QT Base Flow
Jam- R1 (m3/det) R2 (m3/det) R3 (m3/det) R4 (m3/det) R5 (m3/det)
(m3/det/mm) (m3/det)
0 - - 0.30
0.3134034 0.08 1.17 - 0.30
0.5 0.05 0.70 2.10 - 0.30
0.7500199 0.03 0.35 1.26 8.09 - 0.30
1 0.02 0.22 0.63 4.84 1.47 - 0.30
1.4049445 0.01 0.11 0.40 2.43 0.88 0.99 0.30
2 0.00 0.05 0.19 1.53 0.44 0.59 0.30
3 0.00 0.01 0.08 0.73 0.28 0.30 0.30
4 0.00 0.00 0.02 0.32 0.13 0.19 0.30
5 0.00 0.00 0.01 0.08 0.06 0.09 0.30
6 0.00 0.00 0.00 0.02 0.01 0.04 0.30
7 0.00 0.00 0.00 0.01 0.00 0.01 0.30
8 0.00 0.00 0.00 0.00 0.00 0.00 0.30
0.00 0.00 0.00 0.00 0.30
0.00 0.00 0.00 0.30
0.00 0.00 0.30
0.00 0.30
11.71
Q (m3/det)
0.30
1.47
3.10
10.00
7.46
5.10
3.10
1.70
0.97
0.53
0.38
0.32
0.30
0.30
0.30
0.30
0.30
Hujan
Debit Banjir (m3/det)
T (Kala-ulang) Rancangan
R24 (mm) Rasional Haspers Weduwen
2 95.44 1.07 36.88 8.51
5 118.95 1.33 42.24 11.02
10 133.47 1.49 45.13 12.59
25 150.91 1.69 48.26 14.49
50 163.37 1.83 50.30 15.86
100 175.45 1.96 52.14 17.20
1000 214.29 2.40 57.25 21.52
Vef 6,598.60
2.1920984531
2.20
Hd = He - V^2 /2g
Hd = 0.197 m
P/Hd = 5.080 aman
Mercu Pelimpah
direncanakan menggunakan mercu bulat
r = 0.3 sampai 0.7Hmaks
diambil jari-jari mercu bulat 0.7 Hmaks
r = 0.561 m
kemiringan hilir mercu direncanakan 1 : 1
0.82 y2
2.7 y2
potongan U
1.8015072896 * V
rumus di mercu pelimpah ini mengacu di rumus KP-02 sehingga rumusnya seperti bendung
Hasil Akhir Z Yz Vz
Fr
0.166 (m) (m) m/dt
0.130 0.500 0.232 4.416 2.930
0.108 1.000 0.186 5.500 4.073
0.094 1.500 0.160 6.374 5.081
0.082 2.000 0.143 7.128 6.009
0.074 2.500 0.131 7.805 6.885
0.066 3.000 0.121 8.424 7.720
0.060 3.500 0.114 8.998 8.523
4.000 0.107 9.537 9.300
ini berdasar DESIGN OF SMALL DAM
Y1 0.107 m
q 1.022 m3/dt/m
Fr 9.300
Y2 1.357 m
Lj 8.626 m
karena Fr > 4.5 maka berdasar Design of Small Dam halaman 391, dignakan USBR type III
L 7.787 m
Elevasi Elevasi
Lereng Mercu Muka Air
1033.500 1033.732 0.463
1033.000 1033.186 0.372
1032.500 1032.660 0.321
1032.000 1032.143 0.287
1031.500 1031.631 0.262
1031.000 1031.121 0.243
1030.500 1030.614 0.227
1030.000 1030.107 0.214
0.000
0.000
0.000
an USBR type III
Penelusuran Banjir Melalui Pelimpah
Data yang diperlukan:
Elevasi mercu pelimpah + 1034 m
Elevasi dasar pelimpah + 1033 m
P = 1m
Lebar pelimpah (L) = 6m
Jumlah pilar = 0
Q50th = 9.998 m3/dt
Q100th = 10.715 m3/dt
Koefisien pilar (Kp) = 0.02
Koefisien abutmen (Ka) = 0.12
Leff
Nilai Cd dicoba-coba
=
=
=
=
L-2(n.Kp + Ka).Hd
6 - 2(0*0.02 + 0.12)*Hd
6 - 0.24*Hd
2.128
1
Q50 = Cd* Leff *Hd^3/2
9.9979757911 = 12.25728 Hd 2.5
0.8156765441 = Hd 2.5
Hd = 0.922 meter
Persamaan Iwasaki
Cd = 2.20 - 0.0416*(Hd/P)^0.99
Cd = 2.162
Cd = 1.60 * (1+2a(h/Hd))/(1+a(h/Hd))
2.162 = 1.60 * (1+2a(h/Hd))/(1+a(h/Hd)) ,karena h = Hd maka:
2.162 = 1.60*(1+2a)/(1+a)
a = 0.541
kemudian nilai a dimasukkan ke dalam persamaan awal
dengan persamaan Cd tersebut, maka didapat nilai Q untuk berbagai nilai H seperti pada tabel berikut
Tabel 1. Hubungan H dan Q diatas pelimpah Embung Situmba Julu (Cd=2.128)
Elevasi H C L Q
2
(m) (m) (m0.5/det) (m) (m3/det)
1034.00 0.00 1.600 6.000 0.000
1034.05 0.05 1.646 5.988 0.110
1034.10 0.10 1.689 5.976 0.319
1034.15 0.15 1.729 5.964 0.599
1034.20 0.20 1.768 5.952 0.941
1034.25 0.25 1.805 5.940 1.340
1034.30 0.30 1.839 5.928 1.792
1034.35 0.35 1.873 5.916 2.294
1034.40 0.40 1.904 5.904 2.844
1034.45 0.45 1.934 5.892 3.440
1034.50 0.50 1.963 5.880 4.081
1034.55 0.55 1.990 5.868 4.764
1034.60 0.60 2.017 5.856 5.489
1034.65 0.65 2.042 5.844 6.253
1034.70 0.70 2.066 5.832 7.056
1034.75 0.75 2.089 5.820 7.897
1034.80 0.80 2.111 5.808 8.774
1034.85 0.85 2.132 5.796 9.686
1034.90 0.90 2.153 5.784 10.632
1034.95 0.95 2.173 5.772 11.612
1035.00 1.00 2.192 5.760 12.624
Tampungan Banjir
Elevasi Tampungan (m3)
1034 7,745.68
1035 14,275.70
Tabel 3. Perhitungan Fungsi Tampungan untuk Penelusura
Melalui Pelimpah Embung Situmba Julu (Cd=2.128)
Elevasi h S
m m m3
1034.00 0.00 -
1034.05 0.05 8072.18
1034.10 0.10 8398.68
1034.15 0.15 8725.18
1034.20 0.20 9051.68
1034.25 0.25 9378.19
1
1034.30 0.30 9704.69
1034.35 0.35 10031.19
1034.40 0.40 10357.69
1034.45 0.45 10684.19
1034.50 0.50 11010.69
1034.55 0.55 11337.19
1034.60 0.60 11663.69
Tabel 2. Perhitungan Koefisien Debit (Cd) 1034.65 0.65 11990.19
Cd trial Hd Cd hitung 1034.70 0.70 12316.69
(m0.5/dt) (m) (m0.5/dt) 1034.75 0.75 12643.19
1034.80 0.80 12969.69
1034.85 0.85 13296.19
1034.90 0.90 13622.69
1034.95 0.95 13949.20
1035.00 1.00 14275.70
,karena h = Hd maka:
tabel berikut
(jam)
(1)
Inflow
(I)
(m3/det)
(2)
(I1+I2)/2
(m3/det)
(3)
0 0.300 0.000
0.313 1.474 0.887
0.5 3.104 2.289
0.750 9.998 6.551
1 7.463 8.731
1.405 5.104 6.284
2 3.104 4.104
3 1.700 2.402
4 0.965 1.332
5 0.534 0.750
6 0.376 0.455
7 0.319 0.347
8 0.305 0.312
gsi Tampungan untuk Penelusuran Banjir
g Situmba Julu (Cd=2.128)
ΔS/Δt Psi Phi
ΔS Q Q/2
Δt = 3600 dt Ψ=ΔS/Δt - Q/2 φ=ΔS/Δt + Q/2
m3 m3/dt m3/dt m3/dt m3/dt m3/dt
- - 0.00 0.00 0.00 0
8072.18 2.24 0.11 0.06 2.19 2.30
8398.68 2.33 0.32 0.16 2.17 2.49
8725.18 2.42 0.60 0.30 2.12 2.72
9051.68 2.51 0.94 0.47 2.04 2.98
9378.19 2.61 1.34 0.67 1.94 3.28
9704.69 2.70 1.79 0.90 1.80 3.59
10031.19 2.79 2.29 1.15 1.64 3.93
10357.69 2.88 2.84 1.42 1.46 4.30
10,684 2.97 3.44 1.72 1.25 4.69
11,011 3.06 4.08 2.04 1.02 5.10
11,337 3.15 4.76 2.38 0.77 5.53
11,664 3.24 5.49 2.74 0.50 5.98
11,990 3.33 6.25 3.13 0.20 6.46
12,317 3.42 7.06 3.53 -0.11 6.95
12,643 3.51 7.90 3.95 -0.44 7.46
12,970 3.60 8.77 4.39 -0.78 7.99
13,296 3.69 9.69 4.84 -1.15 8.54
13,623 3.78 10.63 5.32 -1.53 9.10
13,949 3.87 11.61 5.81 -1.93 9.68
14,276 3.97 12.62 6.31 -2.35 10.28
3
-1.726 4.558 0.785 8.509 1034.785
-0.679 3.425 0.749 7.875 1034.749
-0.428 1.974 0.668 6.544 1034.668
0.091 1.424 0.659 6.402 1034.659
0.146 0.896 0.643 6.152 1034.643
0.243 0.698 0.664 6.484 1034.664
0.115 0.462 0.676 6.663 1034.676
0.045 0.357 0.707 7.171 1034.707
4
nilai ini masih mempunyai selisih dari nilai Hd sebelumnya. Sehingga perh
menggunakan Cd dari nilai Hd = 0.924 meter sebagai berikut:
Cd = 2,20 - 0.0416(Hd/P)^0.99
Cd 2.162
selanjutnya dilakukan perhitungan nilai a sebagai berikut
Cd = 1.60 * (1+2a(h/Hd))/(1+a(h/Hd))
2.162 = 1.60 * (1+2a(h/Hd))/(1+a(h/Hd))
2.162 = 1.60*(1+2a)/(1+a)
a = 0.541
Tabel 5. Hubungan H dan Q diatas pelimpah Embung Situmba Julu (C
Elevasi H C L Q
(m) (m) (m0.5/det) (m) (m3/det)
1034.00 0.00 1.600 6.000 0.000
1034.05 0.05 1.645 5.988 0.110
1034.10 0.10 1.688 5.976 0.319
1034.15 0.15 1.729 5.964 0.599
1034.20 0.20 1.768 5.952 0.941
1034.25 0.25 1.804 5.940 1.340
1034.30 0.30 1.839 5.928 1.791
1034.35 0.35 1.872 5.916 2.293
1034.40 0.40 1.903 5.904 2.843
1034.45 0.45 1.933 5.892 3.439
1034.50 0.50 1.962 5.880 4.079
1034.55 0.55 1.989 5.868 4.762
1034.60 0.60 2.016 5.856 5.486
1034.65 0.65 2.041 5.844 6.250
1034.70 0.70 2.065 5.832 7.053
1034.75 0.75 2.088 5.820 7.893
1034.80 0.80 2.110 5.808 8.769
1034.85 0.85 2.131 5.796 9.681
1034.90 0.90 2.152 5.784 10.627
1034.95 0.95 2.172 5.772 11.606
1035.00 1.00 2.191 5.760 12.618
Tabel 6. Perhitungan Fungsi Tampungan
meter Melalui Pelimpah Embung Situmba Julu
sebelumnya. Sehingga perhitungan diulang kembali
Elevasi
meter sebagai berikut:
m
1034.00
1034.05
1034.10
,karena h = Hd maka: 1034.15
1034.20
1034.25
Embung Situmba Julu (Cd=2.139) 1034.30
1034.35
5
1034.40
1034.45
1034.50
1034.55
1034.60
1034.65
1034.70
1034.75
1034.80
1034.85
1034.90
1034.95
1035.00
Tabel 7. Perhitungan Penelusuran Banjir
T
(jam)
(1)
0
0.313403
0.5
0.75002
1
1.404945
2
3
4
5
6
7
8
(jam)
(1)
0
0.313
0.5
0.750
1
1.405
2
3
4
5
6
7
8
6
Tabel 8. Perhitungan Penelusuran Banjir Melalui Pelimpah Q100 (Cd = 2.139)
Inflow (I1+I2)/2 ψ1 φ2 h Outflow
(I) (Q)
(m3/det) (m3/det) (m3/det) (m3/det) (m) (m3/det)
(2) (3) (4) (5) (6) (7)
0.300 0.000 - - 0.095 0.300
1.561 0.930 2.175 3.105 0.221 1.106
3.312 2.436 1.999 4.435 0.418 3.052
10.715 7.013 1.383 8.396 0.837 9.452
7.993 9.354 -1.055 8.299 0.829 9.289
5.459 6.726 -0.990 5.736 0.573 5.091
3.311 4.385 0.645 5.030 0.492 3.973
1.803 2.557 1.057 3.614 0.303 1.825
1.014 1.409 1.789 3.198 0.237 1.234
0.552 0.783 1.964 2.747 0.155 0.630
0.381 0.467 2.117 2.583 0.120 0.429
0.321 0.351 2.154 2.505 0.103 0.334
0.305 0.313 2.171 2.484 0.098 0.310
8
Q (m3/detk)
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
T (jam)
2
0
Elevasi 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
(m) T (jam)
(8)
1034.095
1034.213
1034.401
1034.802
1034.795
1034.550
1034.472
1034.293
1034.229
1034.152
1034.118
1034.102
1034.098
10
8
1034.802
Q (m3/detk)
Elevasi 2
(m)
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13
T (jam)
2
(8)
0
1034.095 0 1 2 3 4 5 6 7 8 9 10 11 12 13
1034.221
T (jam)
1034.418
1034.837
1034.829
1034.573
1034.492
1034.303
1034.237
1034.155
1034.120
1034.103
1034.098
1034.837
Grafik Penelusuran Banjir QPMF Bendungan Dib
12
10
8
Q (m3/detk)
2
Q(
4
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
T (jam)
ir Q50th Embung Situmba Julu
inflow
Outflow
11 12 13 14 15 16 17 18 19 20 21 22 23 24
T (jam)
11 12 13 14 15 16 17 18 19 20 21 22 23 24
T (jam)
Inflow
Outflo
w
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
T (jam)
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
T (jam)
PMF Bendungan Dibaya
Column
AO
Column
AT
13 14 15 16 17 18 19 20 21 22 23 24
)
PERENCANAAN MERCU PELIMPAH
Kala ulang debit banjir rancangan T
Debit inflow maksimum Qi
Debit outflow maksimum Qo
Lebar ambang pelimpah L
Kedalaman aliran di atas ambang pelimpah Hd
Kedalaman aliran kritis di atas ambang pelimpah Hc
Kemiringan tubuh spillway Z1
Hd = 0.802 m
OGEE 1
X 1,85
= 2 x Hd 0,85
xY 2.000
Maka Y = 0.603 x X1,85 0.850
Y' = 1.116 xX 0,85
1.850
m
m
m
m
Q50
PERHITUNGAN MUKA AIR SALURAN TRANSISI PADA PELIMPAH SAMPING - BENDUNGAN
Keterangan :
1. El. Dasar - (2) 7.(30*(6))+(0.35*(6)^2) 11.(8)/(9.81*(10)) 15. (14)/(8)
2. El. Dasar - (1) 8. Q 12. (9)1 + (9)2 16. (9)*(15)
9. (8)/(7) 13. (9)1 - (9)2 17. (13) + (16)
10. (8)1 + (8)2 14. ((8)1 - (8)2 18.(11)*(12)*(17)
2.4
Q100
PERHITUNGAN MUKA AIR SALURAN TRANSISI PADA PELIMPAH SAMPING - BENDUNGAN
Keterangan :
1. El. Dasar - (2) 7.(30*(6))+(0.35*(6)^2) 11.(8)/(9.81*(10)) 15. (14)/(8)
2. El. Dasar - (1) 8. Q 12. (9)1 + (9)2 16. (9)*(15)
9. (8)/(7) 13. (9)1 - (9)2 17. (13) + (16)
10. (8)1 + (8)2 14. ((8)1 - (8)2 18.(11)*(12)*(17)
2.4
PEREDAM ENERGI DESAIN Q50th
Q = 8.797 m3/dt
d1 = 0.268 (akhir peluncur)
b = 4.000 m
V1 = 8.202 m/dt
A = 0.897 m2
Fr = 5.057 Kolam Olak USBR Type III
q = 2.199 m /dt/m
3
d2 = 1.788 m
L/d2 = 2.400 m
L = 4.292 m Panjang loncatan dari grafik samping
El. Dasar = 1030.000 m
Z Peluncur & peredam = 2.30 m
Y1 = 0.268
F1 = 5.057
Y2 = 1.788
L = 4.292
=
Jarak Blok Muka dan Blok Halang
= 0.82 x Y2
= 1.466 m
b = 4.000 m
m = 0.000
I = 0.0070
n = 0.025
El. Dasar escape = 1030.500 m
El. Dasar peredam = 1030.000 m
H A P R V Q
No El. Muka Air Fr Keterangan
m m2 m m m/dt m3/dt
1 1030.500 0.0 0.000 0.000 0.000 0.000 0.000 0.0000 Sub Kritis
2 1030.700 0.2 0.800 4.400 0.182 1.074 0.859 0.7668 Sub Kritis
3 1030.900 0.4 1.600 4.800 0.333 1.609 2.574 0.8122 Sub Kritis
4 1031.100 0.6 2.400 5.200 0.462 1.999 4.797 0.8238 Sub Kritis
5 1031.300 0.8 3.200 5.600 0.571 2.305 7.375 0.8226 Sub Kritis
6 1031.500 1.0 4.000 6.000 0.667 2.554 10.216 0.8154 Sub Kritis
7 1031.700 1.2 4.800 6.400 0.750 2.763 13.260 0.8052 Sub Kritis
8 1031.900 1.4 5.600 6.800 0.824 2.940 16.466 0.7934 Sub Kritis
9 1032.100 1.6 6.400 7.200 0.889 3.094 19.801 0.7809 Sub Kritis
10 1032.300 1.8 7.200 7.600 0.947 3.228 23.243 0.7682 Sub Kritis
11 1032.500 2.0 8.000 8.000 1.000 3.347 26.773 0.7555 Sub Kritis
12 1032.700 2.2 8.800 8.400 1.048 3.452 30.378 0.7431 Sub Kritis
13 1032.900 2.4 9.600 8.800 1.091 3.547 34.047 0.7309 Sub Kritis
14 1033.100 2.6 10.400 9.200 1.130 3.632 37.769 0.7191 Sub Kritis
15 1033.300 2.8 11.200 9.600 1.167 3.709 41.539 0.7077 Sub Kritis
16 1033.500 3.0 12.000 10.000 1.200 3.779 45.350 0.6966 Sub Kritis
17 1033.700 3.2 12.800 10.400 1.231 3.843 49.197 0.6860 Sub Kritis
18 1033.900 3.4 13.600 10.800 1.259 3.903 53.075 0.6757 Sub Kritis
19 1034.100 3.6 14.400 11.200 1.286 3.957 56.982 0.6659 Sub Kritis
20 1034.300 3.8 15.200 11.600 1.310 4.007 60.913 0.6564 Sub Kritis
21 1034.500 4.0 16.000 12.000 1.333 4.054 64.867 0.6472 Sub Kritis
22 1034.700 4.2 16.800 12.400 1.355 4.098 68.840 0.6384 Sub Kritis
23 1034.900 4.4 17.600 12.800 1.375 4.138 72.832 0.6299 Sub Kritis Rating Curve Tail Water Level
24 1035.100 4.6 18.400 13.200 1.394 4.176 76.840 0.6217 Sub Kritis 30.0
25 1035.300 4.8 19.200 13.600 1.412 4.212 80.863 0.6138 Sub Kritis
28.0
26 1035.500 5.0 20.000 14.000 1.429 4.245 84.900 0.6061 Sub Kritis
26.0
27 1035.700 5.2 20.800 14.400 1.444 4.276 88.949 0.5987 Sub Kritis
28 1035.900 5.4 21.600 14.800 1.459 4.306 93.009 0.5916 Sub Kritis 24.0
29 1036.100 5.6 22.400 15.200 1.474 4.334 97.079 0.5847 Sub Kritis 22.0
30 1036.300 5.8 23.200 15.600 1.487 4.360 101.159 0.5781 Sub Kritis 20.0
31 1036.500 6.0 24.000 16.000 1.500 4.385 105.248 0.5716 Sub Kritis 18.0 Rating Curve Tail Water Level
16.0
Tinggi Muka Air pada Saluran Akhir
14.0
12.0
Tinggi Muka Air pada Bagian Hilir
10.0 Peredam Energi
8.0
6.0
4.0
2.0
0.0
0 200 400 600 800 1000 1200 1400 1600 1800 2000
Debit H A P R V 94.000
Kala Ulang El. Muka Air Fr Keterangan 92.000
m3/dt m m m m m/dt
50 8.797 0.900 1031.400 3.600 5.800 0.619 2.429 0.819 Sub Kritis 90.000
100 9.452 0.946 1031.446 3.785 5.892 0.641 2.487 0.817 Sub Kritis 88.000 Rating Curve Tail Water Level
86.000
Elevasi Muka Air pada Saluran Akhir
84.000
PERHITUNGAN LONCATAN HIDRAULIK
82.000
Elevasi Muka Air pada Bagian Hilir
ΔH 80.000 Peredam Energi
Kala Ulang Debit H El. Muka Air El. Muka Air
m3/dt m (Y2) (Escape Channel) m 78.000
f = 30 o
k = 0.106
g' = 1.466 ton / m3 (berat efektif tanah)
1.52092831
3.293577982
tan 30
0.577
0.155
3.00 #REF!
tan 30
0.577
- 0.061
2.5 #REF!
SOIL PROPERTIES
Ǿ= 28.200
Ka = (1 - sin Ǿ )/(1+ sin Ǿ) = 0.36
Kp = 2.79
DATA TANAH
Kedalaman C ϒ
No Lokasi Ǿ
(m) (kg/cm2) (t/m2) kg/cm2
1 BH-01 5.000 28.200 0.095 0.950 0.0016
2 BH-02 5.000 28.200 0.980 9.800 0.0019
qu qall
Fs
kg/cm2 ton/m2
3.000 13.112 43.707
3.000 27.363 91.209 3.33333333
Jalur Rembesan dan Tekanan Air saat M.A.N.
Panjang Rembesan
Titik Garis (Lx/L)ΔH Hx
Vertikal Horizontal 1/3 . Horiz Lx
A 0.160 4.600
A-B 0.500 0.500
B 0.267 8.600
B-C 1.000 0.333 0.833
C 0.427 8.600
C-D 0.500 1.333
D 0.589 7.600
D-E 1.513 0.504 1.838
E 0.749 7.600
E-F 0.500 2.338
F 0.934
F-G 1.728 0.576 2.914
G 1.094
G-H 0.5 3.414
H
Jumlah 2.000 4.241 1.414 13.169 4.220 37.000
Sumber : KP-06
Kondisi Waduk Kosong dengan Gempa
Pias Keterangan
Px = Hx - (Lx/L)ΔH
G1 1.000 x 0.500
4.440 A G2 1.000 x 0.500
G3 1.900 x 0.580
8.333 B G4 0.226 x 0.101 x 0.500
G5 0.352 x 0.101 x 0.500
8.173 C G6 1.900 x 1.663 x 0.500
G7 1.728 x 0.500
7.011 D
6.851 E Pa 0.500 x Ka x ϒ
0.500 x 0.358 x 1.510
F Pp 0.500 x Kp x ϒ
0.500 x 2.792 x 1.510
Jumlah
Pa 0.500 x Ka x ϒ
0.500 x 0.358 x 1.510
Pp 0.500 x Kp x ϒ
0.500 x 2.792 x 1.510
Jumlah
x H2
x 2.250 0.608 - 0.608
x H 2
x H2
x 2.250 0.608 0.608 -
x H2
x 0.250 0.527 -0.527 -
Jumlah 10.980 0.082
- 0.500 - 0.304
0.500 - 0.304
Pa 0.500 x Ka x ϒ x H2
0.500 x 0.358 x 1.510 x 2.250 0.608
Pp 0.500 x Kp x ϒ x H2
0.500 x 2.792 x 1.510 x 0.250 0.527
W1 3.000 x 1.000 3.000
Pa 0.500 x Ka x ϒ x H2
0.500 x 0.358 x 1.510 x 2.250 0.608
Pp 0.500 x Kp x ϒ x H2
0.500 x 2.792 x 1.510 x 0.250 0.527
W1 3.000 x 1.000 3.000
- -0.608 - 0.500
- 0.527 - 0.167
1.000 3.000 0.167 0.501 5.500 1.500
4.500 1.830
0.300 0.333
-24.888 5.850
dukung tanah
-0.608 - 0.500 -
4.500 1.830
0.300 0.333
-24.888 4.718 27.339
unsafe
unsafe
using other formula
Kondisi Muka Air Banjir dengan Gempa
Momen Tahan ( tm) Momen Guling ( tm) Pias Keterangan
4.302 0.240 G1 1.000 x
0.000 0.000 G2 1.000 x
6.215 0.613 G3 1.900 x
0.136 0.021 G4 0.226 x
0.098 0.017 G5 0.352 x
G6 1.900 x
G7 1.728 x
W1
W2
W3
- 0.304 W4 HATCH AUTOC
W5
0.088 W6
16.500 0.752 W7
Pa 0.500 x
0.500 x
9.345 Pp 0.500 x
13.911 0.500 x
5.389 Pv1 1.417 +
34.396 Pv2 1.661 +
18.975 Pv3 1.276 +
Pv4 1.388 +
8.235 Pv5 1.004 +
Pv6 1.060 +
0.100 Pv7 0.676 x
27.339 92.298 Pw 0.500 x
0.500 x
Jumlah
Jumlah
Kontrol terhadap Stabilitas
V = 11.527
H = 1.705
Mt = 33.454
Mg = 14.399
ΔM = 19.055
B = 1
L = 4.24
A = 4.24
Stabilitas terhadap guling =
Stabilitas terhadap geser =
Stabilitas eksentrisitas pembebanan =
11.527
m
m
m
1.868 > 1.1 ……… safe
1.454 > 1.1 ……… safe
s pembebanan = 0.77 <= (1/6)L ………….using other formula
ya dukung tanah
t/m2 ………….aman
t/m2 ………….aman
t/m2
11.527 1.705
m
m
m
2.323 > 1.100 ……… safe
3.62 > 1.100 ……… safe
s pembebanan = 0.47 <= (1/6)L …………. safe
ya dukung tanah
t/m2 ………….aman
t/m2 ………….aman
t/m2
Gaya Horizontal X (m) Y (m) Momen Tahan ( tm) Momen Guling ( tm)
0.200 3.741 1.250 4.489 0.251
0.200 2.991 1.000 3.589 0.200
0.442 2.452 1.449 6.485 0.640
0.005 2.588 2.431 0.071 0.011
0.007 2.400 2.431 0.102 0.017
0.633 1.610 1.133 6.105 0.717
0.346 0.864 0.750 1.792 0.260
0.346 3.491 2.401 7.237 0.831
0.136 2.621 2.877 2.141 0.393
0.072 1.986 2.507 0.857 0.181
0.041 1.26 1.681 0.306 0.068
0.039 0.472 1.262 0.110 0.049
0.024 0.649 0.926 0.093 0.022
0.053 0.243 0.828 0.078 0.044
- 0.500 - 0.304
- 0.167 - 0.088
4.010 3.086
3.552 1.737
3.168 2.110
2.615 1.576
2.160 1.115
1.552 0.776
1.161 0.196
2.101 3.411
33.454 14.399
Tabel Rekapitulasi Stabilitas Tubuh Embung
Jenis Stabilitas
Kondisi Guling Geser
SF hitung SF minimum Status SF hitung SF minimum
Waduk Kosong dengan Gempa 9.824 1.500 aman 24.770 1.500
Waduk Kosong tanpa Gempa 104.998 1.300 aman 72.228 1.300
Muka Air Banjir tanpa Gempa 1.868 1.100 aman 1.454 1.100
Muka Air Banjir dengan Gempa 2.323 1.100 aman 3.625 1.100
Jenis Stabilitas
Geser Daya Dukung Tanah
Status σmaks σmin σijin Status
aman 28.200 -6.240 91.209 aman
aman 15.621 6.339 91.209 aman
aman 64.878 -41.824 91.209 aman
aman 43.826 -20.771 91.209 aman