Item Pekerjaan Satuan Volume Harga Satuan Total Keterangan
A Screed Leveling Luas 257,82 m2 Tebal 6 cm 1 Material (M-100) zak 438 44,000 19,272,000 2 Material (Aci & Skimcoat) zak 4 171,600 686,400 3 Upah Periode 11 Maret s/d 6 April ls 1.00 11,380,000 11,380,000 Total 31,338,400