Perhitungan
Perhitungan
Menit ke-6 0
Menit ke-12 1
Menit ke-24 2
Machine run time
Menit ke-36 5
Menit ke-48 8
Menit ke-60 11
Jumlah
2 3 4 5 Total
0 1 0 0 1
1 2 0 0 4
3 3 1 1 10
5 5 4 2 21
7 9 7 4 35
11 13 12 8 55
Jumlah 126
MODEL PERTAMA PADA WAKTU PENYESUAIAN ANTAR MESIN (WPAM)
Rp383,232,000
INPUT DATA
Harga Jual 21$ Sp
material cost 16$ Mc
Biaya operator/jam 288$ Oc
Rework 4$ oT
0.22
499 3750.22
###
Rp229,893,750 0.6006748958
100 60.0674895797
total production cost sales net profit
production cost Pc
rework cost Rc
0,5Mc+(oT+Oc) 0,002(1.250+2.500)
penjualan s
p x Sp
Product D-Df
3000000/1200 = Rp 2.500
2.500/2= Rp1.250 Rp768,000
Rp 500.00 per produksi
Rp768,000
3750
Keterangan :
Rp 500.000+2.500+3.750.,002
Biaya operator perjam Oc
overtime perjam 0,5 dari gaji normal oT
material cost Mc
3,750 production cost Pc
rework cost Rc
total production ∑Pc
penjualan s
total production cost ∑Pc-s
Demand D
Defect Df