Anda di halaman 1dari 13

JATAH UPD

Uang hotel Uang Makan

Nama FSE Hari Nominal Hari


Ramsel 20 Rp 250,000 21
heru 9 Rp 250,000 10
Pak iyan 20 Rp 300,000 21
Total UPD

Sisa Saldo Aktual


Nama Kasbon Biaya bersama Biaya Hotel Aktual
Ramsel Rp 3,039,280 Rp 144,127 Rp 2,750,000
heru Rp 566,000 Rp - Rp 1,237,500
Pak Iyan Rp 172,160 Rp 144,127 Rp 2,750,000

Biaya Hotel aktual


Hari harga total
20 Rp 275,000 Rp 5,500,000
9 275000 2475000
Uang Yang Diterima
Nama Jatah MU Taxi dll Total
Ramsel Rp 23,500.00 - Rp 1,400,094
Heru - Rp 1,546,500
pak iyan Rp 23,500.00 - Rp 6,632,214

RINCIAN BIAYA PERJALANAN DINAS


Keterangan Nilai Laporan Nilai real
UPD total 20,335,000.00
Uang sekurity Heru ma fitrial 115,000.00 115000
Tol Dari Jakarta 101,500 101,500
Beli Spidol dan Isolasi 34,000 34,000
Uang cemilan (entertaint) 114,250 114,250
Entertaint 1,094,950 1,094,950
Bensin 735,961 735,961
Kabel ties 24,990 24,990
Masker 80,000 80,000
Sarung Tangan Elektrik 20,000
Apalah 50,000 40,000
Biaya heru 940,000 940,000
Beli gergaji dan cutter 60,000 43,000
Beli nasgor 200,000 200,000
beli kuas 20,000 20,000
laundry 247,050 247,050
Biaya Taxi

-
-
-
-
Total Biaya 24,172,701.00 3,675,701
JATAH UPD
Uang Makan Uang Saku Total

Nominal Hari Nominal


Rp 75,000 21 Rp 35,000 Rp 7,310,000
Rp 75,000 10 Rp 35,000 Rp 3,350,000
Rp 110,000 21 Rp 65,000 Rp 9,675,000
Rp 20,335,000

Saldo 9 Rp 137,500 Rp 1,237,500


1,376,594
1,546,500
6,608,714

Cashflow
Total UPD transfer Total Biaya laporan Sisa uang cash
Rp 21,000,000 Rp 24,172,701 -Rp3,172,701.00

Lunas
Rp 5,394,714 Jumlah saldo
3725000

LANAN DINAS
Nilai MU Finance
Entertaint
Rokok sekurity
- helper
- heater
- sunlight
- gelas
- cutter
- masker
- Tupperware
20,000 bagus
10,000 Makan Ikan Bakar
- Beli indomie
17,000
-
-
-
47,000.00
pengeluaran
Rp 1,400,094 Rp 2,324,906
5,497,607.00

122000
100000
39900
5090
27980
14990
40000
54990
3000
637000
50000
1094950
RINCIAN BIAYA PERJALANAN DINAS
Keterangan Nilai B
(Ada
Bon)
17 Aug - 25 Aug 15 8 hari 7 malam @Rp500.000 3,500,000.00 X
17 Aug - 25 Aug 15 Loundry 300,000.00 X

Biaya Transportasi (Taxi, Bus, Ojek, dll) :


17 Aug 15 Taxi Ramsel ke bandara 250,000.00 X
17 Aug 15 Taxi Esron Ke bandara 200,000.00 X
17 Aug 15 Taxi dari Bandara sepinggan ke hotel 320,000.00 X
18 Aug-24 Aug 2015 Transport Lokal 600,000.00
Biaya lain-lain
Akrilik setengah lembar 600,000.00
20 Mei 15 Isolasi 3 M 210,000.00 X
Contact Cleaner 65000
17 Mei 15 Headsink trafo 60,000.00 X
Konsumsi Meeting technical (challenge
17 Mei 15 session) 480,000.00 X

19 Mei 15 Uang tips security untuk masukkan tools 100,000.00 X

Total Biaya 6,685,000.00

Total UPD yg d transfer 12.000.000

UPD Esron
UM = 8 X Rp.90.000 = Rp.720.000 2,000,000.00
US = 8 X Rp.35.000 = Rp.280.000
Total = Rp.1000000

UPD Ramsel UH = 7 X Rp.300.000 = Rp.2.500.000


UM = 8 X Rp 90.000 = Rp.825.000
US = 8 X Rp.35.000 = Rp.385.000
Total = Rp.1000000

Total 8,685,000.00
DINAS
TB (Tanpa Finance

Bon)
Keterangan Ramsel Heru pak iyan
Beli tolak angin 31500
pop mie 7980
aqua 9890 4490
makan siang 70000
makan malam 87000 44000
rokok 13000
beli minum di indomaret 41800
Kasbon 2636000 566000
aqua+cemilan 88400 41000
Shampoo 23190
Obat deltome herbal 41190
Makan di solaria 38500 33500

Total 3039280 566000 172160


Biaya bersama
No Tanggal Deskripsi Jumlah
1 10/2/2015 MAKAN siang cfc 76000
2 10/3/2015 semangka 13142
2 10/5/2015 jeruk 42151
2 10/5/2015 Aqua 8970 uang di at
2 Susu 21490
2 makan indomie 26000
2 Makan Subuh 43000 uang cash 3910000
2 Solaria 34000
2 beli minum pulang 23500 Uang total 6692840
2 0
2 0
2 0 payment 7082840
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0
Total 288253
2782840
RINCIAN BIAYA PERJALANAN DINAS
Tanggal Keterangan Nilai B (Ada TB Finance
(Tanpa
Bon) Bon)
Biaya Hotel :
Hotel 9 hari 2,475,000.00 X

Biaya Entertaint :
Biaya Masukin Tools security 50,000 X

Biaya Transportasi (Taxi, Bus, Ojek, dll) :

9-Oct Tol Karang Tengah 5,000 X


9-Oct Tanjung Priok 2 8,000 X
9-Oct Karang Tengah 5,000 X
9-Oct Cengkareng 8,000 X
9-Oct Gerbang Cilegon Timur 5,000 X
9-Oct Gerbang Cikupa 30,500 X
9-Oct Gerbang Serang Barat 5,000 X
9-Oct Tanjung Priok 2 8,000 X
9-Oct Gedong Panjang 2 8,000 X
9-Oct Tol Cawang Tomang 6,000 X
9-Oct Gerbang Kayu Besar 8,500 X
9-Oct Gerbang Cilegon Timur 30,500 X
13-Oct Tanjung Priok 2 8,000 X
13-Oct Gerbang Kayu Besar 8,500 X
13-Oct Karang Tengah 5,000 X
13-Oct Cawang Tomang 6,000 X
13-Oct Gerbang Cilegon Timur 30,500 X
13-Oct Karang Tengah 5,000 X
13-Oct Gerbang Kembangan SLTN 8,500 X
13-Oct Cawang Tomang 14,000 X
13-Oct Gerbang Cikupa 30,500 X
9-Oct Bio Solar 189,474 X
13-Oct Bio Solar 150,000 X

Biaya Lain- Lain

9-Oct Beli Mata Bor 6mm 75,000 X


12-Oct Beli Neo Gum Sealler 70,000 X
22-Oct Laundry 27,500 X
Fitrial kirim material via bus arimbi 65,000
13-Oct UPD Pak Jono 85,000 X
9-Oct UPD Pak Rusdi 85,000 X
Total Biaya 3,520,474

Note : Di Kolom B / TB diberi tanda (x) untuk menyatakan keterangan tersebut dilampiri Bon atau tidak

Anda mungkin juga menyukai