1.4 1.8 2
1.2
1.6
A. Data Teknis
1. Dimensi Gorong-Gorong
a. Lebar gorong-gorong sisi luar (B) = 1.6 m
b. Lebar gorong-gorong sisi dalam (B') = 1.2 m
c. Panjang gorong-gorong (L) = 4m
d. Panjang bentang efektif (L') = 3.7 m
e. Tinggi gorong-gorong sisi luar (H) = 2m
f. Tinggi gorong-gorong sisi dalam (H') = 1.8 m
g. Tebal pelat bawah (t1) = 0.2 m
h. Tebal pelat dinding (t2) = 0.2 m
i Tinggi aliran air (h100) = 1.4 m
3. Mutu Bahan
a. Beton (fc') = 20 MPa
b. Tulangan pokok (fyd) = 343.37 MPa
c. Usulan tulangan pokok (fyd1) = 343.37 MPa
d. Tulangan pembagi (fys) = 423.17 MPa
P1
P2
3 3.5
A. Dimensi Pilar
B. Kelangsingan Pilar
18 D 16
0 D 0
3 D 16
Keruntuhan Tarik & Tulangan Tekan Leleh
Luas tulangan yang diperlukan, As = n*0.25*3.14*d^2 = 3617 mm2
As' = n*0.25*3.14*d^2 = 603 mm2
* asumsi balok a < bf
a = ((As - As')fy) / (0.85*fc*bf) = 39.403922 mm (OK)
CHECK Nilai a
i ) = b1 ((600 / (600 + fy))*d dimana b1 = 0.85-((0.05/7)*(fc'-30)) if fc' > 30 Mpa
b1 = 0.85 if fc' < 30 Mpa
diperoleh = 290.7 mm
a < 290.7 (Tulangan Tarik Leleh)
diperoleh = 15.3 mm
a > 15.3 (Tulangan Tekan Leleh)
Karena semua terpenuhi sesuai asumsi awal (Tulangan Tarik dan Tekan Leleh), maka
Mn = (Ccf * (d - a/2)) + (Ccs * (d - d'))
= (0.85 * fc' * bf * a * (d - (a/2))) + (As' * fy * (d-d'))
= 7.94E+08 Nmm
= 7.94E+02 KNm
CHECK
Mn kap > M ult / 0.8
793.75 > 22.7945
-----> OK
C. Analisis Struktur
1. VD & MD
a. VD = 46.176 kN
b. MD = 42.7128 kN.m
2. VL & ML
a. VL = 31.5425 kN
b. ML = 29.1768125 kN.m
3. VU & MU
a. VU = 105.8792 kN
b. MU = 97.93826 kN.m
D. Desain Struktur
1. Tulangan Pokok
a. Selimut beton = 25 mm
b. Tebal efektif = 175 mm
c. Faktor distribusi tegangan beton = 0.85
b = 0.0267654585
max = 0.0200740939
min = 0.0025
d. Faktor reduksi kekuatan lentur = 0.8
Mn = 122.422825 kN.m
Rn = 2.498425
m = 20.198235294
f. = 0.0079077049
g. As perlu = 2214.1573797 mm2
h. D = 12 mm
i. s perlu = 81.759577295 mm
j. s max = 200 mm
k. s digunakan = 80 mm
l. Konfigurasi = D12 - 80
m. As = 2262.8571429 mm2
n. SF = 2.20%
C. Desain Struktur Pilar
a. Selimut beton = 30 mm
b. d' = 70.5 mm
c. Tebal efektif (d) = 229.5 mm
d. Pu = 228.928 kN
e. Mu = 18.2356 kN.m
f. e = 79.656485882 mm
g. g = 3%
h. = ' = As/(b.d) = 1.5%
i. As = 1032.75 mm2 510203.6009133
j. As = As' = 1032.75 Trial 708347.4516892
k. Digunakan D = 16 mm 1218.551052603
l. As = 1206.8571429 mm2
m. Konfigurasi As = As' = 6 D 16
n. akt = 1.8%
o. Ast = 2413.7142857 mm2
p. A pilar = 90000 mm2
q. Cb = 134.58174106 mm
r. ab = 114.3944799 mm
s. f's = 285.69287582 < 423.17 MPa
t. Pnb = 271.37278883 kN
u. Mnb = 65.633329735 kN.m
v. eb = 241.85670943 > 79.656486 mm RUNTUH TEKAN
w. Pn = 1218.5510526
x. Pn = 792.05818419 > 352.19692 kN AMAN
y. MR = 63.092571567 > 18.2356 kN.m AMAN
2. Tulangan Pembagi
a. Selimut beton = 25 mm
b. Tebal efektif = 175 mm
c. (Vu.d)/Mu = 0.1891891892
d. w = 0.0079077049
e. Vc = 186066.4891612 N
f. Faktor reduksi kekuatan geser = 0.75
g. Vu < 0,5.0,75.Vc = 105879.2 N > 69774.9334 N ---->
h. Vs = -44894.2224945 N
i. D = 10 mm
j. Av = 78.5714285714 mm2
k. s = -129.606599172 mm
l. Konfigurasi = D10 - 150
D. Desain Tulangan Geser
a. Vu,k = 7793.943 N
b. Vc = 60641.62689348 N
c. Vs = -50249.703084 N
d. Vs max = 205271.0403345 N
Vs < Vs max = Ya, Ukuran Kolom Cukup
e. Vu < (.Vc)/2 = 22740.61008505 N --> Ya
f. Av1 = -637.658952775 mm2
g. Av2 = 244.20464559 mm2
h. Av3 = 291.2310335789 mm2
i. Av digunakan = 291.2310335789 mm2
j. Vs < (1/3).fc.b.d = 102635.5201672 N Ya
k. s1 = 776.9972571429 mm
l. s2 = 114.75 mm
m. s3 = 600 mm
n. s = 114.75 mm
o. Konfigurasi = D12 - 110
Vu < 0,75.Vc = 105879.2 N < 139549.867 N ----> s min = 87.5 mm
s = 85 mm
Av min = 107.127947 mm2
D = 10 mm
Av = 157.142857 mm2
Konfigurasi = D10 - 85
DESAIN TALANG - PILAR
DESAIN TALANG (U-DITCH)
1.4 1.8 2
2.8
1.2
1.6
A. Data Teknis B.
1. Dimensi Gorong-Gorong 1.
a. Lebar gorong-gorong sisi luar (B) = 1.6 m
b. Lebar gorong-gorong sisi dalam (B') = 1.2 m
c. Panjang gorong-gorong (L) = 2.8 m
d. Panjang bentang efektif (L') = 2.4 m 2.
e. Tinggi gorong-gorong sisi luar (H) = 2m a.
f. Tinggi gorong-gorong sisi dalam (H') = 1.8 m b.
g. Tebal pelat bawah (t1) = 0.2 m
h. Tebal pelat dinding (t2) = 0.2 m
i. Tinggi aliran air (h100) = 1.4 m C.
j. Konfigurasi tulangan lentur = D12 - 150
k. Konfigurasi tulangan geser = D10 - 200 1.
a.
2. Data Beban Tambahan Struktur b.
Beban inspeksi = 1.79 kN/m
2.
3. Mutu Bahan a.
a. Beton (fc') = 20 MPa b.
b. Tulangan pokok (fyd) = 343 MPa
c. Usulan tulangan pokok (fyd1) = 423 MPa 3.
d. Tulangan pembagi (fys) = 423 MPa a.
b.
4. Berat Jenis Material
a. Beton bertulang (Jc) = 24 kN/m3
b. Air (Jw) = 10 kN/m3
ANG - PILAR
2.8
VD & MD
VD = 29.952 kN
MD = 17.9712 kN.m
VL & ML
VL = 20.58857 kN
ML = 12.35314 kN.m
VU & MU
VU = 68.88411 kN
MU = 41.33047 kN.m
2. Tulangan Pembagi
25 mm a. Selimut beton = 25 mm
169 mm b. Tebal efektif pelat area geser = 169 mm
12 mm c. D = 10 mm
754.2857 mm2 d. Av = 157.1429 mm2
0.004463 e. Vc = 201544.3 N
15.23524 mm f. Vs = 2247637 N
41.79789 kN.m g. Vn = 2449.181
AMAN
c. (Vu.d)/Mu = 0.281667
d. w = 0
e. Vc = 172752.2 N
f. Faktor reduksi kekuatan geser = 0.75
g. Vu < 0,5.0,75.Vc = 68884.11 N > 64782.08 N
h. Vs = -80906.7 N
i. D = 10 mm
j. Av = 78.57143 mm2
k. s = -69.4515 mm
l. Konfigurasi =
s min = 84.5
s = 85
Av min = 107.1279
D = 10
Av = 157.1429
Konfigurasi = D10 - 85