1. GALI TANAH
A. KERJA SEHARIAN PENUH ( 29 HARI X Rp. 60.000 ) = 1,740,000
B. KERJA SETENGAH HARI ( 20 HARI X Rp. 30.000) = 600,000
JUMLAH KERJA 1 = 2,340,000
2. PEMBUATAN KANDANG KAMBING
A. KERJA PEMBUATAN (5 HARI X Rp. 50.000) = 250,000
B. PEMBELIAN BAMBU + ANGKUT = 200,000
JUMLAH KERJA 2 = 450,000
3. LAIN - LAIN
A. JUAL SULUH JABON 100,000
B. TANAM POHON PISANG + BIBIT 100,000
C. BUAT KOLAM ( 4 HARI X Rp. 60.000) 240,000
D. BUAT SAUNG/GARDU ( 1 HARI X RP. 60.000) 60,000
E. TUNGGU RUMAH + JAGA KAMBING 200,000
JUMLAH KERJA 3 = 700,000
TOTAL UPAH KERJA 1+2+3 = 3,490,000