MINGGU ke : : 1 (Satu)
Kontrak
No. Uraian Pekerjaan
Harga
Vol. Sat.
Satuan
1 2 3 4 5
I PEKERJAAN PENDAHULUAN
I.1 MOBILISASI DAN DEMOBILISASI 1.00 LS 760,000.00
I.2 PEK. PEMBERSIHAN 294.40 LS 6,261.75
JUMLAH
PPN 10 %
GRAND TOTAL
DIBULATKAN
Diperiksa Oleh :
Konsultan Pengawas
CV. FLYCONS 760,000.00
6,261.75
WAHYUNI, ST
Inspector
PROGRES KEMAJUAN FISIK MINGGUAN
Periode : Monday, July 31, 2017 S/D
,-
760,000.00 0.43 - - - - - - -
1,843,459.20 1.05 - - - - - - -
-
7,629,443.14 4.33 - - - - - - -
163,200,180.00 92.58 - - - - - - -
2,840,730.00 1.61 - - - - - - -
176,273,812.34 100.00 - -
17,627,381.23
193,901,193.57
193,900,000.00
Mamuju,
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
Realisasi
REALISASI
Bobot
s/d Minggu Ini Per item
Harga (Rp) Bobot (%)
15 16 17
- - 0%
- - 0%
-
- - 0%
- - 0%
- - 0%
- -
-
-
-
SANDHY, ST
aksana Lapangan
LAPORAN PROGR
MINGGU ke : : 2 (Dua)
Kontrak
No. Uraian Pekerjaan
Vol. Sat.
1 2 3 4
I PEKERJAAN PENDAHULUAN
I.1 MOBILISASI DAN DEMOBILISASI 1.00 LS
I.2 PEK. PEMBERSIHAN 294.40 LS
JUMLAH
PPN 10 %
GRAND TOTAL
DIBULATKAN
Diperiksa Oleh :
Konsultan Pengawas
CV. FLYCONS
WAHYUNI, ST
Inspector
LAPORAN PROGRES KEMAJUAN FISIK MINGGUAN
(Dua) Periode : Monday, August 07, 2017
ekerjaan Umum dan Penataan Ruang Prov. Sulawesi Barat Bidang PSDA
si Barat/Kab.MAMUJU
AN PENGUATAN TEBING SUNGAI KATAPI KAB.MAMUJU
muju
891 /PSDA/ APBD/ DPU-PR/ VII/ 2017
2017
3.900.000,00 ,-
RYA ZULINDO
CONS
-
45,321.50 7,629,443.14 4.33 - - - - -
570,630.00 163,200,180.00 92.58 - - - - -
10,292.50 2,840,730.00 1.61 - - - - -
176,273,812.34 100.00 -
17,627,381.23
193,901,193.57
193,900,000.00
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
MUH.AKBAR APANDI
Site Menager
S/D Sunday, August 13, 2017
Realisasi
, HARGA & BOBOT REALISASI
Bobot
INGGU INI s/d Minggu Ini Per item
Bobot Vol Harga (Rp) Bobot (%)
13 14 15 16 17
- -
- - - - 0%
- - - - 0%
- - - - 0%
Kontrak
No. Uraian Pekerjaan
Vol. Sat.
1 2 3 4
I PEKERJAAN PENDAHULUAN
I.1 MOBILISASI DAN DEMOBILISASI 1.00 LS
I.2 PEK. PEMBERSIHAN 294.40 LS
JUMLAH
PPN 10 %
GRAND TOTAL
DIBULATKAN
Diperiksa Oleh :
Konsultan Pengawas
CV. FLYCONS
WAHYUNI, ST
Inspector
LAPORAN PROGRES KEMAJUAN FISIK MINGGUAN
(Tiga) Periode : Monday, August 14, 2017
ekerjaan Umum dan Penataan Ruang Prov. Sulawesi Barat Bidang PSDA
si Barat/Kab.MAMUJU
AN PENGUATAN TEBING SUNGAI KATAPI KAB.MAMUJU
muju
891 /PSDA/ APBD/ DPU-PR/ VII/ 2017
2017
3.900.000,00 ,-
RYA ZULINDO
CONS
-
45,321.50 7,629,443.14 4.33 - - - - -
570,630.00 163,200,180.00 92.58 - - - - -
10,292.50 2,840,730.00 1.61 - - - - -
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
MUH.AKBAR APANDI
Site Menager
S/D Sunday, August 20, 2017
Realisasi
HARGA & BOBOT REALISASI
Bobot
NGGU INI s/d Minggu Ini Per item
Bobot Vol Harga (Rp) Bobot (%)
13 14 15 16 17
- -
- - - - 0%
- - - - 0%
- - - - 0%
Kontrak
No. Uraian Pekerjaan
Vol. Sat.
1 2 3 4
I PEKERJAAN PENDAHULUAN
I.1 MOBILISASI DAN DEMOBILISASI 1.00 LS
I.2 PEK. PEMBERSIHAN 294.40 LS
JUMLAH
PPN 10 %
GRAND TOTAL
DIBULATKAN
Diperiksa Oleh :
Konsultan Pengawas
CV. FLYCONS
WAHYUNI, ST
Inspector
LAPORAN PROGRES KEMAJUAN FISIK MINGGUAN
(Empat) Periode : Monday, August 21, 2017
ekerjaan Umum dan Penataan Ruang Prov. Sulawesi Barat Bidang PSDA
si Barat/Kab.MAMUJU
AN PENGUATAN TEBING SUNGAI KATAPI KAB.MAMUJU
muju
891 /PSDA/ APBD/ DPU-PR/ VII/ 2017
2017
3.900.000,00 ,-
RYA ZULINDO
CONS
-
45,321.50 7,629,443.14 4.33 - - - 31.98
570,630.00 163,200,180.00 92.58 - - - 51.48
10,292.50 2,840,730.00 1.61 - - - 49.68
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
MUH.AKBAR APANDI
Site Menager
day, August 21, 2017 S/D Sunday, August 27, 2017
Realisasi
AH VOLUME, HARGA & BOBOT REALISASI
Bobot
MINGGU INI s/d Minggu Ini Per item
Harga (Rp) Bobot Vol Harga (Rp) Bobot (%)
12 13 14 15 16 17
- -
1,449,594.20 0.82 31.98 1,449,594.20 0.82 19%
29,376,032.40 16.67 51.48 29,376,032.40 16.67 18%
511,331.40 0.29 49.68 511,331.40 0.29 18%
Kontrak
No. Uraian Pekerjaan
Vol. Sat.
1 2 3 4
I PEKERJAAN PENDAHULUAN
I.1 MOBILISASI DAN DEMOBILISASI 1.00 LS
I.2 PEK. PEMBERSIHAN 294.40 LS
JUMLAH
PPN 10 %
GRAND TOTAL
DIBULATKAN
Diperiksa Oleh :
Konsultan Pengawas
CV. FLYCONS
WAHYUNI, ST
Inspector
LAPORAN PROGRES KEMAJUAN FISIK MINGGUAN
(Lima) Periode : Monday, August 28, 2017
ekerjaan Umum dan Penataan Ruang Prov. Sulawesi Barat Bidang PSDA
si Barat/Kab.MAMUJU
AN PENGUATAN TEBING SUNGAI KATAPI KAB.MAMUJU
muju
891 /PSDA/ APBD/ DPU-PR/ VII/ 2017
2017
3.900.000,00 ,-
RYA ZULINDO
CONS
-
45,321.50 7,629,443.14 4.33 31.98 1,449,594.20 0.82 43.77 1,983,655.22
570,630.00 163,200,180.00 92.58 51.48 29,376,032.40 16.67 62.92 35,904,039.60
10,292.50 2,840,730.00 1.61 49.68 511,331.40 0.29 60.72 624,960.60
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
MUH.AKBAR APANDI
Site Menager
S/D Sunday, September 03, 2017
Realisasi
ARGA & BOBOT REALISASI
Bobot
GGU INI s/d Minggu Ini Per item
Bobot Vol Harga (Rp) Bobot (%)
13 14 15 16 17
- -
1.13 75.75 3,433,249.41 1.95 45%
20.37 114.40 65,280,072.00 37.03 40%
0.35 110.40 1,136,292.00 0.64 40%
Mamuju, ###
uat Oleh :
tor Pelaksana
RYA ZULINDO
SANDHY, ST
Pelaksana Lapangan
LAPORAN PROGR
MINGGU ke : : 6 (Enam)
Kontrak
No. Uraian Pekerjaan
Vol. Sat.
1 2 3 4
I PEKERJAAN PENDAHULUAN
I.1 MOBILISASI DAN DEMOBILISASI 1.00 LS
I.2 PEK. PEMBERSIHAN 294.40 LS
JUMLAH
PPN 10 %
GRAND TOTAL
DIBULATKAN
Diperiksa Oleh :
Konsultan Pengawas
CV. FLYCONS
WAHYUNI, ST
Inspector
LAPORAN PROGRES KEMAJUAN FISIK MINGGUAN
(Enam) Periode : Monday, September 04, 2017
ekerjaan Umum dan Penataan Ruang Prov. Sulawesi Barat Bidang PSDA
si Barat/Kab.MAMUJU
AN PENGUATAN TEBING SUNGAI KATAPI KAB.MAMUJU
muju
891 /PSDA/ APBD/ DPU-PR/ VII/ 2017
2017
3.900.000,00 ,-
RYA ZULINDO
CONS
-
45,321.50 7,629,443.14 4.33 75.75 3,433,249.41 1.95 16.83
570,630.00 163,200,180.00 92.58 114.40 65,280,072.00 37.03 28.60
10,292.50 2,840,730.00 1.61 110.40 1,136,292.00 0.64 27.60
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
MUH.AKBAR APANDI
Site Menager
ay, September 04, 2017 S/D Sunday, September 10, 2017
Realisasi
AH VOLUME, HARGA & BOBOT REALISASI
Bobot
MINGGU INI s/d Minggu Ini Per item
Harga (Rp) Bobot Vol Harga (Rp) Bobot (%)
12 13 14 15 16 17
- -
762,944.31 0.43 92.59 4,196,193.73 2.38 55%
16,320,018.00 9.26 143.00 81,600,090.00 46.29 50%
284,073.00 0.16 138.00 1,420,365.00 0.81 50%
Mamuju, ###
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
AR APANDI SANDHY, ST
Menager Pelaksana Lapangan
LAPORAN PROG
MINGGU ke : : 7 (Tujuh)
Kontrak
No. Uraian Pekerjaan
Vol. Sat.
1 2 3 4
I PEKERJAAN PENDAHULUAN
I.1 MOBILISASI DAN DEMOBILISASI 1.00 LS
I.2 PEK. PEMBERSIHAN 294.40 LS
JUMLAH
PPN 10 %
GRAND TOTAL
DIBULATKAN
Diperiksa Oleh :
Konsultan Pengawas
CV. FLYCONS
WAHYUNI, ST
Inspector
LAPORAN PROGRES KEMAJUAN FISIK MINGGUAN
(Tujuh) Periode : Monday, September 11, 2017
ekerjaan Umum dan Penataan Ruang Prov. Sulawesi Barat Bidang PSDA
si Barat/Kab.MAMUJU
AN PENGUATAN TEBING SUNGAI KATAPI KAB.MAMUJU
muju
891 /PSDA/ APBD/ DPU-PR/ VII/ 2017
2017
3.900.000,00 ,-
RYA ZULINDO
CONS
-
45,321.50 7,629,443.14 4.33 92.59 4,196,193.73 2.38 16.83
570,630.00 163,200,180.00 92.58 143.00 81,600,090.00 46.29 28.60
10,292.50 2,840,730.00 1.61 138.00 1,420,365.00 0.81 27.60
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
MUH.AKBAR APANDI
Site Menager
ay, September 11, 2017 S/D Sunday, September 17, 2017
Realisasi
AH VOLUME, HARGA & BOBOT REALISASI
Bobot
MINGGU INI s/d Minggu Ini Per item
Harga (Rp) Bobot Vol Harga (Rp) Bobot (%)
12 13 14 15 16 17
- -
762,944.31 0.43 109.42 4,959,138.04 2.81 65%
16,320,018.00 9.26 171.60 97,920,108.00 55.55 60%
284,073.00 0.16 165.60 1,704,438.00 0.97 60%
Mamuju, ###
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
R APANDI SANDHY, ST
enager Pelaksana Lapangan
LAPORAN PROGR
MINGGU ke : : 8 (Delapan)
Kontrak
No. Uraian Pekerjaan
Vol. Sat.
1 2 3 4
I PEKERJAAN PENDAHULUAN
I.1 MOBILISASI DAN DEMOBILISASI 1.00 LS
I.2 PEK. PEMBERSIHAN 294.40 LS
JUMLAH
PPN 10 %
GRAND TOTAL
DIBULATKAN
Diperiksa Oleh :
Konsultan Pengawas
CV. FLYCONS
WAHYUNI, ST
Inspector
LAPORAN PROGRES KEMAJUAN FISIK MINGGUAN
(Delapan) Periode : Monday, September 18, 2017
ekerjaan Umum dan Penataan Ruang Prov. Sulawesi Barat Bidang PSDA
si Barat/Kab.MAMUJU
AN PENGUATAN TEBING SUNGAI KATAPI KAB.MAMUJU
muju
891 /PSDA/ APBD/ DPU-PR/ VII/ 2017
2017
3.900.000,00 ,-
RYA ZULINDO
CONS
-
45,321.50 7,629,443.14 4.33 109.42 4,959,138.04 2.81 16.83 762,944.31
570,630.00 163,200,180.00 92.58 171.60 97,920,108.00 55.55 28.60 16,320,018.00
10,292.50 2,840,730.00 1.61 165.60 1,704,438.00 0.97 27.60 284,073.00
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
MUH.AKBAR APANDI
Site Menager
S/D Sunday, September 24, 2017
Realisasi
HARGA & BOBOT REALISASI
Bobot
NGGU INI s/d Minggu Ini Per item
Bobot Vol Harga (Rp) Bobot (%)
13 14 15 16 17
- -
0.43 126.26 5,722,082.36 3.25 75%
9.26 200.20 114,240,126.00 64.81 70%
0.16 193.20 1,988,511.00 1.13 70%
Mamuju, ###
ibuat Oleh :
ktor Pelaksana
ARYA ZULINDO
SANDHY, ST
Pelaksana Lapangan
LAPORAN PROG
MINGGU ke : : 9 (Sembilan)
Kontrak
No. Uraian Pekerjaan
Vol. Sat.
1 2 3 4
I PEKERJAAN PENDAHULUAN
I.1 MOBILISASI DAN DEMOBILISASI 1.00 LS
I.2 PEK. PEMBERSIHAN 294.40 LS
JUMLAH
PPN 10 %
GRAND TOTAL
DIBULATKAN
Diperiksa Oleh :
Konsultan Pengawas
CV. FLYCONS
WAHYUNI, ST
Inspector
LAPORAN PROGRES KEMAJUAN FISIK MINGGUAN
(Sembilan) Periode : Monday, September 25, 2017
ekerjaan Umum dan Penataan Ruang Prov. Sulawesi Barat Bidang PSDA
si Barat/Kab.MAMUJU
AN PENGUATAN TEBING SUNGAI KATAPI KAB.MAMUJU
muju
891 /PSDA/ APBD/ DPU-PR/ VII/ 2017
2017
3.900.000,00 ,-
RYA ZULINDO
CONS
-
45,321.50 7,629,443.14 4.33 126.26 5,722,082.36 3.25 8.42
570,630.00 163,200,180.00 92.58 200.20 114,240,126.00 64.81 28.60
10,292.50 2,840,730.00 1.61 193.20 1,988,511.00 1.13 27.60
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
MUH.AKBAR APANDI
Site Menager
ay, September 25, 2017 S/D Sunday, October 01, 2017
Realisasi
AH VOLUME, HARGA & BOBOT REALISASI
Bobot
MINGGU INI s/d Minggu Ini Per item
Harga (Rp) Bobot Vol Harga (Rp) Bobot (%)
12 13 14 15 16 17
- -
381,472.16 0.22 134.67 6,103,554.51 3.46 80%
16,320,018.00 9.26 228.80 130,560,144.00 74.07 80%
284,073.00 0.16 220.80 2,272,584.00 1.29 80%
Mamuju, ###
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
AR APANDI SANDHY, ST
Menager Pelaksana Lapangan
LAPORAN PROGR
MINGGU ke : : 10 (Sepuluh)
Kontrak
No. Uraian Pekerjaan
Vol. Sat.
1 2 3 4
I PEKERJAAN PENDAHULUAN
I.1 MOBILISASI DAN DEMOBILISASI 1.00 LS
I.2 PEK. PEMBERSIHAN 294.40 LS
JUMLAH
PPN 10 %
GRAND TOTAL
DIBULATKAN
Diperiksa Oleh :
Konsultan Pengawas
CV. FLYCONS
WAHYUNI, ST
Inspector
LAPORAN PROGRES KEMAJUAN FISIK MINGGUAN
(Sepuluh) Periode : Monday, October 02, 2017
ekerjaan Umum dan Penataan Ruang Prov. Sulawesi Barat Bidang PSDA
si Barat/Kab.MAMUJU
AN PENGUATAN TEBING SUNGAI KATAPI KAB.MAMUJU
muju
891 /PSDA/ APBD/ DPU-PR/ VII/ 2017
2017
3.900.000,00 ,-
RYA ZULINDO
CONS
- -
45,321.50 7,629,443.14 4.33 134.67 6,103,554.51 3.46 25.25
570,630.00 163,200,180.00 92.58 228.80 130,560,144.00 74.07 22.88
10,292.50 2,840,730.00 1.61 220.80 2,272,584.00 1.29 27.60
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
MUH.AKBAR APANDI
Site Menager
day, October 02, 2017 S/D Sunday, October 08, 2017
Realisasi
AH VOLUME, HARGA & BOBOT REALISASI
Bobot
MINGGU INI s/d Minggu Ini Per item
Harga (Rp) Bobot Vol Harga (Rp) Bobot (%)
12 13 14 15 16 17
- -
1,144,416.47 0.65 159.92 7,247,970.98 4.11 95%
13,056,014.40 7.41 251.68 143,616,158.40 81.47 88%
284,073.00 0.16 248.40 2,556,657.00 1.45 90%
Mamuju, ###
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
AR APANDI SANDHY, ST
enager Pelaksana Lapangan
LAPORAN PROGR
MINGGU ke : : 11 (Sebelas)
Kontrak
No. Uraian Pekerjaan
Vol. Sat.
1 2 3 4
I PEKERJAAN PENDAHULUAN
I.1 MOBILISASI DAN DEMOBILISASI 1.00 LS
I.2 PEK. PEMBERSIHAN 294.40 LS
JUMLAH
PPN 10 %
GRAND TOTAL
DIBULATKAN
Diperiksa Oleh :
Konsultan Pengawas
CV. FLYCONS
WAHYUNI, ST
Inspector
LAPORAN PROGRES KEMAJUAN FISIK MINGGUAN
(Sebelas) Periode : Monday, October 09, 2017
ekerjaan Umum dan Penataan Ruang Prov. Sulawesi Barat Bidang PSDA
si Barat/Kab.MAMUJU
AN PENGUATAN TEBING SUNGAI KATAPI KAB.MAMUJU
muju
891 /PSDA/ APBD/ DPU-PR/ VII/ 2017
2017
3.900.000,00 ,-
RYA ZULINDO
CONS
-
45,321.50 7,629,443.14 4.33 159.92 7,247,970.98 4.11 8.42
570,630.00 163,200,180.00 92.58 251.68 143,616,158.40 81.47 28.60
10,292.50 2,840,730.00 1.61 248.40 2,556,657.00 1.45 27.60
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
MUH.AKBAR APANDI
Site Menager
day, October 09, 2017 S/D Sunday, October 15, 2017
Realisasi
AH VOLUME, HARGA & BOBOT REALISASI
Bobot
MINGGU INI s/d Minggu Ini Per item
Harga (Rp) Bobot Vol Harga (Rp) Bobot (%)
12 13 14 15 16 17
- -
381,472.16 0.22 168.34 7,629,443.14 4.33 100%
16,320,018.00 9.26 280.28 159,936,176.40 90.73 98%
284,073.00 0.16 276.00 2,840,730.00 1.61 100%
Mamuju, ###
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
AR APANDI SANDHY, ST
Menager Pelaksana Lapangan
LAPORAN PROGR
MINGGU ke : : 12 (Duabelas)
Kontrak
No. Uraian Pekerjaan
Vol. Sat.
1 2 3 4
I PEKERJAAN PENDAHULUAN
I.1 MOBILISASI DAN DEMOBILISASI 1.00 LS
I.2 PEK. PEMBERSIHAN 294.40 LS
JUMLAH
PPN 10 %
GRAND TOTAL
DIBULATKAN
Diperiksa Oleh :
Konsultan Pengawas
CV. FLYCONS
WAHYUNI, ST
Inspector
LAPORAN PROGRES KEMAJUAN FISIK MINGGUAN
(Duabelas) Periode : Monday, October 16, 2017
ekerjaan Umum dan Penataan Ruang Prov. Sulawesi Barat Bidang PSDA
si Barat/Kab.MAMUJU
AN PENGUATAN TEBING SUNGAI KATAPI KAB.MAMUJU
muju
891 /PSDA/ APBD/ DPU-PR/ VII/ 2017
2017
3.900.000,00 ,-
RYA ZULINDO
CONS
-
45,321.50 7,629,443.14 4.33 168.34 7,629,443.14 4.33 -
570,630.00 163,200,180.00 92.58 280.28 159,936,176.40 90.73 5.72
10,292.50 2,840,730.00 1.61 276.00 2,840,730.00 1.61 -
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
MUH.AKBAR APANDI
Site Menager
day, October 16, 2017 S/D Friday, October 20, 2017
Realisasi
AH VOLUME, HARGA & BOBOT REALISASI
Bobot
MINGGU INI s/d Minggu Ini Per item
Harga (Rp) Bobot Vol Harga (Rp) Bobot (%)
12 13 14 15 16 17
- -
- - 168.34 7,629,443.14 4.33 100%
3,264,003.60 1.85 286.00 163,200,180.00 92.58 100%
- - 276.00 2,840,730.00 1.61 100%
Mamuju, ###
Dibuat Oleh :
Kontraktor Pelaksana
CV. KARYA ZULINDO
AR APANDI SANDHY, ST
enager Pelaksana Lapangan