Anda di halaman 1dari 1
Halpin, D. W., and Senior, B. A. (2011). Construction Management (Fourth Edi.). United States of America: John Wiley and Sons, Inc. Hansen, 8. (2015). Manajemen Kontrak Konstruksi Pedoman Praktis dalam Mengelola Proyek Konstruksi (1st Ed.). Jakarta: PT GramediaPustaka Utama, Haseeb, M., Bibi, A., and Rabbani, W. (2011). Causes and Effects of Delays in Large Construction Projects of Pakistan. Arabian Journal of Business and Management Riview, 1(4). Hsieh, T., Lu, S., and Wu, C. (2004). Statistical Analysis of Causes for Change Orders in Metropolitan Public Works. International Journal of Project Management, 22(8), 679-686, doi: 10.1016/j.ijproman.2004.03.005 Husen, A. (2009). Manajemen Proyek: Perencanaan, penjadwalan, dan Pengendalian Proyek. Yogjakarta: Penerbit Andi. Ibs, C. W. (1997). Quantitative Impacts of Project Change : Size Issues. Journal of Construction Engineering and Management, 123(September), 308-311. Tbbs, C. W., Wong, C. K., and Kwak, Y. H. (2001). Project Change Management System. Journal of Management in Engineering, 17(July), 159-165. Ibs, W. (2005). Impact of Change’s Timing on Labor Productivity. Journal of Construction Engineering and Management, (November), 1219-1223. Ibbs, W. (2011). Construction Change: Likelihood, Severity, and Impact on Productivity. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 4(3), 67-73. doi:10.1061/(ASCE)LA.1943-4170.0000089 bbs, W., Nguyen, L. D., and Lee, S. (2007). Quantified Impacts of Project Change. Journal of Professional Issue in Engineering Education and Practice, 133(January), 45-52. Tbn-Homaid, N. T., Eldosouky, A. I., and Al-Ghamdi, M. A. (2011). Change Orders in Saudi Linear Construction Projects. Emirates Journal for Engineering Research, 16(1), 33-42. Irfan, R. I, Aulia, B., dan Mubarak. (2012). Faktor-Faktor Penyebab Pekerjaan Ulang (Rework) Pada Pembangunan Gedung di Dinas Bina Marga dan Cipta Karya Unsyiah. Jurnal Teknik Sipil Pascasarjana Universitas Syiah Kuala, I(1), 85-96. Jogiyanto, dan Abdilah, W. (2009). Konsep & Aplikasi PLS (Partial Least Square) untuk Penelitian Empiris (Ist ed.). Yogjakarta: BPFE-Y ogyakart. Kaliba, C., Muya, M., and Mumba, K. (2009). Cost Escalation and Schedule Delays in Road Construction Projects in Zambia. International Journal of Project Management, 27(5), 522-531. doi:10.10164} ijproman,2008.07.003 Kaming, P. F., Olomolaiye, P. ©., Holt, G. D., and Harris, F.C. (1997). Factors Influencing Construction Time and Cost Overruns on High-Rise Projects in Indonesia. Construction Management and Economics, 15, 83-94. Karlsson, A., and Persson, T. (1998). Powersim A Short Sntroduction. Sweden. Kasimu, M. A. (2012). Significant Factors that Causes Cost Overrun in Building 194

Anda mungkin juga menyukai