REPUBLIK INDONESIA ARCENDE KONSULTAN : PT.

Arcende
KEMENTRIAN PEKERJAAN UMUM DAN PT.Wesitan Konsultasi Pembangunan
PERUMAHAN RAKYAT WESITAN PT.Nusvey, PT. Global Profex Synergy (KSO)
DIREKTORAT JENDERAL BINA MARGA
KONTRAKTOR : PT Wijaya Karya (Persero) Tbk
Paket : Pembangunan Jalan Akses Gede Bage I Produksi : Aspal Mixing Plant ( AMP ) PT.Dirgantara Yudha Artha
COMPOSITION OF MATERIAL CHARACHTERISTIC OF MIX (TRIAL MIX AC - WC)

PU Pengawas Pekerjaan Jalan Akses Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya (persero) Tbk
Gede Bage I

___________________ ___________________ ___________________


REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG
Konsultan :
ARCENDE
PT Arcende Kontraktor :
WESITAN PT Wesitan Konsultasi Pembangunan,PT Nusvey, PT. Wijaya Karya (Persero) Tbk.
PT Global Profex Synergy (KSO)
Paket : Pembangunan Jalan Akses Gede Bage 1 Produksi : AMP PT. Dirgantara Yudha Artha
ASPHALT EXTRACTION AND GRADATION (TRIAL MIX AC-WC)

PU Pengawas Pekerjaan Jalan Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya
Akses Gede Bage I (persero) Tbk
PU Pengawas Pekerjaan Jalan Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya
Akses Gede Bage I (persero) Tbk

___________________ ___________________ ___________________


REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG
Konsultan :
ARCENDE
PT Arcende Kontraktor :
WESITAN PT Wesitan Konsultasi Pembangunan,PT Nusvey, PT. Wijaya Karya (Persero) Tbk.
PT Global Profex Synergy (KSO)
Paket : Pembangunan Jalan Akses Gede Bage 1 Produksi : AMP PT. Dirgantara Yudha Artha
ASPHALT EXTRACTION AND GRADATION (TRIAL MIX AC-WC)

PU Pengawas Pekerjaan Jalan Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya
Akses Gede Bage I (persero) Tbk
PU Pengawas Pekerjaan Jalan Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya
Akses Gede Bage I (persero) Tbk

___________________ ___________________ ___________________


REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG
Konsultan :
ARCENDE
PT Arcende Kontraktor :
WESITAN PT Wesitan Konsultasi Pembangunan,PT Nusvey, PT. Wijaya Karya (Persero) Tbk.
PT Global Profex Synergy (KSO)
Paket : Pembangunan Jalan Akses Gede Bage 1 Produksi : AMP PT. Dirgantara Yudha Artha
ASPHALT EXTRACTION AND GRADATION (TRIAL MIX AC-WC)

PU Pengawas Pekerjaan Jalan Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya
Akses Gede Bage I (persero) Tbk
PU Pengawas Pekerjaan Jalan Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya
Akses Gede Bage I (persero) Tbk

___________________ ___________________ ___________________


REPUBLIK INDONESIA ARCENDE KONSULTAN : PT.Arcende
KEMENTRIAN PEKERJAAN UMUM DAN PT.Wesitan Konsultasi Pembangunan
WESITAN PT.Nusvey, PT. Global Profex Synergy (KSO)
PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
KONTRAKTOR : PT Wijaya Karya (Persero) Tbk

Paket : Pembangunan Jalan Akses Gede Bage I Produksi : Aspal Mixing Plant ( AMP ) PT.Dirgantara Yudha Artha
SIFAT - SIFAT CAMPURAN DENGAN METODE MARSHAL (SNI-06-2489-1990) TRIAL MIX AC-WC

PU Pengawas Pekerjaan Jalan Akses Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya (persero) Tbk
Gede Bage I
Gede Bage I

___________________ ___________________ ___________________


REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG
Konsultan :
ARCENDE
PT Arcende Kontraktor :
WESITAN PT Wesitan Konsultasi Pembangunan,PT Nusvey, PT. Wijaya Karya (Persero) Tbk.
PT Global Profex Synergy (KSO)
Paket : Pembangunan Jalan Akses Gede Bage 1 Produksi : AMP PT. Dirgantara Yudha Artha
PROPERTIES COMBINED AGGREGATE (TRIAL MIX AC-WC)

PU Pengawas Pekerjaan Jalan Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya
Akses Gede Bage I (persero) Tbk
Akses Gede Bage I (persero) Tbk

___________________ ___________________ ___________________


REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG
Konsultan :
ARCENDE
PT Arcende Kontraktor :
WESITAN PT Wesitan Konsultasi Pembangunan,PT Nusvey, PT. Wijaya Karya (Persero) Tbk.
PT Global Profex Synergy (KSO)
Paket : Pembangunan Jalan Akses Gede Bage 1 Produksi : AMP PT. Dirgantara Yudha Artha
GABUNGAN GRADASI DAN LUAS PERMUKAAN DARI PARTIKEL AGGREGATE HOT BIN
ASTM C 117 & C 136 ( TRIAL MIX AC - WC )

PU Pengawas Pekerjaan Jalan Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya
Akses Gede Bage I (persero) Tbk
Akses Gede Bage I (persero) Tbk

___________________ ___________________ ___________________


REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG

Konsultan :
ARCENDE
PT Arcende
PT Wesitan Konsultasi Pembangunan,PT Nusvey, Kontraktor :
WESITAN
PT Global Profex Synergy (KSO) PT. Wijaya Karya (Persero) Tbk.

Paket : Pembangunan Jalan Akses Gede Bage 1 Produksi : AMP PT. Dirgantara Yudha Artha
ANALISA SARINGAN HOT BIN
SNI 03 - 4428 - 1997 ( TRIAL MIX AC - WC )

PU Pengawas Pekerjaan Jalan Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya
Akses Gede Bage I (persero) Tbk
Akses Gede Bage I (persero) Tbk

___________________ ___________________ ___________________


REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG

Konsultan :
ARCENDE
PT Arcende
PT Wesitan Konsultasi Pembangunan,PT Nusvey, Kontraktor :
WESITAN
PT Global Profex Synergy (KSO) PT. Wijaya Karya (Persero) Tbk.

Paket : Pembangunan Jalan Akses Gede Bage 1 Produksi : AMP PT. Dirgantara Yudha Artha
ANALISA SARINGAN HOT BIN
SNI 03 - 4428 - 1997 ( TRIAL MIX AC - WC )

PU Pengawas Pekerjaan Jalan Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya
Akses Gede Bage I (persero) Tbk
Akses Gede Bage I (persero) Tbk

___________________ ___________________ ___________________


REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG

Konsultan :
ARCENDE
PT Arcende
PT Wesitan Konsultasi Pembangunan,PT Nusvey, Kontraktor :
WESITAN
PT Global Profex Synergy (KSO) PT. Wijaya Karya (Persero) Tbk.

Paket : Pembangunan Jalan Akses Gede Bage 1 Produksi : AMP PT. Dirgantara Yudha Artha
PEMERIKSAAN BERAT JENIS DAN PENYERAPAN AIR
AASTHO, ASTM C - 117 ( TRIAL MIX AC - WC )

PU Pengawas Pekerjaan Jalan Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya
Akses Gede Bage I (persero) Tbk
Akses Gede Bage I (persero) Tbk

___________________ ___________________ ___________________


REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG

Konsultan :
ARCENDE
PT Arcende
PT Wesitan Konsultasi Pembangunan,PT Nusvey, Kontraktor :
WESITAN
PT Global Profex Synergy (KSO) PT. Wijaya Karya (Persero) Tbk.

Paket : Pembangunan Jalan Akses Gede Bage 1 Produksi : AMP PT. Dirgantara Yudha Artha
PEMERIKSAAN BERAT JENIS DAN PENYERAPAN AIR
AASTHO, ASTM C - 117 ( TRIAL MIX AC - WC )

PU Pengawas Pekerjaan Jalan Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya
Akses Gede Bage I (persero) Tbk
Akses Gede Bage I (persero) Tbk

___________________ ___________________ ___________________


SATUAN KERJA PELAKSANAAN JALAN NASIONAL
METROPOLITAN BANDUNG PEMBUAT KOMITMEN
PADALARANG - CIMAHI - BANDUNG

JOB MIX FORMULA


AC WC

PENGESAHAN
REPUBLIK INDONESIA
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA

SUMMARY JOB MIX FORMULA


AC WC
MATERIAL
1 Coarse agg 10 - 15 mm Ex. Lagadar (Gunung Batujajar) Pangandaran
2 Medium agg 5 - 10 mm Ex. Lagadar (Gunung Batujajar) Pangandaran
3 Fine agg 0 - 5 mm Ex. Lagadar (Gunung Batujajar) Pangandaran
4 Cement Ex. Semen Tiga Roda
5 Asphalt Ex. Esso 60 / 70

LABORATORIUM
PROPORSI COLD BIN
PERCENT TOTAL AGG PERCENT TOTAL MIX

1 Coarse agg 10 - 15 mm 9 % 6.76 %


2 Medium agg 5 - 10 mm 37 % 27.73 %
3 Fine agg 0 - 5 mm 54 % 41.72 %
4 Cement % 0.00 %
5 Asphalt 6.00 %

ASPHALT MIXING PLANT

OPENING GATE COLD BIN


CAPACITY PRODUCT : 50 Tons / Hours.

1 Coarse agg 10 - 15 mm : 4.06 Tons / Hours Speed Cold Bin = 5.7 Rpm
2 Medium agg 5 - 10 mm : 16.64 Tons / Hours Speed Cold Bin = 13.8 Rpm
3 Fine agg 0 - 5 mm : 25.03 Tons / Hours Speed Cold Bin = 17.2 Rpm
4 Cement 0.00 Tons / Hours
5 Asphalt : 3000.00 Tons / Hours

PROPORSI HOT BIN : 1000 Kg / Batch

Total agg Total Mix Accumulative Cummulative


1 HOT BIN. I 53 % 37.37 % 373.65 Kg 373.7 Kg
2 HOT BIN. II 23 % 16.22 % 162.15 Kg 535.8 Kg
3 HOT BIN. III 9% 6.35 % 63.45 Kg 599.3 Kg
4 HOT BIN. IV 15 % 10.58 % 105.75 Kg 705.0 Kg
5 CEMENT 0% 0.00 % 0.00 Kg 599.3 Kg
6 ASPHALT 6% 6% 45.00 Kg 644.3 Kg
PU Pengawas Pekerjaan Jalan Konsultan : PT. ARCENDE (KSO) Kontraktor : PT Wijaya Karya
Akses Gede Bage I (persero) Tbk

___________________ ___________________ ___________________


PROPORSI HOT BIN : 1000 Kg / Batch

Total agg Total Mix Accumulative Cummulative


1 HOT BIN. I 53 % 49.82 % 498.2 Kg 498.2 Kg
2 HOT BIN. II 23 % 21.62 % 216.2 Kg 714.4 Kg
3 HOT BIN. III 15 % 14.10 % 141.0 Kg 855.4 Kg
4 CEMENT 0% 0.00 % 0.0 Kg 855.4 Kg
5 ASPHALT 6% 60.0 Kg 915.4 Kg

TRIAL COMPACTION
RESULT TEST

1 Density Laboratory : 2.357 Gr /Cm³


2 Density Field : 2.3222 Gr /Cm³
3 Degree Compaction : 98.5 %

COMPACTION
PASSING
1 Breackdown Roller : 2 Passing
2 Intermediate : 14 Passing
3 Finishing : 1 Passing

COMBINE GRADING
SIEVE SIZE 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100.
Job Design 1 ( Cold Bin ) 100 96.6 88.4 68.1 40.9 31.1 19.5 15.4 11.3
Job Design 2 ( Hot - Bin ) 100 97.8 89.8 65.8 44.8 32.8 22.2 16.3 11.6
Trial Lapangan 100 98.9 88.6 65.8 44.3 32.4 23.9 15.0 11.3
Specification 100 95 ~ 100 74 ~ 92 48 ~ 70 33 ~ 53 22 ~ 40 15 ~ 30 10 ~ 20

MARSHALL PROPERTY
TEST RESULT
PROPERTIES SPECIFICATION
Trial Lab Trial Mix
Marshall Stability Kg 1310 1241 Min 1100
Marshall Quotient Kg/mm 378.4 352.3
Flow mm 3.46 3.52 2,5 - 4
Air Void % 3.36 3.67 3 - 5
Void Filled % 77.99 76.42 75 - 85
Void Mineral Aggregate % 15.29 15.54
Density 2.364 2.357
Retained Strength Index % 85.03 91.72 Min. 75

Mengetahui Disetujui Diajukan


PT.JASAMARGA PANDAAN TOL KONSULTAN KONTRAKTOR
Pengawas Resident Engineer Quality
REPUBLIK INDONESIA

DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT JENDERAL BINA MARGA

SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG

JOB MIX FORMULA

AC WC

PAKET :

PEMBANGUNAN JALAN AKSES GEDE BAGE I

ARCENDE

WESITAN
CONSULTANT CONTRACTOR
PT. Wijaya Karya (Persero) Tbk
PT Arcende
PT Wesitan Konsultasi Pembangunan,PT Nusvey,
PT Global Profex Synergy (KSO)
KSANAAN JALAN NASIONAL
UNG PEMBUAT KOMITMEN
CIMAHI - BANDUNG

X FORMULA
AC WC

GESAHAN
K INDONESIA
MUM DAN PERUMAHAN RAKYAT
NDERAL BINA MARGA

JOB MIX FORMULA


AC WC
Kontraktor : PT Wijaya Karya
(persero) Tbk

___________________
# 200.
8.0
7.6
6.7
4~9

SPECIFICATION

Min 1100

2,5 - 4
3 - 5
75 - 85

Min. 75

Diajukan
KONTRAKTOR
Quality
IK INDONESIA

UMUM DAN PERUMAHAN RAKYAT

NDERAL BINA MARGA

AN NASIONAL METROPOLITAN BANDUNG

X FORMULA

C WC

PAKET :

LAN AKSES GEDE BAGE I


PT. Wijaya Karya (Persero) Tbk
REPUBLIK INDONESIA
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA

LEMBAR PERSETUJUAN
DATA PENDUKUNG KUALITAS
TRIAL MIX AC - WC
PAKET PEMBANGUNAN JALAN AKSES GEDE BAGE

NO KETERANGAN TANDA TANGAN

KONTRAKTOR
PT.WIJAYA KARYA (Persero) tb

DIAJUKAN OLEH :
1
Tanggal :
DJOKO SUSILO ST.MMT
MANAGER PROYEK

KONSULTAN
PT. ARCENDE

DIPERIKSA & DISETUJUI OLEH : PT.WESITAN KONSULTASI PEMBANGUNAN

Tanggal : PT. NUSVEY, PT. GLOBAL PROFEX SYNERGY (KS


2

DJOKO TJAHYONO.ST
SITE ENGINEER

BINA MARGA
PEJABAT PEMBUAT KOMITMEN PADALA
MENGETAHUI : - CIMAHI - BANDUNG
Tanggal :
3

INDRA CAHYA KUSUMA.ST.MT


3

NIP. 19760524 200502 1 003

KONSULTAN
PT. ARCENDE KONTRAKTOR
PT.WESITAN KONSULTASI PEMBANGUNAN
PT.NUSVEY,PT. GLOBAL PROFEX SYNERGY (KSO) PT. WIJAYA KARYA (Persero

ARC ENDE

WESITAN
BLIK INDONESIA
N UMUM DAN PERUMAHAN RAKYAT
JENDERAL BINA MARGA

PERSETUJUAN
NDUKUNG KUALITAS
L MIX AC - WC
NAN JALAN AKSES GEDE BAGE

TANDA TANGAN

KONTRAKTOR
PT.WIJAYA KARYA (Persero) tbk

KONSULTAN
PT. ARCENDE
PT.WESITAN KONSULTASI PEMBANGUNAN
PT. NUSVEY, PT. GLOBAL PROFEX SYNERGY (KSO),

BINA MARGA
PEJABAT PEMBUAT KOMITMEN PADALARANG
- CIMAHI - BANDUNG
KONTRAKTOR

PT. WIJAYA KARYA (Persero) Tbk.


REPUBLIK INDONESIA ARCENDE

DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL BINA MARGA WESITAN
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG
Type of Mix : AC.WC Contractor PT. Wijaya Karya (Persero)Tbk
Tanggal : ………………………… Consultant PT. Arcende (KSO)
FIELD TRIAL COMPACTION Proyek Jalan Akses Gede Bage
VARIASI COMPACTION
SECTION I SECTION II SECTION II
SECTION
TEMP PASSING TEMP PASSING TEMP PASSING
Tandem Roller Passing Passing Passing

Tire Roller Passing Passing Passing

Finishing Passing Passing Passing

LOCATION CORE DRILL


SECTION I SECTION II SECTION III

TEST COMPACTION
LOOSE THICKNESS DENSITY ( GR / CM ³ ) DEGREE OF COMPACT ( % )
SECTION
(%) ( Cm ) LABORAT FIELD RESULT SPEC
SECTION I 14.Pss ≥ 97

SECTION II 16.Pss ≥ 97

SECTION III 18.Pss

REMAKS : PU Pengawas PT.Arcende (KSO) PT. Wijaya Karya


MONITORING PENDATANGAN PRODUKSI PENGASPALAN
No. Tanggal No. Pol Waktu Temper Penghamparan
Tiba Bongkr atur P L T

REMAKS : PU Pengawas PT.Arcende (KSO) PT. Wijaya Kar


AN PRODUKSI PENGASPALAN

PT. Wijaya Karya


REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG

ARC ENDE
Konsultan : Kontraktor :
PT Arcende PT. Wijaya Karya (Persero) Tbk.
WESITAN PT Wesitan Konsultasi Pembangunan,PT Nusvey,
PT Global Profex Synergy (KSO)

Pekerjaan Pembuatan Jalan Akses Gede Bage - Bandung (Paket-1)


Skets Lokasi Core Drill Aspal : Tgl:

TANGGAL SECTION THICNES RATA -


NO STATION KETERANGAN
PRODUKSI R1/R2 L1/L2 1 2 3 RATA

20 1-Sep-16 4+940 - L2 5.6 5.7 5.7 5.67 2.5 m dr prpt

1 1-Sep-16 4+950 R2 - 6.2 6.2 6.1 6.17 1.0 m dr prpt

2 1-Sep-16 5+000 R2 - 5.9 5.9 5.8 5.87 2.0 m dr prpt

3 1-Sep-16 5+050 R2 - 5.4 6.0 5.8 5.73 3.0 m dr prpt

4 30-Aug-16 5+075 R1 - 7.6 7.7 7.7 7.67 1.1 m dr mdn

5 1-Sep-16 5+100 R2 - 7.2 7.0 7.0 7.07 2.5 m dr prpt

6 30-Aug-16 5+125 R1 - 5.5 5.6 5.6 5.57 2.5 m dr mdn

7 1-Sep-16 5+150 R2 - 5.8 5.9 5.9 5.87 3.8 m dr prpt

8 30-Aug-16 5+175 R1 - 4.8 4.8 5.0 4.87 3.6 m dr mdn

9 1-Sep-16 5+200 R2 - 6.0 6.1 6.2 6.10 3.7 m dr prpt

10 30-Aug-16 5+225 R1 - 4.7 4.7 4.7 4.70 2.5 m dr mdn

11 30-Aug-16 5+250 R2 - 5.6 5.7 5.6 5.63 1.0 m dr prpt

12 1-Sep-16 5+275 R1 - 6.5 6.2 6.3 6.33 1.0 m dr mdn

Skets Lokasi :

L2
Kiri

L1
4+940

4+950
5+000

5+050

5+075

5+100

5+125

5+150

5+175

R1
Kanan

R2

L2
Kiri

L1
5+175

5+200

5+225

5+250

5+275

5+300

5+325
REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG

ARC ENDE
Konsultan : Kontraktor :
PT Arcende PT. Wijaya Karya (Persero) Tbk.
WESITAN PT Wesitan Konsultasi Pembangunan,PT Nusvey,
PT Global Profex Synergy (KSO)

Pekerjaan Pembuatan Jalan Akses Gede Bage - Bandung (Paket-1)


Skets Lokasi Core Drill Aspal : Tgl:

R1
Kanan

R2
REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG

Konsultan :
ARC ENDE
Kontraktor :
PT Arcende
WESITAN PT. Wijaya Karya (Persero) Tbk.
PT Wesitan Konsultasi Pembangunan,PT Nusvey,
PT Global Profex Synergy (KSO)

Pekerjaan Pembuatan Jalan Akses Gede Bage - Bandung (Paket-1)


Skets Lokasi Core Drill Aspal : Tgl:

TANGGAL SECTION THICNES RATA -


NO STATION KETERANGAN
PRODUKSI R1/R2 L1/L2 1 2 3 RATA

13 30-Aug-16 5+300 R2 - 5.7 5.7 5.6 5.67 2.5 m dr prpt

14 30-Aug-16 5+325 R1 - 5.2 5.4 5.3 5.30 2.5 m dr mdn

15 1-Sep-16 5+350 R2 - 5.9 5.9 5.9 5.90 4.0 m dr prpt

16 30-Aug-16 5+375 R2 - 6.5 6.7 6.6 6.60 4.0 m dr mdn

17 1-Sep-16 5+400 R2 - 7.9 7.4 7.3 7.53 2.0 m dr prpt

18 30-Aug-16 5+425 R1 - 6.0 6.1 6.1 6.07 2.5 m dr mdn

19 1-Sep-16 5+442 R2 - 6.5 6.4 6.5 6.47 3.5 m dr prpt

21 m

22 m

23 m

24 m

25 m

26 m

Skets Lokasi :

L2
Kiri

L1
5+300

5+325

5+350

5+375

5+400

5+425

5+442

R1
Kanan

R2

L2
Kiri

L1
REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG

Konsultan :
ARC ENDE
Kontraktor :
PT Arcende
WESITAN PT. Wijaya Karya (Persero) Tbk.
PT Wesitan Konsultasi Pembangunan,PT Nusvey,
PT Global Profex Synergy (KSO)

Pekerjaan Pembuatan Jalan Akses Gede Bage - Bandung (Paket-1)


Skets Lokasi Core Drill Aspal : Tgl:

R1
Kanan

R2
REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG

Konsultan :
ARC ENDE
Kontraktor :
PT Arcende
WESITAN PT. Wijaya Karya (Persero) Tbk.
PT Wesitan Konsultasi Pembangunan,PT Nusvey,
PT Global Profex Synergy (KSO)

Pekerjaan Pembuatan Jalan Akses Gede Bage - Bandung (Paket-1)


Skets Lokasi Core Drill Aspal : Tgl :

TANGGAL SECTION THICNES RATA -


NO STATION KETERANGAN
PRODUKSI R1/R2 L1/L2 1 2 3 RATA

Skets Lokasi :

L2
Kiri

L1

R1
Kanan

R2

L2
Kiri

L1
REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG

Konsultan :
ARC ENDE
Kontraktor :
PT Arcende
WESITAN PT. Wijaya Karya (Persero) Tbk.
PT Wesitan Konsultasi Pembangunan,PT Nusvey,
PT Global Profex Synergy (KSO)

Pekerjaan Pembuatan Jalan Akses Gede Bage - Bandung (Paket-1)


Skets Lokasi Core Drill Aspal : Tgl :

R1
Kanan

R2
REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG
Konsultan :
ARCENDE
PT Arcende Kontraktor :
PT Wesitan Konsultasi Pembangunan,PT Nusvey, PT. Wijaya Karya (Persero) Tbk.
WESITAN
PT Global Profex Synergy (KSO)

Pekerjaan Pembuatan Jalan Akses Gede Bage - Bandung (Paket-1)


Skets Lokasi Core Drill Aspal :
Ramp.1
0+475

0+500

0+525

0+550

0+575

0+600

0+625

0+650

0+675

0+700
L1

L2
0+700

0+725

0+750

0+775

0+800

0+825

0+850

0+875

0+900

0+925
L1

L2
0+925

0+950

0+975

1+000

1+025

1+050

1+075

1+100

1+125

1+150
L1

L2
1+150

1+175

1+200

1+225

1+250

1+275

1+300

1+325

1+350

1+375

L1

L2

Anda mungkin juga menyukai