DIVISI 7. STRUKTUR
7.6.(1) Pondasi Cerucuk Penyediaan dan Pemancangan Cerucuk M1 107,616.67 - - -
7.6.(1) Pondasi Cerucuk Penyediaan dan Pemancangan Cerucuk M1 70,996.69
7.9.(1) Pasangan Batu M3 1,057,684.15 570.00 602,879,965.50 1.17
7.10(3a) Bronjong Dengan Kawat yang Dilapisi Galvanis M3 1,043,108.00 - - -
602,879,965.50 1.17
RIYANTO, ST
RIVANIZAR, ST IKHWAN
General HARAHAP, ST
Superintendent
NIP: 1964. 0811. 2007. 0110. 03 Site Engineer
ENDUM 001
BAH DAN PEKERJAAN KURANG
- - - TETAP
- - - TETAP
- - - TETAP
- - - TETAP
- -
-
- - - - - TETAP
-
570.00 602,879,965.50 - 100.00 BERKURANG
- - - - - - TETAP
-
- - - - - - TETAP
- - - - - - TETAP
74.14 17,399,049.90 606.96 142,440,347.04 1.27 13.91 BERTAMBAH
- 40.00 29,987,726.00 0.27 - TETAP
- 20.00 26,041,163.00 0.23 - TETAP
- 80.00 17,835,939.20 0.16 - TETAP
- 200.00 301,274,098.00 2.70 - TETAP
100.00
4,012,978,426.15 3,440,952,164.21 11,178,831,420.73
REKONTRUKSI LINGKAR SEBATIK
Pekerjaan Tambah Pekerjaan Kurang ADDENDUM 01 Selisih Keterangan
Volume Jumlah Volume Jumlah Volume Jumlah BOBOT
401,297,842.61 344,095,216.42 1,117,883,142.07 (%)
4,414,276,268.76 3,785,047,380.63 12,296,714,562.80
4,414,276,000.00 3,785,047,000.00 12,296,714,000.00
periksa Oleh,
Oleh,
ultan Pengawas
Pelaksana
CREASI
DIRI MITRAYASA
PRATAMA
TO, ST
AN HARAHAP, ST
erintendent
Site Engineer
ADDENDUM 0
AKIBAT PEKERJAAN TAMBAH DAN
Paket Pekerjaan : Preservasi Rehabilitasi Mayor Jalan Sp.3 Pos Batas Negara - Sei Ular Dan Sebatik
No Kontrak : 06-35/APBN/PJNAS.I-KALTARA/2017
Tanggal Kontrak : 06 Januari 2017
Nilai Kontrak : Rp. 56.888.865.000,00
Tahun Anggaran : 2017
KONTRAK AWAL
No.Item Uraian Pekerjaan
Volume Jumlah BOBOT
SATUAN HARGA SATUAN
(%)
Pekerjaan Harga (Rp)
DIVISI 1. UMUM
1.2 Mobilisasi Ls 257,000,000.00 1.00 257,000,000.00 0.50
1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 61,600,000.00 1.00 61,600,000.00 0.12
1.17 Pengamanan Lingkungan Hidup Ls 19,890,000.00 1.00 19,890,000.00 0.04
1.21 Manajemen Mutu Ls 68,500,000.00 1.00 68,500,000.00 0.13
406,990,000.00 0.79
DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Selokan Drainase dan Saluran Air M3 76,078.73 5,748.51 437,339,340.19 0.85
2.2.(1) Pasangan Batu Dengan Mortar M3 1,010,383.53 4,800.00 4,849,840,944.00 9.38
5,287,180,284.19 10.22
DIVISI 7. STRUKTUR
7.6.(1) Pondasi Cerucuk Penyediaan dan Pemancangan Cerucuk M1 107,616.67 400.00 43,046,668.00 0.08
7.6.(1) Pondasi Cerucuk Penyediaan dan Pemancangan Cerucuk M2 70,996.69
7.9.(1) Pasangan Batu M3 1,057,684.15 2,850.00 3,014,399,827.50 5.83
7.10(3a) Bronjong Dengan Kawat yang Dilapisi Galvanis M3 1,043,108.00 1,700.00 1,773,283,600.00 3.43
4,830,730,095.50 9.34
RIYANTO, ST
HARAHAP, ST General Superintendent
Engineer
ADDENDUM 0
AKIBAT PEKERJAAN TAMBAH DAN
Paket Pekerjaan : Preservasi Rehabilitasi Mayor Jalan Sp.3 Pos Batas Negara - Sei Ular Dan Sebatik
No Kontrak : 06-35/APBN/PJNAS.I-KALTARA/2017
Tanggal Kontrak : 06 Januari 2017
Nilai Kontrak : Rp. 56.888.865.000,00
Tahun Anggaran : 2017
DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Selokan Drainase dan Saluran Air M3 76,078.73
2.2.(1) Pasangan Batu Dengan Mortar M3 1,010,383.53
DIVISI 7. STRUKTUR
7.6.(1) Pondasi Cerucuk Penyediaan dan Pemancangan Cerucuk M1 107,616.67
7.9.(1) Pasangan Batu M3 1,057,684.15
7.10(3a) Bronjong Dengan Kawat yang Dilapisi Galvanis M3 1,043,108.00
RIVANIZAR, ST IKHWAN
NIP: 1964. 0811. 2007. 0110. 03 Site
NDUM 001
AH DAN PEKERJAAN KURANG
KONTRAK AWAL
No.Item Uraian Pekerjaan
Volume Jumlah BOBOT
HARGA (%)
SATUAN
SATUAN Pekerjaan Harga (Rp)
DIVISI 1. UMUM
1.2 Mobilisasi Ls 257,000,000.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 61,600,000.00
1.17 Pengamanan Lingkungan Hidup Ls 19,890,000.00
1.21 Manajemen Mutu Ls 68,500,000.00
DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Selokan Drainase dan Saluran Air M3 76,078.73
2.2.(1) Pasangan Batu Dengan Mortar M3 1,010,383.53
KONTRAK AWAL
No.Item Uraian Pekerjaan
Volume Jumlah BOBOT
HARGA (%)
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN SATUAN
SATUAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 557,341.29
DIVISI 7. STRUKTUR
7.6.(1) Pondasi Cerucuk Penyediaan dan Pemancangan Cerucuk M1 107,616.67
7.9.(1) Pasangan Batu M3 1,057,684.15
7.10(3a) Bronjong Dengan Kawat yang Dilapisi Galvanis M3 1,043,108.00
KONTRAK AWAL
No.Item Uraian Pekerjaan
Volume Jumlah BOBOT
HARGA (%)
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN SATUAN
SATUAN
Skh-1.10.1.(1) Galian Tanah Untuk Saluran Air dan Lereng M3 76,078.73 - - -
Skh-1.10.1.(2) Timbunan Pilihan Untuk Lereng Tepi Saluran M3 225,454.88 - - -
Skh-1.10.1.(3) Pasangan Batu Dengan Mortar M3 1,010,383.53 - - -
Skh-1.10.1.(4) Lapis Pondasi Agregat Kelas A M3 671,018.78 1,701.00 1,141,402,944.78 2.21
Skh-1.10.1.(5) Lapis Pondasi Agregat Kelas B M3 619,480.94 - - -
Skh-1.10.1.(6) Lapis Pondasi Agregat Kelas S M3 557,341.29 - - -
Skh-1.10.1.(10) Campuran Aspal Panas M3 3,613,933.63 340.20 1,229,460,220.93 2.38
Skh-1.10.1.(13) Residu Bitumen Liter 12,381.46 8,575.09 106,172,133.83 0.21
Skh-1.10.1.(15) Lapis Pondasi Beton Kurus M3 1,614,478.17 - - -
Skh-1.10.1.(16) Pasangan Batu M3 1,057,684.15 - - -
Skh-1.10.1.(16) Pasangan Batu M3 961,080.77
Skh-1.10.1.(17) Bahan Penutup (Sealent) Kg 44,000.00 - - -
Skh-1.10.1.(18) Pengendalian Tanaman Pada Rumija Km 787,600.00 - - -
2,477,035,299.54 4.79
A Jumlah harga pekerjaan 2,477,035,299.54
B Pajak pertambahan nilai (PPN)10% x A 247,703,529.95
C Jumlah Total Harga Pekerjaan A+B 2,724,738,829.49
D Dibulatkan 2,724,738,000.00
-
Pemeliharaan Rutin Kondisi Jalan Lingkar Pulau Sebatik
- - - - TETAP
- - - - TETAP
493,226,433.27 427,936,360.62 2,542,325,372.19 4.20
493,226,433.27 427,936,360.62 2,542,325,372.19
49,322,643.33 42,793,636.06 254,232,537.22
542,549,076.60 470,729,996.68 2,796,557,909.41
542,549,000.00 470,729,000.00 2,796,557,000.00
Pemelihar
KONTRAK AWAL
No.Item Uraian Pekerjaan
Volume Jumlah BOBOT
HARGA (%)
SATUAN
SATUAN Pekerjaan Harga (Rp)
DIVISI 1. UMUM
1.2 Mobilisasi Ls 257,000,000.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 61,600,000.00
1.17 Pengamanan Lingkungan Hidup Ls 19,890,000.00
1.21 Manajemen Mutu Ls 68,500,000.00
DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Selokan Drainase dan Saluran Air M3 76,078.73
2.2.(1) Pasangan Batu Dengan Mortar M3 1,010,383.53
DIVISI 7. STRUKTUR
7.6.(1) Pondasi Cerucuk Penyediaan dan Pemancangan Cerucuk M1 107,616.67
7.9.(1) Pasangan Batu M3 1,057,684.15
7.10(3a) Bronjong Dengan Kawat yang Dilapisi Galvanis M3 1,043,108.00
Pemeliharaan Rutin Kondisi Jalan Sp. Tiga Pos Gabungan Bts. Negara - Sei Ular
Pekerjaan Tambah Pekerjaan Kurang ADDENDUM 01
Selisih Keterangan
Volume Jumlah Volume Jumlah Volume Jumlah BOBOT
(%)
Pekerjaan Harga (Rp) Pekerjaan Harga (Rp) Pekerjaan Harga (Rp)
-
-
Pemeliharaan Rutin Kondisi Jalan Sp. Tiga Pos Gabungan Bts. Negara - Sei Ular
Pekerjaan Tambah Pekerjaan Kurang ADDENDUM 01
Selisih Keterangan
Volume Jumlah Volume Jumlah Volume Jumlah BOBOT
- 90.00 6,847,085.70 390.00 29,670,704.70 (%)1.78 18.75 BERKURANG
- - - - 360.00 81,163,756.80 4.87 - TETAP
- 242.00 244,512,814.26 198.00 200,055,938.94 12.00 55.00 BERKURANG
165.60 111,120,709.97 - 165.60 111,120,709.97 6.66 BERTAMBAH
- 57.00 35,310,413.58 183.00 113,365,012.02 6.80 23.75 BERKURANG
- - - - - - TETAP
- 11.51 41,606,669.25 64.21 232,040,385.21 13.91 15.20 BERKURANG
- - - - TETAP
- - 141.60 228,610,108.87 146.40 236,359,604.09 14.17 49.17 BERKURANG
- - - 150.00 158,652,622.50 9.51 - TETAP
449.29 431,799,554.24 449.29 431,799,554.24 25.89 BERTAMBAH
- 743.81 32,727,640.00 - - - 100.00 BERKURANG
- - - 34.00 26,778,400.00 1.61 - TETAP
589,614,731.67 589,614,731.67 1,667,701,155.92 100.00
589,614,731.67 589,614,731.67 1,667,701,155.92
58,961,473.17 58,961,473.17 166,770,115.59
648,576,204.83 648,576,204.83 1,834,471,271.52
648,576,000.00 648,576,000.00 1,834,471,000.00
J
u
CCOm1 KONTRAK AWAL
No.Item Uraian Pekerjaan
lBOBOT (%) Volume Jumlah
SATUAN HARGA SATUAN a
Hargah(Rp) Pekerjaan Harga (Rp)
DIVISI 1. UMUM
1.2 Mobilisasi Ls 257,000,000.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 61,600,000.00
1.17 Pengamanan Lingkungan Hidup Ls 19,890,000.00
1.21 Manajemen Mutu Ls 68,500,000.00
DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Selokan Drainase dan Saluran Air M3 76,078.73
2.2.(1) Pasangan Batu Dengan Mortar M3 1,010,383.53
DIVISI 7. STRUKTUR
7.6.(1) Pondasi Cerucuk Penyediaan dan Pemancangan Cerucuk M1 107,616.67
7.9.(1) Pasangan Batu M3 1,057,684.15
7.10(3a) Bronjong Dengan Kawat yang Dilapisi Galvanis M3 1,043,108.00
Disetujui Oleh,
PPK 1.4 KALTARA
Preservasi Lingkar sebatik - sei. Ular PT. DA
RIVANIZAR, ST IKH
NIP: 1964. 0811. 2007. 0110. 03
ENDUM 01
AHN ADAN PEKERJAAN KURANG
-
-
Pemeliharaan Rutin Jalan Lingkar Pulau Sebatik
Pekerjaan Tambah Pekerjaan Kurang ADDENDUM 01
Selisih Keterangan
BOBOT Volume Jumlah Volume Jumlah Volume Jumlah BOBOT
(%) (%)
3.75 915.00 69,612,037.95 1,755.00 133,518,171.15 8.26 108.93 BERTAMBAH
8.38 - - 633.24 142,767,048.21 8.84 - TETAP
56.95 - 69.00 69,716,463.57 891.00 900,251,725.23 55.71 7.19 BERKURANG
- - - - - - - TETAP
- - - - - - - TETAP
14.73 - - 46.32 25,814,616.40 403.68 224,988,964.10 13.92 10.29 BERKURANG
- - - - - - - TETAP
- - - - - - - TETAP
- - - - - - - TETAP
11.18 - - 180.00 190,383,147.00 11.78 - TETAP
- -
3.60 - 1,394.72 61,367,680.00 - - 100.00 BERKURANG
1.41 - - - - 30.39 23,935,164.00 1.48 - TETAP
100.00 69,612,037.95 156,898,759.97 1,615,844,219.69 100.00
69,612,037.95 156,898,759.97 1,615,844,219.69
6,961,203.80 15,689,876.00 161,584,421.97
76,573,241.75 172,588,635.97 1,777,428,641.66
76,573,000.00 172,588,000.00 1,777,428,000.00