Anda di halaman 1dari 19

BILL OF QUANTITY (BQ)

PEKERJAAN : 5EASEC SURABAYA


LOKASI : SURABAYA - JAWA TIMUR

NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

I. PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI 494,477,573.12
B PEKERJAAN GALIAN DAN TANAH 16,440,578.15
C PEKERJAAN STRUKTUR BAWAH 256,778,530.34
D PEKERJAAN STRUKTUR ATAS 1,685,489,395.97

Sub Total 2,453,186,077.58


PPN 10% 245,318,607.76
Total 2,698,504,685.33
Dibulatkan 2,698,500,000.00

Terbilang : Dua Milyar Enam Ratus Sembilan Puluh Delapan Juta Lima Ratus Ribu Rupiah
BILL OF QUANTITY (BQ)

PEKERJAAN : 5EASEC SURABAYA


LOKASI : SURABAYA - JAWA TIMUR

I PEKERJAAN STRUKTUR

No. Uraian Pekerjaan SAT Volume


1 2 3 4

A PEKERJAAN PONDASI
1 Tiang pancang 400x400, pjg. 18 M , 32 titik M' 576.00
2 Ongkos Pemancangan Tiang M' 576.00
(Mesin pancang yang digunakan adalah jenis Hydraulic Jacking)
3 Pengetesan Daya dukung Tiang Pancang
a. Pengujian Metode PDA (Pile Dynamic Analizer) Titik 4.00
Pengujian ‘PDA’ dilaksanakan berdasarkan prosedur yang tercantum dalam
ASTMD-4945-1996.
4 Pemotongan kepala tiang pancang Titik 32.00
5 Penyelidikan tanah (Soilt Test) ulang sebelum pelaksanaan / Pemancangan
3 Titik Sondir ls 1.00

B PEKERJAAN GALIAN DAN TANAH


1 Pek. Galian Tanah m3 65.58
2 Pek. Urugan Pasir Urug m3 5.85
3 Pek. Urugan Sirtu m3 15.39
4 Pek. Urugan Tanah m3 53.84
5 Pek. Pembuangan Tanah ex. Galian m3 11.73

C PEKERJAAN STRUKTUR BAWAH


1 Pek. Lantai Kerja Beton , Tebal 5 cm m3 10.62

2 Pek. Pilecap
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 24.19
- Besi Beton kg 2,488.92
- Bekisting m2 53.23

3 Pek. Tiebeam
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 11.57
- Besi Beton kg 1,418.21
- Bekisting Tiebeam m2 119.35

4 Pek. Plat Lantai Lapangan Dasar


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 14.99
- Wiremesh M6-150 (selapis) m2 149.91
- Bekisting Perimeter Plat m2 155.22

5 Pek. Dinding Pit Lift


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 1.59
- Besi Beton kg 150.08
- Bekisting m2 16.70

6 Pek. Plat Lantai Pit Lift


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 0.79

2 BQ
No. Uraian Pekerjaan SAT Volume
1 2 3 4

- Wiremesh M6-150 (selapis) m2 65.90


- Bekisting Perimeter Plat m2 5.54

7 Pek. Sparator Beam


- Balok WF. 200x100x5.5x8 mm kg 862.65
- Plat 8mm kg 7.80
- Plat 12mm kg 76.05
- Baut M-16 bh 192.00
- Pek. Melubangi konstruksi dengan bor bh 384.00

D PEKERJAAN STRUKTUR ATAS


1 Lantai Dasar
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 9.93
- Besi Beton kg 3,465.52
- Bekisting m2 158.14

2 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15

2 Lantai 2
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42

2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37

3 Pek. Plat Lantai


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 16.91
- Besi Beton kg 1,996.87
- Bekisting m2 147.32

4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15

3 Lantai 3
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42

2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37

3 BQ
No. Uraian Pekerjaan SAT Volume
1 2 3 4

3 Pek. Plat Lantai


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 16.91
- Besi Beton kg 1,996.87
- Bekisting m2 147.32

4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15

4 Lantai 4
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42

2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37

3 Pek. Plat Lantai


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 16.91
- Besi Beton kg 1,996.87
- Bekisting m2 147.32

4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15

5 Lantai 5
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42

2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37

3 Pek. Plat Lantai


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 16.91
- Besi Beton kg 1,996.87
- Bekisting m2 147.32

4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15

4 BQ
No. Uraian Pekerjaan SAT Volume
1 2 3 4

6 Lantai 6
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42

2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37

3 Pek. Plat Lantai


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 16.91
- Besi Beton kg 1,996.87
- Bekisting m2 147.32

4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15

7 Lantai Atap
1 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.43
- Besi Beton kg 1,732.67
- Bekisting m2 101.45

2 Pek. Plat Lantai


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 16.18
- Besi Beton kg 1,910.43
- Bekisting m2 140.39

JUMLAH II.

5 BQ
Harga Satuan Jumlah
( Rp. ) ( Rp. )
5 6=4X5

570,059.05 328,354,012.80
185,145.07 106,643,560.32

12,500,000.00 50,000,000.00

140,000.00 4,480,000.00

5,000,000.00 5,000,000.00

86,157.50 5,649,982.69
265,463.00 1,554,066.86
328,707.50 5,057,493.60
63,415.00 3,414,460.98
65,157.40 764,574.04

944,256.50 10,028,086.65

1,256,701.60 30,400,868.41
19,421.60 48,338,726.04
203,838.47 10,850,321.76

1,256,701.60 14,539,252.07
19,421.60 27,543,942.99
203,838.47 24,327,866.60

1,256,701.60 18,839,213.69
19,421.60 2,911,492.06
203,838.47 31,639,970.38

1,256,701.60 1,998,155.54
19,421.60 2,914,775.86
203,838.47 3,404,102.45

1,256,701.60 992,794.26

6 BQ
Harga Satuan Jumlah
( Rp. ) ( Rp. )
5 6=4X5

19,421.60 1,279,917.82
203,838.47 1,129,265.12

21,495.76 18,543,317.36
21,495.76 167,666.93
21,495.76 1,634,778.34
9,500.00 1,824,000.00
9,036.50 3,470,016.00

1,256,701.60 12,479,549.57
19,421.60 67,306,022.04
203,838.47 32,235,831.00

1,256,701.60 3,442,294.19
19,421.60 7,262,880.97
203,838.47 3,088,275.12

1,256,701.60 10,607,617.13
19,421.60 57,930,151.93
203,838.47 27,400,456.35

1,256,701.60 13,331,560.58
19,421.60 42,245,332.09
203,838.47 26,370,038.62

-
1,256,701.60 21,249,818.69
19,421.60 38,782,443.08
203,838.47 30,029,271.41

1,256,701.60 3,442,294.19
19,421.60 7,262,880.97
203,838.47 3,088,275.12

-
1,256,701.60 10,607,617.13
19,421.60 57,930,151.93
203,838.47 27,400,456.35

-
1,256,701.60 13,331,560.58
19,421.60 42,245,332.09
203,838.47 26,370,038.62

7 BQ
Harga Satuan Jumlah
( Rp. ) ( Rp. )
5 6=4X5

-
1,256,701.60 21,249,818.69
19,421.60 38,782,443.08
203,838.47 30,029,271.41

1,256,701.60 3,442,294.19
19,421.60 7,262,880.97
203,838.47 3,088,275.12

-
1,256,701.60 10,607,617.13
19,421.60 57,930,151.93
203,838.47 27,400,456.35

-
1,256,701.60 13,331,560.58
19,421.60 42,245,332.09
203,838.47 26,370,038.62

-
1,256,701.60 21,249,818.69
19,421.60 38,782,443.08
203,838.47 30,029,271.41

1,256,701.60 3,442,294.19
19,421.60 7,262,880.97
203,838.47 3,088,275.12

-
1,256,701.60 10,607,617.13
19,421.60 57,930,151.93
203,838.47 27,400,456.35

-
1,256,701.60 13,331,560.58
19,421.60 42,245,332.09
203,838.47 26,370,038.62

-
1,256,701.60 21,249,818.69
19,421.60 38,782,443.08
203,838.47 30,029,271.41

1,256,701.60 3,442,294.19
19,421.60 7,262,880.97
203,838.47 3,088,275.12

8 BQ
Harga Satuan Jumlah
( Rp. ) ( Rp. )
5 6=4X5

-
1,256,701.60 10,607,617.13
19,421.60 57,930,151.93
203,838.47 27,400,456.35

-
1,256,701.60 13,331,560.58
19,421.60 42,245,332.09
203,838.47 26,370,038.62

-
1,256,701.60 21,249,818.69
19,421.60 38,782,443.08
203,838.47 30,029,271.41

1,256,701.60 3,442,294.19
19,421.60 7,262,880.97
203,838.47 3,088,275.12

-
1,256,701.60 10,591,983.77
19,421.60 33,651,285.04
203,838.47 20,680,228.14

-
1,256,701.60 20,329,913.12
19,421.60 37,103,549.44
203,838.47 28,616,882.80

JUMLAH II.A 1,958,708,504.46

9 BQ
BILL OF QUANTITY (BQ)

PEKERJAAN : 5EASEC SURABAYA


LOKASI : SURABAYA - JAWA TIMUR

I PEKERJAAN STRUKTUR

No. Uraian Pekerjaan SAT Volume


1 2 3 4

A PEKERJAAN PONDASI
1 Tiang pancang 400x400, pjg. 18 M , 133 titik M' 576.00

2 Ongkos Pemancangan Tiang (Alat M' 576.00


(Mesin pancang yang digunakan adalah jenis Hydraulic Jacking)
3 Pengetesan Daya dukung Tiang Pancang
c Pengujian Metode PDA (Pile Dynamic
‘PDA’ dilaksanakan Analizer)prosedur yang tercantum dalam
berdasarkan Titik 4.00
ASTMD-4945-1996. Dibutuhkan berat hammer 1-2% dari daya dukung ultimate tiang =
4 2-3 ton kepala tiang pancang
Pemotongan Titik 32.00
5 Penyelidikan tanah ulang sebelum pelaksanaan (Soilt Test)
3 Sondir ls 1.00

B PEKERJAAN GALIAN DAN TANAH


1 Pek. Galian Tanah m3 65.58

PC1
PC4
PC4a
PC4b
TB1
TB2
TB3
CTB1
Plat Lantai Dasar
Pit Lift

2 Pek. Urugan Pasir Urug m3 5.85

PC1
PC4
PC4a
PC4b
TB1
TB2
TB3
CTB1
3 Pek. Urugan Sirtu m3 15.39
Plat Lantai Dasar
Plat Lantai Pit Lift
4 Pek. Urugan Tanah m3 53.84
5 Pek. Pembuangan Tanah ex. Galian m3 11.73

C PEKERJAAN STRUKTUR BAWAH


1 Pek. Lantai Kerja Beton , Tebal 5 cm m3 10.62

PC1
PC4
PC4a
PC4b
TB1
TB2
TB3
CTB1
Plat Lantai Dasar
Plat Lantai Pit Lift

2 Pek. Pilecap
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 24.19
- Besi Beton kg 2,488.92
- Bekisting m2 53.23

3 Pek. Tiebeam
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 11.57
- Besi Beton kg 1,418.21
- Bekisting Tiebeam m2 119.35

4 Pek. Plat Lantai Lapangan Dasar


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 14.99
- Wiremesh M6-150 (selapis) m2 149.91
- Bekisting Perimeter Plat m2 155.22

5 Pek. Dinding Pit Lift


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 1.59
- Besi Beton kg 150.08
- Bekisting m2 16.70

6 Pek. Plat Lantai Pit Lift


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 0.79
- Wiremesh M6-150 (selapis) m2 65.90
- Bekisting Perimeter Plat m2 5.54

7 Pek. Sparator Beam


- Balok WF. 200x100x5.5x8 mm kg 862.65

- Plat 8mm kg 7.80

- Plat 12mm kg 76.05

- Baut M-16 bh 192.00

- Pek. Melubangin konstruksi dengan bor bh 384.00


D PEKERJAAN STRUKTUR ATAS
1 Lantai Dasar
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 9.93
- Besi Beton kg 3,465.52
- Bekisting m2 158.14

2 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15

2 Lantai 2
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42

2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37

3 Pek. Plat Lantai


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 16.91
- Besi Beton kg 1,996.87
- Bekisting m2 147.32

4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15

3 Lantai 3
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42

2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37

3 Pek. Plat Lantai


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 16.91
- Besi Beton kg 1,996.87
- Bekisting m2 147.32

4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15

4 Lantai 4
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42

2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37

3 Pek. Plat Lantai


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 16.91
- Besi Beton kg 1,996.87
- Bekisting m2 147.32

4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15

5 Lantai 5
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42

2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37

3 Pek. Plat Lantai


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 16.91
- Besi Beton kg 1,996.87
- Bekisting m2 147.32

4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15

6 Lantai 6
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42

2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37

3 Pek. Plat Lantai


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 16.91
- Besi Beton kg 1,996.87
- Bekisting m2 147.32

4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15

7 Lantai Atap
1 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.43
- Besi Beton kg 1,732.67
- Bekisting m2 101.45

2 Pek. Plat Lantai


- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 16.18
- Besi Beton kg 1,910.43
- Bekisting m2 140.39
Harga Satuan Jumlah
( Rp. ) ( Rp. )
5 6=4X5

jumlah tinggi volume


-
32.00 18.00 576.00
-

lebar tinggi panjang jumlah volume


-
65.58
0.80 0.85 0.80 8.00 4.35
2.00 1.05 2.00 2.00 8.40
2.50 1.05 2.20 3.00 17.33
2.00 1.05 2.00 1.00 4.20
0.25 0.50 62.23 7.78
0.25 0.40 26.30 2.63
0.20 0.40 11.70 0.94
0.25 0.50 1.80 0.23
149.91 0.10 14.99
1.975 1.20 2.00 4.74

-
5.85
0.80 0.10 0.80 8.00 0.51
2.00 0.10 2.00 2.00 0.80
2.50 0.10 2.20 3.00 1.65
2.00 0.10 2.00 1.00 0.40
0.25 0.10 62.23 1.56
0.25 0.10 26.30 0.66
0.20 0.10 11.70 0.23
0.25 0.10 1.80 0.05
-
149.91 0.10 14.99
3.95 0.10 0.40
-

lebar tinggi panjang jumlah volume


-
10.62
0.80 0.05 0.80 8.00 0.26
2.00 0.05 2.00 2.00 0.40
2.50 0.05 2.20 3.00 0.83
2.00 0.05 2.00 1.00 0.20
0.25 0.05 62.23 0.78
0.25 0.05 26.30 0.33
0.20 0.05 11.70 0.12
0.25 0.05 1.80 0.02
149.91 0.05 7.50
3.95 0.05 0.20

-
-
-

-
-
-

-
-
-

panjang lebar jumlah berat jenis volume

1.675 12.00 21.30 428.13


1.700 12.00 21.30 434.52

0.05 0.05 48.00 65.00 7.80

0.10 0.20 48.00 79.22 76.05

48.00 4.00 192.00


-
-
-

-
-
-

-
-
-

-
-
-

-
-
-

-
-
-

-
-

-
-
-

JUMLAH II.A -

Anda mungkin juga menyukai