BULAN(TANPADP)
Angsurania 4.17%H,

Angsuran2 s.d 12 . 91.56% dibagi 11 Bin: H,


3CASH BERTAHAP 24 BULAN (TANPADP)
Angsurania. 2.08%: Hi
Angsuranib. 2.08%: H,
Angsuran 2 s.d 24 : 95 54% dibagi 23 Bin: H, BCA, BRi, SMI, STN, MANDIRJ, CIM8 NIAGA, OCBC NISP. UOe, Danamon
4 Ketentuan Khusus cara bayar KPR:
4CASH BERTAHAP 24 BULAN (DP 50% = 23 BULAN) a Psmbeli dengan KPR Ke-1: cara bayar yang bisa dipiHh KPR 1, KPR 2, Atau KPR 3
DP 1a: 1.09%H; ike 15seteiah UTJ b.Perobeli dengan KPR Ke-21 cara bayar yang blaadipilih KPR 2. Alau KPR 3
DP 1b: 1.09% H, i ke 30 seteiah UTJ c.Pembeli dengan KPR Ke-3, dst: cara bayar yang bisa diptlih HANYA KPR 3
DP 2 - 23 : 47.83% dibagi 22 Bin H, i ke 60 s.d hari ke 690 seteiah UTJ d.Penentuan bahwa pembeli merupakan KPR ke-1 atau Ke-2 berdasarkan Analiaa Bl-Checking ya
PELUNASAN-50%H, ike 720seteiah UTJ
vn Payment (DP), d nengenai KPR ak
5KPR 1 (DP mln. 5% >= 1 bulan)
DP la: 2.5%: Hi e15setelah UTJ
DP 1b. 2.5%* Blaya Surat- Hi e 30 seteiah UTJ
Akad Kredit - KPR 90% 1 an eejak pelunasan DP
b. KPR 3 pada saat jatuh tempo DP ke 20 (20 bulan sejak (Jang Tarn
Hari ke 15 seteiah UTJ
Hari ke 30 seteiah UTJ 7 Pengalihan Hak ( Ganti Mama dlkanakan Blaya 2,51
Hari ke 60 s.d 90 seteiah UTJ n (Pph Final 2,5% + Bla ya Admin 51
1 buian sejak pelunasan DP 3 Sarah Tarima bangunan 24 bulan sejak Uang Tand^
7 KPR 3 (DP 30% = 23 b
Hari ke 15 seteiah UTJ NOTE:
CASH / CASH TAHAP : UTJ diperhrtungkan di
Han ke 60 s.d hari ke 690 sddah UTJ KPR : UTJ diperhitun^an di Total DP
1 bulan sejak pelunasan DP

PENGEMBAIVCl
HARGA JUAL PERDANA
ClTRA MAJA RAYA
An Integrated New Town CLUSTER NAVINA (RE)
Berlaku per: 8 OKTOBER 2016

SUDUT & IRR CARA PEMBAYARAN


LUAS(M2) CASH TAHAP KPR
NO TIPE Ukuran BLOK No
BON TNH 1BULAN DP 50% =13 BUN DP 6% -1BUUAN DPT^-^BDLAN DP^-^BUN
TANPADP TANPADP
1 CHANDANA SUDUT 8X12 F.01 1 42 130 468/65,705 496,825,054 524,684,402 550,222,130 473/08,930 482/95,379 550/22,139

2 CHANDANA SUDUT 8X12 F.02 2 42 130 468/65,705 496,825,054 524,684,402 560/22,139 473/08/30 482,895,379 550/22,139
3 KAMALA IRR 7X12 F.02 36 36 136 438,771,230 464,636/47 490/02,465 514,795,948 443,115/99 451/04/38 514,795,948

CHANDANA SUDUT 8X12 F.03 1 42 130 468/65,705 496,825/54 524/84/02 550,222,139 473/08/30 482,695,379 550/22,139
5 KAMALA SUDUT 7X12 F/3 2 3G 118 408,192/70 432,441/27 456,690/85 478/18,888 412,233/79 420,316/98 478,918/88

6 KAMALA SUDUT 7X12 F.05 1 36 118 408,192/70 432,441,527 456/90/85 476/18,888 412,233/79 420,316/98 478/18/88
7 CHANDANA SUDUT 8X12 F.D5 2 42 130 468/65,705 496,825,054 524/84/02 550,222,139 473,608/30 482/95,379 550/22,139

8 KAMALA SUDUT 7X12 F.06 1 36 118 408,192/70 432,441/27 456,690/85 478/18,688 412,233/79 420,316/98 478/18/88
9 KAMALA SUDUT 7X12 F.06 2 36 118 408,192/70 432,441,527 456/90/85 478,918/88 412,233/79 420,316/98 478/18,888

10 KAMALA SUDUT 7X12 F.07 1 36 118 408,192/70 432,441,527 456/90/85 478/18/88 412,233/79 420,316/98 478/18,888
11 PADMAKA SUDUT 6X12 F.07 2 27 106 351/93,372 371,950/04 392,807/36 411/26,382 354,569,544 361,521/88 411/26,382
T 27 106 351/93,372 371/50/04 392,607/36 411,926,382 354,569,544 361,521,888 411/26,382
12 PADMAKA SUDUT 6X12 F.08
13 PADMAKA SUDUT 6X12 F.08 17 27 94 339,707/32 350,353/24 369/99/16 388,008,342 333/81,864 340,530,528 388/98,342
14 PADMAKA SUDUT 6X12 F.OB 27 186 486,998,972 515/29,604 544,860,236 571,379,982 491,820,744 501/54,288 571,379,982
15 PADMAKA SUDUT 6X12 F.06 16 27 94 330,707,532 350,353,524 369/99/16 388,008,342 333/81,864 340,530,528 3B8,0OB,342

:: PADMAKA SUDUT 6X12 F.06 1 27 94 330,707,532 350,353/24 366/99/16 388,008,342 333/81,884 340,530,528 388/08,342

17 PADMAKA SUDUT 6X12 F.10 1 27 94 330,707,532 350,353/24 369/99/16 388,008,342 333,981,864 340,530,528 388/08,342
18 PADMAKA SUDUT 5X12 94 330,707,532 350,353/24 369/99/16 388,008,342 333/81,864 340,530,528 388/08,342

TV KAMALA SUDUT 7X12 F.11 1 36 11B 408,192,470 432/41,527 456/90,586 478/18,888 412,233/76 420,316/98 478/18,888
20 KAMALA SUDUT 7X12 F.11 2 36 118 408,192/70 432,441,527 456/90,585 478/18,888 412,233/79 420,316,998 478/18,868

21 PADMAKA SUDUT 6X12 F.12 1 27 106 351,093,372 371/50/04 392/07/36 411/26,382 354,569,544 361,521,888 411/26,382
22 KAMALA SUDUT 7X12 F.12 2 36 118 408,192,470 432/41,527 456/90,585 478/18/88 412,233/79 420,316,998 478,918,888

-Harga dan ketentuan dlatas da pat berubah sewaktu -waktu mpa pemberitahuan terteUh dahulu IM-017^MKT-CMR/YO'ns^2016-TANGGAL 4 OKTOBER 2016
-Harga sudah termasuk PPN 8 Bla .Surat(BBN,BPHTB,A
-Untuk cara bayar KPR: Pertiltung; Down Payment (DP) dl t\ dart Harga pengJkatan dikurangr Biaya Surat

^C CIPUTRA2^

PENGEMBANGl
Mr HARGA JUAL PERDANA
CLUSTER TEVANA (RS)
Gitra Maja Raya
An Integrated New Town
Beriaku per : 8 OKTOBER 2016

STANDARD CARA PEMBAYARAN


LUAS (M2) CASH TAHAP KPR
CASH KERAS
12 BULAN 24 BULAN 24 BULAN KPR1 KPR 2 KPR 3
NO TIPE Ukuran
BGN TNH 1BULAN TANPA DP TANPA DP OP 50% = 23 BLN DP 5% = 1 BLN DP15X = 3BLN DP 50% = 23 BLN

1 JAATI 5X12 22 60 149,829,799 157,174,397 165,987,915 174,066,973 151,298,719 154,236,558 174,066,973

2 DRAVANT1 6X12 27 72 187,504,070 196,695,446 207,725,098 217,835,611 189,342,346 193,018,896 217,835,611

3 TARUNP-A 6X12 36 72 211,796,350 222,178,524 234,637,132 246,057,524 213,872,784 218,025,654 246,057,524

4 TARUNI-B 6X18 36 108 261,901,320 274,739,620 290,145,580 304,267,710 264,468,980 269,604,300 304,267,710

-Harga dan ketentuan diatas dapat bembah sewaktu - waktu tan pa pemberitahuan teriebih dahulu IM- 018/MKT-CMR/YO/ns/XT2015 -TANQOAl. 4 OKTOBER M1S
-Harga sudah termasuk PPM & Siaya Surat (BBN, BPHTB, AJB)
-Untuk cara bayar KPR : Perhitungan Down Payment (DP) diambil dari Harga pengikatan dikurangi Biaya Surat

llPUTRATSj.

I SI REIVGEMBANGV
HARGA JUAL PERDANA
Gitra Maja Raya CLUSTER TEVANA (RS)
An Integrated New Town
KETENTUAN CARA BAYAR:
Uang Tanda Jadl [UTJ] Rp. 3 JUTA : Pada saat transaksi
1 PPN 10% (Apabila teijadi pwaturan peroe
ell pada eaat pembayaran an

,ngan biayiipajakyangmengalam
ditangflung daii wajib dib i AJB dKsndatangani)
2CASH BERTAHAP12 BULAN (TANPA DP)
Angsuran1a:4.17% : Hanke15setelahUTJ
Angsuranib 4.17% Cara Bayar KF>R harga 1selum terma^uk Biaya 1
Anasuran2 s d 12: 91.66% dibagi 11 Bin: H
CATATAN :
3CASH BERTAHAP 24 BULAN (TANPA DP) """ak dapat dituker/diganti
Ansstiran 1a: 2.08%: H ( Parjaniian Pengikatan ,an setslah tanda jadi
Anpsuran 1b1 2.08%: H.
Angsuran 2 s.d 24 : 95 84% dibagi 23 Bin: H. BCA, BRI. BNl. BTN. MANDJR1, CIMB NIAGA. OCBC NISP, UOB, Danamon
1 Ketentuan Khuius data bayar KPR:
4CASH BERTAHAP 24 BULAN (DP 50% = 23 BULAN) a Pembeli dennan KPR Ks-1. cars bayar yang bisa dplih KPR 1. KPR 2. Atau KPR 3
b.PembeP dengan KPR Ke-2: cara bavar yans bisa dipilib KPR 2, Atau KPR 3
c.Pembeli dengan KPR Ke-3, dst: cara bayar Yang bisa dipilih HANYA KPR 3
d Penantuan babwa pe^beli merupakan KPR ka-1 atau Ke-2 berdasarkan Anallaa Bl^hecklng yang dlk

e. B%3aran Suku Bunga. Dcwn Payment (DP), dan syarat syarat manganai KPR akart mengikLiti ketentu^
5KPR1 (DP min. 5% > 1 bulan]
DP 1a. 2.5% arike15*etelahUTJ 5 Harga dan ketentuan dapat berubab sewaktu ^uaktu tanoa pemberitabuan taietth dahulu
DPib 2,5% + BiayaSurat an ke 30 setelah UTJ 3 Dckumen KPR lengkaB walib diberikan ke developer:
luta n aejak pejunasan DP

6KPR 2 (DP mln. 13% = 3 blllan)


DP 1a: 2.5% : Harike15Eete1ahUTJ
DP 1b 2.5% : Haii ke 30 setejah UTJ
DP 2 3 : 10% dibagi 2 Bin * Blava Si : Han ke 60 s.d 90 selelah UTJ
AkadKredit-KPR 85% ; 1 bulan sejak oetunasan DP 24 bulan sejak Jang Ts

Hari ke 15 setelah UTJ NOTE:


: Hari ke 30 setelah UTJ CASH / CASH TAHAP : UTJ diberhitungkart di Total Harga
m 22 Bin + Biava Surat : Hari ke 60 s.d hari ke 690 sete KPR : UTJ diperhrtungkan di Total DP
: 1 bulan sejak pelunasan DP

1st PEIVCEMBA MGI


/Mr HARGA JUAL PERDANA
Gitra Maja Raya ^ev z-
An Integrated New Town CLUSTER TEVANA (RS) M per :S OCTOBER 2016

SUDUT & IRR CARA PEMBAYARAN


LUAS |M2) CASH TAHAP KPR
NO TIPE up BLOK No 12 BULAN 24 BULAN 24 BULAN KPR 1 KPR 2 KPR 3
BGN TNH
1 BULAN nwwop TAHP.DP DPJOX-MBLN DPSX-.B.N BF15X-3BLN DPSOX-^BLN

1 TARUNI-B SUDUT 6X16 E.01


........... .__ 160 ^^^ 370,325,905 388,350,617 337,553,701 344,103,142 368,350,617
2 TARUNI-B SUDUT 6X16 E.01 53 36 162 337,060,550 353,563,126 373,410,218 391,585,051 340,366,068 346,974,096 391,585,051

3 DRAVANTI SUDUT 6X12 E.02 1 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,998.896 240,579,360 271,510,992
4 TARUNI-A SUDUT 6X12 E.02 2 36 106 259,118,434 271,820,318 287,062,578 301,034,651 261,658,810 266,739,564 301,034,651
5 TARUNI-A SUDUT 6X12 E.D2 66 36 108 261,901,320 274,739,620 290,145,580 304,267,710 264,468,980 269,604,300 304,267,710

DRAVANTI SUDUT 6X12 E.O3 27 100 233,705,664 245,161,824 258,909,216 271,510,992 235,996,896 240,579,360 271,510,992
DRAVANTI SUDUT 6X12 E.03 2 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,966,896 240,579,360 271,510,992

8 DRAVANTI SUDUT 6X12 E.05 1 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,896 240,579,360 271,510,992
6 DRAVANTI SUDUT 6X12 E.05 2 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,896 240,579,360 271,510,992

io"- TARUNI-B 334,276,461" 350,662,583 370,325,905 386,350,617 337,553,701 344,108,142 388,350,617


SUDUT 6X18 E.07 2 36 160
TARUNI-B SUDUT 6X18 E.07 66 36 162 337,060,550 353,583,128 373,410,218 391,585,051 340,365,066 346,974,096 391,585,051

12 TARUNI-A SUDUT 6X12 E.08 1 36 259,118,434 271,820,318 287,062,578 261,658,810 301,034,651


13 TARUNI-A SUDUT 6X12 E.08 53 36 108 281,901,320 274,739,020 290,145,580 304,287,710 284,488,980 269,604,300 304,267,710
14 DRAVANTI SUDUT 6X12 E.08 2 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,998,898 240,579,360 271,510,992
15 DRAVANTI IRR 6X12 E.08 70 27 108 236,423,474 ! 261,920,124 274,668,448 238,741,352 243,377,106 274,668,448

ia" DRAVANTI SUDUT 6X12 1 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,998,896 240,579,360 271,510,992
17 ORAVANT1 SUDUT 6X12 E.09 51 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,896 240,579,360 271,510,992
18 DRAVANTI SUDUT 6X12 E.09 2 27 106 233,705,664 245,161,624 258,909,216 271,510,992 235,996,896 240,579,380 271,510,992
19 DRAVANTI SUDUT 6X12 E.09 62 27 106 233,705,664 245,161,824 258,906,216 271,510,992 235,996,896 240,579,360 271,510,992
iS 240,579,360 271,510,992
20 DRAVANTI SUDUT 6X12 E.10 1 27 106 233,705,664 245,161,624 258,909,216 271,510,992
21 DRAVANTI IRR 6X12 E.10 3 27 127 262,240,698 275,095,844 290,521,780 304,662,220 264,811,868 269,953,566 304,662,220
22 DRAVANTI SUDUT 6X12 E.10 2 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,898 240,579,360 271,510,992
23 DRAVANTI IRR 6X12 E.10 8 27 70 197,016,996 208,674,894 218,263,930 225,887,395 198,948,538 202,811,618 228,887,395

(Mr HARGA JUAL PERDANA


Citra Maja Raya
An Integrated New Town CLUSTER TEVANA (RS) Kuper:SOKTO6ER201B

SUDUT & IRR CARA PEMBAYARAN


LUAS(M2) CASH TAHAP KPR
NO TIPE Ukuran BLOK No 12 BULAN 24 BULAN 24 BULAN KPR 1 K^^ 2 KPR 3
BON TNH
TANPADF TAN PA DP DP^-iBLN DP15X-3BLN OFMX^23BLN

24 DRAVANTI SUDUT 6X12 E.11 51 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,696 240,579,380 271,510,992
26 DRAVANTI SUDUT 8X12 E.11 82 27 106 233,705,664 245,161,624 258,909,218 271,510,992 235,996,896 240,579,360 271,510,992

26 DRAVANTI SUDUT 6X12 E.12 27 106 233,705,664 243,181,824 258,909,218 271,510,992 235,996,806 240,579,360 271,510,992
27 DRAVANTI IRR 6X12 E.12 5 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,866 240,579,360 271,510,992
28 DRAVANTI SUDUT 6X12 E.12 2 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,896 240,579,360 271,510,992
29 DRAVANTI IRR 8X12 E.12 8 27 69 210,804,867 220,928,835 233,317,157 244,673,302 212,669,621 216,796,128 244,673,302
30 DRAVANTI IRR l_Xla. E.12 10 27 114 244,575,722 256,564,728 270,951,536 264,139,442 246,973,524 251,769,126 284,139,442

31 DRAVANTI SUDUT 6X12 E.15 33 27 106 233,705,664 245,161.824 258,909,218 271,510,992 235,996,896 240,579,360 271,510,992
32 JAATI SUDUT 5X12 E.15 50 22 94 191,993,131 201,404,559 212,698,273 223,050,844 193,875,417 197,639,988 223,050,844

33 DRAVANTI SUDUT 6X12 E.16 1 27 108 233,705,664 245,161,824 258,909,218 271,510,992 235,996,896 240,579,380 271,510,992
34 DRAVANTI IRR 8X12 E.16 7 27 160 307,082,995 322,136,083 340,199,789 356,758,186 310,993,613 316,114,848 358,758,186
35 JAATI SUDUT 5X12 E.16 2 22 94 191,993,131 201,404,559 212,698,273 223,050,644 193,875,417 197,639,988 223,050,844
36 JAATI IRR 5X12 E.16 16 22 78 189,672,063 177,989,321 187,970,031 197,119,015 171,335,515 174,662,418 197,119,015

37 JAATI SUDUT 5X12 E.17 25 22 94 191,993,131 201,404,559 212,898,273 223,050,844 193,876,417 197,639,988 223,050,844
38 JAATI SUDUT 5X12 E.17 32 22 94 191,993,131 201,404,559 212,698,273 223,050,844 193,875,417 197,639,988 223,050,844

212,698,273 223,050,844 193,876,417 "^ 223,050,844


39 JAATI SUDUT 5X12 E.18 1 22 94 191,993,131 201,404,559
40 JAATI IRR 5X12 E.18 11 22 117 220,516,534 231,326,168 244,297,728 256,168,326 222,878,460 227,002,314 256,188,326
JAATI SUDUT 5X12 E.18 2 22 94 191,993,131 201,404,559 212,698,273 223,050,844 193,875,417 167,636,988 223,050,844
42 JAATI SUDUT 5X12 E.18 18 22 82 177,112,025 185,793,987 186,212,341 205,782,499 178,848,417 182,321,202 205,762,499

43 JAATI SUDUT 5X12 E.19 29 22 94 191,993,131 201,404,559 212,698,273 223,050,644 193,875,417 197,639,688 223,050,844
44 JAATI SUDUT 5X12 E.19 58 22 94 191,993,131 201,404,559 212,898,273 223,050,844 193,875,417 197,639,988 223,050,844
HARGA JUAL PERDANA
ClTRA MAJA RAYA Rev t
An Integrated New Town CLUSTER TEVANA (RS) Bcriaku p: 8 0KT08ER20ia

SUDUT & IRR CARA PEMBAYARAN


LUAS(M2) CASH TAHAP KPR
NO TIPE Ukuran BLOK No 12 BULAN 24 BULAN 24 BULAN KPR 1 K^^^ 2 KPR 3
.
TANPADP IANPADP DPBK-HBLN DP^-.BLN DPin-iau DPSOT^23BL^

45 JAAT1 SUDUT 5X12 E.20 1 22 94 191,993,131 201,404,559 212,693,273 223,050,644 193,675,417 187,638,988 223,050,844
46 JAATI iRR 6X12 E.20 15 22 122 226,716,502 237,630,056 251,166,320 263,391,230 226,939,212 233,384,634 263,391,230
"20V,4M^sS9" -"^g^^" 193,875,417" 223,060,844
47 JAATl SUDUT 5X12 E.20 2 22 94 191,993,131 223,050,844 197,639,988
46 JAATI SUDUT 5X12 E.20 20 22 65 160,832,006 169,696,320 200,333,496 210,084,242 162,604,666 166,150,594 210,064,242

49 JAATI SUDUT 5X12 E.21 7 22 94 191,993,131 201,404,559 212,698,273 223,050,644 193,676,417 197,639,985 223,050,844

50 JAATI SUDUT 5X12 E.23 1 22 94 191,993,131 201,404,559 212,698,273 223,050,844 193,875,417 197,639,886 223,050,644
51 JAATI IRR 5X12 E.23 15 22 127 232,917,653 244,335,185 258,036,223 270,595,508 235,201,159 239,768,172 270,595,506

52 TARUNI-A SUDUT 6X12 E.25 1 36 100 259,118,434 271,620,318 287,062,576 301,034,651 261,658,610 266,739,564 301,034,651
53 TARUNI-A SUDUT 6X12 E.25 37 36 106 259,118,434 271,620,318 287,062,576 301,034,651 261,658,810 266,739,564 301,034,651
64 TARUNI-A SUDUT 6X12 E.25 2 36 106 259,118,434 271,620,318 267,062,578 301,034,651 261,658,810 266,739,564 301,034,651
55 TARUNI-A SUDUT 6X12 E.25 56 36 106 259,116,434 271,620,316 287,062,578 301,034,651 261,656,810 266,739,564 301,034,651

271,820,316 301,034,651 2ei,65eTeio' 266,738,664 301,034,651


TARUNI-A SUDUT 6X12 E.26 1 36 106 259,116,434 257,062,576

56 DRAVANTI SUDUT 6X12 E.26 2 27 106 233,705,664 245,161,824 256,909,216 271,510,992 235,996,696 240,579,360 271,510,992
59 JRAVANTI SUDUT 6X12 E.26 56 27 106 233,705,664 ^is'ifii'^sii" 258,906,216 271,510,992 235,986,896 240,579,360 271,510,992

60 DRAVANTI SUDUT 6X12 E.27 1 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,896 240,579,360 271,510,692
61 DRAVANTI SUDUT 6X12 E.27 37 27 106 233,705,664 245,161,824 259,909,218 271,510,992 235,996,898 240,579,360 271,510,992
62 DRAVANTI SUDUT 6X12 E.27 2 27 , 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,686 240,579,360 271,610,992
63 DRAVANTI SUDUT 6X12 E.27 J*. _._!!7. 106 233,705,664 245,161,824 256,909,216 271,610,992 235,996,896 240,579,360 271,510,992

64 DRAVANTI SUDUT 6X12 E.26 1 27 106 233,705,664 245,161,324 258,909,216 271,510,992 235,996,898 240,579,360 271,510,992
65 DRAVANTI SUDUT 6X12 E.26 37 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,896 240,579,360 271,510,992
66 DRAVANTI SUDUT 6X12 E.26 2 27 106 233,705,664 258,906,216 271,510,992 235,996,896 240,579,360 271,510,982
245,181,824 271,510,992 235,996,696" 240,579,360 271,510,992
67 DRAVANTI SUDUT 6X12 E.26 58 27 106 233,705,664 258,906,216

HARGA JUAL PERDANA


ClTRA MAJA RAYA v x.
An Integrated New Town CLUSTER TEVANA (RS) KTOBER2018

SUDUT & IRR CARA PEMBAYARAN


LUA5|M2) CASH TAHAP KPR
NO TIPE Ukuran BLOK No 12 BULAN 24 BULAN 24 BULAN KPR 1 Km 2 KPR 3
,
1 BULAN TANPADP TANPAOP DPK^BLN CP5%-,BLN DP1SS-3BLN DP N-B BUI

68 TARUNI-A SUDUT 6X12 E.31 1 36 106 259,118,434 271,820,318 287,082,578 SViSSi^' 261,558,810 266,739,564 MiiosiioSi"

69 TARUNt-A SUDUT 6X12 E.31 37 36 106 259,118,434 271,620,318 287,062,676 301,034,851 261,656,810 266,739,564 3O1.034.0S1
70 TARUNI-A SUDUT 6X12 E.31 2 36 106 259,118,434 271,820,318 287,062,578 301,034,651 261,656,810 266,739,564 301,034,651
71 TARUNI-A SUDUT 6X12 E.31 56 36 106 259,116,434 271,820,318 287,062,578 301,034,851 261,656,810 266,739,564 301,034,651

72 DRAVANTI SUDUT E.32 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,896 240,579,360 271,510,992
258,909,216 271,510,992 235,99^896 240,579,360 271,510,992
73 DRAVANTi SUDUT 6X12 E.32 37 27 106 233,705,664 245,151,624
74 TARUNI-A SUDUT 6X12 E.32 2 ...^B. 259,118,434 271,820,316 287,062,576 301,034,651 261,658,810 266,739,564 301,034,651

76 DRAVANTI SUDUT 6X12 E.35 1 27 106 233,705,664 245,161,824 258,909,218 271,510,992 235,996,896 240,579,360 271,510,992
77 DRAVANTI SUDUT 6X12 E.35 2 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,896 240,579,360 271,510,992

78 TARUNI-A SUDUT 6X12 E.37 1 36 106 259,118,434 271,520,316 287,062,678 301,034,651 261,658,810 266,739,564 301,034,651
79 TARUNI-A SUDUT E.37 37 36 106 259,118,434 271,820,318 287,062,678 301,034,651 261,658,810 266,739,564 301,034,651
""so _.. 233,705,664 """245^181,824 258,909,216 271,510,992 235,996,896 240,579,360 271,510,992
DRAVANTI SUDUT 6X12 2 27 106
81 DRAVANTI SUDUT 6X12 E.37 56 27 106 233,705,664 245,161,624 256,909,216 271,510,962 235,996,896 240,679,360 271,510,992

82 DRAVANTI SUDUT 6X12 E.38 1 27 106 233,705,664 245,131,824 258,906,216 271,510,992 235,996,896 240,579,360 271,510,992
83 DRAVANTI SUDUT 6X12 E.38 37 27 106 233,705,664 245,161,824 256,909,216 271,510,692 235,996,896 240,579,360 271,510,992
84 DRAVANTI SUDUT 6X12 E.3S 2 27 106 233,705,664 245,161,824 258,906,216 271,510,992 235,996,696 240,679,360 271,510,992
86 DRAVANTI SUDUT 6X12 E.36 56 27 106 233,705,664 245,161,824 258,909,216 271,510,962 235,996,896 240,579,360 271,510,992

DRAVANTI SUDUT 6X12 E.39 ........- 27 106 233,705,664 245,161,824 258,909,218 271,510,992 235,996,696 240,579,360 271,510,992
88
87 DRAVANTI SUDUT 6X12 E.39 2 27 106 233,705,664 245,161,824 258,909,218 271,510,992 235,996,896 240,579,360 271,510,992

66 DRAVANTI SUDUT 6X12 E.50 1 27 106 233,705,664 245,161,824 256,909,218 271,510,992 235,996,896 240,579,360 271,510,992
89 DRAVANTI SUDUT 6X12 E.5O 2 27 106 233,705,664 245,161,824 258,909,218 271,510,992 235,996,896 240,579,360 271,510,992
3^610,992
90 DRAVANTI SUDUT 6X12 E.51 1 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,696 240,579,360
HARGA JUAL PERDANA
Gitra Maja Raya
An Integrated New Town CLUSTER TEVANA (RS) Berlaku per : 8 OKTOBER 2016

SUDUT & IRR CARA PEMBAYARAN


UIAS(M2| CASH TAHAP KPR
NO TIPE Ukuran BLOK No 12 BULAN 24 BULAN 24 BULAN KPR 1 KPR 2 KPR 3
BON
1 bulan TANPADP TANPABP '^ 0P4KOM* DP50%-^3BL

B^ ORAVANTI SUDUT 6X12 E.52 \ 27 106 233,705,684 245,161,624 258,909,216 271,510,992 235,996,896 240,579,360 271,510,992
92 DRAVANTI SUDUT 6X12 E.52 37 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,896 240.579,360 271,510,992
93 TARUNI-A SUDUT 6X12 E.52 2 38 106 259,118,434 271,820,318 287,062,578 301,034,651 261,658,810 266,739,564 301,034,851
94 TARUNI-A SUDUT 6X12 E.52 58 36 106 259,118,434 271,820,318 287,062,578 301,034,651 261,658,810 266,739,564 301,034,651
24L57Bi360'' 271,510,992
95 DRAVANTI SUDUT 6X12 E.53 1 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,896
96 DRAVANTI SUDUT 6X12 E.53 37 27 106 233,705,664 246,161,824 258,909,216 271,510,992 235,996,896 240,579,360 271,510,992
97 DRAVANTI SUDUT 6X12 E.53 2 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,696 240,579,360 271,510,992
98 DRAVANTI SUDUT 6X12 E.S3 58 27 106 233,705,664 245,161,824 258,909,216 271,510,992 235,996,896 240,579,360 271,510,992

99 DRAVANTI SUDUT 6X12 E.55 11 27 168 317,954,237 333,540,229 352,243,419 369,388,010 321,071,435 327,305,832 369,388,010
100 DRAVANTI SUDUT 6X12 E.65 37 27 106 233,705,684 245,161,824 258,909,216 271,510,992 235,996,896 240,579,360 271,510,992
235,996,896 24bi'579,380' 271,510,992
101 DRAVANTI SUDUT 6X12 E.55 58 27 106 233,705,864 245,161,824 258,909,216 271,510,992
^102" TARUNI-A SUOUT 6X12 E.57 1 36 106 259,116,434 271,820,318 287,062,578 301,034,551 261,658,810 266,739,564 301,034,651
103 TARUNI-A IRR 6X12 E.57 17 36 108 281,901,320 274,739,820 290,145,560 304,267,710 284,468,980 269,604,300 304,267,710

104 JAATI SUDUT 5X12 E.5S r 22 94 191,993,131 201,404,559 212,698,273 223,050,544 193,875,417 197,639,988 223,050,844
105 JAAT1 SUDUT 5X12 E.5S 27 22 93 190,753,138 200,103,782 211,324,554 221,610,263 192,623,266 196,363,524 221,610,263
108 JAATI SUDUT 5X12 E.58 51 22 94 191,993,131 201,404,559 212,698,273 223,050,844 193,875,417 197,639,988 223,050,844
107 TARUNI-A SUDUT 6X12 E.68 2 36 106 259,118,434 271,820,315 267,062,578 301,034,651 281,658,810 288,739,584 301,034,651
108 TARUNI-A IRR 6X12 E.E6 28 36 123 282,778,884 296,640,504 313,274,646 328,522,527 285,551,228 291,095,910 328,522,527
109 TARUNI-A SUDUT 6X12 E.58 52 36 106 259,118,434 271,820,318 287,062,576 301,034,651 261,658,810 266,739,684 301,034,551

110 JAATI SUDUT E.58 , 22 94 191,993,131 201,404,559 212,898,273 223,050,844 193,875^417 197,639,988 223,050,844
111 JAATI SUDUT 5X12 E.59 2 22 94 191,993,131 201,404,559 212,698,273 223,050,844 193,875,417 197,639,988 223,050,844
201^559' 212,698,273 223,050,844 193,876,417 197,639,988 223,050,844
112 JAATI SUDUT 6X12 E.60 i 22 94 191,993,131
113 JAATI SUDUT 6X12 E.60 17 22 138 246,558,788 258,644,980 273,148,436 266,443,272 248,976,008 253,810,494 288,443,272
114 JAATI SUDUT 5X12 E.90 2 22 94 191,993,131 201,404,559 * 212,598,273 223,050,844 193,875,417 197,639,988 225^050,844

HARGA JUAL PERDANA


Citra Maja Raya
An Integrated New Town CLUSTER TEVANA (RS) Bertaku per : 8 OKTOBER 2016

SUDUT & IRR CARA PEMBAYARAN


LUAS (M2) CASH TAHAP KPR
NO TIPE BLOK . 12 BULAN 24 BULAN 24 BULAN KPR 1 KPR 2 KPR 3
BQN TOH
TAHFAW TAKFADF "^ DFi%-lBLN DPIM-IOLN DP ^^-

267,750,423 282,764,405" 298,527,337 267,741,061 262,745,742 296,527,337


115 JAATI SUDUT 5X12 E.61 2 22 145 255,238,721
271,653,997 300,350,454 Mi",498,707' 300,650,454
116 JAATI SUDUT 5X12 E.61 10 268,959,885 286,886,931

117 JAATI SUDUT 6X12 E.62 2 22 94 191,993,131 201,404,659 212,098,273 223,050,844 193,875,417 197,639,988 223,050,844
118 JAATI SUDUT 5X12 E.62 20 22 96 194,474,302 204,007,356 215,447,020 225,933,380 196,380,912 200,194,154 225,933,380

TARUNI-A SUDUT 6X12 E.SS 21 36 127 288,347,023 302,461,681 319,443,271 334,991,395 291,173,955 296,827,818 334,991,395

JAATI SUDUT 22 94 191,993ii31 201,404,659 212,698,273 223,050,844 193,876,417 197,839,980 223,050,844


120 5X12 E.66 1
121 JAATI SUDUT 5X12 E.66 21 59 185,793,183 194,900,671 205,829 J1 215,847,940 187,614,665 215,847,940
122 TARUNI-A SUDUT 6X12 E.86 2 36 106 259,118,434 271,820,318 287,002,578 301,034,651 281,658,610 288,739,564 301,034,851
123 TARUNI-A SUDUT 6X12 E.65 20 36 150 320,358,499 338,062,347 364,900,905 372,181,198 323,499,269 329,780,808 372,181,198

TARUNI-A SUDUT 6X12 E.67 1 36 95 245,200,452 257,220,082 271,643,838 284,885,231 247,604,378 252,412,230 284,865,231

214,413,576 237,458,026 206,398,118 """' 210,405,846 237,458,026


125 JAATI SUDUT 5X12 ESS 1 22 104 204,394,250 220,430,708
126 TARUNI-A SUDUT 6X12 E.68 2 36 J!'_ 223,926,518 234,903,300 248,075,454 260,149,923 226,121,874 230,512,590 260,149,923

-Harga dan ketentuan diatas dapat berubah sewaktu - waktu tanpa pemberitahuan teriebih dahukl
-Harga sudah termasuk PPN & Biaya Surat (BBN, BPHTB, AJB)
-Untuk cara bayar KPR : Pertwtungan Down Payment (DP) diambil dari Harga pengikatan dikurangi Biaya Surat
HARGA JUAL PERDANA
Gitra Maja Raya CLUSTER TEVANA (RS)
An Integrated New Town
KETENTUAN CARA BAYAR :
Uang Tanda Jadl (UTJ) Rp. 2 JUTA : Pada s^t transaksi
1 CASH KERAS (1 BUtAN) mak^ selisihnya ditanggung dan ^ajib dibayarkan
Angautart 1 :10% : Hart ke 15 setelah UTJ 2 Biaya surat surat: BBNS BPHTB, AJB^>KHUS
Pelunasan: 90% : Hart ke 30 setelah UTJ (Segala kekurangan blaya pajak yang mengalarm pe^ubahan akibat peratuian
an wajib dibayarkan pembali sebelum AJB ditandatangark )
2 CASH BERTAHAP 12 8ULAN (TANPADP)
Angsuran 1a: 4.17% Hart ke15setelah UTJ
Angsuran 1b: 417% : Hart ke 30 setelah UTJ
Angsurart2 s d 12 : 91.66% dibagi 11 Bin : Hari ke 60 s.d hari ke 360 BetelahUT
3 CASH BERTAHAP 24 BULAN (TANPA DP] dak daoat ditukar/diganti
Angsuran 1a : 2.08% sn PPJB ( Peqarjian Pengikatan Juat Bi art setelati tanda jadl
Angsuran 1b: 2 08% . Hari ke 30 setelah UTJ J Bank Pemberi Kredit :
Angsuran 2 s.d 24 : 95.84% dibagi 23 Sin : Hari ke 60 s d hart ke 720 setekshUT BCA, BRI. BNi, BTN, MANDtRI, CIMB NIAGA OCBC Ti
4 CASH BERTAHAP 24 BULAN (DP 50% = 21 BULAN) a Pambell dengsn KPR Ke-1 atau
Angsuran 1a: 2.38% . Harike 15 setelah UTJ b.Pembeli dsnoan KPR Ke3, dst
Angsuran 1b: 2.38% : Hari ke 30 setelah UTJ c.Penerrtuan bahwa pembefl merupakan KPR ke-1 atau I
Angsuran 2 s.d 6 : 23.8% dibagi 5 Bin : Hanke60s.dhanke180seteSahUT
Anasuran 7 sd 23 : 22.79% dibagi 17 Bin rlahU d.Besaran Suku Bunga, Down Payment ai KPR akan mengikutl ketentuan >
PELUNASAN-50% Han ke 720 setelah UTJ ditetapkan oleh Bank Pembert Kredit
b. Ontuk pembeli dengan care beyar KPR 1 dan KPR 2. wa^b menglkul
KPR 1 (DP min. 5% -1 bulan) Harga dan ketentuan Oapat berubah sewaktu waktu tanpa w
5 DP 1a. 2,5% : Harike 15 setetah UTJ Dokumen KPR lengkap uvahb diberikan ke developer'
: Hari ke 30 setelah UTJ a. KPR 1, KPR 2 : maksimal 2 Minggu setelah UTJt Book!
Akad Kredit-KPR 90% : 1 bulan sejak pelunasan DP b KPR 3 : pada seat Jatuh tempo DP ke 20 (20 bula n sejak
KPR 2 (DP mm. 15% = 3 bulan) JSUS P1LIH UNIT aebelum at
G DP 1a: 2,5% : Han ke 15 setelah UTJ galihan Hak I Gant Nama dike ^ (Pph Final 2.5% + Biaya At
DP 1b 2.5% Hart ke 30 setelah UTJ ak PengaUhao Hak / Ganti Nan
DP2-3. 10%dibagi2Bln BlayaSurat . Hari ke 60 s.d 90 setelah UTJ 31 JANUARI 201!
Akad Kredit - KPR 85% . 1 bulan seiak peturasan DP
KPR 3 (DP 50% = 23 bulan} NOTE:
7 DP 1a: 2.39% : Harrke15seteiahUTJ CASH / CASH TAHAP : UTJ dipertiitungken di Total Hangs
DP 1b: 2 39% : Harike30setelah UTJ KPR . UTJ diperhitungkan di Total DP
DP 2-6: 23.91% dibagi 5 Bin : Hanke60s.dharike180seteir ahUT
DP7-23: 20%dibagi17Bln*BiayaSurat Han ke 210 s.d hart ke 690 setssiahU
Akad Kredit - KPR 50% : 1 bulan aeiak p^unasan DP

SI ^ PENGEMBANG\ dahulu SANG PELOPOR

Anda mungkin juga menyukai