Kebutuhan Material / m³
Mutu W/C Berat Total Water Reducer /
No Semen (kg) Semen (Zak) Pasir (kg) Split (kg) Air (L)
Beton Ratio (Kg / cm³) Admixture (L)
1 100 247 6.175 869 999 215 87.04% 2330 0.494
2 125 276 6.9 828 1012 215 77.90% 2331 0.552
3 150 299 7.475 799 1017 215 71.91% 2330 0.598
4 175 326 8.15 760 1029 215 65.95% 2330 0.652
5 200 352 8.8 731 1031 215 61.08% 2329 0.704
6 225 371 9.275 698 1047 215 57.95% 2331 0.742
7 250 384 9.6 692 1039 215 55.99% 2330 0.768
8 275 406 10.15 684 1026 215 52.96% 2331 0.812
9 300 413 10.325 681 1021 215 52.06% 2330 0.826
10 325 439 10.975 670 1006 215 48.97% 2330 0.878
11 350 448 11.2 667 1000 215 47.99% 2330 0.896
12 365 453 11.3125 666 997 215 47.51% 2330 0.905
13 375 457 11.425 664 994 215 47.05% 2330 0.914
14 400 566 14.15 654 990 215 37.99% 2425 1.132
SNI 73494-2008
24 N
Unit weight of material (U)
Water (w) = 1000 Kg / m³
Cement (PC) = 1250 Kg / m³
Sand (S) = 1500 - 1600 Kg / m³ If there is no laboratory testing, it is used between
Coarse aggregate (C.agg) = 1500 - 1600 Kg / m³ 1500 - 1600 Kg / m³ = 1550 Kg / m³
Comparison Mix
Admixture (L)
0.742
0.003
Comparison Mix
Admixture (L)
0.826
0.003
Comparison Mix
Admixture (L)
0.905
0.003
No. Jenis Material Berat Jenis Satuan
1 Aluminium 2712 Kg / m³
2 Air Bersih 1000 Kg / m³
3 Baja 7850 Kg / m³
4 Batu Alam, Batu Belah 2600 Kg / m³
5 Batu Bulat, Batu Gunung 1500 Kg / m³ w/c
6 Batu Karang 700 Kg / m³ 59.25
7 Batu Pecah 1450 Kg / m³
8 Besi Cor 6800 - 7800 Kg / m³
9 Besi Tempa 7750 Kg / m³
10 Besi Tulangan 7250 Kg / m³
11 Beton 2200 Kg / m³ 0.66737064
12 Beton Bertulang 2400 Kg / m³
13 Emas 19320 Kg / m³
14 Granit 2691 Kg / m³ 40.03%
15 Gypsum 2787 Kg / m³ 40.31%
16 Kardus 689 Kg / m³ 40.35%
17 Kayu (Kelas 1) 1000 Kg / m³ 40.03%
Kerikil, Koral, Split
18 1800 Kg / m³
(Kering / Lembab)
19 Kertas standar 1200 Kg / m³ 0.4003
20 Marmer 2563 Kg / m³
21 Pasangan Bata Merah 1700 Kg / m³
Pasangan Batu Belah,
22 2200 Kg / m³
Bulat, Gunung
23 Pasangan Batu Cetak 2200 Kg / m³
24 Pasangan Batu Karang 1450 Kg / m³
25 Pasir Beton 1400 Kg / m³
26 Perak 10490 Kg / m³
27 Perunggu 8800 Kg / m³
28 Semen 3150 Kg / m³
29 Seng 7135 Kg / m³
30 Serbuk Gergaji 210 Kg / m³
31 Stainless Steel 7480 - 8000 Kg / m³
Tanah, Lempung
32 2000 Kg / m³
(Basah)
Tanah, Lempung
33 1700 Kg / m³
(Kering / Lembab)
34 Tembaga 8930 Kg / m³
35 Timah Hitam / Timbel 11400 Kg / m³
Lapis Resap pengikat
36 0,4 - 1,3 liter / m²
(Prime Coat)
Lapis Perekat
37 0,15 - 0,50 liter / m²
(Tack Coat)
Aspal Hotmix
38 2.3 ton / m³
(Laston)
3.24651163
0.77555556 0.288
0.449163
47.66% 88%
0.4003