RESUME PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Dibuat oleh : Feri Eko H

HASIL TES STANDARD


KARAKTERISTIK JUMLAH
NO PERIODE DEVIASI KETERANGAN
MAX MIN RATA2 BENDA UJI
Kg/Cm2 Kg/Cm2 Kg/Cm2 Kg/Cm2 Kg/Cm2
1 Jan 2013 - - - - - -
2 Feb 2013 - - - - - -
3 Mar 2013 - - - - - -
4 Apr 2013 - - - - - -
5 Mei 2013 67.05 50.37 58.24 52.36 3.58 21.00
6 Jun 2013 81.55 47.47 62.61 43.89 11.42 23.00
7 Jul 2013 63.43 47.57 54.52 47.49 4.29 30.00
8 Agu 2013 63.43 48.93 56.78 49.80 4.25 46.00
9 Sep 2013 63.43 45.31 52.85 47.00 3.57 159.00
10 Okt 2013 72.49 40.77 54.90 46.68 5.01 165.00
11 Nov 2013 65.24 47.57 53.71 46.31 4.51 146.00
12 Des 2013 63.43 47.57 53.15 46.49 4.06 330.00
13 Jan 2014 62.52 47.57 52.29 46.41 3.58 252.00
14 Feb 2014 61.16 47.57 51.77 47.06 2.87 133.00
15 Mar 2014 63.43 47.57 53.16 48.08 3.10 310.00
16 Apr 2014 #N/A #N/A #N/A #N/A #N/A 357.00
17 Mei 2014 61.16 48.93 52.83 48.95 2.37 225.00
18 Jun 2014 57.08 48.93 52.32 48.94 2.06 42.00
19 Jul 2014 57.08 48.93 53.11 50.45 1.62 76.00
20 Agu 2014 72.49 48.93 54.78 46.84 4.84 47.00
21 Sep 2014 59.80 47.57 52.56 48.77 2.31 100.00
22 Okt 2014 55.73 48.93 52.81 50.11 1.65 106.00
23 Nov 2014 55.73 47.57 52.88 50.07 1.71 62.00

QUALITY CONTROL STAFF QC

SUTRISNO FERI EKO H


PT. MARGABUMI ADHIKARAYA
PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN
TAHAP I PAKET 2 ( STA. 5+550 S.D STA 11 + 500 )
Konsultan Pengawas : Kontraktor :
PT Multi Phi Beta - PT Tata Guna Patria - PT.Wijaya Karya (Persero) Tbk
PT Eskapindo Matra (KSO)

REKAPITULASI KUAT TEKAN BETON

Proyek : TOL GEMPOL - PANDAAN


Plant : JAYA READY MIX
Benda Uji : Silinder 15 x 30 cm
Mutu : KLAS C / K - 250
Umur : 7 Hari
Periode : Maret 2013 s/d April 2013
No Tanggal Umur Slump Berat Beban Tegangan Hancur
Kode Benda Uji Rata2x
Produksi Test Silinder Kubus KETERANGAN
( hari ) ( cm ) ( kg ) ( kN ) ( kg/cm2)

116 STA. 9+111 TROTOAR BOX 14-Mar-13 21-Mar-13 7 10 12.95 360 207.7 250.20
TUNNEL 12.97 340 196.1 236.30
251.94
12.95 380 219.2 264.10
12.96 370 213.4 257.15
117 STA.7+400 HEAD WALL+ WING 16-Mar-13 23-Mar-13 7 9 12.96 350 201.9 243.25
WALL 12.94 370 213.4 257.15
253.68
12.92 380 219.2 264.10
12.95 360 207.7 250.20
118 STA.9+111 SLAB BAWAH BOX 17-Mar-13 25-Mar-13 8 10 12.95 400 230.7 278.00
TUNNEL JL.JAMBU ( 1) 12.96 420 242.3 291.90
281.48
12.96 390 225.0 271.05
12.97 410 236.5 284.95
119 STA. 10+639 ULU-ULU BANYU 17-Mar-13 25-Mar-13 8 10 12.95 370 213.4 257.15
A1 KANA
257.15

120 STA.9+111 SLAB BAWAH BOX 17-Mar-13 25-Mar-13 8 10 12.95 360 207.7 250.20
TUNNEL JL.JAMBU (2) 12.92 390 225.0 271.05
260.63
12.93 370 213.4 257.15
12.94 380 219.2 264.10
121 STA.9+111 SLAB BAWAH BOX 17-Mar-13 25-Mar-13 8 9 12.95 400 230.7 278.00
TUNNEL JL.JAMBU (3) 12.95 400 230.7 278.00
12.96 420 242.3 291.90 280.78
12.00 390 225.0 271.05
12.97 410 236.5 284.95
122 STA.7+400 HEAD+WING WALL 18-Mar-13 25-Mar-13 7 9 12.96 380 219.2 264.10
JEMBATAN KALIWANGI A2 12.95 370 213.4 257.15
KANAN 12.96 350 201.9 243.25 252.98
12.95 360 207.7 250.20
12.93 360 207.7 250.20
123 STA.0+321 WALL+PLAT 19-Mar-13 26-Mar-13 7 10 12.94 400 230.7 278.00
12.94 430 248.0 298.85
278.00
12.96 380 219.2 264.10
12.97 390 225.0 271.05
124 STA.0+700 TOP SLAB BOX 19-Mar-13 26-Mar-13 7 10 12.95 410 236.5 284.95
TUNNEL KD.REJO ( 1 ) 12.96 400 230.7 278.00
276.27
12.93 380 219.2 264.10
12.95 400 230.7 278.00
125 STA.0+700 TOP SLAB BOX 19-Mar-13 26-Mar-13 7 10 12.94 360 207.7 250.20
TUNNEL KD.REJO ( 2 ) 12.96 400 230.7 278.00
269.32
12.96 410 236.5 284.95
12.95 380 219.2 264.10
126 STA.10+639 WING WALL ULU- 23-Mar-13 30-Mar-13 7 9 12.96 400 230.7 278.00
ULU BANYU A2 KANAN 12.95 380 219.2 264.10
279.74
12.94 460 265.4 319.71
12.96 370 213.4 257.15
127 STA. 9+111 BOX TUNNEL WALL 23-Mar-13 30-Mar-13 7 10 12.96 360 207.7 250.20
KIRI LAYER 1 12.95 380 219.2 264.10
257.15
12.93 370 213.4 257.15
12.94 370 213.4 257.15
128 STA.7+400 PIER HEAD KIRI 25-Mar-13 1-Apr-13 7 9 12.94 350 201.9 243.25
JEMBATAN KALI WANGI A2 1-Apr-13 7 12.96 360 207.7 250.20
KANAN 246.73
1-Apr-13 7
1-Apr-13 7
129 STA.10+429 WALL PALT 25-Mar-13 1-Apr-13 7 10 12.95 380 219.2 264.10
1-Apr-13 7 12.94 390 225.0 271.05
272.79
1-Apr-13 7 12.96 400 230.7 278.00
1-Apr-13 7 12.98 400 230.7 278.00
130 STA.9+105 BOX TUNNEL 25-Mar-13 1-Apr-13 7 10 12.95 390 225.0 271.05
JAMBU 1-Apr-13 7 12.93 410 236.5 284.95
279.74
1-Apr-13 7 12.94 430 248.0 298.85
1-Apr-13 7 12.94 380 219.2 264.10
131 STA. 0+321 WALL +PLAT BOX 26-Mar-13 2-Apr-13 7 10 12.96 380 219.2 264.10
CULVERT 2-Apr-13 7 12.97 370 213.4 257.15
271.05
2-Apr-13 7 12.95 410 236.5 284.95
2-Apr-13 7 12.96 400 230.7 278.00
132 STA.11+300 SLAB MAIN ROOD 27-Mar-13 3-Apr-13 7 9 12.93 420 242.3 291.90
BOX CULVERT 3-Apr-13 7 12.94 390 225.0 271.05
271.05

Page 2 of 322
PT. MARGABUMI ADHIKARAYA
PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN
TAHAP I PAKET 2 ( STA. 5+550 S.D STA 11 + 500 )
Konsultan Pengawas : Kontraktor :
PT Multi Phi Beta - PT Tata Guna Patria - PT.Wijaya Karya (Persero) Tbk
PT Eskapindo Matra (KSO)

REKAPITULASI KUAT TEKAN BETON

Proyek : TOL GEMPOL - PANDAAN


Plant : JAYA READY MIX
Benda Uji : Silinder 15 x 30 cm
Mutu : KLAS C / K - 250
Umur : 7 Hari
Periode : Maret 2013 s/d April 2013
No Tanggal Umur Slump Berat Beban Tegangan Hancur
Kode Benda Uji Rata2x
132 STA.11+300 SLAB MAIN ROOD Produksi Test Silinder Kubus KETERANGAN
BOX CULVERT ( hari ) ( cm ) ( kg ) ( kN ) ( kg/cm2)
271.05
3-Apr-13 7 12.95 350 201.9 243.25
3-Apr-13 7 12.96 400 230.7 278.00

Page 3 of 322
PT. MARGABUMI ADHIKARAYA
PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN
TAHAP I PAKET 2 ( STA. 5+550 S.D STA 11 + 500 )
Konsultan Pengawas : Kontraktor :
PT Multi Phi Beta - PT Tata Guna Patria - PT.Wijaya Karya (Persero) Tbk
PT Eskapindo Matra (KSO)

REKAPITULASI KUAT TEKAN BETON

Proyek : TOL GEMPOL - PANDAAN


Plant : JAYA READY MIX
Benda Uji : Silinder 15 x 30 cm
Mutu : KLAS C / K - 250
Umur : 7 Hari
Periode : Maret 2013 s/d April 2013
No Tanggal Umur Slump Berat Beban Tegangan Hancur
Kode Benda Uji Rata2x
Produksi Test Silinder Kubus KETERANGAN
( hari ) ( cm ) ( kg ) ( kN ) ( kg/cm2)
133 STA.9+111 DINDING BOX 28-Mar-13 4-Apr-13 7 10 12.94 420 242.3 291.90
TUNNEL LAYER 2 4-Apr-13 7 12.95 360 207.7 250.20
260.63
4-Apr-13 7 12.95 370 213.4 257.15
4-Apr-13 7 12.98 350 201.9 243.25
134 STA. 8+350 RCP SELIMUT 29-Mar-13 5-Apr-13 7 10 12.97 360 207.7 250.20
BETON 5-Apr-13 7 12.93 380 219.2 264.10
258.89
5-Apr-13 7 12.96 390 225.0 271.05
5-Apr-13 7 12.94 360 207.7 250.20
135 STA. 10+639 WING WALL 30-Mar-13 6-Apr-13 7 9 12.95 380 219.2 264.10
JEMBATAN ULU-ULU BANYU 6-Apr-13 7 12.96 370 213.4 257.15
A2 KIRI 253.68
6-Apr-13 7 12.93 360 207.7 250.20
6-Apr-13 7 12.96 350 201.9 243.25
136 STA.11+701 WALL+PLAT MAIN 31-Mar-13 8-Apr-13 8 10 12.97 400 230.7 278.00
HOLE BOX TUNNEL KD.REJO ( 8-Apr-13 8 12.95 430 248.0 298.85
1) 286.69
8-Apr-13 8 12.95 370 213.4 257.15
8-Apr-13 8 12.96 450 259.6 312.76
137 STA.11+701 WALL+PLAT MAIN 31-Mar-13 8-Apr-13 8 10 12.93 460 265.4 319.71
HOLE BOX TUNNEL KD.REJO ( 8-Apr-13 8 12.95 360 207.7 250.20
2) 288.43
8-Apr-13 8 12.97 390 225.0 271.05
8-Apr-13 8 12.95 450 259.6 312.76
138 STA.11+701 WALL+PLAT MAIN 31-Mar-13 8-Apr-13 8 10 12.94 400 230.7 278.00
HOLE BOX TUNNEL KD.REJO ( 8-Apr-13 8 12.96 420 242.3 291.90
3) 293.64
8-Apr-13 8 12.96 440 253.8 305.80
8-Apr-13 8 12.95 430 248.0 298.85
139 STA.10+173 JPO JABON 1-Apr-13 8-Apr-13 7 9 12.93 430 248.0 298.85
8-Apr-13 7 12.94 400 230.7 278.00
288.43
8-Apr-13 7
8-Apr-13 7
140 STA. 7+400 HEAD WALL +WING 1-Apr-13 8-Apr-13 7 9 12.97 390 225.0 271.05
JMBT.KALIWANGI 8-Apr-13 7 12.95 400 230.7 278.00
276.27
8-Apr-13 7 12.96 420 242.3 291.90
8-Apr-13 7 12.93 380 219.2 264.10
141 STA.7+273 WING WALL BOX 2-Apr-13 9-Apr-13 7 10 12.94 410 236.5 284.95
CULVERT 9-Apr-13 7 12.95 390 225.0 271.05
278.00
9-Apr-13 7
9-Apr-13 7
142 STA, 9+111 WALL +PLAT BOX 2-Apr-13 9-Apr-13 7 9 12.96 400 230.7 278.00
TUNNEL JL.JAMBU 9-Apr-13 7 12.94 400 230.7 278.00
278.00
9-Apr-13 7
9-Apr-13 7
143 STA.9+111 WALL BOX 2-Apr-13 9-Apr-13 7 10 12.95 370 213.4 257.15
TUNNEL .JAMBU 9-Apr-13 7 12.95 380 219.2 264.10
269.32
9-Apr-13 7 12.98 410 236.5 284.95
9-Apr-13 7 12.97 390 225.0 271.05
144 STA. 10+173 FOOTING JPO 3-Apr-13 10-Apr-13 7 9 12.93 340 196.1 236.30
JABON 10-Apr-13 7 12.96 360 207.7 250.20
243.25
10-Apr-13 7 12.94 350 201.9 243.25
10-Apr-13 7
145 STA.9+488 WING BOX 3-Apr-13 10-Apr-13 7 10 12.95 400 230.7 278.00
CULVERT KIRI 10-Apr-13 7 12.96 440 253.8 305.80
291.90
10-Apr-13 7
10-Apr-13 7
146 STA.7+900 BOX CULVERT 3-Apr-13 10-Apr-13 7 10 12.93 420 242.3 291.90
10-Apr-13 7 12.96 400 230.7 278.00
284.95
10-Apr-13 7
10-Apr-13 7
147 STA.11+008 KADALPLANG 3-Apr-13 10-Apr-13 7 10 12.97 410 236.5 284.95
10-Apr-13 7 12.95 410 236.5 284.95
295.38
10-Apr-13 7 12.95 450 259.6 312.76
10-Apr-13 7 12.98 430 248.0 298.85
148 STA. 7+400 HEAD +WALL 4-Apr-13 11-Apr-13 7 10 12.93 420 242.3 291.90
KALIWANGI 11-Apr-13 7 12.95 460 265.4 319.71
297.12
11-Apr-13 7 12.97 400 230.7 278.00
11-Apr-13 7 12.95 430 248.0 298.85
149 STA. 9+831 WALL + PLAT BOX 5-Apr-13 12-Apr-13 7 9 12.94 410 236.5 284.95
CULVERT 12-Apr-13 7 12.96 420 242.3 291.90
298.85
12-Apr-13 7 12.96 460 265.4 319.71
12-Apr-13 7 12.95 430 248.0 298.85
150 STA.11+016 5-Apr-13 12-Apr-13 7 10 12.93 460 265.4 319.71
295.38
Page 4 of 322
PT. MARGABUMI ADHIKARAYA
PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN
TAHAP I PAKET 2 ( STA. 5+550 S.D STA 11 + 500 )
Konsultan Pengawas : Kontraktor :
PT Multi Phi Beta - PT Tata Guna Patria - PT.Wijaya Karya (Persero) Tbk
PT Eskapindo Matra (KSO)

REKAPITULASI KUAT TEKAN BETON

Proyek : TOL GEMPOL - PANDAAN


Plant : JAYA READY MIX
Benda Uji : Silinder 15 x 30 cm
Mutu : KLAS C / K - 250
Umur : 7 Hari
Periode : Maret 2013 s/d April 2013
No Tanggal Umur Slump Berat Beban Tegangan Hancur
Kode Benda Uji Rata2x
Produksi Test Silinder Kubus KETERANGAN
150 STA.11+016 ( hari ) ( cm ) ( kg ) ( kN ) ( kg/cm2)
12-Apr-13 7 12.94 470 271.1 326.66
295.38
12-Apr-13 7 12.94 400 230.7 278.00
12-Apr-13 7 12.96 370 213.4 257.15

Page 5 of 322
PT. MARGABUMI ADHIKARAYA
PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN
TAHAP I PAKET 2 ( STA. 5+550 S.D STA 11 + 500 )
Konsultan Pengawas : Kontraktor :
PT Multi Phi Beta - PT Tata Guna Patria - PT.Wijaya Karya (Persero) Tbk
PT Eskapindo Matra (KSO)

REKAPITULASI KUAT TEKAN BETON

Proyek : TOL GEMPOL - PANDAAN


Plant : JAYA READY MIX
Benda Uji : Silinder 15 x 30 cm
Mutu : KLAS C / K - 250
Umur : 7 Hari
Periode : Maret 2013 s/d April 2013
No Tanggal Umur Slump Berat Beban Tegangan Hancur
Kode Benda Uji Rata2x
Produksi Test Silinder Kubus KETERANGAN
( hari ) ( cm ) ( kg ) ( kN ) ( kg/cm2)
151 STA.9+111 WALL BOX TUNNEL 6-Apr-13 13-Apr-13 7 9 12.97 360 207.7 250.20
JL.JAMBU 13-Apr-13 7 12.95 380 219.2 264.10
255.42
13-Apr-13 7 12.96 360 207.7 250.20
13-Apr-13 7 12.93 370 213.4 257.15
152 STA.11+315 WALL+PLAT BOX 6-Apr-13 13-Apr-13 7 10 12.94 360 207.7 250.20
TUNNEL ( 1 ) 13-Apr-13 7 12.95 400 230.7 278.00
293.64
13-Apr-13 7 12.96 460 265.4 319.71
13-Apr-13 7 12.94 470 271.1 326.66
153 STA.11+315 WALL+PLAT BOX 6-Apr-13 13-Apr-13 7 10 12.95 400 230.7 278.00
TUNNEL ( 2 ) 13-Apr-13 7 12.95 390 225.0 271.05
274.53
13-Apr-13 7
13-Apr-13 7
154 STA. 10+527 SLAB BAWAH 7-Apr-13 15-Apr-13 8 10 12.96 360 207.7 250.20
BOX CULVERT 15-Apr-13 8 12.94 380 219.2 264.10
257.15
15-Apr-13 8
15-Apr-13 8
155 STA.11+315 WALL +PLAT BOX 12-Apr-13 19-Apr-13 7 9 12.95 450 259.6 312.76
CULVERT 19-Apr-13 7 12.93 400 230.7 278.00
295.38
19-Apr-13 7
19-Apr-13 7
156 STA. 10+173 JPO JABON P2 12-Apr-13 19-Apr-13 7 9 12.94 410 236.5 284.95
DAN P1 19-Apr-13 7 12.94 430 248.0 298.85
291.90
19-Apr-13 7
19-Apr-13 7
157 STA. 7+400 12-Apr-13 19-Apr-13 7 10 12.96 360 207.7 250.20
19-Apr-13 7 12.97 360 207.7 250.20
250.20
19-Apr-13 7
19-Apr-13 7
158 STA. 11+315 WALL+PLAT BOX 12-Apr-13 19-Apr-13 7 10 12.95 380 219.2 264.10
CULVERT 19-Apr-13 7 12.96 380 219.2 264.10
274.53
19-Apr-13 7 12.93 400 230.7 278.00
19-Apr-13 7 12.95 420 242.3 291.90
159 STA. 9+675 WING WALL BOX 13-Apr-13 20-Apr-13 7 9 12.94 390 225.0 271.05
CULVERT KANAN 20-Apr-13 7 12.96 400 230.7 278.00
274.53
20-Apr-13 7
20-Apr-13 7
160 STA. 10+173 ABUTMENT JPO 13-Apr-13 20-Apr-13 7 10 12.96 420 242.3 291.90
JABON A1 KANAN 20-Apr-13 7 12.95 410 236.5 284.95
288.43
20-Apr-13 7
20-Apr-13 7
161 STA. 10+871 WING WALL 13-Apr-13 20-Apr-13 7 10 12.93 380 219.2 264.10
20-Apr-13 7 12.94 400 230.7 278.00
271.05

Pandaan, ............... 2013


Disetujui Oleh : Diajukan Oleh :
Diketahui Oleh: Konsultan Kontraktor
PT. Margabumi Adhikaraya PT. Multi Phi Beta
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( _____________________________ ) ( _____________________________ ) ( _______________________ )

Page 6 of 322
PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : Mei 2013

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 16-May-13 7 0.75 46.21 61.61 11.36
RIGGID
2 16-May-13 7 0.75 50.29 67.05 77.62
3 16-May-13 7 0.75 38.06 50.75 56.20
#N/A
4 16-May-13 7 0.75 40.77 54.36 15.08
5 21-May-13 7 0.75 43.22 57.63 0.38
RIGGID
6 21-May-13 7 0.75 44.04 58.72 0.23
7 21-May-13 7 0.75 37.78 50.37 61.93
RIGGID
8 21-May-13 7 0.75 43.76 58.35 0.01
9 26-Mei-2013. 7 0.75 42.30 56.40 3.40
10 26-Mei-2013. 7 0.75 43.10 57.47 0.60 RIGGID
11 26-Mei-2013. 7 0.75 44.10 58.80 0.31
12 29-Mei-2013. 7 0.75 45.00 60.00 3.09
13 29-Mei-2013. 7 0.75 42.90 57.20 1.09
RIGGID
14 29-Mei-2013. 7 0.75 43.10 57.47 0.60
15 29-Mei-2013. 7 0.75 44.20 58.93 0.48
16 30-Mei-2013. 7 0.75 44.80 59.73 2.22
17 30-Mei-2013. 7 0.75 46.00 61.33 9.55 RIGGID
18 30-Mei-2013. 7 0.75 44.20 58.93 0.48
19 31-Mei-2013. 7 0.75 45.60 60.80 6.54
20 31-Mei-2013. 7 0.75 45.20 60.27 4.09 RIGGID
21 31-Mei-2013. 7 0.75 42.70 56.93 1.72

Σ(σbn - σbm)2 = 256.96

JUMLAH SAMPLE = 21.00 buah


MIN = 50.37 kg/cm2
MAX = 67.05 kg/cm2
RATA-RATA (σbm) = 58.24 kg/cm2
S ==
KARAKTERISTIK (σbk) = σbm - 1,64 S 3.58 kg/cm2
52.36 kg/cm2

Pandaan,………………..2014

QC STAF QC
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
( ) ( )
PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : Juni 2013

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 21-Jun-13 28 1.00 54.37 54.37 67.92
RIGGID
2 21-Jun-13 28 1.00 61.16 61.16 2.09
3 21-Jun-13 28 1.00 47.57 47.57 226.11
#N/A
4 21-Jun-13 28 1.00 47.57 47.57 226.11
5 25-Jun-13 28 1.00 54.67 54.67 63.00
RIGGID
6 25-Jun-13 28 1.00 50.57 50.57 144.90
7 25-Jun-13 28 1.00 47.47 47.47 229.15
RIGGID
8 29-Jun-13 28 1.00 67.96 67.96 28.63
9 29-Jun-13 28 1.00 67.96 67.96 28.63
10 29-Jun-13 28 1.00 61.16 61.16 2.09 RIGGID
11 29-Jun-13 28 1.00 54.37 54.37 67.92
12 13-Jun-13 7 0.75 37.60 50.13 155.61
RIGID
13 13-Jun-13 7 0.75 37.60 50.13 155.61
14 15-Jun-13 7 0.75 54.37 72.49 97.63 RIGID LAJUR 3 STA.
15 15-Jun-13 7 0.75 61.16 81.55 358.79 8+125
16 17-Jun-13 7 0.75 54.37 72.49 97.63 RIGID LAJUR 3 STA.
17 17-Jun-13 7 0.75 61.16 81.55 358.79 8+125
18 18-Jun-13 7 0.75 54.37 72.49 97.63 RIGID LAJUR 3 STA.
19 18-Jun-13 7 0.75 54.37 72.49 97.63 8+125
20 19-Jun-13 7 0.75 54.37 72.49 97.63 RIGID LAJUR 3 STA.
21 19-Jun-13 7 0.75 54.37 72.49 97.63 8+125
22 28-Jun-13 7 0.75 40.77 54.37 67.92 RIGID LAJUR 3 STA.
23 28-Jun-13 7 0.75 54.37 72.49 97.63 8+125

Σ(σbn - σbm)2 = 2866.68

JUMLAH SAMPLE = 23.00 buah


MIN = 47.47 kg/cm2
MAX = 81.55 kg/cm2
RATA-RATA (σbm) = 62.61 kg/cm2
S ==
KARAKTERISTIK (σbk) = σbm - 1,64 S 11.42 kg/cm2
43.89 kg/cm2

Pandaan,………………..2014

QC STAF QC

( ) ( )
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : Juli 2013

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 4-Jul-13 28 1.00 54.37 54.37 0.02
2 4-Jul-13 28 1.00 54.37 54.37 0.02
RIGID
3 4-Jul-13 28 1.00 54.37 54.37 0.02
4 4-Jul-13 28 1.00 54.37 54.37 0.02
5 6-Jul-13 28 1.00 61.16 61.16 44.15
6 6-Jul-13 28 1.00 54.37 54.37 0.02
RIGID
7 6-Jul-13 28 1.00 54.37 54.37 0.02
8 6-Jul-13 28 1.00 54.37 54.37 0.02
9 8-Jul-13 28 1.00 61.16 61.16 44.15
10 8-Jul-13 28 1.00 54.37 54.37 0.02
RIGID
11 8-Jul-13 28 1.00 54.37 54.37 0.02
12 8-Jul-13 28 1.00 54.37 54.37 0.02
13 9-Jul-13 28 1.00 47.57 47.57 48.26
14 9-Jul-13 28 1.00 47.57 47.57 48.26
RIGID
15 9-Jul-13 28 1.00 47.57 47.57 48.26
16 9-Jul-13 28 1.00 54.37 54.37 0.02
17 10-Jul-13 28 1.00 47.57 47.57 48.26
18 10-Jul-13 28 1.00 54.37 54.37 0.02
RIGID
19 10-Jul-13 28 1.00 54.37 54.37 0.02
20 10-Jul-13 28 1.00 47.57 47.57 48.26
21 6-Jul-13 7 0.75 47.57 63.43 79.39
RIGID
22 6-Jul-13 7 0.75 47.57 63.43 79.39
23 19-Jul-13 28 1.00 54.37 54.37 0.02
24 19-Jul-13 28 1.00 54.37 54.37 0.02
RIGID
25 19-Jul-13 28 1.00 61.16 61.16 44.15
26 19-Jul-13 28 1.00 54.37 54.37 0.02
27 26-Jul-13 7 0.75 40.77 54.37 0.02
RIGID
28 26-Jul-13 7 0.75 40.77 54.37 0.02
29 31-Jul-13 7 0.75 40.77 54.37 0.02
RIGID
30 31-Jul-13 7 0.75 40.77 54.37 0.02

Σ(σbn - σbm)2 = 532.98

JUMLAH SAMPLE = 30.00 buah


MIN = 47.57 kg/cm2
MAX = 63.43 kg/cm2
RATA-RATA (σbm) = 54.52 kg/cm2
KARAKTERISTIK (σbk) = σbm - 1,64 S = 4.29 kg/cm2
47.49 kg/cm2

Pandaan,………………..2014

QC STAF QC
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
( ) ( )
PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : Agustus 2013

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 3-Aug-13 28 1.00 54.37 54.37 5.82
2 3-Aug-13 28 1.00 61.16 61.16 19.21
RIGID
3 3-Aug-13 28 1.00 61.16 61.16 19.21
4 3-Aug-13 28 1.00 61.16 61.16 19.21
5 16-Aug-13 28 1.00 54.37 54.37 5.82
6 16-Aug-13 28 1.00 61.16 61.16 19.21
7 16-Aug-13 28 1.00 61.16 61.16 19.21
RIGID
8 16-Aug-13 28 1.00 61.16 61.16 19.21
9 16-Aug-13 28 1.00 54.37 54.37 5.82
10 16-Aug-13 28 1.00 61.16 61.16 19.21
11 15-Aug-13 7 0.75 40.77 54.37 5.82
12 15-Aug-13 7 0.75 40.77 54.37 5.82
RIGID
13 15-Aug-13 7 0.75 47.57 63.43 44.20
14 15-Aug-13 7 0.75 40.77 54.37 5.82
15 15-Aug-13 7 0.75 47.57 63.43 44.20
16 15-Aug-13 7 0.75 47.57 63.43 44.20
RIGID
17 15-Aug-13 7 0.75 40.77 54.37 5.82
18 15-Aug-13 7 0.75 40.77 54.37 5.82
19 15-Aug-13 7 0.75 47.57 63.43 44.20
20 15-Aug-13 7 0.75 40.77 54.37 5.82
RIGID
21 15-Aug-13 7 0.75 40.77 54.37 5.82
22 15-Aug-13 7 0.75 47.57 63.43 44.20
23 16-Aug-13 7 0.75 40.77 54.37 5.82
RIGID
24 16-Aug-13 7 0.75 47.57 63.43 44.20
25 17-Aug-13 7 0.75 47.57 63.43 44.20
RIGID
26 17-Aug-13 7 0.75 47.57 63.43 44.20
27 27-Aug-14 7 0.75 40.77 54.37 5.82
RIGID
28 27-Aug-14 7 0.75 43.49 57.99 1.47
29 29-Aug-14 7 0.75 42.13 56.18 0.36
RIGID
30 29-Aug-14 7 0.75 40.77 54.37 5.82
31 29-Aug-14 7 0.75 39.42 52.55 17.85
RIGID
32 29-Aug-14 7 0.75 40.77 54.37 5.82
33 27-Aug-14 7 0.75 40.77 54.37 5.82 RIGID
34 27-Aug-14 7 0.75 39.42 52.55 17.85 R16+850-6+920
35 29-Aug-14 7 0.75 39.42 52.55 17.85 RIGID
36 29-Aug-14 7 0.75 40.77 54.37 5.82 R2 6+640-6+745
37 29-Aug-14 7 0.75 38.06 50.74 36.45 RIGID
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
38 29-Aug-14 7 0.75 40.77 54.37 5.82 R2 6+640-6+745
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
39 30-Aug-14 7 0.75 38.06 50.74 36.45 RIGID
40 30-Aug-14 7 0.75 36.70 48.93 61.62 L1 6+810-6+905
41 27-Aug-14 7 0.75 40.77 54.37 5.82
RIGID
42 27-Aug-14 7 0.75 43.49 57.99 1.47
43 29-Aug-14 7 0.75 42.13 56.18 0.36
RIGID
44 29-Aug-14 7 0.75 40.77 54.37 5.82
45 29-Aug-14 7 0.75 39.42 52.55 17.85
RIGID
46 29-Aug-14 7 0.75 40.77 54.37 5.82

Σ(σbn - σbm)2 = 814.07

JUMLAH SAMPLE = 46.00 buah


MIN = 48.93 kg/cm2
MAX = 63.43 kg/cm2
RATA-RATA (σbm) = 56.78 kg/cm2
S ==
KARAKTERISTIK (σbk) = σbm - 1,64 S 4.25 kg/cm2
49.80 kg/cm2

Pandaan,………………..2014

QC STAF QC

( ) ( )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

1 RIGID 12-Aug-14 3.0 19-Aug-14 9-Sep-14 31.00 35 47.57 50.97


R3 6+730-6+640 32.00 40 54.37

2 RIGID 13-Aug-14 3.5 20-Aug-14 10-Sep-14 32.00 35 47.57 47.57


R2 6+800-6+850 31.00 35 47.57
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
3 RIGID 15-Aug-14 3.0 22-Aug-14 12-Sep-14 31.00 38 51.65 52.33
R3 6+850-6+945 32.00 39 53.01

4 RIGID 18-Aug-14 3.5 25-Aug-14 15-Sep-14 32.00 37 50.29 51.65


R2 6+850-6+925 31.00 39 53.01

33 5 RIGID 20-Aug-14 3.0 27-Aug-14 31.00 30 40.77 17-Sep-14 31.00 35 47.57 50.29
34 R16+850-6+920 27-Aug-14 32.00 29 39.42 31.00 39 53.01

35 6 RIGID 22-Aug-14 3.0 29-Aug-14 32.00 29 39.42 19-Sep-14 32.00 37 50.29 52.33
36 R2 6+640-6+745 29-Aug-14 31.00 30 40.77 30.00 40 54.37

37 7 RIGID 22-Aug-14 3.0 29-Aug-14 31.00 28 38.06 19-Sep-14 31.00 36 48.93 49.61
38 R2 6+640-6+745 29-Aug-14 32.00 30 40.77 30.00 37 50.29

39 8 RIGID 23-Aug-14 3.5 30-Aug-14 32.00 28 38.06 20-Sep-14 30.00 37 50.29 51.65
40 L1 6+810-6+905 30-Aug-14 31.00 27 36.70 31.00 39 53.01

9 RIGID 25-Aug-14 3.0 1-Sep-14 30.00 27 36.70 22-Sep-14


L2 6+810-6+905 31.00 29 39.42

10 RIGID 26-Aug-14 3.5 2-Sep-14 32.00 29 39.42 23-Sep-14


R1 6+640-6+740 30.00 28 38.06

11 RIGID 27-Aug-14 3.0 3-Sep-14 31.00 30 40.77 24-Sep-14


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
L3 6+810-6+905 31.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
L3 6+810-6+905 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

12 RIGID 29-Aug-14 5.0 5-Sep-14 30.00 27 36.70 26-Sep-14


R1 6+645-6+625 31.00 27 36.70

13 RIGID 1-Sep-14 3.0 8-Sep-14 31.00 30 40.77 29-Sep-14


R3 6+500-6+585 32.00 29 39.42

14 RIGID 1-Sep-14 3.0 8-Sep-14 32.00 29 39.42 29-Sep-14


R3 6+500-6+585 31.00 30 40.77

15 RIGID 3-Sep-14 3.5 10-Sep-14 31.00 30 40.77 1-Oct-14


R2 6+595-6+640 32.00 29 39.42

16 RIGID 3-Sep-14 3.0 10-Sep-14 32.00 30 40.77 1-Oct-14


R2 6+595-6+640 31.00 29 39.42

17 RIGID 4-Sep-14 4.0 11-Sep-14 31.00 29 39.42 2-Oct-14


R2 0+750-0+762 32.00 30 40.77

18 RIGID 6-Sep-14 3.0 13-Sep-14 32.00 28 38.06 4-Oct-14


L1 6+280-6+225 33.00 28 38.06

19 RIGID 8-Sep-14 5.0 15-Sep-14 31.00 29 39.42 6-Oct-14


L1 0+950-0+990 30.00 27 36.70
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. L1 0+950-0+990 Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

20 RIGID 9-Sep-14 3.5 16-Sep-14 31.00 28 38.06 7-Oct-14


L1 6+740-6+810 30.00 27 36.70

21 RIGID 11-Sep-14 3.0 18-Sep-14 30.00 27 36.70 9-Oct-14


L2 6+740-6+810 31.00 28 38.06

22 RIGID 12-Sep-14 3.5 19-Sep-14 32.00 30 40.77 10-Oct-14


R3 6+945-7+005 31.00 27 36.70

23 RIGID 13-Sep-14 5.0 20-Sep-14 31.00 27 36.70 11-Oct-14


2+330-2+305 RAMP 2 31.00 29 39.42

24 RIGID 13-Sep-14 3.0 20-Sep-14 32.00 28 38.06 11-Oct-14


R2 6+925-7+005 31.00 29 39.42

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT Jasamarga Pandaan Tol Konsultan Kontraktor

( _____________________________ ) ( _____________________________ ) ( ________________________)


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
1 RIGID 9-Aug-14 4.0 16-Aug-14 6-Sep-14 32.00 40 54.37 54.37
32.00 40 54.37
R1 STA. 6+850- 6+950

`
2 RIGID 11-Aug-14 4.5 18-Aug-14 8-Sep-14 31.00 40 54.37 53.35
32.00 40 54.37
R2 STA. 6+850- 6+950
32.00 38 51.65
32.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
3 RIGID 12-Aug-14 3.0 19-Aug-14 9-Sep-14 31.00 38 51.65 53.35
32.00 39 53.01
R3 STA. 6+850- 6+945
32.00 39 53.01
33.00 41 55.73

`
4 RIGID 13-Aug-14 3.5 20-Aug-14 10-Sep-14 30.00 39 53.01 53.46
33.00 41 55.73
31.00 37 50.29
R3 STA. 6+730- 6+850
32.00 40 54.37
31.00 40 54.37
31.00 39 53.01
`

5 RIGID 15-Aug-14 4.0 22-Aug-14 12-Sep-14 32.00 40 54.37 55.73


33.00 42 57.08
R2 STA. 6+850- 6+730

6 RIGID 18-Aug-14 3.5 25-Aug-14 15-Sep-14 31.00 39 53.01 53.01


31.00 39 53.01
R1 STA. 6+850- 6+730

41 7 RIGID 20-Aug-14 4.0 27-Aug-14 34.00 30 40.77 17-Sep-14 31.00 39 53.01 53.01
42 R1 STA. 6+850- 6+920 27-Aug-14 34.00 32 43.49 31.00 39 53.01

43 8 RIGID 22-Aug-14 4.0 29-Aug-14 34.00 31 42.13 19-Sep-14 30.00 38 51.65 53.01
44 29-Aug-14 34.20 30 40.77 31.00 40 54.37
R2 STA. 6+640- 6+745
30.00 39 53.01
30.00 39 53.01

45 9 RIGID 22-Aug-14 4.5 29-Aug-14 34.00 29 39.42 19-Sep-14 32.00 41 55.73 53.01
46 29-Aug-14 34.20 30 40.77 30.00 38 51.65
L1 STA. 6+810- 6+910
30.00 38 51.65
31.00 39 53.01

10 RIGID 25-Aug-14 4.0 1-Sep-14 34.00 29 39.42 22-Sep-14


34.10 31 42.13
L2 STA. 6+810- 6+910

11 RIGID 26-Aug-14 4.5 2-Sep-14 34.00 29 39.42 23-Sep-14


34.00 30 40.77
L1 STA. 6+640- 6+690
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

12 RIGID 27-Aug-14 4.0 3-Sep-14 34.20 30 40.77 24-Sep-14


34.00 31 42.13
L3 STA. 6+810- 6+910

12 RIGID 3-Aug-14 4.0 10-Aug-14 34.00 29 39.42 31-Aug-14


34.00 29 39.42
R3 STA. 6+465- 6+600

12 RIGID 1-Sep-14 4.0 8-Sep-14 34.50 29 39.42 29-Sep-14


34.20 28 38.06
R3 STA. 6+500- 6+585

12 RIGID 2-Sep-14 4.0 9-Sep-14 34.00 28 38.06 30-Sep-14


31.20 30 40.77
R2 STA. 6+465- 6+545

13 RIGID 9-Sep-14 4.0 16-Sep-14 30.00 30 40.77 7-Oct-14


30.00 31 42.13
L1 STA. 6+740- 6+810

14 RIGID 10-Sep-14 3.0 17-Sep-14 30.00 29 39.42 8-Oct-14


30.00 30 40.77
L1 STA. 6+780- 6+690

15 RIGID 11-Sep-14 4.0 18-Sep-14 31.00 31 42.13 9-Oct-14


32.00 33 44.85
L2 STA. 6+740- 6+810

16 RIGID 12-Sep-14 3.5 19-Sep-14 30.00 30 40.77 10-Oct-14


30.00 31 42.13
R3 STA. 6+945- 7+005

17 RIGID 12-Sep-14 4.0 19-Sep-14 29.00 28 38.06 10-Oct-14


29.00 29 39.42
R2 STA. 6+925- 7+005
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
Jasamarga Pandaan Tol Konsultan Kontraktor

( _____________________________ ) ( _____________________________ ) ( ________________________)


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

1 1 RIGID 12-Aug-14 3.0 19-Aug-14 9-Sep-14 31.00 35 47.57 50.97


2 R3 6+730-6+640 9-Sep-14 32.00 40 54.37

3 2 RIGID 13-Aug-14 3.5 20-Aug-14 10-Sep-14 32.00 35 47.57 47.57


4 R2 6+800-6+850 10-Sep-14 31.00 35 47.57
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
5 3 RIGID 15-Aug-14 3.0 22-Aug-14 12-Sep-14 31.00 38 51.65 52.33
6 R3 6+850-6+945 12-Sep-14 32.00 39 53.01

7 4 RIGID 18-Aug-14 3.5 25-Aug-14 15-Sep-14 32.00 37 50.29 51.65


8 R2 6+850-6+925 15-Sep-14 31.00 39 53.01

9 5 RIGID 20-Aug-14 3.0 27-Aug-14 31.00 30 40.77 17-Sep-14 31.00 35 47.57 50.29
10 R16+850-6+920 32.00 29 39.42 17-Sep-14 31.00 39 53.01

11 6 RIGID 22-Aug-14 3.0 29-Aug-14 32.00 29 39.42 19-Sep-14 32.00 37 50.29 52.33
12 R2 6+640-6+745 31.00 30 40.77 19-Sep-14 30.00 40 54.37

13 7 RIGID 22-Aug-14 3.0 29-Aug-14 31.00 28 38.06 19-Sep-14 31.00 36 48.93 49.61
14 R2 6+640-6+745 32.00 30 40.77 19-Sep-14 30.00 37 50.29

15 8 RIGID 23-Aug-14 3.5 30-Aug-14 32.00 28 38.06 20-Sep-14 30.00 37 50.29 51.65
16 L1 6+810-6+905 31.00 27 36.70 20-Sep-14 31.00 39 53.01

17 9 RIGID 25-Aug-14 3.0 1-Sep-14 30.00 27 36.70 22-Sep-14


18 L2 6+810-6+905 1-Sep-14 31.00 29 39.42

19 10 RIGID 26-Aug-14 3.5 2-Sep-14 32.00 29 39.42 23-Sep-14


20 R1 6+640-6+740 2-Sep-14 30.00 28 38.06

21 11 RIGID 27-Aug-14 3.0 3-Sep-14 31.00 30 40.77 24-Sep-14


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
22 L3 6+810-6+905 3-Sep-14 31.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
L3 6+810-6+905 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

23 12 RIGID 29-Aug-14 5.0 5-Sep-14 30.00 27 36.70 26-Sep-14


24 R1 6+645-6+625 5-Sep-14 31.00 27 36.70

25 13 RIGID 1-Sep-14 3.0 8-Sep-14 31.00 30 40.77 29-Sep-14


26 R3 6+500-6+585 8-Sep-14 32.00 29 39.42

27 14 RIGID 1-Sep-14 3.0 8-Sep-14 32.00 29 39.42 29-Sep-14


28 R3 6+500-6+585 8-Sep-14 31.00 30 40.77

29 15 RIGID 3-Sep-14 3.5 10-Sep-14 31.00 30 40.77 1-Oct-14


30 R2 6+595-6+640 10-Sep-14 32.00 29 39.42

31 16 RIGID 3-Sep-14 3.0 10-Sep-14 32.00 30 40.77 1-Oct-14


32 R2 6+595-6+640 10-Sep-14 31.00 29 39.42

33 17 RIGID 4-Sep-14 4.0 11-Sep-14 31.00 29 39.42 2-Oct-14


34 R2 0+750-0+762 11-Sep-14 32.00 30 40.77

35 18 RIGID 6-Sep-14 3.0 13-Sep-14 32.00 28 38.06 4-Oct-14


36 L1 6+280-6+225 13-Sep-14 33.00 28 38.06

37 19 RIGID 8-Sep-14 5.0 15-Sep-14 31.00 29 39.42 6-Oct-14


38 L1 0+950-0+990 15-Sep-14 30.00 27 36.70
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. L1 0+950-0+990 Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

39 20 RIGID 9-Sep-14 3.5 16-Sep-14 31.00 28 38.06 7-Oct-14


40 L1 6+740-6+810 16-Sep-14 30.00 27 36.70

41 21 RIGID 11-Sep-14 3.0 18-Sep-14 30.00 27 36.70 9-Oct-14


42 L2 6+740-6+810 18-Sep-14 31.00 28 38.06

43 22 RIGID 12-Sep-14 3.5 19-Sep-14 32.00 30 40.77 10-Oct-14


44 R3 6+945-7+005 19-Sep-14 31.00 27 36.70

45 23 RIGID 13-Sep-14 5.0 20-Sep-14 31.00 27 36.70 11-Oct-14


46 2+330-2+305RAMP2 20-Sep-14 31.00 29 39.42

47 24 RIGID 13-Sep-14 3.0 20-Sep-14 32.00 28 38.06 11-Oct-14


48 R2 6+925-7+005 20-Sep-14 31.00 29 39.42

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT Jasamarga Pandaan Tol Konsultan Kontraktor

( _____________________________ ) ( _____________________________ ) ( ________________________)


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON

Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2


( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : September 2013

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 9-Sep-14 28 1.00 47.57 47.57 27.85 RIGID
2 9-Sep-14 28 1.00 54.37 54.37 2.31 R3 6+730-6+640
3 10-Sep-14 28 1.00 47.57 47.57 27.85 RIGID
4 10-Sep-14 28 1.00 47.57 47.57 27.85 R2 6+800-6+850
5 12-Sep-14 28 1.00 51.65 51.65 1.44 RIGID
6 12-Sep-14 28 1.00 53.01 53.01 0.03 R3 6+850-6+945
7 15-Sep-14 28 1.00 50.29 50.29 6.55 RIGID
8 15-Sep-14 28 1.00 53.01 53.01 0.03 R2 6+850-6+925
9 17-Sep-14 28 1.00 47.57 47.57 27.85 RIGID
10 17-Sep-14 28 1.00 53.01 53.01 0.03 R16+850-6+920
11 19-Sep-14 28 1.00 50.29 50.29 6.55 RIGID
12 19-Sep-14 28 1.00 54.37 54.37 2.31 R2 6+640-6+745
13 19-Sep-14 28 1.00 48.93 48.93 15.35 RIGID
14 19-Sep-14 28 1.00 50.29 50.29 6.55 R2 6+640-6+745
15 20-Sep-14 28 1.00 50.29 50.29 6.55 RIGID
16 20-Sep-14 28 1.00 53.01 53.01 0.03 L1 6+810-6+905
17 1-Sep-14 7 0.75 36.70 48.93 15.35 RIGID
18 1-Sep-14 7 0.75 39.42 52.55 0.09 L2 6+810-6+905
19 2-Sep-14 7 0.75 39.42 52.55 0.09 RIGID
20 2-Sep-14 7 0.75 38.06 50.74 4.43 R1 6+640-6+740
21 3-Sep-14 7 0.75 40.77 54.37 2.31 RIGID
22 3-Sep-14 7 0.75 38.06 50.74 4.43 L3 6+810-6+905
23 5-Sep-14 7 0.75 36.70 48.93 15.35 RIGID
24 5-Sep-14 7 0.75 36.70 48.93 15.35 R1 6+645-6+625
25 8-Sep-14 7 0.75 40.77 54.37 2.31 RIGID
26 8-Sep-14 7 0.75 39.42 52.55 0.09 R3 6+500-6+585
27 8-Sep-14 7 0.75 39.42 52.55 0.09 RIGID
28 8-Sep-14 7 0.75 40.77 54.37 2.31 R3 6+500-6+585
29 10-Sep-14 7 0.75 40.77 54.37 2.31 RIGID
30 10-Sep-14 7 0.75 39.42 52.55 0.09 R2 6+595-6+640
31 10-Sep-14 7 0.75 40.77 54.37 2.31 RIGID
32 10-Sep-14 7 0.75 39.42 52.55 0.09 R2 6+595-6+640
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
33 11-Sep-14 7 0.75 39.42 52.55 0.09 RIGID
34 11-Sep-14 7 0.75 40.77 54.37 2.31 R2 0+750-0+762
35 13-Sep-14 7 0.75 38.06 50.74 4.43 RIGID
36 13-Sep-14 7 0.75 38.06 50.74 4.43 L1 6+280-6+225
37 15-Sep-14 7 0.75 39.42 52.55 0.09 RIGID
38 15-Sep-14 7 0.75 36.70 48.93 15.35 L1 0+950-0+990
39 16-Sep-14 7 0.75 38.06 50.74 4.43 RIGID
40 16-Sep-14 7 0.75 36.70 48.93 15.35 L1 6+740-6+810
41 18-Sep-14 7 0.75 36.70 48.93 15.35 RIGID
42 18-Sep-14 7 0.75 38.06 50.74 4.43 L2 6+740-6+810
43 19-Sep-14 7 0.75 40.77 54.37 2.31 RIGID
44 19-Sep-14 7 0.75 36.70 48.93 15.35 R3 6+945-7+005
45 20-Sep-14 7 0.75 36.70 48.93 15.35 RIGID
46 20-Sep-14 7 0.75 39.42 52.55 0.09 2+330-2+305RAMP2
47 20-Sep-14 7 0.75 38.06 50.74 4.43 RIGID
48 20-Sep-14 7 0.75 39.42 52.55 0.09 R2 6+925-7+005
49 6-Sep-14 28 1.00 54.37 54.37 2.31
RIGID
50 6-Sep-14 28 1.00 54.37 54.37 2.31
51 8-Sep-14 28 1.00 54.37 54.37 2.31
52 8-Sep-14 28 1.00 54.37 54.37 2.31
RIGID
53 8-Sep-14 28 1.00 51.65 51.65 1.44
54 8-Sep-14 28 1.00 53.01 53.01 0.03
55 9-Sep-14 28 1.00 51.65 51.65 1.44
56 9-Sep-14 28 1.00 53.01 53.01 0.03
RIGID
57 9-Sep-14 28 1.00 53.01 53.01 0.03
58 9-Sep-14 28 1.00 55.73 55.73 8.28
59 10-Sep-14 28 1.00 53.01 53.01 0.03
60 10-Sep-14 28 1.00 55.73 55.73 8.28
61 10-Sep-14 28 1.00 50.29 50.29 6.55
RIGID
62 10-Sep-14 28 1.00 54.37 54.37 2.31
63 10-Sep-14 28 1.00 54.37 54.37 2.31
64 10-Sep-14 28 1.00 53.01 53.01 0.03
65 12-Sep-14 28 1.00 54.37 54.37 2.31
RIGID
66 12-Sep-14 28 1.00 57.08 57.08 17.95
67 15-Sep-14 28 1.00 53.01 53.01 0.03
RIGID
68 15-Sep-14 28 1.00 53.01 53.01 0.03
69 17-Sep-14 28 1.00 53.01 53.01 0.03
RIGID
70 17-Sep-14 28 1.00 53.01 53.01 0.03
71 19-Sep-14 28 1.00 51.65 51.65 1.44
72 19-Sep-14 28 1.00 54.37 54.37 2.31
RIGID
73 19-Sep-14 28 1.00 53.01 53.01 0.03
74 19-Sep-14 28 1.00 53.01 53.01 0.03
75 19-Sep-14 28 1.00 55.73 55.73 8.28
76 19-Sep-14 28 1.00 51.65 51.65 1.44
RIGID
77 19-Sep-14 28 1.00 51.65 51.65 1.44
78 19-Sep-14 28 1.00 53.01 53.01 0.03
79 1-Sep-14 7 0.75 39.42 52.55 0.09
RIGID
80 1-Sep-14 7 0.75 42.13 56.18 11.10
81 2-Sep-14 7 0.75 39.42 52.55 0.09
RIGID
82 2-Sep-14 7 0.75 40.77 54.37 2.31
83 3-Sep-14 7 0.75 40.77 54.37 2.31
RIGID
84 3-Sep-14 7 0.75 42.13 56.18 11.10
85 10-Aug-14 7 0.75 39.42 52.55 0.09
RIGID
86 10-Aug-14 7 0.75 39.42 52.55 0.09
87 8-Sep-14 7 0.75 39.42 52.55 0.09
RIGID
88 8-Sep-14 7 0.75 38.06 50.74 4.43
89 9-Sep-14 7 0.75 38.06 50.74 4.43
RIGID
90 9-Sep-14 7 0.75 40.77 54.37 2.31
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
91 16-Sep-14 7 0.75 40.77 54.37 2.31
RIGID
92 16-Sep-14 7 0.75 42.13 56.18 11.10
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
93 17-Sep-14 7 0.75 39.42 52.55 0.09
RIGID
94 17-Sep-14 7 0.75 40.77 54.37 2.31
95 18-Sep-14 7 0.75 42.13 56.18 11.10
RIGID
96 18-Sep-14 7 0.75 44.85 59.80 48.38
97 19-Sep-14 7 0.75 40.77 54.37 2.31
RIGID
98 19-Sep-14 7 0.75 42.13 56.18 11.10
99 19-Sep-14 7 0.75 38.06 50.74 4.43
RIGID
100 19-Sep-14 7 0.75 39.42 52.55 0.09
101 22-Sep-13 7 0.75 33.98 45.31 56.89 RIGID
R3 STA. 10+600 -
102 22-Sep-13 7 0.75 47.57 63.43 111.93 10+470
103 22-Sep-13 7 0.75 40.77 54.37 2.31 RIGID
R3 STA. 10+600 -
104 22-Sep-13 7 0.75 33.98 45.31 56.89 10+470
105 25-Sep-13 7 0.75 40.77 54.37 2.31 RIGID
L3 STA. 10+135-
106 25-Sep-13 7 0.75 40.77 54.37 2.31 10+095
107 25-Sep-13 7 0.75 47.57 63.43 111.93
108 25-Sep-13 7 0.75 40.77 54.37 2.31
109 27-Sep-13 7 0.75 40.77 54.37 2.31 RIGID
L3 STA. 10+095-
110 27-Sep-13 7 0.75 40.77 54.37 2.31 9+995
111 28-Sep-13 7 0.75 47.57 63.43 111.93 RIGID
L3 STA. 9+845-
112 28-Sep-13 7 0.75 40.77 54.37 2.31 9+755
113 29-Sep-13 7 0.75 33.98 45.31 56.89 RIGID
L3 STA. 9+750 -
114 29-Sep-13 7 0.75 33.98 45.31 56.89 9+800
115 29-Sep-13 7 0.75 40.77 54.37 2.31
116 29-Sep-13 7 0.75 40.77 54.37 2.31
117 30-Sep-13 7 0.75 33.98 45.31 56.89 RIGID
L3 STA. 9+800 -
118 30-Sep-13 7 0.75 33.98 45.31 56.89 9+860
119 30-Sep-13 7 0.75 40.77 54.37 2.31
120 30-Sep-13 7 0.75 40.77 54.37 2.31
121 22-Sep-13 28 1.00 54.37 54.37 2.31 RIGID
STA. 7+700 - 7+650
122 22-Sep-13 28 1.00 54.37 54.37 2.31 R1
123 22-Sep-13 28 1.00 47.57 47.57 27.85
124 22-Sep-13 28 1.00 54.37 54.37 2.31
125 22-Sep-13 28 1.00 54.37 54.37 2.31
126 22-Sep-13 28 1.00 47.57 47.57 27.85
127 23-Sep-13 28 1.00 54.37 54.37 2.31 RIGID
STA. 8+035 - 8+50
128 23-Sep-13 28 1.00 54.37 54.37 2.31 R1
129 23-Sep-13 28 1.00 61.16 61.16 69.13
130 23-Sep-13 28 1.00 47.57 47.57 27.85
131 23-Sep-13 28 1.00 54.37 54.37 2.31
132 23-Sep-13 28 1.00 47.57 47.57 27.85
133 24-Sep-13 28 1.00 47.57 47.57 27.85 RIGID
STA. 7+560 -
134 24-Sep-13 28 1.00 54.37 54.37 2.31 7+510 R1
135 24-Sep-13 28 1.00 54.37 54.37 2.31
136 24-Sep-13 28 1.00 47.57 47.57 27.85
137 24-Sep-13 28 1.00 54.37 54.37 2.31
138 24-Sep-13 28 1.00 54.37 54.37 2.31
139 25-Sep-13 28 1.00 61.16 61.16 69.13 RIGID
STA. 7+560 -
140 25-Sep-13 28 1.00 54.37 54.37 2.31 7+500 R2
141 25-Sep-13 28 1.00 54.37 54.37 2.31
142 25-Sep-13 28 1.00 47.57 47.57 27.85
143 25-Sep-13 28 1.00 54.37 54.37 2.31
144 25-Sep-13 28 1.00 54.37 54.37 2.31
145 27-Sep-13 28 1.00 61.16 61.16 69.13 RIGID
R2 STA. 7+515 -
146 27-Sep-13 28 1.00 54.37 54.37 2.31 7+655
147 27-Sep-13 28 1.00 54.37 54.37 2.31
148 27-Sep-13 28 1.00 54.37 54.37 2.31
149 27-Sep-13 28 1.00 47.57 47.57 27.85
150 27-Sep-13 28 1.00 61.16 61.16 69.13
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
151 28-Sep-13 28 1.00 61.16 61.16 69.13 RIGID
R2 STA. 7+645 -
152 28-Sep-13 28 1.00 47.57 47.57 27.85 7+745
153 28-Sep-13 28 1.00 54.37 54.37 2.31
154 28-Sep-13 28 1.00 54.37 54.37 2.31
155 28-Sep-13 28 1.00 61.16 61.16 69.13
156 28-Sep-13 28 1.00 54.37 54.37 2.31
157 29-Sep-13 28 1.00 47.57 47.57 27.85 RIGID
RIGID R2 STA.
158 29-Sep-13 28 1.00 54.37 54.37 2.31 7+745 - 7+880
159 29-Sep-13 28 1.00 47.57 47.57 27.85

Σ(σbn - σbm)2 = 2011.16

JUMLAH SAMPLE = 159.00 buah


MIN = 45.31 kg/cm2
MAX = 63.43 kg/cm2
RATA-RATA (σbm) = 52.85 kg/cm2
KARAKTERISTIK (σbk) = σbm - 1,64 S
S == 3.57 kg/cm2
47.00 kg/cm2

Pandaan,………………..2014

QC STAF QC

( ) ( )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

PT. MARGABUMI ADHIKARAYA Konsultan Pengawas : Kontraktor :


PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
TAHAP I PAKET 2 ( STA. 5+500 S.D STA 11 + 500 PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
1 RIGID 31-Aug-13 3.0 7-Sep-13 28-Sep-13 34.7 35 47.57 47.57
R3 STA. 9+955-9+965 R3 34.7 35 47.57

2 RIGID 4-Sep-13 3.0 11-Sep-13 2-Oct-13 34.7 40 54.37 47.57


RIGID R3 STA. 9+965- 32.0 30 40.77
9+995 R3

3 RIGID 5-Sep-13 3.0 12-Sep-13 3-Oct-13 34.7 40 54.37 54.37


RIGID R3 STA. 9+995- 34.2 35 47.57
10+020 34.7 45 61.16

4 RIGID 6-Sep-13 4.0 13-Sep-13 4-Oct-13 34.7 40 54.37 57.76


R3 STA. 10+020-10+100 32.0 45 61.16

5 RIGID 8-Sep-13 3.0 15-Sep-13 6-Oct-13 34.2 40 54.37 56.07


L3 STA. 10+355 - 10+415 34.7 40 54.37
34.2 40 54.37
34.7 45 61.16
6 RIGID 9-Sep-13 3.0 16-Sep-13 7-Oct-13 34.0 40 54.37 56.07
L3 STA. 10+415 - 10+523 34.2 40 54.37
34.7 40 54.37
34.7 45 61.16

7 RIGID 11-Sep-13 3.0 18-Sep-13 9-Oct-13 30.0 45 61.16 61.16


L3 STA. 10+470 - 10+544 30.0 45 61.16
32.0 45 61.16
30.0 45 61.16

101 8 RIGID 15-Sep-13 4.0 22-Sep-13 34.0 25 33.98 13-Oct-13 34.0 45 61.16 61.16
102 R3 STA. 10+600 - 10+470 22-Sep-13 34.0 35 47.57 32.0 45 61.16

103 9 RIGID 15-Sep-13 4.0 22-Sep-13 34.2 30 40.77 13-Oct-13 34.7 40 54.37 57.76
104 R3 STA. 10+600 - 10+470 22-Sep-13 34.0 25 33.98 34.2 45 61.16

105 10 RIGID 18-Sep-13 3.0 25-Sep-13 32.0 30 40.77 16-Oct-13 32.0 45 61.16 61.16
106 L3 STA. 10+135-10+095 25-Sep-13 32.0 30 40.77 31.2 45 61.16
107 25-Sep-13 34.7 35 47.57 32.0 45 61.16
108 25-Sep-13 32.0 30 40.77 34.2 45 61.16

109 11 RIGID 20-Sep-13 5.0 27-Sep-13 32.0 30 40.77 18-Oct-13 34.7 45 61.16 57.76
110 L3 STA. 10+095-9+995 27-Sep-13 32.0 30 40.77 34.2 40 54.37

111 12 RIGID 21-Sep-13 4.0 28-Sep-13 32.1 35 47.57 19-Oct-13 32.0 40 54.37 57.76
112 L3 STA. 9+845-9+755 28-Sep-13 32.1 30 40.77 34.2 40 54.37
34.7 45 61.16
34.7 45 61.16

113 13 RIGID 22-Sep-13 4.0 29-Sep-13 34.0 25 33.98 20-Oct-13


114 L3 STA. 9+750 - 9+800 29-Sep-13 34.2 25 33.98
115 29-Sep-13 34.2 30 40.77
116 29-Sep-13 34.7 30 40.77

117 14 RIGID 23-Sep-13 4.0 30-Sep-13 34.2 25 33.98 21-Oct-13


118 L3 STA. 9+800 - 9+860 30-Sep-13 34.2 25 33.98
119 30-Sep-13 34.7 30 40.77
120 30-Sep-13 34.7 30 40.77

15 RIGID 24-Sep-13 4.0 1-Oct-13 34.2 30 40.77 22-Oct-13


L3 STA. 9+600 - 9+520 34.0 30 40.77
34.2 30 40.77
34.0 30 40.77
16 RIGID 25-Sep-13 4.0 2-Oct-13 34.0 25 33.98 23-Oct-13
L3 STA. 10+140-10+237 34.2 25 33.98
34.0 30 40.77
34.2 30 40.77

17 RIGID 27-Sep-13 4.0 4-Oct-13 34.2 25 33.98 25-Oct-13


R2 STA. 9+960-10+080 34.2 30 40.77
34.0 30 40.77
34.0 30 40.77

18 RIGID 28-Sep-13 4.0 5-Oct-13 34.7 35 47.57 26-Oct-13


L2 STA. 10+075 - 10+125 34.2 30 40.77

18 RIGID 29-Sep-13 3.0 6-Oct-13 34.7 35 47.57 27-Oct-13


L2 STA. 10+240 - 10+180 34.7 35 47.57

20 RIGID 30-Sep-13 3.0 7-Oct-13 34.2 30 40.77 28-Oct-13


L2 STA. 10+135 - 10+020 34.7 35 47.57
34.2 30 40.77
34.2 30 40.77

21 RIGID 1-Oct-13 3.0 8-Oct-13 34.2 30 40.77 29-Oct-13


L2 STA. 10+010 - 9+950 34.2 30 40.77

22 RIGID 2-Oct-13 3.0 9-Oct-13 32.0 30 40.77 30-Oct-13


R2 STA. 9+960-10+080 34.2 30 40.77
32.0 30 40.77
34.2 35 47.57

23 RIGID 2-Oct-13 3.0 9-Oct-13 32.0 30 40.77 30-Oct-13


STA. 9+745-9+660 L2 34.2 35 47.57
24 RIGID 3-Oct-13 3.0 10-Oct-13 32.0 30 40.77 31-Oct-13
STA. 9+660-9+535 L2 31.0 30 40.77
32.0 30 40.77
31.0 30 40.77

25 RIGID 4-Oct-13 3.0 11-Oct-13 30.0 30 40.77 1-Nov-13


STA. 9+965-10-120 R1 31.0 30 40.77
30.0 30 40.77
32.0 35 47.57
30.0 30 40.77
31.0 35 47.57

26 RIGID 6-Oct-13 3.0 13-Oct-13 32.0 30 40.77 3-Nov-13


STA. 10+125 - 10+200 L1 31.0 30 40.77
32.0 40 54.37
30.0 30 40.77
32.0 35 47.57
32.0 35 47.57

27 RIGID 8-Oct-13 4.0 15-Oct-13 31.0 30 40.77 5-Nov-13


L1 STA.9+835 - 9+760 32.0 30 40.77
32.0 30 40.77
31.0 35 47.57
32.0 35 47.57
31.0 30 40.77

28 RIGID 11-Oct-13 4.0 18-Oct-13 31.0 30 40.77 8-Nov-13


L2 STA. 10+595 - 10+475 32.0 30 40.77
31.0 30 40.77
31.0 25 33.98
32.0 30 40.77
31.0 25 33.98

29 RIGID 12-Oct-13 4.0 19-Oct-13 32.0 30 40.77 9-Nov-13


STA. 7+120 - 7+235 L1 34.2 30 40.77
32.0 30 40.77
34.2 30 40.77

Diketahui Oleh : Disetujui Oleh : Pandaan, ............... 2013


PT. Margabumi Adhikaraya Konsultan Diajukan Oleh :
PT. Multi Phi Beta Kontraktor
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( _____________________________ ) ( _____________________________ )
( ________________________)
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

PT. MARGABUMI ADHIKARAYA Konsultan Pengawas : Kontraktor :


PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
TAHAP I PAKET 2 ( STA. 5+500 S.D STA 11 + 500 PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

121 1 RIGID 25-Aug-13 3.0 1-Sep-13 22-Sep-13 34.7 40 54.37


122 STA. 7+700 - 7+650 R1 22-Sep-13 34.8 40 54.37
123 22-Sep-13 34.4 35 47.57
52.10
124 22-Sep-13 34.8 40 54.37
125 22-Sep-13 34.7 40 54.37
126 22-Sep-13 34.7 35 47.57

127 2 RIGID 26-Aug-13 3.0 2-Sep-13 23-Sep-13 34.5 40 54.37


128 STA. 8+035 - 8+50 R1 23-Sep-13 34.7 40 54.37
129 23-Sep-13 35.0 45 61.16
53.23
130 23-Sep-13 34.9 35 47.57
131 23-Sep-13 34.2 40 54.37
132 23-Sep-13 33.9 35 47.57

133 3 RIGID 27-Aug-13 3.0 3-Sep-13 24-Sep-13 34.4 35 47.57


134 STA. 7+560 - 7+510 R1 24-Sep-13 34.7 40 54.37
135 24-Sep-13 34.8 40 54.37
52.10
136 24-Sep-13 34.0 35 47.57
137 24-Sep-13 34.8 40 54.37
138 24-Sep-13 34.3 40 54.37
139 4 RIGID 28-Aug-13 3.0 4-Sep-13 25-Sep-13 34.4 45 61.16
140 STA. 7+560 - 7+500 R2 25-Sep-13 34.7 40 54.37
141 25-Sep-13 34.2 40 54.37
54.37
142 25-Sep-13 34.8 35 47.57
143 25-Sep-13 34.3 40 54.37
144 25-Sep-13 34.8 40 54.37
145 5 RIGID 30-Aug-13 3.0 6-Sep-13 27-Sep-13 34.7 45 61.16
146 R2 STA. 7+515 - 7+655 27-Sep-13 34.6 40 54.37
147 27-Sep-13 34.3 40 54.37
55.50
148 27-Sep-13 34.0 40 54.37
149 27-Sep-13 34.8 35 47.57
150 27-Sep-13 34.1 45 61.16
151 6 RIGID 31-Aug-13 3.0 7-Sep-13 28-Sep-13 34.2 45 61.16
152 R2 STA. 7+645 - 7+745 28-Sep-13 34.1 35 47.57
153 28-Sep-13 34.3 40 54.37
154 28-Sep-13 34.2 40 54.37 55.50
155 28-Sep-13 34.8 45 61.16
156 28-Sep-13 34.6 40 54.37

Page 43 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan 55.50
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

157 7 RIGID 1-Sep-13 3.0 8-Sep-13 29-Sep-13 34.1 35 47.57


158 RIGID R2 STA. 7+745 - 29-Sep-13 34.2 40 54.37 49.84
159 7+880 29-Sep-13 34.2 35 47.57

8 RIGID 6-Sep-13 3.0 13-Sep-13 4-Oct-13 34.2 35 47.57


R2 STA. 7+765 - 7+785 34.7 35 47.57
34.6 40 54.37 50.97
34.5 35 47.57
34.7 40 54.37
34.2 40 54.37
9 RIGID 7-Sep-13 0.0 14-Sep-13 5-Oct-13 34.5 35 47.57
R2 STA. 7+800 - 7+890 34.2 40 54.37
34.7 35 47.57
34.2 40 54.37 52.10
34.1 40 54.37
35.0 40 54.37

10 RIGID 8-Sep-13 3.0 15-Sep-13 6-Oct-13 34.7 35 47.57


STA. 8+035 - 8+050 R2 34.2 40 54.37
34.5 40 54.37
34.7 40 54.37 50.97
34.6 35 47.57
34.1 35 47.57

11 RIGID 10-Sep-13 4.0 17-Sep-13 8-Oct-13 34.6 40 54.37


STA. 8+150 - 8+250 L2 34.7 40 54.37
35.0 40 54.37
34.2 35 47.57 52.10
34.1 40 54.37
34.0 35 47.57

12 RIGID 11-Sep-13 3.0 18-Sep-13 9-Oct-13 34.7 40 54.37


L3 STA. 8+250 - 8+225 34.8 35 47.57
34.2 35 47.57
34.6 40 54.37 49.84
34.7 35 47.57
34.3 35 47.57

13 RIGID 13-Sep-13 25.0 20-Sep-13 11-Oct-13 34.0 45 61.16


STA. 7+715 - 7+755 L1 34.2 45 61.16
34.6 40 54.37
34.7 40 54.37 56.63
34.2 40 54.37
34.6 40 54.37

14 RIGID 14-Sep-13 3.0 21-Sep-13 34.0 35 47.57 12-Oct-13 34.2 40 54.37


STA. 7+430 - 7+500 L1 34.0 35 47.57 34.6 40 54.37
34.7 45 61.16
56.63
34.0 40 54.37
34.7 40 54.37
34.0 45 61.16

Page 44 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

15 RIGID 15-Sep-13 3.0 22-Sep-13 34.0 30 40.77 13-Oct-13 34.6 45 61.16


STA. 7+430 - 7+500 L3 34.2 30 40.77 35.0 40 54.37
34.3 40 54.37
55.50
34.0 35 47.57
34.7 40 54.37
34.9 45 61.16

16 RIGID 16-Sep-13 3.0 23-Sep-13 34.2 30 40.77 14-Oct-13 34.8 40 54.37


STA. 7+760 - 7+815 L2 34.7 30 40.77 34.2 35 47.57
34.7 40 54.37
50.97
34.2 35 47.57
34.8 35 47.57
34.9 40 54.37

17 RIGID 17-Sep-13 3.0 24-Sep-13 34.2 30 40.77 15-Oct-13 34.3 35 47.57


STA. 7+710 - 7+515 L2 34.0 30 40.77 34.2 40 54.37
34.7 40 54.37 52.10
34.2 35 47.57
34.8 40 54.37
34.9 40 54.37

18 RIGID 18-Sep-13 3.0 25-Sep-13 34.0 30 40.77 16-Oct-13 34.5 45 61.16


STA. 7+500 - 7+430 L2 34.7 35 47.57 34.7 40 54.37
34.5 45 61.16
56.63
34.2 40 54.37
34.8 40 54.37
34.0 40 54.37

19 RIGID 19-Sep-13 3.0 26-Sep-13 34.2 30 40.77 17-Oct-13 34.2 40 54.37


54.37
STA. 10+095 - 10+900 L3 34.0 30 40.77 34.6 40 54.37

20 RIGID 19-Sep-13 3.0 26-Sep-13 34.4 30 40.77 17-Oct-13 34.7 35 47.57


RIGID 7+430 - 7+500 R2 34.2 30 40.77 34.8 40 54.37
50.97
34.0 35 47.57
34.2 40 54.37

21 RIGID 25-Sep-13 3.0 2-Oct-13 34.0 30 40.77 23-Oct-13


RIGID L3 STA. 10+140 - 34.0 30 40.77
10+240

22 RIGID 2-Oct-13 3.0 9-Oct-13 34.0 30 40.77 30-Oct-13


RIGID STA. 7+430 - 7+500 34.2 35 47.57
KALIWANGI L3

Page 45 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

23 RIGID 3-Oct-13 3.0 10-Oct-13 39.0 30 40.77 31-Oct-13


RIGID STA. 7+430 - 7+500 39.0 30 40.77
KALIWANGI L3

24 RIGID 4-Oct-13 3.0 11-Oct-13 34.0 30 40.77 1-Nov-13


RIGID STA. 7+370 - 7+265 34.1 30 40.77
KALIWANGI R3

25 RIGID 6-Oct-13 3.0 13-Oct-13 34.0 35 47.57 3-Nov-13


RIGID STA. 7+120 - 7+235 34.2 30 40.77
L3

26 RIGID 8-Oct-13 3.0 15-Oct-13 33.8 30 40.77 5-Nov-13


RIGID L1 STA. 8+350 -
7+485

27 RIGID 8-Oct-13 3.0 15-Oct-13 34.1 30 40.77 5-Nov-13


RIGID L1 STA.9+600 -
9+530

28 RIGID 11-Oct-13 3.0 18-Oct-13 34.3 30 40.77 8-Nov-13


RIGID STA. 7+370 - 7+265 34.0 30 40.77
L2

Diketahui Oleh : Disetujui Oleh : Pandaan, ............... 2013


PT. Margabumi Adhikaraya Konsultan Diajukan Oleh :
PT. Multi Phi Beta Kontraktor
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( _____________________________ ) ( _____________________________ )
( ________________________)

Page 46 of 322
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
49 1 RIGID 9-Aug-14 4.0 16-Aug-14 6-Sep-14 32.00 40 54.37 54.37
50 6-Sep-14 32.00 40 54.37
R1 STA 6+850-6+950

51 2 RIGID 11-Aug-14 4.5 18-Aug-14 8-Sep-14 31.00 40 54.37 53.35


52 8-Sep-14 32.00 40 54.37
R2 STA 6+850-6+950
53 8-Sep-14 32.00 38 51.65
54 8-Sep-14 32.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

55 3 RIGID 12-Aug-14 3.0 19-Aug-14 9-Sep-14 31.00 38 51.65 53.35


56 9-Sep-14 32.00 39 53.01
R3 STA.6+850 6+945
57 9-Sep-14 32.00 39 53.01
58 9-Sep-14 33.00 41 55.73

59 4 RIGID 13-Aug-14 3.5 20-Aug-14 10-Sep-14 30.00 39 53.01 53.46


60 10-Sep-14 33.00 41 55.73
61 10-Sep-14 31.00 37 50.29
R3 STA.6+730 6+850
62 10-Sep-14 32.00 40 54.37
63 10-Sep-14 31.00 40 54.37
64 10-Sep-14 31.00 39 53.01

65 5 RIGID 15-Aug-14 4.0 22-Aug-14 12-Sep-14 32.00 40 54.37 55.73


66 12-Sep-14 33.00 42 57.08
R2 STA 6+850-6+730

67 6 RIGID 18-Aug-14 3.5 25-Aug-14 15-Sep-14 31.00 39 53.01 53.01


68 15-Sep-14 31.00 39 53.01
R1 STA. 6+850- 6+730

69 7 RIGID 20-Aug-14 4.0 27-Aug-14 34.00 30 40.77 17-Sep-14 31.00 39 53.01 53.01
70 R1 STA.6+850-6+920 34.00 32 43.49 17-Sep-14 31.00 39 53.01

71 8 RIGID 22-Aug-14 4.0 29-Aug-14 34.00 31 42.13 19-Sep-14 30.00 38 51.65 53.01
72 34.20 30 40.77 19-Sep-14 31.00 40 54.37
R2 STA.6+640-6+745
73 19-Sep-14 30.00 39 53.01
74 19-Sep-14 30.00 39 53.01

75 9 RIGID 22-Aug-14 4.5 29-Aug-14 34.00 29 39.42 19-Sep-14 32.00 41 55.73 53.01
76 34.20 30 40.77 19-Sep-14 30.00 38 51.65
L1 STA 6+810-6+910
77 19-Sep-14 30.00 38 51.65
78 19-Sep-14 31.00 39 53.01

79 10 RIGID 25-Aug-14 4.0 1-Sep-14 34.00 29 39.42 22-Sep-14


80 1-Sep-14 34.10 31 42.13
L2 STA. 6+810- 6+910

81 11 RIGID 26-Aug-14 4.5 2-Sep-14 34.00 29 39.42 23-Sep-14


82 2-Sep-14 34.00 30 40.77
L1 STA. 6+640- 6+690
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

83 12 RIGID 27-Aug-14 4.0 3-Sep-14 34.20 30 40.77 24-Sep-14


84 3-Sep-14 34.00 31 42.13
L3 STA. 6+810- 6+910

85 12 RIGID 3-Aug-14 4.0 10-Aug-14 34.00 29 39.42 31-Aug-14


86 10-Aug-14 34.00 29 39.42
R3 STA. 6+465- 6+600

87 12 RIGID 1-Sep-14 4.0 8-Sep-14 34.50 29 39.42 29-Sep-14


88 8-Sep-14 34.20 28 38.06
R3 STA. 6+500- 6+585

89 12 RIGID 2-Sep-14 4.0 9-Sep-14 34.00 28 38.06 30-Sep-14


90 9-Sep-14 31.20 30 40.77
R2 STA. 6+465- 6+545

91 13 RIGID 9-Sep-14 4.0 16-Sep-14 30.00 30 40.77 7-Oct-14


92 16-Sep-14 30.00 31 42.13
L1 STA. 6+740- 6+810

93 14 RIGID 10-Sep-14 3.0 17-Sep-14 30.00 29 39.42 8-Oct-14


94 17-Sep-14 30.00 30 40.77
L1 STA. 6+780- 6+690

95 15 RIGID 11-Sep-14 4.0 18-Sep-14 31.00 31 42.13 9-Oct-14


96 18-Sep-14 32.00 33 44.85
L2 STA. 6+740- 6+810

97 16 RIGID 12-Sep-14 3.5 19-Sep-14 30.00 30 40.77 10-Oct-14


98 19-Sep-14 30.00 31 42.13
R3 STA. 6+945- 7+005

99 17 RIGID 12-Sep-14 4.0 19-Sep-14 29.00 28 38.06 10-Oct-14


100 19-Sep-14 29.00 29 39.42
R2 STA. 6+925- 7+005
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
Jasamarga Pandaan Tol Konsultan Kontraktor

( _____________________________ ) ( _____________________________ ) ( ________________________)


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : Oktober 2013

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 2-Oct-13 28 1.00 54.37 54.37 0.29
RIGID
2 2-Oct-13 28 1.00 40.77 40.77 199.57
3 3-Oct-13 28 1.00 54.37 54.37 0.29
4 3-Oct-13 28 1.00 47.57 47.57 53.75 RIGID
5 3-Oct-13 28 1.00 61.16 61.16 39.19
6 4-Oct-13 28 1.00 54.37 54.37 0.29
RIGID
7 4-Oct-13 28 1.00 61.16 61.16 39.19
8 6-Oct-13 28 1.00 54.37 54.37 0.29 RIGID
9 6-Oct-13 28 1.00 54.37 54.37 0.29
L3 STA. 10+355 -
10 6-Oct-13 28 1.00 54.37 54.37 0.29
10+415
11 6-Oct-13 28 1.00 61.16 61.16 39.19
12 7-Oct-13 28 1.00 54.37 54.37 0.29 RIGID
13 7-Oct-13 28 1.00 54.37 54.37 0.29
L3 STA. 10+415 -
14 7-Oct-13 28 1.00 54.37 54.37 0.29
10+523
15 7-Oct-13 28 1.00 61.16 61.16 39.19
16 9-Oct-13 28 1.00 61.16 61.16 39.19 RIGID
17 9-Oct-13 28 1.00 61.16 61.16 39.19
L3 STA. 10+470 -
18 9-Oct-13 28 1.00 61.16 61.16 39.19
10+544
19 9-Oct-13 28 1.00 61.16 61.16 39.19
20 13-Oct-13 28 1.00 61.16 61.16 39.19
RIGID
21 13-Oct-13 28 1.00 61.16 61.16 39.19
22 13-Oct-13 28 1.00 54.37 54.37 0.29
RIGID
23 13-Oct-13 28 1.00 61.16 61.16 39.19
24 16-Oct-13 28 1.00 61.16 61.16 39.19 RIGID
25 16-Oct-13 28 1.00 61.16 61.16 39.19
L3 STA. 10+135-
26 16-Oct-13 28 1.00 61.16 61.16 39.19
10+095
27 16-Oct-13 28 1.00 61.16 61.16 39.19
28 18-Oct-13 28 1.00 61.16 61.16 39.19
RIGID
29 18-Oct-13 28 1.00 54.37 54.37 0.29
30 19-Oct-13 28 1.00 54.37 54.37 0.29 RIGID
31 19-Oct-13 28 1.00 54.37 54.37 0.29
32 19-Oct-13 28 1.00 61.16 61.16 39.19 L3 STA. 9+845-9+755
33 19-Oct-13 28 1.00 61.16 61.16 39.19
34 1-Oct-13 7 0.75 40.77 54.37 0.29 RIGID
35 1-Oct-13 7 0.75 40.77 54.37 0.29
36 1-Oct-13 7 0.75 40.77 54.37 0.29 L3 STA. 9+600 - 9+520
37 1-Oct-13 7 0.75 40.77 54.37 0.29
38 2-Oct-13 7 0.75 33.98 45.31 92.09 RIGID
39 2-Oct-13 7 0.75 33.98 45.31 92.09
L3 STA. 10+140-
40 2-Oct-13 7 0.75 40.77 54.37 0.29
10+237
41 2-Oct-13 7 0.75 40.77 54.37 0.29
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
42 4-Oct-13 7 0.75 33.98 45.31 92.09 RIGID
43 4-Oct-13 7 0.75 40.77 54.37 0.29
44 4-Oct-13 7 0.75 40.77 54.37 0.29 R2 STA. 9+960-10+080
45 4-Oct-13 7 0.75 40.77 54.37 0.29
46 5-Oct-13 7 0.75 47.57 63.43 72.69
RIGID
47 5-Oct-13 7 0.75 40.77 54.37 0.29
48 6-Oct-13 7 0.75 47.57 63.43 72.69
RIGID
49 6-Oct-13 7 0.75 47.57 63.43 72.69
50 7-Oct-13 7 0.75 40.77 54.37 0.29 RIGID
51 7-Oct-13 7 0.75 47.57 63.43 72.69
L2 STA. 10+135 -
52 7-Oct-13 7 0.75 40.77 54.37 0.29
10+020
53 7-Oct-13 7 0.75 40.77 54.37 0.29
54 8-Oct-13 7 0.75 40.77 54.37 0.29
RIGID
55 8-Oct-13 7 0.75 40.77 54.37 0.29
56 9-Oct-13 7 0.75 40.77 54.37 0.29 RIGID
57 9-Oct-13 7 0.75 40.77 54.37 0.29
58 9-Oct-13 7 0.75 40.77 54.37 0.29 R2 STA. 9+960-10+080
59 9-Oct-13 7 0.75 47.57 63.43 72.69
60 9-Oct-13 7 0.75 40.77 54.37 0.29
RIGID
61 9-Oct-13 7 0.75 47.57 63.43 72.69
62 10-Oct-13 7 0.75 40.77 54.37 0.29 RIGID
63 10-Oct-13 7 0.75 40.77 54.37 0.29
64 10-Oct-13 7 0.75 40.77 54.37 0.29 STA. 9+660-9+535 L2
65 10-Oct-13 7 0.75 40.77 54.37 0.29
66 11-Oct-13 7 0.75 40.77 54.37 0.29 RIGID
67 11-Oct-13 7 0.75 40.77 54.37 0.29
68 11-Oct-13 7 0.75 40.77 54.37 0.29
69 11-Oct-13 7 0.75 47.57 63.43 72.69 STA. 9+965-10-120 R1
70 11-Oct-13 7 0.75 40.77 54.37 0.29
71 11-Oct-13 7 0.75 47.57 63.43 72.69
72 13-Oct-13 7 0.75 40.77 54.37 0.29 RIGID
73 13-Oct-13 7 0.75 40.77 54.37 0.29
74 13-Oct-13 7 0.75 54.37 72.49 309.29
STA. 10+125 - 10+200
75 13-Oct-13 7 0.75 40.77 54.37 0.29
L1
76 13-Oct-13 7 0.75 47.57 63.43 72.69
77 13-Oct-13 7 0.75 47.57 63.43 72.69
78 15-Oct-13 7 0.75 40.77 54.37 0.29 RIGID
79 15-Oct-13 7 0.75 40.77 54.37 0.29
80 15-Oct-13 7 0.75 40.77 54.37 0.29
81 15-Oct-13 7 0.75 47.57 63.43 72.69 L1 STA.9+835 - 9+760
82 15-Oct-13 7 0.75 47.57 63.43 72.69
83 15-Oct-13 7 0.75 40.77 54.37 0.29
84 18-Oct-13 7 0.75 40.77 54.37 0.29 RIGID
85 18-Oct-13 7 0.75 40.77 54.37 0.29
86 18-Oct-13 7 0.75 40.77 54.37 0.29
L2 STA. 10+595 -
87 18-Oct-13 7 0.75 33.98 45.31 92.09
10+475
88 18-Oct-13 7 0.75 40.77 54.37 0.29
89 18-Oct-13 7 0.75 33.98 45.31 92.09
90 19-Oct-13 7 0.75 40.77 54.37 0.29 RIGID
91 19-Oct-13 7 0.75 40.77 54.37 0.29
92 19-Oct-13 7 0.75 40.77 54.37 0.29 STA. 7+120 - 7+235 L1
93 19-Oct-13 7 0.75 40.77 54.37 0.29
94 4-Oct-13 28 1.00 47.57 47.57 53.75 RIGID
95 4-Oct-13 28 1.00 47.57 47.57 53.75
96 4-Oct-13 28 1.00 54.37 54.37 0.29
R2 STA. 7+765 -
97 4-Oct-13 28 1.00 47.57 47.57 53.75
7+785
98 4-Oct-13 28 1.00 54.37 54.37 0.29
99 4-Oct-13 28 1.00 54.37 54.37 0.29
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
100 5-Oct-13 28 1.00 47.57 47.57 53.75 RIGID
101 5-Oct-13 28 1.00 54.37 54.37 0.29
102 5-Oct-13 28 1.00 47.57 47.57 53.75
R2 STA. 7+800 -
103 5-Oct-13 28 1.00 54.37 54.37 0.29
7+890
104 5-Oct-13 28 1.00 54.37 54.37 0.29
105 5-Oct-13 28 1.00 54.37 54.37 0.29
106 6-Oct-13 28 1.00 47.57 47.57 53.75 RIGID
107 6-Oct-13 28 1.00 54.37 54.37 0.29
108 6-Oct-13 28 1.00 54.37 54.37 0.29
STA. 8+035 - 8+050
109 6-Oct-13 28 1.00 54.37 54.37 0.29
R2
110 6-Oct-13 28 1.00 47.57 47.57 53.75
111 6-Oct-13 28 1.00 47.57 47.57 53.75
112 8-Oct-13 28 1.00 54.37 54.37 0.29 RIGID
113 8-Oct-13 28 1.00 54.37 54.37 0.29
114 8-Oct-13 28 1.00 54.37 54.37 0.29
115 8-Oct-13 28 1.00 47.57 47.57 53.75 STA. 8+150 - 8+250 L2
116 8-Oct-13 28 1.00 54.37 54.37 0.29
117 8-Oct-13 28 1.00 47.57 47.57 53.75
118 9-Oct-13 28 1.00 54.37 54.37 0.29 RIGID
119 9-Oct-13 28 1.00 47.57 47.57 53.75
120 9-Oct-13 28 1.00 47.57 47.57 53.75
121 9-Oct-13 28 1.00 54.37 54.37 0.29 L3 STA. 8+250 - 8+225
122 9-Oct-13 28 1.00 47.57 47.57 53.75
123 9-Oct-13 28 1.00 47.57 47.57 53.75
124 11-Oct-13 28 1.00 61.16 61.16 39.19 RIGID
125 11-Oct-13 28 1.00 61.16 61.16 39.19
126 11-Oct-13 28 1.00 54.37 54.37 0.29
127 11-Oct-13 28 1.00 54.37 54.37 0.29 STA. 7+715 - 7+755 L1
128 11-Oct-13 28 1.00 54.37 54.37 0.29
129 11-Oct-13 28 1.00 54.37 54.37 0.29
130 12-Oct-13 28 1.00 54.37 54.37 0.29 RIGID
131 12-Oct-13 28 1.00 54.37 54.37 0.29
132 12-Oct-13 28 1.00 61.16 61.16 39.19
133 12-Oct-13 28 1.00 54.37 54.37 0.29 STA. 7+430 - 7+500 L1
134 12-Oct-13 28 1.00 54.37 54.37 0.29
135 12-Oct-13 28 1.00 61.16 61.16 39.19
136 13-Oct-13 28 1.00 61.16 61.16 39.19 RIGID
137 13-Oct-13 28 1.00 54.37 54.37 0.29
138 13-Oct-13 28 1.00 54.37 54.37 0.29
139 13-Oct-13 28 1.00 47.57 47.57 53.75 STA. 7+430 - 7+500 L3
140 13-Oct-13 28 1.00 54.37 54.37 0.29
141 13-Oct-13 28 1.00 61.16 61.16 39.19
142 14-Oct-13 28 1.00 54.37 54.37 0.29 RIGID
143 14-Oct-13 28 1.00 47.57 47.57 53.75
144 14-Oct-13 28 1.00 54.37 54.37 0.29
STA. 7+760 - 7+815
145 14-Oct-13 28 1.00 47.57 47.57 53.75
L2
146 14-Oct-13 28 1.00 47.57 47.57 53.75
147 14-Oct-13 28 1.00 54.37 54.37 0.29
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
148 15-Oct-13 28 1.00 47.57 47.57 53.75 RIGID
149 15-Oct-13 28 1.00 54.37 54.37 0.29
150 15-Oct-13 28 1.00 54.37 54.37 0.29
151 15-Oct-13 28 1.00 47.57 47.57 53.75 STA. 7+710 - 7+515 L2
152 15-Oct-13 28 1.00 54.37 54.37 0.29
153 15-Oct-13 28 1.00 54.37 54.37 0.29
154 16-Oct-13 28 1.00 61.16 61.16 39.19 RIGID
155 16-Oct-13 28 1.00 54.37 54.37 0.29
156 16-Oct-13 28 1.00 61.16 61.16 39.19
STA. 7+500 - 7+430
157 16-Oct-13 28 1.00 54.37 54.37 0.29
L2
158 16-Oct-13 28 1.00 54.37 54.37 0.29
159 16-Oct-13 28 1.00 54.37 54.37 0.29
160 17-Oct-13 28 1.00 54.37 54.37 0.29
RIGID
161 17-Oct-13 28 1.00 54.37 54.37 0.29
162 17-Oct-13 28 1.00 47.57 47.57 53.75 RIGID
163 17-Oct-13 28 1.00 54.37 54.37 0.29
RIGID 7+430 - 7+500
164 17-Oct-13 28 1.00 47.57 47.57 53.75
R2
165 17-Oct-13 28 1.00 54.37 54.37 0.29

Σ(σbn - σbm)2 = 4124.54

JUMLAH SAMPLE = 165.00 buah


MIN = 40.77 kg/cm2
MAX = 72.49 kg/cm2
RATA-RATA (σbm) = 54.90 kg/cm2
S ==
KARAKTERISTIK (σbk) = σbm - 1,64 S 5.01 kg/cm2
46.68 kg/cm2

Pandaan,………………..2014

QC STAF QC

( ) ( )
PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : November 2013

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 19-Nov-13 28 1.00 54.37 54.37 0.43 RIGID
2 19-Nov-13 28 1.00 47.57 47.57 37.67
3 19-Nov-13 28 1.00 54.37 54.37 0.43 R3 9+730 - 9+865
4 19-Nov-13 28 1.00 47.57 47.57 37.67
5 20-Nov-13 28 1.00 47.57 47.57 37.67 RIGID
6 20-Nov-13 28 1.00 47.57 47.57 37.67
7 20-Nov-13 28 1.00 54.37 54.37 0.43 R3 9+825 - 9+915
8 20-Nov-13 28 1.00 47.57 47.57 37.67
9 21-Nov-13 28 1.00 47.57 47.57 37.67 RIGID
10 21-Nov-13 28 1.00 47.57 47.57 37.67
11 21-Nov-13 28 1.00 47.57 37.67 R3 STA. 10+140 -
47.57
10+235
12 21-Nov-13 28 1.00 47.57 47.57 37.67
13 24-Nov-13 28 1.00 47.57 47.57 37.67 RIGID
14 24-Nov-13 28 1.00 47.57 47.57 37.67
15 24-Nov-13 28 1.00 47.57 47.57 37.67
16 24-Nov-13 28 1.00 47.57 37.67 R3 STA. 10+335 -
47.57
10+470
17 24-Nov-13 28 1.00 47.57 47.57 37.67
18 24-Nov-13 28 1.00 47.57 47.57 37.67
19 25-Nov-13 28 1.00 47.57 47.57 37.67
RIGID
20 25-Nov-13 28 1.00 47.57 47.57 37.67
21 26-Nov-13 28 1.00 47.57 47.57 37.67 RIGID
22 26-Nov-13 28 1.00 47.57 47.57 37.67
R3 STA. 10+545 -
23 26-Nov-13 28 1.00 47.57 47.57 37.67
10+600
24 26-Nov-13 28 1.00 47.57 47.57 37.67
25 27-Nov-13 28 1.00 47.57 47.57 37.67 RIGID
26 27-Nov-13 28 1.00 47.57 47.57 37.67
R3 STA. 10+665 -
27 27-Nov-13 28 1.00 47.57 47.57 37.67
10+700
28 27-Nov-13 28 1.00 47.57 47.57 37.67
29 29-Nov-13 28 1.00 47.57 47.57 37.67 RIGID
30 29-Nov-13 28 1.00 47.57 47.57 37.67
31 29-Nov-13 28 1.00 54.37 54.37 0.43
R3 STA. 10+740 -
32 29-Nov-13 28 1.00 47.57 47.57 37.67
10+860
33 29-Nov-13 28 1.00 47.57 47.57 37.67
34 29-Nov-13 28 1.00 47.57 47.57 37.67
35 30-Nov-13 28 1.00 47.57 47.57 37.67 RIGID
36 30-Nov-13 28 1.00 47.57 47.57 37.67
R3 STA. 10+865 -
37 30-Nov-13 28 1.00 47.57 47.57 37.67
10+945
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
R3 STA. 10+865 -
BENDA UJI BETON TEST 28 HARI (σbn )
10+945
38 30-Nov-13 28 1.00 47.57 47.57 37.67
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
39 20-Nov-13 7 0.75 40.77 54.37 0.43 RIGID
40 20-Nov-13 7 0.75 40.77 54.37 0.43
R2 STA. 9+655 -
41 20-Nov-13 7 0.75 40.77 54.37 0.43
9+690
42 20-Nov-13 7 0.75 40.77 54.37 0.43
43 21-Nov-13 7 0.75 40.77 54.37 0.43 RIGID
44 21-Nov-13 7 0.75 40.77 54.37 0.43
R1 STA. 9+810 -
45 21-Nov-13 7 0.75 40.77 54.37 0.43
9+900
46 21-Nov-13 7 0.75 40.77 54.37 0.43
47 21-Nov-13 7 0.75 40.77 54.37 0.43 RIGID
48 21-Nov-13 7 0.75 40.77 54.37 0.43
R3 STA.8+540 -
49 21-Nov-13 7 0.75 40.77 54.37 0.43
8+400
50 21-Nov-13 7 0.75 40.77 54.37 0.43
51 22-Nov-13 7 0.75 40.77 54.37 0.43 RIGID
52 22-Nov-13 7 0.75 40.77 54.37 0.43
53 22-Nov-13 7 0.75 40.77 54.37 0.43 R2 10+145 - 10+230
54 22-Nov-13 7 0.75 40.77 54.37 0.43
55 22-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
56 22-Nov-13 7 0.75 40.77 54.37 0.43
57 23-Nov-13 7 0.75 47.57 63.43 94.46
RIGID
58 23-Nov-13 7 0.75 40.77 54.37 0.43
59 24-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
60 24-Nov-13 7 0.75 40.77 54.37 0.43
61 24-Nov-13 7 0.75 40.77 54.37 0.43 RIGID
62 24-Nov-13 7 0.75 40.77 54.37 0.43
R2 STA. 10+300 -
63 24-Nov-13 7 0.75 40.77 54.37 0.43
10+385
64 24-Nov-13 7 0.75 40.77 54.37 0.43
65 25-Nov-13 7 0.75 47.57 63.43 94.46
RIGID
66 25-Nov-13 7 0.75 40.77 54.37 0.43
67 26-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
68 26-Nov-13 7 0.75 40.77 54.37 0.43
69 26-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
70 26-Nov-13 7 0.75 40.77 54.37 0.43
71 26-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
72 26-Nov-13 7 0.75 40.77 54.37 0.43
73 26-Nov-13 7 0.75 47.57 63.43 94.46 RIGID
74 26-Nov-13 7 0.75 40.77 54.37 0.43 R1 STA. 9+732,5 -
75 27-Nov-13 7 0.75 40.77 54.37 0.43 9+725
76 27-Nov-13 7 0.75 40.77 54.37 0.43 R3 STA. 10+515 -
77 27-Nov-13 7 0.75 47.57 63.43 94.46 10+595
78 27-Nov-13 7 0.75 40.77 54.37 0.43 R3 STA. 9+700 -
79 27-Nov-13 7 0.75 40.77 54.37 0.43 9+725
80 27-Nov-13 7 0.75 40.77 54.37 0.43
R3 STA. 7+855 -
81 27-Nov-13 7 0.75 40.77 54.37 0.43
7+745
82 27-Nov-13 7 0.75 40.77 54.37 0.43
83 28-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
84 28-Nov-13 7 0.75 40.77 54.37 0.43
85 28-Nov-13 7 0.75 47.57 63.43 94.46
RIGID
86 28-Nov-13 7 0.75 40.77 54.37 0.43
87 28-Nov-13 7 0.75 40.77 54.37 0.43 RIGID
88 28-Nov-13 7 0.75 40.77 54.37 0.43
89 28-Nov-13 7 0.75 40.77 54.37 0.43
R2 STA. 10+670 -
90 28-Nov-13 7 0.75 40.77 54.37 0.43
10+795
91 28-Nov-13 7 0.75 40.77 54.37 0.43
92 28-Nov-13 7 0.75 40.77 54.37 0.43
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
93 29-Nov-13 7 0.75 47.57 63.43 94.46
RIGID
94 29-Nov-13 7 0.75 47.57 63.43 94.46
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
95 29-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
96 29-Nov-13 7 0.75 40.77 54.37 0.43
97 30-Nov-13 7 0.75 47.57 63.43 94.46
RIGID
98 30-Nov-13 7 0.75 40.77 54.37 0.43
99 30-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
100 30-Nov-13 7 0.75 40.77 54.37 0.43
101 19-Nov-13 28 1.00 54.37 54.37 0.43 RIGID
102 19-Nov-13 28 1.00 54.37 54.37 0.43
103 19-Nov-13 28 1.00 61.16 61.16 55.56
STA. 7+370 - 7+205
104 19-Nov-13 28 1.00 54.37 54.37 0.43
R1
105 19-Nov-13 28 1.00 61.16 61.16 55.56
106 19-Nov-13 28 1.00 61.16 61.16 55.56
107 20-Nov-13 28 1.00 54.37 54.37 0.43 RIGID
108 20-Nov-13 28 1.00 54.37 54.37 0.43
109 20-Nov-13 28 1.00 54.37 54.37 0.43
R1 STA. 7+150 -
110 20-Nov-13 28 1.00 61.16 61.16 55.56
7+240
111 20-Nov-13 28 1.00 54.37 54.37 0.43
112 20-Nov-13 28 1.00 61.16 61.16 55.56
113 23-Nov-13 28 1.00 54.37 54.37 0.43
RIGID
114 23-Nov-13 28 1.00 54.37 54.37 0.43
115 25-Nov-13 28 1.00 61.16 61.16 55.56
RIGID
116 25-Nov-13 28 1.00 54.37 54.37 0.43
117 26-Nov-13 28 1.00 47.57 47.57 37.67 RIGID
118 26-Nov-13 28 1.00 54.37 54.37 0.43
119 26-Nov-13 28 1.00 54.37 54.37 0.43
STA. 8+440 - 8+530
120 26-Nov-13 28 1.00 47.57 47.57 37.67
R1
121 26-Nov-13 28 1.00 54.37 54.37 0.43
122 26-Nov-13 28 1.00 54.37 54.37 0.43
123 27-Nov-13 28 1.00 54.37 54.37 0.43 RIGID
124 27-Nov-13 28 1.00 61.16 61.16 55.56
125 27-Nov-13 28 1.00 54.37 54.37 0.43
STA. 5+200 - 5+250
126 27-Nov-13 28 1.00 54.37 54.37 0.43
L2
127 27-Nov-13 28 1.00 47.57 47.57 37.67
128 27-Nov-13 28 1.00 54.37 54.37 0.43
129 28-Nov-13 28 1.00 61.16 61.16 55.56
RIGID
130 28-Nov-13 28 1.00 61.16 61.16 55.56
131 20-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
132 20-Nov-13 7 0.75 40.77 54.37 0.43
133 21-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
134 21-Nov-13 7 0.75 40.77 54.37 0.43
135 22-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
136 22-Nov-13 7 0.75 40.77 54.37 0.43
137 25-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
138 25-Nov-13 7 0.75 40.77 54.37 0.43
139 26-Nov-13 7 0.75 48.93 65.24 132.97
RIGID
140 26-Nov-13 7 0.75 40.77 54.37 0.43
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
141 27-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
142 27-Nov-13 7 0.75 40.77 54.37 0.43
143 28-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
144 28-Nov-13 7 0.75 48.93 65.24 132.97
145 29-Nov-13 7 0.75 40.77 54.37 0.43
RIGID
146 29-Nov-13 7 0.75 40.77 54.37 0.43

Σ(σbn - σbm)2 = 2954.50

JUMLAH SAMPLE = 146.00 buah


MIN = 47.57 kg/cm2
MAX = 65.24 kg/cm2
RATA-RATA (σbm) = 53.71 kg/cm2
KARAKTERISTIK (σbk) = σbm - 1,64 S = 4.51 kg/cm2
46.31 kg/cm2

Pandaan,………………..2014

QC STAF QC

( ) ( )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

101 1 RIGID 22-Oct-13 4.0 29-Oct-13 19-Nov-13 35.0 40 54.37 57.76


102 STA. 7+370 - 7+205 R1 19-Nov-13 35.0 40 54.37
103 19-Nov-13 35.0 45 61.16
104 19-Nov-13 34.7 40 54.37
105 19-Nov-13 35.0 45 61.16
106 19-Nov-13 35.0 45 61.16

107 2 RIGID 23-Oct-13 4.0 30-Oct-13 20-Nov-13 34.1 40 54.37 56.63


108 R1 STA. 7+150 - 7+240 20-Nov-13 34.5 40 54.37
109 20-Nov-13 34.5 40 54.37
110 20-Nov-13 35.0 45 61.16
111 20-Nov-13 35.0 40 54.37
112 20-Nov-13 33.9 45 61.16

113 3 RIGID 26-Oct-13 3.0 2-Nov-13 23-Nov-13 33.2 40 54.37 54.37


114 R2 7+155 - 7+250 23-Nov-13 33.2 40 54.37

115 4 RIGID 28-Oct-13 3.0 4-Nov-13 25-Nov-13 33.7 45 61.16 57.76


116 R1 STA. 8+295 - 8+335 25-Nov-13 33.5 40 54.37

Page 61 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

117 5 RIGID 29-Oct-13 3.0 5-Nov-13 26-Nov-13 34.8 35 47.57 52.10


118 STA. 8+440 - 8+530 R1 26-Nov-13 35.2 40 54.37
119 26-Nov-13 34.7 40 54.37
120 26-Nov-13 36.1 35 47.57
121 26-Nov-13 33.3 40 54.37
122 26-Nov-13 34.2 40 54.37

123 6 RIGID 30-Oct-13 3.0 6-Nov-13 27-Nov-13 34.7 40 54.37 54.37


124 STA. 5+200 - 5+250 L2 27-Nov-13 35.2 45 61.16
125 27-Nov-13 34.7 40 54.37
126 27-Nov-13 34.8 40 54.37
127 27-Nov-13 33.3 35 47.57
128 27-Nov-13 34.7 40 54.37

129 7 RIGID 31-Oct-13 3.0 7-Nov-13 28-Nov-13 34.0 45 61.16 61.16


130 STA.8+525 - 8+420 L1 28-Nov-13 34.0 45 61.16

`
8 RIGID 3-Nov-13 3.0 11-Nov-13 1-Dec-13 34.7 40 54.37 52.67
STA. 8+540 - 8+400 R2 34.8 40 54.37
32.4 35 47.57
35.2 40 54.37

`
9 RIGID 4-Nov-13 3.0 11-Nov-13 2-Dec-13 33.9 40 54.37 54.37
STA.10+350 - 10+240 L3 33.8 40 54.37

10 RIGID 6-Nov-13 3.0 13-Nov-13 4-Dec-13 33.9 40 54.37 50.97


R1 STA. 8+250 - 8+350 32.4 35 47.57
34.8 35 47.57
34.7 40 54.37

`
11 RIGID 7-Nov-13 3.0 14-Nov-13 5-Dec-13 35.1 40 54.37 50.97
L2 STA. 8+525 - 8+315 34.3 35 47.57
34.5 35 47.57
35.1 40 54.37

`
12 RIGID 11-Nov-13 3.0 18-Nov-13 9-Dec-13 34.1 40 54.37 57.76
STA. 8+325 - 8+400 L3 33.2 45 61.16

`
13 RIGID 12-Nov-13 2.5 19-Nov-13 10-Dec-13 34.3 40 54.37 54.37
STA. 9+755 - 9+760 R2 34.5 40 54.37
34.5 40 54.37
34.4 40 54.37

Page 62 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
131 14 RIGID 13-Nov-13 3.0 20-Nov-13 34.1 30 40.77 11-Dec-13 35.1 40 54.37 54.37
132 20-Nov-13 34.2 30 40.77 35.1 40 54.37
L1 STA. 10+175 - 10+185 34.5 35 47.57
34.5 40 54.37
35.0 40 54.37
35.0 45 61.16

133 15 RIGID 14-Nov-13 3.0 21-Nov-13 34.0 30 40.77 12-Dec-13 35.0 40 54.37 56.63
134 21-Nov-13 34.1 30 40.77 35.0 40 54.37
34.8 45 61.16
R1 STA. 11+120 - 11+195
34.9 40 54.37
34.9 40 54.37
35.0 45 61.16

135 16 RIGID 15-Nov-13 2.5 22-Nov-13 31.2 30 40.77 13-Dec-13 35.0 40 54.37 56.07
136 22-Nov-13 32.4 30 40.77 35.0 40 54.37
STA. 11+095 - 11+170 R2
35.1 45 61.16
34.9 40 54.37

137 17 RIGID 18-Nov-13 3.0 25-Nov-13 34.7 30 40.77 16-Dec-13 34.2 38 51.65 56.86
138 STA. 8+170 - 8+040 R3 25-Nov-13 33.9 30 40.77 34.3 42 57.08
34.1 43 58.44
33.8 41 55.73
34.8 44 59.80
33.2 43 58.44

139 18 RIGID 19-Nov-13 3.0 26-Nov-13 34.0 36 48.93 17-Dec-13 33.2 38 51.65 53.23
140 STA. 7+695 - 7+855 R3 26-Nov-13 33.2 30 40.77 34.0 39 53.01
34.2 42 57.08
32.9 41 55.73
34.2 37 50.29
34.7 38 51.65

141 19 RIGID 20-Nov-13 3.0 27-Nov-13 34.8 30 40.77 18-Dec-13 34.2 38 51.65 52.78
142 STA.11+175 - 11+250 L1 27-Nov-13 34.0 30 40.77 33.0 41 55.73
32.7 39 53.01
34.1 40 54.37
37.6 39 53.01
33.7 36 48.93

143 20 RIGID 21-Nov-13 4.0 28-Nov-13 32.8 30 40.77 19-Dec-13


144 STA. 5+100 - 5+200 R1 28-Nov-13 32.7 36 48.93

145 21 RIGID 22-Nov-13 3.0 29-Nov-13 33.7 30 40.77 20-Dec-13


146 29-Nov-13 32.8 30 40.77
STA. 10+795 - 10+832 R3

Page 63 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
22 RIGID 28-Nov-13 3.0 5-Dec-13 34.0 30 40.77 26-Dec-13
34.2 30 40.77
R1 STA. 11+100 - 11+260

`
23 RIGID 30-Nov-13 3.0 7-Dec-13 32.7 30 40.77 28-Dec-13
R3 STA. 8+670 - 8+745 32.8 30 40.77

`
24 RIGID 6-Dec-13 3.5 13-Dec-13 34.6 33 44.85 3-Jan-14
R1 STA. 0+205 - 0+100 34.7 33 44.85

`
25 RIGID 7-Dec-13 3.0 14-Dec-13 34.5 32 43.49 4-Jan-14
STA. 5+075 5+100 R2 34.5 32 43.49
T. DAYU

`
26 RIGID 9-Dec-13 4.0 16-Dec-13 33.4 27 36.70 6-Jan-14
STA. RAMP 5, STA.
32.8 32 43.49
5+155 - 5+200
STA. 5+155 - 5+200 R2

`
27 RIGID 10-Dec-13 5.0 17-Dec-13 33.8 28 38.06 7-Jan-14
STA. 33.7 29 39.42
11+100 -11+185 L1

`
28 RIGID 11-Dec-13 4.0 18-Dec-13 33.7 29 39.42 8-Jan-14
L2 STA. 11+185 - 11+260 34.2 31 42.13

Disetujui Oleh :
Konsultan Pandaan, ............... 2013
Diketahui Oleh : PT. Multi Phi Beta Diajukan Oleh :
PT. Margabumi Adhikaraya PT.Tata Guna Patria Kontraktor
PT.Eskapindo Matra (KSO)

( _____________________________ ) (__________________________________) ( ________________________)

Page 64 of 322
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

PT. MARGABUMI ADHIKARAYA Konsultan Pengawas : Kontraktor :


PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
TAHAP I PAKET 2 ( STA. 5+500 S.D STA 11 + 500 PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

1 RIGID 25-Aug-13 3.0 1-Sep-13 22-Sep-13 34.7 40 54.37


STA. 7+700 - 7+650 R1 34.8 40 54.37
34.4 35 47.57
52.10
34.8 40 54.37
34.7 40 54.37
34.7 35 47.57

2 RIGID 26-Aug-13 3.0 2-Sep-13 23-Sep-13 34.5 40 54.37


STA. 8+035 - 8+50 R1 34.7 40 54.37
35.0 45 61.16
53.23
34.9 35 47.57
34.2 40 54.37
33.9 35 47.57

3 RIGID 27-Aug-13 3.0 3-Sep-13 24-Sep-13 34.4 35 47.57


STA. 7+560 - 7+510 R1 34.7 40 54.37
34.8 40 54.37
52.10
34.0 35 47.57
34.8 40 54.37
34.3 40 54.37
4 RIGID 28-Aug-13 3.0 4-Sep-13 25-Sep-13 34.4 45 61.16
STA. 7+560 - 7+500 R2 34.7 40 54.37
34.2 40 54.37
54.37
34.8 35 47.57
34.3 40 54.37
34.8 40 54.37
5 RIGID 30-Aug-13 3.0 6-Sep-13 27-Sep-13 34.7 45 61.16
R2 STA. 7+515 - 7+655 34.6 40 54.37
34.3 40 54.37
55.50
34.0 40 54.37
34.8 35 47.57
34.1 45 61.16
6 RIGID 31-Aug-13 3.0 7-Sep-13 28-Sep-13 34.2 45 61.16
R2 STA. 7+645 - 7+745 34.1 35 47.57
34.3 40 54.37
34.2 40 54.37 55.50
34.8 45 61.16
34.6 40 54.37

Page 65 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan 55.50
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

7 RIGID 1-Sep-13 3.0 8-Sep-13 29-Sep-13 34.1 35 47.57


RIGID R2 STA. 7+745 - 34.2 40 54.37 49.84
7+880 34.2 35 47.57

94 8 RIGID 6-Sep-13 3.0 13-Sep-13 4-Oct-13 34.2 35 47.57


95 R2 STA. 7+765 - 7+785 4-Oct-13 34.7 35 47.57
96 4-Oct-13 34.6 40 54.37 50.97
97 4-Oct-13 34.5 35 47.57
98 4-Oct-13 34.7 40 54.37
99 4-Oct-13 34.2 40 54.37
100 9 RIGID 7-Sep-13 0.0 14-Sep-13 5-Oct-13 34.5 35 47.57
101 R2 STA. 7+800 - 7+890 5-Oct-13 34.2 40 54.37
102 5-Oct-13 34.7 35 47.57
103 5-Oct-13 34.2 40 54.37 52.10
104 5-Oct-13 34.1 40 54.37
105 5-Oct-13 35.0 40 54.37

106 10 RIGID 8-Sep-13 3.0 15-Sep-13 6-Oct-13 34.7 35 47.57


107 STA. 8+035 - 8+050 R2 6-Oct-13 34.2 40 54.37
108 6-Oct-13 34.5 40 54.37
109 6-Oct-13 34.7 40 54.37 50.97
110 6-Oct-13 34.6 35 47.57
111 6-Oct-13 34.1 35 47.57

112 11 RIGID 10-Sep-13 4.0 17-Sep-13 8-Oct-13 34.6 40 54.37


113 STA. 8+150 - 8+250 L2 8-Oct-13 34.7 40 54.37
114 8-Oct-13 35.0 40 54.37
115 8-Oct-13 34.2 35 47.57 52.10
116 8-Oct-13 34.1 40 54.37
117 8-Oct-13 34.0 35 47.57

118 12 RIGID 11-Sep-13 3.0 18-Sep-13 9-Oct-13 34.7 40 54.37


119 L3 STA. 8+250 - 8+225 9-Oct-13 34.8 35 47.57
120 9-Oct-13 34.2 35 47.57
121 9-Oct-13 34.6 40 54.37 49.84
122 9-Oct-13 34.7 35 47.57
123 9-Oct-13 34.3 35 47.57

124 13 RIGID 13-Sep-13 25.0 20-Sep-13 11-Oct-13 34.0 45 61.16


125 STA. 7+715 - 7+755 L1 11-Oct-13 34.2 45 61.16
126 11-Oct-13 34.6 40 54.37
127 11-Oct-13 34.7 40 54.37 56.63
128 11-Oct-13 34.2 40 54.37
129 11-Oct-13 34.6 40 54.37

130 14 RIGID 14-Sep-13 3.0 21-Sep-13 34.0 35 47.57 12-Oct-13 34.2 40 54.37
131 STA. 7+430 - 7+500 L1 34.0 35 47.57 12-Oct-13 34.6 40 54.37
132 12-Oct-13 34.7 45 61.16
56.63
133 12-Oct-13 34.0 40 54.37
134 12-Oct-13 34.7 40 54.37
135 12-Oct-13 34.0 45 61.16

Page 66 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

136 15 RIGID 15-Sep-13 3.0 22-Sep-13 34.0 30 40.77 13-Oct-13 34.6 45 61.16
137 STA. 7+430 - 7+500 L3 34.2 30 40.77 13-Oct-13 35.0 40 54.37
138 13-Oct-13 34.3 40 54.37
55.50
139 13-Oct-13 34.0 35 47.57
140 13-Oct-13 34.7 40 54.37
141 13-Oct-13 34.9 45 61.16

142 16 RIGID 16-Sep-13 3.0 23-Sep-13 34.2 30 40.77 14-Oct-13 34.8 40 54.37
143 STA. 7+760 - 7+815 L2 34.7 30 40.77 14-Oct-13 34.2 35 47.57
144 14-Oct-13 34.7 40 54.37
50.97
145 14-Oct-13 34.2 35 47.57
146 14-Oct-13 34.8 35 47.57
147 14-Oct-13 34.9 40 54.37

148 17 RIGID 17-Sep-13 3.0 24-Sep-13 34.2 30 40.77 15-Oct-13 34.3 35 47.57
149 STA. 7+710 - 7+515 L2 34.0 30 40.77 15-Oct-13 34.2 40 54.37
150 15-Oct-13 34.7 40 54.37 52.10
151 15-Oct-13 34.2 35 47.57
152 15-Oct-13 34.8 40 54.37
153 15-Oct-13 34.9 40 54.37

154 18 RIGID 18-Sep-13 3.0 25-Sep-13 34.0 30 40.77 16-Oct-13 34.5 45 61.16
155 STA. 7+500 - 7+430 L2 34.7 35 47.57 16-Oct-13 34.7 40 54.37
156 16-Oct-13 34.5 45 61.16
56.63
157 16-Oct-13 34.2 40 54.37
158 16-Oct-13 34.8 40 54.37
159 16-Oct-13 34.0 40 54.37

160 19 RIGID 19-Sep-13 3.0 26-Sep-13 34.2 30 40.77 17-Oct-13 34.2 40 54.37
54.37
161 STA. 10+095 - 10+900 L3 34.0 30 40.77 17-Oct-13 34.6 40 54.37

162 20 RIGID 19-Sep-13 3.0 26-Sep-13 34.4 30 40.77 17-Oct-13 34.7 35 47.57
163 RIGID 7+430 - 7+500 R2 34.2 30 40.77 17-Oct-13 34.8 40 54.37
50.97
164 17-Oct-13 34.0 35 47.57
165 17-Oct-13 34.2 40 54.37

21 RIGID 25-Sep-13 3.0 2-Oct-13 34.0 30 40.77 23-Oct-13


RIGID L3 STA. 10+140 - 34.0 30 40.77
10+240

22 RIGID 2-Oct-13 3.0 9-Oct-13 34.0 30 40.77 30-Oct-13


RIGID STA. 7+430 - 7+500 34.2 35 47.57
KALIWANGI L3

Page 67 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

23 RIGID 3-Oct-13 3.0 10-Oct-13 39.0 30 40.77 31-Oct-13


RIGID STA. 7+430 - 7+500 39.0 30 40.77
KALIWANGI L3

24 RIGID 4-Oct-13 3.0 11-Oct-13 34.0 30 40.77 1-Nov-13


RIGID STA. 7+370 - 7+265 34.1 30 40.77
KALIWANGI R3

25 RIGID 6-Oct-13 3.0 13-Oct-13 34.0 35 47.57 3-Nov-13


RIGID STA. 7+120 - 7+235 34.2 30 40.77
L3

26 RIGID 8-Oct-13 3.0 15-Oct-13 33.8 30 40.77 5-Nov-13


RIGID L1 STA. 8+350 -
7+485

27 RIGID 8-Oct-13 3.0 15-Oct-13 34.1 30 40.77 5-Nov-13


RIGID L1 STA.9+600 -
9+530

28 RIGID 11-Oct-13 3.0 18-Oct-13 34.3 30 40.77 8-Nov-13


RIGID STA. 7+370 - 7+265 34.0 30 40.77
L2

Diketahui Oleh : Disetujui Oleh : Pandaan, ............... 2013


PT. Margabumi Adhikaraya Konsultan Diajukan Oleh :
PT. Multi Phi Beta Kontraktor
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( _____________________________ ) ( _____________________________ )
( ________________________)

Page 68 of 322
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
1 1 RIGID 22-Oct-13 3.0 29-Oct-13 19-Nov-13 31.0 40 54.37 50.97
2 R3 9+730 - 9+865 19-Nov-13 31.0 35 47.57
3 19-Nov-13 32.0 40 54.37
4 19-Nov-13 31.0 35 47.57

5 2 RIGID 23-Oct-13 3.0 30-Oct-13 20-Nov-13 32.0 35 47.57 49.27


6 R3 9+825 - 9+915 20-Nov-13 32.4 35 47.57
7 20-Nov-13 34.7 40 54.37
8 20-Nov-13 32.0 35 47.57

9 3 RIGID 24-Oct-13 3.0 31-Oct-13 21-Nov-13 32.4 35 47.57 47.57


10 R3 STA. 10+140 - 10+235 21-Nov-13 34.7 35 47.57
11 21-Nov-13 32.4 35 47.57
12 21-Nov-13 34.7 35 47.57

13 4 RIGID 27-Oct-13 3.0 3-Nov-13 24-Nov-13 31.0 35 47.57 47.57


14 R3 STA. 10+335 - 10+470 24-Nov-13 31.0 35 47.57
15 24-Nov-13 31.0 35 47.57
16 24-Nov-13 31.0 35 47.57
17 24-Nov-13 31.0 35 47.57
18 24-Nov-13 31.0 35 47.57

19 5 RIGID 28-Oct-13 3.0 4-Nov-13 25-Nov-13 32.68 35 47.57 47.57


20 R3 STA. 10+510 - 10+600 25-Nov-13 33.10 35 47.57
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
21 6 RIGID 29-Oct-13 4.0 5-Nov-13 26-Nov-13 32.13 35 47.57 47.57
22 R3 STA. 10+545 - 10+600 26-Nov-13 33.10 35 47.57
23 26-Nov-13 31.22 35 47.57
24 26-Nov-13 32.12 35 47.57

25 7 RIGID 30-Oct-13 4.0 6-Nov-13 27-Nov-13 33.10 35 47.57 47.57


26 R3 STA. 10+665 - 10+700 27-Nov-13 33.50 35 47.57
27 27-Nov-13 31.20 35 47.57
28 27-Nov-13 32.62 35 47.57

29 8 RIGID 1-Nov-13 3.0 8-Nov-13 29-Nov-13 30.00 35 47.57 48.70


30 R3 STA. 10+740 - 10+860 29-Nov-13 30.00 35 47.57
31 29-Nov-13 31.00 40 54.37
32 29-Nov-13 30.00 35 47.57
33 29-Nov-13 31.00 35 47.57
34 29-Nov-13 31.00 35 47.57

35 9 RIGID 2-Nov-13 3.0 9-Nov-13 30-Nov-13 30.10 35 47.57 47.57


36 R3 STA. 10+865 - 10+945 30-Nov-13 31.00 35 47.57
37 30-Nov-13 31.00 35 47.57
38 30-Nov-13 30.00 35 47.57

10 RIGID 6-Nov-13 3.0 13-Nov-13 4-Dec-13 31.00 35 47.57 47.57


R2 STA. 8+250 - 8+350 31.00 35 47.57

11 RIGID 6-Nov-13 3.0 13-Nov-13 4-Dec-13 31.00 35 47.57 47.57


L3 STA. 10+845 - 10+895 31.00 35 47.57

12 RIGID 7-Nov-13 3.0 14-Nov-13 5-Dec-13 31.00 45 61.16 58.90


R2 STA. 9+525 - 9+640 31.00 45 61.16
31.00 45 61.16
31.00 45 61.16
31.00 40 54.37
31.00 40 54.37
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
13 RIGID 7-Nov-13 3.0 14-Nov-13 5-Dec-13 31.00 35 47.57 50.97
L2 STA. 8+525 - 8+600 31.00 40 54.37

14 RIGID 8-Nov-13 3.0 15-Nov-13 6-Dec-13 31.00 35 47.57 47.57


R2 STA. 9+640 - 9+690 32.00 35 47.57

15 RIGID 9-Nov-13 4.0 16-Nov-13 7-Dec-13 31.00 35 47.57 47.57


R2 STA. 9+730 - 9+830 31.00 35 47.57
31.00 35 47.57
32.00 35 47.57

16 RIGID 10-Nov-13 4.0 17-Nov-13 8-Dec-13 31.00 35 47.57 47.57


R2 STA. 9+830 - 9+910 31.00 35 47.57
30.00 35 47.57
31.00 35 47.57

17 RIGID 11-Nov-13 3.0 18-Nov-13 9-Dec-13 32.00 35 47.57 49.84


R1 STA. 9+530 - 9+690 32.00 35 47.57
31.00 35 47.57
32.00 40 54.37
32.00 40 54.37
31.00 35 47.57

39 18 RIGID 13-Nov-13 3.0 20-Nov-13 31.0 30 40.77 11-Dec-13 32.00 35 47.57 49.27
40 R2 STA. 9+655 - 9+690 20-Nov-13 30.0 30 40.77 32.00 40 54.37
41 20-Nov-13 31.0 30 40.77 31.00 35 47.57
42 20-Nov-13 30.0 30 40.77 32.00 35 47.57

43 19 RIGID 14-Nov-13 4.0 21-Nov-13 31.0 30 40.77 12-Dec-13 32.00 40 54.37 50.97
44 R1 STA. 9+810 - 9+900 21-Nov-13 30.0 30 40.77 31.00 35 47.57
45 21-Nov-13 30.0 30 40.77 31.00 40 54.37
46 21-Nov-13 31.0 30 40.77 32.00 35 47.57

47 20 RIGID 14-Nov-13 4.0 21-Nov-13 32.0 30 40.77 12-Dec-13 31.00 46 62.52 54.37
48 R3 STA.8+540 - 8+400 21-Nov-13 31.0 30 40.77 31.00 42 57.08
49 21-Nov-13 31.2 30 40.77 32.00 35 47.57
50 21-Nov-13 30.0 30 40.77 32.00 37 50.29

51 21 RIGID 15-Nov-13 3.0 22-Nov-13 30.0 30 40.77 13-Dec-13 31.00 45 61.16 56.07
52 R2 10+145 - 10+230 22-Nov-13 31.0 30 40.77 31.00 40 54.37
53 22-Nov-13 30.0 30 40.77 32.00 40 54.37
54 22-Nov-13 31.0 30 40.77 32.00 40 54.37

55 22 RIGID 15-Nov-13 3.0 22-Nov-13 31.2 30 40.77 13-Dec-13 32.00 40 54.37 50.97
56 R2 STA. 9+725 - 9+730 22-Nov-13 31.2 30 40.77 31.00 35 47.57

57 23 RIGID 16-Nov-13 4.0 23-Nov-13 31.0 35 47.57 14-Dec-13 32.00 45 61.16 54.37
58 R1 STA. 9+700 - 9+715 23-Nov-13 31.0 30 40.77 31.00 35 47.57
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
59 24 RIGID 17-Nov-13 4.0 24-Nov-13 31.0 30 40.77 15-Dec-13 32.00 35 47.57 47.57
60 R2 STA. 9+700 - 9+715 24-Nov-13 31.0 30 40.77 32.00 35 47.57

61 25 RIGID 17-Nov-13 3.0 24-Nov-13 31.0 30 40.77 15-Dec-13 31.00 40 54.37 52.67
62 R2 STA. 10+300 - 10+385 24-Nov-13 32.0 30 40.77 31.00 40 54.37
63 24-Nov-13 31.0 30 40.77 31.00 40 54.37
64 24-Nov-13 32.0 30 40.77 31.00 35 47.57

65 26 RIGID 18-Nov-13 3.0 25-Nov-13 33.12 35 47.57 16-Dec-13 12.70 40 54.37 50.97
66 R3 STA. 11+175 - 11+250 25-Nov-13 33.22 30 40.77 12.80 35 47.57

67 27 RIGID 19-Nov-13 3.0 26-Nov-13 33.10 30 40.77 17-Dec-13


68 R2 STA. 10+360 - 10+400 26-Nov-13 32.00 30 40.77

69 28 RIGID 19-Nov-13 3.0 26-Nov-13 31.00 30 40.77 17-Dec-13


70 R2 STA. 10+410 - 10+400 26-Nov-13 32.00 30 40.77

71 29 RIGID 19-Nov-13 4.0 26-Nov-13 32.00 30 40.77 17-Dec-13


72 L3 STA. 11+150 - 8+100 26-Nov-13 33.20 30 40.77

73 30 RIGID 19-Nov-13 3.0 26-Nov-13 31.00 35 47.57 17-Dec-13


74 R1 STA. 9+732,5 - 9+725 26-Nov-13 31.00 30 40.77

75 31 RIGID 20-Nov-13 3.0 27-Nov-13 30.00 30 40.77 18-Dec-13


76 R3 STA. 10+515 - 10+595 27-Nov-13 31.00 30 40.77

77 32 RIGID 20-Nov-13 4.0 27-Nov-13 31.00 35 47.57 18-Dec-13


78 R3 STA. 9+700 - 9+725 27-Nov-13 33.20 30 40.77

79 33 RIGID 20-Nov-13 3.0 27-Nov-13 30.0 30 40.77 18-Dec-13


80 R3 STA. 7+855 - 7+745 27-Nov-13 31.0 30 40.77
81 27-Nov-13 30.0 30 40.77
82 27-Nov-13 31.0 30 40.77

83 34 RIGID 21-Nov-13 3.0 28-Nov-13 31.00 30 40.77 19-Dec-13


84 STA. 11+245 - 11+300 L2 28-Nov-13 33.20 30 40.77
28-Nov-13
28-Nov-13
85 35 RIGID 21-Nov-13 3.0 28-Nov-13 30.00 35 47.57 19-Dec-13
86 R3 STA. 11+195 - 11+240 28-Nov-13 30.00 30 40.77
28-Nov-13
28-Nov-13
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
87 36 RIGID 21-Nov-13 3.0 28-Nov-13 31.0 30 40.77 19-Dec-13
88 R2 STA. 10+670 - 10+795 28-Nov-13 30.0 30 40.77
89 28-Nov-13 33.2 30 40.77
90 28-Nov-13 30.0 30 40.77
91 28-Nov-13 31.0 30 40.77
92 28-Nov-13 30.0 30 40.77

93 37 RIGID 22-Nov-13 3.0 29-Nov-13 31.00 35 47.57 20-Dec-13


94 RIGID ULU-ULU BANYU 29-Nov-13 31.00 35 47.57
STA. 10+665 - 10+645 L3 29-Nov-13
29-Nov-13
29-Nov-13
95 38 RIGID 22-Nov-13 4.0 29-Nov-13 30.00 30 40.77 20-Dec-13
96 RIGID R3 STA. 7+745 - 29-Nov-13 31.00 30 40.77
7+655 29-Nov-13

97 39 RIGID 23-Nov-13 3.0 30-Nov-13 30.00 35 47.57 21-Dec-13


98 R2 STA. 10+885 - 10+905 30-Nov-13 30.00 30 40.77
30-Nov-13
30-Nov-13
99 40 RIGID 23-Nov-13 4.0 30-Nov-13 31.00 30 40.77 21-Dec-13
100 RIGID L1 STA. 5+150 - 30-Nov-13 30.00 30 40.77
5+200

41 RIGID 24-Nov-13 4.0 1-Dec-13 32.00 30 40.77 22-Dec-13


RIGID ULU-ULU BANYU L2 1-Dec-13 31.00 30 40.77
STA. 10+670 - 10+647 1-Dec-13 31.00 30 40.77
1-Dec-13 30.00 30 40.77

42 RIGID 26-Nov-13 3.0 3-Dec-13 31.00 35 47.57 24-Dec-13


R1 STA. 10+390 - 10+455 3-Dec-13 32.00 35 47.57
3-Dec-13
3-Dec-13
43 RIGID 26-Nov-13 4.0 3-Dec-13 31.00 35 47.57 24-Dec-13
RIGID L1 STA. 10+610 - 3-Dec-13 31.00 35 47.57
10+590

44 RIGID 27-Nov-13 3.0 4-Dec-13 31.00 30 40.77 25-Dec-13


R3 STA. 7+205 - 7+160 4-Dec-13 31.00 30 40.77
4-Dec-13
4-Dec-13
4-Dec-13
45 RIGID 27-Nov-13 4.0 4-Dec-13 31.00 30 40.77 25-Dec-13
RIGID L2 STA. 10+595 - 4-Dec-13 31.00 30 40.77
10+635

46 RIGID 28-Nov-13 3.0 5-Dec-13 31.00 30 40.77 26-Dec-13


L2 STA. 10+360 - 10+260 5-Dec-13 31.00 35 47.57
5-Dec-13 31.00 30 40.77
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) - 10+260
L2 STA. 10+360 Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
5-Dec-13 31.00 30 40.77
5-Dec-13
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
47 RIGID 28-Nov-13 3.0 5-Dec-13 31.00 30 40.77 26-Dec-13
L2 STA. 10+360 - 10+255 5-Dec-13 31.00 30 40.77

48 RIGID 28-Nov-13 3.0 5-Dec-13 31.00 30 40.77 26-Dec-13


L3 STA. 8+100 - 8+130 5-Dec-13 31.00 30 40.77

49 RIGID 29-Nov-13 3.0 6-Dec-13 31.00 30 40.77 27-Dec-13


R1 STA. 10+185 - 10+230 6-Dec-13 31.00 30 40.77
6-Dec-13
6-Dec-13
6-Dec-13
50 RIGID 29-Nov-13 3.0 6-Dec-13 31.00 30 40.77 27-Dec-13
STA. 11+260 - 11+205 R1 6-Dec-13 31.00 30 40.77
6-Dec-13
6-Dec-13
51 RIGID 29-Nov-13 4.0 6-Dec-13 31.00 30 40.77 27-Dec-13
L1 STA. 10+645 - 10+675 6-Dec-13 31.00 30 40.77

52 RIGID 30-Nov-13 4.0 7-Dec-13 31.00 30 40.77 28-Dec-13


TAMAN DAYU STA. 0+560 7-Dec-13 32.00 30 40.77
- 0+610 R1,R2,R3

53 RIGID 1-Dec-13 5.0 8-Dec-13 32.00 35 47.57 29-Dec-13


L1 STA. 10+185 - 10+200 32.00 35 47.57

54 RIGID 1-Dec-13 3.0 8-Dec-13 31.00 30 40.77 29-Dec-13


L3 STA. 8+850 - 8+925 32.00 35 47.57

55 RIGID 4-Dec-13 4.0 11-Dec-13 32.00 30 40.77 1-Jan-14


STA. 11+095 - 11+105 R2 31.00 30 40.77

56 RIGID 5-Dec-13 4.0 12-Dec-13 32.00 30 40.77 2-Jan-14


R1 STA. 10+875 - 10+925 32.00 30 40.77

57 RIGID 6-Dec-13 4.0 13-Dec-13 31.00 30 40.77 3-Jan-14


R2 STA. 10+135 - 10+140 31.00 30 40.77
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
58 RIGID 6-Dec-13 4.0 13-Dec-13 31.00 30 40.77 3-Jan-14
R2 STA. 8+745 - 8+820 32.00 30 40.77

59 RIGID 8-Dec-13 3.0 15-Dec-13 31.00 30 40.77 5-Jan-14


RIGID L1 STA. 8+850 31.00 30 40.77
-8+930

60 RIGID 8-Dec-13 4.0 15-Dec-13 31.00 30 40.77 5-Jan-14


RIGID M R1 STA. 10+965 - 32.00 30 40.77
10+925

61 RIGID 8-Dec-13 3.0 15-Dec-13 32.00 30 40.77 5-Jan-14


RIGID L1 STA. 8+850 31.00 30 40.77
-8+930

62 RIGID 8-Dec-13 4.0 15-Dec-13 31.00 30 40.77 5-Jan-14


RIGID M R1 STA. 10+965 - 31.00 30 40.77
10+925

63 RIGID 9-Dec-13 3.0 16-Dec-13 31.00 30 40.77 6-Jan-14


R1 STA. 8+745 - 8+670 31.00 30 40.77

Pandaan, ............... 2013


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT. Margabumi Adhikaraya Konsultan Kontraktor
PT. Multi Phi Beta
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( _____________________________ ) ( _____________________________ ) ( ________________________)


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

PT. MARGABUMI ADHIKARAYA Konsultan Pengawas : Kontraktor :


PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
TAHAP I PAKET 2 ( STA. 5+500 S.D STA 11 + 500 PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
1 RIGID 31-Aug-13 3.0 7-Sep-13 28-Sep-13 34.7 35 47.57 47.57
R3 STA. 9+955-9+965 R3 34.7 35 47.57

1 2 RIGID 4-Sep-13 3.0 11-Sep-13 2-Oct-13 34.7 40 54.37 47.57


2 RIGID R3 STA. 9+965- 2-Oct-13 32.0 30 40.77
9+995 R3

3 3 RIGID 5-Sep-13 3.0 12-Sep-13 3-Oct-13 34.7 40 54.37 54.37


4 RIGID R3 STA. 9+995- 3-Oct-13 34.2 35 47.57
5 10+020 3-Oct-13 34.7 45 61.16

6 4 RIGID 6-Sep-13 4.0 13-Sep-13 4-Oct-13 34.7 40 54.37 57.76


7 R3 STA. 10+020-10+100 4-Oct-13 32.0 45 61.16

8 5 RIGID 8-Sep-13 3.0 15-Sep-13 6-Oct-13 34.2 40 54.37 56.07


9 L3 STA. 10+355 - 10+415 6-Oct-13 34.7 40 54.37
10 6-Oct-13 34.2 40 54.37
11 6-Oct-13 34.7 45 61.16
12 6 RIGID 9-Sep-13 3.0 16-Sep-13 7-Oct-13 34.0 40 54.37 56.07
13 L3 STA. 10+415 - 10+523 7-Oct-13 34.2 40 54.37
14 7-Oct-13 34.7 40 54.37
15 7-Oct-13 34.7 45 61.16

16 7 RIGID 11-Sep-13 3.0 18-Sep-13 9-Oct-13 30.0 45 61.16 61.16


17 L3 STA. 10+470 - 10+544 9-Oct-13 30.0 45 61.16
18 9-Oct-13 32.0 45 61.16
19 9-Oct-13 30.0 45 61.16

20 8 RIGID 15-Sep-13 4.0 22-Sep-13 34.0 25 33.98 13-Oct-13 34.0 45 61.16 61.16
21 R3 STA. 10+600 - 10+470 34.0 35 47.57 13-Oct-13 32.0 45 61.16

22 9 RIGID 15-Sep-13 4.0 22-Sep-13 34.2 30 40.77 13-Oct-13 34.7 40 54.37 57.76
23 R3 STA. 10+600 - 10+470 34.0 25 33.98 13-Oct-13 34.2 45 61.16

24 10 RIGID 18-Sep-13 3.0 25-Sep-13 32.0 30 40.77 16-Oct-13 32.0 45 61.16 61.16
25 L3 STA. 10+135-10+095 32.0 30 40.77 16-Oct-13 31.2 45 61.16
26 34.7 35 47.57 16-Oct-13 32.0 45 61.16
27 32.0 30 40.77 16-Oct-13 34.2 45 61.16

28 11 RIGID 20-Sep-13 5.0 27-Sep-13 32.0 30 40.77 18-Oct-13 34.7 45 61.16 57.76
29 L3 STA. 10+095-9+995 32.0 30 40.77 18-Oct-13 34.2 40 54.37

30 12 RIGID 21-Sep-13 4.0 28-Sep-13 32.1 35 47.57 19-Oct-13 32.0 40 54.37 57.76
31 L3 STA. 9+845-9+755 32.1 30 40.77 19-Oct-13 34.2 40 54.37
32 19-Oct-13 34.7 45 61.16
33 19-Oct-13 34.7 45 61.16

13 RIGID 22-Sep-13 4.0 29-Sep-13 34.0 25 33.98 20-Oct-13


L3 STA. 9+750 - 9+800 34.2 25 33.98
34.2 30 40.77
34.7 30 40.77

14 RIGID 23-Sep-13 4.0 30-Sep-13 34.2 25 33.98 21-Oct-13


L3 STA. 9+800 - 9+860 34.2 25 33.98
34.7 30 40.77
34.7 30 40.77

34 15 RIGID 24-Sep-13 4.0 1-Oct-13 34.2 30 40.77 22-Oct-13


35 L3 STA. 9+600 - 9+520 1-Oct-13 34.0 30 40.77
36 1-Oct-13 34.2 30 40.77
37 1-Oct-13 34.0 30 40.77
38 16 RIGID 25-Sep-13 4.0 2-Oct-13 34.0 25 33.98 23-Oct-13
39 L3 STA. 10+140-10+237 2-Oct-13 34.2 25 33.98
40 2-Oct-13 34.0 30 40.77
41 2-Oct-13 34.2 30 40.77

42 17 RIGID 27-Sep-13 4.0 4-Oct-13 34.2 25 33.98 25-Oct-13


43 R2 STA. 9+960-10+080 4-Oct-13 34.2 30 40.77
44 4-Oct-13 34.0 30 40.77
45 4-Oct-13 34.0 30 40.77

46 18 RIGID 28-Sep-13 4.0 5-Oct-13 34.7 35 47.57 26-Oct-13


47 L2 STA. 10+075 - 10+125 5-Oct-13 34.2 30 40.77

48 18 RIGID 29-Sep-13 3.0 6-Oct-13 34.7 35 47.57 27-Oct-13


49 L2 STA. 10+240 - 10+180 6-Oct-13 34.7 35 47.57

50 20 RIGID 30-Sep-13 3.0 7-Oct-13 34.2 30 40.77 28-Oct-13


51 L2 STA. 10+135 - 10+020 7-Oct-13 34.7 35 47.57
52 7-Oct-13 34.2 30 40.77
53 7-Oct-13 34.2 30 40.77

54 21 RIGID 1-Oct-13 3.0 8-Oct-13 34.2 30 40.77 29-Oct-13


55 L2 STA. 10+010 - 9+950 8-Oct-13 34.2 30 40.77

56 22 RIGID 2-Oct-13 3.0 9-Oct-13 32.0 30 40.77 30-Oct-13


57 R2 STA. 9+960-10+080 9-Oct-13 34.2 30 40.77
58 9-Oct-13 32.0 30 40.77
59 9-Oct-13 34.2 35 47.57

60 23 RIGID 2-Oct-13 3.0 9-Oct-13 32.0 30 40.77 30-Oct-13


61 STA. 9+745-9+660 L2 9-Oct-13 34.2 35 47.57
62 24 RIGID 3-Oct-13 3.0 10-Oct-13 32.0 30 40.77 31-Oct-13
63 STA. 9+660-9+535 L2 10-Oct-13 31.0 30 40.77
64 10-Oct-13 32.0 30 40.77
65 10-Oct-13 31.0 30 40.77

66 25 RIGID 4-Oct-13 3.0 11-Oct-13 30.0 30 40.77 1-Nov-13


67 STA. 9+965-10-120 R1 11-Oct-13 31.0 30 40.77
68 11-Oct-13 30.0 30 40.77
69 11-Oct-13 32.0 35 47.57
70 11-Oct-13 30.0 30 40.77
71 11-Oct-13 31.0 35 47.57

72 26 RIGID 6-Oct-13 3.0 13-Oct-13 32.0 30 40.77 3-Nov-13


73 STA. 10+125 - 10+200 L1 13-Oct-13 31.0 30 40.77
74 13-Oct-13 32.0 40 54.37
75 13-Oct-13 30.0 30 40.77
76 13-Oct-13 32.0 35 47.57
77 13-Oct-13 32.0 35 47.57

78 27 RIGID 8-Oct-13 4.0 15-Oct-13 31.0 30 40.77 5-Nov-13


79 L1 STA.9+835 - 9+760 15-Oct-13 32.0 30 40.77
80 15-Oct-13 32.0 30 40.77
81 15-Oct-13 31.0 35 47.57
82 15-Oct-13 32.0 35 47.57
83 15-Oct-13 31.0 30 40.77

84 28 RIGID 11-Oct-13 4.0 18-Oct-13 31.0 30 40.77 8-Nov-13


85 L2 STA. 10+595 - 10+475 18-Oct-13 32.0 30 40.77
86 18-Oct-13 31.0 30 40.77
87 18-Oct-13 31.0 25 33.98
88 18-Oct-13 32.0 30 40.77
89 18-Oct-13 31.0 25 33.98

90 29 RIGID 12-Oct-13 4.0 19-Oct-13 32.0 30 40.77 9-Nov-13


91 STA. 7+120 - 7+235 L1 19-Oct-13 34.2 30 40.77
92 19-Oct-13 32.0 30 40.77
93 19-Oct-13 34.2 30 40.77

Diketahui Oleh : Disetujui Oleh : Pandaan, ............... 2013


PT. Margabumi Adhikaraya Konsultan Diajukan Oleh :
PT. Multi Phi Beta Kontraktor
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( _____________________________ ) ( _____________________________ )
( ________________________)
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

101 1 RIGID 22-Oct-13 4.0 29-Oct-13 19-Nov-13 35.0 40 54.37 57.76


102 STA. 7+370 - 7+205 R1 35.0 40 54.37
35.0 45 61.16
34.7 40 54.37
35.0 45 61.16
35.0 45 61.16

2 RIGID 23-Oct-13 4.0 30-Oct-13 20-Nov-13 34.1 40 54.37 56.63


R1 STA. 7+150 - 7+240 34.5 40 54.37
34.5 40 54.37
35.0 45 61.16
35.0 40 54.37
33.9 45 61.16

3 RIGID 26-Oct-13 3.0 2-Nov-13 23-Nov-13 33.2 40 54.37 54.37


R2 7+155 - 7+250 33.2 40 54.37

`
4 RIGID 28-Oct-13 3.0 4-Nov-13 25-Nov-13 33.7 45 61.16 57.76
R1 STA. 8+295 - 8+335 33.5 40 54.37

Page 83 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
5 RIGID 29-Oct-13 3.0 5-Nov-13 26-Nov-13 34.8 35 47.57 52.10
STA. 8+440 - 8+530 R1 35.2 40 54.37
34.7 40 54.37
36.1 35 47.57
33.3 40 54.37
34.2 40 54.37

`
6 RIGID 30-Oct-13 3.0 6-Nov-13 27-Nov-13 34.7 40 54.37 54.37
STA. 5+200 - 5+250 L2 35.2 45 61.16
34.7 40 54.37
34.8 40 54.37
33.3 35 47.57
34.7 40 54.37

`
7 RIGID 31-Oct-13 3.0 7-Nov-13 28-Nov-13 34.0 45 61.16 61.16
STA.8+525 - 8+420 L1 34.0 45 61.16

`
107 8 RIGID 3-Nov-13 3.0 11-Nov-13 1-Dec-13 34.7 40 54.37 52.67
108 STA. 8+540 - 8+400 R2 1-Dec-13 34.8 40 54.37
109 1-Dec-13 32.4 35 47.57
110 1-Dec-13 35.2 40 54.37

111 9 RIGID 4-Nov-13 3.0 11-Nov-13 2-Dec-13 33.9 40 54.37 54.37


112 STA.10+350 - 10+240 L3 2-Dec-13 33.8 40 54.37

113 10 RIGID 6-Nov-13 3.0 13-Nov-13 4-Dec-13 33.9 40 54.37 50.97


114 R1 STA. 8+250 - 8+350 4-Dec-13 32.4 35 47.57
115 4-Dec-13 34.8 35 47.57
116 4-Dec-13 34.7 40 54.37

117 11 RIGID 7-Nov-13 3.0 14-Nov-13 5-Dec-13 35.1 40 54.37 50.97


118 L2 STA. 8+525 - 8+315 5-Dec-13 34.3 35 47.57
119 5-Dec-13 34.5 35 47.57
120 5-Dec-13 35.1 40 54.37

121 12 RIGID 11-Nov-13 3.0 18-Nov-13 9-Dec-13 34.1 40 54.37 57.76


122 STA. 8+325 - 8+400 L3 9-Dec-13 33.2 45 61.16

123 13 RIGID 12-Nov-13 2.5 19-Nov-13 10-Dec-13 34.3 40 54.37 54.37


124 STA. 9+755 - 9+760 R2 10-Dec-13 34.5 40 54.37
125 10-Dec-13 34.5 40 54.37
126 10-Dec-13 34.4 40 54.37

Page 84 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

127 14 RIGID 13-Nov-13 3.0 20-Nov-13 34.1 30 40.77 11-Dec-13 35.1 40 54.37 54.37
128 34.2 30 40.77 11-Dec-13 35.1 40 54.37
129 L1 STA. 10+175 - 10+185 11-Dec-13 34.5 35 47.57
130 11-Dec-13 34.5 40 54.37
131 11-Dec-13 35.0 40 54.37
132 11-Dec-13 35.0 45 61.16

133 15 RIGID 14-Nov-13 3.0 21-Nov-13 34.0 30 40.77 12-Dec-13 35.0 40 54.37 56.63
134 34.1 30 40.77 12-Dec-13 35.0 40 54.37
135 12-Dec-13 34.8 45 61.16
R1 STA. 11+120 - 11+195
136 12-Dec-13 34.9 40 54.37
137 12-Dec-13 34.9 40 54.37
138 12-Dec-13 35.0 45 61.16

139 16 RIGID 15-Nov-13 2.5 22-Nov-13 31.2 30 40.77 13-Dec-13 35.0 40 54.37 56.07
140 32.4 30 40.77 13-Dec-13 35.0 40 54.37
STA. 11+095 - 11+170 R2
141 13-Dec-13 35.1 45 61.16
142 13-Dec-13 34.9 40 54.37

143 17 RIGID 18-Nov-13 3.0 25-Nov-13 34.7 30 40.77 16-Dec-13 34.2 38 51.65 56.86
144 STA. 8+170 - 8+040 R3 33.9 30 40.77 16-Dec-13 34.3 42 57.08
145 16-Dec-13 34.1 43 58.44
146 16-Dec-13 33.8 41 55.73
147 16-Dec-13 34.8 44 59.80
148 16-Dec-13 33.2 43 58.44

149 18 RIGID 19-Nov-13 3.0 26-Nov-13 34.0 36 48.93 17-Dec-13 33.2 38 51.65 53.23
150 STA. 7+695 - 7+855 R3 33.2 30 40.77 17-Dec-13 34.0 39 53.01
151 17-Dec-13 34.2 42 57.08
152 17-Dec-13 32.9 41 55.73
153 17-Dec-13 34.2 37 50.29
154 17-Dec-13 34.7 38 51.65

155 19 RIGID 20-Nov-13 3.0 27-Nov-13 34.8 30 40.77 18-Dec-13 34.2 38 51.65 52.78
156 STA.11+175 - 11+250 L1 34.0 30 40.77 18-Dec-13 33.0 41 55.73
157 18-Dec-13 32.7 39 53.01
158 18-Dec-13 34.1 40 54.37
159 18-Dec-13 37.6 39 53.01
160 18-Dec-13 33.7 36 48.93

`
20 RIGID 21-Nov-13 4.0 28-Nov-13 32.8 30 40.77 19-Dec-13
STA. 5+100 - 5+200 R1 32.7 36 48.93

`
21 RIGID 22-Nov-13 3.0 29-Nov-13 33.7 30 40.77 20-Dec-13
32.8 30 40.77
STA. 10+795 - 10+832 R3

Page 85 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
161 22 RIGID 28-Nov-13 3.0 5-Dec-13 34.0 30 40.77 26-Dec-13
162 5-Dec-13 34.2 30 40.77
R1 STA. 11+100 - 11+260

163 23 RIGID 30-Nov-13 3.0 7-Dec-13 32.7 30 40.77 28-Dec-13


164 R3 STA. 8+670 - 8+745 7-Dec-13 32.8 30 40.77

165 24 RIGID 6-Dec-13 3.5 13-Dec-13 34.6 33 44.85 3-Jan-14


166 R1 STA. 0+205 - 0+100 13-Dec-13 34.7 33 44.85

167 25 RIGID 7-Dec-13 3.0 14-Dec-13 34.5 32 43.49 4-Jan-14


168 STA. 5+075 5+100 R2 14-Dec-13 34.5 32 43.49
T. DAYU

169 26 RIGID 9-Dec-13 4.0 16-Dec-13 33.4 27 36.70 6-Jan-14


STA. RAMP 5, STA.
170 16-Dec-13 32.8 32 43.49
5+155 - 5+200
STA. 5+155 - 5+200 R2

171 27 RIGID 10-Dec-13 5.0 17-Dec-13 33.8 28 38.06 7-Jan-14


172 STA. 17-Dec-13 33.7 29 39.42
11+100 -11+185 L1

173 28 RIGID 11-Dec-13 4.0 18-Dec-13 33.7 29 39.42 8-Jan-14


174 L2 STA. 11+185 - 11+260 18-Dec-13 34.2 31 42.13

Disetujui Oleh :
Konsultan Pandaan, ............... 2013
Diketahui Oleh : PT. Multi Phi Beta Diajukan Oleh :
PT. Margabumi Adhikaraya PT.Tata Guna Patria Kontraktor
PT.Eskapindo Matra (KSO)

( _____________________________ ) (__________________________________) ( ________________________)

Page 86 of 322
PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : Desember 2013

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 4-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
2 4-Dec-13 28 1.00 47.57 47.57 31.08
3 4-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
4 4-Dec-13 28 1.00 47.57 47.57 31.08
5 5-Dec-13 28 1.00 61.16 61.16 64.26 RIGID
6 5-Dec-13 28 1.00 61.16 61.16 64.26
7 5-Dec-13 28 1.00 61.16 61.16 64.26
8 5-Dec-13 28 1.00 61.16 61.16 64.26 R2 STA. 9+525 - 9+640
9 5-Dec-13 28 1.00 54.37 54.37 1.49
10 5-Dec-13 28 1.00 54.37 54.37 1.49
11 5-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
12 5-Dec-13 28 1.00 54.37 54.37 1.49
13 6-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
14 6-Dec-13 28 1.00 47.57 47.57 31.08
15 7-Dec-13 28 1.00 47.57 47.57 31.08 RIGID
16 7-Dec-13 28 1.00 47.57 47.57 31.08
17 7-Dec-13 28 1.00 47.57 47.57 31.08 R2 STA. 9+730 - 9+830
18 7-Dec-13 28 1.00 47.57 47.57 31.08
19 8-Dec-13 28 1.00 47.57 47.57 31.08 RIGID
20 8-Dec-13 28 1.00 47.57 47.57 31.08
21 8-Dec-13 28 1.00 47.57 47.57 31.08 R2 STA. 9+830 - 9+910
22 8-Dec-13 28 1.00 47.57 47.57 31.08
23 9-Dec-13 28 1.00 47.57 47.57 31.08 RIGID
24 9-Dec-13 28 1.00 47.57 47.57 31.08
25 9-Dec-13 28 1.00 47.57 47.57 31.08
26 9-Dec-13 28 1.00 54.37 54.37 1.49 R1 STA. 9+530 - 9+690
27 9-Dec-13 28 1.00 54.37 54.37 1.49
28 9-Dec-13 28 1.00 47.57 47.57 31.08
29 11-Dec-13 28 1.00 47.57 47.57 31.08 RIGID
30 11-Dec-13 28 1.00 54.37 54.37 1.49
31 11-Dec-13 28 1.00 47.57 47.57 31.08 R2 STA. 9+655 - 9+690
32 11-Dec-13 28 1.00 47.57 47.57 31.08
33 12-Dec-13 28 1.00 54.37 54.37 1.49 RIGID
34 12-Dec-13 28 1.00 47.57 47.57 31.08
R1 STA. 9+810 -
35 12-Dec-13 28 1.00 54.37 54.37 1.49
9+900
36 12-Dec-13 28 1.00 47.57 47.57 31.08
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
37 12-Dec-13 28 1.00 62.52 62.52 87.90 RIGID
38 12-Dec-13 28 1.00 57.08 57.08 15.51
39 12-Dec-13 28 1.00 47.57 47.57 31.08 R3 STA.8+540 - 8+400
40 12-Dec-13 28 1.00 50.29 50.29 8.16
41 13-Dec-13 28 1.00 61.16 61.16 64.26 RIGID
42 13-Dec-13 28 1.00 54.37 54.37 1.49
43 13-Dec-13 28 1.00 54.37 54.37 1.49 R2 10+145 - 10+230
44 13-Dec-13 28 1.00 54.37 54.37 1.49
45 13-Dec-13 28 1.00 54.37 54.37 1.49
RIGID
46 13-Dec-13 28 1.00 47.57 47.57 31.08
47 14-Dec-13 28 1.00 61.16 61.16 64.26
RIGID
48 14-Dec-13 28 1.00 47.57 47.57 31.08
49 15-Dec-13 28 1.00 47.57 47.57 31.08 RIGID
50 15-Dec-13 28 1.00 47.57 47.57 31.08
R2 STA. 9+700 - 9+715
51 15-Dec-13 28 1.00 54.37 54.37 1.49
52 15-Dec-13 28 1.00 54.37 54.37 1.49
R2 STA. 10+300 -
53 15-Dec-13 28 1.00 54.37 54.37 1.49
10+385
54 15-Dec-13 28 1.00 47.57 47.57 31.08
55 16-Dec-13 28 1.00 54.37 54.37 1.49
RIGID
56 16-Dec-13 28 1.00 47.57 47.57 31.08
57 1-Dec-13 7 0.75 40.77 54.37 1.49 RIGID
58 1-Dec-13 7 0.75 40.77 54.37 1.49 RIGID ULU-ULU
59 1-Dec-13 7 0.75 40.77 54.37 1.49 BANYU L2 STA.
60 1-Dec-13 7 0.75 40.77 54.37 1.49 10+670 - 10+647
61 3-Dec-13 7 0.75 47.57 63.43 105.71
RIGID
62 3-Dec-13 7 0.75 47.57 63.43 105.71
63 3-Dec-13 7 0.75 47.57 63.43 105.71
RIGID
64 3-Dec-13 7 0.75 47.57 63.43 105.71
65 4-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
66 4-Dec-13 7 0.75 40.77 54.37 1.49
67 4-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
68 4-Dec-13 7 0.75 40.77 54.37 1.49
69 5-Dec-13 7 0.75 40.77 54.37 1.49 RIGID
70 5-Dec-13 7 0.75 47.57 63.43 105.71
L2 STA. 10+360 -
71 5-Dec-13 7 0.75 40.77 54.37 1.49
10+260
72 5-Dec-13 7 0.75 40.77 54.37 1.49
73 5-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
74 5-Dec-13 7 0.75 40.77 54.37 1.49
75 5-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
76 5-Dec-13 7 0.75 40.77 54.37 1.49
77 6-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
78 6-Dec-13 7 0.75 40.77 54.37 1.49
79 6-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
80 6-Dec-13 7 0.75 40.77 54.37 1.49
81 6-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
82 6-Dec-13 7 0.75 40.77 54.37 1.49
83 7-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
84 7-Dec-13 7 0.75 40.77 54.37 1.49
85 8-Dec-13 7 0.75 47.57 63.43 105.71
RIGID
86 8-Dec-13 7 0.75 47.57 63.43 105.71
87 8-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
88 8-Dec-13 7 0.75 47.57 63.43 105.71
89 11-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
90 11-Dec-13 7 0.75 40.77 54.37 1.49
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
91 12-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
92 12-Dec-13 7 0.75 40.77 54.37 1.49
93 13-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
94 13-Dec-13 7 0.75 40.77 54.37 1.49
95 13-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
96 13-Dec-13 7 0.75 40.77 54.37 1.49
97 15-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
98 15-Dec-13 7 0.75 40.77 54.37 1.49
99 15-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
100 15-Dec-13 7 0.75 40.77 54.37 1.49
101 15-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
102 15-Dec-13 7 0.75 40.77 54.37 1.49
103 15-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
104 15-Dec-13 7 0.75 40.77 54.37 1.49
105 16-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
106 16-Dec-13 7 0.75 40.77 54.37 1.49
107 1-Dec-13 28 1.00 54.37 54.37 1.49 RIGID
108 1-Dec-13 28 1.00 54.37 54.37 1.49
109 1-Dec-13 28 1.00 47.57 47.57 31.08 STA. 8+540 - 8+400 R2
110 1-Dec-13 28 1.00 54.37 54.37 1.49
111 2-Dec-13 28 1.00 54.37 54.37 1.49
RIGID
112 2-Dec-13 28 1.00 54.37 54.37 1.49
113 4-Dec-13 28 1.00 54.37 54.37 1.49 RIGID
114 4-Dec-13 28 1.00 47.57 47.57 31.08
115 4-Dec-13 28 1.00 47.57 47.57 31.08 R1 STA. 8+250 - 8+350
116 4-Dec-13 28 1.00 54.37 54.37 1.49
117 5-Dec-13 28 1.00 54.37 54.37 1.49 RIGID
118 5-Dec-13 28 1.00 47.57 47.57 31.08
119 5-Dec-13 28 1.00 47.57 47.57 31.08 L2 STA. 8+525 - 8+315
120 5-Dec-13 28 1.00 54.37 54.37 1.49
121 9-Dec-13 28 1.00 54.37 54.37 1.49
RIGID
122 9-Dec-13 28 1.00 61.16 61.16 64.26
123 10-Dec-13 28 1.00 54.37 54.37 1.49 RIGID
124 10-Dec-13 28 1.00 54.37 54.37 1.49
125 10-Dec-13 28 1.00 54.37 54.37 1.49 STA. 9+755 - 9+760 R2
126 10-Dec-13 28 1.00 54.37 54.37 1.49
127 11-Dec-13 28 1.00 54.37 54.37 1.49 RIGID
128 11-Dec-13 28 1.00 54.37 54.37 1.49
129 11-Dec-13 28 1.00 47.57 47.57 31.08
L1 STA. 10+175 -
130 11-Dec-13 28 1.00 54.37 54.37 1.49
10+185
131 11-Dec-13 28 1.00 54.37 54.37 1.49
132 11-Dec-13 28 1.00 61.16 61.16 64.26
133 12-Dec-13 28 1.00 54.37 54.37 1.49 RIGID
134 12-Dec-13 28 1.00 54.37 54.37 1.49
135 12-Dec-13 28 1.00 61.16 61.16 64.26
R1 STA. 11+120 -
136 12-Dec-13 28 1.00 54.37 54.37 1.49
11+195
137 12-Dec-13 28 1.00 54.37 54.37 1.49
138 12-Dec-13 28 1.00 61.16 61.16 64.26
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
139 13-Dec-13 28 1.00 54.37 54.37 1.49 RIGID
140 13-Dec-13 28 1.00 54.37 54.37 1.49
STA. 11+095 - 11+170
141 13-Dec-13 28 1.00 61.16 61.16 64.26
R2
142 13-Dec-13 28 1.00 54.37 54.37 1.49
143 16-Dec-13 28 1.00 51.65 51.65 2.24 RIGID
144 16-Dec-13 28 1.00 57.08 57.08 15.51
145 16-Dec-13 28 1.00 58.44 58.44 28.07
146 16-Dec-13 28 1.00 55.73 55.73 6.65 STA. 8+170 - 8+040 R3
147 16-Dec-13 28 1.00 59.80 59.80 44.32
148 16-Dec-13 28 1.00 58.44 58.44 28.07
149 17-Dec-13 28 1.00 51.65 51.65 2.24 RIGID
150 17-Dec-13 28 1.00 53.01 53.01 0.02
151 17-Dec-13 28 1.00 57.08 57.08 15.51
152 17-Dec-13 28 1.00 55.73 55.73 6.65 STA. 7+695 - 7+855 R3
153 17-Dec-13 28 1.00 50.29 50.29 8.16
154 17-Dec-13 28 1.00 51.65 51.65 2.24
155 18-Dec-13 28 1.00 51.65 51.65 2.24 RIGID
156 18-Dec-13 28 1.00 55.73 55.73 6.65
157 18-Dec-13 28 1.00 53.01 53.01 0.02
STA.11+175 - 11+250
158 18-Dec-13 28 1.00 54.37 54.37 1.49
L1
159 18-Dec-13 28 1.00 53.01 53.01 0.02
160 18-Dec-13 28 1.00 48.93 48.93 17.78
161 5-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
162 5-Dec-13 7 0.75 40.77 54.37 1.49
163 7-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
164 7-Dec-13 7 0.75 40.77 54.37 1.49
165 13-Dec-13 7 0.75 44.85 59.80 44.32
RIGID
166 13-Dec-13 7 0.75 44.85 59.80 44.32
167 14-Dec-13 7 0.75 43.49 57.99 23.47
RIGID
168 14-Dec-13 7 0.75 43.49 57.99 23.47
169 16-Dec-13 7 0.75 36.70 48.93 17.78
RIGID
170 16-Dec-13 7 0.75 43.49 57.99 23.47
171 17-Dec-13 7 0.75 38.06 50.74 5.78
RIGID
172 17-Dec-13 7 0.75 39.42 52.55 0.35
173 18-Dec-13 7 0.75 39.42 52.55 0.35
RIGID
174 18-Dec-13 7 0.75 42.13 56.18 9.20
175 17-Dec-13 28 1.00 61.16 61.16 64.26
RIGID
176 17-Dec-13 28 1.00 61.16 61.16 64.26
177 17-Dec-13 28 1.00 54.37 54.37 1.49
RIGID
178 17-Dec-13 28 1.00 47.57 47.57 31.08
179 17-Dec-13 28 1.00 54.37 54.37 1.49
RIGID
180 17-Dec-13 28 1.00 54.37 54.37 1.49
181 17-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
182 17-Dec-13 28 1.00 47.57 47.57 31.08
183 18-Dec-13 28 1.00 61.16 61.16 64.26
RIGID
184 18-Dec-13 28 1.00 54.37 54.37 1.49
185 18-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
186 18-Dec-13 28 1.00 54.37 54.37 1.49
187 18-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
188 18-Dec-13 28 1.00 47.57 47.57 31.08
189 19-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
190 19-Dec-13 28 1.00 47.57 47.57 31.08
191 19-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
192 19-Dec-13 28 1.00 47.57 47.57 31.08
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
193 19-Dec-13 28 1.00 47.57 47.57 31.08 RIGID
194 19-Dec-13 28 1.00 54.37 54.37 1.49
195 19-Dec-13 28 1.00 47.57 47.57 31.08
R2 STA. 10+670 -
196 19-Dec-13 28 1.00 54.37 54.37 1.49
10+795
197 19-Dec-13 28 1.00 54.37 54.37 1.49
198 19-Dec-13 28 1.00 47.57 47.57 31.08
199 20-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
200 20-Dec-13 28 1.00 47.57 47.57 31.08
201 20-Dec-13 28 1.00 54.37 54.37 1.49
RIGID
202 20-Dec-13 28 1.00 47.57 47.57 31.08
203 21-Dec-13 28 1.00 54.37 54.37 1.49
RIGID
204 21-Dec-13 28 1.00 47.57 47.57 31.08
205 21-Dec-13 28 1.00 54.37 54.37 1.49
RIGID
206 21-Dec-13 28 1.00 54.37 54.37 1.49
207 22-Dec-13 28 1.00 47.57 47.57 31.08 RIGID
208 22-Dec-13 28 1.00 47.57 47.57 31.08 RIGID ULU-ULU
209 22-Dec-13 28 1.00 47.57 47.57 31.08 BANYU L2 STA.
210 22-Dec-13 28 1.00 54.37 54.37 1.49 10+670 - 10+647
211 24-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
212 24-Dec-13 28 1.00 54.37 54.37 1.49
213 24-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
214 24-Dec-13 28 1.00 47.57 47.57 31.08
215 25-Dec-13 28 1.00 54.37 54.37 1.49
RIGID
216 25-Dec-13 28 1.00 47.57 47.57 31.08
217 25-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
218 25-Dec-13 28 1.00 47.57 47.57 31.08
219 26-Dec-13 28 1.00 47.57 47.57 31.08 RIGID
220 26-Dec-13 28 1.00 54.37 54.37 1.49
L2 STA. 10+360 -
221 26-Dec-13 28 1.00 47.57 47.57 31.08
10+260
222 26-Dec-13 28 1.00 47.57 47.57 31.08
223 26-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
224 26-Dec-13 28 1.00 47.57 47.57 31.08
225 26-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
226 26-Dec-13 28 1.00 47.57 47.57 31.08
227 27-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
228 27-Dec-13 28 1.00 47.57 47.57 31.08
229 27-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
230 27-Dec-13 28 1.00 47.57 47.57 31.08
231 27-Dec-13 28 1.00 54.37 54.37 1.49
RIGID
232 27-Dec-13 28 1.00 47.57 47.57 31.08
233 28-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
234 28-Dec-13 28 1.00 47.57 47.57 31.08
235 29-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
236 29-Dec-13 28 1.00 47.57 47.57 31.08
237 29-Dec-13 28 1.00 47.57 47.57 31.08
RIGID
238 29-Dec-13 28 1.00 47.57 47.57 31.08
239 18-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
240 18-Dec-13 7 0.75 40.77 54.37 1.49
241 19-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
242 19-Dec-13 7 0.75 40.77 54.37 1.49
243 19-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
244 19-Dec-13 7 0.75 40.77 54.37 1.49
245 19-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
246 19-Dec-13 7 0.75 40.77 54.37 1.49
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
247 20-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
248 20-Dec-13 7 0.75 40.77 54.37 1.49
249 20-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
250 20-Dec-13 7 0.75 40.77 54.37 1.49
251 21-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
252 21-Dec-13 7 0.75 40.77 54.37 1.49
253 22-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
254 22-Dec-13 7 0.75 40.77 54.37 1.49
255 23-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
256 23-Dec-13 7 0.75 40.77 54.37 1.49
257 24-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
258 24-Dec-13 7 0.75 40.77 54.37 1.49
259 24-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
260 24-Dec-13 7 0.75 40.77 54.37 1.49
261 25-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
262 25-Dec-13 7 0.75 40.77 54.37 1.49
263 25-Dec-13 7 0.75 36.70 48.93 17.78
RIGID
264 25-Dec-13 7 0.75 38.06 50.74 5.78
265 26-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
266 26-Dec-13 7 0.75 40.77 54.37 1.49
267 27-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
268 27-Dec-13 7 0.75 40.77 54.37 1.49
269 27-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
270 27-Dec-13 7 0.75 40.77 54.37 1.49
271 27-Dec-13 7 0.75 38.06 50.74 5.78 RIGID
272 27-Dec-13 7 0.75 36.70 48.93 17.78
R1 STA. 10+275 -
273 27-Dec-13 7 0.75 39.42 52.55 0.35
10+295
274 27-Dec-13 7 0.75 38.06 50.74 5.78
275 28-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
276 28-Dec-13 7 0.75 40.77 54.37 1.49
277 28-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
278 28-Dec-13 7 0.75 39.42 52.55 0.35
279 29-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
280 29-Dec-13 7 0.75 40.77 54.37 1.49
281 29-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
282 29-Dec-13 7 0.75 40.77 54.37 1.49
283 30-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
284 30-Dec-13 7 0.75 40.77 54.37 1.49
285 30-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
286 30-Dec-13 7 0.75 40.77 54.37 1.49
287 30-Dec-13 7 0.75 39.42 52.55 0.35
RIGID
288 30-Dec-13 7 0.75 40.77 54.37 1.49
289 31-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
290 31-Dec-13 7 0.75 40.77 54.37 1.49
291 31-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
292 31-Dec-13 7 0.75 40.77 54.37 1.49
293 31-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
294 31-Dec-13 7 0.75 40.77 54.37 1.49
295 19-Dec-13 28 1.00 53.01 53.01 0.02 RIGID
296 19-Dec-13 28 1.00 54.37 54.37 1.49
297 19-Dec-13 28 1.00 48.93 48.93 17.78
298 19-Dec-13 28 1.00 50.29 50.29 8.16 STA. 5+100 - 5+200 R1
299 19-Dec-13 28 1.00 54.37 54.37 1.49
300 19-Dec-13 28 1.00 54.37 54.37 1.49
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
301 20-Dec-13 28 1.00 53.01 53.01 0.02 RIGID
302 20-Dec-13 28 1.00 50.29 50.29 8.16
303 20-Dec-13 28 1.00 57.08 57.08 15.51
STA. 10+795 - 10+832
304 20-Dec-13 28 1.00 54.37 54.37 1.49
R3
305 20-Dec-13 28 1.00 55.73 55.73 6.65
306 20-Dec-13 28 1.00 51.65 51.65 2.24
307 26-Dec-13 28 1.00 47.57 47.57 31.08 RIGID
308 26-Dec-13 28 1.00 51.65 51.65 2.24
R1 STA. 11+100 -
309 26-Dec-13 28 1.00 54.37 54.37 1.49
11+260
310 26-Dec-13 28 1.00 57.08 57.08 15.51
311 28-Dec-13 28 1.00 58.44 58.44 28.07 RIGID
312 28-Dec-13 28 1.00 58.44 58.44 28.07
313 28-Dec-13 28 1.00 61.16 61.16 64.26 R3 STA. 8+670 - 8+745
314 28-Dec-13 28 1.00 61.16 61.16 64.26
315 20-Dec-13 7 0.75 44.85 59.80 44.32
RIGID
316 20-Dec-13 7 0.75 38.06 50.74 5.78
317 24-Dec-13 7 0.75 38.06 50.74 5.78
RIGID
318 24-Dec-13 7 0.75 39.42 52.55 0.35
319 24-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
320 24-Dec-13 7 0.75 42.13 56.18 9.20
321 26-Dec-13 7 0.75 39.42 52.55 0.35
RIGID
322 26-Dec-13 7 0.75 40.77 54.37 1.49
323 27-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
324 27-Dec-13 7 0.75 40.77 54.37 1.49
325 28-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
326 28-Dec-13 7 0.75 42.13 56.18 9.20
327 30-Dec-13 7 0.75 39.42 52.55 0.35
RIGID
328 30-Dec-13 7 0.75 38.06 50.74 5.78
329 31-Dec-13 7 0.75 40.77 54.37 1.49
RIGID
330 31-Dec-13 7 0.75 39.42 52.55 0.35

Σ(σbn - σbm)2 = 5425.36

JUMLAH SAMPLE = 330.00 buah


MIN = 47.57 kg/cm2
MAX = 63.43 kg/cm2
RATA-RATA (σbm) = 53.15 kg/cm2
S ==
KARAKTERISTIK (σbk) = σbm - 1,64 S 4.06 kg/cm2
46.49 kg/cm2

Pandaan,………………..2014

QC STAF QC

( ) ( )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
295 1 RIGID 21-Nov-13 3.0 28-Nov-13 19-Dec-13 33.2 39 53.01 52.55
296 19-Dec-13 34.2 40 54.37
297 4.0 19-Dec-13 33.8 36 48.93
298 STA. 5+100 - 5+200 R1 19-Dec-13 34.1 37 50.29
299 19-Dec-13 34.6 40 54.37
300 19-Dec-13 33.7 40 54.37

301 2 RIGID 22-Nov-13 3.0 29-Nov-13 20-Dec-13 33.6 39 53.01 53.69


302 20-Dec-13 34.2 37 50.29
303 4.0 20-Dec-13 35.0 42 57.08
304 STA. 10+795 - 10+832 R3 20-Dec-13 34.1 40 54.37
305 20-Dec-13 32.8 41 55.73
306 20-Dec-13 33.4 38 51.65

307 3 RIGID 28-Nov-13 3.0 5-Dec-13 26-Dec-13 35.0 35 47.57 52.67


308 26-Dec-13 34.6 38 51.65
309 R1 STA. 11+100 - 11+260 26-Dec-13 34.8 40 54.37
310 26-Dec-13 34.8 42 57.08

311 4 RIGID 30-Nov-13 3.0 7-Dec-13 28-Dec-13 35.1 43 58.44 59.80


312 28-Dec-13 35.1 43 58.44
313 R3 STA. 8+670 - 8+745 28-Dec-13 35.2 45 61.16
314 28-Dec-13 35.1 45 61.16

`
5 RIGID 6-Dec-13 3.0 13-Dec-13 3-Jan-14 35.1 42 57.08 60.14
35.1 45 61.16
R1 STA. 0+205 - 0+100 35.4 44 59.80
35.2 46 62.52

Page 94 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
6 RIGID 7-Dec-13 3.0 14-Dec-13 4-Jan-14 33.4 38 51.65 54.71
34.2 40 54.37
STA. 5+075 5+100 R2 35.4 42 57.08
33.7 41 55.73

`
7 RIGID 9-Dec-13 3.0 16-Dec-13 6-Jan-14 33.7 37 50.29 54.14
34.0 39 53.01
32.8 42 57.08
STA. RAMP 5, STA. 39 53.01
34.2
5+155 - 5+200
33.9 40 54.37
34.1 42 57.08

`
8 RIGID 10-Dec-13 4.0 17-Dec-13 7-Jan-14 34.7 37 50.29 52.78
4.0 33.9 41 55.73
3.0 34.2 39 53.01
STA. 11+100 -11+185 L1 3.0 34.6 36 48.93
4.0 33.1 39 53.01
4.0 34.0 41 55.73

`
9 RIGID 11-Dec-13 4.0 18-Dec-13 8-Jan-14 33.2 37 50.29 53.01
4.0 34.2 38 51.65
3.0 33.7 39 53.01
L2 STA. 11+185 - 11+210 3.0 32.9 38 51.65
4.0 34.2 42 57.08
4.0 33.0 40 54.37

`
315 10 RIGID 13-Dec-13 3.0 20-Dec-13 34.2 33 44.85 10-Jan-14 33.7 38 51.65 55.50
316 3.0 20-Dec-13 33.7 28 38.06 32.8 43 58.44
4.0 33.8 42 57.08
R1 STA. 11+205 - 11+275 4.0 34.0 43 58.44
3.0 33.7 39 53.01
3.0 34.2 40 54.37

317 11 RIGID 17-Dec-13 4.0 24-Dec-13 34.2 28 38.06 14-Jan-14 33.40 38 51.65 52.33
318 24-Dec-13 33.7 29 39.42 32.80 39 53.01
R2 STA. 0+510 - 0+530
24-Dec-13
24-Dec-13
24-Dec-13
319 12 RIGID 17-Dec-13 3.0 24-Dec-13 34.5 30 40.77 14-Jan-14 34.00 39 53.01 55.05
320 3.0 24-Dec-13 34.6 31 42.13 33.80 42 57.08
L2 STA. 0+530 - 0+650 4.0 24-Dec-13 34.00 39 53.01
4.0 32.10 42 57.08

321 13 RIGID 19-Dec-13 3.0 26-Dec-13 35.0 29 39.42 16-Jan-14 32.8 40 54.37 57.08
322 26-Dec-13 30.0 30 40.77 33.7 41 55.73
34.1 43 58.44
L1 STA. 0+105 - 0+600 34.8 42 57.08
33.7 42 57.08
Page 95 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
L1 STA. (0+105
STA. )- 0+600 Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
34.3 44 59.80

Page 96 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

323 14 RIGID 20-Dec-13 3.0 27-Dec-13 34.9 30 40.77 17-Jan-14 34.2 40 54.37 54.82
324 27-Dec-13 34.9 30 40.77 34.6 41 55.73
33.9 39 53.01
R2 STA. 0+200 - 0+055 32.7 41 55.73
34.2 39 53.01
35.0 42 57.08

325 15 RIGID 21-Dec-13 3.0 28-Dec-13 35.1 30 40.77 18-Jan-14 34.2 41 55.73 55.50
326 3.0 28-Dec-13 35.1 31 42.13 33.7 42 57.08
4.0 34.2 42 57.08
STA. 0+510 - 0+485 R1 4.0 34.6 38 51.65
3.0 33.8 40 54.37
3.0 33.6 42 57.08

327 16 RIGID 23-Dec-13 3.0 30-Dec-13 35.0 29 39.42 20-Jan-14 35.10 43 58.44 57.08
328 30-Dec-13 39.1 28 38.06 35.00 41 55.73
R1 STA. 0+485 - 0+455

329 17 RIGID 24-Dec-13 3.0 31-Dec-13 34.9 30 40.77 21-Jan-14


330 31-Dec-13 35.0 29 39.42
STA. 0+510 - 0+450 R2

`
18 RIGID 25-Dec-13 3.0 1-Jan-14 35.1 29 39.42 22-Jan-14
35.1 30 40.77
L1 STA. 0+360 - 0+400 L1

`
19 RIGID 25-Dec-13 3.0 1-Jan-14 34.9 30 40.77 22-Jan-14
34.9 28 38.06
R1 STA. 10+735 - 10+575

`
20 RIGID 26-Dec-13 3.0 2-Jan-14 34.8 28 38.06 23-Jan-14
34.9 29 39.42
R2 STA. 10+245 - 10+255

`
21 RIGID 27-Dec-13 3.0 3-Jan-14 34.5 28 38.06 24-Jan-14
34.7 29 39.42
R2 STA. 9+920 - 9+950

`
22 RIGID 28-Dec-13 3.0 4-Jan-14 34.5 28 38.06 25-Jan-14
34.5 28 38.06
L1 STA. 9+955 - 9+835

`
23 RIGID 7-Jan-14 3.0 14-Jan-14 32.7 28 38.06 4-Feb-14
33.0 30 40.77
R2 STA. 0+485 - 0+510

Page 97 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
24 RIGID 9-Jan-14 4.0 16-Jan-14 32.3 28 38.06 6-Feb-14
33.0 31 42.13
L1 STA. 9+560 - 9+395

`
25 RIGID 10-Jan-14 3.0 17-Jan-14 32.7 29 39.42 7-Feb-14
32.8 30 40.77
M. STA. 0+530 - 0+550 R1

`
26 RIGID 11-Jan-14 4.0 18-Jan-14 33.0 32 43.49 8-Feb-14
32.8 32 43.49
STA. 0+485 - 0+460 R1

`
27 RIGID 13-Jan-14 3.0 20-Jan-14 34.6 31 42.13 10-Feb-14
34.6 29 39.42
STA. 0+520 - 0+545 L3

Disetujui Oleh :
Konsultan Pandaan, ............... 2014
PT. Multi Phi Beta Diajukan Oleh :
Diketahui Oleh :
PT.Tata Guna Patria Kontraktor
Jasamarga Pandaan Tol
PT.Eskapindo Matra (KSO)

(__________________________________) ( ________________________)
( _____________________________ )

Page 98 of 322
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
175 1 RIGID 19-Nov-13 3.0 26-Nov-13 17-Dec-13 31.00 45 61.16 61.16
176 R2 STA. 10+360 - 10+400 17-Dec-13 32.00 45 61.16

177 2 RIGID 19-Nov-13 3.0 26-Nov-13 17-Dec-13 31.00 40 54.37 50.97


178 R2 STA. 10+410 - 10+460 17-Dec-13 31.00 35 47.57

179 3 RIGID 19-Nov-13 3.0 26-Nov-13 17-Dec-13 31.00 40 54.37 54.37


180 L3 STA. 11+150 - 11+250 17-Dec-13 32.00 40 54.37

181 4 RIGID 19-Nov-13 4.0 26-Nov-13 17-Dec-13 32.00 35 47.57 47.57


182 R1 STA. 9+732,5 - 9+725 17-Dec-13 31.00 35 47.57

183 5 RIGID 20-Nov-13 3.0 27-Nov-13 18-Dec-13 31.00 45 61.16 57.76


184 R3 STA. 10+515 - 10+595 18-Dec-13 31.00 40 54.37

185 6 RIGID 20-Nov-13 4.0 27-Nov-13 18-Dec-13 32.00 35 47.57 50.97


186 R3 STA. 9+700 - 9+725 18-Dec-13 31.00 40 54.37

187 7 RIGID 20-Nov-13 3.0 27-Nov-13 18-Dec-13 32.00 35 47.57 47.57


188 R3 STA. 7+855 - 7+745 18-Dec-13 31.00 35 47.57

189 8 RIGID 21-Nov-13 3.0 28-Nov-13 19-Dec-13 31.00 35 47.57 47.57


190 STA. 11+245 - 11+300 L2 19-Dec-13 31.00 35 47.57
19-Dec-13
19-Dec-13
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
191 9 RIGID 21-Nov-13 3.0 28-Nov-13 19-Dec-13 32.00 35 47.57 47.57
192 R3 STA. 11+195 - 11+240 19-Dec-13 31.00 35 47.57
19-Dec-13
19-Dec-13
193 10 RIGID 21-Nov-13 3.0 28-Nov-13 19-Dec-13 32.00 35 47.57 50.97
194 R2 STA. 10+670 - 10+795 19-Dec-13 32.00 40 54.37
195 19-Dec-13 31.00 35 47.57
196 19-Dec-13 31.00 40 54.37
197 19-Dec-13 32.00 40 54.37
198 19-Dec-13 31.00 35 47.57

199 11 RIGID 22-Nov-13 3.0 29-Nov-13 20-Dec-13 31.00 35 47.57 47.57


200 RIGID R3 STA. 7+745 - 20-Dec-13 31.00 35 47.57
7+655 20-Dec-13
20-Dec-13
20-Dec-13
201 12 RIGID 22-Nov-13 4.0 29-Nov-13 20-Dec-13 31.00 40 54.37 50.97
202 L3 STA. 10+665 - 10+645 20-Dec-13 32.00 35 47.57
ULU-ULU BANYU

203 13 RIGID 23-Nov-13 3.0 30-Nov-13 21-Dec-13 30.00 40 54.37 50.97


204 R2 STA. 10+885 - 10+905 21-Dec-13 30.00 35 47.57
21-Dec-13
21-Dec-13
205 14 RIGID 23-Nov-13 4.0 30-Nov-13 21-Dec-13 31.00 40 54.37 54.37
206 RIGID L1 STA. 5+150 - 21-Dec-13 30.00 40 54.37
5+200 21-Dec-13

207 15 RIGID 24-Nov-13 4.0 1-Dec-13 22-Dec-13 32.00 35 47.57 49.27


208 RIGID ULU-ULU BANYU L2 22-Dec-13 31.00 35 47.57
209 STA. 10+670 - 10+647 22-Dec-13 31.00 35 47.57
210 22-Dec-13 30.00 40 54.37

211 16 RIGID 26-Nov-13 3.0 3-Dec-13 24-Dec-13 31.00 35 47.57 50.97


212 R1 STA. 10+390 - 10+455 24-Dec-13 32.00 40 54.37

213 17 RIGID 26-Nov-13 4.0 3-Dec-13 24-Dec-13 31.00 35 47.57 47.57


214 RIGID L1 STA. 10+610 - 24-Dec-13 31.00 35 47.57
10+590

215 18 RIGID 27-Nov-13 3.0 4-Dec-13 25-Dec-13 31.00 40 54.37 50.97


216 R3 STA. 7+205 - 7+160 25-Dec-13 31.00 35 47.57

217 19 RIGID 27-Nov-13 4.0 4-Dec-13 25-Dec-13 31.00 35 47.57 47.57


218 RIGID L2 STA. 10+595 - 25-Dec-13 31.00 35 47.57
10+635
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
219 20 RIGID 28-Nov-13 3.0 5-Dec-13 26-Dec-13 31.00 35 47.57 49.27
220 L2 STA. 10+360 - 10+260 26-Dec-13 32.00 40 54.37
221 26-Dec-13 31.00 35 47.57
222 26-Dec-13 31.00 35 47.57
26-Dec-13
223 21 RIGID 28-Nov-13 3.0 5-Dec-13 26-Dec-13 32.00 35 47.57 47.57
224 L2 STA. 10+360 - 10+255 26-Dec-13 32.00 35 47.57

225 22 RIGID 28-Nov-13 3.0 5-Dec-13 26-Dec-13 31.00 35 47.57 47.57


226 L3 STA. 8+100 - 8+130 26-Dec-13 31.00 35 47.57

227 23 RIGID 29-Nov-13 3.0 6-Dec-13 27-Dec-13 32.00 35 47.57 47.57


228 R1 STA. 10+185 - 10+230 27-Dec-13 31.00 35 47.57

229 24 RIGID 29-Nov-13 3.0 6-Dec-13 27-Dec-13 31.00 35 47.57 47.57


230 STA. 11+260 - 11+205 R1 27-Dec-13 30.00 35 47.57

231 25 RIGID 29-Nov-13 4.0 6-Dec-13 27-Dec-13 32.00 40 54.37 50.97


232 L1 STA. 10+645 - 10+675 27-Dec-13 32.00 35 47.57

233 26 RIGID 30-Nov-13 4.0 7-Dec-13 28-Dec-13 31.00 35 47.57 47.57


234 TAMAN DAYU STA. 0+560 28-Dec-13 32.00 35 47.57
- 0+610 R1,R2,R3

235 27 RIGID 1-Dec-13 3.0 8-Dec-13 29-Dec-13 31.00 35 47.57 47.57


236 L3 STA. 8+850 - 8+925 29-Dec-13 31.00 35 47.57
29-Dec-13
29-Dec-13
237 28 RIGID 1-Dec-13 4.0 8-Dec-13 29-Dec-13 32.00 35 47.57 47.57
238 L1 STA. 10+185 - 10+240 29-Dec-13 31.00 35 47.57

29 RIGID 4-Dec-13 4.0 11-Dec-13 1-Jan-14 31.00 35 47.57 47.57


STA. 11+095 - 11+105 R2 32.00 35 47.57

30 RIGID 5-Dec-13 4.0 12-Dec-13 2-Jan-14 31.00 35 47.57 47.57


R1 STA. 10+875 - 10+925 32.00 35 47.57
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
31 RIGID 6-Dec-13 3.0 13-Dec-13 3-Jan-14 31.00 40 54.37 50.97
R2 STA. 8+745 - 8+820 32.00 35 47.57

32 RIGID 6-Dec-13 3.0 13-Dec-13 3-Jan-14 31.00 35 47.57 50.97


R2 STA. 10+135 - 10+140 31.00 40 54.37

33 RIGID 8-Dec-13 3.0 15-Dec-13 5-Jan-14 31.00 35 47.57 47.57


RIGID L1 STA. 8+850 31.00 35 47.57
-8+930

34 RIGID 8-Dec-13 4.0 15-Dec-13 5-Jan-14 31.00 35 47.57 50.97


RIGID R1 STA. 10+965 - 32.00 40 54.37
10+925

35 RIGID 8-Dec-13 3.0 15-Dec-13 5-Jan-14 31.00 35 47.57 47.57


RIGID L1 STA. 8+850 31.00 35 47.57
-8+930

36 RIGID 8-Dec-13 4.0 15-Dec-13 5-Jan-14 31.00 40 54.37 50.97


RIGID R1 STA. 10+965 - 31.00 35 47.57
10+925

37 RIGID 9-Dec-13 3.0 16-Dec-13 6-Jan-14 30.00 35 47.57 47.57


R1 STA. 8+745 - 8+670 31.00 35 47.57

239 38 RIGID 11-Dec-13 4.0 18-Dec-13 31.00 30 40.77 8-Jan-14 30.00 35 47.57 47.57
240 . R2 STA. 10+460 - 10+480 18-Dec-13 32.00 30 40.77 31.00 35 47.57

241 39 RIGID 12-Dec-13 3.0 19-Dec-13 31.00 30 40.77 9-Jan-14 31.00 35 47.57 47.57
242 STA. 11+260 - 11+285 L2 19-Dec-13 31.00 30 40.77 31.00 35 47.57
19-Dec-13
19-Dec-13
243 40 RIGID 12-Dec-13 3.0 19-Dec-13 31.00 30 40.77 9-Jan-14 32.00 40 54.37 50.97
244 R1 STA. 8+855 - 8+945 R1 19-Dec-13 32.00 30 40.77 31.00 35 47.57
19-Dec-13
19-Dec-13
245 41 RIGID 12-Dec-13 4.0 19-Dec-13 31.00 30 40.77 9-Jan-14 30.00 35 47.57 50.97
246 STA. 9+915 - 9+955 R2 19-Dec-13 31.00 30 40.77 31.00 40 54.37

247 42 RIGID 13-Dec-13 4.0 20-Dec-13 31.00 30 40.77 10-Jan-14 31.00 35 47.57 47.57
248 R3 STA. 9+935 -9+915 20-Dec-13 32.00 30 40.77 30.00 35 47.57
20-Dec-13
20-Dec-13
249 43 RIGID 13-Dec-13 4.0 20-Dec-13 32.00 30 40.77 10-Jan-14 31.00 35 47.57 47.57
250 STA. 10+510 - 10+515 R2 20-Dec-13 31.00 30 40.77 31.00 35 47.57

251 44 RIGID 14-Dec-13 3.0 21-Dec-13 32.00 30 40.77 11-Jan-14 31.00 35 47.57 50.97
252 R1 STA. 8+885 - 8+900 21-Dec-13 31.00 30 40.77 31.00 40 54.37
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
R1 STA. 8+885 - 8+900 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
253 45 RIGID 15-Dec-13 3.0 22-Dec-13 31.00 30 40.77 12-Jan-14 31.00 40 54.37 54.37
254 STA. 0+510 - 0+530 R1 22-Dec-13 32.00 30 40.77 31.00 40 54.37

255 46 RIGID 16-Dec-13 4.0 23-Dec-13 32.00 30 40.77 13-Jan-14 31.00 35 47.57 47.57
256 R2 STA. 9+925 - 9+910 23-Dec-13 32.00 30 40.77 31.00 35 47.57
31.00 35 47.57
31.00 35 47.57

257 47 RIGID 17-Dec-13 4.0 24-Dec-13 31.00 30 40.77 14-Jan-14 31.00 35 47.57 47.57
258 L3 STA. 9+945 - 9+895 24-Dec-13 31.00 30 40.77 31.00 35 47.57
24-Dec-13
24-Dec-13
259 48 RIGID 17-Dec-13 4.0 24-Dec-13 32.00 30 40.77 14-Jan-14 32.00 35 47.57 47.57
260 STA. 0+200 - 0+130 L1 24-Dec-13 32.00 30 40.77 32.00 35 47.57
24-Dec-13

261 49 RIGID 18-Dec-13 4.0 25-Dec-13 31.00 30 40.77 15-Jan-14 31.00 40 54.37 50.97
262 STA. 8+860 - 8+900 R2 25-Dec-13 32.00 30 40.77 31.00 35 47.57
25-Dec-13
25-Dec-13
263 50 RIGID 18-Dec-13 3.0 25-Dec-13 32.00 27 36.70 15-Jan-14 32.00 40 54.37 50.97
264 R2 STA. 10+300 - 10+250 25-Dec-13 32.00 28 38.06 32.00 35 47.57
25-Dec-13

265 51 RIGID 19-Dec-13 4.0 26-Dec-13 32.00 30 40.77 16-Jan-14 31.00 35 47.57 50.97
266 R2 STA. 10+290 - 10+280 26-Dec-13 32.00 30 40.77 32.00 35 47.57
31.00 40 54.37
32.00 40 54.37

267 52 RIGID 20-Dec-13 4.0 27-Dec-13 30.00 30 40.77 17-Jan-14 31.00 35 47.57 47.57
268 R1 STA. 10+275 - 10+295 27-Dec-13 31.00 30 40.77 31.00 35 47.57

269 53 RIGID 20-Dec-13 4.0 27-Dec-13 31.00 30 40.77 17-Jan-14 32.00 35 47.57 50.97
270 STA. 7+390 - 7+320 L1 27-Dec-13 32.00 30 40.77 32.00 40 54.37
KALIWANGI 27-Dec-13
27-Dec-13
271 54 RIGID 20-Dec-13 4.0 27-Dec-13 30.00 28 38.06 17-Jan-14 31.00 35 47.57 49.27
272 R1 STA. 10+275 - 10+295 27-Dec-13 30.00 27 36.70 31.00 35 47.57
273 27-Dec-13 30.00 29 39.42 32.00 40 54.37
274 27-Dec-13 31.00 28 38.06 31.00 35 47.57

275 55 RIGID 21-Dec-13 4.0 28-Dec-13 31.00 30 40.77 18-Jan-14 31.00 35 47.57 47.57
276 R3 STA. 10+235 - 10+245 28-Dec-13 32.00 30 40.77 31.00 35 47.57
28-Dec-13
28-Dec-13
28-Dec-13
277 56 RIGID 21-Dec-13 4.0 28-Dec-13 32.00 30 40.77 18-Jan-14 32.00 35 47.57 47.57
278 STA. 7+290 - 7+320 L3. 28-Dec-13 31.00 29 39.42 31.00 35 47.57
KALIWANGI 28-Dec-13

279 57 RIGID 22-Dec-13 3.0 29-Dec-13 31.00 30 40.77 19-Jan-14 31.00 40 54.37 50.97
280 L2 STA. 9+840 - 9+900 29-Dec-13 30.00 30 40.77 31.00 35 47.57
29-Dec-13
29-Dec-13
29-Dec-13
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
281 58 RIGID 22-Dec-13 4.0 29-Dec-13 30.00 30 40.77 19-Jan-14 31.00 35 47.57 47.57
282 STA. 0+470 - 0+490 L2 29-Dec-13 30.00 30 40.77 30.00 35 47.57
TAMAN DAYU

283 59 RIGID 23-Dec-13 4.0 30-Dec-13 31.00 30 40.77 20-Jan-14 31.00 35 47.57 47.57
284 R3 STA. 10+635 - 30-Dec-13 31.00 30 40.77 31.00 35 47.57
10+597,5 30-Dec-13
30-Dec-13
30-Dec-13
285 60 RIGID 23-Dec-13 4.0 30-Dec-13 30.00 30 40.77 20-Jan-14 32.00 35 47.57 47.57
286 L2 STA. 7+235 - 7+250 30-Dec-13 30.00 30 40.77 31.00 35 47.57
30-Dec-13
30-Dec-13
30-Dec-13
287 61 RIGID 23-Dec-13 3.0 30-Dec-13 31.00 29 39.42 20-Jan-14 30.00 40 54.37 57.76
288 L2 STA. 0+480 - 0+455 30-Dec-13 30.00 30 40.77 32.00 45 61.16

289 62 RIGID 24-Dec-13 4.0 31-Dec-13 31.00 30 40.77 21-Jan-14


290 L3 STA. 9+480 - 9+345 31-Dec-13 31.00 30 40.77
31-Dec-13
31-Dec-13
31-Dec-13
291 63 RIGID 24-Dec-13 4.0 31-Dec-13 31.00 30 40.77 21-Jan-14
292 R2 STA. 10+635 - 10+590 31-Dec-13 31.00 30 40.77
31-Dec-13
31-Dec-13
31-Dec-13
293 64 RIGID 24-Dec-13 4.0 31-Dec-13 32.00 30 40.77 21-Jan-14
294 L2 STA. 7+225 - 7+270 31-Dec-13 31.00 30 40.77

65 RIGID 25-Dec-13 4.0 1-Jan-14 31.00 30 40.77 22-Jan-14


R1 STA. 10+245 -10+255 31.00 30 40.77

66 RIGID 26-Dec-13 4.0 2-Jan-14 31.00 30 40.77 23-Jan-14


R1 STA. 10+240 - 10+675 32.00 30 40.77

67 RIGID 27-Dec-13 4.0 3-Jan-14 31.00 30 40.77 24-Jan-14


STA. 6+100 - 6+050 L1 31.00 29 39.42

68 RIGID 27-Dec-13 3.0 3-Jan-14 32.00 30 40.77 24-Jan-14


R1 STA. 10+525 - 10+620 31.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
69 RIGID 28-Dec-13 3.0 4-Jan-14 31.00 30 40.77 25-Jan-14
L2 STA. 7+495 - 7+515 31.00 30 40.77

70 RIGID 5-Jan-14 4.0 12-Jan-14 31.00 30 40.77 2-Feb-14


L3 STA. 10+255 - 10+285 30.00 30 40.77

71 RIGID 6-Jan-14 4.0 13-Jan-14 30.00 30 40.77 3-Feb-14


R1 STA. 10+655 - 8+647 31.00 30 40.77

72 RIGID 7-Jan-14 4.0 14-Jan-14 31.00 30 40.77 4-Feb-14


L2 STA. 9+625 - 9+595 31.00 30 40.77

73 RIGID 7-Jan-14 4.0 14-Jan-14 31.00 30 40.77 4-Feb-14


L3 STA. 7+355 - 7+382,5 32.00 30 40.77

74 RIGID 8-Jan-14 4.0 15-Jan-14 31.00 30 40.77 5-Feb-14


STA. 9+630 - 9+595 31.00 30 40.77

75 RIGID 9-Jan-14 4.0 16-Jan-14 31.00 30 40.77 6-Feb-14


L3 STA. 9+358 - 9+395 31.00 30 40.77

76 RIGID 9-Jan-14 4.0 16-Jan-14 32.00 30 40.77 6-Feb-14


STA. 10+865 - 10+920 31.00 30 40.77

77 RIGID 10-Jan-14 4.0 17-Jan-14 31.00 30 40.77 7-Feb-14


L1,L2,L3 STA. 7+430 - 31.00 30 40.77
7+417

78 RIGID 11-Jan-14 4.0 18-Jan-14 31.00 30 40.77 8-Feb-14


L3 STA. 9+395 - 9+435 31.00 27 36.70

79 RIGID 11-Jan-14 4.0 18-Jan-14 32.00 30 40.77 8-Feb-14


L3 STA. 9+435 - 9+495 31.00 27 36.70
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

80 RIGID 12-Jan-14 4.0 19-Jan-14 30.00 27 36.70 9-Feb-14


TAMAN DAYU STA. 0+430 31.00 27 36.70
- 0+450 R2

81 RIGID 12-Jan-14 3.0 19-Jan-14 31.00 30 40.77 9-Feb-14


GESING 5+800 - 5+850 L1 31.00 30 40.77

82 RIGID 13-Jan-14 4.0 20-Jan-14 31.00 27 36.70 10-Feb-14


STA. 7+220 - 7+265 L3 31.00 27 36.70

83 RIGID 13-Jan-14 4.0 20-Jan-14 30.00 30 40.77 10-Feb-14


L1 STA. 5+995 - 6+325 31.00 30 40.77

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
Jasamarga Pandaan Tol Konsultan Kontraktor
PT. Multi Phi Beta
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( ________________________)
( _____________________________ ) ( _____________________________ )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
101 1 RIGID 22-Oct-13 3.0 29-Oct-13 19-Nov-13 31.0 40 54.37 50.97
Err:522 R3 9+730 - 9+865 31.0 35 47.57
32.0 40 54.37
31.0 35 47.57

2 RIGID 23-Oct-13 3.0 30-Oct-13 20-Nov-13 32.0 35 47.57 49.27


R3 9+825 - 9+915 32.4 35 47.57
34.7 40 54.37
32.0 35 47.57

3 RIGID 24-Oct-13 3.0 31-Oct-13 21-Nov-13 32.4 35 47.57 47.57


R3 STA. 10+140 - 10+235 34.7 35 47.57
32.4 35 47.57
34.7 35 47.57

4 RIGID 27-Oct-13 3.0 3-Nov-13 24-Nov-13 31.0 35 47.57 47.57


R3 STA. 10+335 - 10+470 31.0 35 47.57
31.0 35 47.57
31.0 35 47.57
31.0 35 47.57
31.0 35 47.57

5 RIGID 28-Oct-13 3.0 4-Nov-13 25-Nov-13 32.68 35 47.57 47.57


R3 STA. 10+510 - 10+600 33.10 35 47.57
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
6 RIGID 29-Oct-13 4.0 5-Nov-13 26-Nov-13 32.13 35 47.57 47.57
R3 STA. 10+545 - 10+600 33.10 35 47.57
31.22 35 47.57
32.12 35 47.57

7 RIGID 30-Oct-13 4.0 6-Nov-13 27-Nov-13 33.10 35 47.57 47.57


R3 STA. 10+665 - 10+700 33.50 35 47.57
31.20 35 47.57
32.62 35 47.57

8 RIGID 1-Nov-13 3.0 8-Nov-13 29-Nov-13 30.00 35 47.57 48.70


R3 STA. 10+740 - 10+860 30.00 35 47.57
31.00 40 54.37
30.00 35 47.57
31.00 35 47.57
31.00 35 47.57

9 RIGID 2-Nov-13 3.0 9-Nov-13 30-Nov-13 30.10 35 47.57 47.57


R3 STA. 10+865 - 10+945 31.00 35 47.57
31.00 35 47.57
30.00 35 47.57

1 10 RIGID 6-Nov-13 3.0 13-Nov-13 4-Dec-13 31.00 35 47.57 47.57


2 R2 STA. 8+250 - 8+350 4-Dec-13 31.00 35 47.57

3 11 RIGID 6-Nov-13 3.0 13-Nov-13 4-Dec-13 31.00 35 47.57 47.57


4 L3 STA. 10+845 - 10+895 4-Dec-13 31.00 35 47.57

5 12 RIGID 7-Nov-13 3.0 14-Nov-13 5-Dec-13 31.00 45 61.16 58.90


6 R2 STA. 9+525 - 9+640 5-Dec-13 31.00 45 61.16
7 5-Dec-13 31.00 45 61.16
8 5-Dec-13 31.00 45 61.16
9 5-Dec-13 31.00 40 54.37
10 5-Dec-13 31.00 40 54.37
5-Dec-13
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
11 13 RIGID 7-Nov-13 3.0 14-Nov-13 5-Dec-13 31.00 35 47.57 50.97
12 L2 STA. 8+525 - 8+600 5-Dec-13 31.00 40 54.37

13 14 RIGID 8-Nov-13 3.0 15-Nov-13 6-Dec-13 31.00 35 47.57 47.57


14 R2 STA. 9+640 - 9+690 6-Dec-13 32.00 35 47.57

15 15 RIGID 9-Nov-13 4.0 16-Nov-13 7-Dec-13 31.00 35 47.57 47.57


16 R2 STA. 9+730 - 9+830 7-Dec-13 31.00 35 47.57
17 7-Dec-13 31.00 35 47.57
18 7-Dec-13 32.00 35 47.57
7-Dec-13
19 16 RIGID 10-Nov-13 4.0 17-Nov-13 8-Dec-13 31.00 35 47.57 47.57
20 R2 STA. 9+830 - 9+910 8-Dec-13 31.00 35 47.57
21 8-Dec-13 30.00 35 47.57
22 8-Dec-13 31.00 35 47.57

23 17 RIGID 11-Nov-13 3.0 18-Nov-13 9-Dec-13 32.00 35 47.57 49.84


24 R1 STA. 9+530 - 9+690 9-Dec-13 32.00 35 47.57
25 9-Dec-13 31.00 35 47.57
26 9-Dec-13 32.00 40 54.37
27 9-Dec-13 32.00 40 54.37
28 9-Dec-13 31.00 35 47.57

29 18 RIGID 13-Nov-13 3.0 20-Nov-13 31.0 30 40.77 11-Dec-13 32.00 35 47.57 49.27
30 R2 STA. 9+655 - 9+690 30.0 30 40.77 11-Dec-13 32.00 40 54.37
31 31.0 30 40.77 11-Dec-13 31.00 35 47.57
32 30.0 30 40.77 11-Dec-13 32.00 35 47.57

33 19 RIGID 14-Nov-13 4.0 21-Nov-13 31.0 30 40.77 12-Dec-13 32.00 40 54.37 50.97
34 R1 STA. 9+810 - 9+900 30.0 30 40.77 12-Dec-13 31.00 35 47.57
35 30.0 30 40.77 12-Dec-13 31.00 40 54.37
36 31.0 30 40.77 12-Dec-13 32.00 35 47.57

37 20 RIGID 14-Nov-13 4.0 21-Nov-13 32.0 30 40.77 12-Dec-13 31.00 46 62.52 54.37
38 R3 STA.8+540 - 8+400 31.0 30 40.77 12-Dec-13 31.00 42 57.08
39 31.2 30 40.77 12-Dec-13 32.00 35 47.57
40 30.0 30 40.77 12-Dec-13 32.00 37 50.29

41 21 RIGID 15-Nov-13 3.0 22-Nov-13 30.0 30 40.77 13-Dec-13 31.00 45 61.16 56.07
42 R2 10+145 - 10+230 31.0 30 40.77 13-Dec-13 31.00 40 54.37
43 30.0 30 40.77 13-Dec-13 32.00 40 54.37
44 31.0 30 40.77 13-Dec-13 32.00 40 54.37
13-Dec-13
45 22 RIGID 15-Nov-13 3.0 22-Nov-13 31.2 30 40.77 13-Dec-13 32.00 40 54.37 50.97
46 R2 STA. 9+725 - 9+730 31.2 30 40.77 13-Dec-13 31.00 35 47.57

47 23 RIGID 16-Nov-13 4.0 23-Nov-13 31.0 35 47.57 14-Dec-13 32.00 45 61.16 54.37
48 R1 STA. 9+700 - 9+715 31.0 30 40.77 14-Dec-13 31.00 35 47.57
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
49 24 RIGID 17-Nov-13 4.0 24-Nov-13 31.0 30 40.77 15-Dec-13 32.00 35 47.57 47.57
50 R2 STA. 9+700 - 9+715 31.0 30 40.77 15-Dec-13 32.00 35 47.57

51 25 RIGID 17-Nov-13 3.0 24-Nov-13 31.0 30 40.77 15-Dec-13 31.00 40 54.37 52.67
52 R2 STA. 10+300 - 10+385 32.0 30 40.77 15-Dec-13 31.00 40 54.37
53 31.0 30 40.77 15-Dec-13 31.00 40 54.37
54 32.0 30 40.77 15-Dec-13 31.00 35 47.57

55 26 RIGID 18-Nov-13 3.0 25-Nov-13 33.12 35 47.57 16-Dec-13 12.70 40 54.37 50.97
56 R3 STA. 11+175 - 11+250 33.22 30 40.77 16-Dec-13 12.80 35 47.57

27 RIGID 19-Nov-13 3.0 26-Nov-13 33.10 30 40.77 17-Dec-13


R2 STA. 10+360 - 10+400 32.00 30 40.77

28 RIGID 19-Nov-13 3.0 26-Nov-13 31.00 30 40.77 17-Dec-13


R2 STA. 10+410 - 10+400 32.00 30 40.77

29 RIGID 19-Nov-13 4.0 26-Nov-13 32.00 30 40.77 17-Dec-13


L3 STA. 11+150 - 8+100 33.20 30 40.77

30 RIGID 19-Nov-13 3.0 26-Nov-13 31.00 35 47.57 17-Dec-13


R1 STA. 9+732,5 - 9+725 31.00 30 40.77

31 RIGID 20-Nov-13 3.0 27-Nov-13 30.00 30 40.77 18-Dec-13


R3 STA. 10+515 - 10+595 31.00 30 40.77

32 RIGID 20-Nov-13 4.0 27-Nov-13 31.00 35 47.57 18-Dec-13


R3 STA. 9+700 - 9+725 33.20 30 40.77

33 RIGID 20-Nov-13 3.0 27-Nov-13 30.0 30 40.77 18-Dec-13


R3 STA. 7+855 - 7+745 31.0 30 40.77
30.0 30 40.77
31.0 30 40.77

34 RIGID 21-Nov-13 3.0 28-Nov-13 31.00 30 40.77 19-Dec-13


STA. 11+245 - 11+300 L2 33.20 30 40.77

35 RIGID 21-Nov-13 3.0 28-Nov-13 30.00 35 47.57 19-Dec-13


R3 STA. 11+195 - 11+240 30.00 30 40.77
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
36 RIGID 21-Nov-13 3.0 28-Nov-13 31.0 30 40.77 19-Dec-13
R2 STA. 10+670 - 10+795 30.0 30 40.77
33.2 30 40.77
30.0 30 40.77
31.0 30 40.77
30.0 30 40.77

37 RIGID 22-Nov-13 3.0 29-Nov-13 31.00 35 47.57 20-Dec-13


RIGID ULU-ULU BANYU 31.00 35 47.57
STA. 10+665 - 10+645 L3

38 RIGID 22-Nov-13 4.0 29-Nov-13 30.00 30 40.77 20-Dec-13


RIGID R3 STA. 7+745 - 31.00 30 40.77
7+655

39 RIGID 23-Nov-13 3.0 30-Nov-13 30.00 35 47.57 21-Dec-13


R2 STA. 10+885 - 10+905 30.00 30 40.77

40 RIGID 23-Nov-13 4.0 30-Nov-13 31.00 30 40.77 21-Dec-13


RIGID L1 STA. 5+150 - 30.00 30 40.77
5+200

57 41 RIGID 24-Nov-13 4.0 1-Dec-13 32.00 30 40.77 22-Dec-13


58 RIGID ULU-ULU BANYU L2 1-Dec-13 31.00 30 40.77
59 STA. 10+670 - 10+647 1-Dec-13 31.00 30 40.77
60 1-Dec-13 30.00 30 40.77

61 42 RIGID 26-Nov-13 3.0 3-Dec-13 31.00 35 47.57 24-Dec-13


62 R1 STA. 10+390 - 10+455 3-Dec-13 32.00 35 47.57

63 43 RIGID 26-Nov-13 4.0 3-Dec-13 31.00 35 47.57 24-Dec-13


64 RIGID L1 STA. 10+610 - 3-Dec-13 31.00 35 47.57
10+590

65 44 RIGID 27-Nov-13 3.0 4-Dec-13 31.00 30 40.77 25-Dec-13


66 R3 STA. 7+205 - 7+160 4-Dec-13 31.00 30 40.77

67 45 RIGID 27-Nov-13 4.0 4-Dec-13 31.00 30 40.77 25-Dec-13


68 RIGID L2 STA. 10+595 - 4-Dec-13 31.00 30 40.77
10+635

69 46 RIGID 28-Nov-13 3.0 5-Dec-13 31.00 30 40.77 26-Dec-13


70 L2 STA. 10+360 - 10+260 5-Dec-13 31.00 35 47.57
71 5-Dec-13 31.00 30 40.77
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) - 10+260
L2 STA. 10+360 Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
72 5-Dec-13 31.00 30 40.77
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
73 47 RIGID 28-Nov-13 3.0 5-Dec-13 31.00 30 40.77 26-Dec-13
74 L2 STA. 10+360 - 10+255 5-Dec-13 31.00 30 40.77

75 48 RIGID 28-Nov-13 3.0 5-Dec-13 31.00 30 40.77 26-Dec-13


76 L3 STA. 8+100 - 8+130 5-Dec-13 31.00 30 40.77

77 49 RIGID 29-Nov-13 3.0 6-Dec-13 31.00 30 40.77 27-Dec-13


78 R1 STA. 10+185 - 10+230 6-Dec-13 31.00 30 40.77

79 50 RIGID 29-Nov-13 3.0 6-Dec-13 31.00 30 40.77 27-Dec-13


80 STA. 11+260 - 11+205 R1 6-Dec-13 31.00 30 40.77

81 51 RIGID 29-Nov-13 4.0 6-Dec-13 31.00 30 40.77 27-Dec-13


82 L1 STA. 10+645 - 10+675 6-Dec-13 31.00 30 40.77

83 52 RIGID 30-Nov-13 4.0 7-Dec-13 31.00 30 40.77 28-Dec-13


84 TAMAN DAYU STA. 0+560 7-Dec-13 32.00 30 40.77
- 0+610 R1,R2,R3

85 53 RIGID 1-Dec-13 5.0 8-Dec-13 32.00 35 47.57 29-Dec-13


86 L1 STA. 10+185 - 10+200 8-Dec-13 32.00 35 47.57

87 54 RIGID 1-Dec-13 3.0 8-Dec-13 31.00 30 40.77 29-Dec-13


88 L3 STA. 8+850 - 8+925 8-Dec-13 32.00 35 47.57

89 55 RIGID 4-Dec-13 4.0 11-Dec-13 32.00 30 40.77 1-Jan-14


90 STA. 11+095 - 11+105 R2 11-Dec-13 31.00 30 40.77

91 56 RIGID 5-Dec-13 4.0 12-Dec-13 32.00 30 40.77 2-Jan-14


92 R1 STA. 10+875 - 10+925 12-Dec-13 32.00 30 40.77

93 57 RIGID 6-Dec-13 4.0 13-Dec-13 31.00 30 40.77 3-Jan-14


94 R2 STA. 10+135 - 10+140 13-Dec-13 31.00 30 40.77
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
95 58 RIGID 6-Dec-13 4.0 13-Dec-13 31.00 30 40.77 3-Jan-14
96 R2 STA. 8+745 - 8+820 13-Dec-13 32.00 30 40.77

97 59 RIGID 8-Dec-13 3.0 15-Dec-13 31.00 30 40.77 5-Jan-14


98 RIGID L1 STA. 8+850 15-Dec-13 31.00 30 40.77
-8+930

99 60 RIGID 8-Dec-13 4.0 15-Dec-13 31.00 30 40.77 5-Jan-14


100 RIGID M R1 STA. 10+965 - 15-Dec-13 32.00 30 40.77
10+925

101 61 RIGID 8-Dec-13 3.0 15-Dec-13 32.00 30 40.77 5-Jan-14


102 RIGID L1 STA. 8+850 15-Dec-13 31.00 30 40.77
-8+930

103 62 RIGID 8-Dec-13 4.0 15-Dec-13 31.00 30 40.77 5-Jan-14


104 RIGID M R1 STA. 10+965 - 15-Dec-13 31.00 30 40.77
10+925

105 63 RIGID 9-Dec-13 3.0 16-Dec-13 31.00 30 40.77 6-Jan-14


106 R1 STA. 8+745 - 8+670 16-Dec-13 31.00 30 40.77

Pandaan, ............... 2013


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT. Margabumi Adhikaraya Konsultan Kontraktor
PT. Multi Phi Beta
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( _____________________________ ) ( _____________________________ ) ( ________________________)


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
1 RIGID 21-Nov-13 3.0 28-Nov-13 19-Dec-13 33.2 39 53.01 52.55
34.2 40 54.37
4.0 33.8 36 48.93
STA. 5+100 - 5+200 R1 34.1 37 50.29
34.6 40 54.37
33.7 40 54.37

`
2 RIGID 22-Nov-13 3.0 29-Nov-13 20-Dec-13 33.6 39 53.01 53.69
34.2 37 50.29
4.0 35.0 42 57.08
STA. 10+795 - 10+832 R3 34.1 40 54.37
32.8 41 55.73
33.4 38 51.65

`
3 RIGID 28-Nov-13 3.0 5-Dec-13 26-Dec-13 35.0 35 47.57 52.67
34.6 38 51.65
R1 STA. 11+100 - 11+260 34.8 40 54.37
34.8 42 57.08

`
4 RIGID 30-Nov-13 3.0 7-Dec-13 28-Dec-13 35.1 43 58.44 59.80
35.1 43 58.44
R3 STA. 8+670 - 8+745 35.2 45 61.16
35.1 45 61.16

`
101 5 RIGID 6-Dec-13 3.0 13-Dec-13 3-Jan-14 35.1 42 57.08 60.14
102 3-Jan-14 35.1 45 61.16
103 R1 STA. 0+205 - 0+100 3-Jan-14 35.4 44 59.80
104 3-Jan-14 35.2 46 62.52

Page 116 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

105 6 RIGID 7-Dec-13 3.0 14-Dec-13 4-Jan-14 33.4 38 51.65 54.71


106 4-Jan-14 34.2 40 54.37
107 STA. 5+075 5+100 R2 4-Jan-14 35.4 42 57.08
108 4-Jan-14 33.7 41 55.73

109 7 RIGID 9-Dec-13 3.0 16-Dec-13 6-Jan-14 33.7 37 50.29 54.14


110 6-Jan-14 34.0 39 53.01
111 6-Jan-14 32.8 42 57.08
STA. RAMP 5, STA. 39 53.01
112 6-Jan-14 34.2
5+155 - 5+200
113 6-Jan-14 33.9 40 54.37
114 6-Jan-14 34.1 42 57.08

115 8 RIGID 10-Dec-13 4.0 17-Dec-13 7-Jan-14 34.7 37 50.29 52.78


116 4.0 7-Jan-14 33.9 41 55.73
117 3.0 7-Jan-14 34.2 39 53.01
118 STA. 11+100 -11+185 L1 3.0 7-Jan-14 34.6 36 48.93
119 4.0 7-Jan-14 33.1 39 53.01
120 4.0 7-Jan-14 34.0 41 55.73

121 9 RIGID 11-Dec-13 4.0 18-Dec-13 8-Jan-14 33.2 37 50.29 53.01


122 4.0 8-Jan-14 34.2 38 51.65
123 3.0 8-Jan-14 33.7 39 53.01
124 L2 STA. 11+185 - 11+210 3.0 8-Jan-14 32.9 38 51.65
125 4.0 8-Jan-14 34.2 42 57.08
126 4.0 8-Jan-14 33.0 40 54.37

127 10 RIGID 13-Dec-13 3.0 20-Dec-13 34.2 33 44.85 10-Jan-14 33.7 38 51.65 55.50
128 3.0 33.7 28 38.06 10-Jan-14 32.8 43 58.44
129 4.0 10-Jan-14 33.8 42 57.08
130 R1 STA. 11+205 - 11+275 4.0 10-Jan-14 34.0 43 58.44
131 3.0 10-Jan-14 33.7 39 53.01
132 3.0 10-Jan-14 34.2 40 54.37

133 11 RIGID 17-Dec-13 4.0 24-Dec-13 34.2 28 38.06 14-Jan-14 33.40 38 51.65 52.33
134 33.7 29 39.42 14-Jan-14 32.80 39 53.01
R2 STA. 0+510 - 0+530

135 12 RIGID 17-Dec-13 3.0 24-Dec-13 34.5 30 40.77 14-Jan-14 34.00 39 53.01 55.05
136 3.0 34.6 31 42.13 14-Jan-14 33.80 42 57.08
137 L2 STA. 0+530 - 0+650 4.0 14-Jan-14 34.00 39 53.01
138 4.0 14-Jan-14 32.10 42 57.08

139 13 RIGID 19-Dec-13 3.0 26-Dec-13 35.0 29 39.42 16-Jan-14 32.8 40 54.37 57.08
140 30.0 30 40.77 16-Jan-14 33.7 41 55.73
141 16-Jan-14 34.1 43 58.44
142 L1 STA. 0+105 - 0+600 16-Jan-14 34.8 42 57.08
143 16-Jan-14 33.7 42 57.08
Page 117 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
L1 STA. (0+105
STA. )- 0+600 Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
144 16-Jan-14 34.3 44 59.80

Page 118 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

145 14 RIGID 20-Dec-13 3.0 27-Dec-13 34.9 30 40.77 17-Jan-14 34.2 40 54.37 54.82
146 34.9 30 40.77 17-Jan-14 34.6 41 55.73
147 17-Jan-14 33.9 39 53.01
148 R2 STA. 0+200 - 0+055 17-Jan-14 32.7 41 55.73
149 17-Jan-14 34.2 39 53.01
150 17-Jan-14 35.0 42 57.08

151 15 RIGID 21-Dec-13 3.0 28-Dec-13 35.1 30 40.77 18-Jan-14 34.2 41 55.73 55.50
152 3.0 35.1 31 42.13 18-Jan-14 33.7 42 57.08
153 4.0 18-Jan-14 34.2 42 57.08
154 STA. 0+510 - 0+485 R1 4.0 18-Jan-14 34.6 38 51.65
155 3.0 18-Jan-14 33.8 40 54.37
156 3.0 18-Jan-14 33.6 42 57.08

157 16 RIGID 23-Dec-13 3.0 30-Dec-13 35.0 29 39.42 20-Jan-14 35.10 43 58.44 57.08
158 39.1 28 38.06 20-Jan-14 35.00 41 55.73
R1 STA. 0+485 - 0+455

`
17 RIGID 24-Dec-13 3.0 31-Dec-13 34.9 30 40.77 21-Jan-14
35.0 29 39.42
STA. 0+510 - 0+450 R2

`
159 18 RIGID 25-Dec-13 3.0 1-Jan-14 35.1 29 39.42 22-Jan-14
160 1-Jan-14 35.1 30 40.77
L1 STA. 0+360 - 0+400 L1

161 19 RIGID 25-Dec-13 3.0 1-Jan-14 34.9 30 40.77 22-Jan-14


162 1-Jan-14 34.9 28 38.06
R1 STA. 10+735 - 10+575

163 20 RIGID 26-Dec-13 3.0 2-Jan-14 34.8 28 38.06 23-Jan-14


164 2-Jan-14 34.9 29 39.42
R2 STA. 10+245 - 10+255

165 21 RIGID 27-Dec-13 3.0 3-Jan-14 34.5 28 38.06 24-Jan-14


166 3-Jan-14 34.7 29 39.42
R2 STA. 9+920 - 9+950

167 22 RIGID 28-Dec-13 3.0 4-Jan-14 34.5 28 38.06 25-Jan-14


168 4-Jan-14 34.5 28 38.06
L1 STA. 9+955 - 9+835

169 23 RIGID 7-Jan-14 3.0 14-Jan-14 32.7 28 38.06 4-Feb-14


170 14-Jan-14 33.0 30 40.77
R2 STA. 0+485 - 0+510

Page 119 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

171 24 RIGID 9-Jan-14 4.0 16-Jan-14 32.3 28 38.06 6-Feb-14


172 16-Jan-14 33.0 31 42.13
L1 STA. 9+560 - 9+395

173 25 RIGID 10-Jan-14 3.0 17-Jan-14 32.7 29 39.42 7-Feb-14


174 17-Jan-14 32.8 30 40.77
M. STA. 0+530 - 0+550 R1

175 26 RIGID 11-Jan-14 4.0 18-Jan-14 33.0 32 43.49 8-Feb-14


176 18-Jan-14 32.8 32 43.49
STA. 0+485 - 0+460 R1

177 27 RIGID 13-Jan-14 3.0 20-Jan-14 34.6 31 42.13 10-Feb-14


178 20-Jan-14 34.6 29 39.42
STA. 0+520 - 0+545 L3

Disetujui Oleh :
Konsultan Pandaan, ............... 2014
PT. Multi Phi Beta Diajukan Oleh :
Diketahui Oleh :
PT.Tata Guna Patria Kontraktor
Jasamarga Pandaan Tol
PT.Eskapindo Matra (KSO)

(__________________________________) ( ________________________)
( _____________________________ )

Page 120 of 322


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
1 RIGID 19-Nov-13 3.0 26-Nov-13 17-Dec-13 31.00 45 61.16 61.16
R2 STA. 10+360 - 10+400 32.00 45 61.16

2 RIGID 19-Nov-13 3.0 26-Nov-13 17-Dec-13 31.00 40 54.37 50.97


R2 STA. 10+410 - 10+460 31.00 35 47.57

3 RIGID 19-Nov-13 3.0 26-Nov-13 17-Dec-13 31.00 40 54.37 54.37


L3 STA. 11+150 - 11+250 32.00 40 54.37

4 RIGID 19-Nov-13 4.0 26-Nov-13 17-Dec-13 32.00 35 47.57 47.57


R1 STA. 9+732,5 - 9+725 31.00 35 47.57

5 RIGID 20-Nov-13 3.0 27-Nov-13 18-Dec-13 31.00 45 61.16 57.76


R3 STA. 10+515 - 10+595 31.00 40 54.37

6 RIGID 20-Nov-13 4.0 27-Nov-13 18-Dec-13 32.00 35 47.57 50.97


R3 STA. 9+700 - 9+725 31.00 40 54.37

7 RIGID 20-Nov-13 3.0 27-Nov-13 18-Dec-13 32.00 35 47.57 47.57


R3 STA. 7+855 - 7+745 31.00 35 47.57

8 RIGID 21-Nov-13 3.0 28-Nov-13 19-Dec-13 31.00 35 47.57 47.57


STA. 11+245 - 11+300 L2 31.00 35 47.57
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
9 RIGID 21-Nov-13 3.0 28-Nov-13 19-Dec-13 32.00 35 47.57 47.57
R3 STA. 11+195 - 11+240 31.00 35 47.57

10 RIGID 21-Nov-13 3.0 28-Nov-13 19-Dec-13 32.00 35 47.57 50.97


R2 STA. 10+670 - 10+795 32.00 40 54.37
31.00 35 47.57
31.00 40 54.37
32.00 40 54.37
31.00 35 47.57

11 RIGID 22-Nov-13 3.0 29-Nov-13 20-Dec-13 31.00 35 47.57 47.57


RIGID R3 STA. 7+745 - 31.00 35 47.57
7+655

12 RIGID 22-Nov-13 4.0 29-Nov-13 20-Dec-13 31.00 40 54.37 50.97


L3 STA. 10+665 - 10+645 32.00 35 47.57
ULU-ULU BANYU

13 RIGID 23-Nov-13 3.0 30-Nov-13 21-Dec-13 30.00 40 54.37 50.97


R2 STA. 10+885 - 10+905 30.00 35 47.57

14 RIGID 23-Nov-13 4.0 30-Nov-13 21-Dec-13 31.00 40 54.37 54.37


RIGID L1 STA. 5+150 - 30.00 40 54.37
5+200

15 RIGID 24-Nov-13 4.0 1-Dec-13 22-Dec-13 32.00 35 47.57 49.27


RIGID ULU-ULU BANYU L2 31.00 35 47.57
STA. 10+670 - 10+647 31.00 35 47.57
30.00 40 54.37

16 RIGID 26-Nov-13 3.0 3-Dec-13 24-Dec-13 31.00 35 47.57 50.97


R1 STA. 10+390 - 10+455 32.00 40 54.37

17 RIGID 26-Nov-13 4.0 3-Dec-13 24-Dec-13 31.00 35 47.57 47.57


RIGID L1 STA. 10+610 - 31.00 35 47.57
10+590

18 RIGID 27-Nov-13 3.0 4-Dec-13 25-Dec-13 31.00 40 54.37 50.97


R3 STA. 7+205 - 7+160 31.00 35 47.57

19 RIGID 27-Nov-13 4.0 4-Dec-13 25-Dec-13 31.00 35 47.57 47.57


RIGID L2 STA. 10+595 - 31.00 35 47.57
10+635
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
20 RIGID 28-Nov-13 3.0 5-Dec-13 26-Dec-13 31.00 35 47.57 49.27
L2 STA. 10+360 - 10+260 32.00 40 54.37
31.00 35 47.57
31.00 35 47.57

21 RIGID 28-Nov-13 3.0 5-Dec-13 26-Dec-13 32.00 35 47.57 47.57


L2 STA. 10+360 - 10+255 32.00 35 47.57

22 RIGID 28-Nov-13 3.0 5-Dec-13 26-Dec-13 31.00 35 47.57 47.57


L3 STA. 8+100 - 8+130 31.00 35 47.57

23 RIGID 29-Nov-13 3.0 6-Dec-13 27-Dec-13 32.00 35 47.57 47.57


R1 STA. 10+185 - 10+230 31.00 35 47.57

24 RIGID 29-Nov-13 3.0 6-Dec-13 27-Dec-13 31.00 35 47.57 47.57


STA. 11+260 - 11+205 R1 30.00 35 47.57

25 RIGID 29-Nov-13 4.0 6-Dec-13 27-Dec-13 32.00 40 54.37 50.97


L1 STA. 10+645 - 10+675 32.00 35 47.57

26 RIGID 30-Nov-13 4.0 7-Dec-13 28-Dec-13 31.00 35 47.57 47.57


TAMAN DAYU STA. 0+560 32.00 35 47.57
- 0+610 R1,R2,R3

27 RIGID 1-Dec-13 3.0 8-Dec-13 29-Dec-13 31.00 35 47.57 47.57


L3 STA. 8+850 - 8+925 31.00 35 47.57

28 RIGID 1-Dec-13 4.0 8-Dec-13 29-Dec-13 32.00 35 47.57 47.57


L1 STA. 10+185 - 10+240 31.00 35 47.57

1 29 RIGID 4-Dec-13 4.0 11-Dec-13 1-Jan-14 31.00 35 47.57 47.57


2 STA. 11+095 - 11+105 R2 1-Jan-14 32.00 35 47.57

3 30 RIGID 5-Dec-13 4.0 12-Dec-13 2-Jan-14 31.00 35 47.57 47.57


4 R1 STA. 10+875 - 10+925 2-Jan-14 32.00 35 47.57
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
5 31 RIGID 6-Dec-13 3.0 13-Dec-13 3-Jan-14 31.00 40 54.37 50.97
6 R2 STA. 8+745 - 8+820 3-Jan-14 32.00 35 47.57

7 32 RIGID 6-Dec-13 3.0 13-Dec-13 3-Jan-14 31.00 35 47.57 50.97


8 R2 STA. 10+135 - 10+140 3-Jan-14 31.00 40 54.37

9 33 RIGID 8-Dec-13 3.0 15-Dec-13 5-Jan-14 31.00 35 47.57 47.57


10 RIGID L1 STA. 8+850 5-Jan-14 31.00 35 47.57
-8+930

11 34 RIGID 8-Dec-13 4.0 15-Dec-13 5-Jan-14 31.00 35 47.57 50.97


12 RIGID R1 STA. 10+965 - 5-Jan-14 32.00 40 54.37
10+925

13 35 RIGID 8-Dec-13 3.0 15-Dec-13 5-Jan-14 31.00 35 47.57 47.57


14 RIGID L1 STA. 8+850 5-Jan-14 31.00 35 47.57
-8+930 5-Jan-14
5-Jan-14
15 36 RIGID 8-Dec-13 4.0 15-Dec-13 5-Jan-14 31.00 40 54.37 50.97
16 RIGID R1 STA. 10+965 - 5-Jan-14 31.00 35 47.57
10+925 5-Jan-14

17 37 RIGID 9-Dec-13 3.0 16-Dec-13 6-Jan-14 30.00 35 47.57 47.57


18 R1 STA. 8+745 - 8+670 6-Jan-14 31.00 35 47.57

19 38 RIGID 11-Dec-13 4.0 18-Dec-13 31.00 30 40.77 8-Jan-14 30.00 35 47.57 47.57
20 . R2 STA. 10+460 - 10+480 32.00 30 40.77 8-Jan-14 31.00 35 47.57

21 39 RIGID 12-Dec-13 3.0 19-Dec-13 31.00 30 40.77 9-Jan-14 31.00 35 47.57 47.57
22 STA. 11+260 - 11+285 L2 31.00 30 40.77 9-Jan-14 31.00 35 47.57
9-Jan-14
9-Jan-14
23 40 RIGID 12-Dec-13 3.0 19-Dec-13 31.00 30 40.77 9-Jan-14 32.00 40 54.37 50.97
24 R1 STA. 8+855 - 8+945 R1 32.00 30 40.77 9-Jan-14 31.00 35 47.57
9-Jan-14
9-Jan-14
25 41 RIGID 12-Dec-13 4.0 19-Dec-13 31.00 30 40.77 9-Jan-14 30.00 35 47.57 50.97
26 STA. 9+915 - 9+955 R2 31.00 30 40.77 9-Jan-14 31.00 40 54.37

27 42 RIGID 13-Dec-13 4.0 20-Dec-13 31.00 30 40.77 10-Jan-14 31.00 35 47.57 47.57
28 R3 STA. 9+935 -9+915 32.00 30 40.77 10-Jan-14 30.00 35 47.57
10-Jan-14
10-Jan-14
29 43 RIGID 13-Dec-13 4.0 20-Dec-13 32.00 30 40.77 10-Jan-14 31.00 35 47.57 47.57
30 STA. 10+510 - 10+515 R2 31.00 30 40.77 10-Jan-14 31.00 35 47.57

31 44 RIGID 14-Dec-13 3.0 21-Dec-13 32.00 30 40.77 11-Jan-14 31.00 35 47.57 50.97
32 R1 STA. 8+885 - 8+900 31.00 30 40.77 11-Jan-14 31.00 40 54.37
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
R1 STA. 8+885 - 8+900 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
33 45 RIGID 15-Dec-13 3.0 22-Dec-13 31.00 30 40.77 12-Jan-14 31.00 40 54.37 54.37
34 STA. 0+510 - 0+530 R1 32.00 30 40.77 12-Jan-14 31.00 40 54.37

35 46 RIGID 16-Dec-13 4.0 23-Dec-13 32.00 30 40.77 13-Jan-14 31.00 35 47.57 47.57
36 R2 STA. 9+925 - 9+910 32.00 30 40.77 13-Jan-14 31.00 35 47.57
37 31.00 35 47.57
38 31.00 35 47.57

39 47 RIGID 17-Dec-13 4.0 24-Dec-13 31.00 30 40.77 14-Jan-14 31.00 35 47.57 47.57
40 L3 STA. 9+945 - 9+895 31.00 30 40.77 14-Jan-14 31.00 35 47.57
14-Jan-14
14-Jan-14
41 48 RIGID 17-Dec-13 4.0 24-Dec-13 32.00 30 40.77 14-Jan-14 32.00 35 47.57 47.57
42 STA. 0+200 - 0+130 L1 32.00 30 40.77 14-Jan-14 32.00 35 47.57
14-Jan-14

43 49 RIGID 18-Dec-13 4.0 25-Dec-13 31.00 30 40.77 15-Jan-14 31.00 40 54.37 50.97
44 STA. 8+860 - 8+900 R2 32.00 30 40.77 15-Jan-14 31.00 35 47.57
15-Jan-14
15-Jan-14
45 50 RIGID 18-Dec-13 3.0 25-Dec-13 32.00 27 36.70 15-Jan-14 32.00 40 54.37 50.97
46 R2 STA. 10+300 - 10+250 32.00 28 38.06 15-Jan-14 32.00 35 47.57
15-Jan-14

47 51 RIGID 19-Dec-13 4.0 26-Dec-13 32.00 30 40.77 16-Jan-14 31.00 35 47.57 50.97
48 R2 STA. 10+290 - 10+280 32.00 30 40.77 16-Jan-14 32.00 35 47.57
49 16-Jan-14 31.00 40 54.37
50 16-Jan-14 32.00 40 54.37

51 52 RIGID 20-Dec-13 4.0 27-Dec-13 30.00 30 40.77 17-Jan-14 31.00 35 47.57 47.57
52 R1 STA. 10+275 - 10+295 31.00 30 40.77 17-Jan-14 31.00 35 47.57
17-Jan-14
17-Jan-14
53 53 RIGID 20-Dec-13 4.0 27-Dec-13 31.00 30 40.77 17-Jan-14 32.00 35 47.57 50.97
54 STA. 7+390 - 7+320 L1 32.00 30 40.77 17-Jan-14 32.00 40 54.37
KALIWANGI 17-Jan-14
17-Jan-14
55 54 RIGID 20-Dec-13 4.0 27-Dec-13 30.00 28 38.06 17-Jan-14 31.00 35 47.57 49.27
56 R1 STA. 10+275 - 10+295 30.00 27 36.70 17-Jan-14 31.00 35 47.57
57 30.00 29 39.42 17-Jan-14 32.00 40 54.37
58 31.00 28 38.06 17-Jan-14 31.00 35 47.57
17-Jan-14
59 55 RIGID 21-Dec-13 4.0 28-Dec-13 31.00 30 40.77 18-Jan-14 31.00 35 47.57 47.57
60 R3 STA. 10+235 - 10+245 32.00 30 40.77 18-Jan-14 31.00 35 47.57

61 56 RIGID 21-Dec-13 4.0 28-Dec-13 32.00 30 40.77 18-Jan-14 32.00 35 47.57 47.57
62 STA. 7+290 - 7+320 L3. 31.00 29 39.42 18-Jan-14 31.00 35 47.57
KALIWANGI

63 57 RIGID 22-Dec-13 3.0 29-Dec-13 31.00 30 40.77 19-Jan-14 31.00 40 54.37 50.97
64 L2 STA. 9+840 - 9+900 30.00 30 40.77 19-Jan-14 31.00 35 47.57
19-Jan-14
19-Jan-14
19-Jan-14
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
65 58 RIGID 22-Dec-13 4.0 29-Dec-13 30.00 30 40.77 19-Jan-14 31.00 35 47.57 47.57
66 STA. 0+470 - 0+490 L2 30.00 30 40.77 19-Jan-14 30.00 35 47.57
TAMAN DAYU 19-Jan-14

67 59 RIGID 23-Dec-13 4.0 30-Dec-13 31.00 30 40.77 20-Jan-14 31.00 35 47.57 47.57
68 R3 STA. 10+635 - 31.00 30 40.77 20-Jan-14 31.00 35 47.57
10+597,5 20-Jan-14
20-Jan-14
20-Jan-14
69 60 RIGID 23-Dec-13 4.0 30-Dec-13 30.00 30 40.77 20-Jan-14 32.00 35 47.57 47.57
70 L2 STA. 7+235 - 7+250 30.00 30 40.77 20-Jan-14 31.00 35 47.57
20-Jan-14
20-Jan-14
20-Jan-14
71 61 RIGID 23-Dec-13 3.0 30-Dec-13 31.00 29 39.42 20-Jan-14 30.00 40 54.37 57.76
72 L2 STA. 0+480 - 0+455 30.00 30 40.77 20-Jan-14 32.00 45 61.16

62 RIGID 24-Dec-13 4.0 31-Dec-13 31.00 30 40.77 21-Jan-14


L3 STA. 9+480 - 9+345 31.00 30 40.77

63 RIGID 24-Dec-13 4.0 31-Dec-13 31.00 30 40.77 21-Jan-14


R2 STA. 10+635 - 10+590 31.00 30 40.77

64 RIGID 24-Dec-13 4.0 31-Dec-13 32.00 30 40.77 21-Jan-14


L2 STA. 7+225 - 7+270 31.00 30 40.77

65 RIGID 25-Dec-13 4.0 1-Jan-14 31.00 30 40.77 22-Jan-14


R1 STA. 10+245 -10+255 31.00 30 40.77

66 RIGID 26-Dec-13 4.0 2-Jan-14 31.00 30 40.77 23-Jan-14


R1 STA. 10+240 - 10+675 32.00 30 40.77

67 RIGID 27-Dec-13 4.0 3-Jan-14 31.00 30 40.77 24-Jan-14


STA. 6+100 - 6+050 L1 31.00 29 39.42

68 RIGID 27-Dec-13 3.0 3-Jan-14 32.00 30 40.77 24-Jan-14


R1 STA. 10+525 - 10+620 31.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
69 RIGID 28-Dec-13 3.0 4-Jan-14 31.00 30 40.77 25-Jan-14
L2 STA. 7+495 - 7+515 31.00 30 40.77

73 70 RIGID 5-Jan-14 4.0 12-Jan-14 31.00 30 40.77 2-Feb-14


74 L3 STA. 10+255 - 10+285 12-Jan-14 30.00 30 40.77

75 71 RIGID 6-Jan-14 4.0 13-Jan-14 30.00 30 40.77 3-Feb-14


76 R1 STA. 10+655 - 8+647 13-Jan-14 31.00 30 40.77

77 72 RIGID 7-Jan-14 4.0 14-Jan-14 31.00 30 40.77 4-Feb-14


78 L2 STA. 9+625 - 9+595 14-Jan-14 31.00 30 40.77

79 73 RIGID 7-Jan-14 4.0 14-Jan-14 31.00 30 40.77 4-Feb-14


80 L3 STA. 7+355 - 7+382,5 14-Jan-14 32.00 30 40.77

81 74 RIGID 8-Jan-14 4.0 15-Jan-14 31.00 30 40.77 5-Feb-14


82 STA. 9+630 - 9+595 15-Jan-14 31.00 30 40.77

83 75 RIGID 9-Jan-14 4.0 16-Jan-14 31.00 30 40.77 6-Feb-14


84 L3 STA. 9+358 - 9+395 16-Jan-14 31.00 30 40.77

85 76 RIGID 9-Jan-14 4.0 16-Jan-14 32.00 30 40.77 6-Feb-14


86 STA. 10+865 - 10+920 16-Jan-14 31.00 30 40.77

87 77 RIGID 10-Jan-14 4.0 17-Jan-14 31.00 30 40.77 7-Feb-14


88 L1,L2,L3 STA. 7+430 - 17-Jan-14 31.00 30 40.77
7+417

89 78 RIGID 11-Jan-14 4.0 18-Jan-14 31.00 30 40.77 8-Feb-14


90 L3 STA. 9+395 - 9+435 18-Jan-14 31.00 27 36.70

91 79 RIGID 11-Jan-14 4.0 18-Jan-14 32.00 30 40.77 8-Feb-14


92 L3 STA. 9+435 - 9+495 18-Jan-14 31.00 27 36.70
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

93 80 RIGID 12-Jan-14 4.0 19-Jan-14 30.00 27 36.70 9-Feb-14


94 TAMAN DAYU STA. 0+430 19-Jan-14 31.00 27 36.70
- 0+450 R2

95 81 RIGID 12-Jan-14 3.0 19-Jan-14 31.00 30 40.77 9-Feb-14


96 GESING 5+800 - 5+850 L1 19-Jan-14 31.00 30 40.77

97 82 RIGID 13-Jan-14 4.0 20-Jan-14 31.00 27 36.70 10-Feb-14


98 STA. 7+220 - 7+265 L3 20-Jan-14 31.00 27 36.70

99 83 RIGID 13-Jan-14 4.0 20-Jan-14 30.00 30 40.77 10-Feb-14


100 L1 STA. 5+995 - 6+325 20-Jan-14 31.00 30 40.77

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
Jasamarga Pandaan Tol Konsultan Kontraktor
PT. Multi Phi Beta
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( ________________________)
( _____________________________ ) ( _____________________________ )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
211 1 RIGID 24-Dec-13 3.0 31-Dec-13 21-Jan-14 34.70 39 53.01 54.37
212 21-Jan-14 33.80 40 54.37
STA. 0+510 - 0+450 R2
213 33.40 40 54.37
214 32.80 41 55.73

215 2 RIGID 25-Dec-13 3.0 1-Jan-14 22-Jan-14 34.10 39 53.01 53.69


216 22-Jan-14 33.90 38 51.65
R1 STA. 10+735 - 10+575
217 4.0 22-Jan-14 32.80 40 54.37
218 22-Jan-14 34.70 41 55.73

219 3 RIGID 25-Dec-13 3.0 1-Jan-14 22-Jan-14 33.60 41 55.73 53.69


220 22-Jan-14 32.80 38 51.65
L1 STA. 0+360 - 0+400

221 4 RIGID 26-Dec-13 3.0 2-Jan-14 23-Jan-14 33.70 39 53.01 55.73


222 23-Jan-14 34.00 43 58.44
R2 STA. 10+245 - 10+255

RIGID
223 5 26-Dec-13 3.0 2-Jan-14 23-Jan-14 32.80 41 55.73 54.03
224 23-Jan-14 34.10 39 53.01
225 STA. 0+588 - 0+450 R2 23-Jan-14 34.20 38 51.65
226 23-Jan-14 33.70 41 55.73

227 6 RIGID 27-Dec-13 3.0 3-Jan-14 24-Jan-14 35.30 42 57.08 54.37


228 24-Jan-14 35.10 41 55.73
R2 STA. 9+920 - 9+950
229 24-Jan-14 35.20 38 51.65
230 24-Jan-14 35.20 39 53.01

231 7 RIGID 28-Dec-13 3.0 4-Jan-14 25-Jan-14 34.90 39 53.01 54.71


232 25-Jan-14 35.10 41 55.73
L1 STA. 9+955 - 9+835
233 4.0 25-Jan-14 35.10 40 54.37
234 25-Jan-14 35.20 41 55.73

Page 130 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
8 RIGID 7-Jan-14 3.0 14-Jan-14 4-Feb-14 33.70 38 51.65 53.69
34.00 41 55.73
R2 STA. 0+485 - 0+510

`
9 RIGID 8-Jan-14 3.0 15-Jan-14 5-Feb-14 33.80 36 48.93 50.97
33.90 39 53.01
R2 STA. 0+665 - 0+642.5

`
10 RIGID 9-Jan-14 3.0 16-Jan-14 6-Feb-14 33.80 37 50.29 49.61
33.80 36 48.93
STA. 0+455 - 0+420 R1

`
11 RIGID 9-Jan-14 4.0 16-Jan-14 6-Feb-14 35.20 40 54.37 53.69
34.90 39 53.01
L1 STA. 9+560 - 9+395

`
12 RIGID 10-Jan-14 3.0 17-Jan-14 7-Feb-14 33.90 39 53.01 54.37
34.00 41 55.73
STA. 0+530 - 0+550 R1

`
0 RIGID 10-Jan-14 3.0 17-Jan-14 7-Feb-14 33.80 38 51.65 52.33
33.90 39 53.01
STA. 0+550 - 0+595 L1

`
13 RIGID 11-Jan-14 4.0 18-Jan-14 8-Feb-14 33.70 38 51.65 53.01
33.40 39 53.01
STA. 0+485 - 0+460 R1
32.80 38 51.65
33.00 41 55.73

`
14 RIGID 13-Jan-14 4.0 20-Jan-14 10-Feb-14 33.80 39 53.01 53.69
34.00 40 54.37
STA. 0+530 - 0+545 L3

`
15 RIGID 13-Jan-14 3.0 20-Jan-14 10-Feb-14 32.70 40 54.37 52.33
33.80 37 50.29
STA. 0+540 - 0+560 L3

`
235 16 RIGID 15-Jan-14 3.0 22-Jan-14 33.2 28 38.06 12-Feb-14 33.70 38 51.65 50.29
236 22-Jan-14 32.8 31 42.13 33.70 36 48.93
STA. 10+860 - 10+870 L3

Page 131 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

237 17 RIGID 16-Jan-14 3.0 23-Jan-14 33.2 28 38.06 13-Feb-14 34.10 38 51.65 54.37
238 23-Jan-14 31.8 28 38.06 34.20 39 53.01
L3 STA.7+495 - 7+545
33.80 42 57.08
34.20 41 55.73

239 18 RIGID 17-Jan-14 3.0 24-Jan-14 34.3 29 39.42 14-Feb-14 34.00 40 54.37 54.71
240 24-Jan-14 34.5 28 38.06 34.00 42 57.08
STA. 9+935 - 9+485 R1
35.20 39 53.01
34.10 40 54.37

241 19 RIGID 20-Jan-14 3.0 27-Jan-14 34.5 28 38.06 17-Feb-14 33.20 39 53.01 53.46
242 27-Jan-14 34.5 28 38.06 33.40 39 53.01
R2 STA. 7+515 - 7+495
33.90 40 54.37

243 20 RIGID 21-Jan-14 3.0 28-Jan-14 34.7 29 39.42 18-Feb-14 32.40 39 53.01 54.71
244 28-Jan-14 34.6 32 43.49 33.00 39 53.01
STA. 0+510 - 0+485 R1
36.40 41 55.73
34.10 42 57.08

245 21 RIGID 22-Jan-14 3.0 29-Jan-14 34.7 30 40.77 19-Feb-14 34.70 40 54.37 52.55
246 29-Jan-14 34.7 31 42.13 32.90 38 51.65
STA. 0+470 - 0+520 L2
33.80 38 51.65

247 22 RIGID 23-Jan-14 3.0 30-Jan-14 34.5 29 39.42 20-Feb-14 33.40 39 53.01 55.27
248 30-Jan-14 34.6 28 38.06 34.00 42 57.08
L1 STA. 0+625 - 0+675
33.90 41 55.73

249 23 RIGID 24-Jan-14 3.0 31-Jan-14 34.5 29 39.42 21-Feb-14


250 31-Jan-14 34.6 29 39.42
R2 STA. 0+700 - 0+685

251 24 RIGID 24-Jan-14 3.0 31-Jan-14 34.5 28 38.06 21-Feb-14


252 31-Jan-14 34.6 28 38.06
L1 STA. 0+545 - 0+530

`
25 RIGID 27-Jan-14 4.0 3-Feb-14 32.8 29 39.42 24-Feb-14
32.8 29 39.42
STA. 7+400 - 7+415 L3

`
26 RIGID 27-Jan-14 4.0 3-Feb-14 33.0 30 40.77 24-Feb-14
33.1 29 39.42
L1 STA. 0+205 - 0+255

`
27 RIGID 28-Jan-14 4.0 4-Feb-14 33.1 30 40.77 25-Feb-14
30.0 29 39.42
R3 STA. 8+270 - 8+295

`
28 RIGID 28-Jan-14 3.0 4-Feb-14 33.0 29 39.42 25-Feb-14
Page 132 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
30.0 29 39.42
R1 STA. 5+730 - 5+800

Page 133 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
29 RIGID 29-Jan-14 4.0 5-Feb-14 32.7 28 38.06 26-Feb-14
32.8 30 40.77
STA. 10+200 - 10+290 R3

`
30 RIGID 30-Jan-14 3.0 6-Feb-14 32.7 29 39.42 27-Feb-14
33.1 29 39.42
R2 STA. 8+275 - 8+280

`
31 RIGID 30-Jan-14 3.0 6-Feb-14 33.0 30 40.77 27-Feb-14
33.1 30 40.77
STA. 7+370 - 7+387 L2

`
32 RIGID 30-Jan-14 3.0 6-Feb-14 33.0 28 38.06 27-Feb-14
33.1 30 40.77
STA. 0+205 - 0+310

`
33 RIGID 3-Feb-14 3.0 10-Feb-14 32.2 28 38.06 3-Mar-14
32.4 28 38.06
STA. 0+642 - 0+635 L1

`
34 RIGID 11-Feb-14 4.0 18-Feb-14 32.0 29 39.42 11-Mar-14
32.2 29 39.42
L2 STA. 5+900 - 5+980

`
35 RIGID 12-Feb-14 4.0 19-Feb-14 32.7 30 40.77 12-Mar-14
33.0 32 43.49
STA. 0+ 980 - 0+625 R2

Disetujui Oleh :
Konsultan Pandaan, ............... 2014
PT. Multi Phi Beta Diajukan Oleh :
Diketahui Oleh :
PT.Tata Guna Patria Kontraktor
Jasamarga Pandaan Tol
PT.Eskapindo Matra (KSO)

(__________________________________) ( ________________________)
( _____________________________ )

Page 134 of 322


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
179 1 RIGID 24-Dec-13 4.0 31-Dec-13 21-Jan-14 31.00 35 47.57 47.57
180 L3 STA. 9+480 - 9+345 21-Jan-14 30.00 35 47.57

181 2 RIGID 24-Dec-13 4.0 31-Dec-13 21-Jan-14 30.00 35 47.57 47.57


182 R2 STA. 10+635 - 10+590 21-Jan-14 31.00 35 47.57

183 3 RIGID 24-Dec-13 4.0 31-Dec-13 21-Jan-14 31.00 40 54.37 50.97


184 L2 STA. 7+225 - 7+270 21-Jan-14 31.00 35 47.57

185 4 RIGID 25-Dec-13 4.0 1-Jan-14 22-Jan-14 30.00 35 47.57 47.57


186 R1 STA. 10+245 -10+255 22-Jan-14 31.00 35 47.57

187 5 RIGID 26-Dec-13 4.0 2-Jan-14 23-Jan-14 32.00 35 47.57 47.57


188 R1 STA. 10+240 - 10+675 23-Jan-14 31.00 35 47.57

189 6 RIGID 27-Dec-13 4.0 3-Jan-14 24-Jan-14 31.00 40 54.37 50.97


190 STA. 6+100 - 6+050 L1 24-Jan-14 30.00 35 47.57

191 7 RIGID 27-Dec-13 3.0 3-Jan-14 24-Jan-14 30.00 35 47.57 47.57


192 R1 STA. 10+525 - 10+620 24-Jan-14 30.00 35 47.57
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
193 8 RIGID 28-Dec-13 3.0 4-Jan-14 25-Jan-14 31.00 35 47.57 50.97
194 L2 STA. 7+495 - 7+515 25-Jan-14 31.00 40 54.37

9 RIGID 5-Jan-14 4.0 12-Jan-14 2-Feb-14 31.00 35 47.57 47.57


L3 STA. 10+237,5 - 10+255 31.00 35 47.57

10 RIGID 6-Jan-14 4.0 13-Jan-14 3-Feb-14 31.00 35 47.57 50.97


R1 STA. 10+655 - 8+647 31.00 40 54.37

11 RIGID 7-Jan-14 4.0 14-Jan-14 4-Feb-14 31.00 35 47.57 47.57


L2 STA. 9+625 - 9+595 31.00 35 47.57

12 RIGID 7-Jan-14 4.0 14-Jan-14 4-Feb-14 31.00 35 47.57 47.57


L3 STA. 7+355 - 7+382,5 31.00 35 47.57

13 RIGID 8-Jan-14 4.0 15-Jan-14 5-Feb-14 31.00 35 47.57 47.57


STA. 9+630 - 9+595 L2 32.00 35 47.57

14 RIGID 9-Jan-14 4.0 16-Jan-14 6-Feb-14 31.00 35 47.57 50.97


L3 STA. 9+358 - 9+395 31.00 40 54.37

15 RIGID 9-Jan-14 4.0 16-Jan-14 6-Feb-14 32.00 35 47.57 50.97


STA. 10+865 - 10+920 R2 31.00 40 54.37

16 RIGID 10-Jan-14 4.0 17-Jan-14 7-Feb-14 31.00 35 47.57 50.97


L1,L2,L3 STA. 7+430 - 31.00 40 54.37
7+417

17 RIGID 11-Jan-14 4.0 18-Jan-14 8-Feb-14 32.00 40 54.37 53.01


L3 STA. 9+395 - 9+435 30.00 38 51.65

18 RIGID 11-Jan-14 4.0 18-Jan-14 8-Feb-14 31.00 38 51.65 52.33


L3 STA. 9+435 - 9+495 31.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

19 RIGID 12-Jan-14 4.0 19-Jan-14 9-Feb-14 31.00 40 54.37 54.37


TAMAN DAYU STA. 0+430 30.00 40 54.37
- 0+450 R2

20 RIGID 12-Jan-14 3.0 19-Jan-14 9-Feb-14 32.00 37 50.29 55.73


GESING 5+800 - 5+850 L1 31.00 45 61.16

21 RIGID 13-Jan-14 4.0 20-Jan-14 10-Feb-14 31.00 35 47.57 48.25


STA. 7+220 - 7+265 L3 31.00 36 48.93

22 RIGID 13-Jan-14 4.0 20-Jan-14 10-Feb-14 30.00 38 51.65 49.61


L1 STA. 5+995 - 6+325 31.00 35 47.57

195 23 RIGID 14-Jan-14 4.0 21-Jan-14 31.00 30 40.77 11-Feb-14 31.00 35 47.57 50.97
196 L1 STA. 5+910 - 5+980 21-Jan-14 31.00 30 40.77 31.00 40 54.37

197 24 RIGID 16-Jan-14 4.0 23-Jan-14 31.00 29 39.42 13-Feb-14 31.00 35 47.57 48.25
198 STA. 7+400 - 7+420 R1 23-Jan-14 30.00 30 40.77 32.00 36 48.93

199 25 RIGID 17-Jan-14 4.0 24-Jan-14 31.00 28 38.06 14-Feb-14 31.00 37 50.29 48.93
200 STA. 7+960 - 7+980 L3 24-Jan-14 31.00 30 40.77 31.00 35 47.57

201 26 RIGID 18-Jan-14 3.0 25-Jan-14 31.00 30 40.77 15-Feb-14 30.00 37 50.29 48.93
202 STA. 7+965 - 7+980 L2 25-Jan-14 32.00 30 40.77 32.00 35 47.57

203 27 RIGID 20-Jan-14 3.0 27-Jan-14 31.00 30 40.77 17-Feb-14 31.00 35 47.57 48.25
204 STA. 8+295 - 8+310 R1 27-Jan-14 32.00 30 40.77 31.00 36 48.93

205 28 RIGID 21-Jan-14 3.0 28-Jan-14 32.00 30 40.77 18-Feb-14 32.00 35 47.57 48.93
206 STA. 8+255 - 8+270 R3 28-Jan-14 31.00 30 40.77 32.00 37 50.29

207 29 RIGID 22-Jan-14 4.0 29-Jan-14 31.00 27 36.70 19-Feb-14 30.00 36 48.93 49.61
208 STA. 8+260 - 8+285 L1 29-Jan-14 32.00 27 36.70 31.00 37 50.29

209 30 RIGID 24-Jan-14 4.0 31-Jan-14 31.00 27 36.70 21-Feb-14


210 STA. 8+245 - 8+275 R2 31-Jan-14 32.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
STA. 8+245 - 8+275 R2 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

31 RIGID 25-Jan-14 4.0 1-Feb-14 31.00 28 38.06 22-Feb-14


STA. 7+430 - 7+415 L3 31.00 30 40.77

32 RIGID 26-Jan-14 4.0 2-Feb-14 31.00 30 40.77 23-Feb-14


STA. 7+380 - 7+385 R3 31.00 30 40.77

33 RIGID 26-Jan-14 4.0 2-Feb-14 32.00 27 36.70 23-Feb-14


STA. 0+700 - 0+715 R2 31.00 28 38.06

34 RIGID 28-Jan-14 4.0 4-Feb-14 31.00 30 40.77 25-Feb-14


STA. 0+270 - 0+320 L2 31.00 30 40.77

35 RIGID 30-Jan-14 4.0 6-Feb-14 31.00 30 40.77 27-Feb-14


STA. 5+770 - 5+830 R1 31.00 29 39.42

36 RIGID 31-Jan-14 3.0 7-Feb-14 31.00 28 38.06 28-Feb-14


STA. 5+830 -5+880 L2 30.00 29 39.42
GESING

37 RIGID 1-Feb-14 4.0 8-Feb-14 30.00 27 36.70 1-Mar-14


STA. 8+035 - 8+000 R2 30.00 28 38.06

38 RIGID 2-Feb-14 4.0 9-Feb-14 30.00 27 36.70 2-Mar-14


GESING STA. 5+895 - 31.00 27 36.70
6+100 L1

39 RIGID 2-Feb-14 4.0 9-Feb-14 31.00 28 38.06 2-Mar-14


STA. 8+020 - 7+925 L3 31.00 27 36.70
PUCANG ANOM

40 RIGID 3-Feb-14 4.0 10-Feb-14 31.00 27 36.70 3-Mar-14


STA. 5+945 - 6+150 R1 32.00 28 38.06

41 RIGID 3-Feb-14 4.0 10-Feb-14 31.00 30 40.77 3-Mar-14


STA. 8+020 - 7+990 L3 30.00 29 39.42

42 RIGID 4-Feb-14 4.0 11-Feb-14 31.00 28 38.06 4-Mar-14


STA. 8+005 - 7+995 R2 31.00 29 39.42
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
STA. 8+005 - 7+995 R2 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

43 RIGID 5-Feb-14 4.0 12-Feb-14 31.00 27 36.70 5-Mar-14


STA. 5+995 - 6+025 R1 32.00 28 38.06

41 RIGID 6-Feb-14 4.0 13-Feb-14 31.00 30 40.77 6-Mar-14


STA. 5+550 - 5+650 L1 31.00 30 40.77
GESING

42 RIGID 7-Feb-14 4.0 14-Feb-14 31.00 27 36.70 7-Mar-14


STA. 6+000 - 6+070 L2 31.00 28 38.06
32.00 30 40.77
31.00 28 38.06

44 RIGID 8-Feb-14 4.0 15-Feb-14 30.00 28 38.06 8-Mar-14


STA. 8+000 - 7+990 R2 30.00 30 40.77

45 RIGID 8-Feb-14 4.0 15-Feb-14 31.00 30 40.77 8-Mar-14


STA. 5+895 - 5+840 L2 30.00 30 40.77

46 RIGID 9-Feb-14 4.0 16-Feb-14 31.00 27 36.70 9-Mar-14


STA. 7+995 - 8+000 R3 30.00 27 36.70

47 RIGID 10-Feb-14 4.0 17-Feb-14 31.00 30 40.77 10-Mar-14


STA. 5+820 - 5+750 L2 32.00 29 39.42
GESING

48 RIGID 13-Feb-14 4.0 20-Feb-14 31.00 28 38.06 13-Mar-14


STA. 5+870 - 5+895 R1 31.00 27 36.70

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
Jasamarga Pandaan Tol Konsultan Kontraktor
PT. Multi Phi Beta
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( ________________________)
( _____________________________ ) ( _____________________________ )
PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : Januari 2014

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 1-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
2 1-Jan-14 28 1.00 47.57 47.57 22.25
3 2-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
4 2-Jan-14 28 1.00 47.57 47.57 22.25
5 3-Jan-14 28 1.00 54.37 54.37 4.32
RIGID
6 3-Jan-14 28 1.00 47.57 47.57 22.25
7 3-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
8 3-Jan-14 28 1.00 54.37 54.37 4.32
9 5-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
10 5-Jan-14 28 1.00 47.57 47.57 22.25
11 5-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
12 5-Jan-14 28 1.00 54.37 54.37 4.32
13 5-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
14 5-Jan-14 28 1.00 47.57 47.57 22.25
15 5-Jan-14 28 1.00 54.37 54.37 4.32
RIGID
16 5-Jan-14 28 1.00 47.57 47.57 22.25
17 6-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
18 6-Jan-14 28 1.00 47.57 47.57 22.25
19 8-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
20 8-Jan-14 28 1.00 47.57 47.57 22.25
21 9-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
22 9-Jan-14 28 1.00 47.57 47.57 22.25
23 9-Jan-14 28 1.00 54.37 54.37 4.32
RIGID
24 9-Jan-14 28 1.00 47.57 47.57 22.25
25 9-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
26 9-Jan-14 28 1.00 54.37 54.37 4.32
27 10-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
28 10-Jan-14 28 1.00 47.57 47.57 22.25
29 10-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
30 10-Jan-14 28 1.00 47.57 47.57 22.25
31 11-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
32 11-Jan-14 28 1.00 54.37 54.37 4.32
33 12-Jan-14 28 1.00 54.37 54.37 4.32
RIGID
34 12-Jan-14 28 1.00 54.37 54.37 4.32
35 13-Jan-14 28 1.00 47.57 47.57 22.25 RIGID
36 13-Jan-14 28 1.00 47.57 47.57 22.25
R2 STA. 9+925 -
37 28 1.00 47.57 47.57 22.25
9+910
38 28 1.00 47.57 47.57 22.25
39 14-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
40 14-Jan-14 28 1.00 47.57 47.57 22.25
41 14-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
42 14-Jan-14 28 1.00 47.57 47.57 22.25
43 15-Jan-14 28 1.00 54.37 54.37 4.32
RIGID
44 15-Jan-14 28 1.00 47.57 47.57 22.25
45 15-Jan-14 28 1.00 54.37 54.37 4.32
RIGID
46 15-Jan-14 28 1.00 47.57 47.57 22.25
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
47 16-Jan-14 28 1.00 47.57 47.57 22.25 RIGID
48 16-Jan-14 28 1.00 47.57 47.57 22.25
R2 STA. 10+290 -
49 16-Jan-14 28 1.00 54.37 54.37 4.32
10+280
50 16-Jan-14 28 1.00 54.37 54.37 4.32
51 17-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
52 17-Jan-14 28 1.00 47.57 47.57 22.25
53 17-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
54 17-Jan-14 28 1.00 54.37 54.37 4.32
55 17-Jan-14 28 1.00 47.57 47.57 22.25 RIGID
56 17-Jan-14 28 1.00 47.57 47.57 22.25
R1 STA. 10+275 -
57 17-Jan-14 28 1.00 54.37 54.37 4.32
10+295
58 17-Jan-14 28 1.00 47.57 47.57 22.25
59 18-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
60 18-Jan-14 28 1.00 47.57 47.57 22.25
61 18-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
62 18-Jan-14 28 1.00 47.57 47.57 22.25
63 19-Jan-14 28 1.00 54.37 54.37 4.32
RIGID
64 19-Jan-14 28 1.00 47.57 47.57 22.25
65 19-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
66 19-Jan-14 28 1.00 47.57 47.57 22.25
67 20-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
68 20-Jan-14 28 1.00 47.57 47.57 22.25
69 20-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
70 20-Jan-14 28 1.00 47.57 47.57 22.25
71 20-Jan-14 28 1.00 54.37 54.37 4.32
RIGID
72 20-Jan-14 28 1.00 61.16 61.16 78.75
73 12-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
74 12-Jan-14 7 0.75 40.77 54.37 4.32
75 13-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
76 13-Jan-14 7 0.75 40.77 54.37 4.32
77 14-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
78 14-Jan-14 7 0.75 40.77 54.37 4.32
79 14-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
80 14-Jan-14 7 0.75 40.77 54.37 4.32
81 15-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
82 15-Jan-14 7 0.75 40.77 54.37 4.32
83 16-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
84 16-Jan-14 7 0.75 40.77 54.37 4.32
85 16-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
86 16-Jan-14 7 0.75 40.77 54.37 4.32
87 17-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
88 17-Jan-14 7 0.75 40.77 54.37 4.32
89 18-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
90 18-Jan-14 7 0.75 36.70 48.93 11.28
91 18-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
92 18-Jan-14 7 0.75 36.70 48.93 11.28
93 19-Jan-14 7 0.75 36.70 48.93 11.28
RIGID
94 19-Jan-14 7 0.75 36.70 48.93 11.28
95 19-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
96 19-Jan-14 7 0.75 40.77 54.37 4.32
97 20-Jan-14 7 0.75 36.70 48.93 11.28
RIGID
98 20-Jan-14 7 0.75 36.70 48.93 11.28
99 20-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
100 20-Jan-14 7 0.75 40.77 54.37 4.32
101 3-Jan-14 28 1.00 57.08 57.08 23.01 RIGID
102 3-Jan-14 28 1.00 61.16 61.16 78.75
R1 STA. 0+205 -
103 3-Jan-14 28 1.00 59.80 59.80 56.47
0+100
104 3-Jan-14 28 1.00 62.52 62.52 104.72
105 4-Jan-14 28 1.00 51.65 51.65 0.41 RIGID
106 4-Jan-14 28 1.00 54.37 54.37 4.32
STA. 5+075 5+100
107 4-Jan-14 28 1.00 57.08 57.08 23.01
R2
108 4-Jan-14 28 1.00 55.73 55.73 11.82
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
109 6-Jan-14 28 1.00 50.29 50.29 4.00 RIGID
110 6-Jan-14 28 1.00 53.01 53.01 0.52
111 6-Jan-14 28 1.00 57.08 57.08 23.01
STA. RAMP 5,
112 6-Jan-14 28 1.00 53.01 53.01 0.52
STA. 5+155 - 5+200
113 6-Jan-14 28 1.00 54.37 54.37 4.32
114 6-Jan-14 28 1.00 57.08 57.08 23.01
115 7-Jan-14 28 1.00 50.29 50.29 4.00 RIGID
116 7-Jan-14 28 1.00 55.73 55.73 11.82
117 7-Jan-14 28 1.00 53.01 53.01 0.52
STA. 11+100
118 7-Jan-14 28 1.00 48.93 48.93 11.28
-11+185 L1
119 7-Jan-14 28 1.00 53.01 53.01 0.52
120 7-Jan-14 28 1.00 55.73 55.73 11.82
121 8-Jan-14 28 1.00 50.29 50.29 4.00 RIGID
122 8-Jan-14 28 1.00 51.65 51.65 0.41
123 8-Jan-14 28 1.00 53.01 53.01 0.52
L2 STA. 11+185 -
124 8-Jan-14 28 1.00 51.65 51.65 0.41
11+210
125 8-Jan-14 28 1.00 57.08 57.08 23.01
126 8-Jan-14 28 1.00 54.37 54.37 4.32
127 10-Jan-14 28 1.00 51.65 51.65 0.41 RIGID
128 10-Jan-14 28 1.00 58.44 58.44 37.89
129 10-Jan-14 28 1.00 57.08 57.08 23.01
R1 STA. 11+205 -
130 10-Jan-14 28 1.00 58.44 58.44 37.89
11+275
131 10-Jan-14 28 1.00 53.01 53.01 0.52
132 10-Jan-14 28 1.00 54.37 54.37 4.32
133 14-Jan-14 28 1.00 51.65 51.65 0.41
RIGID
134 14-Jan-14 28 1.00 53.01 53.01 0.52
135 14-Jan-14 28 1.00 53.01 53.01 0.52 RIGID
136 14-Jan-14 28 1.00 57.08 57.08 23.01
L2 STA. 0+530 -
137 14-Jan-14 28 1.00 53.01 53.01 0.52
0+650
138 14-Jan-14 28 1.00 57.08 57.08 23.01
139 16-Jan-14 28 1.00 54.37 54.37 4.32 RIGID
140 16-Jan-14 28 1.00 55.73 55.73 11.82
141 16-Jan-14 28 1.00 58.44 58.44 37.89
L1 STA. 0+105 -
142 16-Jan-14 28 1.00 57.08 57.08 23.01
0+600
143 16-Jan-14 28 1.00 57.08 57.08 23.01
144 16-Jan-14 28 1.00 59.80 59.80 56.47
145 17-Jan-14 28 1.00 54.37 54.37 4.32 RIGID
146 17-Jan-14 28 1.00 55.73 55.73 11.82
147 17-Jan-14 28 1.00 53.01 53.01 0.52
R2 STA. 0+200 -
148 17-Jan-14 28 1.00 55.73 55.73 11.82
0+055
149 17-Jan-14 28 1.00 53.01 53.01 0.52
150 17-Jan-14 28 1.00 57.08 57.08 23.01
151 18-Jan-14 28 1.00 55.73 55.73 11.82 RIGID
152 18-Jan-14 28 1.00 57.08 57.08 23.01
153 18-Jan-14 28 1.00 57.08 57.08 23.01
STA. 0+510 - 0+485
154 18-Jan-14 28 1.00 51.65 51.65 0.41
R1
155 18-Jan-14 28 1.00 54.37 54.37 4.32
156 18-Jan-14 28 1.00 57.08 57.08 23.01
157 20-Jan-14 28 1.00 58.44 58.44 37.89
RIGID
158 20-Jan-14 28 1.00 55.73 55.73 11.82
159 1-Jan-14 7 0.75 39.42 52.55 0.07
RIGID
160 1-Jan-14 7 0.75 40.77 54.37 4.32
161 1-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
162 1-Jan-14 7 0.75 38.06 50.74 2.39
163 2-Jan-14 7 0.75 38.06 50.74 2.39
RIGID
164 2-Jan-14 7 0.75 39.42 52.55 0.07
165 3-Jan-14 7 0.75 38.06 50.74 2.39
RIGID
166 3-Jan-14 7 0.75 39.42 52.55 0.07
167 4-Jan-14 7 0.75 38.06 50.74 2.39
RIGID
168 4-Jan-14 7 0.75 38.06 50.74 2.39
169 14-Jan-14 7 0.75 38.06 50.74 2.39
RIGID
170 14-Jan-14 7 0.75 40.77 54.37 4.32
171 16-Jan-14 7 0.75 38.06 50.74 2.39
RIGID
172 16-Jan-14 7 0.75 42.13 56.18 15.14
173 17-Jan-14 7 0.75 39.42 52.55 0.07
RIGID
174 17-Jan-14 7 0.75 40.77 54.37 4.32
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
175 18-Jan-14 7 0.75 43.49 57.99 32.52
RIGID
176 18-Jan-14 7 0.75 43.49 57.99 32.52
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
177 20-Jan-14 7 0.75 42.13 56.18 15.14
RIGID
178 20-Jan-14 7 0.75 39.42 52.55 0.07
179 21-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
180 21-Jan-14 28 1.00 47.57 47.57 22.25
181 21-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
182 21-Jan-14 28 1.00 47.57 47.57 22.25
183 21-Jan-14 28 1.00 54.37 54.37 4.32
RIGID
184 21-Jan-14 28 1.00 47.57 47.57 22.25
185 22-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
186 22-Jan-14 28 1.00 47.57 47.57 22.25
187 23-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
188 23-Jan-14 28 1.00 47.57 47.57 22.25
189 24-Jan-14 28 1.00 54.37 54.37 4.32
RIGID
190 24-Jan-14 28 1.00 47.57 47.57 22.25
191 24-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
192 24-Jan-14 28 1.00 47.57 47.57 22.25
193 25-Jan-14 28 1.00 47.57 47.57 22.25
RIGID
194 25-Jan-14 28 1.00 54.37 54.37 4.32
195 21-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
196 21-Jan-14 7 0.75 40.77 54.37 4.32
197 23-Jan-14 7 0.75 39.42 52.55 0.07
RIGID
198 23-Jan-14 7 0.75 40.77 54.37 4.32
199 24-Jan-14 7 0.75 38.06 50.74 2.39
RIGID
200 24-Jan-14 7 0.75 40.77 54.37 4.32
201 25-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
202 25-Jan-14 7 0.75 40.77 54.37 4.32
203 27-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
204 27-Jan-14 7 0.75 40.77 54.37 4.32
205 28-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
206 28-Jan-14 7 0.75 40.77 54.37 4.32
207 29-Jan-14 7 0.75 36.70 48.93 11.28
RIGID
208 29-Jan-14 7 0.75 36.70 48.93 11.28
209 31-Jan-14 7 0.75 36.70 48.93 11.28
RIGID
210 31-Jan-14 7 0.75 38.06 50.74 2.39
211 21-Jan-14 28 1.00 53.01 53.01 0.52 RIGID
212 21-Jan-14 28 1.00 54.37 54.37 4.32
STA. 0+510 - 0+450
213 28 1.00 54.37 54.37 4.32
R2
214 28 1.00 55.73 55.73 11.82
215 22-Jan-14 28 1.00 53.01 53.01 0.52 RIGID
216 22-Jan-14 28 1.00 51.65 51.65 0.41
R1 STA. 10+735 -
217 22-Jan-14 28 1.00 54.37 54.37 4.32
10+575
218 22-Jan-14 28 1.00 55.73 55.73 11.82
219 22-Jan-14 28 1.00 55.73 55.73 11.82
RIGID
220 22-Jan-14 28 1.00 51.65 51.65 0.41
221 23-Jan-14 28 1.00 53.01 53.01 0.52 RIGID
222 23-Jan-14 28 1.00 58.44 58.44 37.89
223 23-Jan-14 28 1.00 55.73 55.73 11.82
R2 STA. 10+245 -
224 23-Jan-14 28 1.00 53.01 53.01 0.52
10+255
225 23-Jan-14 28 1.00 51.65 51.65 0.41
226 23-Jan-14 28 1.00 55.73 55.73 11.82
227 24-Jan-14 28 1.00 57.08 57.08 23.01 RIGID
228 24-Jan-14 28 1.00 55.73 55.73 11.82
R2 STA. 9+920 -
229 24-Jan-14 28 1.00 51.65 51.65 0.41
9+950
230 24-Jan-14 28 1.00 53.01 53.01 0.52
231 25-Jan-14 28 1.00 53.01 53.01 0.52 RIGID
232 25-Jan-14 28 1.00 55.73 55.73 11.82
L1 STA. 9+955 -
233 25-Jan-14 28 1.00 54.37 54.37 4.32
9+835
234 25-Jan-14 28 1.00 55.73 55.73 11.82
235 22-Jan-14 7 0.75 38.06 50.74 2.39
RIGID
236 22-Jan-14 7 0.75 42.13 56.18 15.14
237 23-Jan-14 7 0.75 38.06 50.74 2.39
RIGID
238 23-Jan-14 7 0.75 38.06 50.74 2.39
239 24-Jan-14 7 0.75 39.42 52.55 0.07
RIGID
240 24-Jan-14 7 0.75 38.06 50.74 2.39
241 27-Jan-14 7 0.75 38.06 50.74 2.39
RIGID
242 27-Jan-14 7 0.75 38.06 50.74 2.39
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
243 28-Jan-14 7 0.75 39.42 52.55 0.07
RIGID
244 28-Jan-14 7 0.75 43.49 57.99 32.52
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
245 29-Jan-14 7 0.75 40.77 54.37 4.32
RIGID
246 29-Jan-14 7 0.75 42.13 56.18 15.14
247 30-Jan-14 7 0.75 39.42 52.55 0.07
RIGID
248 30-Jan-14 7 0.75 38.06 50.74 2.39
249 31-Jan-14 7 0.75 39.42 52.55 0.07
RIGID
250 31-Jan-14 7 0.75 39.42 52.55 0.07
251 31-Jan-14 7 0.75 38.06 50.74 2.39
RIGID
252 31-Jan-14 7 0.75 38.06 50.74 2.39

Σ(σbn - σbm)2 = 3223.16

JUMLAH SAMPLE = 252.00 buah


MIN = 47.57 kg/cm2
MAX = 62.52 kg/cm2
RATA-RATA (σbm) = 52.29 kg/cm2
KARAKTERISTIK (σbk) = σbm - 1,64 S = 3.58 kg/cm2
46.41 kg/cm2

Pandaan,………………..2014

QC STAF QC

( ) ( )
PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : Februari 2014

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 2-Feb-14 28 1.00 47.57 47.57 17.64
RIGID
2 2-Feb-14 28 1.00 47.57 47.57 17.64
3 3-Feb-14 28 1.00 47.57 47.57 17.64
RIGID
4 3-Feb-14 28 1.00 54.37 54.37 6.74
5 4-Feb-14 28 1.00 47.57 47.57 17.64
RIGID
6 4-Feb-14 28 1.00 47.57 47.57 17.64
7 4-Feb-14 28 1.00 47.57 47.57 17.64
RIGID
8 4-Feb-14 28 1.00 47.57 47.57 17.64
9 5-Feb-14 28 1.00 47.57 47.57 17.64
RIGID
10 5-Feb-14 28 1.00 47.57 47.57 17.64
11 6-Feb-14 28 1.00 47.57 47.57 17.64
RIGID
12 6-Feb-14 28 1.00 54.37 54.37 6.74
13 6-Feb-14 28 1.00 47.57 47.57 17.64
RIGID
14 6-Feb-14 28 1.00 54.37 54.37 6.74
15 7-Feb-14 28 1.00 47.57 47.57 17.64
RIGID
16 7-Feb-14 28 1.00 54.37 54.37 6.74
17 8-Feb-14 28 1.00 54.37 54.37 6.74
RIGID
18 8-Feb-14 28 1.00 51.65 51.65 0.02
19 8-Feb-14 28 1.00 51.65 51.65 0.02
RIGID
20 8-Feb-14 28 1.00 53.01 53.01 1.53
21 9-Feb-14 28 1.00 54.37 54.37 6.74
RIGID
22 9-Feb-14 28 1.00 54.37 54.37 6.74
23 9-Feb-14 28 1.00 50.29 50.29 2.20
RIGID
24 9-Feb-14 28 1.00 61.16 61.16 88.20
25 10-Feb-14 28 1.00 47.57 47.57 17.64
RIGID
26 10-Feb-14 28 1.00 48.93 48.93 8.07
27 10-Feb-14 28 1.00 51.65 51.65 0.02
RIGID
28 10-Feb-14 28 1.00 47.57 47.57 17.64
29 11-Feb-14 28 1.00 47.57 47.57 17.64
RIGID
30 11-Feb-14 28 1.00 54.37 54.37 6.74
31 13-Feb-14 28 1.00 47.57 47.57 17.64
RIGID
32 13-Feb-14 28 1.00 48.93 48.93 8.07
33 14-Feb-14 28 1.00 50.29 50.29 2.20
RIGID
34 14-Feb-14 28 1.00 47.57 47.57 17.64
35 15-Feb-14 28 1.00 50.29 50.29 2.20
RIGID
36 15-Feb-14 28 1.00 47.57 47.57 17.64
37 17-Feb-14 28 1.00 47.57 47.57 17.64
RIGID
38 17-Feb-14 28 1.00 48.93 48.93 8.07
39 18-Feb-14 28 1.00 47.57 47.57 17.64
RIGID
40 18-Feb-14 28 1.00 50.29 50.29 2.20
41 19-Feb-14 28 1.00 48.93 48.93 8.07
RIGID
42 19-Feb-14 28 1.00 50.29 50.29 2.20
43 1-Feb-14 7 0.75 38.06 50.74 1.06
RIGID
44 1-Feb-14 7 0.75 40.77 54.37 6.74
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
45 2-Feb-14 7 0.75 40.77 54.37 6.74
RIGID
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
RIGID
46 2-Feb-14 7 0.75 40.77 54.37 6.74
47 2-Feb-14 7 0.75 36.70 48.93 8.07
RIGID
48 2-Feb-14 7 0.75 38.06 50.74 1.06
49 4-Feb-14 7 0.75 40.77 54.37 6.74
RIGID
50 4-Feb-14 7 0.75 40.77 54.37 6.74
51 6-Feb-14 7 0.75 40.77 54.37 6.74
RIGID
52 6-Feb-14 7 0.75 39.42 52.55 0.61
53 7-Feb-14 7 0.75 38.06 50.74 1.06
RIGID
54 7-Feb-14 7 0.75 39.42 52.55 0.61
55 8-Feb-14 7 0.75 36.70 48.93 8.07
RIGID
56 8-Feb-14 7 0.75 38.06 50.74 1.06
57 9-Feb-14 7 0.75 36.70 48.93 8.07
RIGID
58 9-Feb-14 7 0.75 36.70 48.93 8.07
59 9-Feb-14 7 0.75 38.06 50.74 1.06
RIGID
60 9-Feb-14 7 0.75 36.70 48.93 8.07
61 10-Feb-14 7 0.75 36.70 48.93 8.07
RIGID
62 10-Feb-14 7 0.75 38.06 50.74 1.06
63 10-Feb-14 7 0.75 40.77 54.37 6.74
RIGID
64 10-Feb-14 7 0.75 39.42 52.55 0.61
65 11-Feb-14 7 0.75 38.06 50.74 1.06
RIGID
66 11-Feb-14 7 0.75 39.42 52.55 0.61
67 12-Feb-14 7 0.75 36.70 48.93 8.07
RIGID
68 12-Feb-14 7 0.75 38.06 50.74 1.06
69 13-Feb-14 7 0.75 40.77 54.37 6.74
RIGID
70 13-Feb-14 7 0.75 40.77 54.37 6.74
71 14-Feb-14 7 0.75 36.70 48.93 8.07 RIGID
72 14-Feb-14 7 0.75 38.06 50.74 1.06
73 14-Feb-14 7 0.75 40.77 54.37 6.74 STA. 6+000 - 6+070 L2
74 14-Feb-14 7 0.75 38.06 50.74 1.06
75 15-Feb-14 7 0.75 38.06 50.74 1.06
RIGID
76 15-Feb-14 7 0.75 40.77 54.37 6.74
77 15-Feb-14 7 0.75 40.77 54.37 6.74
RIGID
78 15-Feb-14 7 0.75 40.77 54.37 6.74
79 16-Feb-14 7 0.75 36.70 48.93 8.07
RIGID
80 16-Feb-14 7 0.75 36.70 48.93 8.07
81 17-Feb-14 7 0.75 40.77 54.37 6.74
RIGID
82 17-Feb-14 7 0.75 39.42 52.55 0.61
83 20-Feb-14 7 0.75 38.06 50.74 1.06
RIGID
84 20-Feb-14 7 0.75 36.70 48.93 8.07
85 4-Feb-14 28 1.00 51.65 51.65 0.02
RIGID
86 4-Feb-14 28 1.00 55.73 55.73 15.64
87 5-Feb-14 28 1.00 48.93 48.93 8.07
RIGID
88 5-Feb-14 28 1.00 53.01 53.01 1.53
89 6-Feb-14 28 1.00 50.29 50.29 2.20
RIGID
90 6-Feb-14 28 1.00 48.93 48.93 8.07
91 6-Feb-14 28 1.00 54.37 54.37 6.74
RIGID
92 6-Feb-14 28 1.00 53.01 53.01 1.53
93 7-Feb-14 28 1.00 53.01 53.01 1.53
RIGID
94 7-Feb-14 28 1.00 55.73 55.73 15.64
95 7-Feb-14 28 1.00 51.65 51.65 0.02
RIGID
96 7-Feb-14 28 1.00 53.01 53.01 1.53
97 8-Feb-14 28 1.00 51.65 51.65 0.02 RIGID
98 8-Feb-14 28 1.00 53.01 53.01 1.53
STA. 0+485 - 0+460
99 8-Feb-14 28 1.00 51.65 51.65 0.02
R1
100 8-Feb-14 28 1.00 55.73 55.73 15.64
101 10-Feb-14 28 1.00 53.01 53.01 1.53
RIGID
102 10-Feb-14 28 1.00 54.37 54.37 6.74
103 10-Feb-14 28 1.00 54.37 54.37 6.74
RIGID
104 10-Feb-14 28 1.00 50.29 50.29 2.20
105 12-Feb-14 28 1.00 51.65 51.65 0.02
RIGID
106 12-Feb-14 28 1.00 48.93 48.93 8.07
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
107 13-Feb-14 28 1.00 51.65 51.65 0.02 RIGID
108 13-Feb-14 28 1.00 53.01 53.01 1.53
109 13-Feb-14 28 1.00 57.08 57.08 28.24 L3 STA.7+495 - 7+545
110 13-Feb-14 28 1.00 55.73 55.73 15.64
111 14-Feb-14 28 1.00 54.37 54.37 6.74 RIGID
112 14-Feb-14 28 1.00 57.08 57.08 28.24
STA. 9+935 - 9+485
113 14-Feb-14 28 1.00 53.01 53.01 1.53
R1
114 14-Feb-14 28 1.00 54.37 54.37 6.74
115 17-Feb-14 28 1.00 53.01 53.01 1.53 RIGID
116 17-Feb-14 28 1.00 53.01 53.01 1.53 R2 STA. 7+515 -
117 17-Feb-14 28 1.00 54.37 54.37 6.74 7+495
118 18-Feb-14 28 1.00 53.01 53.01 1.53 RIGID
119 18-Feb-14 28 1.00 53.01 53.01 1.53
STA. 0+510 - 0+485
120 18-Feb-14 28 1.00 55.73 55.73 15.64
R1
121 18-Feb-14 28 1.00 57.08 57.08 28.24
122 19-Feb-14 28 1.00 54.37 54.37 6.74 RIGID
123 19-Feb-14 28 1.00 51.65 51.65 0.02
STA. 0+470 - 0+520 L2
124 19-Feb-14 28 1.00 51.65 51.65 0.02
125 20-Feb-14 28 1.00 53.01 53.01 1.53 RIGID
126 20-Feb-14 28 1.00 57.08 57.08 28.24
L1 STA. 0+625 - 0+675
127 20-Feb-14 28 1.00 55.73 55.73 15.64
128 10-Feb-14 7 0.75 38.06 50.74 1.06
RIGID
129 10-Feb-14 7 0.75 38.06 50.74 1.06
130 18-Feb-14 7 0.75 39.42 52.55 0.61
RIGID
131 18-Feb-14 7 0.75 39.42 52.55 0.61
132 19-Feb-14 7 0.75 40.77 54.37 6.74
RIGID
133 19-Feb-14 7 0.75 43.49 57.99 38.69

Σ(σbn - σbm)2 = 1089.96

JUMLAH SAMPLE = 133.00 buah


MIN = 47.57 kg/cm2
MAX = 61.16 kg/cm2
RATA-RATA (σbm) = 51.77 kg/cm2
S ==
KARAKTERISTIK (σbk) = σbm - 1,64 S 2.87 kg/cm2
47.06 kg/cm2

Pandaan,………………..2014

QC STAF QC

( ) ( )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
1 RIGID 24-Dec-13 3.0 31-Dec-13 21-Jan-14 34.70 39 53.01 54.37
33.80 40 54.37
STA. 0+510 - 0+450 R2
33.40 40 54.37
32.80 41 55.73

`
2 RIGID 25-Dec-13 3.0 1-Jan-14 22-Jan-14 34.10 39 53.01 53.69
33.90 38 51.65
R1 STA. 10+735 - 10+575
4.0 32.80 40 54.37
34.70 41 55.73

`
3 RIGID 25-Dec-13 3.0 1-Jan-14 22-Jan-14 33.60 41 55.73 53.69
32.80 38 51.65
L1 STA. 0+360 - 0+400

`
4 RIGID 26-Dec-13 3.0 2-Jan-14 23-Jan-14 33.70 39 53.01 55.73
34.00 43 58.44
R2 STA. 10+245 - 10+255

RIGID
5 26-Dec-13 3.0 2-Jan-14 23-Jan-14 32.80 41 55.73 54.03
34.10 39 53.01
STA. 0+588 - 0+450 R2 34.20 38 51.65
33.70 41 55.73

`
6 RIGID 27-Dec-13 3.0 3-Jan-14 24-Jan-14 35.30 42 57.08 54.37
35.10 41 55.73
R2 STA. 9+920 - 9+950
35.20 38 51.65
35.20 39 53.01

`
7 RIGID 28-Dec-13 3.0 4-Jan-14 25-Jan-14 34.90 39 53.01 54.71
35.10 41 55.73
L1 STA. 9+955 - 9+835
4.0 35.10 40 54.37
35.20 41 55.73

Page 153 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
85 8 RIGID 7-Jan-14 3.0 14-Jan-14 4-Feb-14 33.70 38 51.65 53.69
86 4-Feb-14 34.00 41 55.73
R2 STA. 0+485 - 0+510

87 9 RIGID 8-Jan-14 3.0 15-Jan-14 5-Feb-14 33.80 36 48.93 50.97


88 5-Feb-14 33.90 39 53.01
R2 STA. 0+665 - 0+642.5

89 10 RIGID 9-Jan-14 3.0 16-Jan-14 6-Feb-14 33.80 37 50.29 49.61


90 6-Feb-14 33.80 36 48.93
STA. 0+455 - 0+420 R1

91 11 RIGID 9-Jan-14 4.0 16-Jan-14 6-Feb-14 35.20 40 54.37 53.69


92 6-Feb-14 34.90 39 53.01
L1 STA. 9+560 - 9+395

93 12 RIGID 10-Jan-14 3.0 17-Jan-14 7-Feb-14 33.90 39 53.01 54.37


94 7-Feb-14 34.00 41 55.73
STA. 0+530 - 0+550 R1

95 0 RIGID 10-Jan-14 3.0 17-Jan-14 7-Feb-14 33.80 38 51.65 52.33


96 7-Feb-14 33.90 39 53.01
STA. 0+550 - 0+595 L1

97 13 RIGID 11-Jan-14 4.0 18-Jan-14 8-Feb-14 33.70 38 51.65 53.01


98 8-Feb-14 33.40 39 53.01
STA. 0+485 - 0+460 R1
99 8-Feb-14 32.80 38 51.65
100 8-Feb-14 33.00 41 55.73

101 14 RIGID 13-Jan-14 4.0 20-Jan-14 10-Feb-14 33.80 39 53.01 53.69


102 10-Feb-14 34.00 40 54.37
STA. 0+530 - 0+545 L3

103 15 RIGID 13-Jan-14 3.0 20-Jan-14 10-Feb-14 32.70 40 54.37 52.33


104 10-Feb-14 33.80 37 50.29
STA. 0+540 - 0+560 L3

105 16 RIGID 15-Jan-14 3.0 22-Jan-14 33.2 28 38.06 12-Feb-14 33.70 38 51.65 50.29
106 32.8 31 42.13 12-Feb-14 33.70 36 48.93
STA. 10+860 - 10+870 L3

Page 154 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

107 17 RIGID 16-Jan-14 3.0 23-Jan-14 33.2 28 38.06 13-Feb-14 34.10 38 51.65 54.37
108 31.8 28 38.06 13-Feb-14 34.20 39 53.01
L3 STA.7+495 - 7+545
109 13-Feb-14 33.80 42 57.08
110 13-Feb-14 34.20 41 55.73
13-Feb-14

111 18 RIGID 17-Jan-14 3.0 24-Jan-14 34.3 29 39.42 14-Feb-14 34.00 40 54.37 54.71
112 34.5 28 38.06 14-Feb-14 34.00 42 57.08
STA. 9+935 - 9+485 R1
113 14-Feb-14 35.20 39 53.01
114 14-Feb-14 34.10 40 54.37

115 19 RIGID 20-Jan-14 3.0 27-Jan-14 34.5 28 38.06 17-Feb-14 33.20 39 53.01 53.46
116 34.5 28 38.06 17-Feb-14 33.40 39 53.01
R2 STA. 7+515 - 7+495
117 17-Feb-14 33.90 40 54.37

118 20 RIGID 21-Jan-14 3.0 28-Jan-14 34.7 29 39.42 18-Feb-14 32.40 39 53.01 54.71
119 34.6 32 43.49 18-Feb-14 33.00 39 53.01
STA. 0+510 - 0+485 R1
120 18-Feb-14 36.40 41 55.73
121 18-Feb-14 34.10 42 57.08

122 21 RIGID 22-Jan-14 3.0 29-Jan-14 34.7 30 40.77 19-Feb-14 34.70 40 54.37 52.55
123 34.7 31 42.13 19-Feb-14 32.90 38 51.65
STA. 0+470 - 0+520 L2
124 19-Feb-14 33.80 38 51.65

125 22 RIGID 23-Jan-14 3.0 30-Jan-14 34.5 29 39.42 20-Feb-14 33.40 39 53.01 55.27
126 34.6 28 38.06 20-Feb-14 34.00 42 57.08
L1 STA. 0+625 - 0+675
127 20-Feb-14 33.90 41 55.73

`
23 RIGID 24-Jan-14 3.0 31-Jan-14 34.5 29 39.42 21-Feb-14
34.6 29 39.42
R2 STA. 0+700 - 0+685

`
24 RIGID 24-Jan-14 3.0 31-Jan-14 34.5 28 38.06 21-Feb-14
34.6 28 38.06
L1 STA. 0+545 - 0+530

`
25 RIGID 27-Jan-14 4.0 3-Feb-14 32.8 29 39.42 24-Feb-14
32.8 29 39.42
STA. 7+400 - 7+415 L3

`
26 RIGID 27-Jan-14 4.0 3-Feb-14 33.0 30 40.77 24-Feb-14
33.1 29 39.42
L1 STA. 0+205 - 0+255

`
27 RIGID 28-Jan-14 4.0 4-Feb-14 33.1 30 40.77 25-Feb-14
30.0 29 39.42
R3 STA. 8+270 - 8+295

`
28 RIGID 28-Jan-14 3.0 4-Feb-14 33.0 29 39.42 25-Feb-14
Page 155 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
30.0 29 39.42
R1 STA. 5+730 - 5+800

Page 156 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
29 RIGID 29-Jan-14 4.0 5-Feb-14 32.7 28 38.06 26-Feb-14
32.8 30 40.77
STA. 10+200 - 10+290 R3

`
30 RIGID 30-Jan-14 3.0 6-Feb-14 32.7 29 39.42 27-Feb-14
33.1 29 39.42
R2 STA. 8+275 - 8+280

`
31 RIGID 30-Jan-14 3.0 6-Feb-14 33.0 30 40.77 27-Feb-14
33.1 30 40.77
STA. 7+370 - 7+387 L2

`
32 RIGID 30-Jan-14 3.0 6-Feb-14 33.0 28 38.06 27-Feb-14
33.1 30 40.77
STA. 0+205 - 0+310

`
128 33 RIGID 3-Feb-14 3.0 10-Feb-14 32.2 28 38.06 3-Mar-14
129 10-Feb-14 32.4 28 38.06
STA. 0+642 - 0+635 L1

130 34 RIGID 11-Feb-14 4.0 18-Feb-14 32.0 29 39.42 11-Mar-14


131 18-Feb-14 32.2 29 39.42
L2 STA. 5+900 - 5+980

132 35 RIGID 12-Feb-14 4.0 19-Feb-14 32.7 30 40.77 12-Mar-14


133 19-Feb-14 33.0 32 43.49
STA. 0+ 980 - 0+625 R2

Disetujui Oleh :
Konsultan Pandaan, ............... 2014
PT. Multi Phi Beta Diajukan Oleh :
Diketahui Oleh :
PT.Tata Guna Patria Kontraktor
Jasamarga Pandaan Tol
PT.Eskapindo Matra (KSO)

(__________________________________) ( ________________________)
( _____________________________ )

Page 157 of 322


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
1 RIGID 24-Dec-13 4.0 31-Dec-13 21-Jan-14 31.00 35 47.57 47.57
L3 STA. 9+480 - 9+345 30.00 35 47.57

2 RIGID 24-Dec-13 4.0 31-Dec-13 21-Jan-14 30.00 35 47.57 47.57


R2 STA. 10+635 - 10+590 31.00 35 47.57

3 RIGID 24-Dec-13 4.0 31-Dec-13 21-Jan-14 31.00 40 54.37 50.97


L2 STA. 7+225 - 7+270 31.00 35 47.57

4 RIGID 25-Dec-13 4.0 1-Jan-14 22-Jan-14 30.00 35 47.57 47.57


R1 STA. 10+245 -10+255 31.00 35 47.57

5 RIGID 26-Dec-13 4.0 2-Jan-14 23-Jan-14 32.00 35 47.57 47.57


R1 STA. 10+240 - 10+675 31.00 35 47.57

6 RIGID 27-Dec-13 4.0 3-Jan-14 24-Jan-14 31.00 40 54.37 50.97


STA. 6+100 - 6+050 L1 30.00 35 47.57

7 RIGID 27-Dec-13 3.0 3-Jan-14 24-Jan-14 30.00 35 47.57 47.57


R1 STA. 10+525 - 10+620 30.00 35 47.57
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
8 RIGID 28-Dec-13 3.0 4-Jan-14 25-Jan-14 31.00 35 47.57 50.97
L2 STA. 7+495 - 7+515 31.00 40 54.37

1 9 RIGID 5-Jan-14 4.0 12-Jan-14 2-Feb-14 31.00 35 47.57 47.57


2 L3 STA. 10+237,5 - 10+255 2-Feb-14 31.00 35 47.57

3 10 RIGID 6-Jan-14 4.0 13-Jan-14 3-Feb-14 31.00 35 47.57 50.97


4 R1 STA. 10+655 - 8+647 3-Feb-14 31.00 40 54.37

5 11 RIGID 7-Jan-14 4.0 14-Jan-14 4-Feb-14 31.00 35 47.57 47.57


6 L2 STA. 9+625 - 9+595 4-Feb-14 31.00 35 47.57

7 12 RIGID 7-Jan-14 4.0 14-Jan-14 4-Feb-14 31.00 35 47.57 47.57


8 L3 STA. 7+355 - 7+382,5 4-Feb-14 31.00 35 47.57

9 13 RIGID 8-Jan-14 4.0 15-Jan-14 5-Feb-14 31.00 35 47.57 47.57


10 STA. 9+630 - 9+595 L2 5-Feb-14 32.00 35 47.57

11 14 RIGID 9-Jan-14 4.0 16-Jan-14 6-Feb-14 31.00 35 47.57 50.97


12 L3 STA. 9+358 - 9+395 6-Feb-14 31.00 40 54.37

13 15 RIGID 9-Jan-14 4.0 16-Jan-14 6-Feb-14 32.00 35 47.57 50.97


14 STA. 10+865 - 10+920 R2 6-Feb-14 31.00 40 54.37

15 16 RIGID 10-Jan-14 4.0 17-Jan-14 7-Feb-14 31.00 35 47.57 50.97


16 L1,L2,L3 STA. 7+430 - 7-Feb-14 31.00 40 54.37
7+417

17 17 RIGID 11-Jan-14 4.0 18-Jan-14 8-Feb-14 32.00 40 54.37 53.01


18 L3 STA. 9+395 - 9+435 8-Feb-14 30.00 38 51.65

19 18 RIGID 11-Jan-14 4.0 18-Jan-14 8-Feb-14 31.00 38 51.65 52.33


20 L3 STA. 9+435 - 9+495 8-Feb-14 31.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

21 19 RIGID 12-Jan-14 4.0 19-Jan-14 9-Feb-14 31.00 40 54.37 54.37


22 TAMAN DAYU STA. 0+430 9-Feb-14 30.00 40 54.37
- 0+450 R2

23 20 RIGID 12-Jan-14 3.0 19-Jan-14 9-Feb-14 32.00 37 50.29 55.73


24 GESING 5+800 - 5+850 L1 9-Feb-14 31.00 45 61.16

25 21 RIGID 13-Jan-14 4.0 20-Jan-14 10-Feb-14 31.00 35 47.57 48.25


26 STA. 7+220 - 7+265 L3 10-Feb-14 31.00 36 48.93

27 22 RIGID 13-Jan-14 4.0 20-Jan-14 10-Feb-14 30.00 38 51.65 49.61


28 L1 STA. 5+995 - 6+325 10-Feb-14 31.00 35 47.57

29 23 RIGID 14-Jan-14 4.0 21-Jan-14 31.00 30 40.77 11-Feb-14 31.00 35 47.57 50.97
30 L1 STA. 5+910 - 5+980 31.00 30 40.77 11-Feb-14 31.00 40 54.37

31 24 RIGID 16-Jan-14 4.0 23-Jan-14 31.00 29 39.42 13-Feb-14 31.00 35 47.57 48.25
32 STA. 7+400 - 7+420 R1 30.00 30 40.77 13-Feb-14 32.00 36 48.93

33 25 RIGID 17-Jan-14 4.0 24-Jan-14 31.00 28 38.06 14-Feb-14 31.00 37 50.29 48.93
34 STA. 7+960 - 7+980 L3 31.00 30 40.77 14-Feb-14 31.00 35 47.57

35 26 RIGID 18-Jan-14 3.0 25-Jan-14 31.00 30 40.77 15-Feb-14 30.00 37 50.29 48.93
36 STA. 7+965 - 7+980 L2 32.00 30 40.77 15-Feb-14 32.00 35 47.57

37 27 RIGID 20-Jan-14 3.0 27-Jan-14 31.00 30 40.77 17-Feb-14 31.00 35 47.57 48.25
38 STA. 8+295 - 8+310 R1 32.00 30 40.77 17-Feb-14 31.00 36 48.93

39 28 RIGID 21-Jan-14 3.0 28-Jan-14 32.00 30 40.77 18-Feb-14 32.00 35 47.57 48.93
40 STA. 8+255 - 8+270 R3 31.00 30 40.77 18-Feb-14 32.00 37 50.29

41 29 RIGID 22-Jan-14 4.0 29-Jan-14 31.00 27 36.70 19-Feb-14 30.00 36 48.93 49.61
42 STA. 8+260 - 8+285 L1 32.00 27 36.70 19-Feb-14 31.00 37 50.29

30 RIGID 24-Jan-14 4.0 31-Jan-14 31.00 27 36.70 21-Feb-14


STA. 8+245 - 8+275 R2 32.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
STA. 8+245 - 8+275 R2 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

43 31 RIGID 25-Jan-14 4.0 1-Feb-14 31.00 28 38.06 22-Feb-14


44 STA. 7+430 - 7+415 L3 1-Feb-14 31.00 30 40.77

45 32 RIGID 26-Jan-14 4.0 2-Feb-14 31.00 30 40.77 23-Feb-14


46 STA. 7+380 - 7+385 R3 2-Feb-14 31.00 30 40.77

47 33 RIGID 26-Jan-14 4.0 2-Feb-14 32.00 27 36.70 23-Feb-14


48 STA. 0+700 - 0+715 R2 2-Feb-14 31.00 28 38.06

49 34 RIGID 28-Jan-14 4.0 4-Feb-14 31.00 30 40.77 25-Feb-14


50 STA. 0+270 - 0+320 L2 4-Feb-14 31.00 30 40.77

51 35 RIGID 30-Jan-14 4.0 6-Feb-14 31.00 30 40.77 27-Feb-14


52 STA. 5+770 - 5+830 R1 6-Feb-14 31.00 29 39.42

53 36 RIGID 31-Jan-14 3.0 7-Feb-14 31.00 28 38.06 28-Feb-14


54 STA. 5+830 -5+880 L2 7-Feb-14 30.00 29 39.42
GESING

55 37 RIGID 1-Feb-14 4.0 8-Feb-14 30.00 27 36.70 1-Mar-14


56 STA. 8+035 - 8+000 R2 8-Feb-14 30.00 28 38.06

57 38 RIGID 2-Feb-14 4.0 9-Feb-14 30.00 27 36.70 2-Mar-14


58 GESING STA. 5+895 - 9-Feb-14 31.00 27 36.70
6+100 L1

59 39 RIGID 2-Feb-14 4.0 9-Feb-14 31.00 28 38.06 2-Mar-14


60 STA. 8+020 - 7+925 L3 9-Feb-14 31.00 27 36.70
PUCANG ANOM

61 40 RIGID 3-Feb-14 4.0 10-Feb-14 31.00 27 36.70 3-Mar-14


62 STA. 5+945 - 6+150 R1 10-Feb-14 32.00 28 38.06

63 41 RIGID 3-Feb-14 4.0 10-Feb-14 31.00 30 40.77 3-Mar-14


64 STA. 8+020 - 7+990 L3 10-Feb-14 30.00 29 39.42

65 42 RIGID 4-Feb-14 4.0 11-Feb-14 31.00 28 38.06 4-Mar-14


66 STA. 8+005 - 7+995 R2 11-Feb-14 31.00 29 39.42
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
STA. 8+005 - 7+995 R2 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

67 43 RIGID 5-Feb-14 4.0 12-Feb-14 31.00 27 36.70 5-Mar-14


68 STA. 5+995 - 6+025 R1 12-Feb-14 32.00 28 38.06

69 41 RIGID 6-Feb-14 4.0 13-Feb-14 31.00 30 40.77 6-Mar-14


70 STA. 5+550 - 5+650 L1 13-Feb-14 31.00 30 40.77
GESING

71 42 RIGID 7-Feb-14 4.0 14-Feb-14 31.00 27 36.70 7-Mar-14


72 STA. 6+000 - 6+070 L2 14-Feb-14 31.00 28 38.06
73 14-Feb-14 32.00 30 40.77
74 14-Feb-14 31.00 28 38.06

75 44 RIGID 8-Feb-14 4.0 15-Feb-14 30.00 28 38.06 8-Mar-14


76 STA. 8+000 - 7+990 R2 15-Feb-14 30.00 30 40.77

77 45 RIGID 8-Feb-14 4.0 15-Feb-14 31.00 30 40.77 8-Mar-14


78 STA. 5+895 - 5+840 L2 15-Feb-14 30.00 30 40.77

79 46 RIGID 9-Feb-14 4.0 16-Feb-14 31.00 27 36.70 9-Mar-14


80 STA. 7+995 - 8+000 R3 16-Feb-14 30.00 27 36.70

81 47 RIGID 10-Feb-14 4.0 17-Feb-14 31.00 30 40.77 10-Mar-14


82 STA. 5+820 - 5+750 L2 17-Feb-14 32.00 29 39.42
GESING

83 48 RIGID 13-Feb-14 4.0 20-Feb-14 31.00 28 38.06 13-Mar-14


84 STA. 5+870 - 5+895 R1 20-Feb-14 31.00 27 36.70

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
Jasamarga Pandaan Tol Konsultan Kontraktor
PT. Multi Phi Beta
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( ________________________)
( _____________________________ ) ( _____________________________ )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
1 RIGID 24-Jan-14 3.0 31-Jan-14 21-Feb-14 33.90 38 51.65 53.01
34.00 40 54.37
R2 STA. 0+700 - 0+685

`
2 RIGID 24-Jan-14 3.0 31-Jan-14 21-Feb-14 35.20 40 54.37 53.69
33.60 39 53.01
L1 STA. 0+545 - 0+530

`
3 RIGID 27-Jan-14 4.0 3-Feb-14 24-Feb-14 33.70 38 51.65 50.97
33.80 37 50.29
STA. 7+400 - 7+415 L3

`
4 RIGID 27-Jan-14 4.0 3-Feb-14 24-Feb-14 35.10 40 54.37 52.67
35.20 39 53.01
L1 STA. 0+205 - 0+255
34.70 39 53.01
34.10 37 50.29

`
5 RIGID 28-Jan-14 4.0 4-Feb-14 25-Feb-14 35.20 40 54.37 53.01
33.70 38 51.65
R3 STA. 8+270 - 8+295

`
6 RIGID 28-Jan-14 3.0 4-Feb-14 25-Feb-14 33.70 38 51.65 52.33
33.80 39 53.01
R1 STA. 5+730 - 5+800

Page 165 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
7 RIGID 29-Jan-14 4.0 5-Feb-14 26-Feb-14 35.20 40 54.37 54.37
35.70 40 54.37
STA. 10+200 - 10+290 R3
34.90 41 55.73
33.90 39 53.01

`
8 RIGID 30-Jan-14 3.0 6-Feb-14 27-Feb-14 34.20 39 53.01 51.65
33.90 37 50.29
R2 STA. 8+275 - 8+280

`
9 RIGID 30-Jan-14 3.0 6-Feb-14 27-Feb-14 35.70 41 55.73 53.69
33.80 38 51.65
STA. 7+370 - 7+387 L2

`
10 RIGID 30-Jan-14 3.0 6-Feb-14 27-Feb-14 35.70 41 55.73 53.01
33.70 38 51.65
STA. 0+205 - 0+310 L1
33.80 38 51.65
34.20 39 53.01

`
93 11 RIGID 1-Feb-14 4.0 8-Feb-14 1-Mar-14 33.80 38 51.65 53.01
94 STA. 11+210 -11+250 RAM 1-Mar-14 34.70 40 54.37
5

95 12 RIGID 1-Feb-14 4.0 8-Feb-14 1-Mar-14 34.20 39 53.01 53.35


96 1-Mar-14 34.50 39 53.01
STA. 0+740 - 0+690 R2
97 1-Mar-14 35.20 41 55.73
98 1-Mar-14 33.70 38 51.65

99 13 RIGID 3-Feb-14 4.0 10-Feb-14 3-Mar-14 34.00 40 54.37 55.05


100 3-Mar-14 34.00 41 55.73
STA. 0+642 - 0+635 L1

101 14 RIGID 3-Feb-14 3.0 10-Feb-14 3-Mar-14 33.90 40 54.37 54.03


102 3-Mar-14 33.80 39 53.01
STA. 0+320 - 0+400 L1
103 3-Mar-14 34.00 40 54.37
104 3-Mar-14 34.00 40 54.37

105 15 RIGID 4-Feb-14 4.0 11-Feb-14 4-Mar-14 34.00 41 55.73 55.73


106 4-Mar-14 34.00 41 55.73
STA. 8+035 - 8+020 R3

107 16 RIGID 5-Feb-14 3.0 12-Feb-14 5-Mar-14 34.00 40 54.37 54.03


108 5-Mar-14 34.00 40 54.37
STA. 0+365 - 0+320 R1
109 5-Mar-14 34.00 39 53.01
110 5-Mar-14 34.00 40 54.37

111 17 RIGID 6-Feb-14 4.0 13-Feb-14 6-Mar-14 34.00 40 54.37 53.69


112 6-Mar-14 33.70 39 53.01
L2 STA. 0+425 - 0+453
Page 166 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
L2 STA. 0+425 - 0+453

Page 167 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

113 18 RIGID 7-Feb-14 4.0 14-Feb-14 7-Mar-14 33.90 37 50.29 50.97


114 7-Mar-14 33.90 38 51.65
L3 STA. 0+100 - 0+140

115 19 RIGID 7-Feb-14 3.0 14-Feb-14 7-Mar-14 34.70 40 54.37 53.01


116 7-Mar-14 34.00 38 51.65
R3 STA. 0+100 - 0+035

117 20 RIGID 11-Feb-14 3.0 18-Feb-14 11-Mar-14 33.90 39 53.01 53.01


118 11-Mar-14 33.80 38 51.65
119 11-Mar-14 35.20 42 57.08
120 L2 STA. 5+900 - 5+980 11-Mar-14 33.70 37 50.29
121 11-Mar-14 33.80 38 51.65
122 11-Mar-14 34.00 40 54.37

123 21 RIGID 12-Feb-14 4.0 19-Feb-14 12-Mar-14 34.00 40 54.37 51.99


124 12-Mar-14 33.70 37 50.29
125 L2 STA. 5+980 - 6+025 12-Mar-14 33.80 38 51.65
126 12-Mar-14 33.80 38 51.65

127 22 RIGID 15-Feb-14 3.0 22-Feb-14 32.7 29 39.42 15-Mar-14 35.20 41 55.73 53.01
128 33.1 31 42.13 15-Mar-14 33.90 39 53.01
129 33.0 28 38.06 15-Mar-14 34.70 37 50.29
130 L1 STA. 0+425 - 0+315 15-Mar-14 33.90 39 53.01
131 15-Mar-14 35.20 40 54.37
132 15-Mar-14 33.80 38 51.65

133 23 RIGID 16-Feb-14 4.0 23-Feb-14 32.7 28 38.06 16-Mar-14 35.20 40 54.37 53.69
134 16-Mar-14 33.90 39 53.01
R2 STA. 0+715 - 0+730

135 24 RIGID 16-Feb-14 4.0 23-Feb-14 32.7 30 40.77 16-Mar-14 35.70 41 55.73 53.69
136 16-Mar-14 33.70 38 51.65
L1 STA. 0+645 - 0+655

137 25 RIGID 17-Feb-14 3.0 24-Feb-14 33.0 29 39.42 17-Mar-14 32.70 36 48.93 52.33
138 34.5 31 42.13 17-Mar-14 33.80 38 51.65
139 33.1 29 39.42 17-Mar-14 33.90 39 53.01
140 32.7 30 40.77 17-Mar-14 33.90 39 53.01
141 R2 STA. 0+285 - 0+400 17-Mar-14 34.70 41 55.73
142 17-Mar-14 34.00 40 54.37
143 17-Mar-14 33.80 37 50.29
144 17-Mar-14 33.90 38 51.65

145 26 RIGID 18-Feb-14 4.0 25-Feb-14 33.1 31 42.13 18-Mar-14 34.00 39 53.01 52.33
146 18-Mar-14 33.70 38 51.65
L2 STA. 0+700 - 0+685

147 27 RIGID 18-Feb-14 4.0 25-Feb-14 32.7 31 42.13 18-Mar-14 33.80 38 51.65 53.69
Page 168 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
148 18-Mar-14 34.70 41 55.73
STA. 0+565 - 0+575 R1

149 28 RIGID 19-Feb-14 3.0 26-Feb-14 33.1 30 40.77 19-Mar-14 33.90 38 51.65 53.23
150 32.7 29 39.42 19-Mar-14 34.00 40 54.37
151 33.1 31 42.13 19-Mar-14 34.20 40 54.37
152 R1 STA. 0+400 - 0+450 19-Mar-14 34.70 41 55.73
153 19-Mar-14 33.90 39 53.01
154 19-Mar-14 33.80 37 50.29

155 29 RIGID 19-Feb-14 4.0 26-Feb-14 34.5 30 40.77 19-Mar-14 33.90 39 53.01 53.01
156 19-Mar-14 33.90 39 53.01
R2 STA. 0+450 - 0+515

157 30 RIGID 20-Feb-14 4.0 27-Feb-14 34.5 30 40.77 20-Mar-14 34.00 40 54.37 55.05
158 20-Mar-14 34.00 41 55.73
L1 STA. 0+390 - 0+410

159 31 RIGID 20-Feb-14 3.0 27-Feb-14 32.7 30 40.77 20-Mar-14 34.50 39 53.01 54.03
160 34.6 31 42.13 20-Mar-14 34.30 39 53.01
161 R1 STA. 0+275 - 0+325 20-Mar-14 34.30 41 55.73
162 20-Mar-14 34.50 40 54.37

` `
163 32 RIGID 24-Feb-14 4.0 3-Mar-14 34.0 34 46.21 24-Mar-14
164 3-Mar-14 34.0 30 40.77
STA. 0+690 - 0+760 RAM 5
`

165 33 RIGID 25-Feb-14 4.0 4-Mar-14 33.9 33 44.85 25-Mar-14


4-Mar-14
STA. 0+715 - 0+760 RAM5

166 34 RIGID 25-Feb-14 3.0 4-Mar-14 34.0 33 44.85 25-Mar-14


167 4-Mar-14 34.0 34 46.21
STA. 8+260 - 8+315 L3

168 35 RIGID 25-Feb-14 3.0 4-Mar-14 33.9 33 44.85 25-Mar-14


169 4-Mar-14 33.8 33 44.85
STA. 8+260 - 8+315 L3
170 4-Mar-14 33.9 35 47.57
171 4-Mar-14 33.9 34 46.21

172 36 RIGID 27-Feb-14 4.0 6-Mar-14 33.8 29 39.42 27-Mar-14

L2 STA. 0+750 - 0+745

173 37 RIGID 27-Feb-14 4.0 6-Mar-14 33.9 30 40.77 27-Mar-14

L2 STA. 0+685 - 0+670

Page 169 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
174 38 RIGID 1-Mar-14 4.0 8-Mar-14 32.7 29 39.42 29-Mar-14
175 8-Mar-14 32.8 29 39.42
L2 STA. 10+925 - 10+975

Page 170 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

176 39 RIGID 3-Mar-14 3.0 10-Mar-14 32.7 28 38.06 31-Mar-14


177 10-Mar-14 33.4 30 40.77
R1 STA. 11+085 - 10+060
178 10-Mar-14 33.9 31 42.13
179 10-Mar-14 33.8 30 40.77

180 40 RIGID 5-Mar-14 4.0 12-Mar-14 33.4 30 40.77 2-Apr-14

L1 STA. 10+915 - 10+930

181 41 RIGID 5-Mar-14 4.0 12-Mar-14 32.8 29 39.42 2-Apr-14

R1 STA. 11+095 - 11+085

182 42 RIGID 6-Mar-14 4.0 13-Mar-14 33.4 29 39.42 3-Apr-14


183 13-Mar-14 32.7 28 38.06
STA. 0+670 - 0+652 R2

184 43 RIGID 7-Mar-14 3.0 14-Mar-14 34.6 30 40.77 4-Apr-14


185 14-Mar-14 33.4 29 39.42
STA. 9+220 - 9+300 L2
186 14-Mar-14 34.7 31 42.13

187 44 RIGID 10-Mar-14 3.0 17-Mar-14 33.8 30 40.77 7-Apr-14


188 17-Mar-14 33.4 29 39.42
STA. 10+990 - 11+075 L3
189 17-Mar-14 33.4 29 39.42

190 45 RIGID 12-Mar-14 4.0 19-Mar-14 34.6 30 40.77 9-Apr-14


191 19-Mar-14 33.8 29 39.42
RAM 5 STA. 0+735 - 0+755
19-Mar-14

Disetujui Oleh :
Konsultan Pandaan, ............... 2014
PT. Multi Phi Beta Diajukan Oleh :
Diketahui Oleh :
PT.Tata Guna Patria Kontraktor
Jasamarga Pandaan Tol
PT.Eskapindo Matra (KSO)

(__________________________________) ( ________________________)
( _____________________________ )

Page 171 of 322


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
192 1 RIGID 22-Feb-14 4.0 1-Mar-14 22-Mar-14 31.00 40 54.37 53.69
193 STA. 0+295 - 0+275 R2 22-Mar-14 32.00 39 53.01

194 2 RIGID 23-Feb-14 3.0 2-Mar-14 23-Mar-14 31.00 38 51.65 53.01


195 STA. 6+075 - 6+125 L2 23-Mar-14 31.00 40 54.37

196 3 RIGID 23-Feb-14 4.0 2-Mar-14 23-Mar-14 32.00 39 53.01 53.69


197 STA. 0+510 - 0+520 R1 23-Mar-14 31.00 40 54.37

198 4 RIGID 24-Feb-14 3.0 3-Mar-14 24-Mar-14 31.00 36 48.93 49.61


199 STA. 8+260 - 8+310 L2 24-Mar-14 31.00 37 50.29

200 5 RIGID 25-Feb-14 4.0 4-Mar-14 25-Mar-14 31.00 38 51.65 52.33


201 STA. 6+050 - 6+080 R1 25-Mar-14 32.00 39 53.01
GESING

202 6 RIGID 28-Feb-14 4.0 7-Mar-14 28-Mar-14 31.00 38 51.65 52.33


203 STA. 8+275 - 8+320 L2 28-Mar-14 31.00 39 53.01
PUCANG ANOM

204 7 RIGID 28-Feb-14 4.0 7-Mar-14 28-Mar-14 32.00 40 54.37 53.69


205 STA. 11+985 - 10+960 R1 28-Mar-14 31.00 39 53.01
KADAPLANG

206 8 RIGID 1-Mar-14 4.0 8-Mar-14 29-Mar-14 31.00 38 51.65 52.33


207 STA. 9+080 - 9+160 L2 29-Mar-14 31.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
208 9 RIGID 2-Mar-14 3.0 9-Mar-14 30-Mar-14 31.00 36 48.93 50.29
209 STA. 10+970 - 10+870 L2 30-Mar-14 31.00 37 50.29
210 4.0 30-Mar-14 32.00 37 50.29
211 30-Mar-14 31.00 38 51.65

212 10 RIGID 2-Mar-14 3.0 9-Mar-14 30-Mar-14 31.00 37 50.29 50.97


213 STA. 9+220 - 9+280 L2 30-Mar-14 32.00 38 51.65

214 11 RIGID 3-Mar-14 4.0 10-Mar-14 31-Mar-14 31.00 40 54.37 53.01


215 STA. 5+895 - 5+825 R2 31-Mar-14 31.00 38 51.65

12 RIGID 4-Mar-14 3.0 11-Mar-14 1-Apr-14 31.00 37 50.29 50.97


STA. 9+085 - 9+065 L3 31.00 38 51.65

13 RIGID 4-Mar-14 4.0 11-Mar-14 1-Apr-14 32.00 40 54.37 53.01


STA. 11+100 - 11+090 L1 31.00 38 51.65

14 RIGID 7-Mar-14 3.0 14-Mar-14 4-Apr-14 31.00 38 51.65 51.99


STA. 11+075 - 11+175 R3 32.00 39 53.01
4.0 31.00 37 50.29
31.00 39 53.01

15 RIGID 8-Mar-14 3.0 15-Mar-14 5-Apr-14 31.00 36 48.93 51.65


STA. 11+075 - 11+185 R3 32.00 37 50.29
31.00 39 53.01
32.00 40 54.37

16 RIGID 9-Mar-14 4.0 16-Mar-14 6-Apr-14 31.00 38 51.65 49.61


STA. 9+120 - 9+290 L1 32.00 35 47.57

17 RIGID 9-Mar-14 4.0 16-Mar-14 6-Apr-14 31.00 37 50.29 52.33


STA. 9+120 - 9+290 L3 32.00 40 54.37

18 RIGID 11-Mar-14 4.0 18-Mar-14 8-Apr-14 31.00 40 54.37 55.73


R2 STA. 9+385 - 9+455 32.00 42 57.08

19 RIGID 12-Mar-14 3.0 19-Mar-14 9-Apr-14 31.00 36 48.93 48.25


R1 STA. 9+485 - 9+530 31.00 35 47.57

20 RIGID 13-Mar-14 3.0 20-Mar-14 10-Apr-14 31.00 40 54.37 54.37


R2 STA. 9+455 - 9+515 32.00 40 54.37

216 21 RIGID 14-Mar-14 4.0 21-Mar-14 31.00 28 38.06 11-Apr-14 31.00 38 51.65 51.65
217 R3 STA. 6+055 - 6+155 21-Mar-14 32.00 29 39.42 30.00 40 54.37
218 4.0 21-Mar-14 31.00 27 36.70 30.00 39 53.01
219 21-Mar-14 31.00 30 40.77 30.00 35 47.57
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
220 22 RIGID 15-Mar-14 3.0 22-Mar-14 31.00 27 36.70 12-Apr-14 31.00 35 47.57 50.97
221 R3 STA. 6+055 - 6+105 22-Mar-14 31.00 28 38.06 32.00 40 54.37

222 23 RIGID 15-Mar-14 4.0 22-Mar-14 32.00 30 40.77 12-Apr-14 31.00 37 50.29 49.61
223 STA. 0+460 - 0+475 L1 22-Mar-14 31.00 29 39.42 31.00 36 48.93

224 24 RIGID 17-Mar-14 3.0 24-Mar-14 31.00 27 36.70 14-Apr-14 30.00 35 47.57 51.65
225 R3 STA. 5+930 - 6+030 24-Mar-14 32.00 28 38.06 31.00 40 54.37
226 4.0 24-Mar-14 32.00 29 39.42 30.00 39 53.01
227 24-Mar-14 31.00 28 38.06 30.00 38 51.65

228 25 RIGID 18-Mar-14 4.0 25-Mar-14 31.00 30 40.77 15-Apr-14 31.00 35 47.57 51.99
229 L3 STA. 5+795 - 5+895 25-Mar-14 31.00 30 40.77 32.00 42 57.08
230 3.0 25-Mar-14 32.00 30 40.77 31.00 39 53.01
231 25-Mar-14 31.00 29 39.42 32.00 37 50.29
25-Mar-14
232 26 RIGID 19-Mar-14 3.0 26-Mar-14 32.00 28 38.06 16-Apr-14 30.00 37 50.29 48.93
233 L3 STA. 5+895 - 5+985 26-Mar-14 31.00 29 39.42 31.00 35 47.57

234 27 RIGID 19-Mar-14 3.0 26-Mar-14 31.00 27 36.70 16-Apr-14 30.00 36 48.93 48.25
235 R2 STA. 9+395 - 9+371 26-Mar-14 31.00 28 38.06 30.00 35 47.57

236 28 RIGID 19-Mar-14 3.0 26-Mar-14 31.00 27 36.70 16-Apr-14 31.00 39 53.01 52.33
237 L3 STA. 5+980 - 6+080 26-Mar-14 31.00 28 38.06 32.00 37 50.29
238 4.0 26-Mar-14 32.00 27 36.70 31.00 40 54.37
239 26-Mar-14 31.00 28 38.06 31.00 38 51.65

240 29 RIGID 20-Mar-14 3.0 27-Mar-14 31.00 29 39.42 17-Apr-14 31.00 38 51.65 52.33
241 L3 STA. 6+055 - 6+105 27-Mar-14 31.00 28 38.06 32.00 39 53.01

242 30 RIGID 22-Mar-14 3.0 29-Mar-14 31.00 29 39.42 19-Apr-14 31.00 38 51.65 53.01
243 L1 STA. 8+980 - 9+930 29-Mar-14 32.00 30 40.77 32.00 40 54.37

244 31 RIGID 23-Mar-14 4.0 30-Mar-14 31.00 29 39.42 20-Apr-14 32.00 38 51.65 50.97
245 L3 STA. 9+095 - 9+145 30-Mar-14 31.00 30 40.77 30.00 37 50.29

246 32 RIGID 23-Mar-14 3.0 30-Mar-14 32.00 30 40.77 20-Apr-14 31.00 39 53.01 53.69
247 R4 STA. 11+230 - 11+250 30-Mar-14 31.00 30 40.77 31.00 40 54.37

248 33 RIGID 24-Mar-14 3.0 31-Mar-14 31.00 30 40.77 21-Apr-14


249 L2 STA. 8+990 - 9+040 31-Mar-14 32.00 28 38.06

250 34 RIGID 24-Mar-14 4.0 31-Mar-14 31.00 27 36.70 21-Apr-14


251 R1 STA. 9+122,5 - 9+225 31-Mar-14 31.00 27 36.70
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

35 RIGID 25-Mar-14 3.0 1-Apr-14 31.00 30 40.77 22-Apr-14


L3 STA. 9+225 - 9+290 1-Apr-14 31.00 30 40.77
4.0 1-Apr-14 32.00 31 42.13
1-Apr-14 31.00 29 39.42

36 RIGID 25-Mar-14 3.0 1-Apr-14 32.00 28 38.06 22-Apr-14


L3 STA. 9+22,5 - 9+172,5 1-Apr-14 31.00 30 40.77

37 RIGID 27-Mar-14 3.0 3-Apr-14 31.00 28 38.06 24-Apr-14


R2 STA. 10+925 - 10+940 3-Apr-14 31.00 29 39.42
KADAPLANG

38 RIGID 27-Mar-14 4.0 3-Apr-14 32.00 30 40.77 24-Apr-14


R1 STA. 9+180 - 9+280 3-Apr-14 31.00 29 39.42
3.0 3-Apr-14 32.00 28 38.06
3-Apr-14 31.00 29 39.42

39 RIGID 28-Mar-14 4.0 4-Apr-14 31.00 29 39.42 25-Apr-14


L3 STA. 6+115 - 6+190 4-Apr-14 31.00 30 40.77
3.0 4-Apr-14 32.00 28 38.06
4-Apr-14 31.00 29 39.42

40 RIGID 29-Mar-14 3.0 5-Apr-14 31.00 28 38.06 26-Apr-14


R1 STA. 9+180 - 9+300 5-Apr-14 31.00 29 39.42
4.0 5-Apr-14 32.00 27 36.70
5-Apr-14 31.00 28 38.06
5-Apr-14
41 RIGID 30-Mar-14 3.0 6-Apr-14 31.00 30 40.77 27-Apr-14
STA. 10+930 - 11+005 R1 31.00 31 42.13

42 RIGID 30-Mar-14 4.0 6-Apr-14 32.00 29 39.42 27-Apr-14


STA. 9+320 - 9+323 L 1,2 31.00 30 40.77

43 RIGID 30-Mar-14 3.0 6-Apr-14 32.00 30 40.77 27-Apr-14


R3 STA. 6+065 - 6+115 31.00 30 40.77

44 RIGID 30-Mar-14 4.0 6-Apr-14 31.00 29 39.42 27-Apr-14


R3 STA. 6+120 - 6+150 32.00 30 40.77

45 RIGID 1-Apr-14 3.0 8-Apr-14 31.00 28 38.06 29-Apr-14


R3 STA. 8+865 - 8+935 31.00 27 36.70
32.00 29 39.42
31.00 30 40.77

46 RIGID 1-Apr-14 4.0 8-Apr-14 32.00 29 39.42 29-Apr-14


R3 STA. 8+970 - 8+925 31.00 30 40.77

47 RIGID 1-Apr-14 4.0 8-Apr-14 31.00 30 40.77 29-Apr-14


R3 STA. 5+825 - 5+725 31.00 27 36.70
3.0 31.00 29 39.42
32.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
48 RIGID 2-Apr-14 3.0 9-Apr-14 31.00 30 40.77 30-Apr-14
L1,2,3 STA. 9+020 - 9+023 31.00 29 39.42

49 RIGID 2-Apr-14 4.0 9-Apr-14 32.00 28 38.06 30-Apr-14


L2 STA. 9+295 - 9+325 31.00 29 39.42

50 RIGID 3-Apr-14 3.0 10-Apr-14 31.00 27 36.70 1-May-14


L1,2,3 STA. 9+023 - 9+030 32.00 28 38.06

51 RIGID 3-Apr-14 3.0 10-Apr-14 32.00 27 36.70 1-May-14


L3 STA. 8+735 - 8+835 32.00 29 39.42
4.0 31.00 27 36.70
31.00 28 38.06

52 RIGID 4-Apr-14 3.0 11-Apr-14 31.00 27 36.70 2-May-14


L3 STA. 5+515 - 5+590 31.00 28 38.06

53 RIGID 6-Apr-14 4.0 13-Apr-14 30.00 27 36.70 4-May-14


L2 STA. 8+875 - 8+830 30.00 28 38.06

54 RIGID 6-Apr-14 3.0 13-Apr-14 31.00 30 40.77 4-May-14


R1 STA. 8+750 - 8+850 30.00 30 40.77
3.0 31.00 28 38.06
31.00 30 40.77

55 RIGID 7-Apr-14 3.0 14-Apr-14 30.00 28 38.06 5-May-14


STA. 8+595 - 8+645 R2 30.00 27 36.70

56 RIGID 8-Apr-14 3.0 15-Apr-14 31.00 29 39.42 6-May-14


STA. 8+595 - 8+645 R1 32.00 28 38.06

57 RIGID 8-Apr-14 4.0 15-Apr-14 30.00 29 39.42 6-May-14


STA. 9+020 - 9+055 31.00 31 42.13

58 RIGID 10-Apr-14 3.0 17-Apr-14 31.00 28 38.06 8-May-14


R2 STA. 5+590 - 5+690 32.00 27 36.70
4.0 31.00 29 39.42
31.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
59 RIGID 10-Apr-14 4.0 17-Apr-14 31.00 27 36.70 8-May-14
R3 STA. 8+865 - 8+835 32.00 30 40.77

60 RIGID 11-Apr-14 3.0 18-Apr-14 31.00 27 36.70 9-May-14


R4 STA. 0+580 - 0+600 31.00 29 39.42

61 RIGID 11-Apr-14 4.0 18-Apr-14 32.00 30 40.77 9-May-14


L3 STA. 9+070 - 9+050 31.00 28 38.06

62 RIGID 11-Apr-14 3.0 18-Apr-14 32.00 27 36.70 9-May-14


L3 STA. 8+595 - 8+645 31.00 29 39.42

63 RIGID 12-Apr-14 3.0 19-Apr-14 30.00 28 38.06 10-May-14


R1 STA. 5+585 - 5+635 30.00 29 39.42

64 RIGID 12-Apr-14 4.0 19-Apr-14 32.00 27 36.70 10-May-14


L3 STA. 9+050 - 9+025 31.00 30 40.77

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT Jasamarga Pandaan Tol Konsultan Kontraktor
PT. Multi Phi Beta
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( ________________________)
( _____________________________ ) ( _____________________________ )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
1 RIGID 24-Jan-14 4.0 31-Jan-14 21-Feb-14 31.00 35 47.57 48.25
STA. 8+245 - 8+275 R2 30.00 36 48.93

2 RIGID 25-Jan-14 4.0 1-Feb-14 22-Feb-14 31.00 35 47.57 48.93


STA. 7+430 - 7+415 L3 32.00 37 50.29

3 RIGID 26-Jan-14 4.0 2-Feb-14 23-Feb-14 30.00 38 51.65 50.97


STA. 7+380 - 7+385 R3 31.00 37 50.29

4 RIGID 26-Jan-14 4.0 2-Feb-14 23-Feb-14 30.00 39 53.01 52.33


STA. 0+700 - 0+715 R2 30.00 38 51.65

5 RIGID 28-Jan-14 4.0 4-Feb-14 25-Feb-14 31.00 36 48.93 52.67


STA. 0+270 - 0+320 L2 31.00 39 53.01
31.00 40 54.37
31.00 40 54.37

6 RIGID 30-Jan-14 4.0 6-Feb-14 27-Feb-14 32.00 35 47.57 48.93


STA. 5+770 - 5+830 R1 31.00 37 50.29

7 RIGID 31-Jan-14 3.0 7-Feb-14 28-Feb-14 31.00 38 51.65 52.33


STA. 5+830 -5+880 L2 31.00 39 53.01
GESING

1 8 RIGID 1-Feb-14 4.0 8-Feb-14 1-Mar-14 31.00 36 48.93 49.61


2 STA. 8+035 - 8+000 R2 1-Mar-14 31.00 37 50.29
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
3 9 RIGID 2-Feb-14 4.0 9-Feb-14 2-Mar-14 30.00 35 47.57 48.93
4 GESING STA. 5+895 - 2-Mar-14 31.00 37 50.29
6+100 L1

5 10 RIGID 2-Feb-14 4.0 9-Feb-14 2-Mar-14 31.00 38 51.65 50.29


6 STA. 8+020 - 7+925 L3 2-Mar-14 31.00 36 48.93
PUCANG ANOM

7 11 RIGID 3-Feb-14 4.0 10-Feb-14 3-Mar-14 31.00 39 53.01 52.33


8 STA. 5+945 - 6+150 R1 3-Mar-14 32.00 38 51.65

9 12 RIGID 3-Feb-14 4.0 10-Feb-14 3-Mar-14 30.00 37 50.29 50.97


10 STA. 8+020 - 7+990 L3 3-Mar-14 30.00 38 51.65

11 13 RIGID 4-Feb-14 4.0 11-Feb-14 4-Mar-14 31.00 35 47.57 47.57


12 STA. 8+005 - 7+995 R2 4-Mar-14 31.00 35 47.57

13 14 RIGID 5-Feb-14 4.0 12-Feb-14 5-Mar-14 31.00 40 54.37 53.69


14 STA. 5+995 - 6+025 R1 5-Mar-14 31.00 39 53.01

15 15 RIGID 6-Feb-14 4.0 13-Feb-14 6-Mar-14 31.00 40 54.37 53.01


16 STA. 5+550 - 5+650 L1 6-Mar-14 31.00 38 51.65
GESING

17 16 RIGID 7-Feb-14 4.0 14-Feb-14 7-Mar-14 31.00 35 47.57 50.63


18 STA. 6+000 - 6+070 L2 7-Mar-14 31.00 36 48.93
19 7-Mar-14 31.00 40 54.37
20 7-Mar-14 32.00 38 51.65

21 17 RIGID 8-Feb-14 4.0 15-Feb-14 8-Mar-14 31.00 38 51.65 50.97


22 STA. 8+000 - 7+990 R2 8-Mar-14 31.00 37 50.29

23 18 RIGID 8-Feb-14 4.0 15-Feb-14 8-Mar-14 32.00 39 53.01 53.69


24 STA. 5+895 - 5+840 L2 8-Mar-14 31.00 40 54.37
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
25 19 RIGID 9-Feb-14 4.0 16-Feb-14 9-Mar-14 31.00 40 54.37 53.01
26 STA. 7+995 - 8+000 R3 9-Mar-14 31.00 38 51.65

27 20 RIGID 10-Feb-14 4.0 17-Feb-14 10-Mar-14 31.00 38 51.65 49.61


28 STA. 5+820 - 5+750 L2 10-Mar-14 32.00 35 47.57
GESING

29 21 RIGID 13-Feb-14 4.0 20-Feb-14 13-Mar-14 31.00 35 47.57 48.25


30 STA. 5+870 - 5+895 R1 13-Mar-14 31.00 36 48.93

31 22 RIGID 14-Feb-14 4.0 21-Feb-14 31.00 28 38.06 14-Mar-14 31.00 38 51.65 53.01
32 STA. 6+030 - 6+100 L2 32.00 29 39.42 14-Mar-14 32.00 40 54.37
31.00 27 36.70
31.00 28 38.06

33 23 RIGID 15-Feb-14 4.0 22-Feb-14 31.00 28 38.06 15-Mar-14 31.00 37 50.29 50.97
34 STA. 6+100 - 6+150 R2 30.00 29 39.42 15-Mar-14 31.00 38 51.65

35 24 RIGID 16-Feb-14 4.0 23-Feb-14 30.00 27 36.70 16-Mar-14 31.00 35 47.57 48.93
36 STA. 8+275 - 8+300 L2 31.00 28 38.06 16-Mar-14 31.00 37 50.29

37 25 RIGID 16-Feb-14 3.0 23-Feb-14 31.00 30 40.77 16-Mar-14 32.00 37 50.29 50.97
38 STA. 6+055 - 6+120 R1 31.00 29 39.42 16-Mar-14 31.00 38 51.65

39 26 RIGID 17-Feb-14 3.0 24-Feb-14 30.00 28 38.06 17-Mar-14 31.00 38 51.65 53.01
40 STA. 6+070 - 6+135 L1 31.00 30 40.77 17-Mar-14 30.00 40 54.37

41 27 RIGID 18-Feb-14 4.0 25-Feb-14 31.00 27 36.70 18-Mar-14 31.00 37 50.29 48.93
42 STA. 9+395 - 9+365 R1 32.00 29 39.42 18-Mar-14 31.00 35 47.57

43 28 RIGID 20-Feb-14 4.0 27-Feb-14 31.00 28 38.06 20-Mar-14 31.00 40 54.37 55.39
44 STA. 5+820 - 5+840 L2 30.00 27 36.70 20-Mar-14 30.00 45 61.16
45 30.00 29 39.42 20-Mar-14 29.00 38 51.65
46 30.00 30 40.77 20-Mar-14 30.00 40 54.37

47 29 RIGID 22-Feb-14 4.0 1-Mar-14 31.00 27 36.70 22-Mar-14


48 STA. 0+295 - 0=275 R2 22-Feb-14 1-Mar-14 31.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
49 30 RIGID 23-Feb-14 3.0 2-Mar-14 32.00 27 36.70 23-Mar-14
50 STA. 6+075 - 6+125 L2 23-Feb-14 2-Mar-14 31.00 28 38.06

51 31 RIGID 23-Feb-14 4.0 2-Mar-14 32.00 29 39.42 23-Mar-14


52 STA. 0+510 - 0+520 R1 23-Feb-14 2-Mar-14 30.00 27 36.70

53 32 RIGID 24-Feb-14 3.0 3-Mar-14 31.00 30 40.77 24-Mar-14


54 STA. 8+260 - 8+310 L2 24-Feb-14 3-Mar-14 31.00 29 39.42

55 33 RIGID 25-Feb-14 4.0 4-Mar-14 31.00 28 38.06 25-Mar-14


56 STA. 6+050 - 6+080 R1 25-Feb-14 4-Mar-14 31.00 30 40.77
GESING

57 34 RIGID 28-Feb-14 4.0 7-Mar-14 31.00 28 38.06 28-Mar-14


58 STA. 8+275 - 8+320 L2 28-Feb-14 7-Mar-14 31.00 30 40.77
PUCANG ANOM

59 35 RIGID 28-Feb-14 4.0 7-Mar-14 32.00 27 36.70 28-Mar-14


60 STA. 11+985 - 10+960 R1 28-Feb-14 7-Mar-14 31.00 27 36.70
KADAPLANG

61 36 RIGID 1-Mar-14 4.0 8-Mar-14 31.00 30 40.77 29-Mar-14


62 STA. 9+080 - 9+660 L2 1-Mar-14 8-Mar-14 32.00 28 38.06

63 37 RIGID 2-Mar-14 4.0 9-Mar-14 31.00 28 38.06 30-Mar-14


64 STA. 10+970 - 10+870 L2 2-Mar-14 9-Mar-14 31.00 29 39.42
65 9-Mar-14 32.00 27 36.70
66 9-Mar-14 31.00 30 40.77

67 38 RIGID 2-Mar-14 4.0 9-Mar-14 31.00 29 39.42 30-Mar-14


68 STA. 9+220 - 9+280 L2 2-Mar-14 9-Mar-14 32.00 28 38.06

69 39 RIGID 3-Mar-14 4.0 10-Mar-14 31.00 28 38.06 31-Mar-14


70 STA. 5+895 - 5+825 R2 3-Mar-14 10-Mar-14 31.00 30 40.77

71 40 RIGID 4-Mar-14 4.0 11-Mar-14 31.00 27 36.70 1-Apr-14


72 STA. 9+085 - 9+065 L3 4-Mar-14 11-Mar-14 31.00 29 39.42
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
73 41 RIGID 4-Mar-14 4.0 11-Mar-14 32.00 30 40.77 1-Apr-14
74 STA. 11+100 - 11+090 L1 4-Mar-14 11-Mar-14 31.00 28 38.06

75 42 RIGID 7-Mar-14 4.0 14-Mar-14 31.00 29 39.42 4-Apr-14


76 STA. 11+075 - 11+175 R3 7-Mar-14 14-Mar-14 32.00 27 36.70
77 7-Mar-14 14-Mar-14 31.00 30 40.77
78 7-Mar-14 14-Mar-14 31.00 30 40.77

79 43 RIGID 8-Mar-14 4.0 15-Mar-14 31.00 30 40.77 5-Apr-14


80 STA. 11+075 - 11+185 R3 8-Mar-14 15-Mar-14 31.00 27 36.70
81 8-Mar-14 15-Mar-14 32.00 28 38.06
82 8-Mar-14 15-Mar-14 31.00 30 40.77

83 44 RIGID 9-Mar-14 4.0 16-Mar-14 31.00 28 38.06 6-Apr-14


84 STA. 9+120 - 9+290 L1 9-Mar-14 16-Mar-14 32.00 29 39.42

85 45 RIGID 9-Mar-14 4.0 16-Mar-14 31.00 27 36.70 6-Apr-14


86 STA. 9+120 - 9+290 L3 9-Mar-14 16-Mar-14 31.00 28 38.06

87 46 RIGID 11-Mar-14 4.0 18-Mar-14 31.00 28 38.06 8-Apr-14


88 R2 STA. 9+385 - 9+455 11-Mar-14 18-Mar-14 30.00 29 39.42

89 47 RIGID 12-Mar-14 3.0 19-Mar-14 31.00 27 36.70 9-Apr-14


90 R1 STA. 9+485 - 9+530 12-Mar-14 19-Mar-14 30.00 28 38.06

91 48 RIGID 13-Mar-14 4.0 20-Mar-14 31.00 28 38.06 10-Apr-14


92 R2 STA. 9+455 - 9+515 13-Mar-14 20-Mar-14 31.00 29 39.42

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
Jasamarga Pandaan Tol Konsultan Kontraktor
PT. Multi Phi Beta
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( ________________________)
( _____________________________ ) ( _____________________________ )
PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : Maret 2014

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 1-Mar-14 28 1.00 48.93 48.93 17.86
RIGID
2 1-Mar-14 28 1.00 50.29 50.29 8.22
3 2-Mar-14 28 1.00 47.57 47.57 31.20
RIGID
4 2-Mar-14 28 1.00 50.29 50.29 8.22
5 2-Mar-14 28 1.00 51.65 51.65 2.27
RIGID
6 2-Mar-14 28 1.00 48.93 48.93 17.86
7 3-Mar-14 28 1.00 53.01 53.01 0.02
RIGID
8 3-Mar-14 28 1.00 51.65 51.65 2.27
9 3-Mar-14 28 1.00 50.29 50.29 8.22
RIGID
10 3-Mar-14 28 1.00 51.65 51.65 2.27
11 4-Mar-14 28 1.00 47.57 47.57 31.20
RIGID
12 4-Mar-14 28 1.00 47.57 47.57 31.20
13 5-Mar-14 28 1.00 54.37 54.37 1.46
RIGID
14 5-Mar-14 28 1.00 53.01 53.01 0.02
15 6-Mar-14 28 1.00 54.37 54.37 1.46
RIGID
16 6-Mar-14 28 1.00 51.65 51.65 2.27
17 7-Mar-14 28 1.00 47.57 47.57 31.20 RIGID
18 7-Mar-14 28 1.00 48.93 48.93 17.86
19 7-Mar-14 28 1.00 54.37 54.37 1.46 STA. 6+000 - 6+070 L2
20 7-Mar-14 28 1.00 51.65 51.65 2.27
21 8-Mar-14 28 1.00 51.65 51.65 2.27
RIGID
22 8-Mar-14 28 1.00 50.29 50.29 8.22
23 8-Mar-14 28 1.00 53.01 53.01 0.02
RIGID
24 8-Mar-14 28 1.00 54.37 54.37 1.46
25 9-Mar-14 28 1.00 54.37 54.37 1.46
RIGID
26 9-Mar-14 28 1.00 51.65 51.65 2.27
27 10-Mar-14 28 1.00 51.65 51.65 2.27
RIGID
28 10-Mar-14 28 1.00 47.57 47.57 31.20
29 13-Mar-14 28 1.00 47.57 47.57 31.20
RIGID
30 13-Mar-14 28 1.00 48.93 48.93 17.86
31 14-Mar-14 28 1.00 51.65 51.65 2.27
RIGID
32 14-Mar-14 28 1.00 54.37 54.37 1.46
33 15-Mar-14 28 1.00 50.29 50.29 8.22
RIGID
34 15-Mar-14 28 1.00 51.65 51.65 2.27
35 16-Mar-14 28 1.00 47.57 47.57 31.20
RIGID
36 16-Mar-14 28 1.00 50.29 50.29 8.22
37 16-Mar-14 28 1.00 50.29 50.29 8.22
RIGID
38 16-Mar-14 28 1.00 51.65 51.65 2.27
39 17-Mar-14 28 1.00 51.65 51.65 2.27
RIGID
40 17-Mar-14 28 1.00 54.37 54.37 1.46
41 18-Mar-14 28 1.00 50.29 50.29 8.22
RIGID
42 18-Mar-14 28 1.00 47.57 47.57 31.20
43 20-Mar-14 28 1.00 54.37 54.37 1.46 RIGID
44 20-Mar-14 28 1.00 61.16 61.16 64.09
STA. 5+820 - 5+840 L2
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
45 20-Mar-14 28 1.00 51.65 51.65 2.27 STA. 5+820 - 5+840 L2
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn ) STA. 5+820 - 5+840 L2
46 20-Mar-14 28 1.00 54.37 54.37 1.46
47 1-Mar-14 7 0.75 36.70 48.93 17.86
RIGID
48 1-Mar-14 7 0.75 38.06 50.74 5.83
49 2-Mar-14 7 0.75 36.70 48.93 17.86
RIGID
50 2-Mar-14 7 0.75 38.06 50.74 5.83
51 2-Mar-14 7 0.75 39.42 52.55 0.36
RIGID
52 2-Mar-14 7 0.75 36.70 48.93 17.86
53 3-Mar-14 7 0.75 40.77 54.37 1.46
RIGID
54 3-Mar-14 7 0.75 39.42 52.55 0.36
55 4-Mar-14 7 0.75 38.06 50.74 5.83
RIGID
56 4-Mar-14 7 0.75 40.77 54.37 1.46
57 7-Mar-14 7 0.75 38.06 50.74 5.83
RIGID
58 7-Mar-14 7 0.75 40.77 54.37 1.46
59 7-Mar-14 7 0.75 36.70 48.93 17.86
RIGID
60 7-Mar-14 7 0.75 36.70 48.93 17.86
61 8-Mar-14 7 0.75 40.77 54.37 1.46
RIGID
62 8-Mar-14 7 0.75 38.06 50.74 5.83
63 9-Mar-14 7 0.75 38.06 50.74 5.83 RIGID
64 9-Mar-14 7 0.75 39.42 52.55 0.36
STA. 10+970 - 10+870
65 9-Mar-14 7 0.75 36.70 48.93 17.86
L2
66 9-Mar-14 7 0.75 40.77 54.37 1.46
67 9-Mar-14 7 0.75 39.42 52.55 0.36
RIGID
68 9-Mar-14 7 0.75 38.06 50.74 5.83
69 10-Mar-14 7 0.75 38.06 50.74 5.83
RIGID
70 10-Mar-14 7 0.75 40.77 54.37 1.46
71 11-Mar-14 7 0.75 36.70 48.93 17.86
RIGID
72 11-Mar-14 7 0.75 39.42 52.55 0.36
73 11-Mar-14 7 0.75 40.77 54.37 1.46
RIGID
74 11-Mar-14 7 0.75 38.06 50.74 5.83
75 14-Mar-14 7 0.75 39.42 52.55 0.36 RIGID
76 14-Mar-14 7 0.75 36.70 48.93 17.86
STA. 11+075 - 11+175
77 14-Mar-14 7 0.75 40.77 54.37 1.46
R3
78 14-Mar-14 7 0.75 40.77 54.37 1.46
79 15-Mar-14 7 0.75 40.77 54.37 1.46 RIGID
80 15-Mar-14 7 0.75 36.70 48.93 17.86
STA. 11+075 - 11+185
81 15-Mar-14 7 0.75 38.06 50.74 5.83
R3
82 15-Mar-14 7 0.75 40.77 54.37 1.46
83 16-Mar-14 7 0.75 38.06 50.74 5.83
RIGID
84 16-Mar-14 7 0.75 39.42 52.55 0.36
85 16-Mar-14 7 0.75 36.70 48.93 17.86
RIGID
86 16-Mar-14 7 0.75 38.06 50.74 5.83
87 18-Mar-14 7 0.75 38.06 50.74 5.83
RIGID
88 18-Mar-14 7 0.75 39.42 52.55 0.36
89 19-Mar-14 7 0.75 36.70 48.93 17.86
RIGID
90 19-Mar-14 7 0.75 38.06 50.74 5.83
91 20-Mar-14 7 0.75 38.06 50.74 5.83
RIGID
92 20-Mar-14 7 0.75 39.42 52.55 0.36
93 1-Mar-14 28 1.00 51.65 51.65 2.27
RIGID
94 1-Mar-14 28 1.00 54.37 54.37 1.46
95 1-Mar-14 28 1.00 53.01 53.01 0.02 RIGID
96 1-Mar-14 28 1.00 53.01 53.01 0.02
STA. 0+740 - 0+690
97 1-Mar-14 28 1.00 55.73 55.73 6.60
R2
98 1-Mar-14 28 1.00 51.65 51.65 2.27
99 3-Mar-14 28 1.00 54.37 54.37 1.46
RIGID
100 3-Mar-14 28 1.00 55.73 55.73 6.60
101 3-Mar-14 28 1.00 54.37 54.37 1.46 RIGID
102 3-Mar-14 28 1.00 53.01 53.01 0.02
103 3-Mar-14 28 1.00 54.37 54.37 1.46 STA. 0+320 - 0+400 L1
104 3-Mar-14 28 1.00 54.37 54.37 1.46
105 4-Mar-14 28 1.00 55.73 55.73 6.60
RIGID
106 4-Mar-14 28 1.00 55.73 55.73 6.60
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
107 5-Mar-14 28 1.00 54.37 54.37 1.46 RIGID
108 5-Mar-14 28 1.00 54.37 54.37 1.46
STA. 0+365 - 0+320
109 5-Mar-14 28 1.00 53.01 53.01 0.02
R1
110 5-Mar-14 28 1.00 54.37 54.37 1.46
111 6-Mar-14 28 1.00 54.37 54.37 1.46
RIGID
112 6-Mar-14 28 1.00 53.01 53.01 0.02
113 7-Mar-14 28 1.00 50.29 50.29 8.22
RIGID
114 7-Mar-14 28 1.00 51.65 51.65 2.27
115 7-Mar-14 28 1.00 54.37 54.37 1.46
RIGID
116 7-Mar-14 28 1.00 51.65 51.65 2.27
117 11-Mar-14 28 1.00 53.01 53.01 0.02 RIGID
118 11-Mar-14 28 1.00 51.65 51.65 2.27
119 11-Mar-14 28 1.00 57.08 57.08 15.43
120 11-Mar-14 28 1.00 50.29 50.29 8.22 L2 STA. 5+900 - 5+980
121 11-Mar-14 28 1.00 51.65 51.65 2.27
122 11-Mar-14 28 1.00 54.37 54.37 1.46
123 12-Mar-14 28 1.00 54.37 54.37 1.46 RIGID
124 12-Mar-14 28 1.00 50.29 50.29 8.22
125 12-Mar-14 28 1.00 51.65 51.65 2.27 L2 STA. 5+980 - 6+025
126 12-Mar-14 28 1.00 51.65 51.65 2.27
127 15-Mar-14 28 1.00 55.73 55.73 6.60 RIGID
128 15-Mar-14 28 1.00 53.01 53.01 0.02
129 15-Mar-14 28 1.00 50.29 50.29 8.22
130 15-Mar-14 28 1.00 53.01 53.01 0.02 L1 STA. 0+425 - 0+315
131 15-Mar-14 28 1.00 54.37 54.37 1.46
132 15-Mar-14 28 1.00 51.65 51.65 2.27
133 16-Mar-14 28 1.00 54.37 54.37 1.46
RIGID
134 16-Mar-14 28 1.00 53.01 53.01 0.02
135 16-Mar-14 28 1.00 55.73 55.73 6.60
RIGID
136 16-Mar-14 28 1.00 51.65 51.65 2.27
137 17-Mar-14 28 1.00 48.93 48.93 17.86 RIGID
138 17-Mar-14 28 1.00 51.65 51.65 2.27
139 17-Mar-14 28 1.00 53.01 53.01 0.02
140 17-Mar-14 28 1.00 53.01 53.01 0.02
R2 STA. 0+285 -
141 17-Mar-14 28 1.00 55.73 55.73 6.60
0+400
142 17-Mar-14 28 1.00 54.37 54.37 1.46
143 17-Mar-14 28 1.00 50.29 50.29 8.22
144 17-Mar-14 28 1.00 51.65 51.65 2.27
145 18-Mar-14 28 1.00 53.01 53.01 0.02
RIGID
146 18-Mar-14 28 1.00 51.65 51.65 2.27
147 18-Mar-14 28 1.00 51.65 51.65 2.27
RIGID
148 18-Mar-14 28 1.00 55.73 55.73 6.60
149 19-Mar-14 28 1.00 51.65 51.65 2.27 RIGID
150 19-Mar-14 28 1.00 54.37 54.37 1.46
151 19-Mar-14 28 1.00 54.37 54.37 1.46
R1 STA. 0+400 -
152 19-Mar-14 28 1.00 55.73 55.73 6.60
0+450
153 19-Mar-14 28 1.00 53.01 53.01 0.02
154 19-Mar-14 28 1.00 50.29 50.29 8.22
155 19-Mar-14 28 1.00 53.01 53.01 0.02
RIGID
156 19-Mar-14 28 1.00 53.01 53.01 0.02
157 20-Mar-14 28 1.00 54.37 54.37 1.46
RIGID
158 20-Mar-14 28 1.00 55.73 55.73 6.60
159 20-Mar-14 28 1.00 53.01 53.01 0.02 RIGID
160 20-Mar-14 28 1.00 53.01 53.01 0.02
R1 STA. 0+275 -
161 20-Mar-14 28 1.00 55.73 55.73 6.60
0+325
162 20-Mar-14 28 1.00 54.37 54.37 1.46
163 3-Mar-14 7 0.75 46.21 61.62 71.55
RIGID
164 3-Mar-14 7 0.75 40.77 54.37 1.46
165 4-Mar-14 7 0.75 44.85 59.80 44.18 RIGID
166 4-Mar-14 7 0.75 44.85 59.80 44.18
RIGID
167 4-Mar-14 7 0.75 46.21 61.62 71.55
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
168 4-Mar-14 7 0.75 44.85 59.80 44.18 RIGID
169 4-Mar-14 7 0.75 44.85 59.80 44.18
170 4-Mar-14 7 0.75 47.57 63.43 105.50 STA. 8+260 - 8+315 L3
171 4-Mar-14 7 0.75 46.21 61.62 71.55
172 6-Mar-14 7 0.75 39.42 52.55 0.36 RIGID
173 6-Mar-14 7 0.75 40.77 54.37 1.46 RIGID
174 8-Mar-14 7 0.75 39.42 52.55 0.36
RIGID
175 8-Mar-14 7 0.75 39.42 52.55 0.36
176 10-Mar-14 7 0.75 38.06 50.74 5.83 RIGID
177 10-Mar-14 7 0.75 40.77 54.37 1.46
R1 STA. 11+085 -
178 10-Mar-14 7 0.75 42.13 56.18 9.13
10+060
179 10-Mar-14 7 0.75 40.77 54.37 1.46
180 12-Mar-14 7 0.75 40.77 54.37 1.46 RIGID
181 12-Mar-14 7 0.75 39.42 52.55 0.36 RIGID
182 13-Mar-14 7 0.75 39.42 52.55 0.36
RIGID
183 13-Mar-14 7 0.75 38.06 50.74 5.83
184 14-Mar-14 7 0.75 40.77 54.37 1.46 RIGID
185 14-Mar-14 7 0.75 39.42 52.55 0.36
STA. 9+220 - 9+300 L2
186 14-Mar-14 7 0.75 42.13 56.18 9.13
187 17-Mar-14 7 0.75 40.77 54.37 1.46 RIGID
188 17-Mar-14 7 0.75 39.42 52.55 0.36 STA. 10+990 - 11+075
189 17-Mar-14 7 0.75 39.42 52.55 0.36 L3
190 19-Mar-14 7 0.75 40.77 54.37 1.46
RIGID
191 19-Mar-14 7 0.75 39.42 52.55 0.36
192 22-Mar-14 28 1.00 54.37 54.37 1.46
RIGID
193 22-Mar-14 28 1.00 53.01 53.01 0.02
194 23-Mar-14 28 1.00 51.65 51.65 2.27
RIGID
195 23-Mar-14 28 1.00 54.37 54.37 1.46
196 23-Mar-14 28 1.00 53.01 53.01 0.02
RIGID
197 23-Mar-14 28 1.00 54.37 54.37 1.46
198 24-Mar-14 28 1.00 48.93 48.93 17.86
RIGID
199 24-Mar-14 28 1.00 50.29 50.29 8.22
200 25-Mar-14 28 1.00 51.65 51.65 2.27
RIGID
201 25-Mar-14 28 1.00 53.01 53.01 0.02
202 28-Mar-14 28 1.00 51.65 51.65 2.27
RIGID
203 28-Mar-14 28 1.00 53.01 53.01 0.02
204 28-Mar-14 28 1.00 54.37 54.37 1.46
RIGID
205 28-Mar-14 28 1.00 53.01 53.01 0.02
206 29-Mar-14 28 1.00 51.65 51.65 2.27
RIGID
207 29-Mar-14 28 1.00 53.01 53.01 0.02
208 30-Mar-14 28 1.00 48.93 48.93 17.86 RIGID
209 30-Mar-14 28 1.00 50.29 50.29 8.22
STA. 10+970 - 10+870
210 30-Mar-14 28 1.00 50.29 50.29 8.22
L2
211 30-Mar-14 28 1.00 51.65 51.65 2.27
212 30-Mar-14 28 1.00 50.29 50.29 8.22
RIGID
213 30-Mar-14 28 1.00 51.65 51.65 2.27
214 31-Mar-14 28 1.00 54.37 54.37 1.46
RIGID
215 31-Mar-14 28 1.00 51.65 51.65 2.27
216 21-Mar-14 7 0.75 38.06 50.74 5.83 RIGID
217 21-Mar-14 7 0.75 39.42 52.55 0.36
R3 STA. 6+055 -
218 21-Mar-14 7 0.75 36.70 48.93 17.86
6+155
219 21-Mar-14 7 0.75 40.77 54.37 1.46
220 22-Mar-14 7 0.75 36.70 48.93 17.86
RIGID
221 22-Mar-14 7 0.75 38.06 50.74 5.83
222 22-Mar-14 7 0.75 40.77 54.37 1.46
RIGID
223 22-Mar-14 7 0.75 39.42 52.55 0.36
224 24-Mar-14 7 0.75 36.70 48.93 17.86 RIGID
225 24-Mar-14 7 0.75 38.06 50.74 5.83
R3 STA. 5+930 -
226 24-Mar-14 7 0.75 39.42 52.55 0.36
6+030
227 24-Mar-14 7 0.75 38.06 50.74 5.83
228 25-Mar-14 7 0.75 40.77 54.37 1.46 RIGID
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
229 25-Mar-14 7 0.75 40.77 54.37 1.46
230 25-Mar-14 7 0.75 40.77 54.37 1.46 L3 STA. 5+795 - 5+895
231 25-Mar-14 7 0.75 39.42 52.55 0.36
232 26-Mar-14 7 0.75 38.06 50.74 5.83
RIGID
233 26-Mar-14 7 0.75 39.42 52.55 0.36
234 26-Mar-14 7 0.75 36.70 48.93 17.86
RIGID
235 26-Mar-14 7 0.75 38.06 50.74 5.83
236 26-Mar-14 7 0.75 36.70 48.93 17.86 RIGID
237 26-Mar-14 7 0.75 38.06 50.74 5.83
238 26-Mar-14 7 0.75 36.70 48.93 17.86 L3 STA. 5+980 - 6+080
239 26-Mar-14 7 0.75 38.06 50.74 5.83
240 27-Mar-14 7 0.75 39.42 52.55 0.36
RIGID
241 27-Mar-14 7 0.75 38.06 50.74 5.83
242 29-Mar-14 7 0.75 39.42 52.55 0.36
RIGID
243 29-Mar-14 7 0.75 40.77 54.37 1.46
244 30-Mar-14 7 0.75 39.42 52.55 0.36
RIGID
245 30-Mar-14 7 0.75 40.77 54.37 1.46
246 30-Mar-14 7 0.75 40.77 54.37 1.46
RIGID
247 30-Mar-14 7 0.75 40.77 54.37 1.46
248 31-Mar-14 7 0.75 40.77 54.37 1.46
RIGID
249 31-Mar-14 7 0.75 38.06 50.74 5.83
250 31-Mar-14 7 0.75 36.70 48.93 17.86
RIGID
251 31-Mar-14 7 0.75 36.70 48.93 17.86
252 24-Mar-14 28 1.00 53.01 53.01 0.02
RIGID
253 24-Mar-14 28 1.00 53.01 53.01 0.02
254 25-Mar-14 28 1.00 48.93 48.93 17.86
RIGID
255 25-Mar-14 28 1.00 51.65 51.65 2.27
256 25-Mar-14 28 1.00 51.65 51.65 2.27
RIGID
257 25-Mar-14 28 1.00 54.37 54.37 1.46
258 25-Mar-14 28 1.00 53.01 53.01 0.02
RIGID
259 25-Mar-14 28 1.00 50.29 50.29 8.22
260 26-Mar-14 28 1.00 57.08 57.08 15.43 RIGID
261 26-Mar-14 28 1.00 57.08 57.08 15.43
262 26-Mar-14 28 1.00 54.37 54.37 1.46
263 26-Mar-14 28 1.00 59.80 59.80 44.18
L3 STA. 11+090 -
264 26-Mar-14 28 1.00 59.80 59.80 44.18
10+950
265 26-Mar-14 28 1.00 57.08 57.08 15.43
266 26-Mar-14 28 1.00 61.16 61.16 64.09
267 26-Mar-14 28 1.00 61.16 61.16 64.09
268 27-Mar-14 28 1.00 54.37 54.37 1.46
RIGID
269 27-Mar-14 28 1.00 54.37 54.37 1.46
270 27-Mar-14 28 1.00 58.44 58.44 27.96
RIGID
271 27-Mar-14 28 1.00 58.44 58.44 27.96
272 28-Mar-14 28 1.00 58.44 58.44 27.96 RIGID
273 28-Mar-14 28 1.00 58.44 58.44 27.96
274 28-Mar-14 28 1.00 61.16 61.16 64.09
R1 STA. 11+085 -
275 28-Mar-14 28 1.00 58.44 58.44 27.96
10+950
276 28-Mar-14 28 1.00 61.16 61.16 64.09
277 28-Mar-14 28 1.00 54.37 54.37 1.46
278 29-Mar-14 28 1.00 54.37 54.37 1.46 RIGID
279 29-Mar-14 28 1.00 61.16 61.16 64.09
L2 STA. 10+925 -
280 29-Mar-14 28 1.00 61.16 61.16 64.09
10+975
281 29-Mar-14 28 1.00 57.08 57.08 15.43
282 31-Mar-14 28 1.00 58.44 58.44 27.96 RIGID
283 31-Mar-14 28 1.00 58.44 58.44 27.96
284 31-Mar-14 28 1.00 54.37 54.37 1.46
285 31-Mar-14 28 1.00 61.16 61.16 64.09
R1 STA. 11+085 -
286 31-Mar-14 28 1.00 61.16 61.16 64.09
10+060
287 31-Mar-14 28 1.00 59.80 59.80 44.18
288 31-Mar-14 28 1.00 61.16 61.16 64.09
289 31-Mar-14 28 1.00 59.80 59.80 44.18
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
290 21-Mar-14 7 0.75 39.42 52.55 0.36 RIGID
291 21-Mar-14 7 0.75 39.42 52.55 0.36 RIGID
292 22-Mar-14 7 0.75 40.77 54.37 1.46
RIGID
293 22-Mar-14 7 0.75 39.42 52.55 0.36
294 24-Mar-14 7 0.75 38.06 50.74 5.83
RIGID
295 24-Mar-14 7 0.75 40.77 54.37 1.46
296 24-Mar-14 7 0.75 40.77 54.37 1.46 RIGID
297 25-Mar-14 7 0.75 40.77 54.37 1.46 RIGID
298 25-Mar-14 7 0.75 40.77 54.37 1.46 RIGID
299 25-Mar-14 7 0.75 39.42 52.55 0.36 RIGID
300 26-Mar-14 7 0.75 40.77 54.37 1.46
RIGID
301 26-Mar-14 7 0.75 40.77 54.37 1.46
302 28-Mar-14 7 0.75 39.42 52.55 0.36
RIGID
303 28-Mar-14 7 0.75 39.42 52.55 0.36
304 28-Mar-14 7 0.75 40.77 54.37 1.46 RIGID
305 29-Mar-14 7 0.75 42.13 56.18 9.13 RIGID
306 29-Mar-14 7 0.75 42.13 56.18 9.13 RIGID
R3 STA. 11+290 -
307 29-Mar-14 7 0.75 40.77 54.37 1.46
11+235
308 31-Mar-14 7 0.75 39.42 52.55 0.36
RIGID
309 31-Mar-14 7 0.75 39.42 52.55 0.36
310 31-Mar-14 7 0.75 40.77 54.37 1.46 RIGID

Σ(σbn - σbm)2 = 2960.71

JUMLAH SAMPLE = 310.00 buah


MIN = 47.57 kg/cm2
MAX = 63.43 kg/cm2
RATA-RATA (σbm) = 53.16 kg/cm2
S ==
KARAKTERISTIK (σbk) = σbm - 1,64 S 3.10 kg/cm2
48.08 kg/cm2

QC STAF QC

( ) ( )
PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : April 2014

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 1-Apr-14 28 1.00 54.37 54.37 #N/A
RIGID
2 1-Apr-14 28 1.00 51.65 51.65 #N/A
3 #N/A 28 1.00 #N/A #N/A #N/A #N/A
4 #N/A 28 1.00 #N/A #N/A #N/A
5 4-Apr-14 28 1.00 50.29 50.29 #N/A #N/A
6 4-Apr-14 28 1.00 53.01 53.01 #N/A
7 5-Apr-14 28 1.00 48.93 48.93 #N/A RIGID
8 5-Apr-14 28 1.00 50.29 50.29 #N/A
STA. 11+075 -
9 5-Apr-14 28 1.00 53.01 53.01 #N/A
11+185 R3
10 5-Apr-14 28 1.00 54.37 54.37 #N/A
11 6-Apr-14 28 1.00 51.65 51.65 #N/A
RIGID
12 6-Apr-14 28 1.00 47.57 47.57 #N/A
13 6-Apr-14 28 1.00 50.29 50.29 #N/A
RIGID
14 6-Apr-14 28 1.00 54.37 54.37 #N/A
15 8-Apr-14 28 1.00 54.37 54.37 #N/A
RIGID
16 8-Apr-14 28 1.00 57.08 57.08 #N/A
17 9-Apr-14 28 1.00 48.93 48.93 #N/A
RIGID
18 9-Apr-14 28 1.00 47.57 47.57 #N/A
19 #N/A 28 1.00 #N/A #N/A #N/A
#N/A
20 10-Apr-14 28 1.00 54.37 54.37 #N/A
21 11-Apr-14 28 1.00 51.65 51.65 #N/A RIGID
22 11-Apr-14 28 1.00 54.37 54.37 #N/A
R3 STA. 6+055 -
23 11-Apr-14 28 1.00 53.01 53.01 #N/A
6+155
24 #N/A 28 1.00 47.57 47.57 #N/A
25 12-Apr-14 28 1.00 47.57 47.57 #N/A
RIGID
26 12-Apr-14 28 1.00 54.37 54.37 #N/A
27 12-Apr-14 28 1.00 50.29 50.29 #N/A
RIGID
28 12-Apr-14 28 1.00 48.93 48.93 #N/A
29 #N/A 28 1.00 #N/A #N/A #N/A #N/A
30 14-Apr-14 28 1.00 54.37 54.37 #N/A
R3 STA. 5+930 -
31 14-Apr-14 28 1.00 53.01 53.01 #N/A
6+030
32 14-Apr-14 28 1.00 51.65 51.65 #N/A
33 15-Apr-14 28 1.00 47.57 47.57 #N/A RIGID
34 15-Apr-14 28 1.00 57.08 57.08 #N/A
L3 STA. 5+795 -
35 15-Apr-14 28 1.00 53.01 53.01 #N/A
5+895
36 15-Apr-14 28 1.00 50.29 50.29 #N/A
37 16-Apr-14 28 1.00 50.29 50.29 #N/A
RIGID
38 16-Apr-14 28 1.00 47.57 47.57 #N/A
39 16-Apr-14 28 1.00 48.93 48.93 #N/A
RIGID
40 16-Apr-14 28 1.00 47.57 47.57 #N/A
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
41 16-Apr-14 28 1.00 53.01 53.01 #N/A RIGID
42 16-Apr-14 28 1.00 50.29 50.29 #N/A
L3 STA. 5+980 -
43 16-Apr-14 28 1.00 54.37 54.37 #N/A
6+080
44 16-Apr-14 28 1.00 51.65 51.65 #N/A
45 17-Apr-14 28 1.00 51.65 51.65 #N/A
RIGID
46 17-Apr-14 28 1.00 53.01 53.01 #N/A
47 19-Apr-14 28 1.00 51.65 51.65 #N/A
RIGID
48 19-Apr-14 28 1.00 54.37 54.37 #N/A
49 20-Apr-14 28 1.00 51.65 51.65 #N/A
RIGID
50 20-Apr-14 28 1.00 50.29 50.29 #N/A
51 20-Apr-14 28 1.00 53.01 53.01 #N/A
RIGID
52 20-Apr-14 28 1.00 54.37 54.37 #N/A
53 1-Apr-14 7 0.75 40.77 54.37 #N/A RIGID
54 1-Apr-14 7 0.75 40.77 54.37 #N/A
L3 STA. 9+225 -
55 1-Apr-14 7 0.75 42.13 56.18 #N/A
9+290
56 1-Apr-14 7 0.75 39.42 52.55 #N/A
57 1-Apr-14 7 0.75 38.06 50.74 #N/A
RIGID
58 1-Apr-14 7 0.75 40.77 54.37 #N/A
59 3-Apr-14 7 0.75 38.06 50.74 #N/A
RIGID
60 3-Apr-14 7 0.75 39.42 52.55 #N/A
61 3-Apr-14 7 0.75 40.77 54.37 #N/A RIGID
62 3-Apr-14 7 0.75 39.42 52.55 #N/A
R1 STA. 9+180 -
63 3-Apr-14 7 0.75 38.06 50.74 #N/A
9+280
64 3-Apr-14 7 0.75 39.42 52.55 #N/A
65 4-Apr-14 7 0.75 39.42 52.55 #N/A RIGID
66 4-Apr-14 7 0.75 40.77 54.37 #N/A
L3 STA. 6+115 -
67 4-Apr-14 7 0.75 38.06 50.74 #N/A
6+190
68 4-Apr-14 7 0.75 39.42 52.55 #N/A
69 5-Apr-14 7 0.75 38.06 50.74 #N/A RIGID
70 5-Apr-14 7 0.75 39.42 52.55 #N/A
R1 STA. 9+180 -
71 5-Apr-14 7 0.75 36.70 48.93 #N/A
9+300
72 5-Apr-14 7 0.75 38.06 50.74 #N/A
73 6-Apr-14 7 0.75 40.77 54.37 #N/A
RIGID
74 6-Apr-14 7 0.75 42.13 56.18 #N/A
75 6-Apr-14 7 0.75 39.42 52.55 #N/A
RIGID
76 6-Apr-14 7 0.75 40.77 54.37 #N/A
77 6-Apr-14 7 0.75 40.77 54.37 #N/A
RIGID
78 6-Apr-14 7 0.75 40.77 54.37 #N/A
79 6-Apr-14 7 0.75 39.42 52.55 #N/A
RIGID
80 6-Apr-14 7 0.75 40.77 54.37 #N/A
81 8-Apr-14 7 0.75 38.06 50.74 #N/A RIGID
82 8-Apr-14 7 0.75 36.70 48.93 #N/A
R3 STA. 8+865 -
83 8-Apr-14 7 0.75 39.42 52.55 #N/A
8+935
84 8-Apr-14 7 0.75 40.77 54.37 #N/A
85 8-Apr-14 7 0.75 39.42 52.55 #N/A
RIGID
86 8-Apr-14 7 0.75 40.77 54.37 #N/A
87 8-Apr-14 7 0.75 40.77 54.37 #N/A RIGID
88 8-Apr-14 7 0.75 36.70 48.93 #N/A
R3 STA. 5+825 -
89 8-Apr-14 7 0.75 39.42 52.55 #N/A
5+725
90 8-Apr-14 7 0.75 38.06 50.74 #N/A
91 9-Apr-14 7 0.75 40.77 54.37 #N/A
RIGID
92 9-Apr-14 7 0.75 39.42 52.55 #N/A
93 9-Apr-14 7 0.75 38.06 50.74 #N/A
RIGID
94 9-Apr-14 7 0.75 39.42 52.55 #N/A
95 10-Apr-14 7 0.75 36.70 48.93 #N/A
RIGID
96 10-Apr-14 7 0.75 38.06 50.74 #N/A
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
97 10-Apr-14 7 0.75 36.70 48.93 #N/A RIGID
98 10-Apr-14 7 0.75 39.42 52.55 #N/A
L3 STA. 8+735 -
99 10-Apr-14 7 0.75 36.70 48.93 #N/A
8+835
100 10-Apr-14 7 0.75 38.06 50.74 #N/A
101 11-Apr-14 7 0.75 36.70 48.93 #N/A
RIGID
102 11-Apr-14 7 0.75 38.06 50.74 #N/A
103 13-Apr-14 7 0.75 36.70 48.93 #N/A
RIGID
104 13-Apr-14 7 0.75 38.06 50.74 #N/A
105 13-Apr-14 7 0.75 40.77 54.37 #N/A RIGID
106 13-Apr-14 7 0.75 40.77 54.37 #N/A
R1 STA. 8+750 -
107 13-Apr-14 7 0.75 38.06 50.74 #N/A
8+850
108 13-Apr-14 7 0.75 40.77 54.37 #N/A
109 14-Apr-14 7 0.75 38.06 50.74 #N/A
RIGID
110 14-Apr-14 7 0.75 36.70 48.93 #N/A
111 15-Apr-14 7 0.75 39.42 52.55 #N/A
RIGID
112 15-Apr-14 7 0.75 38.06 50.74 #N/A
113 15-Apr-14 7 0.75 39.42 52.55 #N/A
RIGID
114 15-Apr-14 7 0.75 42.13 56.18 #N/A
115 17-Apr-14 7 0.75 38.06 50.74 #N/A RIGID
116 17-Apr-14 7 0.75 36.70 48.93 #N/A
R2 STA. 5+590 -
117 17-Apr-14 7 0.75 39.42 52.55 #N/A
5+690
118 17-Apr-14 7 0.75 38.06 50.74 #N/A
119 17-Apr-14 7 0.75 36.70 48.93 #N/A
RIGID
120 17-Apr-14 7 0.75 40.77 54.37 #N/A
121 18-Apr-14 7 0.75 36.70 48.93 #N/A
RIGID
122 18-Apr-14 7 0.75 39.42 52.55 #N/A
123 18-Apr-14 7 0.75 40.77 54.37 #N/A
RIGID
124 18-Apr-14 7 0.75 38.06 50.74 #N/A
125 18-Apr-14 7 0.75 36.70 48.93 #N/A
RIGID
126 18-Apr-14 7 0.75 39.42 52.55 #N/A
127 19-Apr-14 7 0.75 38.06 50.74 #N/A
RIGID
128 19-Apr-14 7 0.75 39.42 52.55 #N/A
129 19-Apr-14 7 0.75 36.70 48.93 #N/A
RIGID
130 19-Apr-14 7 0.75 40.77 54.37 #N/A
131 2-Apr-14 28 1.00 59.80 59.80 #N/A
RIGID
132 2-Apr-14 28 1.00 61.16 61.16 #N/A
133 2-Apr-14 28 1.00 54.37 54.37 #N/A
RIGID
134 2-Apr-14 28 1.00 54.37 54.37 #N/A
135 3-Apr-14 28 1.00 54.37 54.37 #N/A RIGID
136 3-Apr-14 28 1.00 54.37 54.37 #N/A
STA. 0+670 - 0+652
137 3-Apr-14 28 1.00 57.08 57.08 #N/A
R2
138 3-Apr-14 28 1.00 55.73 55.73 #N/A
139 4-Apr-14 28 1.00 51.65 51.65 #N/A RIGID
140 4-Apr-14 28 1.00 53.01 53.01 #N/A
141 4-Apr-14 28 1.00 53.01 53.01 #N/A
STA. 9+220 - 9+300
142 4-Apr-14 28 1.00 50.29 50.29 #N/A
L2
143 4-Apr-14 28 1.00 54.37 54.37 #N/A
144 4-Apr-14 28 1.00 55.73 55.73 #N/A
145 7-Apr-14 28 1.00 53.01 53.01 #N/A RIGID
146 7-Apr-14 28 1.00 51.65 51.65 #N/A
147 7-Apr-14 28 1.00 51.65 51.65 #N/A
STA. 10+990 -
148 7-Apr-14 28 1.00 55.73 55.73 #N/A
11+075 L3
149 7-Apr-14 28 1.00 50.29 50.29 #N/A
150 7-Apr-14 28 1.00 48.93 48.93 #N/A
151 9-Apr-14 28 1.00 54.37 54.37 #N/A
RIGID
152 9-Apr-14 28 1.00 54.37 54.37 #N/A
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
153 9-Apr-14 28 1.00 48.93 48.93 #N/A RIGID
154 9-Apr-14 28 1.00 53.01 53.01 #N/A
RAM 5 STA. 0+735 -
155 9-Apr-14 28 1.00 53.01 53.01 #N/A
0+755
156 9-Apr-14 28 1.00 54.37 54.37 #N/A
157 11-Apr-14 28 1.00 57.08 57.08 #N/A
RIGID
158 11-Apr-14 28 1.00 57.08 57.08 #N/A
159 11-Apr-14 28 1.00 59.80 59.80 #N/A
RIGID
160 11-Apr-14 28 1.00 54.37 54.37 #N/A
161 12-Apr-14 28 1.00 57.08 57.08 #N/A RIGID
162 12-Apr-14 28 1.00 57.08 57.08 #N/A
R2 STA. 0+590 -
163 12-Apr-14 28 1.00 59.80 59.80 #N/A
0+605
164 12-Apr-14 28 1.00 59.80 59.80 #N/A
165 14-Apr-14 28 1.00 61.16 61.16 #N/A RIGID
166 14-Apr-14 28 1.00 61.16 61.16 #N/A R4 STA. 11+010 -
167 14-Apr-14 28 1.00 58.44 58.44 #N/A 11+075
168 14-Apr-14 28 1.00 58.44 58.44 #N/A RIGID
169 14-Apr-14 28 1.00 61.16 61.16 #N/A R3 STA. 11+075 -
170 14-Apr-14 28 1.00 54.37 54.37 #N/A 11+095
171 15-Apr-14 28 1.00 57.08 57.08 #N/A
RIGID
172 15-Apr-14 28 1.00 54.37 54.37 #N/A
173 15-Apr-14 28 1.00 57.08 57.08 #N/A
RIGID
174 15-Apr-14 28 1.00 57.08 57.08 #N/A
175 15-Apr-14 28 1.00 58.44 58.44 #N/A
RIGID
176 15-Apr-14 28 1.00 59.80 59.80 #N/A
177 16-Apr-14 28 1.00 58.44 58.44 #N/A RIGID
178 16-Apr-14 28 1.00 58.44 58.44 #N/A
179 16-Apr-14 28 1.00 57.08 57.08 #N/A R5 STA. 11+050 -
180 16-Apr-14 28 1.00 54.37 54.37 #N/A 11+090
181 16-Apr-14 28 1.00 58.44 58.44 #N/A
182 18-Apr-14 28 1.00 54.37 54.37 #N/A
RIGID
183 18-Apr-14 28 1.00 61.16 61.16 #N/A
184 18-Apr-14 28 1.00 61.16 61.16 #N/A RIGID
185 18-Apr-14 28 1.00 58.44 58.44 #N/A L1 STA. 11+075 -
186 18-Apr-14 28 1.00 58.44 58.44 #N/A 11+100
187 19-Apr-14 28 1.00 57.08 57.08 #N/A
RIGID
188 19-Apr-14 28 1.00 57.08 57.08 #N/A
189 19-Apr-14 28 1.00 54.37 54.37 #N/A RIGID
190 19-Apr-14 28 1.00 61.16 61.16 #N/A R3 STA. 11+290 -
191 19-Apr-14 28 1.00 61.16 61.16 #N/A 11+235
192 1-Apr-14 7 0.75 39.42 52.55 #N/A RIGID
193 1-Apr-14 7 0.75 39.42 52.55 #N/A RIGID
194 1-Apr-14 7 0.75 38.06 50.74 #N/A RAM 2 L2 STA.
195 1-Apr-14 7 0.75 40.77 54.37 #N/A 2+160 - 2+260
196 2-Apr-14 7 0.75 40.77 54.37 #N/A
RIGID
197 2-Apr-14 7 0.75 40.77 54.37 #N/A
198 3-Apr-14 7 0.75 38.06 50.74 #N/A RIGID
199 3-Apr-14 7 0.75 40.77 54.37 #N/A RAM 2 STA. 2+180 -
200 3-Apr-14 7 0.75 40.77 54.37 #N/A 2+260
201 4-Apr-14 7 0.75 40.77 54.37 #N/A
RIGID
202 4-Apr-14 7 0.75 39.42 52.55 #N/A
203 5-Apr-14 7 0.75 39.42 52.55 #N/A RIGID
204 5-Apr-14 7 0.75 39.42 52.55 #N/A RIGID
205 5-Apr-14 7 0.75 40.77 54.37 #N/A RIGID
206 7-Apr-14 7 0.75 39.42 52.55 #N/A
RIGID
207 7-Apr-14 7 0.75 42.13 56.18 #N/A
208 8-Apr-14 7 0.75 38.06 50.74 #N/A
RIGID
209 8-Apr-14 7 0.75 42.13 56.18 #N/A
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
210 9-Apr-14 7 0.75 39.42 52.55 #N/A
RIGID
211 9-Apr-14 7 0.75 39.42 52.55 #N/A
212 10-Apr-14 7 0.75 40.77 54.37 #N/A
RIGID
213 10-Apr-14 7 0.75 39.42 52.55 #N/A
214 10-Apr-14 7 0.75 42.13 56.18 #N/A RIGID
215 10-Apr-14 7 0.75 38.06 50.74 #N/A R2 STA. 5+510 -
216 10-Apr-14 7 0.75 40.77 54.37 #N/A 5+595
217 11-Apr-14 7 0.75 39.42 52.55 #N/A RIGID
218 11-Apr-14 7 0.75 39.42 52.55 #N/A RIGID
219 11-Apr-14 7 0.75 40.77 54.37 #N/A RIGID
220 12-Apr-14 7 0.75 40.77 54.37 #N/A RIGID
221 12-Apr-14 7 0.75 40.77 54.37 #N/A RIGID
222 13-Apr-14 7 0.75 39.42 52.55 #N/A RIGID
223 13-Apr-14 7 0.75 39.42 52.55 #N/A RIGID
224 14-Apr-14 7 0.75 39.42 52.55 #N/A RIGID
225 14-Apr-14 7 0.75 40.77 54.37 #N/A L1 STA. 0+005 -
226 14-Apr-14 7 0.75 40.77 54.37 #N/A 0+040
227 15-Apr-14 7 0.75 40.77 54.37 #N/A
RIGID
228 15-Apr-14 7 0.75 40.77 54.37 #N/A
229 17-Apr-14 7 0.75 40.77 54.37 #N/A
RIGID
230 17-Apr-14 7 0.75 39.42 52.55 #N/A
231 18-Apr-14 7 0.75 39.42 52.55 #N/A RIGID
232 18-Apr-14 7 0.75 39.42 52.55 #N/A L2 STA. 5+515 -
233 18-Apr-14 7 0.75 40.77 54.37 #N/A 5+585
234 21-Apr-14 28 1.00 53.01 53.01 #N/A
RIGID
235 21-Apr-14 28 1.00 50.29 50.29 #N/A
236 21-Apr-14 28 1.00 51.65 51.65 #N/A
RIGID
237 21-Apr-14 28 1.00 48.93 48.93 #N/A
238 22-Apr-14 28 1.00 50.29 50.29 #N/A
RIGID
239 22-Apr-14 28 1.00 51.65 51.65 #N/A
240 22-Apr-14 28 1.00 51.65 51.65 #N/A RIGID
241 22-Apr-14 28 1.00 48.93 48.93 #N/A
L3 STA. 9+225 -
242 22-Apr-14 28 1.00 57.08 57.08 #N/A
9+290
243 22-Apr-14 28 1.00 54.37 54.37 #N/A
244 24-Apr-14 28 1.00 50.29 50.29 #N/A
RIGID
245 24-Apr-14 28 1.00 51.65 51.65 #N/A
246 24-Apr-14 28 1.00 48.93 48.93 #N/A RIGID
247 24-Apr-14 28 1.00 50.29 50.29 #N/A
R1 STA. 9+180 -
248 24-Apr-14 28 1.00 53.01 53.01 #N/A
9+280
249 24-Apr-14 28 1.00 54.37 54.37 #N/A
250 25-Apr-14 28 1.00 53.01 53.01 #N/A RIGID
251 25-Apr-14 28 1.00 55.73 55.73 #N/A
L3 STA. 6+115 -
252 25-Apr-14 28 1.00 51.65 51.65 #N/A
6+190
253 25-Apr-14 28 1.00 53.01 53.01 #N/A
254 26-Apr-14 28 1.00 53.01 53.01 #N/A RIGID
255 26-Apr-14 28 1.00 50.29 50.29 #N/A
R1 STA. 9+180 -
256 26-Apr-14 28 1.00 57.08 57.08 #N/A
9+300
257 26-Apr-14 28 1.00 51.65 51.65 #N/A
258 27-Apr-14 28 1.00 51.65 51.65 #N/A
RIGID
259 27-Apr-14 28 1.00 54.37 54.37 #N/A
260 27-Apr-14 28 1.00 50.29 50.29 #N/A
RIGID
261 27-Apr-14 28 1.00 53.01 53.01 #N/A
262 27-Apr-14 28 1.00 50.29 50.29 #N/A
RIGID
263 27-Apr-14 28 1.00 53.01 53.01 #N/A
264 27-Apr-14 28 1.00 54.37 54.37 #N/A
RIGID
265 27-Apr-14 28 1.00 55.73 55.73 #N/A
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
266 29-Apr-14 28 1.00 51.65 51.65 #N/A RIGID
267 29-Apr-14 28 1.00 53.01 53.01 #N/A
R3 STA. 8+865 -
268 29-Apr-14 28 1.00 55.73 55.73 #N/A
8+935
269 29-Apr-14 28 1.00 54.37 54.37 #N/A
270 29-Apr-14 28 1.00 50.29 50.29 #N/A
RIGID
271 29-Apr-14 28 1.00 53.01 53.01 #N/A
272 29-Apr-14 28 1.00 51.65 51.65 #N/A RIGID
273 29-Apr-14 28 1.00 51.65 51.65 #N/A
R3 STA. 5+825 -
274 29-Apr-14 28 1.00 53.01 53.01 #N/A
5+725
275 29-Apr-14 28 1.00 54.37 54.37 #N/A
276 30-Apr-14 28 1.00 53.01 53.01 #N/A
RIGID
277 30-Apr-14 28 1.00 51.65 51.65 #N/A
278 30-Apr-14 28 1.00 54.37 54.37 #N/A
RIGID
279 30-Apr-14 28 1.00 51.65 51.65 #N/A
280 21-Apr-14 7 0.75 36.70 48.93 #N/A RIGID
281 21-Apr-14 7 0.75 39.42 52.55 #N/A
R3 STA. 9+510 -
282 21-Apr-14 7 0.75 38.06 50.74 #N/A
9+405
283 21-Apr-14 7 0.75 40.77 54.37 #N/A
284 22-Apr-14 7 0.75 39.42 52.55 #N/A
RIGID
285 22-Apr-14 7 0.75 40.77 54.37 #N/A
286 23-Apr-14 7 0.75 38.06 50.74 #N/A
RIGID
287 23-Apr-14 7 0.75 36.70 48.93 #N/A
288 23-Apr-14 7 0.75 38.06 50.74 #N/A RIGID
289 23-Apr-14 7 0.75 39.42 52.55 #N/A
R2 STA. 5+730 -
290 23-Apr-14 7 0.75 36.70 48.93 #N/A
5+830
291 23-Apr-14 7 0.75 39.42 52.55 #N/A
292 26-Apr-14 7 0.75 39.42 52.55 #N/A
RIGID
293 26-Apr-14 7 0.75 38.06 50.74 #N/A
294 26-Apr-14 7 0.75 42.13 56.18 #N/A
RIGID
295 26-Apr-14 7 0.75 39.42 52.55 #N/A
296 27-Apr-14 7 0.75 38.06 50.74 #N/A
RIGID
297 27-Apr-14 7 0.75 39.42 52.55 #N/A
298 27-Apr-14 7 0.75 36.70 48.93 #N/A
RIGID
299 27-Apr-14 7 0.75 40.77 54.37 #N/A
300 27-Apr-14 7 0.75 38.06 50.74 #N/A RIGID
301 27-Apr-14 7 0.75 39.42 52.55 #N/A R3 STA. 9+270 - 9+195
302 28-Apr-14 7 0.75 36.70 48.93 #N/A
RIGID
303 28-Apr-14 7 0.75 38.06 50.74 #N/A
304 28-Apr-14 7 0.75 36.70 48.93 #N/A
RIGID
305 28-Apr-14 7 0.75 36.70 48.93 #N/A
306 28-Apr-14 7 0.75 39.42 52.55 #N/A
RIGID
307 28-Apr-14 7 0.75 38.06 50.74 #N/A
308 28-Apr-14 7 0.75 39.42 52.55 #N/A
RIGID
309 28-Apr-14 7 0.75 40.77 54.37 #N/A
310 21-Apr-14 28 1.00 50.29 50.29 #N/A RIGID
311 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
312 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
313 21-Apr-14 28 1.00 50.29 50.29 #N/A
314 21-Apr-14 28 1.00 50.29 50.29 #N/A RAM 2 STA. 11+105
315 21-Apr-14 28 1.00 50.29 50.29 #N/A - 11+160
316 21-Apr-14 28 1.00 50.29 50.29 #N/A RAM 2 STA. 11+105
317 21-Apr-14 28 1.00 50.29 50.29 #N/A - 11+160
RAM 2 STA. 11+105
318 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
319 21-Apr-14 28 1.00 50.29 50.29 #N/A
320 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
321 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
322 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 - 11+160
KET
BENDA UJI BETON TEST 28 HARI (σbn )
323 21-Apr-14 28 1.00 50.29 50.29 #N/A
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
RAM 2 STA. 11+105
324 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
325 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
326 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
327 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
328 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
329 21-Apr-14 28 1.00 50.29 50.29 #N/A
330 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
331 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
332 21-Apr-14 28 1.00 50.29 50.29 #N/A
333 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
334 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
335 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
336 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
337 21-Apr-14 28 1.00 50.29 50.29 #N/A
338 21-Apr-14 28 1.00 50.29 50.29 #N/A RAM 2 STA. 11+105
339 21-Apr-14 28 1.00 50.29 50.29 #N/A - 11+160
340 21-Apr-14 28 1.00 50.29 50.29 #N/A RAM 2 STA. 11+105
341 21-Apr-14 28 1.00 50.29 50.29 #N/A - 11+160
RAM 2 STA. 11+105
342 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
343 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
344 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
345 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
346 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
347 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
348 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
349 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
350 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
351 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
352 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
353 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
354 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
355 21-Apr-14 28 1.00 50.29 50.29 #N/A
RAM 2 STA. 11+105
356 21-Apr-14 28 1.00 50.29 50.29 #N/A
- 11+160
357 21-Apr-14 28 1.00 50.29 50.29 #N/A

Σ(σbn - σbm)2 = #N/A

JUMLAH SAMPLE = 357.00 buah


MIN = #N/A kg/cm2
MAX = #N/A kg/cm2
RATA-RATA (σbm) = #N/A kg/cm2
S ==
KARAKTERISTIK (σbk) = σbm - 1,64 S #N/A kg/cm2
#N/A kg/cm2

QC STAF QC

( ) ( )
PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON

Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2


( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : Mei 2014

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 1-May-14 28 1.00 51.65 51.65 1.41
RIGID
2 1-May-14 28 1.00 53.01 53.01 0.03
3 1-May-14 28 1.00 53.01 53.01 0.03 RIGID
4 1-May-14 28 1.00 54.37 54.37 2.35
5 1-May-14 28 1.00 55.73 8.36 L3 STA. 8+735 -
55.73
8+835
6 1-May-14 28 1.00 54.37 54.37 2.35
7 2-May-14 28 1.00 53.01 53.01 0.03
RIGID
8 2-May-14 28 1.00 54.37 54.37 2.35
9 4-May-14 28 1.00 54.37 54.37 2.35
RIGID
10 4-May-14 28 1.00 53.01 53.01 0.03
11 4-May-14 28 1.00 54.37 54.37 2.35 RIGID
12 4-May-14 28 1.00 51.65 51.65 1.41
13 4-May-14 28 1.00 53.01 0.03 R1 STA. 8+750 -
53.01
8+850
14 4-May-14 28 1.00 54.37 54.37 2.35
15 5-May-14 28 1.00 54.37 54.37 2.35
RIGID
16 5-May-14 28 1.00 53.01 53.01 0.03
17 6-May-14 28 1.00 54.37 54.37 2.35
RIGID
18 6-May-14 28 1.00 51.65 51.65 1.41
19 6-May-14 28 1.00 53.01 53.01 0.03
RIGID
20 6-May-14 28 1.00 54.37 54.37 2.35
21 8-May-14 28 1.00 51.65 51.65 1.41 RIGID
22 8-May-14 28 1.00 53.01 53.01 0.03
R2 STA. 5+590 -
23 8-May-14 28 1.00 51.65 51.65 1.41
5+690
24 8-May-14 28 1.00 54.37 54.37 2.35
25 8-May-14 28 1.00 53.01 53.01 0.03
RIGID
26 8-May-14 28 1.00 55.73 55.73 8.36
27 9-May-14 28 1.00 53.01 53.01 0.03
RIGID
28 9-May-14 28 1.00 51.65 51.65 1.41
29 9-May-14 28 1.00 50.29 50.29 6.48
RIGID
30 9-May-14 28 1.00 53.01 53.01 0.03
31 9-May-14 28 1.00 55.73 55.73 8.36
RIGID
32 9-May-14 28 1.00 53.01 53.01 0.03
33 10-May-14 28 1.00 48.93 48.93 15.24
RIGID
34 10-May-14 28 1.00 50.29 50.29 6.48
35 10-May-14 28 1.00 53.01 53.01 0.03
RIGID
36 10-May-14 28 1.00 51.65 51.65 1.41
37 12-May-14 28 1.00 51.65 51.65 1.41 RIGID
38 12-May-14 28 1.00 53.01 53.01 0.03
R3 STA. 9+510 -
39 12-May-14 28 1.00 50.29 50.29 6.48
9+405
40 12-May-14 28 1.00 53.01 53.01 0.03
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
41 13-May-14 28 1.00 53.01 53.01 0.03
RIGID
42 13-May-14 28 1.00 54.37 54.37 2.35
43 14-May-14 28 1.00 53.01 53.01 0.03
RIGID
44 14-May-14 28 1.00 51.65 51.65 1.41
45 14-May-14 28 1.00 53.01 53.01 0.03 RIGID
46 14-May-14 28 1.00 54.37 54.37 2.35
R2 STA. 5+730 -
47 14-May-14 28 1.00 50.29 50.29 6.48
5+830
48 14-May-14 28 1.00 51.65 51.65 1.41
49 17-May-14 28 1.00 53.01 53.01 0.03
RIGID
50 17-May-14 28 1.00 54.37 54.37 2.35
51 17-May-14 28 1.00 51.65 51.65 1.41
RIGID
52 17-May-14 28 1.00 50.29 50.29 6.48
53 18-May-14 28 1.00 51.65 51.65 1.41
RIGID
54 18-May-14 28 1.00 54.37 54.37 2.35
55 18-May-14 28 1.00 53.01 53.01 0.03
RIGID
56 18-May-14 28 1.00 51.65 51.65 1.41
57 18-May-14 28 1.00 50.29 50.29 6.48
RIGID
58 18-May-14 28 1.00 53.01 53.01 0.03
59 19-May-14 28 1.00 53.01 53.01 0.03
RIGID
60 19-May-14 28 1.00 54.37 54.37 2.35
61 19-May-14 28 1.00 51.65 51.65 1.41
RIGID
62 19-May-14 28 1.00 54.37 54.37 2.35
63 19-May-14 28 1.00 53.01 53.01 0.03
RIGID
64 19-May-14 28 1.00 51.65 51.65 1.41
65 19-May-14 28 1.00 53.01 53.01 0.03
RIGID
66 19-May-14 28 1.00 54.37 54.37 2.35
67 20-May-14 28 1.00 53.01 53.01 0.03
RIGID
68 20-May-14 28 1.00 54.37 54.37 2.35
69 20-May-14 28 1.00 51.65 51.65 1.41
RIGID
70 20-May-14 28 1.00 53.01 53.01 0.03
71 1-May-14 7 0.75 38.06 50.74 4.38
RIGID
72 1-May-14 7 0.75 39.42 52.55 0.08
73 2-May-14 7 0.75 38.06 50.74 4.38
RIGID
74 2-May-14 7 0.75 39.42 52.55 0.08
75 2-May-14 7 0.75 38.06 50.74 4.38
RIGID
76 2-May-14 7 0.75 40.77 54.37 2.35
77 3-May-14 7 0.75 39.42 52.55 0.08
RIGID
78 3-May-14 7 0.75 38.06 50.74 4.38
79 3-May-14 7 0.75 40.77 54.37 2.35 RIGID
80 3-May-14 7 0.75 39.42 52.55 0.08
L1 STA. 8+835 -
81 3-May-14 7 0.75 38.06 50.74 4.38
8+740
82 3-May-14 7 0.75 36.70 48.93 15.24
83 4-May-14 7 0.75 36.70 48.93 15.24
RIGID
84 4-May-14 7 0.75 38.06 50.74 4.38
85 4-May-14 7 0.75 40.77 54.37 2.35
RIGID
86 4-May-14 7 0.75 39.42 52.55 0.08
87 4-May-14 7 0.75 39.42 52.55 0.08
RIGID
88 4-May-14 7 0.75 38.06 50.74 4.38
89 5-May-14 7 0.75 39.42 52.55 0.08
RIGID
90 5-May-14 7 0.75 40.77 54.37 2.35
91 5-May-14 7 0.75 38.06 50.74 4.38
RIGID
92 5-May-14 7 0.75 39.42 52.55 0.08
93 5-May-14 7 0.75 36.70 48.93 15.24
RIGID
94 5-May-14 7 0.75 39.42 52.55 0.08
95 9-May-14 7 0.75 36.70 48.93 15.24
RIGID
96 9-May-14 7 0.75 38.06 50.74 4.38
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
97 9-May-14 7 0.75 36.70 48.93 15.24
RIGID
98 9-May-14 7 0.75 39.42 52.55 0.08
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
99 10-May-14 7 0.75 36.70 48.93 15.24
RIGID
100 10-May-14 7 0.75 39.42 52.55 0.08
101 10-May-14 7 0.75 38.06 50.74 4.38
RIGID
102 10-May-14 7 0.75 39.42 52.55 0.08
103 11-May-14 7 0.75 36.70 48.93 15.24
RIGID
104 11-May-14 7 0.75 38.06 50.74 4.38
105 11-May-14 7 0.75 40.77 54.37 2.35
RIGID
106 11-May-14 7 0.75 39.42 52.55 0.08
107 12-May-14 7 0.75 39.42 52.55 0.08
RIGID
108 12-May-14 7 0.75 38.06 50.74 4.38
109 12-May-14 7 0.75 39.42 52.55 0.08
RIGID
110 12-May-14 7 0.75 42.13 56.18 11.19
111 13-May-14 7 0.75 36.70 48.93 15.24
RIGID
112 13-May-14 7 0.75 38.06 50.74 4.38
113 14-May-14 7 0.75 38.06 50.74 4.38
RIGID
114 14-May-14 7 0.75 36.70 48.93 15.24
115 15-May-14 7 0.75 36.70 48.93 15.24
RIGID
116 15-May-14 7 0.75 39.42 52.55 0.08
117 16-May-14 7 0.75 36.70 48.93 15.24
RIGID
118 16-May-14 7 0.75 39.42 52.55 0.08
119 16-May-14 7 0.75 38.06 50.74 4.38
RIGID
120 16-May-14 7 0.75 40.77 54.37 2.35
121 17-May-14 7 0.75 36.70 48.93 15.24
RIGID
122 17-May-14 7 0.75 38.06 50.74 4.38
123 17-May-14 7 0.75 40.77 54.37 2.35
RIGID
124 17-May-14 7 0.75 39.42 52.55 0.08
125 18-May-14 7 0.75 39.42 52.55 0.08
RIGID
126 18-May-14 7 0.75 38.06 50.74 4.38
127 18-May-14 7 0.75 40.77 54.37 2.35
RIGID
128 18-May-14 7 0.75 39.42 52.55 0.08
129 19-May-14 7 0.75 38.06 50.74 4.38
RIGID
130 19-May-14 7 0.75 39.42 52.55 0.08
131 19-May-14 7 0.75 38.06 50.74 4.38
RIGID
132 19-May-14 7 0.75 39.42 52.55 0.08
133 20-May-14 7 0.75 36.70 48.93 15.24
RIGID
134 20-May-14 7 0.75 40.77 54.37 2.35
135 20-May-14 7 0.75 38.06 50.74 4.38
RIGID
136 20-May-14 7 0.75 39.42 52.55 0.08
137 1-May-14 28 1.00 57.08 57.08 18.07
RIGID
138 1-May-14 28 1.00 59.80 59.80 48.57
139 1-May-14 28 1.00 59.80 59.80 48.57 RIGID
140 1-May-14 28 1.00 58.44 58.44 31.47 R2 STA. 5+510 -
141 1-May-14 28 1.00 57.08 57.08 18.07 5+595
142 2-May-14 28 1.00 61.16 61.16 69.36
RIGID
143 2-May-14 28 1.00 61.16 61.16 69.36
144 2-May-14 28 1.00 58.44 58.44 31.47
RIGID
145 2-May-14 28 1.00 54.37 54.37 2.35
146 2-May-14 28 1.00 58.44 58.44 31.47 RIGID
147 2-May-14 28 1.00 58.44 58.44 31.47 L3 STA. 5+515 -
148 2-May-14 28 1.00 59.80 59.80 48.57 5+590
149 3-May-14 28 1.00 57.08 57.08 18.07
RIGID
150 3-May-14 28 1.00 57.08 57.08 18.07
151 3-May-14 28 1.00 58.44 58.44 31.47
RIGID
152 3-May-14 28 1.00 57.08 57.08 18.07
153 4-May-14 28 1.00 50.29 50.29 6.48
RIGID
154 4-May-14 28 1.00 54.37 54.37 2.35
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
155 4-May-14 28 1.00 53.01 53.01 0.03
RIGID
156 4-May-14 28 1.00 53.01 53.01 0.03
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
157 5-May-14 28 1.00 51.65 51.65 1.41 RIGID
158 5-May-14 28 1.00 55.73 55.73 8.36
L1 STA. 0+005 -
159 5-May-14 28 1.00 54.37 54.37 2.35
0+040
160 5-May-14 28 1.00 54.37 54.37 2.35
161 6-May-14 28 1.00 50.29 50.29 6.48 RIGID
162 6-May-14 28 1.00 54.37 54.37 2.35
L1 STA. 0+005 -
163 6-May-14 28 1.00 51.65 51.65 1.41
0+040
164 6-May-14 28 1.00 51.65 51.65 1.41
165 8-May-14 28 1.00 48.93 48.93 15.24 RIGID
166 8-May-14 28 1.00 51.65 51.65 1.41
167 8-May-14 28 1.00 53.01 53.01 0.03 R5 STA. 0+595 - 0+560 RAMP 1
168 8-May-14 28 1.00 53.01 53.01 0.03
169 9-May-14 28 1.00 48.93 48.93 15.24 RIGID
170 9-May-14 28 1.00 51.65 51.65 1.41
171 9-May-14 28 1.00 50.29 50.29 6.48
L2 STA. 5+515 -
172 9-May-14 28 1.00 51.65 51.65 1.41
5+585
173 9-May-14 28 1.00 54.37 54.37 2.35
174 9-May-14 28 1.00 55.73 55.73 8.36
175 13-May-14 28 1.00 50.29 50.29 6.48
RIGID
176 13-May-14 28 1.00 54.37 54.37 2.35
177 15-May-14 28 1.00 50.29 50.29 6.48
RIGID RAMP 1
178 15-May-14 28 1.00 51.65 51.65 1.41
179 17-May-14 28 1.00 53.01 53.01 0.03
RIGID
180 17-May-14 28 1.00 53.01 53.01 0.03
181 17-May-14 28 1.00 51.65 51.65 1.41
RIGID
182 17-May-14 28 1.00 54.37 54.37 2.35
183 17-May-14 28 1.00 50.29 50.29 6.48
RIGID
184 17-May-14 28 1.00 51.65 51.65 1.41
185 19-May-14 28 1.00 53.01 53.01 0.03
RIGID RAMP 2
186 19-May-14 28 1.00 53.01 53.01 0.03
187 19-May-14 28 1.00 51.65 51.65 1.41
RIGID RAMP 1
188 19-May-14 28 1.00 54.37 54.37 2.35
189 19-May-14 28 1.00 55.73 55.73 8.36
RIGID
190 19-May-14 28 1.00 54.37 54.37 2.35
191 20-May-14 28 1.00 54.37 54.37 2.35 RIGID RAMP 1
192 20-May-14 28 1.00 54.37 54.37 2.35
L2 STA. 0+740 -
193 20-May-14 28 1.00 51.65 51.65 1.41
0+755
194 20-May-14 28 1.00 54.37 54.37 2.35
195 1-May-14 7 0.75 39.42 52.55 0.08
RIGID
196 1-May-14 7 0.75 42.13 56.18 11.19
197 2-May-14 7 0.75 40.77 54.37 2.35
RIGID
198 2-May-14 7 0.75 40.77 54.37 2.35
199 3-May-14 7 0.75 39.42 52.55 0.08
RIGID
200 3-May-14 7 0.75 40.77 54.37 2.35
201 4-May-14 7 0.75 39.42 52.55 0.08
RIGID
202 4-May-14 7 0.75 40.77 54.37 2.35
203 5-May-14 7 0.75 38.06 50.74 4.38
RIGID RAMP 1
204 5-May-14 7 0.75 40.77 54.37 2.35
205 8-May-14 7 0.75 42.13 56.18 11.19
RIGID
206 8-May-14 7 0.75 39.42 52.55 0.08
207 8-May-14 7 0.75 39.42 52.55 0.08
RIGID
208 8-May-14 7 0.75 38.06 50.74 4.38
209 10-May-14 7 0.75 39.42 52.55 0.08
RIGID
210 10-May-14 7 0.75 36.70 48.93 15.24
211 10-May-14 7 0.75 40.77 54.37 2.35 RIGID RAMP 1
212 10-May-14 7 0.75 40.77 54.37 2.35 L2 STA. 0+945 -
1+060
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn ) L2 STA. 0+945 -
213 10-May-14 7 0.75 42.13 56.18 11.19 1+060
214 12-May-14 7 0.75 38.06 50.74 4.38
RIGID
215 12-May-14 7 0.75 39.42 52.55 0.08
216 13-May-14 7 0.75 40.77 54.37 2.35
RIGID RAMP 1
217 13-May-14 7 0.75 38.06 50.74 4.38
218 17-May-14 7 0.75 38.06 50.74 4.38 RIGID
219 17-May-14 7 0.75 38.06 50.74 4.38
R3 STA. 5+615 -
220 17-May-14 7 0.75 40.77 54.37 2.35
5+720
221 17-May-14 7 0.75 38.06 50.74 4.38
222 19-May-14 7 0.75 38.06 50.74 4.38
RIGID
223 19-May-14 7 0.75 38.06 50.74 4.38
224 20-May-14 7 0.75 40.77 54.37 2.35
RIGID
225 20-May-14 7 0.75 38.06 50.74 4.38

Σ(σbn - σbm)2 = 1253.94

JUMLAH SAMPLE = 225.00 buah


MIN = 48.93 kg/cm2
MAX = 61.16 kg/cm2
RATA-RATA (σbm) = 52.83 kg/cm2
KARAKTERISTIK (σbk) = σbm - 1,64 S = 2.37 kg/cm2
48.95 kg/cm2

QC STAF QC

( ) ( )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
310 1 RIGID 24-Mar-14 3.0 31-Mar-14 21-Apr-14 34.80 37 50.29 51.99
311 21-Apr-14 34.90 37 50.29
RAM 2 STA. 11+105 -
21-Apr-14 35.00 40 54.37
11+160
21-Apr-14 34.90 39 53.01

2 RIGID 24-Mar-14 4.0 31-Mar-14 21-Apr-14 33.80 38 51.65 51.65


RAM 2 STA. 11+275 - 21-Apr-14 33.90 38 51.65
11+295

3 RIGID 25-Mar-14 4.0 1-Apr-14 22-Apr-14 34.90 39 53.01 54.37


22-Apr-14 34.90 41 55.73
L4 STA. 11+115 - 11+080

4 RIGID 25-Mar-14 3.0 1-Apr-14 22-Apr-14 34.50 37 50.29 52.10


22-Apr-14 34.60 36 48.93
22-Apr-14 34.80 39 53.01
RAM 2 L2 STA. 2+160 - 39 53.01
2+260 22-Apr-14 34.90
22-Apr-14 35.20 41 55.73
22-Apr-14 34.70 38 51.65

5 RIGID 26-Mar-14 4.0 2-Apr-14 23-Apr-14 34.20 37 50.29 51.99


23-Apr-14 34.50 37 50.29
RAM2 STA. 2+180 - 2+140 23-Apr-14 34.90 40 54.37
23-Apr-14 34.80 39 53.01

6 RIGID 27-Mar-14 3.0 3-Apr-14 24-Apr-14 34.80 39 53.01 53.69


24-Apr-14 34.90 39 53.01
24-Apr-14 35.20 41 55.73
RAM 2 STA. 2+180 - 2+260 24-Apr-14 34.70 38 51.65
24-Apr-14 35.00 40 54.37
24-Apr-14 35.00 40 54.37

Page 205 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

7 RIGID 28-Mar-14 4.0 4-Apr-14 25-Apr-14 34.60 37 50.29 51.65


25-Apr-14 34.60 37 50.29
L4 STA. 11+005 - 11+035 25-Apr-14 35.00 40 54.37
25-Apr-14 34.80 38 51.65

8 RIGID 29-Mar-14 4.0 5-Apr-14 26-Apr-14 34.70 37 50.29 50.29


R2 STA. 10+950 - 10+960 ; 26-Apr-14 34.80 37 50.29
R1 STA. 10+950 - 10+935

9 RIGID 29-Mar-14 4.0 5-Apr-14 26-Apr-14 34.90 39 53.01 52.33


26-Apr-14 34.90 38 51.65
L3 STA. 10+950 - 10+935

10 RIGID 29-Mar-14 3.0 5-Apr-14 26-Apr-14 34.80 38 51.65 53.01


26-Apr-14 34.90 40 54.37
L4 STA. 11+035 - 11+080 26-Apr-14 35.00 40 54.37
26-Apr-14 34.90 38 51.65

11 RIGID 31-Mar-14 4.0 7-Apr-14 28-Apr-14 34.80 38 51.65 53.35


28-Apr-14 35.00 40 54.37
R4 STA. 0+495 - 0+510 28-Apr-14 34.90 39 53.01
RAMP 1
28-Apr-14 35.20 40 54.37

12 RIGID 1-Apr-14 4.0 8-Apr-14 29-Apr-14 34.90 38 51.65 53.35


29-Apr-14 35.00 40 54.37
L4 STA. 0+510 - 0+525 40 54.37
RAMP 1 29-Apr-14 35.00
29-Apr-14 34.80 39 53.01

13 RIGID 2-Apr-14 3.0 9-Apr-14 30-Apr-14 35.60 45 61.16 59.80


30-Apr-14 35.70 45 61.16
R3 STA. 5+745 - 5+700 30-Apr-14 35.50 44 59.80
30-Apr-14 35.20 42 57.08

137 14 RIGID 3-Apr-14 4.0 10-Apr-14 1-May-14 35.20 42 57.08 58.44


138 1-May-14 35.40 44 59.80
R3 STA. 0+110 - 0+160

Page 206 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

139 15 RIGID 3-Apr-14 3.0 10-Apr-14 1-May-14 35.40 44 59.80 58.44


140 1-May-14 35.20 43 58.44
R2 STA. 5+510 - 5+595
141 1-May-14 35.00 42 57.08

142 16 RIGID 4-Apr-14 4.0 11-Apr-14 2-May-14 35.70 45 61.16 61.16


143 RAM 1B STA 0+015 - RAM 2-May-14 35.80 45 61.16
1A STA. 0+015

144 17 RIGID 4-Apr-14 4.0 11-Apr-14 2-May-14 35.20 43 58.44 56.41


145 2-May-14 35.00 40 54.37
L2 STA. 0+040 - 0+055

146 18 RIGID 4-Apr-14 3.0 11-Apr-14 2-May-14 35.20 43 58.44 58.90


147 2-May-14 35.20 43 58.44
L3 STA. 5+515 - 5+590
148 2-May-14 35.50 44 59.80

149 19 RIGID 5-Apr-14 3.0 12-Apr-14 3-May-14 34.90 42 57.08 57.08


150 3-May-14 35.00 42 57.08
L1 STA. 0+040 - 0+055

151 20 RIGID 5-Apr-14 4.0 12-Apr-14 3-May-14 35.50 43 58.44 57.76


152 3-May-14 34.90 42 57.08
L2 STA. 0+040 - 0+005

153 21 RIGID 6-Apr-14 4.0 13-Apr-14 4-May-14 34.00 37 50.29 52.33


154 RAM 1B L3 STA. 0+005 - 4-May-14 35.20 40 54.37
0+040

155 22 RIGID 6-Apr-14 4.0 13-Apr-14 4-May-14 35.00 39 53.01 53.01


156 4-May-14 35.00 39 53.01
STA. 0+040 - 0+050 L2

157 23 RIGID 7-Apr-14 4.0 14-Apr-14 5-May-14 34.00 38 51.65 54.03


158 5-May-14 35.20 41 55.73
159 L1 STA. 0+005 - 0+040 5-May-14 35.00 40 54.37
160 5-May-14 35.00 40 54.37

161 24 RIGID 8-Apr-14 3.0 15-Apr-14 6-May-14 33.80 37 50.29 51.99


162 6-May-14 34.20 40 54.37
L1 STA. 0+005 - 0+040
163 6-May-14 34.00 38 51.65
164 6-May-14 34.00 38 51.65

Page 207 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

165 25 RIGID 10-Apr-14 3.0 17-Apr-14 8-May-14 34.00 36 48.93 51.65


166 R5 STA. 0+595 - 0+560 8-May-14 34.20 38 51.65
167 RAMP 1 8-May-14 34.50 39 53.01
168 8-May-14 34.20 39 53.01

169 26 RIGID 11-Apr-14 3.0 18-Apr-14 9-May-14 34.00 36 48.93 52.10


170 9-May-14 34.50 38 51.65
171 9-May-14 34.40 37 50.29
172 L2 STA. 5+515 - 5+585 9-May-14 34.50 38 51.65
173 9-May-14 35.00 40 54.37
174 9-May-14 35.20 41 55.73

175 27 RIGID 15-Apr-14 4.0 22-Apr-14 34.0 30 40.77 13-May-14 34.00 37 50.29 52.33
176 L4 STA. 0+600 - 0+620 22-Apr-14 34.2 30 40.77 13-May-14 35.20 40 54.37
RAMP 1

177 28 RIGID RAMP 1 17-Apr-14 4.0 24-Apr-14 34.0 29 39.42 15-May-14 34.40 37 50.29 50.97
178 L1 STA. 0+825 - 0+810 ; R1 24-Apr-14 34.2 30 40.77 15-May-14 34.50 38 51.65
STA. 0+825 - 0+810

179 29 RIGID 19-Apr-14 3.0 26-Apr-14 33.7 28 38.06 17-May-14 35.00 39 53.01 53.01
180 R2 STA. 0+740 - 0+780 26-Apr-14 33.6 27 36.70 17-May-14 35.00 39 53.01
RAMP 1

181 30 RIGID 19-Apr-14 4.0 26-Apr-14 33.8 28 38.06 17-May-14 34.90 38 51.65 53.01
182 R1 STA. 0+790 - 0+780 26-Apr-14 33.9 29 39.42 17-May-14 35.20 40 54.37
RAMP 1

183 31 RIGID 19-Apr-14 4.0 26-Apr-14 34.0 30 40.77 17-May-14 34.80 37 50.29 50.97
184 L1 STA. 0+770 - 0+750 26-Apr-14 33.9 29 39.42 17-May-14 34.90 38 51.65
RAMP 1

185 32 RIGID RAMP 2 21-Apr-14 3.0 28-Apr-14 33.7 29 39.42 19-May-14 34.90 39 53.01 53.01
186 R2 STA. 0+790 - 0+780 ; R1 28-Apr-14 34.0 31 42.13 19-May-14 34.90 39 53.01
STA. 0+745 - 0+750

187 33 RIGID RAMP 1 21-Apr-14 4.0 28-Apr-14 33.7 28 38.06 19-May-14 34.80 38 51.65 53.01
188 28-Apr-14 33.6 27 36.70 19-May-14 35.00 40 54.37
L2 STA. 0+780 - 0+740

Page 208 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
189 34 RIGID 21-Apr-14 3.0 28-Apr-14 33.8 28 38.06 19-May-14 35.20 41 55.73 55.05
190 28-Apr-14 33.9 29 39.42 19-May-14 35.00 40 54.37
L1 STA. 5+590 - 5+700

191 35 RIGID RAMP 1 22-Apr-14 4.0 29-Apr-14 33.7 28 38.06 20-May-14 35.00 40 54.37 53.69
192 29-Apr-14 33.8 29 39.42 20-May-14 35.00 40 54.37
193 L2 STA. 0+740 - 0+755 20-May-14 34.90 38 51.65
194 20-May-14 35.00 40 54.37

36 RIGID 23-Apr-14 4.0 30-Apr-14 34.0 30 40.77 21-May-14


30-Apr-14 34.2 31 42.13
R1,R2 STA. 5+500 - 5+510

195 37 RIGID 24-Apr-14 4.0 1-May-14 33.9 29 39.42 22-May-14


196 RAM 1B STA. 0+005 - 1-May-14 34.2 31 42.13
0+035

197 38 RIGID 25-Apr-14 3.0 2-May-14 33.5 30 40.77 23-May-14


198 2-May-14 33.5 30 40.77
L1 STA. 5+660 - 5+720

199 39 RIGID 26-Apr-14 3.0 3-May-14 34.0 29 39.42 24-May-14


200 3-May-14 34.0 30 40.77
R1 STA. 5+595 - 5+630

201 40 RIGID 27-Apr-14 4.0 4-May-14 33.5 29 39.42 25-May-14


202 4-May-14 33.5 30 40.77
R2 STA. 5+627 - 5+675

203 41 RIGID RAMP 1 28-Apr-14 4.0 5-May-14 33.7 28 38.06 26-May-14


204 5-May-14 33.8 30 40.77
R1 STA. 0+935 - 0+950

205 42 RIGID 1-May-14 3.0 8-May-14 34.0 31 42.13 29-May-14


206 8-May-14 33.8 29 39.42
R2 STA. 5+540 - 5+600

207 43 RIGID 1-May-14 3.0 8-May-14 33.8 29 39.42 29-May-14


208 8-May-14 33.7 28 38.06
R2 STA. 8+625 - 8+600

209 44 RIGID 3-May-14 4.0 10-May-14 33.2 29 39.42 31-May-14


210 L2 STA. 6+725 - 6+745 ; R2 10-May-14 33.0 27 36.70
STA. 6+720 - 6+730

211 45 RIGID RAMP 1 3-May-14 3.0 10-May-14 34.0 30 40.77 31-May-14


212 10-May-14 34.0 30 40.77
L2 STA. 0+945 - 1+060
Page 209 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
L2 STA. 0+945 - 1+060
213 10-May-14 34.2 31 42.13

Page 210 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

214 46 RIGID 5-May-14 3.0 12-May-14 33.7 28 38.06 2-Jun-14


215 12-May-14 33.8 29 39.42
L3 STA. 6+720 - 6+750

216 47 RIGID RAMP 1 6-May-14 4.0 13-May-14 34.0 30 40.77 3-Jun-14


217 13-May-14 33.8 28 38.06
L1 STA. 1+015 - 1+060

218 48 RIGID 10-May-14 3.0 17-May-14 33.7 28 38.06 7-Jun-14


219 17-May-14 33.8 28 38.06
220 R3 STA. 5+615 - 5+720 17-May-14 34.0 30 40.77
221 17-May-14 33.8 28 38.06

222 49 RIGID 12-May-14 4.0 19-May-14 33.7 28 38.06 9-Jun-14


223 19-May-14 33.7 28 38.06
RAM 3 STA. 3+040 - 3+030

224 50 RIGID 13-May-14 4.0 20-May-14 34.0 30 40.77 10-Jun-14


225 R1,R2,R3 STA. 0+000 - 20-May-14 33.9 28 38.06
0+020

Disetujui Oleh :
Pandaan, ............... 2014
Konsultan
Diketahui Oleh : Diajukan Oleh :
PT. Multi Phi Beta
PT Jasamarga Pandaan Tol Kontraktor
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( _____________________________ ) ( ________________________)
(__________________________________)

Page 211 of 322


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
234 1 RIGID 24-Mar-14 3.0 31-Mar-14 21-Apr-14 30.00 39 53.01 51.65
235 L2 STA. 8+990 - 9+040 21-Apr-14 31.00 37 50.29

236 2 RIGID 24-Mar-14 4.0 31-Mar-14 21-Apr-14 30.00 38 51.65 50.29


237 R1 STA. 9+122,5 - 9+225 21-Apr-14 30.00 36 48.93

238 3 RIGID 25-Mar-14 3.0 1-Apr-14 22-Apr-14 30.00 37 50.29 50.97


239 L3 STA. 9+122,5 - 9+172,5 22-Apr-14 31.00 38 51.65

240 4 RIGID 25-Mar-14 3.0 1-Apr-14 22-Apr-14 32.00 38 51.65 53.01


241 L3 STA. 9+225 - 9+290 22-Apr-14 31.00 36 48.93
242 4.0 22-Apr-14 30.00 42 57.08
243 22-Apr-14 30.00 40 54.37

244 5 RIGID 27-Mar-14 4.0 3-Apr-14 24-Apr-14 30.00 37 50.29 50.97


245 R2 STA. 10+925 - 10+940 24-Apr-14 32.00 38 51.65
KADAPLANG

246 6 RIGID 27-Mar-14 3.0 3-Apr-14 24-Apr-14 31.00 36 48.93 51.65


247 R1 STA. 9+180 - 9+280 24-Apr-14 31.00 37 50.29
248 3.0 24-Apr-14 30.00 39 53.01
249 24-Apr-14 31.00 40 54.37

250 7 RIGID 28-Mar-14 3.0 4-Apr-14 25-Apr-14 31.00 39 53.01 53.35


251 L3 STA. 6+115 - 6+190 25-Apr-14 30.00 41 55.73
252 3.0 25-Apr-14 32.00 38 51.65
253 25-Apr-14 30.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
254 8 RIGID 29-Mar-14 3.0 5-Apr-14 26-Apr-14 31.00 39 53.01 53.01
255 R1 STA. 9+180 - 9+300 26-Apr-14 31.00 37 50.29
256 4.0 26-Apr-14 32.00 42 57.08
257 26-Apr-14 31.00 38 51.65

258 9 RIGID 30-Mar-14 3.0 6-Apr-14 27-Apr-14 31.00 38 51.65 53.01


259 STA. 10+930 - 11+005 R1 27-Apr-14 32.00 40 54.37

260 10 RIGID 30-Mar-14 4.0 6-Apr-14 27-Apr-14 31.00 37 50.29 51.65


261 STA. 9+320 - 9+323 L 1,2 27-Apr-14 32.00 39 53.01

262 11 RIGID 30-Mar-14 3.0 6-Apr-14 27-Apr-14 31.00 37 50.29 51.65


263 R3 STA. 6+065 - 6+115 27-Apr-14 32.00 39 53.01

264 12 RIGID 30-Mar-14 4.0 6-Apr-14 27-Apr-14 31.00 40 54.37 55.05


265 R3 STA. 6+120 - 6+150 27-Apr-14 32.00 41 55.73

266 13 RIGID 1-Apr-14 3.0 8-Apr-14 29-Apr-14 31.00 38 51.65 53.69


267 R3 STA. 8+865 - 8+935 29-Apr-14 32.00 39 53.01
268 29-Apr-14 32.00 41 55.73
269 29-Apr-14 32.00 40 54.37

270 14 RIGID 1-Apr-14 4.0 8-Apr-14 29-Apr-14 31.00 37 50.29 51.65


271 R3 STA. 8+970 - 8+925 29-Apr-14 31.00 39 53.01

272 15 RIGID 1-Apr-14 3.0 8-Apr-14 29-Apr-14 32.00 38 51.65 52.67


273 R3 STA. 5+825 - 5+725 29-Apr-14 31.00 38 51.65
274 4.0 29-Apr-14 31.00 39 53.01
275 29-Apr-14 32.00 40 54.37

276 16 RIGID 2-Apr-14 3.0 9-Apr-14 30-Apr-14 31.00 39 53.01 52.33


277 L1,2,3 STA. 9+020 - 9+023 30-Apr-14 32.00 38 51.65

278 17 RIGID 2-Apr-14 4.0 9-Apr-14 30-Apr-14 32.00 40 54.37 53.01


279 L2 STA. 9+295 - 9+325 30-Apr-14 31.00 38 51.65
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
18 RIGID 3-Apr-14 3.0 10-Apr-14 1-May-14 32.00 38 51.65 52.33
L1,2,3 STA. 9+023 - 9+030 31.00 39 53.01

19 RIGID 3-Apr-14 3.0 10-Apr-14 1-May-14 32.00 39 53.01 54.37


L3 STA. 8+735 - 8+835 31.00 40 54.37
4.0 32.00 41 55.73
31.00 40 54.37

20 RIGID 4-Apr-14 3.0 11-Apr-14 2-May-14 31.00 39 53.01 53.69


L3 STA. 5+515 - 5+590 32.00 40 54.37

21 RIGID 6-Apr-14 4.0 13-Apr-14 4-May-14 31.00 40 54.37 53.69


L2 STA. 8+875 - 8+830 31.00 39 53.01

22 RIGID 6-Apr-14 3.0 13-Apr-14 4-May-14 32.00 40 54.37 53.35


R1 STA. 8+750 - 8+850 31.00 38 51.65
3.0 32.00 39 53.01
31.00 40 54.37

23 RIGID 7-Apr-14 3.0 14-Apr-14 5-May-14 31.00 40 54.37 53.69


STA. 8+595 - 8+645 R2 32.00 39 53.01

24 RIGID 8-Apr-14 3.0 15-Apr-14 6-May-14 32.00 40 54.37 53.01


STA. 8+595 - 8+645 R1 31.00 38 51.65

25 RIGID 8-Apr-14 4.0 15-Apr-14 6-May-14 32.00 39 53.01 53.69


STA. 9+020 - 9+055 31.00 40 54.37

26 RIGID 10-Apr-14 3.0 17-Apr-14 8-May-14 32.00 38 51.65 52.67


R2 STA. 5+590 - 5+690 31.00 39 53.01
4.0 31.00 38 51.65
32.00 40 54.37

27 RIGID 10-Apr-14 4.0 17-Apr-14 8-May-14 31.00 39 53.01 54.37


R3 STA. 8+865 - 8+835 32.00 41 55.73

28 RIGID 11-Apr-14 4.0 18-Apr-14 9-May-14 31.00 39 53.01 52.33


R4 STA. 0+580 - 0+600 30.00 38 51.65
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
29 RIGID 11-Apr-14 4.0 18-Apr-14 9-May-14 32.00 37 50.29 51.65
L3 STA. 9+070 - 9+050 30.00 39 53.01

30 RIGID 11-Apr-14 3.0 18-Apr-14 9-May-14 31.00 41 55.73 54.37


L3 STA. 8+595 - 8+645 31.00 39 53.01

31 RIGID 12-Apr-14 3.0 19-Apr-14 10-May-14 31.00 36 48.93 49.61


R1 STA. 5+585 - 5+635 32.00 37 50.29

32 RIGID 12-Apr-14 4.0 19-Apr-14 10-May-14 32.00 39 53.01 52.33


L3 STA. 9+050 - 9+025 31.00 38 51.65

280 33 RIGID 14-Apr-14 3.0 21-Apr-14 32.00 27 36.70 12-May-14 32.00 38 51.65 51.99
281 R3 STA. 9+510 - 9+405 21-Apr-14 31.00 29 39.42 31.00 39 53.01
282 21-Apr-14 30.00 28 38.06 30.00 37 50.29
283 21-Apr-14 32.00 30 40.77 32.00 39 53.01

284 34 RIGID 15-Apr-14 3.0 22-Apr-14 30.00 29 39.42 13-May-14 30.00 39 53.01 53.69
285 L1 STA. 5+515 - 5+565 22-Apr-14 31.00 30 40.77 30.00 40 54.37

286 35 RIGID 16-Apr-14 4.0 23-Apr-14 30.00 28 38.06 14-May-14 31.00 39 53.01 52.33
287 L2 STA. 9+030 - 9+050 23-Apr-14 31.00 27 36.70 30.00 38 51.65

288 36 RIGID 16-Apr-14 3.0 23-Apr-14 30.00 28 38.06 14-May-14 32.00 39 53.01 52.33
289 R2 STA. 5+730 - 5+830 23-Apr-14 30.00 29 39.42 30.00 40 54.37
290 3.0 23-Apr-14 31.00 27 36.70 31.00 37 50.29
291 23-Apr-14 30.00 29 39.42 31.00 38 51.65
23-Apr-14
292 37 RIGID 19-Apr-14 3.0 26-Apr-14 31.00 29 39.42 17-May-14 31.00 39 53.01 53.69
293 R2 STA. 6+125 - 6+175 26-Apr-14 31.00 28 38.06 32.00 40 54.37
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
294 38 RIGID 19-Apr-14 4.0 26-Apr-14 32.00 31 42.13 17-May-14 32.00 38 51.65 50.97
295 R2 STA. 9+185 - 9+235 26-Apr-14 31.00 29 39.42 31.00 37 50.29

296 39 RIGID 20-Apr-14 4.0 27-Apr-14 31.00 28 38.06 18-May-14 31.00 38 51.65 53.01
297 R1 STA. 0+745 - 0+780 27-Apr-14 32.00 29 39.42 32.00 40 54.37

298 40 RIGID 20-Apr-14 3.0 27-Apr-14 32.00 27 36.70 18-May-14 32.00 39 53.01 52.33
299 R1 STA.6+125 - 6+175 27-Apr-14 31.00 30 40.77 31.00 38 51.65

300 41 RIGID 20-Apr-14 4.0 27-Apr-14 31.00 28 38.06 18-May-14 32.00 37 50.29 51.65
301 R3 STA. 9+270 - 9+195 27-Apr-14 32.00 29 39.42 31.00 39 53.01

302 42 RIGID 21-Apr-14 3.0 28-Apr-14 32.00 27 36.70 19-May-14 32.00 39 53.01 53.69
303 R3 STA. 9+195 - 9+125 28-Apr-14 32.00 28 38.06 32.00 40 54.37

304 43 RIGID 21-Apr-14 3.0 28-Apr-14 31.00 27 36.70 19-May-14 31.00 38 51.65 53.01
305 L1 STA. 5+590 - 5+650 28-Apr-14 32.00 27 36.70 32.00 40 54.37

306 44 RIGID 21-Apr-14 4.0 28-Apr-14 31.00 29 39.42 19-May-14 31.00 39 53.01 52.33
307 L2 STA. 6+100 - 6+120 28-Apr-14 32.00 28 38.06 32.00 38 51.65
GESING

308 45 RIGID 21-Apr-14 4.0 28-Apr-14 31.00 29 39.42 19-May-14 31.00 39 53.01 53.69
309 L1 STA. 9+290 - 9+337,5 28-Apr-14 32.00 30 40.77 32.00 40 54.37

310 46 RIGID 22-Apr-14 4.0 29-Apr-14 31.00 27 36.70 20-May-14 32.00 39 53.01 53.69
311 R1 STA. 5+950 - 9+570 29-Apr-14 32.00 28 38.06 31.00 40 54.37
GESING

312 47 RIGID 22-Apr-14 4.0 29-Apr-14 31.00 29 39.42 20-May-14 32.00 38 51.65 52.33
313 L1 STA. 9+290 - 9+337,5 29-Apr-14 31.00 29 39.42 31.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
314 48 RIGID 23-Apr-14 3.0 30-Apr-14 31.00 28 38.06 21-May-14
315 R2 STA. 8+750 - 8+835 30-Apr-14 32.00 29 39.42
316 3.0 30-Apr-14 32.00 27 36.70
317 30-Apr-14 31.00 30 40.77

318 49 RIGID 23-Apr-14 3.0 30-Apr-14 31.00 28 38.06 21-May-14


319 R1 STA. 9+280 - 9+300 30-Apr-14 32.00 29 39.42

50 RIGID 24-Apr-14 3.0 1-May-14 31.00 28 38.06 22-May-14


L2 STA. 8+845 - 8+735 1-May-14 32.00 29 39.42

51 RIGID 25-Apr-14 3.0 2-May-14 31.00 28 38.06 23-May-14


R1 STA. 8+750 - 8+800 2-May-14 31.00 29 39.42

52 RIGID 25-Apr-14 4.0 2-May-14 32.00 28 38.06 23-May-14


L3 STA. 5+500 - 5+515 2-May-14 31.00 30 40.77

53 RIGID 26-Apr-14 4.0 3-May-14 31.00 29 39.42 24-May-14


R2 STA. 9+300 - 9+337,5 3-May-14 32.00 28 38.06

54 RIGID 26-Apr-14 3.0 3-May-14 32.00 30 40.77 24-May-14


L1 STA. 8+835 - 8+740 3-May-14 31.00 29 39.42
3.0 3-May-14 31.00 28 38.06
3-May-14 32.00 27 36.70

55 RIGID 27-Apr-14 4.0 4-May-14 32.00 27 36.70 25-May-14


L1 STA. 0+935 - 0+950 4-May-14 31.00 28 38.06

56 RIGID 27-Apr-14 4.0 4-May-14 31.00 30 40.77 25-May-14


R1,R2 STA. 8+750 - 8+745 4-May-14 32.00 29 39.42

57 RIGID 27-Apr-14 4.0 4-May-14 31.00 29 39.42 25-May-14


R2 STA. 9+300 - 9+275 4-May-14 31.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
58 RIGID 28-Apr-14 4.0 5-May-14 32.00 29 39.42 26-May-14
R3 STA. 9+315 - 9+270 5-May-14 31.00 30 40.77

59 RIGID 28-Apr-14 3.0 5-May-14 31.00 28 38.06 26-May-14


R2 STA. 5+600 - 5+660 5-May-14 31.00 29 39.42

60 RIGID 28-Apr-14 3.0 5-May-14 32.00 27 36.70 26-May-14


R2 STA. 5+600 - 5+720 5-May-14 31.00 29 39.42

61 RIGID 2-May-14 4.0 9-May-14 30.00 27 36.70 30-May-14


L3 STA. 8+525 - 8+545 9-May-14 31.00 28 38.06
9-May-14
9-May-14
9-May-14
62 RIGID 2-May-14 3.0 9-May-14 32.00 27 36.70 30-May-14
L1 STA. 6+130 - 6+180 9-May-14 32.00 29 39.42
9-May-14

63 RIGID 3-May-14 4.0 10-May-14 31.00 27 36.70 31-May-14


L1 STA. 8+525 - 8+545 10-May-14 32.00 29 39.42
10-May-14
10-May-14
10-May-14
64 RIGID 3-May-14 3.0 10-May-14 31.00 28 38.06 31-May-14
L1 STA. 8+665 - 8+610 10-May-14 31.00 29 39.42
10-May-14

65 RIGID 4-May-14 4.0 11-May-14 30.00 27 36.70 1-Jun-14


L1 STA. 8+605 - 8+580 11-May-14 31.00 28 38.06
11-May-14
11-May-14
11-May-14
66 RIGID 4-May-14 3.0 11-May-14 31.00 30 40.77 1-Jun-14
R1 STA. 6+720 - 6+730 11-May-14 32.00 29 39.42

67 RIGID 5-May-14 4.0 12-May-14 31.00 29 39.42 2-Jun-14


L2 STA. 0+990 - 1+040 12-May-14 30.00 28 38.06
12-May-14
12-May-14
12-May-14
68 RIGID 5-May-14 4.0 12-May-14 32.00 29 39.42 2-Jun-14
L1 STA. 8+580 - 8+555 12-May-14 30.00 31 42.13
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
L1 STA. (8+580
STA. )- 8+555 Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
69 RIGID 6-May-14 4.0 13-May-14 31.00 27 36.70 3-Jun-14
L1 STA. 8+595 - 8+610 13-May-14 32.00 28 38.06
KLANGKUNG 13-May-14
13-May-14

70 RIGID 7-May-14 4.0 14-May-14 30.00 28 38.06 4-Jun-14


L2 STA. 8+605 - 8+560 14-May-14 31.00 27 36.70

71 RIGID 8-May-14 3.0 15-May-14 32.00 27 36.70 5-Jun-14


R2 STA. 8+990 - 8+945 15-May-14 30.00 29 39.42
15-May-14

72 RIGID 9-May-14 4.0 16-May-14 30.00 27 36.70 6-Jun-14


R3 STA. 8+990 - 9+005 16-May-14 32.00 29 39.42
16-May-14
16-May-14
16-May-14
73 RIGID 9-May-14 3.0 16-May-14 31.00 28 38.06 6-Jun-14
L1 STA. 9+090 - 9+085 16-May-14 30.00 30 40.77

74 RIGID 10-May-14 3.0 17-May-14 31.00 27 36.70 7-Jun-14


R1 STA. 8+780 - 8+945 17-May-14 31.00 28 38.06
17-May-14
17-May-14
17-May-14
75 RIGID 10-May-14 4.0 17-May-14 31.00 30 40.77 7-Jun-14
R3 STA. 8+990 - 8+940 17-May-14 31.00 29 39.42

76 RIGID 11-May-14 4.0 18-May-14 31.00 29 39.42 8-Jun-14


L1 STA. 0+020 - 0+050 18-May-14 32.00 28 38.06
18-May-14
18-May-14
18-May-14
77 RIGID 11-May-14 4.0 18-May-14 32.00 30 40.77 8-Jun-14
L1 STA. 9+085 - 9+105 18-May-14 32.00 29 39.42
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
78 RIGID 12-May-14 4.0 19-May-14 31.00 28 38.06 9-Jun-14
R3 STA. 8+945 - 8+930 19-May-14 32.00 29 39.42
19-May-14
19-May-14
19-May-14
79 RIGID 13-May-14 4.0 19-May-14 31.00 28 38.06 10-Jun-14
R1 STA. 9+030 - 9+045 19-May-14 32.00 29 39.42

80 RIGID 13-May-14 4.0 20-May-14 31.00 27 36.70 10-Jun-14


R3 STA. 5+720 - 5+730 20-May-14 32.00 30 40.77
20-May-14
20-May-14
20-May-14
81 RIGID 13-May-14 3.0 20-May-14 31.00 28 38.06 10-Jun-14
R2 STA. 5+635 - 5+590 20-May-14 32.00 29 39.42

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT Jasamarga Pandaan Tol Konsultan Kontraktor
PT. Multi Phi Beta
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( ________________________)
( _____________________________ ) ( _____________________________ )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
` `
252 1 RIGID 24-Feb-14 4.0 3-Mar-14 24-Mar-14 34.20 39 53.01 53.01
253 24-Mar-14 34.20 39 53.01
STA. 0+690 - 0+760 RAM 5
`

254 2 RIGID 25-Feb-14 4.0 4-Mar-14 25-Mar-14 32.70 36 48.93 50.29


255 25-Mar-14 33.80 38 51.65
STA. 0+715 - 0+760 RAM5

256 3 RIGID 25-Feb-14 3.0 4-Mar-14 25-Mar-14 33.80 38 51.65 53.01


257 25-Mar-14 34.70 40 54.37
STA. 8+260 - 8+315 L3

258 4 RIGID 25-Feb-14 3.0 4-Mar-14 25-Mar-14 34.20 39 53.01 51.65


259 25-Mar-14 34.00 37 50.29
STA. 8+260 - 8+315 L3

260 5 RIGID 26-Feb-14 3.0 5-Mar-14 26-Mar-14 35.20 42 57.08 58.44


261 26-Mar-14 35.20 42 57.08
262 26-Mar-14 34.00 40 54.37
263 26-Mar-14 35.70 44 59.80
264 L3 STA. 11+090 - 10+950 26-Mar-14 35.70 44 59.80
265 26-Mar-14 34.20 42 57.08
266 26-Mar-14 35.70 45 61.16
267 26-Mar-14 35.20 45 61.16

268 6 RIGID 27-Feb-14 4.0 6-Mar-14 27-Mar-14 34.70 40 54.37 54.37


269 27-Mar-14 34.70 40 54.37
L2 STA. 0+750 - 0+745

270 7 RIGID 27-Feb-14 4.0 6-Mar-14 27-Mar-14 35.20 43 58.44 58.44


271 27-Mar-14 35.20 43 58.44
L2 STA. 0+685 - 0+670

Page 222 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

272 8 RIGID 28-Feb-14 3.0 7-Mar-14 28-Mar-14 35.70 43 58.44 58.67


273 28-Mar-14 35.70 43 58.44
274 28-Mar-14 35.80 45 61.16
275 R1 STA. 11+085 - 10+950 28-Mar-14 35.70 43 58.44
276 28-Mar-14 35.80 45 61.16
277 28-Mar-14 35.20 40 54.37

278 9 RIGID 1-Mar-14 4.0 8-Mar-14 29-Mar-14 34.00 40 54.37 58.44


279 29-Mar-14 35.70 45 61.16
280 L2 STA. 10+925 - 10+975 29-Mar-14 35.70 45 61.16
281 29-Mar-14 34.80 42 57.08

282 10 RIGID 3-Mar-14 3.0 10-Mar-14 31-Mar-14 35.20 43 58.44 59.29


283 31-Mar-14 35.20 43 58.44
284 31-Mar-14 35.20 40 54.37
285 31-Mar-14 35.70 45 61.16
R1 STA. 11+085 - 10+060
286 31-Mar-14 35.70 45 61.16
287 31-Mar-14 35.20 44 59.80
288 31-Mar-14 35.70 45 61.16
289 31-Mar-14 35.70 44 59.80

`
11 RIGID 5-Mar-14 4.0 12-Mar-14 2-Apr-14 34.70 44 59.80 60.48
34.80 45 61.16
L1 STA. 10+915 - 10+930

`
12 RIGID 5-Mar-14 4.0 12-Mar-14 2-Apr-14 34.00 40 54.37 54.37
34.20 40 54.37
R1 STA. 11+095 - 11+085

`
13 RIGID 6-Mar-14 3.0 13-Mar-14 3-Apr-14 34.00 40 54.37 55.39
34.20 40 54.37
STA. 0+670 - 0+652 R2 34.70 42 57.08
34.80 41 55.73

`
14 RIGID 7-Mar-14 3.0 14-Mar-14 4-Apr-14 34.20 38 51.65 53.01
34.50 39 53.01
34.50 39 53.01
STA. 9+220 - 9+300 L2 34.20 37 50.29
34.70 40 54.37
34.80 41 55.73

Page 223 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
15 RIGID 10-Mar-14 3.0 17-Mar-14 7-Apr-14 34.70 39 53.01 51.87
34.80 38 51.65
34.80 38 51.65
STA. 10+990 - 11+075 L3 35.20 41 55.73
35.00 37 50.29
34.20 36 48.93

`
16 RIGID 12-Mar-14 4.0 19-Mar-14 9-Apr-14 35.20 40 54.37 54.37
35.20 40 54.37
RAM 5 STA. 0+735 - 0+755

`
17 RIGID 12-Mar-14 4.0 19-Mar-14 9-Apr-14 34.00 36 48.93 52.33
34.90 39 53.01
RAM 5 STA. 0+735 - 0+755 34.80 39 53.01
35.00 40 54.37

`
290 18 RIGID 14-Mar-14 4.0 21-Mar-14 32.7 29 39.42 11-Apr-14 34.70 42 57.08 57.08
34.80 42 57.08
R3 STA. 9+772,5 - 9+385 ;
R1 STA. 9+220 - 9+215 ; R1
STA. 9+120 - 9+125

291 19 RIGID 14-Mar-14 3.0 21-Mar-14 32.8 29 39.42 11-Apr-14 35.20 44 59.80 57.08
34.20 40 54.37
R2 STA. 0+640 - 0+635 ; R1
STA. 0+605 - 0+620

292 20 RIGID 15-Mar-14 4.0 22-Mar-14 33.8 30 40.77 12-Apr-14 34.20 42 57.08 58.44
293 22-Mar-14 32.7 29 39.42 34.20 42 57.08
R2 STA. 0+590 - 0+605
34.90 44 59.80
35.00 44 59.80

294 21 RIGID 17-Mar-14 3.0 24-Mar-14 32.7 28 38.06 14-Apr-14 34.90 45 61.16 60.26
295 24-Mar-14 34.0 30 40.77 34.90 45 61.16
R4 STA. 11+010 - 11+075
34.70 43 58.44

296 22 RIGID 17-Mar-14 4.0 24-Mar-14 34.2 30 40.77 14-Apr-14 34.80 43 58.44 57.99
35.20 45 61.16
R3 STA. 11+075 - 11+095
34.20 40 54.37

297 23 RIGID 18-Mar-14 4.0 25-Mar-14 33.9 30 40.77 15-Apr-14 34.20 42 57.08 55.73
34.00 40 54.37
R5 STA. 11+010 - 11+050

298 24 RIGID 18-Mar-14 4.0 25-Mar-14 34.0 30 40.77 15-Apr-14 34.20 42 57.08 57.08
34.20 42 57.08
R3 STA. 11+085 - 11+095 ;
R4 STA. 11+075 - 11+090

299 25 RIGID 18-Mar-14 3.0 25-Mar-14 33.8 29 39.42 15-Apr-14 34.50 43 58.44 59.12
34.20 44 59.80
R3 STA. 11+010 - 10+985

Page 224 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

300 26 RIGID 19-Mar-14 4.0 26-Mar-14 34.5 30 40.77 16-Apr-14 34.70 43 58.44 57.36
301 26-Mar-14 34.6 30 40.77 34.80 43 58.44
34.70 42 57.08
R5 STA. 11+050 - 11+090
33.80 40 54.37
34.70 43 58.44

302 27 RIGID 21-Mar-14 3.0 28-Mar-14 33.7 29 39.42 18-Apr-14 33.90 40 54.37 57.76
303 28-Mar-14 33.8 29 39.42 35.70 45 61.16
R2 STA. 11+235 - 11+275

304 28 RIGID 21-Mar-14 3.0 28-Mar-14 34.0 30 40.77 18-Apr-14 35.70 45 61.16 59.35
34.80 43 58.44
L1 STA. 11+075 - 11+100
34.70 43 58.44

305 29 RIGID 22-Mar-14 4.0 29-Mar-14 34.6 31 42.13 19-Apr-14 34.80 42 57.08 57.08
34.90 42 57.08
L3 STA. 10+940 - 11+925 ;
R4 STA.11+ 090 - 11+100

306 30 RIGID 22-Mar-14 3.0 29-Mar-14 34.6 31 42.13 19-Apr-14 34.00 40 54.37 58.90
307 29-Mar-14 34.0 30 40.77 35.20 45 61.16
R3 STA. 11+290 - 11+235
35.20 45 61.16

308 31 RIGID 24-Mar-14 3.0 31-Mar-14 34.0 29 39.42 21-Apr-14


309 RAM 2 STA. 11+105 - 31-Mar-14 34.0 29 39.42
11+160

310 32 RIGID 24-Mar-14 4.0 31-Mar-14 34.0 30 40.77 21-Apr-14


RAM 2 STA. 11+275 -
11+295

`
33 RIGID 25-Mar-14 4.0 1-Apr-14 33.9 29 39.42 22-Apr-14

L4 STA. 11+115 - 11+080

`
34 RIGID 25-Mar-14 3.0 1-Apr-14 33.9 29 39.42 22-Apr-14
RAM 2 L2 STA. 2+160 - 33.8 28 38.06
2+260 34.0 30 40.77

`
35 RIGID 26-Mar-14 4.0 2-Apr-14 34.0 30 40.77 23-Apr-14
34.2 30 40.77
RAM2 STA. 2+180 - 2+140

`
36 RIGID 27-Mar-14 3.0 3-Apr-14 33.7 28 38.06 24-Apr-14
33.9 30 40.77
RAM 2 STA. 2+180 - 2+260
34.0 30 40.77

`
37 RIGID 28-Mar-14 4.0 4-Apr-14 34.0 30 40.77 25-Apr-14
33.9 29 39.42
L4 STA. 11+005 - 11+035

`
38 RIGID 29-Mar-14 4.0 5-Apr-14 33.7 29 39.42 26-Apr-14
R2 STA. 10+950 - 10+960 ;
R1 STA. 10+950 - 10+935
Page 225 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
R2 STA. 10+950 - 10+960 ; ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
R1 STA. 10+950 - 10+935

Page 226 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
39 RIGID 29-Mar-14 4.0 5-Apr-14 33.8 29 39.42 26-Apr-14

L3 STA. 10+950 - 10+935

`
40 RIGID 29-Mar-14 3.0 5-Apr-14 34.0 30 40.77 26-Apr-14

L4 STA. 11+035 - 11+080

`
41 RIGID 31-Mar-14 4.0 7-Apr-14 33.9 29 39.42 28-Apr-14
34.0 31 42.13
R4 STA. 0+495 - 0+510

`
42 RIGID 1-Apr-14 4.0 8-Apr-14 33.7 28 38.06 29-Apr-14
34.2 31 42.13
L4 STA. 0+510 - 0+525

`
43 RIGID 2-Apr-14 3.0 9-Apr-14 33.9 29 39.42 30-Apr-14
33.9 29 39.42
R3 STA. 5+745 - 5+700

`
44 RIGID 3-Apr-14 4.0 10-Apr-14 34.0 30 40.77 1-May-14
33.9 29 39.42
R3 STA. 0+110 - 0+160

`
45 RIGID 3-Apr-14 3.0 10-Apr-14 34.2 31 42.13 1-May-14
33.8 28 38.06
R2 STA. 5+510 - 5+595
34.0 30 40.77

`
45 RIGID 4-Apr-14 4.0 11-Apr-14 33.8 29 39.42 2-May-14
RAM 1B STA 0+015 - RAM
1A STA. 0+015

`
47 RIGID 4-Apr-14 4.0 11-Apr-14 33.9 29 39.42 2-May-14

L2 STA. 0+040 - 0+055

`
48 RIGID 4-Apr-14 3.0 11-Apr-14 34.0 30 40.77 2-May-14

L3 STA. 5+515 - 5+590

`
49 RIGID 5-Apr-14 3.0 12-Apr-14 34.2 30 40.77 3-May-14

L1 STA. 0+040 - 0+055

`
50 RIGID 5-Apr-14 4.0 12-Apr-14 34.0 30 40.77 3-May-14

L2 STA. 0+040 - 0+005

`
51 RIGID 6-Apr-14 4.0 13-Apr-14 33.8 29 39.42 4-May-14
RAM 1B L3 STA. 0+005 -
0+040

Page 227 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
52 RIGID 6-Apr-14 3.0 13-Apr-14 33.8 29 39.42 4-May-14

STA. 0+040 - 0+050 L2

`
53 RIGID 7-Apr-14 4.0 14-Apr-14 33.9 29 39.42 5-May-14
34.0 30 40.77
L1 STA. 0+005 - 0+040
34.0 30 40.77

`
54 RIGID 8-Apr-14 3.0 15-Apr-14 34.0 30 40.77 6-May-14
34.2 30 40.77
L1 STA. 0+005 - 0+040

`
55 RIGID 10-Apr-14 3.0 17-Apr-14 34.0 30 40.77 8-May-14
33.8 29 39.42
R5 STA. 0+595 - 0+560

`
56 RIGID 11-Apr-14 3.0 18-Apr-14 33.8 29 39.42 9-May-14
33.9 29 39.42
L2 STA. 5+515 - 5+585
34.0 30 40.77

Disetujui Oleh :
Pandaan, ............... 2014
Konsultan
Diketahui Oleh : Diajukan Oleh :
PT. Multi Phi Beta
PT Jasamarga Pandaan Tol Kontraktor
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( _____________________________ ) ( ________________________)
(__________________________________)

Page 228 of 322


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
` `
1 RIGID 24-Feb-14 4.0 3-Mar-14 24-Mar-14 34.20 39 53.01 53.01
34.20 39 53.01
STA. 0+690 - 0+760 RAM 5
`

`
2 RIGID 25-Feb-14 4.0 4-Mar-14 25-Mar-14 32.70 36 48.93 50.29
33.80 38 51.65
STA. 0+715 - 0+760 RAM5

`
3 RIGID 25-Feb-14 3.0 4-Mar-14 25-Mar-14 33.80 38 51.65 53.01
34.70 40 54.37
STA. 8+260 - 8+315 L3

`
4 RIGID 25-Feb-14 3.0 4-Mar-14 25-Mar-14 34.20 39 53.01 51.65
34.00 37 50.29
STA. 8+260 - 8+315 L3

`
5 RIGID 26-Feb-14 3.0 5-Mar-14 26-Mar-14 35.20 42 57.08 58.44
35.20 42 57.08
34.00 40 54.37
35.70 44 59.80
L3 STA. 11+090 - 10+950 35.70 44 59.80
34.20 42 57.08
35.70 45 61.16
35.20 45 61.16

`
6 RIGID 27-Feb-14 4.0 6-Mar-14 27-Mar-14 34.70 40 54.37 54.37
34.70 40 54.37
L2 STA. 0+750 - 0+745

`
7 RIGID 27-Feb-14 4.0 6-Mar-14 27-Mar-14 35.20 43 58.44 58.44
35.20 43 58.44
L2 STA. 0+685 - 0+670

Page 229 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
8 RIGID 28-Feb-14 3.0 7-Mar-14 28-Mar-14 35.70 43 58.44 58.67
35.70 43 58.44
35.80 45 61.16
R1 STA. 11+085 - 10+950 35.70 43 58.44
35.80 45 61.16
35.20 40 54.37

`
9 RIGID 1-Mar-14 4.0 8-Mar-14 29-Mar-14 34.00 40 54.37 58.44
35.70 45 61.16
L2 STA. 10+925 - 10+975 35.70 45 61.16
34.80 42 57.08

`
10 RIGID 3-Mar-14 3.0 10-Mar-14 31-Mar-14 35.20 43 58.44 59.29
35.20 43 58.44
35.20 40 54.37
35.70 45 61.16
R1 STA. 11+085 - 10+060
35.70 45 61.16
35.20 44 59.80
35.70 45 61.16
35.70 44 59.80

`
131 11 RIGID 5-Mar-14 4.0 12-Mar-14 2-Apr-14 34.70 44 59.80 60.48
132 2-Apr-14 34.80 45 61.16
L1 STA. 10+915 - 10+930

133 12 RIGID 5-Mar-14 4.0 12-Mar-14 2-Apr-14 34.00 40 54.37 54.37


134 2-Apr-14 34.20 40 54.37
R1 STA. 11+095 - 11+085

135 13 RIGID 6-Mar-14 3.0 13-Mar-14 3-Apr-14 34.00 40 54.37 55.39


136 3-Apr-14 34.20 40 54.37
137 STA. 0+670 - 0+652 R2 3-Apr-14 34.70 42 57.08
138 3-Apr-14 34.80 41 55.73

139 14 RIGID 7-Mar-14 3.0 14-Mar-14 4-Apr-14 34.20 38 51.65 53.01


140 4-Apr-14 34.50 39 53.01
141 4-Apr-14 34.50 39 53.01
142 STA. 9+220 - 9+300 L2 4-Apr-14 34.20 37 50.29
143 4-Apr-14 34.70 40 54.37
144 4-Apr-14 34.80 41 55.73

Page 230 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

145 15 RIGID 10-Mar-14 3.0 17-Mar-14 7-Apr-14 34.70 39 53.01 51.87


146 7-Apr-14 34.80 38 51.65
147 7-Apr-14 34.80 38 51.65
148 STA. 10+990 - 11+075 L3 7-Apr-14 35.20 41 55.73
149 7-Apr-14 35.00 37 50.29
150 7-Apr-14 34.20 36 48.93

151 16 RIGID 12-Mar-14 4.0 19-Mar-14 9-Apr-14 35.20 40 54.37 54.37


152 9-Apr-14 35.20 40 54.37
RAM 5 STA. 0+735 - 0+755

153 17 RIGID 12-Mar-14 4.0 19-Mar-14 9-Apr-14 34.00 36 48.93 52.33


154 9-Apr-14 34.90 39 53.01
155 RAM 5 STA. 0+735 - 0+755 9-Apr-14 34.80 39 53.01
156 9-Apr-14 35.00 40 54.37

157 18 RIGID 14-Mar-14 4.0 21-Mar-14 32.7 29 39.42 11-Apr-14 34.70 42 57.08 57.08
158 11-Apr-14 34.80 42 57.08
R3 STA. 9+772,5 - 9+385 ;
R1 STA. 9+220 - 9+215 ; R1
STA. 9+120 - 9+125

159 19 RIGID 14-Mar-14 3.0 21-Mar-14 32.8 29 39.42 11-Apr-14 35.20 44 59.80 57.08
160 11-Apr-14 34.20 40 54.37
R2 STA. 0+640 - 0+635 ; R1
STA. 0+605 - 0+620

161 20 RIGID 15-Mar-14 4.0 22-Mar-14 33.8 30 40.77 12-Apr-14 34.20 42 57.08 58.44
162 32.7 29 39.42 12-Apr-14 34.20 42 57.08
R2 STA. 0+590 - 0+605
163 12-Apr-14 34.90 44 59.80
164 12-Apr-14 35.00 44 59.80

165 21 RIGID 17-Mar-14 3.0 24-Mar-14 32.7 28 38.06 14-Apr-14 34.90 45 61.16 60.26
166 34.0 30 40.77 14-Apr-14 34.90 45 61.16
R4 STA. 11+010 - 11+075
167 14-Apr-14 34.70 43 58.44

168 22 RIGID 17-Mar-14 4.0 24-Mar-14 34.2 30 40.77 14-Apr-14 34.80 43 58.44 57.99
169 14-Apr-14 35.20 45 61.16
R3 STA. 11+075 - 11+095
170 14-Apr-14 34.20 40 54.37

171 23 RIGID 18-Mar-14 4.0 25-Mar-14 33.9 30 40.77 15-Apr-14 34.20 42 57.08 55.73
172 15-Apr-14 34.00 40 54.37
R5 STA. 11+010 - 11+050

173 24 RIGID 18-Mar-14 4.0 25-Mar-14 34.0 30 40.77 15-Apr-14 34.20 42 57.08 57.08
174 15-Apr-14 34.20 42 57.08
R3 STA. 11+085 - 11+095 ;
R4 STA. 11+075 - 11+090

175 25 RIGID 18-Mar-14 3.0 25-Mar-14 33.8 29 39.42 15-Apr-14 34.50 43 58.44 59.12
176 15-Apr-14 34.20 44 59.80
R3 STA. 11+010 - 10+985

Page 231 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

177 26 RIGID 19-Mar-14 4.0 26-Mar-14 34.5 30 40.77 16-Apr-14 34.70 43 58.44 57.36
178 34.6 30 40.77 16-Apr-14 34.80 43 58.44
179 16-Apr-14 34.70 42 57.08
R5 STA. 11+050 - 11+090
180 16-Apr-14 33.80 40 54.37
181 16-Apr-14 34.70 43 58.44

182 27 RIGID 21-Mar-14 3.0 28-Mar-14 33.7 29 39.42 18-Apr-14 33.90 40 54.37 57.76
183 33.8 29 39.42 18-Apr-14 35.70 45 61.16
R2 STA. 11+235 - 11+275

184 28 RIGID 21-Mar-14 3.0 28-Mar-14 34.0 30 40.77 18-Apr-14 35.70 45 61.16 59.35
185 18-Apr-14 34.80 43 58.44
L1 STA. 11+075 - 11+100
186 18-Apr-14 34.70 43 58.44

187 29 RIGID 22-Mar-14 4.0 29-Mar-14 34.6 31 42.13 19-Apr-14 34.80 42 57.08 57.08
188 19-Apr-14 34.90 42 57.08
L3 STA. 10+940 - 11+925 ;
R4 STA.11+ 090 - 11+100

189 30 RIGID 22-Mar-14 3.0 29-Mar-14 34.6 31 42.13 19-Apr-14 34.00 40 54.37 58.90
190 34.0 30 40.77 19-Apr-14 35.20 45 61.16
R3 STA. 11+290 - 11+235
191 19-Apr-14 35.20 45 61.16

`
31 RIGID 24-Mar-14 3.0 31-Mar-14 34.0 29 39.42 21-Apr-14
RAM 2 STA. 11+105 - 34.0 29 39.42
11+160

`
32 RIGID 24-Mar-14 4.0 31-Mar-14 34.0 30 40.77 21-Apr-14
RAM 2 STA. 11+275 -
11+295

`
192 33 RIGID 25-Mar-14 4.0 1-Apr-14 33.9 29 39.42 22-Apr-14

L4 STA. 11+115 - 11+080

193 34 RIGID 25-Mar-14 3.0 1-Apr-14 33.9 29 39.42 22-Apr-14


194 RAM 2 L2 STA. 2+160 - 1-Apr-14 33.8 28 38.06
195 2+260 34.0 30 40.77

196 35 RIGID 26-Mar-14 4.0 2-Apr-14 34.0 30 40.77 23-Apr-14


197 2-Apr-14 34.2 30 40.77
RAM2 STA. 2+180 - 2+140

198 36 RIGID 27-Mar-14 3.0 3-Apr-14 33.7 28 38.06 24-Apr-14


199 3-Apr-14 33.9 30 40.77
RAM 2 STA. 2+180 - 2+260
200 3-Apr-14 34.0 30 40.77

201 37 RIGID 28-Mar-14 4.0 4-Apr-14 34.0 30 40.77 25-Apr-14


202 4-Apr-14 33.9 29 39.42
L4 STA. 11+005 - 11+035

203 38 RIGID 29-Mar-14 4.0 5-Apr-14 33.7 29 39.42 26-Apr-14


R2 STA. 10+950 - 10+960 ;
R1 STA. 10+950 - 10+935
Page 232 of 322
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
R2 STA. 10+950 - 10+960 ; ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
R1 STA. 10+950 - 10+935

Page 233 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
204 39 RIGID 29-Mar-14 4.0 5-Apr-14 33.8 29 39.42 26-Apr-14

L3 STA. 10+950 - 10+935

205 40 RIGID 29-Mar-14 3.0 5-Apr-14 34.0 30 40.77 26-Apr-14

L4 STA. 11+035 - 11+080

206 41 RIGID 31-Mar-14 4.0 7-Apr-14 33.9 29 39.42 28-Apr-14


207 7-Apr-14 34.0 31 42.13
R4 STA. 0+495 - 0+510

208 42 RIGID 1-Apr-14 4.0 8-Apr-14 33.7 28 38.06 29-Apr-14


209 8-Apr-14 34.2 31 42.13
L4 STA. 0+510 - 0+525

210 43 RIGID 2-Apr-14 3.0 9-Apr-14 33.9 29 39.42 30-Apr-14


211 9-Apr-14 33.9 29 39.42
R3 STA. 5+745 - 5+700

212 44 RIGID 3-Apr-14 4.0 10-Apr-14 34.0 30 40.77 1-May-14


213 10-Apr-14 33.9 29 39.42
R3 STA. 0+110 - 0+160

214 45 RIGID 3-Apr-14 3.0 10-Apr-14 34.2 31 42.13 1-May-14


215 10-Apr-14 33.8 28 38.06
R2 STA. 5+510 - 5+595
216 10-Apr-14 34.0 30 40.77

217 45 RIGID 4-Apr-14 4.0 11-Apr-14 33.8 29 39.42 2-May-14


RAM 1B STA 0+015 - RAM
1A STA. 0+015

218 47 RIGID 4-Apr-14 4.0 11-Apr-14 33.9 29 39.42 2-May-14

L2 STA. 0+040 - 0+055

219 48 RIGID 4-Apr-14 3.0 11-Apr-14 34.0 30 40.77 2-May-14

L3 STA. 5+515 - 5+590

220 49 RIGID 5-Apr-14 3.0 12-Apr-14 34.2 30 40.77 3-May-14

L1 STA. 0+040 - 0+055

221 50 RIGID 5-Apr-14 4.0 12-Apr-14 34.0 30 40.77 3-May-14

L2 STA. 0+040 - 0+005

222 51 RIGID 6-Apr-14 4.0 13-Apr-14 33.8 29 39.42 4-May-14


RAM 1B L3 STA. 0+005 -
0+040

Page 234 of 322


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

223 52 RIGID 6-Apr-14 3.0 13-Apr-14 33.8 29 39.42 4-May-14

STA. 0+040 - 0+050 L2

224 53 RIGID 7-Apr-14 4.0 14-Apr-14 33.9 29 39.42 5-May-14


225 14-Apr-14 34.0 30 40.77
L1 STA. 0+005 - 0+040
226 14-Apr-14 34.0 30 40.77

227 54 RIGID 8-Apr-14 3.0 15-Apr-14 34.0 30 40.77 6-May-14


228 15-Apr-14 34.2 30 40.77
L1 STA. 0+005 - 0+040

229 55 RIGID 10-Apr-14 3.0 17-Apr-14 34.0 30 40.77 8-May-14


230 17-Apr-14 33.8 29 39.42
R5 STA. 0+595 - 0+560

231 56 RIGID 11-Apr-14 3.0 18-Apr-14 33.8 29 39.42 9-May-14


232 18-Apr-14 33.9 29 39.42
L2 STA. 5+515 - 5+585
233 18-Apr-14 34.0 30 40.77

Disetujui Oleh :
Pandaan, ............... 2014
Konsultan
Diketahui Oleh : Diajukan Oleh :
PT. Multi Phi Beta
PT Jasamarga Pandaan Tol Kontraktor
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( _____________________________ ) ( ________________________)
(__________________________________)

Page 235 of 322


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
192 1 RIGID 22-Feb-14 4.0 1-Mar-14 22-Mar-14 31.00 40 54.37 53.69
193 STA. 0+295 - 0+275 R2 22-Mar-14 32.00 39 53.01

2 RIGID 23-Feb-14 3.0 2-Mar-14 23-Mar-14 31.00 38 51.65 53.01


STA. 6+075 - 6+125 L2 23-Mar-14 31.00 40 54.37

3 RIGID 23-Feb-14 4.0 2-Mar-14 23-Mar-14 32.00 39 53.01 53.69


STA. 0+510 - 0+520 R1 23-Mar-14 31.00 40 54.37

4 RIGID 24-Feb-14 3.0 3-Mar-14 24-Mar-14 31.00 36 48.93 49.61


STA. 8+260 - 8+310 L2 24-Mar-14 31.00 37 50.29

5 RIGID 25-Feb-14 4.0 4-Mar-14 25-Mar-14 31.00 38 51.65 52.33


STA. 6+050 - 6+080 R1 25-Mar-14 32.00 39 53.01
GESING

6 RIGID 28-Feb-14 4.0 7-Mar-14 28-Mar-14 31.00 38 51.65 52.33


STA. 8+275 - 8+320 L2 28-Mar-14 31.00 39 53.01
PUCANG ANOM

7 RIGID 28-Feb-14 4.0 7-Mar-14 28-Mar-14 32.00 40 54.37 53.69


STA. 11+985 - 10+960 R1 28-Mar-14 31.00 39 53.01
KADAPLANG

8 RIGID 1-Mar-14 4.0 8-Mar-14 29-Mar-14 31.00 38 51.65 52.33


STA. 9+080 - 9+160 L2 29-Mar-14 31.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
9 RIGID 2-Mar-14 3.0 9-Mar-14 30-Mar-14 31.00 36 48.93 50.29
STA. 10+970 - 10+870 L2 30-Mar-14 31.00 37 50.29
4.0 30-Mar-14 32.00 37 50.29
30-Mar-14 31.00 38 51.65

10 RIGID 2-Mar-14 3.0 9-Mar-14 30-Mar-14 31.00 37 50.29 50.97


STA. 9+220 - 9+280 L2 30-Mar-14 32.00 38 51.65

11 RIGID 3-Mar-14 4.0 10-Mar-14 31-Mar-14 31.00 40 54.37 53.01


STA. 5+895 - 5+825 R2 31-Mar-14 31.00 38 51.65

12 RIGID 4-Mar-14 3.0 11-Mar-14 1-Apr-14 31.00 37 50.29 50.97


STA. 9+085 - 9+065 L3 1-Apr-14 31.00 38 51.65

1 13 RIGID 4-Mar-14 4.0 11-Mar-14 1-Apr-14 32.00 40 54.37 53.01


2 STA. 11+100 - 11+090 L1 1-Apr-14 31.00 38 51.65

3 14 RIGID 7-Mar-14 3.0 14-Mar-14 4-Apr-14 31.00 38 51.65 51.99


4 STA. 11+075 - 11+175 R3 4-Apr-14 32.00 39 53.01
5 4.0 4-Apr-14 31.00 37 50.29
6 4-Apr-14 31.00 39 53.01

7 15 RIGID 8-Mar-14 3.0 15-Mar-14 5-Apr-14 31.00 36 48.93 51.65


8 STA. 11+075 - 11+185 R3 5-Apr-14 32.00 37 50.29
9 5-Apr-14 31.00 39 53.01
10 5-Apr-14 32.00 40 54.37

11 16 RIGID 9-Mar-14 4.0 16-Mar-14 6-Apr-14 31.00 38 51.65 49.61


12 STA. 9+120 - 9+290 L1 6-Apr-14 32.00 35 47.57

13 17 RIGID 9-Mar-14 4.0 16-Mar-14 6-Apr-14 31.00 37 50.29 52.33


14 STA. 9+120 - 9+290 L3 6-Apr-14 32.00 40 54.37

15 18 RIGID 11-Mar-14 4.0 18-Mar-14 8-Apr-14 31.00 40 54.37 55.73


16 R2 STA. 9+385 - 9+455 8-Apr-14 32.00 42 57.08

17 19 RIGID 12-Mar-14 3.0 19-Mar-14 9-Apr-14 31.00 36 48.93 48.25


18 R1 STA. 9+485 - 9+530 9-Apr-14 31.00 35 47.57

19 20 RIGID 13-Mar-14 3.0 20-Mar-14 10-Apr-14 31.00 40 54.37 54.37


20 R2 STA. 9+455 - 9+515 10-Apr-14 32.00 40 54.37

21 21 RIGID 14-Mar-14 4.0 21-Mar-14 31.00 28 38.06 11-Apr-14 31.00 38 51.65 51.65
22 R3 STA. 6+055 - 6+155 32.00 29 39.42 11-Apr-14 30.00 40 54.37
23 4.0 31.00 27 36.70 11-Apr-14 30.00 39 53.01
24 31.00 30 40.77 11-Apr-14 30.00 35 47.57
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
25 22 RIGID 15-Mar-14 3.0 22-Mar-14 31.00 27 36.70 12-Apr-14 31.00 35 47.57 50.97
26 R3 STA. 6+055 - 6+105 31.00 28 38.06 12-Apr-14 32.00 40 54.37

27 23 RIGID 15-Mar-14 4.0 22-Mar-14 32.00 30 40.77 12-Apr-14 31.00 37 50.29 49.61
28 STA. 0+460 - 0+475 L1 31.00 29 39.42 12-Apr-14 31.00 36 48.93

29 24 RIGID 17-Mar-14 3.0 24-Mar-14 31.00 27 36.70 14-Apr-14 30.00 35 47.57 51.65
30 R3 STA. 5+930 - 6+030 32.00 28 38.06 14-Apr-14 31.00 40 54.37
31 4.0 32.00 29 39.42 14-Apr-14 30.00 39 53.01
32 31.00 28 38.06 14-Apr-14 30.00 38 51.65

33 25 RIGID 18-Mar-14 4.0 25-Mar-14 31.00 30 40.77 15-Apr-14 31.00 35 47.57 51.99
34 L3 STA. 5+795 - 5+895 31.00 30 40.77 15-Apr-14 32.00 42 57.08
35 3.0 32.00 30 40.77 15-Apr-14 31.00 39 53.01
36 31.00 29 39.42 15-Apr-14 32.00 37 50.29

37 26 RIGID 19-Mar-14 3.0 26-Mar-14 32.00 28 38.06 16-Apr-14 30.00 37 50.29 48.93
38 L3 STA. 5+895 - 5+985 31.00 29 39.42 16-Apr-14 31.00 35 47.57

39 27 RIGID 19-Mar-14 3.0 26-Mar-14 31.00 27 36.70 16-Apr-14 30.00 36 48.93 48.25
40 R2 STA. 9+395 - 9+371 31.00 28 38.06 16-Apr-14 30.00 35 47.57

41 28 RIGID 19-Mar-14 3.0 26-Mar-14 31.00 27 36.70 16-Apr-14 31.00 39 53.01 52.33
42 L3 STA. 5+980 - 6+080 31.00 28 38.06 16-Apr-14 32.00 37 50.29
43 4.0 32.00 27 36.70 16-Apr-14 31.00 40 54.37
44 31.00 28 38.06 16-Apr-14 31.00 38 51.65

45 29 RIGID 20-Mar-14 3.0 27-Mar-14 31.00 29 39.42 17-Apr-14 31.00 38 51.65 52.33
46 L3 STA. 6+055 - 6+105 31.00 28 38.06 17-Apr-14 32.00 39 53.01

47 30 RIGID 22-Mar-14 3.0 29-Mar-14 31.00 29 39.42 19-Apr-14 31.00 38 51.65 53.01
48 L1 STA. 8+980 - 9+930 32.00 30 40.77 19-Apr-14 32.00 40 54.37

49 31 RIGID 23-Mar-14 4.0 30-Mar-14 31.00 29 39.42 20-Apr-14 32.00 38 51.65 50.97
50 L3 STA. 9+095 - 9+145 31.00 30 40.77 20-Apr-14 30.00 37 50.29

51 32 RIGID 23-Mar-14 3.0 30-Mar-14 32.00 30 40.77 20-Apr-14 31.00 39 53.01 53.69
52 R4 STA. 11+230 - 11+250 31.00 30 40.77 20-Apr-14 31.00 40 54.37

33 RIGID 24-Mar-14 3.0 31-Mar-14 31.00 30 40.77 21-Apr-14


L2 STA. 8+990 - 9+040 32.00 28 38.06

34 RIGID 24-Mar-14 4.0 31-Mar-14 31.00 27 36.70 21-Apr-14


R1 STA. 9+122,5 - 9+225 31.00 27 36.70
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

53 35 RIGID 25-Mar-14 3.0 1-Apr-14 31.00 30 40.77 22-Apr-14


54 L3 STA. 9+225 - 9+290 1-Apr-14 31.00 30 40.77
55 4.0 1-Apr-14 32.00 31 42.13
56 1-Apr-14 31.00 29 39.42

57 36 RIGID 25-Mar-14 3.0 1-Apr-14 32.00 28 38.06 22-Apr-14


58 L3 STA. 9+22,5 - 9+172,5 1-Apr-14 31.00 30 40.77

59 37 RIGID 27-Mar-14 3.0 3-Apr-14 31.00 28 38.06 24-Apr-14


60 R2 STA. 10+925 - 10+940 3-Apr-14 31.00 29 39.42
KADAPLANG

61 38 RIGID 27-Mar-14 4.0 3-Apr-14 32.00 30 40.77 24-Apr-14


62 R1 STA. 9+180 - 9+280 3-Apr-14 31.00 29 39.42
63 3.0 3-Apr-14 32.00 28 38.06
64 3-Apr-14 31.00 29 39.42

65 39 RIGID 28-Mar-14 4.0 4-Apr-14 31.00 29 39.42 25-Apr-14


66 L3 STA. 6+115 - 6+190 4-Apr-14 31.00 30 40.77
67 3.0 4-Apr-14 32.00 28 38.06
68 4-Apr-14 31.00 29 39.42

69 40 RIGID 29-Mar-14 3.0 5-Apr-14 31.00 28 38.06 26-Apr-14


70 R1 STA. 9+180 - 9+300 5-Apr-14 31.00 29 39.42
71 4.0 5-Apr-14 32.00 27 36.70
72 5-Apr-14 31.00 28 38.06

73 41 RIGID 30-Mar-14 3.0 6-Apr-14 31.00 30 40.77 27-Apr-14


74 STA. 10+930 - 11+005 R1 6-Apr-14 31.00 31 42.13

75 42 RIGID 30-Mar-14 4.0 6-Apr-14 32.00 29 39.42 27-Apr-14


76 STA. 9+320 - 9+323 L 1,2 6-Apr-14 31.00 30 40.77

77 43 RIGID 30-Mar-14 3.0 6-Apr-14 32.00 30 40.77 27-Apr-14


78 R3 STA. 6+065 - 6+115 6-Apr-14 31.00 30 40.77

79 44 RIGID 30-Mar-14 4.0 6-Apr-14 31.00 29 39.42 27-Apr-14


80 R3 STA. 6+120 - 6+150 6-Apr-14 32.00 30 40.77

81 45 RIGID 1-Apr-14 3.0 8-Apr-14 31.00 28 38.06 29-Apr-14


82 R3 STA. 8+865 - 8+935 8-Apr-14 31.00 27 36.70
83 8-Apr-14 32.00 29 39.42
84 8-Apr-14 31.00 30 40.77

85 46 RIGID 1-Apr-14 4.0 8-Apr-14 32.00 29 39.42 29-Apr-14


86 R3 STA. 8+970 - 8+925 8-Apr-14 31.00 30 40.77

87 47 RIGID 1-Apr-14 4.0 8-Apr-14 31.00 30 40.77 29-Apr-14


88 R3 STA. 5+825 - 5+725 8-Apr-14 31.00 27 36.70
89 3.0 8-Apr-14 31.00 29 39.42
90 8-Apr-14 32.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
91 48 RIGID 2-Apr-14 3.0 9-Apr-14 31.00 30 40.77 30-Apr-14
92 L1,2,3 STA. 9+020 - 9+023 9-Apr-14 31.00 29 39.42

93 49 RIGID 2-Apr-14 4.0 9-Apr-14 32.00 28 38.06 30-Apr-14


94 L2 STA. 9+295 - 9+325 9-Apr-14 31.00 29 39.42

95 50 RIGID 3-Apr-14 3.0 10-Apr-14 31.00 27 36.70 1-May-14


96 L1,2,3 STA. 9+023 - 9+030 10-Apr-14 32.00 28 38.06

97 51 RIGID 3-Apr-14 3.0 10-Apr-14 32.00 27 36.70 1-May-14


98 L3 STA. 8+735 - 8+835 10-Apr-14 32.00 29 39.42
99 4.0 10-Apr-14 31.00 27 36.70
100 10-Apr-14 31.00 28 38.06

101 52 RIGID 4-Apr-14 3.0 11-Apr-14 31.00 27 36.70 2-May-14


102 L3 STA. 5+515 - 5+590 11-Apr-14 31.00 28 38.06

103 53 RIGID 6-Apr-14 4.0 13-Apr-14 30.00 27 36.70 4-May-14


104 L2 STA. 8+875 - 8+830 13-Apr-14 30.00 28 38.06

105 54 RIGID 6-Apr-14 3.0 13-Apr-14 31.00 30 40.77 4-May-14


106 R1 STA. 8+750 - 8+850 13-Apr-14 30.00 30 40.77
107 3.0 13-Apr-14 31.00 28 38.06
108 13-Apr-14 31.00 30 40.77

109 55 RIGID 7-Apr-14 3.0 14-Apr-14 30.00 28 38.06 5-May-14


110 STA. 8+595 - 8+645 R2 14-Apr-14 30.00 27 36.70

111 56 RIGID 8-Apr-14 3.0 15-Apr-14 31.00 29 39.42 6-May-14


112 STA. 8+595 - 8+645 R1 15-Apr-14 32.00 28 38.06

113 57 RIGID 8-Apr-14 4.0 15-Apr-14 30.00 29 39.42 6-May-14


114 STA. 9+020 - 9+055 15-Apr-14 31.00 31 42.13

115 58 RIGID 10-Apr-14 3.0 17-Apr-14 31.00 28 38.06 8-May-14


116 R2 STA. 5+590 - 5+690 17-Apr-14 32.00 27 36.70
117 4.0 17-Apr-14 31.00 29 39.42
118 17-Apr-14 31.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
119 59 RIGID 10-Apr-14 4.0 17-Apr-14 31.00 27 36.70 8-May-14
120 R3 STA. 8+865 - 8+835 17-Apr-14 32.00 30 40.77

121 60 RIGID 11-Apr-14 3.0 18-Apr-14 31.00 27 36.70 9-May-14


122 R4 STA. 0+580 - 0+600 18-Apr-14 31.00 29 39.42

123 61 RIGID 11-Apr-14 4.0 18-Apr-14 32.00 30 40.77 9-May-14


124 L3 STA. 9+070 - 9+050 18-Apr-14 31.00 28 38.06

125 62 RIGID 11-Apr-14 3.0 18-Apr-14 32.00 27 36.70 9-May-14


126 L3 STA. 8+595 - 8+645 18-Apr-14 31.00 29 39.42

127 63 RIGID 12-Apr-14 3.0 19-Apr-14 30.00 28 38.06 10-May-14


128 R1 STA. 5+585 - 5+635 19-Apr-14 30.00 29 39.42

129 64 RIGID 12-Apr-14 4.0 19-Apr-14 32.00 27 36.70 10-May-14


130 L3 STA. 9+050 - 9+025 19-Apr-14 31.00 30 40.77

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT Jasamarga Pandaan Tol Konsultan Kontraktor
PT. Multi Phi Beta
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( ________________________)
( _____________________________ ) ( _____________________________ )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
234 1 RIGID 24-Mar-14 3.0 31-Mar-14 21-Apr-14 30.00 39 53.01 51.65
235 L2 STA. 8+990 - 9+040 21-Apr-14 31.00 37 50.29

2 RIGID 24-Mar-14 4.0 31-Mar-14 21-Apr-14 30.00 38 51.65 50.29


R1 STA. 9+122,5 - 9+225 21-Apr-14 30.00 36 48.93

3 RIGID 25-Mar-14 3.0 1-Apr-14 22-Apr-14 30.00 37 50.29 50.97


L3 STA. 9+122,5 - 9+172,5 22-Apr-14 31.00 38 51.65

4 RIGID 25-Mar-14 3.0 1-Apr-14 22-Apr-14 32.00 38 51.65 53.01


L3 STA. 9+225 - 9+290 22-Apr-14 31.00 36 48.93
4.0 22-Apr-14 30.00 42 57.08
22-Apr-14 30.00 40 54.37

5 RIGID 27-Mar-14 4.0 3-Apr-14 24-Apr-14 30.00 37 50.29 50.97


R2 STA. 10+925 - 10+940 24-Apr-14 32.00 38 51.65
KADAPLANG

6 RIGID 27-Mar-14 3.0 3-Apr-14 24-Apr-14 31.00 36 48.93 51.65


R1 STA. 9+180 - 9+280 24-Apr-14 31.00 37 50.29
3.0 24-Apr-14 30.00 39 53.01
24-Apr-14 31.00 40 54.37

7 RIGID 28-Mar-14 3.0 4-Apr-14 25-Apr-14 31.00 39 53.01 53.35


L3 STA. 6+115 - 6+190 25-Apr-14 30.00 41 55.73
3.0 25-Apr-14 32.00 38 51.65
25-Apr-14 30.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
8 RIGID 29-Mar-14 3.0 5-Apr-14 26-Apr-14 31.00 39 53.01 53.01
R1 STA. 9+180 - 9+300 26-Apr-14 31.00 37 50.29
4.0 26-Apr-14 32.00 42 57.08
26-Apr-14 31.00 38 51.65

9 RIGID 30-Mar-14 3.0 6-Apr-14 27-Apr-14 31.00 38 51.65 53.01


STA. 10+930 - 11+005 R1 27-Apr-14 32.00 40 54.37

10 RIGID 30-Mar-14 4.0 6-Apr-14 27-Apr-14 31.00 37 50.29 51.65


STA. 9+320 - 9+323 L 1,2 27-Apr-14 32.00 39 53.01

11 RIGID 30-Mar-14 3.0 6-Apr-14 27-Apr-14 31.00 37 50.29 51.65


R3 STA. 6+065 - 6+115 27-Apr-14 32.00 39 53.01

12 RIGID 30-Mar-14 4.0 6-Apr-14 27-Apr-14 31.00 40 54.37 55.05


R3 STA. 6+120 - 6+150 27-Apr-14 32.00 41 55.73

13 RIGID 1-Apr-14 3.0 8-Apr-14 29-Apr-14 31.00 38 51.65 53.69


R3 STA. 8+865 - 8+935 29-Apr-14 32.00 39 53.01
29-Apr-14 32.00 41 55.73
29-Apr-14 32.00 40 54.37

14 RIGID 1-Apr-14 4.0 8-Apr-14 29-Apr-14 31.00 37 50.29 51.65


R3 STA. 8+970 - 8+925 29-Apr-14 31.00 39 53.01

15 RIGID 1-Apr-14 3.0 8-Apr-14 29-Apr-14 32.00 38 51.65 52.67


R3 STA. 5+825 - 5+725 29-Apr-14 31.00 38 51.65
4.0 29-Apr-14 31.00 39 53.01
29-Apr-14 32.00 40 54.37

16 RIGID 2-Apr-14 3.0 9-Apr-14 30-Apr-14 31.00 39 53.01 52.33


L1,2,3 STA. 9+020 - 9+023 30-Apr-14 32.00 38 51.65

17 RIGID 2-Apr-14 4.0 9-Apr-14 30-Apr-14 32.00 40 54.37 53.01


L2 STA. 9+295 - 9+325 30-Apr-14 31.00 38 51.65
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
1 18 RIGID 3-Apr-14 3.0 10-Apr-14 1-May-14 32.00 38 51.65 52.33
2 L1,2,3 STA. 9+023 - 9+030 1-May-14 31.00 39 53.01

3 19 RIGID 3-Apr-14 3.0 10-Apr-14 1-May-14 32.00 39 53.01 54.37


4 L3 STA. 8+735 - 8+835 1-May-14 31.00 40 54.37
5 4.0 1-May-14 32.00 41 55.73
6 1-May-14 31.00 40 54.37

7 20 RIGID 4-Apr-14 3.0 11-Apr-14 2-May-14 31.00 39 53.01 53.69


8 L3 STA. 5+515 - 5+590 2-May-14 32.00 40 54.37

9 21 RIGID 6-Apr-14 4.0 13-Apr-14 4-May-14 31.00 40 54.37 53.69


10 L2 STA. 8+875 - 8+830 4-May-14 31.00 39 53.01

11 22 RIGID 6-Apr-14 3.0 13-Apr-14 4-May-14 32.00 40 54.37 53.35


12 R1 STA. 8+750 - 8+850 4-May-14 31.00 38 51.65
13 3.0 4-May-14 32.00 39 53.01
14 4-May-14 31.00 40 54.37

15 23 RIGID 7-Apr-14 3.0 14-Apr-14 5-May-14 31.00 40 54.37 53.69


16 STA. 8+595 - 8+645 R2 5-May-14 32.00 39 53.01

17 24 RIGID 8-Apr-14 3.0 15-Apr-14 6-May-14 32.00 40 54.37 53.01


18 STA. 8+595 - 8+645 R1 6-May-14 31.00 38 51.65

19 25 RIGID 8-Apr-14 4.0 15-Apr-14 6-May-14 32.00 39 53.01 53.69


20 STA. 9+020 - 9+055 6-May-14 31.00 40 54.37

21 26 RIGID 10-Apr-14 3.0 17-Apr-14 8-May-14 32.00 38 51.65 52.67


22 R2 STA. 5+590 - 5+690 8-May-14 31.00 39 53.01
23 4.0 8-May-14 31.00 38 51.65
24 8-May-14 32.00 40 54.37

25 27 RIGID 10-Apr-14 4.0 17-Apr-14 8-May-14 31.00 39 53.01 54.37


26 R3 STA. 8+865 - 8+835 8-May-14 32.00 41 55.73

27 28 RIGID 11-Apr-14 4.0 18-Apr-14 9-May-14 31.00 39 53.01 52.33


28 R4 STA. 0+580 - 0+600 9-May-14 30.00 38 51.65
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
29 29 RIGID 11-Apr-14 4.0 18-Apr-14 9-May-14 32.00 37 50.29 51.65
30 L3 STA. 9+070 - 9+050 9-May-14 30.00 39 53.01

31 30 RIGID 11-Apr-14 3.0 18-Apr-14 9-May-14 31.00 41 55.73 54.37


32 L3 STA. 8+595 - 8+645 9-May-14 31.00 39 53.01

33 31 RIGID 12-Apr-14 3.0 19-Apr-14 10-May-14 31.00 36 48.93 49.61


34 R1 STA. 5+585 - 5+635 10-May-14 32.00 37 50.29

35 32 RIGID 12-Apr-14 4.0 19-Apr-14 10-May-14 32.00 39 53.01 52.33


36 L3 STA. 9+050 - 9+025 10-May-14 31.00 38 51.65

37 33 RIGID 14-Apr-14 3.0 21-Apr-14 32.00 27 36.70 12-May-14 32.00 38 51.65 51.99
38 R3 STA. 9+510 - 9+405 21-Apr-14 31.00 29 39.42 12-May-14 31.00 39 53.01
39 21-Apr-14 30.00 28 38.06 12-May-14 30.00 37 50.29
40 21-Apr-14 32.00 30 40.77 12-May-14 32.00 39 53.01

41 34 RIGID 15-Apr-14 3.0 22-Apr-14 30.00 29 39.42 13-May-14 30.00 39 53.01 53.69
42 L1 STA. 5+515 - 5+565 22-Apr-14 31.00 30 40.77 13-May-14 30.00 40 54.37

43 35 RIGID 16-Apr-14 4.0 23-Apr-14 30.00 28 38.06 14-May-14 31.00 39 53.01 52.33
44 L2 STA. 9+030 - 9+050 23-Apr-14 31.00 27 36.70 14-May-14 30.00 38 51.65

45 36 RIGID 16-Apr-14 3.0 23-Apr-14 30.00 28 38.06 14-May-14 32.00 39 53.01 52.33
46 R2 STA. 5+730 - 5+830 23-Apr-14 30.00 29 39.42 14-May-14 30.00 40 54.37
47 3.0 23-Apr-14 31.00 27 36.70 14-May-14 31.00 37 50.29
48 23-Apr-14 30.00 29 39.42 14-May-14 31.00 38 51.65
23-Apr-14
49 37 RIGID 19-Apr-14 3.0 26-Apr-14 31.00 29 39.42 17-May-14 31.00 39 53.01 53.69
50 R2 STA. 6+125 - 6+175 26-Apr-14 31.00 28 38.06 17-May-14 32.00 40 54.37
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
51 38 RIGID 19-Apr-14 4.0 26-Apr-14 32.00 31 42.13 17-May-14 32.00 38 51.65 50.97
52 R2 STA. 9+185 - 9+235 26-Apr-14 31.00 29 39.42 17-May-14 31.00 37 50.29

53 39 RIGID 20-Apr-14 4.0 27-Apr-14 31.00 28 38.06 18-May-14 31.00 38 51.65 53.01
54 R1 STA. 0+745 - 0+780 27-Apr-14 32.00 29 39.42 18-May-14 32.00 40 54.37

55 40 RIGID 20-Apr-14 3.0 27-Apr-14 32.00 27 36.70 18-May-14 32.00 39 53.01 52.33
56 R1 STA.6+125 - 6+175 27-Apr-14 31.00 30 40.77 18-May-14 31.00 38 51.65

57 41 RIGID 20-Apr-14 4.0 27-Apr-14 31.00 28 38.06 18-May-14 32.00 37 50.29 51.65
58 R3 STA. 9+270 - 9+195 27-Apr-14 32.00 29 39.42 18-May-14 31.00 39 53.01

59 42 RIGID 21-Apr-14 3.0 28-Apr-14 32.00 27 36.70 19-May-14 32.00 39 53.01 53.69
60 R3 STA. 9+195 - 9+125 28-Apr-14 32.00 28 38.06 19-May-14 32.00 40 54.37

61 43 RIGID 21-Apr-14 3.0 28-Apr-14 31.00 27 36.70 19-May-14 31.00 38 51.65 53.01
62 L1 STA. 5+590 - 5+650 28-Apr-14 32.00 27 36.70 19-May-14 32.00 40 54.37

63 44 RIGID 21-Apr-14 4.0 28-Apr-14 31.00 29 39.42 19-May-14 31.00 39 53.01 52.33
64 L2 STA. 6+100 - 6+120 28-Apr-14 32.00 28 38.06 19-May-14 32.00 38 51.65
GESING

65 45 RIGID 21-Apr-14 4.0 28-Apr-14 31.00 29 39.42 19-May-14 31.00 39 53.01 53.69
66 L1 STA. 9+290 - 9+337,5 28-Apr-14 32.00 30 40.77 19-May-14 32.00 40 54.37

67 46 RIGID 22-Apr-14 4.0 29-Apr-14 31.00 27 36.70 20-May-14 32.00 39 53.01 53.69
68 R1 STA. 5+950 - 9+570 29-Apr-14 32.00 28 38.06 20-May-14 31.00 40 54.37
GESING

69 47 RIGID 22-Apr-14 4.0 29-Apr-14 31.00 29 39.42 20-May-14 32.00 38 51.65 52.33
70 L1 STA. 9+290 - 9+337,5 29-Apr-14 31.00 29 39.42 20-May-14 31.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
48 RIGID 23-Apr-14 3.0 30-Apr-14 31.00 28 38.06 21-May-14
R2 STA. 8+750 - 8+835 30-Apr-14 32.00 29 39.42
3.0 30-Apr-14 32.00 27 36.70
30-Apr-14 31.00 30 40.77

49 RIGID 23-Apr-14 3.0 30-Apr-14 31.00 28 38.06 21-May-14


R1 STA. 9+280 - 9+300 30-Apr-14 32.00 29 39.42

71 50 RIGID 24-Apr-14 3.0 1-May-14 31.00 28 38.06 22-May-14


72 L2 STA. 8+845 - 8+735 1-May-14 32.00 29 39.42

73 51 RIGID 25-Apr-14 3.0 2-May-14 31.00 28 38.06 23-May-14


74 R1 STA. 8+750 - 8+800 2-May-14 31.00 29 39.42

75 52 RIGID 25-Apr-14 4.0 2-May-14 32.00 28 38.06 23-May-14


76 L3 STA. 5+500 - 5+515 2-May-14 31.00 30 40.77

77 53 RIGID 26-Apr-14 4.0 3-May-14 31.00 29 39.42 24-May-14


78 R2 STA. 9+300 - 9+337,5 3-May-14 32.00 28 38.06

79 54 RIGID 26-Apr-14 3.0 3-May-14 32.00 30 40.77 24-May-14


80 L1 STA. 8+835 - 8+740 3-May-14 31.00 29 39.42
81 3.0 3-May-14 31.00 28 38.06
82 3-May-14 32.00 27 36.70

83 55 RIGID 27-Apr-14 4.0 4-May-14 32.00 27 36.70 25-May-14


84 L1 STA. 0+935 - 0+950 4-May-14 31.00 28 38.06

85 56 RIGID 27-Apr-14 4.0 4-May-14 31.00 30 40.77 25-May-14


86 R1,R2 STA. 8+750 - 8+745 4-May-14 32.00 29 39.42

87 57 RIGID 27-Apr-14 4.0 4-May-14 31.00 29 39.42 25-May-14


88 R2 STA. 9+300 - 9+275 4-May-14 31.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
89 58 RIGID 28-Apr-14 4.0 5-May-14 32.00 29 39.42 26-May-14
90 R3 STA. 9+315 - 9+270 5-May-14 31.00 30 40.77

91 59 RIGID 28-Apr-14 3.0 5-May-14 31.00 28 38.06 26-May-14


92 R2 STA. 5+600 - 5+660 5-May-14 31.00 29 39.42

93 60 RIGID 28-Apr-14 3.0 5-May-14 32.00 27 36.70 26-May-14


94 R2 STA. 5+600 - 5+720 5-May-14 31.00 29 39.42

95 61 RIGID 2-May-14 4.0 9-May-14 30.00 27 36.70 30-May-14


96 L3 STA. 8+525 - 8+545 9-May-14 31.00 28 38.06
9-May-14
9-May-14
9-May-14
97 62 RIGID 2-May-14 3.0 9-May-14 32.00 27 36.70 30-May-14
98 L1 STA. 6+130 - 6+180 9-May-14 32.00 29 39.42
9-May-14

99 63 RIGID 3-May-14 4.0 10-May-14 31.00 27 36.70 31-May-14


100 L1 STA. 8+525 - 8+545 10-May-14 32.00 29 39.42
10-May-14
10-May-14
10-May-14
101 64 RIGID 3-May-14 3.0 10-May-14 31.00 28 38.06 31-May-14
102 L1 STA. 8+665 - 8+610 10-May-14 31.00 29 39.42
10-May-14

103 65 RIGID 4-May-14 4.0 11-May-14 30.00 27 36.70 1-Jun-14


104 L1 STA. 8+605 - 8+580 11-May-14 31.00 28 38.06
11-May-14
11-May-14
11-May-14
105 66 RIGID 4-May-14 3.0 11-May-14 31.00 30 40.77 1-Jun-14
106 R1 STA. 6+720 - 6+730 11-May-14 32.00 29 39.42

107 67 RIGID 5-May-14 4.0 12-May-14 31.00 29 39.42 2-Jun-14


108 L2 STA. 0+990 - 1+040 12-May-14 30.00 28 38.06
12-May-14
12-May-14
12-May-14
109 68 RIGID 5-May-14 4.0 12-May-14 32.00 29 39.42 2-Jun-14
110 L1 STA. 8+580 - 8+555 12-May-14 30.00 31 42.13
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
L1 STA. (8+580
STA. )- 8+555 Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
111 69 RIGID 6-May-14 4.0 13-May-14 31.00 27 36.70 3-Jun-14
112 L1 STA. 8+595 - 8+610 13-May-14 32.00 28 38.06
KLANGKUNG 13-May-14
13-May-14

113 70 RIGID 7-May-14 4.0 14-May-14 30.00 28 38.06 4-Jun-14


114 L2 STA. 8+605 - 8+560 14-May-14 31.00 27 36.70

115 71 RIGID 8-May-14 3.0 15-May-14 32.00 27 36.70 5-Jun-14


116 R2 STA. 8+990 - 8+945 15-May-14 30.00 29 39.42
15-May-14

117 72 RIGID 9-May-14 4.0 16-May-14 30.00 27 36.70 6-Jun-14


118 R3 STA. 8+990 - 9+005 16-May-14 32.00 29 39.42
16-May-14
16-May-14
16-May-14
119 73 RIGID 9-May-14 3.0 16-May-14 31.00 28 38.06 6-Jun-14
120 L1 STA. 9+090 - 9+085 16-May-14 30.00 30 40.77

121 74 RIGID 10-May-14 3.0 17-May-14 31.00 27 36.70 7-Jun-14


122 R1 STA. 8+780 - 8+945 17-May-14 31.00 28 38.06
17-May-14
17-May-14
17-May-14
123 75 RIGID 10-May-14 4.0 17-May-14 31.00 30 40.77 7-Jun-14
124 R3 STA. 8+990 - 8+940 17-May-14 31.00 29 39.42

125 76 RIGID 11-May-14 4.0 18-May-14 31.00 29 39.42 8-Jun-14


126 L1 STA. 0+020 - 0+050 18-May-14 32.00 28 38.06
18-May-14
18-May-14
18-May-14
127 77 RIGID 11-May-14 4.0 18-May-14 32.00 30 40.77 8-Jun-14
128 L1 STA. 9+085 - 9+105 18-May-14 32.00 29 39.42
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
129 78 RIGID 12-May-14 4.0 19-May-14 31.00 28 38.06 9-Jun-14
130 R3 STA. 8+945 - 8+930 19-May-14 32.00 29 39.42
19-May-14
19-May-14
19-May-14
131 79 RIGID 13-May-14 4.0 19-May-14 31.00 28 38.06 10-Jun-14
132 R1 STA. 9+030 - 9+045 19-May-14 32.00 29 39.42

133 80 RIGID 13-May-14 4.0 20-May-14 31.00 27 36.70 10-Jun-14


134 R3 STA. 5+720 - 5+730 20-May-14 32.00 30 40.77
20-May-14
20-May-14
20-May-14
135 81 RIGID 13-May-14 3.0 20-May-14 31.00 28 38.06 10-Jun-14
136 R2 STA. 5+635 - 5+590 20-May-14 32.00 29 39.42

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT Jasamarga Pandaan Tol Konsultan Kontraktor
PT. Multi Phi Beta
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( ________________________)
( _____________________________ ) ( _____________________________ )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

1 1 RIGID 25-May-14 3.0 1-Jun-14 22-Jun-14 32.00 38 51.65 53.01


2 L3 11+265-11+280 22-Jun-14 31.00 40 54.37

3 2 RIGID 26-May-14 3.0 2-Jun-14 23-Jun-14 30.00 38 51.65 53.01


4 L1 11+280-11+295 23-Jun-14 31.00 40 54.37

5 3 RIGID 26-May-14 4.0 2-Jun-14 23-Jun-14 32.00 39 53.01 53.01


6 L1 11+280-11+295 23-Jun-14 31.00 39 53.01

7 4 RIGID 26-May-14 3.0 2-Jun-14 23-Jun-14 30.00 37 50.29 51.65


8 R2 6+190-6+240 23-Jun-14 31.00 39 53.01

9 5 RIGID 27-May-14 4.0 3-Jun-14 24-Jun-14 30.00 38 51.65 50.97


10 L2 11+280-11+295 24-Jun-14 31.00 37 50.29

11 6 RIGID 27-May-14 3.0 3-Jun-14 24-Jun-14 32.00 40 54.37 51.65


12 R2 6+275-6+325 24-Jun-14 31.00 36 48.93

13 7 RIGID 27-May-14 3.0 3-Jun-14 24-Jun-14 31.00 39 53.01 51.65


14 R2 6+275-6+325 24-Jun-14 30.00 37 50.29

15 8 RIGID 28-May-14 3.0 4-Jun-14 25-Jun-14 31.00 39 53.01 55.05


16 R3 6+255-6+330 25-Jun-14 30.00 42 57.08
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. )
R3 6+255-6+330 Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

17 9 RIGID 28-May-14 3.0 4-Jun-14 25-Jun-14 31.00 38 51.65 53.01


18 R3 6+255-6+330 25-Jun-14 32.00 40 54.37

19 10 RIGID 29-May-14 4.0 5-Jun-14 26-Jun-14 30.00 40 54.37 55.05


20 R2 6+185-6+190 26-Jun-14 32.00 41 55.73

21 11 RIGID 30-May-14 3.0 6-Jun-14 27-Jun-14 30.00 39 53.01 53.69


22 L2 6+190-6+220 27-Jun-14 31.00 40 54.37
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
23 12 RIGID 31-May-14 3.0 7-Jun-14 28-Jun-14 30.00 39 53.01 53.69
24 R1 6+180-6+200 28-Jun-14 31.00 40 54.37

25 13 RIGID 2-Jun-14 4.0 9-Jun-14 30-Jun-14 31.00 40 54.37 53.69


26 R2 0+925-0+920 30-Jun-14 32.00 39 53.01

14 RIGID 3-Jun-14 4.0 10-Jun-14 1-Jul-14 31.00 39 53.01 53.69


L1 0+040-0+045 32.00 40 54.37

15 RIGID 6-Jun-14 3.0 13-Jun-14 4-Jul-14 31.00 39 53.01 52.33


R1 7+005-7+105 32.00 38 51.65

16 RIGID 6-Jun-14 3.0 13-Jun-14 4-Jul-14 32.00 38 51.65 53.69


R1 7+005-7+105 31.00 41 55.73

17 RIGID 7-Jun-14 3.5 14-Jun-14 5-Jul-14 31.00 38 51.65 54.37


L1 6+990-7+110 32.00 42 57.08

18 RIGID 7-Jun-14 3.5 14-Jun-14 5-Jul-14 32.00 40 54.37 53.69


L1 6+990-7+110 31.00 39 53.01

19 RIGID 8-Jun-14 3.0 15-Jun-14 6-Jul-14 30.00 40 54.37 53.69


R2 7+005-7+145 31.00 39 53.01

20 RIGID 8-Jun-14 4.0 15-Jun-14 6-Jul-14 32.00 41 55.73 55.05


R2 7+005-7+145 30.00 40 54.37

21 RIGID 9-Jun-14 3.0 16-Jun-14 7-Jul-14 30.00 39 53.01 54.37


R2 6+990-7+105 31.00 41 55.73

22 RIGID 9-Jun-14 3.5 16-Jun-14 7-Jul-14 32.00 40 54.37 53.69


R2 6+990-7+105 31.00 39 53.01

23 RIGID 10-Jun-14 3.5 17-Jun-14 8-Jul-14 32.00 39 53.01 53.01


R3 7+005-7+105 31.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
R3 7+005-7+105 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

24 RIGID 10-Jun-14 3.5 17-Jun-14 8-Jul-14 32.00 40 54.37 53.69


R3 7+005-7+105 31.00 39 53.01

25 RIGID 11-Jun-14 3.0 18-Jun-14 9-Jul-14 31.00 40 54.37 53.69


R1 7+105-7+140 30.00 39 53.01

26 RIGID 11-Jun-14 4.0 18-Jun-14 9-Jul-14 31.00 38 51.65 53.01


0+000-0+005 32.00 40 54.37
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
27 RIGID 12-Jun-14 4.0 19-Jun-14 10-Jul-14 31.00 37 50.29 51.65
RAMP 1C 0+020-0+005 30.00 39 53.01

28 RIGID 12-Jun-14 3.0 19-Jun-14 10-Jul-14 32.00 40 54.37 53.69


RAMP L3 6+900-7+070 31.00 39 53.01

27 29 RIGID 13-Jun-14 4.0 20-Jun-14 30.00 27 36.70 11-Jul-14 31.00 39 53.01 53.69
28 L1 7+140-7+120 20-Jun-14 31.00 28 38.06 30.00 40 54.37

29 31 RIGID 14-Jun-14 4.0 21-Jun-14 32.00 28 38.06 12-Jul-14 30.00 42 57.08 55.05
30 R3 7+140-7+120 21-Jun-14 31.00 27 36.70 31.00 39 53.01

31 32 RIGID 16-Jun-14 4.0 23-Jun-14 31.00 27 36.70 14-Jul-14 32.00 41 55.73 54.37
32 R3 7+140-7+160 23-Jun-14 30.00 28 38.06 30.00 39 53.01

33 33 RIGID 18-Jun-14 3.0 25-Jun-14 30.00 30 40.77 16-Jul-14


34 L3 7+045-7+100 25-Jun-14 31.00 28 38.06

35 34 RIGID 21-Jun-14 3.0 28-Jun-14 31.00 28 38.06 19-Jul-14


36 L1 6+380-6+450 28-Jun-14 30.00 29 39.42

37 35 RIGID 21-Jun-14 3.0 28-Jun-14 30.00 28 38.06 19-Jul-14


38 L1 6+380-6+450 28-Jun-14 32.00 30 40.77

39 36 RIGID 22-Jun-14 3.5 29-Jun-14 32.00 27 36.70 20-Jul-14


40 L3 6+385-6+450 29-Jun-14 31.00 28 38.06

41 37 RIGID 22-Jun-14 3.0 29-Jun-14 31.00 29 39.42 20-Jul-14


42 L3 6+385-6+450 29-Jun-14 32.00 30 40.77

38 RIGID 24-Jun-14 3.0 1-Jul-14 31.00 28 38.06 22-Jul-14


R2 6+370-6+455 1-Jul-14 32.00 29 39.42

39 RIGID 24-Jun-14 3.0 1-Jul-14 32.00 30 40.77 22-Jul-14


R2 6+370-6+455 1-Jul-14 31.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
R2 6+370-6+455 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

40 RIGID 25-Jun-14 3.5 2-Jul-14 32.00 28 38.06 23-Jul-14


L2 6+385-6+420 2-Jul-14 31.00 30 40.77

41 RIGID 25-Jun-14 3.5 2-Jul-14 31.00 29 39.42 23-Jul-14


L2 6+385-6+420 2-Jul-14 32.00 30 40.77
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
42 RIGID 28-Jun-14 3.0 5-Jul-14 32.00 30 40.77 26-Jul-14
R1 6+355-6+400 5-Jul-14 31.00 29 39.42

43 RIGID 28-Jun-14 3.5 5-Jul-14 31.00 28 38.06 26-Jul-14


R1 6+355-6+400 5-Jul-14 32.00 30 40.77

44 RIGID 30-Jun-14 3.0 7-Jul-14 31.00 27 36.70 28-Jul-14


R3 6+360-6+410 7-Jul-14 30.00 29 39.42

45 RIGID 30-Jun-14 3.5 7-Jul-14 32.00 30 40.77 28-Jul-14


R3 6+360-6+410 7-Jul-14 31.00 29 39.42

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT Jasamarga Pandaan Tol Konsultan Kontraktor
PT. Multi Phi Beta
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( ________________________)
( _____________________________ ) ( _____________________________ )
PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : Juni 2014

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 22-Jun-14 28 1.00 51.65 51.65 0.45
RIGID
2 22-Jun-14 28 1.00 54.37 54.37 4.20
3 23-Jun-14 28 1.00 51.65 51.65 0.45
RIGID
4 23-Jun-14 28 1.00 54.37 54.37 4.20
5 23-Jun-14 28 1.00 53.01 53.01 0.48
RIGID
6 23-Jun-14 28 1.00 53.01 53.01 0.48
7 23-Jun-14 28 1.00 50.29 50.29 4.11
RIGID
8 23-Jun-14 28 1.00 53.01 53.01 0.48
9 24-Jun-14 28 1.00 51.65 51.65 0.45
RIGID
10 24-Jun-14 28 1.00 50.29 50.29 4.11
11 24-Jun-14 28 1.00 54.37 54.37 4.20
RIGID
12 24-Jun-14 28 1.00 48.93 48.93 11.47
13 24-Jun-14 28 1.00 53.01 53.01 0.48
RIGID
14 24-Jun-14 28 1.00 50.29 50.29 4.11
15 25-Jun-14 28 1.00 53.01 53.01 0.48
RIGID
16 25-Jun-14 28 1.00 57.08 57.08 22.73
17 25-Jun-14 28 1.00 51.65 51.65 0.45
RIGID
18 25-Jun-14 28 1.00 54.37 54.37 4.20
19 26-Jun-14 28 1.00 54.37 54.37 4.20
RIGID
20 26-Jun-14 28 1.00 55.73 55.73 11.62
21 27-Jun-14 28 1.00 53.01 53.01 0.48
RIGID
22 27-Jun-14 28 1.00 54.37 54.37 4.20
23 28-Jun-14 28 1.00 53.01 53.01 0.48
RIGID
24 28-Jun-14 28 1.00 54.37 54.37 4.20
25 30-Jun-14 28 1.00 54.37 54.37 4.20
RIGID
26 30-Jun-14 28 1.00 53.01 53.01 0.48
27 20-Jun-14 7 0.75 36.70 48.93 11.47
RIGID
28 20-Jun-14 7 0.75 38.06 50.74 2.48
29 21-Jun-14 7 0.75 38.06 50.74 2.48
RIGID
30 21-Jun-14 7 0.75 36.70 48.93 11.47
31 23-Jun-14 7 0.75 36.70 48.93 11.47
RIGID
32 23-Jun-14 7 0.75 38.06 50.74 2.48
33 25-Jun-14 7 0.75 40.77 54.37 4.20
RIGID
34 25-Jun-14 7 0.75 38.06 50.74 2.48
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
35 28-Jun-14 7 0.75 38.06 50.74 2.48
RIGID
36 28-Jun-14 7 0.75 39.42 52.55 0.06
37 28-Jun-14 7 0.75 38.06 50.74 2.48
RIGID
38 28-Jun-14 7 0.75 40.77 54.37 4.20
39 29-Jun-14 7 0.75 36.70 48.93 11.47
RIGID
40 29-Jun-14 7 0.75 38.06 50.74 2.48
41 29-Jun-14 7 0.75 39.42 52.55 0.06
RIGID
42 29-Jun-14 7 0.75 40.77 54.37 4.20

Σ(σbn - σbm)2 = 173.33

JUMLAH SAMPLE = 42.00 buah


MIN = 48.93 kg/cm2
MAX = 57.08 kg/cm2
RATA-RATA (σbm) = 52.32 kg/cm2
KARAKTERISTIK (σbk) = σbm - 1,64 S = 2.06 kg/cm2
48.94 kg/cm2

QC STAF QC

( ) ( )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

53 1 RIGID 18-Jun-14 3.0 25-Jun-14 16-Jul-14 31.00 40 54.37 53.69


54 L3 7+045-7+100 16-Jul-14 32.00 39 53.01

55 2 RIGID 21-Jun-14 3.5 28-Jun-14 19-Jul-14 31.00 37 50.29 51.65


56 L1 6+380-6+450 19-Jul-14 30.00 39 53.01

57 3 RIGID 21-Jun-14 3.5 28-Jun-14 19-Jul-14 28.00 40 54.37 53.01


58 L1 6+380-6+450 19-Jul-14 30.00 38 51.65

59 4 RIGID 22-Jun-14 3.0 29-Jun-14 20-Jul-14 32.00 38 51.65 53.01


60 L3 6+385-6+450 20-Jul-14 31.00 40 54.37

61 5 RIGID 22-Jun-14 3.0 29-Jun-14 20-Jul-14 32.00 39 53.01 53.69


62 L3 6+385-6+450 20-Jul-14 31.00 40 54.37

63 6 RIGID 24-Jun-14 3.0 1-Jul-14 22-Jul-14 33.00 39 53.01 53.01


64 R2 6+370-6+455 22-Jul-14 32.00 39 53.01

65 7 RIGID 24-Jun-14 3.0 1-Jul-14 22-Jul-14 32.00 38 51.65 52.33


66 R2 6+370-6+455 22-Jul-14 31.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
67 8 RIGID 25-Jun-14 3.5 2-Jul-14 23-Jul-14 30.00 39 53.01 53.69
68 L2 6+385-6+420 23-Jul-14 32.00 40 54.37

69 9 RIGID 25-Jun-14 3.5 2-Jul-14 23-Jul-14 31.00 38 51.65 52.33


70 L2 6+385-6+420 23-Jul-14 30.00 39 53.01

10 RIGID 28-Jun-14 3.5 5-Jul-14 6-Aug-14 31.00 39 53.01 53.69


R1 6+355-6+400 30.00 40 54.37

11 RIGID 28-Jun-14 3.5 5-Jul-14 6-Aug-14 32.00 38 51.65 50.97


R1 6+355-6+400 31.00 37 50.29

12 RIGID 30-Jun-14 3.0 7-Jul-14 6-Aug-14 30.00 38 51.65 50.97


R3 6+360-6+410 32.00 37 50.29

13 RIGID 30-Jun-14 3.0 7-Jul-14 6-Aug-14 31.00 40 54.37 53.01


R3 6+360-6+410 30.00 38 51.65

71 14 RIGID 12-Jul-14 3.5 19-Jul-14 31.00 30 40.77 9-Aug-14 31.00 39 53.01 52.33
72 R3 6+185-6+250 19-Jul-14 30.00 29 39.42 32.00 38 51.65
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
73 15 RIGID 13-Jul-14 3.0 20-Jul-14 32.00 28 38.06 10-Aug-14 31.00 39 53.01 53.69
74 R1 6+215-6+185 20-Jul-14 31.00 29 39.42 31.00 40 54.37

75 16 RIGID 13-Jul-14 3.0 20-Jul-14 30.00 27 36.70 10-Aug-14 32.00 38 51.65 52.33
76 R1 6+215-6+185 20-Jul-14 31.00 28 38.06 31.00 39 53.01

17 RIGID 9-Aug-14 3.5 16-Aug-14 31.00 30 40.77 6-Sep-14


R2 6+850-6+900 32.00 29 39.42

18 RIGID 11-Aug-14 3.0 18-Aug-14 32.00 30 40.77 8-Sep-14


R3 6+850-6+800 31.00 28 38.06

19 RIGID 12-Aug-14 4.0 19-Aug-14 30.00 30 40.77 9-Sep-14


R3 6+730-6+640 32.00 30 40.77

20 RIGID 13-Aug-14 3.5 20-Aug-14 30.00 27 36.70 10-Sep-14


R2 6+800-6+850 31.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
21 RIGID 15-Aug-14 3.0 22-Aug-14 31.00 30 40.77 12-Sep-14
R3 6+850-6+945 30.00 28 38.06

22 RIGID 18-Aug-14 3.0 25-Aug-14 32.00 29 39.42 15-Sep-14


R2 6+850-6+925 31.00 28 38.06

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT Jasamarga Pandaan Tol Konsultan Kontraktor

( _____________________________ ) ( _____________________________ ) ( ________________________)


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

1 RIGID 25-May-14 3.0 1-Jun-14 22-Jun-14 32.00 38 51.65 53.01


L3 11+265-11+280 22-Jun-14 31.00 40 54.37

2 RIGID 26-May-14 3.0 2-Jun-14 23-Jun-14 30.00 38 51.65 53.01


L1 11+280-11+295 23-Jun-14 31.00 40 54.37

3 RIGID 26-May-14 4.0 2-Jun-14 23-Jun-14 32.00 39 53.01 53.01


L1 11+280-11+295 23-Jun-14 31.00 39 53.01

4 RIGID 26-May-14 3.0 2-Jun-14 23-Jun-14 30.00 37 50.29 51.65


R2 6+190-6+240 23-Jun-14 31.00 39 53.01

5 RIGID 27-May-14 4.0 3-Jun-14 24-Jun-14 30.00 38 51.65 50.97


L2 11+280-11+295 24-Jun-14 31.00 37 50.29

6 RIGID 27-May-14 3.0 3-Jun-14 24-Jun-14 32.00 40 54.37 51.65


R2 6+275-6+325 24-Jun-14 31.00 36 48.93

7 RIGID 27-May-14 3.0 3-Jun-14 24-Jun-14 31.00 39 53.01 51.65


R2 6+275-6+325 24-Jun-14 30.00 37 50.29

8 RIGID 28-May-14 3.0 4-Jun-14 25-Jun-14 31.00 39 53.01 55.05


R3 6+255-6+330 25-Jun-14 30.00 42 57.08
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. )
R3 6+255-6+330 Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

9 RIGID 28-May-14 3.0 4-Jun-14 25-Jun-14 31.00 38 51.65 53.01


R3 6+255-6+330 25-Jun-14 32.00 40 54.37

10 RIGID 29-May-14 4.0 5-Jun-14 26-Jun-14 30.00 40 54.37 55.05


R2 6+185-6+190 26-Jun-14 32.00 41 55.73

11 RIGID 30-May-14 3.0 6-Jun-14 27-Jun-14 30.00 39 53.01 53.69


L2 6+190-6+220 27-Jun-14 31.00 40 54.37
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
12 RIGID 31-May-14 3.0 7-Jun-14 28-Jun-14 30.00 39 53.01 53.69
R1 6+180-6+200 28-Jun-14 31.00 40 54.37

13 RIGID 2-Jun-14 4.0 9-Jun-14 30-Jun-14 31.00 40 54.37 53.69


R2 0+925-0+920 30-Jun-14 32.00 39 53.01

1 14 RIGID 3-Jun-14 4.0 10-Jun-14 1-Jul-14 31.00 39 53.01 53.69


2 L1 0+040-0+045 1-Jul-14 32.00 40 54.37

3 15 RIGID 6-Jun-14 3.0 13-Jun-14 4-Jul-14 31.00 39 53.01 52.33


4 R1 7+005-7+105 4-Jul-14 32.00 38 51.65

5 16 RIGID 6-Jun-14 3.0 13-Jun-14 4-Jul-14 32.00 38 51.65 53.69


6 R1 7+005-7+105 4-Jul-14 31.00 41 55.73

7 17 RIGID 7-Jun-14 3.5 14-Jun-14 5-Jul-14 31.00 38 51.65 54.37


8 L1 6+990-7+110 5-Jul-14 32.00 42 57.08

9 18 RIGID 7-Jun-14 3.5 14-Jun-14 5-Jul-14 32.00 40 54.37 53.69


10 L1 6+990-7+110 5-Jul-14 31.00 39 53.01

11 19 RIGID 8-Jun-14 3.0 15-Jun-14 6-Jul-14 30.00 40 54.37 53.69


12 R2 7+005-7+145 6-Jul-14 31.00 39 53.01

13 20 RIGID 8-Jun-14 4.0 15-Jun-14 6-Jul-14 32.00 41 55.73 55.05


14 R2 7+005-7+145 6-Jul-14 30.00 40 54.37

15 21 RIGID 9-Jun-14 3.0 16-Jun-14 7-Jul-14 30.00 39 53.01 54.37


16 R2 6+990-7+105 7-Jul-14 31.00 41 55.73

17 22 RIGID 9-Jun-14 3.5 16-Jun-14 7-Jul-14 32.00 40 54.37 53.69


18 R2 6+990-7+105 7-Jul-14 31.00 39 53.01

19 23 RIGID 10-Jun-14 3.5 17-Jun-14 8-Jul-14 32.00 39 53.01 53.01


20 R3 7+005-7+105 8-Jul-14 31.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
R3 7+005-7+105 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

21 24 RIGID 10-Jun-14 3.5 17-Jun-14 8-Jul-14 32.00 40 54.37 53.69


22 R3 7+005-7+105 8-Jul-14 31.00 39 53.01

23 25 RIGID 11-Jun-14 3.0 18-Jun-14 9-Jul-14 31.00 40 54.37 53.69


24 R1 7+105-7+140 9-Jul-14 30.00 39 53.01

25 26 RIGID 11-Jun-14 4.0 18-Jun-14 9-Jul-14 31.00 38 51.65 53.01


26 0+000-0+005 9-Jul-14 32.00 40 54.37
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
27 27 RIGID 12-Jun-14 4.0 19-Jun-14 10-Jul-14 31.00 37 50.29 51.65
28 RAMP 1C 0+020-0+005 10-Jul-14 30.00 39 53.01

29 28 RIGID 12-Jun-14 3.0 19-Jun-14 10-Jul-14 32.00 40 54.37 53.69


30 RAMP L3 6+900-7+070 10-Jul-14 31.00 39 53.01

31 29 RIGID 13-Jun-14 4.0 20-Jun-14 30.00 27 36.70 11-Jul-14 31.00 39 53.01 53.69
32 L1 7+140-7+120 20-Jun-14 31.00 28 38.06 11-Jul-14 30.00 40 54.37

33 31 RIGID 14-Jun-14 4.0 21-Jun-14 32.00 28 38.06 12-Jul-14 30.00 42 57.08 55.05
34 R3 7+140-7+120 21-Jun-14 31.00 27 36.70 12-Jul-14 31.00 39 53.01

35 32 RIGID 16-Jun-14 4.0 23-Jun-14 31.00 27 36.70 14-Jul-14 32.00 41 55.73 54.37
36 R3 7+140-7+160 23-Jun-14 30.00 28 38.06 14-Jul-14 30.00 39 53.01

33 RIGID 18-Jun-14 3.0 25-Jun-14 30.00 30 40.77 16-Jul-14


L3 7+045-7+100 25-Jun-14 31.00 28 38.06

34 RIGID 21-Jun-14 3.0 28-Jun-14 31.00 28 38.06 19-Jul-14


L1 6+380-6+450 28-Jun-14 30.00 29 39.42

35 RIGID 21-Jun-14 3.0 28-Jun-14 30.00 28 38.06 19-Jul-14


L1 6+380-6+450 28-Jun-14 32.00 30 40.77

36 RIGID 22-Jun-14 3.5 29-Jun-14 32.00 27 36.70 20-Jul-14


L3 6+385-6+450 29-Jun-14 31.00 28 38.06

37 RIGID 22-Jun-14 3.0 29-Jun-14 31.00 29 39.42 20-Jul-14


L3 6+385-6+450 29-Jun-14 32.00 30 40.77

37 38 RIGID 24-Jun-14 3.0 1-Jul-14 31.00 28 38.06 22-Jul-14


38 R2 6+370-6+455 1-Jul-14 32.00 29 39.42

39 39 RIGID 24-Jun-14 3.0 1-Jul-14 32.00 30 40.77 22-Jul-14


40 R2 6+370-6+455 1-Jul-14 31.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
R2 6+370-6+455 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

41 40 RIGID 25-Jun-14 3.5 2-Jul-14 32.00 28 38.06 23-Jul-14


42 L2 6+385-6+420 2-Jul-14 31.00 30 40.77

43 41 RIGID 25-Jun-14 3.5 2-Jul-14 31.00 29 39.42 23-Jul-14


44 L2 6+385-6+420 2-Jul-14 32.00 30 40.77
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
45 42 RIGID 28-Jun-14 3.0 5-Jul-14 32.00 30 40.77 26-Jul-14
46 R1 6+355-6+400 5-Jul-14 31.00 29 39.42

47 43 RIGID 28-Jun-14 3.5 5-Jul-14 31.00 28 38.06 26-Jul-14


48 R1 6+355-6+400 5-Jul-14 32.00 30 40.77

49 44 RIGID 30-Jun-14 3.0 7-Jul-14 31.00 27 36.70 28-Jul-14


50 R3 6+360-6+410 7-Jul-14 30.00 29 39.42

51 45 RIGID 30-Jun-14 3.5 7-Jul-14 32.00 30 40.77 28-Jul-14


52 R3 6+360-6+410 7-Jul-14 31.00 29 39.42

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT Jasamarga Pandaan Tol Konsultan Kontraktor
PT. Multi Phi Beta
PT.Tata Guna Patria
PT.Eskapindo Matra (KSO)

( ________________________)
( _____________________________ ) ( _____________________________ )
PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : Juli 2014

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 1-Jul-14 28 1.00 53.01 53.01 0.01
RIGID
2 1-Jul-14 28 1.00 54.37 54.37 1.58
3 4-Jul-14 28 1.00 53.01 53.01 0.01
RIGID
4 4-Jul-14 28 1.00 51.65 51.65 2.13
5 4-Jul-14 28 1.00 51.65 51.65 2.13
RIGID
6 4-Jul-14 28 1.00 55.73 55.73 6.85
7 5-Jul-14 28 1.00 51.65 51.65 2.13
RIGID
8 5-Jul-14 28 1.00 57.08 57.08 15.81
9 5-Jul-14 28 1.00 54.37 54.37 1.58
RIGID
10 5-Jul-14 28 1.00 53.01 53.01 0.01
11 6-Jul-14 28 1.00 54.37 54.37 1.58
RIGID
12 6-Jul-14 28 1.00 53.01 53.01 0.01
13 6-Jul-14 28 1.00 55.73 55.73 6.85
RIGID
14 6-Jul-14 28 1.00 54.37 54.37 1.58
15 7-Jul-14 28 1.00 53.01 53.01 0.01
RIGID
16 7-Jul-14 28 1.00 55.73 55.73 6.85
17 7-Jul-14 28 1.00 54.37 54.37 1.58
RIGID
18 7-Jul-14 28 1.00 53.01 53.01 0.01
19 8-Jul-14 28 1.00 53.01 53.01 0.01
RIGID
20 8-Jul-14 28 1.00 53.01 53.01 0.01
21 8-Jul-14 28 1.00 54.37 54.37 1.58
RIGID
22 8-Jul-14 28 1.00 53.01 53.01 0.01
23 9-Jul-14 28 1.00 54.37 54.37 1.58
RIGID
24 9-Jul-14 28 1.00 53.01 53.01 0.01
25 9-Jul-14 28 1.00 51.65 51.65 2.13
RIGID
26 9-Jul-14 28 1.00 54.37 54.37 1.58
27 10-Jul-14 28 1.00 50.29 50.29 7.95
RIGID
28 10-Jul-14 28 1.00 53.01 53.01 0.01
29 10-Jul-14 28 1.00 54.37 54.37 1.58
RIGID
30 10-Jul-14 28 1.00 53.01 53.01 0.01
31 11-Jul-14 28 1.00 53.01 53.01 0.01
RIGID
32 11-Jul-14 28 1.00 54.37 54.37 1.58
33 12-Jul-14 28 1.00 57.08 57.08 15.81
RIGID
34 12-Jul-14 28 1.00 53.01 53.01 0.01
35 14-Jul-14 28 1.00 55.73 55.73 6.85
RIGID
36 14-Jul-14 28 1.00 53.01 53.01 0.01
37 1-Jul-14 7 0.75 38.06 50.74 5.60
RIGID
38 1-Jul-14 7 0.75 39.42 52.55 0.31
39 1-Jul-14 7 0.75 40.77 54.37 1.58
RIGID
40 1-Jul-14 7 0.75 38.06 50.74 5.60
41 2-Jul-14 7 0.75 38.06 50.74 5.60
RIGID
42 2-Jul-14 7 0.75 40.77 54.37 1.58
43 2-Jul-14 7 0.75 39.42 52.55 0.31
RIGID
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
RIGID
44 2-Jul-14 7 0.75 40.77 54.37 1.58
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
45 5-Jul-14 7 0.75 40.77 54.37 1.58
RIGID
46 5-Jul-14 7 0.75 39.42 52.55 0.31
47 5-Jul-14 7 0.75 38.06 50.74 5.60
RIGID
48 5-Jul-14 7 0.75 40.77 54.37 1.58
49 7-Jul-14 7 0.75 36.70 48.93 17.46
RIGID
50 7-Jul-14 7 0.75 39.42 52.55 0.31
51 7-Jul-14 7 0.75 40.77 54.37 1.58
RIGID
52 7-Jul-14 7 0.75 39.42 52.55 0.31
53 16-Jul-14 28 1.00 54.37 54.37 1.58
RIGID
54 16-Jul-14 28 1.00 53.01 53.01 0.01
55 19-Jul-14 28 1.00 50.29 50.29 7.95
RIGID
56 19-Jul-14 28 1.00 53.01 53.01 0.01
57 19-Jul-14 28 1.00 54.37 54.37 1.58
RIGID
58 19-Jul-14 28 1.00 51.65 51.65 2.13
59 20-Jul-14 28 1.00 51.65 51.65 2.13
RIGID
60 20-Jul-14 28 1.00 54.37 54.37 1.58
61 20-Jul-14 28 1.00 53.01 53.01 0.01
RIGID
62 20-Jul-14 28 1.00 54.37 54.37 1.58
63 22-Jul-14 28 1.00 53.01 53.01 0.01
RIGID
64 22-Jul-14 28 1.00 53.01 53.01 0.01
65 22-Jul-14 28 1.00 51.65 51.65 2.13
RIGID
66 22-Jul-14 28 1.00 53.01 53.01 0.01
67 23-Jul-14 28 1.00 53.01 53.01 0.01
RIGID
68 23-Jul-14 28 1.00 54.37 54.37 1.58
69 23-Jul-14 28 1.00 51.65 51.65 2.13
RIGID
70 23-Jul-14 28 1.00 53.01 53.01 0.01
71 19-Jul-14 7 0.75 40.77 54.37 1.58
RIGID
72 19-Jul-14 7 0.75 39.42 52.55 0.31
73 20-Jul-14 7 0.75 38.06 50.74 5.60
RIGID
74 20-Jul-14 7 0.75 39.42 52.55 0.31
75 20-Jul-14 7 0.75 36.70 48.93 17.46
RIGID
76 20-Jul-14 7 0.75 38.06 50.74 5.60

Σ(σbn - σbm)2 = 197.70

JUMLAH SAMPLE = 76.00 buah


MIN = 48.93 kg/cm2
MAX = 57.08 kg/cm2
RATA-RATA (σbm) = 53.11 kg/cm2
KARAKTERISTIK (σbk) = σbm - 1,64 S = 1.62 kg/cm2
50.45 kg/cm2

QC STAF QC

( ) ( )
PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : Agustus 2014

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 6-Aug-14 28 1.00 53.01 53.01 3.15
RIGID
2 6-Aug-14 28 1.00 54.37 54.37 0.17
3 6-Aug-14 28 1.00 51.65 51.65 9.81
RIGID
4 6-Aug-14 28 1.00 50.29 50.29 20.18
5 6-Aug-14 28 1.00 51.65 51.65 9.81
RIGID
6 6-Aug-14 28 1.00 50.29 50.29 20.18
7 6-Aug-14 28 1.00 54.37 54.37 0.17
RIGID
8 6-Aug-14 28 1.00 51.65 51.65 9.81
9 9-Aug-14 28 1.00 53.01 53.01 3.15
RIGID
10 9-Aug-14 28 1.00 51.65 51.65 9.81
11 10-Aug-14 28 1.00 53.01 53.01 3.15
RIGID
12 10-Aug-14 28 1.00 54.37 54.37 0.17
13 10-Aug-14 28 1.00 51.65 51.65 9.81
RIGID
14 10-Aug-14 28 1.00 53.01 53.01 3.15
15 16-Aug-14 7 0.75 40.77 54.37 0.17
RIGID
16 16-Aug-14 7 0.75 39.42 52.55 4.96
17 18-Aug-14 7 0.75 40.77 54.37 0.17
RIGID
18 18-Aug-14 7 0.75 38.06 50.74 16.31
19 19-Aug-14 7 0.75 40.77 54.37 0.17
RIGID
20 19-Aug-14 7 0.75 40.77 54.37 0.17
21 20-Aug-14 7 0.75 36.70 48.93 34.24
RIGID
22 20-Aug-14 7 0.75 38.06 50.74 16.31
23 22-Aug-14 7 0.75 40.77 54.37 0.17
RIGID
24 22-Aug-14 7 0.75 38.06 50.74 16.31
25 25-Aug-14 7 0.75 39.42 52.55 4.96
RIGID
26 25-Aug-14 7 0.75 38.06 50.74 16.31
27 9-Aug-14 28 1.00 53.01 53.01 3.15
RIGID
28 9-Aug-14 28 1.00 54.37 54.37 0.17
29 13-Aug-14 28 1.00 53.01 53.01 3.15
RIGID
30 13-Aug-14 28 1.00 53.01 53.01 3.15
31 14-Aug-14 28 1.00 57.08 57.08 5.31
RIGID
32 14-Aug-14 28 1.00 54.37 54.37 0.17
33 16-Aug-14 28 1.00 53.01 53.01 3.15
RIGID
34 16-Aug-14 28 1.00 53.01 53.01 3.15
35 16-Aug-14 7 0.75 43.49 57.99 10.30
RIGID
36 16-Aug-14 7 0.75 43.49 57.99 10.30
37 18-Aug-14 7 0.75 54.37 72.49 313.56
RIGID
38 18-Aug-14 7 0.75 54.37 72.49 313.56
39 19-Aug-14 7 0.75 47.57 63.43 74.76
RIGID
40 19-Aug-14 7 0.75 47.57 63.43 74.76
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
41 20-Aug-14 7 0.75 40.77 54.37 0.17
42 20-Aug-14 7 0.75 40.77 54.37 0.17 RIGID
43 20-Aug-14 7 0.75 44.85 59.80 25.22
44 22-Aug-14 7 0.75 43.49 57.99 10.30
RIGID
45 22-Aug-14 7 0.75 43.49 57.99 10.30
46 25-Aug-14 7 0.75 40.77 54.37 0.17
RIGID
47 25-Aug-14 7 0.75 40.77 54.37 0.17

Σ(σbn - σbm)2 = 1077.94

JUMLAH SAMPLE = 47.00 buah


MIN = 48.93 kg/cm2
MAX = 72.49 kg/cm2
RATA-RATA (σbm) = 54.78 kg/cm2
KARAKTERISTIK (σbk) = σbm - 1,64 S = 4.84 kg/cm2
46.84 kg/cm2

QC STAF QC

( ) ( )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

1 1 RIGID 12-Aug-14 3.0 19-Aug-14 9-Sep-14 31.00 35 47.57 50.97


2 R3 6+730-6+640 9-Sep-14 32.00 40 54.37

3 2 RIGID 13-Aug-14 3.5 20-Aug-14 10-Sep-14 32.00 35 47.57 47.57


4 R2 6+800-6+850 10-Sep-14 31.00 35 47.57
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
5 3 RIGID 15-Aug-14 3.0 22-Aug-14 12-Sep-14 31.00 38 51.65 52.33
6 R3 6+850-6+945 12-Sep-14 32.00 39 53.01

7 4 RIGID 18-Aug-14 3.5 25-Aug-14 15-Sep-14 32.00 37 50.29 51.65


8 R2 6+850-6+925 15-Sep-14 31.00 39 53.01

9 5 RIGID 20-Aug-14 3.0 27-Aug-14 31.00 30 40.77 17-Sep-14 31.00 35 47.57 50.29
10 R16+850-6+920 32.00 29 39.42 17-Sep-14 31.00 39 53.01

11 6 RIGID 22-Aug-14 3.0 29-Aug-14 32.00 29 39.42 19-Sep-14 32.00 37 50.29 52.33
12 R2 6+640-6+745 31.00 30 40.77 19-Sep-14 30.00 40 54.37

13 7 RIGID 22-Aug-14 3.0 29-Aug-14 31.00 28 38.06 19-Sep-14 31.00 36 48.93 49.61
14 R2 6+640-6+745 32.00 30 40.77 19-Sep-14 30.00 37 50.29

15 8 RIGID 23-Aug-14 3.5 30-Aug-14 32.00 28 38.06 20-Sep-14 30.00 37 50.29 51.65
16 L1 6+810-6+905 31.00 27 36.70 20-Sep-14 31.00 39 53.01

17 9 RIGID 25-Aug-14 3.0 1-Sep-14 30.00 27 36.70 22-Sep-14


18 L2 6+810-6+905 1-Sep-14 31.00 29 39.42

19 10 RIGID 26-Aug-14 3.5 2-Sep-14 32.00 29 39.42 23-Sep-14


20 R1 6+640-6+740 2-Sep-14 30.00 28 38.06

21 11 RIGID 27-Aug-14 3.0 3-Sep-14 31.00 30 40.77 24-Sep-14


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
22 L3 6+810-6+905 3-Sep-14 31.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
L3 6+810-6+905 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

23 12 RIGID 29-Aug-14 5.0 5-Sep-14 30.00 27 36.70 26-Sep-14


24 R1 6+645-6+625 5-Sep-14 31.00 27 36.70

25 13 RIGID 1-Sep-14 3.0 8-Sep-14 31.00 30 40.77 29-Sep-14


26 R3 6+500-6+585 8-Sep-14 32.00 29 39.42

27 14 RIGID 1-Sep-14 3.0 8-Sep-14 32.00 29 39.42 29-Sep-14


28 R3 6+500-6+585 8-Sep-14 31.00 30 40.77

29 15 RIGID 3-Sep-14 3.5 10-Sep-14 31.00 30 40.77 1-Oct-14


30 R2 6+595-6+640 10-Sep-14 32.00 29 39.42

31 16 RIGID 3-Sep-14 3.0 10-Sep-14 32.00 30 40.77 1-Oct-14


32 R2 6+595-6+640 10-Sep-14 31.00 29 39.42

33 17 RIGID 4-Sep-14 4.0 11-Sep-14 31.00 29 39.42 2-Oct-14


34 R2 0+750-0+762 11-Sep-14 32.00 30 40.77

35 18 RIGID 6-Sep-14 3.0 13-Sep-14 32.00 28 38.06 4-Oct-14


36 L1 6+280-6+225 13-Sep-14 33.00 28 38.06

37 19 RIGID 8-Sep-14 5.0 15-Sep-14 31.00 29 39.42 6-Oct-14


38 L1 0+950-0+990 15-Sep-14 30.00 27 36.70
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. L1 0+950-0+990 Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

39 20 RIGID 9-Sep-14 3.5 16-Sep-14 31.00 28 38.06 7-Oct-14


40 L1 6+740-6+810 16-Sep-14 30.00 27 36.70

41 21 RIGID 11-Sep-14 3.0 18-Sep-14 30.00 27 36.70 9-Oct-14


42 L2 6+740-6+810 18-Sep-14 31.00 28 38.06

43 22 RIGID 12-Sep-14 3.5 19-Sep-14 32.00 30 40.77 10-Oct-14


44 R3 6+945-7+005 19-Sep-14 31.00 27 36.70

45 23 RIGID 13-Sep-14 5.0 20-Sep-14 31.00 27 36.70 11-Oct-14


46 2+330-2+305 RAMP 2 20-Sep-14 31.00 29 39.42

47 24 RIGID 13-Sep-14 3.0 20-Sep-14 32.00 28 38.06 11-Oct-14


48 R2 6+925-7+005 20-Sep-14 31.00 29 39.42

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT Jasamarga Pandaan Tol Konsultan Kontraktor

( _____________________________ ) ( _____________________________ ) ( ________________________)


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
27 1 RIGID 12-Jul-14 3.5 19-Jul-14 33.00 30 40.77 9-Aug-14 33.00 39 53.01 53.69
28 34.00 31 42.13 9-Aug-14 32.00 40 54.37
R3 STA. 6+185 - 6+255

29 2 RIGID 16-Jul-14 3.5 6-Aug-14 32.00 34 46.21 13-Aug-14 32.00 39 53.01 53.01
30 32.00 34 46.21 13-Aug-14 32.00 39 53.01
R1 STA. 6+215 - 6+230

31 3 RIGID 17-Jul-14 4.0 6-Aug-14 33.00 33 44.85 14-Aug-14 33.00 42 57.08 55.73
32 32.00 34 46.21 14-Aug-14 31.00 40 54.37
R1 STA. 6+445 - 6+465

33 4 RIGID 19-Jul-14 4.0 6-Aug-14 32.00 31 42.13 16-Aug-14 32.00 39 53.01 53.01
34 31.00 31 42.13 16-Aug-14 32.00 39 53.01
R2 STA. 6+460- 6+465

`
35 5 RIGID 9-Aug-14 4.0 16-Aug-14 31.00 32 43.49 6-Sep-14
36 16-Aug-14 31.00 32 43.49
R1 STA. 6+850- 6+950

37 6 RIGID 11-Aug-14 4.5 18-Aug-14 33.00 40 54.37 8-Sep-14


38 18-Aug-14 33.00 40 54.37
R2 STA. 6+850- 6+950
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

39 7 RIGID 12-Aug-14 3.0 19-Aug-14 31.00 35 47.57 9-Sep-14


40 19-Aug-14 32.00 35 47.57
R3 STA. 6+850- 6+945

41 8 RIGID 13-Aug-14 3.5 20-Aug-14 31.00 30 40.77 10-Sep-14


42 20-Aug-14 32.00 30 40.77
R3 STA. 6+730- 6+850
43 20-Aug-14 31.00 33 44.85

44 9 RIGID 15-Aug-14 4.0 22-Aug-14 31.00 32 43.49 12-Sep-14


45 22-Aug-14 32.00 32 43.49
R2 STA. 6+850- 6+730

46 10 RIGID 18-Aug-14 3.5 25-Aug-14 31.00 30 40.77 15-Sep-14


47 25-Aug-14 32.00 30 40.77
R1 STA. 6+850- 6+730

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
Jasamarga Pandaan Tol Konsultan Kontraktor

( _____________________________ ) ( _____________________________ ) ( ________________________)


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

53 1 RIGID 18-Jun-14 3.0 25-Jun-14 16-Jul-14 31.00 40 54.37 53.69


54 L3 7+045-7+100 16-Jul-14 32.00 39 53.01

2 RIGID 21-Jun-14 3.5 28-Jun-14 19-Jul-14 31.00 37 50.29 51.65


L1 6+380-6+450 19-Jul-14 30.00 39 53.01

3 RIGID 21-Jun-14 3.5 28-Jun-14 19-Jul-14 28.00 40 54.37 53.01


L1 6+380-6+450 19-Jul-14 30.00 38 51.65

4 RIGID 22-Jun-14 3.0 29-Jun-14 20-Jul-14 32.00 38 51.65 53.01


L3 6+385-6+450 20-Jul-14 31.00 40 54.37

5 RIGID 22-Jun-14 3.0 29-Jun-14 20-Jul-14 32.00 39 53.01 53.69


L3 6+385-6+450 20-Jul-14 31.00 40 54.37

6 RIGID 24-Jun-14 3.0 1-Jul-14 22-Jul-14 33.00 39 53.01 53.01


R2 6+370-6+455 22-Jul-14 32.00 39 53.01

7 RIGID 24-Jun-14 3.0 1-Jul-14 22-Jul-14 32.00 38 51.65 52.33


R2 6+370-6+455 22-Jul-14 31.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
8 RIGID 25-Jun-14 3.5 2-Jul-14 23-Jul-14 30.00 39 53.01 53.69
L2 6+385-6+420 23-Jul-14 32.00 40 54.37

9 RIGID 25-Jun-14 3.5 2-Jul-14 23-Jul-14 31.00 38 51.65 52.33


L2 6+385-6+420 23-Jul-14 30.00 39 53.01

1 10 RIGID 28-Jun-14 3.5 5-Jul-14 6-Aug-14 31.00 39 53.01 53.69


2 R1 6+355-6+400 6-Aug-14 30.00 40 54.37

3 11 RIGID 28-Jun-14 3.5 5-Jul-14 6-Aug-14 32.00 38 51.65 50.97


4 R1 6+355-6+400 6-Aug-14 31.00 37 50.29

5 12 RIGID 30-Jun-14 3.0 7-Jul-14 6-Aug-14 30.00 38 51.65 50.97


6 R3 6+360-6+410 6-Aug-14 32.00 37 50.29

7 13 RIGID 30-Jun-14 3.0 7-Jul-14 6-Aug-14 31.00 40 54.37 53.01


8 R3 6+360-6+410 6-Aug-14 30.00 38 51.65

9 14 RIGID 12-Jul-14 3.5 19-Jul-14 31.00 30 40.77 9-Aug-14 31.00 39 53.01 52.33
10 R3 6+185-6+250 19-Jul-14 30.00 29 39.42 9-Aug-14 32.00 38 51.65
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
11 15 RIGID 13-Jul-14 3.0 20-Jul-14 32.00 28 38.06 10-Aug-14 31.00 39 53.01 53.69
12 R1 6+215-6+185 20-Jul-14 31.00 29 39.42 10-Aug-14 31.00 40 54.37

13 16 RIGID 13-Jul-14 3.0 20-Jul-14 30.00 27 36.70 10-Aug-14 32.00 38 51.65 52.33
14 R1 6+215-6+185 20-Jul-14 31.00 28 38.06 10-Aug-14 31.00 39 53.01

15 17 RIGID 9-Aug-14 3.5 16-Aug-14 31.00 30 40.77 6-Sep-14


16 R2 6+850-6+900 16-Aug-14 32.00 29 39.42

17 18 RIGID 11-Aug-14 3.0 18-Aug-14 32.00 30 40.77 8-Sep-14


18 R3 6+850-6+800 18-Aug-14 31.00 28 38.06

19 19 RIGID 12-Aug-14 4.0 19-Aug-14 30.00 30 40.77 9-Sep-14


20 R3 6+730-6+640 19-Aug-14 32.00 30 40.77

21 20 RIGID 13-Aug-14 3.5 20-Aug-14 30.00 27 36.70 10-Sep-14


22 R2 6+800-6+850 20-Aug-14 31.00 28 38.06
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
23 21 RIGID 15-Aug-14 3.0 22-Aug-14 31.00 30 40.77 12-Sep-14
24 R3 6+850-6+945 22-Aug-14 30.00 28 38.06

25 22 RIGID 18-Aug-14 3.0 25-Aug-14 32.00 29 39.42 15-Sep-14


26 R2 6+850-6+925 25-Aug-14 31.00 28 38.06

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT Jasamarga Pandaan Tol Konsultan Kontraktor

( _____________________________ ) ( _____________________________ ) ( ________________________)


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : September 2014

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 9-Sep-14 28 1.00 47.57 47.57 24.93
RIGID
2 9-Sep-14 28 1.00 54.37 54.37 3.25
3 10-Sep-14 28 1.00 47.57 47.57 24.93
RIGID
4 10-Sep-14 28 1.00 47.57 47.57 24.93
5 12-Sep-14 28 1.00 51.65 51.65 0.84
RIGID
6 12-Sep-14 28 1.00 53.01 53.01 0.20
7 15-Sep-14 28 1.00 50.29 50.29 5.17
RIGID
8 15-Sep-14 28 1.00 53.01 53.01 0.20
9 17-Sep-14 28 1.00 47.57 47.57 24.93
RIGID
10 17-Sep-14 28 1.00 53.01 53.01 0.20
11 19-Sep-14 28 1.00 50.29 50.29 5.17
RIGID
12 19-Sep-14 28 1.00 54.37 54.37 3.25
13 19-Sep-14 28 1.00 48.93 48.93 13.20
RIGID
14 19-Sep-14 28 1.00 50.29 50.29 5.17
15 20-Sep-14 28 1.00 50.29 50.29 5.17
RIGID
16 20-Sep-14 28 1.00 53.01 53.01 0.20
17 1-Sep-14 7 0.75 36.70 48.93 13.20
RIGID
18 1-Sep-14 7 0.75 39.42 52.55 0.00
19 2-Sep-14 7 0.75 39.42 52.55 0.00
RIGID
20 2-Sep-14 7 0.75 38.06 50.74 3.32
21 3-Sep-14 7 0.75 40.77 54.37 3.25
RIGID
22 3-Sep-14 7 0.75 38.06 50.74 3.32
23 5-Sep-14 7 0.75 36.70 48.93 13.20
RIGID
24 5-Sep-14 7 0.75 36.70 48.93 13.20
25 8-Sep-14 7 0.75 40.77 54.37 3.25
RIGID
26 8-Sep-14 7 0.75 39.42 52.55 0.00
27 8-Sep-14 7 0.75 39.42 52.55 0.00
RIGID
28 8-Sep-14 7 0.75 40.77 54.37 3.25
29 10-Sep-14 7 0.75 40.77 54.37 3.25
RIGID
30 10-Sep-14 7 0.75 39.42 52.55 0.00
31 10-Sep-14 7 0.75 40.77 54.37 3.25
RIGID
32 10-Sep-14 7 0.75 39.42 52.55 0.00
33 11-Sep-14 7 0.75 39.42 52.55 0.00
RIGID
34 11-Sep-14 7 0.75 40.77 54.37 3.25
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
35 13-Sep-14 7 0.75 38.06 50.74 3.32
RIGID
36 13-Sep-14 7 0.75 38.06 50.74 3.32
37 15-Sep-14 7 0.75 39.42 52.55 0.00
RIGID
38 15-Sep-14 7 0.75 36.70 48.93 13.20
39 16-Sep-14 7 0.75 38.06 50.74 3.32
RIGID
40 16-Sep-14 7 0.75 36.70 48.93 13.20
41 18-Sep-14 7 0.75 36.70 48.93 13.20
RIGID
42 18-Sep-14 7 0.75 38.06 50.74 3.32
43 19-Sep-14 7 0.75 40.77 54.37 3.25
RIGID
44 19-Sep-14 7 0.75 36.70 48.93 13.20
45 20-Sep-14 7 0.75 36.70 48.93 13.20
RIGID
46 20-Sep-14 7 0.75 39.42 52.55 0.00
47 20-Sep-14 7 0.75 38.06 50.74 3.32
RIGID
48 20-Sep-14 7 0.75 39.42 52.55 0.00
49 6-Sep-14 28 1.00 54.37 54.37 3.25
RIGID
50 6-Sep-14 28 1.00 54.37 54.37 3.25
51 8-Sep-14 28 1.00 54.37 54.37 3.25 RIGID
52 8-Sep-14 28 1.00 54.37 54.37 3.25
R2 STA. 6+850-
53 8-Sep-14 28 1.00 51.65 51.65 0.84
6+950
54 8-Sep-14 28 1.00 53.01 53.01 0.20
55 9-Sep-14 28 1.00 51.65 51.65 0.84 RIGID
56 9-Sep-14 28 1.00 53.01 53.01 0.20
R3 STA. 6+850-
57 9-Sep-14 28 1.00 53.01 53.01 0.20
6+945
58 9-Sep-14 28 1.00 55.73 55.73 10.00
59 10-Sep-14 28 1.00 53.01 53.01 0.20 RIGID
60 10-Sep-14 28 1.00 55.73 55.73 10.00
61 10-Sep-14 28 1.00 50.29 50.29 5.17
R3 STA. 6+730-
62 10-Sep-14 28 1.00 54.37 54.37 3.25
6+850
63 10-Sep-14 28 1.00 54.37 54.37 3.25
64 10-Sep-14 28 1.00 53.01 53.01 0.20
65 12-Sep-14 28 1.00 54.37 54.37 3.25
RIGID
66 12-Sep-14 28 1.00 57.08 57.08 20.44
67 15-Sep-14 28 1.00 53.01 53.01 0.20
RIGID
68 15-Sep-14 28 1.00 53.01 53.01 0.20
69 17-Sep-14 28 1.00 53.01 53.01 0.20
RIGID
70 17-Sep-14 28 1.00 53.01 53.01 0.20
71 19-Sep-14 28 1.00 51.65 51.65 0.84 RIGID
72 19-Sep-14 28 1.00 54.37 54.37 3.25
R2 STA. 6+640-
73 19-Sep-14 28 1.00 53.01 53.01 0.20
6+745
74 19-Sep-14 28 1.00 53.01 53.01 0.20
75 19-Sep-14 28 1.00 55.73 55.73 10.00 RIGID
76 19-Sep-14 28 1.00 51.65 51.65 0.84
L1 STA. 6+810-
77 19-Sep-14 28 1.00 51.65 51.65 0.84
6+910
78 19-Sep-14 28 1.00 53.01 53.01 0.20
79 1-Sep-14 7 0.75 39.42 52.55 0.00 RIGID
L2 STA. 6+810-
80 1-Sep-14 7 0.75 42.13 56.18 13.07
6+910
81 2-Sep-14 7 0.75 39.42 52.55 0.00 RIGID
L1 STA. 6+640-
82 2-Sep-14 7 0.75 40.77 54.37 3.25
6+690
83 3-Sep-14 7 0.75 40.77 54.37 3.25 RIGID
L3 STA. 6+810-
84 3-Sep-14 7 0.75 42.13 56.18 13.07
6+910
85 10-Aug-14 7 0.75 39.42 52.55 0.00 RIGID
R3 STA. 6+465-
86 10-Aug-14 7 0.75 39.42 52.55 0.00
6+600
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
87 8-Sep-14 7 0.75 39.42 52.55 0.00 RIGID
R3 STA. 6+500-
88 8-Sep-14 7 0.75 38.06 50.74 3.32
6+585
89 9-Sep-14 7 0.75 38.06 50.74 3.32 RIGID
R2 STA. 6+465-
90 9-Sep-14 7 0.75 40.77 54.37 3.25
6+545
91 16-Sep-14 7 0.75 40.77 54.37 3.25 RIGID
L1 STA. 6+740-
92 16-Sep-14 7 0.75 42.13 56.18 13.07
6+810
93 17-Sep-14 7 0.75 39.42 52.55 0.00 RIGID
L1 STA. 6+780-
94 17-Sep-14 7 0.75 40.77 54.37 3.25
6+690
95 18-Sep-14 7 0.75 42.13 56.18 13.07 RIGID
96 18-Sep-14 7 0.75 59.80 52.41 L2 STA. 6+740-
44.85
6+810
97 19-Sep-14 7 0.75 40.77 54.37 3.25 RIGID
R3 STA. 6+945-
98 19-Sep-14 7 0.75 42.13 56.18 13.07
7+005
99 19-Sep-14 7 0.75 38.06 50.74 3.32 RIGID
R2 STA. 6+925-
100 19-Sep-14 7 0.75 39.42 52.55 0.00
7+005
Σ(σbn - σbm)2 = 528.73

JUMLAH SAMPLE = 100.00 buah


MIN = 47.57 kg/cm2
MAX = 59.80 kg/cm2
RATA-RATA (σbm) = 52.56 kg/cm2
KARAKTERISTIK (σbk) = σbm - 1,64 S = 2.31 kg/cm2
48.77 kg/cm2

QC STAF QC

( ) ( )
1 2 3 4 5 6 7 8 9 15 16 17 18 24 25

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
`
49 1 RIGID 9-Aug-14 4.0 16-Aug-14 6-Sep-14 32.00 40 54.37 54.37
50 6-Sep-14 32.00 40 54.37
R1 STA. 6+850- 6+950

51 2 RIGID 11-Aug-14 4.5 18-Aug-14 8-Sep-14 31.00 40 54.37 53.35


52 8-Sep-14 32.00 40 54.37
R2 STA. 6+850- 6+950
53 8-Sep-14 32.00 38 51.65
54 8-Sep-14 32.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

55 3 RIGID 12-Aug-14 3.0 19-Aug-14 9-Sep-14 31.00 38 51.65 53.35


56 9-Sep-14 32.00 39 53.01
R3 STA. 6+850- 6+945
57 9-Sep-14 32.00 39 53.01
58 9-Sep-14 33.00 41 55.73

59 4 RIGID 13-Aug-14 3.5 20-Aug-14 10-Sep-14 30.00 39 53.01 53.46


60 10-Sep-14 33.00 41 55.73
61 10-Sep-14 31.00 37 50.29
R3 STA. 6+730- 6+850
62 10-Sep-14 32.00 40 54.37
63 10-Sep-14 31.00 40 54.37
64 10-Sep-14 31.00 39 53.01

65 5 RIGID 15-Aug-14 4.0 22-Aug-14 12-Sep-14 32.00 40 54.37 55.73


66 12-Sep-14 33.00 42 57.08
R2 STA. 6+850- 6+730

67 6 RIGID 18-Aug-14 3.5 25-Aug-14 15-Sep-14 31.00 39 53.01 53.01


68 15-Sep-14 31.00 39 53.01
R1 STA. 6+850- 6+730

69 7 RIGID 20-Aug-14 4.0 27-Aug-14 34.00 30 40.77 17-Sep-14 31.00 39 53.01 53.01
70 R1 STA. 6+850- 6+920 34.00 32 43.49 17-Sep-14 31.00 39 53.01

71 8 RIGID 22-Aug-14 4.0 29-Aug-14 34.00 31 42.13 19-Sep-14 30.00 38 51.65 53.01
72 34.20 30 40.77 19-Sep-14 31.00 40 54.37
R2 STA. 6+640- 6+745
73 19-Sep-14 30.00 39 53.01
74 19-Sep-14 30.00 39 53.01

75 9 RIGID 22-Aug-14 4.5 29-Aug-14 34.00 29 39.42 19-Sep-14 32.00 41 55.73 53.01
76 34.20 30 40.77 19-Sep-14 30.00 38 51.65
L1 STA. 6+810- 6+910
77 19-Sep-14 30.00 38 51.65
78 19-Sep-14 31.00 39 53.01

79 10 RIGID 25-Aug-14 4.0 1-Sep-14 34.00 29 39.42 22-Sep-14


80 1-Sep-14 34.10 31 42.13
L2 STA. 6+810- 6+910

81 11 RIGID 26-Aug-14 4.5 2-Sep-14 34.00 29 39.42 23-Sep-14


82 2-Sep-14 34.00 30 40.77
L1 STA. 6+640- 6+690
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

83 12 RIGID 27-Aug-14 4.0 3-Sep-14 34.20 30 40.77 24-Sep-14


84 3-Sep-14 34.00 31 42.13
L3 STA. 6+810- 6+910

85 12 RIGID 3-Aug-14 4.0 10-Aug-14 34.00 29 39.42 31-Aug-14


86 10-Aug-14 34.00 29 39.42
R3 STA. 6+465- 6+600

87 12 RIGID 1-Sep-14 4.0 8-Sep-14 34.50 29 39.42 29-Sep-14


88 8-Sep-14 34.20 28 38.06
R3 STA. 6+500- 6+585

89 12 RIGID 2-Sep-14 4.0 9-Sep-14 34.00 28 38.06 30-Sep-14


90 9-Sep-14 31.20 30 40.77
R2 STA. 6+465- 6+545

91 13 RIGID 9-Sep-14 4.0 16-Sep-14 30.00 30 40.77 7-Oct-14


92 16-Sep-14 30.00 31 42.13
L1 STA. 6+740- 6+810

93 14 RIGID 10-Sep-14 3.0 17-Sep-14 30.00 29 39.42 8-Oct-14


94 17-Sep-14 30.00 30 40.77
L1 STA. 6+780- 6+690

95 15 RIGID 11-Sep-14 4.0 18-Sep-14 31.00 31 42.13 9-Oct-14


96 18-Sep-14 32.00 33 44.85
L2 STA. 6+740- 6+810

97 16 RIGID 12-Sep-14 3.5 19-Sep-14 30.00 30 40.77 10-Oct-14


98 19-Sep-14 30.00 31 42.13
R3 STA. 6+945- 7+005

99 17 RIGID 12-Sep-14 4.0 19-Sep-14 29.00 28 38.06 10-Oct-14


100 19-Sep-14 29.00 29 39.42
R2 STA. 6+925- 7+005
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
Jasamarga Pandaan Tol Konsultan Kontraktor

( _____________________________ ) ( _____________________________ ) ( ________________________)


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

1 RIGID 25-Aug-14 3.0 1-Sep-14 22-Sep-14 30.00 39 53.01 53.69


L2 6+810-6+905 32.00 40 54.37

2 RIGID 26-Aug-14 3.5 2-Sep-14 23-Sep-14 32.00 38 51.65 52.33


R1 6+640-6+740 33.00 39 53.01

3 RIGID 27-Aug-14 3.0 3-Sep-14 24-Sep-14 32.00 39 53.01 53.69


L3 6+810-6+905 33.00 40 54.37
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
L3 6+810-6+905 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

4 RIGID 29-Aug-14 5.0 5-Sep-14 26-Sep-14 32.00 39 53.01 52.33


R1 6+645-6+625 33.00 38 51.65

5 RIGID 1-Sep-14 3.0 8-Sep-14 29-Sep-14 31.00 40 54.37 53.01


R3 6+500-6+585 30.00 38 51.65

6 RIGID 1-Sep-14 3.0 8-Sep-14 29-Sep-14 32.00 38 51.65 50.97


R3 6+500-6+585 31.00 37 50.29

1 7 RIGID 3-Sep-14 3.5 10-Sep-14 1-Oct-14 31.00 40 54.37 53.01


2 R2 6+595-6+640 1-Oct-14 31.00 38 51.65

3 8 RIGID 3-Sep-14 3.0 10-Sep-14 1-Oct-14 30.00 41 55.73 53.69


4 R2 6+595-6+640 1-Oct-14 32.00 38 51.65

5 9 RIGID 4-Sep-14 5.0 11-Sep-14 2-Oct-14 32.00 40 54.37 53.01


6 R2 0+750-0+762 2-Oct-14 31.00 38 51.65

7 10 RIGID 6-Sep-14 3.0 13-Sep-14 4-Oct-14 32.00 39 53.01 53.69


8 L1 6+280-6+225 4-Oct-14 30.00 40 54.37

9 11 RIGID 8-Sep-14 5.0 15-Sep-14 6-Oct-14 31.00 40 54.37 53.69


10 L1 0+950-0+990 6-Oct-14 30.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. L1 0+950-0+990 Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

11 12 RIGID 9-Sep-14 3.5 16-Sep-14 7-Oct-14 32.00 39 53.01 53.69


12 L1 6+740-6+810 7-Oct-14 33.00 40 54.37

13 13 RIGID 11-Sep-14 3.0 18-Sep-14 9-Oct-14 32.00 40 54.37 53.69


14 L2 6+740-6+810 9-Oct-14 33.00 39 53.01

15 14 RIGID 12-Sep-14 3.5 19-Sep-14 10-Oct-14 32.00 39 53.01 52.33


16 R3 6+945-7+005 10-Oct-14 33.00 38 51.65

17 15 RIGID 13-Sep-14 4.0 20-Sep-14 11-Oct-14 33.00 40 54.37 53.01


18 2+330-2+305 RAMP 2 11-Oct-14 32.00 38 51.65

19 16 RIGID 13-Sep-14 3.0 20-Sep-14 11-Oct-14 32.00 40 54.37 53.69


20 R2 6+925-7+005 11-Oct-14 33.00 39 53.01

21 17 RIGID 14-Sep-14 3.5 21-Sep-14 32.00 29 39.42 12-Oct-14 31.00 40 54.37 53.69
22 L2 6+740-6+690 33.00 30 40.77 12-Oct-14 32.00 39 53.01

23 18 RIGID 15-Sep-14 3.5 22-Sep-14 31.00 29 39.42 13-Oct-14 30.00 39 53.01 53.69
24 L1 6+690-6+740 30.00 28 38.06 13-Oct-14 31.00 40 54.37

25 19 RIGID 16-Sep-14 3.0 23-Sep-14 32.00 29 39.42 14-Oct-14 32.00 39 53.01 52.33
26 L3 6+715-6+810 33.00 28 38.06 14-Oct-14 33.00 38 51.65
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
27 20 RIGID 17-Sep-14 3.0 24-Sep-14 32.00 29 39.42 15-Oct-14 32.00 39 53.01 53.69
28 R1 6+955-6+990 33.00 30 40.77 15-Oct-14 30.00 40 54.37

29 21 RIGID 17-Sep-14 4.0 24-Sep-14 31.00 30 40.77 15-Oct-14 30.00 38 51.65 51.65
30 R1 9+945-9+920 32.00 28 38.06 15-Oct-14 31.00 38 51.65

31 22 RIGID 18-Sep-14 4.5 25-Sep-14 32.00 29 39.42 16-Oct-14 30.00 38 51.65 53.01
32 R1 6+990-7+005 33.00 30 40.77 16-Oct-14 31.00 40 54.37

33 23 RIGID 19-Sep-14 3.0 26-Sep-14 32.00 29 39.42 17-Oct-14 31.00 39 53.01 53.69
34 L2 6+280-6+220 33.00 30 40.77 17-Oct-14 31.00 40 54.37

35 24 RIGID 20-Sep-14 3.5 27-Sep-14 32.00 28 38.06 18-Oct-14 30.00 39 53.01 54.37
36 L3 6+280-6+220 33.00 30 40.77 18-Oct-14 30.00 41 55.73

37 25 RIGID 22-Sep-14 3.0 29-Sep-14 30.00 29 39.42 20-Oct-14 31.00 40 54.37 53.01
38 L2 6+630-6+690 30.00 30 40.77 20-Oct-14 30.00 38 51.65

26 RIGID 23-Sep-14 5.0 30-Sep-14 31.00 27 36.70 21-Oct-14


L1 6+615-6+630 30.00 29 39.42

27 RIGID 23-Sep-14 3.0 30-Sep-14 32.00 29 39.42 21-Oct-14


L1 6+630-6+690 31.00 28 38.06

39 28 RIGID 24-Sep-14 3.5 1-Oct-14 30.00 27 36.70 22-Oct-14


Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
40 L3 6+630-6+710 1-Oct-14 31.00 27 36.70
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
L3 6+630-6+710 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

41 29 RIGID 24-Sep-14 3.0 1-Oct-14 30.00 29 39.42 22-Oct-14


42 L3 6+630-6+710 1-Oct-14 30.00 28 38.06

43 30 RIGID 26-Sep-14 3.5 3-Oct-14 30.00 28 38.06 24-Oct-14


44 L1 6+905-6+940 3-Oct-14 30.00 29 39.42

45 31 RIGID 29-Sep-14 4.0 6-Oct-14 31.00 29 39.42 27-Oct-14


46 L3 6+940-6+960 6-Oct-14 30.00 30 40.77

47 32 RIGID 29-Sep-14 3.0 6-Oct-14 32.00 28 38.06 27-Oct-14


48 L3 6+905-6+990 6-Oct-14 30.00 29 39.42

49 33 RIGID 30-Sep-14 3.0 7-Oct-14 33.00 28 38.06 28-Oct-14


50 L3 6+960-6+990 7-Oct-14 32.00 30 40.77

51 34 RIGID 1-Oct-14 3.5 8-Oct-14 32.00 29 39.42 29-Oct-14


52 L2 6+960-6+990 8-Oct-14 33.00 30 40.77

53 35 RIGID 7-Oct-14 3.0 14-Oct-14 33.00 30 40.77 4-Nov-14


54 L2 6+280-6+385 14-Oct-14 32.00 29 39.42
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
55 36 RIGID 8-Oct-14 3.5 15-Oct-14 30.00 27 36.70 5-Nov-14
56 L1 6+310-6+380 15-Oct-14 30.00 29 39.42

57 37 RIGID 9-Oct-14 3.0 16-Oct-14 31.00 27 36.70 6-Nov-14


58 L2 6+310-6+380 16-Oct-14 30.00 28 38.06

59 38 RIGID 11-Oct-14 3.5 18-Oct-14 30.00 28 38.06 8-Nov-14


60 R1 6+320-6+355 18-Oct-14 31.00 28 38.06

61 39 RIGID 13-Oct-14 3.0 20-Oct-14 31.00 27 36.70 10-Nov-14


62 L3 6+280-6+315 20-Oct-14 30.00 27 36.70

63 40 RIGID 13-Oct-14 4.5 20-Oct-14 30.00 28 38.06 10-Nov-14


64 L1 6+280-6+295 20-Oct-14 30.00 27 36.70

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT Jasamarga Pandaan Tol Konsultan Kontraktor

( _____________________________ ) ( _____________________________ ) ( ________________________)


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : Oktober 2014

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 1-Oct-14 28 1.00 54.37 54.37 2.42
RIGID
2 1-Oct-14 28 1.00 51.65 51.65 1.35
3 1-Oct-14 28 1.00 55.73 55.73 8.50
RIGID
4 1-Oct-14 28 1.00 51.65 51.65 1.35
5 2-Oct-14 28 1.00 54.37 54.37 2.42
RIGID
6 2-Oct-14 28 1.00 51.65 51.65 1.35
7 4-Oct-14 28 1.00 53.01 53.01 0.04
RIGID
8 4-Oct-14 28 1.00 54.37 54.37 2.42
9 6-Oct-14 28 1.00 54.37 54.37 2.42
RIGID
10 6-Oct-14 28 1.00 53.01 53.01 0.04
11 7-Oct-14 28 1.00 53.01 53.01 0.04
RIGID
12 7-Oct-14 28 1.00 54.37 54.37 2.42
13 9-Oct-14 28 1.00 54.37 54.37 2.42
RIGID
14 9-Oct-14 28 1.00 53.01 53.01 0.04
15 10-Oct-14 28 1.00 53.01 53.01 0.04
RIGID
16 10-Oct-14 28 1.00 51.65 51.65 1.35
17 11-Oct-14 28 1.00 54.37 54.37 2.42
RIGID
18 11-Oct-14 28 1.00 51.65 51.65 1.35
19 11-Oct-14 28 1.00 54.37 54.37 2.42
RIGID
20 11-Oct-14 28 1.00 53.01 53.01 0.04
21 12-Oct-14 28 1.00 54.37 54.37 2.42
RIGID
22 12-Oct-14 28 1.00 53.01 53.01 0.04
23 13-Oct-14 28 1.00 53.01 53.01 0.04
RIGID
24 13-Oct-14 28 1.00 54.37 54.37 2.42
25 14-Oct-14 28 1.00 53.01 53.01 0.04
RIGID
26 14-Oct-14 28 1.00 51.65 51.65 1.35
27 15-Oct-14 28 1.00 53.01 53.01 0.04
RIGID
28 15-Oct-14 28 1.00 54.37 54.37 2.42
29 15-Oct-14 28 1.00 51.65 51.65 1.35
RIGID
30 15-Oct-14 28 1.00 51.65 51.65 1.35
31 16-Oct-14 28 1.00 51.65 51.65 1.35
RIGID
32 16-Oct-14 28 1.00 54.37 54.37 2.42
33 17-Oct-14 28 1.00 53.01 53.01 0.04
RIGID
34 17-Oct-14 28 1.00 54.37 54.37 2.42
35 18-Oct-14 28 1.00 53.01 53.01 0.04
RIGID
36 18-Oct-14 28 1.00 55.73 55.73 8.50
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
37 20-Oct-14 28 1.00 54.37 54.37 2.42
RIGID
38 20-Oct-14 28 1.00 51.65 51.65 1.35
39 1-Oct-14 7 0.75 36.70 48.93 15.06
RIGID
40 1-Oct-14 7 0.75 36.70 48.93 15.06
41 1-Oct-14 7 0.75 39.42 52.55 0.07
RIGID
42 1-Oct-14 7 0.75 38.06 50.74 4.28
43 3-Oct-14 7 0.75 38.06 50.74 4.28
RIGID
44 3-Oct-14 7 0.75 39.42 52.55 0.07
45 6-Oct-14 7 0.75 39.42 52.55 0.07
RIGID
46 6-Oct-14 7 0.75 40.77 54.37 2.42
47 6-Oct-14 7 0.75 38.06 50.74 4.28
RIGID
48 6-Oct-14 7 0.75 39.42 52.55 0.07
49 7-Oct-14 7 0.75 38.06 50.74 4.28
RIGID
50 7-Oct-14 7 0.75 40.77 54.37 2.42
51 8-Oct-14 7 0.75 39.42 52.55 0.07
RIGID
52 8-Oct-14 7 0.75 40.77 54.37 2.42
53 14-Oct-14 7 0.75 40.77 54.37 2.42
RIGID
54 14-Oct-14 7 0.75 39.42 52.55 0.07
55 15-Oct-14 7 0.75 36.70 48.93 15.06
RIGID
56 15-Oct-14 7 0.75 39.42 52.55 0.07
57 16-Oct-14 7 0.75 36.70 48.93 15.06
RIGID
58 16-Oct-14 7 0.75 38.06 50.74 4.28
59 18-Oct-14 7 0.75 38.06 50.74 4.28
RIGID
60 18-Oct-14 7 0.75 38.06 50.74 4.28
61 20-Oct-14 7 0.75 36.70 48.93 15.06
RIGID
62 20-Oct-14 7 0.75 36.70 48.93 15.06
63 20-Oct-14 7 0.75 38.06 50.74 4.28
RIGID
64 20-Oct-14 7 0.75 36.70 48.93 15.06
65 7-Oct-14 28 1.00 54.37 54.37 2.42 RIGID
66 7-Oct-14 28 1.00 54.37 54.37 2.42
L1 STA. 6+740-
67 7-Oct-14 28 1.00 53.01 53.01 0.04
6+810
68 7-Oct-14 28 1.00 54.37 54.37 2.42
69 8-Oct-14 28 1.00 51.65 51.65 1.35 RIGID
70 8-Oct-14 28 1.00 51.65 51.65 1.35
L1 STA. 6+780-
71 8-Oct-14 28 1.00 53.01 53.01 0.04
6+690
72 8-Oct-14 28 1.00 51.65 51.65 1.35
73 9-Oct-14 28 1.00 53.01 53.01 0.04 RIGID
74 9-Oct-14 28 1.00 53.01 53.01 0.04
L2 STA. 6+740-
75 9-Oct-14 28 1.00 54.37 54.37 2.42
6+810
76 9-Oct-14 28 1.00 53.01 53.01 0.04
77 10-Oct-14 28 1.00 53.01 53.01 0.04
RIGID
78 10-Oct-14 28 1.00 53.01 53.01 0.04
79 10-Oct-14 28 1.00 54.37 54.37 2.42
RIGID
80 10-Oct-14 28 1.00 51.65 51.65 1.35
81 11-Oct-14 28 1.00 54.37 54.37 2.42 RIGID
82 11-Oct-14 28 1.00 54.37 54.37 2.42
R3 STA. 6+925-
83 11-Oct-14 28 1.00 53.01 53.01 0.04
7+005
84 11-Oct-14 28 1.00 55.73 55.73 8.50
85 13-Oct-14 28 1.00 53.01 53.01 0.04 RIGID
86 13-Oct-14 28 1.00 54.37 54.37 2.42
L1 STA. 6+690 -
87 13-Oct-14 28 1.00 54.37 54.37 2.42
6+740
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
L1 STA. 6+690 -
BENDA UJI BETON TEST 28 HARI (σbn )
6+740
88 13-Oct-14 28 1.00 53.01 53.01 0.04
89 14-Oct-14 28 1.00 51.65 51.65 1.35 RIGID
90 14-Oct-14 28 1.00 51.65 51.65 1.35
L3 STA. 6+715 -
91 14-Oct-14 28 1.00 53.01 53.01 0.04
6+810
92 14-Oct-14 28 1.00 53.01 53.01 0.04
93 17-Oct-14 28 1.00 54.37 54.37 2.42 RIGID
94 17-Oct-14 28 1.00 54.37 54.37 2.42
L2 STA. 6+280 -
95 17-Oct-14 28 1.00 51.65 51.65 1.35
6+220
96 17-Oct-14 28 1.00 53.01 53.01 0.04
97 6-Oct-14 7 0.75 39.42 52.55 0.07
RIGID
98 6-Oct-14 7 0.75 40.77 54.37 2.42
99 8-Oct-14 7 0.75 40.77 54.37 2.42
RIGID
100 8-Oct-14 7 0.75 38.06 50.74 4.28
101 14-Oct-14 7 0.75 40.77 54.37 2.42
RIGID
102 14-Oct-14 7 0.75 40.77 54.37 2.42
103 15-Oct-14 7 0.75 38.06 50.74 4.28
RIGID
104 15-Oct-14 7 0.75 40.77 54.37 2.42
105 16-Oct-14 7 0.75 40.77 54.37 2.42
RIGID
106 16-Oct-14 7 0.75 40.77 54.37 2.42

Σ(σbn - σbm)2 = 285.31

JUMLAH SAMPLE = 106.00 buah


MIN = 48.93 kg/cm2
MAX = 55.73 kg/cm2
RATA-RATA (σbm) = 52.81 kg/cm2
KARAKTERISTIK (σbk) = σbm - 1,64 S = 1.65 kg/cm2
50.11 kg/cm2

QC STAF QC

( ) ( )
1 2 3 4 5 6 7 8 14 15 16 17 23 24

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

1 RIGID 25-Aug-14 4.0 1-Sep-14 22-Sep-14 34.30 38 51.65 51.65


34.20 38 51.65
L2 STA. 6+810- 6+910
34.20 40 54.37
34.20 40 54.37

2 RIGID 26-Aug-14 4.5 2-Sep-14 23-Sep-14 34.20 40 54.37 55.05


34.30 41 55.73
L1 STA. 6+640- 6+690
34.30 40 54.37
34.20 39 53.01

3 RIGID 27-Aug-14 4.5 3-Sep-14 24-Sep-14 34.10 40 54.37 53.69


34.10 39 53.01
L3 STA. 6+810- 6+910
34.20 39 53.01
34.30 38 51.65

4 RIGID 30-Aug-14 4.0 6-Sep-14 27-Sep-14 34.20 40 54.37 54.37


34.20 40 54.37
R3 STA. 6+465- 6+600
34.10 41 55.73
34.20 38 51.65

5 RIGID 1-Sep-14 4.0 8-Sep-14 29-Sep-14 34.10 40 54.37 54.37


34.10 40 54.37
R3 STA. 6+500- 6+585
34.00 39 53.01
34.10 40 54.37

6 RIGID 2-Sep-14 4.0 9-Sep-14 30-Sep-14 34.10 38 51.65 51.65


34.00 38 51.65
R2 STA. 6+465- 6+545
34.00 40 54.37
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
34.20 41 55.73

65 7 RIGID 9-Sep-14 4.0 16-Sep-14 7-Oct-14 34.00 40 54.37 54.03


66 7-Oct-14 34.10 40 54.37
L1 STA. 6+740- 6+810
67 7-Oct-14 34.10 39 53.01
68 7-Oct-14 34.00 40 54.37

69 8 RIGID 10-Sep-14 3.0 17-Sep-14 8-Oct-14 34.10 38 51.65 51.99


70 8-Oct-14 34.10 38 51.65
L1 STA. 6+780- 6+690
71 8-Oct-14 34.20 39 53.01
72 8-Oct-14 34.00 38 51.65

73 9 RIGID 11-Sep-14 4.0 18-Sep-14 9-Oct-14 34.00 39 53.01 53.35


74 9-Oct-14 34.10 39 53.01
L2 STA. 6+740- 6+810
75 9-Oct-14 34.00 40 54.37
76 9-Oct-14 34.00 39 53.01

77 10 RIGID 12-Sep-14 3.5 19-Sep-14 10-Oct-14 34.10 39 53.01 53.01


78 10-Oct-14 34.00 39 53.01
R3 STA. 6+945- 7+005

79 11 RIGID 12-Sep-14 4.0 19-Sep-14 10-Oct-14 34.20 40 54.37 53.01


80 10-Oct-14 34.20 38 51.65
R2 STA. 6+925- 7+005

81 12 RIGID 13-Sep-14 4.5 20-Sep-14 34.20 28 38.06 11-Oct-14 34.00 40 54.37 54.37
82 33.20 29 39.42 11-Oct-14 34.00 40 54.37
R3 STA. 6+925- 7+005
83 11-Oct-14 34.10 39 53.01
84 11-Oct-14 34.00 41 55.73

85 13 RIGID 15-Sep-14 4.0 22-Sep-14 34.10 29 39.42 13-Oct-14 34.10 39 53.01 53.69
86 34.00 29 39.42 13-Oct-14 34.10 40 54.37
L1 STA. 6+690 - 6+740
87 13-Oct-14 34.00 40 54.37
88 13-Oct-14 34.20 39 53.01

89 14 RIGID 16-Sep-14 4.5 23-Sep-14 34.20 30 40.77 14-Oct-14 34.00 38 51.65 52.33
90 34.20 29 39.42 14-Oct-14 34.10 38 51.65
L3 STA. 6+715 - 6+810
91 14-Oct-14 34.10 39 53.01
92 14-Oct-14 34.10 39 53.01

93 15 RIGID 19-Sep-14 4.0 26-Sep-14 34.00 30 40.77 17-Oct-14 34.10 40 54.37 53.35
94 34.10 29 39.42 17-Oct-14 34.10 40 54.37
L2 STA. 6+280 - 6+220
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
L2 STA. 6+280 - 6+220
95 17-Oct-14 34.00 38 51.65
96 17-Oct-14 34.20 39 53.01

16 RIGID 20-Sep-14 4.0 27-Sep-14 34.50 30 40.77 18-Oct-14 34.00 40 54.37 54.71
34.10 30 40.77 18-Oct-14 34.10 41 55.73
L3 STA. 6+280 - 6+220
18-Oct-14 34.00 41 55.73
18-Oct-14 34.20 39 53.01

97 17 RIGID 29-Sep-14 4.0 6-Oct-14 34.00 29 39.42 27-Oct-14


98 6-Oct-14 34.00 30 40.77
L3 STA. 6+905 - 6+995

99 18 RIGID 1-Oct-14 4.0 8-Oct-14 34.00 30 40.77 29-Oct-14


100 8-Oct-14 34.10 28 38.06
L2 STA. 6+905 - 6+990

101 19 RIGID 7-Oct-14 4.0 14-Oct-14 34.00 30 40.77 4-Nov-14


102 14-Oct-14 34.00 30 40.77
L2 STA. 6+280 - 6+385

103 20 RIGID 8-Oct-14 4.0 15-Oct-14 34.00 28 38.06 5-Nov-14


104 15-Oct-14 34.00 30 40.77
L1 STA. 6+310 - 6+380

105 21 RIGID 9-Oct-14 4.5 16-Oct-14 34.00 30 40.77 6-Nov-14


106 16-Oct-14 34.00 30 40.77
L3 STA. 6+315- 6+385

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
Jasamarga Pandaan Tol Konsultan Kontraktor

( _____________________________ ) ( _____________________________ ) ( ________________________)


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO) Departemen Sipil Umum

PERHITUNGAN STANDAR DEVIASI BETON

Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2


( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk

Mutu : Fs 45

Bulan : November 2014

NOMOR FAKTOR UMUR KUAT TEKAN


TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
1 4-Nov-14 28 1.00 53.01 53.01 0.02
RIGID
2 4-Nov-14 28 1.00 51.65 51.65 1.51
3 5-Nov-14 28 1.00 54.37 54.37 2.22
RIGID
4 5-Nov-14 28 1.00 53.01 53.01 0.02
5 6-Nov-14 28 1.00 54.37 54.37 2.22
RIGID
6 6-Nov-14 28 1.00 53.01 53.01 0.02
7 8-Nov-14 28 1.00 54.37 54.37 2.22
RIGID
8 8-Nov-14 28 1.00 54.37 54.37 2.22
9 10-Nov-14 28 1.00 53.01 53.01 0.02
RIGID
10 10-Nov-14 28 1.00 54.37 54.37 2.22
11 10-Nov-14 28 1.00 47.57 47.57 28.14
RIGID
12 10-Nov-14 28 1.00 50.29 50.29 6.69
13 11-Nov-14 28 1.00 48.93 48.93 15.57
RIGID
14 11-Nov-14 28 1.00 50.29 50.29 6.69
15 12-Nov-14 28 1.00 51.65 51.65 1.51
RIGID
16 12-Nov-14 28 1.00 54.37 54.37 2.22
17 13-Nov-14 28 1.00 53.01 53.01 0.02
RIGID
18 13-Nov-14 28 1.00 54.37 54.37 2.22
19 13-Nov-14 28 1.00 51.65 51.65 1.51
RIGID
20 13-Nov-14 28 1.00 53.01 53.01 0.02
21 2-Nov-14 7 0.75 40.77 54.37 2.22
RIGID
22 2-Nov-14 7 0.75 39.42 52.55 0.10
23 2-Nov-14 7 0.75 38.06 50.74 4.55
RIGID
24 2-Nov-14 7 0.75 39.42 52.55 0.10
25 3-Nov-14 7 0.75 40.77 54.37 2.22
RIGID
26 3-Nov-14 7 0.75 39.42 52.55 0.10
27 4-Nov-14 7 0.75 40.77 54.37 2.22
RIGID
28 4-Nov-14 7 0.75 39.42 52.55 0.10
29 6-Nov-14 7 0.75 40.77 54.37 2.22
RIGID
30 6-Nov-14 7 0.75 39.42 52.55 0.10
31 6-Nov-14 7 0.75 39.42 52.55 0.10
RIGID
32 6-Nov-14 7 0.75 40.77 54.37 2.22
33 15-Nov-14 7 0.75 38.06 50.74 4.55
RIGID
34 15-Nov-14 7 0.75 40.77 54.37 2.22
35 16-Nov-14 7 0.75 39.42 52.55 0.10
RIGID
36 16-Nov-14 7 0.75 39.42 52.55 0.10
37 16-Nov-14 7 0.75 40.77 54.37 2.22
RIGID
38 16-Nov-14 7 0.75 39.42 52.55 0.10
39 17-Nov-14 7 0.75 36.70 48.93 15.57
RIGID
40 17-Nov-14 7 0.75 39.42 52.55 0.10
41 19-Nov-14 7 0.75 40.77 54.37 2.22
RIGID
42 19-Nov-14 7 0.75 38.06 50.74 4.55
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
43 19-Nov-14 7 0.75 38.06 50.74 4.55
RIGID
44 19-Nov-14 7 0.75 39.42 52.55 0.10
NOMOR FAKTOR UMUR KUAT TEKAN
TANGGAL UJI UMUR (σbn - σbm)2 KET
BENDA UJI BETON TEST 28 HARI (σbn )
45 4-Nov-14 28 1.00 54.37 54.37 2.22 RIGID
46 4-Nov-14 28 1.00 54.37 54.37 2.22
L2 STA. 6+280 -
47 28 1.00 55.73 55.73 8.12
6+385
48 28 1.00 53.01 53.01 0.02
49 5-Nov-14 28 1.00 54.37 54.37 2.22
RIGID
50 5-Nov-14 28 1.00 54.37 54.37 2.22
51 6-Nov-14 28 1.00 54.37 54.37 2.22 RIGID
52 6-Nov-14 28 1.00 53.01 53.01 0.02
L3 STA. 6+310-
53 6-Nov-14 28 1.00 53.01 53.01 0.02
6+380
54 6-Nov-14 28 1.00 55.73 55.73 8.12
55 15-Nov-14 7 0.75 40.77 54.37 2.22
RIGID
56 15-Nov-14 7 0.75 39.42 52.55 0.10
57 17-Nov-14 7 0.75 40.77 54.37 2.22
RIGID
58 17-Nov-14 7 0.75 38.06 50.74 4.55
59 19-Nov-14 7 0.75 38.06 50.74 4.55
RIGID
60 19-Nov-14 7 0.75 38.06 50.74 4.55
61 21-Nov-14 7 0.75 39.42 52.55 0.10
RIGID
62 21-Nov-14 7 0.75 40.77 54.37 2.22

Σ(σbn - σbm)2 = 177.91

JUMLAH SAMPLE = 62.00 buah


MIN = 47.57 kg/cm2
MAX = 55.73 kg/cm2
RATA-RATA (σbm) = 52.88 kg/cm2
KARAKTERISTIK (σbk) = σbm - 1,64 S = 1.71 kg/cm2
50.07 kg/cm2

QC STAF QC

( ) ( )
1 2 3 4 5 6 7 8 14 15 16 17 23 24

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.HOLCIM BETON - PLANT PANDAAN

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

1 RIGID 29-Sep-14 4.0 6-Oct-14 27-Oct-14 34.10 40 54.37 54.37


34.00 40 54.37
L3 STA. 6+905 - 6+995
34.10 39 53.01
34.10 40 54.37

2 RIGID 1-Oct-14 4.0 8-Oct-14 29-Oct-14 34.00 40 54.37 54.37


34.00 40 54.37
L2 STA. 6+905 - 6+990

45 3 RIGID 7-Oct-14 4.0 14-Oct-14 4-Nov-14 34.00 40 54.37 54.37


46 4-Nov-14 34.00 40 54.37
L2 STA. 6+280 - 6+385
47 34.00 41 55.73
48 34.10 39 53.01

49 4 RIGID 8-Oct-14 4.0 15-Oct-14 5-Nov-14 33.00 40 54.37 54.37


50 5-Nov-14 34.00 40 54.37
L1 STA. 6+310 - 6+380

51 5 RIGID 9-Oct-14 4.5 16-Oct-14 6-Nov-14 34.00 40 54.37 53.69


52 6-Nov-14 34.10 39 53.01
L3 STA. 6+310- 6+380
53 6-Nov-14 34.00 39 53.01
54 6-Nov-14 34.10 41 55.73
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur ( 7Hr ) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

55 6 RIGID 8-Nov-14 5.0 15-Nov-14 34.00 30 40.77 6-Dec-14


56 15-Nov-14 34.00 29 39.42
L1 STA. 6+470- 6+550

57 7 RIGID 10-Nov-14 4.0 17-Nov-14 34.10 30 40.77 8-Dec-14


58 17-Nov-14 34.10 28 38.06
L2 STA. 6+470- 6+515

59 8 RIGID 12-Nov-14 4.0 19-Nov-14 34.00 28 38.06 10-Dec-14


60 19-Nov-14 34.00 28 38.06
L2 STA. 6+515- 6+630

61 9 RIGID 14-Nov-14 4.0 21-Nov-14 34.00 29 39.42 12-Dec-14


62 21-Nov-14 34.10 30 40.77
L1 STA. 6+180- 6+190

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
Jasamarga Pandaan Tol Konsultan Kontraktor

( _____________________________ ) ( _____________________________ ) ( ________________________)


1 2 3 4 5 6 7 8 9 15 16 17 18 24 25 26

Konsultan Pengawas : Kontraktor :


PT Multi Phi Beta - PT Tata Guna Patria - PT. WIJAYA KARYA (Persero) Tbk
PT Eskapindo Matra (KSO)

TEST KUAT LENTUR BALOK BETON Fs - 45


Proyek : PEMBANGUNAN JALAN TOL GEMPOL - PANDAAN TAHAP I PAKET 2
( STA. 5+500 s/d STA. 11+500 )
Kontraktor : PT. WIJAYA KARYA ( Persero )Tbk
Jenis Pekerjaan : RIGID
Dikirim oleh : PT.SCG READY MIX INDONESIA

Umur 7 hari Umur 28 hari


Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

1 RIGID 23-Sep-14 4.0 30-Sep-14 21-Oct-14 32.00 40 54.37 53.69


L1 6+615-6+630 33.00 39 53.01

2 RIGID 23-Sep-14 3.0 30-Sep-14 21-Oct-14 33.00 40 54.37 53.01


L1 6+630-6+690 32.00 38 51.65

3 RIGID 24-Sep-14 3.0 1-Oct-14 22-Oct-14 33.00 39 53.01 53.69


L3 6+635-6+710 32.00 40 54.37
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
L3 6+635-6+710 ( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

4 RIGID 24-Sep-14 3.0 1-Oct-14 22-Oct-14 32.00 38 51.65 53.01


L3 6+635-6+710 33.00 40 54.37

5 RIGID 26-Sep-14 3.0 3-Oct-14 24-Oct-14 33.00 40 54.37 54.37


L1 6+905-6+940 32.00 40 54.37

6 RIGID 29-Sep-14 4.0 6-Oct-14 27-Oct-14 31.00 40 54.37 53.69


L3 6+940-6+960 30.00 39 53.01

7 RIGID 29-Sep-14 3.0 6-Oct-14 27-Oct-14 32.00 41 55.73 55.05


L3 6+905-6+990 31.00 40 54.37

8 RIGID 30-Sep-14 3.0 7-Oct-14 28-Oct-14 30.00 39 53.01 53.69


L3 6+960-6+990 32.00 40 54.37

9 RIGID 1-Oct-14 3.5 8-Oct-14 29-Oct-14 32.00 41 55.73 55.05


L2 6+960-6+990 31.00 40 54.37

1 10 RIGID 7-Oct-14 3.0 14-Oct-14 4-Nov-14 33.00 39 53.01 52.33


2 L2 6+280-6+385 4-Nov-14 32.00 38 51.65
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
3 11 RIGID 8-Oct-14 4.0 15-Oct-14 5-Nov-14 31.30 40 54.37 53.69
4 L1 6+310-6+380 5-Nov-14 32.05 39 53.01

5 12 RIGID 9-Oct-14 3.0 16-Oct-14 6-Nov-14 33.00 40 54.37 53.69


6 L2 6+310-6+380 6-Nov-14 32.00 39 53.01

7 13 RIGID 11-Oct-14 3.5 18-Oct-14 8-Nov-14 33.00 40 54.37 54.37


8 R1 6+320-6+355 8-Nov-14 33.00 40 54.37

9 14 RIGID 13-Oct-14 3.0 20-Oct-14 10-Nov-14 32.00 39 53.01 53.69


10 L3 6+280-6+315 10-Nov-14 33.00 40 54.37

11 15 RIGID 13-Oct-14 4.5 20-Oct-14 10-Nov-14 33.00 35 47.57 48.93


12 L1 6+280-6+295 10-Nov-14 32.00 37 50.29

13 16 RIGID 14-Oct-14 4.0 21-Oct-14 33.00 29 39.42 11-Nov-14 33.00 36 48.93 49.61
14 L1 6+295-6+310 32.00 30 40.77 11-Nov-14 32.00 37 50.29

15 17 RIGID 15-Oct-14 3.0 22-Oct-14 32.00 30 40.77 12-Nov-14 31.00 38 51.65 53.01
16 R1 6+465-6+545 33.00 30 40.77 12-Nov-14 32.00 40 54.37

17 18 RIGID 16-Oct-14 3.0 23-Oct-14 32.00 29 39.42 13-Nov-14 32.00 39 53.01 53.69
18 R1 6+545-6+585 33.00 30 40.77 13-Nov-14 31.00 40 54.37

19 19 RIGID 16-Oct-14 3.0 23-Oct-14 33.00 28 38.06 13-Nov-14 30.00 38 51.65 52.33
20 R1 6+595-6+625 33.00 29 39.42 13-Nov-14 32.00 39 53.01
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2
21 20 RIGID 26-Oct-14 3.0 2-Nov-14 33.00 30 40.77 23-Nov-14
22 L2 0+950-1+060 2-Nov-14 32.00 29 39.42

23 21 RIGID 26-Oct-14 3.0 2-Nov-14 33.00 28 38.06 23-Nov-14


24 L2 0+950-1+060 2-Nov-14 33.00 29 39.42

25 22 RIGID 27-Oct-14 3.0 3-Nov-14 33.00 30 40.77 24-Nov-14


26 L2 1+060-2+290 3-Nov-14 32.00 29 39.42

27 23 RIGID 28-Oct-14 3.0 4-Nov-14 33.00 30 40.77 25-Nov-14


28 L2 2+290-2+260 4-Nov-14 33.00 29 39.42

29 24 RIGID 30-Oct-14 3.5 6-Nov-14 33.00 30 40.77 27-Nov-14


30 L1 0+950-2+260 6-Nov-14 32.00 29 39.42

31 25 RIGID 30-Oct-14 3.0 6-Nov-14 32.00 29 39.42 27-Nov-14


32 L1 0+950-2+260 6-Nov-14 33.00 30 40.77

33 26 RIGID 8-Nov-14 3.5 15-Nov-14 31.00 28 38.06 6-Dec-14


34 L1 6+470-6+550 15-Nov-14 30.00 30 40.77

35 27 RIGID 9-Nov-14 3.0 16-Nov-14 30.00 29 39.42 7-Dec-14


36 L1 6+550-6+630 16-Nov-14 32.00 29 39.42

37 28 RIGID 9-Nov-14 3.0 16-Nov-14 31.00 30 40.77 7-Dec-14


38 L1 6+550-6+630 16-Nov-14 30.00 29 39.42
Umur 7 hari Umur 28 hari
Lokasi Tanggal Slump Tanggal Berat Beban Tegangan Tanggal Berat Beban Tegangan
No. Rata-rata
( STA. ) Cor ( Cm ) Test ( Kg ) Hancur (7Hr) Lentur ( 7Hr ) Test ( Kg ) Hancur ( 28Hr ) Lentur ( 28Hr )
( 7 Hr ) ( 7 Hr ) ( KN ) Kg/Cm2 ( 28 Hr ) (28Hr) KN Kg/Cm2

39 29 RIGID 10-Nov-14 3.0 17-Nov-14 30.00 27 36.70 8-Dec-14


40 L3 6+580-6+630 17-Nov-14 31.00 29 39.42

41 30 RIGID 12-Nov-14 3.5 19-Nov-14 31.00 30 40.77 10-Dec-14


42 L2 6+515-6+630 19-Nov-14 31.00 28 38.06

43 31 RIGID 12-Nov-14 3.5 19-Nov-14 30.00 28 38.06 10-Dec-14


44 L2 6+515-6+630 19-Nov-14 31.00 29 39.42

Pandaan, ............... 2014


Diketahui Oleh : Disetujui Oleh : Diajukan Oleh :
PT Jasamarga Pandaan Tol Konsultan Kontraktor

( _____________________________ ) ( _____________________________ ) ( ________________________)