I. PEKERJAAN PERSIAPAN
1. Mobilisasi dan Demobilisasi Peralatan
2. Pekerjaan Pembersihan
3. Pekerjaan Direksi Keet, Barak Kerja dan gudang
4. Papan nama kegiatan
5. Pekerjaan Sondir
Bahan :
1 CCSP W 450 B M' Rp 952,000.00
2 Tiang Pancang Persegi 400x400mm M' Rp 563,000.00
3 Besi Canal CNP 200x75x20 (3,2 mm) M' Rp 83,333.00
2 Semen portland zak Rp 67,000.00
3 Kerikil m3 Rp 435,000.00
4 Pasir beton m3 Rp 125,000.00
5 Pasir pasangan m 3
Rp 95,000.00
6 Besi polos kg Rp 12,000.00
7 Kawat ikat kg Rp 18,000.00
8 Papan kayu m3 Rp 1,400,000.00
9 Kaso 5/7 cm m3 Rp 1,600,000.00
10 Paku 5cm dan 7cm kg Rp 18,000.00
11 Minyak Begisting liter Rp 10,700.00
12 Bata Merah bh Rp 550.00
13 Sling Angkur dia 40 mm M' Rp 161,000.00
14 Accesoris Pemasangan Sing Angkur Ls Rp 375,000.00
15 Tanah Urug / bahan tanah timbunan m3 Rp 59,500.00
16 Plamur kg Rp 9,300.00
17 Cat Dasar kg Rp 33,000.00
18 Cat Penutup kg Rp 52,000.00
19 Bensin Liter Rp 9,240.00
20 Solar Liter Rp 9,130.00
21 Pelumas Liter Rp 23,500.00
Peralatan :
1 Mesin Gerinda Potong Jam Rp 120,000.00
2 Alat Bantu Jam Rp 10,000.00
A HARGA SATUAN PEKERJAAN
Sheet Pile Jakabaring - Palembang, Sumatera Selatan
No. Uraian Pekerjaan/Jenis kegiatan Analisa Volume
I. PEKERJAAN PERSIAPAN
Mobilisasi / Demobilisasi Ls 1.00 Ls
Pengukuran Ls 1.00 Ls
Direksi Keet, Barak Kerja, dan Gudang Ls 1.00 Unit
Papan Nama Kegiatan Ls 1.00 bh
Pekerjaan Sondir Ls 4 titik
PEKERJAAN PAGAR
Pembongkaran Pagar Ls 1.00 Ls
Pembuatan Pagar
2.2 Beton AHSP 2016-B.05.a 32.11 M³
2.3 Pembesian AHSP 2016-B.17.a 73.04 Kg
2.4 Bekisting AHSP 2016-B.05.a 446.40 M²
2.5 Pasangan Batu Bata AHSP 2016-P.02.a.1 18.43 M³
2.6 Plesteran 1PC:4PP AHSP 2016-P.04.c 275.04 M²
2.7 Pengecatan AHSP 2016-A.4.7.1.10 275.04 M²
2.8 Galian Tanah Biasa AHSP 2016-T.06.a.1 4.32 M³
2.9 Urugan Tanah Kembali AHSP 2016-T.14.a.1 1.44 M³
PEKERJAAN LAIN-LAIN
Administrasi dan Pelaporan Ls 1.00 Ls
Dokumentasi Ls 1.00 Ls
Harga Satuan Jumlah Harga
(Rp) (Rp)
DAFTAR UPAH DAN BAHAN
Bahan :
1 CCSP W 450 B M' Rp 941,813.60
2 Tiang Pancang Persegi 400x400mm M' Rp 556,975.90
3 Besi Canal CNP 200x75x20 (3,2 mm) M' Rp 82,441.34
2 Semen portland zak Rp 66,283.10
3 Kerikil m3 Rp 430,345.50
4 Pasir beton m3 Rp 123,662.50
5 Pasir pasangan m 3
Rp 93,983.50
6 Besi polos kg Rp 11,871.60
7 Kawat ikat kg Rp 17,807.40
8 Papan kayu m3 Rp 1,385,020.00
9 Kaso 5/7 cm m3 Rp 1,582,880.00
10 Paku 5cm dan 7cm kg Rp 17,807.40
11 Minyak Begisting liter Rp 10,585.51
12 Bata Merah bh Rp 544.12
13 Sling Angkur dia 40 mm M' Rp 159,277.30
14 Accesoris Pemasangan Sing Angku Ls Rp 370,987.50
15 Tanah Urug / bahan tanah timbunan m3 Rp 58,863.35
16 Plamur kg Rp 9,200.49
17 Cat Dasar kg Rp 32,646.90
18 Cat Penutup kg Rp 51,443.60
19 Bensin Liter Rp 9,141.13
20 Solar Liter Rp 9,032.31
21 Pelumas Liter Rp 23,248.55
22 CRANE Unit Rp 1,088,230,000.00
23 PILE HAMMER Unit Rp 437,270,600.00
24 Las Listrik Unit Rp 24,732,500.00
Peralatan :
1 Mesin Gerinda Potong Jam Rp 118,716.00
2 Alat Bantu Jam Rp 9,893.00
No. Uraian Pekerjaan/Jenis kegiatan Analisa Volume
I. PEKERJAAN PERSIAPAN
1. Mobilisasi / Demobilisasi Ls 1.00
2. Pengukuran Ls 1.00
3. Direksi Keet, Barak Kerja, dan Gudang Ls 1.00
4. Papan Nama Kegiatan Ls 1.00
5. Pekerjaan Sondir Ls 4
PEKERJAAN LAIN-LAIN
Administrasi dan Pelaporan Ls 1.00
Dokumentasi Ls 1.00
Harga Satuan Jumlah Harga
Volume (Rp) (Rp)
Ls
Ls
Unit
bh
titik
btg
M'
btg
M'
Set
btg
btg
M³
Kg
M²
M³
M³
M³
M³
M²
Ls
Ls
ANALISA BIAYA OPERASI ALAT BERAT
1 2 3 4
A. URAIAN PERALATAN
1. Jenis Peralatan
2. Merk/Tipe
3. Tenaga Pw HP
4. Kapasitas Cp -
5. Umur Ekonomis A Tahun
6. Jam Operasi Dalam 1 Tahun W Jam
7. Harga Alat B Rp
Suku Bunga
0.26380 0.26380 0.26380 0.2637974808
i = 10%
Asuransi
1,100 442 25 2037.486794
p = 0.2 %
131,679.75 52,911.32 2,992.72 243,905.234
PERHITUNGAN PERHITUNGAN
BIAYA OPERASI BIAYA OPERASI
PERALATAN PERALATAN
1.61051
120.0 6.0
3.50 125.00
5.0 4
2,000 2000
372,167,641 25,913,950
37,216,764 2,591,395
0.2637974808 0.31547
-647.85
44,179.599 3,678.793
372.167641 25.9140
44,551.766 3,704.7065
40,050.0 2,002.50
14,100.0 705.00
4,186.89 291.53
9,304.19 647.85
23,319 23,319
13,426 13,426
104,386.5 40,392.31
148,938.272 44,097.0158
9,240 9,240
11,125 11,125
23,500 23,500
ANALISA HARGA SATUAN PEKERJAAN
No. Uraian Koefisien Satuan
A. PEKERJAAN PERSIAPAN
1. Mobilisasi dan demobilisasi peralatan per 1 Ls
a. Pengangkutan
1. Bahan dan material 1.00 Ls
Total Biaya
2. Pengukuran per 1 Ls
a. Alat 1 Ls
b. Bahan
1. Kayu kelas
2. Paku Biasa
3. Seng Bergelombang
4. Kayu Papan
Total Biaya
8. Pekerjaan Beton
A. Tenaga
1. Tukang 0.275 O/H
2. Kepala Tukang 0.028 O/H
3. Pekerja 1.65 O/H
4. Mandor 0.165 O/H
B. Bahan
1. Semen Portland 6.520 Zak
2. Kerikil 0.572 m3
3. Pasir Beton 0.543 m3
Total Biaya
9. Pembesian
A. Tenaga
1. Tukang Besi 0.700 O/H
2. Kepala Tukang 0.070 O/H
3. Pekerja 0.700 O/H
4. Mandor 0.070 O/H
B. Bahan
1. Besi Polos 105.000 Kg
2. Kawat Ikat 1.500 Kg
Total Biaya
10. Bekisting
A. Tenaga
1. Tukang Kayu 0.15 O/H
2. Kepala Tukang 0.015 O/H
3. Pekerja 0.3 O/H
4. Mandor 0.03 O/H
B. Bahan
1. Papan Kayu 0.014 m3
2. Kaso 5/7 cm 0.003 m3
3. Paku 5 cm dan 7 cm 0.3 Kg
4. Minyak Begisting 0.2 Liter
Total Biaya
B. Bahan
1. Bata Merah 500.000 bh
2. Semen Portland 3.500 Zak
3. Pasir Pasangan 0.330 m3
Total Biaya
B. Bahan
1. Semen Portland 0.089 Zak
2. Pasir Pasangan 0.018 m3
Total Biaya
B. Bahan
1. Tanah Timbunan 1.10 M3
Total Biaya
14. Pengecatan
A. Tenaga
1. Pekerja 0.02 O/H
2. Tukang 0.06 O/H
3. Kepala Tukang 0.01 O/H
4. Mandor 0.00 O/H
B. Bahan
1. Plamur 0.10 Kg
2. Cat Dasar 0.10 Kg
3. Cat Penutup 0.26 Kg
Total Biaya
17.
ATUAN PEKERJAAN
Harga Satuan (Rp) Biaya Total (Rp)
Rp2,967,900,000.00 Rp2,967,900,000.00
Rp2,967,900,000.00
Rp1,187,160,000.00 Rp1,187,160,000.00
Rp1,187,160,000.00
Rp296,790.00 Rp296,790.00
Rp296,790.00
2,473,250.00 9,893,000.00
9,893,000.00
941,813.60 11,301,763,200
148.40 810,264.00
11,302,573,464
13,426.21 10,581.20
15,546.14 3,500.99
23,319.21 1,837.55
674,260.00 75,921.68
91,841.42
556,975.90 1,670,927,700.00
148.40 123,320.40
1,671,051,020.40
13,426.21 6,335.83
15,546.14 2,095.62
23,319.21 1,100.67
674,260.00 45,445.12
54,977.24
13,426.21 40,278.64
23,319.21 8,744.71
159,277.30 1,911,327.60
370,987.50 370,987.50
9,893.00 9,893.00
2,341,231.45
82441.34 82441.34
148.4 1375.668
83817.008
13,426.21 10,069.66
15,546.14 2,331.92
23,319.21 1,165.96
118,716.00 65,293.80
9,893.00 9,893.00
88,754.34
108,823.00 29,926.33
133,555.50 3,739.55
93,983.50 155,072.78
163,234.50 26,933.69
66,283.10 432,165.81
430,345.50 246,157.63
123,662.50 67,148.74
961,144.52
108,823.00 76,176.10
133,555.50 9,348.89
93,983.50 65,788.45
163,234.50 11,426.42
11,871.60 1,246,518.00
17,807.40 26,711.10
1,435,968.95
108,823.00 16,323.45
133,555.50 2,003.33
93,983.50 28,195.05
163,234.50 4,897.04
1,385,020.00 19,390.28
1,582,880.00 4,748.64
17,807.40 5,342.22
10,585.51 2,117.10
83,017.11
93,983.50 225,560.40
108,823.00 130,587.60
163,234.50 39,176.28
544.12 272,060.00
66,283.10 231,990.85
93,983.50 31,014.56
930,389.69
93,983.50 28,195.05
108,823.00 16,323.45
133,555.50 2,003.33
163,234.50 4,897.04
66,283.10 5,899.20
93,983.50 1,691.70
59,009.77
93983.50 37593.40
163234.50 6529.38
58863.35 64749.69
108872.47
93,983.50 1,879.67
108,823.00 6,855.85
133,555.50 841.40
163,234.50 489.70
9,200.49 920.05
32,646.90 3,264.69
51,443.60 13,375.34
27,626.70
93,983.50 52,912.71
163,234.50 9,190.10
62,102.81
93,983.50 31,014.56
163,234.50 5,386.74
36,401.29
Analisis Produktivitas Alat Berat
SatuanPembayaran : m3/jam
Kapsitas Produksi/jam
Va x Fa x T2 Q1 8.88 m/jam
Koefisien Alat/bh
Tenaga
Kebutuhan Tenaga
Produksi yang menentukan : Pile Driver Q1 8.88 m/jam
Produksi per hari m'/hari
Kebutuhan Tenaga
1. Pekerja orang
2. Tukang Pancang orang
3. Mandor orang
No.
Keterangan
Asumsi
Asumsi
Asumsi
Analisis Produktivitas Alat Berat
Pembayaran : m3/jam
Kapsitas Produksi/jam
Va x Fa x T2 Q1 14.84 m/jam
Koefisien Alat/bh
Tenaga
Kebutuhan Tenaga
Produksi yang menentukan : Pile Driver Q1 14.84 m/jam
Produksi per hari m'/hari
Kebutuhan Tenaga
1. Pekerja orang
2. Tukang Pancang orang
3. Mandor orang
Penyelesaian :
a. Isi Aktual Bucket
kapasitas bucket x carry factor 0,93 x 1,00 0.93
b. Waktu Siklus
Waktu Muat 1.00 menit
Waktu ayun bermuatan 0.10 menit
Waktu menumpahkan muatan 0.10 menit
Waktu ayun kosong 0.08 menit
Total waktu siklus 1.28 menit
= 1445 m2
1.2 Direksi Keet, Barak Kerja, dan Gudang
8m Panjang = 8 m
5m Lebar = 5 m
Luas = 8x 5
= 40 m2
1.3 Pemasangan Bowplank
Panjang = 289 m
Lebar = 2 m
2 (289 +
Keliling =
2)
= 582 m2
1.4 Pembuatan papan nama kerja
1.6 Mobilisasi / Demobilisasi
1.7 Pekerjaan sondir
II. PEKERJAAN STRUKTUR
2.1 Pengadaan Turap Beton Precast W.450 B.1000 L.12M
Jumlah = 532 buah
Panjang = 289 m
Lebar = 12 m
Tinggi = 1 m
p.l.t
Volume = .jumlah
pile cap
1,8 x 1,68
=
x 1 x 27
= m³
2.2 Pemancangan Turap Beton Precast
Jumlah = 4681.6 buah
Panjang = m
Lebar = m
Tinggi = m
p.l.t
Volume = .jumlah
pile cap
1,8 x 1,68
=
x 1 x 27
= m³
2.3 Pengadaan Tiang Pancang Persegi 400x400mm L.6M
Jumlah = 133 buah
Panjang = m
Lebar = m
Tinggi = m
p.l.t
Volume = .jumlah
pile cap
1,8 x 1,68
=
x 1 x 27
= m³
2.4 Pemancangan Tiang Pancang Persegi
Jumlah = 399 buah
Panjang = m
Lebar = m
Tinggi = m
p.l.t
Volume = .jumlah
pile cap
1,8 x 1,68
=
x 1 x 27
= m³
2.5 Sling Angkur Baja + Aksesoris
Jumlah = 133 buah
Panjang = m
Lebar = m
Tinggi = m
p.l.t
Volume = .jumlah
pile cap
1,8 x 1,68
=
x 1 x 27
= m³
2.6 Pengadaan Besi Kanal C
Jumlah = 107 buah
Panjang = m
Lebar = m
Tinggi = m
p.l.t
Volume = .jumlah
pile cap
1,8 x 1,68
=
x 1 x 27
= m³
III. PEKERJAAN PILE CAP
3.1 Pekerjaan Pembobokan Kepala Turap
Jumlah = 532 buah
Panjang = m
Lebar = m
Tinggi = m
p.l.t
Volume = .jumlah
pile cap
1,8 x 1,68
=
x 1 x 27
= m³
3.2 Beton
Jumlah = 85.12 buah
Panjang = 0.8 m
Lebar = 0.2 m
p.l.t
Volume = .jumlah
pile cap
1,8 x 1,68
=
x 1 x 27
= m³
3.3 Pembesian
Besi Ø 10" = 0,617 Kg/m' Jumlah = 9607.92 buah
1.80 Panjang = m
Lebar = m
Besi Ø 12" Tinggi = m
p.l.t
Volume = .jumlah
3.00 pile cap
1,8 x 1,68
=
x 1 x 27
= = m³
=
3.4 Bekisting
Jumlah = 851.20 buah
Panjang = m
Lebar = m
Tinggi = m
p.l.t
Volume = .jumlah
pile cap
1,8 x 1,68
=
x 1 x 27
= m³
3.5 Galian Tanah Biasa
Jumlah = 344.74 buah
Panjang = m
Lebar = m
Tinggi = m
p.l.t
Volume = .jumlah
pile cap
1,8 x 1,68
=
x 1 x 27
= m³
3.6 Urugan Tanah Kembali
Jumlah = 310.26 buah
Panjang = m
Lebar = m
Tinggi = m
p.l.t
Volume = .jumlah
pile cap
1,8 x 1,68
=
x 1 x 27
= m³
3.7 Timbunan Tanah Didatangkan
Jumlah = 310.26 buah
Panjang = m
Lebar = m
Tinggi = m
p.l.t
Volume = .jumlah
pile cap
1,8 x 1,68
=
x 1 x 27
= m³
3.8 Beton Cor
Jumlah = 2109.27 buah
Panjang = m
Lebar = m
Tinggi = m
p.l.t
Volume = .jumlah
pile cap
1,8 x 1,68
=
x 1 x 27
= m³
3.9 Bekisting
Jumlah = 31.92 buah
Panjang = m
Lebar = m
Tinggi = m
p.l.t
Volume = .jumlah
pile cap
1,8 x 1,68
=
x 1 x 27
= m³
ang, Sumatera Selatan
Volume Satuan
1445.00 m²
40.00 m²
582.00 m²
1.00 bh
1.00 Ls
4 Titik
Anal.04.TP 107.00
1.6 Pengadaan Besi Kanal C btg
81.65 m³
81.65 m³
81.65 m³
81.65 m³
81.65 m³
Pembobokan Kepala Turap
Beton
0.20 x 0.80
0.617 x 36.00
0.888 x 36.00
81.65 m³ Bekisting
0.20 x 4.00
81.65 m³
81.65 m³
81.65 m³
81.65 m³
81.65 m³
81.65 m³
= 0 btg
x 0.00 =
kg/m'
=
kg/m'
=
x 0.00 =
x 0.00
=
x 4.00 x 0.00 =
x 0.50 x 0 =
- m3
36.00 m'
36.00 m'
- kg
- kg
- kg
- m2
- m3
TIME SCHEDULE
Program : Program Pembangunan Talud/Turap dan Bronjong
Kegiatan : Perkuatan Tebing Sungai Kota Palembang
Paket Kegiatan : Pembangunan Sheet Pile di Tepian Sungai Kawasan JSC
Lokasi : Kota Palembang
SKPD : Dinas Pengelolaan Sumber Daya Air Provinsi Sumatera Selatan
Tahun Anggaran : 2017
Waktu Pelaksanaan
Bobot
No Uraian Volume I II III IV
(%)
1 2 3 4 5 6 7 8 9 10 11 12 13
I. PEKERJAAN PERSIAPAN
1. Mobilisasi / Demobilisasi 1.00 Ls 0.275 0.137
2. Pengukuran 1.00 Ls 0.110 0.055
3. Direksi Keet, Barak Kerja, dan Gudang 1.00 Unit 0.642 0.642
4. Papan Nama Kegiatan 1.00 bh 0.003 0.003
5. Pekerjaan Sondir 1.00 titik 0.092 0.031 0.031 0.031
Jumlah 98.696 0.87 3.33 3.70 4.53 4.61 4.61 4.61 4.61 4.61 4.61 4.61 4.59 4.60
Rencana Per Minggu 0.873 3.33 3.70 4.53 4.61 4.61 4.61 4.61 4.61 4.61 4.61 4.59 4.60
Komulatif Rencana 0.873 4.20 7.90 12.43 17.04 21.65 26.26 30.87 35.48 40.09 44.71 49.29 53.90
Realisasi Per Minggu 0.837 0.033 3.279 4.202 3.498 3.289 3.315 3.312 4.173 4.154 4.154 4.154 4.154
Komulatif Realisasi 0.837 0.870 4.150 8.351 11.849 15.138 18.453 21.765 25.938 30.092 34.246 38.400 42.553
Deviasi 0.036 3.330 3.749 4.077 5.191 6.513 7.809 9.107 9.546 10.003 10.460 10.895 11.342
0.161 -35.323
16.8786677626846
elaksanaan Pemeliharaan
IV V VI (Bulan) Ket
14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6
0.137 100%
0.055
0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024
0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 50%
0.839 0.839 0.839 0.839 0.839 0.839 0.839 0.839 0.839
0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040
0%
4.83 4.83 4.89 4.89 4.89 4.89 4.89 4.89 4.89 0.73 0.20
4.83 4.83 4.89 4.89 4.89 4.89 4.89 4.89 4.89 0.73 0.20
58.73 63.56 68.45 73.34 78.22 83.11 88.00 92.88 97.77 98.50 98.7 100
Palembang, 2017