PERHITUNGAN VOLUME

PROGRAM : PEMBANGUNAN RUMAH TINGGAL 1


PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI, Dra. LILIS LESTARI
LOKASI : JL. KHR. MOCH. ROSYID. BOJONEGORO

PERHITUNGAN SAT VOLUME


Beton Galian Besi Bekisting Plesteran Benangan Titik
1 BOR PILE Dia = 0.30 m 1 Pengeboran 21.00 Ttk 21.00
Pjg = 3.00 m Beton 3.14 x 0.02 x 3.00 x 1.00 m3 0.21
Galian Tanah 21.00 x 3.00 63.00
Jml = 21.00 Ttk Besi (Tul Pokok) 6.00 x 3.20 x 0.89 x 21.00 Kg 358.04
Tul. Pokok = 6 f 12 Besi (Tul Bagi) 0.94 x 21.00 x 0.22 x 21.00 Kg 91.48
Tul. Bagi = f 6 - 15 JML 0.21 63.00 449.52 - - - 21.00

2 POER PONDASI (P1) Pjg = 0.80 m 2 Beton 0.80 x 0.80 x 0.30 x 28.00 m3 5.38
L = 0.80 m Besi (Tul mmng / atas) 0.85 x 1.12 x 5.00 x 28.00 Kg 133.28
0.05 0.75 0.05 Tebal = 0.30 m Besi (Tul mmng / Bawah) 1.35 x 1.12 x 5.00 x 28.00 Kg 211.68
0.25 0.25 0.30 m Jml = 28.00 Ttk Besi (Tul mltg / atas) 0.85 x 1.12 x 5.00 x 28.00 Kg 133.28
0.75 Tul. Pokok (mmnjg) = f 14 - 18 Besi (Tul mmng / Bawah) 1.35 x 1.12 x 5.00 x 28.00 Kg 211.68
0.80 m Jumlah Tul mmnjg = 5.00 Bekisting 3.20 x 0.30 x 28.00 m2 26.88
Tul. Pokok (mltg) = f 14 - 18 Pasir Urug 0.80 x 0.80 x 0.05 x 28.00 m3 0.90
Jumlah Tul mltg = 5.00 Galian 1.30 x 1.30 x 0.50 x 28.00 m3 23.66 23.66
0.05 0.75 0.05 Tebal Pasir urug = 5.00 cm JML 5.38 23.66 689.92 26.88 - - 24.56
0.25 0.25 0.30 m
0.75 Kedalamn Galian = 0.50 m
0.80 m
PERHITUNGAN VOLUME
PROGRAM : PEMBANGUNAN RUMAH TINGGAL 2
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI, Dra. LILIS LESTARI
LOKASI : JL. KHR. MOCH. ROSYID. BOJONEGORO

PERHITUNGAN SAT VOLUME


Beton Galian Besi Bekisting Plesteran Benangan Titik

3 KOLOM 20/15 (K1) Pjg = 4.00 3 Beton 4.00 x 0.20 x 0.15 x 15.00 m3 1.80
b = 0.20 m Besi (Tul Pokok) 4.55 x 0.62 x 6.00 x 15.00 Kg 252.66
h = 0.15 Besi (Tul bagi) 0.60 x 0.22 x 28.00 x 15.00 Kg 55.44
Jml = 15.00 Ttk Bekisting 0.70 x 4.00 x 15.00 m² 42.00
Tul. Pokok = f 10 Benangan 4.00 x 4.00 x 15.00 m' 240.00
Jumlah Tul Pokok = 6.00 Plesteran 0.70 x 4.00 m² 2.8
Tul. Bagi = f 6 - 15 CAT 0.70 x 4.00 m² 2.8
Jumlah Tul bagi = 28.00 1.80 308.10 42.00 2.80 240.00 2.80
tebal Poer = 0.30 m
Panjang Penyaluran (ke poer) = 0.30 m

4 KOLOM 15/15 (K2) Pjg = 4.50 4 Beton 4.50 x 0.15 x 0.15 x 19.00 m3 1.92
b = 0.15 m Besi (Tul Pokok) 5.05 x 0.62 x 4.00 x 19.00 Kg 236.80
h = 0.15 Besi (Tul bagi) 0.50 x 0.22 x 31.00 x 19.00 Kg 64.79
Jml = 19.00 Ttk Bekisting 0.60 x 4.50 x 19.00 m² 51.30
Tul. Pokok = f 10 Benangan 4.00 x 4.50 x 19.00 m' 342.00
Jumlah Tul Pokok = 4.00 Plesteran 0.60 x 4.50 m² 2.7
Tul. Bagi = f 6 - 15 CAT 0.60 x 4.50 m² 2.7
Jumlah Tul bagi = 31.00 1.92 301.59 51.30 2.70 342.00 2.70
tebal Poer = 0.30 m
Panjang Penyaluran (ke poer) = 0.30 m
5 KOLOM PRAKTIS (K3)
Pjg = 3.50 m 6 Beton 3.50 x 0.15 x 0.15 x 19.00 m3 1.50
b = 0.15 m Besi (Tul Pokok 1) 3.50 x 0.89 x 4.00 x 19.00 Kg 236.21
h = 0.15 m Besi (Tul Pokok 2) 0.15 x 0.62 x 6.00 x 19.00 Kg 10.55
Jml = 19.00 Ttk Besi (Tul bagi) 38.20 x 0.22 x 24.00 x 19.00 Kg 3,832.22
Tul. Pokok (1) = f 12 Bekisting 38.30 x 3.50 x 19.00 m² 2,546.95
Tul. Pokok (2) = f 10 Benangan 4.00 x 3.50 x 19.00 m' 266.00
Jumlah Tul Pokok (1) = 6.00 Plesteran 38.30 x 3.50 m² 134.05
Jumlah Tul Pokok (2) = 2.00 CAT 38.30 x 3.50 m² 134.05
Tul. Bagi = f 8 - 15 1.50 4,078.98 2,546.95 134.05 266.00 134.05
Jumlah Tul bagi = 2.00
tebal Poer = 0.30 m
Panjang Penyaluran (ke poer) = 0.30 m

6 KOLOM PRAKTIS Pjg = 3.50 m Beton 3.50 x 0.15 x 0.15 x 19.00 m3 1.50
b = 0.15 m Besi (Tul Pokok) 3.75 x 0.89 x 4.00 x 19.00 Kg 253.08
h = 0.15 m Besi (Tul bagi) 0.50 x 0.22 x 24.00 x 19.00 Kg 50.16
Jml = 19.00 Ttk Bekisting 0.60 x 0.62 x 19.00 m² 7.03
Tul. Pokok = f 12 Benangan 4.00 x 3.50 x 19.00 m' 266.00
Jumlah Tul Pokok = 4.00 Plesteran 0.60 x 3.50 m² 2.1
Tul. Bagi = f 6 - 15 CAT 0.60 x 3.50 m² 2.1
Jumlah Tul bagi = 24.00 1.50 303.24 7.03 2.10 266.00 2.10
tebal Poer = 0.30 m
Panjang Penyaluran (ke poer) = - m
PERHITUNGAN VOLUME
NAMA KEGIATAN : PEMBANGUNAN RUMAH TINGGAL 3
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI, Dra. LILIS LESTARI
LOKASI : JL. KHR. MOCH. ROSYID. BOJONEGORO

PERHITUNGAN SAT VOLUME


Beton Galian Besi Bekisting Plesteran Benangan Titik

7 BALOK SLOOF 20/30 (S1) L = 1.00 m 7 Beton 1.00 x 0.25 x 0.40 x 52.77 m³ 5.28
(di hitung volume per m') b = 0.25 m Besi (Tul Pokok 1) 1.00 x 1.04 x 5.00 x 52.77 Kg 274.40
h = 0.40 m Besi (Tul Pokok 2) 0.25 x 0.40 x 4.00 x 52.77 Kg 20.84
Tul. Pokok (1) = f 13 Besi (Tul bagi) 1.20 x 0.22 x 8.00 x 52.77 Kg 111.45
Tul. Pokok (2) = f 8 Bekisting 1.05 x 1.00 x 52.77 m² 55.41
Jumlah Tul Pokok (1) = 5.00
Jumlah Tul Pokok (2) = 4.00 -
Tul. Bagi = f 6 - 15 5.28 406.70
Jumlah Tul bagi = 8.00
Panjang Total = 52.77 m

8 BALOK SLOOF 20/30 (S2) L = 1.00 m 8 Beton 1.00 x 0.20 x 0.30 x 21.66 m³ 1.30
(di hitung volume per m') b = 0.20 m Besi (Tul Pokok 1) 1.00 x 0.89 x 4.00 x 21.66 Kg 76.94
h = 0.30 m Besi (Tul Pokok 2) 0.20 x 0.40 x 3.00 x 21.66 Kg 5.13
Tul. Pokok (1) = f 12 Besi (Tul bagi) 0.90 x 0.22 x 8.00 x 21.66 Kg 34.31
Tul. Pokok (2) = f 8 Bekisting 0.80 x 1.00 x 21.66 m² 17.33
Jumlah Tul Pokok (1) = 4.00 -
Jumlah Tul Pokok (2) = 3.00
Tul. Bagi = f 6 - 15 1.30 116.38 17.33
Jumlah Tul bagi = 8.00
Panjang Total = 21.66 m

9 BALOK INDUK 25/40 (B1) L = 1.00 m 9 Beton 1.00 x 0.25 x 0.40 x 30 m³ 3.00
(di hitung volume per m') b = 0.25 m Besi (Tul Pokok 1) 1.00 x 0.89 x 6.00 x 30 Kg 159.84
h = 0.40 m Besi (Tul Pokok 2) 0.25 x 0.62 x 4.00 x 30 Kg 18.51
Tul. Pokok (1) = f 12 Besi (Tul bagi) 1.20 x 0.22 x 8.00 x 30 Kg 63.36
Tul. Pokok (2) = f 10 Bekisting 1.05 x 1.00 x 30 m2 31.50
Jumlah Tul Pokok (1) = 6.00 Plesteran 1.05 x 1.00 m2 1.05
Jumlah Tul Pokok (2) = 4.00 CAT 1.05 x 1.00 m2 1.05
Tul. Bagi = f 6 - 15 3.00 241.71 31.50 1.05 - 1.05
Jumlah Tul bagi = 6.00
Panjang Total = 30 m

10 BALOK 20/30 (B2) L = 1.00 m 10 Beton 1.00 x 0.20 x 0.30 x 3.12 m³ 0.19
(di hitung volume per m') b = 0.20 m Besi (Tul Pokok 1) 1.00 x 0.89 x 5.00 x 3.12 Kg 13.85
h = 0.30 m Besi (Tul Pokok 2) 0.20 x 0.62 x 2.00 x 3.12 Kg 0.77
Tul. Pokok (1) = f 12 Besi (Tul bagi) 0.90 x 0.22 x 8.00 x 3.12 Kg 4.94
Tul. Pokok (2) = f 10 Bekisting 0.80 x 1.00 x 3.12 m² 2.50
Jumlah Tul Pokok (1) = 5.00 Plesteran 0.80 x 1.00 m² 0.8
Jumlah Tul Pokok (2) = 2.00 CAT 0.80 x 1.00 m² 0.8
Tul. Bagi = f 6 - 15 0.19 19.56 2.50 0.8 0.8
Jumlah Tul bagi = 8.00
Panjang Total = 3.12 m

11 RING BALOK 15/20 L = 1.00 m 11 Beton 1.00 x 0.15 x 0.20 x 72.20 m³ 2.17
(di hitung volume per m') b = 0.15 Besi (Tul Pokok) 1.00 x 0.62 x 2.00 x 72.20 Kg 89.09
h = 0.20 m Besi (Tul bagi) 0.60 x 0.22 x 8.00 x 72.20 Kg 76.24
Tul. Pokok = f 10 Bekisting 0.55 x 1.00 x 72.20 m2 39.71
Jumlah Tul Pokok = 2.00 Plesteran 1.30 x 1.00 m² 1.3
Tul. Bagi = f 6 - 15 CAT 1.30 x 1.00 m² 1.3
Jumlah Tul bagi = 8.00 2.17 165.34 39.71 1.3 1.3
Panjang Total = 72.20 m

12 BALOK 15/25 ( B3) L = 1.00 m 12 Beton 1.00 x 0.15 x 25.00 x 8.25 m³ 30.94
(di hitung volume per m') b = 0.15 m Besi (Tul Pokok 1) 1.00 x 0.89 x 5.00 x 8.25 Kg 36.63
h = 25.00 m Besi (Tul Pokok 2) 0.15 x 0.62 x 2.00 x 8.25 Kg 1.53
Tul. Pokok (1) = f 12 Besi (Tul bagi) 50.20 x 0.22 x 8.00 x 8.25 Kg 728.90
Tul. Pokok (2) = f 10 Bekisting 50.15 x 1.00 x 8.25 m² 413.74
Jumlah Tul Pokok (1) = 5.00 Plesteran 50.15 x 1.00 m² 50.15
Jumlah Tul Pokok (2) = 2.00 CAT 50.15 x 1.00 m² 50.15
Tul. Bagi = f 6 - 15 30.94 767.06 413.74 50.15 50.15
Jumlah Tul bagi = 8.00
Panjang Total = 8.25 m

13 BALOK 15/20 ( B4) L = 1.00 m 13 Beton 1.00 x 0.15 x 0.20 x 22.50 m³ 0.68
(di hitung volume per m') b = 0.15 Besi (Tul Pokok) 1.00 x 0.62 x 4.00 x 22.50 Kg 55.53
h = 0.20 m Besi (Tul bagi) 0.60 x 0.22 x 8.00 x 22.50 Kg 23.76
Tul. Pokok = f 10 Bekisting 0.55 x 1.00 x 22.50 m2 12.38
Jumlah Tul Pokok = 4.00 Plesteran 1.30 x 1.00 m² 1.3
Tul. Bagi = f 6 - 15 CAT 1.30 x 1.00 m² 1.3
Jumlah Tul bagi = 8.00 0.68 79.29 12.38 1.3 1.3
Panjang Total = 22.50 m

14 BALOK 12/15 L = 1.00 m 14 Beton 1.00 x 0.12 x 0.15 x 27.50 m³ 0.50


(di hitung volume per m') b = 0.12 Besi (Tul Pokok) 1.00 x 0.40 x 4.00 x 27.50 Kg 43.45
h = 0.15 m Besi (Tul bagi) 0.44 x 0.22 x 8.00 x 27.50 Kg 21.30
Tul. Pokok = f 8 Bekisting 0.42 x 1.00 x 27.50 m2 11.55
Jumlah Tul Pokok = 4.00 Plesteran 1.24 x 1.00 m² 1.24
Tul. Bagi = f 6 - 15 CAT 1.24 x 1.00 m² 1.24
Jumlah Tul bagi = 8.00 0.50 64.75 11.55 1.24 1.24
Panjang Total = 27.50 m
PERHITUNGAN VOLUME
NAMA KEGIATAN : PEMBANGUNAN RUMAH TINGGAL 4
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI, Dra. LILIS LESTARI
LOKASI : JL. KHR. MOCH. ROSYID. BOJONEGORO

PERHITUNGAN SAT VOLUME


Beton Besi Bekisting Plesteran Benangan
15 PLAT, t = 10 cm L = 1.00 m 13 Beton 1.00 x 1.00 x 0.12 x 85.00 m³ 10.20
(di hitung volume per m2) b = 1.00 m Besi (Tul bagi) 1.00 x 0.62 x 5.00 x 85.00 x 2.00 Kg 524.45
h = 0.12 m Bekisting 1.00 x 1.00 + 0.10 x 85.00 m² 93.50
Tul. Arah x dan y = f 10 - 25 Benangan 11.65 x 2.00 m² 23.3
Jumlah Tul = 5.00
Luas Total = 85.00 m²
Panjang Total = 11.65 m² 10.20 524.45 93.50 23.30

16 PLAT KANOPI, t = 8 cm L = 1.00 m 13 Beton 1.00 x 1.00 x 0.08 x 24 m³ 1.95


(di hitung volume per m2) b = 0.80 m Besi (Tul bagi) 0.80 x 0.30 x 8.00 x 24 x 2.00 Kg 94
h = 0.08 m Bekisting 0.80 x 1.00 + 0.10 x 24 m² 22
Tul. Arah x dan y = f 6 - 15 Benangan 24.40 x 2.00 m² 48.8
Jumlah Tul = 8.00
Panjang Total = 24.40 m' 1.95 94 22 48.80

17 LUAS PINTU Luas = 1.96 x 4.00 = 7.82 m²


P1 230 x 85 Panjang Kusen = 5.45 m panjang kusen Kayu 5.45 x 4.00 m' 21.80
Jumlah = 4 Daun Pintu = 1.76 m daun Pintu panil 1.76 x 4.00 m² 7.04
PERHITUNGAN VOLUME
NAMA KEGIATAN : PEMBANGUNAN RUMAH TINGGAL 5
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI, Dra. LILIS LESTARI
LOKASI : JL. KHR. MOCH. ROSYID. BOJONEGORO

PERHITUNGAN SAT VOLUME


Beton Besi Bekisting Plesteran Benangan
18 LUAS PINTU Luas = 1.84 x 2.00 = 3.68 m²
P2 230 x 80 Panjang Kusen = 5.40 m panjang kusen kayu 5.40 x 5.00 m' 27.00
Jumlah = 2 Daun Pintu = 1.69 m Daun pintu panil 1.69 x 5.00 Bh 8.44
19 LUAS PINTU Luas = 2.35 x 1.00 = 2.35 m²
P3 230 x 102 Panjang Kusen = 5.62 m panjang kusen kayu 5.62 x 1.00 m' 5.62
Jumlah = 1 Daun Pintu = 2.18 m daun Pintu panil 2.18 x 4.00 Bh 0.54
20 LUAS JENDELA Luas = 1.15 x 5.00 = 5.74 m²
J1 205 x 56 Panjang Kusen (a) = 1.12 m panjang kusen kayu 11.37 x 5.00 m' 56.85
Jumlah = 5 Panjang Kusen (b) = 10.25 m daun jendela kayu 13.92 x 5.00 m' 69.60
11.37 Daun Kaca mati 8.78 x 5.00 m' 43.90
Daun Jendela = 13.92 m'
Daun Kaca mati = 8.78 m'
21 LUAS JENDELA Luas = 2.68 x 6.00 = 16.07 m²
J2 190 x 141 Panjang Kusen (a) = 2.82 m panjang kusen kayu 14.22 x 6.00 m' 85.32
Jumlah = 6 Panjang Kusen (b) = 11.40 m daun jendela kayu 13.70 x 0.0033 x 6.00 m' 0.27
14.22 Daun Kaca mati 1.40 x 1.00 m' 1.40
Daun Jendela = 14.40 m'
Daun Kaca mati = 1.40 m'
22 LUAS JENDELA Luas = 1.85 x 1.00 = 1.85 m²
J4 226 x 82 Panjang Kusen (a) = 1.64 m panjang kusen kayu 10.68 x 1.00 m' 10.68
Jumlah = 1 Panjang Kusen (b) = 9.04 m daun jendela kayu 12.00 x 1.00 m' 12.00
10.68 Daun Kaca mati 13.20 x 1.00 m' 13.20
Daun Jendela = 12.00 m'
Daun Kaca mati = 13.20 m'
25 LUAS BOUVEN
BV 52 x 62 Luas = 0.32 x 4.00 = 1.29 m²
Jumlah = 4 Panjang Kusen = 1.66 m panjang kusen kayu 1.66 x 4.00 m' 6.64
Daun Pintu = 0.24 m daun Pintu Alm 0.24 x 4.00 Bh 0.96
PERHITUNGAN VOLUME
NAMA KEGIATAN : PEMBANGUNAN RUMAH TINGGAL 6
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI, Dra. LILIS LESTARI
LOKASI : JL. KHR. MOCH. ROSYID. BOJONEGORO

PERHITUNGAN SAT VOLUME


Beton Besi Bekisting Plesteran Benangan
26 LUAS PINTU JENDELA
PJ1 P 245 x 244 Luas = 5.98 x 2.00 = 11.96 m²
Jumlah = 2 Panjang Kusen = 7.34 m panjang kusen kayu 6.35 x 2.00 m' 12.70
Panjang Kusen (a) = 2.58 m panjang kusen kayu 6.35 x - m' -
Panjang Kusen (b) = 3.00 m daun Pintu kayu +kaca 0.54 x 8.00 Bh 4.32
6.35
Daun Jendela = 4.60 m'
Daun Kaca mati = 4.44 m'

22 LUAS JENDELA Luas = 1.79 x 1.00 = 1.79 m²


J3 236 x 76 Panjang Kusen (a) = 1.52 m panjang kusen kayu 10.96 x 1.00 m' 10.96
Jumlah = 1 Panjang Kusen (b) = 9.44 m panjang kusen kayu 12.00 x 1.00 m' 12.00
10.96 Daun Kaca mati 13.20 x 1.00 m' 13.20
Daun Jendela = 12.00 m'
PERHITUNGAN VOLUME

PEKERJAAN : PEMBANGUNAN GEDUNG PENYULUH PERTANIAN KEC. KAPAS

PERHITUNGAN SAT VOLUME


Beton Besi Bekisting Plesteran Benangan
PERHITUNGAN VOLUME

Pekerjaan Pasangan keramik LEBAR PANJANG JUMLAH KOREKSI KRAMIK 40X40 VOLUME SATUAN
Pasangan keramik lantai 40x40 cm Lt.1 dan Lt.2 3 3.5 1 10.5
- Ruang Tamu Lt.1 3 3.5 1 10.5 M2
- Ruang Keluarga Lt.2 5.1 2.43 1 12.393 M2
- Ruang Tidur Lt.1 3 3 1 9 M2
- Ruang Tidur Lt.2 3 3 2 18 M2
- Ruang Santai 2.5 6.5 1 16.25 M2
- Ruang Teras Lt.1 3.4 2 1 6.8 M2
- Balkon Lt.2 3.4 2 1 6.8 M2
TOTAL 72.94 M2

Pekerjaan Pasangan keramik LEBAR PANJANG JUMLAH KOREKSI KRAMIK 30X30 VOLUME SATUAN
- Gudang Lt.1 2.5 4 1 10
- Ruang Kamar mandi/wc Lt.1 1.38 1.88 2 5.1888 M2
0.86 3.19 1 2.7434 M2
TOTAL 17.93 M2

Pekerjaan Pasangan keramik Dinding LEBAR PANJANG JUMLAH KOREKSI KUSEN VOLUME SATUAN
Pasangan keramik dinding km/wc 25x20 cm 1.5 2 2 6.00 M2
Pasangan keramik tangga 30x30 cm 8 1.5 1 12.00 M2
Pasangan Lis keramik dinding km/wc 10x20 cm 2.5 2.5 12 3.80 M1
TOTAL 21.80 M1

Pekerjaan Pasangan Plafon LEBAR PANJANG JUMLAH KOREKSI PLAFON VOLUME SATUAN
Pasangan Plafon Lt. 1 1.00 1.00 1 7.50 1.00 M2
Pasangan Rangka Plafon Lt. 1 1.00 1.00 1 - 1.00 M2
Pasangan Plafon Lt. 2 1.00 1.00 1 - 1.00 M2
Pasangan Rangka Plafon Lt. 2 1.00 1.00 1 - 1.00 M2
TOTAL 4.00 M2

Pekerjaan Pasangan Dinding PANJANG TINGGI JUMLAH KOREKSI KUSEN VOLUME SATUAN

Pasangan Dinding Lt.1 2.00 3.75 5 37.50 M2


2.5 3.45 7 60.375 M2
5 2.00 7 70 M2
TOTAL 167.88 M2
Pasangan Dinding Lt.2 3.5 4.5 2 31.50 M2
4.00 4.5 2 36.00 M2
3.00 4.5 8 12 96.00 M2
TOTAL 163.50 M2
TOTAL Lt1 + Lt2 331.38 M2
Pekerjaan Benangan Kolom 238.84 M1

Pekerjaan Plesteran 2x Pasangan Dinding 662.75 M2

Pekerjaan Pengecatan 2x Pasangan Dinding 662.75 M2

Pekerjaan Pengecatan Plafon 15.00 M2