HARGA SATUAN BAHAN / MATERIAL DAN UPAH

DINAS CIPTA KARYA


TAHUN ANGGARAN 2008
KABUPATEN CIREBON
1.15

NO BAHAN SAT HARGA HARGA HARGA OE


DASAR SETELAH INDEX TAHUN 2008

1 Alumunium foil m2 Rp. 5,000.00 5,750.00 5,750.00


2 Alumunium pelapis pintu KM lbr Rp. 30,900.00 35,535.00 35,550.00
3 Asbes gelombang 1500 x 1050 x 4 mm lbr Rp. 32,700.00 37,605.00 37,600.00
4 Asbes gelombang 1800 x 920 x 4 mm lbr Rp. 39,000.00 44,850.00 44,850.00
5 Asbes gelombang 2100 x 1050 x 4 mm lbr Rp. 45,500.00 52,325.00 52,350.00
6 Asbes gelombang 2400 x 1050 x 4 mm lbr Rp. 52,000.00 59,800.00 59,800.00
7 Asbes gelombang 2700 x 1050 x 4 mm lbr Rp. 58,500.00 67,275.00 67,300.00
8 Asbes gelombang 3000 x 1050 x 4 mm lbr Rp. 65,000.00 74,750.00 74,750.00
9 Atras (tanah urug) m3 Rp. 57,400.00 66,010.00 66,000.00
10 Bak mandi keramik volume 0.3 m3 bh Rp. 90,050.00 103,557.50 103,550.00
11 Bak mandi fiber 120 L bh Rp. 155,000.00 178,250.00 178,250.00
12 Bambu dia. 6-8 cm/ 6 m' btg Rp. 11,250.00 12,937.50 12,950.00
13 Bata merah bh Rp. 290.00 333.50 325.00
14 Batu apung kg Rp. 4,100.00 4,715.00 4,700.00
15 Batu belah 10/15 cm m3 Rp. 80,000.00 92,000.00 92,000.00
16 Batu tempel kapur tekstur tidak rata bh Rp. 1,550.00 1,782.50 1,800.00
17 Batu tempel palimanan 10 x 20 bh Rp. 800.00 920.00 900.00
18 Baut 3/4" bh Rp. 9,200.00 10,580.00 9,200.00
19 Baut 5/8" bh Rp. 5,500.00 6,325.00 5,500.00
20 Baut 1/2" bh Rp. 4,800.00 5,520.00 4,850.00
21 Baut 1/2", panjang 30 cm bh Rp. 4,025.00 4,628.75 4,600.00
22 Baut lawa-lawa bh Rp. 5,750.00 6,612.50 6,500.00
23 Beading penurunan (PC) gypsum m' Rp. 5,000.00 5,750.00 5,750.00
24 Beading horison gypsum m' Rp. 5,900.00 6,785.00 6,800.00
25 Besi beton kg Rp. 7,500.00 8,625.00 10,350.00
26 Besi strip kg Rp. 5,500.00 6,325.00 5,500.00
27 Besi WF kg Rp. 10,925.00 12,563.75 12,650.00
28 Besi galvanis dia. 0,5" m' Rp. 27,500.00 31,625.00 31,650.00
29 Besi galvanis dia. 1" m' Rp. 44,000.00 50,600.00 50,600.00
30 Besi galvanis dia. 1,5" m' Rp. 55,500.00 63,825.00 66,700.00
31 Besi galvanis dia. 2" m' Rp. 62,000.00 71,300.00 72,750.00
32 Besi galvanis dia. 2,5" m' Rp. 85,000.00 97,750.00 112,400.00
33 Besi galvanis dia. 3" m' Rp. 110,000.00 126,500.00 126,500.00
34 Besi stainless dia. 0,5" m' Rp. 29,500.00 33,925.00 33,950.00
35 Besi stainless dia. 1" m' Rp. 47,500.00 54,625.00 54,600.00
36 Besi stainless dia. 1,5" m' Rp. 58,000.00 66,700.00 66,700.00
37 Besi stainless dia. 2" m' Rp. 63,250.00 72,737.50 72,750.00
38 Besi stainless dia. 2,5" m' Rp. 97,750.00 112,412.50 112,400.00
39 Besi stainless dia. 3" m' Rp. 126,500.00 145,475.00 136,400.00
40 Besi biasa dia. 2" btg Rp. 137,425.00 158,038.75 158,050.00
41 Besi biasa dia. 3" btg Rp. 223,100.00 256,565.00 256,550.00
42 Cat dasar / menie sejenis F-TALIT kg Rp. 21,700.00 24,955.00 24,650.00
43 Cat genteng kg Rp. 25,000.00 28,750.00 28,750.00
44 Cat penutup kayu sejenis Kansai kg Rp. 34,500.00 39,675.00 39,400.00
45 Cat penutup tembok sejenis Vinilex kg Rp. 13,800.00 15,870.00 15,750.00
46 Cat penutup besi sejenis Kansai kg Rp. 34,500.00 39,675.00 39,400.00
47 Cat zincromate Kansai kg Rp. 32,775.00 37,691.25 32,800.00
48 Closet jongkok porselen merk INA / KIA bh Rp. 74,900.00 86,135.00 86,150.00
49 Closet duduk ( mono block ) porselen merk INA bh Rp. 799,000.00 918,850.00 918,850.00
50 Closet duduk ( siram) porselen merk INA bh Rp. 250,000.00 287,500.00 287,500.00
51 Dempul kayu kg Rp. 8,500.00 9,775.00 9,800.00
52 Dinding keramik uk. 10 x 20 cm bh Rp. 650.00 747.50 750.00
53 Dinding keramik uk. 20 x 20 cm bh Rp. 1,200.00 1,380.00 1,400.00
54 Dinding keramik uk. 20 x 25 cm bh Rp. 1,800.00 2,070.00 2,050.00
55 Dinding keramik uk. 30 x 30 cm bh Rp. 3,000.00 3,450.00 3,450.00
56 Dop besi dia 3" bh Rp. 23,000.00 26,450.00 26,250.00
57 Engsel jendela set Rp. 5,000.00 5,750.00 5,750.00
58 Elastomer 30 x 30 x 5 bh Rp. 391,000.00 449,650.00 488,750.00
59 Engsel meubeler bh Rp. 2,100.00 2,415.00 2,400.00
60 Engsel pintu set Rp. 6,900.00 7,935.00 7,950.00
61 Eternit tebal 4 mm uk. 1 m x 1 m lbr Rp. 5,000.00 5,750.00 5,750.00
62 Eternit tebal 4 mm uk. 1 m x 0.5 m lbr Rp. 2,500.00 2,875.00 2,900.00
63 Flincote ltr Rp. 12,400.00 14,260.00 14,250.00
64 Genteng glazuur turbo ex Jatiwangi bh Rp. 1,200.00 1,380.00 1,400.00
65 Genteng nok/bubung diglazuur ex jatiwangi bh Rp. 2,500.00 2,875.00 2,900.00
66 Genteng nok/bubung press mesin ex Jtw bh Rp. 2,000.00 2,300.00 2,300.00
67 Genteng nok/bubung press tangan ex Jtw bh Rp. 1,500.00 1,725.00 1,750.00
68 Genteng press diglazuur ex Jatiwangi bh Rp. 1,150.00 1,322.50 1,350.00
69 Genteng press mesin ex Jatiwangi bh Rp. 800.00 920.00 950.00
70 Genteng press tangan ex jatiwangi bh Rp. 575.00 661.25 650.00
71 Geteng beton bh Rp. 3,900.00 4,485.00 4,500.00
72 Gorong buis beton diameter 100 cm bh Rp. 90,000.00 103,500.00 109,250.00
73 Gorong buis beton diameter 80 cm bh Rp. 80,000.00 92,000.00 97,750.00
74 Gorong buis beton diameter 60 cm bh Rp. 70,000.00 80,500.00 86,250.00
75 Gorong buis beton diameter 40 cm bh Rp. 60,000.00 69,000.00 74,750.00
76 Gorong buis beton diameter 30 cm bh Rp. 45,000.00 51,750.00 57,500.00
77 Gorong buis beton diameter 20 cm bh Rp. 30,000.00 34,500.00 39,400.00
78 Gravel 60 cm bh Rp. 49,125.00 56,493.75 63,250.00
79 Gravel 40 cm bh Rp. 31,400.00 36,110.00 41,200.00
80 Gravel 20 cm bh Rp. 19,725.00 22,683.75 25,900.00
81 Grendel pintu / jendela bh Rp. 2,375.00 2,731.25 2,750.00
82 Gypsum board lbr Rp. 45,000.00 51,750.00 51,750.00
83 GRC tebal 4 mm lbr Rp. 40,000.00 46,000.00 46,000.00
84 Hampelas lbr Rp. 2,000.00 2,300.00 2,300.00
85 Kaca nako tebal 5 mm berikut teralis bh Rp. 7,500.00 8,625.00 8,650.00
86 Kaca polos tebal 3 mm m2 Rp. 26,050.00 29,957.50 29,950.00
87 Kaca polos tebal 5 mm m2 Rp. 34,775.00 39,991.25 40,000.00
88 Kait angin bh Rp. 5,975.00 6,871.25 6,900.00
89 Kapur sirih kg Rp. 775.00 891.25 900.00
90 Kawat beton kg Rp. 9,200.00 10,580.00 10,400.00
91 Kawat duri m1 Rp. 6,900.00 7,935.00 7,950.00
92 Kayu bakar m3 Rp. 74,800.00 86,020.00 86,000.00
93 Kayu balau *) m3 Rp. 5,700,000.00 6,555,000.00 6,440,000.00
94 Kayu borneo m3 Rp. 4,000,000.00 4,600,000.00 4,600,000.00
95 Kayu meranti m3 Rp. 2,600,000.00 2,990,000.00 2,990,000.00
96 Kayu dolken dia 8 -10/4 m' btg Rp. Err:522 Err:522 36,800.00
97 Kayu dolken dia 12 -15/4 m' btg Rp. 40,000.00 46,000.00 51,750.00
98 Kayu hutan m3 Rp. 1,947,800.00 2,239,970.00 2,300,000.00
99 Kayu kamper *) m3 Rp. 5,500,000.00 6,325,000.00 6,325,000.00
100 Kayu kaso 5/7 meranti btng Rp. 37,125.00 42,693.75 42,700.00
101 Kayu kruing m3 Rp. 4,500,000.00 5,175,000.00 5,175,000.00
102 Kayu lanan m3 Rp. 2,500,000.00 2,875,000.00 2,875,000.00
103 Kayu jati Jabar m3 Rp. 4,700,000.00 5,405,000.00 5,405,000.00
104 Kerikil m3 Rp. 55,375.00 63,681.25 73,400.00
105 Kunci gembok bh Rp. 4,975.00 5,721.25 5,700.00
106 Kunci pintu ukuran besar bh Rp. 69,550.00 79,982.50 80,000.00
107 Langko-langko kuda-kuda *) bh Rp. 9,725.00 11,183.75 11,200.00
108 Lantai granit 40 x 40 cm ex Essenza bh Rp. 45,550.00 52,382.50 52,400.00
109 Lantai granit 40 x 40 cm ex Granito bh Rp. 19,000.00 21,850.00 21,850.00
110 Lantai keramik uk 10 x 20 cm bh Rp. 575.00 661.25 650.00
111 Lantai keramik uk 20 x 20 cm bh Rp. 1,200.00 1,380.00 1,400.00
112 Lantai keramik uk 30 x 30 cm bh Rp. 2,450.00 2,817.50 2,800.00
113 Lantai keramik uk 40 x 40 cm (putih polos) bh Rp. 4,800.00 5,520.00 5,550.00
114 Lantai terakota 20 x 5 cm bh Rp. 2,350.00 2,702.50 2,700.00
115 Lem kayu ltr Rp. 9,775.00 11,241.25 11,250.00
116 Lemkra kg Rp. 7,375.00 8,481.25 8,500.00
117 List kayu B.3 (lebar sisi 3 cm) m' Rp. 2,250.00 2,587.50 2,600.00
118 List kayu B.4 (lebar sisi 4 cm) m' Rp. 2,475.00 2,846.25 2,850.00
119 List keliling gypsum lebar 8 cm m' Rp. 4,150.00 4,772.50 4,800.00
120 List keliling gypsum lebar 10 cm m' Rp. 5,400.00 6,210.00 6,200.00
121 List keliling gypsum lebar 12 cm m' Rp. 6,500.00 7,475.00 7,500.00
122 List drop m' Rp. 20,125.00 23,143.75 23,150.00
123 Melamin / folywood lbr Rp. 60,975.00 70,121.25 70,100.00
124 Mozaik uk 10 x 20 cm bh Rp. 975.00 1,121.25 1,100.00
125 Mozaik uk 20 x 20 cm bh Rp. 1,275.00 1,466.25 1,450.00
126 Mozaik uk 30 x 30 cm bh Rp. 2,350.00 2,702.50 2,700.00
127 Multiplex tebal 15 mm m2 Rp. 149,900.00 172,385.00 172,400.00
128 Nok steel gelombang 1050 x 5 mm m1 Rp. 16,500.00 18,975.00 19,000.00
129 Nok steel gelombang 920 x 5 mm m1 Rp. 15,650.00 17,997.50 18,000.00
130 Nok/bubung genteng beton bh Rp. 4,250.00 4,887.50 4,900.00
131 Paku biasa 1/2" - 1" kg Rp. 15,000.00 17,250.00 17,250.00
132 Paku biasa 2" - 5" kg Rp. 12,000.00 13,800.00 13,800.00
133 Paku pancing 60 x 230 bh Rp. 500.00 575.00 600.00
134 Paku sekrup 3" - 5" bh Rp. 125.00 143.75 150.00
135 Paku ulir bh Rp. 75.00 86.25 100.00
136 Pasir beton m3 Rp. 100,000.00 115,000.00 120,750.00
137 Pasir pasang m3 Rp. 62,600.00 71,990.00 74,750.00
138 Pasir urug m3 Rp. 50,000.00 57,500.00 57,500.00
139 Paving block bh Rp. 625.00 718.75 825.00
140 Pelumas bekisting ltr Rp. 8,675.00 9,976.25 10,000.00
141 Pipa PVC 2" S-12,5 ( 8 - 10 bar ) m1 Rp. 4,325.00 4,973.75 5,000.00
142 Pipa PVC 3" S-12,5 ( 8 - 10 bar ) m1 Rp. 5,975.00 6,871.25 6,900.00
143 Pipa PVC 2" ( kelas rumah tangga ) btng Rp. 60,000.00 69,000.00 74,750.00
144 Pipa PVC 3" ( kelas rumah tangga ) btng Rp. 85,000.00 97,750.00 97,750.00
145 Pipa reducer PVC 3" - 4" bh Rp. 4,000.00 4,600.00 4,600.00
146 Pipa Knee/bend PVC 3" bh Rp. 4,000.00 4,600.00 4,600.00
147 Plamir kayu / kualitas 1 kg Rp. 13,000.00 14,950.00 14,950.00
148 Plamir tembok kg Rp. 17,250.00 19,837.50 19,900.00
149 Plat baja tebal 5 mm - 20 mm kg Rp. 8,250.00 9,487.50 12,450.00
150 Polycarbonate m2 Rp. 95,000.00 109,250.00 109,250.00
151 Porselin 11 x 11 cm putih / warna bh Rp. 700.00 805.00 800.00
152 Porselin 15 x 15 cm putih bh Rp. 775.00 891.25 900.00
153 Portland cemen (PC) zak Rp. 40,000.00 46,000.00 45,000.00
154 Rubber joint 25 x 10 x 5 bh Rp. 78,250.00 89,987.50 143,750.00
155 Reng kayu borneo uk. 2/3 cm bt Rp. 4,250.00 4,887.50 4,900.00
156 Roster / batu kerawang bh Rp. 2,150.00 2,472.50 2,500.00
157 Ram kawat harmonika m2 Rp. 8,000.00 9,200.00 10,350.00
158 Semen Portland kg Rp. 800.00 920.00 900.00
159 Semen warna kg Rp. 3,000.00 3,450.00 3,450.00
160 Seng BJLS 30 lbr Rp. 17,250.00 19,837.50 19,850.00
161 Seng gelombang 3" - 6" BJLS 30 lbr Rp. 48,300.00 55,545.00 55,200.00
162 Sirlak kg Rp. 16,000.00 18,400.00 18,400.00
163 Sirtu m3 Rp. 75,000.00 86,250.00 86,250.00
164 Spirtus ltr Rp. 6,975.00 8,021.25 8,000.00
165 Split ( batu pecah mesin ) 2/3 m3 Rp. 110,000.00 126,500.00 161,000.00
166 Tali ijuk kg Rp. 5,400.00 6,210.00 6,200.00
167 Teakwood 4 mm (1200 x 2400) lbr Rp. 79,975.00 91,971.25 92,000.00
168 Teakwood 4 mm (900 x 2400) lbr Rp. 64,975.00 74,721.25 74,750.00
169 Ter kayu kg Rp. 4,475.00 5,146.25 5,150.00
170 Triplek tebal 18 mm lbr Rp. 179,975.00 206,971.25 207,000.00
171 Tiner/Minyak cat ltr Rp. 4,975.00 5,721.25 5,750.00
172 Triplek 3 mm lbr Rp. 42,500.00 48,875.00 48,900.00
173 Triplek 4 mm lbr Rp. 55,500.00 63,825.00 63,850.00
174 Triplek 6 mm lbr Rp. 65,500.00 75,325.00 75,350.00
175 Triplek 9 mm lbr Rp. 105,000.00 120,750.00 120,750.00
176 Ubin abu-abu kepala basah 20 x 20 cm bh Rp. 575.00 661.25 650.00
177 Ubin abu-abu kepala basah 30 x 30 cm bh Rp. 825.00 948.75 950.00
178 Ubin wafel ukuran 20 x 20 cm bh Rp. 875.00 1,006.25 1,000.00
179 Ubin warna 20 x 20 cm bh Rp. 875.00 1,006.25 1,000.00
180 Ubin warna 30 x 30 cm bh Rp. 1,475.00 1,696.25 1,700.00

NO UPAH KERJA SAT


1 Mandor Rp. 55,000.00 hari
2 Kepala Tukang Rp. 50,000.00 hari
3 Tukang Rp. 45,000.00 hari
4 Pembantu tukang Rp. 40,000.00 hari

SUMBER, JANUARI 2008

KEPALA DINAS CIPTA KARYA KEPALA SEKSI BANGUNAN GEDUNG


KABUPATEN CIREBON DINAS CIPTA KARYA
KABUPATEN CIREBON

Ir. H. TARDJONO, MM Ir. SUHERNA


Pembina Utama Muda NIP. 480 100 398
NIP. 110 028 228
OE
DAFTAR HARGA BAHAN DAN UPAH BANGUNAN
TAHUN ANGGARAN 2009
KABUPATEN CIREBON
1.15

NO BAHAN HARGA HARGA HARGA SAT


DASAR 2008 DASAR 2009 SATUAN 2009

1 Alumunium foil Rp. 4,956.52 4,950.00 5,700.00 m2

2 Alumunium pelapis pintu KM Rp. 43,043.48 43,050.00 49,500.00 lbr

3 Asbes gelombang 1500 x 1050 x 4 mm Rp. 26,782.61 26,800.00 30,800.00 lbr


4 Asbes gelombang 1800 x 920 x 4 mm Rp. 32,521.74 24,000.00 27,600.00 lbr

5 Asbes gelombang 2100 x 1050 x 4 mm Rp. 37,304.35 45,000.00 51,750.00 lbr

6 Asbes gelombang 2400 x 1050 x 4 mm Rp. 43,043.48 47,500.00 54,625.00 lbr

7 Asbes gelombang 2700 x 1050 x 4 mm Rp. 47,826.09 57,500.00 66,125.00 lbr


8 Asbes gelombang 3000 x 1050 x 4 mm Rp. 53,565.22 75,000.00 86,250.00 lbr

9 Atras (tanah urug) Rp. 56,782.61 57,000.00 66,000.00 m3

10 Bak mandi keramik volume 0.3 m3 Rp. 88,956.52 89,000.00 102,350.00 bh

11 Bak mandi fiber 120 L Rp. 172,173.91 185,000.00 212,750.00 bh

12 Bambu dia. 6-8 cm/ 6 m' Rp. 9,347.83 5,000.00 5,750.00 btg

13 Bata merah Rp. 347.83 350.00 400.00 bh

14 Batu apung Rp. 4,043.48 4,050.00 4,650.00 kg

15 Batu belah 10/15 cm Rp. 76,521.74 95,000.00 110,000.00 m3

16 Batu tempel kapur tekstur tidak rata Rp. 1,565.22 1,575.00 1,800.00 bh
17 Batu tempel palimanan 10 x 20 Rp. 782.61 1,100.00 1,275.00 bh

18 Baut 3/4" Rp. 7,826.09 7,500.00 8,625.00 bh

19 Baut 5/8" Rp. 4,739.13 5,000.00 5,750.00 bh


20 Baut 1/2" Rp. 4,152.17 2,500.00 2,875.00 bh

21 Baut 1/2", panjang 30 cm Rp. 3,956.52 9,000.00 10,350.00 bh

22 Baut lawa-lawa Rp. 5,586.96 5,600.00 6,450.00 bh


23 Beading penurunan (PC) gypsum Rp. 4,956.52 5,000.00 5,750.00 m'

24 Beading horison gypsum Rp. 5,913.04 5,900.00 6,800.00 m'

25 Besi beton Rp. 10,521.74 9,000.00 10,350.00 kg

26 Besi strip Rp. 5,260.87 5,275.00 6,100.00 kg

27 Besi WF Rp. 12,434.78 9,300.00 10,800.00 kg

28 Besi galvanis dia. 0,5" Rp. 26,304.35 26,300.00 30,250.00 m'

29 Besi galvanis dia. 1" Rp. 28,695.65 28,700.00 33,000.00 m'

30 Besi galvanis dia. 1,5" Rp. 46,173.91 46,200.00 53,100.00 m'

31 Besi galvanis dia. 2" Rp. 58,913.04 58,900.00 67,750.00 m'


32 Besi galvanis dia. 2,5" Rp. 82,826.09 82,825.00 95,250.00 m'

33 Besi galvanis dia. 3" Rp. 98,521.74 98,525.00 113,300.00 m'

34 Besi stainless dia. 0,5" Rp. 29,173.91 29,200.00 33,600.00 m'


35 Besi stainless dia. 1" Rp. 47,000.00 47,000.00 54,050.00 m'

36 Besi stainless dia. 1,5" Rp. 57,391.30 57,400.00 66,000.00 m'

37 Besi stainless dia. 2" Rp. 62,608.70 62,600.00 72,000.00 m'


38 Besi stainless dia. 2,5" Rp. 96,739.13 96,750.00 111,275.00 m'

39 Besi stainless dia. 3" Rp. 117,413.04 117,425.00 135,050.00 m'


40 Besi biasa dia. 2" Rp. 136,108.70 136,125.00 156,550.00 btg
41 Besi biasa dia. 3" Rp. 220,739.13 220,750.00 253,875.00 btg

42 Cat dasar / menie sejenis F-TALIT Rp. 23,913.04 23,900.00 27,500.00 kg

43 Cat genteng Rp. 27,065.22 27,100.00 31,175.00 kg

44 Cat penutup kayu sejenis Kansai Rp. 35,869.57 35,900.00 41,300.00 kg

45 Cat penutup tembok sejenis Vinilex Rp. 16,739.13 14,450.00 17,000.00 kg

46 Cat penutup besi sejenis Kansai Rp. 35,869.57 35,900.00 41,300.00 kg

47 Cat zincromate Kansai Rp. 28,695.65 28,700.00 33,000.00 kg

48 Closet jongkok porselen merk INA / KIA Rp. 86,086.96 95,000.00 109,250.00 bh

49 Closet duduk ( mono block ) porselen merk INA Rp. 717,391.30 850,000.00 977,500.00 bh

50 Closet duduk ( siram) porselen merk INA Rp. 334,782.61 375,000.00 431,250.00 bh

51 Dempul kayu Rp. 11,956.52 12,000.00 13,800.00 kg

52 Dinding keramik uk. 10 x 20 cm Rp. 652.17 750.00 875.00 bh

53 Dinding keramik uk. 20 x 20 cm Rp. 1,217.39 1,450.00 1,675.00 bh


54 Dinding keramik uk. 20 x 25 cm Rp. 1,760.87 1,875.00 2,175.00 bh

55 Dinding keramik uk. 30 x 30 cm Rp. 2,956.52 3,400.00 3,925.00 bh

56 Dop besi dia 3" Rp. 22,586.96 22,600.00 25,900.00 bh


57 Engsel jendela Rp. 4,956.52 8,000.00 9,200.00 set

58 Elastomer 30 x 30 x 5 Rp. 420,739.13 420,700.00 483,800.00 bh

59 Engsel meubeler Rp. 2,086.96 2,100.00 2,425.00 bh


60 Engsel pintu Rp. 6,826.09 10,500.00 12,075.00 set

61 Eternit tebal 4 mm uk. 1 m x 1 m Rp. 4,956.52 6,000.00 6,900.00 lbr

62 Eternit tebal 4 mm uk. 1 m x 0.5 m Rp. 2,478.26 3,000.00 3,450.00 lbr

63 Flincote Rp. 14,347.83 14,350.00 16,500.00 ltr

64 Genteng glazuur turbo ex Jatiwangi Rp. 1,391.30 2,350.00 2,725.00 bh

65 Genteng nok/bubung diglazuur ex jatiwangi Rp. 2,521.74 2,550.00 3,000.00 bh

66 Genteng nok/bubung press mesin ex Jtw Rp. 1,673.91 1,675.00 1,925.00 bh

67 Genteng nok/bubung press tangan ex Jtw Rp. 1,500.00 1,600.00 1,850.00 bh

68 Genteng press diglazuur ex Jatiwangi Rp. 1,239.13 1,750.00 2,025.00 bh


69 Genteng press mesin ex Jatiwangi Rp. 869.57 1,600.00 1,850.00 bh

70 Genteng press tangan ex jatiwangi Rp. 608.70 850.00 1,000.00 bh

71 Geteng beton Rp. 3,913.04 3,950.00 4,550.00 bh


72 Gorong buis beton diameter 100 cm Rp. 94,043.48 90,000.00 103,500.00 bh

73 Gorong buis beton diameter 80 cm Rp. 84,152.17 85,000.00 97,750.00 bh

74 Gorong buis beton diameter 60 cm Rp. 74,239.13 65,000.00 74,750.00 bh


75 Gorong buis beton diameter 40 cm Rp. 64,347.83 42,500.00 48,875.00 bh

76 Gorong buis beton diameter 30 cm Rp. 49,500.00 32,500.00 37,375.00 bh

77 Gorong buis beton diameter 20 cm Rp. 33,913.04 25,000.00 28,750.00 bh

78 Gravel 60 cm Rp. 54,434.78 54,400.00 62,550.00 bh

79 Gravel 40 cm Rp. 35,391.30 35,400.00 40,700.00 bh

80 Gravel 20 cm Rp. 22,282.61 22,300.00 25,650.00 bh

81 Grendel pintu / jendela Rp. 3,826.09 8,000.00 9,200.00 bh

82 Gypsum board Rp. 49,739.13 51,000.00 58,650.00 lbr

83 GRC tebal 4 mm Rp. 43,043.48 44,000.00 50,600.00 lbr


84 Hampelas Rp. 2,391.30 2,500.00 2,875.00 lbr

85 Kaca nako tebal 5 mm berikut teralis Rp. 7,456.52 7,500.00 8,625.00 bh


86 Kaca polos tebal 3 mm Rp. 25,760.87 37,500.00 43,125.00 m2
87 Kaca polos tebal 5 mm Rp. 34,434.78 50,000.00 57,500.00 m2

88 Kait angin Rp. 5,913.04 6,000.00 6,900.00 bh

89 Kapur sirih Rp. 1,434.78 1,500.00 1,725.00 kg

90 Kawat beton Rp. 15,304.35 12,500.00 14,800.00 kg

91 Kawat duri Rp. 6,826.09 7,000.00 8,050.00 m1

92 Kayu bakar Rp. 74,021.74 74,000.00 85,100.00 m3

93 Kayu balau *) Rp. 6,217,391.30 7,300,000.00 8,395,000.00 m3

94 Kayu borneo Rp. 3,156,521.74 3,600,000.00 4,140,000.00 m3

95 Kayu meranti Rp. 2,869,565.22 3,700,000.00 4,255,000.00 m3

96 Kayu dolken dia 8 -10/4 m' Rp. 31,695.65 37,500.00 43,125.00 btg

97 Kayu dolken dia 12 -15/4 m' Rp. 44,543.48 40,000.00 46,000.00 btg

98 Kayu hutan Rp. 2,295,652.17 2,300,000.00 2,645,000.00 m3

99 Kayu kamper *) Rp. 5,445,000.00 7,300,000.00 8,395,000.00 m3


100 Kayu kaso 5/7 meranti Rp. 36,717.39 37,000.00 42,550.00 btng

101 Kayu kruing Rp. 4,304,347.83 5,000,000.00 5,750,000.00 m3

102 Kayu lanan Rp. 2,475,000.00 4,500,000.00 5,175,000.00 m3


103 Kayu jati Jabar Rp. 6,121,739.13 7,500,000.00 8,625,000.00 m3

104 Kerikil Rp. 63,130.43 65,000.00 74,750.00 m3

105 Kunci gembok Rp. 4,913.04 7,500.00 8,625.00 bh


106 Kunci pintu ukuran besar Rp. 68,869.57 90,000.00 103,500.00 bh

107 Langko-langko kuda-kuda *) Rp. 9,565.22 9,750.00 11,200.00 bh

108 Lantai granit 40 x 40 cm ex Essenza Rp. 45,086.96 45,000.00 51,750.00 bh

109 Lantai granit 40 x 40 cm ex Granito Rp. 18,739.13 18,700.00 21,500.00 bh

110 Lantai keramik uk 10 x 20 cm Rp. 573.91 750.00 875.00 bh

111 Lantai keramik uk 20 x 20 cm Rp. 1,304.35 1,500.00 1,725.00 bh

112 Lantai keramik uk 30 x 30 cm Rp. 2,413.04 2,450.00 2,825.00 bh

113 Lantai keramik uk 40 x 40 cm (putih polos) Rp. 4,891.30 3,000.00 3,450.00 bh

114 Lantai terakota 20 x 5 cm Rp. 2,347.83 3,250.00 3,750.00 bh


115 Lem kayu Rp. 9,673.91 4,500.00 5,175.00 ltr

116 Lemkra Rp. 7,304.35 10,000.00 11,500.00 kg

117 List kayu B.3 (lebar sisi 3 cm) Rp. 2,239.13 3,000.00 3,450.00 m'
118 List kayu B.4 (lebar sisi 4 cm) Rp. 2,456.52 3,250.00 3,725.00 m'

119 List keliling gypsum lebar 8 cm Rp. 4,108.70 4,500.00 5,175.00 m'

120 List keliling gypsum lebar 10 cm Rp. 5,413.04 6,000.00 6,900.00 m'
121 List keliling gypsum lebar 12 cm Rp. 6,456.52 6,500.00 7,475.00 m'

122 List drop Rp. 19,934.78 20,000.00 23,000.00 m'

123 Melamin / folywood Rp. 62,173.91 67,500.00 77,625.00 lbr

124 Mozaik uk 10 x 20 cm Rp. 934.78 950.00 1,100.00 bh

125 Mozaik uk 20 x 20 cm Rp. 1,239.13 1,250.00 1,450.00 bh

126 Mozaik uk 30 x 30 cm Rp. 2,326.09 2,350.00 2,700.00 bh

127 Multiplex tebal 15 mm Rp. 162,608.70 185,000.00 212,750.00 m2

128 Nok steel gelombang 1050 x 5 mm Rp. 21,043.48 25,000.00 28,750.00 m1

129 Nok steel gelombang 920 x 5 mm Rp. 15,304.35 22,000.00 25,300.00 m1


130 Nok/bubung genteng beton Rp. 4,195.65 4,200.00 4,825.00 bh

131 Paku biasa 1/2" - 1" Rp. 19,130.43 18,000.00 20,700.00 kg

132 Paku biasa 2" - 5" Rp. 15,304.35 12,000.00 13,800.00 kg


133 Paku pancing 60 x 230 Rp. 521.74 550.00 650.00 bh
134 Paku sekrup 3" - 5" Rp. 152.17 175.00 200.00 bh

135 Paku ulir Rp. 108.70 125.00 150.00 bh

136 Pasir beton Rp. 103,956.52 158,125.00 160,000.00 m3

137 Pasir pasang Rp. 73,739.13 106,700.00 120,000.00 m3

138 Pasir urug Rp. 49,500.00 63,000.00 72,500.00 m3

139 Paving block Rp. 717.39 700.00 800.00 bh

140 Pelumas bekisting Rp. 8,608.70 8,600.00 9,900.00 ltr

141 Pipa PVC 2" S-12,5 ( 8 - 10 bar ) Rp. 5,347.83 6,000.00 6,900.00 m1

142 Pipa PVC 3" S-12,5 ( 8 - 10 bar ) Rp. 9,086.96 9,000.00 10,350.00 m1

143 Pipa PVC 2" ( kelas rumah tangga ) Rp. 64,347.83 64,000.00 73,600.00 btng

144 Pipa PVC 3" ( kelas rumah tangga ) Rp. 84,152.17 84,000.00 96,600.00 btng

145 Pipa reducer PVC 3" - 4" Rp. 3,956.52 4,000.00 4,600.00 bh

146 Pipa Knee/bend PVC 3" Rp. 3,956.52 4,000.00 4,600.00 bh


147 Plamir kayu / kualitas 1 Rp. 19,130.43 25,000.00 28,750.00 kg

148 Plamir tembok Rp. 16,260.87 17,000.00 19,550.00 kg

149 Plat baja tebal 5 mm - 20 mm Rp. 10,717.39 10,750.00 12,375.00 kg


150 Polycarbonate Rp. 94,043.48 94,000.00 108,100.00 m2

151 Porselin 11 x 11 cm putih / warna Rp. 717.39 725.00 850.00 bh

152 Porselin 15 x 15 cm putih Rp. 760.87 800.00 925.00 bh


153 Portland cemen (PC) Rp. 44,000.00 52,000.00 55,000.00 zak

154 Rubber joint 25 x 10 x 5 Rp. 123,739.13 123,800.00 142,350.00 bh

155 Reng kayu borneo uk. 2/3 cm Rp. 4,195.65 7,000.00 8,050.00 bt

156 Roster / batu kerawang Rp. 2,152.17 2,200.00 2,525.00 bh

157 Ram kawat harmonika Rp. 8,891.30 8,900.00 10,250.00 m2

158 Semen Portland Rp. 880.00 1,040.00 1,195.00 kg

159 Semen warna Rp. 4,782.61 4,000.00 4,600.00 kg

160 Seng BJLS 30 Rp. 17,021.74 18,000.00 20,700.00 lbr

161 Seng gelombang 3" - 6" BJLS 30 Rp. 47,434.78 47,500.00 54,625.00 lbr
162 Sirlak Rp. 15,826.09 16,000.00 18,400.00 kg

163 Sirtu Rp. 74,239.13 150,000.00 172,500.00 m3

164 Spirtus Rp. 7,173.91 9,000.00 10,350.00 ltr


165 Split ( batu pecah mesin ) 2/3 Rp. 138,608.70 150,000.00 172,500.00 m3

166 Tali ijuk Rp. 5,326.09 5,000.00 5,750.00 kg

167 Teakwood 4 mm (1200 x 2400) Rp. 86,086.96 115,000.00 132,250.00 lbr


168 Teakwood 4 mm (900 x 2400) Rp. 66,956.52 95,000.00 109,250.00 lbr

169 Ter kayu Rp. 4,500.00 12,500.00 14,375.00 kg

170 Triplek tebal 18 mm Rp. 178,195.65 195,000.00 224,250.00 lbr

171 Tiner/Minyak cat Rp. 4,934.78 8,000.00 9,200.00 ltr

172 Triplek 3 mm Rp. 42,086.96 40,000.00 46,000.00 lbr

173 Triplek 4 mm Rp. 54,521.74 55,000.00 63,250.00 lbr

174 Triplek 6 mm Rp. 66,956.52 67,500.00 77,625.00 lbr

175 Triplek 9 mm Rp. 100,434.78 115,000.00 132,250.00 lbr


176 Ubin abu-abu kepala basah 20 x 20 cm Rp. 565.22 1,700.00 1,950.00 bh
177 Ubin abu-abu kepala basah 30 x 30 cm Rp. 826.09 2,000.00 2,300.00 bh

178 Ubin wafel ukuran 20 x 20 cm Rp. 869.57 1,700.00 1,950.00 bh

179 Ubin warna 20 x 20 cm Rp. 869.57 2,000.00 2,300.00 bh

180 Ubin warna 30 x 30 cm Rp. 1,434.78 2,500.00 2,875.00 bh

181 Plester Mutiara Rp. 6,543.48 7,200.00 8,275.00 kg

182 TG 302 Rp. 36,673.91 40,350.00 46,400.00 ltr

183 Skim Coat Rp. 3,304.35 3,650.00 4,200.00 kg

184 Lemkra Just Do It Rp. 3,065.22 3,375.00 3,875.00 kg

185 Lemkra FS Nat Rp. 11,804.35 13,000.00 14,950.00 kg

186 Kusen Aluminium 3'' warna natural Rp. 45,000.00 51,750.00 m'

187 Kusen Aluminium 3'' warna coklat dop Rp. 50,000.00 57,500.00 m'

188 Kusen Aluminium 3'' warna coklat kilap Rp. 90,000.00 103,500.00 m'

189 Kusen Aluminium 4'' warna natural Rp. 70,000.00 80,500.00 m'
190 Kusen Aluminium 4'' warna coklat dop Rp. 80,000.00 92,000.00 m'

191 Kusen Aluminium 4'' warna coklat kilap Rp. 120,000.00 138,000.00 m'

192 Door closer Rp. 175,000.00 201,250.00 bh


193 Daun pintu aluminium lengkap warna natural/coklat dop Rp. 850,000.00 977,500.00 bh

194 Daun pintu aluminium lengkap warna coklat kilap Rp. 1,200,000.00 1,380,000.00 bh

NO UPAH KERJA SAT

1 Mandor Rp. 55,000.00 55,000.00 hari


2 Kepala Tukang Rp. 50,000.00 50,000.00 hari

3 Tukang Rp. 45,000.00 45,000.00 hari

4 Pembantu tukang Rp. 40,000.00 40,000.00 hari

SUMBER, JANUARI 2009


SUMBER, JANUARI 2009

KEPALA DINAS CIPTA KARYA DAN TATA RUANG KEPALA SEKSI BANGUNAN GEDUNG
KABUPATEN CIREBON DINAS CIPTA KARYA DAN TATA RUANG
KABUPATEN CIREBON

Ir. H. TARDJONO, MM Ir. SUHERNA


Pembina Utama Muda NIP. 480 100 398
NIP. 110 028 228
HARGA PERKIRAAN SENDIRI (HPS)
RENCANA BIAYA : PEMBANGUNAN / REHABILITASI
TAHUN : 2016
DESA :
KECAMATAN :
KABUPATEN : CIREBON

HARGA
JUMLAH
NO JENIS PEKERJAAN ANALISA VOLUME SATUAN
Rp Rp
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 Direksikeet dan Los Bahan SNI.100.12 m2 707,800.00 -
2 Bouwplank dan Propil SNI.100.05 m2 94,800.00 -
3 Steiger/alat-alat bantu dari bambu SNI.000.04 m2 44,700.00 -
4 Papan nama proyek SNI.100.03 bh 330,400.00 -
-

II PEKERJAAN BONGKARAN
1 Membongkar atap genteng/asbes SNI.990.07 m2 1,800.00 -
2 Membongkar genteng bubung - Ls - -
3 Membongkar rangka atap SNI.990.09 m2 5,600.00 -
4 Membongkar rangka kuda-kuda SNI.990.12 m3 67,200.00 -
5 Membongkar Plafond SNI.990.09 m2 5,600.00 -
6 Membongkar papan listplank - Ls - -
7 Mengupas plesteran lama SNI.990.06 m2 2,800.00 -
8 Membongkar dinding tembok SNI.990.04 m2 11,200.00 -
9 Membongkar kusen,pintu dan jendela - Ls - -
10 Membongkar lantai tegel/floor SNI.990.05 m2 6,000.00 -
11 Membongkar talang - Ls - -
-

III PEKERJAAN GALIAN/URUGAN


1 Galian tanah untuk pondasi SNI.200.01 m3 36,000.00 -
2 Urugan kembali bekas galian SNI.200.09 m3 17,200.00 -
3 Urugan tanah untuk peninggian berikut SNI.200.12+
pemadatan SNI.200.10 rob m3 238,500.00 -
-

IV PEKERJAAN PONDASI
1 Urugan pasir di bawah pondasi SNI.200.11 m3 227,200.00 -
2 Pasangan batu kosong SNI.250.14 m3 396,300.00 -
3 Pasangan batu belah ad. 1PC : 5PS SNI.250.07 m3 723,600.00 -
-

V PEKERJAAN BETON/PEMBESIAN
1 Pembesian untuk sloop,kolom &ringbalk SNI.300.32 kg 17,000.00 -
2 Bekisting untuk sloop,kolom &ringbalk SNI.300.36 m2 237,000.00 -
3 Bekisting untuk kolom struktur SNI.300.37 m2 462,600.00 -
4 Adukan beton untuk sloop,kolom dan
ringbalk ad. 1 PC : 2PS : 3Krl SNI.300.19 m3 812,500.00 -
-

VI PEKERJAAN PASANGAN DINDING BATA


1 Pasangan dinding bata traasraam ad. 1PC:3PS SNI.350.11 m2 131,000.00 -
2 Pasangan dinding bata ad. 1PC : 5PS SNI.350.13 m2 124,500.00 -
3 Plesteran dinding bata traasraam ad. 1PC:3PS SNI.360.03 m2 47,300.00 -
4 Plesteran dinding bata ad. 1PC : 5PS SNI.360.05 m2 44,400.00 -
5 Acian dinding SNI.360.07 m2 29,500.00
6 Plesteran profilan dinding SNI.Plesprof m2 67,300.00 -
7 Plester Mutiara berikut coating SNI.360.06.rob m2 51,600.00 -
8 Acian menggunakan scim coat (natural) SNI.Skimcoat m2 31,600.00 -
9 Beton tumbuk utk neut ad. 1PC : 3PS : 6Krl SNI.300.08 m3 640,500.00 -
10 Pasang dinding keramik uk. 20 x 20 cm SNI.650.09 m2 185,200.00 -

-
VII PEKERJAAN KUSEN,PINTU DAN JENDELA
1 Kusen, pintu, jendela dari kayu meranti/lanan/ SNI.955.31 m3 9,930,000.00 -
kruing/balau/kamper SNI.955.30 m3 10,667,100.00 -
SNI.955.29 m3 11,649,900.00 -
SNI.955.28 m3 14,655,000.00 -
SNI.955.27 m3 12,900,000.00 -
1 2 3 4 5 6
2 Rangka pintu dan jendela dari kayu meranti/ SNI.960.41 m2 527,600.00 -
lanan/kruing/balau/kamper SNI.960.40 m2 549,100.00 -
SNI.960.39 m2 577,700.00 -
SNI.960.38 m2 665,400.00 -
SNI.960.37 m2 614,200.00 -
3 Triplek untuk melapis daun pintu 3 mm - lb 52,000.00 -
4 Triplek untuk melapis daun pintu 4 mm - lb 55,000.00 -
5 Teakwood untuk melapis daun pintu 4 mm - lb 80,000.00 -
6 Sketsel triplek rangkap rangka kayu kruing SNI.453.42 m2 345,300.00 -
7 Sketsel GRC rangkap rangka kayu meranti SNI.453.44 m2 218,900.00 -
8 Jalusi dari kayu meranti/kruing/kamper tebal 1,5 cm SNI.970.37 m2 240,600.00 -
SNI.970.35 m2 269,200.00 -
SNI.970.33 m2 290,100.00 -
9 Ram kawat harmonika untuk bovenlight SNI.900.13 m2 54,700.00 -
10 Kaca Polos tebal 3 mm SNI.850.16 m2 94,600.00 -
11 Kaca Polos tebal 5 mm SNI.850.17 m2 109,100.00 -
12 Kaca nako tebal 5 mm berikut teralis SNI.900.17 dn 38,000.00 -
-

VIII PEKERJAAN KUDA-KUDA / ATAP


1 Rangka atap baja ringan uk. 075 zinc-alumunium G.550 SNI. BJR.02.a m2 168,700.00 -
2 Rangka kuda-kuda dari kayu meranti/ SNI.975.27 m3 9,352,100.00 -
lanan/kruing/balau/kamper/jati jabar SNI.975.26 m3 10,027,800.00 -
SNI.975.25 m3 10,928,700.00 -
SNI.975.24 m3 13,683,400.00 -
SNI.975.23 m3 12,074,600.00 -
SNI.975.22 m3 12,074,600.00 -
3 Rangka atap dari kayu meranti/lanan/kruing/balau/ SNI.980.21 m2 103,300.00 -
kamper (usuk 5/7 cm dan reng 2/3 cm) SNI.980.20 m2 110,700.00 -
SNI.980.19 m2 120,500.00 -
SNI.980.18 m2 150,500.00 -
SNI.980.17 m2 133,000.00 -
4 Pengadaan reng kayu borneo uk. 2/3 cm - m3 5,000,000.00 -
5 Atap genteng press tangan SNI.460.01 m2 60,500.00 -
6 Pasang genteng lama - m2 18,810.00 -
7 Genteng bubung press tangan SNI.460.05 m' 83,700.00 -
8 Rangka langit-langit eternit dari kayu meranti/lanan/ SNI.450.32 m2 131,000.00 -
kruing SNI.450.33 m2 138,400.00 -
SNI.450.31 m2 148,200.00 -
9 Rangka langit-langit bilik dari kayu meranti SNI.450.34 m2 88,900.00 -
10 Langit-langit eternit tebal 5 mm SNI.470.02 m2 19,100.00 -
11 Langit-langit GRC tebal 4 mm SNI.470.06 m2 38,500.00 -
12 Pasang plafond rangka rangka hollow dengan penutup SNI. PLAFOND m2 96,200.00 -
GRC berikut pengecatan
13 Papan listplank dari kayu meranti/lanan/kruing/ SNI.451.39 m' 80,300.00 -
balau/kamper SNI.451.38 m' 84,700.00 -
SNI.451.37 m' 90,600.00 -
SNI.451.36 m' 108,600.00 -
SNI.451.35 m' 98,100.00 -
14 Papan listplank dari woodplank SNI.451.40 m' 48,600.00 -
15 Asbes gelombang uk. 2.400 x1050 x 5 mm SNI.460.08 m2 53,300.00 -
16 Asbes gelombang uk. 2.100 x 1050 x 5 mm SNI.460.09 m2 53,900.00 -
17 Nok steel asbes gelombang 920 x 5 cm SNI.460.14 m' 84,500.00 -
18 Nok steel asbes gelombang 1050 x 5 cm SNI.460.15 m' 92,300.00 -
19 Pasang talang datar seng BJLS 30 SNI.900.18 m' 147,600.00 -
20 Pasang talang miring seng BJLS 30 SNI.900.19 m' 212,300.00 -
21 Pasang talang pipa 1/2 O 10 cm seng BJLS 30 SNI.900.20 m' 169,100.00 -
22 Pasang baut dia 12 mm untuk sambungan kuda-kuda - bh 8,550.00 -
-

IX PEKERJAAN LANTAI
1 Urugan pasir di bawah lantai SNI.200.11 m3 227,200.00 -
2 Lantai tegel abu-abu kepala basah 20 x 20 cm SNI.650.03 m2 112,400.00 -
3 Lantai tegel wafel SNI.650.04 m2 112,400.00 -
4 Lantai beton tumbuk tebal 5 cm ad. 1PC:3PS:6Krl SNI.300.08 m2 32,025.00 -
5 Pasang lantai keramik uk. 30 x 30 cm SNI.650.05 m2 104,400.00 -
6 Pasang lantai keramik uk. 40 x 40 cm SNI.650.20 m2 113,900.00
7 Pasang lantai keramik uk. 30 x 30 cm (menggunakan SNI.650.05.rob m2 108,900.00 -
zat addictive berikut pengecoran)
1 2 3 4 5 6
8 Pasang lantai keramik uk. 20 x 20 cm SNI.650.06 m2 183,300.00 -
9 Pasang lantai keramik uk. 10 x 20 cm SNI.650.07 m2 183,300.00 -
10 Pasang lantai mozaik uk.30 x 30 cm SNI.650.14 m2 119,353.00 -
11 Pasang lantai mozaik uk.20 x 20 cm SNI.650.15 m2 187,700.00 -
12 Pasang rabat keliling SNI.300.08 m2 32,025.00 -
13 Pembuatan Saluran gravel 1/2 dia 20 cm SNI.GRAVEL m' 161,400.00 -
14 Pasang paving block setara K.125 SNI. 999.01 m2 122,900.00 -
-

X PEKERJAAN BESI / LAIN-LAIN


1 Langko-langko penguat rangka kuda-kuda - bh 18,000.00 -
2 Kunci tanam besar untuk pintu SNI.850.02 bh 193,600.00 -
3 Engsel untuk pintu SNI.850.05 set 39,400.00 -
4 Engsel untuk jendela SNI.850.06 set 31,500.00 -
5 Grendel untuk pintu dan jendela SNI.850.07 bh 30,200.00 -
6 Kait angin untuk jendela SNI.850.09 bh 26,400.00 -
7 Bak mandi keramik volume 0,3 m3 SNI.550.06 bh 480,500.00 -
8 Closet jongkok porselen SNI.550.02 bh 450,100.00 -
9 Washtafel lengkap aksesories SNI.550.07 bh 1,175,200.00 -
10 Bad keep - bh - -
11 Pemasangan sumur pompa tangan dangkal/sumur - 1 Ls - -
gali/sumur bor
12 Pasang pompa listrik - 1 Ls - -
13 Penyediaan instalasi air bersih/perpipaan - 1 Ls - -
14 Pasang menara air dari besi L. 50.50.6 berikut
tabung fiber glass vol.1000 lt tinggi 4 m' - 1 Ls - -
15 Pembuatan septictank berikut rembesan - 1 Ls - -
16 Pekerjaan instalasi lampu dan stop kontak SNI.L -1 ttk 164,700.00 -
17 Pekerjaan stop kontak SNI.L -2 bh 33,400.00 -
18 Pekerjaan lampu SL 18 watt SNI.L -3 bh 50,200.00 -
19 Pekerjaan sekring kast SNI.L -4 unit 59,200.00 -
20 Pekerjaan MCB Box SNI.L -5 bh 115,500.00 -
21 Pekerjaan over spaneng SNI.L -6 m' 34,000.00 -
22 Pekerjaan saklar ganda SNI.L -7 bh 57,800.00 -
23 Pekerjaan saklar tunggal SNI.L -8 bh 53,300.00 -
-

XI PEKERJAAN MENGECAT
1 Mengecat kayu kusen, pintu, jendela dan listplank SNI.950.07 m2 35,400.00 -
berikut plamir
2 Mengecat kayu lama SNI.950.08 m2 31,700.00 -
3 Mengecat tembok baru dan langit-langit dengan cat SNI.950.15 m2 21,600.00 -
tembok berikut plamir
4 Mengecat tembok lama dan langit-langit dengan cat SNI.950.17 m2 15,600.00 -
tembok berikut plamir
5 Mengeter kayu kuda-kuda & rangka atap SNI. 985.36 m2 14,200.00 -
6 Mengosok/dempul kayu yang akan diplistur SNI.950.06 m2 9,500.00 -
7 Mengerjalan plisturan sirlak SNI.985.34 m2 55,200.00 -
-

R E K A P I T U LA S I
I PEKERJAAN PERSIAPAN Rp -
II PEKERJAAN BONGKARAN Rp -
III PEKERJAAN GALIAN/URUGAN Rp -
IV PEKERJAAN PONDASI Rp -
V PEKERJAAN BETON/PEMBESIAN Rp -
VI PEKERJAAN PASANGAN DINDING BATA Rp -
VII PEKERJAAN KUSEN,PINTU DAN JENDELA Rp -
VIII PEKERJAAN KUDA-KUDA / ATAP Rp -
IX PEKERJAAN LANTAI Rp -
1 2 3 4 5 6
X PEKERJAAN BESI / LAIN-LAIN Rp -
XI PEKERJAAN MENGECAT Rp -
JUMLAH -

PPN 10 % Rp -
JUMLAH TOTAL Rp -

DIBULATKAN Rp -

TERBILANG : ( .. )

SUMBER, 2016

KEPALA SEKSI PERUMAHAN DAN PERMUKIMAN DINAS KEPALA SEKSI BANGUNAN GEDUNG
CIPTA KARYA DAN TATA RUANG KABUPATEN CIREBON DINAS CIPTA KARYA DAN TATA RUANG KABUPATEN
CIREBON

H. ABDUL KARIM, ST
NIP. 19620609 199101 1 001 YEDI ADHI PRIATNA, BAE.S.Sos
NIP. 19660815 199803 1 004

KEPALA DINAS CIPTA KARYA DAN TATA RUANG


KEPALA BIDANG BANGUNAN, PERUMAHAN DAN KABUPATEN CIREBON
PERMUKIMAN DINAS CIPTA KARYA DAN TATA RUANG
KABUPATEN CIREBON

Ir. H. SUGENG RAHARJO, M.MP


ASEP DJAMALUDIN MALIK, ST NIP. 19600912 198603 1 005
NIP. 19680607 199703 1 005
DAFTAR HARGA BAHAN, UPAH DAN PERALATAN
DINAS CIPTA KARYA DAN TATA RUANG KABUPATEN CIREBON
TAHUN ANGGARAN 2016

HARGA SATUAN
NO BAHAN
(Rp)
A. BAHAN PEKERJAAN BANGUNAN
1 Alumunium foil Rp. 30,000.00 m2
2 Alumunium pelapis pintu KM (tebal 0,4 cm) Rp. 70,000.00 lbr
3 Asbes gelombang 1500 x 1050 x 4 mm Rp. 42,500.00 lbr
4 Asbes gelombang 1800 x 920 x 4 mm Rp. 32,000.00 lbr
5 Asbes gelombang 2100 x 1050 x 4 mm Rp. 57,000.00 lbr
6 Asbes gelombang 2400 x 1050 x 4 mm Rp. 65,000.00 lbr
7 Asbes gelombang 2700 x 1050 x 4 mm Rp. 75,000.00 lbr
8 Asbes gelombang 3000 x 1050 x 4 mm Rp. 85,000.00 lbr
9 Atras (tanah urug) Rp. 125,000.00 m3
10 Bak mandi keramik volume 0.3 m3 Rp. 185,000.00 bh
11 Bak mandi fiber 120 L Rp. 220,000.00 bh
12 Bambu dia. 6-8 cm/ 6 m' Rp. 17,000.00 btg
13 Bata merah Rp. 800.00 bh
14 Bata berongga Rp. 2,400.00 bh
15 Batu apung Rp. 4,300.00 kg
16 Batu belah 10/15 cm Rp. 175,000.00 m3
17 Batu pecah 5/7 cm Rp. 175,000.00 m3
18 Batu tempel kapur tekstur tidak rata Rp. 2,050.00 bh
19 Batu tempel 10 x 20 Rp. 1,550.00 bh
20 Baut 3/4" Rp. 6,700.00 bh
21 Baut 5/8" Rp. 6,700.00 bh
22 Baut 1/2" Rp. 6,000.00 bh
23 Baut 1/2", panjang 30 cm Rp. 8,550.00 bh
24 Baut lawa-lawa Rp. 13,000.00 kg
25 Beading penurunan (PC) gypsum Rp. 10,000.00 m'
26 Beading horison gypsum Rp. 10,000.00 m'
27 Besi beton Rp. 13,000.00 kg
28 Besi strip Rp. 13,750.00 kg
29 Besi WF Rp. 13,750.00 kg
30 Besi galvanis dia. 0,5" Rp. 25,000.00 m'
31 Besi galvanis dia. 1" Rp. 27,000.00 m'
32 Besi galvanis dia. 1,5" Rp. 45,000.00 m'
33 Besi galvanis dia. 2" Rp. 57,000.00 m'
34 Besi galvanis dia. 2,5" Rp. 80,500.00 m'
35 Besi galvanis dia. 3" Rp. 84,000.00 m'
36 Besi stainless dia. 0,5" Rp. 38,000.00 m'
37 Besi stainless dia. 1" Rp. 60,000.00 m'
38 Besi stainless dia. 1,5" Rp. 75,000.00 m'
39 Besi stainless dia. 2" Rp. 80,000.00 m'
40 Besi stainless dia. 2,5" Rp. 125,000.00 m'
41 Besi stainless dia. 3" Rp. 152,000.00 m'
42 Besi biasa dia. 2" Rp. 250,000.00 btg
43 Besi biasa dia. 3" Rp. 310,000.00 btg
44 Cat dasar / menie Rp. 25,000.00 kg
45 Cat genteng Rp. 50,000.00 kg
46 Cat penutup kayu Rp. 49,000.00 kg
47 Cat penutup tembok Rp. 25,000.00 kg
48 Cat penutup besi Rp. 52,000.00 kg
49 Cat zincromate Rp. 90,000.00 kg
50 Closet jongkok porselen Rp. 140,000.00 bh
51 Closet duduk ( mono block ) porselen Rp. 1,237,000.00 bh
52 Closet duduk ( siram) porselen Rp. 545,000.00 bh
53 Dempul kayu Rp. 18,500.00 kg
54 Dinding keramik uk. 10 x 20 cm Rp. 1,000.00 bh
55 Dinding keramik uk. 20 x 20 cm Rp. 2,000.00 bh
56 Dinding keramik uk. 20 x 25 cm Rp. 2,200.00 bh
57 Dinding keramik uk. 30 x 30 cm Rp. 4,500.00 bh
58 Digital printing Rp. 25,000.00 m'
59 Dop besi dia 3" Rp. 60,000.00 bh
60 Engsel jendela Rp. 12,000.00 set
61 Elastomer 30 x 30 x 5 Rp. 632,500.00 bh
62 Engsel meubeler Rp. 3,800.00 bh
63 Engsel pintu Rp. 19,000.00 set
64 Eternit tebal 4 mm uk. 1 m x 1 m Rp. 6,900.00 lbr
65 Eternit tebal 4 mm uk. 1 m x 0.5 m Rp. 3,450.00 lbr
66 Flincote Rp. 22,000.00 ltr
67 Genteng glazuur turbo Rp. 3,500.00 bh
68 Genteng nok/bubung diglazuur turbo Rp. 4,000.00 bh
69 Genteng nok/bubung press mesin Rp. 2,500.00 bh
70 Genteng nok/bubung press tangan Rp. 2,000.00 bh
71 Genteng nok/ bubung morando diglazuur Rp. 4,500.00 bh
72 Genteng nok/ bubung morando Rp. 4,000.00 bh
73 Genteng press tangan diglazuur Rp. 2,500.00 bh
74 Genteng morando diglazuur Rp. 3,500.00 bh
75 Genteng morando Rp. 3,500.00 bh
76 Genteng press mesin Rp. 1,900.00 bh
77 Genteng press tangan Rp. 1,400.00 bh
78 Genteng Type Viktoria Rp. 9,000.00 bh
79 Genteng nok/bubung type Viktoria Rp. 12,500.00 bh
80 Genteng nok/bubung ujung type Viktoria Rp. 20,000.00 bh
81 Genteng nok/bubung ujung pertigaan type Viktoria Rp. 25,000.00 bh
82 Genteng beton Rp. 5,000.00 bh
83 Glass Block Rp. 17,500.00 bh
84 Gorong buis beton diameter 100 cm Rp. 150,000.00 bh
85 Gorong buis beton diameter 80 cm Rp. 130,000.00 bh
86 Gorong buis beton diameter 60 cm Rp. 140,000.00 bh
87 Gorong buis beton diameter 40 cm Rp. 100,000.00 bh
88 Gorong buis beton diameter 30 cm Rp. 80,000.00 bh
89 Gorong buis beton diameter 20 cm Rp. 60,000.00 bh
90 Gravel 60 cm Rp. 75,000.00 bh
91 Gravel 40 cm Rp. 45,000.00 bh
92 Gravel 20 cm Rp. 35,000.00 bh
93 Grendel pintu / jendela Rp. 5,500.00 bh
94 Gypsum board Rp. 52,500.00 lbr
95 GRC tebal 4 mm Rp. 52,500.00 lbr
96 Hampelas Rp. 3,000.00 lbr
97 Kaca nako tebal 5 mm berikut teralis Rp. 11,400.00 bh
98 Kaca polos tebal 3 mm Rp. 63,250.00 m2
99 Kaca polos tebal 5 mm Rp. 75,000.00 m2
100 Kait angin Rp. 7,500.00 bh
101 Kapur sirih Rp. 2,000.00 kg
102 Kawat beton Rp. 20,000.00 kg
103 Kawat duri Rp. 14,700.00 kg
104 Kayu bakar Rp. 150,000.00 m3
105 Kayu balau *) Rp. 9,500,000.00 m3
106 Kayu borneo Rp. 5,000,000.00 m3
107 Kayu meranti Rp. 6,000,000.00 m3
108 Kayu dolken dia 8 -10/4 m' Rp. 60,000.00 btg
109 Kayu dolken dia 12 -15/4 m' Rp. 68,000.00 btg
110 Kayu hutan Rp. 3,500,000.00 m3
111 Kayu kamper *) Rp. 8,200,000.00 m3
112 Kayu kaso 5/7 meranti Rp. 79,000.00 btng
113 Kayu kruing Rp. 7,274,000.00 m3
114 Kayu lanan Rp. 6,546,000.00 m3
115 Kayu jati Jabar Rp. 8,200,000.00 m3
116 Kerikil Rp. 65,000.00 m3
117 Kunci gembok Rp. 20,000.00 bh
118 Kunci pintu ukuran besar Rp. 125,000.00 bh
119 Langko-langko kuda-kuda *) Rp. 18,000.00 bh
120 Lantai granit 40 x 40 cm B Rp. 43,500.00 bh
121 Lantai granit 40 x 40 cm A Rp. 42,000.00 bh
122 Lantai granit 60 x 60 cm polos Rp. 84,600.00 bh
123 Lantai granit 60 x 60 cm corak Rp. 57,600.00 bh
124 Lantai keramik uk 10 x 20 cm Rp. 1,000.00 bh
125 Lantai keramik uk 20 x 20 cm Rp. 2,000.00 bh
126 Lantai keramik uk 30 x 30 cm Rp. 3,150.00 bh
127 Lantai keramik uk 40 x 40 cm (putih polos) Rp. 7,200.00 bh
128 Lantai terakota 20 x 5 cm Rp. 4,400.00 bh
129 Lem kayu Rp. 30,000.00 ltr
130 Zat addictive Rp. 15,000.00 kg
131 List kayu B.3 (lebar sisi 3 cm) Rp. 4,400.00 m'
132 List kayu B.4 (lebar sisi 4 cm) Rp. 4,800.00 m'
133 List keliling gypsum lebar 7-8 cm Rp. 14,000.00 m'
134 List keliling gypsum lebar 10 cm Rp. 16,000.00 m'
135 List keliling gypsum lebar 12 cm Rp. 18,000.00 m'
136 List drop Rp. 8,900.00 m'
137 Melamin / folywood Rp. 88,500.00 lbr
138 Mozaik uk 20 x 20 cm Rp. 1,900.00 bh
139 Multiplex tebal 15 mm Rp. 275,000.00 m2
140 Nok steel gelombang 1050 x 5 mm Rp. 29,000.00 m1
141 Nok steel gelombang 920 x 5 mm Rp. 22,500.00 m1
142 Nok/bubung genteng beton Rp. 6,000.00 bh
143 Paku biasa 1/2" - 1" Rp. 18,500.00 kg
144 Paku biasa 2" - 5" Rp. 16,000.00 kg
145 Paku pancing 60 x 230 Rp. 825.00 bh
146 Paku sekrup 3" - 5" Rp. 400.00 bh
147 Paku ulir Rp. 150.00 bh
148 Pasir beton Rp. 179,000.00 m3
149 Pasir pasang Rp. 162,000.00 m3
150 Pasir urug Rp. 150,000.00 m3
151 Paving block hexagon natural setara K.225 (uk. 17 x 17 x 6 cm) Rp. 1,650.00 bh
152 Paving block hexagon motif setara K.225 (uk. 17 x 17 x 6 cm) Rp. 1,800.00 bh
153 Paving block hexagon warna setara K.225 (uk. 17 x 17 x 6 cm) Rp. 2,000.00 bh
154 Paving block hexagon natural setara K.225 (uk. 20 x 18 x 7 cm) Rp. 2,450.00 bh
155 Paving block hexagon motif setara K.225 (uk. 20 x 18 x 7 cm) Rp. 2,650.00 bh
156 Paving block hexagon warna setara K.225 (uk. 20 x 18 x 7 cm) Rp. 2,850.00 bh
157 Paving block bolder natural setara K.225 (uk. 20 x 20 x 7 cm) Rp. 3,000.00 bh
158 Paving block bolder warna setara K.225 (uk. 20 x 20 x 7 cm) Rp. 3,200.00 bh
159 Paving block bata natural setara K.225 (uk. 10 x 20 x 7 cm) Rp. 1,400.00 bh
160 Paving block bata warna setara K.225 (uk. 10 x 20 x 7 cm) Rp. 1,500.00 bh
161 Pelumas bekisting Rp. 10,000.00 ltr
162 Plamir kayu / kualitas 1 Rp. 20,000.00 kg
163 Plamir tembok Rp. 23,000.00 kg
164 Plat baja tebal 5 mm - 20 mm Rp. 13,000.00 kg
165 Polycarbonate Rp. 115,000.00 m2
166 Portland cemen (PC) Rp. 70,000.00 zak
167 Rubber joint 25 x 10 x 5 Rp. 235,000.00 bh
168 Reng kayu borneo uk. 2/3 cm Rp. 54,000.00 bt
169 Roster / batu kerawang Rp. 4,000.00 bh
170 Ram kawat harmonika Rp. 25,000.00 m2
171 Semen Portland Rp. 1,400.00 kg
172 Semen warna Rp. 6,000.00 kg
173 Seng BJLS 30 Rp. 38,000.00 lbr
174 Seng gelombang 3" - 6" BJLS 30 Rp. 51,000.00 lbr
175 Sirlak Rp. 19,500.00 kg
176 Sirtu Rp. 145,000.00 m3
177 Spirtus Rp. 9,000.00 ltr
178 Split ( batu pecah mesin ) 2/3 Rp. 200,000.00 m3
179 Solar Rp. 5,950.00 ltr
180 Tali ijuk Rp. 9,000.00 kg
181 Teakwood 4 mm (1200 x 2400) Rp. 80,000.00 lbr
182 Teakwood 4 mm (900 x 2400) Rp. 65,000.00 lbr
183 Ter kayu Rp. 14,500.00 kg
185 Tiner/Minyak cat Rp. 11,500.00 ltr
186 Triplek 3 mm Rp. 52,000.00 lbr
187 Triplek 4 mm Rp. 55,000.00 lbr
188 Triplek 6 mm Rp. 83,000.00 lbr
189 Triplek 9 mm Rp. 102,500.00 lbr
190 Ubin abu-abu kepala basah 20 x 20 cm Rp. 2,000.00 bh
191 Ubin abu-abu kepala basah 30 x 30 cm Rp. 2,500.00 bh
192 Ubin wafel ukuran 20 x 20 cm Rp. 2,000.00 bh
193 Ubin warna 20 x 20 cm Rp. 2,300.00 bh
194 Ubin warna 30 x 30 cm Rp. 2,900.00 bh
195 Woodplank corak 4 m Rp. 60,000.00 bh
196 Woodplank polos 2 m Rp. 32,500.00 bh
197 Wasthafel Rp. 686,000.00 bh
198 Plester Mutiara Rp. 8,000.00 kg
199 TG 302 Rp. 43,600.00 ltr
200 Skim Coat Rp. 4,400.00 kg
201 zat addictive Just Do It Rp. 4,500.00 kg
202 zat addictive FS Nat Rp. 15,850.00 kg
203 Kusen Aluminium 3'' warna natural Rp. 60,000.00 m'
204 Kusen Aluminium 3'' warna coklat dop Rp. 65,000.00 m'
205 Kusen Aluminium 3'' warna coklat kilap Rp. 75,000.00 m'
206 Kusen Aluminium 4'' warna natural Rp. 65,000.00 m'
207 Kusen Aluminium 4'' warna coklat dop Rp. 75,000.00 m'
208 Kusen Aluminium 4'' warna coklat kilap Rp. 85,000.00 m'
209 Daun jendela aluminium lengkap warna natural/coklat dop Rp. 361,750.00 bh
210 Daun jendela aluminium lengkap warna coklat kilap Rp. 400,000.00 bh
211 Door closer Rp. 165,300.00 bh
212 Daun pintu aluminium lengkap warna natural/coklat dop Rp. 945,000.00 bh
213 Daun pintu aluminium lengkap warna coklat kilap Rp. 1,300,000.00 bh
214 Zincalume Rp. 75,000.00 m2
215 plywood Rp. 92,250.00 lbr
216 Holo 4/4 meni Rp. 12,100.00 btg
217 Holo 2/4 meni Rp. 11,000.00 btg
218 Kawat Bwg 12 Rp. 10,000.00 kg
219 Paku screw 2.5 cm Rp. 50.00 bh
220 Adhesive Rp. 6,000.00 kg
221 Kain kasa Rp. 400.00 m'
222 Paku beton Rp. 175.00 bh
223 Profil U 75 53 mm Zinc Alumunium G. 550 Rp. 18,450.00 m'
224 Profil U 60 53 mm Zinc Alumunium G. 550 Rp. 14,000.00 m'
225 Profil U 75 83 mm Zinc Alumunium G. 550 Rp. 22,300.00 m'
226 Reng U 39 0.43 mm Zinc Alumunium G. 550 Rp. 9,050.00 m'
227 Plat Tumpu Rp. 7,975.00 bh
228 Plat Diafragma 0.5 mm Rp. 1,500.00 bh
229 Dynabolt Rp. 950.00 bh
230 Baut Kuda - Kuda Rp. 250.00 bh
231 Baut Reng Rp. 150.00 bh
232 Profil 45 X 27 B50 Rp. 15,490.00 m'
233 Profil 65 X 26 C08 Rp. 22,260.00 m'
234 Profil 75 X 40 W08 Rp. 24,020.00 m'
235 Profil 95 X 33 Z08 Rp. 24,210.00 m'
236 - Multigrip Rp. 4,760.00 bh
237 - Bolt Rp. 2,100.00 bh
238 - Screw Rp. 675.00 bh
239 Profil Batu Alam Rp. 50,000.00 bh
240 Batu Alam Rp. 10,850.00 bh
241 coating Rp. 80,000.00 kg
242 Spanrel Rp. 400,000.00 m2
243 Kabel Listrik NYA 3 x 2,5 mm Rp. 6,500.00 m'
244 Stop Kontak Rp. 12,000.00 Bh
245 Lampu SL 18 watt + fitting Rp. 27,000.00 Bh
246 Sekring Kast Rp. 35,000.00 Bh
247 MCB BOX Rp. 85,000.00 Bh
248 Over Spaneng Rp. 9,000.00 m'
249 Saklar Ganda Rp. 16,000.00 Bh
250 Saklar Tunggal Rp. 12,000.00 Bh
251 Wiremesh Rp. 515,000.00 Lbr

B. BAHAN PEKERJAAN JALAN LINGKUNGAN


1 Pasir beton (kasar) (m.01a) Rp. 179,000.00 m3
2 Pasir halus (untuk HRS) (m.01c) Rp. 175,000.00 m3
3 Agregat kasar (m.03) Rp. 245,000.00 m3
4 Agregat halus (m.04) Rp. 245,000.00 m3
5 Filler (m.05) Rp. 100.00 kg
6 Bahan pilihan (sirtu alam)/sirtu tersaring (m.09) Rp. 147,000.00 m3
7 Aspal curah (m.10) Rp. 12,000.00 kg
8 Aspal kemasan (m.10b) Rp. 12,200.00 kg
9 Aspal bitumen/emulsi (m.10a) Rp. 12,200.00 ltr
10 Kerosen/Minyak Tanah (m.11) Rp. 10,225.00 ltr
11 Chipping (m.41) Rp. 245,000.00 m3

C. BAHAN PEKERJAAN PERPIPAA AIR BERSIH


1 Pipa PVC 2" S-12,5 ( 8 - 10 bar ) Rp. 26,300.00 m1
2 Pipa PVC 3" S-12,5 ( 8 - 10 bar ) Rp. 53,600.00 m1
3 Pipa PVC 2" ( kelas rumah tangga ) Rp. 69,000.00 btng
4 Pipa PVC 3" ( kelas rumah tangga ) Rp. 90,000.00 btng
5 Pipa reducer PVC 3" - 4" Rp. 6,000.00 bh
6 Pipa Knee/bend PVC 3" Rp. 6,000.00 bh
7 Pipa 1/2 inch SNI S-10 SCJ Rp. 5,200.00 m'
8 Pipa 3/4 inch SNI S-10 SCJ Rp. 8,000.00 m'
9 Pipa 1 inch SNI S-10 SCJ Rp. 10,950.00 m'
10 Pipa 1 1/4 inch SNI S-10 SCJ Rp. 14,950.00 m'
11 Pipa 1 1/2 inch SNI S-10 SCJ Rp. 22,200.00 m'
12 Pipa 2 inch SNI S-12,5 RRJ Rp. 31,350.00 m'
13 Pipa 3 inch SNI S-12,5 RRJ Rp. 64,500.00 m'
14 Pipa 4 inch SNI S-12,5 RRJ Rp. 94,000.00 m'
15 Pipa 6 inch SNI S-12,5 RRJ Rp. 199,850.00 m'
16 Pipa 8 inch SNI S-12,5 RRJ Rp. 313,450.00 m'
17 Pipa 1/2 inch (AW) Rp. 4,500.00 m'
18 Pipa 3/4 inch (AW) Rp. 6,300.00 m'
19 Pipa 1 inch (AW) Rp. 8,900.00 m'
20 Pipa 1 1/4 inch (AW) Rp. 12,750.00 m'
21 Pipa 1 1/2 inch (AW) Rp. 15,000.00 m'
22 Pipa 2 inch (AW) Rp. 19,350.00 m'
23 Pipa 3 inch (AW) Rp. 38,650.00 m'
24 Pipa 4 inch (AW) Rp. 63,600.00 m'
25 Pipa 6 inch (AW) Rp. 141,050.00 m'
26 Pipa 8 inch (AW) Rp. 240,900.00 m'
27 Pipa 1/2 inch SDR 17/PN 10 (HDPE) Rp. 8,650.00 m'
28 Pipa 3/4 inch SDR 17/PN 10 (HDPE) Rp. 10,050.00 m'
29 Pipa 1 inch SDR 17/PN 10 (HDPE) Rp. 14,600.00 m'
30 Pipa 1 1/4 inch SDR 17/PN 10 (HDPE) Rp. 20,950.00 m'
31 Pipa 1 1/2 inch SDR 17/PN 10 (HDPE) Rp. 30,000.00 m'
32 Pipa 2 inch SDR 17/PN 10 (HDPE) Rp. 47,550.00 m'
33 Pipa 3 inch SDR 17/PN 10 (HDPE) Rp. 96,000.00 m'
34 Pipa 4 inch SDR 17/PN 10 (HDPE) Rp. 143,400.00 m'
35 Pipa 6 inch SDR 17/PN 10 (HDPE) Rp. 292,950.00 m'
36 Pipa 8 inch SDR 17/PN 10 (HDPE) Rp. 467,150.00 m'
37 Pipa hisap GI Medium A Dia. 2" Rp. 100,000.00 m'
38 Sambungan ( Socket ) GI Dia. 2" Rp. 50,000.00 bh
39 Flange GI Dia. 6" Rp. 300,000.00 bh
40 Cek Valve 2 "dan ACC Rp. 300,000.00 bh
41 Meteran Air SNI 1 1/2" dan ACC Rp. 1,250,000.00 Bh
42 Bentonit Rp. 50,000.00 Zak
43 Gravel Pack ( 2mm - 4mm ) Rp. 1,000,000.00 m3
44 Elbow GI Dia. 2" Rp. 250,000.00 bh
45 Screen aquiver Dia. 6" Rp. 250,000.00 bh
46 Pompa Submersible 1,5 PK (Setara GrundFos) Rp. 15,000,000.00 unit
47 Pompa Submersible 2 PK (Setara GrundFos) type SP 5A 17 2 Hp 3 Phase Rp. 17,500,000.00 unit
48 Pompa Submersible 3 PK (Setara GrundFos) type SP 5A 25 2 Hp 3 Phase Rp. 20,000,000.00 unit
49 Panel Box dan ACC Rp. 2,500,000.00 unit
50 Kabel NYY 3 X 0,75 mm Rp. 8,500.00 m'
51 Kabel NYY 3 X 1,5 mm Rp. 12,500.00 m'
52 Kabel NYY 3 X 2,5 mm Rp. 16,000.00 m'
53 Elektroda Rp. 25,000.00 bh
54 Pengadaan Pipa GI 2 " Medium A Rp. 100,000.00 m
55 Bend Single Plange GI Dia 2 " Rp. 130,000.00 Bh
56 Wall Pipe GI Dia 2 " dan ACC Rp. 500,000.00 Bh
57 Vent GI Dia 2 " Rp. 500,000.00 Bh
58 Gate Valve GI Dia 2 " dan ACC Rp. 1,200,000.00 Bh

HARGA SATUAN
NO UPAH KERJA
(Rp)
1 Mandor Rp. 100,000.00 hari
2 Kepala Tukang Rp. 95,000.00 hari
3 Tukang Rp. 90,000.00 hari
4 Pembantu tukang Rp. 70,000.00 hari
5 Pekerja Rp. 10,000.00 jam
6 Kepala Tukang Rp. 13,571.43 jam
7 Tukang Rp. 12,857.14 jam
8 Mandor Rp. 14,285.71 jam
HARGA SATUAN
NO PERALATAN
(Rp)
1 Asphalt Spayer Rp. 113,747.09 jam
2 Compresor Rp. 185,882.28 jam
3 Dump truck 3.5 ton Rp. 297,684.44 jam
4 Dump truck 5 ton Rp. 401,725.39 jam
5 Motor grader Rp. 499,769.35 jam
6 Wheel Loader Rp. 389,008.13 jam
7 Three Wheel Roller Rp. 207,652.93 jam
8 Tandem Roller Rp. 307,225.14 jam
9 Water Tanker Rp. 283,674.99 jam
10 Asphalt Distributor Rp. 375,875.18 jam
11 AMP Rp. 4,219,019.76 jam
12 Genset Rp. 494,672.17 jam
13 Tyre Roller Rp. 463,787.91 jam
14 Conc. Mixer Rp. 71,434.36 jam
15 Conc. Pan Mixer Rp. 361,536.03 jam
16 Truck Mixer Rp. 596,950.86 jam

SUMBER, 2016

KEPALA SEKSI PERUMAHAN DAN PERMUKIMAN KEPALA SEKSI BANGUNAN GEDUNG


DINAS CIPTA KARYA DAN TATA RUANG KABUPATEN DINAS CIPTA KARYA DAN TATA RUANG
CIREBON KABUPATEN CIREBON

H. ABDUL KARIM, ST
NIP. 19620609 199101 1 001 YEDI ADHI PRIATNA, BAE.S.Sos
NIP. 19660815 199803 1 004
KEPALA DINAS CIPTA KARYA DAN TATA RUANG
KEPALA BIDANG BANGUNAN, PERUMAHAN DAN
KABUPATEN CIREBON
PERMUKIMAN DINAS CIPTA KARYA DAN TATA RUANG
KABUPATEN CIREBON

ASEP DJAMALUDIN MALIK, ST


NIP. 19680607 199703 1 005
Ir. H. SUGENG RAHARJO, M.MP
NIP. 19600912 198603 1 005
ANALISA HARGA SATUAN PEKERJAAN
DINAS CIPTA KARYA DAN TATA RUANG KABUPATEN CIREBON
TAHUN ANGGARAN 2016

HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL


KODE ANALISA INDEX URAIAN
Rp Rp Rp

SNI.000.01 1 M' PAGAR SEMENTARA DARI KAYU TINGGI 2 METER


1.25 btg Dolken kayu 8-10/400 cm 60,000.00 75,000.00
2.5 kg semen portland 1,400.00 3,500.00
0.005 m3 Pasir beton 179,000.00 895.00
0.009 m3 Koral beton 65,000.00 585.00
0.072 m3 Kayu 5/7 79,000.00 5,688.00
0.06 kg Paku biasa 2" - 5" 16,000.00 960.00
0.4 ltr Residu 14,500.00 5,800.00
92,428.00
0.4 Oh Pembantu tukang 70,000.00 28,000.00
0.2 Oh Tukang kayu 90,000.00 18,000.00
0.02 Oh Kepala tukang 95,000.00 1,900.00
0.02 Oh Mandor 100,000.00 2,000.00
49,900.00
Jumlah 142,328.00
OVERHEAD & PROFIT (12.5%) 17,791.00
Jumlah Total 160,119.00
Dibulatkan 160,100.00
SNI.000.02 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER
1.25 btg Dolken kayu 8-10/400 cm 60,000.00 75,000.00
2.5 kg semen portland 1,400.00 3,500.00
1.2 lbr seng gelombang 3''-5" 51,000.00 61,200.00
0.005 m3 Pasir beton 179,000.00 895.00
0.009 m3 Koral beton 65,000.00 585.00
0.072 m3 Kayu 5/7 79,000.00 5,688.00
0.06 kg Paku biasa 2" - 5" 16,000.00 960.00
0.45 kg Meni besi 25,000.00 11,250.00
159,078.00
0.4 Oh Pembantu tukang 70,000.00 28,000.00
0.2 Oh Tukang kayu 90,000.00 18,000.00
0.02 Oh Kepala tukang 95,000.00 1,900.00
0.02 Oh Mandor 100,000.00 2,000.00
49,900.00
Jumlah 208,978.00
OVERHEAD & PROFIT (12.5%) 26,122.25
Jumlah Total 235,100.25
Dibulatkan 235,100.00
SNI.000.03 1 M' PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 METER
1 btg Dolken kayu 8-10/400 cm 60,000.00 60,000.00
2 kg semen portland 1,400.00 2,800.00
25 kg kawat duri 14,700.00 367,500.00
0.005 m3 Pasir beton 179,000.00 895.00
0.009 m3 Koral beton 65,000.00 585.00
0.06 kg Paku biasa 2" - 5" 16,000.00 960.00
432,740.00
0.3 Oh Pembantu tukang 70,000.00 21,000.00
0.2 Oh Tukang kayu 90,000.00 18,000.00
0.02 Oh Kepala tukang 95,000.00 1,900.00
0.02 Oh Mandor 100,000.00 2,000.00
42,900.00
Jumlah 475,640.00
OVERHEAD & PROFIT (12.5%) 59,455.00
Jumlah Total 535,095.00
Dibulatkan 535,000.00
SNI.000.04 1 M2 PEMBUATAN STEIGER DARI BAMBU, UK.(40 X 50 X 20) CM
1 btg Bambu 6-8/600 cm 17,000.00 17,000.00
0.25 kg Tali ijuk 9,000.00 2,250.00
19,250.00
0.25 Oh Pembantu tukang 70,000.00 17,500.00
0.017 Oh Tukang kayu 90,000.00 1,530.00
0.002 Oh Kepala tukang 95,000.00 190.00
0.013 Oh Mandor 100,000.00 1,300.00
20,520.00
Jumlah 39,770.00
OVERHEAD & PROFIT (12.5%) 4,971.25
Jumlah Total 44,741.25
Dibulatkan 44,700.00
SNI.000.05 1 M3 PEMASANGAN LAPISAN IJUK
1.2 m3 Tali ijuk 9,000.00 10,800.00
10,800.00
0.15 Oh Pembantu tukang 70,000.00 10,500.00
0.015 Oh Mandor 100,000.00 1,500.00
12,000.00
Jumlah 22,800.00
OVERHEAD & PROFIT (12.5%) 2,850.00
Jumlah Total 25,650.00
Dibulatkan 25,600.00
SNI.000.06 1 M2 PEMBUATAN JALAN SEMENTARA
1.200 m3 Batu Belah 15/20 175,000.00 210,000.00
0.150 m3 Batu Pecah 5/7 175,000.00 26,250.00
0.900 m3 pasir pasang 162,000.00 145,800.00
0.010
382,050.00
1.000 Oh Pekerja 70,000.00 70,000.00
0.050 Oh Mandor 100,000.00 5,000.00
75,000.00
Jumlah 457,050.00
OVERHEAD & PROFIT (12.5%) 57,131.25
Jumlah Total 514,181.25
Dibulatkan 514,100.00

SNI.000.07 1 M3 BONGKARAN BETON BERTULANG

6.670 Oh Pekerja 70,000.00 466,900.00


0.050 Oh Mandor 100,000.00 5,000.00
471,900.00
Jumlah 471,900.00
OVERHEAD & PROFIT (12.5%) 58,987.50
Jumlah Total 530,887.50
Dibulatkan 530,800.00
SNI.000.08 1 M3 BONGKARAN DINDING BATA MERAH

6.667 Oh Pekerja 70,000.00 466,690.00


0.033 Oh Mandor 100,000.00 3,300.00
Jumlah 469,990.00
OVERHEAD & PROFIT (12.5%) 58,748.75
Jumlah Total 528,738.75
Dibulatkan 528,700.00

SNI.100.03 1 BH PEMBUATAN PAPAN NAMA PROYEK


0.02 m3 Kayu Kaso 5/7 (kayu hutan) 3,500,000.00 70,000.00
0.25 kg Paku Biasa 2-5 16,000.00 4,000.00
1.50 btg Kayu Dolken dia.8 8-10/4 m' 60,000.00 90,000.00
0.35 lbr Triplek 6 mm 83,000.00 29,050.00
1.00 m' Cetak papan nama dg bhn flexi cetak digital print 25,000.00 25,000.00 218,050.00

0.20 oh Pembantu tukang 70,000.00 14,000.00


0.60 oh Tukang kayu 90,000.00 54,000.00
0.06 oh Kepala tukang 95,000.00 5,700.00
0.02 oh Mandor 100,000.00 2,000.00 75,700.00
Jumlah 293,750.00
OVERHEAD & PROFIT (12.5%) 36,718.75
Jumlah Total 330,468.75
Dibulatkan 330,400.00

SNI.100.04 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.1 Pembantu tukang 70,000.00 7,000.00
0.05 Mandor 100,000.00 5,000.00
Jumlah 12,000.00
OVERHEAD & PROFIT (12.5%) 1,500.00
Jumlah Total 13,500.00
Dibulatkan 13,500.00
SNI.100.05 1 M2 PENGUKURAN DAN PEMASANGAN BOUWPLANK / PROPIL
0.012 m3 Kayu kaso (kayu hutan) 3,500,000.00 42,000.00
0.007 m3 Kayu papan (kayu hutan) 3/20 3,500,000.00 24,500.00
0.02 kg Paku biasa 2" - 5" 16,000.00 320.00 66,820.00

0.1 Oh Pembantu tukang 70,000.00 7,000.00


0.1 Oh Tukang kayu 90,000.00 9,000.00
0.01 Oh Kepala tukang 95,000.00 950.00
0.005 Oh Mandor 100,000.00 500.00 17,450.00
Jumlah 84,270.00
OVERHEAD & PROFIT (12.5%) 10,533.75
Jumlah Total 94,803.75
Dibulatkan 94,800.00

SNI.100.07 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


1.700 Btg Dolken kayu 8-10/400 cm 60,000.00 102,000.00
0.210 m3 Kayu 3,500,000.00 735,000.00
0.300 kg Paku biasa 16,000.00 4,800.00
10.500 kg Semen Portland 1,400.00 14,700.00
0.030 m3 Pasir beton 179,000.00 5,370.00
0.050 m3 Koral beton 200,000.00 10,000.00
1.500 lbr Seng gelombang bjls 30 51,000.00 76,500.00
948,370.00
2.000 Oh Tukang kayu 90,000.00 180,000.00
1.000 Oh Pekerja 70,000.00 70,000.00
0.200 Oh Kepala tukang 95,000.00 19,000.00
0.050 Oh Mandor 100,000.00 5,000.00 274,000.00
Jumlah 1,222,370.00
OVERHEAD & PROFIT (12.5%) 152,796.25
Jumlah Total 1,375,166.25
Dibulatkan 1,375,100.00
SNI.100.08 1 M2 PEMBUATAN RUMAH JAGA KONSTRUKSI KAYU
3.000 Btg Dolken kayu 8-10/400 cm 60,000.00 180,000.00
0.210 m3 Kayu 3,500,000.00 735,000.00
0.300 kg Paku biasa 16,000.00 4,800.00
1.500 lbr Seng gelombang bjls 30 51,000.00 76,500.00
996,300.00
2.000 Oh Tukang kayu 90,000.00 180,000.00
1.000 Oh Pekerja 70,000.00 70,000.00
0.200 Oh Kepala tukang 95,000.00 19,000.00
0.050 Oh Mandor 100,000.00 5,000.00 274,000.00
Jumlah 1,270,300.00
OVERHEAD & PROFIT (12.5%) 158,787.50
Jumlah Total 1,429,087.50
Dibulatkan 1,429,000.00

SNI.100.09 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN

0.100 Oh Pekerja 70,000.00 7,000.00


0.050 Oh Mandor 100,000.00 5,000.00
Jumlah 12,000.00
OVERHEAD & PROFIT (12.5%) 1,500.00
Jumlah Total 13,500.00
Dibulatkan 13,500.00

SNI.100.10 1 M2 PEMBUATAN BEDENG BURUH


1.250 Btg Dolken kayu 8-10/400 cm 60,000.00 75,000.00
0.186 m3 Kayu 3,500,000.00 651,000.00
0.300 kg Paku biasa 16,000.00 4,800.00
18.000 kg Semen Portland 1,400.00 25,200.00
0.030 m3 Pasir beton 179,000.00 5,370.00
0.050 m3 Koral beton 200,000.00 10,000.00
1.500 lbr Seng gelombang bjls 30 51,000.00 76,500.00
1.350 lbr Plywood 4 mm 92,250.00 124,537.50
972,407.50
2.000 Oh Tukang kayu 90,000.00 180,000.00
1.000 Oh Pekerja 70,000.00 70,000.00
0.200 Oh Kepala tukang 95,000.00 19,000.00
0.050 Oh Mandor 100,000.00 5,000.00 274,000.00
Jumlah 1,246,407.50
OVERHEAD & PROFIT (12.5%) 155,800.94
Jumlah Total 1,402,208.44
Dibulatkan 1,402,200.00

SNI.100.11 1 M2 PEMBUATAN BAK ADUKAN UK. 40 X 50 X 20 CM


0.036 m3 Kayu terentang 3,500,000.00 126,000.00
0.080 kg Paku biasa 16,000.00 1,280.00
1.000 btg Kaso 5/7 79,000.00 79,000.00
206,280.00
0.300 Oh Tukang kayu 90,000.00 27,000.00
0.0015 Oh Mandor 100,000.00 150.00 27,150.00
Jumlah 233,430.00
OVERHEAD & PROFIT (12.5%) 29,178.75
Jumlah Total 262,608.75
Dibulatkan 262,600.00

SNI.100.12 1 M2 PEMBUATAN LOS KERJA / DIREKSIKEET


1.25 bt Kayu dolken 8 - 10/4 m' 60,000.00 75,000.00
0.12 m3 Kayu hutan 3,500,000.00 420,000.00
4.32 kg Semen portland 1,400.00 6,048.00
0.022 m3 Pasir Pasang 162,000.00 3,564.00
0.25 lbr Seng Gelombang 3"-6" BJLS 30 51,000.00 12,750.00
0.08 m2 Raam kawat 25,000.00 2,000.00
0.15 bh Kunci gembok 20,000.00 3,000.00
0.15 set engsel pintu 19,000.00 2,850.00
0.2 kg Paku biasa 2" - 5" 16,000.00 3,200.00
0.06 lbr Triplek 3 mm 52,000.00 3,120.00 531,532.00

0.5 Pembantu tukang 70,000.00 35,000.00


0.6 Tukang kayu 90,000.00 54,000.00
0.06 Kepala tukang 95,000.00 5,700.00
0.03 Mandor 100,000.00 3,000.00 97,700.00
Jumlah 629,232.00
OVERHEAD & PROFIT (12.5%) 78,654.00
Jumlah Total 707,886.00
Dibulatkan 707,800.00
SNI. 200.01 1 M3 GALIAN TANAH BIASA
0.4 Pembantu tukang 70,000.00 28,000.00
0.04 Mandor 100,000.00 4,000.00
Jumlah 32,000.00
OVERHEAD & PROFIT (12.5%) 4,000.00
Jumlah Total 36,000.00
Dibulatkan 36,000.00
SNI. 200.09 1 M3 URUGAN KEMBALI BEKAS GALIAN
0.192 Pembantu tukang 70,000.00 13,440.00
0.019 Mandor 100,000.00 1,900.00
Jumlah 15,340.00
OVERHEAD & PROFIT (12.5%) 1,917.50
Jumlah Total 17,257.50
Dibulatkan 17,200.00
SNI. 200.10 1 M3 PEMADATAN TANAH
0.5 Pembantu tukang 70,000.00 35,000.00
0.05 Mandor 100,000.00 5,000.00
Jumlah 40,000.00
OVERHEAD & PROFIT (12.5%) 5,000.00
Jumlah Total 45,000.00
Dibulatkan 45,000.00
SNI. 200.11 1 M3 URUGAN PASIR
1.2 m3 Pasir urug 150,000.00 180,000.00
180,000.00
0.3 Pembantu tukang 70,000.00 21,000.00
0.01 Mandor 100,000.00 1,000.00 22,000.00
Jumlah 202,000.00
OVERHEAD & PROFIT (12.5%) 25,250.00
Jumlah Total 227,250.00
Dibulatkan 227,200.00
SNI. 200.12 1 M3 URUGAN TANAH
1.2 m3 Tanah atras 125,000.00 150,000.00
150,000.00
0.3 Pembantu tukang 70,000.00 21,000.00
0.01 Mandor 100,000.00 1,000.00 22,000.00
Jumlah 172,000.00
OVERHEAD & PROFIT (12.5%) 21,500.00
Jumlah Total 193,500.00
Dibulatkan 193,500.00
SNI. 200.13 1 M3 URUGAN SIRTU
1.2 m3 sirtu 145,000.00 174,000.00
174,000.00
0.25 Oh Pembantu tukang 70,000.00 17,500.00
0.025 Oh Mandor 100,000.00 2,500.00 20,000.00
Jumlah 194,000.00
OVERHEAD & PROFIT (12.5%) 24,250.00
Jumlah Total 218,250.00
Dibulatkan 218,200.00

SNI. 200.14 1 M3 GALIAN TANAH BIASA SEDALAM 2 M


0.526 Oh Pembantu tukang 70,000.00 36,820.00
0.052 Oh Mandor 100,000.00 5,200.00
Jumlah 42,020.00
OVERHEAD & PROFIT (12.5%) 5,252.50
Jumlah Total 47,272.50
Dibulatkan 47,200.00

SNI. 200.15 1 M3 GALIAN TANAH BIASA SEDALAM 3 M


0.735 Oh Pembantu tukang 70,000.00 51,450.00
0.073 Oh Mandor 100,000.00 7,300.00
Jumlah 58,750.00
OVERHEAD & PROFIT (12.5%) 7,343.75
Jumlah Total 66,093.75
Dibulatkan 66,000.00

SNI. 200.16 1 M3 GALIAN TANAH KERAS SEDALAM 1 M


0.625 Oh Pembantu tukang 70,000.00 43,750.00
0.062 Oh Mandor 100,000.00 6,200.00
Jumlah 49,950.00
OVERHEAD & PROFIT (12.5%) 6,243.75
Jumlah Total 56,193.75
Dibulatkan 56,100.00

SNI. 200.17 1 M3 GALIAN TANAH CADAS SEDALAM 1 M


1.250 Oh Pembantu tukang 70,000.00 87,500.00
0.125 Oh Mandor 100,000.00 12,500.00
Jumlah 100,000.00
OVERHEAD & PROFIT (12.5%) 12,500.00
Jumlah Total 112,500.00
Dibulatkan 112,500.00

SNI. 200.18 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M


0.823 Oh Pembantu tukang 70,000.00 57,610.00
0.083 Oh Mandor 100,000.00 8,300.00
Jumlah 65,910.00
OVERHEAD & PROFIT (12.5%) 8,238.75
Jumlah Total 74,148.75
Dibulatkan 74,100.00
SNI. 200.19 1 M2 PEKERJAAN STRIPPING SETINGGI 1 M
0.050 Oh Pembantu tukang 70,000.00 3,500.00
0.005 Oh Mandor 100,000.00 500.00
Jumlah 4,000.00
OVERHEAD & PROFIT (12.5%) 500.00
Jumlah Total 4,500.00
Dibulatkan 4,500.00

SNI. 200.20 1 M2 PEMBUANGAN TANAH SAEJAUH 150 M


0.516 Oh Pembantu tukang 70,000.00 36,120.00
0.050 Oh Mandor 100,000.00 5,000.00
Jumlah 41,120.00
OVERHEAD & PROFIT (12.5%) 5,140.00
Jumlah Total 46,260.00
Dibulatkan 46,200.00

SNI.200.23 1 M2 PEMBUATAN JALAN SEMENTARA, TEBAL 25 CM


0.275 m3 Batu belah 175,000.00 48,125.00
0.030 m3 Kerikil 65,000.00 1,950.00
0.050 m3 Pasir urug 150,000.00 7,500.00
57,575.00
1.000 Oh Pembantu tukang 70,000.00 70,000.00
0.100 Oh Mandor 100,000.00 10,000.00
80,000.00
Jumlah 137,575.00
OVERHEAD & PROFIT (12.5%) 17,196.88
Jumlah Total 154,771.88
Dibulatkan 154,700.00
SNI.250.01 1 M3 PASANGAN PONDASI BATU KALI AD. 1:1
1.100 m3 Batu belah 15/20 cm 175,000.00 192,500.00
392.000 kg Semen portland 1,400.00 548,800.00
0.314 m3 Pasir Pasang 162,000.00 50,868.00
792,168.00
1.500 Oh Pembantu tukang 70,000.00 105,000.00
0.600 Oh Tukang batu 90,000.00 54,000.00
0.060 Oh Kepala tukang 95,000.00 5,700.00
0.075 Oh Mandor 100,000.00 7,500.00
172,200.00
Jumlah 964,368.00
OVERHEAD & PROFIT (12.5%) 120,546.00
Jumlah Total 1,084,914.00
Dibulatkan 1,084,900.00
SNI.250.02 1 M3 PASANGAN PONDASI BATU KALI AD. 1:2
1.100 m3 Batu belah 15/20 cm 175,000.00 192,500.00
267.000 kg Semen portland 1,400.00 373,800.00
0.427 m3 Pasir Pasang 162,000.00 69,174.00
635,474.00
1.500 Oh Pembantu tukang 70,000.00 105,000.00
0.600 Oh Tukang batu 90,000.00 54,000.00
0.060 Oh Kepala tukang 95,000.00 5,700.00
0.075 Oh Mandor 100,000.00 7,500.00
172,200.00
Jumlah 807,674.00
OVERHEAD & PROFIT (12.5%) 100,959.25
Jumlah Total 908,633.25
Dibulatkan 908,600.00
SNI.250.03 1 M3 PASANGAN PONDASI BATU KALI AD. 1:2,5
1.100 m3 Batu belah 15/20 cm 175,000.00 192,500.00
392.000 kg Semen portland 1,400.00 548,800.00
0.314 m3 Pasir Pasang 162,000.00 50,868.00
792,168.00
1.500 Oh Pembantu tukang 70,000.00 105,000.00
0.600 Oh Tukang batu 90,000.00 54,000.00
0.060 Oh Kepala tukang 95,000.00 5,700.00
0.075 Oh Mandor 100,000.00 7,500.00
172,200.00
Jumlah 964,368.00
OVERHEAD & PROFIT (12.5%) 120,546.00
Jumlah Total 1,084,914.00
Dibulatkan 1,084,900.00

SNI.250.04 1 M3 PASANGAN PONDASI BATU KALI AD. 1:3


1.100 m3 Batu belah 15/20 cm 175,000.00 192,500.00
202.000 kg Semen portland 1,400.00 282,800.00
0.485 m3 Pasir Pasang 162,000.00 78,570.00
553,870.00
1.500 Oh Pembantu tukang 70,000.00 105,000.00
0.600 Oh Tukang batu 90,000.00 54,000.00
0.060 Oh Kepala tukang 95,000.00 5,700.00
0.075 Oh Mandor 100,000.00 7,500.00
172,200.00
Jumlah 726,070.00
OVERHEAD & PROFIT (12.5%) 90,758.75
Jumlah Total 816,828.75
Dibulatkan 816,800.00
SNI.250.05 1 M3 PASANGAN PONDASI BATU KALI AD. 1:4
1.100 m3 Batu belah 15/20 cm 175,000.00 192,500.00
163.000 kg Semen portland 1,400.00 228,200.00
0.520 m3 Pasir Pasang 162,000.00 84,240.00
504,940.00
1.500 Oh Pembantu tukang 70,000.00 105,000.00
0.600 Oh Tukang batu 90,000.00 54,000.00
0.060 Oh Kepala tukang 95,000.00 5,700.00
0.075 Oh Mandor 100,000.00 7,500.00
172,200.00
Jumlah 677,140.00
OVERHEAD & PROFIT (12.5%) 84,642.50
Jumlah Total 761,782.50
Dibulatkan 761,700.00

SNI.250.06 1 M3 PASANGAN PONDASI BATU BELAH AD. 1:4


1.1 m3 Batu belah 15/20 cm 175,000.00 192,500.00
163 kg Semen portland 1,400.00 228,200.00
0.52 m3 Pasir Pasang 162,000.00 84,240.00
504,940.00
1.5 Pembantu tukang 70,000.00 105,000.00
0.6 Tukang batu 90,000.00 54,000.00
0.06 Kepala tukang 95,000.00 5,700.00
0.075 Mandor 100,000.00 7,500.00
172,200.00
Jumlah 677,140.00
OVERHEAD & PROFIT (12.5%) 84,642.50
Jumlah Total 761,782.50
Dibulatkan 761,700.00
SNI.250.07 1 M3 PASANGAN PONDASI BATU BELAH AD. 1:5
1.1 m3 Batu belah 15/20 cm 175,000.00 192,500.00
136 kg Semen portland 1,400.00 190,400.00
0.544 m3 Pasir Pasang 162,000.00 88,128.00
471,028.00
1.5 Pembantu tukang 70,000.00 105,000.00
0.6 Tukang batu 90,000.00 54,000.00
0.06 Kepala tukang 95,000.00 5,700.00
0.075 Mandor 100,000.00 7,500.00
172,200.00
Jumlah 643,228.00
OVERHEAD & PROFIT (12.5%) 80,403.50
Jumlah Total 723,631.50
Dibulatkan 723,600.00

SNI.250.08 1 M3 PASANGAN PONDASI BATU KALI AD. 1:6


1.100 m3 Batu belah 15/20 cm 175,000.00 192,500.00
117.000 kg Semen portland 1,400.00 163,800.00
0.561 m3 Pasir Pasang 162,000.00 90,882.00
447,182.00
1.500 Oh Pembantu tukang 70,000.00 105,000.00
0.600 Oh Tukang batu 90,000.00 54,000.00
0.060 Oh Kepala tukang 95,000.00 5,700.00
0.075 Oh Mandor 100,000.00 7,500.00
172,200.00
Jumlah 619,382.00
OVERHEAD & PROFIT (12.5%) 77,422.75
Jumlah Total 696,804.75
Dibulatkan 696,800.00
SNI.250.09 1 M3 PASANGAN PONDASI BATU KALI AD. 1:8
1.100 m3 Batu belah 15/20 cm 175,000.00 192,500.00
91.000 kg Semen portland 1,400.00 127,400.00
0.561 m3 Pasir Pasang 162,000.00 90,882.00
410,782.00
1.500 Oh Pembantu tukang 70,000.00 105,000.00
0.600 Oh Tukang batu 90,000.00 54,000.00
0.060 Oh Kepala tukang 95,000.00 5,700.00
0.075 Oh Mandor 100,000.00 7,500.00
172,200.00
Jumlah 582,982.00
OVERHEAD & PROFIT (12.5%) 72,872.75
Jumlah Total 655,854.75
Dibulatkan 655,800.00
SNI.250.10 1 M3 PASANGAN PONDASI SUMURAN DIA. 100 CM
0.450 m3 Batu belah 15/20 cm 175,000.00 78,750.00
280.000 kg Semen portland 1,400.00 392,000.00
0.450 m3 Pasir Beton 179,000.00 80,550.00
0.670 m3 Pasir Pasang 162,000.00 108,540.00
659,840.00
2.380 Oh Pembantu tukang 70,000.00 166,600.00
0.300 Oh Tukang batu 90,000.00 27,000.00
0.030 Oh Kepala tukang 95,000.00 2,850.00
0.080 Oh Mandor 100,000.00 8,000.00
204,450.00
Jumlah 864,290.00
OVERHEAD & PROFIT (12.5%) 108,036.25
Jumlah Total 972,326.25
Dibulatkan 972,300.00
SNI.250.11 1 M' PEMBUATAN TIANG PANCANG 40X40 CM, BETON BERTULANG
0.019 m3 Pasir urug 150,000.00 2,850.00
0.094 m3 Pasir Beton 179,000.00 16,826.00
0.150 m3 Koral Beton 200,000.00 30,000.00
60.500 kg Semen Portland 1,400.00 84,700.00
45.000 kg Besi Beton 13,000.00 585,000.00
0.900 kg Kawat beton 20,000.00 18,000.00
0.032 m3 Kayu Kaso 5/7 4,753,125.00 152,100.00
0.120 kg Paku 16,000.00 1,920.00
0.090 ltr Minyak bekisting 10,000.00 900.00
0.240 kg Plamur tembok 23,000.00 5,520.00
897,816.00
1.000 Oh Pembantu tukang 70,000.00 70,000.00
0.670 Oh Tukang batu 90,000.00 60,300.00
0.067 Oh Kepala tukang 95,000.00 6,365.00
0.050 Oh Mandor 100,000.00 5,000.00
141,665.00
Jumlah 1,039,481.00
OVERHEAD & PROFIT (12.5%) 129,935.13
Jumlah Total 1,169,416.13
Dibulatkan 1,169,400.00

SNI.250.12 1 M' PEMBUATAN TIANG PANCANG 35X35 CM, BETON BERTULANG


0.016 m3 Pasir urug 150,000.00 2,400.00
0.080 m3 Pasir Beton 179,000.00 14,320.00
0.125 m3 Koral Beton 200,000.00 25,000.00
49.000 kg Semen Portland 1,400.00 68,600.00
34.500 kg Besi Beton 13,000.00 448,500.00
0.700 kg Kawat beton 20,000.00 14,000.00
0.027 kg Kayu Kaso 5/7 4,753,125.00 128,334.38
0.120 m3 Paku 16,000.00 1,920.00
0.090 kg Minyak bekisting 10,000.00 900.00
0.200 ltr Plamur tembok 23,000.00 4,600.00
708,574.38
0.800 Oh Pembantu tukang 70,000.00 56,000.00
0.500 Oh Tukang batu 90,000.00 45,000.00
0.050 Oh Kepala tukang 95,000.00 4,750.00
0.040 Oh Mandor 100,000.00 4,000.00
109,750.00
Jumlah 818,324.38
OVERHEAD & PROFIT (12.5%) 102,290.55
Jumlah Total 920,614.92
Dibulatkan 920,600.00

SNI.250.14 1 M3 PASANGAN BATU KOSONG


1.2 m3 Batu belah 10/15 cm 175,000.00 210,000.00
0.3 m3 Pasir urug 150,000.00 45,000.00
255,000.00
0.78 Pembantu tukang 70,000.00 54,600.00
0.39 Tukang batu 90,000.00 35,100.00
0.039 Kepala tukang 95,000.00 3,705.00
0.039 Mandor 100,000.00 3,900.00
97,305.00
Jumlah 352,305.00
OVERHEAD & PROFIT (12.5%) 44,038.13
Jumlah Total 396,343.13
Dibulatkan 396,300.00

SNI.300.06 1 M3 MEMBUAT LANTAI KERJA BETON TUMBUK AD. 1:3:5


10 kg Semen portland 1,400.00 14,000.00
0.026 m3 Pasir beton 179,000.00 4,654.00
0.044 m3 Kerikil 65,000.00 2,860.00
21,514.00
1.15 Pembantu tukang 70,000.00 80,500.00
0.02 Tukang batu 90,000.00 1,800.00
0.002 Kepala tukang 95,000.00 190.00
0.006 Mandor 100,000.00 600.00
83,090.00
Jumlah 104,604.00
OVERHEAD & PROFIT (12.5%) 13,075.50
Jumlah Total 117,679.50
Dibulatkan 117,600.00
SNI.300.07 1 M3 MEMBUAT BETON TUMBUK AD. 1:3:5 TEBAL 5 CM
218 kg Semen portland 1,400.00 305,200.00
0.52 m3 Pasir beton 179,000.00 93,080.00
0.87 m3 Kerikil 65,000.00 56,550.00
454,830.00
1.65 Pembantu tukang 70,000.00 115,500.00
0.25 Tukang batu 90,000.00 22,500.00
0.025 Kepala tukang 95,000.00 2,375.00
0.08 Mandor 100,000.00 8,000.00
148,375.00
Jumlah 603,205.00
OVERHEAD & PROFIT (12.5%) 75,400.63
Jumlah Total 678,605.63
Dibulatkan 678,600.00
Untuk 1 m2 T 5 Cm 33,930.00
SNI.300.08 1 M3 MEMBUAT BETON TUMBUK AD. 1:3:6 TEBAL 5 CM
197 kg Semen portland 1,400.00 275,800.00
0.47 m3 Pasir beton 179,000.00 84,130.00
0.94 m3 Kerikil 65,000.00 61,100.00
421,030.00
1.65 Pembantu tukang 70,000.00 115,500.00
0.25 Tukang batu 90,000.00 22,500.00
0.025 Kepala tukang 95,000.00 2,375.00
0.08 Mandor 100,000.00 8,000.00
148,375.00
Jumlah 569,405.00
OVERHEAD & PROFIT (12.5%) 71,175.63
Jumlah Total 640,580.63
Dibulatkan 640,500.00
Untuk 1 m2 T 5 Cm 32,025.00
SNI. 300.19 1 M3 BETON BERTULANG AD. 1:2:3
232 kg Semen portland 1,400.00 324,800.00
0.52 m3 Pasir beton 179,000.00 93,080.00
0.78 m3 Spleet 2/3 cm 200,000.00 156,000.00
573,880.00
1.65 Pembantu tukang 70,000.00 115,500.00
0.25 Tukang batu 90,000.00 22,500.00
0.025 Kepala tukang 95,000.00 2,375.00
0.08 Mandor 100,000.00 8,000.00
148,375.00
Jumlah 722,255.00
OVERHEAD & PROFIT (12.5%) 90,281.88
Jumlah Total 812,536.88
Dibulatkan 812,500.00
SNI. 300.32 1 KG PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR
1.05 kg Besi beton 13,000.00 13,650.00
0.015 kg Kawat beton 20,000.00 300.00
13,950.00
0.007 Pembantu tukang 70,000.00 490.00
0.007 Tukang besi 90,000.00 630.00
0.0007 Kepala tukang 95,000.00 66.50
0.0003 Mandor 100,000.00 30.00
1,216.50
Jumlah 15,166.50
OVERHEAD & PROFIT (12.5%) 1,895.81
Jumlah Total 17,062.31
Dibulatkan 17,000.00
SNI. 300.35 1 M2 PASANG BEKISTING UNTUK PONDASI
0.04 m3 Kayu hutan/papan/kaso 3,500,000.00 140,000.00
0.3 kg Paku biasa 2" - 5" 16,000.00 4,800.00
0.1 lt Pelumas bekisting 10,000.00 1,000.00
145,800.00
0.3 Pembantu tukang 70,000.00 21,000.00
0.26 Tukang kayu 90,000.00 23,400.00
0.026 Kepala tukang 95,000.00 2,470.00
0.005 Mandor 100,000.00 500.00
47,370.00
Jumlah 193,170.00
OVERHEAD & PROFIT (12.5%) 24,146.25
Jumlah Total 217,316.25
Dibulatkan 217,300.00
SNI. 300.36 1 M2 PASANG BEKISTING UNTUK SLOOP, KOLOM BIASA & RINGBALK
0.045 m3 Kayu hutan/papan/kaso 3,500,000.00 157,500.00
0.3 kg Paku biasa 2" - 5" 16,000.00 4,800.00
0.1 lt Pelumas bekisting 10,000.00 1,000.00
163,300.00
0.3 Pembantu tukang 70,000.00 21,000.00
0.26 Tukang kayu 90,000.00 23,400.00
0.026 Kepala tukang 95,000.00 2,470.00
0.005 Mandor 100,000.00 500.00
47,370.00
Jumlah 210,670.00
OVERHEAD & PROFIT (12.5%) 26,333.75
Jumlah Total 237,003.75
Dibulatkan 237,000.00
SNI. 300.37 1 M2 PASANG BEKISTING UNTUK KOLOM STRUKTUR
0.04 m3 Kayu hutan/papan/kaso 3,500,000.00 140,000.00
0.015 m3 Balok kayu hutan 3,500,000.00 52,500.00
0.4 kg Paku biasa 2" - 5" 16,000.00 6,400.00
0.2 lt Pelumas bekisting 10,000.00 2,000.00
0.35 lb Triplex tebal 9 mm 102,500.00 35,875.00
2 btg Dolken kayu 8-10/4' 60,000.00 120,000.00
356,775.00
0.3 Pembantu tukang 70,000.00 21,000.00
0.33 Tukang kayu 90,000.00 29,700.00
0.033 Kepala tukang 95,000.00 3,135.00
0.006 Mandor 100,000.00 600.00
54,435.00
Jumlah 411,210.00
OVERHEAD & PROFIT (12.5%) 51,401.25
Jumlah Total 462,611.25
Dibulatkan 462,600.00
SNI. 300.38 1 M2 PASANG BEKISTING UNTUK BALOK
0.04 m3 Kayu hutan/papan/kaso 3,500,000.00 140,000.00
0.018 m3 Balok kayu hutan 3,500,000.00 63,000.00
0.4 kg Paku biasa 2" - 5" 16,000.00 6,400.00
0.2 lt Pelumas bekisting 10,000.00 2,000.00
0.35 lb Triplex tebal 9 mm 102,500.00 35,875.00
2 btg Dolken kayu 8-10/4' 60,000.00 120,000.00
367,275.00
0.32 Pembantu tukang 70,000.00 22,400.00
0.33 Tukang kayu 90,000.00 29,700.00
0.033 Kepala tukang 95,000.00 3,135.00
0.006 Mandor 100,000.00 600.00
55,835.00
Jumlah 423,110.00
OVERHEAD & PROFIT (12.5%) 52,888.75
Jumlah Total 475,998.75
Dibulatkan 475,900.00
SNI.300.39 1 M2 PASANG BEKISTING UNTUK LANTAI
0.04 m3 Kayu hutan/papan/kaso 3,500,000.00 140,000.00
0.015 kg Balok kayu hutan 3,500,000.00 52,500.00
0.2 lt Pelumas bekisting 10,000.00 2,000.00
0.4 kg Paku biasa 2" - 5" 16,000.00 6,400.00
0.35 lb Triplex tebal 9 mm 102,500.00 35,875.00
6 btg Dolken kayu 8-10/4' 60,000.00 360,000.00
596,775.00
0.32 Pembantu tukang 70,000.00 22,400.00
0.33 Tukang kayu 90,000.00 29,700.00
0.033 Kepala tukang 95,000.00 3,135.00
0.006 Mandor 100,000.00 600.00
55,835.00
Jumlah 652,610.00
OVERHEAD & PROFIT (12.5%) 81,576.25
Jumlah Total 734,186.25
Dibulatkan 734,100.00

SNI.300.40 1 M2 MEMBUAT BETON DENGAN MUTU K 125


284.2800 kg semen portland 1,400.00 397,992.00
0.6688 m3 Pasir beton 179,000.00 119,715.20
0.7590 m3 Agregat Kasar 245,000.00 185,955.00
0.0400 m3 Kayu Perancah 3,500,000.00 140,000.00
0.3200 kg Paku 16,000.00 5,120.00
848,782.20
1.4458 jam Pekerja 10,000.00 14,458.00
1.4458 jam Tukang 12,857.14 18,588.86
0.7229 jam Mandor 14,285.71 10,327.14
43,374.00
0.7229 jam Conc. Mixer 71,434.36 51,639.90
0.0668 jam Water Tanker 283,674.99 18,949.49
70,589.39
Jumlah 962,745.59
OVERHEAD & PROFIT (12.5%) 120,343.20
Jumlah Total 1,083,088.78
Dibulatkan 1,083,000.00

SNI.300.41 1 M2 MEMBUAT BETON DENGAN MUTU K 175


335.7800 kg semen portland 1,400.00 470,092.00
0.6138 m3 Pasir beton 179,000.00 109,870.20
0.7718 m3 Agregat Kasar 245,000.00 189,091.00
0.0400 m3 Kayu Perancah 3,500,000.00 140,000.00
0.3200 kg Paku 16,000.00 5,120.00
914,173.20
1.4458 jam Pekerja 10,000.00 14,458.00
1.4458 jam Tukang 12,857.14 18,588.86
0.7229 jam Mandor 14,285.71 10,327.14
43,374.00
0.7229 jam Conc. Mixer 71,434.36 51,639.90
0.0668 jam Water Tanker 283,674.99 18,949.49
70,589.39
Jumlah 1,028,136.59
OVERHEAD & PROFIT (12.5%) 128,517.07
Jumlah Total 1,156,653.66
Dibulatkan 1,156,600.00
SNI.300.42 1 M2 MEMBUAT BETON DENGAN MUTU K 225
388 kg semen portland 1,400.00 543,200.00
0.65 m3 Pasir beton 179,000.00 116,350.00
0.65 m3 Kerikil 65,000.00 42,250.00
701,800.00
6 Pembantu tukang 70,000.00 420,000.00
1 Tukang batu 90,000.00 90,000.00
0.1 Kepala tukang 95,000.00 9,500.00
0.3 Mandor 100,000.00 30,000.00
549,500.00
Jumlah 1,251,300.00
OVERHEAD & PROFIT (12.5%) 156,412.50
Jumlah Total 1,407,712.50
Dibulatkan 1,407,700.00
SNI.300.43 1 M2 MEMBUAT BETON DENGAN MUTU K 250
395.5200 kg semen portland 1,400.00 553,728.00
0.5589 m3 Pasir beton 179,000.00 100,043.10
0.7793 m3 Agregat Kasar 245,000.00 190,928.50
0.0400 m3 Kayu Perancah 3,500,000.00 140,000.00
0.3200 kg Paku 16,000.00 5,120.00
989,819.60
0.8032 jam Pekerja 10,000.00 8,032.00
0.6024 jam Tukang 12,857.14 7,745.14
15,777.14
0.0669 jam Conc. Pan Mixer 361,536.03 24,186.76
0.1883 jam Truck Mixer 596,950.86 112,405.85
0.0667 jam Water Tanker 283,674.99 18,921.12
155,513.73
Jumlah 1,161,110.47
OVERHEAD & PROFIT (12.5%) 145,138.81
Jumlah Total 1,306,249.28
Dibulatkan 1,306,200.00

SNI.300.44 1 M2 MEMBUAT BETON DENGAN MUTU K 300


425.3900 kg semen portland 1,400.00 595,546.00
0.5500 m3 Pasir beton 179,000.00 98,450.00
0.7658 m3 Agregat Kasar 245,000.00 187,621.00
0.0400 m3 Kayu Perancah 3,500,000.00 140,000.00
0.3200 kg Paku 16,000.00 5,120.00
1,026,737.00
0.8032 jam Pekerja 10,000.00 8,032.00
0.6024 jam Tukang 12,857.14 7,745.14
0.0669 jam Mandor 14,285.71 955.71
16,732.86
0.0669 jam Conc. Pan Mixer 361,536.03 24,186.76
0.1883 jam Truck Mixer 596,950.86 112,405.85
0.0666 jam Water Tanker 283,674.99 18,892.75
155,485.36
Jumlah 1,198,955.22
OVERHEAD & PROFIT (12.5%) 149,869.40
Jumlah Total 1,348,824.62
Dibulatkan 1,348,800.00

SNI.300.45 1 M2 MEMBUAT BETON DENGAN MUTU K 350


461.4400 kg semen portland 1,400.00 646,016.00
0.5387 m3 Pasir beton 179,000.00 96,427.30
0.7500 m3 Agregat Kasar 245,000.00 183,750.00
0.1080 m3 Kayu Perancah 3,500,000.00 378,000.00
0.8640 kg Paku 16,000.00 13,824.00
1,318,017.30
0.8032 jam Pekerja 10,000.00 8,032.00
0.8032 jam Tukang 12,857.14 10,326.86
0.1004 jam Mandor 14,285.71 1,434.29
19,793.14
0.1004 jam Conc. Pan Mixer 361,536.03 36,298.22
0.2286 jam Truck Mixer 596,950.86 136,462.97
0.0667 jam Water Tanker 283,674.99 18,921.12
191,682.31
Jumlah 1,529,492.75
OVERHEAD & PROFIT (12.5%) 191,186.59
Jumlah Total 1,720,679.34
Dibulatkan 1,720,600.00

SNI.300.46 1 M2 MEMBUAT BETON DENGAN MUTU K 400


492.3400 kg semen portland 1,400.00 689,276.00
0.5024 m3 Pasir beton 179,000.00 89,929.60
0.7440 m3 Agregat Kasar 245,000.00 182,280.00
0.0400 m3 Kayu Perancah 3,500,000.00 140,000.00
0.4800 kg Paku 16,000.00 7,680.00
1,109,165.60
0.8032 jam Pekerja 10,000.00 8,032.00
0.6024 jam Tukang 12,857.14 7,745.14
0.0669 jam Mandor 14,285.71 955.71
16,732.86
0.0669 jam Conc. Pan Mixer 361,536.03 24,186.76
0.1883 jam Truck Mixer 596,950.86 112,405.85
0.0667 jam Water Tanker 283,674.99 18,921.12
155,513.73
Jumlah 1,281,412.19
OVERHEAD & PROFIT (12.5%) 160,176.52
Jumlah Total 1,441,588.71
Dibulatkan 1,441,500.00
SNI.300.47 1 M2 MEMBUAT BETON DENGAN MUTU K 500
595.3400 kg semen portland 1,400.00 833,476.00
0.4345 m3 Pasir beton 179,000.00 77,775.50
0.7440 m3 Agregat Kasar 245,000.00 182,280.00
0.0400 m3 Kayu Perancah 3,500,000.00 140,000.00
0.4800 kg Paku 16,000.00 7,680.00
1,241,211.50
0.5355 jam Pekerja 10,000.00 5,355.00
1.2048 jam Tukang 12,857.14 15,490.29
0.0669 jam Mandor 14,285.71 955.71
21,801.00
0.0669 jam Conc. Pan Mixer 361,536.03 24,186.76
0.1883 jam Truck Mixer 596,950.86 112,405.85
0.0672 jam Water Tanker 283,674.99 19,062.96
155,655.57
Jumlah 1,418,668.07
OVERHEAD & PROFIT (12.5%) 177,333.51
Jumlah Total 1,596,001.57
Dibulatkan 1,596,000.00

SNI.350.10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA AD. 1:2


70 bh Bata merah 5 x 11 x 22 cm 800.00 56,000.00
18.95 kg Semen portland 1,400.00 26,530.00
0.038 m3 Pasir pasang 162,000.00 6,156.00
88,686.00
0.32 Pembantu tukang 70,000.00 22,400.00
0.1 Tukang batu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.015 Mandor 100,000.00 1,500.00
33,850.00
Jumlah 122,536.00
OVERHEAD & PROFIT (12.5%) 15,317.00
Jumlah Total 137,853.00
Dibulatkan 137,800.00

SNI.350.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA AD. 1:3


70 bh Bata merah 5x11x22 cm 800.00 56,000.00
14.37 kg Semen portland 1,400.00 20,118.00
0.04 m3 Pasir pasang 162,000.00 6,480.00
82,598.00
0.32 Pembantu tukang 70,000.00 22,400.00
0.1 Tukang batu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.015 Mandor 100,000.00 1,500.00
33,850.00
Jumlah 116,448.00
OVERHEAD & PROFIT (12.5%) 14,556.00
Jumlah Total 131,004.00
Dibulatkan 131,000.00

SNI.350.12 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA AD. 1:4


70 bh Bata merah 5 x 11 x 22 cm 800.00 56,000.00
11.5 kg Semen Portland 1,400.00 16,100.00
0.043 m3 Pasir Pasang 162,000.00 6,966.00
79,066.00
0.32 Pembantu tukang 70,000.00 22,400.00
0.1 Tukang batu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.015 Mandor 100,000.00 1,500.00
33,850.00
Jumlah 112,916.00
OVERHEAD & PROFIT (12.5%) 14,114.50
Jumlah Total 127,030.50
Dibulatkan 127,000.00

SNI.350.13 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA AD. 1:5


70 bh Bata merah 5 x 11 x 22 cm 800.00 56,000.00
9.68 kg Semen Portland 1,400.00 13,552.00
0.045 m3 Pasir Pasang 162,000.00 7,290.00
76,842.00
0.32 Pembantu tukang 70,000.00 22,400.00
0.1 Tukang batu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.015 Mandor 100,000.00 1,500.00
33,850.00
Jumlah 110,692.00
OVERHEAD & PROFIT (12.5%) 13,836.50
Jumlah Total 124,528.50
Dibulatkan 124,500.00
SNI.350.14 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA AD. 1:5
140 bh Bata merah 5 x 11 x 22 cm 800.00 112,000.00
22.2 kg Semen Portland 1,400.00 31,080.00
0.102 m3 Pasir Pasang 162,000.00 16,524.00
159,604.00
0.65 Pembantu tukang 70,000.00 45,500.00
0.2 Tukang batu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.03 Mandor 100,000.00 3,000.00
68,400.00
Jumlah 228,004.00
OVERHEAD & PROFIT (12.5%) 28,500.50
Jumlah Total 256,504.50
Dibulatkan 256,500.00

SNI.350.15 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA AD. 1:4


140.000 bh Bata merah 5 x 11 x 22 cm 800.00 112,000.00
26.550 kg Semen Portland 1,400.00 37,170.00
0.093 m3 Pasir Pasang 162,000.00 15,066.00
164,236.00
0.650 Oh Pembantu tukang 70,000.00 45,500.00
0.200 Oh Tukang batu 90,000.00 18,000.00
0.020 Oh Kepala tukang 95,000.00 1,900.00
0.030 Oh Mandor 100,000.00 3,000.00
68,400.00
Jumlah 232,636.00
OVERHEAD & PROFIT (12.5%) 29,079.50
Jumlah Total 261,715.50
Dibulatkan 261,700.00

SNI.350.16 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA AD. 1:3


140.000 bh Bata merah 5 x 11 x 22 cm 800.00 112,000.00
32.950 kg Semen Portland 1,400.00 46,130.00
0.091 m3 Pasir Pasang 162,000.00 14,742.00
172,872.00
0.650 Oh Pembantu tukang 70,000.00 45,500.00
0.200 Oh Tukang batu 90,000.00 18,000.00
0.020 Oh Kepala tukang 95,000.00 1,900.00
0.030 Oh Mandor 100,000.00 3,000.00
68,400.00
Jumlah 241,272.00
OVERHEAD & PROFIT (12.5%) 30,159.00
Jumlah Total 271,431.00
Dibulatkan 271,400.00

SNI.350.28 1 M2 PASANG DINDING ROOSTER / KERAWANG 12 X 11 X 24 CM


36 bh Rooster / batu kerawang 4,000.00 144,000.00
12.8 kg Semen Portland 1,400.00 17,920.00
0.035 m3 Pasir Pasang 162,000.00 5,670.00
167,590.00
0.3 Pembantu tukang 70,000.00 21,000.00
0.1 Tukang batu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.015 Mandor 100,000.00 1,500.00
32,450.00
Jumlah 200,040.00
OVERHEAD & PROFIT (12.5%) 25,005.00
Jumlah Total 225,045.00
Dibulatkan 225,000.00

SNI.350.29 1 M2 PASANG BATA BERONGGA UK.(5 X 11 X 24) CM


80 bh Bata berongga 2,400.00 192,000.00
23.65 kg Semen Portland 1,400.00 33,110.00
0.57 m3 Pasir Pasang 162,000.00 92,340.00
317,450.00
0.32 Pembantu tukang 70,000.00 22,400.00
0.15 Tukang batu 90,000.00 13,500.00
0.015 Kepala tukang 95,000.00 1,425.00
0.015 Mandor 100,000.00 1,500.00
38,825.00
Jumlah 356,275.00
OVERHEAD & PROFIT (12.5%) 44,534.38
Jumlah Total 400,809.38
Dibulatkan 400,800.00

SNI.360.02 1 M2 PLESTERAN AD. 1:2 TEBAL 15 MM


8.52 kg Semen Portland 1,400.00 11,928.00
0.017 m3 Pasir Pasang 162,000.00 2,754.00
14,682.00
0.2 Pembantu tukang 70,000.00 14,000.00
0.15 Tukang batu 90,000.00 13,500.00
0.015 Kepala tukang 95,000.00 1,425.00
0.01 Mandor 100,000.00 1,000.00
29,925.00
Jumlah 44,607.00
OVERHEAD & PROFIT (12.5%) 5,575.88
Jumlah Total 50,182.88
Dibulatkan 50,100.00
SNI.360.03 1 M2 PLESTERAN AD. 1:3 TEBAL 15 MM
6.48 kg Semen Portland 1,400.00 9,072.00
0.019 m3 Pasir Pasang 162,000.00 3,078.00
12,150.00
0.2 Pembantu tukang 70,000.00 14,000.00
0.15 Tukang batu 90,000.00 13,500.00
0.015 Kepala tukang 95,000.00 1,425.00
0.01 Mandor 100,000.00 1,000.00
29,925.00
Jumlah 42,075.00
OVERHEAD & PROFIT (12.5%) 5,259.38
Jumlah Total 47,334.38
Dibulatkan 47,300.00

SNI.360.04 1 M2 PLESTERAN AD. 1:4 TEBAL 15 MM


5.2 kg Semen Portland 1,400.00 7,280.00
0.02 m3 Pasir Pasang 162,000.00 3,240.00
10,520.00
0.2 Pembantu tukang 70,000.00 14,000.00
0.15 Tukang batu 90,000.00 13,500.00
0.015 Kepala tukang 95,000.00 1,425.00
0.01 Mandor 100,000.00 1,000.00
29,925.00
Jumlah 40,445.00
OVERHEAD & PROFIT (12.5%) 5,055.63
Jumlah Total 45,500.63
Dibulatkan 45,500.00
SNI.360.05 1 M2 PLESTERAN AD. 1:5 TEBAL 15 MM
4.32 kg Semen Portland 1,400.00 6,048.00
0.022 m3 Pasir Pasang 162,000.00 3,564.00
9,612.00
0.2 Pembantu tukang 70,000.00 14,000.00
0.15 Tukang batu 90,000.00 13,500.00
0.015 Kepala tukang 95,000.00 1,425.00
0.01 Mandor 100,000.00 1,000.00
29,925.00
Jumlah 39,537.00
OVERHEAD & PROFIT (12.5%) 4,942.13
Jumlah Total 44,479.13
Dibulatkan 44,400.00
SNI. 360.06 1 M2 PLESTERAN ADDICTIVE UNTUK BETON
0.5 kg Zat addictive 15,000.00 7,500.00
7,500.00
0.2 Pembantu tukang 70,000.00 14,000.00
0.15 Tukang kayu 90,000.00 13,500.00
0.015 Kepala tukang 95,000.00 1,425.00
0.01 Mandor 100,000.00 1,000.00
29,925.00
Jumlah 37,425.00
OVERHEAD & PROFIT (12.5%) 4,678.13
Jumlah Total 42,103.13
Dibulatkan 42,100.00
SNI. 360.07 1 M2 ACIAN
3.25 kg Semen Portland 1,400.00 4,550.00
4,550.00
0.2 Pembantu tukang 70,000.00 14,000.00
0.1 Tukang batu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.01 Mandor 100,000.00 1,000.00
24,950.00
Jumlah 29,500.00
OVERHEAD & PROFIT (12.5%) 3,687.50
Jumlah Total 33,187.50
Dibulatkan 33,100.00

SNI. 360.10 1 M2 PLESTERAN PLESTERAN SIAR AD. 1 PC : 2 PS


4.320 kg Semen Portland 6,000.00 25,920.00
0.016 kg Pasir Pasang 162,000.00 2,592.00
28,512.00
0.150 Oh Pembantu tukang 70,000.00 10,500.00
0.070 Oh Tukang kayu 90,000.00 6,300.00
0.007 Oh Kepala tukang 95,000.00 665.00
0.008 Oh Mandor 100,000.00 800.00
18,265.00
Jumlah 46,777.00
OVERHEAD & PROFIT (12.5%) 5,847.13
Jumlah Total 52,624.13
Dibulatkan 52,600.00
SNI.450.29 1 M2 MEMBUAT RANGKA LANGIT-LANGIT 1 X 1 M, KAYU JATI JABAR
0.012 m3 Kayu jati jabar 8,200,000.00 98,400.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
100,000.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.25 Tukang kayu 90,000.00 22,500.00
0.025 Kepala tukang 95,000.00 2,375.00
0.075 Mandor 100,000.00 7,500.00
42,875.00
Jumlah 142,875.00
OVERHEAD & PROFIT (12.5%) 17,859.38
Jumlah Total 160,734.38
Dibulatkan 160,700.00
SNI.450.30 1 M2 MEMBUAT RANGKA LANGIT-LANGIT 1X1 M, KAMPER,
0.012 m3 Kayu kamper 8,200,000.00 98,400.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
100,000.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.25 Tukang kayu 90,000.00 22,500.00
0.025 Kepala tukang 95,000.00 2,375.00
0.075 Mandor 100,000.00 7,500.00
42,875.00
Jumlah 142,875.00
OVERHEAD & PROFIT (12.5%) 17,859.38
Jumlah Total 160,734.38
Dibulatkan 160,700.00
SNI.450.31 1 M2 MEMBUAT RANGKA LANGIT-LANGIT 1 X 1 M, KAYU KRUING
0.012 m3 Kayu kruing 7,274,000.00 87,288.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
88,888.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.25 Tukang kayu 90,000.00 22,500.00
0.025 Kepala tukang 95,000.00 2,375.00
0.075 Mandor 100,000.00 7,500.00
42,875.00
Jumlah 131,763.00
OVERHEAD & PROFIT (12.5%) 16,470.38
Jumlah Total 148,233.38
Dibulatkan 148,200.00
SNI.450.32 1 M2 MEMBUAT RANGKA LANGIT-LANGIT 1 X 1 M, KAYU MERANTI
0.012 m3 Kayu meranti 6,000,000.00 72,000.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
73,600.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.25 Tukang kayu 90,000.00 22,500.00
0.025 Kepala tukang 95,000.00 2,375.00
0.075 Mandor 100,000.00 7,500.00
42,875.00
Jumlah 116,475.00
OVERHEAD & PROFIT (12.5%) 14,559.38
Jumlah Total 131,034.38
Dibulatkan 131,000.00
SNI.450.33 1 M2 MEMBUAT RANGKA LANGIT-LANGIT 1 X 1 M, KAYU LANAN
0.012 m3 Kayu lanan 6,546,000.00 78,552.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
80,152.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.25 Tukang kayu 90,000.00 22,500.00
0.025 Kepala tukang 95,000.00 2,375.00
0.075 Mandor 100,000.00 7,500.00
42,875.00
Jumlah 123,027.00
OVERHEAD & PROFIT (12.5%) 15,378.38
Jumlah Total 138,405.38
Dibulatkan 138,400.00
SNI.450.34 1 M2 MEMBUAT RANGKA LANGIT-LANGIT BILIK KAYU MERANTI
0.006 m3 Kayu meranti 6,000,000.00 36,000.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
37,600.00
0.25 Pembantu tukang 70,000.00 17,500.00
0.025 Tukang kayu 90,000.00 2,250.00
0.15 Kepala tukang 95,000.00 14,250.00
0.075 Mandor 100,000.00 7,500.00
41,500.00
Jumlah 79,100.00
OVERHEAD & PROFIT (12.5%) 9,887.50
Jumlah Total 88,987.50
Dibulatkan 88,900.00
SNI. 450.35 1 M2 MENGERJAKAN RANGKA LANGIT-LANGIT (1,00 X 1,00)M, KAYU BORNEO
0.012 m3 Kayu borneo 5,000,000.00 60,000.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
61,600.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.25 Tukang kayu 90,000.00 22,500.00
0.025 Kepala tukang 95,000.00 2,375.00
0.075 Mandor 100,000.00 7,500.00
42,875.00
Jumlah 104,475.00
OVERHEAD & PROFIT (12.5%) 13,059.38
Jumlah Total 117,534.38
Dibulatkan 117,500.00

SNI.451.34 1 M' PASANG LISTPLANK 3X20 CM KAYU JATI JABAR


0.0072 m3 Papan kayu jati jabar 8,200,000.00 59,040.00
0.05 kg Paku biasa 2" - 5" 16,000.00 800.00
59,840.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.2 Tukang kayu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.005 Mandor 100,000.00 500.00
27,400.00
Jumlah 87,240.00
OVERHEAD & PROFIT (12.5%) 10,905.00
Jumlah Total 98,145.00
Dibulatkan 98,100.00
SNI.451.35 1 M' PASANG LISTPLANK 3X20 CM KAYU KAMPER
0.0072 m3 Papan kayu kamper 8,200,000.00 59,040.00
0.05 kg Paku biasa 2" - 5" 16,000.00 800.00
59,840.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.2 Tukang kayu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.005 Mandor 100,000.00 500.00
27,400.00
Jumlah 87,240.00
OVERHEAD & PROFIT (12.5%) 10,905.00
Jumlah Total 98,145.00
Dibulatkan 98,100.00
SNI.451.36 1 M' PASANG LISTPLANK 3X20 CM KAYU BALAU
0.0072 m3 Papan kayu balau 9,500,000.00 68,400.00
0.05 kg Paku biasa 2" - 5" 16,000.00 800.00
69,200.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.2 Tukang kayu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.005 Mandor 100,000.00 500.00
27,400.00
Jumlah 96,600.00
OVERHEAD & PROFIT (12.5%) 12,075.00
Jumlah Total 108,675.00
Dibulatkan 108,600.00
SNI.451.37 1 M' PASANG LISTPLANK 3X20 CM KAYU KRUING
0.0072 m3 Papan kayu kruing 7,274,000.00 52,372.80
0.05 kg Paku biasa 2" - 5" 16,000.00 800.00
53,172.80
0.1 Pembantu tukang 70,000.00 7,000.00
0.2 Tukang kayu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.005 Mandor 100,000.00 500.00
27,400.00
Jumlah 80,572.80
OVERHEAD & PROFIT (12.5%) 10,071.60
Jumlah Total 90,644.40
Dibulatkan 90,600.00
SNI.451.38 1 M' PASANG LISTPLANK 3X20 CM KAYU LANAN
0.0072 m3 Papan kayu lanan 6,546,000.00 47,131.20
0.05 kg Paku biasa 2" - 5" 16,000.00 800.00
47,931.20
0.1 Pembantu tukang 70,000.00 7,000.00
0.2 Tukang kayu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.005 Mandor 100,000.00 500.00
27,400.00
Jumlah 75,331.20
OVERHEAD & PROFIT (12.5%) 9,416.40
Jumlah Total 84,747.60
Dibulatkan 84,700.00
SNI.451.39 1 M' PASANG LISTPLANK 3X20 CM KAYU MERANTI
0.0072 m3 Papan kayu meranti 6,000,000.00 43,200.00
0.05 kg Paku biasa 2" - 5" 16,000.00 800.00
44,000.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.2 Tukang kayu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.005 Mandor 100,000.00 500.00
27,400.00
Jumlah 71,400.00
OVERHEAD & PROFIT (12.5%) 8,925.00
Jumlah Total 80,325.00
Dibulatkan 80,300.00
SNI.451.40 1 M' PASANG LISTPLANK WOODPLANK
0.25 bh woodplank 60,000.00 15,000.00
0.05 kg Paku biasa 2" - 5" 16,000.00 800.00
15,800.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.2 Tukang kayu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.005 Mandor 100,000.00 500.00
27,400.00
Jumlah 43,200.00
OVERHEAD & PROFIT (12.5%) 5,400.00
Jumlah Total 48,600.00
Dibulatkan 48,600.00

SNI.451.41 1 M' PASANG LISTPLANK 3X30 CM KAYU JATI JABAR


0.011 m3 Papan kayu jati jabar 8,200,000.00 90,200.00
0.05 kg Paku biasa 2" - 5" 16,000.00 800.00
91,000.00
0.11 Pembantu tukang 70,000.00 7,700.00
0.22 Tukang kayu 90,000.00 19,800.00
0.022 Kepala tukang 95,000.00 2,090.00
0.005 Mandor 100,000.00 500.00
30,090.00
Jumlah 121,090.00
OVERHEAD & PROFIT (12.5%) 15,136.25
Jumlah Total 136,226.25
Dibulatkan 136,200.00

SNI.451.42 1 M' PASANG LISTPLANK 3X30 CM KAYU KAMPER


0.011 m3 Papan kayu kamper 8,200,000.00 90,200.00
0.05 kg Paku biasa 2" - 5" 16,000.00 800.00
91,000.00
0.11 Pembantu tukang 70,000.00 7,700.00
0.22 Tukang kayu 90,000.00 19,800.00
0.022 Kepala tukang 95,000.00 2,090.00
0.005 Mandor 100,000.00 500.00
30,090.00
Jumlah 121,090.00
OVERHEAD & PROFIT (12.5%) 15,136.25
Jumlah Total 136,226.25
Dibulatkan 136,200.00

SNI.451.43 1 M' PASANG LISTPLANK 2x(3X20) CM KAYU KAMPER


0.0145 m3 Papan kayu kamper 8,200,000.00 118,900.00
0.06 kg Paku biasa 2" - 5" 16,000.00 960.00
119,860.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.25 Tukang kayu 90,000.00 22,500.00
0.025 Kepala tukang 95,000.00 2,375.00
0.075 Mandor 100,000.00 7,500.00
42,875.00
Jumlah 162,735.00
OVERHEAD & PROFIT (12.5%) 20,341.88
Jumlah Total 183,076.88
Dibulatkan 183,000.00

SNI.451.44 1 M' PASANG LISTPLANK 2x(2X20) CM KAYU KAMPER


0.0086 m3 Papan kayu kamper 8,200,000.00 70,520.00
0.06 kg Paku biasa 2" - 5" 16,000.00 960.00
71,480.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.05 Mandor 100,000.00 5,000.00
21,950.00
Jumlah 93,430.00
OVERHEAD & PROFIT (12.5%) 11,678.75
Jumlah Total 105,108.75
Dibulatkan 105,100.00
SNI.451.45 1 M' PASANG LISTPLANK 2x(2X20) CM KAYU BORNEO
0.0088 m3 Papan kayu borneo 5,000,000.00 44,000.00
0.06 kg Paku biasa 2" - 5" 16,000.00 960.00
44,960.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.05 Mandor 100,000.00 5,000.00
21,950.00
Jumlah 66,910.00
OVERHEAD & PROFIT (12.5%) 8,363.75
Jumlah Total 75,273.75
Dibulatkan 75,200.00

SNI.452.35 1 M' PASANG LIST KAYU PROFIL


1 m' List kayu 4,400.00 4,400.00
0.01 kg Paku biasa 1/2' -1' 18,500.00 185.00
4,585.00
0.03 Pembantu tukang 70,000.00 2,100.00
0.07 Tukang kayu 90,000.00 6,300.00
0.007 Kepala tukang 95,000.00 665.00
0.002 Mandor 100,000.00 200.00
9,265.00
Jumlah 13,850.00
OVERHEAD & PROFIT (12.5%) 1,731.25
Jumlah Total 15,581.25
Dibulatkan 15,500.00
SNI.452.36 1 M' PASANG LIST KELILING (TS.5) GYPSUM
1 m' List keliling gypsum 14,000.00 14,000.00
0.05 kg Paku biasa 1/2' -1' 18,500.00 925.00
14,925.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.2 Tukang kayu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.005 Mandor 100,000.00 500.00
27,400.00
Jumlah 42,325.00
OVERHEAD & PROFIT (12.5%) 5,290.63
Jumlah Total 47,615.63
Dibulatkan 47,600.00
SNI.452.37 1 M' PASANG LIST DROP (SB) GYPSUM
1 m' List drop (SB) gypsum 8,900.00 8,900.00
0.05 kg Paku biasa 1/2' -1' 18,500.00 925.00
9,825.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.2 Tukang kayu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.005 Mandor 100,000.00 500.00
27,400.00
Jumlah 37,225.00
OVERHEAD & PROFIT (12.5%) 4,653.13
Jumlah Total 41,878.13
Dibulatkan 41,800.00
SNI.452.38 1 M' PASANG BEADING PENURUNAN (PC) GYPSUM
1 m' Beading penurunan (PC) Gypsum 10,000.00 10,000.00
0.05 kg Paku biasa 1/2' -1' 18,500.00 925.00
10,925.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.2 Tukang kayu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.005 Mandor 100,000.00 500.00
27,400.00
Jumlah 38,325.00
OVERHEAD & PROFIT (12.5%) 4,790.63
Jumlah Total 43,115.63
Dibulatkan 43,100.00
SNI.452.39 1 M' PASANG BEADING HORISON GYPSUM
1 m' Beading horison Gypsum 10,000.00 10,000.00
0.05 kg Paku biasa 1/2' -1' 18,500.00 925.00
10,925.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.2 Tukang kayu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.005 Mandor 100,000.00 500.00
27,400.00
Jumlah 38,325.00
OVERHEAD & PROFIT (12.5%) 4,790.63
Jumlah Total 43,115.63
Dibulatkan 43,100.00
SNI. 452.40 1 M2 PASANG GYPSUM BOARD UNTUK PLAFOND
0.364 lb Gypsum board 52,500.00 19,110.00
0.11 kg Paku biasa 1/2 - 1' 18,500.00 2,035.00
21,145.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.05 Tukang kayu 90,000.00 4,500.00
0.005 Kepala tukang 95,000.00 475.00
0.005 Mandor 100,000.00 500.00
12,475.00
Jumlah 33,620.00
OVERHEAD & PROFIT (12.5%) 4,202.50
Jumlah Total 37,822.50
Dibulatkan 37,800.00
SNI.453.40 1 M2 PASANG RANGKA DINDING PEMISAH/SKETSEL KAYU KAMPER
0.0195 m3 Balok kayu kamper 8,200,000.00 159,900.00
0.007 m3 Papan kayu kamper 8,200,000.00 57,400.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
218,900.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.45 Tukang kayu 90,000.00 40,500.00
0.045 Kepala tukang 95,000.00 4,275.00
0.0075 Mandor 100,000.00 750.00
56,025.00
Jumlah 274,925.00
OVERHEAD & PROFIT (12.5%) 34,365.63
Jumlah Total 309,290.63
Dibulatkan 309,200.00
SNI.453.41 1 M2 DINDING PEMISAH/SKETSEL TEAKWOOD RANGKA KRUING
0.0195 m3 Balok kayu kruing 7,274,000.00 141,843.00
0.007 m3 Papan kayu kruing 7,274,000.00 50,918.00
0.1 kg Paku biasa 1/2" - 1" 18,500.00 1,850.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
0.56 lt Lem kayu 30,000.00 16,800.00
0.35 lb Teakwood tebal 4 mm 80,000.00 28,000.00
241,011.00
0.2 Pembantu tukang 70,000.00 14,000.00
0.6 Tukang kayu 90,000.00 54,000.00
0.06 Kepala tukang 95,000.00 5,700.00
0.01 Mandor 100,000.00 1,000.00
74,700.00
Jumlah 315,711.00
OVERHEAD & PROFIT (12.5%) 39,463.88
Jumlah Total 355,174.88
Dibulatkan 355,100.00
SNI.453.42 1 M2 DINDING PEMISAH/SKETSEL TRIPLEX RANGKA KRUING
0.0195 m3 Balok kayu kruing 7,274,000.00 141,843.00
0.007 m3 Papan kayu kruing 7,274,000.00 50,918.00
0.1 kg Paku biasa 1/2" - 1" 18,500.00 1,850.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
0.56 lt Lem kayu 30,000.00 16,800.00
0.35 lb Triplex tebal 4 mm 55,000.00 19,250.00
232,261.00
0.2 Pembantu tukang 70,000.00 14,000.00
0.6 Tukang kayu 90,000.00 54,000.00
0.06 Kepala tukang 95,000.00 5,700.00
0.01 Mandor 100,000.00 1,000.00
74,700.00
Jumlah 306,961.00
OVERHEAD & PROFIT (12.5%) 38,370.13
Jumlah Total 345,331.13
Dibulatkan 345,300.00
SNI.453.43 1 M2 DINDING PEMISAH/SKETSEL TEAKWOOD RANGKAP, RANGKA KAYU KRUING
0.0195 m3 Balok kayu kruing 7,274,000.00 141,843.00
0.007 m3 Papan kayu kruing 7,274,000.00 50,918.00
0.1 kg Paku biasa 1/2" - 1" 18,500.00 1,850.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
0.5 lt Lem kayu 30,000.00 15,000.00
0.7 lb Teakwood tebal 4 mm 80,000.00 56,000.00
267,211.00
0.2 Pembantu tukang 70,000.00 14,000.00
0.6 Tukang kayu 90,000.00 54,000.00
0.06 Kepala tukang 95,000.00 5,700.00
0.01 Mandor 100,000.00 1,000.00
74,700.00
Jumlah 341,911.00
OVERHEAD & PROFIT (12.5%) 42,738.88
Jumlah Total 384,649.88
Dibulatkan 384,600.00
SNI.453.44 1 M2 DINDING PEMISAH/SKETSEL GRC RANGKAP, RANGKA KAYU MERANTI
0.0144 m3 Balok kayu meranti 6,000,000.00 86,400.00
0.1 kg Paku biasa 1/2" - 1" 18,500.00 1,850.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
0.7 lbr GRC tebal 4 mm 52,500.00 36,750.00
126,600.00
0.2 Pembantu tukang 70,000.00 14,000.00
0.6 Tukang kayu 90,000.00 54,000.00
68,000.00
Jumlah 194,600.00
OVERHEAD & PROFIT (12.5%) 24,325.00
Jumlah Total 218,925.00
Dibulatkan 218,900.00

SNI.453.45 1 M2 PASANG RANGKA DINDING PEMISAH/SKETSEL KAYU BORNEO


0.0195 m3 Balok kayu borneo 5,000,000.00 97,500.00
0.007 m3 Papan kayu borneo 5,000,000.00 35,000.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
134,100.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.45 Tukang kayu 90,000.00 40,500.00
0.045 Kepala tukang 95,000.00 4,275.00
0.0075 Mandor 100,000.00 750.00
56,025.00
Jumlah 190,125.00
OVERHEAD & PROFIT (12.5%) 23,765.63
Jumlah Total 213,890.63
Dibulatkan 213,800.00

SNI.453.46 1 M2 DINDING PEMISAH/SKETSEL TEAKWOOD RANGKA KAYU KAMPER


0.0195 m3 Balok kayu kamper 8,200,000.00 159,900.00
0.007 m3 Papan kayu kamper 8,200,000.00 57,400.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
0.56 lt Lem kayu 30,000.00 16,800.00
1 lb Teakwood tebal 4 mm 80,000.00 80,000.00
315,700.00
0.2 Pembantu tukang 70,000.00 14,000.00
0.6 Tukang kayu 90,000.00 54,000.00
0.06 Kepala tukang 95,000.00 5,700.00
0.01 Mandor 100,000.00 1,000.00
74,700.00
Jumlah 390,400.00
OVERHEAD & PROFIT (12.5%) 48,800.00
Jumlah Total 439,200.00
Dibulatkan 439,200.00

SNI.460.01 1 M2 ATAP GENTENG PRESS TANGAN


25 bh Genteng press tangan 1,400.00 35,000.00
35,000.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.075 Tukang kayu/batu 90,000.00 6,750.00
0.008 Kepala tukang 95,000.00 760.00
0.008 Mandor 100,000.00 800.00
18,810.00
Jumlah 53,810.00
OVERHEAD & PROFIT (12.5%) 6,726.25
Jumlah Total 60,536.25
Dibulatkan 60,500.00
SNI.460.02 1 M2 ATAP GENTENG PRESS MESIN
25 bh Genteng press mesin 1,900.00 47,500.00
47,500.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.075 Tukang kayu/batu 90,000.00 6,750.00
0.008 Kepala tukang 95,000.00 760.00
0.008 Mandor 100,000.00 800.00
18,810.00
Jumlah 66,310.00
OVERHEAD & PROFIT (12.5%) 8,288.75
Jumlah Total 74,598.75
Dibulatkan 74,500.00
SNI.460.03 1 M2 ATAP GENTENG PRESS DIGLAZUUR
25 bh Genteng press diglazuur 2,500.00 62,500.00
62,500.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.075 Tukang kayu/batu 90,000.00 6,750.00
0.008 Kepala tukang 95,000.00 760.00
0.008 Mandor 100,000.00 800.00
18,810.00
Jumlah 81,310.00
OVERHEAD & PROFIT (12.5%) 10,163.75
Jumlah Total 91,473.75
Dibulatkan 91,400.00
SNI.460.04 1 M2 ATAP GENTENG GLAZUUR TURBO
18 bh Genteng diglazuur turbo 3,500.00 63,000.00
63,000.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.06 Tukang kayu/batu 90,000.00 5,400.00
0.006 Kepala tukang 95,000.00 570.00
0.008 Mandor 100,000.00 800.00
17,270.00
Jumlah 80,270.00
OVERHEAD & PROFIT (12.5%) 10,033.75
Jumlah Total 90,303.75
Dibulatkan 90,300.00
SNI.460.05 1 M' ATAP GENTENG NOK/BUBUNG PRESS TANGAN
5 bh Genteng nok / bubung 2,000.00 10,000.00
8 kg Semen portland 1,400.00 11,200.00
0.032 m3 Pasir pasang 162,000.00 5,184.00
26,384.00
0.4 Pembantu tukang 70,000.00 28,000.00
0.2 Tukang kayu/batu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.002 Mandor 100,000.00 200.00
48,100.00
Jumlah 74,484.00
OVERHEAD & PROFIT (12.5%) 9,310.50
Jumlah Total 83,794.50
Dibulatkan 83,700.00
SNI.460.06 1 M' ATAP GENTENG NOK/BUBUNG PRESS MESIN
5 bh Genteng nok / bubung 2,500.00 12,500.00
8 kg Semen portland 1,400.00 11,200.00
0.032 m3 Pasir pasang 162,000.00 5,184.00
28,884.00
0.4 Pembantu tukang 70,000.00 28,000.00
0.2 Tukang kayu/batu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.002 Mandor 100,000.00 200.00
48,100.00
Jumlah 76,984.00
OVERHEAD & PROFIT (12.5%) 9,623.00
Jumlah Total 86,607.00
Dibulatkan 86,600.00
SNI.460.07 1 M' ATAP GENTENG NOK/BUBUNG DIGLAZUUR
5 bh Genteng nok / bubung diglazuur 4,000.00 20,000.00
8 kg Semen portland 1,400.00 11,200.00
0.032 m3 Pasir pasang 162,000.00 5,184.00
36,384.00
0.4 Pembantu tukang 70,000.00 28,000.00
0.2 Tukang kayu/batu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.002 Mandor 100,000.00 200.00
48,100.00
Jumlah 84,484.00
OVERHEAD & PROFIT (12.5%) 10,560.50
Jumlah Total 95,044.50
Dibulatkan 95,000.00
SNI.460.08 1 M2 PASANG ATAP ASBES GELOMBANG 2400 X 1050 X 4 MM
0.44 lb Asbes gelombang 65,000.00 28,600.00
2 bh Paku pancing 60 x 230 825.00 1,650.00
30,250.00
0.14 Pembantu tukang 70,000.00 9,800.00
0.067 Tukang kayu/batu 90,000.00 6,030.00
0.007 Kepala tukang 95,000.00 665.00
0.007 Mandor 100,000.00 700.00
17,195.00
Jumlah 47,445.00
OVERHEAD & PROFIT (12.5%) 5,930.63
Jumlah Total 53,375.63
Dibulatkan 53,300.00
SNI.460.09 1 M2 PASANG ATAP ASBES GELOMBANG 2100 X 1050 X 4 MM
0.51 lb Asbes gelombang 57,000.00 29,070.00
2 bh Paku pancing 60 x 230 825.00 1,650.00
30,720.00
0.14 Pembantu tukang 70,000.00 9,800.00
0.067 Tukang kayu/batu 90,000.00 6,030.00
0.007 Kepala tukang 95,000.00 665.00
0.007 Mandor 100,000.00 700.00
17,195.00
Jumlah 47,915.00
OVERHEAD & PROFIT (12.5%) 5,989.38
Jumlah Total 53,904.38
Dibulatkan 53,900.00
SNI.460.10 1 M2 PASANG ATAP ASBES GELOMBANG 1800 X 920 X 4 MM
0.75 lb Asbes gelombang 32,000.00 24,000.00
2 bh Paku pancing 60 x 230 825.00 1,650.00
25,650.00
0.14 Pembantu tukang 70,000.00 9,800.00
0.07 Tukang kayu 90,000.00 6,300.00
0.007 Kepala tukang 95,000.00 665.00
0.007 Mandor 100,000.00 700.00
17,465.00
Jumlah 43,115.00
OVERHEAD & PROFIT (12.5%) 5,389.38
Jumlah Total 48,504.38
Dibulatkan 48,500.00
SNI.460.11 1 M2 PASANG ATAP ASBES GELOMBANG 1500 X 1050 X 4 MM
0.8 lb Asbes gelombang 42,500.00 34,000.00
2 bh Paku pancing 60 x 230 825.00 1,650.00
35,650.00
0.14 Pembantu tukang 70,000.00 9,800.00
0.067 Tukang kayu 90,000.00 6,030.00
0.007 Kepala tukang 95,000.00 665.00
0.007 Mandor 100,000.00 700.00
17,195.00
Jumlah 52,845.00
OVERHEAD & PROFIT (12.5%) 6,605.63
Jumlah Total 59,450.63
Dibulatkan 59,400.00
SNI.460.12 1 M2 PASANG ATAP ASBES GELOMBANG 3000 X 1050 X 4 MM
0.35 lb Asbes gelombang 85,000.00 29,750.00
2 bh Paku pancing 60 x 230 825.00 1,650.00
31,400.00
0.14 Pembantu tukang 70,000.00 9,800.00
0.07 Tukang kayu 90,000.00 6,300.00
0.007 Kepala tukang 95,000.00 665.00
0.007 Mandor 100,000.00 700.00
17,465.00
Jumlah 48,865.00
OVERHEAD & PROFIT (12.5%) 6,108.13
Jumlah Total 54,973.13
Dibulatkan 54,900.00
SNI.460.13 1 M2 PASANG ATAP ASBES GELOMBANG 2700 X 1050 X 4 MM
0.42 lb Asbes gelombang 75,000.00 31,500.00
2 bh Paku pancing 60 x 230 825.00 1,650.00
33,150.00
0.14 Pembantu tukang 70,000.00 9,800.00
0.07 Tukang kayu 90,000.00 6,300.00
0.007 Kepala tukang 95,000.00 665.00
0.007 Mandor 100,000.00 700.00
17,465.00
Jumlah 50,615.00
OVERHEAD & PROFIT (12.5%) 6,326.88
Jumlah Total 56,941.88
Dibulatkan 56,900.00
SNI.460.14 1 M PASANG NOKSTEEL GELOMBANG 920 X 5 MM
2.4 lb Noksteel gelombang 22,500.00 54,000.00
6 bh Paku sekrup 3" - 5" 400.00 2,400.00
56,400.00
0.084 Pembantu tukang 70,000.00 5,880.00
0.125 Tukang kayu 90,000.00 11,250.00
0.013 Kepala tukang 95,000.00 1,235.00
0.004 Mandor 100,000.00 400.00
18,765.00
Jumlah 75,165.00
OVERHEAD & PROFIT (12.5%) 9,395.63
Jumlah Total 84,560.63
Dibulatkan 84,500.00
SNI.460.15 1 M PASANG NOKSTEEL GELOMBANG 1050 X 5 MM
2.1 lb Noksteel gelombang 29,000.00 60,900.00
6 bh Paku sekrup 3" - 5" 400.00 2,400.00
63,300.00
0.084 Pembantu tukang 70,000.00 5,880.00
0.125 Tukang kayu 90,000.00 11,250.00
0.013 Kepala tukang 95,000.00 1,235.00
0.004 Mandor 100,000.00 400.00
18,765.00
Jumlah 82,065.00
OVERHEAD & PROFIT (12.5%) 10,258.13
Jumlah Total 92,323.13
Dibulatkan 92,300.00
SNI.460.16 1 M2 PASANG GENTENG BETON
11 bh Genteng beton 5,000.00 55,000.00
0.03 Kg Paku biasa 2" - 5" 16,000.00 480.00
55,480.00
0.2 Pembantu tukang 70,000.00 14,000.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.01 Mandor 100,000.00 1,000.00
24,950.00
Jumlah 80,430.00
OVERHEAD & PROFIT (12.5%) 10,053.75
Jumlah Total 90,483.75
Dibulatkan 90,400.00
SNI.460.17 1 M PASANG NOK BUBUNG GENTENG BETON
3.5 bh Nok bubung genteng beton 6,000.00 21,000.00
0.05 bh Paku biasa 2" - 5" 16,000.00 800.00
10.8 Kg Semen portland 1,400.00 15,120.00
0.032 m3 Pasir pasang 162,000.00 5,184.00
1 Kg Semen warna 6,000.00 6,000.00
48,104.00
0.4 Pembantu tukang 70,000.00 28,000.00
0.2 Tukang kayu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.02 Mandor 100,000.00 2,000.00
49,900.00
Jumlah 98,004.00
OVERHEAD & PROFIT (12.5%) 12,250.50
Jumlah Total 110,254.50
Dibulatkan 110,200.00

SNI.460.18 1 M2 PASANG ATAP SENG GELOMBANG


0.7 lb Seng gelombang 51,000.00 35,700.00
0.02 kg Paku biasa 1/2" - 1" 18,500.00 370.00
36,070.00
0.12 Pembantu tukang 70,000.00 8,400.00
0.06 Tukang kayu 90,000.00 5,400.00
0.006 Kepala tukang 95,000.00 570.00
0.006 Mandor 100,000.00 600.00
14,970.00
Jumlah 51,040.00
OVERHEAD & PROFIT (12.5%) 6,380.00
Jumlah Total 57,420.00
Dibulatkan 57,400.00

SNI.460.19 1 M' PASANG ATAP NOK SENG


0.3 lb seng BJLS 38,000.00 11,400.00
0.04 kg Paku biasa 1/2" - 1" 18,500.00 740.00
12,140.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.07 Tukang kayu 90,000.00 6,300.00
0.008 Kepala tukang 95,000.00 760.00
0.006 Mandor 100,000.00 600.00
18,160.00
Jumlah 30,300.00
OVERHEAD & PROFIT (12.5%) 3,787.50
Jumlah Total 34,087.50
Dibulatkan 34,000.00

SNI.470.02 1 M2 LANGIT - LANGIT ETERNIT 1X1 M, TEBAL 5 MM


1.1 lb Eternit tebal 5 mm 6,900.00 7,590.00
0.01 kg Paku biasa 1/2" - 1" 18,500.00 185.00
7,775.00
0.03 Pembantu tukang 70,000.00 2,100.00
0.07 Tukang kayu 90,000.00 6,300.00
0.007 Kepala tukang 95,000.00 665.00
0.0015 Mandor 100,000.00 150.00
9,215.00
Jumlah 16,990.00
OVERHEAD & PROFIT (12.5%) 2,123.75
Jumlah Total 19,113.75
Dibulatkan 19,100.00
SNI.470.03 1 M2 LANGIT - LANGIT TRIPLEK, TEBAL 4 MM
0.36 lb Triplek 4 mm 55,000.00 19,800.00
0.01 kg Paku biasa 1/2" - 1" 18,500.00 185.00
19,985.00
0.07 Pembantu tukang 70,000.00 4,900.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.0035 Mandor 100,000.00 350.00
15,200.00
Jumlah 35,185.00
OVERHEAD & PROFIT (12.5%) 4,398.13
Jumlah Total 39,583.13
Dibulatkan 39,500.00
SNI. 470.04 1 M2 PASANG LANGIT-LANGIT TRIPLEK TEBAL 4 MM + ALUMUNIUM FOIL
0.36 lb Triplek tebal 4 mm 55,000.00 19,800.00
1 lb Alumunium foil 30,000.00 30,000.00
0.01 kg Paku biasa 1/2 - 1' 18,500.00 185.00
49,985.00
0.07 Pembantu tukang 70,000.00 4,900.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.0035 Mandor 100,000.00 350.00
15,200.00
Jumlah 65,185.00
OVERHEAD & PROFIT (12.5%) 8,148.13
Jumlah Total 73,333.13
Dibulatkan 73,300.00
SNI. 470.05 1 M2 PASANG LANGIT-LANGIT MELAMIN TEBAL 4 MM
0.36 lb Melamin 88,500.00 31,860.00
0.01 kg Paku biasa 1/2 - 1' 18,500.00 185.00
32,045.00
0.07 Pembantu tukang 70,000.00 4,900.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.0035 Mandor 100,000.00 350.00
15,200.00
Jumlah 47,245.00
OVERHEAD & PROFIT (12.5%) 5,905.63
Jumlah Total 53,150.63
Dibulatkan 53,100.00
SNI.470.06 1 M2 LANGIT - LANGIT GRC TEBAL 4 MM
0.36 lb GRC tebal 4 mm 52,500.00 18,900.00
0.01 kg Paku biasa 1/2" - 1" 18,500.00 185.00
19,085.00
0.07 Pembantu tukang 70,000.00 4,900.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.0035 Mandor 100,000.00 350.00
15,200.00
Jumlah 34,285.00
OVERHEAD & PROFIT (12.5%) 4,285.63
Jumlah Total 38,570.63
Dibulatkan 38,500.00

SNI.550.01 PASANG 1 BUAH CLOSET DUDUK/MONOBLOK


1 bh Closet duduk/monoblok 1,237,000.00 1,237,000.00
1 ls Perlengkapan 74,220.00 74,220.00
1,311,220.00
3.3 Pembantu tukang 70,000.00 231,000.00
1.1 Tukang kayu 90,000.00 99,000.00
0.001 Kepala tukang 95,000.00 95.00
0.16 Mandor 100,000.00 16,000.00
346,095.00
Jumlah 1,657,315.00
OVERHEAD & PROFIT (12.5%) 207,164.38
Jumlah Total 1,864,479.38
Dibulatkan 1,864,400.00

SNI.550.02 PASANG 1 BUAH CLOSET JONGKOK PORSELIN


1 bh Closet Jongkok Porselin 140,000.00 140,000.00
7 bh Batu bata merah 5x11x22 800.00 5,600.00
6 kg Semen portland 1,400.00 8,400.00
0.01 m3 Pasir pasang 162,000.00 1,620.00
155,620.00
1 Pembantu tukang 70,000.00 70,000.00
1.5 Tukang batu 90,000.00 135,000.00
0.3 Kepala tukang 95,000.00 28,500.00
0.11 Mandor 100,000.00 11,000.00
244,500.00
Jumlah 400,120.00
OVERHEAD & PROFIT (12.5%) 50,015.00
Jumlah Total 450,135.00
Dibulatkan 450,100.00
SNI.550.06 PASANG 1 BUAH BAK MANDI KERAMIK VOL. 0,30 M3
1 bh Bak mandi keramik 185,000.00 185,000.00
6 Kg Semen portland 1,400.00 8,400.00
0.01 m3 Pasir pasang 162,000.00 1,620.00
195,020.00
2.1 Pembantu tukang 70,000.00 147,000.00
0.75 Tukang batu 90,000.00 67,500.00
0.07 Kepala tukang 95,000.00 6,650.00
0.11 Mandor 100,000.00 11,000.00
232,150.00
Jumlah 427,170.00
OVERHEAD & PROFIT (12.5%) 53,396.25
Jumlah Total 480,566.25
Dibulatkan 480,500.00
SNI.550.07 MEMASANG 1 BUAH WASTHAFEL
1 bh Wasthafel 686,000.00 686,000.00
1 ls Perlengkapan 82,320.00 82,320.00
6 Kg Semen warna 6,000.00 36,000.00
0.01 m3 Pasir pasang 162,000.00 1,620.00
805,940.00
1.2 Pembantu tukang 70,000.00 84,000.00
1.45 Tukang batu 90,000.00 130,500.00
0.15 Kepala tukang 95,000.00 14,250.00
0.1 Mandor 100,000.00 10,000.00
238,750.00
Jumlah 1,044,690.00
OVERHEAD & PROFIT (12.5%) 130,586.25
Jumlah Total 1,175,276.25
Dibulatkan 1,175,200.00

SNI.550.08 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,30 M3


1 bh Bak fibreglass 220,000.00 220,000.00
1 ls Perlengkapan 39,600.00 39,600.00
259,600.00
1.8 Pembantu tukang 70,000.00 126,000.00
2.7 Tukang batu 90,000.00 243,000.00
0.54 Kepala tukang 95,000.00 51,300.00
0.11 Mandor 100,000.00 11,000.00
431,300.00
Jumlah 690,900.00
OVERHEAD & PROFIT (12.5%) 86,362.50
Jumlah Total 777,262.50
Dibulatkan 777,200.00

SNI.550.09 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 1 M3


1 bh Bak fibreglass 220,000.00 220,000.00
1 ls Perlengkapan 26,400.00 26,400.00
246,400.00
3 Pembantu tukang 70,000.00 210,000.00
4.5 Tukang batu 90,000.00 405,000.00
0.9 Kepala tukang 95,000.00 85,500.00
0.9 Mandor 100,000.00 90,000.00
790,500.00
Jumlah 1,036,900.00
OVERHEAD & PROFIT (12.5%) 129,612.50
Jumlah Total 1,166,512.50
Dibulatkan 1,166,500.00

SNI.650.02 1 M2 PASANG LANTAI UBIN PC ABU-ABU 30 X 30 CM


11.87 bh Ubin abu-abu 30 x 30 cm 2,500.00 29,675.00
10 Kg Semen Portland 1,400.00 14,000.00
0.0215 m3 Pasir pasang 162,000.00 3,483.00
47,158.00
0.27 Pembantu tukang 70,000.00 18,900.00
0.13 Tukang batu 90,000.00 11,700.00
0.013 Kepala tukang 95,000.00 1,235.00
0.013 Mandor 100,000.00 1,300.00
33,135.00
Jumlah 80,293.00
OVERHEAD & PROFIT (12.5%) 10,036.63
Jumlah Total 90,329.63
Dibulatkan 90,300.00
SNI.650.03 1 M2 PASANG LANTAI UBIN PC ABU-ABU 20 X 20 CM
25 bh Ubin abu-abu 20 x 20 cm 2,000.00 50,000.00
10.4 Kg Semen Portland 1,400.00 14,560.00
0.0135 m3 Pasir pasang 162,000.00 2,187.00

66,747.00
0.27 Pembantu tukang 70,000.00 18,900.00
0.13 Tukang batu 90,000.00 11,700.00
0.013 Kepala tukang 95,000.00 1,235.00
0.0135 Mandor 100,000.00 1,350.00
33,185.00
Jumlah 99,932.00
OVERHEAD & PROFIT (12.5%) 12,491.50
Jumlah Total 112,423.50
Dibulatkan 112,400.00
SNI.650.04 1 M2 PASANG LANTAI UBIN WAFEL PC 20 X 20 CM
25 bh Ubin wafel 20 x 20 cm 2,000.00 50,000.00
10.4 Kg Semen Portland 1,400.00 14,560.00
0.0135 m3 Pasir pasang 162,000.00 2,187.00

66,747.00
0.27 Pembantu tukang 70,000.00 18,900.00
0.13 Tukang batu 90,000.00 11,700.00
0.013 Kepala tukang 95,000.00 1,235.00
0.0135 Mandor 100,000.00 1,350.00
33,185.00
Jumlah 99,932.00
OVERHEAD & PROFIT (12.5%) 12,491.50
Jumlah Total 112,423.50
Dibulatkan 112,400.00
SNI.650.05 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM
11 bh Keramik 30 x 30 cm 3,150.00 34,650.00
9.3 kg Semen portland 1,400.00 13,020.00
0.018 m3 Pasir pasang 162,000.00 2,916.00
1.5 kg Semen warna 6,000.00 9,000.00
59,586.00
0.27 Pembantu tukang 70,000.00 18,900.00
0.13 Tukang batu 90,000.00 11,700.00
0.013 Kepala tukang 95,000.00 1,235.00
0.014 Mandor 100,000.00 1,400.00
33,235.00
Jumlah 92,821.00
OVERHEAD & PROFIT (12.5%) 11,602.63
Jumlah Total 104,423.63
Dibulatkan 104,400.00
SNI.650.06 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM
25 bh Keramik 20 x 20 cm 2,000.00 50,000.00
11.38 kg Semen portland 1,400.00 15,932.00
0.042 m3 Pasir pasang 162,000.00 6,804.00
1.5 kg Semen warna 6,000.00 9,000.00
81,736.00
0.62 Pembantu tukang 70,000.00 43,400.00
0.35 Tukang batu 90,000.00 31,500.00
0.035 Kepala tukang 95,000.00 3,325.00
0.03 Mandor 100,000.00 3,000.00
81,225.00
Jumlah 162,961.00
OVERHEAD & PROFIT (12.5%) 20,370.13
Jumlah Total 183,331.13
Dibulatkan 183,300.00
SNI.650.07 1 M2 PASANG LANTAI KERAMIK 20 X 10 CM
50 bh Keramik 20 x 10 cm 1,000.00 50,000.00
11.38 kg Semen portland 1,400.00 15,932.00
0.042 m3 Pasir pasang 162,000.00 6,804.00
1.5 kg Semen warna 6,000.00 9,000.00
81,736.00
0.62 Pembantu tukang 70,000.00 43,400.00
0.35 Tukang batu 90,000.00 31,500.00
0.035 Kepala tukang 95,000.00 3,325.00
0.03 Mandor 100,000.00 3,000.00
81,225.00
Jumlah 162,961.00
OVERHEAD & PROFIT (12.5%) 20,370.13
Jumlah Total 183,331.13
Dibulatkan 183,300.00
SNI.650.08 1 M2 PASANG DINDING KERAMIK 30 X 30 CM
11 bh Keramik 30 x 30 cm 4,500.00 49,500.00
9.3 kg Semen portland 1,400.00 13,020.00
0.018 m3 Pasir pasang 162,000.00 2,916.00
1.5 kg Semen warna 6,000.00 9,000.00
74,436.00
0.6 Pembantu tukang 70,000.00 42,000.00
0.45 Tukang batu 90,000.00 40,500.00
0.045 Kepala tukang 95,000.00 4,275.00
0.03 Mandor 100,000.00 3,000.00
89,775.00
Jumlah 164,211.00
OVERHEAD & PROFIT (12.5%) 20,526.38
Jumlah Total 184,737.38
Dibulatkan 184,700.00
SNI.650.09 1 M2 PASANG DINDING KERAMIK 20 X 20 CM
25 bh Keramik 20 x 20 cm 2,000.00 50,000.00
9.3 kg Semen portland 1,400.00 13,020.00
0.018 m3 Pasir pasang 162,000.00 2,916.00
1.5 kg Semen warna 6,000.00 9,000.00
74,936.00
0.6 Pembantu tukang 70,000.00 42,000.00
0.45 Tukang batu 90,000.00 40,500.00
0.045 Kepala tukang 95,000.00 4,275.00
0.03 Mandor 100,000.00 3,000.00
89,775.00
Jumlah 164,711.00
OVERHEAD & PROFIT (12.5%) 20,588.88
Jumlah Total 185,299.88
Dibulatkan 185,200.00
SNI.650.10 1 M2 PASANG DINDING KERAMIK 10 X 20 CM
50 bh Keramik 10 x 20 cm 1,000.00 50,000.00
9.3 kg Semen portland 1,400.00 13,020.00
0.018 m3 Pasir pasang 162,000.00 2,916.00
1.5 kg Semen warna 6,000.00 9,000.00
74,936.00
0.6 Pembantu tukang 70,000.00 42,000.00
0.45 Tukang batu 90,000.00 40,500.00
0.045 Kepala tukang 95,000.00 4,275.00
0.03 Mandor 100,000.00 3,000.00
89,775.00
Jumlah 164,711.00
OVERHEAD & PROFIT (12.5%) 20,588.88
Jumlah Total 185,299.88
Dibulatkan 185,200.00
SNI.650.11 1 M2 PASANG DINDING KERAMIK 20 X 25 CM
20 bh Keramik 20 x 25 cm 2,200.00 44,000.00
9.3 kg Semen portland 1,400.00 13,020.00
0.018 m3 Pasir pasang 162,000.00 2,916.00
1.5 kg Semen warna 6,000.00 9,000.00
68,936.00
0.6 Pembantu tukang 70,000.00 42,000.00
0.45 Tukang batu 90,000.00 40,500.00
0.045 Kepala tukang 95,000.00 4,275.00
0.03 Mandor 100,000.00 3,000.00
89,775.00
Jumlah 158,711.00
OVERHEAD & PROFIT (12.5%) 19,838.88
Jumlah Total 178,549.88
Dibulatkan 178,500.00
SNI.650.12 1 M2 PASANG BATU TEMPEL KAPUR TEKSTUR TIDAK RATA 10 X 20 CM
50 bh Batu tempel 10 x 20 cm 2,050.00 102,500.00
9.3 kg Semen portland 1,400.00 13,020.00
0.018 m3 Pasir pasang 162,000.00 2,916.00
1.5 kg Semen warna 6,000.00 9,000.00
127,436.00
0.6 Pembantu tukang 70,000.00 42,000.00
0.45 Tukang batu 90,000.00 40,500.00
0.045 Kepala tukang 95,000.00 4,275.00
0.03 Mandor 100,000.00 3,000.00
89,775.00
Jumlah 217,211.00
OVERHEAD & PROFIT (12.5%) 27,151.38
Jumlah Total 244,362.38
Dibulatkan 244,300.00
SNI.650.13 1 M2 PASANG BATU TEMPEL PALIMANAN TIDAK RATA 10 X 20 CM
50 bh Batu tempel Palimanan 1,550.00 77,500.00
9.3 kg Semen portland 1,400.00 13,020.00
0.018 m3 Pasir pasang 162,000.00 2,916.00
1.5 kg Semen warna 6,000.00 9,000.00
102,436.00
0.6 Pembantu tukang 70,000.00 42,000.00
0.45 Tukang batu 90,000.00 40,500.00
0.045 Kepala tukang 95,000.00 4,275.00
0.03 Mandor 100,000.00 3,000.00
89,775.00
Jumlah 192,211.00
OVERHEAD & PROFIT (12.5%) 24,026.38
Jumlah Total 216,237.38
Dibulatkan 216,200.00
SNI.650.15 1 M2 PASANG LANTAI MOZAIK 20 X 20 CM
25 bh Mozaik 20 x 20 cm 1,900.00 47,500.00
14.15 kg Semen portland 1,400.00 19,810.00
0.039 m3 Pasir pasang 162,000.00 6,318.00
2 kg Semen warna 6,000.00 12,000.00
85,628.00
0.62 Pembantu tukang 70,000.00 43,400.00
0.35 Tukang batu 90,000.00 31,500.00
0.035 Kepala tukang 95,000.00 3,325.00
0.03 Mandor 100,000.00 3,000.00
81,225.00
Jumlah 166,853.00
OVERHEAD & PROFIT (12.5%) 20,856.63
Jumlah Total 187,709.63
Dibulatkan 187,700.00
SNI. 650.17 1 M2 PASANG LANTAI GRANIT 40 X 40 CM B
6.4 bh Granit 40 x 40 cm B 43,500.00 278,400.00
9.3 kg Semen portland 1,400.00 13,020.00
0.018 m3 Pasir pasang 162,000.00 2,916.00
1.5 kg Semen warna 6,000.00 9,000.00
303,336.00
0.27 Pembantu tukang 70,000.00 18,900.00
0.13 Tukang batu 90,000.00 11,700.00
0.013 Kepala tukang 95,000.00 1,235.00
0.0135 Mandor 100,000.00 1,350.00
33,185.00
Jumlah 336,521.00
OVERHEAD & PROFIT (12.5%) 42,065.13
Jumlah Total 378,586.13
Dibulatkan 378,500.00
SNI. 650.18 1 M2 PASANG LANTAI GRANIT 40 X 40 CM A
6.4 bh Granit 40 x 40 cm A 42,000.00 268,800.00
9.3 kg Semen portland 1,400.00 13,020.00
0.018 m3 Pasir pasang 162,000.00 2,916.00
1.5 kg Semen warna 6,000.00 9,000.00
293,736.00
0.27 Pembantu tukang 70,000.00 18,900.00
0.13 Tukang batu 90,000.00 11,700.00
0.013 Kepala tukang 95,000.00 1,235.00
0.0135 Mandor 100,000.00 1,350.00
33,185.00
Jumlah 326,921.00
OVERHEAD & PROFIT (12.5%) 40,865.13
Jumlah Total 367,786.13
Dibulatkan 367,700.00
SNI. 650.19 1 M2 PASANG LANTAI TERAKOTA 20 X 5 CM
100 bh Terakota 20 x 5 cm 4,400.00 440,000.00
9.3 kg Semen portland 1,400.00 13,020.00
0.018 m3 Pasir pasang 162,000.00 2,916.00
1.5 kg Semen warna 6,000.00 9,000.00
464,936.00
0.27 Pembantu tukang 70,000.00 18,900.00
0.13 Tukang batu 90,000.00 11,700.00
0.013 Kepala tukang 95,000.00 1,235.00
0.0135 Mandor 100,000.00 1,350.00
33,185.00
Jumlah 498,121.00
OVERHEAD & PROFIT (12.5%) 62,265.13
Jumlah Total 560,386.13
Dibulatkan 560,300.00
SNI. 650.20 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM
6 bh keramik 40 x 40 cm (putih polos) 7,200.00 43,200.00
9.3 kg Semen portland 1,400.00 13,020.00
0.018 m3 Pasir pasang 162,000.00 2,916.00
1.5 kg Semen warna 6,000.00 9,000.00
68,136.00
0.27 Pembantu tukang 70,000.00 18,900.00
0.13 Tukang batu 90,000.00 11,700.00
0.013 Kepala tukang 95,000.00 1,235.00
0.0135 Mandor 100,000.00 1,350.00
33,185.00
Jumlah 101,321.00
OVERHEAD & PROFIT (12.5%) 12,665.13
Jumlah Total 113,986.13
Dibulatkan 113,900.00
SNI. 650.21 1 M2 PASANG LANTAI GRANIT 60 X 60 POLOS
3 bh Granit 60 x 60 cm 84,600.00 253,800.00
9.3 kg Semen portland 1,400.00 13,020.00
0.018 m3 Pasir pasang 162,000.00 2,916.00
1.5 kg Semen warna 6,000.00 9,000.00
278,736.00
0.27 Pembantu tukang 70,000.00 18,900.00
0.13 Tukang batu 90,000.00 11,700.00
0.013 Kepala tukang 95,000.00 1,235.00
0.0135 Mandor 100,000.00 1,350.00
33,185.00
Jumlah 311,921.00
OVERHEAD & PROFIT (12.5%) 38,990.13
Jumlah Total 350,911.13
Dibulatkan 350,900.00
SNI. 650.22 1 M2 PASANG LANTAI GRANIT 60 X 60 CORAK
3 bh Granit 60 x 60 cm 57,600.00 172,800.00
9.3 kg Semen portland 1,400.00 13,020.00
0.018 m3 Pasir pasang 162,000.00 2,916.00
1.5 kg Semen warna 6,000.00 9,000.00
197,736.00
0.27 Pembantu tukang 70,000.00 18,900.00
0.13 Tukang batu 90,000.00 11,700.00
0.013 Kepala tukang 95,000.00 1,235.00
0.0135 Mandor 100,000.00 1,350.00
33,185.00
Jumlah 230,921.00
OVERHEAD & PROFIT (12.5%) 28,865.13
Jumlah Total 259,786.13
Dibulatkan 259,700.00

SNI.850.02 PASANG 1 BUAH KUNCI PINTU UKURAN BESAR


1 bh Kunci tanam pintu ukuran besar 125,000.00 125,000.00
125,000.00
0.01 Pembantu tukang 70,000.00 700.00
0.5 Tukang kayu 90,000.00 45,000.00
0.01 Kepala tukang 95,000.00 950.00
0.005 Mandor 100,000.00 500.00
47,150.00
Jumlah 172,150.00
OVERHEAD & PROFIT (12.5%) 21,518.75
Jumlah Total 193,668.75
Dibulatkan 193,600.00
SNI.850.05 PASANG 1 SET ENGSEL NYLON UNTUK PINTU
1 bh Engsel pintu 19,000.00 19,000.00
19,000.00
0.015 Pembantu tukang 70,000.00 1,050.00
0.15 Tukang kayu 90,000.00 13,500.00
0.015 Kepala tukang 95,000.00 1,425.00
0.00075 Mandor 100,000.00 75.00
16,050.00
Jumlah 35,050.00
OVERHEAD & PROFIT (12.5%) 4,381.25
Jumlah Total 39,431.25
Dibulatkan 39,400.00
SNI.850.06 PASANG 1 SET ENGSEL NYLON UNTUK JENDELA
1 bh Engsel jendela 12,000.00 12,000.00
12,000.00
0.015 Pembantu tukang 70,000.00 1,050.00
0.15 Tukang kayu 90,000.00 13,500.00
0.015 Kepala tukang 95,000.00 1,425.00
0.00075 Mandor 100,000.00 75.00
16,050.00
Jumlah 28,050.00
OVERHEAD & PROFIT (12.5%) 3,506.25
Jumlah Total 31,556.25
Dibulatkan 31,500.00
SNI.850.07 PASANG 1 BUAH GRENDEL PERNEKEL JENDELA/PINTU
1 bh Grendel Jendela/Pintu 5,500.00 5,500.00
5,500.00
0.02 Pembantu tukang 70,000.00 1,400.00
0.2 Tukang kayu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
0.001 Mandor 100,000.00 100.00
21,400.00
Jumlah 26,900.00
OVERHEAD & PROFIT (12.5%) 3,362.50
Jumlah Total 30,262.50
Dibulatkan 30,200.00
SNI.850.09 PASANG 1 BUAH KAIT ANGIN
1 bh Kait angin 7,500.00 7,500.00
7,500.00
0.015 Pembantu tukang 70,000.00 1,050.00
0.15 Tukang kayu 90,000.00 13,500.00
0.015 Kepala tukang 95,000.00 1,425.00
0.00075 Mandor 100,000.00 75.00
16,050.00
Jumlah 23,550.00
OVERHEAD & PROFIT (12.5%) 2,943.75
Jumlah Total 26,493.75
Dibulatkan 26,400.00
SNI.850.16 1 M2 PASANG KACA POLOS TEBAL 3 MM
1.1 m2 Kaca polos 63,250.00 69,575.00
69,575.00
0.015 Pembantu tukang 70,000.00 1,050.00
0.15 Tukang kayu 90,000.00 13,500.00
14,550.00
Jumlah 84,125.00
OVERHEAD & PROFIT (12.5%) 10,515.63
Jumlah Total 94,640.63
Dibulatkan 94,600.00
SNI.850.17 1 M2 PASANG KACA POLOS TEBAL 5 MM
1.1 m2 Kaca polos 75,000.00 82,500.00
82,500.00
0.015 Pembantu tukang 70,000.00 1,050.00
0.15 Tukang kayu 90,000.00 13,500.00
14,550.00
Jumlah 97,050.00
OVERHEAD & PROFIT (12.5%) 12,131.25
Jumlah Total 109,181.25
Dibulatkan 109,100.00

SNI.850.18 1 M2 PASANG TERALI BESI


11.5 m' Besi strip 13,750.00 158,125.00
158,125.00
1.2 Pembantu tukang 70,000.00 84,000.00
1.2 Tukang 90,000.00 108,000.00
0.012 Kepala tukang 95,000.00 1,140.00
0.0006 Mandor 100,000.00 60.00
192,000.00
Jumlah 350,125.00
OVERHEAD & PROFIT (12.5%) 43,765.63
Jumlah Total 393,890.63
Dibulatkan 393,800.00

SNI.850.19 1 M2 PASANG KAWAT HARMONIKA


1.1 m2 kawat harmonika 25,000.00 27,500.00
0.02 kg paku biasa 1/2"-1" 18,500.00 370.00
0.0018 m3 kayu kamper 8,200,000.00 14,760.00
42,630.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.1 Tukang 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.0005 Mandor 100,000.00 50.00
17,000.00
Jumlah 59,630.00
OVERHEAD & PROFIT (12.5%) 7,453.75
Jumlah Total 67,083.75
Dibulatkan 67,000.00

SNI.850.20 1 M2 PLINT KAYU 2 X 10 CM


0.0024 m3 Kayu jati jabar 8,200,000.00 19,680.00
0.05 kg paku sekrup 3,5" 20,000.00 1,000.00
20,680.00
0.12 Pembantu tukang 70,000.00 8,400.00
0.12 Tukang 90,000.00 10,800.00
0.012 Kepala tukang 95,000.00 1,140.00
0.006 Mandor 100,000.00 600.00
20,940.00
Jumlah 41,620.00
OVERHEAD & PROFIT (12.5%) 5,202.50
Jumlah Total 46,822.50
Dibulatkan 46,800.00

SNI. 900.13 1 M2 PASANG RAM KAWAT HARMONIKA


1.1 m2 Ram kawat harmonika 25,000.00 27,500.00
0.02 kg Paku biasa 1/2" - 1" 18,500.00 370.00
0.0018 m3 Kayu papan meranti 6,000,000.00 10,800.00
38,670.00
0.001 Pembantu tukang 70,000.00 70.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
10,020.00
Jumlah 48,690.00
OVERHEAD & PROFIT (12.5%) 6,086.25
Jumlah Total 54,776.25
Dibulatkan 54,700.00
SNI. 900.17 1 BH PASANG KACA NAKO 5 MM BERIKUT RANGKA TRALIS
1.1 bh Kaca nako 5 mm 11,400.00 12,540.00
0.02 kg Paku biasa 1/2" - 1" 18,500.00 370.00
0.025 m3 Besi strip 13,750.00 343.75
13,253.75
0.01 Pembantu tukang 70,000.00 700.00
0.2 Tukang kayu 90,000.00 18,000.00
0.02 Kepala tukang 95,000.00 1,900.00
20,600.00
Jumlah 33,853.75
OVERHEAD & PROFIT (12.5%) 4,231.72
Jumlah Total 38,085.47
Dibulatkan 38,000.00
SNI. 900,18 1 M' PASANG TALANG DATAR SENG BJLS - 30
0.5 lb Seng BJLS - 30 38,000.00 19,000.00
0.015 kg Paku biasa 2" - 5" 16,000.00 240.00
0.0096 m3 Kayu papan meranti 6,000,000.00 57,600.00
0.25 lt Flincote 22,000.00 5,500.00
82,340.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.4 Tukang kayu 90,000.00 36,000.00
0.025 Kepala tukang 95,000.00 2,375.00
48,875.00
Jumlah 131,215.00
OVERHEAD & PROFIT (12.5%) 16,401.88
Jumlah Total 147,616.88
Dibulatkan 147,600.00
SNI. 900,19 1 M' PASANG TALANG MIRING SENG BJLS - 30
0.5 lb Seng BJLS - 30 38,000.00 19,000.00
0.015 kg Paku biasa 2" - 5" 16,000.00 240.00
0.019 m3 Kayu papan meranti 6,000,000.00 114,000.00
0.3 lt Flincote 22,000.00 6,600.00
139,840.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.4 Tukang kayu 90,000.00 36,000.00
0.025 Kepala tukang 95,000.00 2,375.00
48,875.00
Jumlah 188,715.00
OVERHEAD & PROFIT (12.5%) 23,589.38
Jumlah Total 212,304.38
Dibulatkan 212,300.00
SNI. 900.20 1 M' PASANG TALANG 1/2 LINGKARAN DIA 10 CM SENG BJLS 30
0.3 lb Seng BJLS - 30 38,000.00 11,400.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
0.019 m3 Kayu borneo papan 5,000,000.00 95,000.00
0.5 kg Besi strip 13,750.00 6,875.00
114,875.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.25 Tukang kayu 90,000.00 22,500.00
0.025 Kepala tukang 95,000.00 2,375.00
0.00125 Mandor 100,000.00 125.00
35,500.00
Jumlah 150,375.00
OVERHEAD & PROFIT (12.5%) 18,796.88
Jumlah Total 169,171.88
Dibulatkan 169,100.00

SNI. 950,06 1 M2 MENDEMPUL DAN MENGGOSOK KAYU YANG AKAN DIPLISTUR


0.08 kg Dempul jadi 18,500.00 1,480.00
0.02 kg Minyak cat 11,500.00 230.00
0.01 kg Batu apung 4,300.00 43.00
1,753.00
0.04 Pembantu tukang 70,000.00 2,800.00
0.004 Kepala tukang 95,000.00 380.00
6,780.00
Jumlah 8,533.00
OVERHEAD & PROFIT (12.5%) 1,066.63
Jumlah Total 9,599.63
Dibulatkan 9,500.00
SNI. 950.07 1 M2 PENGECATAN BIDANG KAYU/BESI BERIKUT PLAMIR
0.15 kg Plamir 20,000.00 3,000.00
0.2 kg Menie 25,000.00 5,000.00
0.26 kg Cat penutup kayu/besi 49,000.00 12,740.00
0.17 kg Cat dasar 25,000.00 4,250.00
24,990.00
0.07 Pembantu tukang 70,000.00 4,900.00
0.009 Tukang cat 90,000.00 810.00
0.006 Kepala tukang 95,000.00 570.00
0.0025 Mandor 100,000.00 250.00
6,530.00
Jumlah 31,520.00
OVERHEAD & PROFIT (12.5%) 3,940.00
Jumlah Total 35,460.00
Dibulatkan 35,400.00
SNI. 950.08 1 M2 PENGECATAN BIDANG KAYU LAMA
0.15 kg Plamir 20,000.00 3,000.00
0.17 kg Cat dasar / menie 25,000.00 4,250.00
0.17 kg Cat penutup kayu 49,000.00 8,330.00
15,580.00
0.07 Pembantu tukang 70,000.00 4,900.00
0.075 Tukang cat 90,000.00 6,750.00
0.0075 Kepala tukang 95,000.00 712.50
0.0025 Mandor 100,000.00 250.00
12,612.50
Jumlah 28,192.50
OVERHEAD & PROFIT (12.5%) 3,524.06
Jumlah Total 31,716.56
Dibulatkan 31,700.00
SNI. 950.09 1 M2 PENGECATAN GENTENG DGN CAT GENTENG
0.17 kg Cat genteng 50,000.00 8,500.00
8,500.00
0.075 Pembantu tukang 70,000.00 5,250.00
0.008 Tukang kayu 90,000.00 720.00
0.07 Kepala tukang 95,000.00 6,650.00
0.003 Mandor 100,000.00 300.00
12,920.00
Jumlah 21,420.00
OVERHEAD & PROFIT (12.5%) 2,677.50
Jumlah Total 24,097.50
Dibulatkan 24,000.00
SNI. 950,15 1 M2 PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR +1 LPS CAT DASAR + 2 LPS CAT PENUTUP )

0.1 kg Plamir tembok 23,000.00 2,300.00


0.26 kg Cat penutup 2 x ( tembok ) 25,000.00 6,500.00
0.1 kg Cat dasar / menie 25,000.00 2,500.00
11,300.00
0.02 Pembantu tukang 70,000.00 1,400.00
0.063 Tukang cat 90,000.00 5,670.00
0.0063 Kepala tukang 95,000.00 598.50
0.0025 Mandor 100,000.00 250.00
7,918.50
Jumlah 19,218.50
OVERHEAD & PROFIT (12.5%) 2,402.31
Jumlah Total 21,620.81
Dibulatkan 21,600.00

SNI. 950,15. rob1 1 M2 PENGECATAN TEMBOK BARU ( 2 LPS CAT PENUTUP )

0.26 kg Cat penutup 2 x ( tembok ) 25,000.00 6,500.00


6,500.00
0.02 Pembantu tukang 70,000.00 1,400.00
0.063 Tukang cat 90,000.00 5,670.00
0.0063 Kepala tukang 95,000.00 598.50
0.0025 Mandor 100,000.00 250.00
7,918.50
Jumlah 14,418.50
OVERHEAD & PROFIT (12.5%) 1,802.31
Jumlah Total 16,220.81
Dibulatkan 16,200.00

SNI. 950,15. rob2 1 M2 COATING BATU ALAM/BATA EXPOSE

0.26 kg coating 80,000.00 20,800.00


20,800.00
0.02 Pembantu tukang 70,000.00 1,400.00
0.063 Tukang cat 90,000.00 5,670.00
0.0063 Kepala tukang 95,000.00 598.50
0.0025 Mandor 100,000.00 250.00
7,918.50
Jumlah 28,718.50
OVERHEAD & PROFIT (12.5%) 3,589.81
Jumlah Total 32,308.31
Dibulatkan 32,300.00

SNI. 950.17 1 M2 PENGECATAN TEMBOK LAMA (1 LPS CAT DASAR + 2 LPS CAT PENUTUP )

0.18 kg Cat penutup 2 x ( tembok ) 25,000.00 4,500.00


0.12 kg Cat dasar / menie 25,000.00 3,000.00
7,500.00
0.028 Pembantu tukang 70,000.00 1,960.00
0.042 Tukang cat 90,000.00 3,780.00
0.0042 Kepala tukang 95,000.00 399.00
0.0025 Mandor 100,000.00 250.00
6,389.00
Jumlah 13,889.00
OVERHEAD & PROFIT (12.5%) 1,736.13
Jumlah Total 15,625.13
Dibulatkan 15,600.00
SNI. 950.17.Rob 1 M2 PENGECATAN TEMBOK LAMA ( 2 LPS CAT PENUTUP )
0.18 kg Cat penutup 2 x ( tembok ) 25,000.00 4,500.00
4,500.00
0.028 Pembantu tukang 70,000.00 1,960.00
0.042 Tukang cat 90,000.00 3,780.00
0.0042 Kepala tukang 95,000.00 399.00
0.0025 Mandor 100,000.00 250.00
6,389.00
Jumlah 10,889.00
OVERHEAD & PROFIT (12.5%) 1,361.13
Jumlah Total 12,250.13
Dibulatkan 12,200.00
SNI. 955.26 1 M3 MENGERJAKAN KUSEN PINTU & JENDELA DARI KAYU JATI JABAR
1.1 m3 Kayu jati jabar 8,200,000.00 9,020,000.00
9,020,000.00
6 Pembantu tukang 70,000.00 420,000.00
20 Tukang kayu 90,000.00 1,800,000.00
2 Kepala tukang 95,000.00 190,000.00
0.3 Mandor 100,000.00 30,000.00
2,440,000.00
Upah kerja 2/3 1,626,666.67
Jumlah 10,646,666.67
OVERHEAD & PROFIT (12.5%) 1,330,833.33
Jumlah Total 11,977,500.00
Dibulatkan 11,977,500.00
SNI. 955.27 1 M3 MENGERJAKAN KUSEN-KUSEN PINTU & JENDELA DARI KAYU KAMPER

1.2 m3 Kayu kamper 8,200,000.00 9,840,000.00


9,840,000.00
6 Pembantu tukang 70,000.00 420,000.00
20 Tukang kayu 90,000.00 1,800,000.00
2 Kepala tukang 95,000.00 190,000.00
0.3 Mandor 100,000.00 30,000.00
2,440,000.00
Upah kerja 2/3 1,626,666.67
Jumlah 11,466,666.67
OVERHEAD & PROFIT (12.5%) 1,433,333.33
Jumlah Total 12,900,000.00
Dibulatkan 12,900,000.00
SNI. 955.28 1 M3 MENGERJAKAN KUSEN-KUSEN PINTU & JENDELA DARI KAYU BALAU
1.2 m3 Kayu balau 9,500,000.00 11,400,000.00
11,400,000.00
6 Pembantu tukang 70,000.00 420,000.00
20 Tukang kayu 90,000.00 1,800,000.00
2 Kepala tukang 95,000.00 190,000.00
0.3 Mandor 100,000.00 30,000.00
2,440,000.00
Upah kerja 2/3 1,626,666.67
Jumlah 13,026,666.67
OVERHEAD & PROFIT (12.5%) 1,628,333.33
Jumlah Total 14,655,000.00
Dibulatkan 14,655,000.00
SNI. 955.29 1 M3 MENGERJAKAN KUSEN-KUSEN PINTU & JENDELA DARI KAYU KRUING

1.2 m3 Kayu kruing 7,274,000.00 8,728,800.00


8,728,800.00
6 Pembantu tukang 70,000.00 420,000.00
20 Tukang kayu 90,000.00 1,800,000.00
2 Kepala tukang 95,000.00 190,000.00
0.3 Mandor 100,000.00 30,000.00
2,440,000.00
Upah kerja 1,626,666.67
Jumlah 10,355,466.67
OVERHEAD & PROFIT (12.5%) 1,294,433.33
Jumlah Total 11,649,900.00
Dibulatkan 11,649,900.00
SNI. 955.30 1 M3 MENGERJAKAN KUSEN-KUSEN PINTU & JENDELA DARI KAYU LANAN
1.2 m3 Kayu lanan 6,546,000.00 7,855,200.00
7,855,200.00
6 Pembantu tukang 70,000.00 420,000.00
20 Tukang kayu 90,000.00 1,800,000.00
2 Kepala tukang 95,000.00 190,000.00
0.3 Mandor 100,000.00 30,000.00
2,440,000.00
Upah kerja 1,626,666.67
Jumlah 9,481,866.67
OVERHEAD & PROFIT (12.5%) 1,185,233.33
Jumlah Total 10,667,100.00
Dibulatkan 10,667,100.00
SNI. 955.31 1 M3 MENGERJAKAN KUSEN-KUSEN PINTU & JENDELA DARI KAYU MERANTI
1.2 m3 Kayu meranti 6,000,000.00 7,200,000.00
7,200,000.00
6 Pembantu tukang 70,000.00 420,000.00
20 Tukang kayu 90,000.00 1,800,000.00
2 Kepala tukang 95,000.00 190,000.00
0.3 Mandor 100,000.00 30,000.00
2,440,000.00
Upah kerja 1,626,666.67
Jumlah 8,826,666.67
OVERHEAD & PROFIT (12.5%) 1,103,333.33
Jumlah Total 9,930,000.00
Dibulatkan 9,930,000.00
SNI. 955.32 1 M3 MENGERJAKAN KUSEN PINTU & JENDELA DARI KAYU BORNEO
1.2 m3 Kayu borneo 5,000,000.00 6,000,000.00
6,000,000.00
6 Pembantu tukang 70,000.00 420,000.00
18 Tukang kayu 90,000.00 1,620,000.00
2 Kepala tukang 95,000.00 190,000.00
0.3 Mandor 100,000.00 30,000.00
2,260,000.00
Upah kerja 1,506,666.67
Jumlah 7,506,666.67
OVERHEAD & PROFIT (12.5%) 938,333.33
Jumlah Total 8,445,000.00
Dibulatkan 8,445,000.00

SNI. 960.36 1 M2 MENGERJAKAN RGK DAUN PINTU & JENDELA DARI KAYU JATI JABAR
0.035 m3 Kayu Jati jabar 8,200,000.00 287,000.00
287,000.00
0.8 Pembantu tukang 70,000.00 56,000.00
2 Tukang kayu 90,000.00 180,000.00
0.2 Kepala tukang 95,000.00 19,000.00
0.04 Mandor 100,000.00 4,000.00
259,000.00
Jumlah 546,000.00
OVERHEAD & PROFIT (12.5%) 68,250.00
Jumlah Total 614,250.00
Dibulatkan 614,200.00
SNI. 960.37 1 M2 MENGERJAKAN RANGKA DAUN PINTU & JENDELA DARI KAYU KAMPER

0.035 m3 Kayu kamper 8,200,000.00 287,000.00


287,000.00
0.8 Pembantu tukang 70,000.00 56,000.00
2 Tukang kayu 90,000.00 180,000.00
0.2 Kepala tukang 95,000.00 19,000.00
0.04 Mandor 100,000.00 4,000.00
259,000.00
Jumlah 546,000.00
OVERHEAD & PROFIT (12.5%) 68,250.00
Jumlah Total 614,250.00
Dibulatkan 614,200.00
SNI. 960.38 1 M2 MENGERJAKAN RANGKA DAUN PINTU & JENDELA DARI KAYU BALAU
0.035 m3 Kayu balau 9,500,000.00 332,500.00
332,500.00
0.8 Pembantu tukang 70,000.00 56,000.00
2 Tukang kayu 90,000.00 180,000.00
0.2 Kepala tukang 95,000.00 19,000.00
0.04 Mandor 100,000.00 4,000.00
259,000.00
Jumlah 591,500.00
OVERHEAD & PROFIT (12.5%) 73,937.50
Jumlah Total 665,437.50
Dibulatkan 665,400.00
SNI. 960.39 1 M2 MENGERJAKAN RANGKA DAUN PINTU & JENDELA DARI KAYU KRUING

0.035 m3 Kayu kruing 7,274,000.00 254,590.00


254,590.00
0.8 Pembantu tukang 70,000.00 56,000.00
2 Tukang kayu 90,000.00 180,000.00
0.2 Kepala tukang 95,000.00 19,000.00
0.04 Mandor 100,000.00 4,000.00
259,000.00
Jumlah 513,590.00
OVERHEAD & PROFIT (12.5%) 64,198.75
Jumlah Total 577,788.75
Dibulatkan 577,700.00
SNI. 960.40 1 M2 MENGERJAKAN RANGKA DAUN PINTU & JENDELA DARI KAYU LANAN
0.035 m3 Kayu lanan 6,546,000.00 229,110.00
229,110.00
0.8 Pembantu tukang 70,000.00 56,000.00
2 Tukang kayu 90,000.00 180,000.00
0.2 Kepala tukang 95,000.00 19,000.00
0.04 Mandor 100,000.00 4,000.00
259,000.00
Jumlah 488,110.00
OVERHEAD & PROFIT (12.5%) 61,013.75
Jumlah Total 549,123.75
Dibulatkan 549,100.00
SNI. 960.41 1 M2 MENGERJAKAN RANGKA DAUN PINTU & JENDELA DARI KAYU MERANTI
0.035 m3 Kayu meranti 6,000,000.00 210,000.00
210,000.00
0.8 Pembantu tukang 70,000.00 56,000.00
2 Tukang kayu 90,000.00 180,000.00
0.2 Kepala tukang 95,000.00 19,000.00
0.04 Mandor 100,000.00 4,000.00
259,000.00
Jumlah 469,000.00
OVERHEAD & PROFIT (12.5%) 58,625.00
Jumlah Total 527,625.00
Dibulatkan 527,600.00

SNI. 960.42 1 M2 PASANG PINTU PANEL KAYU JATI JABAR


0.04 m3 Kayu jati jabar 8,200,000.00 328,000.00
328,000.00
1 Pembantu tukang 70,000.00 70,000.00
2.5 Tukang kayu 90,000.00 225,000.00
0.25 Kepala tukang 95,000.00 23,750.00
0.05 Mandor 100,000.00 5,000.00
323,750.00
Jumlah 651,750.00
OVERHEAD & PROFIT (12.5%) 81,468.75
Jumlah Total 733,218.75
Dibulatkan 733,200.00

SNI. 960.43 1 M2 PASANG PINTU PANEL KAYU KAMPER


0.04 m3 Kayu Kamper 8,200,000.00 328,000.00
328,000.00
1 Pembantu tukang 70,000.00 70,000.00
2.5 Tukang kayu 90,000.00 225,000.00
0.25 Kepala tukang 95,000.00 23,750.00
0.05 Mandor 100,000.00 5,000.00
323,750.00
Jumlah 651,750.00
OVERHEAD & PROFIT (12.5%) 81,468.75
Jumlah Total 733,218.75
Dibulatkan 733,200.00

SNI. 960.44 1 M2 PASANG PINTU DAN JENDELA KACA KAYU BORNEO


0.035 m3 Kayu Borneo 5,000,000.00 175,000.00
175,000.00
0.8 Pembantu tukang 70,000.00 56,000.00
2 Tukang kayu 90,000.00 180,000.00
0.2 Kepala tukang 95,000.00 19,000.00
0.04 Mandor 100,000.00 4,000.00
259,000.00
Jumlah 434,000.00
OVERHEAD & PROFIT (12.5%) 54,250.00
Jumlah Total 488,250.00
Dibulatkan 488,200.00

SNI. 960.45 1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU JATI JABAR
0.064 m3 Kayu jati jabar 8,200,000.00 524,800.00
524,800.00
1 Pembantu tukang 70,000.00 70,000.00
3 Tukang kayu 90,000.00 270,000.00
0.3 Kepala tukang 95,000.00 28,500.00
0.3 Mandor 100,000.00 30,000.00
398,500.00
Jumlah 923,300.00
OVERHEAD & PROFIT (12.5%) 115,412.50
Jumlah Total 1,038,712.50
Dibulatkan 1,038,700.00

SNI. 960.46 1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU KAMPER


0.064 m3 Kayu Kamper 8,200,000.00 524,800.00
524,800.00
1 Pembantu tukang 70,000.00 70,000.00
3 Tukang kayu 90,000.00 270,000.00
0.3 Kepala tukang 95,000.00 28,500.00
0.5 Mandor 100,000.00 50,000.00
418,500.00
Jumlah 943,300.00
OVERHEAD & PROFIT (12.5%) 117,912.50
Jumlah Total 1,061,212.50
Dibulatkan 1,061,200.00

SNI. 960.47 1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI JABAR
0.0196 m3 Kayu jati jabar 8,200,000.00 160,720.00
0.03 kg Paku biasa 1/2" - 1" 18,500.00 555.00
0.3 ltr Lem kayu 30,000.00 9,000.00
1 lbr Plywood 4' x 3' x 4 mm 92,250.00 92,250.00
262,525.00
0.6 Pembantu tukang 70,000.00 42,000.00
2 Tukang kayu 90,000.00 180,000.00
0.2 Kepala tukang 95,000.00 19,000.00
0.03 Mandor 100,000.00 3,000.00
244,000.00
Jumlah 506,525.00
OVERHEAD & PROFIT (12.5%) 63,315.63
Jumlah Total 569,840.63
Dibulatkan 569,800.00
SNI. 960.48 1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU KAMPER
0.0196 m3 Kayu kamper 8,200,000.00 160,720.00
0.03 kg Paku biasa 1/2" - 1" 18,500.00 555.00
0.3 ltr Lem kayu 30,000.00 9,000.00
1 lbr Plywood 4' x 3' x 4 mm 92,250.00 92,250.00
262,525.00
0.6 Pembantu tukang 70,000.00 42,000.00
2 Tukang kayu 90,000.00 180,000.00
0.2 Kepala tukang 95,000.00 19,000.00
0.03 Mandor 100,000.00 3,000.00
244,000.00
Jumlah 506,525.00
OVERHEAD & PROFIT (12.5%) 63,315.63
Jumlah Total 569,840.63
Dibulatkan 569,800.00

SNI. 960.49 1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU BORNEO


0.0196 m3 Kayu borneo 5,000,000.00 98,000.00
0.03 kg Paku biasa 1/2" - 1" 18,500.00 555.00
0.3 ltr Lem kayu 30,000.00 9,000.00
1 lbr Plywood 4' x 3' x 4 mm 92,250.00 92,250.00
199,805.00
0.6 Pembantu tukang 70,000.00 42,000.00
2 Tukang kayu 90,000.00 180,000.00
0.2 Kepala tukang 95,000.00 19,000.00
0.03 Mandor 100,000.00 3,000.00
244,000.00
Jumlah 443,805.00
OVERHEAD & PROFIT (12.5%) 55,475.63
Jumlah Total 499,280.63
Dibulatkan 499,200.00

SNI. 960.50 1 M2 PASANG PINTU PLYWOOD DAN FORMIKA RANGKA KAYU JATI JABAR
0.0196 m3 Kayu jati jabar 8,200,000.00 160,720.00
0.3 kg Paku biasa 1/2" - 1" 18,500.00 5,550.00
0.8 ltr Lem kayu 30,000.00 24,000.00
1 lbr Plywood 4' x 8' x 4 mm 92,250.00 92,250.00
0.5 lbr formika 92,250.00 46,125.00
328,645.00
0.8 Pembantu tukang 70,000.00 56,000.00
2.5 Tukang kayu 90,000.00 225,000.00
0.25 Kepala tukang 95,000.00 23,750.00
0.04 Mandor 100,000.00 4,000.00
308,750.00
Jumlah 637,395.00
OVERHEAD & PROFIT (12.5%) 79,674.38
Jumlah Total 717,069.38
Dibulatkan 717,000.00

SNI. 960.51 1 M2 PASANG PINTU PLYWOOD DAN FORMIKA RANGKA KAYU KAMPER
0.0196 m3 Kayu kamper 8,200,000.00 160,720.00
0.3 kg Paku biasa 1/2" - 1" 18,500.00 5,550.00
0.8 ltr Lem kayu 30,000.00 24,000.00
1 lbr Plywood 4' x 8' x 4 mm 92,250.00 92,250.00
0.5 lbr formika 92,250.00 46,125.00
328,645.00
0.8 Pembantu tukang 70,000.00 56,000.00
2.5 Tukang kayu 90,000.00 225,000.00
0.25 Kepala tukang 95,000.00 23,750.00
0.04 Mandor 100,000.00 4,000.00
308,750.00
Jumlah 637,395.00
OVERHEAD & PROFIT (12.5%) 79,674.38
Jumlah Total 717,069.38
Dibulatkan 717,000.00
SNI. 960.52 1 M2 PASANG PINTU FORMIKA DOUBLE RANGKA KAYU JATI
0.0196 m3 Kayu Jati 8,200,000.00 160,720.00
0.300 kg Paku biasa 1/2" - 1" 18,500.00 5,550.00
1.200 ltr Lem kayu 30,000.00 36,000.00
1.000 lbr Plywood 4' x 8' x 4 mm 92,250.00 92,250.00
1.000 lbr formika 92,250.00 92,250.00
386,770.00
1.000 Oh Pembantu tukang 70,000.00 70,000.00
2.600 Oh Tukang kayu 90,000.00 234,000.00
0.260 Oh Kepala tukang 95,000.00 24,700.00
1.000 Oh Mandor 100,000.00 100,000.00
428,700.00
Jumlah 815,470.00
OVERHEAD & PROFIT (12.5%) 101,933.75
Jumlah Total 917,403.75
Dibulatkan 917,400.00
SNI. 970.32 1 M2 PASANGAN JALUSI MATI DARI KAYU JATI JABAR
0.02 m3 Kayu jati jabar 8,200,000.00 164,000.00
0.075 kg Paku biasa 1/2" - 1" 18,500.00 1,387.50
165,387.50
0.025 Pembantu tukang 70,000.00 1,750.00
0.9 Tukang kayu 90,000.00 81,000.00
0.09 Kepala tukang 95,000.00 8,550.00
0.012 Mandor 100,000.00 1,200.00
Upah kerja 92,500.00
Jumlah 257,887.50
OVERHEAD & PROFIT (12.5%) 32,235.94
Jumlah Total 290,123.44
Dibulatkan 290,100.00
SNI. 970.33 1 M2 PASANGAN JALUSI DARI KAYU KAMPER
0.02 m3 Kayu kamper 8,200,000.00 164,000.00
0.075 kg Paku biasa 1/2" - 1" 18,500.00 1,387.50
165,387.50
0.025 Pembantu tukang 70,000.00 1,750.00
0.9 Tukang kayu 90,000.00 81,000.00
0.09 Kepala tukang 95,000.00 8,550.00
0.012 Mandor 100,000.00 1,200.00
Upah kerja 92,500.00
Jumlah 257,887.50
OVERHEAD & PROFIT (12.5%) 32,235.94
Jumlah Total 290,123.44
Dibulatkan 290,100.00
SNI. 970.34 1 M2 PASANGAN JALUSI DARI KAYU BALAU
0.02 m3 Kayu balau 9,500,000.00 190,000.00
0.075 kg Paku biasa 1/2" - 1" 18,500.00 1,387.50
191,387.50
0.025 Pembantu tukang 70,000.00 1,750.00
0.9 Tukang kayu 90,000.00 81,000.00
0.09 Kepala tukang 95,000.00 8,550.00
0.012 Mandor 100,000.00 1,200.00
Upah kerja 92,500.00
Jumlah 283,887.50
OVERHEAD & PROFIT (12.5%) 35,485.94
Jumlah Total 319,373.44
Dibulatkan 319,300.00
SNI. 970.35 1 M2 PASANGAN JALUSI DARI KAYU KRUING
0.02 m3 Kayu kruing 7,274,000.00 145,480.00
0.075 kg Paku biasa 1/2" - 1" 18,500.00 1,387.50
146,867.50
0.025 Pembantu tukang 70,000.00 1,750.00
0.9 Tukang kayu 90,000.00 81,000.00
0.09 Kepala tukang 95,000.00 8,550.00
0.012 Mandor 100,000.00 1,200.00
Upah kerja 92,500.00
Jumlah 239,367.50
OVERHEAD & PROFIT (12.5%) 29,920.94
Jumlah Total 269,288.44
Dibulatkan 269,200.00
SNI. 970.36 1 M2 PASANGAN JALUSI DARI KAYU LANAN
0.02 m3 Kayu lanan 6,546,000.00 130,920.00
0.075 Paku biasa 1/2" - 1" 18,500.00 1,387.50
132,307.50
0.025 Pembantu tukang 70,000.00 1,750.00
0.9 Tukang kayu 90,000.00 81,000.00
0.09 Kepala tukang 95,000.00 8,550.00
0.012 Mandor 100,000.00 1,200.00
92,500.00
Jumlah 224,807.50
OVERHEAD & PROFIT (12.5%) 28,100.94
Jumlah Total 252,908.44
Dibulatkan 252,900.00
SNI. 970.37 1 M2 PASANGAN JALUSI DARI KAYU MERANTI
0.02 m3 Kayu meranti 6,000,000.00 120,000.00
0.075 Paku biasa 1/2" - 1" 18,500.00 1,387.50
121,387.50
0.025 Pembantu tukang 70,000.00 1,750.00
0.9 Tukang kayu 90,000.00 81,000.00
0.09 Kepala tukang 95,000.00 8,550.00
0.012 Mandor 100,000.00 1,200.00
Upah kerja 92,500.00
Jumlah 213,887.50
OVERHEAD & PROFIT (12.5%) 26,735.94
Jumlah Total 240,623.44
Dibulatkan 240,600.00
SNI. 975.22 1 M3 MENGERJAKAN RANGKA KUDA-KUDA DARI JATI JABAR
1.1 m3 Kayu jati jabar 8,200,000.00 9,020,000.00
15 kg Besi strip 13,750.00 206,250.00
0.8 kg Paku biasa 2" - 5" 16,000.00 12,800.00
9,239,050.00
4 Pembantu tukang 70,000.00 280,000.00
12 Tukang kayu 90,000.00 1,080,000.00
1.2 Kepala tukang 95,000.00 114,000.00
0.2 Mandor 100,000.00 20,000.00
1,494,000.00
Jumlah 10,733,050.00
OVERHEAD & PROFIT (12.5%) 1,341,631.25
Jumlah Total 12,074,681.25
Dibulatkan 12,074,600.00
SNI. 975.23 1 M3 MENGERJAKAN RANGKA KUDA-KUDA DARI KAYU KAMPER
1.1 m3 Kayu Kamper 8,200,000.00 9,020,000.00
15 kg Besi strip 13,750.00 206,250.00
0.8 kg Paku biasa 2" - 5" 16,000.00 12,800.00
9,239,050.00
4 Pembantu tukang 70,000.00 280,000.00
12 Tukang kayu 90,000.00 1,080,000.00
1.2 Kepala tukang 95,000.00 114,000.00
0.2 Mandor 100,000.00 20,000.00
1,494,000.00
Jumlah 10,733,050.00
OVERHEAD & PROFIT (12.5%) 1,341,631.25
Jumlah Total 12,074,681.25
Dibulatkan 12,074,600.00
SNI. 975.24 1 M3 MENGERJAKAN RANGKA KUDA-KUDA DARI KAYU BALAU
1.1 m3 Kayu balau 9,500,000.00 10,450,000.00
15 kg Besi strip 13,750.00 206,250.00
0.8 kg Paku biasa 2" - 5" 16,000.00 12,800.00
10,669,050.00
4 Pembantu tukang 70,000.00 280,000.00
12 Tukang kayu 90,000.00 1,080,000.00
1.2 Kepala tukang 95,000.00 114,000.00
0.2 Mandor 100,000.00 20,000.00
1,494,000.00
Jumlah 12,163,050.00
OVERHEAD & PROFIT (12.5%) 1,520,381.25
Jumlah Total 13,683,431.25
Dibulatkan 13,683,400.00
SNI. 975.25 1 M3 MENGERJAKAN RANGKA KUDA-KUDA DARI KRUING
1.1 m3 Kayu kruing 7,274,000.00 8,001,400.00
15 kg Besi strip 13,750.00 206,250.00
0.8 kg Paku biasa 2" - 5" 16,000.00 12,800.00
8,220,450.00
4 Pembantu tukang 70,000.00 280,000.00
12 Tukang kayu 90,000.00 1,080,000.00
1.2 Kepala tukang 95,000.00 114,000.00
0.2 Mandor 100,000.00 20,000.00
1,494,000.00
Jumlah 9,714,450.00
OVERHEAD & PROFIT (12.5%) 1,214,306.25
Jumlah Total 10,928,756.25
Dibulatkan 10,928,700.00
SNI. 975.26 1 M3 MENGERJAKAN RANGKA KUDA-KUDA DARI KAYU LANAN
1.1 m3 Kayu lanan 6,546,000.00 7,200,600.00
15 kg Besi strip 13,750.00 206,250.00
0.8 kg Paku biasa 2" - 5" 16,000.00 12,800.00
7,419,650.00
4 Pembantu tukang 70,000.00 280,000.00
12 Tukang kayu 90,000.00 1,080,000.00
1.2 Kepala tukang 95,000.00 114,000.00
0.2 Mandor 100,000.00 20,000.00
1,494,000.00
Jumlah 8,913,650.00
OVERHEAD & PROFIT (12.5%) 1,114,206.25
Jumlah Total 10,027,856.25
Dibulatkan 10,027,800.00
SNI. 975.27 1 M3 MENGERJAKAN RANGKA KUDA-KUDA DARI MERANTI
1.1 m3 Kayu meranti 6,000,000.00 6,600,000.00
15 kg Besi strip 13,750.00 206,250.00
0.8 kg Paku biasa 2" - 5" 16,000.00 12,800.00
6,819,050.00
4 Pembantu tukang 70,000.00 280,000.00
12 Tukang kayu 90,000.00 1,080,000.00
1.2 Kepala tukang 95,000.00 114,000.00
0.2 Mandor 100,000.00 20,000.00
1,494,000.00
Jumlah 8,313,050.00
OVERHEAD & PROFIT (12.5%) 1,039,131.25
Jumlah Total 9,352,181.25
Dibulatkan 9,352,100.00
SNI. 975.28 1 M3 MENGERJAKAN RANGKA KUDA-KUDA DARI BORNEO
1.1 m3 Kayu borneo 5,000,000.00 5,500,000.00
15 kg Besi strip 13,750.00 206,250.00
0.8 kg Paku biasa 2" - 5" 16,000.00 12,800.00
5,719,050.00
4 Pembantu tukang 70,000.00 280,000.00
12 Tukang kayu 90,000.00 1,080,000.00
1.2 Kepala tukang 95,000.00 114,000.00
0.2 Mandor 100,000.00 20,000.00
1,494,000.00
Jumlah 7,213,050.00
OVERHEAD & PROFIT (12.5%) 901,631.25
Jumlah Total 8,114,681.25
Dibulatkan 8,114,600.00

SNI. 975.29 1 M3 MENGERJAKAN RANGKA LANGIT-LANGIT (1,00 X 1,00)M, KAYU JATI JABAR
0.012 m3 Kayu jati jabar 8,200,000.00 98,400.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
100,000.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.25 Tukang kayu 90,000.00 22,500.00
0.025 Kepala tukang 95,000.00 2,375.00
0.075 Mandor 100,000.00 7,500.00
42,875.00
Jumlah 142,875.00
OVERHEAD & PROFIT (12.5%) 17,859.38
Jumlah Total 160,734.38
Dibulatkan 160,700.00

SNI. 975.30 1 M3 MENGERJAKAN RANGKA LANGIT-LANGIT (1,00 X 1,00)M, KAYU KAMPER


0.012 m3 Kayu kamper 8,200,000.00 98,400.00
0.1 kg Paku biasa 2" - 5" 16,000.00 1,600.00
100,000.00
0.15 Pembantu tukang 70,000.00 10,500.00
0.25 Tukang kayu 90,000.00 22,500.00
0.025 Kepala tukang 95,000.00 2,375.00
0.075 Mandor 100,000.00 7,500.00
42,875.00
Jumlah 142,875.00
OVERHEAD & PROFIT (12.5%) 17,859.38
Jumlah Total 160,734.38
Dibulatkan 160,700.00

SNI. 980.16 1 M2 MENGERJAKAN RANGKA ATAP DARI KAYU JATI JABAR


0.012 m3 Kayu Jati Jabar 8,200,000.00 98,400.00
0.15 kg Paku biasa 2" - 5" 16,000.00 2,400.00
100,800.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.005 Mandor 100,000.00 500.00
17,450.00
Jumlah 118,250.00
OVERHEAD & PROFIT (12.5%) 14,781.25
Jumlah Total 133,031.25
Dibulatkan 133,000.00
SNI. 980.17 1 M2 MENGERJAKAN RANGKA ATAP DARI KAYU KAMPER
0.012 m3 Kayu Kamper 8,200,000.00 98,400.00
0.15 kg Paku biasa 2" - 5" 16,000.00 2,400.00
100,800.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.005 Mandor 100,000.00 500.00
17,450.00
Jumlah 118,250.00
OVERHEAD & PROFIT (12.5%) 14,781.25
Jumlah Total 133,031.25
Dibulatkan 133,000.00
SNI. 980.18 1 M2 MENGERJAKAN RANGKA ATAP DARI KAYU BALAU
0.012 m3 Kayu balau 9,500,000.00 114,000.00
0.15 kg Paku biasa 2" - 5" 16,000.00 2,400.00
116,400.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.005 Mandor 100,000.00 500.00
17,450.00
Jumlah 133,850.00
OVERHEAD & PROFIT (12.5%) 16,731.25
Jumlah Total 150,581.25
Dibulatkan 150,500.00
SNI. 980.19 1 M2 MENGERJAKAN RANGKA ATAP DARI KAYU KRUING
0.012 m3 Kayu Kruing 7,274,000.00 87,288.00
0.15 kg Paku biasa 2" - 5" 16,000.00 2,400.00
89,688.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.005 Mandor 100,000.00 500.00
17,450.00
Jumlah 107,138.00
OVERHEAD & PROFIT (12.5%) 13,392.25
Jumlah Total 120,530.25
Dibulatkan 120,500.00
SNI. 980.20 1 M2 MENGERJAKAN RANGKA ATAP DARI KAYU LANAN
0.012 m3 Kayu Lanan 6,546,000.00 78,552.00
0.15 kg Paku biasa 2" - 5" 16,000.00 2,400.00
80,952.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.005 Mandor 100,000.00 500.00
17,450.00
Jumlah 98,402.00
OVERHEAD & PROFIT (12.5%) 12,300.25
Jumlah Total 110,702.25
Dibulatkan 110,700.00
SNI. 980.21 1 M2 MENGERJAKAN RANGKA ATAP DARI KAYU MERANTI
0.012 m3 Kayu meranti 6,000,000.00 72,000.00
0.15 kg Paku 16,000.00 2,400.00
74,400.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.005 Mandor 100,000.00 500.00
17,450.00
Jumlah 91,850.00
OVERHEAD & PROFIT (12.5%) 11,481.25
Jumlah Total 103,331.25
Dibulatkan 103,300.00

SNI. 980.22 1 M2 MENGERJAKAN RANGKA ATAP DARI KAYU MERANTI


0.012 m3 Kayu borneo 5,000,000.00 60,000.00
0.15 kg Paku 16,000.00 2,400.00
62,400.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.1 Tukang kayu 90,000.00 9,000.00
0.01 Kepala tukang 95,000.00 950.00
0.005 Mandor 100,000.00 500.00
17,450.00
Jumlah 79,850.00
OVERHEAD & PROFIT (12.5%) 9,981.25
Jumlah Total 89,831.25
Dibulatkan 89,800.00

SNI. 985.34 1 M2 MENGERJAKAN PLISTURAN SIRLAK


0.0166 kg Sirlak 19,500.00 323.70
0.33 lt Spirtus 9,000.00 2,970.00
0.2 kg Batu apung 4,300.00 860.00
4,153.70
0.5 Tukang cat 90,000.00 45,000.00
45,000.00
Jumlah 49,153.70
OVERHEAD & PROFIT (12.5%) 6,144.21
Jumlah Total 55,297.91
Dibulatkan 55,200.00
SNI. 985.36 1 M2 MENGERJAKAN PENGETERAN KAYU
0.35 kg Ter kayu 14,500.00 5,075.00
5,075.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.006 Mandor 100,000.00 600.00
7,600.00
Jumlah 12,675.00
OVERHEAD & PROFIT (12.5%) 1,584.38
Jumlah Total 14,259.38
Dibulatkan 14,200.00
SNI. 990.04 10 M2 MEMBONGKAR DINDING TEMBOK & PEMBERSIHAN
2 Pembantu tukang 70,000.00 140,000.00
0.1 Mandor 100,000.00 10,000.00
150,000.00
Jumlah 150,000.00
OVERHEAD & PROFIT (12.5%) 18,750.00
Jumlah Total 168,750.00
Dibulatkan 168,700.00
Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 16,870.00 = Rp 11,246.67
Dibulatkan 11,200.00
SNI. 990.05 10 M2 MEMBONGKAR LANTAI TEGEL/FLOOR
1 Pembantu tukang 70,000.00 70,000.00
0.1 Mandor 100,000.00 10,000.00
80,000.00
Jumlah 80,000.00
OVERHEAD & PROFIT (12.5%) 10,000.00
Jumlah Total 90,000.00
Dibulatkan 90,000.00
Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 9,000.00 = Rp 6,000.00
Dibulatkan 6,000.00
SNI. 990.06 10 M2 MENGUPAS PLESTERAN DINDING LAMA
0.5 Pembantu tukang 70,000.00 35,000.00
0.025 Mandor 100,000.00 2,500.00
37,500.00
Jumlah 37,500.00
OVERHEAD & PROFIT (12.5%) 4,687.50
Jumlah Total 42,187.50
Dibulatkan 42,100.00
Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 4,210.00 = Rp 2,806.67
Dibulatkan 2,800.00
SNI. 990.07 10 M2 MENURUNKAN ATAP GENTENG LAMA
0.2 Pembantu tukang 70,000.00 14,000.00
0.1 Mandor 100,000.00 10,000.00
24,000.00
Jumlah 24,000.00
OVERHEAD & PROFIT (12.5%) 3,000.00
Jumlah Total 27,000.00
Dibulatkan 27,000.00
Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 2,700.00 = Rp 1,800.00
Dibulatkan 1,800.00
SNI. 990.09 10 M2 MENURUNKAN RANGKA ATAP / PLAFOND
1 Pembantu tukang 70,000.00 70,000.00
0.05 Mandor 100,000.00 5,000.00
75,000.00
Jumlah 75,000.00
OVERHEAD & PROFIT (12.5%) 9,375.00
Jumlah Total 84,375.00
Dibulatkan 84,300.00
Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 8,430.00 = Rp 5,620.00
Dibulatkan 5,600.00
SNI. 990.12 10 M3 MENURUNKAN KAYU RANGKA KUDA-KUDA
4 Pembantu tukang 70,000.00 280,000.00
6 Tukang kayu 90,000.00 540,000.00
0.6 Kepala tukang 95,000.00 57,000.00
0.2 Mandor 100,000.00 20,000.00
897,000.00
Jumlah 897,000.00
OVERHEAD & PROFIT (12.5%) 112,125.00
Jumlah Total 1,009,125.00
Dibulatkan 1,009,100.00
Untuk 1 m3, maka : Upah diambil : 2/3 X Rp 100,910.00 = Rp 67,273.33
Dibulatkan 67,200.00

SNI. 999.01 1 M2 PASANG PAVING BLOCK HEXAGON NATURAL SETARA K.225 TEBAL 6 CM
36 bh Paving block hexagon natural (uk. 17 x 17 x 6 cm) 1,650.00 59,400.00
0.1 m3 Pasir pasang 162,000.00 16,200.00
75,600.00
0.125 Pembantu tukang 70,000.00 8,750.00
0.25 Tukang batu 90,000.00 22,500.00
0.0125 Kepala tukang 95,000.00 1,187.50
0.0125 Mandor 100,000.00 1,250.00
33,687.50
Jumlah 109,287.50
OVERHEAD & PROFIT (12.5%) 13,660.94
Jumlah Total 122,948.44
Dibulatkan 122,900.00

SNI. 999.02 1 M2 PASANG PAVING BLOCK HEXAGON MOTIF SETARA K.225 TEBAL 6 CM
36 bh Paving block hexagon motif (uk. 17 x 17 x 6 cm) 1,800.00 64,800.00
0.1 m3 Pasir pasang 162,000.00 16,200.00
81,000.00
0.125 Pembantu tukang 70,000.00 8,750.00
0.25 Tukang batu 90,000.00 22,500.00
0.0125 Kepala tukang 95,000.00 1,187.50
0.0125 Mandor 100,000.00 1,250.00
33,687.50
Jumlah 114,687.50
OVERHEAD & PROFIT (12.5%) 14,335.94
Jumlah Total 129,023.44
Dibulatkan 129,000.00
SNI. 999.03 1 M2 PASANG PAVING BLOCK HEXAGON WARNA SETARA K.225 TEBAL 6 CM
36 bh Paving block hexagon warna (uk. 17 x 17 x 6 cm) 2,000.00 72,000.00
0.1 m3 Pasir pasang 162,000.00 16,200.00
88,200.00
0.125 Pembantu tukang 70,000.00 8,750.00
0.25 Tukang batu 90,000.00 22,500.00
0.0125 Kepala tukang 95,000.00 1,187.50
0.0125 Mandor 100,000.00 1,250.00
33,687.50
Jumlah 121,887.50
OVERHEAD & PROFIT (12.5%) 15,235.94
Jumlah Total 137,123.44
Dibulatkan 137,100.00

SNI. 999.04 1 M2 PASANG PAVING BLOCK HEXAGON NATURAL SETARA K.225 TEBAL 7 CM
27 bh Paving block hexagon natural (uk. 20 x 18 x 7 cm) 2,450.00 66,150.00
0.1 m3 Pasir pasang 162,000.00 16,200.00
82,350.00
0.125 Pembantu tukang 70,000.00 8,750.00
0.25 Tukang batu 90,000.00 22,500.00
0.0125 Kepala tukang 95,000.00 1,187.50
0.0125 Mandor 100,000.00 1,250.00
33,687.50
Jumlah 116,037.50
OVERHEAD & PROFIT (12.5%) 14,504.69
Jumlah Total 130,542.19
Dibulatkan 130,500.00

SNI. 999.05 1 M2 PASANG PAVING BLOCK HEXAGON MOTIF SETARA K.225 TEBAL 7 CM
27 bh Paving block hexagon motif (uk. 20 x 18 x 7 cm) 2,650.00 71,550.00
0.1 m3 Pasir pasang 162,000.00 16,200.00
87,750.00
0.125 Pembantu tukang 70,000.00 8,750.00
0.25 Tukang batu 90,000.00 22,500.00
0.0125 Kepala tukang 95,000.00 1,187.50
0.0125 Mandor 100,000.00 1,250.00
33,687.50
Jumlah 121,437.50
OVERHEAD & PROFIT (12.5%) 15,179.69
Jumlah Total 136,617.19
Dibulatkan 136,600.00

SNI. 999.06 1 M2 PASANG PAVING BLOCK HEXAGON WARNA SETARA K.225 TEBAL 7 CM
27 bh Paving block hexagon warna (uk. 20 x 18 x 7 cm) 2,850.00 76,950.00
0.1 m3 Pasir pasang 162,000.00 16,200.00
93,150.00
0.125 Pembantu tukang 70,000.00 8,750.00
0.25 Tukang batu 90,000.00 22,500.00
0.0125 Kepala tukang 95,000.00 1,187.50
0.0125 Mandor 100,000.00 1,250.00
33,687.50
Jumlah 126,837.50
OVERHEAD & PROFIT (12.5%) 15,854.69
Jumlah Total 142,692.19
Dibulatkan 142,600.00

SNI. 999.07 1 M2 PASANG PAVING BLOCK BOLDER NATURAL SETARA K.225 TEBAL 7 CM
25 bh Paving block bolder natural (uk. 20 x 20 x 7 cm) 3,000.00 75,000.00
0.1 m3 Pasir pasang 162,000.00 16,200.00
91,200.00
0.125 Pembantu tukang 70,000.00 8,750.00
0.25 Tukang batu 90,000.00 22,500.00
0.0125 Kepala tukang 95,000.00 1,187.50
0.0125 Mandor 100,000.00 1,250.00
33,687.50
Jumlah 124,887.50
OVERHEAD & PROFIT (12.5%) 15,610.94
Jumlah Total 140,498.44
Dibulatkan 140,400.00

SNI. 999.08 1 M2 PASANG PAVING BLOCK BOLDER WARNA SETARA K.225 TEBAL 7 CM
25 bh Paving block bolder warna (uk. 20 x 20 x 7 cm) 3,200.00 80,000.00
0.1 m3 Pasir pasang 162,000.00 16,200.00
96,200.00
0.125 Pembantu tukang 70,000.00 8,750.00
0.25 Tukang batu 90,000.00 22,500.00
0.0125 Kepala tukang 95,000.00 1,187.50
0.0125 Mandor 100,000.00 1,250.00
33,687.50
Jumlah 129,887.50
OVERHEAD & PROFIT (12.5%) 16,235.94
Jumlah Total 146,123.44
Dibulatkan 146,100.00
SNI. 999.09 1 M2 PASANG PAVING BLOCK BATA NATURAL SETARA K.225 TEBAL 7 CM
49 bh Paving block bata natural (uk. 10 x 20 x 7 cm) 1,400.00 68,600.00
0.1 m3 Pasir pasang 162,000.00 16,200.00
84,800.00
0.125 Pembantu tukang 70,000.00 8,750.00
0.25 Tukang batu 90,000.00 22,500.00
0.0125 Kepala tukang 95,000.00 1,187.50
0.0125 Mandor 100,000.00 1,250.00
33,687.50
Jumlah 118,487.50
OVERHEAD & PROFIT (12.5%) 14,810.94
Jumlah Total 133,298.44
Dibulatkan 133,200.00

SNI. 999.10 1 M2 PASANG PAVING BLOCK BATA WARNA SETARA K.225 TEBAL 7 CM
49 bh Paving block bata warna (uk. 10 x 20 x 7 cm) 1,500.00 73,500.00
0.1 m3 Pasir pasang 162,000.00 16,200.00
89,700.00
0.125 Pembantu tukang 70,000.00 8,750.00
0.25 Tukang batu 90,000.00 22,500.00
0.0125 Kepala tukang 95,000.00 1,187.50
0.0125 Mandor 100,000.00 1,250.00
33,687.50
Jumlah 123,387.50
OVERHEAD & PROFIT (12.5%) 15,423.44
Jumlah Total 138,810.94
Dibulatkan 138,800.00

SNI.Plesprof 1 M2 PLESTERAN PROFIL


0.4 Pembantu tukang 70,000.00 28,000.00
0.3 Tukang kayu 90,000.00 27,000.00
0.03 Kepala tukang 95,000.00 2,850.00
0.02 Mandor 100,000.00 2,000.00
59,850.00
Jumlah 59,850.00
OVERHEAD & PROFIT (12.5%) 7,481.25
Jumlah Total 67,331.25
Dibulatkan 67,300.00

SNI.360.06. rob 1 M2 PLESTER MUTIARA (PM)


3 kg Plester Mutiara 8,000.00 24,000.00
0.125 ltr TG 302 43,600.00 5,450.00
29,450.00
0.11 Pembantu tukang 70,000.00 7,700.00
0.0825 Tukang batu 90,000.00 7,425.00
0.00825 Kepala tukang 95,000.00 783.75
0.0055 Mandor 100,000.00 550.00
16,458.75
Jumlah 45,908.75
OVERHEAD & PROFIT (12.5%) 5,738.59
Jumlah Total 51,647.34
Dibulatkan 51,600.00

SNI.Skimcoat 1 M2 SKIM COAT (ACIAN)


3 kg Skim Coat 4,400.00 13,200.00
13,200.00
0.1 Pembantu tukang 70,000.00 7,000.00
0.075 Tukang batu 90,000.00 6,750.00
0.0075 Kepala tukang 95,000.00 712.50
0.005 Mandor 100,000.00 500.00
14,962.50
Jumlah 28,162.50
OVERHEAD & PROFIT (12.5%) 3,520.31
Jumlah Total 31,682.81
Dibulatkan 31,600.00

SNI.650.05. rob 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM (MENGGUNAKAN ZAT ADDICTIVE)


11 bh Keramik 30 x 30 cm 3,150.00 34,650.00
6 kg zat addictive Just Do It 4,500.00 27,000.00
0.125 kg zat addictive FS Nat 15,850.00 1,981.25
63,631.25
0.27 Pembantu tukang 70,000.00 18,900.00
0.13 Tukang batu 90,000.00 11,700.00
0.013 Kepala tukang 95,000.00 1,235.00
0.014 Mandor 100,000.00 1,400.00
33,235.00
Jumlah 96,866.25
OVERHEAD & PROFIT (12.5%) 12,108.28
Jumlah Total 108,974.53
Dibulatkan 108,900.00
SNI. BJR.02.a 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL UK.75 ZINC-ALUMUNIUM G.550
BENTUK ATAP PELANA BENTANG < 9 m
1.12 m' Profil U 75 53 mm Zinc Alumunium G. 550 18,450.00 20,664.00
0.94 m' Profil U 60 53 mm Zinc Alumunium G. 550 14,000.00 13,160.00
1.12 m' Profil U 75 83 mm Zinc Alumunium G. 550 22,300.00 24,976.00
6.06 m' Reng U 39 0.43 mm Zinc Alumunium G. 550 9,050.00 54,843.00
0.45 bh Plat Tumpu 7,975.00 3,588.75
2.12 bh Plat Diafragma 0.5 mm 1,500.00 3,180.00
0.75 bh Dynabolt 950.00 712.50
19.40 bh Baut Kuda - Kuda 250.00 4,850.00
20.42 bh Baut Reng 150.00 3,063.00
129,037.25

0.094 oh Kepala tukang 95,000.00 8,937.60


0.085 oh Tukang 90,000.00 7,644.00
0.063 oh Pekerja 70,000.00 4,410.00
20,991.60
Jumlah 150,028.85
OVERHEAD & PROFIT (12.5%) 18,753.61
Jumlah Total 168,782.46
Dibulatkan 168,700.00

SNI. BJR.02.b 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL UK.75 ZINC-ALUMUNIUM G.550
BENTUK ATAP PERISAI BENTANG < 9 m
1.12 m' Profil U 75 53 mm Zinc Alumunium G. 550 18,450.00 20,664.00
0.945 m' Profil U 60 53 mm Zinc Alumunium G. 550 14,000.00 13,230.00
1.12 m' Profil U 75 83 mm Zinc Alumunium G. 550 22,300.00 24,976.00
6.09 m' Reng U 39 0.43 mm Zinc Alumunium G. 550 9,050.00 55,114.50
0.47 bh Plat Tumpu 7,975.00 3,748.25
2.12 bh Plat Diafragma 0.5 mm 1,500.00 3,180.00
0.80 bh Dynabolt 950.00 760.00
19.48 bh Baut Kuda - Kuda 250.00 4,870.00
20.50 bh Baut Reng 150.00 3,075.00
129,617.75

0.094 oh Kepala tukang 95,000.00 8,937.60


0.085 oh Tukang 90,000.00 7,644.00
0.063 oh Pekerja 70,000.00 4,410.00
20,991.60
Jumlah 150,609.35
OVERHEAD & PROFIT (12.5%) 18,826.17
Jumlah Total 169,435.52
Dibulatkan 169,400.00

SNI. BJR.02.c 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL UK.75 ZINC-ALUMUNIUM G.550
BENTUK ATAP PELANA BENTANG 9-12 m
1.31 m' Profil U 75 53 mm Zinc Alumunium G. 550 18,450.00 24,169.50
0.96 m' Profil U 60 53 mm Zinc Alumunium G. 550 14,000.00 13,440.00
1.31 m' Profil U 75 83 mm Zinc Alumunium G. 550 22,300.00 29,213.00
6.06 m' Reng U 39 0.43 mm Zinc Alumunium G. 550 9,050.00 54,843.00
0.45 bh Plat Tumpu 7,975.00 3,588.75
2.12 bh Plat Diafragma 0.5 mm 1,500.00 3,180.00
0.73 bh Dynabolt 950.00 693.50
21.00 bh Baut Kuda - Kuda 250.00 5,250.00
22.53 bh Baut Reng 150.00 3,379.50
137,757.25

0.094 oh Kepala tukang 95,000.00 8,937.60


0.085 oh Tukang 90,000.00 7,644.00
0.063 oh Pekerja 70,000.00 4,410.00
20,991.60
Jumlah 158,748.85
OVERHEAD & PROFIT (12.5%) 19,843.61
Jumlah Total 178,592.46
Dibulatkan 178,500.00

SNI. BJR.02.d 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL UK.75 ZINC-ALUMUNIUM G.550
BENTUK ATAP PERISAI BENTANG 9-12 m
1.31 m' Profil U 75 53 mm Zinc Alumunium G. 550 18,450.00 24,169.50
0.99 m' Profil U 60 53 mm Zinc Alumunium G. 550 14,000.00 13,860.00
1.31 m' Profil U 75 83 mm Zinc Alumunium G. 550 22,300.00 29,213.00
6.09 m' Reng U 39 0.43 mm Zinc Alumunium G. 550 9,050.00 55,114.50
0.45 bh Plat Tumpu 7,975.00 3,588.75
2.12 bh Plat Diafragma 0.5 mm 1,500.00 3,180.00
0.75 bh Dynabolt 950.00 712.50
21.03 bh Baut Kuda - Kuda 250.00 5,257.50
22.55 bh Baut Reng 150.00 3,382.50
138,478.25

0.094 oh Kepala tukang 95,000.00 8,937.60


0.085 oh Tukang 90,000.00 7,644.00
0.063 oh Pekerja 70,000.00 4,410.00
20,991.60
Jumlah 159,469.85
OVERHEAD & PROFIT (12.5%) 19,933.73
Jumlah Total 179,403.58
Dibulatkan 179,400.00
SNI. BJR.02.e 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL UK.75 ZINC-ALUMUNIUM G.550
BENTUK ATAP PELANA BENTANG 12-15 m
1.48 m' Profil U 75 53 mm Zinc Alumunium G. 550 18,450.00 27,306.00
1.01 m' Profil U 60 53 mm Zinc Alumunium G. 550 14,000.00 14,140.00
1.48 m' Profil U 75 83 mm Zinc Alumunium G. 550 22,300.00 33,004.00
6.06 m' Reng U 39 0.43 mm Zinc Alumunium G. 550 9,050.00 54,843.00
0.45 bh Plat Tumpu 7,975.00 3,588.75
2.12 bh Plat Diafragma 0.5 mm 1,500.00 3,180.00
0.73 bh Dynabolt 950.00 693.50
21.00 bh Baut Kuda - Kuda 250.00 5,250.00
22.53 bh Baut Reng 150.00 3,379.50
145,384.75

0.094 oh Kepala tukang 95,000.00 8,937.60


0.085 oh Tukang 90,000.00 7,644.00
0.063 oh Pekerja 70,000.00 4,410.00
20,991.60
Jumlah 166,376.35
OVERHEAD & PROFIT (12.5%) 20,797.04
Jumlah Total 187,173.39
Dibulatkan 187,100.00

SNI. BJR.02.f 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL UK.75 ZINC-ALUMUNIUM G.550
BENTUK ATAP PERISAI BENTANG 12-15 m
1.48 m' Profil U 75 53 mm Zinc Alumunium G. 550 18,450.00 27,306.00
1.01 m' Profil U 60 53 mm Zinc Alumunium G. 550 14,000.00 14,140.00
1.48 m' Profil U 75 83 mm Zinc Alumunium G. 550 22,300.00 33,004.00
6.32 m' Reng U 39 0.43 mm Zinc Alumunium G. 550 9,050.00 57,196.00
0.668 bh Plat Tumpu 7,975.00 5,327.30
2.12 bh Plat Diafragma 0.5 mm 1,500.00 3,180.00
0.84 bh Dynabolt 950.00 798.00
22.5 bh Baut Kuda - Kuda 250.00 5,625.00
24.25 bh Baut Reng 150.00 3,637.50
150,213.80

0.094 oh Kepala tukang 95,000.00 8,937.60


0.085 oh Tukang 90,000.00 7,644.00
0.063 oh Pekerja 70,000.00 4,410.00
20,991.60
Jumlah 171,205.40
OVERHEAD & PROFIT (12.5%) 21,400.68
Jumlah Total 192,606.08
Dibulatkan 192,600.00

SNI. BJR.03.a 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL Z GALVANISED COATING G.550
BENTUK ATAP PELANA BENTANG < 10 m
5.18 m' Profil 45 X 27 B50 15,490.00 80,238.20
0.42 m' Profil 65 X 26 C08 22,260.00 9,349.20
0.92 m' Profil 75 X 40 W08 24,020.00 22,098.40
1.57 m' Profil 95 X 33 Z08 24,210.00 38,009.70
1.78 bh - Multigrip 4,760.00 8,472.80
0.17 bh - Bolt 2,100.00 357.00
29 bh - Screw 675.00 19,575.00
178,100.30

0.098 oh Kepala tukang 95,000.00 9,298.13


0.081 oh Tukang 90,000.00 7,312.50
0.066 oh Pekerja 70,000.00 4,610.38
21,221.00
Jumlah 199,321.30
OVERHEAD & PROFIT (12.5%) 24,915.16
Jumlah Total 224,236.46
Dibulatkan 224,200.00

SNI. BJR.03.b 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL Z GALVANISED COATING G.550
BENTUK ATAP PERISAI BENTANG < 10 m
5.190 m' Profil 45 X 27 B50 15,490.00 80,393.10
0.425 m' Profil 65 X 26 C08 22,260.00 9,460.50
0.925 m' Profil 75 X 40 W08 24,020.00 22,218.50
1.575 m' Profil 95 X 33 Z08 24,210.00 38,130.75
1.785 bh - Multigrip 4,760.00 8,496.60
0.175 bh - Bolt 2,100.00 367.50
29.25 bh - Screw 675.00 19,743.75
178,810.70

0.098 oh Kepala tukang 95,000.00 9,298.13


0.081 oh Tukang 90,000.00 7,312.50
0.066 oh Pekerja 70,000.00 4,610.38
21,221.00
Jumlah 200,031.70
OVERHEAD & PROFIT (12.5%) 25,003.96
Jumlah Total 225,035.66
Dibulatkan 225,000.00
SNI. PLAFOND 1M2 PASANG PLAFOND RANGKA HOLO DAN DENGAN PENUTUP
GRC BERIKUT PENGECATAN
0.35 lbr GRC 4 mm 52,500.00 18,375.00
1.00 btg Holo 4/4 meni 12,100.00 12,100.00
0.34 btg Holo 2/4 meni 11,000.00 3,740.00
0.10 kg Kawat Bwg 12 10,000.00 1,000.00
20.00 bh Paku screw 2.5 cm 50.00 1,000.00
0.02 kg Adhesive 6,000.00 120.00
2.00 m' Kain kasa 400.00 800.00
0.03 kg Cat penutup 2 kali 25,000.00 750.00
4.00 bh Paku beton 175.00 700.00
0.17 oh Pekerja 70,000.00 11,900.00
0.28 oh Tukang 90,000.00 25,200.00
0.03 oh Kep Tukang 95,000.00 2,850.00
0.07 oh Mandor 100,000.00 7,000.00
Jumlah 85,535.00
OVERHEAD & PROFIT (12.5%) 10,691.88
Jumlah Total 96,226.88
Dibulatkan 96,200.00

SNI.GRAVEL 1 M' PEMBUATAN SALURAN GRAVEL


0.170 Galian tanah biasa 36,000.00 6,120.00
0.600 Pasangan 1/2 bata ad.1:4 127,000.00 76,200.00
0.900 Plesteran Bata ad.1:4 tebal 15 mm 45,500.00 40,950.00
0.014 Urugan Pasir 227,200.00 3,180.80
1.000 Pasang Gravel 20 cm 35,000.00 35,000.00
Jumlah 161,450.80
Dibulatkan 161,400.00

SNI.All.1 1M' PEMASANGAN KUSEN PINTU ALUMUNIUM 4'' (BIASA)


1.000 m' Kusen alumunium 4'' (biasa) 65,000.00 65,000.00

1.000 oh Pekerja 70,000.00 70,000.00


0.100 oh Tukang Besi 90,000.00 9,000.00
0.060 oh Kepala Tukang 95,000.00 5,700.00
Jumlah 149,700.00
OVERHEAD & PROFIT (12.5%) 18,712.50
Jumlah Total 168,412.50
Dibulatkan 168,400.00

SNI.All.2 1M' PEMASANGAN KUSEN PINTU ALUMUNIUM 4'' (COKLAT DOP)


1.000 m' Kusen alumunium 4'' (coklat dop) 75,000.00 75,000.00

1.000 oh Pekerja 70,000.00 70,000.00


0.100 oh Tukang Besi 90,000.00 9,000.00
0.060 oh Kepala Tukang 95,000.00 5,700.00
Jumlah 159,700.00
OVERHEAD & PROFIT (12.5%) 19,962.50
Jumlah Total 179,662.50
Dibulatkan 179,600.00

SNI.All.3 1M' PEMASANGAN KUSEN PINTU ALUMUNIUM 4'' (COKLAT KILAP)


1.000 m' Kusen alumunium 4'' (coklat kilap) 85,000.00 85,000.00

1.000 oh Pekerja 70,000.00 70,000.00


0.100 oh Tukang Besi 90,000.00 9,000.00
0.060 oh Kepala Tukang 95,000.00 5,700.00
Jumlah 169,700.00
OVERHEAD & PROFIT (12.5%) 21,212.50
Jumlah Total 190,912.50
Dibulatkan 190,900.00

SNI.All.4 1M' PEMASANGAN KUSEN PINTU ALUMUNIUM 3'' (BIASA)


1.000 m' Kusen alumunium 3'' (biasa) 60,000.00 60,000.00

1.000 oh Pekerja 70,000.00 70,000.00


0.100 oh Tukang Besi 90,000.00 9,000.00
0.060 oh Kepala Tukang 95,000.00 5,700.00
Jumlah 144,700.00
OVERHEAD & PROFIT (12.5%) 18,087.50
Jumlah Total 162,787.50
Dibulatkan 162,700.00
SNI.All.5 1M' PEMASANGAN KUSEN PINTU ALUMUNIUM 3'' (COKLAT DOP)
1.000 m' Kusen alumunium 3'' (coklat dop) 65,000.00 65,000.00

1.000 oh Pekerja 70,000.00 70,000.00


0.100 oh Tukang Besi 90,000.00 9,000.00
0.060 oh Kepala Tukang 95,000.00 5,700.00
Jumlah 149,700.00
OVERHEAD & PROFIT (12.5%) 18,712.50
Jumlah Total 168,412.50
Dibulatkan 168,400.00
SNI.All.6 1M' PEMASANGAN KUSEN PINTU ALUMUNIUM 3'' (COKLAT KILAP)
1.000 m' Kusen alumunium 3'' (coklat kilap) 75,000.00 75,000.00

1.000 oh Pekerja 70,000.00 70,000.00


0.100 oh Tukang Besi 90,000.00 9,000.00
0.060 oh Kepala Tukang 95,000.00 5,700.00
Jumlah 159,700.00
OVERHEAD & PROFIT (12.5%) 19,962.50
Jumlah Total 179,662.50
Dibulatkan 179,600.00

SNI.All.7 1 UNIT PEMASANGAN DAUN PINTU ALLUMUNIUM lengkap warna natural/coklat dop 0,9 x 2,1 m
1.000 bh Daun Pintu Allumunium 945,000.00 945,000.00
0.900 m2 Kaca Polos 5 mm 75,000.00 67,500.00
0.630 m2 Spanrel 400,000.00 252,000.00
1.000 Alat Bantu 200,000.00 200,000.00

1.000 oh Pekerja 70,000.00 70,000.00


0.100 oh Tukang Besi 90,000.00 9,000.00
0.060 oh Kepala Tukang 95,000.00 5,700.00
Jumlah 1,549,200.00
OVERHEAD & PROFIT (12.5%) 193,650.00
Jumlah Total 1,742,850.00
Dibulatkan 1,742,800.00

SNI.All.8 1 UNIT PEMASANGAN Daun pintu aluminium lengkap warna coklat kilap 0,9 x 2,1 m
1.000 bh Daun Pintu Allumunium 1,300,000.00 1,300,000.00
0.900 m2 Kaca Polos 5 mm 75,000.00 67,500.00
0.630 m2 Spanrel 400,000.00 252,000.00
1.000 Alat Bantu 200,000.00 200,000.00

1.000 oh Pekerja 70,000.00 70,000.00


0.100 oh Tukang Besi 90,000.00 9,000.00
0.060 oh Kepala Tukang 95,000.00 5,700.00
Jumlah 1,904,200.00
OVERHEAD & PROFIT (12.5%) 238,025.00
Jumlah Total 2,142,225.00
Dibulatkan 2,142,200.00

SNI.All.9 1 UNIT PEMASANGAN Daun jendela aluminium lengkap warna natural/coklat dop 0,60 x 1m
1.000 bh Daun Jendela 361,750.00 361,750.00
0.900 m2 Kaca Polos 5 mm 75,000.00 67,500.00
1.000 Alat Bantu 100,000.00 100,000.00

1.000 oh Pekerja 70,000.00 70,000.00


0.100 oh Tukang Besi 90,000.00 9,000.00
0.060 oh Kepala Tukang 95,000.00 5,700.00
Jumlah 613,950.00
OVERHEAD & PROFIT (12.5%) 76,743.75
Jumlah Total 690,693.75
Dibulatkan 690,600.00

SNI.All.10 1 UNIT PEMASANGAN Daun jendela aluminium lengkap warna coklat kilap 0,60 x 1m
1.000 bh Daun Jendela 400,000.00 400,000.00
0.900 m2 Kaca Polos 5 mm 75,000.00 67,500.00
1.000 Alat Bantu 100,000.00 100,000.00

1.000 oh Pekerja 70,000.00 70,000.00


0.100 oh Tukang Besi 90,000.00 9,000.00
0.060 oh Kepala Tukang 95,000.00 5,700.00
Jumlah 652,200.00
OVERHEAD & PROFIT (12.5%) 81,525.00
Jumlah Total 733,725.00
Dibulatkan 733,700.00

SNI.650.13.rob.1 1 M' PASANG PROFIL BATU ALAM (BAKAR) UKURAN 5 X 50 CM


2 bh Profil Batu Alam 50,000.00 100,000.00
0.0018 kg Semen portland 1,400.00 2.52
0.93 m3 Pasir pasang 162,000.00 150,660.00
250,662.52
0.06 Pembantu tukang 70,000.00 4,200.00
0.045 Tukang batu 90,000.00 4,050.00
0.0045 Kepala Tukang 95,000.00 427.50
0.003 Mandor 100,000.00 300.00
8,977.50
Jumlah 259,640.02
OVERHEAD & PROFIT (12.5%) 32,455.00
Jumlah Total 292,095.02
Dibulatkan 292,000.00
SNI.650.13.rob.2 1 M2 PASANG BATU ALAM (BAKAR) 15 X 30 CM
23 bh Batu Alam 10,850.00 249,550.00
9.3 kg Semen portland 1,400.00 13,020.00
0.018 m3 Pasir pasang 162,000.00 2,916.00
265,486.00
0.6 Pembantu tukang 70,000.00 42,000.00
0.45 Tukang batu 90,000.00 40,500.00
0.045 Kepala tukang 95,000.00 4,275.00
0.03 Mandor 100,000.00 3,000.00
89,775.00
Jumlah 355,261.00
OVERHEAD & PROFIT (12.5%) 44,407.63
Jumlah Total 399,668.63
Dibulatkan 399,600.00

SNI.L -1 1 TITIK PEKERJAAN INSTALASI LAMPU DAN STOP KONTAK


11 m' Kabel Listrik NYA 3 x 2,5 mm 6,500.00 71,500.00
1 ttk Instalasi lapu dan stop kontak 32,500.00 32,500.00
104,000.00
0.48 oh Pembantu tukang Listrik 70,000.00 33,600.00
0.048 oh Tukang Listrik 90,000.00 4,320.00
0.048 oh Kepala tukang Listrik 95,000.00 4,560.00
42,480.00
Jumlah 146,480.00
OVERHEAD & PROFIT (12.5%) 18,310.00
Jumlah Total 164,790.00
Dibulatkan 164,700.00

SNI.L -2 1 BH PEKERJAAN STOP KONTAK


1 Bh Stop Kontak 12,000.00 12,000.00
12,000.00
0.2 oh Pembantu tukang Listrik 70,000.00 14,000.00
0.02 oh Tukang Listrik 90,000.00 1,800.00
0.02 oh Kepala tukang Listrik 95,000.00 1,900.00
17,700.00
Jumlah 29,700.00
OVERHEAD & PROFIT (12.5%) 3,712.50
Jumlah Total 33,412.50
Dibulatkan 33,400.00

SNI.L -3 1 BH PEKERJAAN LAMPU SL 18 WATT + FITTING


1 Bh Lampu SL 18 watt + fitting 27,000.00 27,000.00
27,000.00
0.2 oh Pembantu tukang Listrik 70,000.00 14,000.00
0.02 oh Tukang Listrik 90,000.00 1,800.00
0.02 oh Kepala tukang Listrik 95,000.00 1,900.00
17,700.00
Jumlah 44,700.00
OVERHEAD & PROFIT (12.5%) 5,587.50
Jumlah Total 50,287.50
Dibulatkan 50,200.00

SNI.L -4 1 UNIT PEKERJAAN SEKRING KAST


1 Bh Sekring Kast 35,000.00 35,000.00
35,000.00
0.2 oh Pembantu tukang Listrik 70,000.00 14,000.00
0.02 oh Tukang Listrik 90,000.00 1,800.00
0.02 oh Kepala tukang Listrik 95,000.00 1,900.00
17,700.00
Jumlah 52,700.00
OVERHEAD & PROFIT (12.5%) 6,587.50
Jumlah Total 59,287.50
Dibulatkan 59,200.00

SNI.L -5 1 BH PEKERJAAN MCB BOX


1 Bh MCB BOX 85,000.00 85,000.00
85,000.00
0.2 oh Pembantu tukang Listrik 70,000.00 14,000.00
0.02 oh Tukang Listrik 90,000.00 1,800.00
0.02 oh Kepala tukang Listrik 95,000.00 1,900.00
17,700.00
Jumlah 102,700.00
OVERHEAD & PROFIT (12.5%) 12,837.50
Jumlah Total 115,537.50
Dibulatkan 115,500.00

SNI.L -6 1 M' PEKERJAAN OVER SPANENG


1 m' Over Spaneng 9,000.00 9,000.00
9,000.00
0.24 oh Pembantu tukang Listrik 70,000.00 16,800.00
0.024 oh Tukang Listrik 90,000.00 2,160.00
0.024 oh Kepala tukang Listrik 95,000.00 2,280.00
21,240.00
Jumlah 30,240.00
OVERHEAD & PROFIT (12.5%) 3,780.00
Jumlah Total 34,020.00
Dibulatkan 34,000.00
SNI.L -7 1 BH PEKERJAAN SAKLAR GANDA
1 Bh Saklar Ganda 16,000.00 16,000.00
16,000.00
0.4 oh Pembantu tukang Listrik 70,000.00 28,000.00
0.04 oh Tukang Listrik 90,000.00 3,600.00
0.04 oh Kepala tukang Listrik 95,000.00 3,800.00
35,400.00
Jumlah 51,400.00
OVERHEAD & PROFIT (12.5%) 6,425.00
Jumlah Total 57,825.00
Dibulatkan 57,800.00

SNI.L -8 1 BH PEKERJAAN SAKLAR TUNGGAL


1 Bh Saklar Tunggal 12,000.00 12,000.00
12,000.00
0.4 oh Pembantu tukang Listrik 70,000.00 28,000.00
0.04 oh Tukang Listrik 90,000.00 3,600.00
0.04 oh Kepala tukang Listrik 95,000.00 3,800.00
35,400.00
Jumlah 47,400.00
OVERHEAD & PROFIT (12.5%) 5,925.00
Jumlah Total 53,325.00
Dibulatkan 53,300.00
ANALISA PEKERJAAN JALAN LINGKUNGAN
EI - 322 1 M3 TIMBUNAN PILIHAN (SIRTU ALAM)
0.9376 Jam Pekerja (L01) 10,000.00 9,376.00
0.2344 Jam Mandor (L03) 14,285.71 3,348.57

1.2 m3 Bahan pilihan (M09) 147,000.00 176,400.00

0.0136 Jam Wheel Loader (E15) 389,008.13 5,290.51


0.2344 Jam Dump Truck (E08) 297,684.44 69,777.23
0.002 Jam Motor Grader (E13) 499,769.35 999.54
0.0289 Jam Tandem (E17) 307,225.14 8,878.81
0.007 Jam Water Tanker (E23) 283,674.99 1,985.72
276,056.38
OVERHEAD & PROFIT (12.5%) 34,507.05
HARGA SATUAN PEKERJAAN 310,563.43

EI - 814 1 M3 WATERBOUND MACADAM UNTUK PEKERJAAN MINOR


0.1631 Jam Pekerja (L01) 10,000.00 1,631.00
0.0102 Jam Mandor (L03) 14,285.71 145.71

0.935 m3 Agregat kasar (M03) 245,000.00 229,075.00


0.165 m3 Agregat halus (M04) 245,000.00 40,425.00

0.0102 Jam Wheel Loader (E15) 389,008.13 3,967.88


0.1671 Jam Dump Truck (E09) 401,725.39 67,128.31
0.0268 Jam 3 - Wheel Roller (E16) 207,652.93 5,565.10
347,938.01
OVERHEAD & PROFIT (12.5%) 43,492.25
HARGA SATUAN PEKERJAAN 391,430.26

EI - 817 1 M3 PENETRASI MACADAM UNTUK PEKERJAAN MINOR


0.1701 Jam Pekerja (L01) 10,000.00 1,701.00
0.017 Jam Mandor (L03) 14,285.71 242.86

1.7556 m3 Agregat kasar (M03) 245,000.00 430,122.00


99.2727 kg Aspal (M10) 12,000.00 1,191,272.40

0.0085 Jam Wheel Loader (E15) 389,008.13 3,306.57


0.406 Jam Dump Truck (E09) 401,725.39 163,100.51
0.0387 Jam 3 - Wheel Roller (E16) 207,652.93 8,036.17
1,797,781.50
OVERHEAD & PROFIT (12.5%) 224,542.91
HARGA SATUAN PEKERJAAN 2,022,324.41

EI - 661 1 M3 LAPIS PERMUKAAN PENETRASI MACADAM


0.1417 Jam Pekerja (L01) 10,000.00 1,417.00
0.0142 Jam Mandor (L03) 14,285.71 202.86

1.669 m3 Agregat kasar (M03) 245,000.00 408,905.00


0.1479 m3 Agregat halus (M04) 245,000.00 36,235.50
98.5857 kg Aspal bitumen (M10a) 12,200.00 1,202,745.54

0.0071 Jam Wheel Loader (E15) 389,008.13 2,761.96


0.3557 Jam Dump Truck (E09) 401,725.39 142,893.72
0.0435 Jam 3 - Wheel Roller (E16) 207,652.93 9,032.90
1,804,194.48
OVERHEAD & PROFIT (12.5%) 225,343.89
HARGA SATUAN PEKERJAAN 2,029,538.37

EI - 611 1 LITER LAPIS RESAP PENGIKAT


0.0021 Jam Pekerja (L01) 10,000.00 21.00
0.0004 Jam Mandor (L03) 14,285.71 5.71

0.679 kg Aspal (M10) 12,000.00 8,148.00


0.3708 ltr Kerosine (M11) 10,225.00 3,791.43

0.0002 Jam Asp. Distributor (E41) 375,875.18 75.18


0.0002 Jam Compresor (E05) 185,882.28 37.18
12,078.50
OVERHEAD & PROFIT (12.5%) 1,509.81
HARGA SATUAN PEKERJAAN 13,588.31

EI - 612 1 LITER LAPIS RESAP PEREKAT


0.0021 Jam Pekerja (L01) 10,000.00 21.00
0.0004 Jam Mandor (L03) 14,285.71 5.71

0.8487 kg Aspal (M10) 12,000.00 10,184.40


0.206 ltr Kerosine (M11) 10,225.00 2,106.35

0.0002 Jam Asp. Distributor (E41) 375,875.18 75.18


0.0002 Jam Compresor (E05) 185,882.28 37.18
12,429.82
OVERHEAD & PROFIT (12.5%) 1,553.73
HARGA SATUAN PEKERJAAN 13,983.54

EI - 621 1 M2 AGREGAT PENUTUP BURTU


0.0025 Jam Pekerja (L01) 10,000.00 25.00
0.0001 Jam Mandor (L03) 14,285.71 1.43

23 kg Chipping 129.99 2,989.71

0.0001 Jam Wheel Loader (E15) 389,008.13 38.90


0.0062 Jam Dump Truck (E08) 297,684.44 1,845.64
1 Ls Alat Bantu 10.00 10.00

4,910.68
OVERHEAD & PROFIT (12.5%) 596.65
HARGA SATUAN PEKERJAAN 5,507.33

EI - 631 1 M2 LATASIR KELAS A (SS-A)


0.0093 Jam Pekerja 10,000.00 93.00
0.0013 Jam Mandor 14,285.71 18.57

0.0069 m3 Pasir Kasar 179,000.00 1,235.10


0.0138 m3 Pasir Halus 175,000.00 2,415.00
1.0395 Kg Filler 100.00 103.95
3.3990 Kg Aspal 12,000.00 40,788.00

0.0003 Jam Wheel Loader 389,008.13 116.70


0.0013 Jam AMP 4,219,019.76 5,484.73
0.0013 Jam Genset 494,672.17 643.07
0.0122 Jam Dump Truck 297,684.44 3,631.75
0.0011 Jam Tandem Roller 307,225.14 337.95
54,867.82
OVERHEAD & PROFIT (15%) 8,230.17
HARGA SATUAN PEKERJAAN 63,097.99

EI - 632 1 M2 LATASIR KELAS B (SS-B)


0.0124 Jam Pekerja 10,000.00 123.69
0.0018 Jam Mandor 14,285.71 25.24

0.0139 m3 Pasir Kasar 179,000.00 2,492.27


0.0139 m3 Pasir Halus 175,000.00 2,436.58
1.3860 Kg Filler 100.00 138.60
4.0788 Kg Aspal 12,000.00 48,945.60

0.0004 Jam Wheel Loader 389,008.13 169.64


0.0018 Jam AMP 4,219,019.76 7,455.30
0.0018 Jam Genset 494,672.17 874.12
0.0163 Jam Dump Truck 297,684.44 4,843.57
0.0011 Jam Tandem Roller 307,225.14 333.47
67,838.08
OVERHEAD & PROFIT (15%) 10,175.71
HARGA SATUAN PEKERJAAN 78,013.80
ANALISA PEKERJAAN AIR BERSIH
ANP 50 PEKERJAAN PILOT HOLE 0 - 50 M
Untuk Pilot Hole Dia 6 Inch Sedalam 20 m
- Penyediaan alat bantu ls 1,000,000.00
- Biaya mesin bor ls 1,500,000.00
- Biaya mesin Genset ls 1,000,000.00
30.000 lt - Solar 5,950.00 178,500.00
20.000 - Tukang Bor 90,000.00 1,800,000.00
2.000 - Kepala tukang 95,000.00 190,000.00
40.000 - Pekerja 70,000.00 2,800,000.00
2.000 - Mandor 100,000.00 200,000.00
Jumlah 8,668,500.00
HARGA PER M' PILOT HOLE 433,425.00
OVERHEAD & PROFIT (12.5%) 54,178.13
Jumlah Total 487,603.13
Dibulatkan 487,600.00

ANP 100 PEKERJAAN PILOT HOLE 50 - 100 M


Untuk Pilot Hole Dia 6 Inch Sedalam 20 m
- Penyediaan alat bantu ls 1,000,000.00
- Biaya mesin bor ls 1,750,000.00
- Biaya mesin Genset ls 1,250,000.00
60.000 lt - Solar 5,950.00 357,000.00
40.000 - Tukang Bor 90,000.00 3,600,000.00
4.000 - Kepala tukang 95,000.00 380,000.00
44.000 - Pekerja 70,000.00 3,080,000.00
4.400 - Mandor 100,000.00 440,000.00
Jumlah 11,857,000.00
HARGA PER M' PILOT HOLE 592,850.00
OVERHEAD & PROFIT (12.5%) 74,106.25
Jumlah Total 666,956.25
Dibulatkan 666,900.00

ANP 150 PEKERJAAN PILOT HOLE 100 - 150 M


Untuk Pilot Hole Dia 6 Inch Sedalam 20 m
- Penyediaan alat bantu ls 1,000,000.00
- Biaya mesin bor ls 2,000,000.00
- Biaya mesin Genset ls 1,500,000.00
60.000 lt - Solar 5,950.00 357,000.00
40.000 - Tukang Bor 90,000.00 3,600,000.00
4.000 - Kepala tukang 95,000.00 380,000.00
44.000 - Pekerja 70,000.00 3,080,000.00
4.400 - Mandor 100,000.00 440,000.00
Jumlah 12,357,000.00
HARGA PER M' PILOT HOLE 617,850.00
OVERHEAD & PROFIT (12.5%) 77,231.25
Jumlah Total 695,081.25
Dibulatkan 695,000.00

ANR 50 PEKERJAAN REAMING 0 - 50 M


Untuk Reaming Dia 8 Inch Sedalam 20 m
- Penyediaan alat bantu ls 1,000,000.00
- Biaya mesin bor ls 1,000,000.00
- Biaya mesin Genset ls 500,000.00
45.000 lt - Solar 5,950.00 267,750.00
30.000 - Tukang Bor 90,000.00 2,700,000.00
0.300 - Kepala tukang 95,000.00 28,500.00
30.000 - Pekerja 70,000.00 2,100,000.00
0.300 - Mandor 100,000.00 30,000.00
Jumlah 7,626,250.00
HARGA PER M' REAMING 381,312.50
OVERHEAD & PROFIT (12.5%) 47,664.06
Jumlah Total 428,976.56
Dibulatkan 428,900.00

ANR 100 PEKERJAAN REAMING 50 - 100 M


Untuk Reaming Dia 8 Inch Sedalam 20 m
- Penyediaan alat bantu ls 1,000,000.00
- Biaya mesin bor ls 1,250,000.00
- Biaya mesin Genset ls 750,000.00
45.000 lt - Solar 5,950.00 267,750.00
30.000 - Tukang Bor 90,000.00 2,700,000.00
0.300 - Kepala tukang 95,000.00 28,500.00
30.000 - Pekerja 70,000.00 2,100,000.00
0.300 - Mandor 100,000.00 30,000.00
Jumlah 8,126,250.00
HARGA PER M' REAMING 406,312.50
OVERHEAD & PROFIT (12.5%) 50,789.06
Jumlah Total 457,101.56
Dibulatkan 457,100.00
ANR 150 PEKERJAAN REAMING 100 - 150 M
Untuk Reaming Dia 8 Inch Sedalam 20 m
- Penyediaan alat bantu ls 1,000,000.00
- Biaya mesin bor ls 1,500,000.00
- Biaya mesin Genset ls 1,000,000.00
50.000 lt - Solar 5,950.00 1,000,000.00
50.000 - Tukang Bor 90,000.00 4,500,000.00
5.000 - Kepala tukang 95,000.00 475,000.00
55.000 - Pekerja 70,000.00 3,850,000.00
5.500 - Mandor 100,000.00 550,000.00
Jumlah 13,875,000.00
HARGA PER M' REAMING 693,750.00
OVERHEAD & PROFIT (12.5%) 86,718.75
Jumlah Total 780,468.75
Dibulatkan 780,400.00

APS PENGEBORAN SUMUR BOR DALAM SEDERHANA DI WILAYAH PESISIR


- Penyediaan alat bantu ls 500,000.00
- Biaya mesin bor ls 1,000,000.00
- Biaya mesin Genset ls 1,000,000.00
20.000 lt - Solar 5,950.00 119,000.00
9.000 - Tukang Bor 90,000.00 810,000.00
0.500 - Kepala tukang 95,000.00 47,500.00
5.000 - Pekerja 70,000.00 350,000.00
1.000 - Mandor 100,000.00 100,000.00
Jumlah 3,926,500.00
HARGA PER M' PILOT HOLE 196,325.00
OVERHEAD & PROFIT (12.5%) 24,540.63
Jumlah Total 220,865.63
Dibulatkan 220,800.00

SNI. 200.01 1 m Galian tanah biasa


0.4 pekerja 70,000.00 28,000.00
0.04 mandor 100,000.00 4,000.00
Jumlah 32,000.00
OVERHEAD & PROFIT (12.5%) 4,000.00
Jumlah Total 36,000.00
Dibulatkan 36,000.00

SNI.200.01.ROB2 1 m Galian tanah keras / berbatu


1.000 pekerja 70,000.00 70,000.00
0.033 mandor 100,000.00 3,300.00
Jumlah 73,300.00
OVERHEAD & PROFIT (12.5%) 9,162.50
Jumlah Total 82,462.50
Dibulatkan 82,400.00

SNI.200.01.ROB3 1 m Galian tanah berbatu / bongkar jalan


1.500 pekerja 70,000.00 105,000.00
0.050 mandor 100,000.00 5,000.00
Jumlah 110,000.00
OVERHEAD & PROFIT (12.5%) 13,750.00
Jumlah Total 123,750.00
Dibulatkan 123,700.00

SNI. 200.09 1 m Urugan tanah kembali


0.192 pekerja 70,000.00 13,440.00
0.019 mandor 100,000.00 1,900.00
Jumlah 15,340.00
OVERHEAD & PROFIT (12.5%) 1,917.50
Jumlah Total 17,257.50
Dibulatkan 17,200.00

SNI.200.20.ROB 1 m Buang tanah sisa galian


0.330 pekerja 70,000.00 23,100.00
0.010 mandor 100,000.00 1,000.00
Jumlah 24,100.00
OVERHEAD & PROFIT (12.5%) 3,012.50
Jumlah Total 27,112.50
Dibulatkan 27,100.00

SNI. 200.11 1 m Urugan pasir


1.200 m pasir urug 150,000.00 180,000.00
0.300 pekerja 70,000.00 21,000.00
0.010 mandor 100,000.00 1,000.00
Jumlah 202,000.00
OVERHEAD & PROFIT (12.5%) 25,250.00
Jumlah Total 227,250.00
Dibulatkan 227,200.00
SNI.300.08 1 m Beton tumbuk 1:3:6
0.940 m kerikil 65,000.00 61,100.00
0.470 m pasir beton 179,000.00 84,130.00
197 kg semen portland 1,400.00 275,800.00
0.250 tukang batu 90,000.00 22,500.00
0.025 kepala tukang 95,000.00 2,375.00
0.080 mandor 100,000.00 8,000.00
1.650 pekerja 70,000.00 115,500.00
Jumlah 569,405.00
OVERHEAD & PROFIT (12.5%) 71,175.63
Jumlah Total 640,580.63
Dibulatkan 640,500.00

PEKERJAAN PEMASANGAN PIPA


A. Galian Tanah Berbatu / Bongkar Jalan
ANB.1 1 m' Pemasangan pipa PVC dia. 355 mm ( 14 Inch) melalui galian tanah berbatu / bongkar jalan
0.880 m Galian tanah berbatu / bongkar jalan 123,700.00 108,856.00
0.240 m Urugan pasir 227,200.00 54,528.00
0.600 m Urugan tanah kembali 17,200.00 10,320.00
0.040 m Buang tanah sisa galian 27,100.00 1,084.00
1 m' Pemasangan pipa PVC dia. 355 mm 5,000.00 5,000.00
1 ls Perapihan 1,500.00 1,500.00
Jumlah 181,288.00
Dibulatkan 181,200.00

ANB.2 1 m' Pemasangan pipa PVC dia. 315 (12 Inch) mm melalui galian tanah berbatu / bongkar jalan
0.825 m Galian tanah berbatu / bongkar jalan 123,700.00 102,052.50
0.225 m Urugan pasir 227,200.00 51,120.00
0.563 m Urugan tanah kembali 17,200.00 9,675.00
0.038 m Buang tanah sisa galian 27,100.00 1,016.25
1 m' Pemasangan pipa PVC dia. 315 mm 4,500.00 4,500.00
1 ls Perapihan 1,500.00 1,500.00
Jumlah 169,863.75
Dibulatkan 169,800.00

ANB.3 1 m' Pemasangan pipa PVC dia. 250 mm (10 Ich ) melalui galian tanah berbatu / bongkar jalan
0.715 m Galian tanah berbatu / bongkar jalan 123,700.00 88,445.50
0.195 m Urugan pasir 227,200.00 44,304.00
0.488 m Urugan tanah kembali 17,200.00 8,385.00
0.033 m Buang tanah sisa galian 27,100.00 880.75
1 m' Pemasangan pipa PVC dia. 250 mm 4,000.00 4,000.00
1 ls Perapihan 1,500.00 1,500.00
Jumlah 147,515.25
Dibulatkan 147,500.00

ANB.4 1 m' Pemasangan pipa PVC dia. 200 mm ( 8 Inch) melalui galian tanah berbatu / bongkar jalan
0.600 m Galian tanah berbatu / bongkar jalan 123,700.00 74,220.00
0.120 m Urugan pasir 227,200.00 27,264.00
0.450 m Urugan tanah kembali 17,200.00 7,740.00
0.030 m Buang tanah sisa galian 27,100.00 813.00
1 m' Pemasangan pipa PVC dia. 200 mm 3,500.00 3,500.00
1 ls Perapihan 1,500.00 1,500.00
Jumlah 115,037.00
Dibulatkan 115,000.00
ANB.5 1 m' Pemasangan pipa PVC dia. 160 mm ( 6 Inch) melalui galian tanah berbatu / bongkar jalan
0.450 m Galian tanah berbatu / bongkar jalan 123,700.00 55,665.00
0.100 m Urugan pasir 227,200.00 22,720.00
0.325 m Urugan tanah kembali 17,200.00 5,590.00
0.025 m Buang tanah sisa galian 27,100.00 677.50
1 m' Pemasangan pipa PVC dia. 160 mm 3,000.00 3,000.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 88,852.50
Dibulatkan 88,800.00

ANB.6 1 m' Pemasangan pipa PVC dia. 110 mm ( 4 Inch) melalui galian tanah berbatu / bongkar jalan
0.360 m Galian tanah berbatu / bongkar jalan 123,700.00 44,532.00
0.080 m Urugan pasir 227,200.00 18,176.00
0.260 m Urugan tanah kembali 17,200.00 4,472.00
0.020 m Buang tanah sisa galian 27,100.00 542.00
1 m' Pemasangan pipa PVC dia. 110 mm 2,500.00 2,500.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 71,422.00
Dibulatkan 71,400.00

ANB.7 1 m' Pemasangan pipa PVC dia. 90 mm ( 3 Inch) melalui galian tanah berbatu / bongkar jalan
0.320 m Galian tanah berbatu / bongkar jalan 82,400.00 26,368.00
0.080 m Urugan pasir 227,200.00 18,176.00
0.220 m Urugan tanah kembali 17,200.00 3,784.00
0.020 m Buang tanah sisa galian 27,100.00 542.00
1 m' Pemasangan pipa PVC dia. 90 mm 2,000.00 2,000.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 52,070.00
Dibulatkan 52,000.00
ANB.8 1 m' Pemasangan pipa PVC dia. 63 mm ( 2 Inch) melalui galian tanah berbatu / bongkar jalan
0.180 m Galian tanah berbatu / bongkar jalan 82,400.00 14,832.00
0.060 m Urugan pasir 227,200.00 13,632.00
0.105 m Urugan tanah kembali 17,200.00 1,806.00
0.015 m Buang tanah sisa galian 27,100.00 406.50
1 m' Pemasangan pipa PVC dia. 63 mm 1,500.00 1,500.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 33,376.50
Dibulatkan 33,300.00

ANB.9 1 m' Pemasangan pipa PVC dia. 50 mm ( 1 1/2 Inch)melalui galian tanah berbatu / bongkar jalan
0.180 m Galian tanah berbatu / bongkar jalan 82,400.00 14,832.00
0.060 m Urugan pasir 227,200.00 13,632.00
0.105 m Urugan tanah kembali 17,200.00 1,806.00
0.015 m Buang tanah sisa galian 27,100.00 406.50
1 m' Pemasangan pipa PVC dia. 50 mm 1,000.00 1,000.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 32,876.50
Dibulatkan 32,800.00

ANB.10 1 m' Pemasangan pipa PVC dia. 25 mm ( 3/4 Inch) melalui galian tanah berbatu / bongkar jalan
0.120 m Galian tanah berbatu / bongkar jalan 82,400.00 9,888.00
0.105 m Urugan tanah kembali 227,200.00 23,856.00
0.015 m Buang tanah sisa galian 27,100.00 406.50
1 m' Pemasangan pipa PVC dia. 25 mm 500.00 500.00
1 ls Perapihan 1,000.00 1,000.00
Jumlah 35,650.50
Dibulatkan 35,600.00

B. Galian Tanah Keras / Berbatu


ANK.1 1 m' Pemasangan pipa PVC dia. 355 mm (14 Inch ) melalui galian tanah keras / berbatu
0.880 m Galian tanah keras / berbatu 82,400.00 72,512.00
0.240 m Urugan pasir 227,200.00 54,528.00
0.600 m Urugan tanah kembali 17,200.00 10,320.00
0.040 m Buang tanah sisa galian 27,100.00 1,084.00
1 m' Pemasangan pipa PVC dia. 355 mm 5,000.00 5,000.00
1 ls Perapihan 1,500.00 1,500.00
Jumlah 144,944.00
Dibulatkan 144,900.00

ANK.2 1 m' Pemasangan pipa PVC dia. 315 mm ( 12 Inch)melalui galian tanah keras / berbatu
0.825 m Galian tanah keras / berbatu 82,400.00 67,980.00
0.225 m Urugan pasir 227,200.00 51,120.00
0.563 m Urugan tanah kembali 17,200.00 9,675.00
0.038 m Buang tanah sisa galian 27,100.00 1,016.25
1 m' Pemasangan pipa PVC dia. 315 mm 4,500.00 4,500.00
1 ls Perapihan 1,500.00 1,500.00
Jumlah 135,791.25
Dibulatkan 135,700.00

ANK.3 1 m' Pemasangan pipa PVC dia. 250 mm ( 10 Inch )melalui galian tanah keras / berbatu
0.715 m Galian tanah keras / berbatu 82,400.00 58,916.00
0.195 m Urugan pasir 227,200.00 44,304.00
0.488 m Urugan tanah kembali 17,200.00 8,385.00
0.033 m Buang tanah sisa galian 27,100.00 880.75
1 m' Pemasangan pipa PVC dia. 250 mm 4,000.00 4,000.00
1 ls Perapihan 1,500.00 1,500.00
Jumlah 117,985.75
Dibulatkan 117,900.00

ANK.4 1 m' Pemasangan pipa PVC dia. 200 mm (8 Inch) melalui galian tanah keras / berbatu
0.600 m Galian tanah keras / berbatu 82,400.00 49,440.00
0.120 m Urugan pasir 227,200.00 27,264.00
0.450 m Urugan tanah kembali 17,200.00 7,740.00
0.030 m Buang tanah sisa galian 27,100.00 813.00
1 m' Pemasangan pipa PVC dia. 200 mm 3,500.00 3,500.00
1 ls Perapihan 1,500.00 1,500.00
Jumlah 90,257.00
Dibulatkan 90,200.00

ANK.5 1 m' Pemasangan pipa PVC dia. 160 mm ( 6 Inch ) melalui galian tanah keras / berbatu
0.450 m Galian tanah keras / berbatu 82,400.00 37,080.00
0.100 m Urugan pasir 227,200.00 22,720.00
0.325 m Urugan tanah kembali 17,200.00 5,590.00
0.025 m Buang tanah sisa galian 27,100.00 677.50
1 m' Pemasangan pipa PVC dia. 160 mm 3,000.00 3,000.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 70,267.50
Dibulatkan 70,200.00
ANK.6 1 m' Pemasangan pipa PVC dia. 110 mm ( 4 Inch ) melalui galian tanah keras / berbatu
0.360 m Galian tanah keras / berbatu 82,400.00 29,664.00
0.080 m Urugan pasir 227,200.00 18,176.00
0.260 m Urugan tanah kembali 17,200.00 4,472.00
0.020 m Buang tanah sisa galian 27,100.00 542.00
1 m' Pemasangan pipa PVC dia. 110 mm 2,500.00 2,500.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 56,554.00
Dibulatkan 56,500.00
ANK.7 1 m' Pemasangan pipa PVC dia. 90 mm ( 3 Inch) melalui galian tanah keras / berbatu
0.320 m Galian tanah keras / berbatu 82,400.00 26,368.00
0.080 m Urugan pasir 227,200.00 18,176.00
0.220 m Urugan tanah kembali 17,200.00 3,784.00
0.020 m Buang tanah sisa galian 27,100.00 542.00
1 m' Pemasangan pipa PVC dia. 90 mm 2,000.00 2,000.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 52,070.00
Dibulatkan 52,000.00
ANK.8 1 m' Pemasangan pipa PVC dia. 63 mm ( 2 Inch) melalui galian tanah keras / berbatu
0.180 m Galian tanah keras / berbatu 82,400.00 14,832.00
0.060 m Urugan pasir 227,200.00 13,632.00
0.105 m Urugan tanah kembali 17,200.00 1,806.00
0.015 m Buang tanah sisa galian 27,100.00 406.50
1 m' Pemasangan pipa PVC dia. 63 mm 1,500.00 1,500.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 33,376.50
Dibulatkan 33,300.00
ANK.9 1 m' Pemasangan pipa PVC dia. 50 mm 1 1/2 Inch) melalui galian tanah keras / berbatu
0.180 m Galian tanah keras / berbatu 82,400.00 14,832.00
0.060 m Urugan pasir 227,200.00 13,632.00
0.105 m Urugan tanah kembali 17,200.00 1,806.00
0.015 m Buang tanah sisa galian 27,100.00 406.50
1 m' Pemasangan pipa PVC dia. 50 mm 1,000.00 1,000.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 32,876.50
Dibulatkan 32,800.00
ANK.10 1 m' Pemasangan pipa PVC dia. 25 mm (3/4 Inch ) melalui galian tanah keras / berbatu
0.120 m Galian tanah keras / berbatu 82,400.00 9,888.00
0.105 m Urugan tanah kembali 17,200.00 1,806.00
0.015 m Buang tanah sisa galian 27,100.00 406.50
1 m' Pemasangan pipa PVC dia. 25 mm 500.00 500.00
1 ls Perapihan 1,000.00 1,000.00
Jumlah 13,600.50
Dibulatkan 13,600.00

C. Galian Tanah Biasa


ANBS.1 1 m' Pemasangan pipa PVC dia. 355 mm (14 Inch) melalui galian tanah biasa
0.880 m Galian tanah biasa 36,000.00 31,680.00
0.240 m Urugan pasir 227,200.00 54,528.00
0.600 m Urugan tanah kembali 17,200.00 10,320.00
0.040 m Buang tanah sisa galian 27,100.00 1,084.00
1 m' Pemasangan pipa PVC dia. 355 mm 5,000.00 5,000.00
1 ls Perapihan 1,500.00 1,500.00
Jumlah 104,112.00
Dibulatkan 104,100.00

ANBS.2 1 m' Pemasangan pipa PVC dia. 315 mm ( 12 Inch) melalui galian tanah biasa
0.825 m Galian tanah biasa 36,000.00 29,700.00
0.225 m Urugan pasir 227,200.00 51,120.00
0.563 m Urugan tanah kembali 17,200.00 9,675.00
0.038 m Buang tanah sisa galian 27,100.00 1,016.25
1 m' Pemasangan pipa PVC dia. 315 mm 4,500.00 4,500.00
1 ls Perapihan 1,500.00 1,500.00
Jumlah 97,511.25
Dibulatkan 97,500.00

ANBS.3 1 m' Pemasangan pipa PVC dia. 250 mm ( 10 Inch) melalui galian tanah biasa
0.715 m Galian tanah biasa 36,000.00 25,740.00
0.195 m Urugan pasir 227,200.00 44,304.00
0.488 m Urugan tanah kembali 17,200.00 8,385.00
0.033 m Buang tanah sisa galian 27,100.00 880.75
1 m' Pemasangan pipa PVC dia. 250 mm 4,000.00 4,000.00
1 ls Perapihan 1,500.00 1,500.00
Jumlah 84,809.75
Dibulatkan 84,800.00

ANBS.4 1 m' Pemasangan pipa PVC dia. 200 mm ( 8 Inch ) melalui galian tanah biasa
0.600 m Galian tanah biasa 36,000.00 21,600.00
0.120 m Urugan pasir 227,200.00 27,264.00
0.450 m Urugan tanah kembali 17,200.00 7,740.00
0.030 m Buang tanah sisa galian 27,100.00 813.00
1 m' Pemasangan pipa PVC dia. 200 mm 3,500.00 3,500.00
1 ls Perapihan 1,500.00 1,500.00
Jumlah 62,417.00
Dibulatkan 62,400.00
ANBS.5 1 m' Pemasangan pipa PVC dia. 160 mm ( 6 Inch ) melalui galian tanah biasa
0.450 m Galian tanah biasa 36,000.00 16,200.00
0.100 m Urugan pasir 227,200.00 22,720.00
0.325 m Urugan tanah kembali 17,200.00 5,590.00
0.025 m Buang tanah sisa galian 27,100.00 677.50
1 m' Pemasangan pipa PVC dia. 160 mm 3,000.00 3,000.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 49,387.50
Dibulatkan 49,300.00

ANBS.6 1 m' Pemasangan pipa PVC dia. 110 mm ( 4 Inch ) melalui galian tanah biasa
0.360 m Galian tanah biasa 36,000.00 12,960.00
0.080 m Urugan pasir 227,200.00 18,176.00
0.260 m Urugan tanah kembali 17,200.00 4,472.00
0.020 m Buang tanah sisa galian 27,100.00 542.00
1 m' Pemasangan pipa PVC dia. 110 mm 2,500.00 2,500.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 39,850.00
Dibulatkan 39,800.00

ANBS.7 1 m' Pemasangan pipa PVC dia. 90 mm ( 3 Inch) melalui galian tanah biasa
0.320 m Galian tanah biasa 36,000.00 11,520.00
0.080 m Urugan pasir 227,200.00 18,176.00
0.220 m Urugan tanah kembali 17,200.00 3,784.00
0.020 m Buang tanah sisa galian 27,100.00 542.00
1 m' Pemasangan pipa PVC dia. 90 mm 2,000.00 2,000.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 37,222.00
Dibulatkan 37,200.00

ANBS.8 1 m' Pemasangan pipa PVC dia. 63 mm ( 2 Inch) melalui galian tanah biasa
0.180 m Galian tanah biasa 36,000.00 6,480.00
0.060 m Urugan pasir 227,200.00 13,632.00
0.105 m Urugan tanah kembali 17,200.00 1,806.00
0.015 m Buang tanah sisa galian 27,100.00 406.50
1 m' Pemasangan pipa PVC dia. 63 mm 1,500.00 1,500.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 25,024.50
Dibulatkan 25,000.00

ANBS.9 1 m' Pemasangan pipa PVC dia. 50 mm ( 1 1/2 Inch) melalui galian tanah biasa
0.180 m Galian tanah biasa 36,000.00 6,480.00
0.060 m Urugan pasir 227,200.00 13,632.00
0.105 m Urugan tanah kembali 17,200.00 1,806.00
0.015 m Buang tanah sisa galian 27,100.00 406.50
1 m' Pemasangan pipa PVC dia. 50 mm 1,000.00 1,000.00
1 ls Perapihan 1,200.00 1,200.00
Jumlah 24,524.50
Dibulatkan 24,500.00

ANBS.10 1 m' Pemasangan pipa PVC dia. 25 mm ( 3/4 Inch) melalui galian tanah biasa
0.120 m Galian tanah biasa 36,000.00 4,320.00
0.105 m Urugan tanah kembali 17,200.00 1,806.00
0.015 m Buang tanah sisa galian 27,100.00 406.50
1 m' Pemasangan pipa PVC dia. 25 mm 500.00 500.00
1 ls Perapihan 1,000.00 1,000.00
Jumlah 8,032.50
Dibulatkan 8,000.00

SUMBER, 2016

KEPALA SEKSI PERUMAHAN DAN PERMUKIMAN KEPALA SEKSI BANGUNAN GEDUNG


DINAS CIPTA KARYA DAN TATA RUANG KABUPATEN DINAS CIPTA KARYA DAN TATA RUANG KABUPATEN
CIREBON CIREBON

H. ABDUL KARIM, ST YEDI ADHI PRIATNA, BAE.S.Sos


NIP. 19620609 199101 1 001 NIP. 19660815 199803 1 004
CIREBON CIREBON

H. ABDUL KARIM, ST YEDI ADHI PRIATNA, BAE.S.Sos


NIP. 19620609 199101 1 001 NIP. 19660815 199803 1 004

KEPALA DINAS CIPTA KARYA DAN TATA RUANG


KEPALA BIDANG BANGUNAN, PERUMAHAN DAN
KABUPATEN CIREBON
PERMUKIMAN DINAS CIPTA KARYA DAN TATA RUANG
KABUPATEN CIREBON

ASEP DJAMALUDIN MALIK, ST Ir. H. SUGENG RAHARJO, M.MP


NIP. 19680607 199703 1 005 NIP. 19600912 198603 1 005
DAFTAR HARGA SATUAN PEKERJAAN BANGUNAN GEDUNG DAN PERUMAHAN
DINAS CIPTA KARYA DAN TATA RUANG KABUPATEN CIREBON
TAHUN ANGGARAN 2016

HARGA SATUAN
NO KODE SATUAN PEKERJAAN
Rp

1 SNI.000.01 1 M' PAGAR SEMENTARA DARI KAYU TINGGI 2 METER 160,100.00


2 SNI.000.02 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER 235,100.00
3 SNI.000.03 1 M' PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 METER 535,000.00
4 SNI.000.04 1 M2 PEMBUATAN STEIGER DARI BAMBU, UK.(40 X 50 X 20) CM 44,700.00
5 SNI.000.05 1 M3 PEMASANGAN LAPISAN IJUK 25,600.00
6 SNI.000.06 1 M2 PEMBUATAN JALAN SEMENTARA 514,100.00
7 SNI.000.07 1 M3 BONGKARAN BETON BERTULANG 530,800.00
8 SNI.000.08 1 M3 BONGKARAN DINDING BATA MERAH 528,700.00
9 SNI.100.03 1 BH PEMBUATAN PAPAN NAMA PROYEK 330,400.00
10 SNI.100.04 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN 13,500.00
11 SNI.100.05 1 M2 PENGUKURAN DAN PEMASANGAN BOUWPLANK / PROPIL 94,800.00
12 SNI.100.07 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT 1,375,100.00
13 SNI.100.08 1 M2 PEMBUATAN RUMAH JAGA KONSTRUKSI KAYU 1,429,000.00
14 SNI.100.09 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN 13,500.00
15 SNI.100.10 1 M2 PEMBUATAN BEDENG BURUH 1,402,200.00
16 SNI.100.11 1 M2 PEMBUATAN BAK ADUKAN UK. 40 X 50 X 20 CM 262,600.00
17 SNI.100.12 1 M2 PEMBUATAN LOS KERJA / DIREKSIKEET 707,800.00
18 SNI. 200.01 1 M3 GALIAN TANAH BIASA 36,000.00
19 SNI. 200.09 1 M3 URUGAN KEMBALI BEKAS GALIAN 17,200.00
20 SNI. 200.10 1 M3 PEMADATAN TANAH 45,000.00
21 SNI. 200.11 1 M3 URUGAN PASIR 227,200.00
22 SNI. 200.12 1 M3 URUGAN TANAH 193,500.00
23 SNI. 200.13 1 M3 URUGAN SIRTU 218,200.00
24 SNI. 200.14 1 M3 GALIAN TANAH BIASA SEDALAM 2 M 47,200.00
25 SNI. 200.15 1 M3 GALIAN TANAH BIASA SEDALAM 3 M 66,000.00
26 SNI. 200.16 1 M3 GALIAN TANAH KERAS SEDALAM 1 M 56,100.00
27 SNI. 200.17 1 M3 GALIAN TANAH CADAS SEDALAM 1 M 112,500.00
28 SNI. 200.18 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M 74,100.00
29 SNI. 200.19 1 M2 PEKERJAAN STRIPPING SETINGGI 1 M 4,500.00
30 SNI. 200.20 1 M2 PEMBUANGAN TANAH SAEJAUH 150 M 46,200.00
31 SNI.200.23 1 M2 PEMBUATAN JALAN SEMENTARA, TEBAL 25 CM 154,700.00
32 SNI.250.01 1 M3 PASANGAN PONDASI BATU KALI AD. 1:1 1,084,900.00
33 SNI.250.02 1 M3 PASANGAN PONDASI BATU KALI AD. 1:2 908,600.00
34 SNI.250.03 1 M3 PASANGAN PONDASI BATU KALI AD. 1:2,5 1,084,900.00
35 SNI.250.04 1 M3 PASANGAN PONDASI BATU KALI AD. 1:3 816,800.00
36 SNI.250.05 1 M3 PASANGAN PONDASI BATU KALI AD. 1:4 761,700.00
37 SNI.250.06 1 M3 PASANGAN PONDASI BATU BELAH AD. 1:4 761,700.00
38 SNI.250.07 1 M3 PASANGAN PONDASI BATU BELAH AD. 1:5 723,600.00
39 SNI.250.08 1 M3 PASANGAN PONDASI BATU KALI AD. 1:6 696,800.00
40 SNI.250.09 1 M3 PASANGAN PONDASI BATU KALI AD. 1:8 655,800.00
41 SNI.250.10 1 M3 PASANGAN PONDASI SUMURAN DIA. 100 CM 972,300.00
42 SNI.250.11 1 M' PEMBUATAN TIANG PANCANG 40X40 CM, BETON BERTULANG 1,169,400.00
43 SNI.250.12 1 M' PEMBUATAN TIANG PANCANG 35X35 CM, BETON BERTULANG 920,600.00
44 SNI.250.14 1 M3 PASANGAN BATU KOSONG 396,300.00
45 SNI.300.06 1 M3 MEMBUAT LANTAI KERJA BETON TUMBUK AD. 1:3:5 117,600.00
46 SNI.300.07 1 M3 MEMBUAT BETON TUMBUK AD. 1:3:5 TEBAL 5 CM 678,600.00
47 SNI.300.08 1 M3 MEMBUAT BETON TUMBUK AD. 1:3:6 TEBAL 5 CM 32,025.00
48 SNI. 300.19 1 M3 BETON BERTULANG AD. 1:2:3 812,500.00
49 SNI. 300.32 1 KG PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR 17,000.00
50 SNI. 300.35 1 M2 PASANG BEKISTING UNTUK PONDASI 217,300.00
51 SNI. 300.36 1 M2 PASANG BEKISTING UNTUK SLOOP, KOLOM BIASA & RINGBALK 237,000.00
52 SNI. 300.37 1 M2 PASANG BEKISTING UNTUK KOLOM STRUKTUR 462,600.00
53 SNI. 300.38 1 M2 PASANG BEKISTING UNTUK BALOK 475,900.00
54 SNI.300.39 1 M2 PASANG BEKISTING UNTUK LANTAI 734,100.00
55 SNI.300.40 1 M2 MEMBUAT BETON DENGAN MUTU K 125 1,083,000.00
56 SNI.300.41 1 M2 MEMBUAT BETON DENGAN MUTU K 175 1,156,600.00
57 SNI.300.42 1 M2 MEMBUAT BETON DENGAN MUTU K 225 1,407,700.00
58 SNI.300.43 1 M2 MEMBUAT BETON DENGAN MUTU K 250 1,306,200.00
59 SNI.300.44 1 M2 MEMBUAT BETON DENGAN MUTU K 300 1,348,800.00
60 SNI.300.45 1 M2 MEMBUAT BETON DENGAN MUTU K 350 1,720,600.00
61 SNI.300.46 1 M2 MEMBUAT BETON DENGAN MUTU K 400 1,441,500.00
62 SNI.300.47 1 M2 MEMBUAT BETON DENGAN MUTU K 500 1,596,000.00
63 SNI.350.10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA AD. 1:2 137,800.00
64 SNI.350.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA AD. 1:3 131,000.00
65 SNI.350.12 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA AD. 1:4 127,000.00
66 SNI.350.13 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA AD. 1:5 124,500.00
67 SNI.350.14 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA AD. 1:5 256,500.00
68 SNI.350.15 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA AD. 1:4 261,700.00
69 SNI.350.16 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA AD. 1:3 271,400.00
70 SNI.350.28 1 M2 PASANG DINDING ROOSTER / KERAWANG 12 X 11 X 24 CM 225,000.00
71 SNI.350.29 1 M2 PASANG BATA BERONGGA UK.(5 X 11 X 24) CM 400,800.00
72 SNI.360.02 1 M2 PLESTERAN AD. 1:2 TEBAL 15 MM 50,100.00
73 SNI.360.03 1 M2 PLESTERAN AD. 1:3 TEBAL 15 MM 47,300.00
74 SNI.360.04 1 M2 PLESTERAN AD. 1:4 TEBAL 15 MM 45,500.00
75 SNI.360.05 1 M2 PLESTERAN AD. 1:5 TEBAL 15 MM 44,400.00
76 SNI. 360.06 1 M2 PLESTERAN ADDICTIVE UNTUK BETON 42,100.00
77 SNI.360.07 1 M2 ACIAN 29,500.00
78 SNI. 360.10 1 M2 PLESTERAN PLESTERAN SIAR AD. 1 PC : 2 PS 52,600.00
79 SNI.450.29 1 M2 MEMBUAT RANGKA LANGIT-LANGIT 1 X 1 M, KAYU JATI JABAR 160,700.00
80 SNI.450.30 1 M2 MEMBUAT RANGKA LANGIT-LANGIT 1X1 M, KAMPER, 160,700.00
81 SNI.450.31 1 M2 MEMBUAT RANGKA LANGIT-LANGIT 1 X 1 M, KAYU KRUING 148,200.00
82 SNI.450.32 1 M2 MEMBUAT RANGKA LANGIT-LANGIT 1 X 1 M, KAYU MERANTI 131,000.00
83 SNI.450.33 1 M2 MEMBUAT RANGKA LANGIT-LANGIT 1 X 1 M, KAYU LANAN 138,400.00
84 SNI.450.34 1 M2 MEMBUAT RANGKA LANGIT-LANGIT BILIK KAYU MERANTI 88,900.00
85 SNI. 450.35 1 M2 MENGERJAKAN RANGKA LANGIT-LANGIT (1,00 X 1,00)M, KAYU BORNEO 117,500.00
86 SNI.451.34 1 M' PASANG LISTPLANK 3X20 CM KAYU JATI JABAR 98,100.00
87 SNI.451.35 1 M' PASANG LISTPLANK 3X20 CM KAYU KAMPER 98,100.00
88 SNI.451.36 1 M' PASANG LISTPLANK 3X20 CM KAYU BALAU 108,600.00
89 SNI.451.37 1 M' PASANG LISTPLANK 3X20 CM KAYU KRUING 90,600.00
90 SNI.451.38 1 M' PASANG LISTPLANK 3X20 CM KAYU LANAN 84,700.00
91 SNI.451.39 1 M' PASANG LISTPLANK 3X20 CM KAYU MERANTI 80,300.00
92 SNI.451.40 1 M' PASANG LISTPLANK WOODPLANK 48,600.00
93 SNI.451.41 1 M' PASANG LISTPLANK 3X30 CM KAYU JATI JABAR 136,200.00
94 SNI.451.42 1 M' PASANG LISTPLANK 3X30 CM KAYU KAMPER 136,200.00
95 SNI.451.43 1 M' PASANG LISTPLANK 2x(3X20) CM KAYU KAMPER 183,000.00
96 SNI.451.44 1 M' PASANG LISTPLANK 2x(2X20) CM KAYU KAMPER 105,100.00
97 SNI.451.45 1 M' PASANG LISTPLANK 2x(2X20) CM KAYU BORNEO 75,200.00
98 SNI.452.35 1 M' PASANG LIST KAYU PROFIL 15,500.00
99 SNI.452.36 1 M' PASANG LIST KELILING (TS.5) GYPSUM 47,600.00
100 SNI.452.37 1 M' PASANG LIST DROP (SB) GYPSUM 41,800.00
101 SNI.452.38 1 M' PASANG BEADING PENURUNAN (PC) GYPSUM 43,100.00
102 SNI.452.39 1 M' PASANG BEADING HORISON GYPSUM 43,100.00
103 SNI. 452.40 1 M2 PASANG GYPSUM BOARD UNTUK PLAFOND 37,800.00
104 SNI.453.40 1 M2 PASANG RANGKA DINDING PEMISAH/SKETSEL KAYU KAMPER 37,800.00
105 SNI.453.41 1 M2 DINDING PEMISAH/SKETSEL TEAKWOOD RANGKA KRUING 355,100.00
106 SNI.453.42 1 M2 DINDING PEMISAH/SKETSEL TRIPLEX RANGKA KRUING 345,300.00
107 SNI.453.43 1 M2 DINDING PEMISAH/SKETSEL TEAKWOOD RANGKAP, RANGKA KAYU KRUING 384,600.00
108 SNI.453.44 1 M2 DINDING PEMISAH/SKETSEL GRC RANGKAP, RANGKA KAYU MERANTI 218,900.00
109 SNI.453.45 1 M2 PASANG RANGKA DINDING PEMISAH/SKETSEL KAYU BORNEO 213,800.00
110 SNI.453.46 1 M2 DINDING PEMISAH/SKETSEL TEAKWOOD RANGKA KAYU KAMPER 439,200.00
111 SNI.460.01 1 M2 ATAP GENTENG PRESS TANGAN 60,500.00
112 SNI.460.02 1 M2 ATAP GENTENG PRESS MESIN 74,500.00
113 SNI.460.03 1 M2 ATAP GENTENG PRESS DIGLAZUUR 91,400.00
114 SNI.460.04 1 M2 ATAP GENTENG GLAZUUR TURBO 90,300.00
115 SNI.460.05 1 M' ATAP GENTENG NOK/BUBUNG PRESS TANGAN 83,700.00
116 SNI.460.06 1 M' ATAP GENTENG NOK/BUBUNG PRESS MESIN 86,600.00
117 SNI.460.07 1 M' ATAP GENTENG NOK/BUBUNG DIGLAZUUR 95,000.00
118 SNI.460.08 1 M2 PASANG ATAP ASBES GELOMBANG 2400 X 1050 X 4 MM 53,300.00
119 SNI.460.09 1 M2 PASANG ATAP ASBES GELOMBANG 2100 X 1050 X 4 MM 53,900.00
120 SNI.460.10 1 M2 PASANG ATAP ASBES GELOMBANG 1800 X 920 X 4 MM 48,500.00
121 SNI.460.11 1 M2 PASANG ATAP ASBES GELOMBANG 1500 X 1050 X 4 MM 59,400.00
122 SNI.460.12 1 M2 PASANG ATAP ASBES GELOMBANG 3000 X 1050 X 4 MM 54,900.00
123 SNI.460.13 1 M2 PASANG ATAP ASBES GELOMBANG 2700 X 1050 X 4 MM 56,900.00
124 SNI.460.14 1 M PASANG NOKSTEEL GELOMBANG 920 X 5 MM 84,500.00
125 SNI.460.15 1 M PASANG NOKSTEEL GELOMBANG 1050 X 5 MM 92,300.00
126 SNI.460.16 1 M2 PASANG GENTENG BETON 90,400.00
127 SNI.460.17 1 M PASANG NOK BUBUNG GENTENG BETON 110,200.00
128 SNI.460.18 1 M2 PASANG ATAP SENG GELOMBANG 57,400.00
129 SNI.460.19 1 M' PASANG ATAP NOK SENG 34,000.00
130 SNI.470.02 1 M2 LANGIT - LANGIT ETERNIT 1X1 M, TEBAL 5 MM 19,100.00
131 SNI.470.03 1 M2 LANGIT - LANGIT TRIPLEK, TEBAL 4 MM 39,500.00
132 SNI. 470.04 1 M2 PASANG LANGIT-LANGIT TRIPLEK TEBAL 4 MM + ALUMUNIUM FOIL 73,300.00
133 SNI. 470.05 1 M2 PASANG LANGIT-LANGIT MELAMIN TEBAL 4 MM 53,100.00
134 SNI.470.06 1 M2 LANGIT - LANGIT GRC TEBAL 4 MM 38,500.00
135 SNI.550.01 PASANG 1 BUAH CLOSET DUDUK/MONOBLOK 1,864,400.00
136 SNI.550.02 PASANG 1 BUAH CLOSET JONGKOK PORSELIN 450,100.00
137 SNI.550.06 PASANG 1 BUAH BAK MANDI KERAMIK VOL. 0,30 M3 480,500.00
138 SNI.550.07 MEMASANG 1 BUAH WASTHAFEL 1,175,200.00
139 SNI.550.08 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,30 M3 777,200.00
140 SNI.550.09 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 1 M3 1,166,500.00
141 SNI.650.02 1 M2 PASANG LANTAI UBIN PC ABU-ABU 30 X 30 CM 90,300.00
142 SNI.650.03 1 M2 PASANG LANTAI UBIN PC ABU-ABU 20 X 20 CM 112,400.00
143 SNI.650.04 1 M2 PASANG LANTAI UBIN WAFEL PC 20 X 20 CM 112,400.00
144 SNI.650.05 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM 104,400.00
145 SNI.650.06 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM 183,300.00
146 SNI.650.07 1 M2 PASANG LANTAI KERAMIK 20 X 10 CM 183,300.00
147 SNI.650.08 1 M2 PASANG DINDING KERAMIK 30 X 30 CM 184,700.00
148 SNI.650.09 1 M2 PASANG DINDING KERAMIK 20 X 20 CM 185,200.00
149 SNI.650.10 1 M2 PASANG DINDING KERAMIK 10 X 20 CM 185,200.00
150 SNI.650.11 1 M2 PASANG DINDING KERAMIK 20 X 25 CM 178,500.00
151 SNI.650.12 1 M2 PASANG BATU TEMPEL KAPUR TEKSTUR TIDAK RATA 10 X 20 CM 244,300.00
152 SNI.650.13 1 M2 PASANG BATU TEMPEL PALIMANAN TIDAK RATA 10 X 20 CM 216,200.00
154 SNI.650.15 1 M2 PASANG LANTAI MOZAIK 20 X 20 CM 187,700.00
156 SNI. 650.17 1 M2 PASANG LANTAI GRANIT 40 X 40 CM B 378,500.00
157 SNI. 650.18 1 M2 PASANG LANTAI GRANIT 40 X 40 CM A 367,700.00
158 SNI. 650.19 1 M2 PASANG LANTAI TERAKOTA 20 X 5 CM 560,300.00
159 SNI. 650.20 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM 113,900.00
160 SNI. 650.21 1 M2 PASANG LANTAI GRANIT 60 X 60 POLOS 350,900.00
161 SNI. 650.22 1 M2 PASANG LANTAI GRANIT 60 X 60 CORAK 259,700.00
162 SNI.850.02 PASANG 1 BUAH KUNCI PINTU UKURAN BESAR 193,600.00
163 SNI.850.05 PASANG 1 SET ENGSEL NYLON UNTUK PINTU 39,400.00
164 SNI.850.06 PASANG 1 SET ENGSEL NYLON UNTUK JENDELA 31,500.00
165 SNI.850.07 PASANG 1 BUAH GRENDEL PERNEKEL JENDELA/PINTU 30,200.00
166 SNI.850.09 PASANG 1 BUAH KAIT ANGIN 26,400.00
167 SNI.850.16 1 M2 PASANG KACA POLOS TEBAL 3 MM 94,600.00
168 SNI.850.17 1 M2 PASANG KACA POLOS TEBAL 5 MM 109,100.00
169 SNI.850.18 1 M2 PASANG TERALI BESI 393,800.00
170 SNI.850.19 1 M2 PASANG KAWAT HARMONIKA 67,000.00
171 SNI.850.20 1 M2 PLINT KAYU 2 X 10 CM 46,800.00
172 SNI. 900.13 1 M2 PASANG RAM KAWAT HARMONIKA 54,700.00
173 SNI. 900.17 1 BH PASANG KACA NAKO 5 MM BERIKUT RANGKA TRALIS 38,000.00
174 SNI. 900,18 1 M' PASANG TALANG DATAR SENG BJLS - 30 147,600.00
175 SNI. 900,19 1 M' PASANG TALANG MIRING SENG BJLS - 30 212,300.00
176 SNI. 900.20 1 M' PASANG TALANG 1/2 LINGKARAN DIA 10 CM SENG BJLS 30 169,100.00
177 SNI. 950,06 1 M2 MENDEMPUL DAN MENGGOSOK KAYU YANG AKAN DIPLISTUR 9,500.00
178 SNI. 950.07 1 M2 PENGECATAN BIDANG KAYU/BESI BERIKUT PLAMIR 35,400.00
179 SNI. 950.08 1 M2 PENGECATAN BIDANG KAYU LAMA 31,700.00
180 SNI. 950.09 1 M2 PENGECATAN GENTENG DGN CAT GENTENG 24,000.00
181 SNI. 950,15 1 M2 PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR +1 LPS CAT DASAR + 2 LPS CAT PENUTUP ) 21,600.00
182 SNI. 950,15. rob1 1 M2 PENGECATAN TEMBOK BARU ( 2 LPS CAT PENUTUP ) 16,200.00
183 SNI. 950,15. rob2 1 M2 COATING BATU ALAM/BATA EXPOSE 32,300.00
184 SNI. 950.17 1 M2 PENGECATAN TEMBOK LAMA (1 LPS CAT DASAR + 2 LPS CAT PENUTUP ) 15,600.00
185 SNI. 950.17.Rob 1 M2 PENGECATAN TEMBOK LAMA ( 2 LPS CAT PENUTUP ) 12,200.00
186 SNI. 955.26 1 M3 MENGERJAKAN KUSEN PINTU & JENDELA DARI KAYU JATI JABAR 11,977,500.00
187 SNI. 955.27 1 M3 MENGERJAKAN KUSEN-KUSEN PINTU & JENDELA DARI KAYU KAMPER 12,900,000.00
188 SNI. 955.28 1 M3 MENGERJAKAN KUSEN-KUSEN PINTU & JENDELA DARI KAYU BALAU 14,655,000.00
189 SNI. 955.29 1 M3 MENGERJAKAN KUSEN-KUSEN PINTU & JENDELA DARI KAYU KRUING 11,649,900.00
190 SNI. 955.30 1 M3 MENGERJAKAN KUSEN-KUSEN PINTU & JENDELA DARI KAYU LANAN 10,667,100.00
191 SNI. 955.31 1 M3 MENGERJAKAN KUSEN-KUSEN PINTU & JENDELA DARI KAYU MERANTI 9,930,000.00
192 SNI. 955.32 1 M3 MENGERJAKAN KUSEN PINTU & JENDELA DARI KAYU BORNEO 8,445,000.00
193 SNI. 960.36 1 M2 MENGERJAKAN RGK DAUN PINTU & JENDELA DARI KAYU JATI JABAR 614,200.00
194 SNI. 960.37 1 M2 MENGERJAKAN RANGKA DAUN PINTU & JENDELA DARI KAYU KAMPER 614,200.00
195 SNI. 960.38 1 M2 MENGERJAKAN RANGKA DAUN PINTU & JENDELA DARI KAYU BALAU 665,400.00
196 SNI. 960.39 1 M2 MENGERJAKAN RANGKA DAUN PINTU & JENDELA DARI KAYU KRUING 577,700.00
197 SNI. 960.40 1 M2 MENGERJAKAN RANGKA DAUN PINTU & JENDELA DARI KAYU LANAN 549,100.00
198 SNI. 960.41 1 M2 MENGERJAKAN RANGKA DAUN PINTU & JENDELA DARI KAYU MERANTI 527,600.00
199 SNI. 960.42 1 M2 PASANG PINTU PANEL KAYU JATI JABAR 733,200.00
200 SNI. 960.43 1 M2 PASANG PINTU PANEL KAYU KAMPER 733,200.00
201 SNI. 960.44 1 M2 PASANG PINTU DAN JENDELA KACA KAYU BORNEO 488,200.00
202 SNI. 960.45 1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU JATI JABAR 1,038,700.00
203 SNI. 960.46 1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU KAMPER 1,061,200.00
204 SNI. 960.47 1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI JABAR 569,800.00
205 SNI. 960.48 1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU KAMPER 569,800.00
206 SNI. 960.49 1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU BORNEO 499,200.00
207 SNI. 960.50 1 M2 PASANG PINTU PLYWOOD DAN FORMIKA RANGKA KAYU JATI JABAR 717,000.00
208 SNI. 960.51 1 M2 PASANG PINTU PLYWOOD DAN FORMIKA RANGKA KAYU KAMPER 717,000.00
209 SNI. 960.52 1 M2 PASANG PINTU FORMIKA DOUBLE RANGKA KAYU JATI 917,400.00
210 SNI. 970.32 1 M2 PASANGAN JALUSI MATI DARI KAYU JATI JABAR 290,100.00
211 SNI. 970.33 1 M2 PASANGAN JALUSI DARI KAYU KAMPER 290,100.00
212 SNI. 970.34 1 M2 PASANGAN JALUSI DARI KAYU BALAU 319,300.00
213 SNI. 970.35 1 M2 PASANGAN JALUSI DARI KAYU KRUING 269,200.00
214 SNI. 970.36 1 M2 PASANGAN JALUSI DARI KAYU LANAN 252,900.00
215 SNI. 970.37 1 M2 PASANGAN JALUSI DARI KAYU MERANTI 240,600.00
216 SNI. 975.22 1 M3 MENGERJAKAN RANGKA KUDA-KUDA DARI JATI JABAR 12,074,600.00
217 SNI. 975.23 1 M3 MENGERJAKAN RANGKA KUDA-KUDA DARI KAYU KAMPER 12,074,600.00
218 SNI. 975.24 1 M3 MENGERJAKAN RANGKA KUDA-KUDA DARI KAYU BALAU 13,683,400.00
219 SNI. 975.25 1 M3 MENGERJAKAN RANGKA KUDA-KUDA DARI KRUING 10,928,700.00
220 SNI. 975.26 1 M3 MENGERJAKAN RANGKA KUDA-KUDA DARI KAYU LANAN 10,027,800.00
221 SNI. 975.27 1 M3 MENGERJAKAN RANGKA KUDA-KUDA DARI MERANTI 9,352,100.00
222 SNI. 975.28 1 M3 MENGERJAKAN RANGKA KUDA-KUDA DARI BORNEO 8,114,600.00
223 SNI. 975.29 1 M3 MENGERJAKAN RANGKA LANGIT-LANGIT (1,00 X 1,00)M, KAYU JATI JABAR 160,700.00
224 SNI. 975.30 1 M3 MENGERJAKAN RANGKA LANGIT-LANGIT (1,00 X 1,00)M, KAYU KAMPER 160,700.00
225 SNI. 980.16 1 M2 MENGERJAKAN RANGKA ATAP DARI KAYU JATI JABAR 133,000.00
226 SNI. 980.17 1 M2 MENGERJAKAN RANGKA ATAP DARI KAYU KAMPER 133,000.00
227 SNI. 980.18 1 M2 MENGERJAKAN RANGKA ATAP DARI KAYU BALAU 150,500.00
228 SNI. 980.19 1 M2 MENGERJAKAN RANGKA ATAP DARI KAYU KRUING 120,500.00
229 SNI. 980.20 1 M2 MENGERJAKAN RANGKA ATAP DARI KAYU LANAN 110,700.00
230 SNI. 980.21 1 M2 MENGERJAKAN RANGKA ATAP DARI KAYU MERANTI 103,300.00
231 SNI. 980.22 1 M2 MENGERJAKAN RANGKA ATAP DARI KAYU MERANTI 89,800.00
232 SNI. 985.34 1 M2 MENGERJAKAN PLISTURAN SIRLAK 55,200.00
233 SNI. 985.36 1 M2 MENGERJAKAN PENGETERAN KAYU 14,200.00
234 SNI. 990.04 1 M2 MEMBONGKAR DINDING TEMBOK & PEMBERSIHAN 11,200.00
235 SNI. 990.05 1 M2 MEMBONGKAR LANTAI TEGEL/FLOOR 6,000.00
236 SNI. 990.06 1 M2 MENGUPAS PLESTERAN DINDING LAMA 2,800.00
237 SNI. 990.07 1 M2 MENURUNKAN ATAP GENTENG LAMA 1,800.00
238 SNI. 990.09 1 M2 MENURUNKAN RANGKA ATAP / PLAFOND 5,600.00
239 SNI. 990.12 1 M3 MENURUNKAN KAYU RANGKA KUDA-KUDA 67,200.00
240 SNI. 999.01 1 M2 PASANG PAVING BLOCK HEXAGON NATURAL SETARA K.225 TEBAL 6 CM 122,900.00
241 SNI. 999.02 1 M2 PASANG PAVING BLOCK HEXAGON MOTIF SETARA K.225 TEBAL 6 CM 129,000.00
242 SNI. 999.03 1 M2 PASANG PAVING BLOCK HEXAGON WARNA SETARA K.225 TEBAL 6 CM 137,100.00
243 SNI. 999.04 1 M2 PASANG PAVING BLOCK HEXAGON NATURAL SETARA K.225 TEBAL 7 CM 130,500.00
244 SNI. 999.05 1 M2 PASANG PAVING BLOCK HEXAGON MOTIF SETARA K.225 TEBAL 7 CM 136,600.00
245 SNI. 999.06 1 M2 PASANG PAVING BLOCK HEXAGON WARNA SETARA K.225 TEBAL 7 CM 142,600.00
246 SNI. 999.07 1 M2 PASANG PAVING BLOCK BOLDER NATURAL SETARA K.225 TEBAL 7 CM 140,400.00
247 SNI. 999.08 1 M2 PASANG PAVING BLOCK BOLDER WARNA SETARA K.225 TEBAL 7 CM 146,100.00
248 SNI. 999.09 1 M2 PASANG PAVING BLOCK BATA NATURAL SETARA K.225 TEBAL 7 CM 133,200.00
249 SNI. 999.10 1 M2 PASANG PAVING BLOCK BATA WARNA SETARA K.225 TEBAL 7 CM 138,800.00
250 SNI.Plesprof 1 M2 PLESTERAN PROFIL 67,300.00
251 SNI.360.06. rob 1 M2 PLESTER MUTIARA (PM) 51,600.00
252 SNI.Skimcoat 1 M2 SKIM COAT (ACIAN) 31,600.00
253 SNI.650.05. rob 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM (MENGGUNAKAN ZAT ADDICTIVE) 108,900.00
280 SNI. PLAFOND 1M2 PASANG PLAFOND RANGKA HOLO DAN DENGAN PENUTUP
GRC BERIKUT PENGECATAN 96,200.00
281 SNI.GRAVEL 1 M' PEMBUATAN SALURAN GRAVEL 161,400.00
282 SNI. BJR.02.a 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL UK.75 ZINC-ALUMUNIUM G.550
BENTUK ATAP PELANA BENTANG < 9 m 168,700.00
283 SNI. BJR.02.b 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL UK.75 ZINC-ALUMUNIUM G.550
BENTUK ATAP PERISAI BENTANG < 9 m 169,400.00
284 SNI. BJR.02.c 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL UK.75 ZINC-ALUMUNIUM G.550
BENTUK ATAP PELANA BENTANG 9-12 m 178,500.00
285 SNI. BJR.02.d 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL UK.75 ZINC-ALUMUNIUM G.550
BENTUK ATAP PERISAI BENTANG 9-12 m 179,400.00
286 SNI. BJR.02.e 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL UK.75 ZINC-ALUMUNIUM G.550
BENTUK ATAP PELANA BENTANG 12-15 m 187,100.00
287 SNI. BJR.02.f 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL UK.75 ZINC-ALUMUNIUM G.550
BENTUK ATAP PERISAI BENTANG 12-15 m 192,600.00
288 SNI. BJR.03.a 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL Z GALVANISED COATING G.550
BENTUK ATAP PELANA BENTANG < 10 m 224,200.00
289 SNI. BJR.03.b 1M2 MENGERJAKAN RANGKA ATAP BAJA RINGAN PROFIL Z GALVANISED COATING G.550
BENTUK ATAP PERISAI BENTANG < 10 m 225,000.00
290 SNI.All.1 1M' PEMASANGAN KUSEN PINTU ALUMUNIUM 4'' (BIASA) 168,400.00
291 SNI.All.2 1M' PEMASANGAN KUSEN PINTU ALUMUNIUM 4'' (COKLAT DOP) 179,600.00
292 SNI.All.3 1M' PEMASANGAN KUSEN PINTU ALUMUNIUM 4'' (COKLAT KILAP) 190,900.00
293 SNI.All.4 1M' PEMASANGAN KUSEN PINTU ALUMUNIUM 3'' (BIASA) 162,700.00
294 SNI.All.5 1M' PEMASANGAN KUSEN PINTU ALUMUNIUM 3'' (COKLAT DOP) 168,400.00
295 SNI.All.6 1M' PEMASANGAN KUSEN PINTU ALUMUNIUM 3'' (COKLAT KILAP) 179,600.00
296 SNI.All.7 1 UNIT PEMASANGAN DAUN PINTU ALLUMUNIUM lengkap warna natural/coklat dop 0,9 x 2,1 m 1,742,800.00
297 SNI.All.8 1 UNIT PEMASANGAN Daun pintu aluminium lengkap warna coklat kilap 0,9 x 2,1 m 2,142,200.00
298 SNI.All.9 1 UNIT PEMASANGAN Daun jendela aluminium lengkap warna natural/coklat dop 0,60 x 1m 690,600.00
299 SNI.All.10 1 UNIT PEMASANGAN Daun jendela aluminium lengkap warna coklat kilap 0,60 x 1m 733,700.00
300 SNI.650.13.rob.1 1 M' PASANG PROFIL BATU ALAM (BAKAR) UKURAN 5 X 50 CM 292,000.00
301 SNI.650.13.rob.2 1 M2 PASANG BATU ALAM (BAKAR) 15 X 30 CM 399,600.00
302 SNI.L -1 1 TITIK PEKERJAAN INSTALASI LAMPU DAN STOP KONTAK 164,700.00
303 SNI.L -2 1 BH PEKERJAAN STOP KONTAK 33,400.00
304 SNI.L -3 1 BH PEKERJAAN LAMPU SL 18 WATT + FITTING 50,200.00
305 SNI.L -4 1 UNIT PEKERJAAN SEKRING KAST 59,200.00
306 SNI.L -5 1 BH PEKERJAAN MCB BOX 115,500.00
307 SNI.L -6 1 M' PEKERJAAN OVER SPANENG 34,000.00
308 SNI.L -7 1 BH PEKERJAAN SAKLAR GANDA 57,800.00
309 SNI.L -8 1 BH PEKERJAAN SAKLAR TUNGGAL 53,300.00

PEKERJAAN JALAN LINGKUNGAN


HARGA SATUAN
NO KODE SATUAN PEKERJAAN
Rp
1 EI - 322 1 M3 TIMBUNAN PILIHAN (SIRTU ALAM) 310,563.43
2 EI - 814 1 M3 WATERBOUND MACADAM UNTUK PEKERJAAN MINOR 391,430.26
3 EI - 817 1 M3 PENETRASI MACADAM UNTUK PEKERJAAN MINOR 2,022,324.41
4 EI - 661 1 M3 LAPIS PERMUKAAN PENETRASI MACADAM 2,029,538.37
5 EI - 611 1 LITER LAPIS RESAP PENGIKAT 13,588.31
6 EI - 612 1 LITER LAPIS RESAP PEREKAT 13,983.54
7 EI - 621 1 M2 AGREGAT PENUTUP BURTU 5,507.33
8 EI - 631 1 M2 LATASIR KELAS A (SS-A) 63,097.99
9 EI - 632 1 M2 LATASIR KELAS B (SS-B) 78,013.80
PEKERJAAN AIR BERSIH
HARGA SATUAN
NO KODE SATUAN PEKERJAAN
Rp
1 ANP 50 PEKERJAAN PILOT HOLE 0 - 50 M 487,600.00
2 ANP 100 PEKERJAAN PILOT HOLE 50 - 100 M 666,900.00
3 ANP 150 PEKERJAAN PILOT HOLE 100 - 150 M 695,000.00
4 ANR 50 PEKERJAAN REAMING 0 - 50 M 428,900.00
5 ANR 100 PEKERJAAN REAMING 50 - 100 M 457,100.00
6 ANR 150 PEKERJAAN REAMING 100 - 150 M 780,400.00
7 APS PENGEBORAN SUMUR BOR DALAM SEDERHANA DI WILAYAH PESISIR 220,800.00
8 ANB.1 1 m' Pemasangan pipa PVC dia. 355 mm ( 14 Inch) melalui galian tanah berbatu / bongkar jalan 181,200.00
9 ANB.2 1 m' Pemasangan pipa PVC dia. 315 (12 Inch) mm melalui galian tanah berbatu / bongkar jalan 169,800.00
10 ANB.3 1 m' Pemasangan pipa PVC dia. 250 mm (10 Ich ) melalui galian tanah berbatu / bongkar jalan 147,500.00
11 ANB.4 1 m' Pemasangan pipa PVC dia. 200 mm ( 8 Inch) melalui galian tanah berbatu / bongkar jalan 115,000.00
12 ANB.5 1 m' Pemasangan pipa PVC dia. 160 mm ( 6 Inch) melalui galian tanah berbatu / bongkar jalan 88,800.00
13 ANB.6 1 m' Pemasangan pipa PVC dia. 110 mm ( 4 Inch) melalui galian tanah berbatu / bongkar jalan 71,400.00
14 ANB.7 1 m' Pemasangan pipa PVC dia. 90 mm ( 3 Inch) melalui galian tanah berbatu / bongkar jalan 52,000.00
15 ANB.8 1 m' Pemasangan pipa PVC dia. 63 mm ( 2 Inch) melalui galian tanah berbatu / bongkar jalan 33,300.00
16 ANB.9 1 m' Pemasangan pipa PVC dia. 50 mm ( 1 1/2 Inch)melalui galian tanah berbatu / bongkar jalan 32,800.00
17 ANB.10 1 m' Pemasangan pipa PVC dia. 25 mm ( 3/4 Inch) melalui galian tanah berbatu / bongkar jalan 35,600.00
18 ANK.1 1 m' Pemasangan pipa PVC dia. 355 mm (14 Inch ) melalui galian tanah keras / berbatu 144,900.00
19 ANK.2 1 m' Pemasangan pipa PVC dia. 315 mm ( 12 Inch)melalui galian tanah keras / berbatu 135,700.00
20 ANK.3 1 m' Pemasangan pipa PVC dia. 250 mm ( 10 Inch )melalui galian tanah keras / berbatu 117,900.00
21 ANK.4 1 m' Pemasangan pipa PVC dia. 200 mm (8 Inch) melalui galian tanah keras / berbatu 90,200.00
22 ANK.5 1 m' Pemasangan pipa PVC dia. 160 mm ( 6 Inch ) melalui galian tanah keras / berbatu 70,200.00
23 ANK.6 1 m' Pemasangan pipa PVC dia. 110 mm ( 4 Inch ) melalui galian tanah keras / berbatu 56,500.00
24 ANK.7 1 m' Pemasangan pipa PVC dia. 90 mm ( 3 Inch) melalui galian tanah keras / berbatu 52,000.00
25 ANK.8 1 m' Pemasangan pipa PVC dia. 63 mm ( 2 Inch) melalui galian tanah keras / berbatu 33,300.00
26 ANK.9 1 m' Pemasangan pipa PVC dia. 50 mm 1 1/2 Inch) melalui galian tanah keras / berbatu 32,800.00
27 ANK.10 1 m' Pemasangan pipa PVC dia. 25 mm (3/4 Inch ) melalui galian tanah keras / berbatu 13,600.00
28 ANBS.1 1 m' Pemasangan pipa PVC dia. 355 mm (14 Inch) melalui galian tanah biasa 104,100.00
29 ANBS.2 1 m' Pemasangan pipa PVC dia. 315 mm ( 12 Inch) melalui galian tanah biasa 97,500.00
30 ANBS.3 1 m' Pemasangan pipa PVC dia. 250 mm ( 10 Inch) melalui galian tanah biasa 84,800.00
31 ANBS.4 1 m' Pemasangan pipa PVC dia. 200 mm ( 8 Inch ) melalui galian tanah biasa 62,400.00
32 ANBS.5 1 m' Pemasangan pipa PVC dia. 160 mm ( 6 Inch ) melalui galian tanah biasa 49,300.00
33 ANBS.6 1 m' Pemasangan pipa PVC dia. 110 mm ( 4 Inch ) melalui galian tanah biasa 39,800.00
34 ANBS.7 1 m' Pemasangan pipa PVC dia. 90 mm ( 3 Inch) melalui galian tanah biasa 37,200.00
35 ANBS.8 1 m' Pemasangan pipa PVC dia. 63 mm ( 2 Inch) melalui galian tanah biasa 25,000.00
36 ANBS.9 1 m' Pemasangan pipa PVC dia. 50 mm ( 1 1/2 Inch) melalui galian tanah biasa 24,500.00
37 ANBS.10 1 m' Pemasangan pipa PVC dia. 25 mm ( 3/4 Inch) melalui galian tanah biasa 8,000.00

SUMBER, 2016

KEPALA SEKSI PERUMAHAN DAN PERMUKIMAN KEPALA SEKSI BANGUNAN GEDUNG


DINAS CIPTA KARYA DAN TATA RUANG DINAS CIPTA KARYA DAN TATA RUANG
KABUPATEN CIREBON KABUPATEN CIREBON

H. ABDUL KARIM, ST
NIP. 19620609 199101 1 001 YEDI ADHI PRIATNA, BAE.S.Sos
NIP. 19660815 199803 1 004
H. ABDUL KARIM, ST
NIP. 19620609 199101 1 001 YEDI ADHI PRIATNA, BAE.S.Sos
NIP. 19660815 199803 1 004

KEPALA DINAS CIPTA KARYA DAN TATA RUANG


KEPALA BIDANG BANGUNAN, PERUMAHAN DAN
KABUPATEN CIREBON
PERMUKIMAN DINAS CIPTA KARYA DAN TATA RUANG