Pengendalian Metode Eva
Pengendalian Metode Eva
Bobot Realisasi
SPI
CPI
ETC
EAC
ETS(Minggu)
EAS(Minggu)
JULI
Durasi Pekerjaan
M1 M2 M3 M4 M1
Ra 4 0.02 0.02 0.02 0.02
Ri 5
Ra 2
Ri 5
Ra 12
Ri 13
Ra 3
Ri 3
Ra 6
Ri 3
Ra 3
Ri 2
Ra 1
Ri 2
Ra 3
Ri 2
Ra 4
Ri 2
Ra 1
Ri 1
Ra 1
Ri 2
Ra 5
Ri 2
Ra 3
Ri 1
Ra 3
Ri 2
M2 M3 M4 M1 M2 M3 M4
0.02
0.02 0.02
0.04
0.018 0.018 0.022 0.022 0.022 0.022 0.022
M1 M2 M3 M4 M1 M2
0.02 0.02
0.022 0.022 0.022 0.038 0.060 0.060
M3 M4 M1 M2 M3 M4
0.02
0.017
0.02
M1 M2 M3 M4 M1 M2
0.017 0.01
0.023 0.03
0.01 0.01
0.03 0.03
0.02
0.04 0.04
0.01
0.01
0.01
0.01
0.02
0.04 0.05
0.06
M3 M4
0.01
0.02 0.02
0.0221 0.0165
98.35% 100%
926,843,089.72 942,349,016.76
942,570,467.44 958,339,510.83
958,339,510.83 958,339,510.83
-15769043.39 0.00
lambat Tepat
15727377.72 15990494.07
Hemat Hemat
0.9835454521 1
lambat Tepat
1.0169687598 1.0169687598
Hemat Hemat
15,505,927.04 -
942,608,428.28 942,349,016.76
1.02 0.00
33.02 32.00
RENCANA ANGGARAN BIAYA
Volume Volume BOBOT (%) BOBOT (%) BOBOT Aktual BOBOT BOBOT
NO URAIAN PEKERJAAN HARGA SATUAN Satuan HARGA RENCANA HARGA AKTUAL AC EV PV SV CV
Rencana Aktual RENCANA AKTUAL Aktual(%) perencanaan (%)
Minggu lalu Minggu ini
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter 65.75 67.00 704,145.00 m1 46,297,533.75 47,177,715.00 4.831% 5.006% 5.006%
2 Pengukuran dan pemasangan bouwplank 42.50 41.00 500,000.00 Ls 21,250,000.00 20,500,000.00 2.217% 2.175% 2.175%
3 Pembuatan gudang semen dan alat-alat 4.00 4.00 1,868,460.00 m2 7,473,840.00 7,473,840.00 0.780% 0.793% 0.793% 8.347% 8.195% 78,653,680.00 79,988,335.40 78,536,311.25 1,452,024.15 1,334,655.40
4 Membersihkan lapangan dan perataan 269.75 268.50 10,250.00 m2 2,764,937.50 2,752,125.00 0.289% 0.292% 0.292%
5 Pasang papan nama kegiatan 1.00 1.00 750,000.00 Ls 750,000.00 750,000.00 0.078% 0.080% 0.080%
II. PEKERJAAN TANAH -
1 Galian tanah biasa sedalam 1 m 103.21 100.00 47,125.00 m3 4,863,959.75 4,712,500.00 0.508% 0.500% 0.500%
2 Urugan kembali 36.12 35.00 19,275.00 m3 696,307.45 674,625.00 0.073% 0.072% 0.072% 0.956% 0.961% 9,005,675.000 9,158,490.14 9,207,289.47 (48,799.34) 152,815.14
3 Urugan pasir 19.15 19.00 190,450.00 m3 3,647,022.28 3,618,550.00 0.381% 0.384% 0.384%
III. PEKERJAAN PONDASI - -
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 41.00 710,595.00 m3 29,280,777.57 29,134,395.00 3.055% 3.092% 3.092%
3.636% 3.590% 34,267,140.000 34,848,610.87 34,408,047.64 440,563.22 581,470.87
2 Pasang pondasi batu kosong 14.98 15.00 342,183.00 m3 5,127,270.07 5,132,745.00 0.535% 0.545% 0.545%
IV. PEKERJAAN BETON - -
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w 1.34 1.50 849,572.26 m3 1,139,446.32 1,274,358.39 0.119% 0.135% 0.135%
2 Plat lantai beton bertulang t = 12 cm 13.32 12.00 5,078,546.00 m3 67,646,232.72 60,942,552.00 7.059% 6.467% 6.467%
3 Plat teras t = 10 cm 0.70 0.70 5,078,546.00 m3 3,554,982.20 3,554,982.20 0.371% 0.377% 0.377%
4 Plat carport t = 15 cm 8.04 8.00 5,078,546.00 m3 40,831,509.84 40,628,368.00 4.261% 4.311% 4.311%
5 Pondasi telapak beton bertulang 3.54 3.50 5,078,546.00 m3 17,978,052.84 17,774,911.00 1.876% 1.886% 1.886% 22.041% 26.663% 207,700,099.90 211,224,512.99 255,526,354.73 (44,301,841.74) 3,524,413.10
6 Sloof beton bertulang 4.73 4.20 5,078,546.00 m3 24,030,410.04 21,329,893.20 2.508% 2.263% 2.263%
7 Kolom beton bertulang 13.35 13.00 5,078,546.00 m3 67,787,162.37 66,021,098.00 7.073% 7.006% 4.800% 1.800%
8 Balok beton bertulang 5.69 5.40 5,078,546.00 m3 28,871,534.01 27,424,148.40 3.013% 2.910%
9 Plat beton tangga t = 12 cm 0.73 0.80 5,078,546.00 m3 3,687,024.40 4,062,836.80 0.385% 0.431%
V. PEKERJAAN DINDING - -
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 59.44 59.00 114,864.00 m2 6,827,516.16 6,776,976.00 0.712% 0.719%
4.79% - - 45,857,949.08 (45,857,949.08) -
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 367.77 365.00 106,127.00 m2 39,030,432.92 38,736,355.00 4.073% 4.111%
VI. PEKERJAAN LANTAI DAN DINDING - -
1 Pasang lantai granit 60 x 60 cm 168.00 168.00 429,799.00 m2 72,206,232.00 72,206,232.00 7.535% 7.662%
2 Pasang lantai kayu 15.75 15.75 1,500,000.00 m2 23,625,000.00 23,625,000.00 2.465% 2.507%
3 Pasang lantai keramik KM 25 x 25 cm 16.00 16.00 158,800.00 m2 2,540,800.00 2,540,800.00 0.265% 0.270% 10.9% - - 104,476,631.75 (104,476,631.75) -
4 Pasang dinding keramik ukuran 20 x 25 cm 64.00 64.00 167,966.00 m2 10,749,824.00 10,749,824.00 1.122% 1.141%
5 Pasang dinding batu Palimanan 67.46 67.46 240,885.00 m2 16,250,102.10 16,250,102.10 1.696% 1.724%
VII. PEKERJAAN SANITASI - -
1 Pasang kloset duduk porselin kw. A 4.00 4.00 1,880,267.44 bh 7,521,069.76 7,521,069.76 0.785% 0.798%
2 Pasang wastafel kw. A 1.00 1.00 699,782.00 bh 699,782.00 699,782.00 0.073% 0.074%
3 Pasang tempat sabun keramik 4.00 4.00 41,005.00 bh 164,020.00 164,020.00 0.017% 0.017%
4 Pasang badkip porselen 1.00 1.00 1,033,775.00 bh 1,033,775.00 1,033,775.00 0.108% 0.110%
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 50.00 20,294.00 m1 1,014,700.00 1,014,700.00 0.106% 0.108%
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 35.00 31,448.00 m1 1,100,680.00 1,100,680.00 0.115% 0.117%
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 35.00 107,012.75 m1 3,745,446.25 3,745,446.25 0.391% 0.397%
8 Memasang bak cuci piring stainles steel 1.00 1.00 342,167.50 bh 342,167.50 342,167.50 0.036% 0.036%
9 Memasang kran Ø 1/2" 7.00 7.00 69,742.50 bh 488,197.50 488,197.50 0.051% 0.052% 3.3% - - 31,495,953.26 (31,495,953.26) -
10 Memasang Shower TOTO 4.00 4.00 2,750,000.00 Unit 11,000,000.00 11,000,000.00 1.148% 1.167%
11 Memasang Afor Stainless Steel 4.00 4.00 59,305.00 bh 237,220.00 237,220.00 0.025% 0.025%
12 Pasang Kaca Wastafel 0.50 0.50 202,583.75 m2 101,291.88 101,291.88 0.011% 0.011%
13 Memasang water heater WASSER WH506A 2.00 2.00 1,657,500.00 Unit 3,315,000.00 3,315,000.00 0.346% 0.352%
14 Pekerjaan sumur bor 1.00 1.00 3,000,000.00 Unit 3,000,000.00 3,000,000.00 0.313% 0.318%
15 Pekerjaan septicktank 20.21 20.21 250,000.00 Unit 5,052,680.00 5,052,680.00 0.527% 0.536%
16 Pasang pompa air SANYO PDH200B 1.00 1.00 3,487,900.00 Unit 3,487,900.00 3,487,900.00 0.364% 0.370%
17 Pasang tandon air 1 m³ PINGUIN 1.00 1.00 4,940,000.00 Unit 4,940,000.00 4,940,000.00 0.515% 0.524%
VIII. PEKERJAAN INSTALASI LISTRIK - -
1 Pemasangan Stop Kontak 19.00 20.00 256,350.00 Titik 4,870,650.00 5,127,000.00 0.508% 0.544%
2 Pemasangan Saklar Tunggal 10.00 20.00 204,500.00 Titik 2,045,000.00 4,090,000.00 0.213% 0.434%
3 Pemasangan Saklar Ganda 10.00 15.00 263,350.00 Titik 2,633,500.00 3,950,250.00 0.275% 0.419%
4 Pemasangan titik lampu TL 20 Watt (komplit) 22.00 20.00 229,525.00 Titik 5,049,550.00 4,590,500.00 0.527% 0.487% 2.5% - - 23,872,623.50 (23,872,623.50) -
5 Pemasangan titik lampu XL 18 Watt 25.00 3.00 231,225.00 Titik 5,780,625.00 693,675.00 0.603% 0.074%
6 Pemasangan Sekering 2 Group 1.00 2.00 253,073.50 Unit 253,073.50 506,147.00 0.026% 0.054%
7 Pemasangan Penangkal Petir 1.00 1.00 3,240,225.00 Unit 3,240,225.00 3,240,225.00 0.338% 0.344%
IX. PEKERJAAN KUNCI DAN KACA - -
1 Pasang kunci tanam 14.00 14.00 149,305.00 bh 2,090,270.00 2,090,270.00 0.218% 0.222%
2 Pasang engsel pintu 61.00 61.00 50,883.75 bh 3,103,908.75 3,103,908.75 0.324% 0.329%
3 Pasang engsel jendela 96.00 96.00 31,922.50 bh 3,064,560.00 3,064,560.00 0.320% 0.325%
4 Pasang grendel pintu 14.00 14.00 19,683.75 bh 275,572.50 275,572.50 0.029% 0.029%
5 Pasang grendel jendela 48.00 48.00 13,422.50 bh 644,280.00 644,280.00 0.067% 0.068%
6 Pasang hak angin 96.00 96.00 48,610.00 bh 4,666,560.00 4,666,560.00 0.487% 0.495%
- - - - -
- - - - -
7 Pasang pegangan pintu/door holder 14.00 14.00 224,612.50 bh 3,144,575.00 3,144,575.00 0.328% 0.334%
8 Pasang door stop 14.00 14.00 47,982.50 bh 671,755.00 671,755.00 0.070% 0.071%
9 Pasang kaca polos, tebal 5 mm 32.42 32.42 205,883.75 m2 6,675,574.71 6,675,574.71 0.697% 0.708%
10 Pasang kaca polos, tebal 8 mm 19.60 19.60 281,233.75 m2 5,512,743.97 5,512,743.97 0.575% 0.585%
11 Pasang kaca buram, tebal 5 mm 2.90 2.90 224,926.25 m2 652,286.13 652,286.13 0.068% 0.069%
12 Pasang kaca tempered 10 mm 48.00 48.00 450,000.00 m2 21,600,000.00 21,600,000.00 2.254% 2.292%
X. PEKERJAAN KAYU - -
1 Pasang kusen pintu dan jendela kayu kamper 2.62 2.60 15,874,125.00 m3 41,556,617.85 41,272,725.00 4.336% 4.380%
2 Pasang pintu klamp kayu kamper 5.76 5.60 610,295.00 m2 3,515,299.20 3,417,652.00 0.367% 0.363%
- - - - -
3 Pasang pintu dan jendela kaca kayu kamper 62.06 62.00 520,600.00 m2 32,308,436.00 32,277,200.00 3.371% 3.425%
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 42.50 41.00 161,310.00 m1 6,855,675.00 6,613,710.00 0.715% 0.702%
XI. PEKERJAAN ATAP - - 0.000% 0.000%
1 Pasang atap genteng beton 116.28 118.00 85,425.00 m2 9,933,219.00 10,080,150.00 1.037% 1.070%
2 Pasang bubung genteng beton 35.50 32.00 102,419.00 m1 3,635,874.50 3,277,408.00 0.379% 0.348%
- - - - -
XII. PEKERJAAN LANGIT - LANGIT - -
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm 227.28 227.28 47,537.00 m2 10,804,209.36 10,804,209.36 1.127% 1.147%
XIII. PEKERJAAN BESI DAN ALMUNIUM - -
1 Pasang besi profil 1,267.15 1,270.00 30,222.30 kg 38,296,211.62 38,382,321.00 3.996% 4.073%
2 Pasang rangka kuda-kuda baja WF 1,036.00 1,035.00 30,222.30 kg 31,310,302.80 31,280,080.50 3.267% 3.319%
3 Ikatan angin/Trekstang 70.43 68.00 33,022.30 kg 2,325,909.77 2,245,516.40 0.243% 0.238% 1.848% - - 17,705,920.64 (17,705,920.64) -
4 Pasang talang miring, seng bjls 30 L = 0.90 m 5.00 5.00 222,492.50 m1 1,112,462.50 1,112,462.50 0.116% 0.118%
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3) 31.16 31.00 496,942.12 m1 15,484,716.51 15,405,205.77 1.616% 1.635%
XIV. PEKERJAAN PLESTERAN - -
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 118.00 42,445.20 m2 5,045,885.38 5,008,533.60 0.527% 0.531%
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.54 736.00 37,421.20 m2 27,524,864.29 27,542,003.20 2.872% 2.923%
- - - - -
3 Benangan 274.00 270.00 23,662.00 m1 6,483,388.00 6,388,740.00 0.677% 0.678%
4 Acian 786.96 785.00 23,485.00 m2 18,481,802.57 18,435,725.00 1.929% 1.956%
XV. PEKERJAAN PENGECATAN - -
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis 67.82 66.00 52,804.50 m2 3,581,201.19 3,485,097.00 0.374% 0.370%
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapi 393.48 393.00 22,228.90 m2 8,746,649.80 8,735,957.70 0.913% 0.927%
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat das 393.48 393.00 28,858.90 m2 11,355,428.83 11,341,547.70 1.185% 1.204%
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis 227.28 230.00 20,238.90 m2 4,599,897.19 4,654,947.00 0.480% 0.494% - - - - -
5 Pengecatan permukaan baja dengan meni besi - - 21,775.00 m2 - -
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapi - - 37,925.50 m2 - -
7 Pengecatan permukaan baja dengan cat besi 116.28 115.00 27,992.00 m2 3,254,909.76 3,219,080.00 0.340% 0.342%
JUMLAH 8,142.64 958,339,510.83 942,349,016.76 33.179% 1.800% 34.98% 62.7% 329,626,594.90 335,219,949.40 601,087,081.32
SV (265,867,131.92)
CV 5,593,354.50
SPI 0.5576894926
CPI 1.0169687598
ETC 612,722,421.86
EAC 1,428,306,828.21
ETS 19.7242374937
EAS 51.7242374937
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS Minggu ke 21
LOKASI : KOTA BATU Bulan ke 6
Tanggal 26 November s/d 1 Desember 2018
Volume Volume BOBOT (%) BOBOT (%) BOBOT Aktual BOBOT BOBOT
NO URAIAN PEKERJAAN HARGA SATUAN Satuan HARGA RENCANA HARGA AKTUAL AC EV PV SV CV
Rencana Aktual RENCANA AKTUAL Aktual(%) perencanaan (%)
Minggu lalu Minggu ini
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter 65.75 67.00 704,145.00 m1 46,297,533.75 47,177,715.00 4.831% 5.006% 5.006%
2 Pengukuran dan pemasangan bouwplank 42.50 41.00 500,000.00 Ls 21,250,000.00 20,500,000.00 2.217% 2.175% 2.175%
3 Pembuatan gudang semen dan alat-alat 4.00 4.00 1,868,460.00 m2 7,473,840.00 7,473,840.00 0.780% 0.793% 0.793% 8.347% 8.195% 78,653,680.00 79,988,335.40 78,536,311.25 1,452,024.15 1,334,655.40
4 Membersihkan lapangan dan perataan 269.75 268.50 10,250.00 m2 2,764,937.50 2,752,125.00 0.289% 0.292% 0.292%
5 Pasang papan nama kegiatan 1.00 1.00 750,000.00 Ls 750,000.00 750,000.00 0.078% 0.080% 0.080%
II. PEKERJAAN TANAH -
1 Galian tanah biasa sedalam 1 m 103.21 100.00 47,125.00 m3 4,863,959.75 4,712,500.00 0.508% 0.500% 0.500%
2 Urugan kembali 36.12 35.00 19,275.00 m3 696,307.45 674,625.00 0.073% 0.072% 0.072% 0.956% 0.961% 9,005,675.000 9,158,490.14 9,207,289.47 (48,799.34) 152,815.14
3 Urugan pasir 19.15 19.00 190,450.00 m3 3,647,022.28 3,618,550.00 0.381% 0.384% 0.384%
III. PEKERJAAN PONDASI - -
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 41.00 710,595.00 m3 29,280,777.57 29,134,395.00 3.055% 3.092% 3.092%
3.636% 3.590% 34,267,140.000 34,848,610.87 34,408,047.64 440,563.22 581,470.87
2 Pasang pondasi batu kosong 14.98 15.00 342,183.00 m3 5,127,270.07 5,132,745.00 0.535% 0.545% 0.545%
IV. PEKERJAAN BETON - -
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w 1.34 1.50 849,572.26 m3 1,139,446.32 1,274,358.39 0.119% 0.135% 0.135%
2 Plat lantai beton bertulang t = 12 cm 13.32 12.00 5,078,546.00 m3 67,646,232.72 60,942,552.00 7.059% 6.467% 6.467%
3 Plat teras t = 10 cm 0.70 0.70 5,078,546.00 m3 3,554,982.20 3,554,982.20 0.371% 0.377% 0.377%
4 Plat carport t = 15 cm 8.04 8.00 5,078,546.00 m3 40,831,509.84 40,628,368.00 4.261% 4.311% 4.311%
5 Pondasi telapak beton bertulang 3.54 3.50 5,078,546.00 m3 17,978,052.84 17,774,911.00 1.876% 1.886% 1.886% 24.041% 26.663% 226,547,080.23 230,391,303.21 255,526,354.73 (25,135,051.52) 3,844,222.98
6 Sloof beton bertulang 4.73 4.20 5,078,546.00 m3 24,030,410.04 21,329,893.20 2.508% 2.263% 2.263%
7 Kolom beton bertulang 13.35 13.00 5,078,546.00 m3 67,787,162.37 66,021,098.00 7.073% 7.006% 6.600%
8 Balok beton bertulang 5.69 5.40 5,078,546.00 m3 28,871,534.01 27,424,148.40 3.013% 2.910% 2.000%
9 Plat beton tangga t = 12 cm 0.73 0.80 5,078,546.00 m3 3,687,024.40 4,062,836.80 0.385% 0.431%
V. PEKERJAAN DINDING - -
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 59.44 59.00 114,864.00 m2 6,827,516.16 6,776,976.00 0.712% 0.719%
4.79% - - 45,857,949.08 (45,857,949.08) -
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 367.77 365.00 106,127.00 m2 39,030,432.92 38,736,355.00 4.073% 4.111%
VI. PEKERJAAN LANTAI DAN DINDING - -
1 Pasang lantai granit 60 x 60 cm 168.00 168.00 429,799.00 m2 72,206,232.00 72,206,232.00 7.535% 7.662%
2 Pasang lantai kayu 15.75 15.75 1,500,000.00 m2 23,625,000.00 23,625,000.00 2.465% 2.507%
3 Pasang lantai keramik KM 25 x 25 cm 16.00 16.00 158,800.00 m2 2,540,800.00 2,540,800.00 0.265% 0.270% 13.1% - - 125,371,958.10 (125,371,958.10) -
4 Pasang dinding keramik ukuran 20 x 25 cm 64.00 64.00 167,966.00 m2 10,749,824.00 10,749,824.00 1.122% 1.141%
5 Pasang dinding batu Palimanan 67.46 67.46 240,885.00 m2 16,250,102.10 16,250,102.10 1.696% 1.724%
VII. PEKERJAAN SANITASI - -
1 Pasang kloset duduk porselin kw. A 4.00 4.00 1,880,267.44 bh 7,521,069.76 7,521,069.76 0.785% 0.798%
2 Pasang wastafel kw. A 1.00 1.00 699,782.00 bh 699,782.00 699,782.00 0.073% 0.074%
3 Pasang tempat sabun keramik 4.00 4.00 41,005.00 bh 164,020.00 164,020.00 0.017% 0.017%
4 Pasang badkip porselen 1.00 1.00 1,033,775.00 bh 1,033,775.00 1,033,775.00 0.108% 0.110%
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 50.00 20,294.00 m1 1,014,700.00 1,014,700.00 0.106% 0.108%
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 35.00 31,448.00 m1 1,100,680.00 1,100,680.00 0.115% 0.117%
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 35.00 107,012.75 m1 3,745,446.25 3,745,446.25 0.391% 0.397%
8 Memasang bak cuci piring stainles steel 1.00 1.00 342,167.50 bh 342,167.50 342,167.50 0.036% 0.036%
9 Memasang kran Ø 1/2" 7.00 7.00 69,742.50 bh 488,197.50 488,197.50 0.051% 0.052% 4.9% - - 47,243,929.89 (47,243,929.89) -
10 Memasang Shower TOTO 4.00 4.00 2,750,000.00 Unit 11,000,000.00 11,000,000.00 1.148% 1.167%
11 Memasang Afor Stainless Steel 4.00 4.00 59,305.00 bh 237,220.00 237,220.00 0.025% 0.025%
12 Pasang Kaca Wastafel 0.50 0.50 202,583.75 m2 101,291.88 101,291.88 0.011% 0.011%
13 Memasang water heater WASSER WH506A 2.00 2.00 1,657,500.00 Unit 3,315,000.00 3,315,000.00 0.346% 0.352%
14 Pekerjaan sumur bor 1.00 1.00 3,000,000.00 Unit 3,000,000.00 3,000,000.00 0.313% 0.318%
15 Pekerjaan septicktank 20.21 20.21 250,000.00 Unit 5,052,680.00 5,052,680.00 0.527% 0.536%
16 Pasang pompa air SANYO PDH200B 1.00 1.00 3,487,900.00 Unit 3,487,900.00 3,487,900.00 0.364% 0.370%
17 Pasang tandon air 1 m³ PINGUIN 1.00 1.00 4,940,000.00 Unit 4,940,000.00 4,940,000.00 0.515% 0.524%
VIII. PEKERJAAN INSTALASI LISTRIK - -
1 Pemasangan Stop Kontak 19.00 20.00 256,350.00 Titik 4,870,650.00 5,127,000.00 0.508% 0.544%
2 Pemasangan Saklar Tunggal 10.00 20.00 204,500.00 Titik 2,045,000.00 4,090,000.00 0.213% 0.434%
3 Pemasangan Saklar Ganda 10.00 15.00 263,350.00 Titik 2,633,500.00 3,950,250.00 0.275% 0.419%
4 Pemasangan titik lampu TL 20 Watt (komplit) 22.00 20.00 229,525.00 Titik 5,049,550.00 4,590,500.00 0.527% 0.487% 2.5% - - 23,872,623.50 (23,872,623.50) -
5 Pemasangan titik lampu XL 18 Watt 25.00 3.00 231,225.00 Titik 5,780,625.00 693,675.00 0.603% 0.074%
6 Pemasangan Sekering 2 Group 1.00 2.00 253,073.50 Unit 253,073.50 506,147.00 0.026% 0.054%
7 Pemasangan Penangkal Petir 1.00 1.00 3,240,225.00 Unit 3,240,225.00 3,240,225.00 0.338% 0.344%
IX. PEKERJAAN KUNCI DAN KACA - -
1 Pasang kunci tanam 14.00 14.00 149,305.00 bh 2,090,270.00 2,090,270.00 0.218% 0.222%
2 Pasang engsel pintu 61.00 61.00 50,883.75 bh 3,103,908.75 3,103,908.75 0.324% 0.329%
3 Pasang engsel jendela 96.00 96.00 31,922.50 bh 3,064,560.00 3,064,560.00 0.320% 0.325%
4 Pasang grendel pintu 14.00 14.00 19,683.75 bh 275,572.50 275,572.50 0.029% 0.029%
5 Pasang grendel jendela 48.00 48.00 13,422.50 bh 644,280.00 644,280.00 0.067% 0.068%
6 Pasang hak angin 96.00 96.00 48,610.00 bh 4,666,560.00 4,666,560.00 0.487% 0.495%
1.812% - - 17,367,362.02 (17,367,362.02) -
1.812% - - 17,367,362.02 (17,367,362.02) -
7 Pasang pegangan pintu/door holder 14.00 14.00 224,612.50 bh 3,144,575.00 3,144,575.00 0.328% 0.334%
8 Pasang door stop 14.00 14.00 47,982.50 bh 671,755.00 671,755.00 0.070% 0.071%
9 Pasang kaca polos, tebal 5 mm 32.42 32.42 205,883.75 m2 6,675,574.71 6,675,574.71 0.697% 0.708%
10 Pasang kaca polos, tebal 8 mm 19.60 19.60 281,233.75 m2 5,512,743.97 5,512,743.97 0.575% 0.585%
11 Pasang kaca buram, tebal 5 mm 2.90 2.90 224,926.25 m2 652,286.13 652,286.13 0.068% 0.069%
12 Pasang kaca tempered 10 mm 48.00 48.00 450,000.00 m2 21,600,000.00 21,600,000.00 2.254% 2.292%
X. PEKERJAAN KAYU - -
1 Pasang kusen pintu dan jendela kayu kamper 2.62 2.60 15,874,125.00 m3 41,556,617.85 41,272,725.00 4.336% 4.380%
2 Pasang pintu klamp kayu kamper 5.76 5.60 610,295.00 m2 3,515,299.20 3,417,652.00 0.367% 0.363%
2.197% - - 21,059,007.01 (21,059,007.01) -
3 Pasang pintu dan jendela kaca kayu kamper 62.06 62.00 520,600.00 m2 32,308,436.00 32,277,200.00 3.371% 3.425%
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 42.50 41.00 161,310.00 m1 6,855,675.00 6,613,710.00 0.715% 0.702%
XI. PEKERJAAN ATAP - -
1 Pasang atap genteng beton 116.28 118.00 85,425.00 m2 9,933,219.00 10,080,150.00 1.037% 1.070%
2 Pasang bubung genteng beton 35.50 32.00 102,419.00 m1 3,635,874.50 3,277,408.00 0.379% 0.348%
- - - - -
XII. PEKERJAAN LANGIT - LANGIT - -
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm 227.28 227.28 47,537.00 m2 10,804,209.36 10,804,209.36 1.127% 1.147%
XIII. PEKERJAAN BESI DAN ALMUNIUM - -
1 Pasang besi profil 1,267.15 1,270.00 30,222.30 kg 38,296,211.62 38,382,321.00 3.996% 4.073%
2 Pasang rangka kuda-kuda baja WF 1,036.00 1,035.00 30,222.30 kg 31,310,302.80 31,280,080.50 3.267% 3.319%
3 Ikatan angin/Trekstang 70.43 68.00 33,022.30 kg 2,325,909.77 2,245,516.40 0.243% 0.238% 3.695% - - 35,411,841.28 (35,411,841.28) -
4 Pasang talang miring, seng bjls 30 L = 0.90 m 5.00 5.00 222,492.50 m1 1,112,462.50 1,112,462.50 0.116% 0.118%
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3) 31.16 31.00 496,942.12 m1 15,484,716.51 15,405,205.77 1.616% 1.635%
XIV. PEKERJAAN PLESTERAN - -
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 118.00 42,445.20 m2 5,045,885.38 5,008,533.60 0.527% 0.531%
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.54 736.00 37,421.20 m2 27,524,864.29 27,542,003.20 2.872% 2.923%
- - - - -
3 Benangan 274.00 270.00 23,662.00 m1 6,483,388.00 6,388,740.00 0.677% 0.678%
4 Acian 786.96 785.00 23,485.00 m2 18,481,802.57 18,435,725.00 1.929% 1.956%
XV. PEKERJAAN PENGECATAN - -
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis 67.82 66.00 52,804.50 m2 3,581,201.19 3,485,097.00 0.374% 0.370%
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapi 393.48 393.00 22,228.90 m2 8,746,649.80 8,735,957.70 0.913% 0.927%
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat das 393.48 393.00 28,858.90 m2 11,355,428.83 11,341,547.70 1.185% 1.204%
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis 227.28 230.00 20,238.90 m2 4,599,897.19 4,654,947.00 0.480% 0.494% - - - - -
5 Pengecatan permukaan baja dengan meni besi - - 21,775.00 m2 - -
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapi - - 37,925.50 m2 - -
7 Pengecatan permukaan baja dengan cat besi 116.28 115.00 27,992.00 m2 3,254,909.76 3,219,080.00 0.340% 0.342%
JUMLAH 8,142.64 958,339,510.83 942,349,016.76 34.979% 2.000% 36.98% 72.4% 348,473,575.23 354,386,739.61 693,862,673.97
SV (339,475,934.35)
CV 5,913,164.38
SPI 0.5107447812
CPI 1.0169687598
ETC 593,875,441.52
EAC 1,511,237,177.25
ETS 21.5371755218
EAS 53.5371755218
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS Minggu ke 21
LOKASI : KOTA BATU Bulan ke 6
Tanggal 26 November s/d 1 Desember 2018
Volume Volume BOBOT (%) BOBOT (%) BOBOT Aktual BOBOT BOBOT
NO URAIAN PEKERJAAN HARGA SATUAN Satuan HARGA RENCANA HARGA AKTUAL AC EV PV SV CV
Rencana Aktual RENCANA AKTUAL Aktual(%) perencanaan (%)
Minggu lalu Minggu ini
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter 65.75 67.00 704,145.00 m1 46,297,533.75 47,177,715.00 4.831% 5.006% 5.006%
2 Pengukuran dan pemasangan bouwplank 42.50 41.00 500,000.00 Ls 21,250,000.00 20,500,000.00 2.217% 2.175% 2.175%
3 Pembuatan gudang semen dan alat-alat 4.00 4.00 1,868,460.00 m2 7,473,840.00 7,473,840.00 0.780% 0.793% 0.793% 8.347% 8.195% 78,653,680.00 79,988,335.40 78,536,311.25 1,452,024.15 1,334,655.40
4 Membersihkan lapangan dan perataan 269.75 268.50 10,250.00 m2 2,764,937.50 2,752,125.00 0.289% 0.292% 0.292%
5 Pasang papan nama kegiatan 1.00 1.00 750,000.00 Ls 750,000.00 750,000.00 0.078% 0.080% 0.080%
II. PEKERJAAN TANAH -
1 Galian tanah biasa sedalam 1 m 103.21 100.00 47,125.00 m3 4,863,959.75 4,712,500.00 0.508% 0.500% 0.500%
2 Urugan kembali 36.12 35.00 19,275.00 m3 696,307.45 674,625.00 0.073% 0.072% 0.072% 0.956% 0.961% 9,005,675.000 9,158,490.14 9,207,289.47 (48,799.34) 152,815.14
3 Urugan pasir 19.15 19.00 190,450.00 m3 3,647,022.28 3,618,550.00 0.381% 0.384% 0.384%
III. PEKERJAAN PONDASI - -
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 41.00 710,595.00 m3 29,280,777.57 29,134,395.00 3.055% 3.092% 3.092%
3.636% 3.590% 34,267,140.000 34,848,610.87 34,408,047.64 440,563.22 581,470.87
2 Pasang pondasi batu kosong 14.98 15.00 342,183.00 m3 5,127,270.07 5,132,745.00 0.535% 0.545% 0.545%
IV. PEKERJAAN BETON - -
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w 1.34 1.50 849,572.26 m3 1,139,446.32 1,274,358.39 0.119% 0.135% 0.135%
2 Plat lantai beton bertulang t = 12 cm 13.32 12.00 5,078,546.00 m3 67,646,232.72 60,942,552.00 7.059% 6.467% 6.467%
3 Plat teras t = 10 cm 0.70 0.70 5,078,546.00 m3 3,554,982.20 3,554,982.20 0.371% 0.377% 0.377%
4 Plat carport t = 15 cm 8.04 8.00 5,078,546.00 m3 40,831,509.84 40,628,368.00 4.261% 4.311% 4.311%
5 Pondasi telapak beton bertulang 3.54 3.50 5,078,546.00 m3 17,978,052.84 17,774,911.00 1.876% 1.886% 1.886% 25.241% 26.663% 237,855,268.43 241,891,377.34 255,526,354.73 (13,634,977.39) 4,036,108.91
6 Sloof beton bertulang 4.73 4.20 5,078,546.00 m3 24,030,410.04 21,329,893.20 2.508% 2.263% 2.263%
7 Kolom beton bertulang 13.35 13.00 5,078,546.00 m3 67,787,162.37 66,021,098.00 7.073% 7.006% 6.600%
8 Balok beton bertulang 5.69 5.40 5,078,546.00 m3 28,871,534.01 27,424,148.40 3.013% 2.910% 2.000% 1.200%
9 Plat beton tangga t = 12 cm 0.73 0.80 5,078,546.00 m3 3,687,024.40 4,062,836.80 0.385% 0.431%
V. PEKERJAAN DINDING - -
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 59.44 59.00 114,864.00 m2 6,827,516.16 6,776,976.00 0.712% 0.719%
4.79% - - 45,857,949.08 (45,857,949.08) -
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 367.77 365.00 106,127.00 m2 39,030,432.92 38,736,355.00 4.073% 4.111%
VI. PEKERJAAN LANTAI DAN DINDING - -
1 Pasang lantai granit 60 x 60 cm 168.00 168.00 429,799.00 m2 72,206,232.00 72,206,232.00 7.535% 7.662%
2 Pasang lantai kayu 15.75 15.75 1,500,000.00 m2 23,625,000.00 23,625,000.00 2.465% 2.507%
3 Pasang lantai keramik KM 25 x 25 cm 16.00 16.00 158,800.00 m2 2,540,800.00 2,540,800.00 0.265% 0.270% 13.1% - - 125,371,958.10 (125,371,958.10) -
4 Pasang dinding keramik ukuran 20 x 25 cm 64.00 64.00 167,966.00 m2 10,749,824.00 10,749,824.00 1.122% 1.141%
5 Pasang dinding batu Palimanan 67.46 67.46 240,885.00 m2 16,250,102.10 16,250,102.10 1.696% 1.724%
VII. PEKERJAAN SANITASI - -
1 Pasang kloset duduk porselin kw. A 4.00 4.00 1,880,267.44 bh 7,521,069.76 7,521,069.76 0.785% 0.798%
2 Pasang wastafel kw. A 1.00 1.00 699,782.00 bh 699,782.00 699,782.00 0.073% 0.074%
3 Pasang tempat sabun keramik 4.00 4.00 41,005.00 bh 164,020.00 164,020.00 0.017% 0.017%
4 Pasang badkip porselen 1.00 1.00 1,033,775.00 bh 1,033,775.00 1,033,775.00 0.108% 0.110%
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 50.00 20,294.00 m1 1,014,700.00 1,014,700.00 0.106% 0.108%
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 35.00 31,448.00 m1 1,100,680.00 1,100,680.00 0.115% 0.117%
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 35.00 107,012.75 m1 3,745,446.25 3,745,446.25 0.391% 0.397%
8 Memasang bak cuci piring stainles steel 1.00 1.00 342,167.50 bh 342,167.50 342,167.50 0.036% 0.036%
9 Memasang kran Ø 1/2" 7.00 7.00 69,742.50 bh 488,197.50 488,197.50 0.051% 0.052% 4.9% - - 47,243,929.89 (47,243,929.89) -
10 Memasang Shower TOTO 4.00 4.00 2,750,000.00 Unit 11,000,000.00 11,000,000.00 1.148% 1.167%
11 Memasang Afor Stainless Steel 4.00 4.00 59,305.00 bh 237,220.00 237,220.00 0.025% 0.025%
12 Pasang Kaca Wastafel 0.50 0.50 202,583.75 m2 101,291.88 101,291.88 0.011% 0.011%
13 Memasang water heater WASSER WH506A 2.00 2.00 1,657,500.00 Unit 3,315,000.00 3,315,000.00 0.346% 0.352%
14 Pekerjaan sumur bor 1.00 1.00 3,000,000.00 Unit 3,000,000.00 3,000,000.00 0.313% 0.318%
15 Pekerjaan septicktank 20.21 20.21 250,000.00 Unit 5,052,680.00 5,052,680.00 0.527% 0.536%
16 Pasang pompa air SANYO PDH200B 1.00 1.00 3,487,900.00 Unit 3,487,900.00 3,487,900.00 0.364% 0.370%
17 Pasang tandon air 1 m³ PINGUIN 1.00 1.00 4,940,000.00 Unit 4,940,000.00 4,940,000.00 0.515% 0.524%
VIII. PEKERJAAN INSTALASI LISTRIK - -
1 Pemasangan Stop Kontak 19.00 20.00 256,350.00 Titik 4,870,650.00 5,127,000.00 0.508% 0.544%
2 Pemasangan Saklar Tunggal 10.00 20.00 204,500.00 Titik 2,045,000.00 4,090,000.00 0.213% 0.434%
3 Pemasangan Saklar Ganda 10.00 15.00 263,350.00 Titik 2,633,500.00 3,950,250.00 0.275% 0.419%
4 Pemasangan titik lampu TL 20 Watt (komplit) 22.00 20.00 229,525.00 Titik 5,049,550.00 4,590,500.00 0.527% 0.487% 2.5% - - 23,872,623.50 (23,872,623.50) -
5 Pemasangan titik lampu XL 18 Watt 25.00 3.00 231,225.00 Titik 5,780,625.00 693,675.00 0.603% 0.074%
6 Pemasangan Sekering 2 Group 1.00 2.00 253,073.50 Unit 253,073.50 506,147.00 0.026% 0.054%
7 Pemasangan Penangkal Petir 1.00 1.00 3,240,225.00 Unit 3,240,225.00 3,240,225.00 0.338% 0.344%
IX. PEKERJAAN KUNCI DAN KACA - -
1 Pasang kunci tanam 14.00 14.00 149,305.00 bh 2,090,270.00 2,090,270.00 0.218% 0.222%
2 Pasang engsel pintu 61.00 61.00 50,883.75 bh 3,103,908.75 3,103,908.75 0.324% 0.329%
3 Pasang engsel jendela 96.00 96.00 31,922.50 bh 3,064,560.00 3,064,560.00 0.320% 0.325%
4 Pasang grendel pintu 14.00 14.00 19,683.75 bh 275,572.50 275,572.50 0.029% 0.029%
5 Pasang grendel jendela 48.00 48.00 13,422.50 bh 644,280.00 644,280.00 0.067% 0.068%
6 Pasang hak angin 96.00 96.00 48,610.00 bh 4,666,560.00 4,666,560.00 0.487% 0.495%
3.624% - - 34,734,724.04 (34,734,724.04) -
3.624% - - 34,734,724.04 (34,734,724.04) -
7 Pasang pegangan pintu/door holder 14.00 14.00 224,612.50 bh 3,144,575.00 3,144,575.00 0.328% 0.334%
8 Pasang door stop 14.00 14.00 47,982.50 bh 671,755.00 671,755.00 0.070% 0.071%
9 Pasang kaca polos, tebal 5 mm 32.42 32.42 205,883.75 m2 6,675,574.71 6,675,574.71 0.697% 0.708%
10 Pasang kaca polos, tebal 8 mm 19.60 19.60 281,233.75 m2 5,512,743.97 5,512,743.97 0.575% 0.585%
11 Pasang kaca buram, tebal 5 mm 2.90 2.90 224,926.25 m2 652,286.13 652,286.13 0.068% 0.069%
12 Pasang kaca tempered 10 mm 48.00 48.00 450,000.00 m2 21,600,000.00 21,600,000.00 2.254% 2.292%
X. PEKERJAAN KAYU - -
1 Pasang kusen pintu dan jendela kayu kamper 2.62 2.60 15,874,125.00 m3 41,556,617.85 41,272,725.00 4.336% 4.380%
2 Pasang pintu klamp kayu kamper 5.76 5.60 610,295.00 m2 3,515,299.20 3,417,652.00 0.367% 0.363%
4.395% - - 42,118,014.03 (42,118,014.03) -
3 Pasang pintu dan jendela kaca kayu kamper 62.06 62.00 520,600.00 m2 32,308,436.00 32,277,200.00 3.371% 3.425%
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 42.50 41.00 161,310.00 m1 6,855,675.00 6,613,710.00 0.715% 0.702%
XI. PEKERJAAN ATAP - - 0.000% 0.000%
1 Pasang atap genteng beton 116.28 118.00 85,425.00 m2 9,933,219.00 10,080,150.00 1.037% 1.070%
2 Pasang bubung genteng beton 35.50 32.00 102,419.00 m1 3,635,874.50 3,277,408.00 0.379% 0.348%
- - - - -
XII. PEKERJAAN LANGIT - LANGIT - -
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm 227.28 227.28 47,537.00 m2 10,804,209.36 10,804,209.36 1.127% 1.147%
XIII. PEKERJAAN BESI DAN ALMUNIUM - -
1 Pasang besi profil 1,267.15 1,270.00 30,222.30 kg 38,296,211.62 38,382,321.00 3.996% 4.073%
2 Pasang rangka kuda-kuda baja WF 1,036.00 1,035.00 30,222.30 kg 31,310,302.80 31,280,080.50 3.267% 3.319%
3 Ikatan angin/Trekstang 70.43 68.00 33,022.30 kg 2,325,909.77 2,245,516.40 0.243% 0.238% 5.543% - - 53,117,761.92 (53,117,761.92) -
4 Pasang talang miring, seng bjls 30 L = 0.90 m 5.00 5.00 222,492.50 m1 1,112,462.50 1,112,462.50 0.116% 0.118%
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3) 31.16 31.00 496,942.12 m1 15,484,716.51 15,405,205.77 1.616% 1.635%
XIV. PEKERJAAN PLESTERAN - -
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 118.00 42,445.20 m2 5,045,885.38 5,008,533.60 0.527% 0.531%
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.54 736.00 37,421.20 m2 27,524,864.29 27,542,003.20 2.872% 2.923%
- - - - -
3 Benangan 274.00 270.00 23,662.00 m1 6,483,388.00 6,388,740.00 0.677% 0.678%
4 Acian 786.96 785.00 23,485.00 m2 18,481,802.57 18,435,725.00 1.929% 1.956%
XV. PEKERJAAN PENGECATAN - -
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis 67.82 66.00 52,804.50 m2 3,581,201.19 3,485,097.00 0.374% 0.370%
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapi 393.48 393.00 22,228.90 m2 8,746,649.80 8,735,957.70 0.913% 0.927%
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat das 393.48 393.00 28,858.90 m2 11,355,428.83 11,341,547.70 1.185% 1.204%
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis 227.28 230.00 20,238.90 m2 4,599,897.19 4,654,947.00 0.480% 0.494% - - - - -
5 Pengecatan permukaan baja dengan meni besi - - 21,775.00 m2 - -
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapi - - 37,925.50 m2 - -
7 Pengecatan permukaan baja dengan cat besi 116.28 115.00 27,992.00 m2 3,254,909.76 3,219,080.00 0.340% 0.342%
JUMLAH 8,142.64 958,339,510.83 942,349,016.76 36.979% 1.200% 38.18% 78.3% 359,781,763.43 365,886,813.74 749,994,963.64
SV (384,108,149.89)
CV 6,105,050.31
SPI 0.487852361
CPI 1.0169687598
ETC 582,567,253.32
EAC 1,553,928,394.47
ETS 22.5478051959
EAS 54.5478051959
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS Minggu ke 21
LOKASI : KOTA BATU Bulan ke 6
Tanggal 26 November s/d 1 Desember 2018
Volume Volume BOBOT (%) BOBOT (%) BOBOT Aktual BOBOT BOBOT
NO URAIAN PEKERJAAN HARGA SATUAN Satuan HARGA RENCANA HARGA AKTUAL AC EV PV SV CV
Rencana Aktual RENCANA AKTUAL Aktual(%) perencanaan (%)
Minggu lalu Minggu ini
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter 65.75 67.00 704,145.00 m1 46,297,533.75 47,177,715.00 4.831% 5.006% 5.006%
2 Pengukuran dan pemasangan bouwplank 42.50 41.00 500,000.00 Ls 21,250,000.00 20,500,000.00 2.217% 2.175% 2.175%
3 Pembuatan gudang semen dan alat-alat 4.00 4.00 1,868,460.00 m2 7,473,840.00 7,473,840.00 0.780% 0.793% 0.793% 8.347% 8.195% 78,653,680.00 79,988,335.40 78,536,311.25 1,452,024.15 1,334,655.40
4 Membersihkan lapangan dan perataan 269.75 268.50 10,250.00 m2 2,764,937.50 2,752,125.00 0.289% 0.292% 0.292%
5 Pasang papan nama kegiatan 1.00 1.00 750,000.00 Ls 750,000.00 750,000.00 0.078% 0.080% 0.080%
II. PEKERJAAN TANAH -
1 Galian tanah biasa sedalam 1 m 103.21 100.00 47,125.00 m3 4,863,959.75 4,712,500.00 0.508% 0.500% 0.500%
2 Urugan kembali 36.12 35.00 19,275.00 m3 696,307.45 674,625.00 0.073% 0.072% 0.072% 0.956% 0.961% 9,005,675.000 9,158,490.14 9,207,289.47 (48,799.34) 152,815.14
3 Urugan pasir 19.15 19.00 190,450.00 m3 3,647,022.28 3,618,550.00 0.381% 0.384% 0.384%
III. PEKERJAAN PONDASI - -
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 41.00 710,595.00 m3 29,280,777.57 29,134,395.00 3.055% 3.092% 3.092%
3.636% 3.590% 34,267,140.000 34,848,610.87 34,408,047.64 440,563.22 581,470.87
2 Pasang pondasi batu kosong 14.98 15.00 342,183.00 m3 5,127,270.07 5,132,745.00 0.535% 0.545% 0.545%
IV. PEKERJAAN BETON - -
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w 1.34 1.50 849,572.26 m3 1,139,446.32 1,274,358.39 0.119% 0.135% 0.135%
2 Plat lantai beton bertulang t = 12 cm 13.32 12.00 5,078,546.00 m3 67,646,232.72 60,942,552.00 7.059% 6.467% 6.467%
3 Plat teras t = 10 cm 0.70 0.70 5,078,546.00 m3 3,554,982.20 3,554,982.20 0.371% 0.377% 0.377%
4 Plat carport t = 15 cm 8.04 8.00 5,078,546.00 m3 40,831,509.84 40,628,368.00 4.261% 4.311% 4.311%
5 Pondasi telapak beton bertulang 3.54 3.50 5,078,546.00 m3 17,978,052.84 17,774,911.00 1.876% 1.886% 1.886% 26.481% 26.663% 249,540,396.24 253,774,787.27 255,526,354.73 (1,751,567.45) 4,234,391.03
6 Sloof beton bertulang 4.73 4.20 5,078,546.00 m3 24,030,410.04 21,329,893.20 2.508% 2.263% 2.263%
7 Kolom beton bertulang 13.35 13.00 5,078,546.00 m3 67,787,162.37 66,021,098.00 7.073% 7.006% 6.600% 0.800%
8 Balok beton bertulang 5.69 5.40 5,078,546.00 m3 28,871,534.01 27,424,148.40 3.013% 2.910% 3.200%
9 Plat beton tangga t = 12 cm 0.73 0.80 5,078,546.00 m3 3,687,024.40 4,062,836.80 0.385% 0.431% 0.440%
V. PEKERJAAN DINDING - -
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 59.44 59.00 114,864.00 m2 6,827,516.16 6,776,976.00 0.712% 0.719%
1.700% 4.79% 16,019,933.28 16,291,771.68 45,857,949.08 (29,566,177.39) 271,838.40
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 367.77 365.00 106,127.00 m2 39,030,432.92 38,736,355.00 4.073% 4.111% 1.700%
VI. PEKERJAAN LANTAI DAN DINDING - -
1 Pasang lantai granit 60 x 60 cm 168.00 168.00 429,799.00 m2 72,206,232.00 72,206,232.00 7.535% 7.662%
2 Pasang lantai kayu 15.75 15.75 1,500,000.00 m2 23,625,000.00 23,625,000.00 2.465% 2.507%
3 Pasang lantai keramik KM 25 x 25 cm 16.00 16.00 158,800.00 m2 2,540,800.00 2,540,800.00 0.265% 0.270% 13.1% - - 125,371,958.10 (125,371,958.10) -
4 Pasang dinding keramik ukuran 20 x 25 cm 64.00 64.00 167,966.00 m2 10,749,824.00 10,749,824.00 1.122% 1.141%
5 Pasang dinding batu Palimanan 67.46 67.46 240,885.00 m2 16,250,102.10 16,250,102.10 1.696% 1.724%
VII. PEKERJAAN SANITASI - -
1 Pasang kloset duduk porselin kw. A 4.00 4.00 1,880,267.44 bh 7,521,069.76 7,521,069.76 0.785% 0.798%
2 Pasang wastafel kw. A 1.00 1.00 699,782.00 bh 699,782.00 699,782.00 0.073% 0.074%
3 Pasang tempat sabun keramik 4.00 4.00 41,005.00 bh 164,020.00 164,020.00 0.017% 0.017%
4 Pasang badkip porselen 1.00 1.00 1,033,775.00 bh 1,033,775.00 1,033,775.00 0.108% 0.110%
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 50.00 20,294.00 m1 1,014,700.00 1,014,700.00 0.106% 0.108%
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 35.00 31,448.00 m1 1,100,680.00 1,100,680.00 0.115% 0.117%
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 35.00 107,012.75 m1 3,745,446.25 3,745,446.25 0.391% 0.397%
8 Memasang bak cuci piring stainles steel 1.00 1.00 342,167.50 bh 342,167.50 342,167.50 0.036% 0.036%
9 Memasang kran Ø 1/2" 7.00 7.00 69,742.50 bh 488,197.50 488,197.50 0.051% 0.052% 4.9% - - 47,243,929.89 (47,243,929.89) -
10 Memasang Shower TOTO 4.00 4.00 2,750,000.00 Unit 11,000,000.00 11,000,000.00 1.148% 1.167%
11 Memasang Afor Stainless Steel 4.00 4.00 59,305.00 bh 237,220.00 237,220.00 0.025% 0.025%
12 Pasang Kaca Wastafel 0.50 0.50 202,583.75 m2 101,291.88 101,291.88 0.011% 0.011%
13 Memasang water heater WASSER WH506A 2.00 2.00 1,657,500.00 Unit 3,315,000.00 3,315,000.00 0.346% 0.352%
14 Pekerjaan sumur bor 1.00 1.00 3,000,000.00 Unit 3,000,000.00 3,000,000.00 0.313% 0.318%
15 Pekerjaan septicktank 20.21 20.21 250,000.00 Unit 5,052,680.00 5,052,680.00 0.527% 0.536%
16 Pasang pompa air SANYO PDH200B 1.00 1.00 3,487,900.00 Unit 3,487,900.00 3,487,900.00 0.364% 0.370%
17 Pasang tandon air 1 m³ PINGUIN 1.00 1.00 4,940,000.00 Unit 4,940,000.00 4,940,000.00 0.515% 0.524%
VIII. PEKERJAAN INSTALASI LISTRIK - -
1 Pemasangan Stop Kontak 19.00 20.00 256,350.00 Titik 4,870,650.00 5,127,000.00 0.508% 0.544%
2 Pemasangan Saklar Tunggal 10.00 20.00 204,500.00 Titik 2,045,000.00 4,090,000.00 0.213% 0.434%
3 Pemasangan Saklar Ganda 10.00 15.00 263,350.00 Titik 2,633,500.00 3,950,250.00 0.275% 0.419%
4 Pemasangan titik lampu TL 20 Watt (komplit) 22.00 20.00 229,525.00 Titik 5,049,550.00 4,590,500.00 0.527% 0.487% 2.5% - - 23,872,623.50 (23,872,623.50) -
5 Pemasangan titik lampu XL 18 Watt 25.00 3.00 231,225.00 Titik 5,780,625.00 693,675.00 0.603% 0.074%
6 Pemasangan Sekering 2 Group 1.00 2.00 253,073.50 Unit 253,073.50 506,147.00 0.026% 0.054%
7 Pemasangan Penangkal Petir 1.00 1.00 3,240,225.00 Unit 3,240,225.00 3,240,225.00 0.338% 0.344%
IX. PEKERJAAN KUNCI DAN KACA - -
1 Pasang kunci tanam 14.00 14.00 149,305.00 bh 2,090,270.00 2,090,270.00 0.218% 0.222%
2 Pasang engsel pintu 61.00 61.00 50,883.75 bh 3,103,908.75 3,103,908.75 0.324% 0.329%
3 Pasang engsel jendela 96.00 96.00 31,922.50 bh 3,064,560.00 3,064,560.00 0.320% 0.325%
4 Pasang grendel pintu 14.00 14.00 19,683.75 bh 275,572.50 275,572.50 0.029% 0.029%
5 Pasang grendel jendela 48.00 48.00 13,422.50 bh 644,280.00 644,280.00 0.067% 0.068%
6 Pasang hak angin 96.00 96.00 48,610.00 bh 4,666,560.00 4,666,560.00 0.487% 0.495%
5.437% - - 52,102,086.05 (52,102,086.05) -
5.437% - - 52,102,086.05 (52,102,086.05) -
7 Pasang pegangan pintu/door holder 14.00 14.00 224,612.50 bh 3,144,575.00 3,144,575.00 0.328% 0.334%
8 Pasang door stop 14.00 14.00 47,982.50 bh 671,755.00 671,755.00 0.070% 0.071%
9 Pasang kaca polos, tebal 5 mm 32.42 32.42 205,883.75 m2 6,675,574.71 6,675,574.71 0.697% 0.708%
10 Pasang kaca polos, tebal 8 mm 19.60 19.60 281,233.75 m2 5,512,743.97 5,512,743.97 0.575% 0.585%
11 Pasang kaca buram, tebal 5 mm 2.90 2.90 224,926.25 m2 652,286.13 652,286.13 0.068% 0.069%
12 Pasang kaca tempered 10 mm 48.00 48.00 450,000.00 m2 21,600,000.00 21,600,000.00 2.254% 2.292%
X. PEKERJAAN KAYU - -
1 Pasang kusen pintu dan jendela kayu kamper 2.62 2.60 15,874,125.00 m3 41,556,617.85 41,272,725.00 4.336% 4.380%
2 Pasang pintu klamp kayu kamper 5.76 5.60 610,295.00 m2 3,515,299.20 3,417,652.00 0.367% 0.363%
6.592% - - 63,177,021.04 (63,177,021.04) -
3 Pasang pintu dan jendela kaca kayu kamper 62.06 62.00 520,600.00 m2 32,308,436.00 32,277,200.00 3.371% 3.425%
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 42.50 41.00 161,310.00 m1 6,855,675.00 6,613,710.00 0.715% 0.702%
XI. PEKERJAAN ATAP - - 0.000% 0.000%
1 Pasang atap genteng beton 116.28 118.00 85,425.00 m2 9,933,219.00 10,080,150.00 1.037% 1.070%
2 Pasang bubung genteng beton 35.50 32.00 102,419.00 m1 3,635,874.50 3,277,408.00 0.379% 0.348%
- - - - -
XII. PEKERJAAN LANGIT - LANGIT - -
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm 227.28 227.28 47,537.00 m2 10,804,209.36 10,804,209.36 1.127% 1.147%
XIII. PEKERJAAN BESI DAN ALMUNIUM - -
1 Pasang besi profil 1,267.15 1,270.00 30,222.30 kg 38,296,211.62 38,382,321.00 3.996% 4.073%
2 Pasang rangka kuda-kuda baja WF 1,036.00 1,035.00 30,222.30 kg 31,310,302.80 31,280,080.50 3.267% 3.319%
3 Ikatan angin/Trekstang 70.43 68.00 33,022.30 kg 2,325,909.77 2,245,516.40 0.243% 0.238% 7.390% - - 70,823,682.56 (70,823,682.56) -
4 Pasang talang miring, seng bjls 30 L = 0.90 m 5.00 5.00 222,492.50 m1 1,112,462.50 1,112,462.50 0.116% 0.118%
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3) 31.16 31.00 496,942.12 m1 15,484,716.51 15,405,205.77 1.616% 1.635%
XIV. PEKERJAAN PLESTERAN - -
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 118.00 42,445.20 m2 5,045,885.38 5,008,533.60 0.527% 0.531%
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.54 736.00 37,421.20 m2 27,524,864.29 27,542,003.20 2.872% 2.923%
- - - - -
3 Benangan 274.00 270.00 23,662.00 m1 6,483,388.00 6,388,740.00 0.677% 0.678%
4 Acian 786.96 785.00 23,485.00 m2 18,481,802.57 18,435,725.00 1.929% 1.956%
XV. PEKERJAAN PENGECATAN - -
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis 67.82 66.00 52,804.50 m2 3,581,201.19 3,485,097.00 0.374% 0.370%
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapi 393.48 393.00 22,228.90 m2 8,746,649.80 8,735,957.70 0.913% 0.927%
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat das 393.48 393.00 28,858.90 m2 11,355,428.83 11,341,547.70 1.185% 1.204%
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis 227.28 230.00 20,238.90 m2 4,599,897.19 4,654,947.00 0.480% 0.494% - - - - -
5 Pengecatan permukaan baja dengan meni besi - - 21,775.00 m2 - -
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapi - - 37,925.50 m2 - -
7 Pengecatan permukaan baja dengan cat besi 116.28 115.00 27,992.00 m2 3,254,909.76 3,219,080.00 0.340% 0.342%
JUMLAH 8,142.64 958,339,510.83 942,349,016.76 38.179% 2.940% 41.12% 84.1% 387,486,824.53 394,061,995.36 806,127,253.31
SV (412,065,257.94)
CV 6,575,170.83
SPI 0.488833486
CPI 1.0169687598
ETC 554,862,192.23
EAC 1,522,560,849.05
ETS 22.5025500829
EAS 54.5025500829
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS Minggu ke 21
LOKASI : KOTA BATU Bulan ke 6
Tanggal 26 November s/d 1 Desember 2018
Volume Volume BOBOT (%) BOBOT (%) BOBOT Aktual BOBOT BOBOT
NO URAIAN PEKERJAAN HARGA SATUAN Satuan HARGA RENCANA HARGA AKTUAL AC EV PV SV CV
Rencana Aktual RENCANA AKTUAL Aktual(%) perencanaan (%)
Minggu lalu Minggu ini
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter 65.75 67.00 704,145.00 m1 46,297,533.75 47,177,715.00 4.831% 5.006% 5.006%
2 Pengukuran dan pemasangan bouwplank 42.50 41.00 500,000.00 Ls 21,250,000.00 20,500,000.00 2.217% 2.175% 2.175%
3 Pembuatan gudang semen dan alat-alat 4.00 4.00 1,868,460.00 m2 7,473,840.00 7,473,840.00 0.780% 0.793% 0.793% 8.347% 8.195% 78,653,680.00 79,988,335.40 78,536,311.25 1,452,024.15 1,334,655.40
4 Membersihkan lapangan dan perataan 269.75 268.50 10,250.00 m2 2,764,937.50 2,752,125.00 0.289% 0.292% 0.292%
5 Pasang papan nama kegiatan 1.00 1.00 750,000.00 Ls 750,000.00 750,000.00 0.078% 0.080% 0.080%
II. PEKERJAAN TANAH -
1 Galian tanah biasa sedalam 1 m 103.21 100.00 47,125.00 m3 4,863,959.75 4,712,500.00 0.508% 0.500% 0.500%
2 Urugan kembali 36.12 35.00 19,275.00 m3 696,307.45 674,625.00 0.073% 0.072% 0.072% 0.956% 0.961% 9,005,675.000 9,158,490.14 9,207,289.47 (48,799.34) 152,815.14
3 Urugan pasir 19.15 19.00 190,450.00 m3 3,647,022.28 3,618,550.00 0.381% 0.384% 0.384%
III. PEKERJAAN PONDASI - -
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 41.00 710,595.00 m3 29,280,777.57 29,134,395.00 3.055% 3.092% 3.092%
3.636% 3.590% 34,267,140.000 34,848,610.87 34,408,047.64 440,563.22 581,470.87
2 Pasang pondasi batu kosong 14.98 15.00 342,183.00 m3 5,127,270.07 5,132,745.00 0.535% 0.545% 0.545%
IV. PEKERJAAN BETON - -
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w 1.34 1.50 849,572.26 m3 1,139,446.32 1,274,358.39 0.119% 0.135% 0.135%
2 Plat lantai beton bertulang t = 12 cm 13.32 12.00 5,078,546.00 m3 67,646,232.72 60,942,552.00 7.059% 6.467% 6.467%
3 Plat teras t = 10 cm 0.70 0.70 5,078,546.00 m3 3,554,982.20 3,554,982.20 0.371% 0.377% 0.377%
4 Plat carport t = 15 cm 8.04 8.00 5,078,546.00 m3 40,831,509.84 40,628,368.00 4.261% 4.311% 4.311%
5 Pondasi telapak beton bertulang 3.54 3.50 5,078,546.00 m3 17,978,052.84 17,774,911.00 1.876% 1.886% 1.886% 26.481% 26.663% 249,540,396.24 253,774,787.27 255,526,354.73 (1,751,567.45) 4,234,391.03
6 Sloof beton bertulang 4.73 4.20 5,078,546.00 m3 24,030,410.04 21,329,893.20 2.508% 2.263% 2.263%
7 Kolom beton bertulang 13.35 13.00 5,078,546.00 m3 67,787,162.37 66,021,098.00 7.073% 7.006% 7.400%
8 Balok beton bertulang 5.69 5.40 5,078,546.00 m3 28,871,534.01 27,424,148.40 3.013% 2.910% 3.200%
9 Plat beton tangga t = 12 cm 0.73 0.80 5,078,546.00 m3 3,687,024.40 4,062,836.80 0.385% 0.431% 0.440%
V. PEKERJAAN DINDING - -
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 59.44 59.00 114,864.00 m2 6,827,516.16 6,776,976.00 0.712% 0.719%
3.400% 4.79% 32,039,866.57 32,583,543.37 45,857,949.08 (13,274,405.71) 543,676.80
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 367.77 365.00 106,127.00 m2 39,030,432.92 38,736,355.00 4.073% 4.111% 1.700% 1.700%
VI. PEKERJAAN LANTAI DAN DINDING - -
1 Pasang lantai granit 60 x 60 cm 168.00 168.00 429,799.00 m2 72,206,232.00 72,206,232.00 7.535% 7.662%
2 Pasang lantai kayu 15.75 15.75 1,500,000.00 m2 23,625,000.00 23,625,000.00 2.465% 2.507%
3 Pasang lantai keramik KM 25 x 25 cm 16.00 16.00 158,800.00 m2 2,540,800.00 2,540,800.00 0.265% 0.270% 13.1% - - 125,371,958.10 (125,371,958.10) -
4 Pasang dinding keramik ukuran 20 x 25 cm 64.00 64.00 167,966.00 m2 10,749,824.00 10,749,824.00 1.122% 1.141%
5 Pasang dinding batu Palimanan 67.46 67.46 240,885.00 m2 16,250,102.10 16,250,102.10 1.696% 1.724%
VII. PEKERJAAN SANITASI - -
1 Pasang kloset duduk porselin kw. A 4.00 4.00 1,880,267.44 bh 7,521,069.76 7,521,069.76 0.785% 0.798% 0.670%
2 Pasang wastafel kw. A 1.00 1.00 699,782.00 bh 699,782.00 699,782.00 0.073% 0.074%
3 Pasang tempat sabun keramik 4.00 4.00 41,005.00 bh 164,020.00 164,020.00 0.017% 0.017%
4 Pasang badkip porselen 1.00 1.00 1,033,775.00 bh 1,033,775.00 1,033,775.00 0.108% 0.110% 0.100%
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 50.00 20,294.00 m1 1,014,700.00 1,014,700.00 0.106% 0.108%
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 35.00 31,448.00 m1 1,100,680.00 1,100,680.00 0.115% 0.117%
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 35.00 107,012.75 m1 3,745,446.25 3,745,446.25 0.391% 0.397%
8 Memasang bak cuci piring stainles steel 1.00 1.00 342,167.50 bh 342,167.50 342,167.50 0.036% 0.036%
9 Memasang kran Ø 1/2" 7.00 7.00 69,742.50 bh 488,197.50 488,197.50 0.051% 0.052% 2.270% 4.9% 21,391,322.68 21,754,306.90 47,243,929.89 (25,489,622.99) 362,984.22
10 Memasang Shower TOTO 4.00 4.00 2,750,000.00 Unit 11,000,000.00 11,000,000.00 1.148% 1.167% 1.000%
11 Memasang Afor Stainless Steel 4.00 4.00 59,305.00 bh 237,220.00 237,220.00 0.025% 0.025%
12 Pasang Kaca Wastafel 0.50 0.50 202,583.75 m2 101,291.88 101,291.88 0.011% 0.011%
13 Memasang water heater WASSER WH506A 2.00 2.00 1,657,500.00 Unit 3,315,000.00 3,315,000.00 0.346% 0.352%
14 Pekerjaan sumur bor 1.00 1.00 3,000,000.00 Unit 3,000,000.00 3,000,000.00 0.313% 0.318%
15 Pekerjaan septicktank 20.21 20.21 250,000.00 Unit 5,052,680.00 5,052,680.00 0.527% 0.536% 0.500%
16 Pasang pompa air SANYO PDH200B 1.00 1.00 3,487,900.00 Unit 3,487,900.00 3,487,900.00 0.364% 0.370%
17 Pasang tandon air 1 m³ PINGUIN 1.00 1.00 4,940,000.00 Unit 4,940,000.00 4,940,000.00 0.515% 0.524%
VIII. PEKERJAAN INSTALASI LISTRIK - -
1 Pemasangan Stop Kontak 19.00 20.00 256,350.00 Titik 4,870,650.00 5,127,000.00 0.508% 0.544%
2 Pemasangan Saklar Tunggal 10.00 20.00 204,500.00 Titik 2,045,000.00 4,090,000.00 0.213% 0.434%
3 Pemasangan Saklar Ganda 10.00 15.00 263,350.00 Titik 2,633,500.00 3,950,250.00 0.275% 0.419%
4 Pemasangan titik lampu TL 20 Watt (komplit) 22.00 20.00 229,525.00 Titik 5,049,550.00 4,590,500.00 0.527% 0.487% 2.5% - - 23,872,623.50 (23,872,623.50) -
5 Pemasangan titik lampu XL 18 Watt 25.00 3.00 231,225.00 Titik 5,780,625.00 693,675.00 0.603% 0.074%
6 Pemasangan Sekering 2 Group 1.00 2.00 253,073.50 Unit 253,073.50 506,147.00 0.026% 0.054%
7 Pemasangan Penangkal Petir 1.00 1.00 3,240,225.00 Unit 3,240,225.00 3,240,225.00 0.338% 0.344%
IX. PEKERJAAN KUNCI DAN KACA - -
1 Pasang kunci tanam 14.00 14.00 149,305.00 bh 2,090,270.00 2,090,270.00 0.218% 0.222%
2 Pasang engsel pintu 61.00 61.00 50,883.75 bh 3,103,908.75 3,103,908.75 0.324% 0.329%
3 Pasang engsel jendela 96.00 96.00 31,922.50 bh 3,064,560.00 3,064,560.00 0.320% 0.325%
4 Pasang grendel pintu 14.00 14.00 19,683.75 bh 275,572.50 275,572.50 0.029% 0.029%
5 Pasang grendel jendela 48.00 48.00 13,422.50 bh 644,280.00 644,280.00 0.067% 0.068%
6 Pasang hak angin 96.00 96.00 48,610.00 bh 4,666,560.00 4,666,560.00 0.487% 0.495%
5.437% - - 52,102,086.05 (52,102,086.05) -
5.437% - - 52,102,086.05 (52,102,086.05) -
7 Pasang pegangan pintu/door holder 14.00 14.00 224,612.50 bh 3,144,575.00 3,144,575.00 0.328% 0.334%
8 Pasang door stop 14.00 14.00 47,982.50 bh 671,755.00 671,755.00 0.070% 0.071%
9 Pasang kaca polos, tebal 5 mm 32.42 32.42 205,883.75 m2 6,675,574.71 6,675,574.71 0.697% 0.708%
10 Pasang kaca polos, tebal 8 mm 19.60 19.60 281,233.75 m2 5,512,743.97 5,512,743.97 0.575% 0.585%
11 Pasang kaca buram, tebal 5 mm 2.90 2.90 224,926.25 m2 652,286.13 652,286.13 0.068% 0.069%
12 Pasang kaca tempered 10 mm 48.00 48.00 450,000.00 m2 21,600,000.00 21,600,000.00 2.254% 2.292%
X. PEKERJAAN KAYU - -
1 Pasang kusen pintu dan jendela kayu kamper 2.62 2.60 15,874,125.00 m3 41,556,617.85 41,272,725.00 4.336% 4.380%
2 Pasang pintu klamp kayu kamper 5.76 5.60 610,295.00 m2 3,515,299.20 3,417,652.00 0.367% 0.363%
8.790% - - 84,236,028.05 (84,236,028.05) -
3 Pasang pintu dan jendela kaca kayu kamper 62.06 62.00 520,600.00 m2 32,308,436.00 32,277,200.00 3.371% 3.425%
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 42.50 41.00 161,310.00 m1 6,855,675.00 6,613,710.00 0.715% 0.702%
XI. PEKERJAAN ATAP - - 0.000% 0.000%
1 Pasang atap genteng beton 116.28 118.00 85,425.00 m2 9,933,219.00 10,080,150.00 1.037% 1.070%
2 Pasang bubung genteng beton 35.50 32.00 102,419.00 m1 3,635,874.50 3,277,408.00 0.379% 0.348%
- - - - -
XII. PEKERJAAN LANGIT - LANGIT - -
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm 227.28 227.28 47,537.00 m2 10,804,209.36 10,804,209.36 1.127% 1.147%
XIII. PEKERJAAN BESI DAN ALMUNIUM - -
1 Pasang besi profil 1,267.15 1,270.00 30,222.30 kg 38,296,211.62 38,382,321.00 3.996% 4.073%
2 Pasang rangka kuda-kuda baja WF 1,036.00 1,035.00 30,222.30 kg 31,310,302.80 31,280,080.50 3.267% 3.319%
3 Ikatan angin/Trekstang 70.43 68.00 33,022.30 kg 2,325,909.77 2,245,516.40 0.243% 0.238% 9.238% - - 88,529,603.20 (88,529,603.20) -
4 Pasang talang miring, seng bjls 30 L = 0.90 m 5.00 5.00 222,492.50 m1 1,112,462.50 1,112,462.50 0.116% 0.118%
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3) 31.16 31.00 496,942.12 m1 15,484,716.51 15,405,205.77 1.616% 1.635%
XIV. PEKERJAAN PLESTERAN - -
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 118.00 42,445.20 m2 5,045,885.38 5,008,533.60 0.527% 0.531%
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.54 736.00 37,421.20 m2 27,524,864.29 27,542,003.20 2.872% 2.923%
- - - - -
3 Benangan 274.00 270.00 23,662.00 m1 6,483,388.00 6,388,740.00 0.677% 0.678%
4 Acian 786.96 785.00 23,485.00 m2 18,481,802.57 18,435,725.00 1.929% 1.956%
XV. PEKERJAAN PENGECATAN - -
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis 67.82 66.00 52,804.50 m2 3,581,201.19 3,485,097.00 0.374% 0.370%
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapi 393.48 393.00 22,228.90 m2 8,746,649.80 8,735,957.70 0.913% 0.927%
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat das 393.48 393.00 28,858.90 m2 11,355,428.83 11,341,547.70 1.185% 1.204%
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis 227.28 230.00 20,238.90 m2 4,599,897.19 4,654,947.00 0.480% 0.494% - - - - -
5 Pengecatan permukaan baja dengan meni besi - - 21,775.00 m2 - -
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapi - - 37,925.50 m2 - -
7 Pengecatan permukaan baja dengan cat besi 116.28 115.00 27,992.00 m2 3,254,909.76 3,219,080.00 0.340% 0.342%
JUMLAH 8,142.64 958,339,510.83 942,349,016.76 41.119% 3.970% 45.09% 88.2% 424,898,080.49 432,108,073.94 844,892,180.96
SV (412,784,107.02)
CV 7,209,993.45
SPI 0.5114357591
CPI 1.0169687598
ETC 517,450,936.27
EAC 1,436,659,434.76
ETS 21.5080776107
EAS 53.5080776107
RENCANA ANGGARAN BIAYA
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter A.002
2 Pengukuran dan pemasangan bouwplank A.005
3 Pembuatan gudang semen dan alat-alat A.007
4 Membersihkan lapangan dan perataan A.009
5 Pasang papan nama kegiatan Ls
V. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm E.003
2 Plesteran 1 Pc : 6 Ps tebal 15 mm E.006
3 Benangan E.025
4 Acian E.026
X. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A J.004
2 Pasang wastafel kw. A J.007
3 Pasang tempat sabun keramik J.009
4 Pasang badkip porselen J.013
5 Memasang pipa PVC tipe AW, Ø 1/2" J.038
6 Memasang pipa PVC tipe AW, Ø 3/4" J.039
7 Memasang pipa PVC tipe AW, Ø 3" J.044
8 Memasang bak cuci piring stainles steel J.064
9 Memasang kran Ø 1/2" J.066
10 Memasang Shower TOTO LS
11 Memasang Afor Stainless Steel J.068
12 Pasang Kaca Wastafel J.070
13 Memasang water heater WASSER WH506A Ls
14 Pekerjaan sumur bor Ls
15 Pekerjaan septicktank Ls
16 Pasang pompa air SANYO PDH200B Ls
17 Pasang tandon air 1 m³ PINGUIN Ls
REKAPITULASI :
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN TANAH
III. PEKERJAAN PONDASI
IV. PEKERJAAN DINDING
V. PEKERJAAN PLESTERAN
VI. PEKERJAAN KAYU
VII. PEKERJAAN BETON
VIII. PEKERJAAN ATAP
IX. PEKERJAAN LANGIT - LANGIT
X. PEKERJAAN SANITASI
XI. PEKERJAAN BESI DAN ALMUNIUM
XII. PEKERJAAN KUNCI DAN KACA
XIII. PEKERJAAN LANTAI DAN DINDING
XIV. PEKERJAAN PENGECATAN
XV. PEKERJAAN INSTALASI LISTRIK
Terbilang :
SATU MILYAR LIMA PULUH EMPAT JUTA SERATUS TUJU
NGGARAN BIAYA
HARGA
SATUAN VOLUME JUMLAH HARGA ( Rp. )
SATUAN ( Rp. )
Ra 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022 0.022 0.022
Kum. Ra 2.05% 4.10% 6.15% 8.68% 9.16% ### ### ### ### ### ### ###
OKTOBER NOVEMBER DESEMBER JANUARI FEBRUARI
M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 Total
8.20%
0.96%
3.59%
0.025 2.49%
0.014 1.42%
0.011 1.13%
0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031 0.011
100.00%
100.00%
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
No Uraian Pekerjaan RAB RAP Perbedaan Bobot Rencana Bobot Aktual
Bobot Realisasi
JULI
Durasi Pekerjaan
M1 M2 M3 M4 M1
Ra 4 0.02 0.02 0.02 0.02
Ri 5
Ra 2
Ri 5
Ra 12
Ri 13
Ra 3
Ri 3
Ra 6
Ri 3
Ra 3
Ri 2
Ra 1
Ri 2
Ra 3
Ri 2
Ra 4
Ri 2
Ra 1
Ri 1
Ra 1
Ri 2
Ra 5
Ri 2
Ra 3
Ri 1
Ra 3
Ri 2
AGUSTUS SEPTEMBER
M2 M3 M4 M1 M2 M3 M4
0.02
0.02 0.02
0.04
0.018 0.018 0.022 0.022 0.022 0.022 0.022
OKTOBER NOVEMBER
M1 M2 M3 M4 M1 M2
0.02 0.02
0.022 0.022 0.022 0.038 0.060 0.060
NOVEMBER DESEMBER
M3 M4 M1 M2 M3 M4
0.02
0.02
0.02
0.02 0.02 0.02
JANUARI FEBRUARI
M1 M2 M3 M4 M1 M2
0.02 0.01
0.02 0.03
0.01 0.01
0.03 0.03
0.02
0.04 0.04
0.01
0.01
0.01
0.01
0.02
0.04 0.05
0.06
FEBRUARI
M3 M4 Total
8.20%
0.96%
3.59%
26.66%
4.79%
13.08%
4.93%
2.49%
5.44%
8.79%
1.42%
0.01 1.13%
9.24%
6.00%
100.00%
0.0221 0.0165
98.35% 100%
926,843,089.72 942,349,016.76
PEMBANGUNAN VILLA KUSUMA HILLS
Ra 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022 0.022 0.022
Kum. Ra 2.05% 4.10% 6.15% 8.68% 9.16% ### ### ### ### ### ### ###
OKTOBER NOVEMBER DESEMBER JANUARI FEBRUARI
M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 Total
8.20%
0.96%
3.59%
0.025 2.49%
0.014 1.42%
0.011 1.13%
0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031 0.011
100.00%
100.00%
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
LAPORAN MINGGUAN
KEGIATAN : PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
VOLUME VOLUME
Prosentse Total BOBOT
PELAKSANAAN PELAKSANAAN Pelaksan
Minggu lalu Minggu ini Minggu lalu Minggu ini Volume Bobot aan(%)
JULI
Durasi Pekerjaan
M1 M2 M3 M4 M1
Ra 4 0.02 0.02 0.02 0.02
Ri 5
Ra 2
Ri 5
Ra 12
Ri 13
Ra 3
Ri 3
Ra 6
Ri 3
Ra 3
Ri 2
Ra 1
Ri 2
Ra 3
Ri 2
Ra 4
Ri 2
POG
6 7 8 9 10 11
AGUSTUS SEPTEMBER
M2 M3 M4 M1 M2 M3
0.02
0.02 0.02
12 13 14 15 16 17
OKTOBER
M4 M1 M2 M3 M4 M1
0.02 0.02
0.02
18 19 20 21 22 23
NOVEMBER DESEMBER
M2 M3 M4 M1 M2 M3
0.02 0.02
0.02
0.02
0.02 0.02
0.02 0.02
24 25 26
DESEMBER JANUARI
M4 M1 M2
0.01
0.01
0.02
0.02 0.02
LAPORAN MINGGUAN
KEGIATAN: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
Pengawas
Lapangan
Jumlah 7 Instruksi
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca CERAH 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini Volu
1 Pagar sementara dari seng gelombang, tinggi 2 meter 2.73958 m2
2 Pengukuran dan pemasangan bouwplank 2.36111 Ls
3 Membersihkan lapangan dan perataan 6.42262 m2
4
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 7 Instruksi
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca CERAH 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Tenaga Kerja Jumlah Material
Keahlian (org) Jenis Jumlah Sat Diterima Ditolak
Jumlah 7 Instruksi
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca CERAH 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 7 Instruksi
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca HUJAN 5
Catatan lalu
Pekerjaan kurang maksimal karena
hujan
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 7 Instruksi
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1 Istirahat Jumat jam 11.00-12.30
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 7 Instruksi
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
Hari : Senin
Tanggal : 16 Juli 2018
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cangkul 2
19 Palu 2
20 Benang bol 2
21
22
23
24
25
Hari : Selasa
Tanggal : 17 Juli 2018
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cangkul 2
19 Palu 2
20 Benang bol 2
21
22
23
24
25
Volume
Hari : Rabu
Tanggal : 18 Juli 2018
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cangkul 2
19 Palu 2
20 Benang bol 2
21
22
23
24
25
Volume
Hari : Kamis
Tanggal : 19 Juli 2018
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cangkul 2
19 Palu 2
20 Benang bol 2
21
22
23
24
25
Hari : Jumat
Tanggal : 20 Juli 2018
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cangkul 2
19 Palu 2
20 Benang bol 2
21
22
23
24
25
Volume
Hari : Sabtu
Tanggal : 21 Juli 2018
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cangkul 2
19 Palu 2
20 Benang bol 2
21
22
23
24
25
Volume
LAPORAN MINGGUA
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 me 65.75 m1 1.407
2 Pengukuran dan pemasangan bouwplank 42.50 Ls 0.909
3 Pembuatan gudang semen dan alat-alat 4.00 m2 0.086
4 Membersihkan lapangan dan perataan 269.75 m2 5.772
5 Pasang papan nama kegiatan 1.00 Ls 0.021
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 103.21 m3 0.626
2 Urugan kembali 36.12 m3 0.219
3 Urugan pasir 19.15 m3 0.116
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 m3 2.633
2 Pasang pondasi batu kosong 14.98 m3 0.957
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump 1.34 m3 0.695
2 Plat lantai beton bertulang t = 12 cm 13.32 m3 6.905
3 Plat teras t = 10 cm 0.70 m3 0.363
4 Plat carport t = 15 cm 8.04 m3 4.168
5 Pondasi telapak beton bertulang 3.54 m3 1.835
6 Sloof beton bertulang 4.73 m3 2.453
7 Kolom beton bertulang 13.35 m3 6.920
8 Balok beton bertulang 5.69 m3 2.947
9 Plat beton tangga t = 12 cm 0.73 m3 0.376
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 59.44 m2 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 367.77 m2 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 168.00 m2 6.636
2 Pasang lantai kayu 15.75 m2 0.622
3 Pasang lantai keramik KM 25 x 25 cm 16.00 m2 0.632
4 Pasang dinding keramik ukuran 20 x 25 cm 64.00 m2 2.528
5 Pasang dinding batu Palimanan 67.46 m2 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 4.00 bh 0.115
2 Pasang wastafel kw. A 1.00 bh 0.029
3 Pasang tempat sabun keramik 4.00 bh 0.115
4 Pasang badkip porselen 1.00 bh 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 m1 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 m1 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 m1 1.005
8 Memasang bak cuci piring stainles steel 1.00 bh 0.029
9 Memasang kran Ø 1/2" 7.00 bh 0.201
10 Memasang Shower TOTO 4.00 Unit 0.115
11 Memasang Afor Stainless Steel 4.00 bh 0.115
12 Pasang Kaca Wastafel 0.50 m2 0.014
13 Memasang water heater WASSER WH506A 2.00 Unit 0.057
14 Pekerjaan sumur bor 1.00 Unit 0.029
15 Pekerjaan septicktank 20.21 Unit 0.580
16 Pasang pompa air SANYO PDH200B 1.00 Unit 0.029
17 Pasang tandon air 1 m³ PINGUIN 1.00 Unit 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 19.00 Titik 0.538
2 Pemasangan Saklar Tunggal 10.00 Titik 0.283
3 Pemasangan Saklar Ganda 10.00 Titik 0.283
4 Pemasangan titik lampu TL 20 Watt (komplit) 22.00 Titik 0.623
5 Pemasangan titik lampu XL 18 Watt 25.00 Titik 0.708
6 Pemasangan Sekering 2 Group 1.00 Unit 0.028
7 Pemasangan Penangkal Petir 1.00 Unit 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 14.00 bh 0.165
2 Pasang engsel pintu 61.00 bh 0.721
3 Pasang engsel jendela 96.00 bh 1.135
4 Pasang grendel pintu 14.00 bh 0.165
5 Pasang grendel jendela 48.00 bh 0.567
6 Pasang hak angin 96.00 bh 1.135
7 Pasang pegangan pintu/door holder 14.00 bh 0.165
8 Pasang door stop 14.00 bh 0.165
9 Pasang kaca polos, tebal 5 mm 32.42 m2 0.383
10 Pasang kaca polos, tebal 8 mm 19.60 m2 0.232
11 Pasang kaca buram, tebal 5 mm 2.90 m2 0.034
12 Pasang kaca tempered 10 mm 48.00 m2 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper 2.62 m3 0.204
2 Pasang pintu klamp kayu kamper 5.76 m2 0.448
3 Pasang pintu dan jendela kaca kayu kamper 62.06 m2 4.830
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 42.50 m1 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 116.28 m2 1.085
2 Pasang bubung genteng beton 35.50 m1 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, 227.28 m2 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 1,267.15 kg 4.858
2 Pasang rangka kuda-kuda baja WF 1,036.00 kg 3.972
3 Ikatan angin/Trekstang 70.43 kg 0.270
4 Pasang talang miring, seng bjls 30 L = 0.90 m 5.00 m1 0.019
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2. 31.16 m1 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 m2 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.54 m2 2.306
3 Benangan 274.00 m1 0.859
4 Acian 786.96 m2 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat d 67.82 m2 0.186
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat 393.48 m2 1.081
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 393.48 m2 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat 227.28 m2 0.624
5 Pengecatan permukaan baja dengan meni besi - m2 0.000
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis ca - m2 0.000
7 Pengecatan permukaan baja dengan cat besi 116.28 m2 0.319
LAPORAN MINGGUAN
Minggu ke 3
Bulan ke :1
Tanggal : 23 Juli s/d 28 Juli 2018
BOBOT
Pelaksana
an(%)
4.156
KONTRAKTOR
LAPORAN HARIAN
Jumlah 7
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
LAPORAN HARIAN
Jumlah 7
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
LAPORAN HARIAN
Jumlah 7
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
LAPORAN HARIAN
Jumlah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
LAPORAN HARIAN
Jumlah 5
Catatan lalu
1 Istirahat Jumat jam 11.00-12.30
2
3
4
5
6
KONTRAKTOR
LAPORAN HARIAN
Jumlah 5
Catatan lalu
1
2
3
4
5
6
AKTOR
Hari : Senin
Tanggal : 23 Juli 2018
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Palu 2
19 Cangkul 2
20 Bennag bol 2
21
22
23
24
25
AKTOR
Hari : Selasa
Tanggal : 24 Juli 2018
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Palu 2
19 Cangkul 2
20 Bennag bol 2
21
22
23
24
25
Volume
2.73958 m2
2.36111 Ls
6.42262 m2
AKTOR
Hari : Rabu
Tanggal : 25 Juli 2018
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Palu 2
19 Cangkul 2
20 Bennag bol 2
21
22
23
24
25
Volume
2.73958 m2
2.36111 Ls
6.42262 m2
AKTOR
Hari : Kamis
Tanggal : 26 Juli 2018
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Volume
2.73958 m2
2.36111 Ls
6.42262 m2
AKTOR
Hari : Jumat
Tanggal : 27 Juli 2018
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Volume
2.73958 m2
2.36111 Ls
6.42262 m2
AKTOR
Hari : Sabtu
Tanggal : 28 Juli 2018
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Volume
2.73958 m2
2.36111 Ls
6.42262 m2
POGRES PELAKSANAAN MING
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.0% 4.1% 6.1% 8.7% 9.2% 11.0% 12.7% 15.0% 17.2% 19.4% 21.6%
M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 Total
4.16%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031 0.011
4.16%
23.9% 26.1% 28.3% 30.5% 34.3% 40.3% 46.3% 50.7% 57.1% 62.7% 72.4% 78.3% 84.1% 88.2% 90.7% 92.7% 95.8% 98.9% 100.0%
100%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 me 65.75 m1 1.407
2 Pengukuran dan pemasangan bouwplank 42.50 Ls 0.909
3 Pembuatan gudang semen dan alat-alat 4.00 m2 0.086
4 Membersihkan lapangan dan perataan 269.75 m2 5.772
5 Pasang papan nama kegiatan 1.00 Ls 0.021
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 103.21 m3 0.626
2 Urugan kembali 36.12 m3 0.219
3 Urugan pasir 19.15 m3 0.116
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 m3 2.633
2 Pasang pondasi batu kosong 14.98 m3 0.957
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump 1.34 m3 0.695
2 Plat lantai beton bertulang t = 12 cm 13.32 m3 6.905
3 Plat teras t = 10 cm 0.70 m3 0.363
4 Plat carport t = 15 cm 8.04 m3 4.168
5 Pondasi telapak beton bertulang 3.54 m3 1.835
6 Sloof beton bertulang 4.73 m3 2.453
7 Kolom beton bertulang 13.35 m3 6.920
8 Balok beton bertulang 5.69 m3 2.947
9 Plat beton tangga t = 12 cm 0.73 m3 0.376
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 59.44 m2 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 367.77 m2 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 168.00 m2 6.636
2 Pasang lantai kayu 15.75 m2 0.622
3 Pasang lantai keramik KM 25 x 25 cm 16.00 m2 0.632
4 Pasang dinding keramik ukuran 20 x 25 cm 64.00 m2 2.528
5 Pasang dinding batu Palimanan 67.46 m2 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 4.00 bh 0.115
2 Pasang wastafel kw. A 1.00 bh 0.029
3 Pasang tempat sabun keramik 4.00 bh 0.115
4 Pasang badkip porselen 1.00 bh 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 m1 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 m1 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 m1 1.005
8 Memasang bak cuci piring stainles steel 1.00 bh 0.029
9 Memasang kran Ø 1/2" 7.00 bh 0.201
10 Memasang Shower TOTO 4.00 Unit 0.115
11 Memasang Afor Stainless Steel 4.00 bh 0.115
12 Pasang Kaca Wastafel 0.50 m2 0.014
13 Memasang water heater WASSER WH506A 2.00 Unit 0.057
14 Pekerjaan sumur bor 1.00 Unit 0.029
15 Pekerjaan septicktank 20.21 Unit 0.580
16 Pasang pompa air SANYO PDH200B 1.00 Unit 0.029
17 Pasang tandon air 1 m³ PINGUIN 1.00 Unit 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 19.00 Titik 0.538
2 Pemasangan Saklar Tunggal 10.00 Titik 0.283
3 Pemasangan Saklar Ganda 10.00 Titik 0.283
4 Pemasangan titik lampu TL 20 Watt (komplit) 22.00 Titik 0.623
5 Pemasangan titik lampu XL 18 Watt 25.00 Titik 0.708
6 Pemasangan Sekering 2 Group 1.00 Unit 0.028
7 Pemasangan Penangkal Petir 1.00 Unit 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 14.00 bh 0.165
2 Pasang engsel pintu 61.00 bh 0.721
3 Pasang engsel jendela 96.00 bh 1.135
4 Pasang grendel pintu 14.00 bh 0.165
5 Pasang grendel jendela 48.00 bh 0.567
6 Pasang hak angin 96.00 bh 1.135
7 Pasang pegangan pintu/door holder 14.00 bh 0.165
8 Pasang door stop 14.00 bh 0.165
9 Pasang kaca polos, tebal 5 mm 32.42 m2 0.383
10 Pasang kaca polos, tebal 8 mm 19.60 m2 0.232
11 Pasang kaca buram, tebal 5 mm 2.90 m2 0.034
12 Pasang kaca tempered 10 mm 48.00 m2 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper 2.62 m3 0.204
2 Pasang pintu klamp kayu kamper 5.76 m2 0.448
3 Pasang pintu dan jendela kaca kayu kamper 62.06 m2 4.830
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 42.50 m1 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 116.28 m2 1.085
2 Pasang bubung genteng beton 35.50 m1 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, 227.28 m2 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 1,267.15 kg 4.858
2 Pasang rangka kuda-kuda baja WF 1,036.00 kg 3.972
3 Ikatan angin/Trekstang 70.43 kg 0.270
4 Pasang talang miring, seng bjls 30 L = 0.90 m 5.00 m1 0.019
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2. 31.16 m1 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 m2 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.54 m2 2.306
3 Benangan 274.00 m1 0.859
4 Acian 786.96 m2 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat da 67.82 m2 0.186
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat 393.48 m2 1.081
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 393.48 m2 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat 227.28 m2 0.624
5 Pengecatan permukaan baja dengan meni besi - m2 0.000
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis ca - m2 0.000
7 Pengecatan permukaan baja dengan cat besi 116.28 m2 0.319
LAPORAN MINGGUAN
Minggu ke 4
Bulan ke :1
Tanggal : 30 Juli s/d 4 Agustus 2018
Pengawas
Lapangan
Jumlah 6 Instruks
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini Volu
1 Pagar sementara dari seng gelombang, tinggi 2 meter 2.73958 m2
2 Pengukuran dan pemasangan bouwplank 2.36111 Ls
3 Pembuatan gudang semen dan alat-alat 0.33333 m2
4 Membersihkan lapangan dan perataan 6.42262 m2
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 6 Instruks
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 6 Instruks
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
KEGIATAN : PEMBANGUNAN VILLA KUSUMA HILLS
Pengawas
Lapangan
Jumlah 6 Instruks
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Hujan 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 6 Instruks
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1 Istirahat Jumat jam 11.00-12.30
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 6 Instruks
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Hujan 5
Catatan lalu
1
2
3
4
5
6
Hari : Senin
Tanggal : 30 Juli 2018
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Palu
19 Cangkul
20
21
22
23
24
25
Hari : Selasa
Tanggal : 31 Juli 2018
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Volume
Hari : Rabu
Tanggal : 1 Agustus 2018
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Volume
Hari : Kamis
Tanggal : 2 Agustus 2018
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Volume
Hari : Jumat
Tanggal : 3 Agustus 2018
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Volume
Hari : Sabtu
Tanggal : 4 Agustus 2018
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Volume
POGRES PELAKSANAAN MINGGU
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 11.0% 12.7% 15.0% 17.2% 19.4% 21.6% 23.9%
1. Penipuan
Resiko Keterlamatan
2.Depresiasi nilai tukar uang
SANAAN MINGGUAN
M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 Total
5.68%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031 0.011
5.68%
26.1% 28.3% 30.5% 34.3% 40.3% 46.3% 50.7% 57.1% 62.7% 72.4% 78.3% 84.1% 88.2% 90.7% 92.7% 95.8% 98.9% 100%
100%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 65.75 m1 1.407
2 Pengukuran dan pemasangan bouwplank 42.50 Ls 0.909
3 Pembuatan gudang semen dan alat-alat 4.00 m2 0.086
4 Membersihkan lapangan dan perataan 269.75 m2 5.772
5 Pasang papan nama kegiatan 1.00 Ls 0.021
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 103.21 m3 0.626
2 Urugan kembali 36.12 m3 0.219
3 Urugan pasir 19.15 m3 0.116
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 m3 2.633
2 Pasang pondasi batu kosong 14.98 m3 0.957
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) s 1.34 m3 0.695
2 Plat lantai beton bertulang t = 12 cm 13.32 m3 6.905
3 Plat teras t = 10 cm 0.70 m3 0.363
4 Plat carport t = 15 cm 8.04 m3 4.168
5 Pondasi telapak beton bertulang 3.54 m3 1.835
6 Sloof beton bertulang 4.73 m3 2.453
7 Kolom beton bertulang 13.35 m3 6.920
8 Balok beton bertulang 5.69 m3 2.947
9 Plat beton tangga t = 12 cm 0.73 m3 0.376
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 59.44 m2 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 367.77 m2 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 168.00 m2 6.636
2 Pasang lantai kayu 15.75 m2 0.622
3 Pasang lantai keramik KM 25 x 25 cm 16.00 m2 0.632
4 Pasang dinding keramik ukuran 20 x 25 cm 64.00 m2 2.528
5 Pasang dinding batu Palimanan 67.46 m2 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 4.00 bh 0.115
2 Pasang wastafel kw. A 1.00 bh 0.029
3 Pasang tempat sabun keramik 4.00 bh 0.115
4 Pasang badkip porselen 1.00 bh 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 m1 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 m1 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 m1 1.005
8 Memasang bak cuci piring stainles steel 1.00 bh 0.029
9 Memasang kran Ø 1/2" 7.00 bh 0.201
10 Memasang Shower TOTO 4.00 Unit 0.115
11 Memasang Afor Stainless Steel 4.00 bh 0.115
12 Pasang Kaca Wastafel 0.50 m2 0.014
13 Memasang water heater WASSER WH506A 2.00 Unit 0.057
14 Pekerjaan sumur bor 1.00 Unit 0.029
15 Pekerjaan septicktank 20.21 Unit 0.580
16 Pasang pompa air SANYO PDH200B 1.00 Unit 0.029
17 Pasang tandon air 1 m³ PINGUIN 1.00 Unit 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 19.00 Titik 0.538
2 Pemasangan Saklar Tunggal 10.00 Titik 0.283
3 Pemasangan Saklar Ganda 10.00 Titik 0.283
4 Pemasangan titik lampu TL 20 Watt (komplit) 22.00 Titik 0.623
5 Pemasangan titik lampu XL 18 Watt 25.00 Titik 0.708
6 Pemasangan Sekering 2 Group 1.00 Unit 0.028
7 Pemasangan Penangkal Petir 1.00 Unit 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 14.00 bh 0.165
2 Pasang engsel pintu 61.00 bh 0.721
3 Pasang engsel jendela 96.00 bh 1.135
4 Pasang grendel pintu 14.00 bh 0.165
5 Pasang grendel jendela 48.00 bh 0.567
6 Pasang hak angin 96.00 bh 1.135
7 Pasang pegangan pintu/door holder 14.00 bh 0.165
8 Pasang door stop 14.00 bh 0.165
9 Pasang kaca polos, tebal 5 mm 32.42 m2 0.383
10 Pasang kaca polos, tebal 8 mm 19.60 m2 0.232
11 Pasang kaca buram, tebal 5 mm 2.90 m2 0.034
12 Pasang kaca tempered 10 mm 48.00 m2 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper 2.62 m3 0.204
2 Pasang pintu klamp kayu kamper 5.76 m2 0.448
3 Pasang pintu dan jendela kaca kayu kamper 62.06 m2 4.830
4 Pasang lisplang ukuran (3 x 30) cm, kayu kam 42.50 m1 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 116.28 m2 1.085
2 Pasang bubung genteng beton 35.50 m1 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) 227.28 m2 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 1,267.15 kg 4.858
2 Pasang rangka kuda-kuda baja WF 1,036.00 kg 3.972
3 Ikatan angin/Trekstang 70.43 kg 0.270
4 Pasang talang miring, seng bjls 30 L = 0.90 m 5.00 m1 0.019
5 Pasang pagar besi hollow (40x40x2.3 & 20x4 31.16 m1 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 m2 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.54 m2 2.306
3 Benangan 274.00 m1 0.859
4 Acian 786.96 m2 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis c 67.82 m2 0.186
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis 393.48 m2 1.081
3 Pengecatan tembok baru eksterior (1 lapis plami 393.48 m2 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis 227.28 m2 0.624
5 Pengecatan permukaan baja dengan meni besi - m2 0.000
6 Pengecatan genteng baru (1 lapis plamir, 1 lapi - m2 0.000
7 Pengecatan permukaan baja dengan cat besi 116.28 m2 0.319
LAPORAN MINGGUAN
Minggu ke 5
Bulan ke 2
Tanggal : 6 Agustus s/d 11 Agustus 2018
VOLUME BOBOT
VOLUME PELAKSANAAN Prosentse Total
PELAKSANAAN Pelaksa
Minggu lalu Minggu ini Minggu lalu Minggu ini Volume Bobot naan(%)
Pengawas
Lapangan
Jumlah 5 Instruksi
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Hujan 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini Volu
1 Pembuatan gudang semen dan alat-alat 0.33333 m2
2 Membersihkan lapangan dan perataan 6.42262 m2
3
4
Catatan lalu
1 Pekerjaan terganggu karena hujan
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 7 Instruksi
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Hujan 5
Catatan lalu
1 Pekerjaan terganggu karena hujan
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 6 Instruksi
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Hujan 5
Catatan lalu
1 Pekerjaan terganggu karena hujan
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 6 Instruksi
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 6 Instruksi
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Hujan 5
Catatan lalu
1 Pekerjaan terganggu karena hujan
2
3
4
5
6
Hari : Senin
Tanggal : 6 Agustus 2018
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Palu 2
19 Cangkul 2
20 Benang bol
21
22
23
24
25
Hari : Selasa
Tanggal : 7 agustus 2018
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Volume
Hari : Rabu
Tanggal : 8 Agustus 2018
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
da Hari Ini
Hari : Kamis
Tanggal : 9 Agustus 2018
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Volume
Hari : Sabtu
Tanggal : 10 Agustus 2018
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cangkul 2
19 Palu 2
20
21
22
23
24
25
Volume
POGRES PELAKSANAAN MINGGUA
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 11.0% 12.7% 15.0% 17.2% 19.4% 21.6% 23.9%
M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 Total
6.55%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031 0.011
6.55%
26.1% 28.3% 30.5% 34.3% 40.3% 46.3% 50.7% 57.1% 62.7% 72.4% 78.3% 84.1% 88.2% 90.7% 92.7% 95.8% 98.9% 100%
100%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tin 65.75 m1 1.407
2 Pengukuran dan pemasangan bouwplank 42.50 Ls 0.909
3 Pembuatan gudang semen dan alat-alat 4.00 m2 0.086
4 Membersihkan lapangan dan perataan 269.75 m2 5.772
5 Pasang papan nama kegiatan 1.00 Ls 0.021
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 103.21 m3 0.626
2 Urugan kembali 36.12 m3 0.219
3 Urugan pasir 19.15 m3 0.116
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 m3 2.633
2 Pasang pondasi batu kosong 14.98 m3 0.957
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K10 1.34 m3 0.695
2 Plat lantai beton bertulang t = 12 cm 13.32 m3 6.905
3 Plat teras t = 10 cm 0.70 m3 0.363
4 Plat carport t = 15 cm 8.04 m3 4.168
5 Pondasi telapak beton bertulang 3.54 m3 1.835
6 Sloof beton bertulang 4.73 m3 2.453
7 Kolom beton bertulang 13.35 m3 6.920
8 Balok beton bertulang 5.69 m3 2.947
9 Plat beton tangga t = 12 cm 0.73 m3 0.376
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 59.44 m2 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 367.77 m2 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 168.00 m2 6.636
2 Pasang lantai kayu 15.75 m2 0.622
3 Pasang lantai keramik KM 25 x 25 cm 16.00 m2 0.632
4 Pasang dinding keramik ukuran 20 x 25 64.00 m2 2.528
5 Pasang dinding batu Palimanan 67.46 m2 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 4.00 bh 0.115
2 Pasang wastafel kw. A 1.00 bh 0.029
3 Pasang tempat sabun keramik 4.00 bh 0.115
4 Pasang badkip porselen 1.00 bh 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 m1 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 m1 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 m1 1.005
8 Memasang bak cuci piring stainles steel 1.00 bh 0.029
9 Memasang kran Ø 1/2" 7.00 bh 0.201
10 Memasang Shower TOTO 4.00 Unit 0.115
11 Memasang Afor Stainless Steel 4.00 bh 0.115
12 Pasang Kaca Wastafel 0.50 m2 0.014
13 Memasang water heater WASSER WH50 2.00 Unit 0.057
14 Pekerjaan sumur bor 1.00 Unit 0.029
15 Pekerjaan septicktank 20.21 Unit 0.580
16 Pasang pompa air SANYO PDH200B 1.00 Unit 0.029
17 Pasang tandon air 1 m³ PINGUIN 1.00 Unit 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 19.00 Titik 0.538
2 Pemasangan Saklar Tunggal 10.00 Titik 0.283
3 Pemasangan Saklar Ganda 10.00 Titik 0.283
4 Pemasangan titik lampu TL 20 Watt (komp 22.00 Titik 0.623
5 Pemasangan titik lampu XL 18 Watt 25.00 Titik 0.708
6 Pemasangan Sekering 2 Group 1.00 Unit 0.028
7 Pemasangan Penangkal Petir 1.00 Unit 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 14.00 bh 0.165
2 Pasang engsel pintu 61.00 bh 0.721
3 Pasang engsel jendela 96.00 bh 1.135
4 Pasang grendel pintu 14.00 bh 0.165
5 Pasang grendel jendela 48.00 bh 0.567
6 Pasang hak angin 96.00 bh 1.135
7 Pasang pegangan pintu/door holder 14.00 bh 0.165
8 Pasang door stop 14.00 bh 0.165
9 Pasang kaca polos, tebal 5 mm 32.42 m2 0.383
10 Pasang kaca polos, tebal 8 mm 19.60 m2 0.232
11 Pasang kaca buram, tebal 5 mm 2.90 m2 0.034
12 Pasang kaca tempered 10 mm 48.00 m2 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kam 2.62 m3 0.204
2 Pasang pintu klamp kayu kamper 5.76 m2 0.448
3 Pasang pintu dan jendela kaca kayu kamp 62.06 m2 4.830
4 Pasang lisplang ukuran (3 x 30) cm, kay 42.50 m1 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 116.28 m2 1.085
2 Pasang bubung genteng beton 35.50 m1 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 227.28 m2 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 1,267.15 kg 4.858
2 Pasang rangka kuda-kuda baja WF 1,036.00 kg 3.972
3 Ikatan angin/Trekstang 70.43 kg 0.270
4 Pasang talang miring, seng bjls 30 L = 0. 5.00 m1 0.019
5 Pasang pagar besi hollow (40x40x2.3 & 31.16 m1 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 m2 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.54 m2 2.306
3 Benangan 274.00 m1 0.859
4 Acian 786.96 m2 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 la 67.82 m2 0.186
2 Pengecatan tembok baru (1 lapis plamir, 1 393.48 m2 1.081
3 Pengecatan tembok baru eksterior (1 lapis 393.48 m2 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 l 227.28 m2 0.624
5 Pengecatan permukaan baja dengan meni - m2 0.000
6 Pengecatan genteng baru (1 lapis plamir, 1 - m2 0.000
7 Pengecatan permukaan baja dengan cat be 116.28 m2 0.319
LAPORAN MINGGUAN
Minggu ke 6
Bulan ke 2
Tanggal : 13 Agustus s/d 18 Agustus 2018
Pengawas
Lapangan
Jumlah 5 Instruksi
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Hujan 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini Volum
1 Membersihkan lapangan dan perataan 19.2679 m2
2
3
Catatan lalu
1 Pekerjaan terganggu karena hujan
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 5 Instruksi
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Hujan 5
Catatan lalu
1 Pekerjaan terganggu karena hujan
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 5 Instruksi
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Hujan 5
Catatan lalu
1 Pekerjaan terganggu karena hujan
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 5 Instruksi
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Hujan 5
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 5 Instruksi
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
Hari : Senin
Tanggal : 13 Agustus 2018
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Palu 2
19 Benang bol 2
20 Cangkul 2
21
22
23
24
25
AS
Hari : Selasa
Tanggal : 14 Agustus 2018
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Volume
AS
Hari : Rabu
Tanggal : 15 Agustus 2018
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Volume
AS
Hari : Kamis
Tanggal : 16 Agustus 2018
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Volume
AS
Hari : Sabtu
Tanggal : 18 Agustus 2018
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Volume
POGRES PELAKSANAAN MINGGU
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 11.0% 12.7% 15.0% 17.2% 19.4% 21.6% 23.9%
M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 Total
8.20%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031 0.011
8.20%
26.1% 28.3% 30.5% 34.3% 40.3% 46.3% 50.7% 57.1% 62.7% 72.4% 78.3% 84.1% 88.2% 90.7% 92.7% 95.8% 98.9% 100%
100%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
VOLUME
NO URAIAN PEKERJAAN BOBOT
Volume Satuan PELAKSANAAN
(%)
Minggu lalu
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tin 65.75 m1 1.407 65.750
2 Pengukuran dan pemasangan bouwplank 42.50 Ls 0.909 42.500
3 Pembuatan gudang semen dan alat-alat 4.00 m2 0.086 4.000
4 Membersihkan lapangan dan perataan 269.8 m2 5.772 269.750
5 Pasang papan nama kegiatan 1.00 Ls 0.021 1.000
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 103.21 m3 0.626
2 Urugan kembali 36.12 m3 0.219
3 Urugan pasir 19.15 m3 0.116
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 m3 2.633
2 Pasang pondasi batu kosong 14.98 m3 0.957
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K10 1.34 m3 0.695
2 Plat lantai beton bertulang t = 12 cm 13.32 m3 6.905
3 Plat teras t = 10 cm 0.70 m3 0.363
4 Plat carport t = 15 cm 8.04 m3 4.168
5 Pondasi telapak beton bertulang 3.54 m3 1.835
6 Sloof beton bertulang 4.73 m3 2.453
7 Kolom beton bertulang 13.35 m3 6.920
8 Balok beton bertulang 5.69 m3 2.947
9 Plat beton tangga t = 12 cm 0.73 m3 0.376
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 59.44 m2 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 367.77 m2 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 168.00 m2 6.636
2 Pasang lantai kayu 15.75 m2 0.622
3 Pasang lantai keramik KM 25 x 25 cm 16.00 m2 0.632
4 Pasang dinding keramik ukuran 20 x 25 64.00 m2 2.528
5 Pasang dinding batu Palimanan 67.46 m2 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 4.00 bh 0.115
2 Pasang wastafel kw. A 1.00 bh 0.029
3 Pasang tempat sabun keramik 4.00 bh 0.115
4 Pasang badkip porselen 1.00 bh 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 m1 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 m1 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 m1 1.005
8 Memasang bak cuci piring stainles steel 1.00 bh 0.029
9 Memasang kran Ø 1/2" 7.00 bh 0.201
10 Memasang Shower TOTO 4.00 Unit 0.115
11 Memasang Afor Stainless Steel 4.00 bh 0.115
12 Pasang Kaca Wastafel 0.50 m2 0.014
13 Memasang water heater WASSER WH5 2.00 Unit 0.057
14 Pekerjaan sumur bor 1.00 Unit 0.029
15 Pekerjaan septicktank 20.21 Unit 0.580
16 Pasang pompa air SANYO PDH200B 1.00 Unit 0.029
17 Pasang tandon air 1 m³ PINGUIN 1.00 Unit 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 19.00 Titik 0.538
2 Pemasangan Saklar Tunggal 10.00 Titik 0.283
3 Pemasangan Saklar Ganda 10.00 Titik 0.283
4 Pemasangan titik lampu TL 20 Watt (komp 22.00 Titik 0.623
5 Pemasangan titik lampu XL 18 Watt 25.00 Titik 0.708
6 Pemasangan Sekering 2 Group 1.00 Unit 0.028
7 Pemasangan Penangkal Petir 1.00 Unit 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 14.00 bh 0.165
2 Pasang engsel pintu 61.00 bh 0.721
3 Pasang engsel jendela 96.00 bh 1.135
4 Pasang grendel pintu 14.00 bh 0.165
5 Pasang grendel jendela 48.00 bh 0.567
6 Pasang hak angin 96.00 bh 1.135
7 Pasang pegangan pintu/door holder 14.00 bh 0.165
8 Pasang door stop 14.00 bh 0.165
9 Pasang kaca polos, tebal 5 mm 32.42 m2 0.383
10 Pasang kaca polos, tebal 8 mm 19.60 m2 0.232
11 Pasang kaca buram, tebal 5 mm 2.90 m2 0.034
12 Pasang kaca tempered 10 mm 48.00 m2 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kam 2.62 m3 0.204
2 Pasang pintu klamp kayu kamper 5.76 m2 0.448
3 Pasang pintu dan jendela kaca kayu kamp 62.06 m2 4.830
4 Pasang lisplang ukuran (3 x 30) cm, kay 42.50 m1 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 116.28 m2 1.085
2 Pasang bubung genteng beton 35.50 m1 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 227.28 m2 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 1,267 kg 4.858
2 Pasang rangka kuda-kuda baja WF 1,036 kg 3.972
3 Ikatan angin/Trekstang 70.43 kg 0.270
4 Pasang talang miring, seng bjls 30 L = 0 5.00 m1 0.019
5 Pasang pagar besi hollow (40x40x2.3 & 31.16 m1 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 m2 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.54 m2 2.306
3 Benangan 274.00 m1 0.859
4 Acian 786.96 m2 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 la 67.82 m2 0.186
2 Pengecatan tembok baru (1 lapis plamir, 1 393.48 m2 1.081
3 Pengecatan tembok baru eksterior (1 lapis 393.48 m2 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 l 227.28 m2 0.624
5 Pengecatan permukaan baja dengan meni - m2 0.000
6 Pengecatan genteng baru (1 lapis plamir, 1 - m2 0.000
7 Pengecatan permukaan baja dengan cat be 116.28 m2 0.319
RAN MINGGUAN
Minggu ke 7
Bulan ke 2
Tanggal : 20 Agustus s/d 25 Agustus 2018
Pengawas
Lapangan
Jumlah 10
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah
5
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Galian tanah biasa sedalam 1 m 10.3214 m3
2 Urugan pasir 0.76598 m3
3 Pasang pondasi batu kali 1 Pc : 4 Ps 1.64824 m3
4 Pasang pondasi batu kosong 0.59936 m3
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja
karena cuaca Cerah
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 6
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja
karena cuaca Cerah
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 6
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja
karena cuaca Cerah
Catatan lalu
1 Istirahat Jumat jam 11.00-12.30
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 7
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja
karena cuaca Cerah 4
Catatan lalu
1
2
3
4
5
6
Hari : Senin
Tanggal : 20 Agustus 2018
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cangkul 2
19 Cetok 4
20 Skop 3
21 ember 4
22
23
24
25
Hari : Selasa
Tanggal : 21 Agustus 2018
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cangkul 2
19 Cetok 4
20 Skop 3
21 ember 4
22
23
24
25
Volume
Hari : Kamis
Tanggal : 23 Agustus 2018
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cangkul 2
19 Cetok 4
20 Skop 3
21 ember 4
22
23
24
25
Volume
Hari : Jumat
Tanggal : 24 Agustus 2018
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cangkul 2
19 Cetok 4
20 Skop 3
21 ember 4
22
23
24
25
Volume
Hari : Sabtu
Tanggal : 25 Agustus 2018
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cangkul 2
19 Cetok 4
20 Skop 3
21 ember 4
22
23
24
25
Volume
POGRES PELAKSANAAN MINGGU
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 11.0% 12.7% 15.0% 17.2% 19.4% 21.6% 23.9%
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25%
M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 Total
8.20%
0.34%
0.72%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031 0.011
9.25%
26.1% 28.3% 30.5% 34.3% 40.3% 46.3% 50.7% 57.1% 62.7% 72.4% 78.3% 84.1% 88.2% 90.7% 92.7% 95.8% 98.9% 100%
100%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
VOLUME
NO URAIAN PEKERJAAN BOBOT
Volume Satuan PELAKSANAAN
(%)
Minggu lalu
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, t 65.75 m1 1.407 65.750
2 Pengukuran dan pemasangan bouwplan 42.50 Ls 0.909 42.500
3 Pembuatan gudang semen dan alat-alat 4.00 m2 0.086 4.000
4 Membersihkan lapangan dan perataan 269.8 m2 5.772 269.750
5 Pasang papan nama kegiatan 1.00 Ls 0.021 1.000
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 103.2 m3 0.626 51.607
2 Urugan kembali 36.12 m3 0.219
3 Urugan pasir 19.15 m3 0.116 3.830
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 m3 2.633 8.241
2 Pasang pondasi batu kosong 14.98 m3 0.957 2.997
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K 1.34 m3 0.695
2 Plat lantai beton bertulang t = 12 cm 13.32 m3 6.905
3 Plat teras t = 10 cm 0.70 m3 0.363
4 Plat carport t = 15 cm 8.04 m3 4.168
5 Pondasi telapak beton bertulang 3.54 m3 1.835
6 Sloof beton bertulang 4.73 m3 2.453
7 Kolom beton bertulang 13.35 m3 6.920
8 Balok beton bertulang 5.69 m3 2.947
9 Plat beton tangga t = 12 cm 0.73 m3 0.376
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc 59.44 m2 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc 367.77 m2 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 168.00 m2 6.636
2 Pasang lantai kayu 15.75 m2 0.622
3 Pasang lantai keramik KM 25 x 25 cm 16.00 m2 0.632
4 Pasang dinding keramik ukuran 20 x 2 64.00 m2 2.528
5 Pasang dinding batu Palimanan 67.46 m2 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 4.00 bh 0.115
2 Pasang wastafel kw. A 1.00 bh 0.029
3 Pasang tempat sabun keramik 4.00 bh 0.115
4 Pasang badkip porselen 1.00 bh 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 m1 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 m1 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 m1 1.005
8 Memasang bak cuci piring stainles stee 1.00 bh 0.029
9 Memasang kran Ø 1/2" 7.00 bh 0.201
10 Memasang Shower TOTO 4.00 Unit 0.115
11 Memasang Afor Stainless Steel 4.00 bh 0.115
12 Pasang Kaca Wastafel 0.50 m2 0.014
13 Memasang water heater WASSER WH 2.00 Unit 0.057
14 Pekerjaan sumur bor 1.00 Unit 0.029
15 Pekerjaan septicktank 20.21 Unit 0.580
16 Pasang pompa air SANYO PDH200B 1.00 Unit 0.029
17 Pasang tandon air 1 m³ PINGUIN 1.00 Unit 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 19.00 Titik 0.538
2 Pemasangan Saklar Tunggal 10.00 Titik 0.283
3 Pemasangan Saklar Ganda 10.00 Titik 0.283
4 Pemasangan titik lampu TL 20 Watt (ko 22.00 Titik 0.623
5 Pemasangan titik lampu XL 18 Watt 25.00 Titik 0.708
6 Pemasangan Sekering 2 Group 1.00 Unit 0.028
7 Pemasangan Penangkal Petir 1.00 Unit 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 14.00 bh 0.165
2 Pasang engsel pintu 61.00 bh 0.721
3 Pasang engsel jendela 96.00 bh 1.135
4 Pasang grendel pintu 14.00 bh 0.165
5 Pasang grendel jendela 48.00 bh 0.567
6 Pasang hak angin 96.00 bh 1.135
7 Pasang pegangan pintu/door holder 14.00 bh 0.165
8 Pasang door stop 14.00 bh 0.165
9 Pasang kaca polos, tebal 5 mm 32.42 m2 0.383
10 Pasang kaca polos, tebal 8 mm 19.60 m2 0.232
11 Pasang kaca buram, tebal 5 mm 2.90 m2 0.034
12 Pasang kaca tempered 10 mm 48.00 m2 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu k 2.62 m3 0.204
2 Pasang pintu klamp kayu kamper 5.76 m2 0.448
3 Pasang pintu dan jendela kaca kayu ka 62.06 m2 4.830
4 Pasang lisplang ukuran (3 x 30) cm, k 42.50 m1 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 116.28 m2 1.085
2 Pasang bubung genteng beton 35.50 m1 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 227.3 m2 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 1,267 kg 4.858
2 Pasang rangka kuda-kuda baja WF 1,036 kg 3.972
3 Ikatan angin/Trekstang 70.43 kg 0.270
4 Pasang talang miring, seng bjls 30 L = 5.00 m1 0.019
5 Pasang pagar besi hollow (40x40x2.3 31.16 m1 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 m2 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.5 m2 2.306
3 Benangan 274.0 m1 0.859
4 Acian 787.0 m2 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 67.82 m2 0.186
2 Pengecatan tembok baru (1 lapis plamir, 393.5 m2 1.081
3 Pengecatan tembok baru eksterior (1 lapi 393.5 m2 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 227.3 m2 0.624
5 Pengecatan permukaan baja dengan men - m2 0.000
6 Pengecatan genteng baru (1 lapis plamir, - m2 0.000
7 Pengecatan permukaan baja dengan cat 116.28 m2 0.319
ORAN MINGGUAN
Minggu ke 8
Bulan ke 2
Tanggal : 27 Agustus s/d 1 September 2018
Pengawas
Lapangan
Jumlah 9 Instruksi
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja
karena cuaca Cerah 4
Pekerjaan Yang Dilaksanakan Pada Hari Ini Volum
1 Galian tanah biasa sedalam 1 m 8.60117 m3
2 Urugan pasir 0.63832 m3
3 Pasang pondasi batu kali 1 Pc : 4 Ps 1.373533 m3
4 Pasang pondasi batu kosong 0.499467 m3
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 6 Instruksi
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 5 Instruksi
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 5 Instruksi
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 5 Instruksi
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 5 Instruksi
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
Hari : Senin
Tanggal : 27 Agustus 2018
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Hari : Selasa
Tanggal : 28 Agustus 2018
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
Hari : Rabu
Tanggal : 29 Agustus 2018
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
Hari : Kamis
Tanggal : 30 Agustus 2018
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
Hari : Jumat
Tanggal : 31 Agustus 2018
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
Hari : Sabtu
Tanggal : 01-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
POGRES PELAKSANAAN MIN
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 11.0% 12.7% 15.0% 17.2% 19.4% 21.6%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.3%
M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 Total
8.20%
0.67%
1.44%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031 0.011
10.3%
23.9% 26.1% 28.3% 30.5% 34.3% 40.3% 46.3% 50.7% 57.1% 62.7% 72.4% 78.3% 84.1% 88.2% 90.7% 92.7% 95.8% 98.9% 100%
100%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS Minggu ke
LOKASI : KOTA BATU Bulan ke
Tanggal
VOLUME
NO URAIAN PEKERJAAN BOBOT
Volume Satuan PELAKSANAAN
(%)
Minggu lalu
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, t 65.75 m1 1.407 65.750
2 Pengukuran dan pemasangan bouwplan 42.50 Ls 0.909 42.500
3 Pembuatan gudang semen dan alat-alat 4.00 m2 0.086 4.000
4 Membersihkan lapangan dan perataan 269.75 m2 5.772 269.750
5 Pasang papan nama kegiatan 1.00 Ls 0.021 1.000
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 103.21 m3 0.626 103.214
2 Urugan kembali 36.12 m3 0.219
3 Urugan pasir 19.15 m3 0.116 7.660
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 m3 2.633 16.482
2 Pasang pondasi batu kosong 14.98 m3 0.957 5.994
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K 1.34 m3 0.695
2 Plat lantai beton bertulang t = 12 cm 13.32 m3 6.905
3 Plat teras t = 10 cm 0.70 m3 0.363
4 Plat carport t = 15 cm 8.04 m3 4.168
5 Pondasi telapak beton bertulang 3.54 m3 1.835
6 Sloof beton bertulang 4.73 m3 2.453
7 Kolom beton bertulang 13.35 m3 6.920
8 Balok beton bertulang 5.69 m3 2.947
9 Plat beton tangga t = 12 cm 0.73 m3 0.376
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc 59.44 m2 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc 367.77 m2 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 168.00 m2 6.636
2 Pasang lantai kayu 15.75 m2 0.622
3 Pasang lantai keramik KM 25 x 25 cm 16.00 m2 0.632
4 Pasang dinding keramik ukuran 20 x 2 64.00 m2 2.528
5 Pasang dinding batu Palimanan 67.46 m2 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 4.00 bh 0.115
2 Pasang wastafel kw. A 1.00 bh 0.029
3 Pasang tempat sabun keramik 4.00 bh 0.115
4 Pasang badkip porselen 1.00 bh 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 m1 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 m1 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 m1 1.005
8 Memasang bak cuci piring stainles steel 1.00 bh 0.029
9 Memasang kran Ø 1/2" 7.00 bh 0.201
10 Memasang Shower TOTO 4.00 Unit 0.115
11 Memasang Afor Stainless Steel 4.00 bh 0.115
12 Pasang Kaca Wastafel 0.50 m2 0.014
13 Memasang water heater WASSER WH 2.00 Unit 0.057
14 Pekerjaan sumur bor 1.00 Unit 0.029
15 Pekerjaan septicktank 20.21 Unit 0.580
16 Pasang pompa air SANYO PDH200B 1.00 Unit 0.029
17 Pasang tandon air 1 m³ PINGUIN 1.00 Unit 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 19.00 Titik 0.538
2 Pemasangan Saklar Tunggal 10.00 Titik 0.283
3 Pemasangan Saklar Ganda 10.00 Titik 0.283
4 Pemasangan titik lampu TL 20 Watt (kom 22.00 Titik 0.623
5 Pemasangan titik lampu XL 18 Watt 25.00 Titik 0.708
6 Pemasangan Sekering 2 Group 1.00 Unit 0.028
7 Pemasangan Penangkal Petir 1.00 Unit 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 14.00 bh 0.165
2 Pasang engsel pintu 61.00 bh 0.721
3 Pasang engsel jendela 96.00 bh 1.135
4 Pasang grendel pintu 14.00 bh 0.165
5 Pasang grendel jendela 48.00 bh 0.567
6 Pasang hak angin 96.00 bh 1.135
7 Pasang pegangan pintu/door holder 14.00 bh 0.165
8 Pasang door stop 14.00 bh 0.165
9 Pasang kaca polos, tebal 5 mm 32.42 m2 0.383
10 Pasang kaca polos, tebal 8 mm 19.60 m2 0.232
11 Pasang kaca buram, tebal 5 mm 2.90 m2 0.034
12 Pasang kaca tempered 10 mm 48.00 m2 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu k 2.62 m3 0.204
2 Pasang pintu klamp kayu kamper 5.76 m2 0.448
3 Pasang pintu dan jendela kaca kayu ka 62.06 m2 4.830
4 Pasang lisplang ukuran (3 x 30) cm, ka 42.50 m1 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 116.28 m2 1.085
2 Pasang bubung genteng beton 35.50 m1 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 227.28 m2 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 1,267.15 kg 4.858
2 Pasang rangka kuda-kuda baja WF 1,036.00 kg 3.972
3 Ikatan angin/Trekstang 70.43 kg 0.270
4 Pasang talang miring, seng bjls 30 L = 5.00 m1 0.019
5 Pasang pagar besi hollow (40x40x2.3 31.16 m1 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 m2 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.54 m2 2.306
3 Benangan 274.00 m1 0.859
4 Acian 786.96 m2 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 l 67.82 m2 0.186
2 Pengecatan tembok baru (1 lapis plamir, 393.48 m2 1.081
3 Pengecatan tembok baru eksterior (1 lapis 393.48 m2 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 227.28 m2 0.624
5 Pengecatan permukaan baja dengan men - m2 0.000
6 Pengecatan genteng baru (1 lapis plamir, - m2 0.000
7 Pengecatan permukaan baja dengan cat 116.28 m2 0.319
RAN MINGGUAN
9
3
: 2 September s/d 8 September 2018
VOLUME VOLUME
Prosentse Total BOBOT
PELAKSANAAN PELAKSANAAN Pelaksan
Minggu ini Minggu lalu Minggu ini Volume Bobot aan(%)
Pengawas
Lapangan
Jumlah 9 Instr
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini V
1 Urugan kembali 3.01041 m3
2 Urugan pasir 0.63832 m3
3 Pasang pondasi batu kali 1 Pc : 4 Ps 1.373533 m3
4 Pasang pondasi batu kosong 0.499467 m3
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instr
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instr
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instr
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instr
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instr
1
Bekerja mulai jam : 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
Hari : Senin
Tanggal : 3-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Hari : Selasa
Tanggal : 4-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
Hari : Rabu
Tanggal : 5-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
Hari : Kamis
Tanggal : 6-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
Hari : Jumat
Tanggal : 7-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
Hari : Sabtu
Tanggal : 8-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
POGRES PELAKSANAAN MIN
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 11.0% 12.7% 15.0% 17.2% 19.4% 21.6%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.3% 11.15%
M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 Total
8.20%
0.80%
2.15%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031 0.011
11.15%
23.9% 26.1% 28.3% 30.5% 34.3% 40.3% 46.3% 50.7% 57.1% 62.7% 72.4% 78.3% 84.1% 88.2% 90.7% 92.7% 95.8% 98.9% 100%
100%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tin 65.75 m1 1.407
2 Pengukuran dan pemasangan bouwplank 42.50 Ls 0.909
3 Pembuatan gudang semen dan alat-alat 4.00 m2 0.086
4 Membersihkan lapangan dan perataan 269.75 m2 5.772
5 Pasang papan nama kegiatan 1.00 Ls 0.021
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 103.21 m3 0.626
2 Urugan kembali 36.12 m3 0.219
3 Urugan pasir 19.15 m3 0.116
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 m3 2.633
2 Pasang pondasi batu kosong 14.98 m3 0.957
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K10 1.34 m3 0.695
2 Plat lantai beton bertulang t = 12 cm 13.32 m3 6.905
3 Plat teras t = 10 cm 0.70 m3 0.363
4 Plat carport t = 15 cm 8.04 m3 4.168
5 Pondasi telapak beton bertulang 3.54 m3 1.835
6 Sloof beton bertulang 4.73 m3 2.453
7 Kolom beton bertulang 13.35 m3 6.920
8 Balok beton bertulang 5.69 m3 2.947
9 Plat beton tangga t = 12 cm 0.73 m3 0.376
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 59.44 m2 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 367.77 m2 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 168.00 m2 6.636
2 Pasang lantai kayu 15.75 m2 0.622
3 Pasang lantai keramik KM 25 x 25 cm 16.00 m2 0.632
4 Pasang dinding keramik ukuran 20 x 25 64.00 m2 2.528
5 Pasang dinding batu Palimanan 67.46 m2 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 4.00 bh 0.115
2 Pasang wastafel kw. A 1.00 bh 0.029
3 Pasang tempat sabun keramik 4.00 bh 0.115
4 Pasang badkip porselen 1.00 bh 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 m1 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 m1 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 m1 1.005
8 Memasang bak cuci piring stainles steel 1.00 bh 0.029
9 Memasang kran Ø 1/2" 7.00 bh 0.201
10 Memasang Shower TOTO 4.00 Unit 0.115
11 Memasang Afor Stainless Steel 4.00 bh 0.115
12 Pasang Kaca Wastafel 0.50 m2 0.014
13 Memasang water heater WASSER WH50 2.00 Unit 0.057
14 Pekerjaan sumur bor 1.00 Unit 0.029
15 Pekerjaan septicktank 20.21 Unit 0.580
16 Pasang pompa air SANYO PDH200B 1.00 Unit 0.029
17 Pasang tandon air 1 m³ PINGUIN 1.00 Unit 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 19.00 Titik 0.538
2 Pemasangan Saklar Tunggal 10.00 Titik 0.283
3 Pemasangan Saklar Ganda 10.00 Titik 0.283
4 Pemasangan titik lampu TL 20 Watt (komp 22.00 Titik 0.623
5 Pemasangan titik lampu XL 18 Watt 25.00 Titik 0.708
6 Pemasangan Sekering 2 Group 1.00 Unit 0.028
7 Pemasangan Penangkal Petir 1.00 Unit 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 14.00 bh 0.165
2 Pasang engsel pintu 61.00 bh 0.721
3 Pasang engsel jendela 96.00 bh 1.135
4 Pasang grendel pintu 14.00 bh 0.165
5 Pasang grendel jendela 48.00 bh 0.567
6 Pasang hak angin 96.00 bh 1.135
7 Pasang pegangan pintu/door holder 14.00 bh 0.165
8 Pasang door stop 14.00 bh 0.165
9 Pasang kaca polos, tebal 5 mm 32.42 m2 0.383
10 Pasang kaca polos, tebal 8 mm 19.60 m2 0.232
11 Pasang kaca buram, tebal 5 mm 2.90 m2 0.034
12 Pasang kaca tempered 10 mm 48.00 m2 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kam 2.62 m3 0.204
2 Pasang pintu klamp kayu kamper 5.76 m2 0.448
3 Pasang pintu dan jendela kaca kayu kamp 62.06 m2 4.830
4 Pasang lisplang ukuran (3 x 30) cm, kay 42.50 m1 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 116.28 m2 1.085
2 Pasang bubung genteng beton 35.50 m1 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 227.28 m2 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 1,267.15 kg 4.858
2 Pasang rangka kuda-kuda baja WF 1,036.00 kg 3.972
3 Ikatan angin/Trekstang 70.43 kg 0.270
4 Pasang talang miring, seng bjls 30 L = 0. 5.00 m1 0.019
5 Pasang pagar besi hollow (40x40x2.3 & 31.16 m1 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 m2 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.54 m2 2.306
3 Benangan 274.00 m1 0.859
4 Acian 786.96 m2 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lap 67.82 m2 0.186
2 Pengecatan tembok baru (1 lapis plamir, 1 393.48 m2 1.081
3 Pengecatan tembok baru eksterior (1 lapis 393.48 m2 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 l 227.28 m2 0.624
5 Pengecatan permukaan baja dengan meni - m2 0.000
6 Pengecatan genteng baru (1 lapis plamir, 1 - m2 0.000
7 Pengecatan permukaan baja dengan cat be 116.28 m2 0.319
LAPORAN MINGGUAN
Minggu ke 10
Bulan ke 3
Tanggal : 10 September s/d 15 September 2018
Pengawas
Lapangan
Jumlah 9 Instruksi Y
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini Volum
1 Urugan pasir 0.76598 m3
2 Pasang pondasi batu kali 1 Pc : 4 Ps 1.64824 m3
3 Pasang pondasi batu kosong 0.59936 m3
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instruksi Y
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instruksi Y
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instruksi Y
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini Volum
1 Urugan pasir 0.76598 m3
2 Pasang pondasi batu kali 1 Pc : 4 Ps 1.64824 m3
3 Pasang pondasi batu kosong 0.59936 m3
Catatan lalu
1 Istirahat sholat jumat jam 11.00-12
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instruksi Y
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
Hari : Senin
Tanggal : 10-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Hari : Rabu
Tanggal : 12-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
Hari : Kamis'
Tanggal : 13-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
Hari : Jumat
Tanggal : 14-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Hari : Sabtu
Tanggal : 15-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
POGRES PELAKSANAAN MIN
1 PEKERJAAN PERSIAPAN Rp 78,536,311.3 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 11.0% 12.7% 15.0% 17.2% 19.4% 21.6%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 1.6% 1.1% 1.1% 0.9% 0.7%
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.2% 9.2% 10.3% 11.2% 11.9%
M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 Total
8.20%
0.83%
2.87%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031 0.011
11.90%
23.9% 26.1% 28.3% 30.5% 34.3% 40.3% 46.3% 50.7% 57.1% 62.7% 72.4% 78.3% 84.1% 88.2% 90.7% 92.7% 95.8% 98.9% 100%
100%
LAPORAN MINGG
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan gudang semen dan alat-alat
4 Membersihkan lapangan dan perataan
5 Pasang papan nama kegiatan
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m
2 Urugan kembali
3 Urugan pasir
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps
2 Pasang pondasi batu kosong
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
2 Plat lantai beton bertulang t = 12 cm
3 Plat teras t = 10 cm
4 Plat carport t = 15 cm
5 Pondasi telapak beton bertulang
6 Sloof beton bertulang
7 Kolom beton bertulang
8 Balok beton bertulang
9 Plat beton tangga t = 12 cm
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm
2 Pasang lantai kayu
3 Pasang lantai keramik KM 25 x 25 cm
4 Pasang dinding keramik ukuran 20 x 25 cm
5 Pasang dinding batu Palimanan
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A
2 Pasang wastafel kw. A
3 Pasang tempat sabun keramik
4 Pasang badkip porselen
5 Memasang pipa PVC tipe AW, Ø 1/2"
6 Memasang pipa PVC tipe AW, Ø 3/4"
7 Memasang pipa PVC tipe AW, Ø 3"
8 Memasang bak cuci piring stainles steel
9 Memasang kran Ø 1/2"
10 Memasang Shower TOTO
11 Memasang Afor Stainless Steel
12 Pasang Kaca Wastafel
13 Memasang water heater WASSER WH506A
14 Pekerjaan sumur bor
15 Pekerjaan septicktank
16 Pasang pompa air SANYO PDH200B
17 Pasang tandon air 1 m³ PINGUIN
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak
2 Pemasangan Saklar Tunggal
3 Pemasangan Saklar Ganda
4 Pemasangan titik lampu TL 20 Watt (komplit)
5 Pemasangan titik lampu XL 18 Watt
6 Pemasangan Sekering 2 Group
7 Pemasangan Penangkal Petir
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam
2 Pasang engsel pintu
3 Pasang engsel jendela
4 Pasang grendel pintu
5 Pasang grendel jendela
6 Pasang hak angin
7 Pasang pegangan pintu/door holder
8 Pasang door stop
9 Pasang kaca polos, tebal 5 mm
10 Pasang kaca polos, tebal 8 mm
11 Pasang kaca buram, tebal 5 mm
12 Pasang kaca tempered 10 mm
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper
2 Pasang pintu klamp kayu kamper
3 Pasang pintu dan jendela kaca kayu kamper
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton
2 Pasang bubung genteng beton
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil
2 Pasang rangka kuda-kuda baja WF
3 Ikatan angin/Trekstang
4 Pasang talang miring, seng bjls 30 L = 0.90 m
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm
2 Plesteran 1 Pc : 6 Ps tebal 15 mm
3 Benangan
4 Acian
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
5 Pengecatan permukaan baja dengan meni besi
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
7 Pengecatan permukaan baja dengan cat besi
LAPORAN MINGGUAN
Minggu ke 11
Bulan ke 3
Tanggal : 17 September s/d 22 September 2018
VOLUME VOLUME
BOBOT Prosentse Total
Volume Satuan (%) PELAKSANAAN PELAKSANAAN
Minggu lalu Minggu ini Minggu lalu Minggu ini Volume
1.34 m3 0.695
13.32 m3 6.905
0.70 m3 0.363
8.04 m3 4.168
3.54 m3 1.835
4.73 m3 2.453
13.35 m3 6.920
5.69 m3 2.947
0.73 m3 0.376
59.44 m2 0.666
367.77 m2 4.119
168.00 m2 6.636
15.75 m2 0.622
16.00 m2 0.632
64.00 m2 2.528
67.46 m2 2.665
4.00 bh 0.115
1.00 bh 0.029
4.00 bh 0.115
1.00 bh 0.029
50.00 m1 1.435
35.00 m1 1.005
35.00 m1 1.005
1.00 bh 0.029
7.00 bh 0.201
4.00 Unit 0.115
4.00 bh 0.115
0.50 m2 0.014
2.00 Unit 0.057
1.00 Unit 0.029
20.21 Unit 0.580
1.00 Unit 0.029
1.00 Unit 0.029
14.00 bh 0.165
61.00 bh 0.721
96.00 bh 1.135
14.00 bh 0.165
48.00 bh 0.567
96.00 bh 1.135
14.00 bh 0.165
14.00 bh 0.165
32.42 m2 0.383
19.60 m2 0.232
2.90 m2 0.034
48.00 m2 0.567
2.62 m3 0.204
5.76 m2 0.448
62.06 m2 4.830
42.50 m1 3.308
116.28 m2 1.085
35.50 m1 0.331
227.28 m2 1.127
1,267.15 kg 4.858
1,036.00 kg 3.972
70.43 kg 0.270
5.00 m1 0.019
31.16 m1 0.119
118.88 m2 0.373
735.54 m2 2.306
274.00 m1 0.859
786.96 m2 2.467
67.82 m2 0.186
393.48 m2 1.081
393.48 m2 1.081
227.28 m2 0.624
- m2 0.000
- m2 0.000
116.28 m2 0.319
September s/d 22 September 2018
1.407 8.195
0.909
0.086
5.772
0.021
0.626 0.9608
0.219
0.116
2.633 3.590
0.957
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instruksi Y
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini Volum
1 Urugan kembali 3.01041 m3
2 Urugan pasir 0.63832 m3
3 Pasang pondasi batu kali 1 Pc : 4 Ps 1.373533 m3
4 Pasang pondasi batu kosong 0.499467 m3
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instruksi Y
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instruksi Y
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instruksi Y
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instruksi Y
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 9 Instruksi Y
1
Bekerja mulai jam 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1
2
3
4
5
6
Hari : Senin
Tanggal : 17-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Hari : Selasa
Tanggal : 18-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
Hari : Rabu
Tanggal : 19-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
Hari : Kamis
Tanggal : 20-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
Hari : Jumat
Tanggal : 21-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
Hari : Sabtu
Tanggal : 22-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Cetok 3
19 Ember 4
20 Benangan 2
21
22
23
24
25
Volume
POGRES PELA
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
1. Produktivitas rendah
Resiko Keterlambatan
2. Keterlambatan melihat masalah
ES PELAKSANAAN MINGGUAN
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
0.022 0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
0.009
12.75%
FEBRUARI
M2 Total
0.08%
0.01%
0.04%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.011
0.13%
100.0%
100.0%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS Minggu ke
LOKASI : KOTA BATU Bulan ke
Tanggal
VOLUME
NO URAIAN PEKERJAAN BOBOT
Volume Satuan PELAKSANAAN
(%)
Minggu lalu
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, t 65.75 m1 1.407 65.750
2 Pengukuran dan pemasangan bouwplan 42.50 Ls 0.909 42.500
3 Pembuatan gudang semen dan alat-alat 4.00 m2 0.086 4.000
4 Membersihkan lapangan dan perataan 269.75 m2 5.772 269.750
5 Pasang papan nama kegiatan 1.00 Ls 0.021 1.000
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 103.21 m3 0.626 103.214
2 Urugan kembali 36.12 m3 0.219 36.125
3 Urugan pasir 19.15 m3 0.116 19.150
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 m3 2.633 41.206
2 Pasang pondasi batu kosong 14.98 m3 0.957 14.984
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K 1.34 m3 0.695
2 Plat lantai beton bertulang t = 12 cm 13.32 m3 6.905
3 Plat teras t = 10 cm 0.70 m3 0.363
4 Plat carport t = 15 cm 8.04 m3 4.168
5 Pondasi telapak beton bertulang 3.54 m3 1.835
6 Sloof beton bertulang 4.73 m3 2.453
7 Kolom beton bertulang 13.35 m3 6.920
8 Balok beton bertulang 5.69 m3 2.947
9 Plat beton tangga t = 12 cm 0.73 m3 0.376
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc 59.44 m2 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc 367.77 m2 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 168.00 m2 6.636
2 Pasang lantai kayu 15.75 m2 0.622
3 Pasang lantai keramik KM 25 x 25 cm 16.00 m2 0.632
4 Pasang dinding keramik ukuran 20 x 2 64.00 m2 2.528
5 Pasang dinding batu Palimanan 67.46 m2 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 4.00 bh 0.115
2 Pasang wastafel kw. A 1.00 bh 0.029
3 Pasang tempat sabun keramik 4.00 bh 0.115
4 Pasang badkip porselen 1.00 bh 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 m1 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 m1 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 m1 1.005
8 Memasang bak cuci piring stainles stee 1.00 bh 0.029
9 Memasang kran Ø 1/2" 7.00 bh 0.201
10 Memasang Shower TOTO 4.00 Unit 0.115
11 Memasang Afor Stainless Steel 4.00 bh 0.115
12 Pasang Kaca Wastafel 0.50 m2 0.014
13 Memasang water heater WASSER WH 2.00 Unit 0.057
14 Pekerjaan sumur bor 1.00 Unit 0.029
15 Pekerjaan septicktank 20.21 Unit 0.580
16 Pasang pompa air SANYO PDH200B 1.00 Unit 0.029
17 Pasang tandon air 1 m³ PINGUIN 1.00 Unit 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 19.00 Titik 0.538
2 Pemasangan Saklar Tunggal 10.00 Titik 0.283
3 Pemasangan Saklar Ganda 10.00 Titik 0.283
4 Pemasangan titik lampu TL 20 Watt (ko 22.00 Titik 0.623
5 Pemasangan titik lampu XL 18 Watt 25.00 Titik 0.708
6 Pemasangan Sekering 2 Group 1.00 Unit 0.028
7 Pemasangan Penangkal Petir 1.00 Unit 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 14.00 bh 0.165
2 Pasang engsel pintu 61.00 bh 0.721
3 Pasang engsel jendela 96.00 bh 1.135
4 Pasang grendel pintu 14.00 bh 0.165
5 Pasang grendel jendela 48.00 bh 0.567
6 Pasang hak angin 96.00 bh 1.135
7 Pasang pegangan pintu/door holder 14.00 bh 0.165
8 Pasang door stop 14.00 bh 0.165
9 Pasang kaca polos, tebal 5 mm 32.42 m2 0.383
10 Pasang kaca polos, tebal 8 mm 19.60 m2 0.232
11 Pasang kaca buram, tebal 5 mm 2.90 m2 0.034
12 Pasang kaca tempered 10 mm 48.00 m2 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu k 2.62 m3 0.204
2 Pasang pintu klamp kayu kamper 5.76 m2 0.448
3 Pasang pintu dan jendela kaca kayu ka 62.06 m2 4.830
4 Pasang lisplang ukuran (3 x 30) cm, k 42.50 m1 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 116.28 m2 1.085
2 Pasang bubung genteng beton 35.50 m1 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 227.28 m2 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil ### kg 4.858
2 Pasang rangka kuda-kuda baja WF ### kg 3.972
3 Ikatan angin/Trekstang 70.43 kg 0.270
4 Pasang talang miring, seng bjls 30 L = 5.00 m1 0.019
5 Pasang pagar besi hollow (40x40x2.3 31.16 m1 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 m2 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.54 m2 2.306
3 Benangan 274.00 m1 0.859
4 Acian 786.96 m2 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 67.82 m2 0.186
2 Pengecatan tembok baru (1 lapis plamir, 393.48 m2 1.081
3 Pengecatan tembok baru eksterior (1 lapi 393.48 m2 1.081
4 Pengecatan plafon baru (1 lapis plamir, 227.28 m2 0.624
5 Pengecatan permukaan baja dengan men - m2 0.000
6 Pengecatan genteng baru (1 lapis plamir, - m2 0.000
7 Pengecatan permukaan baja dengan cat 116.28 m2 0.319
LAPORAN MINGGUAN
12
3
: 24 September s/d 29 September 2018
VOLUME VOLUME
Prosentse Total BOBOT
PELAKSANAAN PELAKSANAAN Pelaksa
Minggu iniMinggu lalu Minggu ini Volume Bobot naan(%)
3.75373
Pengawas
Lapangan
Jumlah 10 Instru
1
Bekerja mulai ja 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini Vo
1 Pondasi telapak beton bertulang 0.59 m3
2 Sloof beton bertulang 0.39431 m3
3 Kolom beton bertulang 0.222463 m3
4
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instru
1
Bekerja mulai ja 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instru
1
Bekerja mulai ja 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instru
1
Bekerja mulai ja 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instru
1
Bekerja mulai ja 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instru
1
Bekerja mulai ja 07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena cuaca Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
Hari : Senin
Tanggal : 24-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Hari : Selasa
Tanggal : 25-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Volume
Hari : Rabu
Tanggal : 26-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Volume
Hari : Kamis
Tanggal : 27-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Volume
Hari : Jumat
Tanggal : 28-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Volume
Hari : Sabtu
Tanggal : 29-Sep-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Volume
POGRES PELA
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
0.038
0.022 0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
0.009 0.038
12.75% 16.50%
FEBRUARI
M2 Total
8.20%
0.96%
3.59%
3.75%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.011
16.50%
100.0%
100.0%
LAPORAN MINGG
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter 65.75 m1 1.407
2 Pengukuran dan pemasangan bouwplank 42.50 Ls 0.909
3 Pembuatan gudang semen dan alat-alat 4.00 m2 0.086
4 Membersihkan lapangan dan perataan 269.75 m2 5.772
5 Pasang papan nama kegiatan 1.00 Ls 0.021
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 103.21 m3 0.626
2 Urugan kembali 36.12 m3 0.219
3 Urugan pasir 19.15 m3 0.116
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 41.21 m3 2.633
2 Pasang pondasi batu kosong 14.98 m3 0.957
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 1.34 m3 0.695
2 Plat lantai beton bertulang t = 12 cm 13.32 m3 6.905
3 Plat teras t = 10 cm 0.70 m3 0.363
4 Plat carport t = 15 cm 8.04 m3 4.168
5 Pondasi telapak beton bertulang 3.54 m3 1.835
6 Sloof beton bertulang 4.73 m3 2.453
7 Kolom beton bertulang 13.35 m3 6.920
8 Balok beton bertulang 5.69 m3 2.947
9 Plat beton tangga t = 12 cm 0.73 m3 0.376
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 59.44 m2 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 367.77 m2 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 168.00 m2 6.636
2 Pasang lantai kayu 15.75 m2 0.622
3 Pasang lantai keramik KM 25 x 25 cm 16.00 m2 0.632
4 Pasang dinding keramik ukuran 20 x 25 cm 64.00 m2 2.528
5 Pasang dinding batu Palimanan 67.46 m2 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 4.00 bh 0.115
2 Pasang wastafel kw. A 1.00 bh 0.029
3 Pasang tempat sabun keramik 4.00 bh 0.115
4 Pasang badkip porselen 1.00 bh 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 50.00 m1 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 35.00 m1 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 35.00 m1 1.005
8 Memasang bak cuci piring stainles steel 1.00 bh 0.029
9 Memasang kran Ø 1/2" 7.00 bh 0.201
10 Memasang Shower TOTO 4.00 Unit 0.115
11 Memasang Afor Stainless Steel 4.00 bh 0.115
12 Pasang Kaca Wastafel 0.50 m2 0.014
13 Memasang water heater WASSER WH506A 2.00 Unit 0.057
14 Pekerjaan sumur bor 1.00 Unit 0.029
15 Pekerjaan septicktank 20.21 Unit 0.580
16 Pasang pompa air SANYO PDH200B 1.00 Unit 0.029
17 Pasang tandon air 1 m³ PINGUIN 1.00 Unit 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 19.00 Titik 0.538
2 Pemasangan Saklar Tunggal 10.00 Titik 0.283
3 Pemasangan Saklar Ganda 10.00 Titik 0.283
4 Pemasangan titik lampu TL 20 Watt (komplit) 22.00 Titik 0.623
5 Pemasangan titik lampu XL 18 Watt 25.00 Titik 0.708
6 Pemasangan Sekering 2 Group 1.00 Unit 0.028
7 Pemasangan Penangkal Petir 1.00 Unit 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 14.00 bh 0.165
2 Pasang engsel pintu 61.00 bh 0.721
3 Pasang engsel jendela 96.00 bh 1.135
4 Pasang grendel pintu 14.00 bh 0.165
5 Pasang grendel jendela 48.00 bh 0.567
6 Pasang hak angin 96.00 bh 1.135
7 Pasang pegangan pintu/door holder 14.00 bh 0.165
8 Pasang door stop 14.00 bh 0.165
9 Pasang kaca polos, tebal 5 mm 32.42 m2 0.383
10 Pasang kaca polos, tebal 8 mm 19.60 m2 0.232
11 Pasang kaca buram, tebal 5 mm 2.90 m2 0.034
12 Pasang kaca tempered 10 mm 48.00 m2 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper 2.62 m3 0.204
2 Pasang pintu klamp kayu kamper 5.76 m2 0.448
3 Pasang pintu dan jendela kaca kayu kamper 62.06 m2 4.830
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 42.50 m1 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 116.28 m2 1.085
2 Pasang bubung genteng beton 35.50 m1 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 227.28 m2 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 1,267.15 kg 4.858
2 Pasang rangka kuda-kuda baja WF 1,036.00 kg 3.972
3 Ikatan angin/Trekstang 70.43 kg 0.270
4 Pasang talang miring, seng bjls 30 L = 0.90 m 5.00 m1 0.019
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3) 31.16 m1 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 118.88 m2 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 735.54 m2 2.306
3 Benangan 274.00 m1 0.859
4 Acian 786.96 m2 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 67.82 m2 0.186
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar 393.48 m2 1.081
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis 393.48 m2 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 227.28 m2 0.624
5 Pengecatan permukaan baja dengan meni besi - m2 0.000
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasa - m2 0.000
7 Pengecatan permukaan baja dengan cat besi 116.28 m2 0.319
LAPORAN MINGGUAN
Minggu ke 13
Bulan ke 4
Tanggal : 1 Oktober s/d 6 Oktober 2018
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini Volum
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, 0.07451 m3
2 Plat lantai beton bertulang t = 12 cm 0.222 m3
3 Plat teras t = 10 cm 0.03889 m3
4 Plat carport t = 15 cm 0.134 m3
5 Sloof beton bertulang 0.39431 m3
6 Kolom beton bertulang 0.22246 m3
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2 Istirahat sholat jumat jam 11-12.30
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
R
Hari : Senin
Tanggal : 1-Oct-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
R
Hari : Selasa
Tanggal : 2-Oct-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Volume
R
Hari : Rabu
Tanggal : 3-Oct-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Volume
R
Hari : Kamis
Tanggal : 4-Oct-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Volume
R
Hari : Jumat
Tanggal : 5-Oct-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Volume
R
Hari : Sabtu
Tanggal : 6-Oct-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Volume
POGRES PELA
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
0.038 0.034
0.022 0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
M2 Total
8.20%
0.96%
3.59%
7.13%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.011
19.88%
100.00%
100.00%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan gudang semen dan alat-alat
4 Membersihkan lapangan dan perataan
5 Pasang papan nama kegiatan
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m
2 Urugan kembali
3 Urugan pasir
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps
2 Pasang pondasi batu kosong
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
2 Plat lantai beton bertulang t = 12 cm
3 Plat teras t = 10 cm
4 Plat carport t = 15 cm
5 Pondasi telapak beton bertulang
6 Sloof beton bertulang
7 Kolom beton bertulang
8 Balok beton bertulang
9 Plat beton tangga t = 12 cm
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm
2 Pasang lantai kayu
3 Pasang lantai keramik KM 25 x 25 cm
4 Pasang dinding keramik ukuran 20 x 25 cm
5 Pasang dinding batu Palimanan
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A
2 Pasang wastafel kw. A
3 Pasang tempat sabun keramik
4 Pasang badkip porselen
5 Memasang pipa PVC tipe AW, Ø 1/2"
6 Memasang pipa PVC tipe AW, Ø 3/4"
7 Memasang pipa PVC tipe AW, Ø 3"
8 Memasang bak cuci piring stainles steel
9 Memasang kran Ø 1/2"
10 Memasang Shower TOTO
11 Memasang Afor Stainless Steel
12 Pasang Kaca Wastafel
13 Memasang water heater WASSER WH506A
14 Pekerjaan sumur bor
15 Pekerjaan septicktank
16 Pasang pompa air SANYO PDH200B
17 Pasang tandon air 1 m³ PINGUIN
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak
2 Pemasangan Saklar Tunggal
3 Pemasangan Saklar Ganda
4 Pemasangan titik lampu TL 20 Watt (komplit)
5 Pemasangan titik lampu XL 18 Watt
6 Pemasangan Sekering 2 Group
7 Pemasangan Penangkal Petir
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam
2 Pasang engsel pintu
3 Pasang engsel jendela
4 Pasang grendel pintu
5 Pasang grendel jendela
6 Pasang hak angin
7 Pasang pegangan pintu/door holder
8 Pasang door stop
9 Pasang kaca polos, tebal 5 mm
10 Pasang kaca polos, tebal 8 mm
11 Pasang kaca buram, tebal 5 mm
12 Pasang kaca tempered 10 mm
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper
2 Pasang pintu klamp kayu kamper
3 Pasang pintu dan jendela kaca kayu kamper
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton
2 Pasang bubung genteng beton
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil
2 Pasang rangka kuda-kuda baja WF
3 Ikatan angin/Trekstang
4 Pasang talang miring, seng bjls 30 L = 0.90 m
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm
2 Plesteran 1 Pc : 6 Ps tebal 15 mm
3 Benangan
4 Acian
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
5 Pengecatan permukaan baja dengan meni besi
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
7 Pengecatan permukaan baja dengan cat besi
N MINGGUAN
Minggu ke 14
Bulan ke 4
Tanggal 8 Oktober s/d 13 Oktober 2018
VOLUME BOBOT
BOBOT
PELAKSANAAN Prosentse Pelaksa
(%) Total (%)
Minggu laluMinggu ini naan(%)
0.666
4.119
6.636
0.622
0.632
2.528
2.665
0.115
0.029
0.115
0.029
1.435
1.005
1.005
0.029
0.201
0.115
0.115
0.014
0.057
0.029
0.580
0.029
0.029
0.538
0.283
0.283
0.623
0.708
0.028
0.028
0.165
0.721
1.135
0.165
0.567
1.135
0.165
0.165
0.383
0.232
0.034
0.567
0.204
0.448
4.830
3.308
1.085
0.331
1.127
4.858
3.972
0.270
0.019
0.119
0.373
2.306
0.859
2.467
0.186
1.081
1.081
0.624
0.000
0.000
0.319
KONTRAKTOR
LAPORAN HARIAN
Jumlah 10
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
LAPORAN HARIAN
Jumlah 10
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
LAPORAN HARIAN
Jumlah 10
KONTRAKTOR
LAPORAN HARIAN
Jumlah 10
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
LAPORAN HARIAN
Jumlah 10
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
LAPORAN HARIAN
Jumlah 10
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
AKTOR
Hari : Senin
Tanggal : 8-Oct-18
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
AKTOR
Hari : Selasa
Tanggal : 9-Oct-18
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
AKTOR
Hari : Rabu
Tanggal : 10-Oct-18
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
AKTOR
Hari : Jumat
Tanggal : 12-Oct-18
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
AKTOR
Hari : Sabtu
Tanggal : 13-Oct-18
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
Resiko Keterlambatan
RES PELAKSANAAN MINGGUAN
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
M2 Total
8.20%
0.96%
3.59%
9.28%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.011
22.03%
100.00%
100.00%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan gudang semen dan alat-alat
4 Membersihkan lapangan dan perataan
5 Pasang papan nama kegiatan
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m
2 Urugan kembali
3 Urugan pasir
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps
2 Pasang pondasi batu kosong
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
2 Plat lantai beton bertulang t = 12 cm
3 Plat teras t = 10 cm
4 Plat carport t = 15 cm
5 Pondasi telapak beton bertulang
6 Sloof beton bertulang
7 Kolom beton bertulang
8 Balok beton bertulang
9 Plat beton tangga t = 12 cm
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm
2 Pasang lantai kayu
3 Pasang lantai keramik KM 25 x 25 cm
4 Pasang dinding keramik ukuran 20 x 25 cm
5 Pasang dinding batu Palimanan
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A
2 Pasang wastafel kw. A
3 Pasang tempat sabun keramik
4 Pasang badkip porselen
5 Memasang pipa PVC tipe AW, Ø 1/2"
6 Memasang pipa PVC tipe AW, Ø 3/4"
7 Memasang pipa PVC tipe AW, Ø 3"
8 Memasang bak cuci piring stainles steel
9 Memasang kran Ø 1/2"
10 Memasang Shower TOTO
11 Memasang Afor Stainless Steel
12 Pasang Kaca Wastafel
13 Memasang water heater WASSER WH506A
14 Pekerjaan sumur bor
15 Pekerjaan septicktank
16 Pasang pompa air SANYO PDH200B
17 Pasang tandon air 1 m³ PINGUIN
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak
2 Pemasangan Saklar Tunggal
3 Pemasangan Saklar Ganda
4 Pemasangan titik lampu TL 20 Watt (komplit)
5 Pemasangan titik lampu XL 18 Watt
6 Pemasangan Sekering 2 Group
7 Pemasangan Penangkal Petir
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam
2 Pasang engsel pintu
3 Pasang engsel jendela
4 Pasang grendel pintu
5 Pasang grendel jendela
6 Pasang hak angin
7 Pasang pegangan pintu/door holder
8 Pasang door stop
9 Pasang kaca polos, tebal 5 mm
10 Pasang kaca polos, tebal 8 mm
11 Pasang kaca buram, tebal 5 mm
12 Pasang kaca tempered 10 mm
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper
2 Pasang pintu klamp kayu kamper
3 Pasang pintu dan jendela kaca kayu kamper
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton
2 Pasang bubung genteng beton
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil
2 Pasang rangka kuda-kuda baja WF
3 Ikatan angin/Trekstang
4 Pasang talang miring, seng bjls 30 L = 0.90 m
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm
2 Plesteran 1 Pc : 6 Ps tebal 15 mm
3 Benangan
4 Acian
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
5 Pengecatan permukaan baja dengan meni besi
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
7 Pengecatan permukaan baja dengan cat besi
LAPORAN MINGGUAN
Minggu ke 15
Bulan ke 4
Tanggal 15 Oktober s/d 20 Oktober 2018
VOLUME BOBOT
BOBOT
PELAKSANAAN Prosentse
(%) Pelaksa
Total (%)
Minggu lalu Minggu ini naan(%)
0.666
4.119
6.636
0.622
0.632
2.528
2.665
0.115
0.029
0.115
0.029
1.435
1.005
1.005
0.029
0.201
0.115
0.115
0.014
0.057
0.029
0.580
0.029
0.029
0.538
0.283
0.283
0.623
0.708
0.028
0.028
0.165
0.721
1.135
0.165
0.567
1.135
0.165
0.165
0.383
0.232
0.034
0.567
0.204
0.448
4.830
3.308
1.085
0.331
1.127
4.858
3.972
0.270
0.019
0.119
0.373
2.306
0.859
2.467
0.186
1.081
1.081
0.624
0.000
0.000
0.319
KONTRAKTOR
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 7
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 7
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 7
KONTRAKTOR
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 7
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 7
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
LAPORAN HARIAN
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 7
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KTOR
Hari : Senin
Tanggal : 15-Oct-18
Pengawas
Lapangan
l
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
KTOR
Hari : Selasa
Tanggal : 16-Oct-18
Pengawas
Lapangan
l
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
KTOR
Hari : Rabu
Tanggal : 17-Oct-18
Pengawas
Lapangan
l
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Pengawas
Lapangan
l
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
KTOR
Hari : Jumat
Tanggal : 19-Oct-18
Pengawas
Lapangan
l
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
KTOR
Hari : Sabtu
Tanggal : 20-Oct-18
Pengawas
Lapangan
l
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
Resiko Keterlambatan
RES PELAKSANAAN MINGGUAN
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
M2 Total
8.20%
0.96%
3.59%
11.44%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.011
24.18%
100.00%
100.00%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan gudang semen dan alat-alat
4 Membersihkan lapangan dan perataan
5 Pasang papan nama kegiatan
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m
2 Urugan kembali
3 Urugan pasir
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps
2 Pasang pondasi batu kosong
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
2 Plat lantai beton bertulang t = 12 cm
3 Plat teras t = 10 cm
4 Plat carport t = 15 cm
5 Pondasi telapak beton bertulang
6 Sloof beton bertulang
7 Kolom beton bertulang
8 Balok beton bertulang
9 Plat beton tangga t = 12 cm
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm
2 Pasang lantai kayu
3 Pasang lantai keramik KM 25 x 25 cm
4 Pasang dinding keramik ukuran 20 x 25 cm
5 Pasang dinding batu Palimanan
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A
2 Pasang wastafel kw. A
3 Pasang tempat sabun keramik
4 Pasang badkip porselen
5 Memasang pipa PVC tipe AW, Ø 1/2"
6 Memasang pipa PVC tipe AW, Ø 3/4"
7 Memasang pipa PVC tipe AW, Ø 3"
8 Memasang bak cuci piring stainles steel
9 Memasang kran Ø 1/2"
10 Memasang Shower TOTO
11 Memasang Afor Stainless Steel
12 Pasang Kaca Wastafel
13 Memasang water heater WASSER WH506A
14 Pekerjaan sumur bor
15 Pekerjaan septicktank
16 Pasang pompa air SANYO PDH200B
17 Pasang tandon air 1 m³ PINGUIN
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak
2 Pemasangan Saklar Tunggal
3 Pemasangan Saklar Ganda
4 Pemasangan titik lampu TL 20 Watt (komplit)
5 Pemasangan titik lampu XL 18 Watt
6 Pemasangan Sekering 2 Group
7 Pemasangan Penangkal Petir
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam
2 Pasang engsel pintu
3 Pasang engsel jendela
4 Pasang grendel pintu
5 Pasang grendel jendela
6 Pasang hak angin
7 Pasang pegangan pintu/door holder
8 Pasang door stop
9 Pasang kaca polos, tebal 5 mm
10 Pasang kaca polos, tebal 8 mm
11 Pasang kaca buram, tebal 5 mm
12 Pasang kaca tempered 10 mm
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper
2 Pasang pintu klamp kayu kamper
3 Pasang pintu dan jendela kaca kayu kamper
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton
2 Pasang bubung genteng beton
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil
2 Pasang rangka kuda-kuda baja WF
3 Ikatan angin/Trekstang
4 Pasang talang miring, seng bjls 30 L = 0.90 m
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm
2 Plesteran 1 Pc : 6 Ps tebal 15 mm
3 Benangan
4 Acian
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
5 Pengecatan permukaan baja dengan meni besi
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
7 Pengecatan permukaan baja dengan cat besi
LAPORAN MINGGUAN
Minggu ke 16
Bulan ke 4
Tanggal : 22 Oktober s/d 27 Oktober 2018
VOLUME BOBOT
BOBOT
PELAKSANAAN Prosentse Pelaksa
(%) Total (%)
Minggu laluMinggu ini naan(%)
0.666
4.119
6.636
0.622
0.632
2.528
2.665
0.115
0.029
0.115
0.029
1.435
1.005
1.005
0.029
0.201
0.115
0.115
0.014
0.057
0.029
0.580
0.029
0.029
0.538
0.283
0.283
0.623
0.708
0.028
0.028
0.165
0.721
1.135
0.165
0.567
1.135
0.165
0.165
0.383
0.232
0.034
0.567
0.204
0.448
4.830
3.308
1.085
0.331
1.127
4.858
3.972
0.270
0.019
0.119
0.373
2.306
0.859
2.467
0.186
1.081
1.081
0.624
0.000
0.000
0.319
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Plat lantai
2 Plat carport
3 Kolom beton bertulang
4
5
6
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2 Istirahat jumat 11-12.30
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
R
Hari : Senin
Tanggal : 22-Oct-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
R
Hari : Selasa
Tanggal : 23-Oct-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
R
Hari : Rabu
Tanggal : 24-Oct-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
R
Hari : Jumat
Tanggal : 26-Oct-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
R
Hari : Sabtu
Tanggal : 27-Oct-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
M2 Total
8.20%
0.96%
3.59%
13.24%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.011
25.98%
100.00%
100.00%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan gudang semen dan alat-alat
4 Membersihkan lapangan dan perataan
5 Pasang papan nama kegiatan
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m
2 Urugan kembali
3 Urugan pasir
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps
2 Pasang pondasi batu kosong
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
2 Plat lantai beton bertulang t = 12 cm
3 Plat teras t = 10 cm
4 Plat carport t = 15 cm
5 Pondasi telapak beton bertulang
6 Sloof beton bertulang
7 Kolom beton bertulang
8 Balok beton bertulang
9 Plat beton tangga t = 12 cm
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm
2 Pasang lantai kayu
3 Pasang lantai keramik KM 25 x 25 cm
4 Pasang dinding keramik ukuran 20 x 25 cm
5 Pasang dinding batu Palimanan
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A
2 Pasang wastafel kw. A
3 Pasang tempat sabun keramik
4 Pasang badkip porselen
5 Memasang pipa PVC tipe AW, Ø 1/2"
6 Memasang pipa PVC tipe AW, Ø 3/4"
7 Memasang pipa PVC tipe AW, Ø 3"
8 Memasang bak cuci piring stainles steel
9 Memasang kran Ø 1/2"
10 Memasang Shower TOTO
11 Memasang Afor Stainless Steel
12 Pasang Kaca Wastafel
13 Memasang water heater WASSER WH506A
14 Pekerjaan sumur bor
15 Pekerjaan septicktank
16 Pasang pompa air SANYO PDH200B
17 Pasang tandon air 1 m³ PINGUIN
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak
2 Pemasangan Saklar Tunggal
3 Pemasangan Saklar Ganda
4 Pemasangan titik lampu TL 20 Watt (komplit)
5 Pemasangan titik lampu XL 18 Watt
6 Pemasangan Sekering 2 Group
7 Pemasangan Penangkal Petir
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam
2 Pasang engsel pintu
3 Pasang engsel jendela
4 Pasang grendel pintu
5 Pasang grendel jendela
6 Pasang hak angin
7 Pasang pegangan pintu/door holder
8 Pasang door stop
9 Pasang kaca polos, tebal 5 mm
10 Pasang kaca polos, tebal 8 mm
11 Pasang kaca buram, tebal 5 mm
12 Pasang kaca tempered 10 mm
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper
2 Pasang pintu klamp kayu kamper
3 Pasang pintu dan jendela kaca kayu kamper
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton
2 Pasang bubung genteng beton
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil
2 Pasang rangka kuda-kuda baja WF
3 Ikatan angin/Trekstang
4 Pasang talang miring, seng bjls 30 L = 0.90 m
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm
2 Plesteran 1 Pc : 6 Ps tebal 15 mm
3 Benangan
4 Acian
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
5 Pengecatan permukaan baja dengan meni besi
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
7 Pengecatan permukaan baja dengan cat besi
N MINGGUAN
Minggu ke 17
Bulan ke 5
Tanggal 29 Oktober s/d 3 November 2018
VOLUME BOBOT
BOBOT
PELAKSANAAN Prosentse
(%) Pelaksa
Total (%)
Minggu lalu Minggu ini naan(%)
0.666
4.119
6.636
0.622
0.632
2.528
2.665
0.115
0.029
0.115
0.029
1.435
1.005
1.005
0.029
0.201
0.115
0.115
0.014
0.057
0.029
0.580
0.029
0.029
0.538
0.283
0.283
0.623
0.708
0.028
0.028
0.165
0.721
1.135
0.165
0.567
1.135
0.165
0.165
0.383
0.232
0.034
0.567
0.204
0.448
4.830
3.308
1.085
0.331
1.127
4.858
3.972
0.270
0.019
0.119
0.373
2.306
0.859
2.467
0.186
1.081
1.081
0.624
0.000
0.000
0.319
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Plat lantai
2 Plat carport
3 Kolom beton bertulang
4
5
6
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2 Istirahat sholat Jumat 11-12.20
3
4
5
6
KONTRAKTOR
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
R
Hari : Senin
Tanggal : 29-Oct-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
R
Hari : Selasa
Tanggal : 30-Oct-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
R
Hari : Rabu
Tanggal : 31-Oct-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
R
Hari : Jumat
Tanggal : 2-Nov-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
R
Hari : Sabtu
Tanggal : 3-Nov-18
AKHMAD MISBAKHUDIN
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
M2 Total
8.20%
0.96%
3.59%
15.04%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.011
27.78%
100.0%
100.0%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan gudang semen dan alat-alat
4 Membersihkan lapangan dan perataan
5 Pasang papan nama kegiatan
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m
2 Urugan kembali
3 Urugan pasir
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps
2 Pasang pondasi batu kosong
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
2 Plat lantai beton bertulang t = 12 cm
3 Plat teras t = 10 cm
4 Plat carport t = 15 cm
5 Pondasi telapak beton bertulang
6 Sloof beton bertulang
7 Kolom beton bertulang
8 Balok beton bertulang
9 Plat beton tangga t = 12 cm
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm
2 Pasang lantai kayu
3 Pasang lantai keramik KM 25 x 25 cm
4 Pasang dinding keramik ukuran 20 x 25 cm
5 Pasang dinding batu Palimanan
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A
2 Pasang wastafel kw. A
3 Pasang tempat sabun keramik
4 Pasang badkip porselen
5 Memasang pipa PVC tipe AW, Ø 1/2"
6 Memasang pipa PVC tipe AW, Ø 3/4"
7 Memasang pipa PVC tipe AW, Ø 3"
8 Memasang bak cuci piring stainles steel
9 Memasang kran Ø 1/2"
10 Memasang Shower TOTO
11 Memasang Afor Stainless Steel
12 Pasang Kaca Wastafel
13 Memasang water heater WASSER WH506A
14 Pekerjaan sumur bor
15 Pekerjaan septicktank
16 Pasang pompa air SANYO PDH200B
17 Pasang tandon air 1 m³ PINGUIN
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak
2 Pemasangan Saklar Tunggal
3 Pemasangan Saklar Ganda
4 Pemasangan titik lampu TL 20 Watt (komplit)
5 Pemasangan titik lampu XL 18 Watt
6 Pemasangan Sekering 2 Group
7 Pemasangan Penangkal Petir
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam
2 Pasang engsel pintu
3 Pasang engsel jendela
4 Pasang grendel pintu
5 Pasang grendel jendela
6 Pasang hak angin
7 Pasang pegangan pintu/door holder
8 Pasang door stop
9 Pasang kaca polos, tebal 5 mm
10 Pasang kaca polos, tebal 8 mm
11 Pasang kaca buram, tebal 5 mm
12 Pasang kaca tempered 10 mm
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper
2 Pasang pintu klamp kayu kamper
3 Pasang pintu dan jendela kaca kayu kamper
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton
2 Pasang bubung genteng beton
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil
2 Pasang rangka kuda-kuda baja WF
3 Ikatan angin/Trekstang
4 Pasang talang miring, seng bjls 30 L = 0.90 m
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm
2 Plesteran 1 Pc : 6 Ps tebal 15 mm
3 Benangan
4 Acian
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
5 Pengecatan permukaan baja dengan meni besi
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
7 Pengecatan permukaan baja dengan cat besi
N MINGGUAN
Minggu ke 18
Bulan ke 5
Tanggal 5 November s/d 10 November 2018
BOBOT
BOBOTVOLUME PELAKSANAAN Prosentse
(%) Pelaksa
Total (%)
Minggu laluMinggu ini naan(%)
0.666
4.119
6.636
0.622
0.632
2.528
2.665
0.115
0.029
0.115
0.029
1.435
1.005
1.005
0.029
0.201
0.115
0.115
0.014
0.057
0.029
0.580
0.029
0.029
0.538
0.283
0.283
0.623
0.708
0.028
0.028
0.165
0.721
1.135
0.165
0.567
1.135
0.165
0.165
0.383
0.232
0.034
0.567
0.204
0.448
4.830
3.308
1.085
0.331
1.127
4.858
3.972
0.270
0.019
0.119
0.373
2.306
0.859
2.467
0.186
1.081
1.081
0.624
0.000
0.000
0.319
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Plat lantai
2 Plat carport
3 Kolom beton bertulang
4
5
6
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2 Istirahat Sholat Jumat 11.00-12.30
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
AWAS
Hari : Senin
Tanggal : 5-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
AWAS
Hari : Selasa
Tanggal : 6-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
AWAS
Hari : Rabu
Tanggal : 7-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
AWAS
Hari : Jumat
Tanggal : 9-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
AWAS
Hari : Sabtu
Tanggal : 10-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15%
M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3
0.0002 0.001
0.0072 0.007
19.41% 21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71%
M4 M1 M2 Total
8.20%
0.96%
3.59%
16.83%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan gudang semen dan alat-alat
4 Membersihkan lapangan dan perataan
5 Pasang papan nama kegiatan
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m
2 Urugan kembali
3 Urugan pasir
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps
2 Pasang pondasi batu kosong
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
2 Plat lantai beton bertulang t = 12 cm
3 Plat teras t = 10 cm
4 Plat carport t = 15 cm
5 Pondasi telapak beton bertulang
6 Sloof beton bertulang
7 Kolom beton bertulang
8 Balok beton bertulang
9 Plat beton tangga t = 12 cm
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm
2 Pasang lantai kayu
3 Pasang lantai keramik KM 25 x 25 cm
4 Pasang dinding keramik ukuran 20 x 25 cm
5 Pasang dinding batu Palimanan
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A
2 Pasang wastafel kw. A
3 Pasang tempat sabun keramik
4 Pasang badkip porselen
5 Memasang pipa PVC tipe AW, Ø 1/2"
6 Memasang pipa PVC tipe AW, Ø 3/4"
7 Memasang pipa PVC tipe AW, Ø 3"
8 Memasang bak cuci piring stainles steel
9 Memasang kran Ø 1/2"
10 Memasang Shower TOTO
11 Memasang Afor Stainless Steel
12 Pasang Kaca Wastafel
13 Memasang water heater WASSER WH506A
14 Pekerjaan sumur bor
15 Pekerjaan septicktank
16 Pasang pompa air SANYO PDH200B
17 Pasang tandon air 1 m³ PINGUIN
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak
2 Pemasangan Saklar Tunggal
3 Pemasangan Saklar Ganda
4 Pemasangan titik lampu TL 20 Watt (komplit)
5 Pemasangan titik lampu XL 18 Watt
6 Pemasangan Sekering 2 Group
7 Pemasangan Penangkal Petir
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam
2 Pasang engsel pintu
3 Pasang engsel jendela
4 Pasang grendel pintu
5 Pasang grendel jendela
6 Pasang hak angin
7 Pasang pegangan pintu/door holder
8 Pasang door stop
9 Pasang kaca polos, tebal 5 mm
10 Pasang kaca polos, tebal 8 mm
11 Pasang kaca buram, tebal 5 mm
12 Pasang kaca tempered 10 mm
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper
2 Pasang pintu klamp kayu kamper
3 Pasang pintu dan jendela kaca kayu kamper
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton
2 Pasang bubung genteng beton
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil
2 Pasang rangka kuda-kuda baja WF
3 Ikatan angin/Trekstang
4 Pasang talang miring, seng bjls 30 L = 0.90 m
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm
2 Plesteran 1 Pc : 6 Ps tebal 15 mm
3 Benangan
4 Acian
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
5 Pengecatan permukaan baja dengan meni besi
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
7 Pengecatan permukaan baja dengan cat besi
N MINGGUAN
Minggu ke 19
Bulan ke 5
Tanggal 12 November s/d 17 November 2018
VOLUME BOBOT
BOBOT
PELAKSANAAN Prosentse Pelaksan
(%) Total (%)
Minggu laluMinggu ini aan(%)
0.666
4.119
6.636
0.622
0.632
2.528
2.665
0.115
0.029
0.115
0.029
1.435
1.005
1.005
0.029
0.201
0.115
0.115
0.014
0.057
0.029
0.580
0.029
0.029
0.538
0.283
0.283
0.623
0.708
0.028
0.028
0.165
0.721
1.135
0.165
0.567
1.135
0.165
0.165
0.383
0.232
0.034
0.567
0.204
0.448
4.830
3.308
1.085
0.331
1.127
4.858
3.972
0.270
0.019
0.119
0.373
2.306
0.859
2.467
0.186
1.081
1.081
0.624
0.000
0.000
0.319
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Plat lantai
2 Plat carport
3 Kolom beton bertulang
4
5
6
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2 Istirahat Sholat Jumat 11.00-12.30
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruksi Y
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
AWAS
Hari : Senin
Tanggal : 12-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
AWAS
Hari : Selasa
Tanggal : 13-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
AWAS
Hari : Rabu
Tanggal : 14-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
AWAS
Hari : Jumat
Tanggal : 16-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
AWAS
Hari : Sabtu
Tanggal : 17-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
1. Produktifitas rendah
Resiko Keterlambatan
2. Keterlambatan material
RES PELAKSANAAN MINGGUAN
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
M2 Total
8.20%
0.96%
3.59%
18.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.011
31.38%
100.0%
100.0%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan gudang semen dan alat-alat
4 Membersihkan lapangan dan perataan
5 Pasang papan nama kegiatan
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m
2 Urugan kembali
3 Urugan pasir
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps
2 Pasang pondasi batu kosong
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
2 Plat lantai beton bertulang t = 12 cm
3 Plat teras t = 10 cm
4 Plat carport t = 15 cm
5 Pondasi telapak beton bertulang
6 Sloof beton bertulang
7 Kolom beton bertulang
8 Balok beton bertulang
9 Plat beton tangga t = 12 cm
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm
2 Pasang lantai kayu
3 Pasang lantai keramik KM 25 x 25 cm
4 Pasang dinding keramik ukuran 20 x 25 cm
5 Pasang dinding batu Palimanan
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A
2 Pasang wastafel kw. A
3 Pasang tempat sabun keramik
4 Pasang badkip porselen
5 Memasang pipa PVC tipe AW, Ø 1/2"
6 Memasang pipa PVC tipe AW, Ø 3/4"
7 Memasang pipa PVC tipe AW, Ø 3"
8 Memasang bak cuci piring stainles steel
9 Memasang kran Ø 1/2"
10 Memasang Shower TOTO
11 Memasang Afor Stainless Steel
12 Pasang Kaca Wastafel
13 Memasang water heater WASSER WH506A
14 Pekerjaan sumur bor
15 Pekerjaan septicktank
16 Pasang pompa air SANYO PDH200B
17 Pasang tandon air 1 m³ PINGUIN
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak
2 Pemasangan Saklar Tunggal
3 Pemasangan Saklar Ganda
4 Pemasangan titik lampu TL 20 Watt (komplit)
5 Pemasangan titik lampu XL 18 Watt
6 Pemasangan Sekering 2 Group
7 Pemasangan Penangkal Petir
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam
2 Pasang engsel pintu
3 Pasang engsel jendela
4 Pasang grendel pintu
5 Pasang grendel jendela
6 Pasang hak angin
7 Pasang pegangan pintu/door holder
8 Pasang door stop
9 Pasang kaca polos, tebal 5 mm
10 Pasang kaca polos, tebal 8 mm
11 Pasang kaca buram, tebal 5 mm
12 Pasang kaca tempered 10 mm
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper
2 Pasang pintu klamp kayu kamper
3 Pasang pintu dan jendela kaca kayu kamper
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton
2 Pasang bubung genteng beton
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil
2 Pasang rangka kuda-kuda baja WF
3 Ikatan angin/Trekstang
4 Pasang talang miring, seng bjls 30 L = 0.90 m
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm
2 Plesteran 1 Pc : 6 Ps tebal 15 mm
3 Benangan
4 Acian
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
5 Pengecatan permukaan baja dengan meni besi
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
7 Pengecatan permukaan baja dengan cat besi
N MINGGUAN
Minggu ke 20
Bulan ke 5
Tanggal 19 November s/d 24 November 2018
VOLUME BOBOT
BOBOT
PELAKSANAAN Prosentse Pelaksa
(%) Total (%)
Minggu laluMinggu ini naan(%)
0.666
4.119
6.636
0.622
0.632
2.528
2.665
0.115
0.029
0.115
0.029
1.435
1.005
1.005
0.029
0.201
0.115
0.115
0.014
0.057
0.029
0.580
0.029
0.029
0.538
0.283
0.283
0.623
0.708
0.028
0.028
0.165
0.721
1.135
0.165
0.567
1.135
0.165
0.165
0.383
0.232
0.034
0.567
0.204
0.448
4.830
3.308
1.085
0.331
1.127
4.858
3.972
0.270
0.019
0.119
0.373
2.306
0.859
2.467
0.186
1.081
1.081
0.624
0.000
0.000
0.319
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Plat lantai
2 Plat carport
3 Kolom beton bertulang
4
5
6
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2 Istirahat Sholat Jumat 11.00-12.30
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
NGAWAS
Hari : Senin
Tanggal : 19-Nov-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
NGAWAS
Hari : Rabu
Tanggal : 21-Nov-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
NGAWAS
Hari : Kamis
Tanggal : 22-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
NGAWAS
Hari : Sabtu
Tanggal : 24-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
0.009 0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018
12.75% 16.50% 19.88% 22.03% 24.18% 25.98% 27.78% 29.58% 31.38% 33.18%
FEBRUARI
M2 Total
8.20%
0.96%
3.59%
20.43%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.011
33.18%
100.0%
100.0%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS Minggu ke
LOKASI : KOTA BATU Bulan ke
Tanggal
VOLUME
NO URAIAN PEKERJAAN BOBOT
PELAKSANAAN
(%)
Minggu lalu
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter 1.407 1.407
2 Pengukuran dan pemasangan bouwplank 0.909 0.909
3 Pembuatan gudang semen dan alat-alat 0.086 0.086
4 Membersihkan lapangan dan perataan 5.772 5.772
5 Pasang papan nama kegiatan 0.021 0.021
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 0.626 0.626
2 Urugan kembali 0.219 0.000
3 Urugan pasir 0.116 0.046
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 2.633 2.633
2 Pasang pondasi batu kosong 0.957 0.957
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 0.695 0.695
2 Plat lantai beton bertulang t = 12 cm 6.905 5.524
3 Plat teras t = 10 cm 0.363 0.363
4 Plat carport t = 15 cm 4.168 3.335
5 Pondasi telapak beton bertulang 1.835 1.835
6 Sloof beton bertulang 2.453 2.453
7 Kolom beton bertulang 6.920 6.228
8 Balok beton bertulang 2.947
9 Plat beton tangga t = 12 cm 0.376
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 6.636
2 Pasang lantai kayu 0.622
3 Pasang lantai keramik KM 25 x 25 cm 0.632
4 Pasang dinding keramik ukuran 20 x 25 cm 2.528
5 Pasang dinding batu Palimanan 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 0.115
2 Pasang wastafel kw. A 0.029
3 Pasang tempat sabun keramik 0.115
4 Pasang badkip porselen 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 1.005
8 Memasang bak cuci piring stainles steel 0.029
9 Memasang kran Ø 1/2" 0.201
10 Memasang Shower TOTO 0.115
11 Memasang Afor Stainless Steel 0.115
12 Pasang Kaca Wastafel 0.014
13 Memasang water heater WASSER WH506A 0.057
14 Pekerjaan sumur bor 0.029
15 Pekerjaan septicktank 0.580
16 Pasang pompa air SANYO PDH200B 0.029
17 Pasang tandon air 1 m³ PINGUIN 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 0.538
2 Pemasangan Saklar Tunggal 0.283
3 Pemasangan Saklar Ganda 0.283
4 Pemasangan titik lampu TL 20 Watt (komplit) 0.623
5 Pemasangan titik lampu XL 18 Watt 0.708
6 Pemasangan Sekering 2 Group 0.028
7 Pemasangan Penangkal Petir 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 0.165
2 Pasang engsel pintu 0.721
3 Pasang engsel jendela 1.135
4 Pasang grendel pintu 0.165
5 Pasang grendel jendela 0.567
6 Pasang hak angin 1.135
7 Pasang pegangan pintu/door holder 0.165
8 Pasang door stop 0.165
9 Pasang kaca polos, tebal 5 mm 0.383
10 Pasang kaca polos, tebal 8 mm 0.232
11 Pasang kaca buram, tebal 5 mm 0.034
12 Pasang kaca tempered 10 mm 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper 0.204
2 Pasang pintu klamp kayu kamper 0.448
3 Pasang pintu dan jendela kaca kayu kamper 4.830
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 1.085
2 Pasang bubung genteng beton 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, teb 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 4.858
2 Pasang rangka kuda-kuda baja WF 3.972
3 Ikatan angin/Trekstang 0.270
4 Pasang talang miring, seng bjls 30 L = 0.90 m 0.019
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3) 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 2.306
3 Benangan 0.859
4 Acian 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar 0.186
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat das 1.081
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lap 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasa 0.624
5 Pengecatan permukaan baja dengan meni besi 0.000
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat da 0.000
7 Pengecatan permukaan baja dengan cat besi 0.319
UAN
21
6
26 November s/d 1 Desember 2018
VOLUME BOBOT
PELAKSANAAN Prosentse Pelaksa
Total (%)
Minggu ini naan(%)
1.407 8.195
0.909
0.086
5.772
0.021
0.626 0.6721
0.000
0.046
2.633 3.59038
0.957
0.695 22.2325
0.691 6.215
0.363
0.417 3.751
1.835
2.453
0.692 6.920
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Plat lantai
2 Plat carport
3 Kolom beton bertulang
4
5
6
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 6 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 6 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2 Istirahat Sholat Jumat 11.00-12.30
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 6 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Plat lantai
2 Plat carport
3 Kolom beton bertulang
4
5
6
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
NGAWAS
Hari : Senin
Tanggal : 26-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
NGAWAS
Hari : Selasa
Tanggal : 27-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
NGAWAS
Hari : Rabu
Tanggal : 28-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
NGAWAS
Hari : Jumat
Tanggal : 30-Nov-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018
0.022 0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
0.009 0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018
12.75% 16.50% 19.88% 22.03% 24.18% 25.98% 27.78% 29.58% 31.38% 33.18% 34.98%
FEBRUARI
M2 Total
8.20%
0.96%
3.59%
22.23%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.011
34.98%
100.0%
100.0%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS Minggu ke
LOKASI : KOTA BATU Bulan ke
Tanggal
VOLUME
NO URAIAN PEKERJAAN BOBOT
PELAKSANAAN
(%)
Minggu lalu
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter 1.407 1.407
2 Pengukuran dan pemasangan bouwplank 0.909 0.909
3 Pembuatan gudang semen dan alat-alat 0.086 0.086
4 Membersihkan lapangan dan perataan 5.772 5.772
5 Pasang papan nama kegiatan 0.021 0.021
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 0.626 0.626
2 Urugan kembali 0.219 0.000
3 Urugan pasir 0.116 0.046
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 2.633 2.633
2 Pasang pondasi batu kosong 0.957 0.957
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) 0.695 0.695
2 Plat lantai beton bertulang t = 12 cm 6.905 6.215
3 Plat teras t = 10 cm 0.363 0.363
4 Plat carport t = 15 cm 4.168 3.751
5 Pondasi telapak beton bertulang 1.835 1.835
6 Sloof beton bertulang 2.453 2.453
7 Kolom beton bertulang 6.920 6.920
8 Balok beton bertulang 2.947
9 Plat beton tangga t = 12 cm 0.376
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 6.636
2 Pasang lantai kayu 0.622
3 Pasang lantai keramik KM 25 x 25 cm 0.632
4 Pasang dinding keramik ukuran 20 x 25 cm 2.528
5 Pasang dinding batu Palimanan 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 0.115
2 Pasang wastafel kw. A 0.029
3 Pasang tempat sabun keramik 0.115
4 Pasang badkip porselen 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 1.005
8 Memasang bak cuci piring stainles steel 0.029
9 Memasang kran Ø 1/2" 0.201
10 Memasang Shower TOTO 0.115
11 Memasang Afor Stainless Steel 0.115
12 Pasang Kaca Wastafel 0.014
13 Memasang water heater WASSER WH506A 0.057
14 Pekerjaan sumur bor 0.029
15 Pekerjaan septicktank 0.580
16 Pasang pompa air SANYO PDH200B 0.029
17 Pasang tandon air 1 m³ PINGUIN 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 0.538
2 Pemasangan Saklar Tunggal 0.283
3 Pemasangan Saklar Ganda 0.283
4 Pemasangan titik lampu TL 20 Watt (komplit) 0.623
5 Pemasangan titik lampu XL 18 Watt 0.708
6 Pemasangan Sekering 2 Group 0.028
7 Pemasangan Penangkal Petir 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 0.165
2 Pasang engsel pintu 0.721
3 Pasang engsel jendela 1.135
4 Pasang grendel pintu 0.165
5 Pasang grendel jendela 0.567
6 Pasang hak angin 1.135
7 Pasang pegangan pintu/door holder 0.165
8 Pasang door stop 0.165
9 Pasang kaca polos, tebal 5 mm 0.383
10 Pasang kaca polos, tebal 8 mm 0.232
11 Pasang kaca buram, tebal 5 mm 0.034
12 Pasang kaca tempered 10 mm 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper 0.204
2 Pasang pintu klamp kayu kamper 0.448
3 Pasang pintu dan jendela kaca kayu kamper 4.830
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 1.085
2 Pasang bubung genteng beton 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 4.858
2 Pasang rangka kuda-kuda baja WF 3.972
3 Ikatan angin/Trekstang 0.270
4 Pasang talang miring, seng bjls 30 L = 0.90 m 0.019
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3) 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 2.306
3 Benangan 0.859
4 Acian 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 0.186
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 1.081
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis c 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 0.624
5 Pengecatan permukaan baja dengan meni besi 0.000
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar, 0.000
7 Pengecatan permukaan baja dengan cat besi 0.319
AN
22
6
3 Desember s/d 8 Desember 2018
VOLUME BOBOT
PELAKSANAAN Prosentse Pelaksa
Total (%)
Minggu ini naan(%)
1.407 8.195
0.909
0.086
5.772
0.021
0.626 0.6721
0.000
0.046
2.633 3.59038
0.957
0.695 24.2384
0.230 6.445
0.363
0.417 4.168
1.835
2.453
6.920
0.982 0.982
0.376 0.376
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Plat lantai
2 Plat carport
3 Balok beton bertulang
4 Plat beton tangga
5
6
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2 Istirahat Sholat Jumat jam 11.00-12.30
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instruks
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
NGAWAS
Hari : Senin
Tanggal : 3-Dec-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
NGAWAS
Hari : Selasa
Tanggal : 4-Dec-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
NGAWAS
Hari : Rabu
Tanggal : 5-Dec-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
NGAWAS
Hari : Jumat
Tanggal : 7-Dec-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
NGAWAS
Hari : Sabtu
Tanggal : 8-Dec-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.02006
0.022 0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
0.009 0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.020
12.75% 16.50% 19.88% 22.03% 24.18% 25.98% 27.78% 29.58% 31.38% 33.18% 34.98% 36.98%
FEBRUARI
M2 Total
8.20%
0.96%
3.59%
24.24%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.011
36.98%
100.0%
100.0%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS Minggu ke
LOKASI : KOTA BATU Bulan ke
Tanggal
VOLUME
NO URAIAN PEKERJAAN BOBOT
PELAKSANAAN
(%)
Minggu lalu
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter 1.407 1.407
2 Pengukuran dan pemasangan bouwplank 0.909 0.909
3 Pembuatan gudang semen dan alat-alat 0.086 0.086
4 Membersihkan lapangan dan perataan 5.772 5.772
5 Pasang papan nama kegiatan 0.021 0.021
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 0.626 0.626
2 Urugan kembali 0.219 0.000
3 Urugan pasir 0.116 0.046
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 2.633 2.633
2 Pasang pondasi batu kosong 0.957 0.957
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 0.695 0.695
2 Plat lantai beton bertulang t = 12 cm 6.905 6.445
3 Plat teras t = 10 cm 0.363 0.363
4 Plat carport t = 15 cm 4.168 4.168
5 Pondasi telapak beton bertulang 1.835 1.835
6 Sloof beton bertulang 2.453 2.453
7 Kolom beton bertulang 6.920 6.920
8 Balok beton bertulang 2.947 0.982
9 Plat beton tangga t = 12 cm 0.376 0.376
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 6.636
2 Pasang lantai kayu 0.622
3 Pasang lantai keramik KM 25 x 25 cm 0.632
4 Pasang dinding keramik ukuran 20 x 25 cm 2.528
5 Pasang dinding batu Palimanan 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 0.115
2 Pasang wastafel kw. A 0.029
3 Pasang tempat sabun keramik 0.115
4 Pasang badkip porselen 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 1.005
8 Memasang bak cuci piring stainles steel 0.029
9 Memasang kran Ø 1/2" 0.201
10 Memasang Shower TOTO 0.115
11 Memasang Afor Stainless Steel 0.115
12 Pasang Kaca Wastafel 0.014
13 Memasang water heater WASSER WH506A 0.057
14 Pekerjaan sumur bor 0.029
15 Pekerjaan septicktank 0.580
16 Pasang pompa air SANYO PDH200B 0.029
17 Pasang tandon air 1 m³ PINGUIN 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 0.538
2 Pemasangan Saklar Tunggal 0.283
3 Pemasangan Saklar Ganda 0.283
4 Pemasangan titik lampu TL 20 Watt (komplit) 0.623
5 Pemasangan titik lampu XL 18 Watt 0.708
6 Pemasangan Sekering 2 Group 0.028
7 Pemasangan Penangkal Petir 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 0.165
2 Pasang engsel pintu 0.721
3 Pasang engsel jendela 1.135
4 Pasang grendel pintu 0.165
5 Pasang grendel jendela 0.567
6 Pasang hak angin 1.135
7 Pasang pegangan pintu/door holder 0.165
8 Pasang door stop 0.165
9 Pasang kaca polos, tebal 5 mm 0.383
10 Pasang kaca polos, tebal 8 mm 0.232
11 Pasang kaca buram, tebal 5 mm 0.034
12 Pasang kaca tempered 10 mm 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper 0.204
2 Pasang pintu klamp kayu kamper 0.448
3 Pasang pintu dan jendela kaca kayu kamper 4.830
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 1.085
2 Pasang bubung genteng beton 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, te 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 4.858
2 Pasang rangka kuda-kuda baja WF 3.972
3 Ikatan angin/Trekstang 0.270
4 Pasang talang miring, seng bjls 30 L = 0.90 m 0.019
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3) 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 2.306
3 Benangan 0.859
4 Acian 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasa 0.186
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat da 1.081
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 la 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat da 0.624
5 Pengecatan permukaan baja dengan meni besi 0.000
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat d 0.000
7 Pengecatan permukaan baja dengan cat besi 0.319
UAN
23
6
10 Desember s/d 15 Desember 2018
VOLUME BOBOT
PELAKSANAAN Prosentse
Pelaksa
Total (%)
Minggu ini naan(%)
1.407 8.195
0.909
0.086
5.772
0.021
0.626 0.6721
0.000
0.046
2.633 3.59038
0.957
0.695 25.812
0.215 6.660
0.363
4.168
1.835
2.453
6.920
0.982 1.965
0.753
KONSULTAN PENGAWAS
LAPORAN HARIAN
Jumlah 10
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
LAPORAN HARIAN
Jumlah 10
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
LAPORAN HARIAN
Jumlah 10
KONSULTAN PENGAWAS
LAPORAN HARIAN
Jumlah 10
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
LAPORAN HARIAN
Jumlah 10
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
LAPORAN HARIAN
Jumlah 10
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
ONSULTAN PENGAWAS
Hari : Senin
Tanggal : 10-Dec-18
Kontraktor
Pelaksana
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
ONSULTAN PENGAWAS
Hari : Selasa
Tanggal : 11-Dec-18
Kontraktor
Pelaksana
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
ONSULTAN PENGAWAS
Hari : Rabu
Tanggal : 12-Dec-18
Kontraktor
Pelaksana
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Kontraktor
Pelaksana
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
ONSULTAN PENGAWAS
Hari : Jumat
Tanggal : 14-Dec-18
Kontraktor
Pelaksana
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
ONSULTAN PENGAWAS
Hari : Sabtu
Tanggal : 15-Dec-18
Kontraktor
Pelaksana
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.02006 0.012
0.022 0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
0.009 0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.020 0.012
12.75% 16.50% 19.88% 22.03% 24.18% 25.98% 27.78% 29.58% 31.38% 33.18% 34.98% 36.98% 38.18%
FEBRUARI
M2 Total
8.20%
0.96%
3.59%
25.44%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.011
38.18%
100.0%
100.0%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS Minggu ke
LOKASI : KOTA BATU Bulan ke
Tanggal
VOLUME
NO URAIAN PEKERJAAN BOBOT
PELAKSANAAN
(%)
Minggu lalu
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter 1.407 1.407
2 Pengukuran dan pemasangan bouwplank 0.909 0.909
3 Pembuatan gudang semen dan alat-alat 0.086 0.086
4 Membersihkan lapangan dan perataan 5.772 5.772
5 Pasang papan nama kegiatan 0.021 0.021
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 0.626 0.626
2 Urugan kembali 0.219 0.000
3 Urugan pasir 0.116 0.046
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 2.633 2.633
2 Pasang pondasi batu kosong 0.957 0.957
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 0.695 0.695
2 Plat lantai beton bertulang t = 12 cm 6.905 6.660
3 Plat teras t = 10 cm 0.363 0.363
4 Plat carport t = 15 cm 4.168 4.168
5 Pondasi telapak beton bertulang 1.835 1.835
6 Sloof beton bertulang 2.453 2.453
7 Kolom beton bertulang 6.920 6.920
8 Balok beton bertulang 2.947 1.965
9 Plat beton tangga t = 12 cm 0.376 0.753
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 6.636
2 Pasang lantai kayu 0.622
3 Pasang lantai keramik KM 25 x 25 cm 0.632
4 Pasang dinding keramik ukuran 20 x 25 cm 2.528
5 Pasang dinding batu Palimanan 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 0.115
2 Pasang wastafel kw. A 0.029
3 Pasang tempat sabun keramik 0.115
4 Pasang badkip porselen 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 1.005
8 Memasang bak cuci piring stainles steel 0.029
9 Memasang kran Ø 1/2" 0.201
10 Memasang Shower TOTO 0.115
11 Memasang Afor Stainless Steel 0.115
12 Pasang Kaca Wastafel 0.014
13 Memasang water heater WASSER WH506A 0.057
14 Pekerjaan sumur bor 0.029
15 Pekerjaan septicktank 0.580
16 Pasang pompa air SANYO PDH200B 0.029
17 Pasang tandon air 1 m³ PINGUIN 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 0.538
2 Pemasangan Saklar Tunggal 0.283
3 Pemasangan Saklar Ganda 0.283
4 Pemasangan titik lampu TL 20 Watt (komplit) 0.623
5 Pemasangan titik lampu XL 18 Watt 0.708
6 Pemasangan Sekering 2 Group 0.028
7 Pemasangan Penangkal Petir 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 0.165
2 Pasang engsel pintu 0.721
3 Pasang engsel jendela 1.135
4 Pasang grendel pintu 0.165
5 Pasang grendel jendela 0.567
6 Pasang hak angin 1.135
7 Pasang pegangan pintu/door holder 0.165
8 Pasang door stop 0.165
9 Pasang kaca polos, tebal 5 mm 0.383
10 Pasang kaca polos, tebal 8 mm 0.232
11 Pasang kaca buram, tebal 5 mm 0.034
12 Pasang kaca tempered 10 mm 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper 0.204
2 Pasang pintu klamp kayu kamper 0.448
3 Pasang pintu dan jendela kaca kayu kamper 4.830
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 1.085
2 Pasang bubung genteng beton 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, teb 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 4.858
2 Pasang rangka kuda-kuda baja WF 3.972
3 Ikatan angin/Trekstang 0.270
4 Pasang talang miring, seng bjls 30 L = 0.90 m 0.019
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3) 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 2.306
3 Benangan 0.859
4 Acian 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar 0.186
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat da 1.081
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lap 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat das 0.624
5 Pengecatan permukaan baja dengan meni besi 0.000
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat da 0.000
7 Pengecatan permukaan baja dengan cat besi 0.319
UAN
24
6
17 Desember s/d 22 Desember 2018
VOLUME BOBOT
PELAKSANAAN Prosentse Pelaksa
Total (%)
Minggu ini naan(%)
1.407 8.195
0.909
0.086
5.772
0.021
0.626 0.6721
0.000
0.046
2.633 3.59038
0.957
0.695 27.0398
0.245 6.905
0.363
4.168
1.835
2.453
6.920
0.982 2.947
0.753
Pengawas
Lapangan
Jumlah 10 Instru
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Plat lantai
2 Balok beton bertulang
3 Pekerjaan pasangan batu bata
4
5
6
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instru
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instru
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instru
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instru
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2 Istirahat Shalat Jumat 11.00-12.30
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 10 Instru
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan beton cair
2
3
4
5
6
ENGAWAS
Hari : Senin
Tanggal : 17-Dec-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
ENGAWAS
Hari : Selasa
Tanggal : 18-Dec-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
ENGAWAS
Hari : Rabu
Tanggal : 19-Dec-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
ENGAWAS
Hari : Jumat
Tanggal : 21-Dec-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
ENGAWAS
Hari : Sabtu
Tanggal : 22-Dec-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cagkul 2
20 Sekop 2
21 Sendok spesi 3
22 Perata 2
23 Vibrator 1
24
25
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
1. Keterlambatan material
Resiko Keterlambatan
2. Kesulitan mobilisasi material
RES PELAKSANAAN MINGGUAN
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.02006 0.012 0.01228
0.01706
0.022 0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
0.009 0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.020 0.012 0.029
12.75% 16.50% 19.88% 22.03% 24.18% 25.98% 27.78% 29.58% 31.38% 33.18% 34.98% 36.98% 38.18% 41.12%
FEBRUARI
M2 Total
8.20%
0.96%
3.59%
26.66%
1.71%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.011
41.12%
100.00%
100.00%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS Minggu ke
LOKASI : KOTA BATU Bulan ke
Tanggal
VOLUME
NO URAIAN PEKERJAAN BOBOT
PELAKSANAAN
(%)
Minggu lalu
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter 1.407 1.407
2 Pengukuran dan pemasangan bouwplank 0.909 0.909
3 Pembuatan gudang semen dan alat-alat 0.086 0.086
4 Membersihkan lapangan dan perataan 5.772 5.772
5 Pasang papan nama kegiatan 0.021 0.021
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 0.626 0.626
2 Urugan kembali 0.219 0.000
3 Urugan pasir 0.116 0.046
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 2.633 2.633
2 Pasang pondasi batu kosong 0.957 0.957
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 0.695 0.695
2 Plat lantai beton bertulang t = 12 cm 6.905 6.905
3 Plat teras t = 10 cm 0.363 0.363
4 Plat carport t = 15 cm 4.168 4.168
5 Pondasi telapak beton bertulang 1.835 1.835
6 Sloof beton bertulang 2.453 2.453
7 Kolom beton bertulang 6.920 6.920
8 Balok beton bertulang 2.947 2.947
9 Plat beton tangga t = 12 cm 0.376 0.753
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 0.666 0.333
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 4.119 1.373
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 6.636
2 Pasang lantai kayu 0.622
3 Pasang lantai keramik KM 25 x 25 cm 0.632
4 Pasang dinding keramik ukuran 20 x 25 cm 2.528
5 Pasang dinding batu Palimanan 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 0.115
2 Pasang wastafel kw. A 0.029
3 Pasang tempat sabun keramik 0.115
4 Pasang badkip porselen 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 1.005
8 Memasang bak cuci piring stainles steel 0.029
9 Memasang kran Ø 1/2" 0.201
10 Memasang Shower TOTO 0.115
11 Memasang Afor Stainless Steel 0.115
12 Pasang Kaca Wastafel 0.014
13 Memasang water heater WASSER WH506A 0.057
14 Pekerjaan sumur bor 0.029
15 Pekerjaan septicktank 0.580
16 Pasang pompa air SANYO PDH200B 0.029
17 Pasang tandon air 1 m³ PINGUIN 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 0.538
2 Pemasangan Saklar Tunggal 0.283
3 Pemasangan Saklar Ganda 0.283
4 Pemasangan titik lampu TL 20 Watt (komplit) 0.623
5 Pemasangan titik lampu XL 18 Watt 0.708
6 Pemasangan Sekering 2 Group 0.028
7 Pemasangan Penangkal Petir 0.028
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 0.165
2 Pasang engsel pintu 0.721
3 Pasang engsel jendela 1.135
4 Pasang grendel pintu 0.165
5 Pasang grendel jendela 0.567
6 Pasang hak angin 1.135
7 Pasang pegangan pintu/door holder 0.165
8 Pasang door stop 0.165
9 Pasang kaca polos, tebal 5 mm 0.383
10 Pasang kaca polos, tebal 8 mm 0.232
11 Pasang kaca buram, tebal 5 mm 0.034
12 Pasang kaca tempered 10 mm 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper 0.204
2 Pasang pintu klamp kayu kamper 0.448
3 Pasang pintu dan jendela kaca kayu kamper 4.830
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 1.085
2 Pasang bubung genteng beton 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, teb 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 4.858
2 Pasang rangka kuda-kuda baja WF 3.972
3 Ikatan angin/Trekstang 0.270
4 Pasang talang miring, seng bjls 30 L = 0.90 m 0.019
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3) 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 2.306
3 Benangan 0.859
4 Acian 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasa 0.186
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat da 1.081
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 la 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat das 0.624
5 Pengecatan permukaan baja dengan meni besi 0.000
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat d 0.000
7 Pengecatan permukaan baja dengan cat besi 0.319
UAN
25
7
24 Desember s/d 29 Desember 2018
VOLUME BOBOT
PELAKSANAAN Prosentse Pelaksa
Total (%)
Minggu ini naan(%)
1.407 8.195
0.909
0.086
5.772
0.021
0.626 0.6721
0.000
0.046
2.633 3.59038
0.957
0.695 27.040
6.905
0.363
4.168
1.835
2.453
6.920
2.947
0.753
2.27109
0.718 0.718
0.502 0.502
0.502 0.502
0.201 0.201
0.029 0.029
0.290 0.290
0.029 0.029
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 11 Instru
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Pekerjaan pengeboran sumur
2 Pekerjaan septiktank
3 Pekerjaan pasangan batu bata
4 Pekerjaan pemasangan PVC, kran, dan pompa air.
5
6
Catatan lalu
1 Penerimaan pengada
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 11 Instru
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan pengada
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 11 Instru
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 11 Instru
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
Catatan lalu
1 Penerimaan pengada
2
3
4
5
6
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
Jumlah 6 Instru
1
Bekerja m07.30 Berakhir jam : 16.00 2
3
Sepenuhnya digunakan bekerja 4
karena c Cerah 5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Pekerjaan pengeboran sumur
2 Pekerjaan septiktank
3 Pekerjaan pasangan batu bata
4 Pekerjaan pemasangan PVC, kran, dan pompa air.
5
6
Catatan lalu
1 Penerimaan pengada
2
3
4
5
6
ENGAWAS
Hari : Senin
Tanggal : 24-Dec-18
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Sendok spesi
19 Selotip pvc 1
20 Lem Pvc 1
21 Ember 4
22 Cangkul 2
23 Skop 2
24
25
ENGAWAS
Hari : Rabu
Tanggal : 26-Dec-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Sendok spesi
19 Selotip pvc 1
20 Lem Pvc 1
21 Ember 4
22 Cangkul 2
23 Skop 2
24
25
ENGAWAS
Hari : Kamis
Tanggal : 27-Dec-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Sendok spesi
19 Selotip pvc 1
20 Lem Pvc 1
21 Ember 4
22 Cangkul 2
23 Skop 2
24
25
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Sendok spesi
19 Selotip pvc 1
20 Lem Pvc 1
21 Ember 4
22 Cangkul 2
23 Skop 2
24
25
ENGAWAS
Hari : Sabtu
Tanggal : 29-Dec-18
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
JULI AGUSTUS
No Uraian Pekerjaan Jumlah Bobot
M1 M2 M3 M4 M1 M2 M3 M4 M1
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15%
POGRES PELAKSANAAN MINGGUAN
M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3
0.0002 0.001
0.0072 0.007
0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.02006 0.012 0.01228
0.01706 0.01706
0.02271
0.022 0.022 0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020
19.41% 21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71%
0.007 0.009 0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.020 0.012 0.029 0.040
11.90% 12.75% 16.50% 19.88% 22.03% 24.18% 25.98% 27.78% 29.58% 31.38% 33.18% 34.98% 36.98% 38.18% 41.12% 45.09%
JANUARI FEBRUARI
M4 M1 M2 Total
8.20%
0.96%
3.59%
26.66%
3.41%
0.00%
2.27%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan gudang semen dan alat-alat
4 Membersihkan lapangan dan perataan
5 Pasang papan nama kegiatan
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m
2 Urugan kembali
3 Urugan pasir
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps
2 Pasang pondasi batu kosong
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
2 Plat lantai beton bertulang t = 12 cm
3 Plat teras t = 10 cm
4 Plat carport t = 15 cm
5 Pondasi telapak beton bertulang
6 Sloof beton bertulang
7 Kolom beton bertulang
8 Balok beton bertulang
9 Plat beton tangga t = 12 cm
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm
2 Pasang lantai kayu
3 Pasang lantai keramik KM 25 x 25 cm
4 Pasang dinding keramik ukuran 20 x 25 cm
5 Pasang dinding batu Palimanan
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A
2 Pasang wastafel kw. A
3 Pasang tempat sabun keramik
4 Pasang badkip porselen
5 Memasang pipa PVC tipe AW, Ø 1/2"
6 Memasang pipa PVC tipe AW, Ø 3/4"
7 Memasang pipa PVC tipe AW, Ø 3"
8 Memasang bak cuci piring stainles steel
9 Memasang kran Ø 1/2"
10 Memasang Shower TOTO
11 Memasang Afor Stainless Steel
12 Pasang Kaca Wastafel
13 Memasang water heater WASSER WH506A
14 Pekerjaan sumur bor
15 Pekerjaan septicktank
16 Pasang pompa air SANYO PDH200B
17 Pasang tandon air 1 m³ PINGUIN
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak
2 Pemasangan Saklar Tunggal
3 Pemasangan Saklar Ganda
4 Pemasangan titik lampu TL 20 Watt (komplit)
5 Pemasangan titik lampu XL 18 Watt
6 Pemasangan Sekering 2 Group
7 Pemasangan Penangkal Petir
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam
2 Pasang engsel pintu
3 Pasang engsel jendela
4 Pasang grendel pintu
5 Pasang grendel jendela
6 Pasang hak angin
7 Pasang pegangan pintu/door holder
8 Pasang door stop
9 Pasang kaca polos, tebal 5 mm
10 Pasang kaca polos, tebal 8 mm
11 Pasang kaca buram, tebal 5 mm
12 Pasang kaca tempered 10 mm
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper
2 Pasang pintu klamp kayu kamper
3 Pasang pintu dan jendela kaca kayu kamper
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton
2 Pasang bubung genteng beton
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil
2 Pasang rangka kuda-kuda baja WF
3 Ikatan angin/Trekstang
4 Pasang talang miring, seng bjls 30 L = 0.90 m
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm
2 Plesteran 1 Pc : 6 Ps tebal 15 mm
3 Benangan
4 Acian
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
5 Pengecatan permukaan baja dengan meni besi
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
7 Pengecatan permukaan baja dengan cat besi
N MINGGUAN
Minggu ke 26
Bulan ke 7
Tanggal 31 Desember s/d 5 Januari 2019
VOLUME BOBOT
BOBOT
PELAKSANAAN Prosentse Pelaksa
(%) Total (%)
Minggu laluMinggu ini naan(%)
6.636
0.622
0.632
2.528
2.665
0.165
0.721
1.135
0.165
0.567
1.135
0.165
0.165
0.383
0.232
0.034
0.567
0.204
0.448
4.830
3.308
1.085
0.331
1.127
4.858
3.972
0.270
0.019
0.119
0.373
2.306
0.859
2.467
0.186
1.081
1.081
0.624
0.000
0.000
0.319
KONSULTAN PENGAWAS
LAPORAN HARIAN
Jumlah 13
Catatan lalu
1 Penerimaan kloset duduk porselin kw. A
2 Penerimaan wastafel kw. A
3 Penerimaan tempat sabun keramik
4 Penerimaan badkip porselen
5 Penerimaan bak cuci piring stainles steel
6 Penerimaan Shower TOTO
7 Penerimaan Afor Stainless Steel
8 Penerimaan Kaca Wastafel
9 Penerimaan water heater WASSER WH506A
10 Penerimaan tandon air 1 m³ PINGUIN
11 Pengadaan Stop Kontak
12 Pengadaan Saklar Tunggal
13 Pengadaan Saklar Ganda
14 Pengadaan titik lampu TL 20 Watt (komplit)
15 Pengadaan titik lampu XL 18 Watt
16 Pengadaan Sekering 2 Group
17 Pengadaan Penangkal Petir
KONSULTAN PENGAWAS
LAPORAN HARIAN
1 Project Manager
2 Site Manager
3 Site Engine 1
4 Kepala Pelaksana
5 Pelaksana 1
6 Surveyor 1
7 Logistik 1
8 Drafter
9 Adminitrasi
10 Mekanik
11 Mandor 1
12 KepalaTuk 1
13 Tukang Bat 1
14 Tukang Kayu
15 Tukang Besi
16 Tukang Gali
17 Tukang Lisr 1
18 Tukang Cat
19 Tukang Baja
20 Tukang Aluminium
21 Tukang Pip 1
22 Operator
23 Supir
24 Pekerja 4
25 Penjaga Malam
Jumlah 13
Catatan lalu
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
KONSULTAN PENGAWAS
LAPORAN HARIAN
1 Project Manager
2 Site Manager
3 Site Engine 1
4 Kepala Pelaksana
5 Pelaksana 1
6 Surveyor 1
7 Logistik 1
8 Drafter
9 Adminitrasi
10 Mekanik
11 Mandor 1
12 KepalaTuk 1
13 Tukang Bat 1
14 Tukang Kayu
15 Tukang Besi
16 Tukang Gali
17 Tukang Lisr 1
18 Tukang Cat
19 Tukang Baja
20 Tukang Aluminium
21 Tukang Pip 1
22 Operator
23 Supir
24 Pekerja 4
25 Penjaga Malam
Jumlah 13
Catatan lalu
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
KONSULTAN PENGAWAS
LAPORAN HARIAN
1 Project Manager
2 Site Manager
3 Site Engine 1
4 Kepala Pelaksana
5 Pelaksana 1
6 Surveyor 1
7 Logistik 1
8 Drafter
9 Adminitrasi
10 Mekanik
11 Mandor 1
12 KepalaTuk 1
13 Tukang Bat 1
14 Tukang Kayu
15 Tukang Besi
16 Tukang Gali
17 Tukang Lisr 1
18 Tukang Cat
19 Tukang Baja
20 Tukang Aluminium
21 Tukang Pip 1
22 Operator
23 Supir
24 Pekerja 4
25 Penjaga Malam
Jumlah 13
Catatan lalu
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
KONSULTAN PENGAWAS
LAPORAN HARIAN
1 Project Manager
2 Site Manager
3 Site Engine 1
4 Kepala Pelaksana
5 Pelaksana 1
6 Surveyor 1
7 Logistik 1
8 Drafter
9 Adminitrasi
10 Mekanik
11 Mandor 1
12 KepalaTuk 1
13 Tukang Bat 1
14 Tukang Kayu
15 Tukang Besi
16 Tukang Gali
17 Tukang Lisr 1
18 Tukang Cat
19 Tukang Baja
20 Tukang Aluminium
21 Tukang Pip 1
22 Operator
23 Supir
24 Pekerja 4
25 Penjaga Malam
Jumlah 13
Catatan lalu
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
KONSULTAN PENGAWAS
LAPORAN HARIAN
1 Project Manager
2 Site Manager
3 Site Engine 1
4 Kepala Pelaksana
5 Pelaksana 1
6 Surveyor 1
7 Logistik 1
8 Drafter
9 Adminitrasi
10 Mekanik
11 Mandor 1
12 KepalaTuk 1
13 Tukang Bat 1
14 Tukang Kayu
15 Tukang Besi
16 Tukang Gali
17 Tukang Lisr 1
18 Tukang Cat
19 Tukang Baja
20 Tukang Aluminium
21 Tukang Pip 1
22 Operator
23 Supir
24 Pekerja 4
25 Penjaga Malam
Jumlah 13
Catatan lalu
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
ONSULTAN PENGAWAS
Hari : Senin
Tanggal : 31-Dec-18
Kontraktor
Pelaksana
Material
Alat-Alat Jumlah
Diterima Ditolak
√ 1 Waterpass 1
√ 2 Theodolith
√ 3 Mesin molen
√ 4 Cuting Well
√ 5 Hammer drill 1
√ 6 Disgrender
√ 7 Vibrator
√ 8 M.Pompa
√ 9 Terpal 5x7
√ 10 Kabel hitam
√ 11 Selang 1
√ 12 Lampu TL 40 W
√ 13 Lampu Halogen 500 W
√ 14 Schafolding 190
√ 15 Pipa support
√ 16 Mesin las
√ 17 Gerobak arco
18 Ember 4
19 Cangkul 2
20 Skop 2
21 Selotip pvc 1
22 Lem pvc 1
23 Selotip kertas 1
24
25
Kontraktor
Pelaksana
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cangkul 2
20 Skop 2
21 Selotip pvc 1
22 Lem pvc 1
23 Selotip kertas 1
24
25
Kontraktor
Pelaksana
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cangkul 2
20 Skop 2
21 Selotip pvc 1
22 Lem pvc 1
23 Selotip kertas 1
24
25
Kontraktor
Pelaksana
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cangkul 2
20 Skop 2
21 Selotip pvc 1
22 Lem pvc 1
23 Selotip kertas 1
24
25
Kontraktor
Pelaksana
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cangkul 2
20 Skop 2
21 Selotip pvc 1
22 Lem pvc 1
23 Selotip kertas 1
24
25
Kontraktor
Pelaksana
Pengawas
Lapangan
Material
Alat-Alat Jumlah
Diterima Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cangkul 2
20 Skop 2
21 Selotip pvc 1
22 Lem pvc 1
23 Selotip kertas 1
24
25
JULI AGUSTUS
No Uraian Pekerjaan Jumlah Bobot
M1 M2 M3 M4 M1 M2 M3 M4 M1
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15%
POGRES PELAKSANAAN MINGGUAN
M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3
0.0002 0.001
0.0072 0.007
0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.020059 0.012 0.012276
0.022711 0.026587
0.012455
0.022 0.022 0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020
19.41% 21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71%
0.007 0.009 0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.020 0.012 0.029 0.040 0.053
11.90% 12.75% 16.50% 19.88% 22.03% 24.18% 25.98% 27.78% 29.58% 31.38% 33.18% 34.98% 36.98% 38.18% 41.12% 45.09% 50.37%
JANUARI FEBRUARI
M4 M1 M2 Total
8.20%
0.96%
3.59%
26.66%
4.79%
0.00%
4.93%
1.25%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.0%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS Minggu ke
LOKASI : KOTA BATU Bulan ke
Tanggal
VOLUME
NO URAIAN PEKERJAAN BOBOT
PELAKSANAAN
(%)
Minggu lalu
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter 1.407 1.407
2 Pengukuran dan pemasangan bouwplank 0.909 0.909
3 Pembuatan gudang semen dan alat-alat 0.086 0.086
4 Membersihkan lapangan dan perataan 5.772 5.772
5 Pasang papan nama kegiatan 0.021 0.021
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m 0.626 0.626
2 Urugan kembali 0.219 0.000
3 Urugan pasir 0.116 0.046
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps 2.633 2.633
2 Pasang pondasi batu kosong 0.957 0.957
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 0.695 0.695
2 Plat lantai beton bertulang t = 12 cm 6.905 6.905
3 Plat teras t = 10 cm 0.363 0.363
4 Plat carport t = 15 cm 4.168 4.168
5 Pondasi telapak beton bertulang 1.835 1.835
6 Sloof beton bertulang 2.453 2.453
7 Kolom beton bertulang 6.920 6.920
8 Balok beton bertulang 2.947 2.947
9 Plat beton tangga t = 12 cm 0.376 0.753
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 0.666 0.666
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 4.119 4.119
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm 6.636
2 Pasang lantai kayu 0.622
3 Pasang lantai keramik KM 25 x 25 cm 0.632
4 Pasang dinding keramik ukuran 20 x 25 cm 2.528
5 Pasang dinding batu Palimanan 2.665
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A 0.115 0.115
2 Pasang wastafel kw. A 0.029 0.029
3 Pasang tempat sabun keramik 0.115 0.115
4 Pasang badkip porselen 0.029 0.029
5 Memasang pipa PVC tipe AW, Ø 1/2" 1.435 1.435
6 Memasang pipa PVC tipe AW, Ø 3/4" 1.005 1.005
7 Memasang pipa PVC tipe AW, Ø 3" 1.005 1.005
8 Memasang bak cuci piring stainles steel 0.029 0.029
9 Memasang kran Ø 1/2" 0.201 0.201
10 Memasang Shower TOTO 0.115 0.115
11 Memasang Afor Stainless Steel 0.115 0.115
12 Pasang Kaca Wastafel 0.014 0.014
13 Memasang water heater WASSER WH506A 0.057 0.057
14 Pekerjaan sumur bor 0.029 0.029
15 Pekerjaan septicktank 0.580 0.580
16 Pasang pompa air SANYO PDH200B 0.029 0.029
17 Pasang tandon air 1 m³ PINGUIN 0.029 0.029
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak 0.538 0.269
2 Pemasangan Saklar Tunggal 0.283 0.142
3 Pemasangan Saklar Ganda 0.283 0.142
4 Pemasangan titik lampu TL 20 Watt (komplit) 0.623 0.311
5 Pemasangan titik lampu XL 18 Watt 0.708 0.354
6 Pemasangan Sekering 2 Group 0.028 0.014
7 Pemasangan Penangkal Petir 0.028 0.014
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 0.165
2 Pasang engsel pintu 0.721
3 Pasang engsel jendela 1.135
4 Pasang grendel pintu 0.165
5 Pasang grendel jendela 0.567
6 Pasang hak angin 1.135
7 Pasang pegangan pintu/door holder 0.165
8 Pasang door stop 0.165
9 Pasang kaca polos, tebal 5 mm 0.383
10 Pasang kaca polos, tebal 8 mm 0.232
11 Pasang kaca buram, tebal 5 mm 0.034
12 Pasang kaca tempered 10 mm 0.567
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper 0.204
2 Pasang pintu klamp kayu kamper 0.448
3 Pasang pintu dan jendela kaca kayu kamper 4.830
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper 3.308
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton 1.085
2 Pasang bubung genteng beton 0.331
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, teb 1.127
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil 4.858
2 Pasang rangka kuda-kuda baja WF 3.972
3 Ikatan angin/Trekstang 0.270
4 Pasang talang miring, seng bjls 30 L = 0.90 m 0.019
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3) 0.119
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm 0.373
2 Plesteran 1 Pc : 6 Ps tebal 15 mm 2.306
3 Benangan 0.859
4 Acian 2.467
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar 0.186
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat das 1.081
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lap 1.081
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat das 0.624
5 Pengecatan permukaan baja dengan meni besi 0.000
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat da 0.000
7 Pengecatan permukaan baja dengan cat besi 0.319
UAN
27
7
7 Januari s/d 12 Januari 2019
VOLUME BOBOT
PELAKSANAAN Prosentse Pelaksa
Total (%)
Minggu ini naan(%)
1.407 8.195
0.909
0.086
5.772
0.021
0.626 0.6721
0.000
0.046
2.633 3.59038
0.957
0.695 27.0398
6.905
0.363
4.168
1.835
2.453
6.920
2.947
0.753
0.666 4.785
4.119
0.115 4.92977
0.029
0.115
0.029
1.435
1.005
1.005
0.029
0.201
0.115
0.115
0.014
0.057
0.029
0.580
0.029
0.029
Pengawas
Lapangan
Jumlah 14 Instruks
1
2
3
4
5
Bekerja mu07.30 Berakhir jam : 16.00 6
7
Sepenuhnya digunakan bekerja 8
karena cu Cerah 9
10
11
12
13
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Pengadaan lantai granit 60 x 60 cm
2 Pengadaan lantai kayu
3 Pengadaan lantai keramik KM 25 x 25 cm
4 Pengadaan dinding keramik ukuran 20 x 25 cm
5 Pengadaan dinding batu Palimanan
6 Pengadaan besi profil
7 Pengadaan rangka kuda-kuda baja WF
8 Pekerjaan pasang Stop Kontak
9 Pekerjaan pasang Saklar Tunggal
10 Pekerjaan paang Saklar Ganda
11 Pekerjaan pasang titik lampu TL 20 Watt (komplit)
12 Pekerjaan pasang titik lampu XL 18 Watt
13 Pekerjaan pasang Sekering 2 Group
14 Pekerjaan pasang Penangkal Petir
Catatan lalu
1
2
3
4
5
6
7
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
1 Project Manager
2 Site Manager
3 Site Engin 1
4 Kepala Pelaksana
5 Pelaksana 1
6 Surveyor 1
7 Logistik 1
8 Drafter
9 Adminitrasi
10 Mekanik
11 Mandor 1
12 KepalaTuk 1
13 Tukang Ba 1
14 Tukang Ka 1
15 Tukang Be 1
16 Tukang Gali
17 Tukang Lis 1
18 Tukang Cat
19 Tukang Baja
20 Tukang Aluminium
21 Tukang Pipa
22 Operator
23 Supir
24 Pekerja 4
25 Penjaga Malam
Jumlah 14 Instruks
1
2
3
4
5
Bekerja mu07.30 Berakhir jam : 16.00 6
7
Sepenuhnya digunakan bekerja 8
karena cu Cerah 9
10
11
12
13
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Pengadaan lantai granit 60 x 60 cm
2 Pengadaan lantai kayu
3 Pengadaan lantai keramik KM 25 x 25 cm
4 Pengadaan dinding keramik ukuran 20 x 25 cm
5 Pengadaan dinding batu Palimanan
6 Pengadaan besi profil
7 Pengadaan rangka kuda-kuda baja WF
8 Pekerjaan pasang Stop Kontak
9 Pekerjaan pasang Saklar Tunggal
10 Pekerjaan paang Saklar Ganda
11 Pekerjaan pasang titik lampu TL 20 Watt (komplit)
12 Pekerjaan pasang titik lampu XL 18 Watt
13 Pekerjaan pasang Sekering 2 Group
14 Pekerjaan pasang Penangkal Petir
Catatan lalu
1
2
3
4
5
6
7
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
1 Project Manager
2 Site Manager
3 Site Engin 1
4 Kepala Pelaksana
5 Pelaksana 1
6 Surveyor 1
7 Logistik 1
8 Drafter
9 Adminitrasi
10 Mekanik
11 Mandor 1
12 KepalaTuk 1
13 Tukang Ba 1
14 Tukang Ka 1
15 Tukang Be 1
16 Tukang Gali
17 Tukang Lis 1
18 Tukang Cat
19 Tukang Baja
20 Tukang Aluminium
21 Tukang Pipa
22 Operator
23 Supir
24 Pekerja 4
25 Penjaga Malam
Jumlah 14 Instruks
1
2
3
4
5
Bekerja mu07.30 Berakhir jam : 16.00 6
7
Sepenuhnya digunakan bekerja 8
karena cu Cerah 9
10
11
12
13
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Pengadaan lantai granit 60 x 60 cm
2 Pengadaan lantai kayu
3 Pengadaan lantai keramik KM 25 x 25 cm
4 Pengadaan dinding keramik ukuran 20 x 25 cm
5 Pengadaan dinding batu Palimanan
6 Pengadaan besi profil
7 Pengadaan rangka kuda-kuda baja WF
8 Pekerjaan pasang Stop Kontak
9 Pekerjaan pasang Saklar Tunggal
10 Pekerjaan paang Saklar Ganda
11 Pekerjaan pasang titik lampu TL 20 Watt (komplit)
12 Pekerjaan pasang titik lampu XL 18 Watt
13 Pekerjaan pasang Sekering 2 Group
14 Pekerjaan pasang Penangkal Petir
Catatan lalu
1
2
3
4
5
6
7
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
1 Project Manager
2 Site Manager
3 Site Engin 1
4 Kepala Pelaksana
5 Pelaksana 1
6 Surveyor 1
7 Logistik 1
8 Drafter
9 Adminitrasi
10 Mekanik
11 Mandor 1
12 KepalaTuk 1
13 Tukang Ba 1
14 Tukang Ka 1
15 Tukang Be 1
16 Tukang Gali
17 Tukang Lis 1
18 Tukang Cat
19 Tukang Baja
20 Tukang Aluminium
21 Tukang Pipa
22 Operator
23 Supir
24 Pekerja 4
25 Penjaga Malam
Jumlah 14 Instruks
1
2
3
4
5
Bekerja mu07.30 Berakhir jam : 16.00 6
7
Sepenuhnya digunakan bekerja 8
karena cu Cerah 9
10
11
12
13
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Pengadaan lantai granit 60 x 60 cm
2 Pengadaan lantai kayu
3 Pengadaan lantai keramik KM 25 x 25 cm
4 Pengadaan dinding keramik ukuran 20 x 25 cm
5 Pengadaan dinding batu Palimanan
6 Pengadaan besi profil
7 Pengadaan rangka kuda-kuda baja WF
8 Pekerjaan pasang Stop Kontak
9 Pekerjaan pasang Saklar Tunggal
10 Pekerjaan paang Saklar Ganda
11 Pekerjaan pasang titik lampu TL 20 Watt (komplit)
12 Pekerjaan pasang titik lampu XL 18 Watt
13 Pekerjaan pasang Sekering 2 Group
14 Pekerjaan pasang Penangkal Petir
Catatan lalu
1
2
3
4
5
6
7
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
1 Project Manager
2 Site Manager
3 Site Engin 1
4 Kepala Pelaksana
5 Pelaksana 1
6 Surveyor 1
7 Logistik 1
8 Drafter
9 Adminitrasi
10 Mekanik
11 Mandor 1
12 KepalaTuk 1
13 Tukang Ba 1
14 Tukang Ka 1
15 Tukang Be 1
16 Tukang Gali
17 Tukang Lis 1
18 Tukang Cat
19 Tukang Baja
20 Tukang Aluminium
21 Tukang Pipa
22 Operator
23 Supir
24 Pekerja 4
25 Penjaga Malam
Jumlah 14 Instruks
1
2
3
4
5
Bekerja mu07.30 Berakhir jam : 16.00 6
7
Sepenuhnya digunakan bekerja 8
karena cu Cerah 9
10
11
12
13
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Pengadaan lantai granit 60 x 60 cm
2 Pengadaan lantai kayu
3 Pengadaan lantai keramik KM 25 x 25 cm
4 Pengadaan dinding keramik ukuran 20 x 25 cm
5 Pengadaan dinding batu Palimanan
6 Pengadaan besi profil
7 Pengadaan rangka kuda-kuda baja WF
8 Pekerjaan pasang Stop Kontak
9 Pekerjaan pasang Saklar Tunggal
10 Pekerjaan paang Saklar Ganda
11 Pekerjaan pasang titik lampu TL 20 Watt (komplit)
12 Pekerjaan pasang titik lampu XL 18 Watt
13 Pekerjaan pasang Sekering 2 Group
14 Pekerjaan pasang Penangkal Petir
Catatan lalu
1
2
3
4
5
6
7
KONSULTAN PENGAWAS
Hari
LAPORAN HARIAN
Tanggal
Pengawas
Lapangan
1 Project Manager
2 Site Manager
3 Site Engin 1
4 Kepala Pelaksana
5 Pelaksana 1
6 Surveyor 1
7 Logistik 1
8 Drafter
9 Adminitrasi
10 Mekanik
11 Mandor 1
12 KepalaTuk 1
13 Tukang Ba 1
14 Tukang Ka 1
15 Tukang Be 1
16 Tukang Gali
17 Tukang Lis 1
18 Tukang Cat
19 Tukang Baja
20 Tukang Aluminium
21 Tukang Pipa
22 Operator
23 Supir
24 Pekerja 4
25 Penjaga Malam
Jumlah 14 Instruks
1
2
3
4
5
Bekerja mu07.30 Berakhir jam : 16.00 6
7
Sepenuhnya digunakan bekerja 8
karena cu Cerah 9
10
11
12
13
14
15
16
17
18
19
20
Pekerjaan Yang Dilaksanakan Pada Hari Ini
1 Pengadaan lantai granit 60 x 60 cm
2 Pengadaan lantai kayu
3 Pengadaan lantai keramik KM 25 x 25 cm
4 Pengadaan dinding keramik ukuran 20 x 25 cm
5 Pengadaan dinding batu Palimanan
6 Pengadaan besi profil
7 Pengadaan rangka kuda-kuda baja WF
8 Pekerjaan pasang Stop Kontak
9 Pekerjaan pasang Saklar Tunggal
10 Pekerjaan paang Saklar Ganda
11 Pekerjaan pasang titik lampu TL 20 Watt (komplit)
12 Pekerjaan pasang titik lampu XL 18 Watt
13 Pekerjaan pasang Sekering 2 Group
14 Pekerjaan pasang Penangkal Petir
Catatan lalu
1
2
3
4
5
6
7
GAWAS
Hari : Senin
Tanggal : 7-Jan-19
Akhmad Misbakhudin
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cangkul 2
20 Skop 2
21 Selotip pvc 1
22 Lem pvc 1
23 Selotip kertas 1
24
25
GAWAS
Hari : Selasa
Tanggal : 8-Jan-19
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cangkul 2
20 Skop 2
21 Selotip pvc 1
22 Lem pvc 1
23 Selotip kertas 1
24
25
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cangkul 2
20 Skop 2
21 Selotip pvc 1
22 Lem pvc 1
23 Selotip kertas 1
24
25
GAWAS
Hari : Kamis
Tanggal : 10-Jan-19
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cangkul 2
20 Skop 2
21 Selotip pvc 1
22 Lem pvc 1
23 Selotip kertas 1
24
25
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cangkul 2
20 Skop 2
21 Selotip pvc 1
22 Lem pvc 1
23 Selotip kertas 1
24
25
Alat-Alat Jumlah
Ditolak
1 Waterpass 1
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill 1
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang 1
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18 Ember 4
19 Cangkul 2
20 Skop 2
21 Selotip pvc 1
22 Lem pvc 1
23 Selotip kertas 1
24
25
JULI AGUSTUS
No Uraian Pekerjaan Jumlah Bobot
M1 M2 M3 M4 M1 M2 M3 M4
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30%
POGRES PELAKSANAAN MINGGUAN
M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4
0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.020059 0.012 0.012276
0.01706
0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059
17.19% 19.41% 21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12%
0.009 0.007 0.009 0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.020 0.012 0.029
11.15% 11.90% 12.75% 16.50% 19.88% 22.03% 24.18% 25.98% 27.78% 29.58% 31.38% 33.18% 34.98% 36.98% 38.18% 41.12%
JANUARI FEBRUARI
M1 M2 M3 M4 M1 M2 Total
8.20%
0.96%
3.59%
26.66%
0.043607 4.36%
0.00%
0.00%
0.00%
0.00%
0.044 4.41%
0.060037 6.00%
0.00%
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan gudang semen dan alat-alat
4 Membersihkan lapangan dan perataan
5 Pasang papan nama kegiatan
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m
2 Urugan kembali
3 Urugan pasir
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps
2 Pasang pondasi batu kosong
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
2 Plat lantai beton bertulang t = 12 cm
3 Plat teras t = 10 cm
4 Plat carport t = 15 cm
5 Pondasi telapak beton bertulang
6 Sloof beton bertulang
7 Kolom beton bertulang
8 Balok beton bertulang
9 Plat beton tangga t = 12 cm
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm
2 Pasang lantai kayu
3 Pasang lantai keramik KM 25 x 25 cm
4 Pasang dinding keramik ukuran 20 x 25 cm
5 Pasang dinding batu Palimanan
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A
2 Pasang wastafel kw. A
3 Pasang tempat sabun keramik
4 Pasang badkip porselen
5 Memasang pipa PVC tipe AW, Ø 1/2"
6 Memasang pipa PVC tipe AW, Ø 3/4"
7 Memasang pipa PVC tipe AW, Ø 3"
8 Memasang bak cuci piring stainles steel
9 Memasang kran Ø 1/2"
10 Memasang Shower TOTO
11 Memasang Afor Stainless Steel
12 Pasang Kaca Wastafel
13 Memasang water heater WASSER WH506A
14 Pekerjaan sumur bor
15 Pekerjaan septicktank
16 Pasang pompa air SANYO PDH200B
17 Pasang tandon air 1 m³ PINGUIN
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak
2 Pemasangan Saklar Tunggal
3 Pemasangan Saklar Ganda
4 Pemasangan titik lampu TL 20 Watt (komplit)
5 Pemasangan titik lampu XL 18 Watt
6 Pemasangan Sekering 2 Group
7 Pemasangan Penangkal Petir
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam
2 Pasang engsel pintu
3 Pasang engsel jendela
4 Pasang grendel pintu
5 Pasang grendel jendela
6 Pasang hak angin
7 Pasang pegangan pintu/door holder
8 Pasang door stop
9 Pasang kaca polos, tebal 5 mm
10 Pasang kaca polos, tebal 8 mm
11 Pasang kaca buram, tebal 5 mm
12 Pasang kaca tempered 10 mm
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper
2 Pasang pintu klamp kayu kamper
3 Pasang pintu dan jendela kaca kayu kamper
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
XI. PEKERJAAN ATAP
1 Pasang atap genteng beton
2 Pasang bubung genteng beton
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil
2 Pasang rangka kuda-kuda baja WF
3 Ikatan angin/Trekstang
4 Pasang talang miring, seng bjls 30 L = 0.90 m
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm
2 Plesteran 1 Pc : 6 Ps tebal 15 mm
3 Benangan
4 Acian
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
5 Pengecatan permukaan baja dengan meni besi
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
7 Pengecatan permukaan baja dengan cat besi
N MINGGUAN
Minggu ke 28
Bulan ke 7
Tanggal 14 Januari s/d 19 Januari 2019
VOLUME BOBOT
BOBOT
PELAKSANAAN Prosentse Pelaksa
(%) Total (%)
Minggu laluMinggu ini naan(%)
0.165
0.721
1.135
0.165
0.567
1.135
0.165
0.165
0.383
0.232
0.034
0.567
1.127
0.186
1.081
1.081
0.624
0.000
0.000
0.319
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
1 Project Manager
2 Site Manager
3 Site Engineerin 1
4 Kepala Pelaksana
5 Pelaksana 1
6 Surveyor
7 Logistik 1
8 Drafter
9 Adminitrasi
10 Mekanik
11 Mandor 1
12 KepalaTukang
13 Tukang Batu 1
14 Tukang Kayu
15 Tukang Besi
16 Tukang Gali
17 Tukang Lisrik 1
18 Tukang Cat
19 Tukang Baja
20 Tukang Aluminium
21 Tukang Pipa 1
22 Operator
23 Supir
24 Pekerja 2
25 Penjaga Malam
Jumlah 9
Bekerja mulai j 07.30 Berakhir jam : 16.00
Catatan lalu
1 Penerimaan pengadaan lantai granit 60 x 60 cm
2 Penerimaan pengadaan lantai kayu
3 Penerimaan pengadaan lantai keramik KM 25 x 25 cm
4 Penerimaan pengadaan dinding keramik ukuran 20 x 25 cm
5 Penerimaan pengadaan din
6 Penerimaan pengadaan besi profil
7 Penerimaan pengadaan rangka kuda-kuda baja WF
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mulai j 07.30 Berakhir jam : 16.00
Catatan lalu
1
2
3
4
5
6
7
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
1 Project Manager
2 Site Manager
3 Site Engineerin 1
4 Kepala Pelaksana
5 Pelaksana 1
6 Surveyor
7 Logistik 1
8 Drafter
9 Adminitrasi
10 Mekanik
11 Mandor 1
12 KepalaTukang
13 Tukang Batu 1
14 Tukang Kayu
15 Tukang Besi
16 Tukang Gali
17 Tukang Lisrik 1
18 Tukang Cat
19 Tukang Baja
20 Tukang Aluminium
21 Tukang Pipa 1
22 Operator
23 Supir
24 Pekerja 2
25 Penjaga Malam
Jumlah 9
Bekerja mulai j 07.30 Berakhir jam : 16.00
Catatan lalu
1
2
3
4
5
6
7
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
1 Project Manager
2 Site Manager
3 Site Engineerin 1
4 Kepala Pelaksana
5 Pelaksana 1
6 Surveyor
7 Logistik 1
8 Drafter
9 Adminitrasi
10 Mekanik
11 Mandor 1
12 KepalaTukang
13 Tukang Batu 1
14 Tukang Kayu
15 Tukang Besi
16 Tukang Gali
17 Tukang Lisrik 1
18 Tukang Cat
19 Tukang Baja
20 Tukang Aluminium
21 Tukang Pipa 1
22 Operator
23 Supir
24 Pekerja 2
25 Penjaga Malam
Jumlah 9
Bekerja mulai j 07.30 Berakhir jam : 16.00
Catatan lalu
1
2
3
4
5
6
7
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mulai j 07.30 Berakhir jam : 16.00
Catatan lalu
1
2
3
4
5
6
7
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
1 Project Manager
2 Site Manager
3 Site Engineerin 1
4 Kepala Pelaksana
5 Pelaksana 1
6 Surveyor
7 Logistik 1
8 Drafter
9 Adminitrasi
10 Mekanik
11 Mandor 1
12 KepalaTukang
13 Tukang Batu 1
14 Tukang Kayu
15 Tukang Besi
16 Tukang Gali
17 Tukang Lisrik 1
18 Tukang Cat
19 Tukang Baja
20 Tukang Aluminium
21 Tukang Pipa 1
22 Operator
23 Supir
24 Pekerja 2
25 Penjaga Malam
Jumlah 9
Bekerja mulai j 07.30 Berakhir jam : 16.00
Kontraktor
Pelaksana
Pengawas
Lapangan Akhmad Misbakhudin
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
AN PENGAWAS
Hari : Selasa
Tanggal : 15-Jan-19
Kontraktor
Pelaksana
Pengawas
Lapangan
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Kontraktor
Pelaksana
Pengawas
Lapangan
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Kontraktor
Pelaksana
Pengawas
Lapangan
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
AN PENGAWAS
Hari : Jumat
Tanggal : 18-Jan-19
Kontraktor
Pelaksana
Pengawas
Lapangan
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Kontraktor
Pelaksana
Pengawas
Lapangan
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
GRES PELAKSANAAN MINGGUAN
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.02006 0.012 0.01228
0.04361 0.044
0.02271 0.02659
0.01246 0.01246
0.04497
0.014
0.044 0.04823
0.06004
0.022 0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
0.009 0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.020 0.012 0.029 0.040 0.053 0.160 0.151
12.75% 16.50% 19.88% 22.03% 24.18% 25.98% 27.78% 29.58% 31.38% 33.18% 34.98% 36.98% 38.18% 41.12% 45.09% 50.37% 66.39% 81.49%
FEBRUARI
M2 Total
8.20%
0.96%
3.59%
26.66%
4.79%
8.72%
4.93%
2.49%
0.00%
4.50%
1.42%
0.00%
9.24%
6.00%
0.00%
0.011
81.49%
100.0%
100.0%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan gudang semen dan alat-alat
4 Membersihkan lapangan dan perataan
5 Pasang papan nama kegiatan
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m
2 Urugan kembali
3 Urugan pasir
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps
2 Pasang pondasi batu kosong
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
2 Plat lantai beton bertulang t = 12 cm
3 Plat teras t = 10 cm
4 Plat carport t = 15 cm
5 Pondasi telapak beton bertulang
6 Sloof beton bertulang
7 Kolom beton bertulang
8 Balok beton bertulang
9 Plat beton tangga t = 12 cm
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm
2 Pasang lantai kayu
3 Pasang lantai keramik KM 25 x 25 cm
4 Pasang dinding keramik ukuran 20 x 25 cm
5 Pasang dinding batu Palimanan
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A
2 Pasang wastafel kw. A
3 Pasang tempat sabun keramik
4 Pasang badkip porselen
5 Memasang pipa PVC tipe AW, Ø 1/2"
6 Memasang pipa PVC tipe AW, Ø 3/4"
7 Memasang pipa PVC tipe AW, Ø 3"
8 Memasang bak cuci piring stainles steel
9 Memasang kran Ø 1/2"
10 Memasang Shower TOTO
11 Memasang Afor Stainless Steel
12 Pasang Kaca Wastafel
13 Memasang water heater WASSER WH506A
14 Pekerjaan sumur bor
15 Pekerjaan septicktank
16 Pasang pompa air SANYO PDH200B
17 Pasang tandon air 1 m³ PINGUIN
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak
2 Pemasangan Saklar Tunggal
3 Pemasangan Saklar Ganda
4 Pemasangan titik lampu TL 20 Watt (komplit)
5 Pemasangan titik lampu XL 18 Watt
6 Pemasangan Sekering 2 Group
7 Pemasangan Penangkal Petir
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam
2 Pasang engsel pintu
3 Pasang engsel jendela
4 Pasang grendel pintu
5 Pasang grendel jendela
6 Pasang hak angin
7 Pasang pegangan pintu/door holder
8 Pasang door stop
9 Pasang kaca polos, tebal 5 mm
10 Pasang kaca polos, tebal 8 mm
11 Pasang kaca buram, tebal 5 mm
12 Pasang kaca tempered 10 mm
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper
2 Pasang pintu klamp kayu kamper
3 Pasang pintu dan jendela kaca kayu kamper
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
XI. PEKERJAAN ATAP
Pasang atap genteng beton
2 Pasang bubung genteng beton
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil
2 Pasang rangka kuda-kuda baja WF
3 Ikatan angin/Trekstang
4 Pasang talang miring, seng bjls 30 L = 0.90 m
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm
2 Plesteran 1 Pc : 6 Ps tebal 15 mm
3 Benangan
4 Acian
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
5 Pengecatan permukaan baja dengan meni besi
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
7 Pengecatan permukaan baja dengan cat besi
N MINGGUAN
Minggu ke 29
Bulan ke 8
Tanggal 21 Januari s/d 26 Januari 2019
VOLUME BOBOT
BOBOT
PELAKSANAAN Prosentse Pelaksa
(%) Total (%)
Minggu laluMinggu ini naan(%)
1.127
0.186
1.081
1.081
0.624
0.000
0.000
0.319
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
Catatan lalu
1
2
3
4
5
6
7
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
Catatan lalu
1
2
3
4
5
6
7
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
Catatan lalu
1
2
3
4
5
6
7
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
Catatan lalu
1
2
3
4
5
6
7
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
Catatan lalu
1
2
3
4
5
6
7
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
Sepenuhnya digunakan bekerja
karena cu Cerah
Catatan lalu
1
2
3
4
5
6
7
NGAWAS
Hari : Senin
Tanggal : 21-Jan-19
Kontraktor
Pelaksana
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Kontraktor
Pelaksana
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Kontraktor
Pelaksana
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Kontraktor
Pelaksana
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Kontraktor
Pelaksana
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Kontraktor
Pelaksana
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
JULI AGUSTUS
No Uraian Pekerjaan Jumlah Bobot
M1 M2 M3 M4 M1 M2 M3 M4 M1
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15%
POGRES PELAKSANAAN MINGGUAN
M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2
0.0002 0.001
0.0072 0.007
0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.020059 0.012 0.012276
0.022711 0.026587
0.012455
0.022 0.022 0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025
19.41% 21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71%
0.007 0.009 0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.020 0.012 0.029 0.040 0.053
11.90% 12.75% 16.50% 19.88% 22.03% 24.18% 25.98% 27.78% 29.58% 31.38% 33.18% 34.98% 36.98% 38.18% 41.12% 45.09% 50.37%
JANUARI FEBRUARI
M3 M4 M1 M2 M3 M4 Total
8.20%
0.96%
3.59%
26.66%
4.79%
4.93%
0.012455 2.49%
0.027184 2.72%
0.014 1.42%
0.00%
0.044 0.048232 9.24%
0.060037 6.00%
0.00%
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan gudang semen dan alat-alat
4 Membersihkan lapangan dan perataan
5 Pasang papan nama kegiatan
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m
2 Urugan kembali
3 Urugan pasir
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps
2 Pasang pondasi batu kosong
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
2 Plat lantai beton bertulang t = 12 cm
3 Plat teras t = 10 cm
4 Plat carport t = 15 cm
5 Pondasi telapak beton bertulang
6 Sloof beton bertulang
7 Kolom beton bertulang
8 Balok beton bertulang
9 Plat beton tangga t = 12 cm
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm
2 Pasang lantai kayu
3 Pasang lantai keramik KM 25 x 25 cm
4 Pasang dinding keramik ukuran 20 x 25 cm
5 Pasang dinding batu Palimanan
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A
2 Pasang wastafel kw. A
3 Pasang tempat sabun keramik
4 Pasang badkip porselen
5 Memasang pipa PVC tipe AW, Ø 1/2"
6 Memasang pipa PVC tipe AW, Ø 3/4"
7 Memasang pipa PVC tipe AW, Ø 3"
8 Memasang bak cuci piring stainles steel
9 Memasang kran Ø 1/2"
10 Memasang Shower TOTO
11 Memasang Afor Stainless Steel
12 Pasang Kaca Wastafel
13 Memasang water heater WASSER WH506A
14 Pekerjaan sumur bor
15 Pekerjaan septicktank
16 Pasang pompa air SANYO PDH200B
17 Pasang tandon air 1 m³ PINGUIN
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak
2 Pemasangan Saklar Tunggal
3 Pemasangan Saklar Ganda
4 Pemasangan titik lampu TL 20 Watt (komplit)
5 Pemasangan titik lampu XL 18 Watt
6 Pemasangan Sekering 2 Group
7 Pemasangan Penangkal Petir
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam
2 Pasang engsel pintu
3 Pasang engsel jendela
4 Pasang grendel pintu
5 Pasang grendel jendela
6 Pasang hak angin
7 Pasang pegangan pintu/door holder
8 Pasang door stop
9 Pasang kaca polos, tebal 5 mm
10 Pasang kaca polos, tebal 8 mm
11 Pasang kaca buram, tebal 5 mm
12 Pasang kaca tempered 10 mm
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper
2 Pasang pintu klamp kayu kamper
3 Pasang pintu dan jendela kaca kayu kamper
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
XI. PEKERJAAN ATAP
Pasang atap genteng beton
2 Pasang bubung genteng beton
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil
2 Pasang rangka kuda-kuda baja WF
3 Ikatan angin/Trekstang
4 Pasang talang miring, seng bjls 30 L = 0.90 m
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm
2 Plesteran 1 Pc : 6 Ps tebal 15 mm
3 Benangan
4 Acian
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
5 Pengecatan permukaan baja dengan meni besi
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
7 Pengecatan permukaan baja dengan cat besi
N MINGGUAN
Minggu ke 30
Bulan ke 8
Tanggal 28 Januari s/d 2 Februari 2019
BOBOT
BOBOTVOLUME PELAKSANAAN Prosentse
(%) Pelaksa
Total (%)
Minggu laluMinggu ini naan(%)
0.186
1.081
1.081
0.624
0.000
0.000
0.319
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
Kontraktor
Pelaksana
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
TAN PENGAWAS
Hari : Selasa
Tanggal : 29-Jan-19
Kontraktor
Pelaksana
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Kontraktor
Pelaksana
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
TAN PENGAWAS
Hari : Kamis
Tanggal : 31-Jan-19
Kontraktor
Pelaksana
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Kontraktor
Pelaksana
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Kontraktor
Pelaksana
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90%
POGRES PELAKSANAAN MINGGUAN
M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1
0.001
0.007
0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.02006 0.012 0.01228
0.02271 0.02659
0.01246 0.01246
0.02718
0.04497 0.04293
0.014
0.044 0.04823
0.06004
0.022 0.022 0.022 0.022 0.022 0.038 0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031
21.63% 23.86% 26.08% 28.30% 30.52% 34.34% 40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90%
0.009 0.038 0.034 0.022 0.022 0.018 0.018 0.018 0.018 0.018 0.018 0.020 0.012 0.029 0.040 0.053 0.160 0.151 0.114
12.75% 16.50% 19.88% 22.03% 24.18% 25.98% 27.78% 29.58% 31.38% 33.18% 34.98% 36.98% 38.18% 41.12% 45.09% 50.37% 66.39% 81.49% 92.86%
FEBRUARI
M2 M3 M4 Total
8.20%
0.96%
3.59%
26.66%
4.79%
13.08%
4.93%
2.49%
0.02718 5.44%
8.79%
1.42%
0.00564 0.56%
9.24%
6.00%
0.00%
0.011
96.15%
100.00%
0.03282
96.15% 100.0%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan gudang semen dan alat-alat
4 Membersihkan lapangan dan perataan
5 Pasang papan nama kegiatan
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m
2 Urugan kembali
3 Urugan pasir
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps
2 Pasang pondasi batu kosong
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
2 Plat lantai beton bertulang t = 12 cm
3 Plat teras t = 10 cm
4 Plat carport t = 15 cm
5 Pondasi telapak beton bertulang
6 Sloof beton bertulang
7 Kolom beton bertulang
8 Balok beton bertulang
9 Plat beton tangga t = 12 cm
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm
2 Pasang lantai kayu
3 Pasang lantai keramik KM 25 x 25 cm
4 Pasang dinding keramik ukuran 20 x 25 cm
5 Pasang dinding batu Palimanan
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A
2 Pasang wastafel kw. A
3 Pasang tempat sabun keramik
4 Pasang badkip porselen
5 Memasang pipa PVC tipe AW, Ø 1/2"
6 Memasang pipa PVC tipe AW, Ø 3/4"
7 Memasang pipa PVC tipe AW, Ø 3"
8 Memasang bak cuci piring stainles steel
9 Memasang kran Ø 1/2"
10 Memasang Shower TOTO
11 Memasang Afor Stainless Steel
12 Pasang Kaca Wastafel
13 Memasang water heater WASSER WH506A
14 Pekerjaan sumur bor
15 Pekerjaan septicktank
16 Pasang pompa air SANYO PDH200B
17 Pasang tandon air 1 m³ PINGUIN
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak
2 Pemasangan Saklar Tunggal
3 Pemasangan Saklar Ganda
4 Pemasangan titik lampu TL 20 Watt (komplit)
5 Pemasangan titik lampu XL 18 Watt
6 Pemasangan Sekering 2 Group
7 Pemasangan Penangkal Petir
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam
2 Pasang engsel pintu
3 Pasang engsel jendela
4 Pasang grendel pintu
5 Pasang grendel jendela
6 Pasang hak angin
7 Pasang pegangan pintu/door holder
8 Pasang door stop
9 Pasang kaca polos, tebal 5 mm
10 Pasang kaca polos, tebal 8 mm
11 Pasang kaca buram, tebal 5 mm
12 Pasang kaca tempered 10 mm
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper
2 Pasang pintu klamp kayu kamper
3 Pasang pintu dan jendela kaca kayu kamper
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
XI. PEKERJAAN ATAP
Pasang atap genteng beton
2 Pasang bubung genteng beton
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil
2 Pasang rangka kuda-kuda baja WF
3 Ikatan angin/Trekstang
4 Pasang talang miring, seng bjls 30 L = 0.90 m
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm
2 Plesteran 1 Pc : 6 Ps tebal 15 mm
3 Benangan
4 Acian
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
5 Pengecatan permukaan baja dengan meni besi
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
7 Pengecatan permukaan baja dengan cat besi
N MINGGUAN
Minggu ke 31
Bulan ke 8
Tanggal 4 Februari s/d 9 Februari 2019
VOLUME BOBOT
BOBOT
PELAKSANAAN Prosentse Pelaksan
(%) Total (%)
Minggu laluMinggu ini aan(%)
Jumlah 9
Bekerja mu07.30
KONSULTAN PENGAWAS
LAPORAN HARIAN
Jumlah 9
Bekerja mu07.30
Jumlah 9
Bekerja mu07.30
KONSULTAN PENGAWAS
LAPORAN HARIAN
Jumlah 9
Bekerja mu07.30
Jumlah 9
Bekerja mu07.30
KONSULTAN PENGAWAS
LAPORAN HARIAN
Jumlah 9
Bekerja mu07.30
Kontraktor
Pelaksana
Material
Alat-Alat Jumlah
Sat Diterima Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
KONSULTAN PENGAWAS
Hari : Selasa
Tanggal : 5-Feb-19
Kontraktor
Pelaksana
Material
Alat-Alat Jumlah
Sat Diterima Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Kontraktor
Pelaksana
Material
Alat-Alat Jumlah
Sat Diterima Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
KONSULTAN PENGAWAS
Hari : Kamis
Tanggal : 7-Feb-19
Kontraktor
Pelaksana
Material
Alat-Alat Jumlah
Sat Diterima Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Kontraktor
Pelaksana
Material
Alat-Alat Jumlah
Sat Diterima Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
KONSULTAN PENGAWAS
Hari : Sabtu
Tanggal : 9-Feb-19
Kontraktor
Pelaksana
Material
Alat-Alat Jumlah
Sat Diterima Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
1 PEKERJAAN PERSIAPAN Rp 78,536,311 8.20% 0.012 0.015 0.015 0.015 0.009 0.016
Bobot Rencana 0.020 0.020 0.020 0.025 0.005 0.018 0.018 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.038
Bobot Kumulatif Rencana 0 2.05% 4.10% 6.15% 8.68% 9.16% 10.95% 12.75% 14.97% 17.19% 19.41% 21.63% 23.86% 26.08% 28.30% 30.52% 34.34%
Bobot Realisasi 0.012 0.015 0.015 0.015 0.009 0.016 0.011 0.011 0.009 0.007 0.009 0.038 0.034 0.022 0.022 0.018
Bobot Kumulatif Realisasi 0 1.20% 2.68% 4.16% 5.68% 6.55% 8.20% 9.25% 10.30% 11.15% 11.90% 12.75% 16.50% 19.88% 22.03% 24.18% 25.98%
LAKSANAAN MINGGUAN
M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 Total
8.20%
0.96%
3.59%
0.014 1.42%
0.060037 6.00%
0.0165 1.65%
0.060 0.060 0.044 0.063 0.057 0.097 0.059 0.059 0.040 0.025 0.020 0.031 0.031 0.011
98.35%
40.34% 46.33% 50.74% 57.05% 62.72% 72.40% 78.26% 84.12% 88.16% 90.71% 92.71% 95.80% 98.90% 100.00%
0.018 0.018 0.018 0.018 0.018 0.020 0.012 0.029 0.040 0.053 0.160 0.151 0.114 0.03282 0.022
27.78% 29.58% 31.38% 33.18% 34.98% 36.98% 38.18% 41.12% 45.09% 50.37% 66.39% 81.49% 92.86% 96.15% 98.35% 100%
LAPORAN MINGGUAN
KEGIATA: PEMBANGUNAN VILLA KUSUMA HILLS
LOKASI : KOTA BATU
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang, tinggi 2 meter
2 Pengukuran dan pemasangan bouwplank
3 Pembuatan gudang semen dan alat-alat
4 Membersihkan lapangan dan perataan
5 Pasang papan nama kegiatan
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m
2 Urugan kembali
3 Urugan pasir
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali 1 Pc : 4 Ps
2 Pasang pondasi batu kosong
IV. PEKERJAAN BETON
1 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
2 Plat lantai beton bertulang t = 12 cm
3 Plat teras t = 10 cm
4 Plat carport t = 15 cm
5 Pondasi telapak beton bertulang
6 Sloof beton bertulang
7 Kolom beton bertulang
8 Balok beton bertulang
9 Plat beton tangga t = 12 cm
V. PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
VI. PEKERJAAN LANTAI DAN DINDING
1 Pasang lantai granit 60 x 60 cm
2 Pasang lantai kayu
3 Pasang lantai keramik KM 25 x 25 cm
4 Pasang dinding keramik ukuran 20 x 25 cm
5 Pasang dinding batu Palimanan
VII. PEKERJAAN SANITASI
1 Pasang kloset duduk porselin kw. A
2 Pasang wastafel kw. A
3 Pasang tempat sabun keramik
4 Pasang badkip porselen
5 Memasang pipa PVC tipe AW, Ø 1/2"
6 Memasang pipa PVC tipe AW, Ø 3/4"
7 Memasang pipa PVC tipe AW, Ø 3"
8 Memasang bak cuci piring stainles steel
9 Memasang kran Ø 1/2"
10 Memasang Shower TOTO
11 Memasang Afor Stainless Steel
12 Pasang Kaca Wastafel
13 Memasang water heater WASSER WH506A
14 Pekerjaan sumur bor
15 Pekerjaan septicktank
16 Pasang pompa air SANYO PDH200B
17 Pasang tandon air 1 m³ PINGUIN
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Stop Kontak
2 Pemasangan Saklar Tunggal
3 Pemasangan Saklar Ganda
4 Pemasangan titik lampu TL 20 Watt (komplit)
5 Pemasangan titik lampu XL 18 Watt
6 Pemasangan Sekering 2 Group
7 Pemasangan Penangkal Petir
IX. PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam
2 Pasang engsel pintu
3 Pasang engsel jendela
4 Pasang grendel pintu
5 Pasang grendel jendela
6 Pasang hak angin
7 Pasang pegangan pintu/door holder
8 Pasang door stop
9 Pasang kaca polos, tebal 5 mm
10 Pasang kaca polos, tebal 8 mm
11 Pasang kaca buram, tebal 5 mm
12 Pasang kaca tempered 10 mm
X. PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela kayu kamper
2 Pasang pintu klamp kayu kamper
3 Pasang pintu dan jendela kaca kayu kamper
4 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
XI. PEKERJAAN ATAP
Pasang atap genteng beton
2 Pasang bubung genteng beton
XII. PEKERJAAN LANGIT - LANGIT
1 Langit-langit gypsum board (120 x 240 x 9) mm, tebal 9 mm
XIII. PEKERJAAN BESI DAN ALMUNIUM
1 Pasang besi profil
2 Pasang rangka kuda-kuda baja WF
3 Ikatan angin/Trekstang
4 Pasang talang miring, seng bjls 30 L = 0.90 m
5 Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
XIV. PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm
2 Plesteran 1 Pc : 6 Ps tebal 15 mm
3 Benangan
4 Acian
XV. PEKERJAAN PENGECATAN
1 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
3 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
4 Pengecatan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
5 Pengecatan permukaan baja dengan meni besi
6 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
7 Pengecatan permukaan baja dengan cat besi
N MINGGUAN
Minggu ke 32
Bulan ke 8
Tanggal 11 Februari s/d 16 Februari 2019
VOLUME BOBOT
BOBOT
PELAKSANAAN Prosentse Pelaksa
(%) Total (%)
Minggu laluMinggu ini naan(%)
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
KONSULTAN PENGAWAS
LAPORAN HARIAN
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
KONSULTAN PENGAWAS
LAPORAN HARIAN
Pengawas
Lapangan
Jumlah 9
Bekerja mu07.30 Berakhir jam : 16.00
Kontraktor
Pelaksana
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
TAN PENGAWAS
Hari : Selasa
Tanggal : 12-Feb-19
Kontraktor
Pelaksana
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
TAN PENGAWAS
Hari : Rabu
Tanggal : 13-Feb-19
Kontraktor
Pelaksana
Pengawas Akhmad Misbakhudin
Lapangan
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
Kontraktor
Pelaksana
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
TAN PENGAWAS
Hari : Jumat
Tanggal : 15-Feb-19
Kontraktor
Pelaksana
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
TAN PENGAWAS
Hari : Sabtu
Tanggal : 17-Feb-19
Kontraktor
Pelaksana
l
Alat-Alat Jumlah
Ditolak
1 Waterpass
2 Theodolith
3 Mesin molen
4 Cuting Well
5 Hammer drill
6 Disgrender
7 Vibrator
8 M.Pompa
9 Terpal 5x7
10 Kabel hitam
11 Selang
12 Lampu TL 40 W
13 Lampu Halogen 500 W
14 Schafolding 190
15 Pipa support
16 Mesin las
17 Gerobak arco
18
19
20
21
22
23
24
25
PEKERJAAN TANAH
1 Galian tanah 78.67 +
2 Urugan kembali 36.12
3 Urugan pasir 3.75 +
PEKERJAAN PONDASI
1 Pasang batu kosong (Aanstampeng) 14.98
2 Pasang pondasi batu kali 1 : 4 41.21
PEKERJAAN DINDING
1 Pasang dinding bata 1 : 3 Lt1 18.65 +
Pasang dinding bata 1:3 Lt2 24.00 -
2 Pasang dinding bata 1 : 6 130.55 +
Pasang dinding bata 1 : 6 Lt2 248.50 -
PEKERJAAN PLESTERAN
1 Pekerjaan plesteran 1 : 3 59.44 x
2 Pekerjaan plesteran 1 : 6 367.77 x
3 Benangan 274.00
4 Acian 854.42 -
PEKERJAAN KAYU
1 Pasang kusen pintu dan jendela 0.01 x
2 Pasang daun pintu 5.76
3 Pasang daun jendela kaca 62.06
4 Pasang lisplank 42.50
PEKERJAAN BETON
1 Pekerjaan lantai kerja 0.07 x
2 Pekerjaan pondasi telapak 1.25 +
3 Pekerjaan kolom 13.35
4 Pekerjaan sloof 4.73
5 Pekerjaan balok 3.69 +
6 Pekerjaan plat 13.32 +
Plat cart port 8.04
7 Pekerjaan tangga 0.03 x
PEKERJAAN ATAP
1 Pekerjaan atap beton 116.28
2 Pasang bubungan 35.50
PEKERJAAN SANITASI
1 Pasang kloset duduk 4.00
2 Pasang wastafel 1.00
3 Pasang tempat sabun 4.00
4 Pasang bak mandi 1.00
5 Pasang pipa 1/2" 50.00
6 Pasang pipa 3/4" 35.00
7 Pasang pipa 3" 35.00
8 Pasang bak cuci piring 1.00
9 Pasang kran 1/2" 7.00
10 Pasang Shower 4.00
11 Pasang afor 4.00
12 Pasang kaca wastafel 1.00
13 Pasang pemanas air 2.00
14 Pekerjaan sumur bor 1.00
15 Pekerjaan septiktank 1.00
16 Pasang pompa air 1.00
17 Pasang tandon 1.00
PEKERJAAN PENGECATAN
1 Pengecatan kayu baru 67.82
2 Pengecatan tembok interior baru 393.48
3 Pengecatan tembok eksterior baru 393.48
4 Pengecatan plafon 227.28
5 Pengecatan baja dengan meni
6 Pengecatan besi
7 Waterproofing 116.28
65.75 65.75 m1
21.75 269.75 269.75 m2
42.50 42.50 m1
4.00 4.00 m2
14.98 14.98 m3
41.21 41.21 m3
116.28 116.28 m2
35.50 35.50 m1
227.28 227.28 m2
227.28 227.28 m2
70.43 70.43 kg
5.00 5.00 m1
31.16 31.16 m2
32.42 32.42 Unit
19.60 19.60 Unit
2.90 2.90 Unit
48.00 48.00 Unit
14.00 14.00 Unit
61.00 61.00 Unit
96.00 96.00 Unit
14.00 14.00 Unit
48.00 48.00 Unit
96.00 96.00 Unit
14.00 14.00 Unit
14.00 14.00 Unit
67.82 67.82 m2
393.48 393.48 m2
393.48 393.48 m2
227.28 227.28 m2
- m2
- m2
116.28 116.28 m2
KODE
JENIS PEKERJAAN
ANALISA
1 2
I. PEKERJAAN PERSIAPAN
A.001 Pagar sementara dari kayu, tinggi 2 meter
A.002 Pagar sementara dari seng gelombang, tinggi 2 meter
A.003 Pagar sementara dari kawat duri, tinggi 1.8 meter
A.004 Pasang pagar kawat jaring galvanis, tinggi 1 m
A.005 Pengukuran dan pemasangan bouwplank
A.006 Pembuatan kantor sementara
A.007 Pembuatan gudang semen dan alat-alat
A.008 Pembuatan rumah jaga/konstruksi kayu
A.009 Membersihkan lapangan dan perataan
A.010 Pembuatan bedeng buruh
A.011 Pembuatan bak adukan, ukuran (40x50x20) cm
A.012 Pembuatan jalan sementara
A.013 Bongkar pasang kayu kuda-kuda / kusen / loteng
A.014 Bongkaran beton bertulang
A.015 Bongkaran tembok bata merah
A.016 Bongkaran atap
A.017 Bongkaran lantai
A.018 Bongkaran plafon
V. PEKERJAAN PLESTERAN
E.001 Plesteran 1 Pc : 1 Ps tebal 15 mm
1 2
F.054 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu kruing
F.055 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu meranti
F.056 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu jati
F.057 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu kamper
F.058 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu borneo
F.059 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu bengkirai
F.060 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu kruing
F.061 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu meranti
F.062 Pasang kaso 5/7 + reng 3/5 genteng beton kayu jati
F.063 Pasang kaso 5/7 + reng 3/5 genteng beton kayu kamper
F.064 Pasang kaso 5/7 + reng 3/5 genteng beton kayu borneo
F.065 Pasang kaso 5/7 + reng 3/5 genteng beton kayu bengkirai
F.066 Pasang kaso 5/7 + reng 3/5 genteng beton kayu kruing
F.067 Pasang kaso 5/7 + reng 3/5 genteng beton kayu meranti
F.068 Pasang kaso 5/7 + reng 3/5 atap sirap kayu jati
F.069 Pasang kaso 5/7 + reng 3/5 atap sirap kayu kamper
F.070 Pasang kaso 5/7 + reng 3/5 atap sirap kayu borneo
F.071 Pasang kaso 5/7 + reng 3/5 atap sirap kayu bengkirai
F.072 Pasang kaso 5/7 + reng 3/5 atap sirap kayu kruing
F.073 Pasang kaso 5/7 + reng 3/5 atap sirap kayu meranti
F.074 Pasang rangka langit-langit (0.5 x 1.0) m, kayu jati
F.075 Pasang rangka langit-langit (0.5 x 1.0) m, kayu kamper
F.076 Pasang rangka langit-langit (0.5 x 1.0) m, kayu borneo
F.077 Pasang rangka langit-langit (0.5 x 1.0) m, kayu bengkirai
F.078 Pasang rangka langit-langit (0.5 x 1.0) m, kayu kruing
F.079 Pasang rangka langit-langit (0.5 x 1.0) m, kayu meranti
F.080 Pasang lisplang ukuran (3 x 20) cm, kayu jati
F.081 Pasang lisplang ukuran (3 x 20) cm, kayu kamper
F.082 Pasang lisplang ukuran (3 x 20) cm, kayu borneo
F.083 Pasang lisplang ukuran (3 x 20) cm, kayu bengkirai
F.084 Pasang lisplang ukuran (3 x 20) cm, kayu kruing
F.085 Pasang lisplang ukuran (3 x 20) cm, kayu meranti
F.086 Pasang lisplang ukuran (3 x 30) cm, kayu jati
F.087 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
F.088 Pasang lisplang ukuran (3 x 30) cm, kayu borneo
F.089 Pasang lisplang ukuran (3 x 30) cm, kayu bengkirai
F.090 Pasang lisplang ukuran (3 x 30) cm, kayu kruing
F.091 Pasang lisplang ukuran (3 x 30) cm, kayu meranti
F.092 Pasang rangka dinding pemisah kayu jati
F.093 Pasang rangka dinding pemisah kayu kamper
F.094 Pasang rangka dinding pemisah kayu borneo
F.095 Pasang rangka dinding pemisah kayu meranti
F.096 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu jati
F.097 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu kamper
F.098 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu borneo
F.099 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu meranti
1 2
F.100 Pasang rangka dinding pemisah plywood rangkap, rangka kayu jati
F.101 Pasang rangka dinding pemisah plywood rangkap, rangka kayu kamper
F.102 Pasang rangka dinding pemisah plywood rangkap, rangka kayu borneo
F.103 Pasang rangka dinding pemisah plywood rangkap, rangka kayu meranti
F.104 Pasang dinding lambriziring dari papan jati
F.105 Pasang dinding lambriziring dari papan kamper
X. PEKERJAAN SANITASI
J.001 Pasang kloset jongkok teraso
J.002 Pasang kloset jongkok porselin kw. A
J.003 Pasang kloset jongkok lux
J.004 Pasang kloset duduk porselin kw. A
J.005 Pasang kloset duduk lux
J.006 Pasang buah urinoir
J.007 Pasang wastafel kw. A
J.008 Pasang wastafel lux
J.009 Pasang tempat sabun keramik
J.010 Pasang bak mandi teraso volume 0.3 m3
J.011 Pasang bak mandi fibreglass volume 0.3 m3
J.012 Pasang bak mandi batu bata volume 0.3 m3
J.013 Pasang badkip porselen
J.014 Memasang bak beton volume 1.0 m3
J.015 Memasang pipa penyalur air limbah jenis pipa tanah, Ø 15 cm
J.016 Memasang pipa penyalur air limbah jenis pipa tanah, Ø 20 cm
J.017 Memasang pipa beton, Ø 20 cm
J.018 Memasang pipa beton, Ø 30 cm
J.019 Memasang pipa beton, Ø 40 cm
J.020 Memasang pipa beton, Ø 50 cm
J.021 Memasang pipa beton, Ø 60 cm
J.022 Memasang pipa beton, Ø 80 cm
J.023 Memasang pipa beton, Ø 90 cm
J.024 Memasang pipa beton, Ø 100 cm
J.025 Memasang pipa beton U, Ø 20 cm
J.026 Memasang pipa beton U, Ø 30 cm
J.027 Memasang bak kontrol pasangan batu bata (30 x 30 x 35) cm
J.028 Memasang bak kontrol pasangan batu bata (45 x 45 x 60) cm
J.029 Memasang bak kontrol pasangan batu bata (60 x 60 x 65) cm
J.030 Memasang pipa galvanis, Ø 1/2"
J.031 Memasang pipa galvanis, Ø 3/4"
J.032 Memasang pipa galvanis, Ø 1"
1 2
K.005 Plendes
K.006 Pasang pintu plat baja tebal 2 mm rangkap rangka baja siku
K.007 Pengelasan dengan las listrik
K.008 Pasang pintu gulung besi (rolling door)
K.009 Pasang pintu lipat (folding door)
K.010 Pasang sunscream aluminium
K.011 Pasang rolling door aluminium
K.012 Pasang alluminium coklat
K.013 Pasang pintu aluminium coklat strip lebar = 8 cm
K.014 Pasang pintu kaca rangka aluminium coklat
K.015 Pasang venetion blinds dan vertikal blind (tirai)
K.016 Pasang teralis besi (2 x 3) mm
K.017 Pasang kawat nyamuk
K.018 Pasang jendela nako & tralis
K.019 Pasang pintu fiber KM
K.020 Pasang talang datar, seng bjls 30 L = 0.60 m
K.021 Pasang talang datar, seng bjls 30 L = 0.90 m
K.022 Pasang talang miring, seng bjls 30 L = 0.60 m
K.023 Pasang talang miring, seng bjls 30 L = 0.90 m
K.024 Pasang talang tegak pipa PVC Ø 3"
K.025 Pasang talang tegak pipa PVC Ø 4"
K.026 Pasang talang 1/2 lingkaran D-15 cm bjls 30, L = 45 cm
K.027 Pasang pagar BRC tinggi 1 m
K.028 Pasang tiang pagar BRC dia 2" tinggi 1 m
K.029 Pasang pintu pagar BRC tinggi 1 m
K.030 Pasang pagar besi
K.030a Pasang sunscreen besi hollow (40x40x1.6)
K.030b Pasang pagar besi hollow (40x40x2.3 & 20x40x2.3)
K.030c Pasang pintu pagar besi hollow (40x40x2.3 & 20x40x2.3)
K.031 Pasang pintu pagar besi
K.032 Pasang atap baja ringan untuk penutup atap genteng
K.033 Pasang atap baja ringan untuk penutup atap asbes gelombang
K.034 Pasang rangka plafon metal furing
HARGA
SATUAN
(Rp.)
3 4
m1 599,005.00
m1 704,145.00
m 1
529,165.00
m1 32,112.00
m 1
74,535.00
m2 1,874,410.00
m 2
1,868,460.00
m2 1,745,470.00
m 2
10,250.00
m2 1,886,670.00
bh 352,747.50
m2 114,450.00
m 3
741,900.00
m3 428,325.00
m 3
402,825.00
m2 70,250.00
m 2
12,850.00
m2 17,818.00
m3 47,125.00
m3 57,825.00
m 3
68,695.00
m3 62,720.00
m 3
95,100.00
m3 75,825.00
m 2
3,425.00
m3 20,650.00
m 3
19,275.00
m3 34,250.00
m 3
190,450.00
m3 407,461.00
m 3
528,236.80
m3 973,725.00
m 3
240,875.00
m3
m3 129,995.00
m3 119,806.50
3 4
m3 298,117.97
m3
m3
m3 770,875.00
m 3
710,595.00
m3 668,823.00
m 3
639,447.00
m3 599,203.00
m 3
676,643.00
m3 740,619.20
m 3
689,285.60
m3 342,183.00
m 3
3,172,438.00
m3 780,198.00
m2 254,820.00
m2 238,777.00
m 2
228,241.00
m2 222,394.00
m 2
219,544.00
m2 239,112.50
m 2
122,306.00
m2 114,864.00
m 2
110,501.00
m2 107,751.00
m 2
106,127.00
m2 103,205.00
m 2
121,054.00
m2 115,674.20
m 2
110,944.60
m2 238,300.60
m 2
228,755.40
m2 197,474.00
m 2
190,306.40
m2 149,627.80
m 2
144,889.60
m2 356,859.00
m 2
352,275.00
m2 130,999.00
m 2
1,001,401.00
m2 54,378.80
3 4
m2 46,090.80
m2 42,445.20
m 2
40,006.00
m2 38,554.80
m 2
37,421.20
m2 36,777.20
m 2
36,133.20
m2 40,348.80
m 2
35,656.80
m2 40,130.60
m 2
37,937.80
m2 61,083.40
m 2
56,222.60
m2 52,913.00
m 2
51,035.40
m2 49,466.60
m 2
54,173.60
m2 28,760.80
m 2
38,225.00
m2 186,685.00
m 2
174,685.00
m2 32,761.00
m 2
43,709.00
m1 23,662.00
m 2
23,485.00
m3 17,315,835.00
m 3
15,874,125.00
m3 12,520,125.00
m 3
9,364,125.00
m2 726,115.00
m 2
610,295.00
m2 557,095.00
3 4
m2 372,295.00
m2 893,070.00
m 2
777,250.00
m2 724,050.00
m 2
539,250.00
m2 590,092.00
m 2
520,600.00
m2 488,680.00
m 2
377,800.00
m2 1,303,962.00
m 2
1,118,650.00
m2 1,033,530.00
m 2
737,850.00
m2 680,532.50
m 2
608,145.00
m2 574,895.00
m 2
459,395.00
m2 1,141,930.00
m 2
950,200.00
m2 870,400.00
m 2
593,200.00
m2 698,282.50
m 2
625,895.00
m2 592,645.00
m 2
477,145.00
m2 817,332.50
m 2
744,945.00
m2 711,695.00
m 2
596,195.00
m2 824,632.50
m 2
736,095.00
m2 620,595.00
m 3
16,959,710.00
m3 14,505,500.00
m 3
11,431,000.00
m3 11,774,750.00
m 3
9,968,000.00
m3 8,538,000.00
m 3
19,136,220.00
m3 16,458,900.00
m 3
9,424,860.00
m3 7,994,860.00
m 2
711,635.00
m2 230,710.00
m 2
460,330.00
m2 443,830.00
3 4
m2 368,830.00
m2 267,630.00
m 2
711,635.00
m2 230,710.00
m 2
460,330.00
m2 443,830.00
m 2
368,830.00
m2 267,630.00
m 2
1,002,613.10
m2 255,490.00
m 2
645,760.00
m2 622,330.00
m 2
515,830.00
m2 362,130.00
m 2
249,571.65
m2 220,596.00
m 2
166,641.00
m2 161,196.00
m 2
136,446.00
m2 123,246.00
m 2
252,758.94
m2 225,715.00
m 2
175,357.00
m2 170,275.00
m 2
147,175.00
m2 134,855.00
m 1
191,296.40
m1 170,825.00
m 1
145,661.00
m1 140,936.00
m 1
112,775.00
m1 95,765.00
m 1
193,160.50
m1 161,310.00
m 1
146,680.00
m1 160,232.00
m 1
113,185.00
m1 95,860.00
m 1
437,385.80
m1 374,915.00
m 1
296,655.00
m1 223,015.00
m 2
523,483.80
m2 461,013.00
m 2
382,753.00
m2 309,113.00
3 4
m2 532,795.80
m2 470,325.00
m 2
392,065.00
m2 318,425.00
m 2
303,508.50
m2 283,240.00
m3 903,961.15
m3 949,056.43
m 3
984,327.81
m3 849,572.26
m 3
1,026,153.67
m3 1,065,913.96
m 3
1,095,957.49
m3 1,148,839.71
m 3
1,115,425.00
m3 1,159,219.77
m 3
1,233,566.64
m3 1,247,142.99
m 3
1,300,785.00
m1 50,754.00
m 1
87,847.00
m1 101,797.00
kg 20,188.60
kg 19,978.60
kg 32,409.50
kg 18,272.00
m 2
160,488.00
m2 172,988.00
m 2
423,279.00
m2 433,779.00
m 2
715,279.00
m2 142,414.50
m 2
523,979.00
m2 397,979.00
m 2
152,620.00
m3 5,078,546.00
m 3
6,093,784.00
m3 8,321,530.00
m 3
10,953,374.00
m3 8,333,089.00
m 3
7,703,796.00
m3 7,983,384.00
m 1
94,027.00
m1 116,361.00
3 4
m1 115,041.00
m2 43,429.00
m2 45,929.00
m 2
80,929.00
m2 78,429.00
m 2
103,429.00
m1 72,834.00
m 1
92,334.00
m1 92,334.00
m 1
84,834.00
m1 89,834.00
m 2
85,929.00
m2 73,429.00
m 2
80,478.00
m2 85,425.00
m 2
114,979.00
m2 125,257.00
m 2
124,640.00
m1 79,834.00
m 1
95,834.00
m1 90,634.00
m 1
102,419.00
m1 149,640.00
m 1
138,910.00
m1 84,565.00
m 2
55,401.00
m2 59,461.00
m 2
49,106.00
m2 56,371.00
m 2
55,111.00
m2 72,779.00
m 2
74,849.00
m2 46,291.00
m 2
65,416.00
m2 111,316.00
m 2
66,506.00
m2 64,220.00
m 2
69,451.00
m1 137,749.00
m 1
125,089.00
m1 125,039.00
m 1
72,349.00
m1 71,869.00
m 1
75,949.00
3 4
m1 78,959.00
m1 63,779.00
m 2
73,008.00
m1 42,104.00
m 2
173,719.00
m2 204,210.00
m 2
46,685.00
m2 101,081.00
m 2
148,866.00
m2 183,589.00
m 1
213,450.00
m2 28,281.00
m 2
27,071.00
m2 26,081.00
m 2
32,131.00
m2 349,416.00
m 2
191,020.00
m2 68,610.00
m 2
15,864.50
m2 16,230.00
m 2
22,085.00
m2 23,735.00
m 2
16,044.50
m2 23,547.50
m 2
439,987.00
m2 241,687.00
m 2
394,495.00
m2 69,985.00
m 2
217,280.00
m2 229,524.20
m 2
208,451.00
m2 169,211.00
m 2
165,251.00
m2 147,251.00
m 2
137,651.00
m2 403,297.80
m 2
362,907.50
m2 287,697.50
m 2
280,107.50
m2 245,607.50
m 2
227,207.50
m2 547,565.30
m 2
507,175.00
m2 431,965.00
3 4
m2 424,375.00
m2 389,875.00
m 2
371,475.00
m2 754,788.20
m 2
707,373.50
m2 619,083.50
m 2
610,173.50
m2 569,673.50
m 2
619,083.50
m2 47,537.00
m 1
17,010.00
m1 27,245.00
bh 286,070.00
bh 475,020.00
bh 631,220.00
bh 1,880,267.44
bh 1,943,694.96
bh 1,403,640.00
bh 699,782.00
bh 1,623,697.52
bh 41,005.00
bh 352,480.00
bh 720,935.48
bh 1,163,820.00
bh 1,033,775.00
bh #REF!
m 1
46,408.17
m1 68,329.33
m 1
89,339.00
m1 169,686.51
m 1
215,094.60
m1 269,481.50
m 1
296,038.40
m1 446,172.20
m 1
489,559.10
m1 579,916.00
m 1
#VALUE!
m1 204,581.50
bh 295,453.50
bh 445,596.00
bh 679,549.00
m1 27,985.75
m 1
32,422.00
m1 47,420.75
3 4
m1 72,374.00
m1 94,090.50
m 1
123,243.00
m1 130,425.50
m 1
196,308.00
m1 20,294.00
m 1
31,448.00
m1 34,933.63
m 1
17,040.75
m1 65,762.00
m 1
142,910.50
m1 107,012.75
m 1
144,192.75
m1 80,269.15
m 1
122,005.33
m1 21,646.00
m 1
11,083.50
m1 10,576.50
m 1
11,717.25
m1 19,033.50
m 1
40,496.50
m1 62,861.50
m 1
95,605.25
m1 8,548.50
m 1
26,293.50
m1 9,773.75
m 1
10,618.75
m1 15,400.00
m 1
16,625.25
m1 23,146.50
m 1
24,963.25
bh 342,167.50
bh 266,012.50
bh 69,742.50
bh 69,742.50
bh 59,305.00
bh 25,205.00
m2 202,583.75
m 1
117,198.50
m1 154,378.50
kg 30,222.30
kg 30,222.30
kg 16,050.00
kg 33,022.30
3 4
kg 30,222.30
m2 1,022,130.00
cm 10,510.60
m2 2,221,570.00
m 2
1,842,970.00
m2 381,880.00
m 2
747,050.00
m1 154,218.90
m 2
837,075.00
m2 651,039.00
m 2
609,310.00
m2 610,576.00
m 2
199,677.77
m2 477,225.00
unit 502,180.00
m1 200,232.50
m 1
222,492.50
m1 200,232.50
m 1
222,492.50
m1 61,940.00
m 1
83,565.00
m1 84,690.00
m 1
346,851.90
bh 84,876.90
m1 551,031.80
m2 484,619.80
m1 490,067.86
m1 496,942.12
m1 450,444.74
m2 700,581.64
m2 273,910.19
m2 251,084.27
m2 112,971.13
bh 148,235.00
bh 149,305.00
bh 98,402.50
bh 138,211.25
bh 156,845.00
bh 37,806.25
bh 50,883.75
bh 31,922.50
bh 19,683.75
bh 13,422.50
bh 48,610.00
3 4
bh 28,383.75
bh 32,922.50
bh 268,112.50
bh 224,612.50
bh 47,982.50
bh 225,535.00
m 2
126,683.75
m2 205,883.75
m 2
281,233.75
m2 385,073.75
m 2
157,386.25
m2 224,926.25
m 2
248,711.00
m2 393,031.00
m 2
202,583.75
m2 291,903.75
m 2
394,330.00
m2 149,673.75
m 2
260,883.75
m2 424,030.00
m 2
668,340.00
m2 696,153.75
m 2
1,502,453.75
bh 39,343.75
m 2
621,793.75
m2 65,690.00
m 2
73,200.00
m2 82,724.00
m 2
86,009.00
m2 92,635.00
m 2
110,554.00
m2 89,324.00
m 2
99,757.00
m2 304,799.00
m 2
290,864.00
m2 345,032.00
m 2
497,402.00
m2 290,211.00
m 2
424,462.00
m2 572,776.50
m 1
32,310.00
m1 26,844.00
m 1
24,911.00
m1 26,171.00
3 4
m1 26,515.00
m1 25,641.00
m 1
31,104.00
m1 32,001.00
m 1
50,021.00
m1 46,989.00
m 2
44,521.20
m2 545,143.00
m 2
1,030,793.00
m2 1,030,793.00
m 2
171,926.00
m2 1,032,416.00
m 1
103,489.90
m1 189,669.90
m 1
101,777.90
m2 210,214.00
m 2
346,680.00
m2 340,905.00
m 2
104,491.00
m2 218,705.00
m 2
186,730.00
m2 158,800.00
m 2
168,230.90
m2 197,075.00
m 2
217,069.50
m2 200,091.00
m 2
510,173.00
m1 40,336.00
m 1
94,727.90
m1 141,339.90
m 2
148,716.00
m2 182,356.00
m 2
199,556.00
m2 153,216.00
m 2
172,466.00
m2 167,826.00
m 2
189,026.00
m2 167,966.00
m 2
176,125.00
m2 748,580.00
m 2
140,316.00
m2 240,885.00
m 2
114,675.00
m2 523,753.00
m 2
97,770.00
m2 152,445.00
3 4
m2 144,345.00
m2 112,045.00
m 2
120,445.00
m2 131,445.00
m 2
118,245.00
m2 10,687.50
m 2
11,297.50
m2 11,297.50
m 2
11,297.50
m2 897,930.00
m 2
9,942.50
m2 32,065.50
m 2
39,379.50
m2 52,804.50
m 2
13,292.00
m2 59,145.50
m 2
15,995.00
m2 30,880.50
m 2
22,228.90
m2 19,758.90
m 2
28,858.90
m2 28,020.10
m 2
17,970.10
m2 6,230.10
m 2
21,000.30
m2 16,836.50
m 2
20,238.90
m2 21,775.00
m 2
55,092.50
m2 27,576.00
m 2
146,223.00
m2 121,190.00
m 2
61,708.90
Titik 256,350.00
Titik 204,500.00
Titik 263,350.00
Titik 211,425.00
Titik 223,525.00
Titik 229,525.00
Titik 255,525.00
Titik 220,325.00
Titik 224,425.00
3 4
Titik 228,525.00
Titik 231,225.00
Titik 236,525.00
Unit 154,828.00
Unit 253,073.50
Unit 357,237.50
Unit 3,240,225.00
bh 680,575.00
km1 945,575.00
bh 123,415.00
m2 89,445.00
m3 156,952.00
m3 60,475.00
m3 71,630.00
m3 109,450.00
m3 109,330.00
m3 98,215.00
m3 107,025.00
m3 45,740.00
m3 18,435.00
m3 46,495.00
m3 175,520.00
m3 142,135.00
m3 710,595.00
m2 43,709.00
m2 42,445.20
m3 1,026,157.60
m2 213,829.00
kg 19,978.60
kg 20,188.60
m 2
714,955.80
m2 35,300.00
m 2
31,900.00
m2 38,800.00
btg 232,600.00
m3 219,166.00
m 2
30,300.00
m3 15,388,800.00
Unit 33,289,920.00
m1 216,298.00
bh 219,922.20
bh 273,960.00
3 4
bh 221,460.00
bh 148,595.00
bh 126,595.00
bh 70,907.40
bh 1,234,422.20
bh 687,142.50
bh 604,428.00
bh 1,229,428.00
bh 218,571.00
bh 23,765.00
unit 2,482,600.00
m1 33,342.50
unit 1,174,780.00
DAFTAR HARGA SATUAN PEKERJAAN KONSTRUKSI (HSPK)
DINAS KELAUTAN DAN PERIKANAN KABUPATEN MALANG
TAHUN ANGGARAN 2015
KODE
JENIS PEKERJAAN
ANALISA
1 2
I. PEKERJAAN PERSIAPAN
A.001 Pagar sementara dari kayu, tinggi 2 meter
A.002 Pagar sementara dari seng gelombang, tinggi 2 meter
A.003 Pagar sementara dari kawat duri, tinggi 1.8 meter
A.004 Pasang pagar kawat jaring galvanis, tinggi 1 m
A.005 Pengukuran dan pemasangan bouwplank
A.006 Pembuatan kantor sementara
A.007 Pembuatan gudang semen dan alat-alat
A.008 Pembuatan rumah jaga/konstruksi kayu
A.009 Membersihkan lapangan dan perataan
A.010 Pembuatan bedeng buruh
A.011 Pembuatan bak adukan, ukuran (40x50x20) cm
A.012 Pembuatan jalan sementara
A.013 Bongkar pasang kayu kuda-kuda / kusen / loteng
A.014 Bongkaran beton bertulang
A.015 Bongkaran tembok bata merah
A.016 Bongkaran atap
A.017 Bongkaran lantai
A.018 Bongkaran plafon
B.001 Galian tanah biasa sedalam 1 m
B.002 Galian tanah biasa sedalam 2 m
B.003 Galian tanah biasa sedalam 3 m
B.004 Galian tanah keras sedalam 1 m
B.005 Galian tanah cadas sedalam 1 m
B.006 Galian tanah lumpur sedalam 1 m
B.007 Pekerjaan striping setinggi 1 m
B.008 Pembuangan tanah sejauh 30 m
B.009 Urugan kembali
B.010 Pemadatan tanah
B.011 Urugan pasir
B.012 Lapisan Pudel Campuran 1 Kp : 3 Ps : 7 TL
B.013 Lapisan Pudel Campuran 1 Kp : 5 TL
B.014 Pasangan lapisan ijuk tebal 10 cm
B.015 Urugan sirtu
B.016 Cut and fill
B.017 Galian tanah keras sedalam > 5 m
B.018 Galian tanah keras sedalam > 10 m
C.001 Pasang pondasi batu kali 1 Pc : 3 Ps
C.002 Pasang pondasi batu kali 1 Pc : 4 Ps
1 2
F.053 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu bengkirai
F.054 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu kruing
F.055 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu meranti
F.056 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu jati
F.057 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu kamper
F.058 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu borneo
F.059 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu bengkirai
F.060 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu kruing
F.061 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu meranti
F.062 Pasang kaso 5/7 + reng 3/5 genteng beton kayu jati
F.063 Pasang kaso 5/7 + reng 3/5 genteng beton kayu kamper
F.064 Pasang kaso 5/7 + reng 3/5 genteng beton kayu borneo
F.065 Pasang kaso 5/7 + reng 3/5 genteng beton kayu bengkirai
F.066 Pasang kaso 5/7 + reng 3/5 genteng beton kayu kruing
F.067 Pasang kaso 5/7 + reng 3/5 genteng beton kayu meranti
F.068 Pasang kaso 5/7 + reng 3/5 atap sirap kayu jati
F.069 Pasang kaso 5/7 + reng 3/5 atap sirap kayu kamper
F.070 Pasang kaso 5/7 + reng 3/5 atap sirap kayu borneo
F.071 Pasang kaso 5/7 + reng 3/5 atap sirap kayu bengkirai
F.072 Pasang kaso 5/7 + reng 3/5 atap sirap kayu kruing
F.073 Pasang kaso 5/7 + reng 3/5 atap sirap kayu meranti
F.074 Pasang rangka langit-langit (0.5 x 1.0) m, kayu jati
F.075 Pasang rangka langit-langit (0.5 x 1.0) m, kayu kamper
F.076 Pasang rangka langit-langit (0.5 x 1.0) m, kayu borneo
F.077 Pasang rangka langit-langit (0.5 x 1.0) m, kayu bengkirai
F.078 Pasang rangka langit-langit (0.5 x 1.0) m, kayu kruing
F.079 Pasang rangka langit-langit (0.5 x 1.0) m, kayu meranti
F.080 Pasang lisplang ukuran (3 x 20) cm, kayu jati
F.081 Pasang lisplang ukuran (3 x 20) cm, kayu kamper
F.082 Pasang lisplang ukuran (3 x 20) cm, kayu borneo
F.083 Pasang lisplang ukuran (3 x 20) cm, kayu bengkirai
F.084 Pasang lisplang ukuran (3 x 20) cm, kayu kruing
F.085 Pasang lisplang ukuran (3 x 20) cm, kayu meranti
F.086 Pasang lisplang ukuran (3 x 30) cm, kayu jati
F.087 Pasang lisplang ukuran (3 x 30) cm, kayu kamper
F.088 Pasang lisplang ukuran (3 x 30) cm, kayu borneo
F.089 Pasang lisplang ukuran (3 x 30) cm, kayu bengkirai
F.090 Pasang lisplang ukuran (3 x 30) cm, kayu kruing
F.091 Pasang lisplang ukuran (3 x 30) cm, kayu meranti
F.092 Pasang rangka dinding pemisah kayu jati
F.093 Pasang rangka dinding pemisah kayu kamper
F.094 Pasang rangka dinding pemisah kayu borneo
F.095 Pasang rangka dinding pemisah kayu meranti
F.096 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu jati
F.097 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu kamper
F.098 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu borneo
1 2
F.099 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu meranti
F.100 Pasang rangka dinding pemisah plywood rangkap, rangka kayu jati
F.101 Pasang rangka dinding pemisah plywood rangkap, rangka kayu kamper
F.102 Pasang rangka dinding pemisah plywood rangkap, rangka kayu borneo
F.103 Pasang rangka dinding pemisah plywood rangkap, rangka kayu meranti
F.104 Pasang dinding lambriziring dari papan jati
F.105 Pasang dinding lambriziring dari papan kamper
G.001 Beton mutu fc'=7,4 Mpa (K100) slump (12 ± 2) cm, w/c = 0,87
G.002 Beton mutu fc'=9,8 Mpa (K125) slump (12 ± 2) cm, w/c = 0,78
G.003 Beton mutu fc'=12,2 Mpa (K150) slump (12 ± 2) cm, w/c = 0,72
G.004 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
G.005 Beton mutu fc'=14,5 Mpa (K175) slump (12 ± 2) cm, w/c = 0,66
G.006 Beton mutu fc'=16,9 Mpa (K200) slump (12 ± 2) cm, w/c = 0,61
G.007 Beton mutu fc'=19,3 Mpa (K225) slump (12 ± 2) cm, w/c = 0,58
G.008 Beton mutu fc'=24,0 Mpa (K275) slump (12 ± 2) cm, w/c = 0,53
G.009 Beton mutu fc'=21,7 Mpa (K250) slump (12 ± 2) cm, w/c = 0,56
G.010 Beton mutu fc'=26,4 Mpa (K300) slump (12 ± 2) cm, w/c = 0,52
G.011 Beton mutu fc'=28,8 Mpa (K325) slump (12 ± 2) cm, w/c = 0,49
G.012 Beton mutu fc'=31,2 Mpa (K350) slump (12 ± 2) cm, w/c = 0,48
G.013 Beton kedap air dengan storox - 100
G.014 Pasang PVC Waterstop lebar 150 mm
G.015 Pasang PVC Waterstop lebar 200 mm
G.016 Pasang PVC Waterstop lebar 230 mm - 320 mm
G.017 Pembesian dengan besi polos
G.018 Pembesian dengan besi ulir
G.019 Kabel prestressed polos/strands
G.020 Memasang 1 kg jaring kawat baja / wire mesh
G.021 Pasang bekisting untuk pondasi
G.022 Pasang bekisting untuk Beton
G.023 Pasang bekisting untuk kolom
G.024 Pasang bekisting untuk balok
G.025 Pasang bekisting untuk plat lantai
G.025A Pasang bekisting untuk plat meja
G.026 Pasang bekisting untuk dinding
G.027 Pasang bekisting untuk tangga
G.028 Pasang jembatan untuk pengecoran
G.029 Beton bertulang (150 kg besi + bekisting)
G.029a Beton bertulang (100 kg besi + bekisting)
G.030 Sloof beton bertulang (200 kg besi + bekisting)
G.031 Kolom beton bertulang (150 kg besi + bekisting)
G.032 Kolom beton bertulang (300 kg besi + bekisting)
G.033 Balok beton bertulang (200 kg besi + bekisting)
G.034 Dinding beton bertulang (150 kg besi + bekisting)
G.035 Dinding beton bertulang (200 kg besi + bekisting)
G.036 Kolom penguat beton bertulang (11 x 11) cm
G.037 Ring balok beton bertulang (10 x 15) cm
1 2
N.008 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
N.009 Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
N.010 Pelaburan kayu dengan teak oil
N.011 Pelaburan kayu dengan politur
N.012 Pelaburan kayu dengan cat residu dan ter
N.013 Pelaburan kayu dengan vernis
N.014 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
N.015 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
N.016 Pengecatan tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
N.016a Pengecatan tembok lama eksterior (1 lapis cat dasar, 2 lapis cat penutup)
N.017 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
N.018 Melabur tembok dengan kalkarium
N.019 Melabur tembok dengan kapur sirih
N.020 Melabur tembok lama dengan kapur sirih (untuk pemeliharaan)
N.021 Pengecatan tembok dan plafon baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
N.022 Pengecatan permukaan baja dengan meni besi
N.023 Pengecatan permukaan baja dengan meni besi dan perancah
N.024 Pengecatan permukaan baja lapis seng (galbani) secara manual, 1 lapis
N.025 Pengecatan permukaan baja lapis seng (galbani) secara manual, 3 lapis
N.026 Pengecatan permukaan baja lapis seng (galbani) secara semprot, 1 lapis
N.027 Pekerjaan Waterproofing
N.028 Pengecatan genteng baru (1 lapis plamir, 1 lapis cat dasar,2 lapis cat penutup)
N.029 Pengecatan permukaan baja dengan cat besi
P.001 Pemasangan Stop Kontak
P.002 Pemasangan Saklar Tunggal
P.003 Pemasangan Saklar Ganda
P.004 Pemasangan titik lampu pijar 5 - 40 watt
P.005 Pemasangan titik lampu pijar 50 - 100 watt
P.006 Pemasangan titik lampu TL 20 Watt (komplit)
P.007 Pemasangan titik lampu TL 40 Watt (komplit)
P.008 Pemasangan titik lampu XL 5 Watt
P.009 Pemasangan titik lampu XL 8 Watt
P.010 Pemasangan titik lampu XL 14 Watt
P.011 Pemasangan titik lampu XL 18 Watt
P.012 Pemasangan titik lampu XL 23 Watt
P.013 Pemasangan Sekering 1 Group
P.014 Pemasangan Sekering 2 Group
P.015 Pemasangan Sekering 3 Group
P.016 Pemasangan Penangkal Petir
R.001 Pengukuran bendung untuk MC
R.002 Pengukuran saluran untuk MC
R.003 Pengukuran bangunan untuk MC
R.004 Pendongkelan Rumpun Bambu
R.005 Pembuatan dan pembongkaran kisdam > 1 m
R.006 Galian tanah biasa diangkut > 1 m dibuang
R.007 Galian tanah biasa diangkut > 50 m dibuang
1 2
HARGA
SATUAN
(Rp.)
3 4
m1 599,005.00
m1 704,145.00
m 1
529,165.00
m1 32,112.00
m 1
74,535.00
m2 1,874,410.00
m 2
1,868,460.00
m2 1,745,470.00
m 2
10,250.00
m2 1,886,670.00
bh 352,747.50
m2 114,450.00
m 3
741,900.00
m3 428,325.00
m 3
402,825.00
m2 70,250.00
m 2
12,850.00
m2 17,818.00
m 3
47,125.00
m3 57,825.00
m 3
68,695.00
m3 62,720.00
m 3
95,100.00
m3 75,825.00
m 2
3,425.00
m3 20,650.00
m 3
19,275.00
m3 34,250.00
m 3
190,450.00
m3 407,461.00
m 3
528,236.80
m3 973,725.00
m 3
240,875.00
m3 129,995.00
m 3
119,806.50
m3 298,117.97
m 3
770,875.00
m3 710,595.00
3 4
m3 668,823.00
m3 639,447.00
m 3
599,203.00
m3 676,643.00
m 3
740,619.20
m3 689,285.60
m 3
342,183.00
m3 3,172,438.00
m 3
780,198.00
m2 254,820.00
m 2
238,777.00
m2 228,241.00
m 2
222,394.00
m2 219,544.00
m 2
239,112.50
m2 122,306.00
m 2
114,864.00
m2 110,501.00
m 2
107,751.00
m2 106,127.00
m 2
103,205.00
m2 121,054.00
m 2
115,674.20
m2 110,944.60
m 2
238,300.60
m2 228,755.40
m 2
197,474.00
m2 190,306.40
m 2
149,627.80
m2 144,889.60
m 2
356,859.00
m2 352,275.00
m 2
130,999.00
m2 1,001,401.00
m 2
54,378.80
m2 46,090.80
m 2
42,445.20
m2 40,006.00
m 2
38,554.80
m2 37,421.20
m 2
36,777.20
m2 36,133.20
m 2
40,348.80
m2 35,656.80
m 2
40,130.60
m2 37,937.80
3 4
m2 61,083.40
m2 56,222.60
m 2
52,913.00
m2 51,035.40
m 2
49,466.60
m2 54,173.60
m 2
28,760.80
m2 38,225.00
m 2
186,685.00
m2 174,685.00
m 2
32,761.00
m2 43,709.00
m 1
23,662.00
m2 23,485.00
m 3
17,315,835.00
m3 15,874,125.00
m 3
12,520,125.00
m3 9,364,125.00
m 2
726,115.00
m2 610,295.00
m 2
557,095.00
3 4
m2 372,295.00
m2 893,070.00
m 2
777,250.00
m2 724,050.00
m 2
539,250.00
m2 590,092.00
m 2
520,600.00
m2 488,680.00
m 2
377,800.00
m2 1,303,962.00
m 2
1,118,650.00
m2 1,033,530.00
m 2
737,850.00
m2 680,532.50
m 2
608,145.00
m2 574,895.00
m 2
459,395.00
m2 1,141,930.00
m 2
950,200.00
m2 870,400.00
m 2
593,200.00
m2 698,282.50
m 2
625,895.00
m2 592,645.00
m 2
477,145.00
m2 817,332.50
m 2
744,945.00
m2 711,695.00
m 2
596,195.00
m2 824,632.50
m 2
736,095.00
m2 620,595.00
m 3
16,959,710.00
m3 14,505,500.00
m 3
11,431,000.00
m3 11,774,750.00
m 3
9,968,000.00
m3 9,968,000.00
m 3
8,538,000.00
m3 19,136,220.00
m 3
16,458,900.00
m3 9,424,860.00
m 3
7,994,860.00
m2 711,635.00
m 2
230,710.00
m2 460,330.00
3 4
m2 443,830.00
m2 368,830.00
m 2
267,630.00
m2 711,635.00
m 2
230,710.00
m2 460,330.00
m 2
443,830.00
m2 368,830.00
m 2
267,630.00
m2 1,002,613.10
m 2
255,490.00
m2 645,760.00
m 2
622,330.00
m2 515,830.00
m 2
362,130.00
m2 249,571.65
m 2
220,596.00
m2 166,641.00
m 2
161,196.00
m2 136,446.00
m 2
123,246.00
m2 252,758.94
m 2
225,715.00
m2 175,357.00
m 2
170,275.00
m2 147,175.00
m 2
134,855.00
m1 191,296.40
m 1
170,825.00
m1 145,661.00
m 1
140,936.00
m1 112,775.00
m 1
95,765.00
m1 193,160.50
m 1
161,310.00
m1 146,680.00
m 1
160,232.00
m1 113,185.00
m 1
95,860.00
m1 437,385.80
m 1
374,915.00
m1 296,655.00
m 1
223,015.00
m2 523,483.80
m 2
461,013.00
m2 382,753.00
3 4
m2 309,113.00
m2 532,795.80
m 2
470,325.00
m2 392,065.00
m 2
318,425.00
m2 303,508.50
m 2
283,240.00
m3 903,961.15
m 3
949,056.43
m3 984,327.81
m 3
849,572.26
m3 1,026,153.67
m 3
1,065,913.96
m3 1,095,957.49
m 3
1,148,839.71
m3 1,115,425.00
m 3
1,159,219.77
m3 1,233,566.64
m 3
1,247,142.99
m3 1,300,785.00
m 1
50,754.00
m1 87,847.00
m 1
101,797.00
kg 20,188.60
kg 19,978.60
kg 32,409.50
kg 18,272.00
m2 160,488.00
m 2
172,988.00
m2 423,279.00
m 2
433,779.00
m2 715,279.00
m 2
142,414.50
m2 523,979.00
m 2
397,979.00
m2 152,620.00
m 3
5,078,546.00
m3 3,609,296.00
m 3
6,093,784.00
m3 8,321,530.00
m 3
10,953,374.00
m3 8,333,089.00
m 3
7,703,796.00
m3 7,983,384.00
m 1
94,027.00
m1 116,361.00
3 4
m1 115,041.00
m 2
43,429.00
m2 45,929.00
m 2
80,929.00
m2 78,429.00
m 2
103,429.00
m1 72,834.00
m 1
92,334.00
m1 92,334.00
m 1
84,834.00
m1 89,834.00
m 2
85,929.00
m2 73,429.00
m 2
80,478.00
m2 85,425.00
m 2
114,979.00
m2 125,257.00
m 2
124,640.00
m1 79,834.00
m 1
95,834.00
m1 90,634.00
m 1
102,419.00
m1 149,640.00
m 1
138,910.00
m1 84,565.00
m 2
55,401.00
m2 59,461.00
m 2
49,106.00
m2 56,371.00
m 2
55,111.00
m2 72,779.00
m 2
74,849.00
m2 46,291.00
m 2
65,416.00
m2 111,316.00
m 2
66,506.00
m2 64,220.00
m 2
69,451.00
m1 137,749.00
m 1
125,089.00
m1 125,039.00
m 1
72,349.00
m1 71,869.00
m 1
75,949.00
m1 78,959.00
m 1
63,779.00
3 4
m2 73,008.00
m1 42,104.00
m 2
173,719.00
m2 204,210.00
m 2
46,685.00
m2 101,081.00
m 2
148,866.00
m2 183,589.00
m 1
213,450.00
m2 28,281.00
m 2
27,071.00
m2 26,081.00
m 2
32,131.00
m2 349,416.00
m 2
191,020.00
m2 68,610.00
m 2
15,864.50
m2 16,230.00
m 2
22,085.00
m2 23,735.00
m 2
16,044.50
m2 23,547.50
m 2
439,987.00
m2 241,687.00
m 2
394,495.00
m2 69,985.00
m 2
217,280.00
m2 229,524.20
m 2
208,451.00
m2 169,211.00
m 2
165,251.00
m2 147,251.00
m 2
137,651.00
m2 403,297.80
m 2
362,907.50
m2 287,697.50
m 2
280,107.50
m2 245,607.50
m 2
227,207.50
m2 547,565.30
m 2
507,175.00
m2 431,965.00
m 2
424,375.00
m2 389,875.00
m 2
371,475.00
m2 754,788.20
3 4
m2 707,373.50
m2 619,083.50
m 2
610,173.50
m2 569,673.50
m 2
619,083.50
m2 47,537.00
m 1
17,010.00
m1 27,245.00
bh 286,070.00
bh 475,020.00
bh 631,220.00
bh 1,880,267.44
bh 1,943,694.96
bh 1,403,640.00
bh 699,782.00
bh 1,623,697.52
bh 41,005.00
bh 352,480.00
bh 720,935.48
bh 1,163,820.00
bh 1,033,775.00
bh #REF!
m 1
46,408.17
m1 68,329.33
m 1
89,339.00
m1 169,686.51
m 1
215,094.60
m1 269,481.50
m 1
296,038.40
m1 446,172.20
m 1
489,559.10
m1 579,916.00
m 1
#VALUE!
m1 204,581.50
bh 295,453.50
bh 445,596.00
bh 679,549.00
m1 27,985.75
m 1
32,422.00
m1 47,420.75
m 1
72,374.00
m1 94,090.50
m 1
123,243.00
m1 130,425.50
m 1
196,308.00
m1 20,294.00
3 4
m1 31,448.00
m1 34,933.63
m 1
17,040.75
m1 65,762.00
m 1
142,910.50
m1 107,012.75
m 1
144,192.75
m1 80,269.15
m 1
122,005.33
m1 21,646.00
m 1
11,083.50
m1 10,576.50
m 1
11,717.25
m1 19,033.50
m 1
40,496.50
m1 62,861.50
m 1
95,605.25
m1 8,548.50
m 1
26,293.50
m1 9,773.75
m 1
10,618.75
m1 15,400.00
m 1
16,625.25
m1 23,146.50
m 1
24,963.25
bh 342,167.50
bh 266,012.50
bh 69,742.50
bh 69,742.50
bh 59,305.00
bh 25,205.00
m2 202,583.75
m 1
117,198.50
m1 154,378.50
kg 30,222.30
kg 30,222.30
kg 16,050.00
kg 33,022.30
kg 30,222.30
m2 1,022,130.00
cm 10,510.60
m2 2,221,570.00
m 2
1,842,970.00
m2 381,880.00
m 2
747,050.00
m1 154,218.90
3 4
m2 837,075.00
m2 651,039.00
m 2
609,310.00
m2 610,576.00
m 2
199,677.77
m2 477,225.00
unit 502,180.00
m1 200,232.50
m 1
222,492.50
m1 200,232.50
m 1
222,492.50
m1 61,940.00
m 1
83,565.00
m1 84,690.00
m 1
346,851.90
bh 84,876.90
m1 551,031.80
m2 484,619.80
m1 490,067.86
m1 496,942.12
m1 450,444.74
m2 700,581.64
m2 273,910.19
m2 251,084.27
m2 112,971.13
bh 148,235.00
bh 149,305.00
bh 98,402.50
bh 138,211.25
bh 156,845.00
bh 37,806.25
bh 50,883.75
bh 31,922.50
bh 19,683.75
bh 13,422.50
bh 48,610.00
bh 28,383.75
bh 32,922.50
bh 268,112.50
bh 224,612.50
bh 47,982.50
bh 225,535.00
m 2
126,683.75
m2 205,883.75
m 2
281,233.75
m2 385,073.75
3 4
m2 157,386.25
m2 224,926.25
m 2
248,711.00
m2 393,031.00
m 2
202,583.75
m2 291,903.75
m 2
394,330.00
m2 149,673.75
m 2
260,883.75
m2 424,030.00
m 2
668,340.00
m2 696,153.75
m 2
1,502,453.75
bh 39,343.75
m 2
621,793.75
m2 65,690.00
m 2
73,200.00
m2 82,724.00
m 2
86,009.00
m2 92,635.00
m 2
110,554.00
m2 89,324.00
m 2
99,757.00
m2 304,799.00
m 2
290,864.00
m2 345,032.00
m 2
497,402.00
m2 290,211.00
m 2
424,462.00
m2 572,776.50
m 1
32,310.00
m1 26,844.00
m 1
24,911.00
m1 26,171.00
m 1
26,515.00
m1 25,641.00
m 1
31,104.00
m1 32,001.00
m 1
50,021.00
m1 46,989.00
m 2
44,521.20
m2 545,143.00
m 2
1,030,793.00
m2 1,030,793.00
m 2
171,926.00
m2 1,032,416.00
3 4
m1 103,489.90
m1 189,669.90
m 1
101,777.90
m2 210,214.00
m 2
346,680.00
m2 340,905.00
m 2
104,491.00
m2 218,705.00
m 2
186,730.00
m2 158,800.00
m 2
168,230.90
m2 197,075.00
m 2
217,069.50
m2 200,091.00
m 2
510,173.00
m1 40,336.00
m 1
94,727.90
m1 141,339.90
m 2
148,716.00
m2 182,356.00
m 2
199,556.00
m2 153,216.00
m 2
172,466.00
m2 167,826.00
m 2
189,026.00
m2 167,966.00
m 2
176,125.00
m2 748,580.00
m 2
140,316.00
m2 240,885.00
m 2
114,675.00
m2 523,753.00
m 2
97,770.00
m2 152,445.00
m 2
144,345.00
m2 112,045.00
m 2
120,445.00
m2 131,445.00
m 2
118,245.00
m2 10,687.50
m 2
11,297.50
m2 11,297.50
m 2
11,297.50
m2 897,930.00
m 2
9,942.50
m2 32,065.50
3 4
m2 39,379.50
m2 52,804.50
m 2
13,292.00
m2 59,145.50
m 2
15,995.00
m2 30,880.50
m 2
22,228.90
m2 19,758.90
m 2
28,858.90
m2 28,020.10
m 2
17,970.10
m2 6,230.10
m 2
21,000.30
m2 16,836.50
m 2
20,238.90
m2 21,775.00
m 2
55,092.50
m2 27,576.00
m 2
146,223.00
m2 121,190.00
m 2
61,708.90
m2 37,925.50
m 2
27,992.00
Titik 256,350.00
Titik 204,500.00
Titik 263,350.00
Titik 211,425.00
Titik 223,525.00
Titik 229,525.00
Titik 255,525.00
Titik 220,325.00
Titik 224,425.00
Titik 228,525.00
Titik 231,225.00
Titik 236,525.00
Unit 154,828.00
Unit 253,073.50
Unit 357,237.50
Unit 3,240,225.00
bh 680,575.00
km1 945,575.00
bh 123,415.00
m2 89,445.00
m3 156,952.00
m3 60,475.00
m3 71,630.00
3 4
m3 109,450.00
m3 109,330.00
m3 98,215.00
m3 107,025.00
m3 45,740.00
m3 18,435.00
m3 46,495.00
m3 175,520.00
m3 142,135.00
m3 710,595.00
m2 43,709.00
m2 42,445.20
m3 1,026,157.60
m2 213,829.00
kg 19,978.60
kg 20,188.60
m 2
714,955.80
m2 35,300.00
m 2
31,900.00
m2 38,800.00
btg 232,600.00
m3 219,166.00
m 2
30,300.00
m3 15,388,800.00
Unit 33,289,920.00
m1 216,298.00
bh 219,922.20
bh 273,960.00
bh 221,460.00
bh 148,595.00
bh 126,595.00
bh 70,907.40
bh 1,234,422.20
bh 687,142.50
bh 604,428.00
bh 1,229,428.00
bh 218,571.00
bh 23,765.00
unit 2,482,600.00
m1 33,342.50
unit 1,174,780.00
DAFTAR HARGA UPAH
TAHUN 2015
KET.
KET.
KET.
KET.
KET.
KET.
KET.
KET.
KET.
KET.
KET.
KET.
KET.
KET.
KET.
KET.
KET.
202,500.00
210,000.00
377,500.00
KET.
2200 watt
KET.
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) PER LUAS 2,781 m2 526,050.00
E JUMLAH HARGA per 1 m2 189,158.58
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA A. TENAGA
1 Pekerja Biasa L17 Org/hr 4.0000 60,000.00 240,000.00 1 Pekerja Biasa L17 Org/hr 4.0000 60,000.00 240,000.00
2 Tukang Kayu L08 Org/hr 12.0000 75,000.00 900,000.00 2 Tukang Kayu L08 Org/hr 12.0000 75,000.00 900,000.00
3 Kepala Tukang Kayu L03 Org/hr 1.2000 78,000.00 93,600.00 3 Kepala Tukang Kayu L03 Org/hr 1.2000 78,000.00 93,600.00
4 Mandor L01 Org/hr 0.2000 85,000.00 17,000.00 4 Mandor L01 Org/hr 0.2000 85,000.00 17,000.00
B BAHAN B BAHAN
1 Balok M068 m3 1.1000 7,500,000.00 8,250,000.00 1 Balok M068 m3 1.1000 7,500,000.00 8,250,000.00
2 Besi Strip M114 kg 15.0000 25,000.00 375,000.00 2 Besi Strip M114 kg 15.0000 25,000.00 375,000.00
3 Paku Kayu Segala Ukuran M140 kg 5.6000 16,500.00 92,400.00 3 Paku Kayu Segala Ukuran M140 kg 5.6000 16,500.00 92,400.00
C PERALATAN C PERALATAN
D JUMLAH HARGATENAGA, BAHAN DAN PERALATAN (A + B + C) 9,968,000.00 D JUMLAH HARGATENAGA, BAHAN DAN PERALATAN (A + B + C) 9,968,000.00
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.1000 60,000.00 6,000.00 1 Pekerja Biasa L17 Org/hr 0.1000 60,000.00 6,000.00
2 Tukang Kayu L08 Org/hr 0.1000 75,000.00 7,500.00 2 Tukang Kayu L08 Org/hr 0.1000 75,000.00 7,500.00
3 Kepala Tukang Kayu L03 Org/hr 0.0100 78,000.00 780.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 78,000.00 780.00
4 Mandor L01 Org/hr 0.0050 85,000.00 425.00 4 Mandor L01 Org/hr 0.0050 85,000.00 425.00
B BAHAN B BAHAN
1 Usuk : 5/7 M061 m3 0.0140 6,200,000.00 86,800.00 1 Usuk : 5/7 M061 m3 0.0140 6,200,000.00 86,800.00
2 Paku Kayu Segala Ukuran M140 kg 0.2500 16,500.00 4,125.00 2 Paku Kayu Segala Ukuran M140 kg 0.1000 16,500.00 1,650.00
3 Reng : 2/3, 3/5 M060 m3 0.0360 4,500,000.00 162,000.00 3 Reng : 2/3, 3/5 M060 m3 4,500,000.00 -
C PERALATAN C PERALATAN
D JUMLAH HARGATENAGA, BAHAN DAN PERALATAN (A + B + C) 267,630.00 D JUMLAH HARGATENAGA, BAHAN DAN PERALATAN (A + B + C) 103,155.00
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.1000 60,000.00 6,000.00 1 Pekerja Biasa L17 Org/hr 0.1000 60,000.00 6,000.00
2 Tukang Kayu L08 Org/hr 0.1000 75,000.00 7,500.00 2 Tukang Kayu L08 Org/hr 0.1000 75,000.00 7,500.00
3 Kepala Tukang Kayu L03 Org/hr 0.0100 78,000.00 780.00 3 Kepala Tukang Kayu L03 Org/hr 0.0100 78,000.00 780.00
4 Mandor L01 Org/hr 0.0050 85,000.00 425.00 4 Mandor L01 Org/hr 0.0050 85,000.00 425.00
1 Usuk : 5/7 M067 m3 0.0140 7,000,000.00 98,000.00 1 Usuk : 5/7 M067 m3 0.0070 7,000,000.00 49,000.00
2 Paku Kayu Segala Ukuran M140 kg 0.2500 16,500.00 4,125.00 2 Paku Kayu Segala Ukuran M140 kg 0.2500 16,500.00 4,125.00
3 Reng : 2/3, 3/5 M066 m3 0.0360 7,000,000.00 252,000.00 3 Reng : 2/3, 3/5 M066 m3 0.0045 7,000,000.00 31,500.00
C PERALATAN C PERALATAN
D JUMLAH HARGATENAGA, BAHAN DAN PERALATAN (A + B + C) 368,830.00 D JUMLAH HARGATENAGA, BAHAN DAN PERALATAN (A + B + C) 99,330.00
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 Balok M096 m3 0.0280 13,856,100.00 387,970.80
2 Paku Kayu Segala Ukuran M140 kg 0.1500 16,500.00 2,475.00
3 Lem Kayu M422 bh 0.5600 12,000.00 6,720.00
4 Plywood (120 x 240) cm x 4 mm M226 lbr 0.8600 85,000.00 73,100.00
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
I. BAHAN
1 Bahan konstruksi
- Besi siku kg 307.00 7,300.00 2,241,100.00
- Besi plate kg 104.00 7,350.00 764,400.00
- Besi plate strip kg 45.00 7,820.00 351,900.00
- Besi beton kg 12.00 6,500.00 78,000.00
- pipa kg 1.00 9,250.00 9,250.00
3,444,650.00
IV. PEMBONGKARAN kg
A. TENAGA
B BAHAN
1 Pompa Submersible Q = 3,5 lt/det, H=150 m bh 1.0000 33,000,000.00
C PERALATAN
A. TENAGA
B BAHAN
1 Pipa Galvanis Ø 3 " tebal 2.5 mm M382 Ljr 0.0700 257,000.00
2 Flange GI Ø 4" (pengelasan, packing, baut) 2.0000 85,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 Solar Industri M483 ltr 75.0000 25,000.00
2 Minyak Pelumas M484 ltr 5.0000 25,000.00
C PERALATAN
A. TENAGA
B BAHAN
1 Kabel NYYHY 3 x 4 mm M438.a m1 1.0000 13,100.00
JUMLAH HARGA BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 Kabel NYYHY 3 x 1.5 mm M438.b m1 1.0000 7,900.00
C PERALATAN
A. TENAGA
B BAHAN
1 Panel pompa bh 1.0000 -
JUMLAH HARGA BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 Junction Box bh 1.0000 -
C PERALATAN
A. TENAGA
B BAHAN
1 Elektroda Pompa bh 1.0000 -
JUMLAH HARGA BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 Pipa PVC moof 6 m S - 12.5 Ø 3" M400.k ljr 0.2000 62,800.00
2 Perlengkapan 0.3500 12,560.00
C PERALATAN
JUMLAH
HARGA
(Rp.)
137,520.00
85,500.00
44,460.00
22,440.00
289,920.00
33,000,000.00
33,000,000.00
33,289,920.00
JUMLAH
HARGA
(Rp.)
8,100.00
16,875.00
1,755.00
578.00
27,308.00
17,990.00
171,000.00
188,990.00
216,298.00
NALISA HARGA SATUAN
JUMLAH
HARGA
(Rp.)
61,776.00
39,105.00
20,077.20
13,464.00
134,422.20
85,500.00
85,500.00
219,922.20
JUMLAH
HARGA
(Rp.)
12,000.00
7,500.00
3,900.00
3,060.00
26,460.00
247,500.00
247,500.00
273,960.00
NALISA HARGA SATUAN
JUMLAH
HARGA
(Rp.)
12,000.00
7,500.00
3,900.00
3,060.00
26,460.00
195,000.00
195,000.00
221,460.00
JUMLAH
HARGA
(Rp.)
4,050.00
2,287.50
1,365.00
892.50
8,595.00
140,000.00
140,000.00
148,595.00
NALISA HARGA SATUAN
JUMLAH
HARGA
(Rp.)
4,050.00
2,287.50
1,365.00
892.50
8,595.00
118,000.00
118,000.00
126,595.00
JUMLAH
HARGA
(Rp.)
6,078.00
3,435.00
2,051.40
1,343.00
12,907.40
58,000.00
58,000.00
70,907.40
NALISA HARGA SATUAN
JUMLAH
HARGA
(Rp.)
61,776.00
39,105.00
20,077.20
13,464.00
134,422.20
1,100,000.00
1,100,000.00
1,234,422.20
JUMLAH
HARGA
(Rp.)
23,400.00
14,812.50
7,605.00
3,825.00
49,642.50
637,500.00
637,500.00
687,142.50
NALISA HARGA SATUAN
JUMLAH
HARGA
(Rp.)
37,440.00
23,700.00
12,168.00
6,120.00
79,428.00
525,000.00
525,000.00
604,428.00
JUMLAH
HARGA
(Rp.)
37,440.00
23,700.00
12,168.00
6,120.00
79,428.00
1,150,000.00
1,150,000.00
1,229,428.00
NALISA HARGA SATUAN
JUMLAH
HARGA
(Rp.)
28,080.00
17,775.00
9,126.00
4,590.00
59,571.00
159,000.00
159,000.00
218,571.00
JUMLAH
HARGA
(Rp.)
1,344.00
772.50
351.00
297.50
2,765.00
21,000.00
21,000.00
23,765.00
NALISA HARGA SATUAN
JUMLAH
HARGA
(Rp.)
300,000.00
150,000.00
15,600.00
17,000.00
482,600.00
1,875,000.00
125,000.00
2,000,000.00
2,482,600.00
JUMLAH
HARGA
(Rp.)
1,800.00
1,125.00
117.00
127.50
3,169.50
13,100.00
13,100.00
16,269.50
NALISA HARGA SATUAN
JUMLAH
HARGA
(Rp.)
1,344.00
772.50
351.00
297.50
2,765.00
7,900.00
7,900.00
10,665.00
JUMLAH
HARGA
(Rp.)
90,000.00
93,750.00
9,750.00
10,625.00
204,125.00
-
-
204,125.00
NALISA HARGA SATUAN
JUMLAH
HARGA
(Rp.)
75,000.00
56,250.00
5,850.00
6,375.00
143,475.00
143,475.00
JUMLAH
HARGA
(Rp.)
15,000.00
11,250.00
1,170.00
1,275.00
28,695.00
-
-
28,695.00
NALISA HARGA SATUAN
JUMLAH
HARGA
(Rp.)
4,860.00
10,125.00
1,053.00
348.50
16,386.50
12,560.00
4,396.00
16,956.00
33,342.50
ANALISA HARGA SATUAN
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B BAHAN
C PERALATAN
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
1 Pekerja Biasa L17 Org/hr - 60,000.00
2 Tukang Taman L14 Org/hr 0.4000 75,000.00
3 Mandor L01 Org/hr 0.0200 85,000.00
B BAHAN
C PERALATAN
-
11,250.00
850.00
12,100.00
23,200.00
23,200.00
35,300.00
JUMLAH
HARGA
(Rp.)
-
11,250.00
850.00
12,100.00
19,800.00
19,800.00
31,900.00
JUMLAH
HARGA
(Rp.)
-
24,750.00
850.00
25,600.00
13,200.00
13,200.00
38,800.00
JUMLAH
HARGA
(Rp.)
-
30,000.00
1,700.00
31,700.00
200,900.00
200,900.00
232,600.00
ANALISA HARGA SATUAN
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B BAHAN
1 Stenslah/batu pecah tangan 2/3 M014 m3 1.0000 205,000.00
C PERALATAN
12,000.00
1,500.00
156.00
510.00
14,166.00
205,000.00
205,000.00
219,166.00
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 Pipa Screen PVC tipe AW Ø 6 " M400 ljr 0.2500 161,100.00 40,275.00
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN