DESIGN OF CARINGIN WEIR ON CISOLOK
DISTRICT, SUKABUMI – WEST JAVA
Laporan ini disusun untuk memenuhi salah satu syarat menyelesaikan pendidikan
Diploma III Program Studi Konstruksi Sipil
di Jurusan Teknik Sipil
Oleh:
Panji Agustiawan 101121022
Vika Nurati Utami 101121032
ABSTRAK
Air merupakan sumber kehidupan bagi manusia. Indonesia merupakan
sebuah negara berkembang dengan kondisi masyarakat yang agraris. Sumber
daya alam yang begitu banyak dan melimpah di setiap daerahnya, sektor
vi
ABSTRACT
Water is source of life for human. Indonesia is develop country and
agrarian people. Indonesia have a lot nature source in each country and
agriculture sector have a lot to. To support agriculture develop is needed to build
the weir. The function of Caringin weir is to up the water elevation to supply
the irrigation area. Caringin weir is designed to irrigate the water requirement for
agriculture land which is rice field elevation higher than river elevation.
To design the weir is needed several analysis consist of hydrology
analysis, weir hydraulic analiysis and stability analysis. Flood design discharge
can be determined of hydrology analysis from rainfall data. Weir hydraulic
analysis from lengthwise profile data and across river. Stability analysis from
hydraulic data to control weir stability. Intake structure and scouring sluice to
tap water that has been dammed.
With the flood design of 424,03 m3/s weir designed use the bucket type
stilling bassin. The weir intake located at left bank of the weir who can supply
the water requirement to 1500 ha area of rice field with or 2,88 m3/s.
vii
DAFTAR ISI
HALAMAN JUDUL ........................................................................................... i
LEMBAR PENGESAHAN ................................................................................ ii
LEMBAR PERSEMBAHAN............................................................................. iv
ABSTRAK ........................................................................................................... vi
KATA
PENGANTAR......................................................................................... viii
DAFTAR ISI........................................................................................................ x
DAFTAR TABEL................................................................................................ xvi
DAFTAR GAMBAR ........................................................................................... xviii
DAFTAR LAMPIRAN ....................................................................................... xxii
DAFTAR NOTASI.............................................................................................. xxiii
BAB I PENDAHULUAN
1.1 Latar Belakang ....................................................................... I-1
1.2 Lokasi Pekerjaan .................................................................... I-2
1.3 Tujuan ..................................................................................... I-3
1.4 Ruang Lingkup ....................................................................... I-3
1.5 Metode Penulisan ................................................................... I-4
1.6 Pembatasan Masalah .............................................................. I-4
1.7 Sistematika Penulisan ............................................................ I-5
BAB II TINJAUAN PUSTAKA
2.1 Bangunan Utama .................................................................... II-1
2.1.1 Pengertian Bendung ...................................................... II-2
2.1.2 Klasifikasi Bendung ...................................................... II-3
2.1.3 TataLetak Bendung dan Perlengkapannya ................... II-3
2.2 Lokasi Bendung ...................................................................... II-4
2.2.1 Pemilihan Lokasi Bendung ........................................... II-4
2.2.2 Penempatan Bendung di Sudetan Sungai..................... II-6
2.3 Analisis Hidrologi .................................................................. II-7
2.3.1 Curah Hujan Wilayah ................................................... II-7
x
A. Cara Rata- rata Arithmatik ...................................... II-8
B. Cara Poligon Thiessen ............................................. II-8
C. Cara Isohiet .............................................................. II-8
2.3.2 Analisis Frekuensi Curah Hujan ................................... II-9
A. Analisis Curah Hujan Metode Gumbel .................... II-9
B. Analisis Curah Hujan Metode Hasspers .................. II-11
C. Analisis Curah Hujan Metode der Weduwen ........... II-12
2.3.3 Debit Banjir Rencana .................................................... II-13
A. Rumus Debit Banjir Melchior .................................. II-13
B. Rumus Debit Banjir der Weduwen .......................... II-14
C. Rumus Debit Banjir Hasspers .................................. II-15
2.4 Perencanaan Hidrolis .............................................................. II-16
2.4.1 Elevasi Mercu dan Tinggi Bendung ............................. II-16
2.4.2 Tinggi Muka Air Banjir................................................ II-17
A. Tinggi Muka Air Banjir di Hilir Bendung ............... II-17
B. Tinggi Muka Air Banjir di Hulu Bendung ............... II-19
1. Lebar dan Lebar Efektif Bendung ....................... II-19
2. Perencanaan Mercu ............................................. II-22
3. Muka Air Banjir di Hulu ………………………. II-23
2.4.3 Kurva Pengempangan atau Back Water Curve ............. II-29
2.4.4 Bangunan Peredam Energi (Stilling Basin) .................. II-30
A. Kolam Olakan Loncatan Air .................................... II-32
B. Bangunan Peredam Energi Tipe USBR ................... II-33
C. Bangunan Peredam Energi Tipe Bak Tenggelam .... II-36
Bangunan Peredam Energi Tipe Vlugther............... II-37
2.5 Analisa Stabilitas Bendung .................................................... II-38
2.5.1 Tekanan Rembesan ....................................................... II-38
A. Teori Flow Net Analisis ........................................... II-39
B. Teori Bligh ............................................................... II-39
C. Teori Lane ................................................................ II-40
D. Tebal Lantai ............................................................ II-41
xi
2.5.2 Stabilitas Tubuh Bendung ............................................ II-42
A. Gaya dan Momen ..................................................... II-43
1. Berat Sendiri ........................................................ II-44
2. Gaya Gempa ........................................................ II-45
3. Tekanan Air ......................................................... II-47
4. Tekanan Lumpur ................................................. II-51
B. Kontrol Stabilitas ....................................................... II-52
2.6 Bangunan Pengambilan dan pembilas .................................... II-53
2.6.1 Bangunan Pengambilan ................................................ II-53
2.6.2 Bangunan Pembilas ...................................................... II-56
2.6.3 Daun Pintu .................................................................... II-57
2.7 Tembok Sayap, Tembok Pangkal, dan Pengarah Arus .......... II-58
2.7.1 Tembok Sayap Hilir ..................................................... II-58
2.7.2 Tembok Pangkal Bendung ........................................... II-60
A. Dinding Penahaan Tanah ......................................... II-61
B. Perencanaan Dinding Penahan Tanah ...................... II-63
2.7.3 Tembok Sayap Hulu dan Pengarah Arus ...................... II-65
2.8 Kantong Lumpur .................................................................... II-65
2.8.1 Dimensi Kantong Lumpur ............................................ II-66
A. Panjang dan Lebar Kantong Lumpur ....................... II-66
B. Volume Tampungan ................................................. II-68
C. Pengecekan Efisiensi ................................................ II-70
2.8.2 Alat Ukur Ambang Lebar ............................................. II-71
2.9 Bangunan Pelengkap .............................................................. II-73
xii
A. Mengisi Data Curah Hujan yang Kosong ................ III-4
B. Curah Hujan Wilayah .............................................. III-4
C. Analisis Frekuensi Curah Hujan .............................. III-5
D. Debit Banjir Rencana ............................................... III-5
E. Perencanaan Hidrolis ............................................... III-5
F. Bangunan Pengambilan dan Pembilas ..................... III-5
G. Stabilitas Bendung ................................................... III-6
H. Tembok Sayap, Tembok Pangkal, dan Pengarah
Arus .......................................................................... III-6
BAB IV DATA DAN PERENCANAAN
4.1 Data ........................................................................................ IV-1
4.1.1 Data Curah Hujan Stasiun Citarik................................ IV-1
4.1.2 Data Curah Hujan Stasiun Cimandiri ........................... IV-1
4.1.3 Profil Melintang Rata- rata Sungai ............................... IV-2
4.1.4 Profil Memanjang Rata- rata Sungai ............................ IV-3
4.2 Analisis Hidrologi .................................................................. IV-4
4.2.1 Curah Hujan Wilayah ................................................... IV-4
4.2.2 Analisis Frekuensi Curah Hujan ................................... IV-5
A. Metode Gumbel ........................................................ IV-6
B. Metode Hasspers ...................................................... IV-7
C. Metode der Weduwen .............................................. IV-8
4.2.3 Debit Banjir Rencana .................................................... IV-9
A. Metode Melchior- Gumbel ....................................... IV-10
B. Metode Melchior- Hasspers ..................................... IV-11
C. Metode Melchior- der Weduwen ............................. IV-12
D. Metode Hasspers- Gumbel ....................................... IV-12
E. Metode Hasspers- Hasspers ..................................... IV-13
F. Metode Hasspers- der Weduwen ............................. IV-14
4.3 Perhitungan Hidrolis Bendung ............................................... IV-17
4.3.1 Elevasi Mercu dan Tinggi Bendung ............................. IV-17
xiii
4.3.2 Tinggi Muka Air Banjir ................................................ IV-18
A. Tinggi Muka Air Banjir di Hilir Bendung ............... IV-18
B. Tinggi Muka Air Banjir di Hulu Bendung ............... IV-22
1. Lebar Efektif Bendung ........................................ IV-22
2. Perencanaan Mercu ............................................. IV-23
3. Muka Air Banjir di Hulu Bendung ...................... IV-24
4.3.3 Kurva Pengempangan atau Back Water Curve ............ IV-26
4.3.4 Bangunan Peredam Energi ........................................... IV-27
4.4 Analisis Stabilitas Bendung ................................................... IV-37
4.4.1 Tekanan Rembesan ....................................................... IV-37
A. Kontrol Bahaya Sufosi ............................................. IV-37
B. Tebal Lantai ............................................................. IV-38
4.4.2 Stabilitas Tubuh Bendung ............................................. IV-41
A. Gaya dan Momen ..................................................... IV-41
1. Berat Sendiri dan Gaya Gempa ........................... IV-41
2. Tekanan Hidrostatis Air Normal ......................... IV-46
3. Tekanan Hidrostatis Air Banjir ........................... IV-48
4. Daya Angkat (Uplift Pressure) ............................ IV-49
5. Tekanan Lumpur ................................................. IV-54
B. Kontrol Stabilitas Bendung ...................................... IV-56
1. Kombinasi 1 (M+ T+ Thn) .................................. IV-56
2. Kombinasi 2 (M+ T+ Thn+ G) ............................ IV-57
3. Kombinasi 3 (M+ T+ Thb) .................................. IV-58
4. Kombinasi 4 (M+ T+ Thb+ G) ............................ IV-59
C. Kontrol Pondasi ........................................................ IV-61
1. Panjang Bendung ................................................. IV-61
2. Daya Dukung Tanah ............................................ IV-61
4.5 Bangunan Pengambilan dan Pembilas ................................... IV-64
4.5.1 Bangunan Pengambilan ................................................ IV-64
4.5.2 Bangunan Pembilas ...................................................... IV-65
4.6 Tembok Sayap, Tembok Pangkal, dan Pengarah Arus .......... IV-65
xiv
4.6.1 Tembok Sayap Hilir ...................................................... IV-65
4.6.2 Tembok Pangkal Bendung ............................................ IV-66
4.6.3 Tembok Sayap Hulu dan Pengarah Arus ...................... IV-71
4.7 Kantong Lumpur .................................................................... IV-72
4.7.1 Volume Kantong Lumpur ............................................. IV-72
4.7.2 Luas Permukaan Rata- rata ........................................... IV-72
4.7.3 Penentuan Kemiringan Energi di Kantong selama
Ekploitasi Normal (In) .................................................. IV-73
4.7.4 Penentuan Kemiringan Energi selama Pembilasan ....... IV-74
4.7.5 Penentuan Elevasi dan Panjang Kantong Lumpur ........ IV-75
4.7.6 Pengecekan Efisiensi .................................................... IV-75
4.7.7 Alat Ukur Ambang Lebar ............................................. IV-76
xv
DAFTAR PUSTAKA
Armen dan Rokhani. 2000. Perencanaan Hidrolis Bendung Cilangkap IV
(Tugas Akhir). Bandung: Politeknik Negeri Bandung.
Departemen Pekerjaan Umum, SK SNI M-18-1989-F. 1989. Metode
Perhitungan Debit Banjir. Bandung: Yayasan LPMB.
DAFTAR TABEL
Tabel 2.1 Hubungan Antara Kala Ulang dengan Faktor Reduksi Yt ................ II- 10
Tabel 2.2 Rata- rata Tereduksi (Yn) ................................................................. II- 10
Tabel 2.3 Simpangan Baku Tereduksi (Sn) ....................................................... II- 10
xvi
Tabel 4.16 Resume Debit Rencana ...................................................................... IV- 16
Tabel 4.17 Perhitungan Tinggi Muka Air di Hilir ............................................... IV- 20
Tabel 4.18 Tinggi Muka Air di Hulu ................................................................... IV- 24
Tabel
4.19 Loncatan Air ..................................................................................... IV- 32
Tabel 4.20 Elevasi Muka Air ............................................................................... IV- 33
Tabel 4.21 Loncatan Air ..................................................................................... IV- 35
Tabel 4.22 Elevasi Muka Air .............................................................................. IV- 35
Tabel 4.23a Perhitungan Berat Sendiri Bendung ................................................. IV- 45
4.23b Perhitungan Berat Sendiri dan Gaya Gempa Bendung ..................... IV- 45
Tabel
Tabel 4.24a Perhitungan Uplift Pressure Kondisi Air Normal .............................. IV- 50
Tabel 4.24b Perhitungan Uplift Pressure Kondisi Air Normal .............................. IV- 52
Tabel 4.25a Perhitungan Uplift Pressure Kondisi Air Banjir ................................ IV- 53
Tabel 4.25b Perhitungan Uplift Pressure Kondisi Air Banjir ............................... IV- 54
Tabel 4.26a Resume Gaya dan Momen ................................................................. IV- 56
Tabel 4.26b Resume Gaya dan Momen ................................................................ IV- 56
Tabel 4.27 Hasil Kombinasi Kontrol Stabilitas ................................................... IV- 60
Tabel 4.28 Hasil Kombinasi Kontrol Pondasi ..................................................... IV- 63
Tabel 4.29 Momen Penahan ................................................................................ IV- 70
Tabel 4.30 Momen Guling ................................................................................... IV- 70
xvii
DAFTAR GAMBAR
Gambar 1.1 Lokasi Pekerjaan Bendung ........................................................... I- 2
Gambar 1.2 Detail Lokasi Bendung ................................................................. I- 3
Gambar 2.1 Bendung Tetap .............................................................................. II- 4
xviii
Gambar 2.21 Hubungan percobaan antara Fru, y2/y1untuk ambang ujung
pendek (menurut Forster danSkrinde, 1950) ................................. II- 35
Gambar 2.22 Bangunan Peredam Energi Tipe USBR III ................................... II- 35
Gambar
2.23 Bangunan Peredam Energi Tipe USBR IV ................................... II- 36
Gambar 2.24 Bangunan Peredam Energi Tipe Bucket ........................................ II- 36
Gambar 2.25 Jari- jari Minimum Bangunan Peredam Energi Tipe Bucket ........ II- 37
Gambar 2.26 Bangunan Peredam Energi Tipe Vlugther..................................... II- 38
Gambar 2.27 Jalur Rembesan dan Bahaya Sufosi ............................................... II- 39
Gambar 2.28 Teori Bligh .................................................................................... II- 40
Gambar 2.29 Ilustrasi Daya Angkat Akibat Tekanan Rembesan di Bawah
Pondasi .......................................................................................... II- 42
Gambar 2.30 Berat Sendiri Tubuh Bendung....................................................... II- 43
Gambar 2.31 Anggapan pada Peninjauan Stabilitas Bendung............................ II- 45
Gambar 2.32 Gaya dan Momen Akibat Gempa.................................................. II- 46
Gambar 2.33 Tekanan Hidrostatis Air Normal ................................................... II- 47
Gambar 2.34 Tekanan Hidrostatis Air Banjir untuk Mercu tidak Tenggelam.... II- 48
Gambar 2.35 Tekanan Hidrostatis Air Banjir untuk Mercu Tenggelam............. II-49
Gambar 2.36 Gaya Angkat pada tubuh Bendung ............................................... II- 50
Gambar 2.37 Tekanan Lumpur ........................................................................... II- 51
Gambar 2.38 Dimensi Pintu Pengambilan .......................................................... II- 55
Gambar 2.39 Geometri Bangunan Pengambilan................................................. II- 56
Gambar 2.40 Geometri Bangunan Pembilas ....................................................... II- 57
Gambar 2.41 Daun Pintu Pengambilan/ Pembilas .............................................. II- 58
Gambar 2.42 Tembok Sayap Hilir ...................................................................... II- 59
Gambar 2.43 Tembok Pangkal dan Sayap Hulu ................................................. II- 61
Gambar 2.44 Dinding Gravitasi .......................................................................... II- 62
Gambar 2.45 Dinding Penahan Kantilever ......................................................... II- 62
Gambar 2.46 Dinding Penahan Kontrafort ......................................................... II- 63
Gambar 2.47 Ukuran Standar Dimensi ............................................................... II- 63
Gambar 2.48 Tipe Tata Letak Kantong Lumpur................................................. II-66
Gambar 2.49 Skema Kantong Lumpur ............................................................... II- 66
xix
Gambar 2.50 Hubungan Diameter Ayak dan Kecepatan Endap untuk Air
Tenang ........................................................................................... II- 68
Gambar 2.51 Potongan Melintang dan Memanjang Kantong Lumpur ............... II- 69
Gambar
2.52 Grafik Pembilasan Sedimen Camp untuk Aliran Terbulen
(Camp 1945) ................................................................................. II- 71
Gambar 2.53 Alat Ukur Ambang Lebar dengan Mulut Pemasukan yang
Dibulatkan .................................................................................... II-72
Gambar 2.54 Alat Ukur Ambang Lebar dengan Pemasukan Bermuka Datar
dan Peralihan Penyempitan ........................................................... II-72
Gambar 2.55 Ilustrasi Peristilahan yang Digunakan .......................................... II-73
Gambar 3.1a Bagan Alir Penyelesaian Tugas Akhir .......................................... III- 2
Gambar 3.1b Bagan Alir Penyelesaian Tugas Akhir .......................................... III- 3
Gambar 4.1a Profil Melintang Sungai di Bagian Hulu....................................... IV- 2
Gambar 4.1b Profil Melintang Sungai di Bagian Hulu ....................................... IV- 2
Gambar 4.1c Profil Melintang Sungai di As Bendung ....................................... IV- 2
Gambar 4.1d Profil Melintang Sungai di Bagian Hilir ....................................... IV- 3
Gambar 4.1e Profil Melintang Sungai di Bagian Hilir ....................................... IV- 3
Gambar 4.2 Profil Melintang Rata- rata Sungai .............................................. IV- 3
Gambar 4.3 Profil Memanjang Sungai ............................................................ IV- 4
Gambar 4.4 Tinggi Mercu Bendung ................................................................. IV- 18
Gambar 4.5 Grafik Lengkung Debit ................................................................. IV- 20
Gambar 4.6 Tinggi Muka Air di Hilir Bendung ............................................... IV- 21
Gambar 4.7 Penampang Sungai ........................................................................ IV- 22
Gambar 4.8 Lebar Efektif Bendung .................................................................. IV- 23
Gambar 4.9 Mercu Bulat ................................................................................... IV- 23
Gambar 4.10 Grafik Lengkung Debit ................................................................ IV- 25
Gambar 4.11 Tinggi Muka Air di Hulu Bendung ............................................... IV- 26
Gambar 4.12 Kurva Pengempangan ................................................................... IV- 27
Gambar 4.13 Bangunan Peredam Energi Tipe Bucket ....................................... IV- 28
Gambar 4.14 Bangunan Peredam Energi Tipe Bucket z = 4,627 ...................... IV- 29
Gambar 4.15 Grafik Loncatan Air ..................................................................... IV- 34
xx
Gambar 4.16 Bangunan Peredam Energi Tipe Bucket z = 5,127 ....................... IV- 34
Gambar 4.17 Grafik Loncatan Air ...................................................................... IV- 36
Gambar 4.18 Potongan Bendung ........................................................................ IV- 37
Gambar
4.19 Tebal Lantai .................................................................................. IV- 39
Gambar 4.20 Anggapan pada Peninjauan Stabilitas Bendung............................ IV- 42
Gambar 4.21 Berat Sendiri Tubuh Bendung....................................................... IV- 43
Gambar 4.22 Lengan Momen ............................................................................. IV- 44
Gambar 4.23 Tekanan Air Normal ..................................................................... IV- 47
Gambar 4.24 Tekanan Air Banjir ........................................................................ IV- 48
Gambar 4.25 Uplift Pressure............................................................................... IV- 50
Gambar 4.26 Tekanan Lumpur ........................................................................... IV- 54
Gamba r4.27 Dimensi Pintu Pengambilan .......................................................... IV- 65
Gambar 4.28 Dimensi Dinding Penahan Tanah.................................................. IV- 67
Gambar 4.29 Gaya- gaya yang Bekerja pada Dinding Penahan Tanah .............. IV- 68
Gambar 4.30 Potongan Memanjang Kantong Lumpur ....................................... IV- 75
xxi
DAFTAR LAMPIRAN
Lampiran I Administrasi Tugas Akhir
I–1 Surat Permohonan Data Jaringan Irigasi di Jawa Barat kepada
Dinas Pengelolaan Sumber Daya Air Jawa Barat
I–2 Formulir Asistensi Tugas Akhir
Lampiran II Peta dan Grafik
II – 1 Peta Gempa Indonesia
II – 2 Grafik q Melchior
II – 3 Tabel T0
II – 4 Tabel Melchior
II – 5 Peta DAS
xxii
DAFTAR NOTASI
I = Kemiringan
R = Curah hujan rata- rata kawasan
∆h = Beda tekanan
A = Luas penampang
ac = Percepatan kejut dasar
ad =Percepatan gaya rencana
An = Luas daerah pengaruh stasiun ke n
b = Lebar dasar sungai
B = Lebar seluruh bendung
Ba = Lebar sungai atas
Be = Lebar efektif mercu bendung
Bs = Lebar sungai
C = Koefisien kecepatan
C- Bligh = Creep line ratio bligh
C- Lane = Creep line ratio lane
Cd = Koefisien debit
E = Koefisien gempa
F = Luas daerah aliran sungai
f = Koefisien geser antara tubuh pondasi dan tanah dasar
Fg = Faktor keamanan terhadap guling
Fr = Bilangan froude
Fs = Faktor keamanan terhadap geser
g = Percepatan gravitasi
ɣ = Koefisien kekasaran dinding
Gb = Gaya berat
Gg = Gaya gempa
ɣp = Berat isi pasangan
H = Beda tinggi antara dasar sungai di mulut DAS dengan dasar sungai di
xxiii
titik 0,9 L ke arah hilir
h = Tinggi kenaikan muka air di titik bendung
Han = Gaya horizontal
hc = Kedalaman air kritis di atas mercu
Hgg = Gaya horizontal akibat gempa
Hh = Gaya horizontal
hi = Tinggi air banjir
Hi = Tinggi energi
Hv = Gaya vertikal
Hx = Tinggi energi di hulu sampai titik x
Hx = Tinggi energi di hulu sampai titik x
K = Faktor frekuensi
Ka = Koefisien kontraksi pangkal bendung
Kp = Koefisien kontraksi pilar
L = Panjang sungai
l = Lengan momen
L' = Panjang creepline
Lh = Panjang creep line horizontal
Lv = Panjang creepline vertikal
Lx = Panjang pengaruh akibat pengempangan
Lx = Panjang creep line sampai titik x
m = Kemiringan talud sungai
Man = Momen putar
Mg = Momen total penyebab guling
Mgb = Momen putar
Mgg = Momen akibat gempa
Mn = Index R yang diperlukan (n) dalam tahun
Mp = Jumlah pengamatan (p) dalam tahun
Mt = Momen penahan total
n = Jumlah pengamatan
nb = Jumlah pilar
xxiv
O = Keliling basah
Px = Gaya angkat pada titik X
Px = Daya angkat pada titik X
q = Hujan maksimum
Q = Debit sungai
q = Debit persatuan lebar
Qn = Debit maksimum
R = Jari- jari hidrolis
R1 = Curah hujan maksimum pertama selama 24 jam
R2 = Curah hujan maksimum kedua selama 24 jam
Ri = Curah hujan pengamatan ke- i
Rn = Curah hujan stasiun ke-n
Sn = Reduced standard deviation
Sx = Standar deviasi
t = Periode ulang
tk = Waktu konsentrasi
V = Kecepatan air rata- rata
v = Volume
v1 = Kecepatan awala lonctan
Van = Gaya vertikal
Vgb = Gaya berat
Xa = Harga curah hujan rata- rata
Xi = Harga besaran pengamatan tertentu
Xt = Curah hujan diharapkan dalam T tahun
y1 = Kedalaman air di awal loncat air
y2 = Kedalaman air diatas ambang ujung
Yn = Reduced mean
Yt = Reduced variate
z = Tinggi jatuh
z = Faktor gempa
α = Koefisien aliran
xxv
β = Koefisien reduksi
μ = Standar variabel untuk periode ulang tertentu
xxvi
KATA PENGANTAR
viii
6. Staf bagian Data dan Informasi Dinas Pengelolaan Sumber Daya Air
yang telah memberikan data yang menunjang untuk pengerjaan Tugas
Akhir ini.
Penulis menyadari bahwa dalam pembuatan laporan ini masih terdapat
kekurangan-kekurangan mengingat terbatasnya kemampuan dan pengetahuan
penulis. Akhir kata, penulis berharap semoga laporan ini dapat bermanfaat dan
menambah wawasan bagi pembaca pada umumnya dan khususnya bagi penulis
sendiri.
Bandung, Juni 2013
Penulis
ix
PANJI AGUSTIAWAN
Agustiawan.panji@gmail.com
08569865119
CURRICULUM VITAE
Full Name
PANJI AGUSTIAWAN
Personal Details
o Place, Date of Birth : Karawang, 15thAgustus 1991
o Sex : Male
o Height / weight : 170 cm / 60 kg
o Religion : Islam
o Family : 3st(First) son of2(two) brother and 1 (one) sister
o Marital Status : Single
o Identity Card : 36.0214.150891.008253
o Hobbies :listening music, reading comic
Formal Education
Year Institution
2007–2010 SMA Negeri 1 Rangkasbitung
2004– 2007 SMP Negeri 4Rangkasbitung
2001– 2004 SD Negeri 8Rangkasbitung
1999–2001 SD Negeri 3 Malingping
College Information
Institution
Year of Study : Civil Engineering, POLITEKNIK NEGERI BANDUNG
GPA : 2010 – 2012
Additional Information
Additional Capability
o Indonesian Language : very good
o English Language : writing – good enough
oral –enough
o MS Office (Word, Excel,Powerpoint) : good
: enough
o AUTOCAD
: enough
o MS. Project
CURRICULUM VITAE
Full Name
Personal Details
o Place, Date of Birth : Garut, 29th September 1992
o Sex : Female
o Height / weight : 170 cm / 53 kg
o Religion : Islam
o Family : 1st(First) daughter of 2 (two) sister
o Marital Status : Single
o Identity Card : 32.0505.69099.20003
o Hobbies : reading and writing
Formal Education
Year Institution
2007 - 2010 SMA Negeri 1 Tarogong Kidul
2004 - 2007 SMP Negeri 1 Garut
2001 - 2004 SD Negeri 5 Sukagalih
1999 - 2001 SD Negeri 4 Sukamentri
1998 -1999 TK Aisyiah
College Information
Institution
Year of Study : Civil Engineering, POLBAN
GPA : 2010 – 2013
Additional Information
Additional Capability
o Indonesian Language : very good
o English Language : writing – good enough
oral – enough
o MS Office (Word, Excel, Powerpoint) : good
: enough
o AUTOCAD