KEGIATAN : PENYUSUNAN PERENCANAAN DED MASTERPLAN REVITALISASI KAWASAN JAM GADANG KOT
LOKASI : KOTA BUKITTINGGI
TRIWULAN : III
TAHUN : 2017
HARGA SATUAN
NO URAIAN PEKERJAAN KETERANGANSATUAN
(Rp.)
1 2 3 4 5
I. U P A H
1 Kepala Tukang Hari
2 Tukang kayu Hari
3 Tukang Batu Hari
4 Tukang besi Hari
5 Tukang Cat Hari
6 Tukang las Hari
7 Pekerja Hari
8 Mandor Hari
9 Mekanik Hari
10 Electrician Hari
11 Operator Hari
12 Cut of Pile Hari
II. B A H A N
A BATU - BATUAN
1 Batu Kali M3
2 Split 0,5 - 1 cm M3
3 Kerikil
a Kerikil Beton M3
4 Pasir
a Pasir Pasang M3
b Pasir Beton M3
c Pasir Urug M3
d Tanah Urug M3
B BATU BATA
1 Batu bata Bh
2 Batu Bata Ringan Bh
C SEMEN
1 Semen PCC ( 50 Kg ) Zak
2 Tepung Afa AA (semen warna) Kg
D BAHAN KAYU
1 Kayu Bekisting (Papan) Kelas III M3
2 Kayu Bekisting (Balok) Kelas III M3
3 Dolken Ø 8 cm- 4 m Btg
4 Profil alumunium 3 " utk Kusen ( Alexindo ) M
Profil alumunium Utk Frame Pintu ( Alexindo ) m
Profil alumunium Utk Frame Jendela ( Alexindo ) M
Paku Skrup bh
Sealant Tube
E BAHAN LOTENG
1 Multiplek tebal 9 mm, 1.20 x 2.40 Lbr
2 Formite/ penjaga jarak bekesting/spacer Btg
1 2 3 4
b Besi Baja IWF Kg
c Bahan Paku
- (2-5)" (Paku Biasa) Kg
- Baut/Screw Bh
G BAHAN LANTAI/DINDING
1 Keramik
a. Untuk Lantai
- Uk. (40 x 40 ) Motif Batu Alam Bh
2 Granito
b Untuk Dinding
- Uk. (60 x 60 ) setara Granito Bh
- Batu Tempel Strip Stone M2
H BAHAN CAT
1 Plamer kayu Kg
2 Plamer Tembok Kg
3 Meni Kayu - Warna Kg
4 Meni Besi- warna
5 Cat Dasar TL Kg
6 Minyak Bekisting Ltr
7 Cat Minyak / Cat warna (setara Platon) Kg
8 Cat Air / Cat Tembok (setara Dulux weathershield) Kg
9 Thinner Ltr
10 Sealent Tube
I BAHAN SANITARY
1 Wastafel unt
2 Kloset duduk unt
3 Kloset Jongkok unt
4 Urinoir unt
5 Jemuran Handuk unt
6 Shower Set unt
7 Tempat Tysu unt
8 Shower Spray unt
9 Floordrain unt
10 Gantunagan Handuk unt
11 Cermin Wastafel unt
12 Kran Air unt
13 Seal tape Bh
BAHAN KUNCI
1 Kunci Pintu tanam Bh
2 Engsel pintu Bh
3 Grendel Pintu Bh
4 Grendel Jendela Bh
5 Engsel Pintu Bh
6 Grendel Jendela Bh
7 Kait Angin Bh
8 Kaca t. 8 mm M2
I BAHAN-BAHAN LAIN
1 Seng bergelombang 2' - 5 ' Lbr
2 Kuas M2
3 Elektroda / Kawat las RB 2,6 mm Kg
4 Solar Non Subsidi Liter
5 Minyak pelumas Liter
6 Diesel Oil Ltr
7 Lubricant Ltr
8 Boring Equipment Jam
9 Buang Tanah hasil Pengeboran M³
J PERALATAN
1 Mesin Las (sewa alat) Jam
BAHAN
BAHAN PENGANTI
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
Dalam Analisa
LW 641J/TX109LU ex Toto, Komplit kran & acc
OMNI CW 868J/ TX868CWS ex. Toto Komplit & acc
CE 9/ TV150NWV12 ex. Toto Komplit +acc
U370M/ T60S ex. Toto Komplit + acc
TX4W
TX 492SES(N)
TX720ACR
TB19CSNCR
TX1BNV1
TS115S
TX716AW
T26-13
KEGIATAN : PENYUSUNAN PERENCANAAN DED MASTERPLAN REVITALISASI KAWASAN JAM
PEKERJAAN : TOILET JAM GADANG
LOKASI : KOTA BUKITTINGGI
Untuk 1 M2
Overhead / Keuntungan 10%
2 1 M' Memasang Pagar sementara dari seng gelombang ( tinggi 2 m) (SNI - 2001)
Tenaga
0.4000 Oh Pekerja -
0.2000 Oh Tukang Kayu -
0.0200 Oh Kepala Tukang -
0.0200 Oh Mandor -
Bahan
1.2500 Btg Dolken Kayu Pancang Ø (8-10) cm. P=4 m -
2.5000 Kg Semen Porland -
1.2000 Lbr Seng bergelombang 2' - 5 ' -
0.0050 M3 Pasir pasang -
0.0090 M3 Kerikil beton -
0.0720 M3 Kayu Balok 5/7 (kayu klas IV) -
0.0600 Kg Paku biasa 2"-5" -
0.4500 Kg Meni Besi -
Untuk 1 M
Overhead / Keuntungan 10%
Bahan
0.0120 M3 Kayu Balok 5/7 ( kayu klas IV) -
0.0200 Kg Paku biasa 2"-5" -
0.0070 M3 Kayu papan 3/20 (klas IV) -
Untuk 1 M1
Overhead / Keuntungan 10%
5 1 M3 Urugan Pasir
Tenaga
0.300 Oh Pekerja -
0.010 Oh Mandor -
Bahan
1.200 M3 Pasir Urug -
Untuk 1 M3
Overhead / Keuntungan 10%
Bahan
1.200 M3 Tanah Urug -
Untuk 1 M3
Overhead / Keuntungan 10%
7 1 M³ Membuat Beton Mutu K-100 untuk Lantai Kerja (fc = 7,4 Mpa), Slump (3-6) cm, w/c = 0,87
Tenaga
1.200 OH Pekerja -
0.200 OH Tukang batu -
0.020 OH Kepala Tukang -
0.060 OH Mandor -
Bahan
230.000 Kg Semen PCC (50 Kg) -
893.000 Kg Pasir Beton -
1027.000 Kg Kerikil Beton -
Untuk 1 M3
Overhead / Keuntungan 10%
8 1 M3 Beton Mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Tenaga
1.650 Oh Pekerja -
0.275 Oh Tukang Batu -
0.028 Oh Kepala Tukang -
0.083 Oh Mandor -
Bahan
6.520 Zak Semen PCC (50 Kg) -
0.543 M3 Pasir Beton -
0.7622 M3 Kerikil Beton -
Untuk 1 M3
Overhead / Keuntungan 10%
9 1 M³ Membuat beton mutu f'c = 21,7 Mpa (K- 250), slump (12 ± 2) cm, w/c = 0,56
Tenaga
1.650 OH Pekerja -
0.275 OH Tukang batu -
0.028 OH Kepala Tukang -
0.083 OH Mandor -
Bahan
7.680 Zak Semen PCC (50 Kg) -
0.494 M3 Pasir Beton -
0.770 M3 Batu Split Pecah Mesin 1/2 -
Untuk 1 M3
Overhead / Keuntungan 10%
NO. ANALISA Sat. Bahan
/ Upah
10 1 M3 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
Tenaga
1.6500 OH Pekerja -
0.2750 OH Tukang batu -
0.0280 OH Kepala Tukang -
0.0830 OH Mandor -
Bahan
8.120 Zak Semen PCC (50 Kg) -
0.507 M3 Pasir Beton -
0.733 M3 Batu Split Pecah Mesin 1/2 -
Untuk 1 M3
Overhead / Keuntungan 10%
11 1 M3 Membuat Beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 Untuk Bored Pile Dia 40
Tenaga
1.6500 OH Pekerja -
0.2750 OH Tukang batu -
0.0280 OH Kepala Tukang -
0.0830 OH Mandor -
Bahan
8.2600 Zak Semen PCC (50 Kg) -
0.5044 M3 Pasir Beton -
0.7293 M3 Split -
Untuk 1 M3
Overhead / Keuntungan 10%
Bahan
0.300 Kg Paku 5 cm - 10 cm -
0.100 Liter Minyak Bekisting -
0.040 M3 Kayu Papan Kelas IV -
Bahan
0.300 Kg Paku 5 cm - 10 cm -
0.100 Liter Minyak Bekisting -
0.045 M3 Kayu Papan Kelas III -
Bahan
0.015 M3 Kayu Balok kelas IV -
0.040 M3 Kayu Papan Kelas IV -
2.000 Btg Dolken dia 8 s/d 10 cm -
0.350 Lbr Triplek tebal 9 mm -
0.400 Kg Paku 5 cm - 10 cm -
0.200 Ltr Minyak Bekisting -
Bahan
0.040 M3 Kayu Papan Kelas IV -
0.018 M3 Kayu Balok Kelas IV -
2.000 Btg Dolken dia 8 s/d 10 cm -
0.400 Kg Paku 5 cm - 10 cm -
0.200 Lt Minyak bekisting -
0.350 Lbr Triplek tebal 9 mm -
Bahan
0.040 M3 Kayu Papan Kelas III -
0.015 M3 Kayu Balok kelas III -
6.000 Btg Dolken dia 8 s/d 10 cm -
0.400 Kg Paku 5 cm - 10 cm -
0.200 Liter Minyak Bekisting -
0.350 Lbr Triplek tebal 9 mm -
Asumsi : Bahan 2x Pakai = 0.5x
Untuk 1 M2 ( Upah + Bahan 2x Pakai )
Overhead / Keuntungan 10%
Bahan
1.050 Kg Besi beton -
0.015 Kg Kawat beton -
Untuk 1 kg
Overhead / Keuntungan 10%
0.0050 OH Mandor -
0.0160 OH Kepala Tukang -
0.0050 OH Mekanik -
0.0050 OH Electrician -
0.0050 OH Operator -
0.0260 OH Pekerja -
0.0420 OH Cut of Pile -
Untuk 1 M'
Overhead/Keuntungan 10%
0.3000 OH Pekerja -
0.1000 OH Tukang batu -
0.0100 OH Kepala tukang -
0.0150 OH Mandor -
Untuk 1 M2
Overhead / Keuntungan 10%
Bahan
70.000 Bh Batu Bata -
0.230 Kg Semen PCC (50 Kg) -
0.043 M3 Pasir pasang -
Untuk 1 M2
Overhead / Keuntungan 10%
Bahan
0.204 Zak Semen PCC (50 Kg) -
0.020 M3 Pasir pasang -
Untuk 1 M2
Overhead / Keuntungan 10%
22 1 M2 Plesteran 1 Pc : 4 Ps, tebal 15 mm
Tenaga
0.300 Oh Pekerja -
0.150 Oh Tukang batu -
0.015 Oh Kepala tukang -
0.015 Oh Mandor -
Bahan
0.125 Zak Semen PCC (50 Kg) -
0.024 M3 Pasir pasang -
Untuk 1 M2
Overhead / Keuntungan 10%
Bahan
3.250 Kg Semen PCC (50 Kg) -
0.020 M3 Pasir pasang -
Untuk 1 M2
Overhead / Keuntungan 10%
Untuk 1 M2
Overhead / Keuntungan 5%
Bahan
6.250 Bh Keramik 40x40 Motif Batu Alam -
10.000 Kg Semen PCC (50 Kg) -
0.045 M3 Pasir pasang -
1.500 Kg Tepung AFA -
Untuk 1 M2
Overhead / Keuntungan 10%
Bahan
1.000 M2 Batu Tempel Strip Stone -
11.750 Kg Semen PCC (50 Kg) -
0.035 M3 Pasir pasang -
Untuk 1 M2
Overhead / Keuntungan 10%
NO. ANALISA Sat. Bahan
/ Upah
Bahan
3.100 Bh Granite Tile Unpolished ( Uk. 60 x 60 cm ) Setara gr -
9.600 Kg Semen PCC (50 Kg) -
0.045 M3 Pasir pasang -
1.500 Kg Tepung AFA -
Untuk 1 M2
Overhead / Keuntungan 10%
28 1 M2 Mencat Bidang Tembok Baru ( 1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Tenaga
0.020 Oh Pekerja -
0.063 Oh Tukang Cat -
0.006 Oh Kepala tukang -
0.003 Oh Mandor -
Bahan
0.100 Kg Plamir (Dempul Tembok) -
0.100 Kg Cat Dasar -
0.260 Kg Cat Air 2x (Setara Dulux ) -
Untuk 1 M2
Overhead / Keuntungan 10%
Bahan
1.100 m Kusen Alumunium -
2.000 bh Paku Skrup -
0.060 Tube Sealant -
Untuk 1 M
Overhead / Keuntungan 10%
Bahan
4.400 M Profil alumunium Utk Frame Pintu ( Alexindo ) -
1.100 M2 Kaca Tebal 8 MM -
0.270 Tube Sealant -
Untuk 1 M
Overhead / Keuntungan 10%
Bahan
4.4000 M' Profil alumunium Utk Frame Jendela ( Alexindo ) -
1.1000 M2 Kaca Tebal 8 MM -
0.2700 Tube Sealant -
Untuk 1 M
Overhead / Keuntungan 10%
32 Pemasangan 1 Bh engsel pintu
Tenaga
0.015 Oh Pekerja -
0.150 Oh Tukang besi -
0.015 Oh Kepala tukang -
0.001 Oh Mandor -
Bahan
1.000 Bh Engsel pintu -
Untuk 1 Bh
Overhead / Keuntungan 10%
Bahan
1.000 Bh Kunci Pintu tanam -
Untuk 1 Bh
Overhead / Keuntungan 10%
Bahan
1.000 Bh Grendel Pintu -
Untuk 1 Bh
Overhead / Keuntungan 10%
NO. ANALISA Sat. Bahan
/ Upah
35 Pemasangan 1 Bh Grendel Jendela Alumunium
Tenaga
0.010 Oh Pekerja -
0.250 Oh Tukang besi -
0.025 Oh Kepala tukang -
0.000 Oh Mandor -
Bahan
1.000 Bh Grendel Jendela -
Untuk 1 Bh
Overhead / Keuntungan 10%
Bahan
1.000 Bh Engsel Pintu -
Untuk 1 Bh
Overhead / Keuntungan 10%
Bahan
1.000 Bh Grendel Jendela -
Untuk 1 Bh
Overhead / Keuntungan 10%
Bahan
1.000 Bh Kait Angin -
Untuk 1 Bh
Overhead / Keuntungan 10%
Bahan
1.000 Bh Kaca t.8 mm -
Untuk 1 M2
Overhead / Keuntungan 10%
40 Pemasangan 1 Bh Washtafel Keramik Type LW 641J/TX109LU ex Toto, Komplit kran & acc
Tenaga
1.200 Oh Pekerja -
1.450 Oh Tukang besi -
0.150 Oh Kepala tukang -
0.100 Oh Mandor -
Bahan
1.000 Bh Wastafel -
1.000 Bh Seal tape -
Untuk 1 Bh
Overhead / Keuntungan 10%
41 Pemasangan 1 Bh Kloset Duduk keramik Type OMNI CW 868J/ TX868CWS ex. Toto Komplit & acc
Tenaga
3.300 Oh Pekerja -
1.100 Oh Tukang besi -
0.110 Oh Kepala tukang -
0.016 Oh Mandor -
Bahan
1.000 Bh Kloset Duduk -
Untuk 1 Bh
Overhead / Keuntungan 10%
42 Pemasangan 1 Bh Urinoir keramik Type U370M/ T60S ex. Toto Komplit + acc
Tenaga
3.300 Oh Pekerja -
1.100 Oh Tukang besi -
0.110 Oh Kepala tukang -
0.016 Oh Mandor -
Bahan
1.000 Bh Urinoir -
Untuk 1 Bh
Overhead / Keuntungan 10%
NO. ANALISA Sat. Bahan
/ Upah
43 Pemasangan 1 Bh Kloset jongkok keramik Type CE 9/ TV150NWV12 ex. Toto Komplit +acc
Tenaga
0.000 Oh Pekerja -
1.100 Oh Tukang besi -
0.110 Oh Kepala tukang -
0.016 Oh Mandor -
Bahan
1.000 Bh Kloset Jongkok -
0.120 Zak Semen -
Untuk 1 Bh
Overhead / Keuntungan 10%
Bahan
1.000 Bh Shower Spray -
0.025 Bh Seal tape -
Untuk 1 Bh
Overhead / Keuntungan 10%
45 Pemasangan 1 Bh Shower Set Type TX 492SES(N)
Tenaga
0.000 Oh Pekerja -
1.100 Oh Tukang besi -
0.110 Oh Kepala tukang -
0.016 Oh Mandor -
Bahan
1.000 Bh Shower Set -
0.025 Bh Seal tape -
Untuk 1 Bh
Overhead / Keuntungan 10%
Bahan
1.000 Bh Tempat Tysu -
0.025 Bh Paku Skrup -
Untuk 1 Bh
Overhead / Keuntungan 10%
Bahan
1.000 Bh Kran Air -
0.025 Bh seal tape -
Untuk 1 Bh
Overhead / Keuntungan 10%
Bahan
1.000 Bh Floor Drain -
0.120 Zak Semen -
Untuk 1 Bh
Overhead / Keuntungan 10%
Bahan
1.000 Bh Cermin -
0.025 Bh Paku Skrup -
Untuk 1 Bh
Overhead / Keuntungan 10%
Bahan
1.000 Bh Gantungan Handuk -
0.025 Bh Paku Skrup -
Untuk 1 Bh
Overhead / Keuntungan 10%
Bahan
1.000 Bh Jemuran Handuk -
0.025 Bh Paku Skrup -
Untuk 1Bh
Overhead / Keuntungan 10%
AWASAN JAM GADANG KOTA BUKITTINGGI
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
Upah Bahan Jumlah
Rp. Rp. Rp.
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
Upah Bahan Jumlah
Rp. Rp. Rp.
-
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
Upah Bahan Jumlah
Rp. Rp. Rp.
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
& acc
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
-
-
-
-
-
-
-
-
-
-
Jumlah -
Dibulatkan -
DAFTAR HARGA SATUAN PEKERJAAN
Kegiatan : PENYUSUNAN PERENCANAAN DED MASTERPLAN REVITALISASI KAWASAN JAM GADANG KOTA
Pekerjaan : TOILET JAM GADANG
Lokasi : KOTA BUKITTINGGI
7 Handel Pintu
8 Pas. Pintu GLASS CUBICAL TOILET + Kaca Panas 12 mm + Sandblast
9 Pas. Plafond WPC + Rangka Hollow
10 Pas. PVC
11 Pas. Finishing GRC Kerawang
12 Pas. Finishing GRC Motif Ukiran Minang
13 Pas. Railling Plat 10 mm+Besi Pipa GIP 2"+Besi ɸ 10+Dinabolt+Acc+las+siap pasang
ARGA SATUAN PEKERJAAN
REVITALISASI KAWASAN JAM GADANG KOTA BUKITTINGGI
HARGA
SAT SATUAN KET
PEKERJAAN
M2 -
M1 -
M1 -
M3 -
M3 -
M3 -
M3 -
M3 -
M3 -
M3 -
M3 -
M2 -
M2 -
M2 -
M2 -
M2 -
Kg -
M1 -
M2 -
M2 -
M2 -
M2 -
M2 -
M2 -
M2 -
M2 -
M2 -
M2 -
M1 -
M1 -
M1 -
Bh -
Bh -
Bh -
Bh -
Bh -
Bh -
Bh -
M2 -
Bh -
Bh -
Bh -
Bh -
Bh -
Bh -
Bh -
Bh -
Bh -
Bh -
Bh -
Bh -
Ls -
Ls -
Ls -
Ls -
M2 -
M2 -
Bh -
Unit -
M2 -
M2 -
M2 -
M2 -
M1 -
RENCANA ANGGARAN BIAYA
KEGIATAN : PENYUSUNAN PERENCANAAN DED MASTERPLAN REVITALISASI KAWASAN JAM GADANG KOTA BUKIT
PEKERJAAN : TOILET JAM GADANG
LOKASI : KOTA BUKITTINGGI
PT. ANIRINDO MITRA KONSULTAN
PERENCANA :
SA
NO URAIAN PEKERJAAN TUAN VOLUME
C. ZONA 3
I. PEKERJAAN TOILET JAM GADANG
A. MOBILISASI & DEMOBILISASI
1. Mendatangkan alat Ls 1.00
2. Sewa Scofolding (perancah) Ls 1.00
JUMLAH A
B. PEKERJAAN PENDAHULUAN
1. Pembersihan Lapangan M2 406.56
2. Pas. Pagar Proyek seng t = 2 m M1 91.60
3. Pas. Papan Bouplank M1 75.60
4. Papan Nama Proyek Ls 1.00
5. Pembongkaran Gedung Lama Ls 1.00
JUMLAH B
C. PEKERJAAN PONDASI
1. Pondasi Bored file ( Cor Ditempat )
a. Type P1 (54 unit)
1. Pengeboran Pondasi Bored Pile Ø 60 cm dengan K-275 M1 756.00
2. Pondasi Bored Pile Ø 60 cm
a. Beton K-275 M3 213.84
b. Pembesian
b.1. Tulangan Besi utama 14 D 16 Kg 16,708.61
b.2. Tulangan sengkang Φ 10 - 120 Kg 5,616.60
b.3. Tulangan Besi Stek 14 D 16 Kg 835.43
3. Galian Poer Pondasi (type P1) 150 x 150 cm M3 91.13
4. Pas. Poer Pondasi (type P1) 150 x 150 cm
a. Lantai Kerja Beton K-100 M3 8.51
b. Beton K-275 M3 85.05
c. Bekisting M2 226.80
d. Pembesian Kg 7,092.63
JUMLAH C
c. Balok
1. Beton Balok P + 3,84
a. Balok 25 x 45 cm (B1)
a.1. Beton K-250 M3 4.66
a.2. Bekisting M2 37.67
a.3. Pembesian Kg 1,082.50
b. Balok 25 x 45 cm (B2)
b.1. Beton K-250 M3 9.92
b.2. Bekisting M2 73.21
b.3. Pembesian Kg 1,419.33
c. Balok 25 x 45 cm (B3)
c.1. Beton K-250 M3 2.61
c.2. Bekisting M2 21.11
c.3. Pembesian Kg 497.17
d. Balok 25 x 45 cm (B4)
d.1. Beton K-250 M3 12.15
d.2. Bekisting M2 98.28
d.3. Pembesian Kg 2,505.22
SA
NO URAIAN PEKERJAAN TUAN VOLUME
e. Balok 20 x 35 cm (BA1)
e.1. Beton K-250 M3 1.04
e.2. Bekisting M2 9.80
e.3. Pembesian Kg 157.98
f. Balok 20 x 40 cm (BK)
f.1. Beton K-250 M3 0.54
f.2. Bekisting M2 5.09
f.3. Pembesian Kg 66.51
g. Balok 20 x 40 cm (BT)
g.1. Beton K-250 M3 0.38
g.2. Bekisting M2 3.63
g.3. Pembesian Kg 67.70
d. Plat Lantai + 3,84
1. Beton Pelat t. 12 cm
a. Beton K-250 M3 33.06
b. Bekisting M2 275.48
c. Pembesian Kg 5,014.86
2. Lantai 2
a. Kolom
1. Beton Kolom P + 7,68
a. Kolom 40 x 40 cm (K1)
a.1. Beton K-300 M3 5.82
a.2. Bekisting M2 58.18
a.3. Pembesian Kg 1,731.98
a.4. Afweerking M2 58.18
a.5. Cat Afweerking M2 58.18
b. Kolom 40 x 40 cm (K2)
b.1. Beton K-300 M3 27.65
b.2. Bekisting M2 276.48
b.3. Pembesian Kg 4,914.66
b.4. Afweerking M2 276.48
b.5. Cat Afweerking M2 276.48
b. Balok
1. Beton Balok P + 7,68
a. Balok 25 x 45 cm (B5)
a.1. Beton K-250 M3 4.66
a.2. Bekisting M2 37.67
a.3. Pembesian Kg 857.09
b. Balok 25 x 45 cm (B6)
b.1. Beton K-250 M3 9.92
b.2. Bekisting M2 73.21
b.3. Pembesian Kg 1,188.19
c. Balok 25 x 45 cm (B7)
c.1. Beton K-250 M3 15.21
c.2. Bekisting M2 123.03
c.3. Pembesian Kg 2,116.69
d. Balok 20 x 35 cm (BA2)
d.1. Beton K-250 M3 1.34
d.2. Bekisting M2 12.67
d.3. Pembesian Kg 201.55
e. Balok 25 x 45 cm (BT)
e.1. Beton K-250 M3 1.22
e.2. Bekisting M2 9.83
e.3. Pembesian Kg 151.49
c. Beton Plat Lantai + 7,68
1. Beton Pelat t. 12 cm
a. Beton K-250 M3 41.21
b. Bekisting M3 355.53
c. Pembesian Kg 6,243.77
d. Waterproofing Membran lantai Pelataran M2 299.03
JUMLAH D
SA
NO URAIAN PEKERJAAN TUAN VOLUME
2. Lantai 2
a. Toilet Wanita
1. Pas. Batu Bata 1 : 2 ( 1/2 Bata) tinggi dinding 3,44 m dan 2,35 m M2 61.99
2. Pas. Batu Bata 1 : 4 ( 1/2 Bata) tinggi dinding 3,44 m M2 22.26
3. Pas. Plasteran 1 : 2 tinggi dinding 3,44 m dan 2,35 m M2 123.98
4. Pas. Plasteran 1 : 4 tinggi dinding 3,44 m M2 44.51
5. Pas. Granite dinding 30 x 60 cm tinggi dinding 3,44 m dan 2,35 m M2 64.23
6. Pas. Acian 1 : 4 tinggi dinding 3,44 m M2 97.38
7. Pas. Cat Dinding Batu Bata tinggi dinding 3,44 m M2 161.60
8. Kolom Praktis 15 x 15 cm tinggi dinding 3,44 m dan 2,35 m
8.a. Beton K 175 M3 0.51
8.b. Pembesian tinggi dinding 3,44 m dan 2,35 m Kg 89.82
8.c. Bekisting tinggi dinding 3,44 m dan 2,35 m M2 6.94
8.d. Afweerking tinggi dinding 3,44 m dan 2,35 m M2 6.58
9. Pekerjaan Balok Latei 15 x 15 cm tinggi dinding 3,44 m dan 2,35 m
9.a. Beton K 175 M3 0.67
9.b. Pembesian tinggi dinding 3,44 m dan 2,35 m Kg 133.16
9.c. Bekisting tinggi dinding 3,44 m dan 2,35 m M2 9.01
10. Pas. Lantai Waterproofing Integral (Membran) M2 8.88
11. Kloset Jongkok Type CE 9/ TV150NWV12 ex. Toto Komplit +acc Unit 1.00
12. Tempat Kloset Jongkok
12.a. Pas. Batu Bata 1:2 (1/2 bata) peninggian closet M2 0.40
12.b. Urugan Pasir Peninggian Closet M3 0.21
12.c. Beton K-100 Peninggian Closet M3 0.07
12.d. Plasteran Batu Bata 1 : 2 cm Peninggian Closet M2 1.08
13. Kran Air Type T26-13 Unit 3.00
14. Cermin Wastafel Type TX716AW Unit 1.00
15. Gantungan Handuk Type TS115S Unit 1.00
16. Jemuran Handuk Type TX4W Unit 1.00
17. Floar Drain Type TX1BNV1 Unit 4.00
18. Shower Set Type TX492SES(N) Lengkap Accesories Unit 1.00
19. Wastafel type LW 641J/TX109LU ex Toto, Komplit kran & acc Unit 2.00
20. Meja Beton Wastafel
21.a. Beton K-175 M3 0.13
21.b. Granite 30 x 60 cm M2 1.56
b. Ruang Laktasi
1. Pas. Batu Bata 1 : 2 ( 1/2 Bata) tinggi dinding 3,44 m dan 2,35 m M2 14.39
2. Pas. Batu Bata 1 : 4 ( 1/2 Bata) tinggi dinding 3,44 m M2 3.33
3. Pas. Plasteran 1 : 2 tinggi dinding 3,44 m dan 2,35 m M2 28.79
4. Pas. Plasteran 1 : 4 tinggi dinding 3,44 m M2 6.66
5. Pas. Acian 1:2 tinggi dinding 3,44 m dan 2,35 m M2 28.79
6. Pas. Acian 1 : 4 tinggi dinding 3,44 m M2 6.66
7. Pas. Cat Dinding Batu Bata tinggi dinding 3,44 m M2 6.66
8. Pekerjaan Balok Latei 15 x 15 cm tinggi dinding 3,44 m dan 2,35 m
8.a. Beton K 175 M3 0.13
8.b. Pembesian tinggi dinding 3,44 m dan 2,35 m Kg 25.96
8.c. Bekisting tinggi dinding 3,44 m dan 2,35 m M2 1.83
9. Keramik lantai Unpolished 40 X 40 cm M2 9.77
SA
NO URAIAN PEKERJAAN TUAN VOLUME
e Toilet Pria
1. Pas. Batu Bata 1 : 2 ( 1/2 Bata) tinggi dinding 3,44 m dan 2,35 m M2 75.68
2. Pas. Batu Bata 1 : 4 ( 1/2 Bata) tinggi dinding 3,44 m M2 28.91
3. Pas. Plasteran 1 : 2 tinggi dinding 3,44 m dan 2,35 m M2 151.37
4. Pas. Plasteran 1 : 4 tinggi dinding 3,44 m M2 57.82
5. Pas. Granite dinding 30 x 60 cm tinggi dinding 3,44 m dan 2,35 m M2 91.12
6. Pas. Acian 1 : 2 Bagian Luar t. 3,44 m M2 57.75
7. Pas. Acian 1 : 4 Dinding Luar Dalam t. 3,44 m M2 27.58
8. Pas. Cat Dinding Batu Bata tinggi dinding 3,44 m M2 85.33
9. Kolom Praktis 15 x 15 cm tinggi dinding 3,44 m dan 2,35 m
9.a. Beton K 175 M3 0.51
9.b. Pembesian tinggi dinding 3,44 m dan 2,35 m Kg 89.82
9.c. Bekisting tinggi dinding 3,44 m dan 2,35 m M2 6.94
9.d. Afweerking tinggi dinding 3,44 m dan 2,35 m M2 6.58
10. Pekerjaan Balok Latei 15 x 15 cm tinggi dinding 3,44 m dan 2,35 m
10.a. Beton K 175 M3 0.88
10.b. Pembesian tinggi dinding 3,44 m dan 2,35 m Kg 163.05
10.c. Bekisting tinggi dinding 3,44 m dan 2,35 m M2 11.89
11. Pas. Lantai Waterproofing Integral (Membran) M2 8.88
12. Kloset Jongkok Type CE 9/ TV150NWV12 ex. Toto Komplit +acc Unit 1.00
13. Tempat Kloset Jongkok
13.a. Pas. Batu Bata 1:2 (1/2 bata) peninggian closet M2 0.40
13.b. Urugan Pasir Peninggian Closet M3 0.21
13.c. Beton K-100 Peninggian Closet M3 0.07
13.d. Plasteran Batu Bata 1 : 2 cm Peninggian Closet M2 1.08
14. Kran Air Type T26-13 Unit 3.00
15. Cermin Wastafel Type TX716AW Unit 1.00
16. Gantungan Handuk Type TS115S Unit 1.00
17. Jemuran Handuk Type TX4W Unit 1.00
18. Floar Drain Type TX1BNV1 Unit 4.00
19. Shower Set Type TX492SES(N) Lengkap Accesories Unit 1.00
20. Urinoir Type U 370 M T 60 S ex. Toto, Komplit kran & acc Unit 6.00
21. Wastafel type LW 641J/TX109LU ex Toto, Komplit kran & acc Unit 2.00
22. Meja Beton Wastafel
22.a. Beton K-175 M3 0.13
22.b. Granite 30 x 60 cm M2 1.56
JUMLAH E
F. PEKERJAAN PINTU DAN JENDELA
1. Type P1 ( 2 Unit )
a. Kuzen alumanium M1 23.20
b. Pas. Pintu Kaca Panas 8 mm+ Rangka Frame+ Sandblast M2 3.36
c. Pas. Sandblast Pintu Kaca Transparan M2 3.36
d. Engsel Pintu Bh 6.00
e. Kunci Pintu Bh 2.00
f. Handel Pintu Bh 2.00
g. Grendel Pintu Bh 4.00
h. Pas. Jendela Kaca Mati Panas 8 mm M2 4.01
i. Pas. Sandblast Jendela Kaca Transparan M2 4.01
2. Type P2 ( 2 Unit )
a. Pas. Pintu GLASS CUBICAL TOILET + Kaca Panas 12 mm + Sandblast Unit 2.00
3. Type P3 ( 1 Unit )
a. Kuzen alumanium M1 5.10
b. Pas. Pintu Kaca Panas 8 mm+ Rangka Frame M2 1.68
c. Pas. Pas. Sandblast Pintu Kaca Transparan M2 1.68
d. Engsel Pintu Bh 3.00
e. Kunci Pintu Bh 1.00
f. Handel Pintu Bh 1.00
g. Grendel Pintu Bh 2.00
JUMLAH F
SA
NO URAIAN PEKERJAAN TUAN VOLUME
G. PEKERJAAN PLAFOND
1. Lantai I
a Plafond Expose Afweerking
a.1 Pas. Plafond Expose Afweerking M2 290.19
a.2 Cat Plafond Expose Afweerking M2 290.19
2. Lantai 2
a Plafond Expose Afweerking
a.1 Pas. Plafond Expose Afweerking M2 286.93
a.2 Cat Plafond Expose Afweerking M2 286.93
JUMLAH G
H. PEKERJAAN LANTAI
1. Lantai 1
a Lantai Tempat Parkir Honda
a.1. Tanah urug (timbunan lantai) M3 119.55
a.2. Urugan Pasir tebal 10 cm M3 24.02
a.3. Lantai Beton Wiremesh K-250 tebal 10 cm M3 24.02
2. Lantai 2
a. Pas. Granite 60 x 60 cm M2 113.44
b. Pas. Granite 30 x 60 cm M2 178.98
c. Pas. Border Keramik Tektur 40 x 40 cm Motif Batu Alam M2 9.76
d. Pas. Keramik Tektur 40 x 40 cm M2 64.08
3. Lantai 3
a. Pas. Granite 30 x 60 cm Unpolish motif kayu M2 311.29
b. Pas. PVC M2 108.80
JUMLAH H
I. PEKERJAAN FINISHING
1. Pas. Finishing Strip Stone M2 39.31
2. Pas. Finishing WPC M2 32.83
3. Pas. Finishing GRC Kerawang M2 9.31
4. Pas. Finishing GRC Motif Ukiran Minang M2 85.50
5. Pas. Railling Plat 10 mm+Besi Pipa GIP 2"+Besi ɸ 10+Dinabolt+Acc+las+siap p M1 59.60
JUMLAH I
A
ADANG KOTA BUKITTINGGI
-
-
- -
- -
- -
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
-
-
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
-
- -
- -
-
- -
- -
-
- -
- -
- -
-
-
-
- -
- -
- -
- -
- -
- -
- -
-
-
- -
- -
-
- -
- -
-
-
-
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
- -
-
- -
-
-
- -
- -
-
-
-
-
RENCANA ANGGARAN BIAYA
KEGIATAN : PENYUSUNAN PERENCANAAN DED MASTERPLAN REVITALISASI KAWASAN JAM GADANG KOTA BU
PEKERJAAN : PEKERJAAN STRUKTUR PANGGUNG
LOKASI : KOTA BUKITTINGGI
PT. ANIRINDO MITRA KONSULTAN
PERENCANA :
SA
NO URAIAN PEKERJAAN TUAN VOLUME
A. PEKERJAAN PONDASI
1. Pondasi Bored file ( Cor Ditempat )
a. Type P1 (20 unit)
1. Pengeboran Pondasi Bored Pile Ø 60 cm dengan K-275 M1 280.00
2. Pondasi Bored Pile Ø 60 cm
a. Beton K-275 M3 79.20
b. Pembesian
b.1. Tulangan Besi utama 14 D 16 Kg 6,188.37
b.2. Tulangan sengkang Φ 10 - 120 Kg 2,080.22
b.3. Tulangan Besi Stek 14 D 16 Kg 309.42
3. Galian Poer Pondasi (type P1) 150 x 150 cm M3 33.75
4. Pas. Poer Pondasi (type P1) 150 x 150 cm
a. Lantai Kerja Beton K-100 M3 3.15
b. Beton K-275 M3 31.50
c. Bekisting M2 84.00
d. Pembesian Kg 2,626.90
JUMLAH A
2. Balok
a. Balok 25 x 40 cm (B1)
1. Beton K-250 M3 7.54
2. Bekisting M2 61.09
3. Pembesian Kg 1,395.33
b. Balok 25 x 40 cm (B2)
1 Beton K-250 M3 2.70
2 Bekisting M2 21.87
3 Pembesian Kg 549.67
c. Balok 20 x 35 cm (B3)
1 Beton K-250 M3 3.29
2 Bekisting M2 31.07
3 Pembesian Kg 499.59
JUMLAH B
NG KOTA BUKITTINGGI
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
-
- -
- -
- -
-
-
REKAPITULASI ANGGARAN BIAYA
: PENYUSUNAN PERENCANAAN DED MASTERPLAN REVITALISASI KAWASAN JAM
KEGIATAN GADANG KOTA BUKITTINGGI
PEKERJAAN : TOILET JAM GADANG
LOKASI : KOTA BUKITTINGGI
PT. ANIRINDO MITRA KONSULTAN
PERENCANA :
A. ZONA A
I. AREA JAM GADANG
A. PEKERJAAN PENDAHULUAN
B. PEKERJAAN PEDESTRIAN AREA JAM GADANG
C. PEKERJAAN STREET FURNITURE JAM GADANG
B. ZONA B
I. PEDESTRIAN ATAS JL.IMAM BONJOL
C. ZONA 3
I. PEKERJAAN TOILET JAM GADANG
A. MOBILISASI & DEMOBILISASI
B. PEKERJAAN PENDAHULUAN
C. PEKERJAAN PONDASI
D. PEKERJAAN BETON BERTULANG
E. PEKERJAAN DINDING BATA
F. PEKERJAAN PINTU DAN JENDELA
G. PEKERJAAN PLAFOND
H. PEKERJAAN LANTAI
I. PEKERJAAN FINISHING
II. PEKERJAAN STRUKTUR PANGGUNG
A. PEKERJAAN PONDASI
B. PEKERJAAN BETON BERTULANG
III PEKERJAAN TANGGA MUSHOLLAH (2 Unit)
IV PEKERJAAN PEDESTRIAN ATAS JL IMAM BONJOL
D ZONA D
I. MEKANIKAL & ELEKTRIKAL
Terbilang ; Rupiah.
……….......……. , ………...……………2
Dibuat oleh :
Kontraktor Penawar,
PT / CV……….........……………….
…………………………….........…………………
Direktur / Direktris
ALISASI KAWASAN JAM
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-