I. PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI 494,477,573.12
B PEKERJAAN GALIAN DAN TANAH 16,440,578.15
C PEKERJAAN STRUKTUR BAWAH 256,778,530.34
D PEKERJAAN STRUKTUR ATAS 1,685,489,395.97
Terbilang : Dua Milyar Enam Ratus Sembilan Puluh Delapan Juta Lima Ratus Ribu Rupiah
BILL OF QUANTITY (BQ)
I PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI
1 Tiang pancang 400x400, pjg. 18 M , 32 titik M' 576.00
2 Ongkos Pemancangan Tiang M' 576.00
(Mesin pancang yang digunakan adalah jenis Hydraulic Jacking)
3 Pengetesan Daya dukung Tiang Pancang
a. Pengujian Metode PDA (Pile Dynamic Analizer) Titik 4.00
Pengujian ‘PDA’ dilaksanakan berdasarkan prosedur yang tercantum dalam
ASTMD-4945-1996.
4 Pemotongan kepala tiang pancang Titik 32.00
5 Penyelidikan tanah (Soilt Test) ulang sebelum pelaksanaan / Pemancangan
3 Titik Sondir ls 1.00
2 Pek. Pilecap
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 24.19
- Besi Beton kg 2,488.92
- Bekisting m2 53.23
3 Pek. Tiebeam
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 11.57
- Besi Beton kg 1,418.21
- Bekisting Tiebeam m2 119.35
2 BQ
No. Uraian Pekerjaan SAT Volume
1 2 3 4
2 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15
2 Lantai 2
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42
2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37
4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15
3 Lantai 3
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42
2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37
3 BQ
No. Uraian Pekerjaan SAT Volume
1 2 3 4
4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15
4 Lantai 4
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42
2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37
4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15
5 Lantai 5
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42
2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37
4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15
4 BQ
No. Uraian Pekerjaan SAT Volume
1 2 3 4
6 Lantai 6
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42
2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37
4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15
7 Lantai Atap
1 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.43
- Besi Beton kg 1,732.67
- Bekisting m2 101.45
JUMLAH II.
5 BQ
Harga Satuan Jumlah
( Rp. ) ( Rp. )
5 6=4X5
570,059.05 328,354,012.80
185,145.07 106,643,560.32
12,500,000.00 50,000,000.00
140,000.00 4,480,000.00
5,000,000.00 5,000,000.00
86,157.50 5,649,982.69
265,463.00 1,554,066.86
328,707.50 5,057,493.60
63,415.00 3,414,460.98
65,157.40 764,574.04
944,256.50 10,028,086.65
1,256,701.60 30,400,868.41
19,421.60 48,338,726.04
203,838.47 10,850,321.76
1,256,701.60 14,539,252.07
19,421.60 27,543,942.99
203,838.47 24,327,866.60
1,256,701.60 18,839,213.69
19,421.60 2,911,492.06
203,838.47 31,639,970.38
1,256,701.60 1,998,155.54
19,421.60 2,914,775.86
203,838.47 3,404,102.45
1,256,701.60 992,794.26
6 BQ
Harga Satuan Jumlah
( Rp. ) ( Rp. )
5 6=4X5
19,421.60 1,279,917.82
203,838.47 1,129,265.12
21,495.76 18,543,317.36
21,495.76 167,666.93
21,495.76 1,634,778.34
9,500.00 1,824,000.00
9,036.50 3,470,016.00
1,256,701.60 12,479,549.57
19,421.60 67,306,022.04
203,838.47 32,235,831.00
1,256,701.60 3,442,294.19
19,421.60 7,262,880.97
203,838.47 3,088,275.12
1,256,701.60 10,607,617.13
19,421.60 57,930,151.93
203,838.47 27,400,456.35
1,256,701.60 13,331,560.58
19,421.60 42,245,332.09
203,838.47 26,370,038.62
-
1,256,701.60 21,249,818.69
19,421.60 38,782,443.08
203,838.47 30,029,271.41
1,256,701.60 3,442,294.19
19,421.60 7,262,880.97
203,838.47 3,088,275.12
-
1,256,701.60 10,607,617.13
19,421.60 57,930,151.93
203,838.47 27,400,456.35
-
1,256,701.60 13,331,560.58
19,421.60 42,245,332.09
203,838.47 26,370,038.62
7 BQ
Harga Satuan Jumlah
( Rp. ) ( Rp. )
5 6=4X5
-
1,256,701.60 21,249,818.69
19,421.60 38,782,443.08
203,838.47 30,029,271.41
1,256,701.60 3,442,294.19
19,421.60 7,262,880.97
203,838.47 3,088,275.12
-
1,256,701.60 10,607,617.13
19,421.60 57,930,151.93
203,838.47 27,400,456.35
-
1,256,701.60 13,331,560.58
19,421.60 42,245,332.09
203,838.47 26,370,038.62
-
1,256,701.60 21,249,818.69
19,421.60 38,782,443.08
203,838.47 30,029,271.41
1,256,701.60 3,442,294.19
19,421.60 7,262,880.97
203,838.47 3,088,275.12
-
1,256,701.60 10,607,617.13
19,421.60 57,930,151.93
203,838.47 27,400,456.35
-
1,256,701.60 13,331,560.58
19,421.60 42,245,332.09
203,838.47 26,370,038.62
-
1,256,701.60 21,249,818.69
19,421.60 38,782,443.08
203,838.47 30,029,271.41
1,256,701.60 3,442,294.19
19,421.60 7,262,880.97
203,838.47 3,088,275.12
8 BQ
Harga Satuan Jumlah
( Rp. ) ( Rp. )
5 6=4X5
-
1,256,701.60 10,607,617.13
19,421.60 57,930,151.93
203,838.47 27,400,456.35
-
1,256,701.60 13,331,560.58
19,421.60 42,245,332.09
203,838.47 26,370,038.62
-
1,256,701.60 21,249,818.69
19,421.60 38,782,443.08
203,838.47 30,029,271.41
1,256,701.60 3,442,294.19
19,421.60 7,262,880.97
203,838.47 3,088,275.12
-
1,256,701.60 10,591,983.77
19,421.60 33,651,285.04
203,838.47 20,680,228.14
-
1,256,701.60 20,329,913.12
19,421.60 37,103,549.44
203,838.47 28,616,882.80
9 BQ
BILL OF QUANTITY (BQ)
I PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI
1 Tiang pancang 400x400, pjg. 18 M , 133 titik M' 576.00
PC1
PC4
PC4a
PC4b
TB1
TB2
TB3
CTB1
Plat Lantai Dasar
Pit Lift
PC1
PC4
PC4a
PC4b
TB1
TB2
TB3
CTB1
3 Pek. Urugan Sirtu m3 15.39
Plat Lantai Dasar
Plat Lantai Pit Lift
4 Pek. Urugan Tanah m3 53.84
5 Pek. Pembuangan Tanah ex. Galian m3 11.73
PC1
PC4
PC4a
PC4b
TB1
TB2
TB3
CTB1
Plat Lantai Dasar
Plat Lantai Pit Lift
2 Pek. Pilecap
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 24.19
- Besi Beton kg 2,488.92
- Bekisting m2 53.23
3 Pek. Tiebeam
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 11.57
- Besi Beton kg 1,418.21
- Bekisting Tiebeam m2 119.35
2 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15
2 Lantai 2
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42
2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37
4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15
3 Lantai 3
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42
2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37
4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15
4 Lantai 4
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42
2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37
4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15
5 Lantai 5
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42
2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37
4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15
6 Lantai 6
1 Pek. Kolom
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.44
- Besi Beton kg 2,982.77
- Bekisting m2 134.42
2 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 10.61
- Besi Beton kg 2,175.17
- Bekisting m2 129.37
4 Pek. Tangga
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 2.74
- Besi Beton kg 373.96
- Bekisting m2 15.15
7 Lantai Atap
1 Pek. Balok
- Beton mutu f'c = 26,4 MPa (K 300), slump (12±2) cm, w/c = 0,52 m3 8.43
- Besi Beton kg 1,732.67
- Bekisting m2 101.45
-
5.85
0.80 0.10 0.80 8.00 0.51
2.00 0.10 2.00 2.00 0.80
2.50 0.10 2.20 3.00 1.65
2.00 0.10 2.00 1.00 0.40
0.25 0.10 62.23 1.56
0.25 0.10 26.30 0.66
0.20 0.10 11.70 0.23
0.25 0.10 1.80 0.05
-
149.91 0.10 14.99
3.95 0.10 0.40
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH II.A -