NO URAIAN SATUAN
MATERIAL BETON
1 Beton Ready Mix K-225 m3
2 Beton Ready Mix K-250 m3
3 Beton Ready Mix K-350 m3
4 Beton Ready Mix K-400 m3
5 Alat bantu (Slang + Tes Lab) Oh
MATERIAL KAYU
1 Kayu papan 2/20 m3
2 Kayu kaso 5/7 m3
3 Kayu borneo, balok m3
4 Kayu kelas III m3
5 Plywood 9 mm lbr
6 Plywood 12 mm lbr
7 Dolken kayu 8-10/400 cm btg
Rp 8,000.00
Rp 22,000.00
Rp 34,000.00
Rp 48,000.00
Rp 65,000.00
Rp 85,000.00
Rp 120,000.00
Rp 135,000.00
Rp 10,500.00
Rp 22,683.33
Rp 24,350.00
Rp 208,446.18
Rp 3,000.00
Rp 25,000.00
Rp 25,000.00
Rp 20,000.00
Rp 910,000.00
Rp 925,000.00
Rp 1,045,000.00
Rp 1,110,000.00
Rp 45,000.00
Rp 6,500,000.00
Rp 5,700,000.00
Rp 4,500,000.00
Rp 2,500,000.00
Rp 175,000.00
Rp 284,000.00
Rp 53,000.00
Rp 4,500.00
Rp 1,050.00
Rp 12,500.00
Rp 1,800.00
Rp 195,000.00
Rp 145,000.00
Rp 185,000.00
Rp 105,000.00
Rp 215,000.00
Rp 275,000.00
Rp 15,000.00
Rp 100,000.00
Rp 170,000.00
Rp 51,850.00
Rp 34,800.00
Rp 10,000.00
Rp 20,000.00
Rp 10.00
Rp 15,000.00
Rp 9,500.00
Rp 110,950.00
Rp 60,300.00
Rp 42,000.00
Rp 5,333.33
Rp 500.00
Rp 394.00
Rp 5,150.00
HARGA SATUAN ALAT
1 Mandor Oh Rp 100,000.00
2 Kepala tukang Oh Rp 85,000.00
3 Tukang batu Oh Rp 75,000.00
4 Tukang besi Oh Rp 75,000.00
5 Tukang cat Oh Rp 75,000.00
6 Tukang gali Oh Rp 75,000.00
7 Tukang kayu Oh Rp 75,000.00
8 Pekerja Oh Rp 65,000.00
9 Operator Crane Oh Rp 120,000.00
10 Pembantu Operator Crane Oh Rp 85,000.00
PERHITUNGAN VOLUME
PEKERJAAN : PEMBANGUNAN RUSUNAWA TYPE 24 KOTA BLITAR
LOKASI : KELURAHAN TURI, KECAMATAN SUKOREJO, KOTA BLITAR
A. PEKERJAAN PERSIAPAN
B. PEKERJAAN TANAH
C. PEKERJAAN PONDASI
PC-2 X Y
Tul. Atas D13-150 Jumlah 4.00 Jumlah
panjang 1.70 panjang
Kg/m 1.04 Kg/m
PC-2A X Y
Tul. Atas D13-150 Jumlah 4.00 Jumlah
panjang 1.70 panjang
Kg/m 1.04 Kg/m
PC-3 X Y
Tul. Atas D13-150 Jumlah 9.00 Jumlah
panjang 1.70 panjang
Kg/m 1.04 Kg/m
PC-5 X Y
Tul. Atas D13-150 Jumlah 9.00 Jumlah
panjang 2.25 panjang
Kg/m 1.04 Kg/m
PC-20 X Y
Tul. Atas D13-150 Jumlah 11.00 36.00 Jumlah
panjang 6.53 2.03 panjang
Kg/m 1.04 Kg/m
E. PEKERJAAN KOLOM
b) Lub. Grouting 1,5" Kolom Pct. Lt. 1 p x Jml. Lubang x Jml. Kolom
K-1 1.20 8.00 50.00
K-1A 1.20 8.00 4.00
K-1B 1.20 8.00 2.00
K-1C 1.20 8.00 2.00
K-1D 1.20 8.00 2.00
K-1E 1.20 8.00 2.00
K-1T 1.20 8.00 1.00
K-1Ta 1.20 8.00 1.00
K-1Tb 1.20 8.00 1.00
K-1R 1.20 6.00 2.00
2 Pekerjaan Kolom Pracetak Lt. 2 - Lt. 4 a) Pembesian Kolom Pracetak Lt. 2 - Lt. 4
K-2 p x Jml. Tulangan x Kg/m
Tul. Utama 8 D16 3.48 8.00 1.58
Tul. Sengkang D10-130/165 1.40 22.00 0.62
Tul. Lifting D10 1.50 3.00 0.62
b) Lub. Grouting 1,5" Kolom Pct. Lt. 2 - Lt. 4 p x Jml. Lubang x Jml. Kolom
K-2 0.90 8.00 54.00
K-2A 0.90 8.00 8.00
K-2T 0.90 8.00 1.00
K-2Ta 0.90 8.00 1.00
K-2Tb 0.90 8.00 1.00
K-2R 0.90 6.00 2.00
F. PEKERJAAN BALOK
2 Pekerjaan Balok Pracetak Lt. 2 a) Pembesian Balok Pracetak Lt. 2 Tul. D16 Tul. D13 Tul. D10 Tul. 8 Tul. 6
G-1 80.26 14.21 50.59
G-1a 61.62 10.19 36.78
G-1b 46.45 29.17 27.85 2.45
G-1b' 56.88 29.17 27.85 2.45
G-1b'' 56.88 29.17 27.85 2.45
G-1c 91.88 7.68 61.15
G-2 48.71 26.41 1.85
G-2a 49.79 26.41 1.85
G-2b 44.16 28.46 1.24
G-2c 48.71 26.41 1.85
G-3a 48.71 58.07 1.85
G-3b 48.71 58.07 1.85
G-3c 48.71 58.07 1.85
G-3d 48.71 58.07 1.85
G-3e 76.96 61.88 3.05
G-3f 76.96 61.88 3.05
G-4a 37.76 67.48 1.63
G-4b 37.76 63.88 1.63
G-4c 37.76 63.88 1.63
G-5a 54.75 35.16 1.63
G-5b 54.75 35.16 1.63
G-5c 80.63 53.03 2.55
G-5d 80.63 53.03 2.55
G-6 29.20 16.86 1.19
G-7 34.08 19.59 1.18
G-8 23.95 16.48 0.91
CG-1 23.70 22.05 0.88
3 Pekerjaan Balok Pracetak Lt. 3 - Lt. 5 a) Pembesian Balok Pracetak Lt. 3 - Lt. 5 Tul. D16 Tul. D13 Tul. D10 Tul. 8 Tul. 6
G-1 80.26 14.21 50.59
G-1a 61.62 10.19 36.78
G-1b 46.45 29.17 27.85 2.45
G-1b' 56.88 29.17 27.85 2.45
G-1b'' 56.88 29.17 27.85 2.45
G-2 48.71 26.41 1.85
G-2a 49.79 26.41 1.85
G-2b 44.16 28.46 1.24
G-2cc 48.71 26.41 1.85
G-3a 48.71 58.07 1.85
G-3aa 48.71 58.07 1.85
G-3b 48.71 58.07 1.85
G-3bb 48.71 58.07 1.85
G-4a 37.76 67.48 1.63
G-4b 37.76 63.88 1.63
G-4c 37.76 63.88 1.63
G-5a 54.75 35.16 1.63
G-5b 54.75 35.16 1.63
G-5c 80.63 53.03 2.55
G-5d 80.63 53.03 2.55
G-6 29.20 16.86 1.19
G-7 34.08 19.59 1.18
G-8 23.95 16.48 0.91
CG-1 23.70 22.05 0.88
4 Pekerjaan Balok Pracetak Lt. Dak a) Pembesian Balok Pracetak Lt. Dak Tul. D16 Tul. D13 Tul. D10 Tul. 8 Tul. 6
G-1a 61.62 10.19 36.78
G-2 48.71 26.41 1.85
G-2a 49.79 26.41 1.85
G-2cc 48.71 26.41 1.85
G-5a' 54.75 35.16 1.63
G-6 29.20 16.86 1.19
G-6a 28.47 89.78 1.19
G-7a 24.55 53.07 1.18
G-7b 24.55 53.07 1.18
G-8a 23.95 78.98 0.91
G-9 80.26 14.21 50.59
G-9a 61.62 10.19 134.06
G-9a' 61.62 10.19 134.06
G-9b 46.45 29.17 27.85
G-9b' 46.45 29.17 27.85
G-9b'' 46.45 29.17 27.85
G-10 48.71 155.43 1.85
G-10a 48.71 155.43 1.85
G-10b 48.71 155.43 1.85
G-11 37.76 150.03 1.63
G-12a 37.76 63.88 1.63
G-12b 37.76 63.88 1.63
G-13a 80.63 53.03 2.55
G-13b 80.63 53.03 2.55
CG-1 23.70 22.05 0.88
3 Pekerjaan Plat Lantai Pracetak Lt. 3 - Lt. 5 a) Pembesian Plat Lantai Pracetak Lt. 3 - Lt. Tul. D10 x Jml. Plat Lantai
S.1 197.64 72.00
S.2A 200.07 10.00
S.2B 200.07 10.00
S.2C 201.19 1.00
S.2D 201.19 1.00
S.3A 221.18 1.00
S.3B 221.18 1.00
S.4 228.17 2.00
S.5A 123.76 1.00
S.5B 123.76 1.00
S.6 107.69 4.00
S.7 134.68 4.00
S.8A 72.56 1.00
S.8B 72.56 1.00
4 Pekerjaan Plat Lantai Pracetak Lt. Dak & a) Pembesian Plat Lantai Pracetak Lt. Dak Tul. D10 Tul. D13 x Jml. Plat Lantai
Rooftank S.4 228.17 4.00
S.5 123.76 2.00
S.6 107.69 4.00
S.7 134.68 4.00
S.10 201.19 4.00
S.11 200.07 20.00
S.12 106.73 4.00
S.13 106.73 2.00
S.14A 78.86 1.00
S.14B 78.86 1.00
S.15 4.71 348.82 4.00
H. PEKERJAAN TANGGA
2 Pekerjaan 1 Tangga Servis Lt. 2 - Lt. 4 a) Pembesian Tangga Servis Lt. 2 - Lt. 4
Plat Tangga A p x Jml. Tulangan x Kg/m
Tul. D10-150 (Plat Arah X) 2.68 9.00 0.62
Tul. D10-200 (Plat Arah Y) 1.32 14.00 0.62
Tul. D10-150 (Anak Tangga Arah X) 3.35 9.00 0.62
Tul. 8 (Anak Tangga Arah Y) 1.32 9.00 0.37
Plat Tangga B (Bordes) p x Jml. Tulangan x Kg/m
Tul. D10-150 (Plat Arah X) 1.97 19.00 0.62
Tul. D10-200 (Plat Arah Y) 2.85 10.00 0.62
Plat Tangga C p x Jml. Tulangan x Kg/m
Tul. D10-150 (Plat Arah X) 2.69 9.00 0.62
Tul. D10-200 (Plat Arah Y) 1.32 14.00 0.62
Tul. D10-150 (Anak Tangga Arah X) 3.35 9.00 0.62
Tul. 8 (Anak Tangga Arah Y) 1.32 9.00 0.37
Balok Bordes
Tul. 6D16 3.00 6.00 1.58
Tul. Sengkang D10-150 1.10 20.00 0.62
4 Pekerjaan Tangga Utama Lt. 2 - Lt. 4 a) Pembesian Tangga Utama Lt. 2 - Lt. 4
Plat Tangga A p x Jml. Tulangan x Kg/m
Tul. D10-150 (Plat Arah X) 2.67 11.00 0.62
Tul. D10-200 (Plat Arah Y) 1.54 14.00 0.62
Tul. D10-150 (Anak Tangga Arah X) 3.82 11.00 0.62
Tul. 8 (Anak Tangga Arah Y) 1.54 9.00 0.37
Plat Tangga B (Bordes) p x Jml. Tulangan x Kg/m
Tul. D10-150 (Plat Arah X) 1.76 27.00 0.62
Tul. D10-200 (Plat Arah Y) 4.00 9.00 0.62
Plat Tangga C p x Jml. Tulangan x Kg/m
Tul. D10-150 (Plat Arah X) 2.71 11.00 0.62
Tul. D10-200 (Plat Arah Y) 1.54 14.00 0.62
Tul. D10-150 (Anak Tangga Arah X) 3.82 11.00 0.62
Tul. 8 (Anak Tangga Arah Y) 1.54 9.00 0.37
Balok Bordes
Tul. 6D16 4.00 6.00 1.58
Tul. Sengkang D10-150 1.10 27.00 0.62
I. PEKERJAAN ATAP
NO JENIS PEKERJAAN SUB PEKERJAAN PERHITUNGAN VOLUME
1 Pekerjaan Shear Wall Lt. 1 a) Pembesian Shear Wall Lt. 1 p x Jml. Tulangan x Kg/m
Shear Wall - A
Tul. D13-200 (Arah X) 4.50 19.00 1.04
Tul. D13-300 (Arah Y) 3.90 16.00 1.04
Shear Wall - B
Tul. D13-200 (Arah X) 5.40 19.00 1.04
Tul. D13-300 (Arah Y) 3.90 18.00 1.04
1 Pekerjaan kolom praktis teras lt. 2 - lt. 5 a) Pembesian Kolom Praktis 25x25 p x Jml. Tulangan x Kg/m
Tul. Utama 4D16 1.15 4.00 1.58
Tul. Sengkang D10-200 1.10 6.00 0.62
2044.00 m2
166.40 m1
180.00 m2
4.00
0.95
1.04 7.90 kg
4.00
1.15
1.58 14.54 kg
= 44.88 kg
9.00
0.95
1.04 15.96 kg
9.00
1.15
1.58 28.36 kg
= 443.25 kg
9.00
0.95
1.04 15.96 kg
9.00
1.15
1.58 28.36 kg
= 88.65 kg
9.00
1.70
1.04 31.82 kg
9.00
1.90
1.58 54.04 kg
= 1631.34 kg
9.00
1.70
1.04 31.82 kg
9.00
1.90
1.58 54.04 kg
= 1545.48 kg
13.00
1.70
1.04 44.04 kg
13.00
1.90
1.58 73.87 kg
= 707.45 kg
11.00 30.00
7.43 2.03
1.04 159.70 kg
11.00 30.00
7.63 2.23
1.58 249.58 kg
= 1637.12 kg
= 3180.00 m1
x Jml. Kolom
50.00 4094.28
50.00 1345.40
50.00 139.50
= 5579.18 kg
x Jml. Kolom
4.00 327.54
4.00 107.63
4.00 11.16
4.00 201.34
= 647.68 kg
x Jml. Kolom
2.00 163.77
2.00 53.82
2.00 5.58
2.00 201.34
= 424.51 kg
x Jml. Kolom
2.00 163.77
2.00 53.82
2.00 5.58
2.00 201.34
= 424.51 kg
x Jml. Kolom
2.00 163.77
2.00 53.82
2.00 5.58
2.00 100.67
= 323.84 kg
x Jml. Kolom
2.00 163.77
2.00 53.82
2.00 5.58
2.00 100.67
= 323.84 kg
x Jml. Kolom
1.00 81.89
1.00 26.91
1.00 2.79
1.00 11.85
= 123.43 kg
x Jml. Kolom
1.00 81.89
1.00 26.91
1.00 2.79
1.00 7.51
= 119.09 kg
x Jml. Kolom
1.00 81.89
1.00 26.91
1.00 2.79
1.00 7.51
= 119.09 kg
x Jml. Kolom
2.00 87.03
2.00 31.00
2.00 5.58
= 123.61 kg
480.00
38.40
19.20
19.20
19.20
19.20
9.60
9.60
9.60
14.40
= 638.40 m1
x Jml. Kolom
50.00 239.25
4.00 19.14
2.00 9.57
2.00 9.57
2.00 9.57
2.00 9.57
1.00 4.79
1.00 4.79
1.00 4.79
2.00 6.57
= 317.60 m2
x Jml. Kolom
50.00 29.25
4.00 2.34
2.00 1.17
2.00 1.17
2.00 1.17
2.00 1.17
1.00 0.59
1.00 0.59
1.00 0.59
2.00 0.70
= 38.73 m3
x Jml. Kolom
54.00 2375.31
54.00 1031.18
54.00 150.66
= 3557.15 kg
x Jml. Kolom
8.00 351.90
8.00 152.77
8.00 22.32
8.00 274.56
= 801.55 kg
x Jml. Kolom
1.00 43.99
1.00 19.10
1.00 2.79
1.00 7.80
= 73.67 kg
x Jml. Kolom
1.00 43.99
1.00 19.10
1.00 2.79
1.00 4.94
= 70.81 kg
x Jml. Kolom
1.00 43.99
1.00 19.10
1.00 2.79
1.00 4.94
= 70.81 kg
x Jml. Kolom
2.00 65.98
2.00 22.32
2.00 5.58
= 93.88 kg
388.80
57.60
7.20
7.20
7.20
10.80
= 478.80 m1
x Jml. Kolom
54.00 205.47
8.00 30.44
1.00 3.81
1.00 3.81
1.00 3.81
2.00 5.13
= 252.46 m2
x Jml. Kolom
54.00 22.68
8.00 3.36
1.00 0.42
1.00 0.42
1.00 0.42
2.00 0.50
= 27.80 m3
x Jml. Kolom
44.00 1657.36
44.00 802.03
44.00 122.76
= 2582.15 kg
x Jml. Kolom
8.00 301.34
8.00 145.82
8.00 22.32
8.00 237.12
= 706.60 kg
x Jml. Kolom
10.00 376.67
10.00 182.28
10.00 27.90
= 586.85 kg
x Jml. Kolom
3.00 113.00
3.00 54.68
3.00 8.37
= 176.06 kg
x Jml. Kolom
2.00 56.50
2.00 24.80
2.00 5.58
= 86.88 kg
Tul. D16 = 2504.87 kg
Tul. D13 = 237.12 kg
Tul. D10 = 1396.55 kg
Total = 4138.54 kg
316.80
57.60
72.00
21.60
10.80
= 478.80 m1
x Jml. Kolom
44.00 159.06
8.00 28.92
10.00 36.15
3.00 10.85
2.00 4.95
= 239.93 m2
x Jml. Kolom
44.00 19.80
8.00 3.60
10.00 4.50
3.00 1.35
2.00 0.54
= 29.79 m3
x Jml. Kolom
9.00 422.27
9.00 83.70
= 505.97 kg
x Jml. Kolom
52.00 640.85
52.00 255.34
= 896.19 kg
22.91
14.69
8.30
14.21
34.37
48.73
1.86
18.49
7.58
9.48
10.19
26.07
34.92
1.86
18.49
2.45
27.97
25.99
1.86
29.17
18.49
2.45
27.97
25.99
1.86
29.17
10.43
26.23
18.01
8.30
7.68
39.34
59.29
1.86
15.80
7.11
7.11
1.85
14.98
3.71
24.55
1.86
15.93
7.11
7.11
1.85
15.93
3.71
24.55
1.86
13.11
7.11
7.11
1.24
13.11
3.71
26.60
1.86
Tul. D16 = 44.16 kg
Tul. D10 = 28.46 kg
Tul. 6 = 1.24 kg
Total = 73.86 kg
15.80
7.11
7.11
1.85
14.98
3.71
18.41
1.86
13.54
7.44
3.42
13.39
15.80
7.11
7.11
1.85
14.98
3.71
36.83
1.86
14.13
1.21
14.13
23.19
15.80
4.11
4.11
1.63
13.75
23.55
1.86
13.39
28.68
15.80
4.11
4.11
1.63
13.75
23.55
1.86
12.55
25.92
23.70
1.63
20.62
33.30
1.86
10.43
23.70
1.63
20.62
33.30
1.86
10.43
12.94
0.92
12.94
17.87
11.19
3.41
3.41
1.19
11.19
15.00
1.86
11.19
1.71
1.71
1.19
11.19
2.69
15.00
1.86
26.04
46.87
9.76
4.27
5.40
1.18
14.65
17.73
1.86
9.76
1.42
1.80
1.18
9.76
1.80
17.73
1.86
13.64
19.84
9.48
1.61
1.58
0.91
9.16
2.12
14.62
1.86
9.48
1.61
1.58
0.91
9.16
2.12
14.62
1.86
23.44
39.06
11.85
0.88
11.85
21.12
0.93
18.49
7.58
9.48
10.19
26.07
34.92
1.86
33.48
63.80
15.80
7.11
7.11
1.85
14.98
3.71
18.41
1.86
46.62
88.54
15.80
4.11
4.11
1.63
13.75
23.55
1.86
46.62
78.00
15.80
4.11
4.11
1.63
13.75
23.55
1.86
12.55
25.92
23.70
1.63
20.62
33.30
1.86
10.43
12.94
0.92
12.94
17.87
27.73
4.74
4.74
1.88
24.41
1.94
41.42
1.86
14.22
0.84
12.32
17.06
1.86
34.06
16.48
1.24
28.38
14.06
1.24
87.92
80.73
13.91
12.80
4.71
Tul. D10 = 200.07 kg
87.92
80.73
15.03
12.80
4.71
Tul. D10 = 201.19 kg
87.92
80.73
25.40
22.42
4.71
Tul. D10 = 221.18 kg
87.92
80.73
28.99
25.82
4.71
Tul. D10 = 228.17 kg
39.93
35.22
23.34
20.55
4.71
Tul. D10 = 123.76 kg
39.93
35.22
15.03
12.80
4.71
Tul. D10 = 107.69 kg
39.93
35.22
28.99
25.82
4.71
Tul. D10 = 134.68 kg
23.09
19.62
12.57
12.57
4.71
Tul. D10 = 72.56 kg
40.52
35.81
24.70
23.21
4.71
Tul. D10 = 128.96 kg
39.93
35.22
13.99
12.87
4.71
Tul. D10 = 106.73 kg
20.07
16.85
19.27
17.97
4.71
Tul. D10 = 78.86 kg
148.99
136.93
33.63
29.27
4.71
14230.34
2000.74
2000.74
201.19
201.19
221.18
221.18
456.34
123.76
123.76
430.78
538.71
72.56
72.56
Tul. D10 = 20895.04 kg
x Jml. Plat Lantai
72.00 614.30
10.00 89.41
10.00 89.41
1.00 8.94
1.00 8.94
1.00 11.40
1.00 11.40
2.00 24.53
1.00 7.47
1.00 7.47
4.00 23.89
4.00 32.79
1.00 5.66
1.00 5.66
= 941.26 m2
x Jml. Plat Lantai
72.00 65.45
10.00 9.59
10.00 9.59
1.00 0.96
1.00 0.96
1.00 1.26
1.00 1.26
2.00 2.73
1.00 0.80
1.00 0.80
4.00 2.50
4.00 3.55
1.00 0.59
1.00 0.59
= 100.65 m3
912.69
247.53
430.78
538.71
804.76
4001.48
426.91
213.45
78.86
78.86
1414.11
16.25
11.98
22.40
4.60
21.74
17.58
17.74
13.70
22.40
4.60
0.00
29.86
14.32
7.20
5.26
7.68
2.50
= 22.64 m2
x Jml. Anak Tangga
0.55
8.00 0.28
0.71
0.60
8.00 0.28
0.23
= 2.65 m3
15.67
11.98
19.60
4.60
24.37
18.55
15.78
11.98
19.60
4.60
0.00
29.86
14.32
6.79
6.21
6.81
2.50
= 22.31 m2
x Jml. Anak Tangga
0.53
7.00 0.25
0.71
0.53
7.00 0.25
0.23
= 2.50 m3
19.76
14.04
27.38
5.38
25.84
20.83
21.98
16.04
27.38
5.38
0.00
39.82
19.33
8.10
6.10
8.69
3.35
= 26.24 m2
x Jml. Anak Tangga
0.64
8.00 0.33
0.96
0.71
8.00 0.33
0.31
= 3.28 m3
19.12
14.04
27.38
5.38
30.94
23.44
19.41
14.04
27.38
5.38
0.00
39.82
19.33
7.91
7.30
7.99
3.35
= 26.56 m2
x Jml. Anak Tangga
0.62
8.00 0.33
1.02
0.63
8.00 0.33
0.31
= 3.23 m3
PERHITUNGAN VOLUME VOLUME SATUAN
x Jml. Atap
2.00 1011.78 m2
Jml. Atap
2.00 1011.78 m2
4.00 355.68
4.00 259.58
4.00 426.82
4.00 292.03
4.00 426.82
4.00 209.66
A. TENAGA
Pekerja OH 0.200
Tukang Kayu OH 0.400
Kepala Tukang OH 0.020
Mandor OH 0.020
JUMLAH TENAGA KERJA
B. BAHAN
Dolken kayu 8-10/400 cm batang 1.250
Semen Portland kg 2.500
Seng gelombang lbr 1.200
Pasir Beton m3 0.005
Koral beton m3 0.009
Kayu 5/7 m3 0.072
Paku biasa 2"-5" kg 0.060
Meni besi kg 0.450
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.100
Tukang Kayu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.005
JUMLAH TENAGA KERJA
B. BAHAN
Kayu balok 5/7 m3 0.012
Paku biasa 2"-3" kg 0.020
Kayu papan 2/20 m3 0.007
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.100
Mandor OH 0.050
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.750
Tukang gali OH 0.750
Mandor OH 0.025
JUMLAH TENAGA KERJA
B. BAHAN
A. TENAGA
Pekerja OH 0.500
Tukang gali OH 0.500
Mandor OH 0.050
JUMLAH TENAGA KERJA
B. BAHAN
A. TENAGA
Pekerja OH 0.500
Mandor OH 0.050
JUMLAH TENAGA KERJA
B. BAHAN
A. TENAGA
Pekerja OH 0.300
Mandor OH 0.010
JUMLAH TENAGA KERJA
B. BAHAN
Pasir Urug m3 1.200
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.250
Mandor OH 0.025
JUMLAH TENAGA KERJA
B. BAHAN
Sirtu m3 1.200
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
JUMLAH TENAGA KERJA
B. BAHAN
Tiang pancang 25 x 25 m1 1.000
JUMLAH HARGA BAHAN
C. PERALATAN
Alat bantu m1 0.100
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 15% x D
F. Harga Satuan Pekerjaan (D+E)
1 m' - Pemancangan tiang pancang
A. TENAGA
A. TENAGA
Pekerja OH 0.045
Tukang batu OH 0.075
Kepala tukang OH 0.008
Mandor OH 0.008
JUMLAH TENAGA KERJA
B. BAHAN
A. TENAGA
Pekerja OH 1.200
Tukang batu OH 0.200
Kepala Tukang OH 0.025
Mandor OH 0.060
JUMLAH TENAGA KERJA
B. BAHAN
Kerikil (Maks 30 mm) kg 1027.000
Air Lt 200.000
Pasir beton kg 893.000
Sement portland kg 230.000
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 1.150
Tukang batu OH 0.115
Kepala Tukang OH 0.012
Mandor OH 0.001
JUMLAH TENAGA KERJA
B. BAHAN
Beton Ready Mix K-225 m3 1.070
JUMLAH HARGA BAHAN
C. PERALATAN
Vibrator m3 1.000
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 15% x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja OH 1.150
Tukang batu OH 0.115
Kepala Tukang OH 0.012
Mandor OH 0.001
JUMLAH TENAGA KERJA
B. BAHAN
Beton Ready Mix K-350 m3 1.070
JUMLAH HARGA BAHAN
C. PERALATAN
Vibrator m3 1.000
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 15% x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja OH 0.070
Tukang besi OH 0.070
Kepala Tukang OH 0.007
Mandor OH 0.004
JUMLAH TENAGA KERJA
B. BAHAN
Besi beton (polos/ulir) kg 10.500
Kawat beton kg 0.150
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.520
Tukang kayu OH 0.260
Kepala tukang OH 0.026
Mandor OH 0.026
JUMLAH TENAGA KERJA
B. BAHAN
Kayu kelas III m3 0.040
Paku 5 - 10 cm kg 0.300
Minyak Bekisting lt 0.100
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.520
Tukang kayu OH 0.260
Kepala tukang OH 0.026
Mandor OH 0.026
JUMLAH TENAGA KERJA
B. BAHAN
Kayu kelas III m3 0.045
Paku 5 - 10 cm kg 0.300
Minyak bekisting lt 0.100
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.660
Tukang kayu OH 0.330
Kepala tukang OH 0.033
Mandor OH 0.033
JUMLAH TENAGA KERJA
B. BAHAN
Kayu kelas III m3 0.040
Paku 5 - 12 cm Kg 0.400
Minyak bekisting Lt 0.200
Balok kayu kelas II m3 0.015
Plywood 9 mm Lbr 0.350
Dolken kayu 8-10/400 cm Btg 2.000
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.150
Tukang kayu OH 0.450
Kepala tukang OH 0.025
Mandor OH 0.025
JUMLAH TENAGA KERJA
B. BAHAN
Kayu kelas III m3 0.030
Paku 5 - 12 cm Kg 0.400
Minyak bekisting Lt 0.200
Balok kayu kelas II m3 0.020
Plywood 9 mm Lbr 0.350
Dolken kayu 8-10/400 cm Btg 3.000
Penjaga jarak bekisting Btg 4.000
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.660
Tukang kayu OH 0.330
Kepala tukang OH 0.033
Mandor OH 0.033
JUMLAH TENAGA KERJA
B. BAHAN
Kayu kelas III m3 0.030
Paku 5 - 12 cm Kg 0.400
Minyak bekisting Lt 0.150
Balok kayu kelas II m3 0.015
Plywood 9 mm Lbr 0.350
Dolken kayu 8-10/400 cm Btg 2.000
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.165
Tukang batu OH 0.028
Kepala tukang OH 0.003
Mandor OH 0.008
JUMLAH TENAGA KERJA
B. BAHAN
Semen PC kg 32.600
Pasir beton kg 76.000
Kerikil (maks 30 mm) kg 102.900
Air lt 21.500
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.004
Tukang kayu OH 0.038
Kepala tukang OH 0.004
Mandor OH 0.001
JUMLAH TENAGA KERJA
B. BAHAN
Kaso 5/7 m3 0.004
Playwood 12 mm Lbr 0.048
Paku (5 s.d. 7) cm Kg 0.046
Dinabolt 12 (10 s.d. 12) cm Bh 0.693
Minyak bekisting Lt 0.200
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.004
Tukang kayu OH 0.038
Kepala tukang OH 0.004
Mandor OH 0.001
JUMLAH TENAGA KERJA
B. BAHAN
Kaso 5/7 m3 0.005
Playwood 12 mm Lbr 0.043
Paku (5 s.d. 7) cm Kg 0.046
Dinabolt 12 (10 s.d. 12) cm Bh 0.693
Minyak bekisting Lt 0.200
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.007
Tukang kayu OH 0.076
Kepala tukang OH 0.008
Mandor OH 0.001
JUMLAH TENAGA KERJA
B. BAHAN
Lantai kerja tebal 10 cm m3 0.008
Besi Hollow (50 x 50 x 3) mm kg 9.394
Kaso 5/7 m3 0.005
Playwood 12 mm Lbr 0.080
Dinabolt 12 (10 s.d. 12) cm Bh 3.882
Minyak bekisting Lt 0.200
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.071
Tukang kayu OH 0.024
Mandor OH 0.005
JUMLAH TENAGA KERJA
B. BAHAN
A. TENAGA
Pekerja OH 0.089
Tukang kayu OH 0.030
Mandor OH 0.005
JUMLAH TENAGA KERJA
B. BAHAN
A. TENAGA
Pekerja OH 0.053
Tukang kayu OH 0.018
Mandor OH 0.005
JUMLAH TENAGA KERJA
B. BAHAN
A. TENAGA
Pekerja OH 0.061
Tukang batu OH 0.213
Tukang vibrator OH 0.122
Kepala tukang OH 0.033
Mandor OH 0.033
JUMLAH TENAGA KERJA
B. BAHAN
A. TENAGA
Pekerja OH 0.069
Tukang batu OH 0.242
Tukang vibrator OH 0.138
Kepala tukang OH 0.037
Mandor OH 0.073
JUMLAH TENAGA KERJA
B. BAHAN
A. TENAGA
Pekerja OH 0.064
Tukang batu OH 0.244
Tukang vibrator OH 0.128
Kepala tukang OH 0.034
Mandor OH 0.073
JUMLAH TENAGA KERJA
B. BAHAN
A. TENAGA
Pekerja OH 0.083
Tukang batu OH 0.083
Tukang erection OH 0.166
Operator crane OH 0.083
Pembantu operator crane OH 0.083
Kepala tukang OH 0.083
Mandor OH 0.083
JUMLAH TENAGA KERJA
B. BAHAN
Solar liter 8.277
JUMLAH HARGA BAHAN
C. PERALATAN
Sewa crane UH 0.083
Sewa pipe support UH 2.200
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 15% x D
F. Harga Satuan Pekerjaan (D+E)
1 bh - Mendirikan komponen balok pracetak
A. TENAGA
Pekerja OH 0.061
Tukang batu OH 0.061
Tukang erection OH 0.122
Operator crane OH 0.061
Pembantu operator crane OH 0.061
Kepala tukang OH 0.061
Mandor OH 0.061
JUMLAH TENAGA KERJA
B. BAHAN
Solar liter 6.110
JUMLAH HARGA BAHAN
C. PERALATAN
Sewa crane UH 0.061
Sewa pipe support UH 1.100
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 15% x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja OH 0.067
Tukang batu OH 0.067
Tukang erection OH 0.134
Operator crane OH 0.067
Pembantu operator crane OH 0.067
Kepala tukang OH 0.067
Mandor OH 0.067
JUMLAH TENAGA KERJA
B. BAHAN
Solar liter 6.676
JUMLAH HARGA BAHAN
C. PERALATAN
Sewa crane UH 0.067
Sewa pipe support UH 1.100
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 15% x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja OH 0.019
Tukang batu OH 0.038
Operator crane OH 0.019
Pembantu operator crane OH 0.019
JUMLAH TENAGA KERJA
B. BAHAN
Solar liter 1.897
JUMLAH HARGA BAHAN
C. PERALATAN
Sewa crane UH 0.019
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 15% x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
A. TENAGA
Tukang batu OH 0.367
Kepala tukang OH 0.074
Mandor OH 0.037
JUMLAH TENAGA KERJA
B. BAHAN
A. TENAGA
Pekerja OH 0.147
Tukang kayu OH 0.147
Kepala tukang OH 0.015
Mandor OH 0.005
JUMLAH TENAGA KERJA
B. BAHAN
Kayu kaso 5/7 m3 0.012
Papan cor m3 0.004
Paku 5-7cm kg 0.264
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.220
Tukang kayu OH 0.220
Tukang besi OH 0.220
Mandor OH 0.011
JUMLAH TENAGA KERJA
B. BAHAN
1 m2 - Pemasangan kuda-kuda baja ringan dan reng untuk atap genteng metal
A. TENAGA
Pekerja OH 0.200
Tukang besi OH 0.450
Kepala tukang OH 0.010
Mandor OH 0.050
JUMLAH TENAGA KERJA
B. BAHAN
C-75,80 m' 1.488
C-75,60 m' 2.232
Baut bh 28.000
Dinabolt bh 1.600
Reng m' 5.400
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
Pekerja OH 0.200
Tukang kayu OH 0.100
Kepala tukang OH 0.010
Mandor OH 0.001
JUMLAH TENAGA KERJA
B. BAHAN
Genteng metal bh 1.020
Paku biasa 1/2" - 1" kg 0.200
JUMLAH HARGA BAHAN
C. PERALATAN
Rp 65,000.00 Rp 13,000.00
Rp 75,000.00 Rp 30,000.00
Rp 85,000.00 Rp 1,700.00
Rp 100,000.00 Rp 2,000.00
JUMLAH TENAGA KERJA Rp 46,700.00
Rp 53,000.00 Rp 66,250.00
Rp 1,800.00 Rp 4,500.00
Rp 42,000.00 Rp 50,400.00
Rp 145,000.00 Rp 725.00
Rp 275,000.00 Rp 2,475.00
Rp 5,700,000.00 Rp 410,400.00
Rp 25,000.00 Rp 1,500.00
Rp 34,800.00 Rp 15,660.00
JUMLAH HARGA BAHAN Rp 551,910.00
Rp 65,000.00 Rp 6,500.00
Rp 75,000.00 Rp 7,500.00
Rp 85,000.00 Rp 850.00
Rp 100,000.00 Rp 500.00
JUMLAH TENAGA KERJA Rp 15,350.00
Rp 5,700,000.00 Rp 68,400.00
Rp 25,000.00 Rp 500.00
Rp 6,500,000.00 Rp 45,500.00
JUMLAH HARGA BAHAN Rp 114,400.00
JUMLAH HARGA ALAT
Rp 129,750.00
Rp 19,462.50
Rp 149,212.50
Rp 65,000.00 Rp 6,500.00
Rp 100,000.00 Rp 5,000.00
JUMLAH TENAGA KERJA Rp 11,500.00
JUMLAH HARGA BAHAN
Rp 65,000.00 Rp 48,750.00
Rp 75,000.00 Rp 56,250.00
Rp 100,000.00 Rp 2,500.00
JUMLAH TENAGA KERJA Rp 107,500.00
Rp 65,000.00 Rp 32,500.00
Rp 75,000.00 Rp 37,500.00
Rp 100,000.00 Rp 5,000.00
JUMLAH TENAGA KERJA Rp 75,000.00
Rp 65,000.00 Rp 32,500.00
Rp 100,000.00 Rp 5,000.00
JUMLAH TENAGA KERJA Rp 37,500.00
Rp 65,000.00 Rp 19,500.00
Rp 100,000.00 Rp 1,000.00
JUMLAH TENAGA KERJA Rp 20,500.00
Rp 65,000.00 Rp 16,250.00
Rp 100,000.00 Rp 2,500.00
JUMLAH TENAGA KERJA Rp 18,750.00
Rp 170,000.00 Rp 170,000.00
JUMLAH HARGA BAHAN Rp 170,000.00
Rp 170,000.00 Rp 17,000.00
JUMLAH HARGA ALAT Rp 17,000.00
Rp 187,000.00
Rp 28,050.00
Rp 215,050.00
HARGA SATUAN JUMLAH HARGA
Rp 51,850.00 Rp 51,850.00
Rp 1,361.00 Rp 95.27
JUMLAH HARGA ALAT Rp 51,945.27
Rp 51,945.27
Rp 7,791.79
Rp 59,737.06
Rp 65,000.00 Rp 2,925.00
Rp 75,000.00 Rp 5,625.00
Rp 85,000.00 Rp 637.50
Rp 100,000.00 Rp 750.00
JUMLAH TENAGA KERJA Rp 9,937.50
Rp 45,000 Rp 45,000.00
JUMLAH HARGA ALAT Rp 45,000.00
Rp 54,937.50
Rp 8,240.63
Rp 63,178.13
Rp 65,000.00 Rp 78,000.00
Rp 75,000.00 Rp 15,000.00
Rp 85,000.00 Rp 2,125.00
Rp 100,000.00 Rp 6,000.00
JUMLAH TENAGA KERJA Rp 101,125.00
Rp 152.78 Rp 156,902.78
Rp 10.00 Rp 2,000.00
Rp 103.57 Rp 92,489.29
Rp 1,800.00 Rp 414,000.00
JUMLAH HARGA BAHAN Rp 665,392.06
Rp 65,000.00 Rp 74,750.00
Rp 75,000.00 Rp 8,625.00
Rp 85,000.00 Rp 977.50
Rp 100,000.00 Rp 115.00
JUMLAH TENAGA KERJA Rp 84,467.50
Rp 910,000.00 Rp 973,700.00
JUMLAH HARGA BAHAN Rp 973,700.00
Rp 5,000.00 Rp 5,000.00
JUMLAH HARGA ALAT Rp 5,000.00
Rp 1,063,167.50
Rp 159,475.13
Rp 1,222,642.63
Rp 65,000.00 Rp 74,750.00
Rp 75,000.00 Rp 8,625.00
Rp 85,000.00 Rp 977.50
Rp 100,000.00 Rp 115.00
JUMLAH TENAGA KERJA Rp 84,467.50
Rp 1,045,000.00 Rp 1,118,150.00
JUMLAH HARGA BAHAN Rp 1,118,150.00
Rp 5,000.00 Rp 5,000.00
JUMLAH HARGA ALAT Rp 5,000.00
Rp 1,207,617.50
Rp 181,142.63
Rp 1,388,760.13
Rp 65,000.00 Rp 4,550.00
Rp 75,000.00 Rp 5,250.00
Rp 85,000.00 Rp 595.00
Rp 100,000.00 Rp 400.00
JUMLAH TENAGA KERJA Rp 10,795.00
Rp 8,000.00 Rp 84,000.00
Rp 25,000.00 Rp 3,750.00
JUMLAH HARGA BAHAN Rp 87,750.00
Rp 65,000.00 Rp 33,800.00
Rp 75,000.00 Rp 19,500.00
Rp 85,000.00 Rp 2,210.00
Rp 100,000.00 Rp 2,600.00
JUMLAH TENAGA KERJA Rp 58,110.00
Rp 2,500,000.00 Rp 100,000.00
Rp 25,000.00 Rp 7,500.00
Rp 10,000.00 Rp 1,000.00
JUMLAH HARGA BAHAN Rp 108,500.00
Rp 65,000.00 Rp 33,800.00
Rp 75,000.00 Rp 19,500.00
Rp 85,000.00 Rp 2,210.00
Rp 100,000.00 Rp 2,600.00
JUMLAH TENAGA KERJA Rp 58,110.00
Rp 2,500,000.00 Rp 112,500.00
Rp 25,000.00 Rp 7,500.00
Rp 10,000.00 Rp 1,000.00
JUMLAH HARGA BAHAN Rp 121,000.00
Rp 65,000.00 Rp 42,900.00
Rp 75,000.00 Rp 24,750.00
Rp 85,000.00 Rp 2,805.00
Rp 100,000.00 Rp 3,300.00
JUMLAH TENAGA KERJA Rp 73,755.00
Rp 2,500,000.00 Rp 100,000.00
Rp 25,000.00 Rp 10,000.00
Rp 10,000.00 Rp 2,000.00
Rp 4,500,000.00 Rp 67,500.00
Rp 284,000.00 Rp 99,400.00
Rp 53,000.00 Rp 106,000.00
JUMLAH HARGA BAHAN Rp 384,900.00
Rp 65,000.00 Rp 9,750.00
Rp 75,000.00 Rp 33,750.00
Rp 85,000.00 Rp 2,125.00
Rp 100,000.00 Rp 2,500.00
JUMLAH TENAGA KERJA Rp 48,125.00
Rp 2,500,000.00 Rp 75,000.00
Rp 25,000.00 Rp 10,000.00
Rp 10,000.00 Rp 2,000.00
Rp 4,500,000.00 Rp 90,000.00
Rp 284,000.00 Rp 99,400.00
Rp 53,000.00 Rp 159,000.00
Rp 15,000.00 Rp 60,000.00
JUMLAH HARGA BAHAN Rp 495,400.00
Rp 65,000.00 Rp 42,900.00
Rp 75,000.00 Rp 24,750.00
Rp 85,000.00 Rp 2,805.00
Rp 100,000.00 Rp 3,300.00
JUMLAH TENAGA KERJA Rp 73,755.00
Rp 2,500,000.00 Rp 75,000.00
Rp 25,000.00 Rp 10,000.00
Rp 10,000.00 Rp 1,500.00
Rp 4,500,000.00 Rp 67,500.00
Rp 284,000.00 Rp 99,400.00
Rp 53,000.00 Rp 106,000.00
JUMLAH HARGA BAHAN Rp 359,400.00
Rp 65,000.00 Rp 10,725.00
Rp 75,000.00 Rp 2,100.00
Rp 85,000.00 Rp 255.00
Rp 100,000.00 Rp 800.00
JUMLAH TENAGA KERJA Rp 13,880.00
Rp 1,800.00 Rp 58,680.00
Rp 103.57 Rp 7,871.43
Rp 152.78 Rp 15,720.83
Rp 10.00 Rp 215.00
JUMLAH HARGA BAHAN Rp 82,487.26
Rp 65,000.00 Rp 260.00
Rp 75,000.00 Rp 2,850.00
Rp 85,000.00 Rp 340.00
Rp 100,000.00 Rp 100.00
JUMLAH TENAGA KERJA Rp 3,550.00
Rp 5,700,000.00 Rp 22,800.00
Rp 284,000.00 Rp 13,632.00
Rp 25,000.00 Rp 1,150.00
Rp 3,000.00 Rp 2,079.00
Rp 10,000.00 Rp 2,000.00
JUMLAH HARGA BAHAN Rp 41,661.00
Rp 65,000.00 Rp 260.00
Rp 75,000.00 Rp 2,850.00
Rp 85,000.00 Rp 340.00
Rp 100,000.00 Rp 100.00
JUMLAH TENAGA KERJA Rp 3,550.00
Rp 5,700,000.00 Rp 28,500.00
Rp 284,000.00 Rp 12,212.00
Rp 25,000.00 Rp 1,150.00
Rp 3,000.00 Rp 2,079.00
Rp 10,000.00 Rp 2,000.00
JUMLAH HARGA BAHAN Rp 45,941.00
JUMLAH HARGA ALAT
Rp 49,491.00
Rp 7,423.65
Rp 56,914.65
Rp 65,000.00 Rp 455.00
Rp 75,000.00 Rp 5,700.00
Rp 85,000.00 Rp 680.00
Rp 100,000.00 Rp 100.00
JUMLAH TENAGA KERJA Rp 6,935.00
Rp 881,494.62 Rp 7,051.96
Rp 1,337.18 Rp 12,561.44
Rp 5,700,000.00 Rp 28,500.00
Rp 284,000.00 Rp 22,720.00
Rp 3,000.00 Rp 11,646.00
Rp 10,000.00 Rp 2,000.00
JUMLAH HARGA BAHAN Rp 84,479.40
Rp 65,000.00 Rp 4,615.00
Rp 75,000.00 Rp 1,800.00
Rp 100,000.00 Rp 500.00
JUMLAH TENAGA KERJA Rp 6,915.00
Rp 65,000.00 Rp 5,785.00
Rp 75,000.00 Rp 2,250.00
Rp 100,000.00 Rp 500.00
JUMLAH TENAGA KERJA Rp 8,535.00
Rp 65,000.00 Rp 3,445.00
Rp 75,000.00 Rp 1,350.00
Rp 100,000.00 Rp 500.00
JUMLAH TENAGA KERJA Rp 5,295.00
Rp 65,000.00 Rp 3,965.00
Rp 75,000.00 Rp 15,975.00
Rp 75,000.00 Rp 9,150.00
Rp 85,000.00 Rp 2,805.00
Rp 100,000.00 Rp 3,300.00
JUMLAH TENAGA KERJA Rp 35,195.00
Rp 65,000.00 Rp 4,485.00
Rp 75,000.00 Rp 18,150.00
Rp 75,000.00 Rp 10,350.00
Rp 85,000.00 Rp 3,145.00
Rp 100,000.00 Rp 7,300.00
JUMLAH TENAGA KERJA Rp 43,430.00
Rp 65,000.00 Rp 4,160.00
Rp 75,000.00 Rp 18,300.00
Rp 75,000.00 Rp 9,600.00
Rp 85,000.00 Rp 2,890.00
Rp 100,000.00 Rp 7,300.00
JUMLAH TENAGA KERJA Rp 42,250.00
Rp 65,000.00 Rp 5,395.00
Rp 75,000.00 Rp 6,225.00
Rp 75,000.00 Rp 12,450.00
Rp 120,000.00 Rp 9,960.00
Rp 85,000.00 Rp 7,055.00
Rp 85,000.00 Rp 7,055.00
Rp 100,000.00 Rp 8,300.00
JUMLAH TENAGA KERJA Rp 56,440.00
Rp 5,150.00 Rp 42,626.55
JUMLAH HARGA BAHAN Rp 42,626.55
Rp 2,250,000.00 Rp 186,750.00
Rp 1,166.67 Rp 2,566.67
JUMLAH HARGA ALAT Rp 189,316.67
Rp 288,383.22
Rp 43,257.48
Rp 331,640.70
HARGA SATUAN JUMLAH HARGA
Rp 65,000.00 Rp 3,965.00
Rp 75,000.00 Rp 4,575.00
Rp 75,000.00 Rp 9,150.00
Rp 120,000.00 Rp 7,320.00
Rp 85,000.00 Rp 5,185.00
Rp 85,000.00 Rp 5,185.00
Rp 100,000.00 Rp 6,100.00
JUMLAH TENAGA KERJA Rp 41,480.00
Rp 5,150.00 Rp 31,466.50
JUMLAH HARGA BAHAN Rp 31,466.50
Rp 2,250,000.00 Rp 137,250.00
Rp 1,166.67 Rp 1,283.33
JUMLAH HARGA ALAT Rp 138,533.33
Rp 211,479.83
Rp 31,721.98
Rp 243,201.81
Rp 65,000.00 Rp 4,355.00
Rp 75,000.00 Rp 5,025.00
Rp 75,000.00 Rp 10,050.00
Rp 120,000.00 Rp 8,040.00
Rp 85,000.00 Rp 5,695.00
Rp 85,000.00 Rp 5,695.00
Rp 100,000.00 Rp 6,700.00
JUMLAH TENAGA KERJA Rp 45,560.00
Rp 5,150.00 Rp 34,381.40
JUMLAH HARGA BAHAN Rp 34,381.40
Rp 2,250,000.00 Rp 150,750.00
Rp 1,166.67 Rp 1,283.33
JUMLAH HARGA ALAT Rp 152,033.33
Rp 231,974.73
Rp 34,796.21
Rp 266,770.94
Rp 65,000.00 Rp 1,235.00
Rp 75,000.00 Rp 2,850.00
Rp 120,000.00 Rp 2,280.00
Rp 85,000.00 Rp 1,615.00
JUMLAH TENAGA KERJA Rp 7,980.00
Rp 5,150.00 Rp 9,769.55
JUMLAH HARGA BAHAN Rp 9,769.55
Rp 2,250,000 Rp 42,750.00
JUMLAH HARGA ALAT Rp 42,750.00
Rp 54,134.55
Rp 8,120.18
Rp 62,254.73
Rp 75,000.00 Rp 27,525.00
Rp 85,000.00 Rp 6,290.00
Rp 100,000.00 Rp 3,700.00
JUMLAH TENAGA KERJA Rp 37,515.00
Rp 65,000.00 Rp 9,555.00
Rp 75,000.00 Rp 11,025.00
Rp 85,000.00 Rp 1,275.00
Rp 100,000.00 Rp 500.00
JUMLAH TENAGA KERJA Rp 22,355.00
Rp 5,700,000.00 Rp 68,400.00
Rp 6,500,000.00 Rp 26,000.00
Rp 25,000.00 Rp 6,600.00
JUMLAH HARGA BAHAN Rp 101,000.00
Rp 65,000.00 Rp 14,300.00
Rp 75,000.00 Rp 16,500.00
Rp 75,000.00 Rp 16,500.00
Rp 100,000.00 Rp 1,100.00
JUMLAH TENAGA KERJA Rp 48,400.00
Rp 65,000 Rp 13,000
Rp 75,000 Rp 33,750
Rp 85,000 Rp 850
Rp 100,000 Rp 5,000
JUMLAH TENAGA KERJA Rp 52,600
Rp 15,000 Rp 22,320
Rp 9,500 Rp 21,204
Rp 394 Rp 11,032
Rp 3,000 Rp 4,800
Rp 5,333 Rp 28,800
JUMLAH HARGA BAHAN Rp 88,156
Rp 65,000.00 Rp 13,000.00
Rp 75,000.00 Rp 7,500.00
Rp 85,000.00 Rp 850.00
Rp 100,000.00 Rp 100.00
JUMLAH TENAGA KERJA Rp 21,450.00
Rp 68,487.65 Rp 69,857.41
Rp 25,000.00 Rp 5,000.00
JUMLAH HARGA BAHAN Rp 74,857.41
A. PEKERJAAN PERSIAPAN
1 Pembersihan site m2 2044.00 Rp 13,225.00
B. PEKERJAAN TANAH
1 Pekerjaan galian
- Galian pile cap m3 195.25 Rp 123,625.00
- Galian tie beam m3 51.76 Rp 123,625.00
2 Pile cap
- Bekisting m2 219.85 Rp 191,601.50
- Besi beton kg 6098.17 Rp 11,332.68
- Beton K-350 m3 162.36 Rp 1,388,760.13
3 Tie beam
- Bekisting m2 250.98 Rp 205,976.50
- Besi beton kg 6117.85 Rp 11,332.68
- Beton K-350 m3 25.10 Rp 1,388,760.13
D. LANTAI 1
1 Kolom pracetak
- Bekisting m2 317.60 Rp 51,992.65
- Besi beton kg 8431.94 Rp 11,332.68
- Beton K-350 m3 38.73 Rp 1,118,150.00
- Tuang tebar beton bh 67.00 Rp 40,474.25
- Buka pasang bekisting bh 67.00 Rp 7,952.25
- Langsir bh 67.00 Rp 62,254.73
- Ereksi bh 67.00 Rp 331,640.70
- Joint titik 67.00 Rp 84,031.65
- Grouting titik 67.00 Rp 43,142.25
2 Shear wall
- Besi beton kg 1334.11 Rp 11,332.68
- Bekisting m2 251.16 Rp 312,526.88
- Beton K-350 m3 25.12 Rp 1,388,760.13
3 Tangga utama
- Bekisting m2 26.24 Rp 249,064.13
- Besi beton kg 243.18 Rp 11,332.68
- Beton K-350 m3 3.28 Rp 1,388,760.13
2 Shear wall
- Besi beton kg 636.48 Rp 11,332.68
- Bekisting m2 92.12 Rp 312,526.88
- Beton K-350 m3 9.21 Rp 1,388,760.13
4 Kolom pracetak
- Bekisting m2 252.46 Rp 51,992.65
- Besi beton kg 4667.88 Rp 11,332.68
- Beton K-350 m3 27.80 Rp 1,118,150.00
- Tuang tebar beton bh 67.00 Rp 40,474.25
- Buka pasang bekisting bh 67.00 Rp 7,952.25
- Langsir bh 67.00 Rp 62,254.73
- Ereksi bh 67.00 Rp 331,640.70
- Joint titik 67.00 Rp 84,031.65
- Grouting titik 67.00 Rp 43,142.25
5 Tangga utama
- Bekisting m2 26.56 Rp 249,064.13
- Besi beton kg 245.66 Rp 11,332.68
- Beton K-350 m3 3.23 Rp 1,388,760.13
2 Shear wall
- Besi beton kg 636.48 Rp 11,332.68
- Bekisting m2 92.12 Rp 312,526.88
- Beton K-350 m3 9.21 Rp 1,388,760.13
4 Kolom pracetak
- Bekisting m2 252.46 Rp 51,992.65
- Besi beton kg 4667.88 Rp 11,332.68
- Beton K-350 m3 27.80 Rp 1,118,150.00
- Tuang tebar beton bh 67.00 Rp 40,474.25
- Buka pasang bekisting bh 67.00 Rp 7,952.25
- Langsir bh 67.00 Rp 62,254.73
- Ereksi bh 67.00 Rp 331,640.70
- Joint titik 67.00 Rp 84,031.65
- Grouting titik 67.00 Rp 43,142.25
5 Tangga utama
- Bekisting m2 26.56 Rp 249,064.13
- Besi beton kg 245.66 Rp 11,332.68
- Beton K-350 m3 3.23 Rp 1,388,760.13
2 Shear wall
- Besi beton kg 636.48 Rp 11,332.68
- Bekisting m2 92.12 Rp 312,526.88
- Beton K-350 m3 9.21 Rp 1,388,760.13
4 Kolom pracetak
- Bekisting m2 252.46 Rp 51,992.65
- Besi beton kg 4667.88 Rp 11,332.68
- Beton K-350 m3 27.80 Rp 1,118,150.00
- Tuang tebar beton bh 67.00 Rp 40,474.25
- Buka pasang bekisting bh 67.00 Rp 7,952.25
- Langsir bh 67.00 Rp 62,254.73
- Ereksi bh 67.00 Rp 331,640.70
- Joint titik 67.00 Rp 84,031.65
- Grouting titik 67.00 Rp 43,142.25
5 Tangga utama
- Bekisting m2 26.56 Rp 249,064.13
- Besi beton kg 245.66 Rp 11,332.68
- Beton K-350 m3 3.23 Rp 1,388,760.13
2 Shear wall
- Besi beton kg 636.48 Rp 11,332.68
- Bekisting m2 92.12 Rp 312,526.88
- Beton K-350 m3 9.21 Rp 1,388,760.13
4 Kolom pracetak
- Bekisting m2 239.93 Rp 51,992.65
- Besi beton kg 4138.54 Rp 11,332.68
- Beton K-350 m3 29.79 Rp 1,118,150.00
- Tuang tebar beton bh 67.00 Rp 40,474.25
- Buka pasang bekisting bh 67.00 Rp 7,952.25
- Langsir bh 67.00 Rp 62,254.73
- Ereksi bh 67.00 Rp 331,640.70
- Joint titik 67.00 Rp 84,031.65
- Grouting titik 67.00 Rp 43,142.25
3 Kolom pracetak
- Bekisting m2 36.94 Rp 51,992.65
- Besi beton kg 1402.16 Rp 11,332.68
- Beton K-350 m3 4.82 Rp 1,118,150.00
- Tuang tebar beton bh 67.00 Rp 40,474.25
- Buka pasang bekisting bh 67.00 Rp 7,952.25
- Langsir bh 67.00 Rp 62,254.73
- Ereksi bh 67.00 Rp 331,640.70
- Joint titik 67.00 Rp 84,031.65
- Grouting titik 67.00 Rp 43,142.25
Rp 175,773,130.00
Rp 27,031,900.00
Rp 24,828,960.00
Rp 123,912,270.00
Rp 45,230,891.60
Rp 30,537,198.47
Rp 24,137,898.69
Rp 6,399,299.78
Rp 746,041.72
Rp 598,122.74
Rp 147,918.98
Rp 13,947,651.42
Rp 11,182,226.49
Rp 2,765,424.93
Rp 1,383,153,515.97
Rp 890,565,055.52
Rp 683,859,000.00
Rp 189,963,852.39
Rp 16,742,203.13
Rp 336,707,155.06
Rp 42,123,972.98
Rp 69,108,587.77
Rp 225,474,594.31
Rp 155,881,305.39
Rp 51,695,158.06
Rp 69,331,601.22
Rp 34,854,546.11
Rp 490,534,874.02
Rp 193,527,897.89
Rp 16,512,605.68
Rp 95,556,476.44
Rp 43,302,595.05
Rp 2,711,774.75
Rp 532,800.75
Rp 4,171,067.08
Rp 22,219,926.84
Rp 5,630,120.55
Rp 2,890,530.75
Rp 128,493,406.93
Rp 15,119,057.71
Rp 78,494,249.93
Rp 34,880,099.30
Rp 13,841,906.65
Rp 6,534,974.40
Rp 2,755,905.61
Rp 4,551,026.65
Rp 23,116,880.10
Rp 11,277,205.15
Rp 4,469,150.00
Rp 7,370,524.95
Rp 39,123,000.00
Rp 92,431,782.45
Rp 1,011,783,396.92
Rp 261,916,085.34
Rp 28,656,918.99
Rp 125,570,049.63
Rp 60,068,834.99
Rp 5,294,117.00
Rp 1,040,416.50
Rp 6,599,001.65
Rp 25,779,391.68
Rp 8,907,354.90
Rp 48,796,254.98
Rp 7,213,020.98
Rp 28,789,975.73
Rp 12,793,258.27
Rp 507,206,669.40
Rp 100,632,358.88
Rp 239,719,639.10
Rp 114,468,454.93
Rp 5,441,800.00
Rp 681,996.00
Rp 6,972,530.04
Rp 29,878,345.65
Rp 9,411,544.80
Rp 135,270,621.16
Rp 13,125,804.46
Rp 52,899,553.38
Rp 31,089,042.60
Rp 2,711,774.75
Rp 532,800.75
Rp 4,171,067.08
Rp 22,219,926.84
Rp 5,630,120.55
Rp 2,890,530.75
Rp 13,876,838.48
Rp 6,614,052.26
Rp 2,783,940.38
Rp 4,478,845.84
Rp 22,379,566.04
Rp 11,112,165.30
Rp 4,327,485.87
Rp 6,939,914.87
Rp 22,337,361.51
Rp 5,407,045.90
Rp 12,737,995.99
Rp 4,192,319.63
Rp 1,002,724,895.51
Rp 260,328,404.87
Rp 28,628,973.89
Rp 124,158,413.22
Rp 59,920,736.03
Rp 5,294,117.00
Rp 1,040,416.50
Rp 6,599,001.65
Rp 25,779,391.68
Rp 8,907,354.90
Rp 48,796,254.98
Rp 7,213,020.98
Rp 28,789,975.73
Rp 12,793,258.27
Rp 499,735,848.47
Rp 98,951,931.82
Rp 236,796,715.56
Rp 112,536,452.74
Rp 5,344,625.00
Rp 669,817.50
Rp 6,848,020.58
Rp 29,344,803.77
Rp 9,243,481.50
Rp 135,270,621.16
Rp 13,125,804.46
Rp 52,899,553.38
Rp 31,089,042.60
Rp 2,711,774.75
Rp 532,800.75
Rp 4,171,067.08
Rp 22,219,926.84
Rp 5,630,120.55
Rp 2,890,530.75
Rp 13,876,838.48
Rp 6,614,052.26
Rp 2,783,940.38
Rp 4,478,845.84
Rp 22,379,566.04
Rp 11,112,165.30
Rp 4,327,485.87
Rp 6,939,914.87
Rp 22,337,361.51
Rp 5,407,045.90
Rp 12,737,995.99
Rp 4,192,319.63
Rp 1,002,724,895.51
Rp 260,328,404.87
Rp 28,628,973.89
Rp 124,158,413.22
Rp 59,920,736.03
Rp 5,294,117.00
Rp 1,040,416.50
Rp 6,599,001.65
Rp 25,779,391.68
Rp 8,907,354.90
Rp 48,796,254.98
Rp 7,213,020.98
Rp 28,789,975.73
Rp 12,793,258.27
Rp 499,735,848.47
Rp 98,951,931.82
Rp 236,796,715.56
Rp 112,536,452.74
Rp 5,344,625.00
Rp 669,817.50
Rp 6,848,020.58
Rp 29,344,803.77
Rp 9,243,481.50
Rp 135,270,621.16
Rp 13,125,804.46
Rp 52,899,553.38
Rp 31,089,042.60
Rp 2,711,774.75
Rp 532,800.75
Rp 4,171,067.08
Rp 22,219,926.84
Rp 5,630,120.55
Rp 2,890,530.75
Rp 13,876,838.48
Rp 6,614,052.26
Rp 2,783,940.38
Rp 4,478,845.84
Rp 22,379,566.04
Rp 11,112,165.30
Rp 4,327,485.87
Rp 6,939,914.87
Rp 22,337,361.51
Rp 5,407,045.90
Rp 12,737,995.99
Rp 4,192,319.63
Rp 962,038,830.80
Rp 260,328,404.87
Rp 28,628,973.89
Rp 124,158,413.22
Rp 59,920,736.03
Rp 5,294,117.00
Rp 1,040,416.50
Rp 6,599,001.65
Rp 25,779,391.68
Rp 8,907,354.90
Rp 48,796,254.98
Rp 7,213,020.98
Rp 28,789,975.73
Rp 12,793,258.27
Rp 499,735,848.47
Rp 98,951,931.82
Rp 236,796,715.56
Rp 112,536,452.74
Rp 5,344,625.00
Rp 669,817.50
Rp 6,848,020.58
Rp 29,344,803.77
Rp 9,243,481.50
Rp 130,840,960.97
Rp 12,474,336.55
Rp 46,900,715.20
Rp 33,309,688.50
Rp 2,711,774.75
Rp 532,800.75
Rp 4,171,067.08
Rp 22,219,926.84
Rp 5,630,120.55
Rp 2,890,530.75
Rp 22,337,361.51
Rp 5,407,045.90
Rp 12,737,995.99
Rp 4,192,319.63
Rp 564,407,060.18
Rp 308,059,769.53
Rp 33,016,444.58
Rp 160,777,253.15
Rp 67,095,038.01
Rp 5,244,172.50
Rp 1,030,601.25
Rp 6,536,746.91
Rp 25,536,189.88
Rp 8,823,323.25
Rp 194,989,209.06
Rp 40,068,925.81
Rp 87,647,234.83
Rp 45,757,280.93
Rp 2,235,025.00
Rp 280,105.50
Rp 2,863,717.70
Rp 12,271,463.39
Rp 3,865,455.90
Rp 61,358,081.59
Rp 1,920,738.47
Rp 15,890,241.71
Rp 5,390,880.69
Rp 2,711,774.75
Rp 532,800.75
Rp 4,171,067.08
Rp 22,219,926.84
Rp 5,630,120.55
Rp 2,890,530.75
Rp 172,897,978.64
Rp 73,945,191.26
Rp 9,236,496.42
Rp 16,025,671.71
Rp 17,235,667.27
Rp 3,496,115.00
Rp 687,067.50
Rp 4,357,831.28
Rp 17,024,126.58
Rp 5,882,215.50
Rp 98,952,787.38
Rp 4,362,500.00
Rp 87,647,234.83
Rp 5,072,116.25
Rp 194,350.00
Rp 24,357.00
Rp 249,018.93
Rp 1,067,083.77
Rp 336,126.60
Rp 275,833,865.57
Rp 163,775,894.42
Rp 112,057,971.15
Rp 7,087,103,334.71
REKAPITULASI RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUSUNAWA KOTA BLITAR
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
IV PEKERJAAN STRUKTUR
V PEKERJAAN ATAP
Terbilang = "Tujuh Milyar Tujuh Ratus Sebilan Puluh Enam Juta Rupiah"
A ANGGARAN BIAYA
AWA KOTA BLITAR
JUMLAH HARGA
Rp.
Rp 175,773,130.00
Rp 45,230,891.60
Rp 1,383,153,515.97
Rp 5,207,111,931.56
Rp 275,833,865.57
Total Rp 7,087,103,334.71
PPN 10% Rp 708,710,333.47
Jumlah Rp 7,795,813,668.18
Dibulatkan Rp 7,796,000,000.00
Enam Juta Rupiah"
TIME SCHEDULE (KURVA S)
JANGKA WAKTU PELAKSANAAN 120 HARI
NO JENIS PEKERJAAN JUMLAH HARGA BOBOT (%) Jan-17 Feb-17 Mar-17 Apr-17 May-17 KET.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A PEKERJAAN PERSIAPAN Rp 175,773,130.00 2.480
1 Pembersihan site Rp 27,031,900.00 0.381 0.38
2 Pasang bouwplank Rp 24,828,960.00 0.350 0.35
3 Pasang pagar seng gelombang tinggi 2 m Rp 123,912,270.00 1.748 1.75
A B C D E=CxD
a PEKERJAAN PERSIAPAN
1 Pembersihan site
Pekerja 2044.00 m2 0.100 OH 204
Mandor 2044.00 m2 0.050 OH 102
2 Pasang bouwplank
Pekerja 166.40 m1 0.100 OH 17
Tukang Kayu 166.40 m1 0.100 OH 17
Kepala Tukang 166.40 m1 0.010 OH 2
Mandor 166.40 m1 0.005 OH 1
3 Pasang pagar seng gelombang tinggi 2 m
Pekerja 180.00 m2 0.200 OH 36
Tukang Kayu 180.00 m2 0.400 OH 72
Kepala Tukang 180.00 m2 0.020 OH 4
Mandor 180.00 m2 0.020 OH 4
b PEKERJAAN TANAH
1 Pekerjaan Galian
Galian pile cap
Pekerja 195.25 m3 0.750 OH 146
Tukang gali 195.25 m3 0.750 OH 146
Mandor 195.25 m3 0.025 OH 5
Galian tie beam
Pekerja 51.76 m3 0.750 OH 39
Tukang gali 51.76 m3 0.750 OH 39
Mandor 51.76 m3 0.025 OH 1
2 Pile Cap
Bekisting
Pekerja 219.85 m2 0.520 OH 114
Tukang kayu 219.85 m2 0.260 OH 57
Kepala Tukang 219.85 m2 0.026 OH 6
Mandor 219.85 m2 0.026 OH 6
Besi Beton
Pekerja 6098.17 kg 0.070 OH 43
Tukang besi 6098.17 kg 0.070 OH 43
Kepala Tukang 6098.17 kg 0.007 OH 4
Mandor 6098.17 kg 0.004 OH 2
Beton K-350
Pekerja 162.36 m3 1.150 OH 187
Tukang batu 162.36 m3 0.115 OH 19
Kepala Tukang 162.36 m3 0.012 OH 2
Mandor 162.36 m3 0.001 OH 0
3 Tie Beam
Bekisting
Pekerja 250.98 m2 0.520 OH 131
Tukang kayu 250.98 m2 0.260 OH 65
Kepala Tukang 250.98 m2 0.026 OH 7
Mandor 250.98 m2 0.026 OH 7
Besi Beton
Pekerja 6117.85 kg 0.070 OH 43
Tukang besi 6117.85 kg 0.070 OH 43
Kepala Tukang 6117.85 kg 0.007 OH 4
Mandor 6117.85 kg 0.004 OH 2
Beton K-350
Pekerja 25.10 m3 1.150 OH 29
Tukang batu 25.10 m3 0.115 OH 3
Kepala Tukang 25.10 m3 0.012 OH 0
Mandor 25.10 m3 0.001 OH 0
2 Shear Wall
Besi Beton
Pekerja 1334.11 kg 0.070 OH 9
Tukang besi 1334.11 kg 0.070 OH 9
Kepala Tukang 1334.11 kg 0.007 OH 1
Mandor 1334.11 kg 0.004 OH 1
Bekisting
Pekerja 251.16 m2 0.150 OH 38
Tukang kayu 251.16 m2 0.450 OH 113
Kepala Tukang 251.16 m2 0.025 OH 6
Mandor 251.16 m2 0.025 OH 6
Beton K-350
Pekerja 25.12 m3 1.150 OH 29
Tukang batu 25.12 m3 0.115 OH 3
Kepala Tukang 25.12 m3 0.012 OH 0
Mandor 25.12 m3 0.001 OH 0
3 Tangga Utama
Bekisting
Pekerja 26.24 m2 0.660 OH 17
Tukang kayu 26.24 m2 0.330 OH 9
Kepala Tukang 26.24 m2 0.033 OH 1
Mandor 26.24 m2 0.033 OH 1
Besi Beton
Pekerja 243.18 kg 0.070 OH 2
Tukang besi 243.18 kg 0.070 OH 2
Kepala Tukang 243.18 kg 0.007 OH 0
Mandor 243.18 kg 0.004 OH 0
Beton K-350
Pekerja 3.28 m3 1.150 OH 4
Tukang batu 3.28 m3 0.115 OH 0
Kepala Tukang 3.28 m3 0.012 OH 0
Mandor 3.28 m3 0.001 OH 0
5 Peninggian tanah
Pekerja 302.40 m3 0.500 OH 151
Mandor 302.40 m3 0.050 OH 15
2 Shear Wall
Besi Beton
Pekerja 636.48 kg 0.070 OH 4
Tukang besi 636.48 kg 0.070 OH 4
Kepala Tukang 636.48 kg 0.007 OH 0
Mandor 636.48 kg 0.004 OH 0
Bekisting
Pekerja 92.12 m2 0.150 OH 14
Tukang kayu 92.12 m2 0.450 OH 41
Kepala Tukang 92.12 m2 0.025 OH 2
Mandor 92.12 m2 0.025 OH 2
Beton K-350
Pekerja 9.21 m3 1.150 OH 11
Tukang batu 9.21 m3 0.115 OH 1
Kepala Tukang 9.21 m3 0.012 OH 0
Mandor 9.21 m3 0.001 OH 0
4 Kolom Pracetak
Bekisting
Pekerja 252.46 m2 0.004 OH 1
Tukang kayu 252.46 m2 0.038 OH 10
Kepala Tukang 252.46 m2 0.004 OH 1
Mandor 252.46 m2 0.001 OH 0
Besi Beton
Pekerja 4667.88 kg 0.070 OH 33
Tukang besi 4667.88 kg 0.070 OH 33
Kepala Tukang 4667.88 kg 0.007 OH 3
Mandor 4667.88 kg 0.004 OH 2
Tuang tebar Beton K-350
Pekerja 67.00 bh 0.061 OH 4
Tukang batu 67.00 bh 0.213 OH 14
Tukang vibrator 67.00 bh 0.122 OH 8
Kepala Tukang 67.00 bh 0.033 OH 2
Mandor 67.00 bh 0.033 OH 2
Buka pasang Bekisting
Pekerja 67.00 bh 0.071 OH 5
Tukang kayu 67.00 bh 0.024 OH 2
Mandor 67.00 bh 0.005 OH 0
Langsir
Pekerja 67.00 bh 0.019 OH 1
Tukang batu 67.00 bh 0.038 OH 3
Operator crane 67.00 bh 0.019 OH 1
Pembantu operator crane 67.00 bh 0.019 OH 1
Ereksi
Pekerja 67.00 bh 0.083 OH 6
Tukang batu 67.00 bh 0.083 OH 6
Tukang erection 67.00 bh 0.166 OH 11
Operator crane 67.00 bh 0.083 OH 6
Pembantu operator crane 67.00 bh 0.083 OH 6
Kepala tukang 67.00 bh 0.083 OH 6
Mandor 67.00 bh 0.083 OH 6
Join
Pekerja 67.00 bh 0.147 OH 10
Tukang kayu 67.00 bh 0.147 OH 10
Kepala tukang 67.00 bh 0.015 OH 1
Pembantu operator crane 67.00 bh 0.005 OH 0
Grouting
Tukang batu 67.00 bh 0.367 OH 25
Kepala tukang 67.00 bh 0.074 OH 5
Pembantu operator crane 67.00 bh 0.037 OH 2
5 Tangga Utama
Bekisting
Pekerja 26.56 m2 0.660 OH 18
Tukang kayu 26.24 m2 0.330 OH 9
Kepala Tukang 26.24 m2 0.033 OH 1
Mandor 26.24 m2 0.033 OH 1
Besi Beton
Pekerja 243.18 kg 0.070 OH 2
Tukang besi 243.18 kg 0.070 OH 2
Kepala Tukang 243.18 kg 0.007 OH 0
Mandor 243.18 kg 0.004 OH 0
Beton K-350
Pekerja 3.28 m3 1.150 OH 4
Tukang batu 3.28 m3 0.115 OH 0
Kepala Tukang 3.28 m3 0.012 OH 0
Mandor 3.28 m3 0.001 OH 0
7 Kolom Praktis
Besi Beton
Pekerja 477.12 kg 0.070 OH 3
Tukang besi 477.12 kg 0.070 OH 3
Kepala Tukang 477.12 kg 0.007 OH 0
Mandor 477.12 kg 0.004 OH 0
Bekisting
Pekerja 48.30 m2 0.150 OH 7
Tukang kayu 48.30 m2 0.450 OH 22
Kepala Tukang 48.30 m2 0.025 OH 1
Mandor 48.30 m2 0.025 OH 1
Beton K-350
Pekerja 3.02 m3 1.150 OH 3
Tukang batu 3.02 m3 0.115 OH 0
Kepala Tukang 3.02 m3 0.012 OH 0
Mandor 3.02 m3 0.001 OH 0
3 Kolom Pracetak
Bekisting
Pekerja 36.94 m2 0.004 OH 0
Tukang kayu 36.94 m2 0.038 OH 1
Kepala Tukang 36.94 m2 0.004 OH 0
Mandor 36.94 m2 0.001 OH 0
Besi Beton
Pekerja 1402.16 kg 0.070 OH 10
Tukang besi 1402.16 kg 0.070 OH 10
Kepala Tukang 1402.16 kg 0.007 OH 1
Mandor 1402.16 kg 0.004 OH 1
Tuang tebar Beton K-350
Pekerja 67.00 bh 0.061 OH 4
Tukang batu 67.00 bh 0.213 OH 14
Tukang vibrator 67.00 bh 0.122 OH 8
Kepala Tukang 67.00 bh 0.033 OH 2
Mandor 67.00 bh 0.033 OH 2
Buka pasang Bekisting
Pekerja 67.00 bh 0.071 OH 5
Tukang kayu 67.00 bh 0.024 OH 2
Mandor 67.00 bh 0.005 OH 0
Langsir
Pekerja 67.00 bh 0.019 OH 1
Tukang batu 67.00 bh 0.038 OH 3
Operator crane 67.00 bh 0.019 OH 1
Pembantu operator crane 67.00 bh 0.019 OH 1
Ereksi
Pekerja 67.00 bh 0.083 OH 6
Tukang batu 67.00 bh 0.083 OH 6
Tukang erection 67.00 bh 0.166 OH 11
Operator crane 67.00 bh 0.083 OH 6
Pembantu operator crane 67.00 bh 0.083 OH 6
Kepala tukang 67.00 bh 0.083 OH 6
Mandor 67.00 bh 0.083 OH 6
Join
Pekerja 67.00 bh 0.147 OH 10
Tukang kayu 67.00 bh 0.147 OH 10
Kepala tukang 67.00 bh 0.015 OH 1
Pembantu operator crane 67.00 bh 0.005 OH 0
Grouting
Tukang batu 67.00 bh 0.367 OH 25
Kepala tukang 67.00 bh 0.074 OH 5
Pembantu operator crane 67.00 bh 0.037 OH 2
E=CxD F G = E/F H
NO JENIS KONSTRUKSI
A STRUKTUR BAWAH
1 Pondasi Pile Cap
2 Tie Beam
B LANTAI 1
1 Kolom pracetak
2 Shear wall
3 Tangga utama
4 Tangga servis (2 unit)
JUMLAH YG
DIBUTUHKAN (m2)
219.85
250.98
317.60
251.16
26.24
45.28
503.51
92.12
957.25
252.46
26.56
44.62
48.30
503.02
92.12
941.26
252.46
26.56
44.62
48.30
503.02
92.12
941.26
252.46
26.56
44.62
48.30
503.02
92.12
941.26
239.93
48.30
580.10
422.65
36.94
120.79
41.50
9879.16
REKAPITULASI KEBUTUHAN BETON K-350
NO JENIS KONSTRUKSI
A STRUKTUR BAWAH
1 Pondasi Pile Cap
2 Tie Beam
B LANTAI 1
1 Kolom pracetak
2 Shear wall
3 Tangga utama
4 Tangga servis (2 unit)
JUMLAH YG
DIBUTUHKAN (m3)
162.36
25.10
38.73
25.12
3.28
5.31
53.72
9.21
102.37
27.80
6.45
5.00
3.02
53.59
9.21
100.65
27.80
6.45
5.00
3.02
53.59
9.21
100.65
27.80
6.45
5.00
3.02
53.59
9.21
100.65
29.79
3.02
60.01
45.46
4.82
10.88
4.54
1200.85
REKAPITULASI KEBUTUHAN BESI
DIAMETER
NO JENIS KONSTRUKSI
TULANGAN
A STRUKTUR BAWAH
1 Pondasi Pile Cap
Tul. D13
Tul. D16
2 Tie Beam
Tul. D10
Tul. D16
B LANTAI 1
1 Kolom pracetak
Tul. D19
Tul. D16
Tul. D13
Tul. D10
2 Shear wall
Tul. D13
3 Tangga utama
Tul. D16
Tul. D10
Tul. 8
4 Tangga servis (2 unit)
Tul. D16
Tul. D10
Tul. 8
JUMLAH YG
JUMLAH YG
DIBUTUHKAN
DIBUTUHKAN (kg)
(lonjor)
2287.94 184.00
3810.23 201.00
1928.45 260.00
4189.40 221.00
5322.56 199.00
113.89 7.00
1028.54 83.00
1966.95 265.00
1334.11 107.00
39.82 3.00
192.60 26.00
10.77 3.00
59.72 4.00
316.24 44.00
18.39 6.00
5847.01 309.00
444.16 36.00
4637.52 624.00
0.00 0.00
151.67 58.00
636.48 51.00
21152.96 2844.00
2942.83 156.00
274.56 22.00
1450.49 195.00
39.82 3.00
195.07 27.00
10.77 3.00
29.86 2.00
151.87 21.00
9.20 3.00
305.26 17.00
171.86 24.00
5755.92 304.00
446.80 36.00
4603.94 619.00
0.00 0.00
149.13 57.00
636.48 51.00
20895.04 2809.00
2942.83 156.00
274.56 22.00
1450.49 195.00
39.82 3.00
195.07 27.00
10.77 3.00
29.86 2.00
151.87 21.00
9.20 3.00
305.26 17.00
171.86 24.00
5755.92 304.00
446.80 36.00
4603.94 619.00
0.00 0.00
149.13 57.00
636.48 51.00
20895.04 2809.00
2942.83 156.00
274.56 22.00
1450.49 195.00
39.82 3.00
195.07 27.00
10.77 3.00
29.86 2.00
151.87 21.00
9.20 3.00
305.26 17.00
171.86 24.00
5755.92 304.00
446.80 36.00
4603.94 619.00
0.00 0.00
149.13 57.00
636.48 51.00
20895.04 2809.00
2504.87 133.00
237.12 19.00
1396.55 188.00
305.26 17.00
171.86 24.00
5670.89 300.00
446.80 36.00
7931.17 1067.00
0.00 0.00
138.18 53.00
348.82 28.00
9143.43 1229.00
422.27 16.00
640.85 34.00
339.04 46.00
3292.38 174.00
0.00 0.00
467.37 63.00
881.48 199.00
17.10 7.00
348.82 28.00
9143.43 1229.00
213543.79 23472.00