ORE
TAHUN PRODUKSI ELEVASI ORE
LG MG HG
1 15216098.465 504_1 - 594_10 951321.9991 2246817.665 556962.5 2246817.665
2 15807841.822 594_11 - 630_8 1297534.038 3819638.372 866200 3819638.372
3 14638696.937 630_9 - 684_3 778222.586 3828208.717 117729.0205 3828208.717
Total 9894664.754
WASTE TARGET PRODUKSI
12969280.8 15216098.465
11988203.45 15807841.822
10810488.22 14638696.937
35767972.470 45662637.224
LUAS
No JENIS KEGIATAN
(Ha) m²
Areal prasarana / sarana pendukung 16.08
a. Kantor Administrasi Tambang, Mushola dan Kantin 2.097 20,970.00
b. Pemukiman Karyawan (mess) 3.335 33,350.00
1 c. Nursery 3.895 38,950.00
d. Pos Keamanan 0.621 6,210.00
e. Settling Pond 11.330 113,300.00
f. Bengkel dan Parkir 10.028 100,280.00
g. Lainnya 1.276 12,760.00
2 Bukaan Tambang 92.786 927,860.00
3 Areal Timbunan (Disposal) 88.768 887,680.00
4 Areal jalan tambang 6.835 68,350.00
5 Areal Komoditi Tambang (stockpile) 5.150 51,500.00
Total 226.121 2,261,210
#NAME?
325820.000
325,820.00
Tahun
No KETERANGAN
1 2
1 Lahan yang dibuka (ha)
a. area penambangan (pit) 30.929 61.857
b. area luar penambangan
1) tumbunan tanah zona pengakaran (Nursery) 1.298 2.597
2) timbunan batuan samping (disposal) 29.589 59.179
3) timbunan komoditi tambang (stockfile) 1.717 3.433
4) timbunan limbah fasilitas penunjang - -
5) jalan tambang - -
6) kolam sedimen - -
7) instalasi dan fasilitas pengolahan - -
8) kantor dan perumahan - -
9) bengkel - -
10) fasilitas penunjang lainnya - -
2 Penambangan
a. lahan selesai ditambang (ha) 30.929
b. lahan/front aktif ditambang (ha) 15.464 30.929
c. volume batuan samping (m3) 12,969,280.80 11988203.450
3 Penimbunan
a. di bekas tambang (ha) 15.464 30.929
b. di luar bekas tambang (ha) 31.306 62.612
c. volume yang ditimbun di bekas tambang (m3) 773216.667 1546433.333
d. volume yang ditimbun di luar bekas tambang (m3) 93918.000 187836.000
4 Reklamasi
a. penatagunaan lahan :
1) penataan permukaan tanah (ha) 46.770 93.541
2) penebaran tanah zona pengakaran (ha) 1.298 2.597
3) pengendalian erosi dan pengeloaan air 29.589 59.179
b. revegetasi (ha) :
1) analisis kualitas tanah (contoh) 30 30
2) pemupukan (ha) 1.298 2.597
3) pengadaan bibit (batang) 20578.947 41157.893
4) penanaman batang 18708.133 37416.267
5) pemeliharaan tanaman (ha) 46.770 93.541
Pencegahan dan pananggulangan air asam tambang
5 25 25
(conto)
Pekerjaan sipil sesuai peruntukan lahan pasca
6
tambang
7 rencana pemanfaatan lubang bekas tambang :
a. stabilitas lereng (ha)
b. pengamanan lubang bekas tambang (ha) 15.464 30.929
c. pemulihan dan pemantauan kualitas air dan serta
pengolahan air dalam lubang bekas tambang sesuai 15.464 30.929
dengan peruntukannya
d. pemeliharan lubang bekas tambang 15.464 30.929
ahun
3
final 3 th
92.786 pit 92.786
3.895 final 3 th
88.768 dispo 88.77
5.150
- stokpile final 3 th
6.835 5.15
11.330
-
5.432
10.028
1.276
61.857
46.393 final 1 th
10810488.22 V Waste 35767972.47
46.393
93.918
2319650.000 tinggi jenjang 4
398142.000
140.311
3.895 38950
100.098
30
3.895
61736.840
56124.400
140.311
25
23.571
46.393
46.393
46.393
46.393
per tahun
30.9286666667
per tahun
29.5893333333
per tahun
1.7166666667
per tahun
11,922,657.49
Kegiatan Penatagunaan Waktu Kapasitas Jumlah
Tahun Unit
Lahan Edar Alat Alat
Perataan permukaan lahan Excavator (PC 2000-8) 0.35 13.70 4
Buldozer (D-155A-5) 7.89 7.00 1
Penebaran tanah pucuk dan
Akhir Excavator (PC 2000-8) 0.35 13.70 4
penataan akhir
Dump Truck (HD 985-5) 13.76 64 8
Total 22.35 98.40 17
Ket : harga Solar Industri per Periode 1 Desember 2017 (wilayah 1) ialah Rp. 7600,00
Biaya Kegiatan
Tingkat Produksi Topsoil Jam Operasi Kebutuhan
Biaya Solar (Rp)
(m³/jam) (m³) (jam/unit) Solar (Lt/jam)
934.64 425.98 26.73 108,164,239
31.26 12736.28 22.20 2,685,839,975
398142.00
934.64 425.98 39.27 158,919,846
32.38 12295.92 60.73 5,301,443,939
1,932.92 25884.17 148.92 8,254,368,000
Biaya (Rp)
Semua Unit (Rp) Total (Rp)
432,656,955 432,656,955
2,685,839,975
635,679,386 45,733,070,875
42,411,551,514
46,165,727,830 Rp 46,165,727,830
Perhitungan Produktivitas Excavator Bulldozer
Alat Muat Jenis Komatsu
Jenis Komatsu Type Bulldozer
Type Excavator Spesifikasi D-155A-5
Spesifikasi PC 2000-8 Keterangan
Keterangan Simbol Nilai
Simbol Nilai Satuan Job Efficiency E 0.75
Job Efficiency e 0.77 Blade Capacity Hm 7.00
Bucket Capacity Hm 13.70 m3 Grade Factor e 0.87
Swelling Factor SF 0.57 Cycle Time cm 7.89
Bucket Fill Factor Ff 0.90 Production per Cycle q 6.30
Cms 21.00 detik p 31.26
Cycle Time Produktivitas
0.35 menit 121790.74
Loading Time 2.10 menit Kebutuhan Alat M 3.27
Density ρob 5.00 ton/m3 1
p 934.64 m3/jam
Produktivitas
6431578.11 m3/tahun
Kebutuhan Alat M 4.00 unit
Perhitungan Produktivitas Dump Truck
Komatsu Alat Angkut
Bulldozer Jenis Komatsu
D-155A-5 Type Rigid Dump Truck
Spesifikasi HD 985-5
Satuan Keterangan
Simbol Nilai Satuan
m3 Job Efficiency e 0.77
Heaped Capacity Ha 64.00 m3
menit Bucket Capacity Alat Muat Hm 13.70 m3
menit Swelling Factor SF 0.57
m3/jam Bucket Fill Factor Ff 0.90
m3/tahun Cycle Time Cmt 13.76 menit
unit Jumlah Pengisian np 6.0 kali
unit Kebutuhan Alat M 8 unit
32.38 m3/jam/alat
Produktivitas p
276687.24 m3/tahun
Pengendalian Erosi
Pengendalian Erosi
Drainase
Panjang 325820 m
Luas Permukaan 488730 m2
Volume yang akan dipindahkan 733095 m3
Excavator
Prod (m3/jam) Waktu (jam)
934.64 784.36
20578.9467
Biaya (Rp)
9,260,526
5,556,316
29,633,683
30,868,420
70,155,500
101,023,920
1,680,000
45,000,000
46,680,000
3,750,000
2,400,000
6,150,000
183,487,603
Keterangan
No
1. Biaya langsung
a. penatagunaan lahan :
1) Meratakan permukaan tanah
2) Penebaran zona pengekaran
3) Pengendalian Erosi dan pengelolaan air
b. revegetasi (ha) :
1 1) Analisis kualitas tanah
2) Pemupukan
3) Pengadaan bibit (batang/kg)
4) Penumbuhan/Penanaman batang
5) Pemeliharaan tanaman
d. Pekerjaan sipil
Total
2. Biaya Tidak Langsung
a. Biaya mobilisasi alat
b. Biaya perencanaan reklamasi
2
c. Biaya administrasi dan keuntungan kontraktor
d. Biaya supervisi
Total
Biaya Reklamasi (Rp)
Rp 432,656,954.86
Rp 45,733,070,874.80
Rp 299,147,845.06
Rp 9,000,000.00
Rp 7,790,000.00
Rp 1,500.00
Rp 194,750,007.79
Rp 97,375,000.00
Rp 106,069,500.00
46,773,792,183
1,403,213,765.48
1,403,213,765.48
1,870,951,687.30
1,870,951,687.30
6,548,330,905.55
-
No. Kegiatan Keterangan Rencana (ha)
Pemantauan Permukaan Tanah 92.786
Penimbunan Kembali Lahan Bekas Tambang 92.786
1 Penatagunaan Lahan
Penebaran zona pengakaran 3.90
Pengendalian erosi dan pengelolaan air 100.10
Penanaman 3.90
2 Revegetasi
Pengelolaan air asam tambang 181.55
Penutupan tajuk 181.554
3 Penyelesaian Akhir
pemeliharaan 3.895
Evaluasi
Berhasil
Berhasil
Berhasil
Berhasil
Berhasil
Berhasil
Berhasil
Berhasil
s
REKAPITULASI RENCANA DAN BIAYA PASCA TAMBANG
e. Pemeliharaan 55,317,600
f. Pemantauan 120,000,000
SUBTOTAL 1,797,405,020
2 Biaya Tidak Langsung, terdiri atas biaya:
a. Biaya mobilisasi alat 26,961,075
b. Biaya perencanaan Reklamasi 143,792,402
Biaya administrasi dan keuntungan sebagai pelaksana
c. 82,680,631
Reklamasi tahap Operasi Produksi
d. Biaya supervisi 32,353,290
SUBTOTAL 285,787,398
TOTAL 2,083,192,418