Anda di halaman 1dari 8

RENCANA ANGGARAN BIAYA (RAB)

RUMAH TINGGAL GRAHA PRATAMA TIPE 27/90

HARGA SATUAN HARGA


NO. URAIAN PEKERJAAN SAT VOL
(dalam Rp) (dalam Rp)
I PEKERJAAN PERSIAPAN
1 PEK. PEMBERSIHAN LAHAN m^2 42 10.000 Rp 420.000
2 PEK. PENGUKURAN DAN PEMASANGAN BOUWPLANK m^1 268 63.310 Rp 16,967.080
SUB TOTAL I Rp 17,387.080
II PEKERJAAN TANAH
1 PEK. GALIAN TANAH m^3 100 40.000 Rp 4,000.000
2 PEK. URUGAN KEMBALI m^3 40 10.000 Rp 400.000
SUB TOTAL II Rp 4,400.000
III PEKERJAAN PONDASI
1 PEK. URUGAN PASIR BAWAH PONDASI m^3 12 10.000 Rp 120.000
2 PEK. LANTAI KERJA (1 : 3 : 5) m^3 6 546.550 Rp 3,279.300
3 PEK. AASTAMPING m^3 24 170.000 Rp 4,080.000
4 PEK. PONDASI BATU KALI m^3 55.5 564.950 Rp 31,354.725
SUB TOTAL III Rp 38,834.025
IV PEKERJAAN STRUKTUR DAN BETON
1 PEK. RING BALOK PRAKTIS m^1 193 129.995 Rp 25,089.035
2 PEK. KOLOM PRAKTIS m^1 60 129.995 Rp 7,799.700
SUB TOTAL IV Rp 32,888.735
V PEKERJAAN DINDING
1 PEK. PASANGAN BATA MERAH 1/2 BATA AD 1 : 4 m^2 218 71.945 Rp 15,684.010
2 PEK. PLESTERAN 1 : 4 m^2 436 30.760 Rp 13,411.360
3 PEK. ACIAN m^2 436 13.995 Rp 6,101.820
SUB TOTAL V Rp 35,197.190
VI PEKERJAAN PASANGAN ATAP
a. PASANGAN RANGKA ATAP BAJA RINGAN m^2 50 130.000 Rp 6,500.000
b. PASANGAN GENTENG BETON m^2 50 96.440 Rp 4,822.000
c. PASANGAN NOK m^1 5 126.520 Rp 632.600
SUB TOTAL VI Rp 11,954.600
VII PEKERJAAN LANTAI DAN KERAMIK
1 PEK. LANTAI KERJA (1 : 3 : 5) m^2 48 546.550 Rp 26,234.400
2 PAS. LANTAI KERAMIK UK. 30 x 30 cm (RUANG UTAMA) m^2 45 61.400 Rp 2,763.000
3 PAS. PLIN KERAMIK m^2 160 70.996 Rp 11,359.360
4 PAS. LANTAI KERAMIK UK. 20 x 20 (TERAS DEPAN & BELAKANG m^2 3 137.200 Rp 411.600
5 PAS.LANTAI KERAMIK KM/WC UK. 20 x 20 (ANTI SLIP) m^2 15 132.229 Rp 1,983.435
SUB TOTAL VII Rp 42,751.795
VIII PEKERJAAN PLAFON
PEK. TRIPLEKS DICAT m^2 54 101.710 Rp 5,492.340
SUB TOTAL VIII Rp 5,492.340
IX PEKERJAAN KUSEN, PINTU, JENDELA, DAN KACA
1 PEK. KUSEN PINTU
a. PINTU DOUBLE TRIPLEKS Unit 1 900.000 Rp 900.000
b. PINTU KM/WC Unit 1 400.000 Rp 400.000
2 PEK. KUSEN JENDELA Rp 1,300.000
a. KERANGKA KAYU BORNEO DICAT Unit 2 700.000 Rp 1,400.000
b. KACA BENING 5 mm Unit 2 700.000 Rp 1,400.000
c. LUBANG ANGIN UKURAN 200 x 200 Unit 6 50.000 Rp 300.000
SUB TOTAL IX Rp 3,100.000
X PEKERJAAN PENGGANTUNG
1 PAS. HANDLE + KUNCI PINTU bh 4 40.000 Rp 160.000
2 PAS. ENGSEL PINTU bh 10 15.000 Rp 150.000
SUB TOTAL X Rp 310.000
XI PEKERJAAN PENGECATAN
1 PEK. PENGECATAN DINDING (3x) m^2 218 12.931 Rp 2,818.958
2 PEK. PENGECATAN TRIPLEKS (3x) m^2 54 12.931 Rp 698.274
3 PEK. CAT KAYU m^2 50 15.285 Rp 764.250
SUB TOTAL XI Rp 4,281.482
XII PEKERJAAN MEKANIKAL ELEKTRIKAL
1 PAS. BOKS PANEL Unit 1 57.200 Rp 57.200
2 PEK. INSTALASI TITIK LAMPU Titik 5 137.500 Rp 687.500
3 PEK. STOPKONTAK Titik 4 137.500 Rp 550.000
4 PAS. LAMPU DOWN LIGHT bh 5 30.000 Rp 150.000
5 PAS. STOPKONTAK bh 4 10.000 Rp 40.000
6 PAS. SAKELAR bh 5 15.000 Rp 75.000
SUB TOTAL XII Rp 1,559.700
XIII PEKERJAAN SANITAIR
1 PAS. INSTALASI PIPA PVC 1/2" m^1 15 38.826 Rp 582.390
2 PAS. INSTALASI PIPA PVC 2" m^1 30 127.862 Rp 3,835.860
3 PAS. INSTALASI PIPA PVC 4" m^1 10 306.062 Rp 3,060.620
4 PAS. KLOSED DUDUK Unit 1 298.270 Rp 298.270
5 PAS. BAK MANDI FIBERGLASS Unit 1 910.000 Rp 910.000
6 PAS. KERAN TEMBOK bh 3 25.000 Rp 75.000
7 PAS. TEMPAT SABUN bh 1 30.000 Rp 30.000
8 PEK. SEPTICTANK UK 2,5 X 1,5 X 2 m + REMBESAN Unit 1 3000.000 Rp 3,000.000
9 PEK. BAK KONTROL SALURAN AIR KOTOR UK.30 X 30 X 40 cm Unit 1 100.000 Rp 100.000
SUB TOTAL XIII Rp 11,892.140
XIV PEKERJAAN FINISHING
1 PEK. LANTAI CARPORT m^3 1.8 650.000 Rp 1,170.000
2 PEK. FINISHING & PELESTERAN DINDING LUAR m^3 4.5 100.000 Rp 450.000
SUB TOTAL XIV Rp 1,620.000
TOTAL Rp 211,669.087
TERBILANG : DUA RATUS SEBELAS JUTA ENAM RATUS ENAM PULUH SEMBILAN RIBU DELAPAN TUJUH RUPIAH
BOBOT HARGA DURASI M
NO. URAIAN PEKERJAAN BOBOT
(dalam Rp) (MINGGU) 1 2 3 4 5
I PEKERJAAN PERSIAPAN Rp 17,387,080 2 8.21 4.11 4.11
IIPEKERJAAN TANAH Rp 4,400,000 2 2.08 1.04 1.04
IIIPEKERJAAN PONDASI Rp 38,834,025 3 18.35 6.12 6.12 6.12
IV PEKERJAAN STRUKTUR DAN BETON Rp 32,888,735 2 15.54 7.77 7.77
V PEKERJAAN DINDING Rp 35,197,190 3 16.63 5.54
VI PEKERJAAN PASANGAN ATAP Rp 11,954,600 2 5.65
VII PEKERJAAN LANTAI DAN KERAMIK Rp 42,751,795 2 20.20
VIIIPEKERJAAN PLAFON Rp 5,492,340 2 2.59
IX PEKERJAAN KUSEN, PINTU, JENDELA, DAN KACA Rp 3,100,000 2 1.46
X PEKERJAAN PENGGANTUNG Rp 310,000 1 0.15
XI PEKERJAAN PENGECATAN Rp 4,281,482 1 2.02
XII PEKERJAAN MEKANIKAL ELEKTRIKAL Rp 1,559,700 1 0.74
XIIIPEKERJAAN SANITAIR Rp 11,892,140 2 5.62
XIV PEKERJAAN FINISHING Rp 1,620,000 2 0.77
NILAI NOMINAL Rp 211,669,087 100
PRESTASI PER MINGGU 4.11 5.15 7.16 13.89 19.43
PRESTASI KUMULATIF 4.11 9.25 16.41 30.29 49.72
MINGGU
6 7 8 9 10 11 12 13 14

5.54 5.54
2.83 2.83
10.10 10.10
1.30 1.30
0.73
0.15
2.02
0.37
2.81 2.81
0.38 0.38

8.37 18.47 11.40 2.03 0.88 2.02 3.18 3.56 0.38


58.09 76.56 87.96 89.98 90.86 92.88 96.06 99.62 100.00
BOBOT HARGA DURASI
NO. URAIAN PEKERJAAN BOBOT
(dalam Rp) (MINGGU)
I PEK.PENDAHULUAN Rp 1,601,120 2 2.40
II PEK. GALIAN TANAH Rp 237,150 1 30.05
III PEK. PONDASI Rp 20,063,065 3 0.36
IV PEK. STRUKTUR BANGUNAN Rp 7,120,880 2 10.67
V PEK. DINDING DAN LANTAI Rp 19,665,952 3 29.45
VI PEK. KUSEN Rp 1,662,988 2 2.49
VII PEK. PENGGANTUNG Rp 457,000 1 0.68
VIII PEK. KERAMIK Rp 7,280,000 3 10.90
IX PEK. ATAP DAN PLAFOND Rp 6,406,949 3 9.60
X PEK. SANITARY Rp 470,000 1 0.70
XI PEK. INSTALASI LISTRIK Rp 745,000 1 1.12
XII PEK. FINISHING Rp 1,061,300 2 1.59
NILAI NOMINAL Rp 66,771,404 100
PRESTASI PER MINGGU
PRESTASI KUMULATIF
MINGGU
1 2 3 4 5 6 7 8 9 10
1.99 1.99
0.36
10.02 10.02 10.02
5.33 5.33
9.82 9.82 9.82
1.25 1.25
0.68
3.63 3.63 3.63
3.20 3.20

1.99 2.35 10.02 15.35 25.16 11.06 11.75 3.63 6.83 6.83
1.99 4.34 14.35 29.70 54.86 65.92 77.67 81.30 88.13 94.97
11 12

3.20
0.703
1.12
0.80

3.90 1.91
98.87 100.78