2 ATK Rp 2,845,000
Map Bantek Buah 13 Rp 60,000 Rp 780,000
Kertas A4 Rim 5 Rp 40,000 Rp 200,000
Kertas F4 Rim 2 Rp 55,000 Rp 110,000
Buffalo Kuning Pak 1 Rp 650,000 Rp 650,000
Lakban Hitam Buah 3 Rp 25,000 Rp 75,000
Biaya Foto copy Rp 1,000,000
Kertas Foto Pak 1 Rp 30,000 Rp 30,000
4 Lermbur Rp 5,000,000
Konsumsi Lembur Hari 10 Rp 500,000 Rp 5,000,000
Total Rp 27,445,000
R.A.B. MIRM
I Instalasi Petir
a). AIP 10 Unit Rp 150,000 Rp 1,500,000
b).Lighting Cantter 1 Unit Rp 4,500,000 Rp 4,500,000
c). BL 25 mm 150 Meter Rp 60,000 Rp 9,000,000
d). Relling Plat 60 Unit Rp 5,000 Rp 300,000
e). Box Conter 1 Unit Rp 500,000 Rp 500,000
f). Konrud AB 5/8" 1 Unit Rp 1,500,000 Rp 1,500,000
g). Pipa Galvanium Patrikasi 10 Unit Rp 200,000 Rp 2,000,000
h). Bor Graunding 15 - 20 cm Unit Rp 6,000,000 Rp 6,000,000
i). Ongkos Pasang 1 Set Rp 2,500,000 Rp 2,500,000
TOTAL Rp 27,800,000
II Untuk Pengurusan
a). Izin Petir
b). Izin Listrik
c). Izin Genset
d). Izin Radiologi
e). IPAL
f). Uji Ukuran Emisi
TOTAL ESTIMASI Rp 300,000,000
TOTAL Rp 342,800,000