I PEKERJAAN PERSIAPAN
A Pekerjaan Persiapan dan Biaya Umum Lainnya 3,800,000.00
SUB-TOTAL I 3,800,000.00 Err:509
II PEKERJAAN STRUKTUR
A Pekerjaan Bongkaran 2,811,000.00
V PEKERJAAN ELEKTRIKAL
A Pekerjaan inst. Penerangan & Power 1,980,000.00
Page 1 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
REKAPITULASI ANGGARAN BIAYA
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
Page 2 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
I PEKERJAAN PERSIAPAN
1. Demobilitation, persiapan, & pengukuran site 60.00 M2
2. Pagar pengaman proyek ; - M'
3. Pasang bouwplank ; 32.00 M'
- Rangka kaso + papan
4. Gudang material Uk. 4 x 3 m - M2
5. Kantor proyek Uk. 6 x 3 m - M2
6. Barak pekerja Uk. 6 x 4 m - M2
7. Air kerja ; 2.00 BLN
8. Listrik kerja ; 2.00 BLN
9. Mobilisasi dan demobilisasi 1.00 L/S
10. Akomodasi 1.00 L/S
11. Shop drawing + as built drawing 1.00 L/S
12. Keamanan selama proyek berlangsung 2.00 BLN
13. Transportasi tenaga kerja 1.00 ls
14. Pembersihan rutin dan akhir proyek 1.00 ls
SUB-TOTAL I
II PEKERJAAN STRUKTUR
A. Pekerjaan Bongkaran
1. Pekerjaan bongkaran atap 51.60 M2
2. Pekerjaan bongkaran plafond 55.20 M2
3. Pekerjaan bongkaran dinding 55.00 M2
4. Pekerjaan bongkaran kolom praktis - M3
5. Pekerjaan bongkaran lantai 21.00 M3
6. Pekerjaan bongkaran pintu dan jendela 4.00 Unit
Page 4 of 47
NO ITEM PEKERJAAN VOL ITEM
D Pekerjaan Plafond
1. Pasang plafond gypsum ; 59.00 M2
- Rangka hollow Galv.
- Gypsum plat 12mm
SUB-TOTAL IV
Page 5 of 47
NO ITEM PEKERJAAN VOL ITEM
V PEKERJAAN ELEKTRIKAL
A Pekerjaan inst. Penerangan & Power
1. Instalasi titik lampu 3.00 ttk
2. Instalasi Stop Kontak 6.00 ttk
3. Instalasi Stop Kontak AC - ttk
SUB-TOTAL IV
GRAND TOTAL
PEMBULATAN
Thank you
Best Regards,
Agus Aminudin
Page 6 of 47
CUR UNIT PRICE TOTAL PRICE
23,905,600.00
Page 8 of 47
CUR UNIT PRICE TOTAL PRICE
- 1,000,000.00 1,000,000.00
1,500,000.00
Page 9 of 47
CUR UNIT PRICE TOTAL PRICE
2,680,500.00
71,435,500.00
71,400,000.00
Page 10 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
I PEKERJAAN PERSIAPAN
1. Demobilitation, persiapan, & pengukuran site 6.00 12.00 1.00 72.00
2. Pagar pengaman proyek ; - - - -
- Seng gelombang
- Rangka kaso
3. Pasang bouwplank ; 42.00 1.00 1.00 42.00
- Rangka kaso + papan
4. Gudang material Uk. 4 x 3 m - - - -
5. Kantor proyek Uk. 6 x 3 m - - - -
6. Barak pekerja Uk. 6 x 4 m - - - -
7. Air kerja ; 1.00 1.00 1.00 1.00
- Alat bantu
8. Listrik kerja ; 1.00 1.00 1.00 1.00
- Alat bantu
9. Mobilisasi dan demobilisasi 1.00 1.00 1.00 1.00
10. Akomodasi 1.00 1.00 1.00 1.00
11. Shop drawing + as built drawing 1.00 1.00 1.00 1.00
12. Keamanan selama proyek berlangsung 1.00 1.00 1.00 1.00
13. Transportasi tenaga kerja 1.00 1.00 1.00 1.00
14. Pembersihan rutin dan akhir proyek 1.00 1.00 1.00 1.00
SUB-TOTAL
II PEKERJAAN STRUKTUR
Page 11 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
A. Pekerjaan Bongkaran
1. Pekerjaan bongkaran atap 87.91 1.00 1.00 87.91
2. Pekerjaan bongkaran plafond 72.00 1.00 1.00 72.00
3. Pekerjaan bongkaran dinding 65.04 1.00 1.00 65.04
4. Pekerjaan bongkaran kolom praktis 0.81 1.00 1.00 0.81
5. Pekerjaan bongkaran lantai 4.52 1.00 1.00 4.52
6. Pekerjaan bongkaran pintu dan jendela 1.00 1.00 1.00 1.00
Page 12 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
PC4 - - - -
PC5 - - - -
Sloof BP 1 25.11 0.20 1.00 5.02
Sloof BP 2 - - - -
Sloof BP 3 - - - -
Sloof BP 4 - - - -
3. Urugan tanah kembali dan isi untuk plat lantai 1 11.65 1.00 1.00 11.65
4. Urugan pasir bawah pondasi, sloof dan lantai ; 1.40 1.00 1.00 1.40
- Tebal 10cm Lantai - - - -
- Pemadatan PC1 0.65 0.80 0.10 0.05
PC2 0.80 0.80 0.10 0.06
PC3 0.65 0.65 0.10 0.04
PC4 - - - -
PC5 - - - -
Sloof BP 1 25.11 0.20 0.10 0.50
Sloof BP 2 - - - -
Sloof BP 3 - - - -
Sloof BP 4 - - - -
5. Pondasi batu kali Batu Kali PBK1 1.00 0.35 0.70 0.21
Page 13 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
PC3 0.65 0.65 0.10 0.04
PC4 - - - -
PC5 - - - -
Sloof BP 1 25.11 0.20 0.10 0.50
Sloof BP 2 - - - -
Sloof BP 3 - - - -
Sloof BP 4 - - - -
2. Foot Plate 80x80x35 K-300, Pembesian 198Kg/m3 ;
- Beton K-250 1.66 1.00 1.00 1.66
PC1 0.65 0.80 0.25 0.13
PC2 0.80 0.80 0.25 0.16
PC3 0.65 0.65 0.25 0.11
PC4 - - - -
PC5 - - - -
- Pembesian U24 dan U36 308.67 1.00 1.00 308.67
12 - SNI PC1 0.65 0.80 0.25 24.45
PC2 0.80 0.80 0.25 28.20
PC3 0.65 0.65 0.25 21.15
PC4 - - - 1.50
PC5 - - - 1.50
- Bekesting 8.93 1.00 1.00 8.93
PC1 0.65 0.80 0.25 0.73
PC2 0.80 0.80 0.25 0.80
PC3 0.65 0.65 0.25 0.65
PC4 - - - -
Page 14 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
PC5 - - - -
3. Sloof Basement;
- Beton K-250 1.51 1.00 1.00 1.51
Sloof BP 1 25.11 0.20 0.30 1.51
Sloof BP 2 - - - -
Sloof BP 3 - - - -
Sloof BP 4 - - - -
- Pembesian U24 dan U36 254.24 1.00 1.00 254.24
4-D13 - Sngkng 8-150 Sloof BP 1 25.11 0.20 0.30 25.11
Sloof BP 2 - - - -
Sloof BP 3 - - - -
Sloof BP 4 - - - -
- Bekesting 15.07 1.00 1.00 15.07
Sloof BP 1 25.11 0.20 0.30 15.07
Sloof BP 2 - - - -
Sloof BP 3 - - - -
Sloof BP 4 - - - -
Page 15 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
Balok B5 tangga & Canopy 17.70 0.20 0.30 1.06
- Pembesian U24 dan U36 1,036.95 1.00 1.00 1,036.95
6-13 - Sngkng 10-150 Balok Plat Lt.2 Balok B1 45.87 0.20 0.35 45.87
4-D12 - Sngkng 8-150 Balok Plat Lt.2 Balok B2 12.00 0.15 0.25 12.00
6-D12 - Sngkng 8-150 Balok Plat Lt.2 Balok B3 9.42 0.15 0.50 9.42
Balok B4 - - - -
6-D10 - Sngkng 8-150 Balok Plat Lt.2 Balok B5 tangga & Canopy 17.70 0.20 0.30 17.70
- Bekesting 88.24 1.00 1.00 88.24
Balok B1 45.87 0.20 0.35 41.28
Balok B2 12.00 0.15 0.25 7.80
Balok B3 9.42 0.15 0.50 10.83
Balok B4 - - - -
Balok B5 tangga & Canopy 17.70 0.20 0.30 14.16
Page 16 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
Balok B4 - - - -
Balok B5 - - - -
- Bekesting 73.04 1.00 1.00 73.04
Balok B1 43.26 0.20 0.35 38.93
Balok B2 14.00 0.15 0.25 9.10
Balok B3 (atap) 55.57 0.15 0.15 25.01
Balok B4 - - - -
Balok B5 - - - -
6. Kolom Lt. 1;
- Beton K-250 2.05 1.00 1.00 2.05
Kolom K1 T - - - -
Kolom K1 I 0.30 0.15 3.60 0.16
Kolom K1 L 0.50 0.15 3.60 0.27
Kolom K2 - - - -
Kolom K3 - - - -
Kolom KP - - - -
- Pembesian U24 dan U36 614.24 1.00 1.00 614.24
Kolom K1 T - - - -
6-D12 - Sngkng 10-150 K1 I&L Kolom K1 I 0.30 0.15 3.60 3.60
8-D12 - Sngkng 10-150 K2 Kolom K1 L 0.50 0.15 3.60 3.60
Kolom K2 - - - -
Kolom K3 - - - -
Page 17 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
Kolom KP - - - -
- Bekesting 40.32 1.00 1.00 40.32
Kolom K1 T - - - -
Kolom K1 I 0.30 0.15 3.60 3.24
Kolom K1 L 0.50 0.15 3.60 4.68
Kolom K2 - - - -
Kolom K3 - - - -
Kolom KP - - - -
Page 18 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
Kolom K1 T - - - -
Kolom K1 I 0.20 0.15 3.65 2.56
Kolom K1 L 0.30 0.15 3.65 3.29
Kolom K2 - - - -
Kolom KP 0.15 0.15 3.65 2.19
Kolom KP 2 - - - -
Page 19 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
- Bekesting 1.10 1.30 0.12 1.43
Page 20 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
- Lantai 2
Bangunan utama 52.09 1.00 3.60 187.52
Pagar - - - -
- Lantai 3 40.70 1.00 3.10 126.17
2. Plester dan acian dinding bata biasa (Ad. 1 : 5) 599.95 1.00 1.00 599.95
- Lantai 1 15.21 1.00 1.00 15.21
- Lantai 2 & 3 301.34 1.00 1.00 301.34
Page 21 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
- Lantai 1 - - - -
- Lantai 2 - - - -
3. Pekerjaan Railling Besi tempat jemur + Fin Duco 4.50 1.00 1.00 4.50
Page 22 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
- Uk. 2000x700 mm
- Kusen pintu alumunium + panel alm.
3. Kusen + Daun jendela type J1 + Handle & Acc. ; 1.00 1.00 1.00 1.00
- Uk. 1300x1800 mm
- Kusen jendela Allumunium + kaca 5mm
4. Kusen + Daun jendela type J2 + Handle & Acc. ; 1.00 1.00 1.00 1.00
- Uk. 1400x2200 mm
- Kusen jendela Allumunium + kaca 5mm
5. Kusen + Daun jendela type J3 + Handle & Acc. ; 1.00 1.00 1.00 1.00
- Uk. 1400x1200 mm
- Kusen jendela Allumunium + kaca 5mm
### 6. Kusen + Daun jendela type J4 + Handle & Acc. ; 1.00 1.00 1.00 1.00
- Uk. 1000x500 mm
- Kusen jendela Allumunium + kaca 5mm
D Pekerjaan Plafond
1. Pasang plafond gypsum ; 110.20 1.00 1.00 110.20
- Rangka hollow Galv. Lantai 1 47.90 1.00 1.00 47.90
- Gypsum plat 12mm Lantai 2 & 3 62.30 1.00 1.00 62.30
Page 23 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
2. Pasang Lantai Tangga Keramik 40x40 Ex. Roman 18.52 1.00 1.00 18.52
Lantai 1 8.96 1.00 1.00 8.96
Lantai 2 9.56 1.00 1.00 9.56
3. Pasang Lantai Keramik KM 20x20 Ex. Hercules 3.50 1.00 1.00 3.50
Lantai 1 - - - -
Lantai 2 & 3 3.50 1.00 1.00 3.50
4. Pasang Dinding Keramik 20x25 Ex. Hercules 30.82 1.00 1.00 30.82
Lantai 1 (dapur) 3.34 1.00 1.00 3.34
Lantai 2 & 3 17.40 1.00 1.00 17.40
F Pekerjaan Pengecatan
1. Pengecatan interior Ex. Dulux Pentalite 419.65 1.00 1.00 419.65
Lantai 1,2&3 599.95 1.00 1.00 599.95
Page 24 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
Page 25 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
- Elbow 4" 2.00 1.00 1.00 2.00
- V sok 4-3" 2.00 1.00 1.00 2.00
C. Pekerjaan Sanitary
1. Pemasangan Closet Duduk Ex. Toto + Jet Shower 1.00 1.00 1.00 1.00
2. Pemasangan Floor Drain 1.00 1.00 1.00 1.00
3. Pemasangan Roof Drain 1.00 1.00 1.00 1.00
4. Pemasangan Kran Shower 1.00 1.00 1.00 1.00
5. Pemasangan Kran Air 1.00 1.00 1.00 1.00
6. Pemasangan kran Kitchen zink 1.00 1.00 1.00 1.00
7. Pemasangan Kitchen zink Modena 1.00 1.00 1.00 1.00
V PEKERJAAN ELEKTRIKAL
A Pekerjaan inst. Penerangan & Power
1. Instalasi titik lampu 1.00 1.00 1.00 1.00
2. Instalasi Stop Kontak 1.00 1.00 1.00 1.00
3. Instalasi Stop Kontak AC 1.00 1.00 1.00 1.00
Page 26 of 47
PT. ASA REKA UTAMA
www.asareka.co.id
PERHITUNGAN VOLUME
Customer : MR. SOFYAN
Judul Proyek : HOUSE MR. SOFYAN AT SERPONG GARDEN
Lokasi : Serpong Garden Cluster Green Valley Blok E7 No.16
Update Period : Wednesday, August 10, 2016
VOLUME / UNIT
NO ITEM PEKERJAAN POSISI / LOKASI P L T
T. VOL
(METER) (METER) (METER)
5. Stop Kontak 1.00 1.00 1.00 1.00
6. Stop Kontak AC 1.00 1.00 1.00 1.00
GRAND TOTAL
Page 27 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
Page 28 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
Page 29 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
- - - - 0.00 1.00 - m2
- - - - 0.00 1.00 - m2
1.00 1.00 1.00 5.02 0.00 1.00 5.02 m2
- - - - 0.00 1.00 - m2
- - - - 0.00 1.00 - m2
- - - - 0.00 1.00 - m2
1.00 1.00 1.00 11.65 0.00 0.45 5.24 m3
1.00 1.00 1.00 1.40 0.00 1.00 1.40 m3
- - - - 0.00 1.00 - m3
1.00 7.00 7.00 0.36 0.00 1.20 0.44 m3
1.00 4.00 4.00 0.26 0.00 1.20 0.31 m3
1.00 1.00 1.00 0.04 0.00 1.20 0.05 m3
- - - - 0.00 1.00 - m3
- - - - 0.00 1.00 - m3
1.00 1.00 1.00 0.50 0.00 1.20 0.60 m3
- - - - 0.00 1.00 - m3
- - - - 0.00 1.00 - m3
- - - - 0.00 1.00 - m3
1.00 1.00 1.00 0.21 0.00 1.10 0.23 m3
Page 30 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
1.00 1.00 1.00 0.04 0.00 1.00 0.04 m3
- - - - 0.00 1.00 - m3
- - - - 0.00 1.00 - m3
1.00 1.00 1.00 0.50 0.00 1.00 0.50 m3
- - - - 0.00 1.00 - m3
- - - - 0.00 1.00 - m3
- - - - 0.00 1.00 - m3
Page 31 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
- - - - 0.00 1.00 - m2
Page 32 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
1.00 2.00 2.00 2.12 0.00 1.00 2.12 m3
1.00 1.00 1.00 1,036.95 0.00 1.00 1,036.95 Kg
6.00 1.00 6.00 286.75 303.53 1.25 737.84 Kg
4.00 1.00 4.00 42.61 39.93 1.25 103.18 Kg
6.00 1.00 6.00 50.18 45.59 1.25 119.71 Kg
- - - - 0.00 1.25 - Kg
1.00 2.00 2.00 21.82 39.15 1.25 76.22 Kg
1.00 1.00 1.00 88.24 0.00 1.00 88.24 m2
1.00 1.00 1.00 41.28 0.00 1.00 41.28 m2
1.00 1.00 1.00 7.80 0.00 1.00 7.80 m2
1.00 1.00 1.00 10.83 0.00 1.00 10.83 m2
- - - - 0.00 1.00 - m2
1.00 2.00 2.00 28.32 0.00 1.00 28.32 m2
Page 33 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
- - - - 0.00 1.25 - Kg
- - - - 0.00 1.25 - Kg
1.00 1.00 1.00 73.04 0.00 1.00 73.04 m2
1.00 1.00 1.00 38.93 0.00 1.00 38.93 m2
1.00 1.00 1.00 9.10 0.00 1.00 9.10 m2
1.00 1.00 1.00 25.01 0.00 1.00 25.01 m2
- - - - 0.00 1.00 - m2
- - - - 0.00 1.00 - m2
Page 34 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
- - - - 0.00 1.00 - kg
1.00 1.00 1.00 40.32 0.00 1.00 40.32 m2
- - - 0.00 1.00 - m2
1.00 11.00 11.00 35.64 0.00 1.00 35.64 m2
1.00 1.00 1.00 4.68 0.00 1.00 4.68 m2
- - - 0.00 1.00 - m2
- - - 0.00 1.00 - m2
- - - 0.00 1.00 - m2
Page 35 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
- - - - 0.00 1.00 - m2
1.00 18.00 18.00 45.99 0.00 1.00 45.99 m2
1.00 2.00 2.00 6.57 0.00 1.00 6.57 m2
- - - - 0.00 1.00 - m2
1.00 28.00 28.00 61.32 0.00 1.00 61.32 m2
- - - - 0.00 1.00 - m2
Page 36 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
1.00 1.00 1.00 1.43 0.00 1.00 1.43 m2
Page 37 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
Page 38 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
- - - - 0.00 1.00 - m'
- - - - 0.00 1.00 - m'
Page 39 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
Page 40 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
1.00 1.00 1.00 18.52 - 1.00 18.52 M2
1.00 1.00 1.00 8.96 - 1.00 8.96 M2
1.00 1.00 1.00 9.56 - 1.00 9.56 M2
Page 41 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
Page 42 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
1.00 4.00 4.00 8.00 - 1.00 8.00 bh
1.00 1.00 1.00 2.00 - 1.00 2.00 bh
Page 43 of 47
TOTAL VOLUME TAMBAH / ESTIMASI
KURANG KELEBIHAN VOL ITEM KET.
QTY/UNIT JMLH. UNIT T. UNIT T. VOL PEKERJAAN PEKERJAAN
1.00 14.00 14.00 14.00 - 1.00 14.00 bh
1.00 5.00 5.00 5.00 - 1.00 5.00 bh
Page 44 of 47
P-PLAT BT KALI SLOOF
M3 JLH TOTAL M3 P TOTAL M3 P TOTAL M3 T J
PONDASI BT KALI
DIMENSI 0.3 0.5 1 0.15
SLOOF
DIMENSI 0.2 0.25 1 0.05
KOLOM STR
DIMENSI 0.13 0.3 1 0.039
KOLOM PRT
DIMENSI 0.13 0.13 1 0.0169
B-LT1