Anda di halaman 1dari 1

CATATAN KERJA BAH DIDIN

1. GALI TANAH
A. KERJA SEHARIAN PENUH ( 29 HARI X Rp. 60.000 ) = 1,740,000
B. KERJA SETENGAH HARI ( 20 HARI X Rp. 30.000) = 600,000
JUMLAH KERJA 1 = 2,340,000
2. PEMBUATAN KANDANG KAMBING
A. KERJA PEMBUATAN (5 HARI X Rp. 50.000) = 250,000
B. PEMBELIAN BAMBU + ANGKUT = 200,000
JUMLAH KERJA 2 = 450,000
3. LAIN - LAIN
A. JUAL SULUH JABON 100,000
B. TANAM POHON PISANG + BIBIT 100,000
C. BUAT KOLAM ( 4 HARI X Rp. 60.000) 240,000
D. BUAT SAUNG/GARDU ( 1 HARI X RP. 60.000) 60,000
E. TUNGGU RUMAH + JAGA KAMBING 200,000
JUMLAH KERJA 3 = 700,000
TOTAL UPAH KERJA 1+2+3 = 3,490,000

CATATAN HUTANG BAH DIDIN

1. TUNGGAKAN SETORAN KOPERASI TAHUN LALU = 1,313,000


2. PINJAM UANG PADA TANGGAL 17 MARET 2017 = 300,000
3. SETORAN KOPERASI TAHUN 2017
A. TANGGAL 17 MEI 2017 (POKOK) = 567,000
B. TANGGAL 13 JUNI 2017 (POKOK) = 567,000
C. TANGGAL 17 JULI 2017 (TAMBAHAN) = 167,000
D. TANGGAL 14 AGUSTUS 2017 ( POKOK) = 567,000
E. TANGGAL 15 SEPTEMBER 2017 (POKOK) = 567,000
F. TANGGAL 12 OKTOBER 2017 (POKOK) = 567,000
TOTAL SETORAN KOPERASI = 3,002,000
4. SISA SETORAN KOPERASI ( 4 BULAN X Rp. 567.000) = 2,268,000
TOTAL HUTANG 1+2+3+4 = 6,883,000

JADI, JUMLAH YANG HARUS DIBAYAR/DILUNASI ADALAH :


1. TOTAL SELURUH HUTANG = 6,883,000
2. TOTAL JUMLAH UPAH KERJA = 3,490,000
JUMLAH YANG HARUS DIBAYAR = 3,393,000

Anda mungkin juga menyukai