DIKETAHUI
Ukuran Umpan Hasil Penambangan = mm
Fraksi produk akhir yang diinginkan = mm
mm
-10 +5 mm
-5 mm 300 HARI DAN 8 JAM KE
Density loose batuandesit = 1.60 ton/LCM
Target produksi = 152 LCM/hari 242
Kapasitas produksi Jaw Crusher = 30 ton/jam 18.75
HOPPER
a= 3.00 m
b= 2.00 m
c= 0.50 m
d= 2.00 m
e= 3.00 m
f= 3.00 m
La = 6 m2
Lb = 9 m2
Kapasitas Hopper = 15.58 LCM
JAW CRUSHER 1
Setting = 150 mm
Umpan = 30 ton/jam
Faktor kehilangan = 0.50%
Jumlah produk = 28.79 ton/jam Berat Komulatif
Distribusi Produk Jaw Crusher 1 material lolos
Distribusi ukuran (mm) Berat material (ton/jam) Persen Berat Materal (%) (ton/jam)
-150 +50 10.36 36% 28.79
-50 +30 8.92 31% 18.42
-30 +20 4.32 15% 9.50
-20 +10 2.88 10% 5.18
-10 +5 1.44 5% 2.30
-5 0.86 3% 0.86
Jumlah 28.79 100%
JAW CRUSHER 2
Setting = 50 mm
Umpan = 28.79 ton/jam
Faktor kehilangan = 0.50%
Jumlah produk = 28.64 ton/jam
Asumsi oversize = 25%
Jumlah oversize (masuk ke jaw crusher 3) = 7.10 ton/jam
Distribusi Produk Jaw Crusher 2
Berat Komulatif
material lolos
Distribusi ukuran (mm) Berat material (ton/jam) Persen Berat Materal (%) (ton/jam)
-50 +30 7.10 24.79 28.64
-30 +20 6.50 22.70 21.54
-20 +10 6.09 21.26 15.04
-10 +5 4.98 17.39 8.95
-5 3.97 13.86 3.97
Jumlah 28.64 100
28.64
Jadi umpan untuk Vibrating screen adalah = 21.54 ton/jam
angkanya harus disamakan
angkanya diubah sampai totalnya sama dengan yg kuning
JAW CRUSHER 3
Setting = 30 mm
Umpan = 7.10 ton/jam
Distribusi Produk Jaw Crusher 3
Berat Komulatif
material lolos
Distribusi ukuran (mm) Berat material (ton/jam) Persen Berat Materal (%) (ton/jam)
-30 +20 2.60 36.62 7.10
-20 +10 2.00 28.17 4.50
-10 +5 1.70 23.94 2.50
-5 0.80 11.27 0.80
Jumlah 7.10 100
STOCKPILE
DIKETAHUI
Produksi batuandesit per fraksi =
-5 mm 5.60 ton/jam 44.80
-10 +5 mm 7.40 ton/jam 59.20
-20 +10 mm 8.00 ton/jam 64.00
-30 +20 mm 9.00 ton/jam 72.00
Waktu kerja = 8 jam/hari 240.00
Density looses batuandesit = 1.60 ton/LCM 150.00
JAWAB
Volume batuandesit per fraksi =
-5 mm 28.00 LCM/hari 8,400
-10 +5 mm 37.00 LCM/hari 11,100
-20 +10 mm 40.00 LCM/hari 12,000
-30 +20 mm 45.00 LCM/hari 13,500
TOTAL 150 LCM/hari 45,000
Dimensi Stockpile =
p= 40 m
l= 30 m
t= 2m
Volume stocpile = 2,400 m3
Daya tampung stockpile = 16.00 hari
HARI DAN 8 JAM KERJA
Persen Berat
material lolos
(%)
100
64
33
18
8
3
Persen Berat
material lolos
(%)
100.0
75.2
52.5
31.2
13.9
a dengan yg kuning
Persen Berat
material lolos
(%)
100.00
63.38
35.21
11.27
di tabel distribusi per fraksi
ton/hari
ton/hari
ton/hari
ton/hari
ton/hari
LCM/hari
LCM/tahun
LCM/tahun
LCM/tahun
LCM/tahun
LCM/tahun