Pemerintah Kota Singkawang
Dinas Pekerjaan Umum dan Penataan Ruang
Jl. Jenderal Ahmad Yani
Singkawang

ST
A
.0
+5
PEKERJAAN :

00
.00
Perencanaan Pembangunan Jalan (DAU)
285750.000

2018

LOKASI :

285950.000
Jalan Mencong
Kecamatan Singkawang Timur

ST
A.
0+
45
DISETUJUI :

0.
00
Pejabat Pembuat Komitmen
Bidang Bina Marga
250.00
STA. 0+

ST
A.
RACHMAT KURNIAWAN, S.T.

300.00

0+
40
NIP. 19720605 200312 1 012

0.0
STA. 0+350.00
STA. 0+

0
DIPERIKSA :

Pejabat Pelaksana Teknis Kegiatan


285700.000

285900.000
FRAN QUILLO SAING, S.T., M.T.
NIP. 19710714 200312 1 005
Meters
30 0 30 60 KONSULTAN :

1:1000

JABATAN NAMA PARAF


TEAM LEADER HARY WAHYU N, ST
AHLI JALAN RAYA EMELDA YUNIATI, ST
100750.000 100800.000 100850.000 100900.000 100950.000
ESTIMATOR INDAH SRI REZEKI, ST
LOW PT STA: 2+39.20 LOW PT STA: 3+09.02 HIGH PT STA: 3+56.82 HIGH PT STA: 3+99.80 LOW PT STA: 4+45.67 HIGH PT STA: 4+59.97 LOW PT STA: 5+05.92

LONG SECTION LOW PT ELEV: 97.12 LOW PT ELEV: 98.39


PVI STA:0+320.00
PVI ELEV:98.62
HIGH PT ELEV: 100.23
PVI STA:0+352.74
PVI ELEV:100.12
HIGH PT ELEV: 101.28
PVI STA:0+399.98
PVI ELEV:101.42
LOW PT ELEV: 100.23
PVI STA:0+438.86
PVI ELEV:100.31
HIGH PT ELEV: 100.08
PVI STA:0+466.08
PVI ELEV:100.02
LOW PT ELEV: 98.50
PVI STA:0+500.00
PVI ELEV:98.61
K:9.00 K:4.54 K:3.62 K:7.55 K:3.93 K:5.04 Keterangan :
105 LVC:21.95 LVC:8.17 LVC:20.33 LVC:13.63 LVC:12.23 LVC:11.84
Ibu Kota Kabupaten HT (Hutan)
BVCS: 0+309.02

BVCS: 0+389.82
BVCE: 101.14

BVCE: 100.50

BVCE: 100.08
EVCS: 0+259.08
EVCE: 97.33

BVCE: 98.39

EVCS: 0+330.98
EVCE: 99.12

BVCS: 0+348.65
BVCE: 99.93

EVCS: 0+356.82

EVCS: 0+410.14

BVCS: 0+432.05

EVCS: 0+445.67

BVCS: 0+459.97

EVCS: 0+472.20
EVCE: 99.77

BVCS: 0+494.08
BVCE: 98.85

EVCS: 0+505.92
EVCE: 98.50
EVCE: 100.23

EVCE: 101.13

EVCE: 100.23
Ibu Kota Kecamatan KC (Kebun Campuran)
Desa PL (Palawija)

-2.86% Garis Kontur KL (Kelapa)


2.76%
-1.05% Jalan Kabupaten KRT (Karet)
100 4.56% -4.16%
Saluran PRK (Permukiman)

-1.81% SB (Semak Belukar)


Gorong-Gorong
2.12% SW (Sawah)
Jembatan SWT (Sawit)
KI (Kolam/Kolam Ikan)
Box Culvert
TB (Tambang)

SKALA VERTIKAL 1:200


95 JR (Jeruk)
SKALA HORIZONTAL 1:1000 JB (Jabon)
DATUM 90 M
JT (Jati)

EXT. ELEVATIONS

PROPOSED ELEVATIONS

JUDUL GAMBAR : SKALA


STATIONS 0+250 0+300 0+350 0+400 0+450 0+500
SITUASI DAN LONG SECTION

EXT. ELEVATIONS 97.26 98.32 99.99 101.30 100.23 98.63 TAHUN JLH. LEMBAR NO. LEMBAR

PROPOSED ELEVATIONS
97.19 98.20 99.99 101.28 100.19 98.64 2017 19 4