KADAR AIR
(ASTM D 2216-98)
Data Pengamatan.
No. Cawan Simbol Satuan 1 2 3
Berat Cawan W1 gram
Berat Tanah Basah + Cawan W2 gram
Berat Tanah Kering + Cawan W3 gram
Berat Tanah Basah Wtb = W2 - W1 gram
Berat Tanah Kering Ws = W3 - W1 gram
Berat Air Ww = Wtb - Ws gram
Kadar Air Wn = (Ww / Ws) x 100% %
Kadar Air Rata - rata Wn Average %
Catatan :
(ASTM D 854-02)
Data Pengamatan
Piknometer No. Simbol Satuan 1 2
Berat Piknometer Kosong W1 gram
Berat Piknometer + air pada suhu uji W4 gram
Faktor Koreksi k
Berat Piknometer pada Suhu 250 C W4 gram
Berat Piknometer + tanah W2 gram
Berat Piknometer + tanah + Air W3 gram
Specific gravity Gs
Specific gravity Gs average
Catatan :
(ASTM C-29)
Data Pengamatan
Item Simbol Satuan Nilai
No. Ring No -
Tinggi Ring T cm
Diameter Ring D cm
Volume Ring V cm3
Berat Ring W1 gram
Berat Tanah Basah + Ring W2 gram
Berat Tanah Kering + Kering W3 gram
Berat Tanah Basah Wtb = W2 - W1 gram
Berat Tanah Kering Ws = W3 - W1 gram
Berat Air Ww = Wtb - Ws gram
Kadar Air wn = (Ww / Ws) x 100% gram
Berat Isi Tanah Yn = w / V gr/cm3
Berat Isi Kering Yd = Yn / (1 + Wn) gr/cm3
Catatan :
Data Pengamatan
No. Uji 1 2 3 4 5
Berat cawan, W1 (gram)
Berat tanah basah + cawan, W2 (gram)
Berat tanah kering + cawan, W3 (gram)
Berat tanah basah, W4=W2-W1 (gram)
Berat tanah kering, W5=W3-W1 (gram)
Berat air tanah, W6=W4-W5 (gram)
Kadar air, w=(W6/W5)x100%
Jumlah ketukan, N
Batas cair (Dari grafik)
Catatan :
Catatan :
Data pengamatan
No. Cawan 1 2 3
Berat cawan, W1 (gram)
Berat tanah basah + cawan, W2 (gram)
Berat tanah kering + cawan, W3 (gram)
Berat tanah basah, W4 = W2 - W1 (gram)
Berat tanah kering, W5 = W3 - W1 (gram)
Berat air tanah, W6 = W4 - W5 (gram)
Kadar air, w = (W6 / W5) x 100%
Batas Plastis, %
Catatan :
Data Pengamatan
Catatan :
Data Pengamatan
Diamete Berat
No Berat Saringan Tanah Berat Jumlah
N r lewat
Saringan Saringan + Benda diatas diatas diatas
o Saringan ayakan
(mm) (gr) Uji (gr) (gr) (%) (%)
(mm) (%)
Catatan :
Catatan :
Data Pengamatan
Keterangan
Persentase kerikil (%)
Persentase Pasir (%)
Persentase Lanau/lempung (%)
D10 (mm)
D30 (mm)
D60 (mm)
Cu
Cc
Catatan :
PEMADATAN TANAH
(ASTM D 698)
Data Pengamatan
Metode Pemadatan Standart Proctor test Modified Proctor Test
Spesific Gravity, Gs
Tinggi Mold, T mold (cm)
Diameter Mold, D mold (cm)
Volume Mold, V mold (cm3)
Berat Mold, W mold (gram)
Catatan :
PEMADATAN TANAH
(ASTM D 698)
Data pengamatan
Uji Ke- 1 2 3 4 5
Air yang diberikan (ml)
Mold + tanah basah, W2 (gr)
Tanah basah, W3 = W2 - Wmold (gram)
Berat isi, = W3 / Vmold (gr/cm3)
Berat isi kering, d = /(1 + w) (gr/cm3)
d (ZAVC) (SR= 80%)
d (ZAVC) (SR= 100%)
Catatan :
PEMADATAN TANAH
(ASTM D 698)
Catatan :
CBR LABORATORIUM
(ASTM D1883)
Data pengamatan
UNSOAKED SOAKED
Metode pemadatan 10 25 56 10 25 56
Pukulan Pukulan Pukulan Pukulan Pukulan Pukulan
Tinggi Mold, tmold (cm)
Diameter mold, Dmold (cm)
Volume mold, Vmold (cm3)
Berat mold, Wmold (gr)
Catatan :
CBR LABORATORIUM
(ASTM D1883)
Catatan :
CBR LABORATORIUM
(ASTM D1883)
Catatan :
CBR LABORATORIUM
(ASTM D1883)
CBR LABORATORIUM
(ASTM D1883)
CBR LABORATORIUM
(ASTM D1883)
Data Pengamatan
Catatan :
No Satua
Uraian Simbol Titik 1
. n
1 Massa (botol + corong) M1 gr
2 Massa (air botol + corong) M2 gr
3 Isi botol = massa air M2-M1 cm3
4 Massa (pasir di botol + corong) M3 gr
gr/cm
5 Kerapatan pasir (M3-M1)/(M2-M1) 3
Catatan :
Data Pengamatan
KEPADATAN TANAH
No
Uraian Simbol Satuan Titik 1
.
1 Massa (tanah + wadah) M8 gr
2 Massa wadah M9 gr
3 Massa tanah basah M8-M9 gr
4 Kerapatan tanah (M8-M9)/V gr/cm3
5 Kadar air tanah %
6 Kerapatan kering di laboratorium gr/cm3
7 Kerapatan kering di lapangan dlap = d (1 + w) gr/cm3
8 Derajat kerapatan di lapangan D %
Catatan :
Data pengamatan
Catatan :
Data Pengamatan
Catatan :
KUAT TEKAN BEBAS
(ASTM D 2166-00)
a1 : a2 :
Dial Reading
Dial Reading
Gaya Geser
Gaya Geser
Pergeseran
Penurunan
Horisontal
Tegangan
Tegangan
Geser
Geser
10 15 25
20 30 50
30 45 75
40 60 100
50 75 125
60 90 150
70 105 175
80 120 200
90 135 225
100 150 250
110 165 275
120 180 300
130 195 325
140 210 350
150 225 375
160 240 400
170 255 425
180 270 450
190 285 475
200 300 500
Diameter Contoh : Massa :
Tinggi Contoh : Volume :
Luas Contoh : C :
Kalibrasi Proving Ring : :
PENGEBORAN DENGAN HAND BORE
(ASTM D 1452-80)
Data Pengamatan
Kedalamaan Bor Foto Tanah Diskripsi Tanah Catatan
(cm)
-20
-40
-60
-80
-100
Catatan :
SONDIR
(ASTM C-29)
Data Pengamatan
F
Qc JP Fs Fs/2 TF
Kedalama (kg/cm2 FR (%)
(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
n (cm) )
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
Catatan :
Data Pengamatan
Catatan :
LAMPIRAN
PENGUJIAN TRIAXIAL UU
( )
t H Proving Ring 3 A P 1 - 3
2 2 -4 2
detik mm kN/m kg/cm % 10 m kN kN/m2
Mengetahui
Kepala Laboratorium Asisten Laboratorium
LAMPIRAN
PENGUJIAN TRIAXIAL UU
( )
Mengetahui
Kepala Laboratorium Asisten Laboratorium