Biaya bersama

No Tanggal Deskripsi Jumlah


1 8/2/2015 Modal taxi dari bandara ke hotel 0
2 8/4/2015 Modal makan konro 0
8/5/2015 Modal Makan Chinese food 0
8/3/2015 modal makan nasi campur 0
modal loundry 0
Minum Kopi 0
0
2 8/8/2015 Makan malam bebek 0
karaoke 0
0
3 17 - 04 - 2011 Makan Indomie 0
Makan siang 0
Beli aqua I & II 0
Makan malam 0
0
4 18 - 04 - 2011 solar 0
Makan siang 0
makan malam 0
beli aqua 0
0
5 19 - 04 - 2011 Makan pagi 0
beli aqua I & II 0
Makan siang 0
makan malam 0
0
6 20 - 04 - 2011 Beli snack Alfamart 0
0
7 21 - 04- 2011 Makan siang 0
Beli Aqua 0

219000
0
JATAH UPD
Uang hotel

Nama FSE Hari Nominal


Ramsel 11 Rp 300,000
Robson 0 Rp 350,000
Esron 11 Rp 300,000
Total UPD
Rp 950,000

Sisa Saldo Aktual


Nama Kasbon Biaya bersama
Ramsel Rp 4,500,000 Rp -
Robson Rp - Rp -
Esron Rp - Rp -

Biaya Hotel aktual


Hari harga total
11 Rp 210,000 Rp 2,310,000

Calculator cashflow harian


Total UPD Sisa UPD
Rp 12,000,000 Rp 4,290,000.00

Uang Yang Diterima


Nama Jatah MU Taxi dll
Ramsel Rp 1,632,000.00 500000
Robson Rp - 0
Esron Rp 1,632,000.00 400000

RINCIAN BIAYA PERJALANAN DINAS


Keterangan Nilai
10 Mei - 20 Mei 15 UPD total 9,600,000.00
06 mei-07 mei 2015 Loundry

Biaya Transportasi (Taxi, Bus, Ojek, dll) :


Tol 0.00
Tol dan Bensin -
02 Aug 15 Taxi Esron ke bandara (PP) 400,000.00
2 Aug 15 Taxi Robson ke bandara -
2 Aug 15 Taxi Ramsel ke bandara 500,000.00
0.00
Biaya lain-lain
Akrilik stengah lembar 600,000
loundry 260,000

2 -12Aug 15 Taxi dari hotel ke site perhari 600,000.00

2 Aug 15 Uang Sewa Taxi dari bandara ke hotel 230,000.00


11 Aug 15 Beli Isolasi 3M 194,000.00

11 Aug 15 Uang tips security untuk masukkan tools 200,000.00


12 Aug 15 Uang Taxi Pulang ke bandara 320,000.00
20 Mei 15 entertaint 760,000.00
uang konsumsi challenge session 480,000.00
print 220,000.00
Total Biaya 14,364,000.00
JATAH UPD
Uang Makan Uang Saku

Hari Nominal Hari Nominal


12 Rp 90,000 12 Rp 35,000
0 Rp 105,000 0 Rp 45,000
12 Rp 90,000 12 Rp 35,000
Total UPD
Rp 9,500,000

Biaya Hotel Aktual Saldo


Rp 1,155,000 Rp (855,000)
Rp - Rp -
Rp 1,155,000 Rp 3,645,000

Cashflow
Total UPD transfer Total Biaya Sisa uang cash
Rp 12,000,000 Rp 14,364,000 -Rp2,602,500.00

Biaya Mark up
Total Biaya Total UPD aktual Total Taxi
14,364,000.00 Rp 9,600,000 Rp 1,500,000.00

Sisa Uang ramsel esron


Rp (24,250.00) Rp 4,375,750.00

Total
Rp 1,277,000
Rp -
Rp 5,677,000

RJALANAN DINAS
B (Ada Bon) TB (Tanpa Bon) Finance
X
X

X
X
X
X

X total Pengeluaran

X
X

X 1764000
X
X
Total
Rp 4,800,000
Rp -
Rp 4,800,000
Rp 9,600,000

Biaya Asli Yang keluar Nilai Yang dicantumkan di selisih


Biaya Taxi 90000 320000 230000
Tips Hotel 20000 -20000
Beli Isolasi 3 M 3 pcs 16000 210000 194000
Total MU Beli headsink trafo 12500 60000 47500
Rp 3,264,000.00 loundry 80000 340000 260000
print 20000 240000 220000
0
untung payment 0
Rp1,301,250.00 0
0
Total 238500

sisa uang cash 120000


-Rp2,482,500.00
total MU

2,304,000.00

sisa
540,000.00
sisa cashflow
14,364,000.00
RINCIAN BIAYA PERJALANAN DINAS
Keterangan Nilai B
(Ada
Bon)
17 Aug - 25 Aug 15 8 hari 7 malam @Rp500.000 3,500,000.00 X
17 Aug - 25 Aug 15 Loundry 300,000.00 X

Biaya Transportasi (Taxi, Bus, Ojek, dll) :


17 Aug 15 Taxi Ramsel ke bandara 250,000.00 X
17 Aug 15 Taxi Esron Ke bandara 200,000.00 X
17 Aug 15 Taxi dari Bandara sepinggan ke hotel 320,000.00 X
18 Aug-24 Aug 2015 Transport Lokal 600,000.00
Biaya lain-lain
Akrilik setengah lembar 600,000.00
20 Mei 15 Isolasi 3 M 210,000.00 X
Contact Cleaner 65000
17 Mei 15 Headsink trafo 60,000.00 X
Konsumsi Meeting technical (challenge
17 Mei 15 session) 480,000.00 X

19 Mei 15 Uang tips security untuk masukkan tools 100,000.00 X

Total Biaya 6,685,000.00

Total UPD yg d transfer 12.000.000

UPD Esron
UM = 8 X Rp.90.000 = Rp.720.000 2,000,000.00
US = 8 X Rp.35.000 = Rp.280.000
Total = Rp.1000000

UPD Ramsel UH = 7 X Rp.300.000 = Rp.2.500.000


UM = 8 X Rp 90.000 = Rp.825.000
US = 8 X Rp.35.000 = Rp.385.000
Total = Rp.1000000

Total 8,685,000.00