Anda di halaman 1dari 2

POWER INSTALLATION OC: S2B1120079

APOLLO MTP-616F-Slave APOLLO MTP-616F-Master


(Front view) (Front view)

LEONICS LEONICS

INV CHG RS-232


RS-232

RS-232-CTRL RS-232-CTRL

AC INV. BATTERY AC INV. BATTERY


OUTPUT OUTPUT

INV MC INV MC

L1 L2 L3 N L1 L2 L3 N L1 L2 L3 N PE
AC OUTPUT PE AC OUTPUT SLAVE
+ - + -
BATTERY BATTERY
Item 3.1, 3.2

Item 4.1 Item 1.3


Item 1.4
Item 2.1, 2.2
L1 AC OUTPUT to AC
L2 DISTRIBUTION PANNEL
L3
N (400VL-L to 230VL-N)
Item 1.2 DC BUS

BATT. FUSE
Item 1.1 Item 4.2

+ -
BATTERY 144kWh PE / EARTH
240VDC 600Ah

NOTE: - Continuous product development is our commitment. In the manner, the above specifications may be changed without prior notice. M.LEN.STK.SYS.859 Rev.1.00/2012
LEONICS ESCO CONSULTANT CLIENT / EMPLOYER PROJECT Title
INSTALLATION
Issue
1
Rev.
A
Eff. Date
17/03/2012
ELECTRICAL ENGINEERING
Prepared By
29, Soi Bangna-Trad 34 Bangna-Trad Road, Solar Hybrid System Drawing Type Approved By
Bangna, Bangna, Bangkok 10260 PT.Jaya POWER CIVIL ENGINEERING
Tel. 66-2746-9500, 66-274-8708 LOCATION Drawing No. Page/TPIS Prepared By
Fax. 66-2746-8712 Kur Island, Indonesia LEN-I-01 1/1 Approved By
SIGNAL INSTALLATION OC: S2B1120079

APOLLO MTP-616F-Slave APOLLO MTP-616F-Master HCCU


(Front view) (Front view) (Back view)

LEONICS LEONICS

INV CHG
START/STOP GENERATOR SIGNAL
RS-232
RS-232 (If available)
RS-232 cable 10m. RS-232-CTRL RS-232-CTRL COM NO
(Provided by Leonics) RS-232 cable 10m.
Item 8.1.1 RS-232 cable 5m.(Provided by Leonics) (Provided by Leonics)
Item 6.1.1 Item 7.1.1
BATTERY 2x1Cx2.5 sq.mm.
AC INV. AC INV. BATTERY
OUTPUT OUTPUT (Provide by Customer) Item 9.1

INV MC INV MC

NC COM NO
CHARGER
CONTROL

Ext. DC
RS232-MTP
L1 L2 L3 N L1 L2 L3 N L1 L2 L3 N MASTER
AC OUTPUT PE AC OUTPUT SLAVE
+ - + - RS232-MTP

NO COM
ACC
BATTERY BATTERY
SLAVE

GENERATOR
CONTROL

NO COM
START
PROTECTION BYPASS CB

NO COM
DEB

NO COM
AUX. NO
AC INPUT
FUSE
(F1) Battery temperature sensor (NTC) 10m.

NO COM
AUX. NO
INV CB
(Provide by Leonics)
(Install by customer)
Item 10.1

+
BATT. TEMP.

-
Shield
+ - D+ GND D- D+ GND D-
SUPPLY RS-485 Signal RS-485#2
+ -
PE / EARTH

NO COM
MTP FAIL
DC INPUT PE Twisted 2Pair #22AWG with shield 5m.
12VDC (GTP) (Power Meter) 240VDC
(Provide by Leonics)
Item 7.2.1

D+
(POWER METER)
RS-485 COMM.

D-
GND
Item 5.1
1 x 1C x 16AWG red 5 m. (Provide by Leonics)

+
SUPPLY
POWER
HCCU
1 x 1C x 16AWG blk 5 m. (Provide by Leonics)

-
NOTE: - Continuous product development is our commitment. In the manner, the above specifications may be changed without prior notice. M.LEN.STK.SYS.859 Rev.1.00/2012
LEONICS ESCO CONSULTANT CLIENT / EMPLOYER PROJECT Title
INSTALLATION
Issue
1
Rev.
A
Eff. Date
17/03/2012
ELECTRICAL ENGINEERING
Prepared By
29, Soi Bangna-Trad 34 Bangna-Trad Road, Solar Hybrid System Drawing Type Approved By
Bangna, Bangna, Bangkok 10260 PT.Jaya SIGNAL CIVIL ENGINEERING
Tel. 66-2746-9500, 66-274-8708 LOCATION Drawing No. Page/TPIS Prepared By
Fax. 66-2746-8712 Kur Island, Indonesia LEN-I-02 1/1 Approved By

Anda mungkin juga menyukai