Oe Satker
Oe Satker
b. PEKERJAAN LANTAI 02
. Pek. Balok B.1 (30/60) M3 2.1060
. Pek. Balok B.2 (30/60) M3 2.8080
. Pek. Balok B.3 (30/60) M3 23.4000
. Pek. Balok B.4 (30/60) M3 11.0590
. Pek. Balok B.5 (30/60) M3 15.9840
. Pek. Balok B.6 (30/60) M3 17.7980
. Pek. Balok B.7 (30/60) M3 7.3440
. Pek. Balok B.8 (30/60) M3 21.1680
. Pek. Balok B.9 (30/60) M3 53.6760
. Pek. Balok B.10 (25/45) M3 13.5500
. Pek. Balok B.11 (30/60) M3 13.9530
. Pek. Balok B.12 (35/70) M3 16.6180
. Pek. Balok B.13 (25/45) M3 4.4300
. Pek. Balok B.14 (35/70) M3 23.1720
. Pek. Balok B.15 (30/60) M3 9.1120
. Pek. Balok B.16 a (25/45) M3 1.7960
. Pek. Balok B.19 (30/60) M3 0.9410
. Pek. Plat Lantai Tebal = 14 cm M3 344.6540
. Pek. Kolom K.1 (45 x 45) M3 27.2160
. Pek. Kolom K.2 (45 x 45) M3 5.1030
. Pek. Kolom K.3 (45 x 45) M3 3.4020
. Pek. Kolom K.5 (30 x 30) M3 2.2680
. Pek. Atap Dak Beton Tebal = 12 cm M3 9.0780
. Pek. Kolom K.1 ' Ø 45 M3 10.6820
. Pek. Kolom Praktis 12/15 M' 1,016.0000
. Pek. Kolom Listplank pada Entrance M3 3.6000
. Pek. Listplank Beton M3 9.1000
. Pek. Beton Tangga M3 12.0600
c. PEKERJAAN LANTAI 03
. Pek. Balok B.19 a (30/60) M3 2.3940
. Pek. Balok B.19 (30/60) M3 7.7870
. Pek. Balok B.20 (30/60) M3 9.2610
. Pek. Balok B.21 (35/70) M3 16.6180
. Pek. Balok B.22 (35/70) M3 20.1340
. Pek. Balok B.23 (30/60) M3 3.6720
. Pek. Balok B.24 (30/60) M3 7.9920
. Pek. Balok B.25 (30/60) M3 7.9920
. Pek. Balok B.26 (25/45) M3 4.4890
. Pek. Balok B.27 (25/45) M3 4.4890
. Pek. Ringbalk RB. 1 (30/50) M3 8.9510
. Pek. Ringbalk RB. 2 (30/50) M3 2.3400
. Pek. Ringbalk RB. 3 (30/60) M3 28.9300
. Pek. Ringbalk RB. 4 (30/50) M3 0.9000
. Pek. Ringbalk RB. 5 (30/50) M3 1.8000
. Pek. Ringbalk RB. 6 (25/45) M3 4.3670
. Pek. Ringbalk RB. 7 (25/45) M3 1.6200
. Pek. Ringbalk RB. 8 (30/50) M3 1.1250
. Pek. Ringbalk RB. 9 (20/30) M3 0.2880
. Pek. Plat Lantai Tebal = 14 cm M3 122.0030
. Pek. Kolom K.1 (45 x 45) M3 22.1130
. Pek. Kolom K.2 (45 x 45) M3 5.1030
. Pek. Kolom K.3 (45 x 45) M3 3.4020
. Pek. Kolom K.5 (30 x 30) M3 2.2680
. Pek. Kolom K.1 ' Ø 45 M3 4.0060
d. PEKERJAAN LANTAI 04
. Pek. Balok B.21 (35/70) M3 2.3740
. Pek. Balok B.27 (25/45) M3 0.6380
. Pek. Balok B.28 (30/50) M3 8.1900
. Pek. Balok B.29 (30/50) M3 12.3270
. Pek. Balok B.30 (30/50) M3 3.6000
. Pek. Balok B.31 (30/50) M3 14.1300
. Pek. Ringbalk RB. 4 (30/50) M3 2.4000
. Pek. Ringbalk RB. 10 (20/30) M3 3.3910
. Pek. Ringbalk RB. 11 (30/60) M3 5.3780
. Pek. Ringbalk RB. 12 (30/60) M3 4.1830
. Pek. Ringbalk RB. 13 (20/30) M3 2.1060
. Pek. Ringbalk RB. 15 (30/60) M3 15.7370
. Pek. Ringbalk RB. 16 (30/50) M3 1.8000
. Pek. Ringbalk RB. 17 (30/50) M3 2.7600
. Pek. Ringbalk RB. 18 (20/30) M3 6.0020
. Pek. Ringbalk RB. 19 (25/45) M3 0.9520
. Pek. Kolom K.1 (45 x 45) M3 10.4490
. Pek. Kolom K.3 (45 x 45) M3 3.4020
. Pek. Kolom K.5 (30 x 30) M3 2.2680
. Pek. Kolom Ø 45 M3 1.3990
. Pek. Kolom Praktis 12/15 M' 254.0000
. Pek. Atap Dak Beton M3 25.8100
. Pek. Beton Sirip M3 3.2000
. Pek. Kolom Tumpuan Kuda-kuda M3 0.7150
. Pek. Listplank Beton M3 14.2080
d. PEKERJAAN LANTAI 04
1 Pek. Dinding Tembok 1 : 4 M3 57.3130
2 Pek. Plesteran 1 : 4 M2 1,146.2620
3 Pek. Plesteran Kolom 1 : 3 M2 137.0480
4 Pek. Acian Dinding dan Kolom M2 1,283.3100
5 Pek. Plesteran Atap Dak Beton M2 135.1780
6 Pek. Water Proofing M2 135.1780
b. PEKERJAAN LANTAI 02
1 Pek. Kusen Pintu dan Jendela M3 5.0620
2 Pek. Pintu Utama (ukiran) Lapis Granit Set 1.0000
3 Pek. Pintu Panil Kaca M2 35.8260
4 Pek. Pintu Panil Kayu M2 62.4860
5 Pek. Pintu Double Teakwood + Kaca M2 13.6080
6 Pek. Jendela Kaca Buka 5 mm M2 83.8140
7 Pek. Jendela Kaca Mati M2 45.9750
8 Pek. Rangka Dinding Partisi (Kayu Besi) M2 589.3040
9 Pek. Dinding Gypsum M2 1,178.6080
10 Pek. Dinding Tripleks 6 mm M2 151.6800
11 Pek. Dinding Hias Lapis Sungkai M2 151.6800
12 Pek. Stiker Sand Blasting M2 52.0800
13 Pek. Plafon Gypsum + Rangka M2 1,546.4750
14 Pek. Plafon Tripleks 6 mm M2 86.7550
15 Pek. Plafon Hias Lapis Sungkai M2 907.4600
16 Pek. List Profil Plafon M' 275.4800
17 Pek. List Plint Kayu M' 1,275.4800
18 Pek. List Plafon 8 cm M' 1,075.4800
19 Pek. List Profil Dinding 5 cm M' 1,275.4800
20 Pek. List Papan pada Dinding dibawah Plafon M' 1,275.4800
21 Pek. Railing Stainless Tangga Utama type 2 M' 14.0000
22 Pek. Railing Stainless Tangga Samping 2 Unit type 3 M' 19.7000
23 Pek. Railing Balkon Depan (pada Entrance) M' 12.0000
24 Pek. Pintu Panil + Jalusi M2 3.4020
25 Pek. Jendela Kaca Bovenlight M2 6.8000
26 Pek. Papan Lambersering M2 38.4200
c. PEKERJAAN LANTAI 03
1 Pek. Kusen Pintu dan Jendela M3 2.9690
2 Pek. Pintu Panil Kaca M2 34.0200
3 Pek. Pintu Panil Kayu M2 16.5900
4 Pek. Pintu Double Teakwood + Kaca M2 4.5360
5 Pek. Jendela Kaca Buka 5 mm M2 79.7700
6 Pek. Jendela Kaca Mati M2 18.6000
7 Pek. Stiker Sand Blasting M2 18.6000
8 Pek. Plafon Gypsum + Rangka M2 987.9900
9 Pek. Plafon Tripleks 6 mm M2 33.9450
10 Pek. List Plint Kayu M' 302.9050
11 Pek. List Plafon 8 cm M' 352.9050
12 Pek. List Profil Dinding 5 cm M' 302.9050
13 Pek. List Papan pada Dinding dibawah Plafon M' 302.9050
14 Pek. Railing Stainless Tangga Utama type 4 M' 5.5000
15 Pek. Jendela Kaca Bovenlight M2 2.0000
16 Pek. Papan Lambersering M2 28.0600
17 Pek. Kusen Lt. 04 M3 1.0000
18 Pek. Jendela Kaca Mati M2 33.1200
b. PEKERJAAN LANTAI 02
1 Pek. Kunci Pintu Kayu (Ruangan) Set 34.0000
2 Pek. Kunci Cylinder (KM/WC) Set 14.0000
3 Pek. Kunci Pintu Double Set 10.0000
4 Pek. Handle Pintu Double Psg 10.0000
5 Pek. Door Closer Psg 48.0000
6 Pek. Door Stop Psg 32.0000
7 Pek. Engsel Pintu Stainless 4 " Bh 207.0000
8 Pek. Grendel Tanam Pintu Double Psg 11.0000
9 Pek. Engsel Jendela Stainless 3 " Psg 141.0000
10 Pek. Grendel Jendela Bh 141.0000
11 Pek. Hak Angin Psg 141.0000
c. PEKERJAAN LANTAI 03
1 Pek. Kunci Pintu Kayu (Ruangan) Set 10.0000
2 Pek. Kunci Cylinder (KM/WC) Set 3.0000
3 Pek. Door Closer Psg 20.0000
4 Pek. Door Stop Psg 17.0000
5 Pek. Engsel Pintu Stainless 4 " Bh 99.0000
6 Pek. Engsel Jendela Stainless 3 " Psg 124.0000
7 Pek. Grendel Jendela Bh 124.0000
8 Pek. Hak Angin Psg 124.0000
9 Pek. Kunci Pintu Double Set 10.0000
10 Pek. Handle Pintu Double Psg 10.0000
b. PEKERJAAN LANTAI 02
1 Pek. Cat Dinding Tembok bagian Dalam M2 4,197.7430
2 Pek. Cat Dinding Tembok bagian Luar (Dulux) M2 816.4290
3 Pek. Cat Duco Kusen Pintu dan Jendela Kayu M2 202.4600
4 Pek. Cat Plafon Gypsum dan Tripleks M2 1,633.2300
5 Pek. Cat Meny Rangka Plafon M2 1,633.2300
6 Pek. Cat Compound Dinding Gypsum M' 738.0000
7 Pek. Cat Compound Plafon Gypsum M' 2,043.0000
8 Pek. Cat Melamin Dinding Hias Lapis Sungkai M2 151.6800
9 Pek. Cat Melamin Plafon Hias M2 907.4600
10 Pek. Cat Melamin List Papan dibawah Dinding M2 255.0960
11 Pek. Cat Duco Pintu Panil + Jalusi M2 6.8040
12 Pek. Cat Duco Pintu Panil Kaca M2 17.9130
NO JENIS PEKERJAAN SAT VOLUME
c. PEKERJAAN LANTAI 03
1 Pek. Cat Dinding Tembok bagian Dalam M2 2,243.7640
2 Pek. Cat Dinding Tembok bagian Luar (Dulux) M2 2,154.5330
3 Pek. Cat Duco Kusen Pintu dan Jendela Kayu M2 118.7400
4 Pek. Cat Plafon M2 1,021.9350
5 Pek. Cat Meny Rangka Plafon M2 1,021.9350
6 Pek. Cat Compound Plafon Gypsum M' 1,278.0000
7 Pek. Cat Melamin List Papan dibawah Dinding M2 60.5810
8 Pek. Cat Duco Pintu Panil Kaca M2 17.0100
9 Pek. Cat Duco Pintu Panil M2 33.1800
10 Pek. Cat Duco Pintu Double Teakwood + Kaca M2 4.6320
11 Pek. Cat Duco Jendela Kaca Buka M2 39.8850
12 Pek. Cat Duco Pintu Lambersering M2 28.0600
13 Pek. Cat Duco Kusen Lt. 04 M 40.0000
b. PEKERJAAN LANTAI 02
1 Pek. Ornamen Ukiran pada Dinding Border M' 284.2400
2 Pek. Ornamen Ukiran pada Papan Nama Ruangan Unit 56.0000
3 Pek. Ornamen Ukiran pada Pintu Kayu Unit 54.0000
4 Pek. Ornamen Ukiran pada Kolom Unit 124.0000
5 Pek. Pasang Papan Penunjuk Ruangan Unit 36.0000
6 Pek. Pasang Wallpaper M2 1,180.2400
7 Pek. Pasang Border Wallpaper M' 234.0000
c. PEKERJAAN LANTAI 03
1 Pek. Ornamen Ukiran pada Dinding Border M' 120.7200
2 Pek. Ornamen Ukiran pada Papan Nama Ruangan Unit 24.0000
3 Pek. Ornamen Ukiran pada Pintu Kayu Unit 26.0000
4 Pek. Ornamen Ukiran pada Kolom Unit 36.0000
5 Pek. Pasang Papan Penunjuk Ruangan Unit 29.0000
6 Pek. Pasang Wallpaper M2 686.7400
7 Pek. Pasang Border Wallpaper M' 76.2000
X. PEKERJAAN EXTERIOR
1 Pek. Ornamen Ukiran (Fiber pada Sirip Beton) Unit 92.0000
2 Pek. List Profil Beton pada Listplank M' 864.0000
3 Pek. Profil pada Kolom Lot 10.0000
NO JENIS PEKERJAAN SAT VOLUME
c. PEKERJAAN SANITAIR
1 Closet duduk (lengkap) set 9.0000
2 Urinoir bh 4.0000
3 Washtafel Meja bh 6.0000
4 Shower Spray bh 9.0000
5 Soap Holder bh 9.0000
6 Double Robe Hock bh 9.0000
7 Cermin Toilet bh 6.0000
8 Kran dinding bh 9.0000
9 Floor drain bh 9.0000
10 Partition Plate bh 3.0000
PEKERJAAN LANTAI 02
a. PEK. INSTALASI PIPA AIR BERSIH
1 Pipa GIP medium Ø1¼" m 45.0000
Ø1" m 75.0000
ؽ" m 315.0000
2 Knie GIP Ø1¼" bh 10.0000
Ø1" bh 17.0000
ؽ" bh 200.0000
3 Testik GIP Ø1¼" x 1" bh 7.0000
Ø1" x ½" bh 12.0000
ؽ" bh 30.0000
4 Sock GIP Ø1¼" bh 10.0000
Ø1" bh 20.0000
ؽ" bh 40.0000
5 Double Nepple Ø1¼" bh 10.0000
Ø1" bh 15.0000
ؽ" bh 30.0000
6 Over sock GIP Ø1½" x 1" bh 3.0000
Ø1" x ½" bh 2.0000
7 Water Mor Ø1¼" bh 4.0000
Ø1" bh 6.0000
ؽ" bh 30.0000
8 Boult Valve Ø1¼" bh 2.0000
9 Seal tape dos 70.0000
c. PEKERJAAN SANITAIR
1 Closet duduk (lengkap) set 15.0000
2 Urinoir bh 9.0000
3 Washtafel Meja bh 10.0000
4 Shower Spray bh 15.0000
5 Soap Holder bh 15.0000
6 Double Robe Hock bh 15.0000
7 Cermin Toilet bh 10.0000
8 Kran dinding bh 15.0000
9 Floor drain bh 15.0000
10 Partition Plate bh 7.0000
PEKERJAAN LANTAI 03
a. PEK. INSTALASI PIPA AIR BERSIH
1 Pipa GIP medium Ø3" m 25.0000
Ø1¼" m 6.0000
Ø1" m 12.0000
ؽ" m 70.0000
2 Knie GIP Ø1¼" x ½" bh 6.0000
Ø1" bh 10.0000
ؽ" bh 35.0000
3 Testik GIP Ø2" bh 2.0000
Ø1" x ½" bh 10.0000
ؽ" bh 15.0000
4 Sock GIP Ø1¼" bh 2.0000
Ø1" bh 3.0000
ؽ" bh 15.0000
5 Double Nepple Ø1¼" bh 5.0000
Ø1" bh 7.0000
ؽ" bh 12.0000
6 Over sock GIP Ø1¼" x 1" bh 3.0000
Ø1" x ½" bh 4.0000
7 Water Mor Ø2" bh 2.0000
Ø1" bh 4.0000
ؽ" bh 15.0000
8 Boult Valve Ø3" bh 2.0000
Ø1¼" bh 1.0000
9 Seal tape dos 50.0000
c. PEKERJAAN SANITAIR
1 Closet duduk (lengkap) set 3.0000
2 Urinoir bh 4.0000
3 Washtafel Meja bh 2.0000
4 Shower Spray bh 3.0000
5 Soap Holder bh 3.0000
6 Double Robe Hock bh 3.0000
7 Cermin Toilet bh 2.0000
8 Kran dinding bh 3.0000
9 Floor drain bh 5.0000
10 Partition Plate bh 3.0000
g. PEKERJAAN HYDRANT
1 Fleksible joint dia 4" Bh 2.0000
2 Air relief valve Bh 1.0000
3 Jocky Pump unit 1.0000
4 Electric Pump unit 1.0000
5 Pressure Switch Bh 2.0000
6 Pressure Tank Bh 2.0000
7 Gate Valve dia. 4" Flens 10 K bh 7.0000
8 Straner 4" merk Kitz Flens 10 K bh 1.0000
9 Fot Valve 4" merk Socla PN 16 bh 1.0000
10 Check Valve 4 " merk KitzFlens 10 K bh 1.0000
11 Hydrant Pilar 3 " One Way bh 10.0000
f. PEKERJAAN TELEPHONE
1 Pengadaan PABX 80 Extension dan Aksesorisnya Unit 1.0000
2 Main Dsitribution Board kapasitas 100 Extension Unit 1.0000
3 Panel Telephone kapasitas 80 Ext. Unit 1.0000
4 Kabel Feeder 2 x 30 x 0,6 mm M 50.0000
5 Kabel Feeder 2 x 80 x 0,6 mm M 30.0000
6 Outlet Telephone Unit 55.0000
7 Single Line Telephone Unit 55.0000
8 Instalasi Outlet Telephone Jack Titik 55.0000
PEKERJAAN LANTAI 02
a. PEKERJAAN INSTALASI
1 Pek. Instalasi Titik Cahaya Lampu Titik 272.0000
2 Pek. Instalasi Titik Exhaust Fan Titik 11.0000
3 Pek. Instalasi Titik Stop Kontak Titik 85.0000
4 Pek. Instalasi Power AC 1 Phase Titik 36.0000
5 Pek. Instalasi Power AC 3 Phase Titik 6.0000
6 Pek. Armatur :
- Lampu Fitting PLC 18 Watt Bh 27.0000
- Lampu DLH 1 Unit 27.0000
- Lampu Down Light Silver 150 PLC 14 Watt Unit 102.0000
- Lampu Down Light Gold Hologen 25 Watt Unit 44.0000
- Lampu Hias (LH 1) Unit 4.0000
- Lampu Dinding Unit 18.0000
- Lampu Baret 32 Watt (LB 2) Unit 18.0000
- Lampu Baret 40 Watt (LB 1) Unit 31.0000
- Lampu Gantung Unit 1.0000
- Saklar Tunggal Bh 22.0000
- Saklar Seri Bh 35.0000
- Saklar Triple Bh 4.0000
- Stop Kontak Arde Bh 74.0000
- Stop Kontak Lantai Bh 11.0000
- Stop Kontak AC Bh 36.0000
7 Exhaust Fan Bh 11.0000
8 Tranking Cable M 130.0000
9 Kabel Tee 20 x 20 x 300 cm Pcs 2,000.0000
10 Grounding Panel (Tembaga) 50 mm M 20.0000
11 Unimax Klem (Kuku Macan) Bh 2.0000
d. PEKERJAAN TELEPHONE
1 Panel Telephone kapasitas 50 Ext. Unit 1.0000
2 Kabel Feeder 2 x 50 x 0,6 mm M 30.0000
3 Outlet Telephone Jack Unit 34.0000
4 Single Line Telephone Unit 34.0000
5 Instalasi Outlet Telephone Jack Titik 34.0000
PEKERJAAN LANTAI 03
a. PEKERJAAN INSTALASI
1 Pek. Instalasi Titik Cahaya Lampu Titik 74.0000
2 Pek. Instalasi Titik Stop Kontak Titik 48.0000
3 Pek. Instalasi Power AC 1 Phase Titik 15.0000
4 Pek. Armatur :
- Lampu Hias (LH 1) Unit 3.0000
- Lampu Down Light Silver 150 PLC 18 Watt Unit 29.0000
- Lampu Down Light Silver 150 Sorot 80 Watt Unit 3.0000
- Lampu Baret 40 Watt (LB 1) Unit 2.0000
- Lampu Baret 32 Watt (LB 2) Unit 15.0000
- Lampu Fitting PLC 18 Watt Bh 12.0000
- Lampu Sorot 250 Watt Unit 9.0000
- Handle ON/OFF Bh 1.0000
- Saklar Tunggal Bh 8.0000
- Saklar Tunggal Tukar Bh 1.0000
- Saklar Seri Bh 11.0000
- Saklar Triple Bh 2.0000
- Stop Kontak Arde Bh 48.0000
- Stop Kontak AC Bh 15.0000
5 Tranking Cable M 60.0000
6 Kabel Tee 20 x 20 x 300 cm Pcs 1,000.0000
7 Grounding Panel (Tembaga) 50 mm M 40.0000
8 Unimax Klem (Kuku Macan) Bh 2.0000
d. PEKERJAAN TELEPHONE
1 Panel Telephone kapasitas 30 Ext. Unit 1.0000
2 Kabel Feeder 2 x 40 x 0,6 mm M 40.0000
3 Outlet Telephone Jack Unit 13.0000
4 Single Line Telephone Unit 13.0000
5 Instalasi Outlet Telephone Jack Titik 13.0000
REKAPITULASI
RENCANA ANGGRAN BIAYA
UNIT GEDUNG UTAMA
KEGIATAN : REVIEW DESIGN PERENCANAAN GEDUNG DPRD - KABUPATEN MIMI
PEKERJAAN : REVIEW DESIGN PERENCANAAN GEDUNG DPRD - KABUPATEN MIMI
LOKASI : KOTA TIMIKA
TAHUN ANGGARAN : 2009
NO JENIS PEKERJAAN
A. PEKERJAAN CIVIL
I. PEKERJAAN PENDAHULUAN
II. PEKERJAAN TANAH, BATU, dan PASIR
III. PEKERJAAN BETON
IV. PEKERJAAN KAP (ATAP)
V. PEKERJAAN DINDING dan LANTAI
VI. PEKERJAAN DINDING PARTISI, KUSEN, JENDELA, dan PLAFON
VII. PEKERJAAN PENGGANTUNG dan PENGUNCI
VIII. PEKERJAAN PENGECATAN
IX. PEKERJAAN INTERIOR
X. PEKERJAAN EXTERIOR
XI. PEKERJAAN PENUNJANG BANGUNAN
REAL COST
NO JENIS PEKERJAAN SAT VOLUME
c. PEKERJAAN SANITAIR
1 Closet duduk (lengkap) set 6.0000
2 Urinoir bh 10.0000
3 Washtafel Meja bh 8.0000
4 Shower Spray bh 6.0000
5 Soap Holder bh 6.0000
6 Double Robe Hock bh 6.0000
7 Cermin Toilet bh 8.0000
8 Kran dinding bh 2.0000
9 Floor drain bh 10.0000
10 Partition Plate bh 12.0000
REKAPITULASI
RENCANA ANGGARAN BIAYA
UNIT GEDUNG SERBA GUNA
REAL COST
NO JENIS PEKERJAAN SAT VOLUME
NO JENIS PEKERJAAN
REAL COST
NO JENIS PEKERJAAN SAT VOLUME
NO JENIS PEKERJAAN
REAL COST
Untuk 2 Unit
NO JENIS PEKERJAAN SAT VOLUME
c. SALURAN KOMPLEK
1 Pek. Saluran Keliling dekat Pagar (type 1) M' 591.6400
2 Pek. Saluran Depan (Tepi Jalan) type 2 M' 152.8000
3 Pek. Saluran Tertutup dari Bangunan ke Saluran
Komplek (type 3 M' 190.0000
REKAPITULASI
RENCANA ANGGARAN BIAYA
UNIT PAGAR, HALAMAN PARKIR/TAMAN, dan SALURAN
NO JENIS PEKERJAAN
I. PAGAR DEPAN
REKAPITULASI TOTAL
RENCANA ANGGARAN BIAYA
KEGIATAN : REVIEW DESIGN PERENCANAAN GEDUNG DPRD - KABUPATEN MIMI
PEKERJAAN : REVIEW DESIGN PERENCANAAN GEDUNG DPRD - KABUPATEN MIMI
LOKASI : KOTA TIMIKA
TAHUN ANGGARAN : 2009
NO JENIS PEKERJAAN
REAL COST
PPN 10 %
TOTAL COST
DIBULATKAN
Terbilang :
ENAM PULUH TIGA MILIAR SEMBILAN RATUS EMPAT PULUH TIGA JUTA DUA RATUS DELAPA
PULUH RIBU RUPIAH
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
2,167.45 75,489,566.56
223,209.98 5,441,878,094.97
23,983.57 584,721,563.61
371,040.00 137,563,080.00
1,104,450.00 39,760,200.00
2,000,000.00 2,000,000.00
JUMLAH I 6,281,412,505.14
61,300.00 43,508,288.00
59,000.00 3,398,400.00
119,100.00 23,378,532.03
19,666.67 890,868.53
233,600.00 1,681,920.00
233,600.00 8,925,949.44
233,600.00 1,643,399.36
219,200.00 413,867,136.00
43,000.00 81,187,440.00
819,919.84 15,664,732.55
901,485.00 12,792,072.15
1,314,425.00 52,051,230.00
JUMLAH II 658,989,968.06
819,919.84 13,650,271.49
5,981,832.23 775,923,796.64
4,524,712.12 206,294,294.87
4,266,424.87 125,592,882.06
5,740,864.98 86,850,101.82
6,619,746.00 238,310,855.93
5,674,333.83 99,407,519.55
5,127,225.31 80,194,418.30
4,364,622.38 106,134,522.41
3,493,371.29 158,531,983.90
4,263,404.91 110,224,365.24
4,253,325.97 40,831,929.35
7,363,328.05 412,294,827.71
7,635,691.50 766,203,463.28
6,365,139.07 17,185,875.49
7,804,396.26 305,331,394.83
9,786,619.46 49,941,119.11
8,795,462.86 29,922,164.63
9,046,842.81 24,317,913.47
10,087,796.58 22,879,122.64
7,453,823.57 251,067,139.27
7,804,396.26 104,212,103.24
10,087,796.58 35,922,643.62
96,005.00 15,591,212.00
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
1,929,955.83 490,341,948.73
7,884,191.36 56,766,177.83
7,884,191.36 168,721,695.20
Jumlah (a) 4,792,645,742.63
7,466,715.03 15,724,901.85
7,964,777.58 22,365,095.44
7,964,777.58 186,375,795.33
7,466,715.03 82,574,401.49
7,964,777.58 127,309,004.81
7,825,202.87 139,272,960.72
7,466,715.03 54,835,555.16
9,221,161.45 195,193,545.66
7,825,202.87 420,025,589.38
9,301,929.02 126,041,138.22
9,360,758.66 130,610,665.62
8,812,217.09 146,441,423.57
9,301,929.02 41,207,545.56
8,299,413.31 192,314,005.29
9,221,161.45 84,023,223.17
8,335,261.61 14,970,129.86
6,940,664.18 6,531,164.99
9,565,287.17 3,296,714,485.89
7,804,396.26 212,404,448.58
9,786,619.46 49,941,119.11
8,795,462.86 29,922,164.63
9,046,842.81 20,518,239.49
10,248,458.86 93,035,509.57
7,804,396.26 83,366,560.83
96,005.00 97,541,080.00
7,091,887.44 25,530,794.77
7,687,349.61 69,954,881.44
7,884,191.36 95,083,347.86
Jumlah (b) 6,059,828,778.31
6,940,664.18 16,615,950.04
6,940,664.18 54,046,951.95
7,494,964.35 69,410,864.86
8,401,976.32 139,624,042.46
7,889,172.54 158,840,599.98
7,127,223.58 26,171,164.99
7,322,538.61 58,521,728.58
7,601,850.04 60,753,985.51
9,167,928.12 41,154,829.34
9,413,596.44 42,257,634.40
7,799,918.25 69,817,068.22
7,799,918.25 18,251,808.70
8,157,879.54 236,007,455.04
7,480,613.57 6,732,552.21
7,480,613.57 13,465,104.42
8,853,654.95 38,663,911.15
8,853,654.95 14,342,921.01
8,088,843.97 9,099,949.47
12,476,747.24 3,593,303.21
9,565,287.17 1,166,993,731.17
7,804,396.26 172,578,614.47
9,786,619.46 49,941,119.11
8,795,462.86 29,922,164.63
9,046,842.81 20,518,239.49
7,804,396.26 31,264,411.41
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
96,005.00 48,770,540.00
10,248,458.86 231,522,934.21
7,553,825.95 31,763,838.13
7,804,396.26 25,286,243.88
7,687,349.61 142,000,721.98
7,884,191.36 47,541,673.93
Jumlah (c) 3,075,476,057.97
8,401,976.32 19,946,291.78
9,413,596.44 6,005,874.53
8,319,168.92 68,133,993.42
8,319,168.92 102,550,395.22
7,565,420.05 27,235,512.17
8,134,918.24 114,946,394.77
7,480,613.57 17,953,472.56
12,476,747.24 42,308,649.89
8,383,587.21 45,086,931.99
7,127,223.58 29,813,176.24
12,476,747.24 26,276,029.69
7,197,021.06 113,259,520.43
7,480,613.57 13,465,104.42
8,188,355.71 22,599,861.76
12,476,747.24 74,885,436.94
9,167,928.12 8,727,867.57
7,804,396.26 81,548,136.51
8,795,462.86 29,922,164.63
9,046,842.81 20,518,239.49
7,804,396.26 10,918,350.37
96,005.00 24,385,270.00
10,248,458.86 264,512,723.30
7,553,825.95 24,172,243.05
7,804,396.26 5,580,143.32
7,687,349.61 109,221,863.25
Jumlah (d) 1,303,973,647.31
JUMLAH III 15,231,924,226.21
2,810,500.00 22,484,000.00
124,727.50 16,214,575.00
60,000.00 7,800,000.00
475,175.00 74,127,300.00
350,000.00 9,450,000.00
Jumlah (a) 130,075,875.00
4,678,600.00 37,428,800.00
124,727.50 22,700,405.00
60,000.00 10,920,000.00
475,175.00 94,084,650.00
350,000.00 9,450,000.00
Jumlah (b) 174,583,855.00
34,796.55 500,379,956.45
34,339.25 172,744,668.51
75,000.00 40,800,000.00
20,000.00 35,000,520.00
61,755.00 62,827,066.80
35,505.00 36,121,366.80
61,755.00 62,827,066.80
261,600.00 266,141,376.00
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
182,850.00 72,408,600.00
69,650.00 7,435,137.50
32,200.00 97,405,000.00
Jumlah (c) 1,354,090,758.86
34,796.55 191,583,547.88
34,796.55 44,856,368.31
34,339.25 110,042,702.07
75,000.00 68,100,000.00
20,000.00 3,600,000.00
61,755.00 35,848,777.50
35,505.00 20,610,652.50
61,755.00 35,848,777.50
261,600.00 151,858,800.00
182,850.00 6,582,600.00
69,650.00 1,358,175.00
32,200.00 3,864,000.00
Jumlah (d) 674,154,400.76
34,796.55 257,460,463.33
34,796.55 100,224,057.57
34,339.25 181,777,515.51
75,000.00 118,200,000.00
20,000.00 8,100,000.00
61,755.00 67,207,657.73
35,505.00 38,639,913.98
61,755.00 67,207,657.73
261,600.00 284,697,972.00
182,850.00 15,359,400.00
69,650.00 1,457,078.00
32,200.00 12,236,000.00
Jumlah (e) 1,152,567,715.83
JUMLAH IV 3,485,472,605.45
1,172,500.00 194,333,667.50
56,709.00 187,982,792.70
58,916.60 34,182,822.15
32,350.00 126,005,093.95
233,600.00 53,831,484.80
819,919.84 132,262,089.52
242,559.00 547,087,215.88
228,035.00 11,161,173.08
255,795.00 42,516,965.93
238,105.00 27,036,346.54
99,919.00 8,428,167.65
Jumlah (a) 1,364,827,819.69
1,172,500.00 259,650,125.00
1,332,405.00 41,304,555.00
56,709.00 251,163,423.78
58,916.60 22,357,023.29
32,350.00 157,494,551.60
233,600.00 59,350,518.40
1,054,750.00 80,394,099.75
242,559.00 595,224,019.67
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
228,035.00 19,783,176.43
255,795.00 80,032,883.81
238,105.00 16,000,656.00
99,919.00 11,917,339.13
133,250.00 11,560,103.75
Jumlah (b) 1,606,232,475.59
1,172,500.00 145,931,695.00
56,709.00 141,161,857.49
58,916.60 17,069,376.27
32,350.00 89,899,129.55
233,600.00 23,872,518.40
1,054,750.00 32,336,525.50
242,559.00 239,645,866.41
228,035.00 7,740,648.08
255,795.00 25,864,711.43
99,919.00 5,330,678.65
58,916.60 25,040,262.00
133,250.00 61,156,020.25
Jumlah (c) 815,049,289.02
1,172,500.00 67,199,492.50
56,709.00 65,003,371.76
58,916.60 8,074,402.20
32,350.00 41,515,078.50
58,916.60 7,964,228.15
133,250.00 18,012,468.50
Jumlah (d) 207,769,041.61
JUMLAH V 3,993,878,625.91
51,499,586.23 51,499,586.23
718,100.00 32,995,258.80
2,653,417.50 2,653,417.50
6,799,000.00 43,479,605.00
572,000.00 37,213,176.00
537,350.00 2,437,419.60
773,382.50 107,306,821.88
347,782.50 21,247,771.84
162,855.00 139,099,341.15
79,255.00 135,388,146.30
57,275.00 13,582,880.80
251,750.00 59,703,016.00
295,375.00 10,917,060.00
79,255.00 145,739,721.11
47,735.00 2,282,735.44
251,750.00 9,119,643.75
30,805.00 52,398,072.80
33,805.00 29,492,834.20
29,605.00 50,356,920.80
33,805.00 29,492,834.20
42,000.00 71,440,320.00
3,493,085.63 75,101,340.94
3,493,085.63 68,813,786.81
7,500,000.00 7,500,000.00
656,000.00 4,463,424.00
347,782.50 1,530,243.00
94,932.50 5,409,253.85
Jumlah (a) 1,210,664,631.99
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
6,799,000.00 34,416,538.00
98,015,297.60 98,015,297.60
718,100.00 25,726,650.60
572,000.00 35,741,992.00
537,350.00 7,312,258.80
773,382.50 64,820,280.86
347,782.50 15,989,300.44
162,855.00 95,971,102.92
79,255.00 93,410,577.04
57,275.00 8,687,472.00
251,750.00 38,185,440.00
295,375.00 15,383,130.00
79,255.00 122,565,876.13
47,735.00 4,141,249.93
251,750.00 228,453,055.00
33,805.00 9,312,601.40
30,805.00 39,291,161.40
33,805.00 36,356,601.40
29,605.00 37,760,585.40
42,000.00 53,570,160.00
3,493,085.63 48,903,198.75
3,493,085.63 68,813,786.81
829,507.25 9,954,087.00
656,000.00 2,231,712.00
347,782.50 2,364,921.00
94,932.50 3,647,306.65
Jumlah (b) 1,201,026,343.12
6,799,000.00 20,186,231.00
718,100.00 24,429,762.00
572,000.00 9,489,480.00
537,350.00 2,437,419.60
773,382.50 61,692,722.03
347,782.50 6,468,754.50
295,375.00 5,493,975.00
79,255.00 78,303,147.45
47,735.00 1,620,364.58
30,805.00 9,330,988.53
33,805.00 11,929,953.53
29,605.00 8,967,502.53
42,000.00 12,722,010.00
3,493,085.63 19,211,970.94
347,782.50 695,565.00
94,932.50 2,663,805.95
6,799,000.00 6,799,000.00
347,782.50 11,518,556.40
Jumlah (c) 293,961,209.01
JUMLAH VI 2,705,652,184.11
321,130.00 11,239,550.00
200,927.50 2,009,275.00
252,350.00 3,280,550.00
317,782.50 4,131,172.50
609,275.00 31,073,025.00
91,855.00 3,949,765.00
82,782.50 18,129,367.50
171,800.00 2,577,000.00
51,855.00 11,304,390.00
27,782.50 6,056,585.00
42,782.50 9,326,585.00
Jumlah (a) 103,077,265.00
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
321,130.00 10,918,420.00
200,927.50 2,812,985.00
252,350.00 2,523,500.00
317,782.50 3,177,825.00
609,275.00 29,245,200.00
91,855.00 2,939,360.00
82,782.50 17,135,977.50
171,800.00 1,889,800.00
51,855.00 7,311,555.00
27,782.50 3,917,332.50
42,782.50 6,032,332.50
Jumlah (b) 87,904,287.50
321,130.00 3,211,300.00
200,927.50 602,782.50
609,275.00 12,185,500.00
91,855.00 1,561,535.00
82,782.50 8,195,467.50
51,855.00 6,430,020.00
27,782.50 3,445,030.00
42,782.50 5,305,030.00
171,800.00 1,718,000.00
317,782.50 3,177,825.00
Jumlah (c) 45,832,490.00
JUMLAH VII 236,814,042.50
20,736.50 68,223,707.10
45,936.50 30,549,012.79
182,028.00 46,559,121.84
20,905.00 39,441,296.26
32,200.00 60,751,482.40
14,136.50 30,195,564.00
14,136.50 33,362,140.00
162,785.00 38,604,788.32
162,785.00 55,378,154.72
182,028.00 2,477,037.02
182,028.00 4,181,911.27
182,028.00 23,684,755.25
182,028.00 843,153.70
182,028.00 12,628,192.50
182,028.00 10,371,955.44
20,736.50 35,423,333.49
20,905.00 8,709,232.05
Jumlah (a) 501,384,838.14
20,736.50 87,046,497.72
45,936.50 37,503,890.76
182,028.00 36,853,388.88
20,905.00 34,142,673.15
32,200.00 52,590,006.00
14,136.50 10,432,737.00
14,136.50 28,880,869.50
162,785.00 24,691,228.80
162,785.00 147,720,876.10
162,785.00 41,525,802.36
182,028.00 1,238,518.51
182,028.00 3,260,667.56
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
182,028.00 22,748,403.22
182,028.00 2,529,461.09
182,028.00 7,628,247.40
182,028.00 6,993,515.76
20,736.50 24,440,204.79
Jumlah (b) 570,226,988.60
20,736.50 46,527,812.19
45,936.50 98,971,705.15
182,028.00 21,614,004.72
20,905.00 21,363,551.18
32,200.00 32,906,307.00
14,136.50 18,066,447.00
162,785.00 9,861,678.09
182,028.00 3,096,296.28
182,028.00 6,039,689.04
182,028.00 843,153.70
182,028.00 7,260,186.78
182,028.00 5,107,705.68
182,028.00 7,281,120.00
Jumlah (c) 278,939,656.80
JUMLAH VIII 1,350,551,483.53
250,000.00 60,900,000.00
500,000.00 24,000,000.00
275,000.00 15,950,000.00
300,000.00 37,200,000.00
280,000.00 9,520,000.00
241,505.00 238,558,639.00
103,875.00 22,083,825.00
Jumlah (a) 408,212,464.00
250,000.00 71,060,000.00
500,000.00 28,000,000.00
275,000.00 14,850,000.00
300,000.00 37,200,000.00
280,000.00 10,080,000.00
241,505.00 285,033,861.20
103,875.00 24,306,750.00
Jumlah (b) 470,530,611.20
250,000.00 30,180,000.00
500,000.00 12,000,000.00
275,000.00 7,150,000.00
300,000.00 10,800,000.00
280,000.00 8,120,000.00
241,505.00 165,851,143.70
103,875.00 7,915,275.00
Jumlah (c) 242,016,418.70
JUMLAH IX 1,120,759,493.90
600,000.00 55,200,000.00
270,000.00 233,280,000.00
5,000,000.00 50,000,000.00
JUMLAH X 338,480,000.00
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
16,684,816.35 100,108,898.12
64,860,374.27 64,860,374.27
21,000,000.00 42,000,000.00
282,778.50 144,217,037.10
2,021,995.62 327,563,290.81
100,253,836.40 100,253,836.40
JUMLAH XI 779,003,436.71
129,334.00 2,328,012.00
209,469.00 2,513,628.00
94,465.00 2,361,625.00
89,350.00 3,127,250.00
68,657.50 8,238,900.00
11,000.00 132,000.00
8,500.00 127,500.00
5,000.00 450,000.00
15,000.00 30,000.00
13,000.00 65,000.00
13,000.00 91,000.00
8,000.00 80,000.00
5,000.00 175,000.00
12,000.00 84,000.00
7,000.00 70,000.00
5,000.00 100,000.00
12,000.00 60,000.00
7,500.00 52,500.00
4,000.00 200,000.00
12,000.00 36,000.00
10,000.00 50,000.00
17,500.00 35,000.00
45,000.00 180,000.00
32,000.00 128,000.00
20,000.00 100,000.00
12,000.00 300,000.00
350,000.00 700,000.00
450,000.00 450,000.00
Jumlah (a) 22,265,415.00
75,693.50 6,055,480.00
50,506.00 3,535,420.00
45,292.00 1,358,760.00
39,190.50 470,286.00
26,965.50 323,586.00
30,000.00 1,050,000.00
15,000.00 300,000.00
10,000.00 100,000.00
7,000.00 280,000.00
30,000.00 300,000.00
75,000.00 600,000.00
30,000.00 360,000.00
90,000.00 720,000.00
30,000.00 150,000.00
20,000.00 100,000.00
15,000.00 90,000.00
35,000.00 525,000.00
10,000.00 200,000.00
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
30,000.00 900,000.00
12,000.00 120,000.00
40,000.00 120,000.00
Jumlah (b) 17,658,532.00
2,866,205.00 25,795,845.00
3,198,600.00 12,794,400.00
2,793,850.00 16,763,100.00
600,000.00 5,400,000.00
150,000.00 1,350,000.00
150,000.00 1,350,000.00
600,000.00 3,600,000.00
90,000.00 810,000.00
524,127.50 4,717,147.50
750,000.00 2,250,000.00
Jumlah (c) 74,830,492.50
JUMLAH Lt. 01 114,754,439.50
129,334.00 5,820,030.00
94,465.00 7,084,875.00
68,657.50 21,627,112.50
11,000.00 110,000.00
8,500.00 144,500.00
5,000.00 1,000,000.00
13,000.00 91,000.00
8,000.00 96,000.00
5,000.00 150,000.00
12,000.00 120,000.00
7,000.00 140,000.00
5,000.00 200,000.00
12,000.00 120,000.00
7,500.00 112,500.00
4,000.00 120,000.00
12,000.00 36,000.00
10,000.00 20,000.00
32,000.00 128,000.00
20,000.00 120,000.00
12,000.00 360,000.00
350,000.00 700,000.00
17,000.00 1,190,000.00
Jumlah (a) 39,490,017.50
75,693.50 26,492,725.00
50,506.00 5,050,600.00
45,292.00 5,435,040.00
39,190.50 3,135,240.00
26,965.50 674,137.50
30,000.00 1,500,000.00
15,000.00 1,125,000.00
10,000.00 250,000.00
7,000.00 210,000.00
30,000.00 1,110,000.00
22,000.00 330,000.00
10,000.00 150,000.00
6,500.00 130,000.00
75,000.00 900,000.00
30,000.00 600,000.00
90,000.00 2,250,000.00
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
30,000.00 300,000.00
20,000.00 300,000.00
15,000.00 150,000.00
35,000.00 525,000.00
10,000.00 250,000.00
22,000.00 660,000.00
30,000.00 1,350,000.00
12,000.00 300,000.00
40,000.00 400,000.00
Jumlah (b) 53,577,742.50
2,866,205.00 42,993,075.00
3,198,600.00 28,787,400.00
2,793,850.00 27,938,500.00
600,000.00 9,000,000.00
150,000.00 2,250,000.00
150,000.00 2,250,000.00
600,000.00 6,000,000.00
90,000.00 1,350,000.00
524,127.50 7,861,912.50
750,000.00 5,250,000.00
Jumlah (c) 133,680,887.50
JUMLAH Lt. 02 226,748,647.50
286,969.00 7,174,225.00
129,334.00 776,004.00
94,465.00 1,133,580.00
68,657.50 4,806,025.00
11,000.00 66,000.00
8,500.00 85,000.00
5,000.00 175,000.00
13,000.00 26,000.00
8,000.00 80,000.00
5,000.00 75,000.00
12,000.00 24,000.00
7,000.00 21,000.00
5,000.00 75,000.00
12,000.00 60,000.00
7,500.00 52,500.00
4,000.00 48,000.00
12,000.00 36,000.00
10,000.00 40,000.00
32,000.00 64,000.00
20,000.00 80,000.00
12,000.00 180,000.00
1,750,000.00 3,500,000.00
350,000.00 350,000.00
17,000.00 850,000.00
Jumlah (a) 19,777,334.00
75,693.50 2,270,805.00
50,506.00 757,590.00
45,292.00 1,132,300.00
39,190.50 313,524.00
26,965.50 107,862.00
30,000.00 600,000.00
15,000.00 300,000.00
10,000.00 100,000.00
7,000.00 35,000.00
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
30,000.00 60,000.00
75,000.00 225,000.00
30,000.00 120,000.00
90,000.00 270,000.00
30,000.00 60,000.00
20,000.00 80,000.00
15,000.00 30,000.00
35,000.00 140,000.00
25,000.00 150,000.00
10,000.00 60,000.00
22,000.00 110,000.00
30,000.00 180,000.00
12,000.00 24,000.00
Jumlah (b) 7,126,081.00
2,866,205.00 8,598,615.00
3,198,600.00 12,794,400.00
2,793,850.00 5,587,700.00
600,000.00 1,800,000.00
150,000.00 450,000.00
150,000.00 450,000.00
600,000.00 1,200,000.00
90,000.00 270,000.00
524,127.50 2,620,637.50
750,000.00 2,250,000.00
Jumlah (c) 36,021,352.50
129,334.00 16,813,420.00
750,000.00 750,000.00
500,000.00 1,500,000.00
Jumlah (d) 19,063,420.00
9,000,000.00 18,000,000.00
350,000.00 1,400,000.00
350,000.00 1,400,000.00
400,000.00 3,200,000.00
129,334.00 2,328,012.00
94,465.00 6,612,550.00
1,500,000.00 1,500,000.00
Jumlah (e) 34,440,562.00
234,568.50 11,728,425.00
75,693.50 18,923,375.00
250,000.00 1,500,000.00
75,000.00 1,875,000.00
150,000.00 1,200,000.00
75,000.00 6,000,000.00
35,000.00 1,050,000.00
45,000.00 675,000.00
Jumlah (f) 42,951,800.00
720,000.00 1,440,000.00
1,950,000.00 1,950,000.00
15,000,000.00 15,000,000.00
75,000,000.00 75,000,000.00
500,000.00 1,000,000.00
3,500,000.00 7,000,000.00
3,350,000.00 23,450,000.00
3,375,000.00 3,375,000.00
7,020,000.00 7,020,000.00
2,300,000.00 2,300,000.00
4,850,000.00 48,500,000.00
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
120,000.00 120,000.00
96,000.00 3,360,000.00
420,000.00 840,000.00
420,000.00 840,000.00
75,000.00 1,950,000.00
2,350,000.00 23,500,000.00
6,000,000.00 30,000,000.00
332,870.50 113,175,970.00
286,969.00 71,742,250.00
209,469.00 35,609,730.00
40,000.00 2,800,000.00
30,000.00 1,800,000.00
17,500.00 1,750,000.00
45,000.00 450,000.00
40,000.00 1,080,000.00
20,000.00 300,000.00
40,000.00 600,000.00
15,000.00 750,000.00
Jumlah (g) 476,702,950.00
JUMLAH Lt. 03 636,083,499.50
TOTAL 977,586,586.50
350,000,000.00 350,000,000.00
200,000,000.00 200,000,000.00
85,000,000.00 85,000,000.00
45,000,000.00 45,000,000.00
15,000,000.00 15,000,000.00
16,000,000.00 16,000,000.00
15,000,000.00 15,000,000.00
16,000,000.00 16,000,000.00
13,000,000.00 13,000,000.00
14,000,000.00 14,000,000.00
15,000,000.00 15,000,000.00
12,000,000.00 12,000,000.00
10,000,000.00 10,000,000.00
35,000,000.00 35,000,000.00
5,000,000.00 5,000,000.00
Jumlah (a) 846,000,000.00
275,000.00 22,000,000.00
650,000.00 97,500,000.00
325,000.00 21,125,000.00
325,000.00 21,125,000.00
325,000.00 24,375,000.00
425,000.00 31,875,000.00
325,000.00 27,625,000.00
325,000.00 27,625,000.00
350,000.00 7,000,000.00
200,000.00 51,000,000.00
325,000.00 32,500,000.00
200,000.00 51,200,000.00
35,000.00 2,240,000.00
50,000.00 500,000.00
75,000.00 600,000.00
85,000.00 1,360,000.00
1,500.00 1,500,000.00
Jumlah (b) 421,150,000.00
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
410,250.00 99,690,750.00
410,250.00 2,051,250.00
434,000.00 39,060,000.00
1,150,350.00 43,713,300.00
1,630,350.00 6,521,400.00
125,000.00 1,875,000.00
400,000.00 10,800,000.00
123,000.00 14,637,000.00
110,000.00 440,000.00
375,000.00 11,250,000.00
450,000.00 13,500,000.00
1,200,000.00 2,400,000.00
550,000.00 2,200,000.00
6,000,000.00 24,000,000.00
5,000,000.00 20,000,000.00
95,000.00 1,995,000.00
48,000.00 1,296,000.00
50,000.00 100,000.00
75,000.00 150,000.00
55,000.00 1,375,000.00
60,000.00 480,000.00
65,000.00 5,330,000.00
450,000.00 4,500,000.00
125,000.00 4,750,000.00
250,000.00 1,250,000.00
255,977.50 38,396,625.00
1,500.00 3,000,000.00
1,215,100.00 2,430,200.00
45,000.00 135,000.00
Jumlah (c) 357,326,525.00
9,800,000.00 9,800,000.00
500,000.00 500,000.00
95,000.00 6,460,000.00
275,000.00 275,000.00
75,000.00 150,000.00
250,000.00 500,000.00
350,000.00 700,000.00
1,500,000.00 10,500,000.00
432,675.00 38,075,400.00
432,675.00 432,675.00
432,675.00 865,350.00
432,675.00 865,350.00
432,675.00 865,350.00
Jumlah (d) 69,989,125.00
3,750,000.00 11,250,000.00
3,500,000.00 3,500,000.00
1,250,000.00 1,250,000.00
1,500,000.00 1,500,000.00
1,500,000.00 1,500,000.00
650,000.00 650,000.00
750,000.00 750,000.00
105,000.00 4,410,000.00
175,000.00 6,300,000.00
250,000.00 750,000.00
950,000.00 950,000.00
443,600.00 18,631,200.00
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
443,600.00 17,300,400.00
500,000.00 2,000,000.00
443,600.00 1,774,400.00
Jumlah (e) 72,516,000.00
95,000,000.00 95,000,000.00
4,500,000.00 4,500,000.00
750,000.00 750,000.00
40,000.00 2,000,000.00
60,000.00 1,800,000.00
65,000.00 3,575,000.00
250,000.00 13,750,000.00
398,450.00 21,914,750.00
Jumlah (f) 143,289,750.00
TOTAL Lt. 01 1,910,271,400.00
410,250.00 111,588,000.00
410,250.00 4,512,750.00
434,000.00 36,890,000.00
1,150,350.00 41,412,600.00
1,630,350.00 9,782,100.00
95,000.00 2,565,000.00
250,000.00 6,750,000.00
123,000.00 12,546,000.00
110,000.00 4,840,000.00
6,000,000.00 24,000,000.00
550,000.00 9,900,000.00
375,000.00 6,750,000.00
450,000.00 13,950,000.00
15,000,000.00 15,000,000.00
48,000.00 1,056,000.00
55,000.00 1,925,000.00
60,000.00 240,000.00
65,000.00 4,810,000.00
450,000.00 4,950,000.00
125,000.00 4,500,000.00
250,000.00 2,750,000.00
255,977.50 33,277,075.00
1,500.00 3,000,000.00
75,000.00 1,500,000.00
45,000.00 90,000.00
Jumlah (a) 358,584,525.00
500,000.00 500,000.00
432,675.00 1,730,700.00
95,000.00 4,750,000.00
275,000.00 550,000.00
75,000.00 150,000.00
250,000.00 500,000.00
350,000.00 700,000.00
1,500,000.00 9,000,000.00
432,675.00 21,633,750.00
432,675.00 865,350.00
432,675.00 865,350.00
432,675.00 865,350.00
432,675.00 865,350.00
Jumlah (b) 42,975,850.00
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
443,600.00 443,600.00
105,000.00 3,360,000.00
175,000.00 4,725,000.00
250,000.00 500,000.00
443,600.00 14,195,200.00
443,600.00 12,864,400.00
Jumlah (c) 36,088,200.00
750,000.00 750,000.00
60,000.00 1,800,000.00
65,000.00 2,210,000.00
250,000.00 8,500,000.00
398,450.00 13,547,300.00
Jumlah (d) 26,807,300.00
TOTAL Lt. 02 464,455,875.00
410,250.00 30,358,500.00
434,000.00 20,832,000.00
1,150,350.00 17,255,250.00
6,000,000.00 18,000,000.00
95,000.00 2,755,000.00
145,000.00 435,000.00
450,000.00 900,000.00
375,000.00 5,625,000.00
95,000.00 1,140,000.00
750,000.00 6,750,000.00
500,000.00 500,000.00
48,000.00 384,000.00
50,000.00 50,000.00
55,000.00 605,000.00
60,000.00 120,000.00
65,000.00 3,120,000.00
125,000.00 1,875,000.00
255,977.50 15,358,650.00
1,500.00 1,500,000.00
75,000.00 3,000,000.00
45,000.00 90,000.00
Jumlah (a) 130,653,400.00
500,000.00 500,000.00
432,675.00 1,730,700.00
95,000.00 1,995,000.00
275,000.00 275,000.00
75,000.00 75,000.00
250,000.00 250,000.00
350,000.00 350,000.00
1,500,000.00 6,000,000.00
432,675.00 9,086,175.00
432,675.00 432,675.00
432,675.00 432,675.00
432,675.00 432,675.00
432,675.00 432,675.00
Jumlah (b) 21,992,575.00
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
443,600.00 443,600.00
105,000.00 1,575,000.00
175,000.00 1,750,000.00
250,000.00 500,000.00
443,600.00 6,654,000.00
443,600.00 5,323,200.00
Jumlah (c) 16,245,800.00
1,250,000.00 1,250,000.00
75,000.00 3,000,000.00
65,000.00 845,000.00
250,000.00 3,250,000.00
398,450.00 5,179,850.00
Jumlah (d) 13,524,850.00
410,250.00 20,922,750.00
125,000.00 1,250,000.00
1,500,000.00 54,000,000.00
550,000.00 2,750,000.00
48,000.00 48,000.00
55,000.00 110,000.00
15,000.00 11,250,000.00
550,000.00 550,000.00
45,000.00 180,000.00
2,500,000.00 10,000,000.00
3,500,000.00 56,000,000.00
750,000.00 20,250,000.00
141,745.33 4,252,360.00
Jumlah (f) 181,563,110.00
35,000,000.00 35,000,000.00
175,000.00 14,000,000.00
1,215,100.00 1,215,100.00
5,000.00 600,000.00
2,000,000.00 2,000,000.00
3,500,000.00 3,500,000.00
Jumlah (g) 56,315,100.00
TOTAL Lt. 03 420,294,835.00
JUMLAH II 2,795,022,110.00
LASI
AN BIAYA
UTAMA
DUNG DPRD - KABUPATEN MIMIKA
DUNG DPRD - KABUPATEN MIMIKA
JUMLAH
(Rp)
6,281,412,505.14
658,989,968.06
15,231,924,226.21
3,485,472,605.45
3,993,878,625.91
2,705,652,184.11
236,814,042.50
1,350,551,483.53
1,120,759,493.90
338,480,000.00
779,003,436.71
977,586,586.50
2,795,022,110.00
39,955,547,268.03
3,995,554,726.80
43,951,101,994.83
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
61,300.00 10,122,469.00
119,100.00 5,408,092.80
59,000.00 6,059,123.00
59,000.00 57,897,467.00
19,666.67 1,192,429.33
233,600.00 2,579,411.20
901,485.00 19,605,495.78
1,314,425.00 64,317,444.10
219,200.00 148,927,548.80
233,600.00 19,838,947.20
233,600.00 13,099,120.00
JUMLAH I 349,047,548.21
819,919.84 1,128,209.70
819,919.84 3,428,084.86
819,919.84 51,998,496.41
819,919.84 32,184,313.53
1,929,955.83 129,866,728.05
7,345,322.50 149,727,053.84
4,732,452.15 65,118,541.52
5,492,106.96 178,663,731.68
7,583,180.17 27,489,028.11
96,005.00 19,201,000.00
8,126,882.40 141,602,798.89
6,869,265.02 130,495,427.56
7,700,954.84 275,963,716.68
10,874,665.23 15,442,024.63
128,597.00 15,537,089.54
10,175,530.29 405,779,797.03
7,687,349.61 99,120,685.86
7,700,954.84 16,079,593.71
9,492,358.60 153,871,132.96
7,700,954.84 30,649,800.26
10,394,618.55 61,764,823.42
7,700,954.84 8,409,442.68
7,168,832.92 17,893,406.98
JUMLAH II 2,031,414,927.90
34,796.55 200,205,430.08
34,339.25 68,553,848.52
5,908,425.00 25,967,527.88
5,197,225.00 18,044,765.20
69,650.00 13,693,190.00
261,600.00 226,744,416.00
182,850.00 36,789,420.00
61,755.00 53,526,763.80
61,755.00 53,526,763.80
35,505.00 30,774,313.80
JUMLAH III 727,826,439.08
1,172,500.00 68,296,952.50
56,709.00 68,256,313.42
62,083.40 9,195,793.21
32,350.00 52,548,046.00
133,250.00 101,661,755.00
245,124.00 249,812,241.62
228,035.00 12,861,174.00
255,795.00 39,003,621.60
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
99,919.00 7,693,763.00
52,219.00 22,013,963.83
238,105.00 6,814,565.10
1,172,500.00 2,265,270.00
255,795.00 51,719,191.05
238,105.00 133,517,378.75
62,083.40 16,924,928.17
133,250.00 56,877,895.75
2,436,132.60 17,832,490.63
JUMLAH IV 917,295,343.63
6,799,000.00 9,668,178.00
572,000.00 24,051,456.00
773,382.50 17,912,312.08
347,782.50 7,720,771.50
90,110.00 127,683,617.25
79,255.00 95,260,943.53
47,735.00 2,465,990.10
251,750.00 41,125,880.00
33,805.00 36,809,926.45
27,805.00 11,355,562.00
3,493,085.63 533,848,276.07
442,787.40 5,313,448.80
JUMLAH V 913,216,361.78
321,130.00 1,284,520.00
252,350.00 4,542,300.00
200,927.50 1,205,565.00
171,800.00 687,200.00
317,782.50 1,271,130.00
82,782.50 7,947,120.00
51,855.00 4,770,660.00
42,782.50 3,935,990.00
27,782.50 1,277,995.00
609,275.00 6,092,750.00
JUMLAH VI 33,015,230.00
45,936.50 13,639,098.09
20,736.50 18,452,830.73
14,136.50 22,166,032.00
20,905.00 26,206,821.58
79,685.00 8,146,356.92
182,028.00 10,353,752.64
182,028.00 15,320,932.70
182,028.00 2,108,066.27
162,785.00 26,592,557.60
45,936.50 12,523,024.88
JUMLAH VII 155,509,473.41
1,250,000.00 40,525,000.00
251,750.00 24,032,558.50
162,855.00 15,546,464.01
29,605.00 2,517,609.20
29,605.00 1,582,091.20
241,505.00 14,979,106.12
103,875.00 5,551,080.00
162,785.00 15,539,781.67
329,475.00 12,065,374.50
30,805.00 1,646,219.20
162,785.00 2,273,943.67
JUMLAH VIII 136,259,228.07
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
64,860,374.27 64,860,374.27
16,684,816.35 16,684,816.35
282,778.50 34,018,254.05
270,000.00 48,600,000.00
2,750,000.00 38,500,000.00
JUMLAH IX 202,663,444.67
157,776.50 1,893,318.00
94,465.00 2,361,625.00
68,657.50 6,179,175.00
1,500,000.00 1,500,000.00
Jumlah (a) 11,934,118.00
75,693.50 2,270,805.00
50,506.00 757,590.00
45,292.00 1,132,300.00
39,190.50 313,524.00
26,965.50 107,862.00
1,000,000.00 1,000,000.00
Jumlah (b) 5,582,081.00
2,866,205.00 17,197,230.00
3,198,600.00 31,986,000.00
2,793,850.00 22,350,800.00
600,000.00 3,600,000.00
150,000.00 900,000.00
150,000.00 900,000.00
600,000.00 4,800,000.00
90,000.00 180,000.00
524,127.50 5,241,275.00
750,000.00 9,000,000.00
Jumlah (c) 96,155,305.00
6,000,000.00 12,000,000.00
12,000,000.00 24,000,000.00
500,000.00 2,500,000.00
400,000.00 3,200,000.00
1,000,000.00 1,000,000.00
26,965.50 485,379.00
Jumlah (d) 43,185,379.00
JUMLAH X 156,856,883.00
410,250.00 76,306,500.00
65,000.00 780,000.00
1,150,350.00 5,751,750.00
125,000.00 1,000,000.00
400,000.00 11,200,000.00
123,000.00 6,519,000.00
110,000.00 1,100,000.00
375,000.00 2,625,000.00
95,000.00 3,040,000.00
15,000,000.00 15,000,000.00
65,000.00 2,600,000.00
6,000,000.00 18,000,000.00
48,000.00 576,000.00
55,000.00 550,000.00
60,000.00 240,000.00
65,000.00 780,000.00
125,000.00 625,000.00
250,000.00 2,750,000.00
550,000.00 550,000.00
JUMLAH XI 149,993,250.00
LASI
AN BIAYA
RBA GUNA
349,047,548.21
2,031,414,927.90
727,826,439.08
917,295,343.63
913,216,361.78
33,015,230.00
155,509,473.41
136,259,228.07
202,663,444.67
156,856,883.00
149,993,250.00
5,773,098,129.74
577,309,812.97
6,350,407,942.71
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
61,300.00 4,413,600.00
59,000.00 1,327,500.00
119,100.00 3,683,167.50
59,000.00 3,209,600.00
19,666.67 571,906.67
219,200.00 27,356,160.00
233,600.00 4,737,408.00
233,600.00 2,359,944.00
901,485.00 8,113,365.00
1,314,425.00 36,146,687.50
43,000.00 5,366,400.00
JUMLAH I 97,285,738.67
819,919.84 2,847,171.65
819,919.84 7,446,675.98
1,929,955.83 14,132,487.58
819,919.84 2,623,743.49
5,010,456.07 21,544,961.09
4,814,849.88 13,000,094.67
7,345,322.50 28,206,038.40
1,929,955.83 11,672,372.88
9,492,358.60 32,896,717.98
7,949,478.02 41,973,243.94
12,401,177.24 73,476,975.12
10,874,665.23 57,418,232.42
128,597.00 5,272,477.00
96,005.00 8,448,440.00
JUMLAH II 320,959,632.21
1,172,500.00 23,680,044.50
56,709.00 22,906,182.83
62,083.40 1,986,668.80
32,350.00 14,102,173.75
62,083.40 9,905,096.05
32,350.00 5,161,280.75
238,105.00 5,434,151.36
52,219.00 720,622.20
228,035.00 18,790,084.00
133,250.00 10,979,800.00
62,083.40 5,115,672.16
JUMLAH III 118,781,776.40
5,908,425.00 6,676,520.25
3,767,225.00 7,007,038.50
69,650.00 5,572,000.00
261,600.00 72,986,400.00
182,850.00 6,582,600.00
90,110.00 18,923,100.00
79,255.00 16,643,550.00
47,735.00 763,760.00
33,805.00 6,226,881.00
JUMLAH IV 141,381,849.75
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
6,799,000.00 1,842,529.00
572,000.00 8,694,400.00
1,592,177.15 30,633,488.45
540,231.73 15,558,673.80
773,382.50 3,229,645.32
JUMLAH V 59,958,736.56
252,350.00 1,261,750.00
171,800.00 687,200.00
150,000.00 300,000.00
82,782.50 2,235,127.50
51,855.00 414,840.00
42,782.50 171,130.00
27,782.50 111,130.00
JUMLAH VI 5,181,177.50
20,736.50 9,039,558.76
20,905.00 4,390,050.00
14,136.50 3,541,193.25
182,028.00 1,973,183.52
182,028.00 6,218,804.59
182,028.00 626,176.32
182,028.00 5,242,406.40
JUMLAH VII 31,031,372.84
410,250.00 5,333,250.00
434,000.00 2,170,000.00
1,150,350.00 2,300,700.00
1,630,350.00 4,891,050.00
125,000.00 1,125,000.00
95,000.00 380,000.00
48,000.00 96,000.00
55,000.00 165,000.00
65,000.00 325,000.00
550,000.00 550,000.00
45,000.00 180,000.00
250,000.00 500,000.00
JUMLAH VIII 18,016,000.00
89,350.00 1,072,200.00
68,657.50 823,890.00
45,292.00 181,168.00
75,693.50 605,548.00
796,800.00 796,800.00
150,000.00 150,000.00
90,000.00 90,000.00
524,127.50 524,127.50
JUMLAH IX 4,243,733.50
LASI
AN BIAYA
ERVICE
JUMLAH
(Rp)
97,285,738.67
320,959,632.21
118,781,776.40
141,381,849.75
59,958,736.56
5,181,177.50
31,031,372.84
18,016,000.00
4,243,733.50
796,840,017.43
79,684,001.74
876,524,019.18
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
61,300.00 1,839,000.00
59,000.00 1,125,956.00
19,666.67 93,829.67
219,200.00 1,734,310.40
43,000.00 340,216.00
233,600.00 401,792.00
233,600.00 533,729.28
901,485.00 4,119,425.86
1,314,425.00 16,853,294.47
16,684,816.35 16,684,816.35
JUMLAH I 43,726,370.02
7,583,180.17 3,393,473.13
16,341,257.68 21,447,900.71
10,436,551.64 6,236,883.26
10,248,458.86 39,878,803.13
7,687,349.61 32,489,814.39
819,919.84 1,410,262.13
7,168,832.92 2,701,216.25
JUMLAH II 107,558,352.98
1,172,500.00 3,094,813.75
56,709.00 2,993,668.11
62,083.40 1,033,688.61
62,083.40 2,415,789.26
62,083.40 5,247,785.64
133,250.00 5,185,024.00
32,350.00 2,246,384.00
32,350.00 1,258,803.20
32,350.00 2,734,480.80
238,105.00 3,381,091.00
228,035.00 684,105.00
255,795.00 3,599,035.65
99,919.00 619,497.80
242,559.00 913,962.31
JUMLAH III 35,408,129.13
6,799,000.00 989,254.50
572,000.00 1,849,848.00
773,382.50 3,248,206.50
JUMLAH IV 6,087,309.00
252,350.00 504,700.00
82,782.50 496,695.00
51,855.00 518,550.00
27,782.50 138,912.50
42,782.50 427,825.00
JUMLAH V 2,086,682.50
45,936.50 7,647,508.52
20,736.50 990,105.67
182,028.00 1,059,402.96
182,028.00 1,177,357.10
182,028.00 378,618.24
JUMLAH VI 11,252,992.49
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
410,250.00 5,333,250.00
434,000.00 868,000.00
95,000.00 1,235,000.00
48,000.00 48,000.00
55,000.00 110,000.00
65,000.00 130,000.00
JUMLAH VII 7,724,250.00
89,350.00 6,701,250.00
68,657.50 961,205.00
45,292.00 181,168.00
75,693.50 605,548.00
796,800.00 796,800.00
150,000.00 150,000.00
90,000.00 90,000.00
524,127.50 524,127.50
JUMLAH VIII 10,010,098.50
LASI
AN BIAYA
2 UNIT
JUMLAH
(Rp)
43,726,370.02
107,558,352.98
35,408,129.13
6,087,309.00
2,086,682.50
11,252,992.49
10,010,098.50
216,129,934.62
432,259,869.25
43,225,986.92
475,485,856.17
HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
61,300.00 9,366,640.00
59,000.00 2,704,560.00
19,666.67 225,380.00
233,600.00 2,141,644.80
901,485.00 16,529,628.96
1,314,425.00 60,253,242.00
7,583,180.17 34,761,297.89
58,916.60 11,948,286.48
32,350.00 6,560,580.00
6,365,139.07 75,363,246.59
2,728,143.15 354,658,609.50
15,134,592.00 30,269,184.00
1,750,000.00 64,750,000.00
JUMLAH (a) 669,532,300.22
5,000.00 66,228,263.00
255,200.00 3,380,290,543.52
124,517.50 1,649,315,547.62
97,917.50 1,296,981,188.46
218,753.26 280,800,439.96
229,420.00 518,377,357.75
9,565,287.17 263,083,658.45
443,600.00 835,887,102.32
69,700.00 1,034,151,097.50
806,225.00 135,445,800.00
831,225.00 154,607,850.00
606,225.00 54,560,250.00
JUMLAH (b) 9,669,729,098.59
310,892.00 183,936,145.04
2,621,917.11 400,628,934.30
1,308,862.58 248,683,890.38
JUMLAH (c) 833,248,969.72
LASI
AN BIAYA
R/TAMAN, dan SALURAN
JUMLAH
(Rp)
669,532,300.22
9,669,729,098.59
833,248,969.72
11,172,510,368.53
RATAMA-
Engineer
ner
26 Fax (0967) 537216 - Jayapura
I TOTAL
AN BIAYA
DUNG DPRD - KABUPATEN MIMIKA
DUNG DPRD - KABUPATEN MIMIKA
JUMLAH
(Rp)
39,955,547,268.03
5,773,098,129.74
796,840,017.43
432,259,869.25
OMPLEK 11,172,510,368.53
58,130,255,652.97
5,813,025,565.30
63,943,281,218.27
63,943,280,000.00
H TIGA JUTA DUA RATUS DELAPAN
HARGA SATUAN YG
NO BAHAN BANGUNAN SAT DITETAPKAN (DALAM
KOTA)
1 2 3 11
1 Semen PC Sak
- Semen Gresik Sak 73,908
- Semen Tonasa Sak 73,908
- Semen Tiga Roda Sak 73,908
- Semen Bosowa Sak
2 Semen Putih zak 142,537
3 Kawat Ikat Kg 21,117
4 Besi Beton
- Besi Ø 6 staf 26,396
- Besi Ø 8 staf 42,233
- Besi Ø 10 staf 68,629
- Besi Ø 12 staf 89,746
5 Tripleks 3 mm Lbr 47,512
6 Tripleks 4 mm Lbr 68,629
7 Tripleks 5 mm Lbr
8 Tripleks 6 mm Lbr 105,583
9 Tripleks 9 mm Lbr 147,816
10 Tripleks 12 mm Lbr 190,049
11 Tripleks 18 mm Lbr 263,958
12 Teakwood Ukuran 122 X 244 Cm Lbr 174,212
13 Atap Seng BJLS 30 Lbr 73,908
14 Atap Seng BJLS 20 Lbr 39,066
15 Seng Plat BJLS 30 M 63,350
16 Seng Plat BJLS 20 M 42,233
17 Kaca Bening 3 mm M2 -
18 Kaca Bening 5 mm M2 184,770
19 Kaca Ryben 5 mm M2 227,003
20 Kaca Lover 7 Klip set 137,258
21 Kaca Lover 8 Klip set 161,014
22 Kaca Naco Lbr 14,254
23 Kunci 1 Slag Bh 47,512
24 Kunci 2 Slag Bh 211,166
25 Kunci Kuda Terbang 1 Slag Bh 63,350
26 Kunci Kuda Terbang 2 Slag Bh 73,908
27 Kunci Yale Besar Bh 158,375
28 Engsel H Jendela Psg 26,396
29 Engsel H Pintu Psg 36,954
30 Engsel Kupu2 R. Nilon Jendela Psg 17,245
31 Engsel Kupu2 Ring Nilon Pintu Psg 21,117
32 Expanyolet Bh -
33 Kunci Gembok Bh 36,954
34 Grendel Kecil Bh 8,447
35 Grendel sedang Bh 15,837
36 Grendel Besar Bh 26,396
37 Klosed duduk Keramik KIA Bh 1,900,494
38 Klosed duduk Keramik Biasa Bh 1,478,162
39 Klosed Jongkok merk TOTO Bh 263,958
40 Klosed Jongkok merk KIA Bh 211,166
41 Klosed Jongkok Biasa Bh 126,700
42 Wastafel Toto Set 1,003,039
43 Pompa Air Sanyo PH 100 Bh 1,055,830
44 Pompa Air Honda (Alkon) Bh 3,695,405
45 Kran Ledeng Bh 26,396
46 Paku Campuran Kg 19,005
47 Paku Tripleks Kg 21,117
49 Paku Seng Kg 26,396
50 Paku Jembatan Kg 31,675
51 Mur Baut 5 - 20 cm Btg 10,558
52 Besi Siku 20. 20 6m Btg 73,908
53 Besi Siku 30 .30 6m Btg 95,025
54 Besi Siku 40 .40 6m Btg 121,420
55 Besi Siku 40 . 40 6 m Btg -
56 Besi Siku 50 . 50 6m Btg 211,166
57 Pipa PVC Diameter 1/2" - 4 m Btg 19,005
58 Pipa PVC Diameter 3/4" - 4 m Btg 24,284
59 Pipa PVC Diameter 1" - 4 m Btg 31,675
60 Pipa PVC Diameter 2" - 4 m Btg 52,792
61 Pipa PVC Diameter 3" - 4 m Btg 89,746
62 Pipa PVC Diameter 4" - 4 m Btg 121,420
63 Pipa PVC Diameter 5" - 4 m Btg 263,958
64 Pipa PVC Diameter 6" - 4 m Btg 290,353
65 Kopling PVC 2" - 4" Bh 21,117
66 Kopling PVC 4" - 6" Bh 89,746
67 Pipa GIV Diameter 1/2" -6 m Btg 174,212
68 Pipa GIV Diameter 3/4" -6 m Btg 205,887
69 Pipa GIV Diameter 1" - 6 m Btg 263,958
Pipa GIV Diameter 1,5"- 6m Btg 422,332
70 Pipa GIV Diameter 2" - 6 m Btg 527,915
71 Pipa GIV Diameter 3" - 6 m Btg 1,055,830
72 Pipa Leding Diameter 1/2" Btg -
73 Cat Tembok Kg -
- Merk Avitex pail 322,028
- Merk Aries pail 121,420
- Merk Altex pail 311,470
Merk Lainnya: -
- Beauty Color pail -
- Metrolite pail -
- Jatilux pail -
74 Cat Vernis / Politur Klg 51,736
75 Cat Kilat Kayu / Cat Besi ( Avian) Klg 41,177
76 Cat Dasar / Cat Meni Klg 21,117
77 Melamine IMPRA Ltr 52,792
78 Cat Residu Kg 21,117
HARGA SATUAN YG
NO BAHAN BANGUNAN SAT
DITETAPKAN
79 Cat Alluminium Klg 52,792
80 Plamur Tembok Kg 10,558
81 Dempul Klg 21,117
82 Cat Meni Klg 26,396
83 Amplas Lbr 4,223
84 Thinner Kg 26,396
85 Lem Kayu bks 36,954
86 Lem Aibon kg 47,512
87 Kuas Biasa Bh 15,837
88 Kuas Roll (Besar) Bh 21,117
89 Lampu Tl 20 Watt Bh 89,746
90 Lampu Tl 40 Watt Bh 116,141
91 Lampu Pijar 10-100 Watt+Vitting Bh 21,117
92 Vitting Bh 15,837
93 Saklar Doble Bh 21,117
94 Saklar Tunggal Bh 21,117
95 Stop Kontak 5.000 Watt Bh 21,117
96 Stop Kontak 1.000 Watt Bh 26,396
97 MCB (Miniatur Circuit Breaker) Bh 68,629
98 Sekring Otomatis Bh 52,792
99 Box MCB Grup 79,187
100 Kabel NYA 2,5 X 2 mm M' 8,447
101 Tegel Keramik 30/30 M2 63,350
102 Tegel Keramik 10/20 M2 52,792
103 Tegel Mozaik 30/30 M2 52,792
104 Tegel Teraso 30/30 M2 58,071
105 Tegel PC Abu-abu 20/20 M2 52,792
106 Paving Block Bh -
107 Gypsum Lbr 89,746
108 Genteng Metal Lbr 100,304
109 Bubungan Genteng Metal Bh 47,512
110 Polycarbonate M2 -
111 Lumbersharing Lbr 26,396
112 Tandon 1100Ltr bh -
113 Batu Alam Palimanan Bh 15,837
114 Lis Plafon M' 5,279
115 Balok Kayu Klas I m3 2,700,000
116 Papan Kayu Klas I m3 3,100,000
117 Balok Kayu Klas II m3 1,500,000
118 Papan Kayu Klas II m3 1,600,000
119 Split 1-2 m3 1,000,000
120 Split 2-3 m3 1,000,000
121 Split 3-5 m3 850,000
122 Batu Kali m3 425,000
123 Pasir Beton m3 180,000
124 Pasir Pasang m3 220,000
125 Sirtu m3 155,000
126 Tanah Timbunan m3 85,000
127
128
DAFTAR UPAH
CATATAN:
* DATA PER 21 AGUSTUS 2010. SEWAKTU-WAKTU HARGA
DAPAT MENGALAMI PERUBAHAN
* BESARAN BIAYA TIBA DI LOKASI DAN HARGA KHUSUS
DALAM KOTA TIMIKA
* UNTUK LUAR KOTA, SETIAP HARGA SATUAN BAHAN BANGUNAN
DIKALIKAN KOEFISIEN BOBOT PERTAMBAHAN BIAYA PER KM YAITU 0,0558
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L.
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 225,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam
c. Harga Alat (*) B' 225,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 17.00 % / Tahun
2. Upah Operator / Sopir U1 13,125.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 9,375.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 6,000.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
KET.
E23
Alat Baru
Alat Baru
Alat Baru
Analisa EI-322
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Pemadatan TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK
A. TENAGA
B. PERALATAN
1 Motor Grader (E13) Jam 0.0117 516,234.49
2 Vibro Roller (E19) Jam 0.0214 364,199.92
3 Water Tanker (E23) Jam 0.0070 240,845.30
4 Alat Bantu Ls 0.0150 75,000.00
TUAN
:
:
:
JUMLAH
HARGA
(Rp.)
5,354.75
1,963.41
7,318.16
6,046.92
7,800.80
1,692.69
1,125.00
16,665.41
23,983.57
ANALISA HARGA DASAR SATUAN BAHAN
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi L 30.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 1.00 menit
- Lain-lain T2 0.50 menit
Ts1 1.50 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 12.45 M3 / Jam
Ts1
File : 394808568.xlsx
AN BAHAN
HARGA SATUAN
(Rp.)
50,000.00
735,384.35
284,578.42
File : 394808568.xlsx
File : 394808568.xlsx
RENCANA ANGGARAN BIAYA
UNIT GEDUNG UTAMA
KEGIATAN : REVIEW DESIGN PERENCANAAN GEDUNG DPRD - KABUPATEN MIMIK
PEKERJAAN : GEDUNG UTAMA
LOKASI : KOTA TIMIKA
TAHUN ANGGAR : 2009
VOLUME
NO JENIS PEKERJAAN SAT
RAB AWAL REAL
1 2 3
I. UNIT GEDUNG UTAMA
A. PEKERJAAN CIVIL
I. PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi (Perataan) M2 34,828.69 #REF!
2 Pek. Urugan Sirtu Timbunan pada Lokasi M3 24,380.08 #REF!
3 Pek. Pemadatan Tanah pada Lokasi M3 24,380.08 #REF!
4 Pek. Pagar Seng (Pagar Pengaman Lokasi) M' 370.75 #REF!
5 Pek. Pembuatan Direksi Keet M2 36.00 #REF!
6 Pek. Papan Nama Proyek Unit 1.00 #REF!
###
1 ### ### ### #REF!
2 ### ### ### #REF!
3 ### ### ### #REF!
4 ### ### ### #REF!
5 ### ### ### #REF!
6 ### ### ### #REF!
7 ### ### ### #REF!
8 ### ### ### #REF!
9 ### ### ### #REF!
10 ### ### ### #REF!
11 ### ### ### #REF!
12 ### ### ### #REF!
13 ### ### ### #REF!
14 ### ### ### #REF!
15 ### ### ### #REF!
16 ### ### ### #REF!
17 ### ### ### #REF!
18 ### ### ### #REF!
19 ### ### ### #REF!
d. PEKERJAAN LANTAI 04
. Pek. Balok B.21 (35/70) M3 2.37 #REF!
. Pek. Balok B.27 (25/45) M3 0.64 #REF!
. Pek. Balok B.28 (30/50) M3 8.19 #REF!
. Pek. Balok B.29 (30/50) M3 12.33 #REF!
. ### ### #REF!
. ### ### #REF!
. Pek. Balok B.30 (30/50) M3 3.60 #REF!
. Pek. Balok B.31 (30/50) M3 14.13 #REF!
. ### ### #REF!
. ### ### #REF!
. Pek. Ringbalk RB. 4 (30/50) M3 2.40 #REF!
. ### ### #REF!
. Pek. Ringbalk RB. 10 (20/30) M3 3.39 #REF!
. Pek. Ringbalk RB. 11 (30/60) M3 5.38 #REF!
. Pek. Ringbalk RB. 12 (30/60) M3 4.18 #REF!
. Pek. Ringbalk RB. 13 (20/30) M3 2.11 #REF!
. Pek. Ringbalk RB. 15 (30/60) M3 15.74 #REF!
. Pek. Ringbalk RB. 16 (30/50) M3 1.80 #REF!
. Pek. Ringbalk RB. 17 (30/50) M3 2.76 #REF!
. Pek. Ringbalk RB. 18 (20/30) M3 6.00 #REF!
. Pek. Ringbalk RB. 19 (25/45) M3 0.95 #REF!
. Pek. Kolom K.1 (45 x 45) M3 10.45 #REF!
. Pek. Kolom K.3 (45 x 45) M3 3.40 #REF!
. Pek. Kolom K.5 (30 x 30) M3 2.27 #REF!
. Pek. Kolom Ø 45 M3 1.40 #REF!
. Pek. Kolom Praktis 12/15 M' 254.00 #REF!
. ### ### #REF!
. Pek. Atap Dak Beton M3 25.81 #REF!
. Pek. Beton Sirip M3 3.20 #REF!
. Pek. Kolom Tumpuan Kuda-kuda M3 0.72 #REF!
. Pek. Listplank Beton M3 14.21 #REF!
b. PEKERJAAN LANTAI 02
1 Pek. Dinding Tembok 1 : 4 M3 221.45 #REF!
2 Pek. Pasang Loster Keramik 30/30 M2 31.00 #REF!
3 Pek. Plesteran 1 : 4 M2 4,428.99 #REF!
4 Pek. Plesteran Kolom 1 : 3 M2 379.47 #REF!
5 Pek. Acian Dinding dan Kolom M2 4,868.46 #REF!
6 ### ### 86.76 #REF!
7 ### ### #REF!
8 ### ### #REF!
9 ### ### #REF!
10 ### ### #REF!
11 ### ### #REF!
12 ### ### #REF!
13 ### ### #REF!
14 ### ### #REF!
15 ### ### #REF!
16 Pek. Urugan Pasir dibawah Lantai M3 254.07 121.62
17 Pek. Cor Spesie Tebal = 3 cm M3 76.22 72.97
18 Pek. Pasang Keramik 60/60 cm M2 2,453.94 2,357.69
19 Pek. Pasang Keramik 20/20 (KM/WC) M2 86.76 74.74
20 Pek. Pasang Dinding Keramik 20/25 (KM/WC) M2 312.88 308.57
21 Pek. Pasang Keramik Tangga M2 67.20 67.20
22 Pek. List Border Keramik 10/20 cm M' 119.27 119.27
c. PEKERJAAN LANTAI 03
1 Pek. Dinding Tembok 1 : 4 M3 124.46 #REF!
2 Pek. Plesteran 1 : 4 M2 2,489.23 #REF!
3 Pek. Plesteran Kolom 1 : 3 M2 289.72 #REF!
4 Pek. Acian Dinding dan Kolom M2 2,778.95 #REF!
5 Pek. ### M2 425.01 #REF!
6 Pek. ### M2 458.96 #REF!
7 ### ### M2 #REF!
8 ### ### M2 #REF!
9 ### ### M2 #REF!
10 ### ### M2 #REF!
11 ### ### M2 #REF!
12 Pek. Urugan Pasir dibawah Lantai M3 102.19 51.10
13 Pek. Cor Spesie Tebal = 3 cm M3 30.66 30.66
14 Pek. Pasang Keramik 60/60 cm M2 987.99 995.02
15 Pek. Pasang Keramik 20/20 (KM/WC) M2 33.95 27.07
16 Pek. Pasang Dinding Keramik 20/25 (KM/WC) M2 101.12 93.76
17 Pek. List Border Keramik 10/20 cm M' 53.35 53.35
d. PEKERJAAN LANTAI 04
1 Pek. ### M3 57.31 #REF!
2 Pek. ### M2 1,146.26 #REF!
3 Pek. ### M2 137.05 #REF!
4 Pek. ### M2 1,283.31 #REF!
5 Pek. ### M2 135.18 #REF!
6 Pek. ### M2 135.18 #REF!
7 ### ### M2 #REF!
8 ### ### M2 #REF!
9 ### ### M2 #REF!
10 ### ### M2 #REF!
#REF!
b. PEKERJAAN LANTAI 02
1 Pek. Kusen Pintu dan Jendela M3 5.06 5.20
2 Pek. Pintu Utama (ukiran) Lapis Granit Set 1.00 1.00
3 Pek. Pintu Panil Kaca M2 35.83 35.83
4 Pek. Pintu Panil Kayu M2 62.49 62.49
5 Pek. Pintu Double Teakwood + Kaca M2 13.61 13.61
6 Pek. Jendela Kaca Buka 5 mm M2 83.81 83.81
7 Pek. Jendela Kaca Mati M2 45.98 45.98
8 Pek. Rangka Dinding Partisi (Kayu Besi) M2 589.30 156.18
Pek. Rangka Dinding Triplex M2 151.68
Pek. Rangka Dinding Hias (DH) M2 151.68
Pek. Rangka Plafon Gipsum M2 1,333.46
Pek. Rangka Plapon Triplex M2 80.83
Pek. Rangka Plapon Lambersering M2 21.14
9 Pek. Dinding Gypsum M2 1,178.61 312.36
10 Pek. Dinding Tripleks 6 mm M2 151.68 151.68
11 Pek. Dinding Hias Lapis Sungkai M2 151.68 151.68
12 Pek. Stiker Sand Blasting M2 52.08 52.08
13 Pek. Plafon Gypsum + Rangka M2 1,546.48 1,333.46
14 Pek. Plafon Tripleks 6 mm M2 86.76 80.83
15 Pek. Plafon Hias Lapis Sungkai M2 907.46 1,538.38
26 Pek. Plapfon Lambersering M2 38.42 21.14
16 Pek. List Profil Plafon M' 275.48 275.48
17 Pek. List Plint Kayu M' 1,275.48 1,275.48
18 Pek. List Plafon 8 cm M' 1,075.48 1,075.48
19 Pek. List Profil Dinding 5 cm M' 1,275.48 1,275.48
20 Pek. List Papan pada Dinding dibawah Plafon M' 1,275.48 1,275.48
21 Pek. Railing Stainless Tangga Utama type 2 M' 14.00 14.00
22 Pek. Railing Stainless Tangga Samping 2 Unit type 3 M' 19.70 19.70
23 Pek. Railing Balkon Depan (pada Entrance) M' 12.00 12.00
24 Pek. Pintu Panil + Jalusi M2 3.40 3.40
25 Pek. Jendela Kaca Bovenlight M2 6.80 6.80
c. PEKERJAAN LANTAI 03
1 Pek. Kusen Pintu dan Jendela M3 2.97 3.19
2 Pek. Pintu Panil Kaca M2 34.02 34.02
3 Pek. Pintu Panil Kayu M2 16.59 16.59
4 Pek. Pintu Double Teakwood + Kaca M2 4.54 4.54
5 Pek. Jendela Kaca Buka 5 mm M2 79.77 79.77
6 Pek. Jendela Kaca Mati M2 18.60 18.60
Pek. Rangka Dinding Partisi (Kayu Besi) M2 165.25
Pek. Rangka Plafon Gipsum M2 1,055.53
Pek. Rangka Plapon Triplex M2 32.42
Pek. Rangka Plapon Lambersering M2 28.06
Pek. Dinding Gypsum M2 330.50
7 Pek. Stiker Sand Blasting M2 18.60 18.60
8 Pek. Plafon Gypsum + Rangka M2 987.99 1,055.53
9 Pek. Plafon Tripleks 6 mm M2 33.95 32.42
16 Pek. Plapfon Lambersering M2 28.06 28.06
10 Pek. List Plint Kayu M' 302.91 302.91
11 Pek. List Plafon 8 cm M' 352.91 352.91
12 Pek. List Profil Dinding 5 cm M' 302.91 302.91
13 Pek. List Papan pada Dinding dibawah Plafon M' 302.91 302.91
14 Pek. Railing Stainless Tangga Utama type 4 M' 5.50 5.50
15 Pek. Jendela Kaca Bovenlight M2 2.00 2.00
17 Pek. Kusen Lt. 04 M3 1.00 1.41
18 Pek. Jendela Kaca Mati M2 33.12 33.12
b. PEKERJAAN LANTAI 02
1 Pek. Kunci Pintu Kayu (Ruangan) Set 34.00 34.00
2 Pek. Kunci Cylinder (KM/WC) Set 14.00 14.00
3 Pek. Kunci Pintu Double Set 10.00 10.00
4 Pek. Handle Pintu Double Psg 10.00 10.00
5 Pek. Door Closer Psg 48.00 48.00
6 Pek. Door Stop Psg 32.00 32.00
7 Pek. Engsel Pintu Stainless 4 " Bh 207.00 207.00
8 Pek. Grendel Tanam Pintu Double Psg 11.00 11.00
9 Pek. Engsel Jendela Stainless 3 " Psg 141.00 141.00
10 Pek. Grendel Jendela Bh 141.00 141.00
11 Pek. Hak Angin Psg 141.00 141.00
c. PEKERJAAN LANTAI 03
1 Pek. Kunci Pintu Kayu (Ruangan) Set 10.00 10.00
2 Pek. Kunci Cylinder (KM/WC) Set 3.00 3.00
3 Pek. Door Closer Psg 20.00 20.00
4 Pek. Door Stop Psg 17.00 17.00
5 Pek. Engsel Pintu Stainless 4 " Bh 99.00 99.00
6 Pek. Engsel Jendela Stainless 3 " Psg 124.00 124.00
7 Pek. Grendel Jendela Bh 124.00 124.00
8 Pek. Hak Angin Psg 124.00 124.00
9 Pek. Kunci Pintu Double Set 10.00 10.00
10 Pek. Handle Pintu Double Psg 10.00 10.00
b. PEKERJAAN LANTAI 02
1 Cat Tembok Bagian Dalam
Pek. Cat Dinding Tembok bagian Dalam M2 4,197.74 3,092.46
Pek. Cat Kolom M2 426.00
Pek. Cat Lisplng Pembatas Plafon M2 314.22
Pek. Cat Plat Tangga M2 85.66
Pek. Cat Balok Exphose M2 142.20
2 Cat Tembok Bagian Luar
1 Pek. Cat Dinding Tembok bagian Luar (Dulux) M2 816.43 470.62
Pek. Cat Kolom M2 262.93
Pek. Cat Lisplng dan talang beton M2 417.81
Pek. Cat Plat Kanopy M2 295.27
Pek. Cat Sirip Beton M2 175.76
2 Pek. Cat Duco Kusen Pintu dan Jendela Kayu M2 202.46 207.90
3 Pek. Cat Plafon Gypsum dan Tripleks M2 1,633.23 1,414.29
4 Pek. Cat Meny Rangka Plafon M2 1,633.23 #REF!
5 Pek. Cat Compound Dinding Gypsum M' 738.00 195.59
6 Pek. Cat Compound Plafon Gypsum M' 2,043.00 1,761.59
7 Pek. Cat Melamin Dinding Hias Lapis Sungkai M2 151.68 151.68
8 Pek. Cat Melamin Plafon Hias M2 907.46 907.46
9 Pek. Cat Melamin List Papan dibawah Dinding M2 255.10 255.10
10 Pek. Cat Duco Pintu Panil + Jalusi M2 6.80 6.80
11 Pek. Cat Duco Pintu Panil Kaca M2 17.91 17.91
12 Pek. Cat Duco Pintu Panil M2 124.97 124.97
13 Pek. Cat Duco Pintu Double Teakwood + Kaca M2 13.90 13.90
14 Pek. Cat Duco Jendela Kaca Buka M2 41.91 41.91
15 Pek. Cat Duco Pintu Lambersering M2 38.42 38.42
16 Pek. Cat Dinding Gypsum M2 1,178.61 464.04
Pek. Cat Lisplank kayu M2 70.60
c. PEKERJAAN LANTAI 03
1 Pek. Cat Dinding Tembok bagian Dalam M2 2,243.76 2,243.76
2 Pek. Cat Dinding Tembok bagian Luar (Dulux) M2 2,154.53 2,154.53
3 Pek. Cat Duco Kusen Pintu dan Jendela Kayu M2 118.74 118.74
4 Pek. Cat Plafon M2 1,021.94 1,021.94
5 Pek. Cat Meny Rangka Plafon M2 1,021.94 1,021.94
6 Pek. Cat Compound Plafon Gypsum M' 1,278.00 1,278.00
7 Pek. Cat Melamin List Papan dibawah Dinding M2 60.58 60.58
8 Pek. Cat Duco Pintu Panil Kaca M2 17.01 17.01
9 Pek. Cat Duco Pintu Panil M2 33.18 33.18
10 Pek. Cat Duco Pintu Double Teakwood + Kaca M2 4.63 4.63
11 Pek. Cat Duco Jendela Kaca Buka M2 39.89 39.89
12 Pek. Cat Duco Pintu Lambersering M2 28.06 28.06
13 Pek. Cat Duco Kusen Lt. 04 M 40.00 40.00
Pek. Cat Lisplank kayu M2 25.41
b. PEKERJAAN LANTAI 02
1 Pek. Ornamen Ukiran pada Dinding Border M' 284.24 284.24
2 Pek. Ornamen Ukiran pada Papan Nama Ruangan Unit 56.00 56.00
3 Pek. Ornamen Ukiran pada Pintu Kayu Unit 54.00 54.00
4 Pek. Ornamen Ukiran pada Kolom Unit 124.00 124.00
5 Pek. Pasang Papan Penunjuk Ruangan Unit 36.00 36.00
6 Pek. Pasang Wallpaper M2 1,180.24 1,180.24
7 Pek. Pasang Border Wallpaper M' 234.00 234.00
c. PEKERJAAN LANTAI 03
1 Pek. Ornamen Ukiran pada Dinding Border M' 120.72 120.72
2 Pek. Ornamen Ukiran pada Papan Nama Ruangan Unit 24.00 24.00
3 Pek. Ornamen Ukiran pada Pintu Kayu Unit 26.00 26.00
4 Pek. Ornamen Ukiran pada Kolom Unit 36.00 36.00
5 Pek. Pasang Papan Penunjuk Ruangan Unit 29.00 29.00
6 Pek. Pasang Wallpaper M2 686.74 686.74
7 Pek. Pasang Border Wallpaper M' 76.20 76.20
X. PEKERJAAN EXTERIOR
1 Pek. Ornamen Ukiran (Fiber pada Sirip Beton) Unit 92.00 92.00
2 Pek. List Profil Beton pada Listplank M' 864.00 864.00
2 Pek. Profil pada Kolom Lot 10.00 10.00
3 Pek. Pas. Batu alam/Batu candi Dinding Ramp Depan m2 215.00
Pek. Vergola Enterance Depan m2 70.52
Pek. Plapon Kerawang Enterace Depan m2 67.56
Pek. Flesing Alcubond Lantai 3 Bgian Belakang m 114.75
c. PEKERJAAN SANITAIR
1 Closet duduk (lengkap) set 9.00 9.00
2 Urinoir bh 4.00 4.00
3 Washtafel Meja bh 6.00 6.00
4 Shower Spray bh 9.00 9.00
5 Soap Holder bh 9.00 9.00
6 Double Robe Hock bh 9.00 9.00
7 Cermin Toilet bh 6.00 6.00
8 Kran dinding bh 9.00 9.00
9 Floor drain bh 9.00 9.00
10 Partition Plate bh 3.00 3.00
PEKERJAAN LANTAI 02
a. PEK. INSTALASI PIPA AIR BERSIH
1 Pipa GIP medium Ø 1 ¼ " m 45.00 45.00
Ø1" m 75.00 75.00
ؽ" m 315.00 315.00
2 Knie GIP Ø1¼" bh 10.00 10.00
Ø1" bh 17.00 17.00
ؽ" bh 200.00 200.00
3 Testik GIP Ø1¼" x 1" bh 7.00 7.00
Ø1" x ½" bh 12.00 12.00
ؽ" bh 30.00 30.00
4 Sock GIP Ø1¼" bh 10.00 10.00
Ø1" bh 20.00 20.00
ؽ" bh 40.00 40.00
5 Double Nepple Ø1¼" bh 10.00 10.00
Ø1" bh 15.00 15.00
ؽ" bh 30.00 30.00
6 Over sock GIP Ø1½" x 1" bh 3.00 3.00
Ø1" x ½" bh 2.00 2.00
7 Water Mor Ø1¼" bh 4.00 4.00
Ø1" bh 6.00 6.00
ؽ" bh 30.00 30.00
8 Boult Valve Ø1¼" bh 2.00 2.00
9 Seal tape dos 70.00 70.00
c. PEKERJAAN SANITAIR
1 Closet duduk (lengkap) set 15.00 15.00
2 Urinoir bh 9.00 9.00
3 Washtafel Meja bh 10.00 10.00
4 Shower Spray bh 15.00 15.00
5 Soap Holder bh 15.00 15.00
6 Double Robe Hock bh 15.00 15.00
7 Cermin Toilet bh 10.00 10.00
8 Kran dinding bh 15.00 15.00
9 Floor drain bh 15.00 15.00
10 Partition Plate bh 7.00 7.00
PEKERJAAN LANTAI 03
a. PEK. INSTALASI PIPA AIR BERSIH
1 Pipa GIP medium Ø 3 " m 25.00 25.00
Ø1¼" m 6.00 6.00
Ø1" m 12.00 12.00
ؽ" m 70.00 70.00
2 Knie GIP Ø1¼" x ½" bh 6.00 6.00
Ø1" bh 10.00 10.00
ؽ" bh 35.00 35.00
3 Testik GIP Ø2" bh 2.00 2.00
Ø1" x ½" bh 10.00 10.00
ؽ" bh 15.00 15.00
4 Sock GIP Ø1¼" bh 2.00 2.00
Ø1" bh 3.00 3.00
ؽ" bh 15.00 15.00
5 Double Nepple Ø1¼" bh 5.00 5.00
Ø1" bh 7.00 7.00
ؽ" bh 12.00 12.00
6 Over sock GIP Ø1¼" x 1" bh 3.00 3.00
Ø1" x ½" bh 4.00 4.00
7 Water Mor Ø2" bh 2.00 2.00
Ø1" bh 4.00 4.00
ؽ" bh 15.00 15.00
8 Boult Valve Ø3" bh 2.00 2.00
Ø1¼" bh 1.00 1.00
9 Seal tape dos 50.00 50.00
b. PEK. PIPA AIR KOTOR BEKAS
1 Pipa PVC AW Ø4" m 30.00 30.00
Type D Ø3" m 15.00 15.00
Ø2" m 25.00 25.00
Ø1½" m 8.00 8.00
Ø1" m 4.00 4.00
2 Knie PVC Ø4" bh 20.00 20.00
Ø2" bh 20.00 20.00
Ø1½" bh 10.00 10.00
Ø1" bh 5.00 5.00
3 Testik PVC Ø4" x 2" bh 2.00 2.00
4 Ty 90 º Ø4" bh 3.00 3.00
Ø2" bh 4.00 4.00
Ø3" x 2" bh 3.00 3.00
5 Over sock PVC Ø 3 " x 2 " bh 2.00 2.00
Ø2" x 1½" bh 4.00 4.00
Ø2" x 1" bh 2.00 2.00
6 Knie PVC 45 º Ø 4 " bh 4.00 4.00
Ø3" bh 6.00 6.00
Ø2" bh 6.00 6.00
7 Shock Drat Dalam Ø 2 " bh 5.00 5.00
8 Knie PVC type D Ø 3 " bh 6.00 6.00
9 Testik PVC type D Ø 3 " bh 2.00 2.00
c. PEKERJAAN SANITAIR
1 Closet duduk (lengkap) set 3.00 3.00
2 Urinoir bh 4.00 4.00
3 Washtafel Meja bh 2.00 2.00
4 Shower Spray bh 3.00 3.00
5 Soap Holder bh 3.00 3.00
6 Double Robe Hock bh 3.00 3.00
7 Cermin Toilet bh 2.00 2.00
8 Kran dinding bh 3.00 3.00
9 Floor drain bh 5.00 5.00
10 Partition Plate bh 3.00 3.00
g. PEKERJAAN HYDRANT
1 Fleksible joint dia 4" Bh 2.00 2.00
2 Air relief valve Bh 1.00 1.00
3 Jocky Pump unit 1.00 1.00
4 Electric Pump unit 1.00 1.00
5 Pressure Switch Bh 2.00 2.00
6 Pressure Tank Bh 2.00 2.00
7 Gate Valve dia. 4" Flens 10 K bh 7.00 7.00
8 Straner 4" merk Kitz Flens 10 K bh 1.00 1.00
9 Fot Valve 4" merk Socla PN 16 bh 1.00 1.00
10 Check Valve 4 " merk KitzFlens 10 K bh 1.00 1.00
11 Hydrant Pilar 3 " One Way bh 10.00 10.00
12 Pressure Gauge dia. 3 " bh 1.00 1.00
13 Knee Las 4 " (Elbow GIP 90° 4 ") bh 35.00 35.00
14 Flange Buta 8 " bh 2.00 2.00
15 Flange 8 " bh 2.00 2.00
16 Flange 4 " bh 26.00 26.00
17 Fire Hose Box (komplit) untuk Hydrant Pilar Roll 10.00 10.00
18 Hydrant Box (komplit) Fire Hose 35 m unit 5.00 5.00
19 Pipa GIP medium Ø 4 " m 340.00 340.00
Ø3" m 250.00 250.00
Ø2" m 170.00 170.00
20 Knee Las Ø4" bh 70.00 70.00
Ø3" bh 60.00 60.00
Ø2" bh 100.00 100.00
21 Testik Las Ø4"x 3" bh 10.00 10.00
Ø3"x 2" bh 27.00 27.00
Ø2" bh 15.00 15.00
22 Over Shock Las Ø 3 " x 2 " bh 15.00 15.00
23 Shock Gip Ø2" bh 50.00 50.00
II. PEKERJAAN ELEKTRIKAL
PEKERJAAN LANTAI 01
a. PEKERJAAN PANEL dan DAYA
1 Pek. Penyambungan Daya dan KWH meter Digital Unit 1.00 1.00
2 Pek. Panel LVMDP 1 Utama + AMF Unit 1.00 1.00
3 Pek. Panel LVMDP 2 Unit 1.00 1.00
4 Pek. Panel Pompa (Hydrant) Star Delta Unit 1.00 1.00
5 Pek. Panel Penerangan, Stop Kontak Lantai 01 Unit 1.00 1.00
6 Pek. Panel AC Lantai 01 Unit 1.00 1.00
7 Pek. Panel Penerangan, Stop Kontak Lantai 02 Unit 1.00 1.00
8 Pek. Panel AC Lantai 02 Unit 1.00 1.00
9 Pek. Panel Penerangan, Stop Kontak Lantai 03 Unit 1.00 1.00
10 Pek. Panel AC Lantai 03 Unit 1.00 1.00
11 Pek. Panel Penerangan Outdoor Unit 1.00 1.00
12 Pek. Panel Penerangan Gedung Serba Guna Unit 1.00 1.00
13 Pek. Panel AC Gedung Serba Guna Unit 1.00 1.00
14 Pek. Panel Pompa Hydrant Unit 1.00 1.00
15 Pek. Panel Power Hose / Genset Unit 1.00 1.00
c. PEKERJAAN INSTALASI
1 Pek. Instalasi Titik Cahaya Lampu Titik 243.00 243.00
2 Pek. Instalasi Titik Exhaust Fan Titik 5.00 5.00
3 Pek. Instalasi Titik Stop Kontak Titik 90.00 90.00
4 Pek. Instalasi Power AC 1 Phase Titik 38.00 38.00
5 Pek. Instalasi Power AC 3 Phase Titik 4.00 4.00
6 Pek. Armatur : 0.00
- Lampu TL 1 x 36 Watt Balok Outbow Unit 15.00 15.00
- Lampu TL 2 x 36 Watt Inbow Unit 27.00 27.00
- Lampu Down Light Silver 150 PLC 18 Watt Unit 119.00 119.00
- Lampu Down Light Gold 150 Unit 4.00 4.00
- Lampu Baret 32 Watt Kap Kaca (LB 2) Unit 30.00 30.00
- Lampu Baret 40 Watt Kap Kaca (LB 1) Unit 30.00 30.00
- Lampu Sorot 500 Watt Unit 2.00 2.00
- Lampu Dinding Unit 4.00 4.00
- Lampu Hias (LH 1) Bh 4.00 4.00
- Lampu Hias (LH 2) Bh 4.00 4.00
- Lampu Fitting PLC Bh 21.00 21.00
- Saklar Tunggal Bh 27.00 27.00
- Saklar Tunggal Tukar Bh 2.00 2.00
- Saklar Seri Tukar Bh 2.00 2.00
- Saklar Seri Bh 25.00 25.00
- Saklar Triple Bh 8.00 8.00
- Stop Kontak Arde Bh 82.00 82.00
- Stop Kontak Lantai Bh 10.00 10.00
- Stop Kontak AC Bh 38.00 38.00
7 Exhaust Fan Bh 5.00 5.00
8 Tranking Cable M 150.00 150.00
9 Kabel Tee 20 x 20 x 300 cm Pcs 2,000.00 2,000.00
10 Grounding Pentanahan Panel Unit 2.00 2.00
11 Unimax Klem (Kuku Macan) Bh 3.00 3.00
f. PEKERJAAN TELEPHONE
1 Pengadaan PABX 80 Extension dan Aksesorisnya Unit 1.00 1.00
2 Main Dsitribution Board kapasitas 100 Extension Unit 1.00 1.00
3 Panel Telephone kapasitas 80 Ext. Unit 1.00 1.00
4 Kabel Feeder 2 x 30 x 0,6 mm M 50.00 50.00
5 Kabel Feeder 2 x 80 x 0,6 mm M 30.00 30.00
6 Outlet Telephone Unit 55.00 55.00
7 Single Line Telephone Unit 55.00 55.00
8 Instalasi Outlet Telephone Jack Titik 55.00 55.00
PEKERJAAN LANTAI 02
a. PEKERJAAN INSTALASI
1 Pek. Instalasi Titik Cahaya Lampu Titik 272.00 272.00
2 Pek. Instalasi Titik Exhaust Fan Titik 11.00 11.00
3 Pek. Instalasi Titik Stop Kontak Titik 85.00 85.00
4 Pek. Instalasi Power AC 1 Phase Titik 36.00 36.00
5 Pek. Instalasi Power AC 3 Phase Titik 6.00 6.00
6 Pek. Armatur :
- Lampu Fitting PLC 18 Watt Bh 27.00 27.00
- Lampu DLH 1 Unit 27.00 27.00
- Lampu Down Light Silver 150 PLC 14 Watt Unit 102.00 102.00
- Lampu Down Light Gold Hologen 25 Watt Unit 44.00 44.00
- Lampu Hias (LH 1) Unit 4.00 4.00
- Lampu Dinding Unit 18.00 18.00
- Lampu Baret 32 Watt (LB 2) Unit 18.00 18.00
- Lampu Baret 40 Watt (LB 1) Unit 31.00 31.00
- Lampu Gantung Unit 1.00 1.00
- Saklar Tunggal Bh 22.00 22.00
- Saklar Seri Bh 35.00 35.00
- Saklar Triple Bh 4.00 4.00
- Stop Kontak Arde Bh 74.00 74.00
- Stop Kontak Lantai Bh 11.00 11.00
- Stop Kontak AC Bh 36.00 36.00
7 Exhaust Fan Bh 11.00 11.00
8 Tranking Cable M 130.00 130.00
9 Kabel Tee 20 x 20 x 300 cm Pcs 2,000.00 2,000.00
10 Grounding Panel (Tembaga) 50 mm M 20.00 20.00
11 Unimax Klem (Kuku Macan) Bh 2.00 2.00
d. PEKERJAAN TELEPHONE
1 Panel Telephone kapasitas 50 Ext. Unit 1.00 1.00
2 Kabel Feeder 2 x 50 x 0,6 mm M 30.00 30.00
3 Outlet Telephone Jack Unit 34.00 34.00
4 Single Line Telephone Unit 34.00 34.00
5 Instalasi Outlet Telephone Jack Titik 34.00 34.00
PEKERJAAN LANTAI 03
a. PEKERJAAN INSTALASI
1 Pek. Instalasi Titik Cahaya Lampu Titik 74.00 74.00
2 Pek. Instalasi Titik Stop Kontak Titik 48.00 48.00
3 Pek. Instalasi Power AC 1 Phase Titik 15.00 15.00
4 Pek. Armatur :
- Lampu Hias (LH 1) Unit 3.00 3.00
- Lampu Down Light Silver 150 PLC 18 Watt Unit 29.00 29.00
- Lampu Down Light Silver 150 Sorot 80 Watt Unit 3.00 3.00
- Lampu Baret 40 Watt (LB 1) Unit 2.00 2.00
- Lampu Baret 32 Watt (LB 2) Unit 15.00 15.00
- Lampu Fitting PLC 18 Watt Bh 12.00 12.00
- Lampu Sorot 250 Watt Unit 9.00 9.00
- Handle ON/OFF Bh 1.00 1.00
- Saklar Tunggal Bh 8.00 8.00
- Saklar Tunggal Tukar Bh 1.00 1.00
- Saklar Seri Bh 11.00 11.00
- Saklar Triple Bh 2.00 2.00
- Stop Kontak Arde Bh 48.00 48.00
- Stop Kontak AC Bh 15.00 15.00
5 Tranking Cable M 60.00 60.00
6 Kabel Tee 20 x 20 x 300 cm Pcs 1,000.00 1,000.00
7 Grounding Panel (Tembaga) 50 mm M 40.00 40.00
8 Unimax Klem (Kuku Macan) Bh 2.00 2.00
d. PEKERJAAN TELEPHONE
1 Panel Telephone kapasitas 30 Ext. Unit 1.00 1.00
2 Kabel Feeder 2 x 40 x 0,6 mm M 40.00 40.00
3 Outlet Telephone Jack Unit 13.00 13.00
4 Single Line Telephone Unit 13.00 13.00
5 Instalasi Outlet Telephone Jack Titik 13.00 13.00
REKAPITULASI
RENCANA ANGGRAN BIAYA
UNIT GEDUNG UTAMA
###
X. PEKERJAAN EXTERIOR
REAL COST
AN BIAYA
TAMA
RD - KABUPATEN MIMIKA
4 5 6 7
ASI
N BIAYA
TAMA
RD - KABUPATEN MIMIKA
RD - KABUPATEN MIMIKA
8 9 10
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
0.00 0.00
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
0.00 65,504,734.93
0.00 14,268,605.81
0.00 53,736,745.98
0.00 11,125,884.00
0.00 335,248,897.20
0.00 4,237,127.07
0.00 8,208,295.20
0.00 28,880,290.29
0.00 52,393,820.40
0.00 29,490,653.10
0.00 52,546,906.80
0.00 29,490,653.10
0.00 71,440,320.00
0.00 73,888,958.63
0.00 67,702,906.28
0.00 7,500,000.00
0.00 4,458,321.00
0.00 1,021,878.00
#REF! #REF! #REF!
0.00 5,599,065.00
0.00 206,023,095.29
0.00 1,673,990.49
0.00 2,767,136.90
0.00 9,330,231.26
0.00 11,929,071.26
0.00 9,357,492.71
0.00 12,722,010.00
0.00 18,901,826.63
0.00 464,490.00
#REF! #REF! #REF!
0.00 7,691,954.40
#REF! #REF! #REF!
#REF! #REF! #REF!
0.00 11,059,300.00
0.00 1,989,150.00
0.00 3,280,225.00
0.00 3,805,685.00
0.00 30,556,650.00
0.00 4,034,690.00
0.00 17,026,155.00
0.00 2,723,250.00
0.00 11,298,940.00
0.00 6,004,810.00
0.00 9,972,410.00
0.00 0.00 101,751,265.00
0.00 10,743,320.00
0.00 2,784,810.00
0.00 2,523,250.00
0.00 2,927,450.00
0.00 28,759,200.00
0.00 3,002,560.00
0.00 16,093,215.00
0.00 1,997,050.00
0.00 7,308,030.00
0.00 3,883,845.00
0.00 6,450,045.00
0.00 0.00 86,472,775.00
0.00 3,159,800.00
0.00 596,745.00
0.00 11,983,000.00
0.00 1,595,110.00
0.00 7,696,755.00
0.00 6,426,920.00
0.00 3,415,580.00
0.00 5,672,380.00
0.00 1,815,500.00
0.00 2,927,450.00
0.00 0.00 45,289,240.00
0.00 0.00 233,513,280.00
0.00 110,101,675.42
0.00 7,630,385.17
0.00 15,439,230.54
0.00 2,485,789.75
0.00 28,709,012.01
0.00 Err:509
0.00 Err:509
0.00 Err:509
0.00 Err:509
0.00 Err:509
0.00 49,000,336.08
0.00 40,541,840.65
0.00 #REF!
0.00 12,978,852.74
0.00 28,154,757.95
0.00 38,333,842.16
0.00 54,989,485.36
0.00 2,460,333.20
0.00 4,153,710.69
0.00 23,525,037.86
0.00 837,467.92
0.00 12,543,034.69
0.00 10,302,012.49
0.00 21,771,830.98
0.00 17,388,526.70
0.00 0.00 Err:509
0.00 89,745,544.82
0.00 12,362,839.50
0.00 9,118,975.52
0.00 2,485,789.75
0.00 4,126,622.96
0.00 Err:509
0.00 Err:509
0.00 Err:509
0.00 Err:509
0.00 Err:509
0.00 37,588,326.80
0.00 31,860,305.34
0.00 #REF!
0.00 2,706,107.83
0.00 24,372,953.60
0.00 24,517,934.40
0.00 146,684,103.05
0.00 41,234,355.18
0.00 1,230,166.60
0.00 3,238,679.36
0.00 22,595,000.09
0.00 2,512,403.75
0.00 7,576,806.55
0.00 6,946,355.21
0.00 13,466,788.83
5,679,401.39
0.00 0.00 Err:509
0.00 65,115,714.10
0.00 Err:509
0.00 21,468,251.37
0.00 23,021,640.71
0.00 33,698,306.63
0.00 17,682,088.50
0.00 9,792,464.29
0.00 3,075,416.51
0.00 5,998,960.59
0.00 837,467.92
0.00 7,211,227.94
0.00 5,073,262.03
0.00 7,232,020.00
2,044,043.93
0.00 0.00 Err:509
0.00 0.00 Err:509
0.00 54,810,000.00
0.00 21,600,000.00
0.00 14,500,000.00
0.00 46,500,000.00
0.00 9,350,000.00
0.00 250,617,207.50
0.00 22,176,837.50
0.00 0.00 419,554,045.00
0.00 63,954,000.00
0.00 25,200,000.00
0.00 13,500,000.00
0.00 46,500,000.00
0.00 9,900,000.00
0.00 299,441,641.00
0.00 24,409,125.00
0.00 0.00 482,904,766.00
0.00 27,162,000.00
0.00 10,800,000.00
0.00 6,500,000.00
0.00 13,500,000.00
0.00 7,975,000.00
0.00 174,234,522.25
0.00 7,948,612.50
0.00 0.00 248,120,134.75
0.00 0.00 1,150,578,945.75
0.00 55,200,000.00
0.00 227,219,040.00
0.00 50,000,000.00
0.00 225,579,838.25
0.00 24,682,000.00
0.00 68,958,694.68
0.00 117,125,669.25
0.00 0.00 768,765,242.18
0.00 96,358,013.25
0.00 63,522,789.24
0.00 42,000,000.00
0.00 143,496,459.32
0.00 312,471,348.61
0.00 372,159,278.30
0.00 0.00 1,030,007,888.72
0.00 2,271,402.00
0.00 2,481,468.00
0.00 2,283,562.50
0.00 3,088,487.50
0.00 8,171,100.00
0.00 132,000.00
0.00 127,500.00
0.00 450,000.00
0.00 30,000.00
0.00 65,000.00
0.00 91,000.00
0.00 80,000.00
0.00 175,000.00
0.00 84,000.00
0.00 70,000.00
0.00 100,000.00
0.00 60,000.00
0.00 52,500.00
0.00 200,000.00
0.00 36,000.00
0.00 50,000.00
0.00 35,000.00
0.00 180,000.00
0.00 128,000.00
0.00 100,000.00
0.00 300,000.00
0.00 700,000.00
0.00 450,000.00
0.00 0.00 21,992,020.00
0.00 5,680,780.00
0.00 3,505,932.50
0.00 1,334,835.00
0.00 465,456.00
0.00 318,756.00
0.00 1,050,000.00
0.00 300,000.00
0.00 100,000.00
0.00 280,000.00
0.00 300,000.00
0.00 600,000.00
0.00 360,000.00
0.00 720,000.00
0.00 150,000.00
0.00 100,000.00
0.00 90,000.00
0.00 525,000.00
0.00 200,000.00
0.00 900,000.00
0.00 120,000.00
0.00 120,000.00
0.00 0.00 17,220,759.50
0.00 25,557,322.50
0.00 13,311,360.00
0.00 17,093,790.00
0.00 5,400,000.00
0.00 1,350,000.00
0.00 1,350,000.00
0.00 3,600,000.00
0.00 810,000.00
0.00 4,717,023.75
0.00 2,250,000.00
0.00 0.00 75,439,496.25
0.00 0.00 114,652,275.75
0.00 5,678,505.00
0.00 6,850,687.50
0.00 21,449,137.50
0.00 110,000.00
0.00 144,500.00
0.00 1,000,000.00
0.00 91,000.00
0.00 96,000.00
0.00 150,000.00
0.00 120,000.00
0.00 140,000.00
0.00 200,000.00
0.00 120,000.00
0.00 112,500.00
0.00 120,000.00
0.00 36,000.00
0.00 20,000.00
0.00 128,000.00
0.00 120,000.00
0.00 360,000.00
0.00 700,000.00
0.00 1,190,000.00
0.00 0.00 38,936,330.00
0.00 24,853,412.50
0.00 5,008,475.00
0.00 5,339,340.00
0.00 3,103,040.00
0.00 664,075.00
0.00 1,500,000.00
0.00 1,125,000.00
0.00 250,000.00
0.00 210,000.00
0.00 1,110,000.00
0.00 330,000.00
0.00 150,000.00
0.00 130,000.00
0.00 900,000.00
0.00 600,000.00
0.00 2,250,000.00
0.00 300,000.00
0.00 300,000.00
0.00 150,000.00
0.00 525,000.00
0.00 250,000.00
0.00 660,000.00
0.00 1,350,000.00
0.00 300,000.00
0.00 400,000.00
0.00 0.00 51,758,342.50
0.00 42,595,537.50
0.00 29,950,560.00
0.00 28,489,650.00
0.00 9,000,000.00
0.00 2,250,000.00
0.00 2,250,000.00
0.00 6,000,000.00
0.00 1,350,000.00
0.00 7,861,706.25
0.00 5,250,000.00
0.00 0.00 134,997,453.75
0.00 0.00 225,692,126.25
0.00 7,107,225.00
0.00 757,134.00
0.00 1,096,110.00
0.00 4,766,475.00
0.00 66,000.00
0.00 85,000.00
0.00 175,000.00
0.00 26,000.00
0.00 80,000.00
0.00 75,000.00
0.00 24,000.00
0.00 21,000.00
0.00 75,000.00
0.00 60,000.00
0.00 52,500.00
0.00 48,000.00
0.00 36,000.00
0.00 40,000.00
0.00 64,000.00
0.00 80,000.00
0.00 180,000.00
0.00 3,500,000.00
0.00 350,000.00
0.00 850,000.00
0.00 0.00 19,614,444.00
0.00 2,130,292.50
0.00 751,271.25
0.00 1,112,362.50
0.00 310,304.00
0.00 106,252.00
0.00 600,000.00
0.00 300,000.00
0.00 100,000.00
0.00 35,000.00
0.00 60,000.00
0.00 225,000.00
0.00 120,000.00
0.00 270,000.00
0.00 60,000.00
0.00 80,000.00
0.00 30,000.00
0.00 140,000.00
0.00 150,000.00
0.00 60,000.00
0.00 110,000.00
0.00 180,000.00
0.00 24,000.00
0.00 0.00 6,954,482.25
0.00 8,519,107.50
0.00 13,311,360.00
0.00 5,697,930.00
0.00 1,800,000.00
0.00 450,000.00
0.00 450,000.00
0.00 1,200,000.00
0.00 270,000.00
0.00 2,620,568.75
0.00 2,250,000.00
0.00 0.00 36,568,966.25
0.00 16,404,570.00
0.00 750,000.00
0.00 1,500,000.00
0.00 0.00 18,654,570.00
0.00 18,000,000.00
0.00 1,400,000.00
0.00 1,400,000.00
0.00 3,200,000.00
0.00 2,271,402.00
0.00 6,393,975.00
0.00 1,500,000.00
0.00 0.00 34,165,377.00
0.00 11,532,987.50
0.00 17,752,437.50
0.00 1,500,000.00
0.00 1,875,000.00
0.00 1,200,000.00
0.00 6,000,000.00
0.00 1,050,000.00
0.00 675,000.00
0.00 0.00 41,585,425.00
0.00 1,440,000.00
0.00 1,950,000.00
0.00 15,000,000.00
0.00 75,000,000.00
0.00 1,000,000.00
0.00 7,000,000.00
0.00 23,450,000.00
0.00 3,375,000.00
0.00 7,020,000.00
0.00 2,300,000.00
0.00 48,500,000.00
0.00 120,000.00
0.00 3,360,000.00
0.00 840,000.00
0.00 840,000.00
0.00 1,950,000.00
0.00 23,500,000.00
0.00 30,000,000.00
0.00 112,260,945.00
0.00 71,072,250.00
0.00 35,154,130.00
0.00 2,800,000.00
0.00 1,800,000.00
0.00 1,750,000.00
0.00 450,000.00
0.00 1,080,000.00
0.00 300,000.00
0.00 600,000.00
0.00 750,000.00
0.00 0.00 474,662,325.00
0.00 0.00 632,205,589.50
0.00 0.00 972,549,991.50
0.00 350,000,000.00
0.00 200,000,000.00
0.00 85,000,000.00
0.00 45,000,000.00
0.00 15,000,000.00
0.00 16,000,000.00
0.00 15,000,000.00
0.00 16,000,000.00
0.00 13,000,000.00
0.00 14,000,000.00
0.00 15,000,000.00
0.00 12,000,000.00
0.00 10,000,000.00
0.00 35,000,000.00
0.00 5,000,000.00
0.00 0.00 846,000,000.00
0.00 22,000,000.00
0.00 97,500,000.00
0.00 21,125,000.00
0.00 21,125,000.00
0.00 24,375,000.00
0.00 31,875,000.00
0.00 27,625,000.00
0.00 27,625,000.00
0.00 7,000,000.00
0.00 51,000,000.00
0.00 32,500,000.00
0.00 51,200,000.00
0.00 2,240,000.00
0.00 500,000.00
0.00 600,000.00
0.00 1,360,000.00
0.00 1,500,000.00
0.00 0.00 421,150,000.00
0.00 105,067,125.00
0.00 2,161,875.00
0.00 40,065,750.00
0.00 43,946,050.00
0.00 6,305,900.00
0.00 0.00
0.00 1,875,000.00
0.00 10,800,000.00
0.00 14,637,000.00
0.00 440,000.00
0.00 11,250,000.00
0.00 13,500,000.00
0.00 2,400,000.00
0.00 2,200,000.00
0.00 24,000,000.00
0.00 20,000,000.00
0.00 1,995,000.00
0.00 1,296,000.00
0.00 100,000.00
0.00 150,000.00
0.00 1,375,000.00
0.00 480,000.00
0.00 5,330,000.00
0.00 4,500,000.00
0.00 4,750,000.00
0.00 1,250,000.00
0.00 37,342,950.00
0.00 3,000,000.00
0.00 2,420,000.00
0.00 135,000.00
0.00 0.00 362,772,650.00
0.00 9,800,000.00
0.00 500,000.00
0.00 6,460,000.00
0.00 275,000.00
0.00 150,000.00
0.00 500,000.00
0.00 700,000.00
0.00 10,500,000.00
0.00 40,812,200.00
0.00 463,775.00
0.00 927,550.00
0.00 927,550.00
0.00 927,550.00
0.00 0.00 72,943,625.00
0.00 11,250,000.00
0.00 3,500,000.00
0.00 1,250,000.00
0.00 1,500,000.00
0.00 1,500,000.00
0.00 650,000.00
0.00 750,000.00
0.00 4,410,000.00
0.00 6,300,000.00
0.00 750,000.00
0.00 950,000.00
0.00 19,096,350.00
0.00 17,732,325.00
0.00 2,000,000.00
0.00 1,818,700.00
0.00 0.00 73,457,375.00
0.00 95,000,000.00
0.00 4,500,000.00
0.00 750,000.00
0.00 2,000,000.00
0.00 1,800,000.00
0.00 3,575,000.00
0.00 13,750,000.00
0.00 23,148,125.00
0.00 0.00 144,523,125.00
0.00 0.00 1,920,846,775.00
0.00 117,606,000.00
0.00 4,756,125.00
0.00 37,839,875.00
0.00 41,633,100.00
0.00 9,458,850.00
0.00 0.00
0.00 2,565,000.00
0.00 6,750,000.00
0.00 12,546,000.00
0.00 4,840,000.00
0.00 24,000,000.00
0.00 9,900,000.00
0.00 6,750,000.00
0.00 13,950,000.00
0.00 15,000,000.00
0.00 1,056,000.00
0.00 1,925,000.00
0.00 240,000.00
0.00 4,810,000.00
0.00 4,950,000.00
0.00 4,500,000.00
0.00 2,750,000.00
0.00 32,363,890.00
0.00 3,000,000.00
0.00 1,500,000.00
0.00 90,000.00
0.00 0.00 364,779,840.00
0.00 500,000.00
0.00 1,855,100.00
0.00 4,750,000.00
0.00 550,000.00
0.00 150,000.00
0.00 500,000.00
0.00 700,000.00
0.00 9,000,000.00
0.00 23,188,750.00
0.00 927,550.00
0.00 927,550.00
0.00 927,550.00
0.00 927,550.00
0.00 0.00 44,904,050.00
0.00 454,675.00
0.00 3,360,000.00
0.00 4,725,000.00
0.00 500,000.00
0.00 14,549,600.00
0.00 13,185,575.00
0.00 0.00 36,774,850.00
0.00 750,000.00
0.00 1,800,000.00
0.00 2,210,000.00
0.00 8,500,000.00
0.00 14,309,750.00
0.00 0.00 27,569,750.00
0.00 0.00 474,028,490.00
0.00 31,995,750.00
0.00 21,368,400.00
0.00 17,347,125.00
0.00 0.00
0.00 18,000,000.00
0.00 2,755,000.00
0.00 435,000.00
0.00 900,000.00
0.00 5,625,000.00
0.00 1,140,000.00
0.00 6,750,000.00
0.00 500,000.00
0.00 384,000.00
0.00 50,000.00
0.00 605,000.00
0.00 120,000.00
0.00 3,120,000.00
0.00 1,875,000.00
0.00 14,937,180.00
0.00 1,500,000.00
0.00 3,000,000.00
0.00 90,000.00
0.00 0.00 132,497,455.00
0.00 500,000.00
0.00 1,855,100.00
0.00 1,995,000.00
0.00 275,000.00
0.00 75,000.00
0.00 250,000.00
0.00 350,000.00
0.00 6,000,000.00
0.00 9,739,275.00
0.00 463,775.00
0.00 463,775.00
0.00 463,775.00
0.00 463,775.00
0.00 0.00 22,894,475.00
0.00 454,675.00
0.00 1,575,000.00
0.00 1,750,000.00
0.00 500,000.00
0.00 6,820,125.00
0.00 5,456,100.00
0.00 0.00 16,555,900.00
0.00 1,250,000.00
0.00 3,000,000.00
0.00 845,000.00
0.00 3,250,000.00
0.00 5,471,375.00
0.00 0.00 13,816,375.00
0.00 22,051,125.00
0.00 0.00
0.00 1,250,000.00
0.00 0.00
0.00 54,000,000.00
0.00 2,750,000.00
0.00 48,000.00
0.00 110,000.00
0.00 11,250,000.00
0.00 550,000.00
0.00 180,000.00
0.00 0.00
0.00 10,000,000.00
0.00 0.00
0.00 56,000,000.00
0.00 20,250,000.00
0.00 0.00
0.00 4,306,360.00
0.00 0.00 182,745,485.00
0.00 35,000,000.00
0.00 14,000,000.00
0.00 1,210,000.00
0.00 600,000.00
0.00 2,000,000.00
0.00 3,500,000.00
0.00 0.00 56,310,000.00
0.00 0.00 424,819,690.00
0.00 0.00 2,819,694,955.00
1 2
I. UNIT GEDUNG UTAMA
A. PEKERJAAN CIVIL
I. PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi (Perataan) M2 34,828.69
2 Pek. Urugan Sirtu Timbunan pada Lokasi M3 24,380.08
3 Pek. Pemadatan Tanah pada Lokasi M3 24,380.08
4 Pek. Pagar Seng (Pagar Pengaman Lokasi) M' 370.75
5 Pek. Pembuatan Direksi Keet M2 36.00
6 Pek. Papan Nama Proyek Unit 1.00
###
1 ### ### ### -
2 ### ### ### -
3 ### ### ### -
4 ### ### ### -
5 ### ### ### -
6 ### ### ### -
7 ### ### ### -
8 ### ### ### -
9 ### ### ### -
10 ### ### ### -
11 ### ### ### -
12 ### ### ### -
13 ### ### ### -
14 ### ### ### -
15 ### ### ### -
16 ### ### ### -
17 ### ### ### -
18 ### ### ### -
19 ### ### ### -
1 2
. Pek. Kolom K.2 (45 x 45) M3 5.10
. Pek. Kolom K.3 (45 x 45) M3 3.40
. Pek. Kolom K.4 (45 x 45) M3 2.69
. Pek. Kolom K.5 (30 x 30) M3 2.27
. Pek. Kolom K.6 (30/150) M3 33.68
. Pek. Kolom K.1 ' Ø 45 M3 13.35
. Pek. Kolom K.5 ' Ø 30 M3 3.56
. Pek. Kolom Praktis M' 162.40
. Pek. Cor Lantai Rabat 1 : 3 : 5 Bertulang M3 254.07
. ### ### -
. ### ### -
. ### ### -
. ### ### -
. Pek. Pondasi Tangga M3 7.20
. Pek. Beton Tangga M3 21.40
. Pek. #REF! -
. Pek. #REF! -
b. PEKERJAAN LANTAI 02
. Pek. Balok B.1 (30/60) M3 2.11
. Pek. Balok B.2 (30/60) M3 2.81
. Pek. Balok B.3 (30/60) M3 23.40
. Pek. Balok B.4 (30/60) M3 11.06
. Pek. Balok B.5 (30/60) M3 15.98
. Pek. Balok B.6 (30/60) M3 17.80
. Pek. Balok B.7 (30/60) M3 7.34
. Pek. Balok B.8 (30/60) M3 21.17
. Pek. Balok B.9 (30/60) M3 53.68
. ### ### -
. Pek. Balok B.10 (25/45) M3 13.55
. Pek. Balok B.11 (30/60) M3 13.95
. Pek. Balok B.12 (35/70) M3 16.62
. Pek. Balok B.13 (25/45) M3 4.43
. Pek. Balok B.14 (35/70) M3 23.17
. Pek. Balok B.15 (30/60) M3 9.11
. ### ### -
. Pek. Balok B.16 a (25/45) M3 1.80
. ### ### -
. Pek. Balok B.19 (30/60) M3 0.94
. Pek. Plat Lantai Tebal = 14 cm M3 344.65
. ### ### -
. Pek. Kolom K.1 (45 x 45) M3 27.22
. Pek. Kolom K.2 (45 x 45) M3 5.10
. Pek. Kolom K.3 (45 x 45) M3 3.40
. Pek. Kolom K.5 (30 x 30) M3 2.27
. Pek. Atap Dak BeTebal = 12 cm M3 9.08
. Pek. Kolom K.1 ' Ø 45 M3 10.68
. Pek. Kolom Praktis 12/15 M' 1,016.00
. ### ### -
. ### ### -
. ### ### -
. ### ### -
. Pek. Kolom Listplank pada Entrance M3 3.60
. Pek. Listplank Beton M3 9.10
. Pek. Beton Tangga M3 12.06
. ### M3 -
. ### M3 -
. ### -
### ### M3 -
### ### M3 -
### ### M3 -
### ### M3 -
### ### M3 -
c. PEKERJAAN LANTAI 03
. Pek. Balok B.19 a (30/60) M3 2.39
. Pek. Balok B.19 (30/60) M3 7.79
. Pek. Balok B.20 (30/60) M3 9.26
. Pek. Balok B.21 (35/70) M3 16.62
. Pek. Balok B.22 (35/70) M3 20.13
. Pek. Balok B.23 (30/60) M3 3.67
. Pek. Balok B.24 (30/60) M3 7.99
. Pek. Balok B.25 (30/60) M3 7.99
. Pek. Balok B.26 (25/45) M3 4.49
. Pek. Balok B.27 (25/45) M3 4.49
1 2
. Pek. Ringbalk RB. 1 (30/50) M3 8.95
. Pek. Ringbalk RB. 2 (30/50) M3 2.34
. Pek. ### M3
. Pek. Ringbalk RB. 3 (30/60) M3 28.93
. ### M3
. Pek. Ringbalk RB. 4 (30/50) M3 0.90
. Pek. Ringbalk RB. 5 (30/50) M3 1.80
. Pek. Ringbalk RB. 6 (25/45) M3 4.37
. Pek. Ringbalk RB. 7 (25/45) M3 1.62
. Pek. Ringbalk RB. 8 (30/50) M3 1.13
. Pek. Ringbalk RB. 9 (20/30) M3 0.29
. Pek. Plat Lantai Tebal = 14 cm M3 122.00
. Pek. Kolom K.1 (45 x 45) M3 22.11
. Pek. Kolom K.2 (45 x 45) M3 5.10
. Pek. Kolom K.3 (45 x 45) M3 3.40
. Pek. Kolom K.5 (30 x 30) M3 2.27
. Pek. Kolom K.1 ' Ø 45 M3 4.01
. Pek. Kolom Praktis 12/15 M' 508.00
. ### ### -
. Pek. Atap Dak Beton M3 22.59
. Pek. Beton Sirip M3 4.21
. Pek. Kolom Tumpuan Kuda-kuda M3 3.24
. Pek. Listplank Beton M3 18.47
. Pek. Beton Tangga M3 6.03
. ### M3 -
. ### M3 -
d. PEKERJAAN LANTAI 04
. Pek. Balok B.21 (35/70) M3 2.37
. Pek. Balok B.27 (25/45) M3 0.64
. Pek. Balok B.28 (30/50) M3 8.19
. Pek. Balok B.29 (30/50) M3 12.33
. ### ### -
. ### ### -
. Pek. Balok B.30 (30/50) M3 3.60
. Pek. Balok B.31 (30/50) M3 14.13
. ### ### -
. ### ### -
. Pek. Ringbalk RB. 4 (30/50) M3 2.40
. ### ### -
. Pek. Ringbalk RB. 10 (20/30) M3 3.39
. Pek. Ringbalk RB. 11 (30/60) M3 5.38
. Pek. Ringbalk RB. 12 (30/60) M3 4.18
. Pek. Ringbalk RB. 13 (20/30) M3 2.11
. Pek. Ringbalk RB. 15 (30/60) M3 15.74
. Pek. Ringbalk RB. 16 (30/50) M3 1.80
. Pek. Ringbalk RB. 17 (30/50) M3 2.76
. Pek. Ringbalk RB. 18 (20/30) M3 6.00
. Pek. Ringbalk RB. 19 (25/45) M3 0.95
. Pek. Kolom K.1 (45 x 45) M3 10.45
. Pek. Kolom K.3 (45 x 45) M3 3.40
. Pek. Kolom K.5 (30 x 30) M3 2.27
. Pek. Kolom Ø 45 M3 1.40
. Pek. Kolom Praktis 12/15 M' 254.00
. ### ### -
. Pek. Atap Dak Beton M3 25.81
. Pek. Beton Sirip M3 3.20
. Pek. Kolom Tumpuan Kuda-kuda M3 0.72
. Pek. Listplank Beton M3 14.21
1 2
c. PEKERJAAN ATAP LANTAI 02 (AULA)
1 Pek. Kuda-kuda Besi Siku (K. 1) Kg 14,380.16
2 Pek. Gording Canal 150.50.20.2,3 Kg 5,030.53
3 Pek. Plat Penyambung Kuda-kuda Besi Siku Bh 544.00
4 Pek. Restang Bh 1,750.03
5 Pek. Wiramesh M2 1,017.36
6 Pek. Alumunium Foil M2 1,017.36
7 Pek. Glass Wall M2 1,017.36
8 Pek. Atap Spandek M2 1,017.36
9 Pek. Nok Spandek M' 396.00
10 Pek. Listplank Kayu Besi M' 106.75
11 Pek. Cat Meny Rangka Kuda-kuda & Gording M2 3,025.00
12 ### ### ttk
13 ### ###
14 ### ###
15 ### ###
16 ### ###
17 ### ###
18 ### ###
19 ### ###
20 ### ###
21 ### ###
22 ### ###
23 ### ###
24 ### ###
25 ### ###
1 2
8 ### ### M2
9 ### ### M2
Pek Perataan dan Pembenahan Tanah bawah lantai m3
10 Pek. Urugan Pasir dibawah Lantai M3 230.44
11 Pek. Cor Lantai 1 : 3 : 5 Tebal = 7 cm M3 161.31
12 Pek. Pasang Keramik 60/60 cm M2 2,255.48
13 Pek. Pasang Keramik 20/20 (KM/WC) M2 48.95
14 Pek. Pasang Dinding Keramik 20/25 (KM/WC) M2 166.22
15 Pek. Pasang Keramik Tangga M2 113.55
16 Pek. List Border Keramik 6/20 cm M' 84.35
b. PEKERJAAN LANTAI 02
1 Pek. Dinding Tembok 1 : 4 M3 221.45
2 Pek. Pasang Loster Keramik 30/30 M2 31.00
3 Pek. Plesteran 1 : 4 M2 4,428.99
4 Pek. Plesteran Kolom 1 : 3 M2 379.47
5 Pek. Acian Dinding dan Kolom M2 4,868.46
6 ### ### M2 86.76
7 ### ### M2
8 ### ### M2
9 ### ### M2
10 ### ### M2
11 ### ### M2
12 ### ### M2
13 ### ### M2
14 ### ### M2
15 ### ### M2
16 Pek. Urugan Pasir dibawah Lantai M3 254.07
17 Pek. Cor Spesie Tebal = 3 cm M3 76.22
18 Pek. Pasang Keramik 60/60 cm M2 2,453.94
19 Pek. Pasang Keramik 20/20 (KM/WC) M2 86.76
20 Pek. Pasang Dinding Keramik 20/25 (KM/WC) M2 312.88
21 Pek. Pasang Keramik Tangga M2 67.20
22 Pek. List Border Keramik 10/20 cm M' 119.27
c. PEKERJAAN LANTAI 03
1 Pek. Dinding Tembok 1 : 4 M3 124.46
2 Pek. Plesteran 1 : 4 M2 2,489.23
3 Pek. Plesteran Kolom 1 : 3 M2 289.72
4 Pek. Acian Dinding dan Kolom M2 2,778.95
5 Pek. ### M2 425.01
6 Pek. ### M2 458.96
7 ### ### M2
8 ### ### M2
9 ### ### M2
10 ### ### M2
11 ### ### M2
12 Pek. Urugan Pasir dibawah Lantai M3 102.19
13 Pek. Cor Spesie Tebal = 3 cm M3 30.66
14 Pek. Pasang Keramik 60/60 cm M2 987.99
15 Pek. Pasang Keramik 20/20 (KM/WC) M2 33.95
16 Pek. Pasang Dinding Keramik 20/25 (KM/WC) M2 101.12
17 Pek. List Border Keramik 10/20 cm M' 53.35
d. PEKERJAAN LANTAI 04
1 Pek. ### M3 57.31
2 Pek. ### M2 1,146.26
3 Pek. ### M2 137.05
4 Pek. ### M2 1,283.31
5 Pek. ### M2 135.18
6 Pek. ### M2 135.18
7 ### ### M2
8 ### ### M2
9 ### ### M2
10 ### ### M2
#REF!
VI. PEKERJAAN KUSEN, PINTU, JENDELA, DINDING
PARTISI, PLAFON, dan RAILING
a. PEKERJAAN LANTAI 01
1 Pek. Pintu Utama Lapis Granit (Kaca tebal 12 cm) Unit 1.00
2 Pek. Pintu Panil Kaca M2 45.95
3 Pek. Pintu Besi pada Ruang Panel Unit 1.00
4 Pek. Kusen Pintu dan Jendela M3 6.40
5 Pek. Pintu Panil Kayu M2 65.06
1 2
6 Pek. Pintu Double Teakwood + Kaca M2 4.54
7 Pek. Jendela Kaca Buka 5 mm M2 138.75
8 Pek. Jendela Kaca Mati M2 61.10
9 Pek. Rangka Dinding Partisi (Kayu Besi) M2 854.13
10 Pek. Rangka Dinding Triplex M2
11 Pek. Rangka Dinding Hias (DH) M2
12 Pek. Rangka Plafon Gipsum (hollow) M2
13 Pek. Rangka Plapon Triplex (kayu Kls 2) M2
14 Pek. Rangka Plapon Sungkai (kayu Kls 2) M2
15 Pek. Rangka Plapon Lambersering (kayu Kls 2) M2
16 Pek. Dinding Gypsum M2 1,708.26
17 Pek. Dinding Tripleks 6 mm (DH4) M2 237.15
18 Pek. Dinding Hias Lapis Sungkai (DH4) M2 237.15
19 Pek. Stiker Sand Blasting M2 36.96
20 Pek. Plafon Gypsum + Rangka M2 1,838.87
21 Pek. Plafon Tripleks 6 mm M2 47.82
22 Pek. Plafon Hias Lapis Sungkai M2 36.23
23 Pek. Plapfon Lambersering M2 56.98
24 Pek. List Plint Kayu M' 1,700.96
25 Pek. List Plafon 8 cm M' 872.44
26 Pek. List Profil Dinding 5 cm M' 1,700.96
27 Pek. List Profil Plafon M' 872.44
28 Pek. List Papan pada Dinding dibawah Plafon M' 1,700.96
29 Pek. Railing Stainless Tangga Utama type 1 M' 21.50
30 Pek. Railing Stainless Tangga Samping 2 Unit type 3 M' 19.70
31 Pek. Pintu Besi Plat Unit 1.00
32 Pek. Pintu Panil + Jalusi M2 6.80
33 Pek. Jendela Kaca Bovenlight M2 4.40
b. PEKERJAAN LANTAI 02
1 Pek. Kusen Pintu dan Jendela M3 5.06
2 Pek. Pintu Utama (ukiran) Lapis Granit Set 1.00
3 Pek. Pintu Panil Kaca M2 35.83
4 Pek. Pintu Panil Kayu M2 62.49
5 Pek. Pintu Double Teakwood + Kaca M2 13.61
6 Pek. Jendela Kaca Buka 5 mm M2 83.81
7 Pek. Jendela Kaca Mati M2 45.98
8 Pek. Rangka Dinding Partisi (Kayu Besi) M2 589.30
Pek. Rangka Dinding Triplex M2
Pek. Rangka Dinding Hias (DH) M2
Pek. Rangka Plafon Gipsum (Hollow) M2
Pek. Rangka Plapon Triplex (kayu Matoa) M2
Pek. Rangka Plapon Lambersering (kayu Matoa) M2
9 Pek. Dinding Gypsum M2 1,178.61
10 Pek. Dinding Tripleks 6 mm M2 151.68
11 Pek. Dinding Hias Lapis Sungkai M2 151.68
12 Pek. Stiker Sand Blasting M2 52.08
13 Pek. Plafon Gypsum + Rangka M2 1,546.48
14 Pek. Plafon Tripleks 6 mm M2 86.76
15 Pek. Plafon Hias Lapis Sungkai M2 907.46
26 Pek. Plapfon Lambersering M2 38.42
16 Pek. List Profil Plafon M' 275.48
17 Pek. List Plint Kayu M' 1,275.48
18 Pek. List Plafon 8 cm M' 1,075.48
19 Pek. List Profil Dinding 5 cm M' 1,275.48
20 Pek. List Papan pada Dinding dibawah Plafon M' 1,275.48
21 Pek. Railing Stainless Tangga Utama type 2 M' 14.00
22 Pek. Railing Stainless Tangga Samping 2 Unit type 3 M' 19.70
23 Pek. Railing Balkon Depan (pada Entrance) M' 12.00
24 Pek. Pintu Panil + Jalusi M2 3.40
25 Pek. Jendela Kaca Bovenlight M2 6.80
c. PEKERJAAN LANTAI 03
1 Pek. Kusen Pintu dan Jendela M3 2.97
2 Pek. Pintu Panil Kaca M2 34.02
3 Pek. Pintu Panil Kayu M2 16.59
4 Pek. Pintu Double Teakwood + Kaca M2 4.54
5 Pek. Jendela Kaca Buka 5 mm M2 79.77
6 Pek. Jendela Kaca Mati M2 18.60
Pek. Rangka Dinding Partisi (Kayu Besi) M2
Pek. Rangka Plafon Gipsum M2
Pek. Rangka Plapon Triplex M2
Pek. Rangka Plapon Lambersering M2
Pek. Dinding Gypsum M2
7 Pek. Stiker Sand Blasting M2 18.60
1 2
8 Pek. Plafon Gypsum + Rangka M2 987.99
9 Pek. Plafon Tripleks 6 mm M2 33.95
16 Pek. Plapfon Lambersering M2 28.06
10 Pek. List Plint Kayu M' 302.91
11 Pek. List Plafon 8 cm M' 352.91
12 Pek. List Profil Dinding 5 cm M' 302.91
13 Pek. List Papan pada Dinding dibawah Plafon M' 302.91
14 Pek. Railing Stainless Tangga Utama type 4 M' 5.50
15 Pek. Jendela Kaca Bovenlight M2 2.00
17 Pek. Kusen Lt. 04 M3 1.00
18 Pek. Jendela Kaca Mati M2 33.12
b. PEKERJAAN LANTAI 02
1 Pek. Kunci Pintu Kayu (Ruangan) Set 34.00
2 Pek. Kunci Cylinder (KM/WC) Set 14.00
3 Pek. Kunci Pintu Double Set 10.00
4 Pek. Handle Pintu Double Psg 10.00
5 Pek. Door Closer Psg 48.00
6 Pek. Door Stop Psg 32.00
7 Pek. Engsel Pintu Stainless 4 " Bh 207.00
8 Pek. Grendel Tanam Pintu Double Psg 11.00
9 Pek. Engsel Jendela Stainless 3 " Psg 141.00
10 Pek. Grendel Jendela Bh 141.00
11 Pek. Hak Angin Psg 141.00
c. PEKERJAAN LANTAI 03
1 Pek. Kunci Pintu Kayu (Ruangan) Set 10.00
2 Pek. Kunci Cylinder (KM/WC) Set 3.00
3 Pek. Door Closer Psg 20.00
4 Pek. Door Stop Psg 17.00
5 Pek. Engsel Pintu Stainless 4 " Bh 99.00
6 Pek. Engsel Jendela Stainless 3 " Psg 124.00
7 Pek. Grendel Jendela Bh 124.00
8 Pek. Hak Angin Psg 124.00
9 Pek. Kunci Pintu Double Set 10.00
10 Pek. Handle Pintu Double Psg 10.00
1 2
9 Pek. Cat Duco Pintu Panil Kaca M2 22.97
10 Pek. Cat Duco Pintu Panil M2 130.12
11 Pek. Cat Duco Pintu Double Teakwood + Kaca M2 4.63
12 Pek. Cat Duco Jendela Kaca Buka M2 69.38
13 Pek. Cat Duco Pintu Lambersering M2 56.98
14 Pek. Cat Dinding Gypsum M2 1,708.26
15 Pek. Cat Plafon Dak Beton (Plat Exphose) M2 416.61
b. PEKERJAAN LANTAI 02
1 Cat Tembok Bagian Dalam
Pek. Cat Dinding Tembok bagian Dalam M2 4,197.74
Pek. Cat Kolom M2
Pek. Cat Lisplng Pembatas Plafon M2
Pek. Cat Plat Tangga M2
Pek. Cat Balok Exphose M2
2 Cat Tembok Bagian Luar
1 Pek. Cat Dinding Tembok bagian Luar (Dulux) M2 816.43
Pek. Cat Kolom M2
Pek. Cat Lisplng dan talang beton M2
Pek. Cat Plat Kanopy M2
Pek. Cat Sirip Beton M2
2 Pek. Cat Duco Kusen Pintu dan Jendela Kayu M2 202.46
3 Pek. Cat Plafon Gypsum dan Tripleks M2 1,633.23
4 Pek. Cat Meny Rangka Plafon M2 1,633.23
5 Pek. Cat Compound Dinding Gypsum M' 738.00
6 Pek. Cat Compound Plafon Gypsum M' 2,043.00
7 Pek. Cat Melamin Dinding Hias Lapis Sungkai M2 151.68
8 Pek. Cat Melamin Plafon Hias M2 907.46
9 Pek. Cat Melamin List Papan dibawah Dinding M2 255.10
10 Pek. Cat Duco Pintu Panil + Jalusi M2 6.80
11 Pek. Cat Duco Pintu Panil Kaca M2 17.91
12 Pek. Cat Duco Pintu Panil M2 124.97
13 Pek. Cat Duco Pintu Double Teakwood + Kaca M2 13.90
14 Pek. Cat Duco Jendela Kaca Buka M2 41.91
15 Pek. Cat Duco Pintu Lambersering M2 38.42
16 Pek. Cat Dinding Gypsum M2 1,178.61
Pek. Cat Lisplank kayu M2
c. PEKERJAAN LANTAI 03
1 Pek. Cat Dinding Tembok bagian Dalam M2 2,243.76
2 Pek. Cat Dinding Tembok bagian Luar (Dulux) M2 2,154.53
3 Pek. Cat Duco Kusen Pintu dan Jendela Kayu M2 118.74
4 Pek. Cat Plafon M2 1,021.94
5 Pek. Cat Meny Rangka Plafon M2 1,021.94
6 Pek. Cat Compound Plafon Gypsum M' 1,278.00
7 Pek. Cat Melamin List Papan dibawah Dinding M2 60.58
8 Pek. Cat Duco Pintu Panil Kaca M2 17.01
9 Pek. Cat Duco Pintu Panil M2 33.18
10 Pek. Cat Duco Pintu Double Teakwood + Kaca M2 4.63
11 Pek. Cat Duco Jendela Kaca Buka M2 39.89
12 Pek. Cat Duco Pintu Lambersering M2 28.06
13 Pek. Cat Duco Kusen Lt. 04 M 40.00
Pek. Cat Lisplank kayu M2
b. PEKERJAAN LANTAI 02
1 Pek. Ornamen Ukiran pada Dinding Border M' 284.24
2 Pek. Ornamen Ukiran pada Papan Nama Ruangan Unit 56.00
3 Pek. Ornamen Ukiran pada Pintu Kayu Unit 54.00
4 Pek. Ornamen Ukiran pada Kolom Unit 124.00
5 Pek. Pasang Papan Penunjuk Ruangan Unit 36.00
6 Pek. Pasang Wallpaper M2 1,180.24
7 Pek. Pasang Border Wallpaper M' 234.00
Pek. Stage Ruang Sidang Unit
1 2
c. PEKERJAAN LANTAI 03
1 Pek. Ornamen Ukiran pada Dinding Border M' 120.72
2 Pek. Ornamen Ukiran pada Papan Nama Ruangan Unit 24.00
3 Pek. Ornamen Ukiran pada Pintu Kayu Unit 26.00
4 Pek. Ornamen Ukiran pada Kolom Unit 36.00
5 Pek. Pasang Papan Penunjuk Ruangan Unit 29.00
6 Pek. Pasang Wallpaper M2 686.74
7 Pek. Pasang Border Wallpaper M' 76.20
X. PEKERJAAN EXTERIOR
1 Pek. Ornamen Ukiran (Fiber pada Sirip Beton) Unit 92.00
2 Pek. List Profil Beton pada Listplank M' 864.00
2 Pek. Profil pada Kolom Lot 10.00
3 Pek. Pas. Batu alam Undesrsit m2
Pek. Batu candi Dinding Pot Bunga Ramp m2
Pek. Vergola Enterance Depan m2
Pek. Plapon Kerawang Enterace Depan m2
Pek. Flesing Alcubond Lantai 3 Bgian Belakang m
Pek. Penebalan Kolom Bagian Luar Lt s/Lt 4 m
1 2
5 Over sock PVC Ø 4 " x 2 " bh 5.00
Ø2" x 1½" bh 5.00
Ø2" x 1" bh 6.00
6 Knie PVC 45 º Ø 4 " bh 15.00
Ø2" bh 20.00
7 Knie PVC type D Ø 3 " bh 30.00
8 Testik PVC type D Ø 3 " bh 10.00
9 Lem Pipa PVC merk Wavin 500 Gram klg 3.00
c. PEKERJAAN SANITAIR
1 Closet duduk (lengkap) set 9.00
2 Urinoir bh 4.00
3 Washtafel Meja bh 6.00
4 Shower Spray bh 9.00
5 Soap Holder bh 9.00
6 Double Robe Hock bh 9.00
7 Cermin Toilet bh 6.00
8 Kran dinding bh 9.00
9 Floor drain bh 9.00
10 Partition Plate bh 3.00
PEKERJAAN LANTAI 02
a. PEK. INSTALASI PIPA AIR BERSIH
1 Pipa GIP medium Ø 1 ¼ " m 45.00
Ø1" m 75.00
ؽ" m 315.00
2 Knie GIP Ø1¼" bh 10.00
Ø1" bh 17.00
ؽ" bh 200.00
3 Testik GIP Ø1¼" x 1" bh 7.00
Ø1" x ½" bh 12.00
ؽ" bh 30.00
4 Sock GIP Ø1¼" bh 10.00
Ø1" bh 20.00
ؽ" bh 40.00
5 Double Nepple Ø1¼" bh 10.00
Ø1" bh 15.00
ؽ" bh 30.00
6 Over sock GIP Ø1½" x 1" bh 3.00
Ø1" x ½" bh 2.00
7 Water Mor Ø1¼" bh 4.00
Ø1" bh 6.00
ؽ" bh 30.00
8 Boult Valve Ø1¼" bh 2.00
9 Seal tape dos 70.00
1 2
c. PEKERJAAN SANITAIR
1 Closet duduk (lengkap) set 15.00
2 Urinoir bh 9.00
3 Washtafel Meja bh 10.00
4 Shower Spray bh 15.00
5 Soap Holder bh 15.00
6 Double Robe Hock bh 15.00
7 Cermin Toilet bh 10.00
8 Kran dinding bh 15.00
9 Floor drain bh 15.00
10 Partition Plate bh 7.00
PEKERJAAN LANTAI 03
a. PEK. INSTALASI PIPA AIR BERSIH
1 Pipa GIP medium Ø 3 " m 25.00
Ø1¼" m 6.00
Ø1" m 12.00
ؽ" m 70.00
2 Knie GIP Ø1¼" x ½" bh 6.00
Ø1" bh 10.00
ؽ" bh 35.00
3 Testik GIP Ø2" bh 2.00
Ø1" x ½" bh 10.00
ؽ" bh 15.00
4 Sock GIP Ø1¼" bh 2.00
Ø1" bh 3.00
ؽ" bh 15.00
5 Double Nepple Ø1¼" bh 5.00
Ø1" bh 7.00
ؽ" bh 12.00
6 Over sock GIP Ø1¼" x 1" bh 3.00
Ø1" x ½" bh 4.00
7 Water Mor Ø2" bh 2.00
Ø1" bh 4.00
ؽ" bh 15.00
8 Boult Valve Ø3" bh 2.00
Ø1¼" bh 1.00
9 Seal tape dos 50.00
c. PEKERJAAN SANITAIR
1 Closet duduk (lengkap) set 3.00
2 Urinoir bh 4.00
3 Washtafel Meja bh 2.00
4 Shower Spray bh 3.00
5 Soap Holder bh 3.00
6 Double Robe Hock bh 3.00
7 Cermin Toilet bh 2.00
8 Kran dinding bh 3.00
9 Floor drain bh 5.00
10 Partition Plate bh 3.00
1 2
d. PEKERJAAN PIPA SUPPLY DARI PDAM
. Pipa Gip Ø 1¼" M' 130.00
. Fitting-fitting Ls 1.00
. Katup Pelampung Ø 1 ½ " Bh 3.00
g. PEKERJAAN HYDRANT
1 Fleksible joint dia 4" Bh 2.00
2 Air relief valve Bh 1.00
3 Jocky Pump unit 1.00
4 Electric Pump unit 1.00
5 Pressure Switch Bh 2.00
6 Pressure Tank Bh 2.00
7 Gate Valve dia. 4" Flens 10 K bh 7.00
8 Straner 4" merk Kitz Flens 10 K bh 1.00
9 Fot Valve 4" merk Socla PN 16 bh 1.00
10 Check Valve 4 " merk KitzFlens 10 K bh 1.00
11 Hydrant Pilar 3 " One Way bh 10.00
12 Pressure Gauge dia. 3 " bh 1.00
13 Knee Las 4 " (Elbow GIP 90° 4 ") bh 35.00
14 Flange Buta 8 " bh 2.00
15 Flange 8 " bh 2.00
16 Flange 4 " bh 26.00
17 Fire Hose Box (komplit) untuk Hydrant Pilar Roll 10.00
18 Hydrant Box (komplit) Fire Hose 35 m unit 5.00
19 Pipa GIP medium Ø 4 " m 340.00
Ø3" m 250.00
Ø2" m 170.00
20 Knee Las Ø4" bh 70.00
Ø3" bh 60.00
Ø2" bh 100.00
21 Testik Las Ø4"x 3" bh 10.00
Ø3"x 2" bh 27.00
Ø2" bh 15.00
22 Over Shock Las Ø 3 " x 2 " bh 15.00
23 Shock Gip Ø2" bh 50.00
1 2
b. PEKERJAAN KABEL FEEDER
1 Kabel NYY 1 x 300 mm (Feeder Utama LVMDP 1) M 80.00
2 Kabel NYY 4 x 250 mm M 150.00
3 Kabel NYY 4 x 50 mm (Feeder Lt. 01 Penerangan) M 65.00
4 Kabel NYY 4 x 50 mm (Feeder Lt. 01 AC) M 65.00
5 Kabel NYY 4 x 50 mm (Feeder Lt. 02 Penerangan) M 75.00
6 Kabel NYY 4 x 70 mm (Feeder Lt. 02 AC M 75.00
7 Kabel NYY 4 x 50 mm (Feeder Lt. 03 Penerangan) M 85.00
8 Kabel NYY 4 x 50 mm (Feeder Lt. 03 AC M 85.00
9 Kabel Feeder Pompa Hydrant NYY 4 x 25 mm M 20.00
10 Kabel Feeder Lampu Jalan NYFGBY 4 x 16 mm M 255.00
11 Kabel Feeder GSG NYY 4 x 50 mm M 100.00
12 Kabel Feeder Power Hose NYY 4 x 6 mm M 256.00
13 Schum Cable 50 mm Bh 64.00
14 Schum Cable 75 mm Bh 10.00
15 Schum Cable 250 mm Bh 8.00
16 Schum Cable 300 mm Bh 16.00
17 Kabel Tee 20 x 20 x 300 cm Pcs 1,000.00
c. PEKERJAAN INSTALASI
1 Pek. Instalasi Titik Cahaya Lampu Titik 243.00
2 Pek. Instalasi Titik Exhaust Fan Titik 5.00
3 Pek. Instalasi Titik Stop Kontak Titik 90.00
4 Pek. Instalasi Power AC 1 Phase Titik 38.00
5 Pek. Instalasi Power AC 3 Phase Titik 4.00
6 Pek. Armatur :
- Lampu TL 1 x 36 Watt Balok Outbow Unit 15.00
- Lampu TL 2 x 36 Watt Inbow Unit 27.00
- Lampu Down Light Silver 150 PLC 18 Watt Unit 119.00
- Lampu Down Light Gold 150 Unit 4.00
- Lampu Baret 32 Watt Kap Kaca (LB 2) Unit 30.00
- Lampu Baret 40 Watt Kap Kaca (LB 1) Unit 30.00
- Lampu Sorot 500 Watt Unit 2.00
- Lampu Dinding Unit 4.00
- Lampu Hias (LH 1) Bh 4.00
- Lampu Hias (LH 2) Bh 4.00
- Lampu Fitting PLC Bh 21.00
- Saklar Tunggal Bh 27.00
- Saklar Tunggal Tukar Bh 2.00
- Saklar Seri Tukar Bh 2.00
- Saklar Seri Bh 25.00
- Saklar Triple Bh 8.00
- Stop Kontak Arde Bh 82.00
- Stop Kontak Lantai Bh 10.00
- Stop Kontak AC Bh 38.00
7 Exhaust Fan Bh 5.00
8 Tranking Cable M 150.00
9 Kabel Tee 20 x 20 x 300 cm Pcs 2,000.00
10 Grounding Pentanahan Panel Unit 2.00
11 Unimax Klem (Kuku Macan) Bh 3.00
1 2
9 Level Control (Attenuator) 6 Watt Bh 36.00
10 Level Control (Attenuator) 30 Watt Bh 3.00
11 Rak Equipment Unit 1.00
12 Instalasi Ceiling Speaker Titik 42.00
13 Instalasi Level Control (Attenuator) Titik 39.00
14 Speaker Car Calling Unit 4.00
15 Instalasi Car Calling Titik 4.00
f. PEKERJAAN TELEPHONE
1 Pengadaan PABX 80 Extension dan Aksesorisnya Unit 1.00
2 Main Dsitribution Board kapasitas 100 Extension Unit 1.00
3 Panel Telephone kapasitas 80 Ext. Unit 1.00
4 Kabel Feeder 2 x 30 x 0,6 mm M 50.00
5 Kabel Feeder 2 x 80 x 0,6 mm M 30.00
6 Outlet Telephone Unit 55.00
7 Single Line Telephone Unit 55.00
8 Instalasi Outlet Telephone Jack Titik 55.00
PEKERJAAN LANTAI 02
a. PEKERJAAN INSTALASI
1 Pek. Instalasi Titik Cahaya Lampu Titik 272.00
2 Pek. Instalasi Titik Exhaust Fan Titik 11.00
3 Pek. Instalasi Titik Stop Kontak Titik 85.00
4 Pek. Instalasi Power AC 1 Phase Titik 36.00
5 Pek. Instalasi Power AC 3 Phase Titik 6.00
6 Pek. Armatur :
- Lampu Fitting PLC 18 Watt Bh 27.00
- Lampu DLH 1 Unit 27.00
- Lampu Down Light Silver 150 PLC 14 Watt Unit 102.00
- Lampu Down Light Gold Hologen 25 Watt Unit 44.00
- Lampu Hias (LH 1) Unit 4.00
- Lampu Dinding Unit 18.00
- Lampu Baret 32 Watt (LB 2) Unit 18.00
- Lampu Baret 40 Watt (LB 1) Unit 31.00
- Lampu Gantung Unit 1.00
- Saklar Tunggal Bh 22.00
- Saklar Seri Bh 35.00
- Saklar Triple Bh 4.00
- Stop Kontak Arde Bh 74.00
- Stop Kontak Lantai Bh 11.00
- Stop Kontak AC Bh 36.00
7 Exhaust Fan Bh 11.00
8 Tranking Cable M 130.00
9 Kabel Tee 20 x 20 x 300 cm Pcs 2,000.00
10 Grounding Panel (Tembaga) 50 mm M 20.00
11 Unimax Klem (Kuku Macan) Bh 2.00
d. PEKERJAAN TELEPHONE
1 Panel Telephone kapasitas 50 Ext. Unit 1.00
2 Kabel Feeder 2 x 50 x 0,6 mm M 30.00
1 2
3 Outlet Telephone Jack Unit 34.00
4 Single Line Telephone Unit 34.00
5 Instalasi Outlet Telephone Jack Titik 34.00
PEKERJAAN LANTAI 03
a. PEKERJAAN INSTALASI
1 Pek. Instalasi Titik Cahaya Lampu Titik 74.00
2 Pek. Instalasi Titik Stop Kontak Titik 48.00
3 Pek. Instalasi Power AC 1 Phase Titik 15.00
4 Pek. Armatur :
- Lampu Hias (LH 1) Unit 3.00
- Lampu Down Light Silver 150 PLC 18 Watt Unit 29.00
- Lampu Down Light Silver 150 Sorot 80 Watt Unit 3.00
- Lampu Baret 40 Watt (LB 1) Unit 2.00
- Lampu Baret 32 Watt (LB 2) Unit 15.00
- Lampu Fitting PLC 18 Watt Bh 12.00
- Lampu Sorot 250 Watt Unit 9.00
- Handle ON/OFF Bh 1.00
- Saklar Tunggal Bh 8.00
- Saklar Tunggal Tukar Bh 1.00
- Saklar Seri Bh 11.00
- Saklar Triple Bh 2.00
- Stop Kontak Arde Bh 48.00
- Stop Kontak AC Bh 15.00
5 Tranking Cable M 60.00
6 Kabel Tee 20 x 20 x 300 cm Pcs 1,000.00
7 Grounding Panel (Tembaga) 50 mm M 40.00
8 Unimax Klem (Kuku Macan) Bh 2.00
d. PEKERJAAN TELEPHONE
1 Panel Telephone kapasitas 30 Ext. Unit 1.00
2 Kabel Feeder 2 x 40 x 0,6 mm M 40.00
3 Outlet Telephone Jack Unit 13.00
4 Single Line Telephone Unit 13.00
5 Instalasi Outlet Telephone Jack Titik 13.00
1 2
7 Pek. Tiang Lampu Jalan Cabang (Dobel) lengkap
dengan MCB 2 x 6 A Unit 16.00
8 Pek. Lampu Taman + Tiang Bh 27.00
9 Pek. Galian Tanah dan Urugan Pasir pada Kabel
Feeder dan Lampu Jalan m3 30.00
NO JENIS PEKERJAAN
A. PEKERJAAN CIVIL
I. PEKERJAAN PENDAHULUAN
###
X. PEKERJAAN EXTERIOR
153.67
VOLUME
REALISASI HARGA SATUAN
REAL (Rp)
TA 2009 TA 2010 TA 2011 JUMLAH
3 4 5 6 7 8
3 4 5 6 7 8
#REF! #REF! - - #REF! 9,340,464.55
#REF! #REF! - - #REF! 8,390,117.49
#REF! #REF! - - #REF! 8,622,305.46
#REF! #REF! - - #REF! 9,598,308.89
#REF! #REF! - - #REF! 7,109,970.29
#REF! #REF! - - #REF! 7,439,856.74
#REF! #REF! - - #REF! 9,598,308.89
#REF! - #REF! - #REF! 93,410.00
#REF! - #REF! - #REF! 1,893,641.93
#REF! - #REF! - #REF! 125,585.00
#REF! - #REF! - #REF! 7,390,601.99
#REF! - #REF! - #REF! 9,598,308.89
#REF! - #REF! - #REF! 10,305,797.22
#REF! - #REF! - #REF! 7,514,094.61
#REF! - #REF! - #REF! 7,514,094.61
#REF! - #REF! - #REF! 9,771,321.70
#REF! - #REF! - #REF! 9,771,321.70
- Jumlah (a)
-
#REF! #REF! - - #REF! 7,090,560.79
#REF! #REF! - - #REF! 7,568,116.28
#REF! #REF! - - #REF! 7,568,116.28
#REF! #REF! - - #REF! 7,090,560.79
#REF! #REF! - - #REF! 7,568,116.28
#REF! #REF! - - #REF! 7,434,288.38
#REF! #REF! - - #REF! 7,090,560.79
#REF! #REF! - - #REF! 8,772,770.23
#REF! #REF! - - #REF! 7,434,288.38
#REF! #REF! - - #REF! 7,434,288.38
#REF! #REF! - - #REF! 8,830,405.68
#REF! #REF! - - #REF! 8,906,619.71
#REF! #REF! - - #REF! 8,393,148.43
#REF! #REF! - - #REF! 8,830,405.68
#REF! #REF! - - #REF! 7,901,458.66
#REF! #REF! - - #REF! 8,772,770.23
#REF! #REF! - - #REF! 8,772,770.23
#REF! #REF! - - #REF! 7,903,539.50
#REF! #REF! - - #REF! 10,703,211.57
#REF! #REF! - - #REF! 6,586,169.38
#REF! #REF! - - #REF! 9,187,020.31
#REF! #REF! - - #REF! 9,187,020.31
#REF! #REF! - - #REF! 7,439,856.74
#REF! #REF! - - #REF! 9,340,464.55
#REF! #REF! - - #REF! 8,390,117.49
#REF! #REF! - - #REF! 8,622,305.46
#REF! #REF! - - #REF! 9,841,438.36
#REF! #REF! - - #REF! 7,439,856.74
#REF! - #REF! - #REF! 93,410.00
85.80 - #REF! - #REF! 125,585.00
#REF! - #REF! - #REF! 9,598,308.89
#REF! - #REF! - #REF! 10,305,797.22
#REF! - #REF! - #REF! 7,204,292.09
#REF! #REF! - - #REF! 6,778,794.91
#REF! #REF! - - #REF! 7,320,482.67
#REF! #REF! - - #REF! 7,514,094.61
#REF! #REF! - - #REF! 9,771,321.70
#REF! #REF! - - #REF! 9,771,321.70
- - - - -
#REF! #REF! - - #REF! 7,439,856.74
#REF! #REF! - - #REF! 8,622,305.46
#REF! #REF! - - #REF! 8,830,405.68
#REF! #REF! - - #REF! 9,187,020.31
#REF! #REF! - - #REF! 7,320,482.67
Jumlah (b)
3 4 5 6 7 8
#REF! #REF! - - #REF! 7,406,553.84
#REF! #REF! - - #REF! 7,406,553.84
#REF! #REF! - - #REF! 7,406,553.84
#REF! #REF! - - #REF! 7,749,776.56
#REF! #REF! - - #REF! 7,320,482.67
#REF! #REF! - - #REF! 7,100,396.11
#REF! #REF! - - #REF! 7,100,396.11
#REF! #REF! - - #REF! 8,400,588.69
#REF! #REF! - - #REF! 8,400,588.69
#REF! #REF! - - #REF! 7,667,267.78
#REF! #REF! - - #REF! 11,841,865.30
#REF! #REF! - - #REF! 9,187,020.31
#REF! #REF! - - #REF! 7,439,856.74
#REF! #REF! - - #REF! 9,340,464.55
#REF! #REF! - - #REF! 8,390,117.49
#REF! #REF! - - #REF! 8,622,305.46
#REF! #REF! - - #REF! 7,439,856.74
#REF! - #REF! - #REF! 93,410.00
#REF! - #REF! - #REF! 125,585.00
#REF! #REF! - - #REF! 9,841,438.36
#REF! #REF! - - #REF! 7,204,292.09
#REF! #REF! - - #REF! 7,439,856.74
#REF! #REF! - - #REF! 7,320,482.67
#REF! #REF! - - #REF! 7,514,094.61
#REF! #REF! - - #REF! 9,771,321.70
#REF! #REF! - - #REF! 9,771,321.70
- - Jumlah (c)
- -
#REF! #REF! - - #REF! 7,999,798.77
#REF! #REF! - - #REF! 8,937,475.34
#REF! #REF! - - #REF! 7,904,425.06
#REF! #REF! - - #REF! 7,904,425.06
#REF! #REF! - - #REF! 7,904,425.06
#REF! #REF! - - #REF! 7,904,425.06
#REF! #REF! - - #REF! 7,181,710.79
#REF! #REF! - - #REF! 7,727,760.66
#REF! #REF! - - #REF! 7,904,425.06
#REF! #REF! - - #REF! 7,727,760.66
#REF! #REF! - - #REF! 7,100,396.11
#REF! #REF! - - #REF! 7,100,396.11
#REF! #REF! - - #REF! 11,841,865.30
#REF! #REF! - - #REF! 7,969,681.98
#REF! #REF! - - #REF! 6,765,047.45
#REF! #REF! - - #REF! 11,841,865.30
#REF! #REF! - - #REF! 6,831,971.11
#REF! #REF! - - #REF! 7,100,396.11
#REF! #REF! - - #REF! 7,794,973.71
#REF! #REF! - - #REF! 11,841,865.30
#REF! #REF! - - #REF! 8,701,922.08
#REF! #REF! - - #REF! 7,439,856.74
#REF! #REF! - - #REF! 8,390,117.49
#REF! #REF! - - #REF! 8,622,305.46
#REF! #REF! - - #REF! 7,439,856.74
#REF! - #REF! - #REF! 93,410.00
#REF! - #REF! - #REF! 125,585.00
#REF! #REF! - - #REF! 9,841,438.36
#REF! #REF! - - #REF! 7,204,292.09
#REF! #REF! - - #REF! 7,439,856.74
#REF! #REF! - - #REF! 7,320,482.67
Jumlah (d)
JUMLAH III
3 4 5 6 7 8
- - - - - 33,631.53
- - - - - 33,295.00
- - - - - 75,000.00
- - - - - 20,000.00
- - - - - 61,742.50
- - - - - 33,392.50
- - - - - 61,742.50
- - - - - 265,467.50
- - - - - 188,725.00
106.52 - - 106.52 106.52 69,650.00
- - - - 32,975.00
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
Jumlah (c)
- - - - - 33,631.53
- - - - - 33,631.53
- - - - - 33,295.00
- - - - - 75,000.00
- - - - - 20,000.00
- - - - - 61,742.50
- - - - - 33,392.50
- - - - - 61,742.50
- - - - - 265,467.50
- - - - - 188,725.00
95.20 - - 95.20 95.20 69,650.00
- - - - 32,975.00
591.02 - 591.02 - 591.02 #REF!
591.02 - 591.02 - 591.02 #REF!
591.02 - 591.02 - 591.02 #REF!
591.02 - 591.02 - 591.02 #REF!
#REF! - #REF! - #REF! #REF!
Jumlah (d)
- - - - 33,631.53
- - - - 33,631.53
- - - - 33,295.00
- - - - 75,000.00
- - - - 20,000.00
- - - - 61,742.50
- - - - 33,392.50
- - - - 61,742.50
- - - - 265,467.50
- - - - 188,725.00
72.60 - - 72.60 72.60 69,650.00
- - - - 32,975.00
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
#REF! - #REF! - #REF! #REF!
Jumlah (e)
3 4 5 6 7 8
#REF! - #REF! - #REF! 90,197.54
#REF! - #REF! - #REF! 90,197.54
230.44 - - 230.44 230.44 43,000.00
230.44 - - 230.44 230.44 239,600.00
161.31 - - 161.31 161.31 829,310.19
2,146.31 - - 2,146.31 2,146.31 Err:509
48.95 - - 48.95 48.95 226,428.50
151.61 - - 151.61 151.61 256,684.50
113.55 - - 113.55 113.55 227,122.50
84.35 - - 84.35 84.35 99,933.10
Jumlah (a)
JUMLAH V
3 4 5 6 7 8
4.54 - - 4.54 4.54 535,750.00
138.75 - - 138.75 138.75 657,245.00
61.10 - - 61.10 61.10 232,245.00
375.11 - - 375.11 375.11 155,892.50
237.15 - - 237.15 237.15 68,496.60
237.15 - - 237.15 237.15 68,496.60
1,717.60 - - 1,717.60 1,717.60 90,112.00
82.06 - - 82.06 82.06 89,959.00
36.23 - - 36.23 36.23 0.00
292.86 - - 292.86 292.86 89,959.00
750.22 - - 750.22 750.22 87,314.50
237.15 - - 237.15 237.15 60,166.50
237.15 - - 237.15 237.15 226,592.00
36.96 - - 36.96 36.96 301,025.00
1,717.60 - - 1,717.60 1,717.60 195,184.50
82.06 - - 82.06 82.06 51,634.50
36.23 - - 36.23 36.23 226,592.00
292.86 - - 292.86 292.86 98,615.00
1,700.96 - - 1,700.96 1,700.96 30,802.50
872.44 - - 872.44 872.44 33,802.50
1,700.96 - - 1,700.96 1,700.96 30,892.50
872.44 - - 872.44 872.44 33,802.50
1,700.96 - - 1,700.96 1,700.96 42,000.00
21.50 - - 21.50 21.50 3,436,695.75
19.70 - - 19.70 19.70 3,436,695.75
1.00 - - 1.00 1.00 7,500,000.00
6.80 - - 6.80 6.80 655,250.00
4.40 - - 4.40 4.40 232,245.00
- - Jumlah (a)
- -
5.20 - 5.20 5.20 6,520,000.00
1.00 - - 1.00 1.00 97,011,171.36
35.83 - - 35.83 35.83 602,000.00
62.49 - - 62.49 62.49 571,250.00
13.61 - - 13.61 13.61 535,750.00
83.81 - - 83.81 83.81 657,245.00
45.98 - - 45.98 45.98 232,245.00
156.18 - - 156.18 156.18 155,892.50
151.68 - - 151.68 151.68 68,496.60
151.68 - - 151.68 151.68 68,496.60
1,333.46 - - 1,333.46 1,333.46 90,112.00
80.83 - - 80.83 80.83 89,959.00
21.14 - - 21.14 21.14 89,959.00
312.36 - - 312.36 312.36 87,314.50
151.68 - - 151.68 151.68 60,166.50
151.68 - - 151.68 151.68 226,592.00
52.08 - - 52.08 52.08 301,025.00
1,333.46 - - 1,333.46 1,333.46 195,184.50
80.83 - - 80.83 80.83 51,634.50
1,538.38 - - 1,538.38 1,538.38 226,592.00
21.14 - - 21.14 21.14 98,615.00
275.48 - - 275.48 275.48 33,802.50
1,275.48 - - 1,275.48 1,275.48 30,802.50
1,075.48 - - 1,075.48 1,075.48 33,802.50
1,275.48 - - 1,275.48 1,275.48 30,892.50
1,275.48 - - 1,275.48 1,275.48 42,000.00
14.00 - - 14.00 14.00 3,436,695.75
19.70 - - 19.70 19.70 3,436,695.75
12.00 - - 12.00 12.00 821,287.50
3.40 - - 3.40 3.40 655,250.00
6.80 - - 6.80 6.80 232,245.00
Jumlah (b)
3 4 5 6 7 8
1,055.53 - - 1,055.53 1,055.53 195,184.50
32.42 - - 32.42 32.42 51,634.50
28.06 - - 28.06 28.06 98,615.00
302.91 - - 302.91 302.91 30,802.50
352.91 - - 352.91 352.91 33,802.50
302.91 - - 302.91 302.91 30,892.50
302.91 - - 302.91 302.91 42,000.00
5.50 - - 5.50 5.50 3,436,695.75
2.00 - - 2.00 2.00 232,245.00
1.41 - 1.41 1.41 6,520,000.00
33.12 - - 33.12 33.12 232,245.00
Jumlah (c)
JUMLAH VI
3 4 5 6 7 8
22.97 - - 22.97 22.97 180,800.50
130.12 - - 130.12 130.12 180,800.50
4.63 - - 4.63 4.63 180,800.50
69.38 - - 69.38 69.38 180,800.50
56.98 - - 56.98 56.98 180,800.50
750.22 - - 750.22 750.22 29,020.75
771.88 - - 771.88 771.88 22,527.50
- - - Jumlah (a)
- - -
- - -
3,092.46 - - 3,092.46 3,092.46 29,020.75
426.00 - - 426.00 426.00 29,020.75
314.22 - - 314.22 314.22 29,020.75
85.66 - - 85.66 85.66 29,020.75
142.20 - - 142.20 142.20 29,020.75
- - - -
470.62 - - 470.62 470.62 Err:509
262.93 - - 262.93 262.93 Err:509
417.81 - - 417.81 417.81 Err:509
295.27 - - 295.27 295.27 Err:509
175.76 - - 175.76 175.76 Err:509
207.90 - - 207.90 207.90 180,800.50
1,414.29 - - 1,414.29 1,414.29 22,527.50
1,435.43 - - 1,435.43 1,435.43 32,975.00
195.59 - - 195.59 195.59 13,835.75
1,761.59 - - 1,761.59 1,761.59 13,835.75
151.68 - - 151.68 151.68 161,642.50
907.46 - - 907.46 907.46 161,642.50
255.10 - - 255.10 255.10 161,642.50
6.80 - - 6.80 6.80 180,800.50
17.91 - - 17.91 17.91 180,800.50
124.97 - - 124.97 124.97 180,800.50
13.90 - - 13.90 13.90 180,800.50
41.91 - - 41.91 41.91 180,800.50
38.42 - - 38.42 38.42 180,800.50
464.04 - - 464.04 464.04 29,020.75
70.60 - - 70.60 70.60 80,442.50
- - - Jumlah (b)
- - -
2,243.76 - - 2,243.76 2,243.76 29,020.75
2,154.53 - - 2,154.53 2,154.53 Err:509
118.74 - - 118.74 118.74 180,800.50
1,021.94 - - 1,021.94 1,021.94 22,527.50
1,021.94 - - 1,021.94 1,021.94 32,975.00
1,278.00 - - 1,278.00 1,278.00 13,835.75
60.58 - - 60.58 60.58 161,642.50
17.01 - - 17.01 17.01 180,800.50
33.18 - - 33.18 33.18 180,800.50
4.63 - - 4.63 4.63 180,800.50
39.89 - - 39.89 39.89 180,800.50
28.06 - - 28.06 28.06 180,800.50
40.00 - - 40.00 40.00 180,800.50
25.41 - - 25.41 25.41 80,442.50
- - - Jumlah (c)
- - - JUMLAH VIII
- - -
- - -
243.60 - - 243.60 243.60 225,000.00
48.00 - - 48.00 48.00 450,000.00
58.00 - - 58.00 58.00 250,000.00
124.00 - - 124.00 124.00 375,000.00
34.00 - - 34.00 34.00 275,000.00
987.80 - - 987.80 987.80 253,712.50
212.60 - - 212.60 212.60 104,312.50
- - - - Jumlah (a)
- - - -
284.24 - - 284.24 284.24 225,000.00
56.00 - - 56.00 56.00 450,000.00
54.00 - - 54.00 54.00 250,000.00
124.00 - - 124.00 124.00 375,000.00
36.00 - - 36.00 36.00 275,000.00
1,180.24 - - 1,180.24 1,180.24 253,712.50
234.00 - - 234.00 234.00 104,312.50
1.00 - - 1.00 1.00 163,704,362.78
- - - - Jumlah (b)
3 4 5 6 7 8
- - - -
120.72 - - 120.72 120.72 225,000.00
24.00 - - 24.00 24.00 450,000.00
26.00 - - 26.00 26.00 250,000.00
36.00 - - 36.00 36.00 375,000.00
29.00 - - 29.00 29.00 275,000.00
686.74 - - 686.74 686.74 253,712.50
76.20 - - 76.20 76.20 104,312.50
- - - - Jumlah (c)
- - - - JUMLAH IX
- - - -
92.00 - - 92.00 92.00 600,000.00
864.00 - - 864.00 864.00 262,985.00
10.00 - - 10.00 10.00 5,000,000.00
264.49 - - 264.49 264.49 492,850.00
193.43 193.43 193.43 519,100.00
70.52 - - 70.52 70.52 600,000.00
67.56 - - 67.56 67.56 1,020,703.00
126.23 - - 126.23 126.23 1,020,703.00
75.00 75.00 75.00 262,985.00
- - - - JUMLAH X
- - - -
6.00 - - 6.00 6.00 16,059,669
1.00 - - 1.00 1.00 63,522,789
2.00 - - 2.00 2.00 21,000,000
265.00 - - 510.00 510.00 281,366
162.00 - - 162.00 162.00 1,928,835
1.00 - - 1.00 1.00 372,159,278
445.01 - - 445.01 445.01 297,762.50
- - - - JUMLAH XI
- - - -
- - - -
- - - -
- - - -
18.00 - - 18.00 18.00 126,189.00
12.00 - - 12.00 12.00 206,789.00
25.00 - - 25.00 25.00 91,342.50
35.00 - - 35.00 35.00 88,242.50
120.00 - - 120.00 120.00 68,092.50
12.00 - - 12.00 12.00 11,000.00
15.00 - - 15.00 15.00 8,500.00
90.00 - - 90.00 90.00 5,000.00
2.00 - - 2.00 2.00 15,000.00
5.00 - - 5.00 5.00 13,000.00
7.00 - - 7.00 7.00 13,000.00
10.00 - - 10.00 10.00 8,000.00
35.00 - - 35.00 35.00 5,000.00
7.00 - - 7.00 7.00 12,000.00
10.00 - - 10.00 10.00 7,000.00
20.00 - - 20.00 20.00 5,000.00
5.00 - - 5.00 5.00 12,000.00
7.00 - - 7.00 7.00 7,500.00
50.00 - - 50.00 50.00 4,000.00
3.00 - - 3.00 3.00 12,000.00
5.00 - - 5.00 5.00 10,000.00
2.00 - - 2.00 2.00 17,500.00
4.00 - - 4.00 4.00 45,000.00
4.00 - - 4.00 4.00 32,000.00
5.00 - - 5.00 5.00 20,000.00
25.00 - - 25.00 25.00 12,000.00
2.00 - - 2.00 2.00 350,000.00
1.00 - - 1.00 1.00 450,000.00
- - - - Jumlah (a)
- - - -
80.00 - - 80.00 80.00 71,009.75
70.00 - - 70.00 70.00 50,084.75
30.00 - - 30.00 30.00 44,494.50
12.00 - - 12.00 12.00 38,788.00
12.00 - - 12.00 12.00 26,563.00
35.00 - - 35.00 35.00 30,000.00
20.00 - - 20.00 20.00 15,000.00
10.00 - - 10.00 10.00 10,000.00
40.00 - - 40.00 40.00 7,000.00
10.00 - - 10.00 10.00 30,000.00
8.00 - - 8.00 8.00 75,000.00
12.00 - - 12.00 12.00 30,000.00
8.00 - - 8.00 8.00 90,000.00
3 4 5 6 7 8
5.00 - - 5.00 5.00 30,000.00
5.00 - - 5.00 5.00 20,000.00
6.00 - - 6.00 6.00 15,000.00
15.00 - - 15.00 15.00 35,000.00
20.00 - - 20.00 20.00 10,000.00
30.00 - - 30.00 30.00 30,000.00
10.00 - - 10.00 10.00 12,000.00
3.00 - - 3.00 3.00 40,000.00
- - - - Jumlah (b)
- - - -
9.00 - - 9.00 9.00 2,839,702.50
4.00 - - 4.00 4.00 3,327,840.00
6.00 - - 6.00 6.00 2,848,965.00
9.00 - - 9.00 9.00 600,000.00
9.00 - - 9.00 9.00 150,000.00
9.00 - - 9.00 9.00 150,000.00
6.00 - - 6.00 6.00 600,000.00
9.00 - - 9.00 9.00 90,000.00
9.00 - - 9.00 9.00 524,113.75
3.00 - - 3.00 3.00 750,000.00
- - - - Jumlah (c)
- - - - JUMLAH Lt. 01
- - - -
- - - -
45.00 - - 45.00 45.00 126,189.00
75.00 - - 75.00 75.00 91,342.50
315.00 - - 315.00 315.00 68,092.50
10.00 - - 10.00 10.00 11,000.00
17.00 - - 17.00 17.00 8,500.00
200.00 - - 200.00 200.00 5,000.00
7.00 - - 7.00 7.00 13,000.00
12.00 - - 12.00 12.00 8,000.00
30.00 - - 30.00 30.00 5,000.00
10.00 - - 10.00 10.00 12,000.00
20.00 - - 20.00 20.00 7,000.00
40.00 - - 40.00 40.00 5,000.00
10.00 - - 10.00 10.00 12,000.00
15.00 - - 15.00 15.00 7,500.00
30.00 - - 30.00 30.00 4,000.00
3.00 - - 3.00 3.00 12,000.00
2.00 - - 2.00 2.00 10,000.00
4.00 - - 4.00 4.00 32,000.00
6.00 - - 6.00 6.00 20,000.00
30.00 - - 30.00 30.00 12,000.00
2.00 - - 2.00 2.00 350,000.00
70.00 - - 70.00 70.00 17,000.00
- - - - Jumlah (a)
- - - -
350.00 - - 350.00 350.00 71,009.75
100.00 - - 100.00 100.00 50,084.75
120.00 - - 120.00 120.00 44,494.50
80.00 - - 80.00 80.00 38,788.00
25.00 - - 25.00 25.00 26,563.00
50.00 - - 50.00 50.00 30,000.00
75.00 - - 75.00 75.00 15,000.00
25.00 - - 25.00 25.00 10,000.00
30.00 - - 30.00 30.00 7,000.00
37.00 - - 37.00 37.00 30,000.00
15.00 - - 15.00 15.00 22,000.00
15.00 - - 15.00 15.00 10,000.00
20.00 - - 20.00 20.00 6,500.00
12.00 - - 12.00 12.00 75,000.00
20.00 - - 20.00 20.00 30,000.00
25.00 - - 25.00 25.00 90,000.00
10.00 - - 10.00 10.00 30,000.00
15.00 - - 15.00 15.00 20,000.00
10.00 - - 10.00 10.00 15,000.00
15.00 - - 15.00 15.00 35,000.00
25.00 - - 25.00 25.00 10,000.00
30.00 - - 30.00 30.00 22,000.00
45.00 - - 45.00 45.00 30,000.00
25.00 - - 25.00 25.00 12,000.00
10.00 - - 10.00 10.00 40,000.00
- - - - Jumlah (b)
3 4 5 6 7 8
- - - -
15.00 - - 15.00 15.00 2,839,702.50
9.00 - - 9.00 9.00 3,327,840.00
10.00 - - 10.00 10.00 2,848,965.00
15.00 - - 15.00 15.00 600,000.00
15.00 - - 15.00 15.00 150,000.00
15.00 - - 15.00 15.00 150,000.00
10.00 - - 10.00 10.00 600,000.00
15.00 - - 15.00 15.00 90,000.00
15.00 - - 15.00 15.00 524,113.75
7.00 - - 7.00 7.00 750,000.00
- - - - Jumlah (c)
- - - - JUMLAH Lt. 02
- - - -
- - - -
25.00 - - 25.00 25.00 284,289.00
6.00 - - 6.00 6.00 126,189.00
12.00 - - 12.00 12.00 91,342.50
70.00 - - 70.00 70.00 68,092.50
6.00 - - 6.00 6.00 11,000.00
10.00 - - 10.00 10.00 8,500.00
35.00 - - 35.00 35.00 5,000.00
2.00 - - 2.00 2.00 13,000.00
10.00 - - 10.00 10.00 8,000.00
15.00 - - 15.00 15.00 5,000.00
2.00 - - 2.00 2.00 12,000.00
3.00 - - 3.00 3.00 7,000.00
15.00 - - 15.00 15.00 5,000.00
5.00 - - 5.00 5.00 12,000.00
7.00 - - 7.00 7.00 7,500.00
12.00 - - 12.00 12.00 4,000.00
3.00 - - 3.00 3.00 12,000.00
4.00 - - 4.00 4.00 10,000.00
2.00 - - 2.00 2.00 32,000.00
4.00 - - 4.00 4.00 20,000.00
15.00 - - 15.00 15.00 12,000.00
2.00 - - 2.00 2.00 1,750,000.00
1.00 - - 1.00 1.00 350,000.00
50.00 - - 50.00 50.00 17,000.00
- - - - Jumlah (a)
- - - -
30.00 - - 30.00 30.00 71,009.75
15.00 - - 15.00 15.00 50,084.75
25.00 - - 25.00 25.00 44,494.50
8.00 - - 8.00 8.00 38,788.00
4.00 - - 4.00 4.00 26,563.00
20.00 - - 20.00 20.00 30,000.00
20.00 - - 20.00 20.00 15,000.00
10.00 - - 10.00 10.00 10,000.00
5.00 - - 5.00 5.00 7,000.00
2.00 - - 2.00 2.00 30,000.00
3.00 - - 3.00 3.00 75,000.00
4.00 - - 4.00 4.00 30,000.00
3.00 - - 3.00 3.00 90,000.00
2.00 - - 2.00 2.00 30,000.00
4.00 - - 4.00 4.00 20,000.00
2.00 - - 2.00 2.00 15,000.00
4.00 - - 4.00 4.00 35,000.00
6.00 - - 6.00 6.00 25,000.00
6.00 - - 6.00 6.00 10,000.00
5.00 - - 5.00 5.00 22,000.00
6.00 - - 6.00 6.00 30,000.00
2.00 - - 2.00 2.00 12,000.00
- - - - Jumlah (b)
- - - -
3.00 - - 3.00 3.00 2,839,702.50
4.00 - - 4.00 4.00 3,327,840.00
2.00 - - 2.00 2.00 2,848,965.00
3.00 - - 3.00 3.00 600,000.00
3.00 - - 3.00 3.00 150,000.00
3.00 - - 3.00 3.00 150,000.00
2.00 - - 2.00 2.00 600,000.00
3.00 - - 3.00 3.00 90,000.00
5.00 - - 5.00 5.00 524,113.75
3.00 - - 3.00 3.00 750,000.00
- - - - Jumlah (c)
3 4 5 6 7 8
- - - -
130.00 - - 130.00 130.00 126,189.00
1.00 - - 1.00 1.00 750,000.00
3.00 - - 3.00 3.00 500,000.00
- - - - Jumlah (d)
- - - -
2.00 - - 2.00 2.00 9,000,000.00
4.00 - - 4.00 4.00 350,000.00
4.00 - - 4.00 4.00 350,000.00
8.00 - - 8.00 8.00 400,000.00
18.00 - - 18.00 18.00 126,189.00
70.00 - - 70.00 70.00 91,342.50
1.00 - - 1.00 1.00 1,500,000.00
- - - - Jumlah (e)
- - - -
50.00 - - 50.00 50.00 230,659.75
250.00 - - 250.00 250.00 71,009.75
6.00 - - 6.00 6.00 250,000.00
25.00 - - 25.00 25.00 75,000.00
8.00 - - 8.00 8.00 150,000.00
80.00 - - 80.00 80.00 75,000.00
30.00 - - 30.00 30.00 35,000.00
15.00 - - 15.00 15.00 45,000.00
- - - - Jumlah (f)
- - - -
2.00 - - 2.00 2.00 720,000.00
1.00 - - 1.00 1.00 1,950,000.00
1.00 - - 1.00 1.00 15,000,000.00
1.00 - - 1.00 1.00 75,000,000.00
2.00 - - 2.00 2.00 500,000.00
2.00 - - 2.00 2.00 3,500,000.00
7.00 - - 7.00 7.00 3,350,000.00
1.00 - - 1.00 1.00 3,375,000.00
1.00 - - 1.00 1.00 7,020,000.00
1.00 - - 1.00 1.00 2,300,000.00
10.00 - - 10.00 10.00 4,850,000.00
1.00 - - 1.00 1.00 120,000.00
35.00 - - 35.00 35.00 96,000.00
2.00 - - 2.00 2.00 420,000.00
2.00 - - 2.00 2.00 420,000.00
26.00 - - 26.00 26.00 75,000.00
10.00 - - 10.00 10.00 2,350,000.00
5.00 - - 5.00 5.00 6,000,000.00
340.00 - - 340.00 340.00 330,179.25
250.00 - - 250.00 250.00 284,289.00
170.00 - - 170.00 170.00 206,789.00
70.00 - - 70.00 70.00 40,000.00
60.00 - - 60.00 60.00 30,000.00
100.00 - - 100.00 100.00 17,500.00
10.00 - - 10.00 10.00 45,000.00
27.00 - - 27.00 27.00 40,000.00
15.00 - - 15.00 15.00 20,000.00
15.00 - - 15.00 15.00 40,000.00
50.00 - - 50.00 50.00 15,000.00
- - - - Jumlah (g)
- - - - JUMLAH Lt. 03
- - - - TOTAL
- - - -
- - - -
- - - -
1.00 - - 1.00 1.00 350,000,000.00
1.00 - - 1.00 1.00 200,000,000.00
1.00 - - 1.00 1.00 85,000,000.00
1.00 - - 1.00 1.00 45,000,000.00
1.00 - - 1.00 1.00 15,000,000.00
1.00 - - 1.00 1.00 16,000,000.00
1.00 - - 1.00 1.00 15,000,000.00
1.00 - - 1.00 1.00 16,000,000.00
1.00 - - 1.00 1.00 13,000,000.00
1.00 - - 1.00 1.00 14,000,000.00
1.00 - - 1.00 1.00 15,000,000.00
1.00 - - 1.00 1.00 12,000,000.00
1.00 - - 1.00 1.00 10,000,000.00
1.00 - - 1.00 1.00 35,000,000.00
1.00 - - 1.00 1.00 5,000,000.00
- - - - Jumlah (a)
3 4 5 6 7 8
- - - -
80.00 - - 80.00 80.00 275,000.00
150.00 - - 150.00 150.00 650,000.00
65.00 - - 65.00 65.00 325,000.00
65.00 - - 65.00 65.00 325,000.00
75.00 - - 75.00 75.00 325,000.00
75.00 - - 75.00 75.00 425,000.00
85.00 - - 85.00 85.00 325,000.00
85.00 - - 85.00 85.00 325,000.00
20.00 - - 20.00 20.00 350,000.00
255.00 - - 255.00 255.00 200,000.00
100.00 - - 100.00 100.00 325,000.00
256.00 - - 256.00 256.00 200,000.00
64.00 - - 64.00 64.00 35,000.00
10.00 - - 10.00 10.00 50,000.00
8.00 - - 8.00 8.00 75,000.00
16.00 - - 16.00 16.00 85,000.00
1,000.00 - - 1,000.00 1,000.00 1,500.00
- - - - Jumlah (b)
- - - -
243.00 - - 243.00 243.00 432,375.00
5.00 - - 5.00 5.00 432,375.00
90.00 - - 90.00 90.00 445,175.00
38.00 - - 38.00 38.00 1,156,475.00
4.00 - - 4.00 4.00 1,576,475.00
- - - - -
15.00 - - 15.00 15.00 125,000.00
27.00 - - 27.00 27.00 400,000.00
119.00 - - 119.00 119.00 123,000.00
4.00 - - 4.00 4.00 110,000.00
30.00 - - 30.00 30.00 375,000.00
30.00 - - 30.00 30.00 450,000.00
2.00 - - 2.00 2.00 1,200,000.00
4.00 - - 4.00 4.00 550,000.00
4.00 - - 4.00 4.00 6,000,000.00
4.00 - - 4.00 4.00 5,000,000.00
21.00 - - 21.00 21.00 95,000.00
27.00 - - 27.00 27.00 48,000.00
2.00 - - 2.00 2.00 50,000.00
2.00 - - 2.00 2.00 75,000.00
25.00 - - 25.00 25.00 55,000.00
8.00 - - 8.00 8.00 60,000.00
82.00 - - 82.00 82.00 65,000.00
10.00 - - 10.00 10.00 450,000.00
38.00 - - 38.00 38.00 125,000.00
5.00 - - 5.00 5.00 250,000.00
150.00 - - 150.00 150.00 248,953.00
2,000.00 - - 2,000.00 2,000.00 1,500.00
2.00 - - 2.00 2.00 1,210,000.00
3.00 - - 3.00 3.00 45,000.00
- - - - Jumlah (c)
- - - -
1.00 - - 1.00 1.00 9,800,000.00
1.00 - - 1.00 1.00 500,000.00
68.00 - - 68.00 68.00 95,000.00
1.00 - - 1.00 1.00 275,000.00
2.00 - - 2.00 2.00 75,000.00
2.00 - - 2.00 2.00 250,000.00
2.00 - - 2.00 2.00 350,000.00
7.00 - - 7.00 7.00 1,500,000.00
88.00 - - 88.00 88.00 463,775.00
1.00 - - 1.00 1.00 463,775.00
2.00 - - 2.00 2.00 463,775.00
2.00 - - 2.00 2.00 463,775.00
2.00 - - 2.00 2.00 463,775.00
- - - - Jumlah (d)
- - - -
3.00 - - 3.00 3.00 3,750,000.00
1.00 - - 1.00 1.00 3,500,000.00
1.00 - - 1.00 1.00 1,250,000.00
1.00 - - 1.00 1.00 1,500,000.00
1.00 - - 1.00 1.00 1,500,000.00
1.00 - - 1.00 1.00 650,000.00
1.00 - - 1.00 1.00 750,000.00
42.00 - - 42.00 42.00 105,000.00
3 4 5 6 7 8
36.00 - - 36.00 36.00 175,000.00
3.00 - - 3.00 3.00 250,000.00
1.00 - - 1.00 1.00 950,000.00
42.00 - - 42.00 42.00 454,675.00
39.00 - - 39.00 39.00 454,675.00
4.00 - - 4.00 4.00 500,000.00
4.00 - - 4.00 4.00 454,675.00
- - - - Jumlah (e)
- - - -
1.00 - - 1.00 1.00 95,000,000.00
1.00 - - 1.00 1.00 4,500,000.00
1.00 - - 1.00 1.00 750,000.00
50.00 - - 50.00 50.00 40,000.00
30.00 - - 30.00 30.00 60,000.00
55.00 - - 55.00 55.00 65,000.00
55.00 - - 55.00 55.00 250,000.00
55.00 - - 55.00 55.00 420,875.00
Jumlah (f)
TOTAL Lt. 01
3 4 5 6 7 8
- - - - -
16.00 - - 16.00 16.00 3,500,000.00
27.00 - - 27.00 27.00 750,000.00
- - - - -
30.00 - - 30.00 30.00 143,545.33
- - - - Jumlah (f)
- - - -
1.00 - - 1.00 1.00 35,000,000.00
80.00 - - 80.00 80.00 175,000.00
1.00 - - 1.00 1.00 1,210,000.00
120.00 - - 120.00 120.00 5,000.00
1.00 - - 1.00 1.00 2,000,000.00
1.00 - - 1.00 1.00 3,500,000.00
Jumlah (g)
TOTAL Lt. 03
JUMLAH II
TABEL REALISASI PENGGUNAAN ANGGARAN
D - KABUPATEN MIMIKA
D - KABUPATEN MIMIKA
JENIS PEKERJAAN
REAL COST
PPN 10%
TOTAL
PEMBULATAN
GGUNAAN ANGGARAN
NG UTAMA
Err:509
JUMLAH HARGA
REALISASI
RAB AWAL (2X8) REAL (3X8)
TA 2009 (4X8) TA 2010 (5X8)
9 10 11 12
9 10 11 12
47,664,390.62 #REF! #REF! 0.00
28,543,179.71 #REF! #REF! 0.00
23,176,757.08 #REF! #REF! 0.00
21,768,964.57 #REF! #REF! 0.00
239,485,129.39 #REF! #REF! 0.00
99,344,407.00 #REF! #REF! 0.00
34,179,577.97 #REF! #REF! 0.00
15,169,784.00 #REF! 0.00 #REF!
481,115,712.20 #REF! 0.00 #REF!
0.00 #REF! 0.00 #REF!
0.00 #REF! 0.00 #REF!
0.00 #REF! 0.00 #REF!
0.00 #REF! 0.00 #REF!
54,101,481.22 #REF! 0.00 #REF!
160,801,624.73 #REF! 0.00 #REF!
0.00 #REF! 0.00 #REF!
0.00 #REF! 0.00 #REF!
4,626,012,117.59 #REF! #REF! #REF!
9 10 11 12
66,296,063.45 #REF! #REF! 0.00
17,331,335.99 #REF! #REF! 0.00
#REF! #REF! 0.00
224,201,035.85 #REF! #REF! 0.00
#REF! #REF! 0.00
6,390,356.50 #REF! #REF! 0.00
12,780,712.99 #REF! #REF! 0.00
36,685,370.80 #REF! #REF! 0.00
13,608,953.67 #REF! #REF! 0.00
8,625,676.25 #REF! #REF! 0.00
3,410,457.21 #REF! #REF! 0.00
1,120,844,038.71 #REF! #REF! 0.00
164,517,552.02 #REF! #REF! 0.00
47,664,390.62 #REF! #REF! 0.00
28,543,179.71 #REF! #REF! 0.00
19,555,388.79 #REF! #REF! 0.00
29,804,066.09 #REF! #REF! 0.00
47,452,280.00 #REF! 0.00 #REF!
#REF! 0.00 #REF!
222,327,934.07 #REF! #REF! 0.00
30,294,048.23 #REF! #REF! 0.00
24,105,135.83 #REF! #REF! 0.00
135,223,955.86 #REF! #REF! 0.00
45,309,990.52 #REF! #REF! 0.00
#REF! #REF! 0.00
#REF! #REF! 0.00
2,939,341,914.30 #REF! #REF! #REF!
9 10 11 12
9 10 11 12
#REF! 0.00 #REF!
#REF! 0.00 #REF!
9,909,049.00 0.00
55,214,142.80 55,214,142.80 0.00 0.00
133,776,855.28 133,776,855.28 0.00 0.00
830,121,887.87 Err:509 Err:509 Err:509
11,082,542.93 11,082,542.93 0.00 0.00
42,664,814.17 38,914,653.62 0.00 0.00
25,789,305.63 25,789,305.63 0.00 0.00
8,429,356.99 8,429,356.99 0.00 0.00
1,631,984,635.67 #REF! Err:509 #REF!
9 10 11 12
2,430,162.00 2,430,162.00 0.00 0.00
91,192,743.75 91,192,743.75 0.00 0.00
14,189,008.28 14,189,008.28 0.00 0.00
133,152,461.03 58,476,523.89 0.00 0.00
0.00 16,244,105.11 0.00 0.00
0.00 16,244,105.11 0.00 0.00
0.00 154,776,371.20 0.00 0.00
0.00 7,382,035.54 0.00 0.00
0.00 0.00 0.00 0.00
0.00 26,345,302.78 0.00 0.00
149,155,867.77 65,504,734.93 0.00 0.00
14,268,605.81 14,268,605.81 0.00 0.00
53,736,745.98 53,736,745.98 0.00 0.00
11,125,884.00 11,125,884.00 0.00 0.00
358,919,116.70 335,248,897.20 0.00 0.00
2,469,213.42 4,237,127.07 0.00 0.00
8,208,295.20 8,208,295.20 0.00 0.00
5,409,253.85 28,880,290.29 0.00 0.00
52,393,820.40 52,393,820.40 0.00 0.00
29,490,653.10 29,490,653.10 0.00 0.00
52,546,906.80 52,546,906.80 0.00 0.00
29,490,653.10 29,490,653.10 0.00 0.00
71,440,320.00 71,440,320.00 0.00 0.00
73,888,958.63 73,888,958.63 0.00 0.00
67,702,906.28 67,702,906.28 0.00 0.00
7,500,000.00 7,500,000.00 0.00 0.00
4,458,321.00 4,458,321.00 0.00 0.00
1,021,878.00 1,021,878.00 0.00 0.00
1,390,617,992.12 1,457,335,692.46 0.00 44,179,520.00
9 10 11 12
192,840,334.16 206,023,095.29 0.00 0.00
1,752,733.10 1,673,990.49 0.00 0.00
2,767,136.90 2,767,136.90 0.00 0.00
9,330,231.26 9,330,231.26 0.00 0.00
11,929,071.26 11,929,071.26 0.00 0.00
9,357,492.71 9,357,492.71 0.00 0.00
12,722,010.00 12,722,010.00 0.00 0.00
18,901,826.63 18,901,826.63 0.00 0.00
464,490.00 464,490.00 0.00 0.00
6,520,000.00 9,180,160.00 0.00 9,180,160.00
7,691,954.40 7,691,954.40 0.00 0.00
388,369,655.57 558,227,452.10 0.00 29,980,590.00
3,116,416,986.75 3,460,208,514.48 0.00 108,051,070.00
9 10 11 12
4,153,710.69 4,153,710.69 0.00 0.00
23,525,037.86 23,525,037.86 0.00 0.00
837,467.92 837,467.92 0.00 0.00
12,543,034.69 12,543,034.69 0.00 0.00
10,302,012.49 10,302,012.49 0.00 0.00
49,574,986.40 21,771,830.98 0.00 0.00
9,385,181.78 17,388,526.70 0.00 0.00
Err:509 Err:509 Err:509 Err:509
9 10 11 12
9 10 11 12
150,000.00 150,000.00 0.00 0.00
100,000.00 100,000.00 0.00 0.00
90,000.00 90,000.00 0.00 0.00
525,000.00 525,000.00 0.00 0.00
200,000.00 200,000.00 0.00 0.00
900,000.00 900,000.00 0.00 0.00
120,000.00 120,000.00 0.00 0.00
120,000.00 120,000.00 0.00 0.00
17,220,759.50 17,220,759.50 0.00 0.00
9 10 11 12
9 10 11 12
9 10 11 12
9 10 11 12
6,300,000.00 6,300,000.00 0.00 0.00
750,000.00 750,000.00 0.00 0.00
950,000.00 950,000.00 0.00 0.00
19,096,350.00 19,096,350.00 0.00 0.00
17,732,325.00 17,732,325.00 0.00 0.00
2,000,000.00 2,000,000.00 0.00 0.00
1,818,700.00 1,818,700.00 0.00 0.00
73,457,375.00 73,457,375.00 0.00 0.00
9 10 11 12
0.00 0.00 0.00
56,000,000.00 56,000,000.00 0.00 0.00
20,250,000.00 20,250,000.00 0.00 0.00
0.00 0.00 0.00
4,306,360.00 4,306,360.00 0.00 0.00
182,745,485.00 182,745,485.00 0.00 0.00
JUMLAH HARGA
REALISASI
RAB AWAL (2X8) REAL (3X8)
TA 2009 (4X8) TA 2010 (5X8)
9 10 11 12
39,955,547,268.03
Err:509
479,435,005.17
Err:509
JUMLAH HARGA
REALISASI
SISA (9 -14)
TA 2011 (6X8) JUMLAH (7X8)
13 14 15
-
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
13 14 15.00
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
13 14 15.00
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 #REF! #REF!
0.00 22,180,000.00 -
0.00 43,893,861.00 (27,733,561.00)
0.00 21,186,000.00 (13,386,000.00)
0.00 138,295,821.70 (66,268,671.70)
0.00 5,019,675.50 4,430,324.50
0.00 230,575,358.20 (102,957,908.20)
0.00 36,624,000.00 -
0.00 22,465,303.20 159,116.80
0.00 10,843,200.00 76,800.00
0.00 72,315,258.60 19,103,816.40
0.00 1,880,550.00 7,569,450.00
0.00 144,128,311.80 26,909,183.20
13 14 15.00
Err:509 14 15.00
0.00 #REF! #REF!
0.00 #REF! #REF!
9,909,049.00 9,909,049.00 (9,909,049.00)
55,214,142.80 55,214,142.80 -
133,776,855.28 133,776,855.28 -
Err:509 Err:509 Err:509
11,082,542.93 11,082,542.93 -
38,914,653.62 38,914,653.62 3,750,160.55
25,789,305.63 25,789,305.63 -
8,429,356.99 8,429,356.99 -
Err:509 #REF! #REF!
47,326,146.78 47,326,146.78 -
27,660,696.00 27,660,696.00 -
2,579,591.75 2,579,591.75 -
0.00 44,179,520.00 (2,484,120.00)
37,164,382.50 37,164,382.50 -
13 14 15.00
2,430,162.00 2,430,162.00 -
91,192,743.75 91,192,743.75 -
14,189,008.28 14,189,008.28 -
58,476,523.89 58,476,523.89 74,675,937.14
16,244,105.11 16,244,105.11 (16,244,105.11)
16,244,105.11 16,244,105.11 (16,244,105.11)
154,776,371.20 154,776,371.20 (154,776,371.20)
7,382,035.54 7,382,035.54 (7,382,035.54)
0.00 0.00 -
26,345,302.78 26,345,302.78 (26,345,302.78)
65,504,734.93 65,504,734.93 83,651,132.84
14,268,605.81 14,268,605.81 -
53,736,745.98 53,736,745.98 -
11,125,884.00 11,125,884.00 -
335,248,897.20 335,248,897.20 23,670,219.50
4,237,127.07 4,237,127.07 (1,767,913.65)
8,208,295.20 8,208,295.20 -
28,880,290.29 28,880,290.29 (23,471,036.44)
52,393,820.40 52,393,820.40 -
29,490,653.10 29,490,653.10 -
52,546,906.80 52,546,906.80 -
29,490,653.10 29,490,653.10 -
71,440,320.00 71,440,320.00 -
73,888,958.63 73,888,958.63 -
67,702,906.28 67,702,906.28 -
7,500,000.00 7,500,000.00 -
4,458,321.00 4,458,321.00 -
1,021,878.00 1,021,878.00 -
1,413,156,172.46 1,457,335,692.46 (66,717,700.35)
13 14 15.00
206,023,095.29 206,023,095.29 (13,182,761.13)
1,673,990.49 1,673,990.49 78,742.61
2,767,136.90 2,767,136.90 -
9,330,231.26 9,330,231.26 -
11,929,071.26 11,929,071.26 -
9,357,492.71 9,357,492.71 -
12,722,010.00 12,722,010.00 -
18,901,826.63 18,901,826.63 -
464,490.00 464,490.00 -
0.00 9,180,160.00 (2,660,160.00)
7,691,954.40 7,691,954.40 -
528,246,862.10 558,227,452.10 (169,857,796.53)
3,352,157,444.48 3,460,208,514.48 (343,791,527.73)
11,059,300.00 11,059,300.00 -
1,989,150.00 1,989,150.00 -
3,280,225.00 3,280,225.00 -
3,805,685.00 3,805,685.00 -
30,556,650.00 30,556,650.00 -
4,034,690.00 4,034,690.00 -
17,026,155.00 17,026,155.00 -
2,723,250.00 2,723,250.00 -
11,298,940.00 11,298,940.00 -
6,004,810.00 6,004,810.00 -
9,972,410.00 9,972,410.00 -
101,751,265.00 101,751,265.00 -
10,743,320.00 10,743,320.00 -
2,784,810.00 2,784,810.00 -
2,523,250.00 2,523,250.00 -
2,927,450.00 2,927,450.00 -
28,759,200.00 28,759,200.00 -
3,002,560.00 3,002,560.00 -
16,093,215.00 16,093,215.00 -
1,997,050.00 1,997,050.00 -
7,308,030.00 7,308,030.00 -
3,883,845.00 3,883,845.00 -
6,450,045.00 6,450,045.00 -
86,472,775.00 86,472,775.00 -
3,159,800.00 3,159,800.00 -
596,745.00 596,745.00 -
11,983,000.00 11,983,000.00 -
1,595,110.00 1,595,110.00 -
7,696,755.00 7,696,755.00 -
6,426,920.00 6,426,920.00 -
3,415,580.00 3,415,580.00 -
5,672,380.00 5,672,380.00 -
1,815,500.00 1,815,500.00 -
2,927,450.00 2,927,450.00 -
45,289,240.00 45,289,240.00 -
233,513,280.00 233,513,280.00 -
13 14 15.00
4,153,710.69 4,153,710.69 -
23,525,037.86 23,525,037.86 -
837,467.92 837,467.92 -
12,543,034.69 12,543,034.69 -
10,302,012.49 10,302,012.49 -
21,771,830.98 21,771,830.98 27,803,155.41
17,388,526.70 17,388,526.70 (8,003,344.93)
Err:509 Err:509 Err:509
65,115,714.10 65,115,714.10 -
Err:509 Err:509 Err:509
21,468,251.37 21,468,251.37 -
23,021,640.71 23,021,640.71 -
33,698,306.63 33,698,306.63 -
17,682,088.50 17,682,088.50 -
9,792,464.29 9,792,464.29 -
3,075,416.51 3,075,416.51 -
5,998,960.59 5,998,960.59 -
837,467.92 837,467.92 -
7,211,227.94 7,211,227.94 -
5,073,262.03 5,073,262.03 -
7,232,020.00 7,232,020.00 -
2,044,043.93 2,044,043.93 (2,044,043.93)
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
54,810,000.00 54,810,000.00 -
21,600,000.00 21,600,000.00 -
14,500,000.00 14,500,000.00 -
46,500,000.00 46,500,000.00 -
9,350,000.00 9,350,000.00 -
250,617,207.50 250,617,207.50 -
22,176,837.50 22,176,837.50 -
419,554,045.00 419,554,045.00 -
63,954,000.00 63,954,000.00 -
25,200,000.00 25,200,000.00 -
13,500,000.00 13,500,000.00 -
46,500,000.00 46,500,000.00 -
9,900,000.00 9,900,000.00 -
299,441,641.00 299,441,641.00 -
24,409,125.00 24,409,125.00 -
163,704,362.78 163,704,362.78 (163,704,362.78)
646,609,128.78 646,609,128.78 -163,704,362.78
13 14 15.00
27,162,000.00 27,162,000.00 -
10,800,000.00 10,800,000.00 -
6,500,000.00 6,500,000.00 -
13,500,000.00 13,500,000.00 -
7,975,000.00 7,975,000.00 -
174,234,522.25 174,234,522.25 -
7,948,612.50 7,948,612.50 -
248,120,134.75 248,120,134.75 -
1,314,283,308.53 1,314,283,308.53 (163,704,362.78)
55,200,000.00 55,200,000.00 -
227,219,040.00 227,219,040.00 -
50,000,000.00 50,000,000.00 -
130,353,896.50 130,353,896.50 (130,353,896.50)
100,409,513.00 100,409,513.00 (100,409,513.00)
42,312,000.00 42,312,000.00 (42,312,000.00)
68,958,694.68 68,958,694.68 (68,958,694.68)
128,847,218.36 128,847,218.36 (128,847,218.36)
19,723,875.00 19,723,875.00 (19,723,875.00)
823,024,237.54 823,024,237.54 -490,605,197.54
96,358,013.25 96,358,013.25 -
63,522,789.24 63,522,789.24 -
42,000,000.00 42,000,000.00 -
143,496,459.32 143,496,459.32 -
312,471,348.61 312,471,348.61 -
372,159,278.30 372,159,278.30 (271,989,203.90)
132,507,885.65 132,507,885.65 (132,507,885.65)
1,162,515,774.37 1,162,515,774.37 -404,497,089.55
2,271,402.00 2,271,402.00 -
2,481,468.00 2,481,468.00 -
2,283,562.50 2,283,562.50 -
3,088,487.50 3,088,487.50 -
8,171,100.00 8,171,100.00 -
132,000.00 132,000.00 -
127,500.00 127,500.00 -
450,000.00 450,000.00 -
30,000.00 30,000.00 -
65,000.00 65,000.00 -
91,000.00 91,000.00 -
80,000.00 80,000.00 -
175,000.00 175,000.00 -
84,000.00 84,000.00 -
70,000.00 70,000.00 -
100,000.00 100,000.00 -
60,000.00 60,000.00 -
52,500.00 52,500.00 -
200,000.00 200,000.00 -
36,000.00 36,000.00 -
50,000.00 50,000.00 -
35,000.00 35,000.00 -
180,000.00 180,000.00 -
128,000.00 128,000.00 -
100,000.00 100,000.00 -
300,000.00 300,000.00 -
700,000.00 700,000.00 -
450,000.00 450,000.00 -
21,992,020.00 21,992,020.00 -
5,680,780.00 5,680,780.00 -
3,505,932.50 3,505,932.50 -
1,334,835.00 1,334,835.00 -
465,456.00 465,456.00 -
318,756.00 318,756.00 -
1,050,000.00 1,050,000.00 -
300,000.00 300,000.00 -
100,000.00 100,000.00 -
280,000.00 280,000.00 -
300,000.00 300,000.00 -
600,000.00 600,000.00 -
360,000.00 360,000.00 -
720,000.00 720,000.00 -
13 14 15.00
150,000.00 150,000.00 -
100,000.00 100,000.00 -
90,000.00 90,000.00 -
525,000.00 525,000.00 -
200,000.00 200,000.00 -
900,000.00 900,000.00 -
120,000.00 120,000.00 -
120,000.00 120,000.00 -
17,220,759.50 17,220,759.50 -
25,557,322.50 25,557,322.50 -
13,311,360.00 13,311,360.00 -
17,093,790.00 17,093,790.00 -
5,400,000.00 5,400,000.00 -
1,350,000.00 1,350,000.00 -
1,350,000.00 1,350,000.00 -
3,600,000.00 3,600,000.00 -
810,000.00 810,000.00 -
4,717,023.75 4,717,023.75 -
2,250,000.00 2,250,000.00 -
75,439,496.25 75,439,496.25 -
114,652,275.75 114,652,275.75 -
5,678,505.00 5,678,505.00 -
6,850,687.50 6,850,687.50 -
21,449,137.50 21,449,137.50 -
110,000.00 110,000.00 -
144,500.00 144,500.00 -
1,000,000.00 1,000,000.00 -
91,000.00 91,000.00 -
96,000.00 96,000.00 -
150,000.00 150,000.00 -
120,000.00 120,000.00 -
140,000.00 140,000.00 -
200,000.00 200,000.00 -
120,000.00 120,000.00 -
112,500.00 112,500.00 -
120,000.00 120,000.00 -
36,000.00 36,000.00 -
20,000.00 20,000.00 -
128,000.00 128,000.00 -
120,000.00 120,000.00 -
360,000.00 360,000.00 -
700,000.00 700,000.00 -
1,190,000.00 1,190,000.00 -
38,936,330.00 38,936,330.00 -
24,853,412.50 24,853,412.50 -
5,008,475.00 5,008,475.00 -
5,339,340.00 5,339,340.00 -
3,103,040.00 3,103,040.00 -
664,075.00 664,075.00 -
1,500,000.00 1,500,000.00 -
1,125,000.00 1,125,000.00 -
250,000.00 250,000.00 -
210,000.00 210,000.00 -
1,110,000.00 1,110,000.00 -
330,000.00 330,000.00 -
150,000.00 150,000.00 -
130,000.00 130,000.00 -
900,000.00 900,000.00 -
600,000.00 600,000.00 -
2,250,000.00 2,250,000.00 -
300,000.00 300,000.00 -
300,000.00 300,000.00 -
150,000.00 150,000.00 -
525,000.00 525,000.00 -
250,000.00 250,000.00 -
660,000.00 660,000.00 -
1,350,000.00 1,350,000.00 -
300,000.00 300,000.00 -
400,000.00 400,000.00 -
51,758,342.50 51,758,342.50 -
13 14 15.00
42,595,537.50 42,595,537.50 -
29,950,560.00 29,950,560.00 -
28,489,650.00 28,489,650.00 -
9,000,000.00 9,000,000.00 -
2,250,000.00 2,250,000.00 -
2,250,000.00 2,250,000.00 -
6,000,000.00 6,000,000.00 -
1,350,000.00 1,350,000.00 -
7,861,706.25 7,861,706.25 -
5,250,000.00 5,250,000.00 -
134,997,453.75 134,997,453.75 -
225,692,126.25 225,692,126.25 -
7,107,225.00 7,107,225.00 -
757,134.00 757,134.00 -
1,096,110.00 1,096,110.00 -
4,766,475.00 4,766,475.00 -
66,000.00 66,000.00 -
85,000.00 85,000.00 -
175,000.00 175,000.00 -
26,000.00 26,000.00 -
80,000.00 80,000.00 -
75,000.00 75,000.00 -
24,000.00 24,000.00 -
21,000.00 21,000.00 -
75,000.00 75,000.00 -
60,000.00 60,000.00 -
52,500.00 52,500.00 -
48,000.00 48,000.00 -
36,000.00 36,000.00 -
40,000.00 40,000.00 -
64,000.00 64,000.00 -
80,000.00 80,000.00 -
180,000.00 180,000.00 -
3,500,000.00 3,500,000.00 -
350,000.00 350,000.00 -
850,000.00 850,000.00 -
19,614,444.00 19,614,444.00 -
2,130,292.50 2,130,292.50 -
751,271.25 751,271.25 -
1,112,362.50 1,112,362.50 -
310,304.00 310,304.00 -
106,252.00 106,252.00 -
600,000.00 600,000.00 -
300,000.00 300,000.00 -
100,000.00 100,000.00 -
35,000.00 35,000.00 -
60,000.00 60,000.00 -
225,000.00 225,000.00 -
120,000.00 120,000.00 -
270,000.00 270,000.00 -
60,000.00 60,000.00 -
80,000.00 80,000.00 -
30,000.00 30,000.00 -
140,000.00 140,000.00 -
150,000.00 150,000.00 -
60,000.00 60,000.00 -
110,000.00 110,000.00 -
180,000.00 180,000.00 -
24,000.00 24,000.00 -
6,954,482.25 6,954,482.25 -
8,519,107.50 8,519,107.50 -
13,311,360.00 13,311,360.00 -
5,697,930.00 5,697,930.00 -
1,800,000.00 1,800,000.00 -
450,000.00 450,000.00 -
450,000.00 450,000.00 -
1,200,000.00 1,200,000.00 -
270,000.00 270,000.00 -
2,620,568.75 2,620,568.75 -
2,250,000.00 2,250,000.00 -
36,568,966.25 36,568,966.25 -
13 14 15.00
16,404,570.00 16,404,570.00 -
750,000.00 750,000.00 -
1,500,000.00 1,500,000.00 -
18,654,570.00 18,654,570.00 -
18,000,000.00 18,000,000.00 -
1,400,000.00 1,400,000.00 -
1,400,000.00 1,400,000.00 -
3,200,000.00 3,200,000.00 -
2,271,402.00 2,271,402.00 -
6,393,975.00 6,393,975.00 -
1,500,000.00 1,500,000.00 -
34,165,377.00 34,165,377.00 -
-
11,532,987.50 11,532,987.50 -
17,752,437.50 17,752,437.50 -
1,500,000.00 1,500,000.00 -
1,875,000.00 1,875,000.00 -
1,200,000.00 1,200,000.00 -
6,000,000.00 6,000,000.00 -
1,050,000.00 1,050,000.00 -
675,000.00 675,000.00 -
41,585,425.00 41,585,425.00 -
1,440,000.00 1,440,000.00 -
1,950,000.00 1,950,000.00 -
15,000,000.00 15,000,000.00 -
75,000,000.00 75,000,000.00 -
1,000,000.00 1,000,000.00 -
7,000,000.00 7,000,000.00 -
23,450,000.00 23,450,000.00 -
3,375,000.00 3,375,000.00 -
7,020,000.00 7,020,000.00 -
2,300,000.00 2,300,000.00 -
48,500,000.00 48,500,000.00 -
120,000.00 120,000.00 -
3,360,000.00 3,360,000.00 -
840,000.00 840,000.00 -
840,000.00 840,000.00 -
1,950,000.00 1,950,000.00 -
23,500,000.00 23,500,000.00 -
30,000,000.00 30,000,000.00 -
112,260,945.00 112,260,945.00 -
71,072,250.00 71,072,250.00 -
35,154,130.00 35,154,130.00 -
2,800,000.00 2,800,000.00 -
1,800,000.00 1,800,000.00 -
1,750,000.00 1,750,000.00 -
450,000.00 450,000.00 -
1,080,000.00 1,080,000.00 -
300,000.00 300,000.00 -
600,000.00 600,000.00 -
750,000.00 750,000.00 -
474,662,325.00 474,662,325.00 -
632,205,589.50 632,205,589.50 -
972,549,991.50 972,549,991.50 -
350,000,000.00 350,000,000.00 -
200,000,000.00 200,000,000.00 -
85,000,000.00 85,000,000.00 -
45,000,000.00 45,000,000.00 -
15,000,000.00 15,000,000.00 -
16,000,000.00 16,000,000.00 -
15,000,000.00 15,000,000.00 -
16,000,000.00 16,000,000.00 -
13,000,000.00 13,000,000.00 -
14,000,000.00 14,000,000.00 -
15,000,000.00 15,000,000.00 -
12,000,000.00 12,000,000.00 -
10,000,000.00 10,000,000.00 -
35,000,000.00 35,000,000.00 -
5,000,000.00 5,000,000.00 -
846,000,000.00 846,000,000.00 -
13 14 15.00
22,000,000.00 22,000,000.00 -
97,500,000.00 97,500,000.00 -
21,125,000.00 21,125,000.00 -
21,125,000.00 21,125,000.00 -
24,375,000.00 24,375,000.00 -
31,875,000.00 31,875,000.00 -
27,625,000.00 27,625,000.00 -
27,625,000.00 27,625,000.00 -
7,000,000.00 7,000,000.00 -
51,000,000.00 51,000,000.00 -
32,500,000.00 32,500,000.00 -
51,200,000.00 51,200,000.00 -
2,240,000.00 2,240,000.00 -
500,000.00 500,000.00 -
600,000.00 600,000.00 -
1,360,000.00 1,360,000.00 -
1,500,000.00 1,500,000.00 -
421,150,000.00 421,150,000.00 -
105,067,125.00 105,067,125.00 -
2,161,875.00 2,161,875.00 -
40,065,750.00 40,065,750.00 -
43,946,050.00 43,946,050.00 -
6,305,900.00 6,305,900.00 -
0.00 0.00 -
1,875,000.00 1,875,000.00 -
10,800,000.00 10,800,000.00 -
14,637,000.00 14,637,000.00 -
440,000.00 440,000.00 -
11,250,000.00 11,250,000.00 -
13,500,000.00 13,500,000.00 -
2,400,000.00 2,400,000.00 -
2,200,000.00 2,200,000.00 -
24,000,000.00 24,000,000.00 -
20,000,000.00 20,000,000.00 -
1,995,000.00 1,995,000.00 -
1,296,000.00 1,296,000.00 -
100,000.00 100,000.00 -
150,000.00 150,000.00 -
1,375,000.00 1,375,000.00 -
480,000.00 480,000.00 -
5,330,000.00 5,330,000.00 -
4,500,000.00 4,500,000.00 -
4,750,000.00 4,750,000.00 -
1,250,000.00 1,250,000.00 -
37,342,950.00 37,342,950.00 -
3,000,000.00 3,000,000.00 -
2,420,000.00 2,420,000.00 -
135,000.00 135,000.00 -
362,772,650.00 362,772,650.00 -
9,800,000.00 9,800,000.00 -
500,000.00 500,000.00 -
6,460,000.00 6,460,000.00 -
275,000.00 275,000.00 -
150,000.00 150,000.00 -
500,000.00 500,000.00 -
700,000.00 700,000.00 -
10,500,000.00 10,500,000.00 -
40,812,200.00 40,812,200.00 -
463,775.00 463,775.00 -
927,550.00 927,550.00 -
927,550.00 927,550.00 -
927,550.00 927,550.00 -
72,943,625.00 72,943,625.00 -
11,250,000.00 11,250,000.00 -
3,500,000.00 3,500,000.00 -
1,250,000.00 1,250,000.00 -
1,500,000.00 1,500,000.00 -
1,500,000.00 1,500,000.00 -
650,000.00 650,000.00 -
750,000.00 750,000.00 -
4,410,000.00 4,410,000.00 -
13 14 15.00
6,300,000.00 6,300,000.00 -
750,000.00 750,000.00 -
950,000.00 950,000.00 -
19,096,350.00 19,096,350.00 -
17,732,325.00 17,732,325.00 -
2,000,000.00 2,000,000.00 -
1,818,700.00 1,818,700.00 -
73,457,375.00 73,457,375.00 -
95,000,000.00 95,000,000.00 -
4,500,000.00 4,500,000.00 -
750,000.00 750,000.00 -
2,000,000.00 2,000,000.00 -
1,800,000.00 1,800,000.00 -
3,575,000.00 3,575,000.00 -
13,750,000.00 13,750,000.00 -
23,148,125.00 23,148,125.00 -
144,523,125.00 144,523,125.00 -
1,920,846,775.00 1,920,846,775.00 -
117,606,000.00 117,606,000.00 -
4,756,125.00 4,756,125.00 -
37,839,875.00 37,839,875.00 -
41,633,100.00 41,633,100.00 -
9,458,850.00 9,458,850.00 -
0.00 0.00 -
2,565,000.00 2,565,000.00 -
6,750,000.00 6,750,000.00 -
12,546,000.00 12,546,000.00 -
4,840,000.00 4,840,000.00 -
24,000,000.00 24,000,000.00 -
9,900,000.00 9,900,000.00 -
6,750,000.00 6,750,000.00 -
13,950,000.00 13,950,000.00 -
15,000,000.00 15,000,000.00 -
1,056,000.00 1,056,000.00 -
1,925,000.00 1,925,000.00 -
240,000.00 240,000.00 -
4,810,000.00 4,810,000.00 -
4,950,000.00 4,950,000.00 -
4,500,000.00 4,500,000.00 -
2,750,000.00 2,750,000.00 -
32,363,890.00 32,363,890.00 -
3,000,000.00 3,000,000.00 -
1,500,000.00 1,500,000.00 -
90,000.00 90,000.00 -
364,779,840.00 364,779,840.00 -
500,000.00 500,000.00 -
1,855,100.00 1,855,100.00 -
4,750,000.00 4,750,000.00 -
550,000.00 550,000.00 -
150,000.00 150,000.00 -
500,000.00 500,000.00 -
700,000.00 700,000.00 -
9,000,000.00 9,000,000.00 -
23,188,750.00 23,188,750.00 -
927,550.00 927,550.00 -
927,550.00 927,550.00 -
927,550.00 927,550.00 -
927,550.00 927,550.00 -
44,904,050.00 44,904,050.00 -
454,675.00 454,675.00 -
3,360,000.00 3,360,000.00 -
4,725,000.00 4,725,000.00 -
500,000.00 500,000.00 -
14,549,600.00 14,549,600.00 -
13,185,575.00 13,185,575.00 -
36,774,850.00 36,774,850.00 -
750,000.00 750,000.00 -
1,800,000.00 1,800,000.00 -
13 14 15.00
2,210,000.00 2,210,000.00 -
8,500,000.00 8,500,000.00 -
14,309,750.00 14,309,750.00 -
27,569,750.00 27,569,750.00 -
474,028,490.00 474,028,490.00 -
31,995,750.00 31,995,750.00 -
21,368,400.00 21,368,400.00 -
17,347,125.00 17,347,125.00 -
0.00 0.00 -
18,000,000.00 18,000,000.00 -
2,755,000.00 2,755,000.00 -
435,000.00 435,000.00 -
900,000.00 900,000.00 -
5,625,000.00 5,625,000.00 -
1,140,000.00 1,140,000.00 -
6,750,000.00 6,750,000.00 -
500,000.00 500,000.00 -
384,000.00 384,000.00 -
50,000.00 50,000.00 -
605,000.00 605,000.00 -
120,000.00 120,000.00 -
3,120,000.00 3,120,000.00 -
1,875,000.00 1,875,000.00 -
14,937,180.00 14,937,180.00 -
1,500,000.00 1,500,000.00 -
3,000,000.00 3,000,000.00 -
90,000.00 90,000.00 -
132,497,455.00 132,497,455.00 -
500,000.00 500,000.00 -
1,855,100.00 1,855,100.00 -
1,995,000.00 1,995,000.00 -
275,000.00 275,000.00 -
75,000.00 75,000.00 -
250,000.00 250,000.00 -
350,000.00 350,000.00 -
6,000,000.00 6,000,000.00 -
9,739,275.00 9,739,275.00 -
463,775.00 463,775.00 -
463,775.00 463,775.00 -
463,775.00 463,775.00 -
463,775.00 463,775.00 -
22,894,475.00 22,894,475.00 -
454,675.00 454,675.00 -
1,575,000.00 1,575,000.00 -
1,750,000.00 1,750,000.00 -
500,000.00 500,000.00 -
6,820,125.00 6,820,125.00 -
5,456,100.00 5,456,100.00 -
16,555,900.00 16,555,900.00 -
1,250,000.00 1,250,000.00 -
3,000,000.00 3,000,000.00 -
845,000.00 845,000.00 -
3,250,000.00 3,250,000.00 -
5,471,375.00 5,471,375.00 -
13,816,375.00 13,816,375.00 -
22,051,125.00 22,051,125.00 -
0.00 0.00 -
1,250,000.00 1,250,000.00 -
0.00 0.00 -
54,000,000.00 54,000,000.00 -
2,750,000.00 2,750,000.00 -
48,000.00 48,000.00 -
110,000.00 110,000.00 -
11,250,000.00 11,250,000.00 -
550,000.00 550,000.00 -
180,000.00 180,000.00 -
0.00 0.00 -
10,000,000.00 10,000,000.00 -
13 14 15.00
0.00 0.00 -
56,000,000.00 56,000,000.00 -
20,250,000.00 20,250,000.00 -
0.00 0.00 -
4,306,360.00 4,306,360.00 -
182,745,485.00 182,745,485.00 -
35,000,000.00 35,000,000.00 -
14,000,000.00 14,000,000.00 -
1,210,000.00 1,210,000.00 -
600,000.00 600,000.00 -
2,000,000.00 2,000,000.00 -
3,500,000.00 3,500,000.00 -
56,310,000.00 56,310,000.00 -
424,819,690.00 424,819,690.00 -
2,819,694,955.00 2,819,694,955.00 -
JUMLAH HARGA
REALISASI
SISA (9 -14)
TA 2011 (6X8) JUMLAH (7X8)
13 14 15.00
233,513,280.00 233,513,280.00 -
Err:509 Err:509 Err:509
972,549,991.50 972,549,991.50 -
2,819,694,955.00 2,819,694,955.00 -
Rp 16,643,920,994.83
Err:509
DAFTAR HARGA BAHAN
HARGA
NO JENIS BAHAN SAT NO JENIS BAHAN
SATUAN (Rp)
HARGA
NO JENIS BAHAN SAT
SATUAN (Rp)
NO JENIS BAHAN
127
128 Alcubound m2 400,000.00 161 Sock PVC Clipsal 3/4
129 Joint Plat (penyambungan) Unit 295,000.00 162 Las Dop Legrand 4 mm2
130 Oksigen Btl 435,000.00 163 Isolasi Unibel
131 Pipa Stainless Ø 3 " m' 435,000.00 164 Mesin Gilas
132 Pipa Stainless Ø 2 ½ " m' 290,000.00 165 Alat Berat Grader
133 Pipa Stainless Ø 1 " m' 100,000.00 166 Excavator
134 Ring Kaki Ø 3 " bh 18,000.00 167 Bulldozer
135 Ring Kaki Ø 1 " bh 10,000.00 168 Air
136 Bola Ø 4 " bh 38,000.00 169 Minyak Bekisting
137 Cincin Ø 3 " bh 42,000.00 170 Besi Plat Dudukan Kuda-kuda
138 Cincin Ø 1 " bh 15,000.00 171 Besi Plat Penghubung Dudukan
139 Dina Bolt bh 7,000.00 172 Baut Anker Dudukan Kuda-kuda
140 Karbit Kg 11,000.00 173 Atap Polycarbonat
141 Kawat Las Dos 75,000.00 174 Silent
142 Bath Tub Unit 5,200,000.00 175 Sekrup
143 Water Heater Set 3,550,000.00 176 Alumunium Foil
144 Washtafel Meja (Toto) Bh 2,300,000.00 177 Alumunium Tape
145 Washtafel Gantung Bh 2,675,000.00 178 Glass Wool
146 Tangki Fuber cap. 2 M3 Unit 4,750,000.00 179 Wira Mesh
147 Floor Drain (Toto) Bh 300,000.00 180 Ukiran pada Dinding Border
148 Urinoir (Toto) Bh 2,400,000.00 181 Ukiran pada Papan Nama Ruangan
149 Pompa Hisap Unit 7,750,000.00 182 Ukiran pada Pintu Kayu
150 Pompa Tekan Unit 5,250,000.00 183 Ukiran pada Kolom
151 Kabel NYM 2 x 2,5 mm m' 17,000.00 184 Pasang Papan Penunjuk Ruangan
152 Kabel NYM 3 x 2,5 mm m' 20,000.00 185 Tanah Subur
153 Kabel NYM 3 x 4 mm m' 29,000.00 186 Pupuk (TSP)
154 Kabel NYM 4 x 4 mm m' 43,000.00 187 Rumput
155 Kabel ITC 2 x 2 x 0,6 mm m' 3,000.00 188 Palem Raja
156 Pipa PVC Clipsal 3/4 m' 4,000.00 189 Palem Botol
157 Pipa PVC 5/8 m' 2,600.00 190 Cemara
158 Tee Dos PVC 3/4 bh 4,500.00
159 Elbo PVC Clipsal 3/4 bh 4,500.00
160 Klem PVC Clipsal 3/4 bh 700.00
HARGA
NO URAIAN SAT
SATUAN (Rp)
NO URAIAN
1 Pekerja O/h 75,000.00
2 Pembantu Tukang O/h 85,000.00 4 Kepala Tukang
3 Tukang O/h 100,000.00 5 Mandor
DAFTAR HARGA BAHAN
HARGA
JENIS BAHAN SAT
SATUAN (Rp)
Psg 120,000.00
Psg 28,000.00
Bh 9,800.00
Bh 148,000.00
Kunci Gembok Besar Bh 32,000.00
Bh 540,000.00
Bh 82,000.00
Closed Duduk (Toto) Bh 2,325,000.00
Bh 55,000.00
Bh 76,000.00
Bh 17,000.00
Bh 8,000.00
Bh 3,500.00
Bh 4,700.00
Batu Candi 20 x 40 Bh 23,200.00
List Keramik 6 x 20 cm Bh 15,000.00
List Keramik 10 x 40 cm Bh 5,800.00
Zak 77,000.00
Kg 1,540.00
Kg 7,500.00
Kg 53,000.00
Lbr 176,000.00
Kg 42,000.00
Kg 40,000.00
Kg 46,000.00
Kg 49,700.00
Kg 49,700.00
Kg 49,700.00
Lbr 4,000.00
Kg 46,000.00
Plester "Cotton Tape" M' 700.00
Kg 9,500.00
Kg 34,000.00
Kg 50,000.00
kg 35,000.00
Atap Super Deck Tebal 0,35 mm M' 135,000.00
Nok Seng Plat Bjls 30 lebar 45 cm M' 65,000.00
Atap Seng Gelombang Bjls 30 Lbr 75,000.00
Stiker Sand Blasting M2 230,000.00
Perekat (sampo 250 mg) Scht 1,200.00
M' 90,000.00
Kg 40,000.00
Bh 2,900.00
M' 220,000.00
Roll 27,500.00
m2 2,050,000.00
Pipa PVC AW dia. 6 " m' 135,000.00
Pipa PVC AW dia. 4 " m' 32,000.00
Pipa PVC AW dia. 3 " m' 18,500.00
Pipa PVC AW dia. 2 " m' 19,500.00
Pipa PVC AW dia. 1 ½ " m' 18,500.00
Pipa PVC AW dia. 1 " m' 11,000.00
Pipa GIP Medium A dia. 1 " m' 48,000.00
Pipa GIP Medium A dia. ¾ " m' 46,000.00
Pipa GIP Medium A dia. ½ " m' 33,000.00
Pipa GIP Medium A dia. 4 " m' 190,000.00
Pipa GIP Medium A dia. 3 " m' 165,000.00
Pipa GIP Medium A dia. 2 " m' 115,000.00
Btg 50,000.00
Besi Siku 40x40x2 mm Btg 220,000.00
Pipa GIP Medium A dia. 1 ¼ " m' 63,000.00
Pipa GIP Medium A Ø 1 ½ " m' 83,000.00
m' 223,000.00
bh 2,400.00
HARGA
JENIS BAHAN SAT
SATUAN (Rp)
HARGA
URAIAN SAT
SATUAN (Rp)
O/h 102,500.00
O/h 110,000.00
ANALISA HARGA SATUAN PEKERJAAN
Jumlah
19 1 M3 CAMPURAN BETON K. 175
326.0000 Kg Semen Pc 1,540.00
760.0000 Kg Pasir cor 175.00
1,029.0000 Kg Batu Pecah 2/3 648.15
215.0000 Ltr Air 50.00
1.6500 o/h Pekerja 75,000.00
0.2750 o/h Tukang 100,000.00
0.0280 o/h Kepala Tukang 102,500.00
0.0830 o/h Mandor 110,000.00
Jumlah
31 1 M3 SLOOF PRAKTIS
0.9800 M3 Beton K.175 1,475,984.44
110.0000 Kg Besi beton 21,575.75
13.3330 M2 Bekisting 176,125.00
0.5000 o/h Tukang bongkar/siram 75,000.00
Jumlah
58 1 M3 COR SPESIE 1 : 5
190.0000 Kg Semen Pc 1,540.00
0.8500 M3 Pasir cor 245,000.00
6.0000 o/h Pekerja 75,000.00
0.5000 o/h Tukang 100,000.00
0.0500 o/h Kepala tukang 102,500.00
0.3000 o/h Mandor 110,000.00
Jumlah
59 1 M3 LISTPLANK BETON
1.0000 M3 Beton K.175 1,475,984.44
102.3660 Kg Besi beton 21,575.75
10.0000 M2 Bekisting 357,962.50
0.7500 o/h Tukang bongkar 75,000.00
Jumlah
60 1 M3 PLAT LANTAI
1.0000 M3 Beton K. 225 1,546,101.11
152.4300 Kg Besi beton 21,575.75
8.3300 M2 Bekisting 517,962.50
0.5000 o/h Tukang bongkar/siram 75,000.00
Jumlah
66 1 M2 ACIAN
3.2500 Kg Semen Pc 1,540.00
0.2000 o/h Pekerja 75,000.00
0.1000 o/h Tukang 100,000.00
0.0100 o/h Kepala tukang 102,500.00
0.0100 o/h Mandor 110,000.00
Jumlah
Jumlah Lt 3 X 1.09
73 1 M2 PASANG DINDING GRANIT 30/60
1.0600 M2 Granit 2,050,000.00
3.0030 Bh Paku 12 1,200.00
1 2 3
Jumlah
82 1 M' PEKERJAAN COMPOUND
1.2000 M' Plester "Cotton Tape" 700.00
0.4500 Kg Compound (2 x Lari ) 9,500.00
0.0200 o/h Pekerja 75,000.00
0.0630 o/h Tukang 100,000.00
0.0063 o/h Kepala Tukang 102,500.00
0.0025 o/h Mandor 110,000.00
Jumlah
84 1 M2 CAT PLAFON
0.1100 Kg Cat Plafon 35,000.00
0.0800 o/h Pekerja 75,000.00
0.1100 o/h Tukang cat 100,000.00
0.0110 o/h Kepala tukang 102,500.00
0.0050 o/h Mandor 110,000.00
Jumlah
85 1 M2 CAT DINDING TEMBOK BARU / DINDING DALAM
(1 Lapis Plamir, 1 Lapis Cat Dasar, dan 2 lapis cat penutup)
(SNI 2002)
0.1000 Kg Plamur 34,000.00
0.1000 Kg Cat Tembok Dasar 35,000.00
0.2600 Kg Cat Penutup 2 x 40,000.00
0.0200 o/h Pekerja 75,000.00
0.0630 o/h Tukang cat 100,000.00
0.0063 o/h Kepala tukang 102,500.00
0.0025 o/h Mandor 110,000.00
1.0000 Ls Alat Bantu (kuas, amplas, lem, 3,000.00
scafolding)
Jumlah Lt 1
87 1 M2 CAT DASAR
0.3300 Ltr Cat Dasar / Meni 25,000.00
0.0100 Bh Kuas 7,500.00
0.0200 o/h Pekerja 75,000.00
0.2000 o/h Tukang cat 100,000.00
0.0200 o/h Kepala tukang 102,500.00
0.0100 o/h Mandor 110,000.00
Jumlah
88 1 M2 MENCAT DUCO
0.3500 Kg Cat Duco (Nippe) 53,000.00
0.2000 Kg Dempul Isamu Plastik 50,000.00
0.1700 Kg Cat Dasar Abu-abu 42,900.00
1.0000 Lbr Kertas Gosok 4,000.00
1.2500 Kg Thinner 49,700.00
0.3000 Kg Clear 49,700.00
1.0000 Ls Alat Bantu (Kompresor) 7,500.00
0.2500 o/h Pekerja 75,000.00
0.3500 o/h Tukang cat 100,000.00
0.0250 o/h Kepala tukang 102,500.00
0.0010 o/h Mandor 110,000.00
Jumlah
89 1 M2 CAT MELAMIN
0.4000 Kg Wood Filler 46,000.00
1.0000 Kg Thinner 49,700.00
0.3000 Kg Sending 49,700.00
0.3000 Kg Clear 49,700.00
0.3000 Kg Pewarna 55,000.00
0.2000 Lbr Kertas gosok 4,000.00
0.2500 o/h Pekerja 75,000.00
0.2500 o/h Tukang 100,000.00
0.0250 o/h Kepala tukang 102,500.00
0.0010 o/h Mandor 110,000.00
Jumlah
Jumlah
157 1 Unit PEKERJAAN SEPTICTANK & REMBESAN
21.3650 M3 Galian tanah 59,000.00
6.4095 M3 Urugan tanah kembali 19,666.67
0.3800 M3 Urugan Pasir 239,600.00
1.2190 M3 Pasangan Pondasi Batu Kali 1 : 4 1,176,657.50
2.2240 M3 Pasangan Tembok 1 pc : 4 psr 1,089,900.00
0.2180 M3 Cor rabat 1 pc : 3 psr : 5 krl 829,310.19
0.5780 M3 Sloof, Kolom, Ringbalk 6,205,571.88
0.4240 M3 Beton Plat Penutup 9,136,145.12
30.8970 M2 Plesteran 1 pc : 2 psr 58,067.54
0.4480 M3 Urugan Kerikil 323,600.00
0.5220 M3 Pekerjaan Ijuk 1,250,000.00
4.0000 M' Pipa PVC Ø 4 " 71,009.75
1.0000 Bh Pipa Udara Gip. Ø 2 " 206,789.00
Jumlah
181 All IN PEK. INSTALASI PIPA AIR BERSIH Lantai 1 (Total 210 m)
18.00 m Pipa GIP medium Ø1¼" 126,189.00
12.00 m Pipa GIP medium Ø2" 206,789.00
Jumlah
Jumlah
JUMLAH
HARGA (Rp)
4
65,400.00
3,850.00
90,000.00
1,225.00
2,250.00
156,960.00
1,260.00
30,000.00
20,000.00
2,050.00
2,200.00
375,195.00
130,800.00
601,680.00
14,700.00
112,500.00
75,000.00
150,000.00
15,375.00
5,500.00
1,105,555.00
26,160.00
420.00
15,260.00
7,500.00
10,000.00
1,025.00
550.00
60,915.00
56,250.00
2,750.00
59,000.00
112,500.00
6,600.00
119,100.00
18,750.00
916.67
19,666.67
37,500.00
5,500.00
43,000.00
38,700.00
5,500.00
40,000.00
84,200.00
192,000.00
22,500.00
1,100.00
215,600.00
216,000.00
22,500.00
1,100.00
239,600.00
300,000.00
22,500.00
1,100.00
323,600.00
600,000.00
77,760.00
58,500.00
39,000.00
3,997.50
4,290.00
783,547.50
600,000.00
251,020.00
122,200.00
112,500.00
75,000.00
7,687.50
8,250.00
1,176,657.50
46,000.00
29,183.00
8,930.00
22,500.00
10,000.00
1,025.00
1,650.00
119,288.00
1,192,880.00
46,000.00
17,710.00
10,105.00
22,500.00
10,000.00
1,025.00
1,650.00
108,990.00
1,089,900.00
354,200.00
156,275.00
190,185.19
10,000.00
90,000.00
20,000.00
2,050.00
6,600.00
829,310.19
829,310.19
1,064,331.75
1,893,641.93
571,340.00
122,150.00
678,611.11
10,750.00
123,750.00
27,500.00
2,870.00
9,130.00
1,546,101.11
502,040.00
133,000.00
666,944.44
10,750.00
123,750.00
27,500.00
2,870.00
9,130.00
1,475,984.44
425,040.00
145,075.00
187,407.41
10,750.00
123,750.00
27,500.00
2,870.00
9,130.00
931,522.41
199,500.00
2,850.00
5,250.00
7,000.00
717.50
440.00
215,757.50
21,575.75
87,200.00
6,300.00
1,200.00
39,000.00
26,000.00
2,665.00
2,860.00
165,225.00
98,100.00
6,300.00
1,200.00
39,000.00
26,000.00
2,665.00
2,860.00
176,125.00
87,200.00
8,400.00
2,400.00
80,000.00
57,750.00
32,700.00
49,500.00
33,000.00
3,382.50
3,630.00
357,962.50
87,200.00
8,400.00
2,400.00
80,000.00
57,750.00
39,240.00
49,500.00
33,000.00
3,382.50
3,630.00
364,502.50
87,200.00
8,400.00
2,400.00
32,700.00
57,750.00
240,000.00
49,500.00
33,000.00
3,382.50
3,630.00
517,962.50
65,400.00
8,400.00
1,800.00
32,700.00
57,750.00
80,000.00
49,500.00
33,000.00
3,382.50
3,630.00
335,562.50
65,400.00
8,400.00
2,400.00
43,600.00
57,750.00
120,000.00
49,500.00
33,000.00
3,382.50
3,630.00
387,062.50
4,360.00
210.00
57,000.00
855.00
6,160.00
1,470.00
2,250.00
13,500.00
2,000.00
2,000.00
2,000.00
615.00
990.00
93,410.00
6,540.00
420.00
68,400.00
950.00
8,470.00
2,205.00
3,750.00
22,275.00
3,300.00
3,300.00
3,300.00
1,025.00
1,650.00
125,585.00
523,200.00
67,200.00
19,200.00
2,992,500.00
42,750.00
517,440.00
132,300.00
202,500.00
348,800.00
462,000.00
960,000.00
397,500.00
27,500.00
130,000.00
105,000.00
26,855.00
29,150.00
6,983,895.00
1,446,464.76
2,373,332.50
2,348,274.63
37,500.00
6,205,571.88
1,546,101.11
3,236,362.50
4,316,181.51
37,500.00
9,136,145.12
1,546,101.11
2,690,140.03
330,450.00
4,566,691.14
1,546,101.11
3,186,367.17
2,982,973.11
37,500.00
7,752,941.39
1,546,101.11
2,102,159.84
2,863,664.20
37,500.00
6,549,425.16
1,546,101.11
2,569,084.96
1,174,154.93
37,500.00
5,326,841.00
1,475,984.44
3,512,007.81
2,348,309.85
37,500.00
7,373,802.10
1,475,984.44
3,288,791.57
4,314,627.63
37,500.00
9,116,903.64
1,546,101.11
2,569,095.75
3,158,960.92
37,500.00
7,311,657.78
1,546,101.11
3,864,106.79
4,858,089.32
37,500.00
10,305,797.22
1,546,101.11
2,569,095.75
3,158,960.92
37,500.00
7,311,657.78
1,546,101.11
2,569,095.75
3,158,960.92
37,500.00
7,311,657.78
1,546,101.11
3,402,025.42
4,859,838.93
37,500.00
9,845,465.47
1,546,101.11
2,569,095.75
3,158,960.92
37,500.00
7,311,657.78
1,475,984.44
3,078,212.25
5,179,625.00
37,500.00
9,771,321.70
1,475,984.44
3,288,791.57
4,314,627.63
37,500.00
9,116,903.64
1,475,984.44
4,556,796.24
5,727,400.00
37,500.00
11,797,680.69
1,475,984.44
3,864,106.79
2,347,394.00
37,500.00
7,724,985.23
1,475,984.44
2,814,293.36
550,744.49
4,841,022.30
1,475,984.44
2,732,913.95
440,588.99
4,649,487.38
1,475,984.44
3,864,106.79
4,858,089.32
37,500.00
10,235,680.55
1,475,984.44
5,172,870.21
8,828,858.69
37,500.00
15,515,213.34
1,475,984.44
3,512,007.81
2,348,309.85
37,500.00
7,373,802.10
1,475,984.44
3,512,007.81
4,859,984.73
37,500.00
9,885,476.99
1,546,101.11
3,621,647.14
367,163.00
5,534,911.25
1,546,101.11
4,340,475.62
495,675.00
6,382,251.73
1,546,101.11
3,439,053.73
490,420.85
5,475,575.68
292,600.00
208,250.00
450,000.00
50,000.00
5,125.00
33,000.00
1,038,975.00
1,475,984.44
2,208,623.22
3,579,625.00
56,250.00
7,320,482.67
1,546,101.11
3,288,791.57
4,314,627.63
37,500.00
9,187,020.31
1,546,101.11
3,078,212.25
5,179,625.00
37,500.00
9,841,438.36
82,931.02
46,454.03
25,704.00
64,354.00
219,443.05
931,522.41
767,017.91
5,179,625.00
37,500.00
6,915,665.32
15,744.96
4,700.00
22,500.00
15,000.00
1,537.50
1,650.00
61,132.46
11,975.04
5,405.00
22,500.00
15,000.00
1,537.50
1,650.00
58,067.54
5,005.00
15,000.00
10,000.00
1,025.00
1,100.00
32,130.00
9,609.60
5,640.00
22,500.00
15,000.00
1,537.50
1,650.00
55,937.10
87,000.00
22,500.00
20,000.00
2,050.00
1,650.00
133,200.00
30,740.00
1,755.60
705.00
750.00
6,750.00
9,000.00
922.50
550.00
51,173.10
79,500.00
1,755.60
705.00
750.00
6,750.00
9,000.00
922.50
550.00
99,933.10
101,520.00
14,322.00
4,230.00
14,550.00
67,500.00
45,000.00
4,612.50
4,950.00
256,684.50
235,600.00
10,575.00
14,784.00
12,150.00
52,500.00
35,000.00
3,587.50
3,850.00
368,046.50
372,750.00
12,000.00
18,660.00
6,250.00
4,500.00
39,000.00
65,000.00
6,825.00
3,850.00
528,835.00
401,170.69
2,173,000.00
3,603.60
5,875.00
19,157.60
4,875.00
97,500.00
65,000.00
6,662.50
7,150.00
2,382,823.70
112,710.00
10,575.00
12,612.60
12,150.00
52,500.00
35,000.00
3,587.50
3,850.00
242,985.10
94,960.00
10,575.00
15,400.00
11,250.00
52,500.00
35,000.00
3,587.50
3,850.00
227,122.50
92,750.00
10,575.00
16,016.00
12,150.00
52,500.00
35,000.00
3,587.50
3,850.00
226,428.50
1,250,000.00
14,322.00
4,230.00
45,000.00
10,000.00
4,612.50
3,300.00
1,331,464.50
276,000.00
1,200.00
1,500.00
20,000.00
2,050.00
275.00
301,025.00
198,000.00
10,000.00
26,250.00
17,500.00
1,742.50
220.00
253,712.50
54,000.00
4,000.00
18,750.00
25,000.00
2,562.50
104,312.50
4,800.00
2,250.00
500.00
120.00
12,000.00
16,000.00
1,680.00
275.00
37,625.00
5,250.0000
2,500.0000
400.0000
120.0000
12,000.0000
16,000.0000
1,640.0000
275.0000
38,185.0000
840.00
4,275.00
1,500.00
6,300.00
645.75
275.00
13,835.75
5,000.00
5,100.00
7,820.00
16,100.00
18,750.00
25,000.00
2,562.50
110.00
80,442.50
3,850.00
6,000.00
11,000.00
1,127.50
550.00
22,527.50
3,400.00
3,500.00
10,400.00
1,500.00
6,300.00
645.75
275.00
3,000.00
29,020.75
-
3,400.00
5,000.00
22,100.00
1,500.00
6,300.00
645.75
275.00
4,000.00
43,220.75
8,250.00
75.00
1,500.00
20,000.00
2,050.00
1,100.00
32,975.00
18,550.00
10,000.00
7,293.00
4,000.00
62,125.00
14,910.00
7,500.00
18,750.00
35,000.00
2,562.50
110.00
180,800.50
18,400.00
49,700.00
14,910.00
14,910.00
16,500.00
800.00
18,750.00
25,000.00
2,562.50
110.00
161,642.50
91,000.00
3,150.00
11,250.00
45,000.00
4,612.50
880.00
155,892.50
34,880.00
1,687.50
6,026.79
24,107.14
1,323.74
471.43
68,496.60
35,534.00
5,250.00
15,000.00
30,000.00
3,075.00
1,100.00
89,959.00
21,850.00
3,450.00
2,000.00
4,500.00
6,000.00
615.00
330.00
1,000.00
39,745.00
61,694.00
8,400.00
1,000.00
20,250.00
40,500.00
4,151.25
1,485.00
137,480.25
42,500.00
17,000.00
42,952.00
19,600.00
24,750.00
41,860.00
4,817.50
1,705.00
195,184.50
42,500.00
1,000.00
42,952.00
19,600.00
37,125.00
62,790.00
7,226.25
2,557.50
1,000.00
215,750.75
37,632.00
440.00
7,500.00
5,000.00
512.50
550.00
51,634.50
41,104.00
5,500.00
7,500.00
5,000.00
512.50
550.00
60,166.50
89,375.00
5,250.00
1,575.00
2,100.00
205.00
110.00
98,615.00
64,592.00
40,320.00
440.00
10,500.00
21,000.00
80,000.00
8,200.00
1,540.00
226,592.00
64,592.00
40,320.00
440.00
10,500.00
28,350.00
108,000.00
11,070.00
2,079.00
1,000.00
266,351.00
42,952.00
30,800.00
7,500.00
5,000.00
512.50
550.00
87,314.50
24,000.00
210.00
3,750.00
5,000.00
512.50
330.00
33,802.50
18,000.00
210.00
3,750.00
5,000.00
512.50
330.00
27,802.50
12,000.00
210.00
3,750.00
5,000.00
512.50
330.00
21,802.50
19,200.00
2,100.00
3,750.00
5,000.00
512.50
330.00
30,892.50
21,000.00
210.00
3,750.00
5,000.00
512.50
330.00
30,802.50
18,375.00
210.00
3,750.00
5,000.00
512.50
330.00
28,177.50
10,500.00
210.00
3,750.00
5,000.00
512.50
330.00
20,302.50
3,575,000.00
26,250.00
40,000.00
525,000.00
2,100,000.00
215,250.00
38,500.00
6,520,000.00
84,000.00
12,000.00
60,000.00
240,000.00
24,600.00
4,400.00
425,000.00
425,000.00
232,245.00
657,245.00
214,500.00
1,125.00
15,000.00
1,537.50
82.50
232,245.00
84,000.00
214,500.00
22,500.00
240,000.00
24,600.00
4,400.00
602,000.00
140,000.00
20,000.00
75,000.00
300,000.00
30,750.00
5,500.00
571,250.00
224,000.00
20,000.00
75,000.00
300,000.00
30,750.00
5,500.00
655,250.00
52,500.00
20,000.00
206,902.40
393,750.00
5,000.00
75,000.00
300,000.00
30,750.00
5,500.00
1,089,402.40
199,920.00
75,000.00
300,000.00
30,750.00
5,500.00
611,170.00
245,300.00
4,800.00
2,700.00
3,225.00
4,300.00
440.75
231.00
260,996.75
594,000.00
3,225.00
4,300.00
440.75
231.00
602,196.75
1,165,350.00
6,120,000.00
659,501.40
7,944,851.40
25,234,102.98
7,725,503.80
740,000.00
3,904,200.00
1,222,340.00
5,500,000.00
2,500,000.00
500,000.00
47,326,146.78
34,312,661.28
57,202,930.08
932,940.00
631,960.00
1,170,980.00
363,100.00
2,396,600.00
97,011,171.36
87,500.00
20,000.00
630.00
97,000.00
50,000.00
60,000.00
240,000.00
24,600.00
4,400.00
584,130.00
87,500.00
20,000.00
2,250.00
97,000.00
60,000.00
240,000.00
24,600.00
4,400.00
535,750.00
137,100.00
130,980.00
55,090.00
59,545.00
30,000.00
43,438.95
456,153.95
8,500,000.00
37,500.00
200,000.00
500,000.00
125,000.00
150,000.00
29,855.17
19,278.00
36,679.48
450,000.00
800,000.00
82,000.00
22,000.00
1,589,812.64
117,363.00
108,787.70
125,250.00
167,000.00
1,711.75
9,130.00
529,242.45
202,500.00
132,000.00
220,000.00
140,800.00
100,000.00
1,481,200.00
125,250.00
167,000.00
1,711.75
9,130.00
2,579,591.75
3,575,000.00
285,000.00
117,600.00
300,000.00
1,200,000.00
123,000.00
22,000.00
5,622,600.00
3,900,000.00
285,000.00
117,600.00
502,500.00
2,010,000.00
206,025.00
36,850.00
7,057,975.00
3,575,000.00
285,000.00
63,000.00
180,000.00
720,000.00
73,800.00
13,200.00
4,910,000.00
2,398,000.00
285,000.00
63,000.00
180,000.00
720,000.00
73,800.00
13,200.00
3,733,000.00
177,187.50
550.00
11,250.00
75,000.00
820.00
660.00
265,467.50
78,000.00
1,100.00
7,500.00
100,000.00
1,025.00
1,100.00
188,725.00
15,750.00
11,250.00
5,000.00
512.50
880.00
33,392.50
26,250.00
17,850.00
11,250.00
5,000.00
512.50
880.00
61,742.50
21,850.00
4,500.00
6,000.00
615.00
330.00
33,295.00
21,850.00
4,500.00
6,000.00
615.00
330.00
33,295.00
7,000.00
3,500.00
7,500.00
10,000.00
102.50
550.00
5,000.00
33,652.50
336.53
33,295.00
336.53
33,631.53
8,643,700.00
208,162.50
1,800,000.00
400,000.00
600,000.00
205,000.00
66,000.00
11,922,862.50
38,500.00
1,050.00
7,500.00
20,000.00
2,050.00
550.00
69,650.00
165,300.00
23,500.00
22,500.00
20,000.00
2,050.00
220.00
233,570.00
30,000.00
1,800.00
900.00
3,000.00
2,000.00
205.00
220.00
2,125.00
40,250.00
4,025.00
76,000.00
36,100.00
32,200.00
42,000.00
56,000.00
5,740.00
913.00
248,953.00
173,166.00
292,000.00
1,175,000.00
3,140.00
120,000.00
56,808.00
12,628.00
180,000.00
75,000.00
1,125,993.75
90,000.00
120,000.00
12,300.00
660.00
3,436,695.75
321,200.00
100,000.00
3,140.00
15,000.00
158,987.50
90,000.00
120,000.00
12,300.00
660.00
821,287.50
480,000.00
1,045,800.00
159,600.00
689,482.50
125,250.00
167,000.00
17,117.50
9,130.00
2,693,380.00
1,785,000.00
4,444,650.00
678,300.00
2,650,000.00
300,000.00
3,735,200.00
532,312.50
709,750.00
72,744.25
38,797.00
14,946,753.75
24,160.50
2,011.90
7,188.00
105,899.18
33,172.41
92,908.06
32,130.00
297,470.05
14,750.00
1,229.17
5,990.00
426,069.43
309,650.00
69,681.05
73,358.95
1,630,722.51
2,531,451.11
56,640.00
4,720.00
28,752.00
188,051.40
564,795.60
99,517.22
174,202.62
96,390.00
1,213,068.84
60,000.00
77,000.00
32,177.00
169,177.00
19,250.00
25,000.00
235.00
56,250.00
100,000.00
51,250.00
11,000.00
262,985.00
82,931.02
127,748.59
70,686.00
281,365.61
1,830,120.67
98,714.82
1,928,835.49
1,260,535.00
126,053.50
91,048.00
1,434,345.49
2,423,937.60
180,789.62
3,586,820.55
3,873,725.53
1,794,112.78
144,972.80
652,500.00
284,039.00
206,789.00
16,059,668.88
52,500.00
15,000.00
2,090.00
21,150.00
90,740.00
210,000.00
22,500.00
1,100.00
21,150.00
254,750.00
3,060,000.00
2,100,000.00
1,080,000.00
470,000.00
1,440,000.00
450,000.00
562,500.00
41,250.00
3,102,000.00
12,305,750.00
123,057.50
1,905,600.00
31,466.67
15,638,041.14
2,234,005.88
1,340,403.53
22,836,504.52
4,964,457.50
1,787,204.70
663,448.15
489,059.68
2,136,885.47
7,245,712.00
1,500,000.00
750,000.00
63,522,789.24
400,000.00
2,100,000.00
1,080,000.00
490,000.00
1,440,000.00
450,000.00
562,500.00
41,250.00
3,102,000.00
9,665,750.00
96,657.50
2,970,000.00
460,000.00
132,000.00
144,000.00
75,000.00
120,000.00
225,000.00
400,000.00
41,000.00
11,000.00
4,578,000.00
1,725,000.00
300,000.00
72,000.00
56,250.00
90,000.00
187,500.00
300,000.00
30,750.00
11,000.00
2,772,500.00
87,150.00
15,000.00
20,000.00
2,050.00
110.00
124,310.00
412,500.00
11,250.00
3,600.00
11,250.00
20,000.00
2,562.50
550.00
461,712.50
39,600.00
11,550.00
4,050.00
9,000.00
922.50
2,970.00
68,092.50
55,200.00
16,100.00
4,050.00
9,000.00
922.50
2,970.00
88,242.50
57,600.00
16,800.00
4,050.00
9,000.00
922.50
2,970.00
91,342.50
75,600.00
22,050.00
8,100.00
18,000.00
1,845.00
594.00
126,189.00
99,600.00
29,050.00
8,100.00
18,000.00
1,845.00
594.00
157,189.00
138,000.00
40,250.00
8,100.00
18,000.00
1,845.00
594.00
206,789.00
198,000.00
57,750.00
8,100.00
18,000.00
1,845.00
594.00
284,289.00
228,000.00
66,500.00
10,125.00
22,500.00
2,306.25
748.00
330,179.25
162,000.00
47,250.00
6,075.00
13,500.00
1,383.75
451.00
230,659.75
38,400.00
11,200.00
6,075.00
13,500.00
1,383.75
451.00
71,009.75
22,200.00
6,475.00
6,075.00
13,500.00
1,383.75
451.00
50,084.75
23,400.00
6,825.00
4,050.00
9,000.00
922.50
297.00
44,494.50
22,200.00
6,475.00
2,700.00
6,600.00
615.00
198.00
38,788.00
13,200.00
3,850.00
2,700.00
6,000.00
615.00
198.00
26,563.00
3,746,436.90
1,323,637.50
4,500,000.00
7,500,000.00
83,100,000.00
100,170,074.40
5,793,470.42
3,414,854.50
7,896,125.86
68,307,496.76
136,865,097.20
2,074,306.16
25,357,852.73
11,562,278.33
10,717,721.94
271,989,203.90
372,159,278.30
2,271,402.00
2,481,468.00
2,283,562.50
3,088,487.50
8,171,100.00
132,000.00
127,500.00
450,000.00
30,000.00
65,000.00
91,000.00
80,000.00
175,000.00
84,000.00
70,000.00
100,000.00
60,000.00
52,500.00
200,000.00
36,000.00
50,000.00
35,000.00
180,000.00
128,000.00
100,000.00
300,000.00
700,000.00
450,000.00
21,992,020.00
5,678,505.00
6,850,687.50
21,449,137.50
110,000.00
144,500.00
1,000,000.00
91,000.00
96,000.00
150,000.00
120,000.00
140,000.00
200,000.00
120,000.00
112,500.00
120,000.00
36,000.00
20,000.00
128,000.00
120,000.00
360,000.00
700,000.00
1,190,000.00
38,936,330.00
7,107,225.00
757,134.00
1,096,110.00
4,766,475.00
66,000.00
85,000.00
175,000.00
26,000.00
80,000.00
75,000.00
24,000.00
21,000.00
75,000.00
60,000.00
52,500.00
48,000.00
36,000.00
40,000.00
64,000.00
80,000.00
180,000.00
3,500,000.00
350,000.00
850,000.00
19,614,444.00
5,680,780.00
3,505,932.50
1,334,835.00
465,456.00
318,756.00
1,050,000.00
300,000.00
100,000.00
280,000.00
300,000.00
600,000.00
360,000.00
720,000.00
150,000.00
100,000.00
90,000.00
525,000.00
200,000.00
900,000.00
120,000.00
120,000.00
17,220,759.50
24,853,412.50
5,008,475.00
5,339,340.00
3,103,040.00
664,075.00
1,500,000.00
1,125,000.00
250,000.00
210,000.00
1,110,000.00
330,000.00
150,000.00
130,000.00
900,000.00
600,000.00
2,250,000.00
300,000.00
300,000.00
150,000.00
525,000.00
250,000.00
660,000.00
1,350,000.00
300,000.00
400,000.00
51,758,342.50
2,130,292.50
751,271.25
1,112,362.50
310,304.00
106,252.00
600,000.00
300,000.00
100,000.00
35,000.00
60,000.00
225,000.00
120,000.00
270,000.00
60,000.00
80,000.00
30,000.00
140,000.00
150,000.00
60,000.00
110,000.00
180,000.00
24,000.00
6,954,482.25
245,000.00
4,500.00
60,000.00
6,150.00
330.00
315,980.00
200,000.00
750.00
50,000.00
1,025.00
550.00
252,325.00
148,000.00
375.00
50,000.00
512.50
27.50
198,915.00
28,000.00
1,125.00
15,000.00
1,537.50
82.50
45,745.00
60,000.00
1,125.00
15,000.00
1,537.50
82.50
77,745.00
15,000.00
1,125.00
15,000.00
1,537.50
82.50
32,745.00
9,800.00
32,000.00
1,125.00
15,000.00
1,537.50
82.50
59,545.00
40,000.00
750.00
10,000.00
1,025.00
55.00
51,830.00
9,800.00
1,125.00
15,000.00
1,537.50
82.50
27,545.00
120,000.00
750.00
50,000.00
10,250.00
550.00
181,550.00
275,000.00
1,125.00
15,000.00
1,537.50
82.50
292,745.00
540,000.00
3,750.00
50,000.00
5,125.00
275.00
599,150.00
82,000.00
750.00
10,000.00
1,025.00
55.00
93,830.00
2,325,000.00
139,500.00
247,500.00
110,000.00
102.50
17,600.00
2,839,702.50
55,000.00
14,000.00
9,240.00
2,350.00
75,000.00
150,000.00
30,750.00
12,100.00
348,440.00
5,200,000.00
1,040,000.00
7,500.00
76,875.00
27,500.00
6,351,875.00
2,300,000.00
276,000.00
9,240.00
2,350.00
90,000.00
145,000.00
15,375.00
11,000.00
2,848,965.00
2,675,000.00
321,000.00
9,240.00
2,350.00
90,000.00
145,000.00
15,375.00
11,000.00
3,268,965.00
3,550,000.00
213,000.00
7,500.00
76,875.00
27,500.00
3,874,875.00
4,750,000.00
570,000.00
135,000.00
270,000.00
55,350.00
12,100.00
5,792,450.00
300,000.00
36,000.00
123,750.00
55,000.00
563.75
8,800.00
524,113.75
2,400,000.00
720,000.00
9,240.00
2,350.00
75,000.00
100,000.00
10,250.00
11,000.00
3,327,840.00
7,750,000.00
465,000.00
135,000.00
270,000.00
55,350.00
12,100.00
8,687,450.00
5,250,000.00
315,000.00
135,000.00
270,000.00
55,350.00
12,100.00
6,037,450.00
253,725.73
100,476.75
172,907.90
35,400.00
1,500,000.00
75,000.00
77,456.13
51,250.00
5,500.00
2,271,716.50
36,816.00
11,500.80
32,360.00
295,890.00
2,479,653.87
23,315.62
850,000.00
3,729,536.28
90,000.00
170,000.00
20,000.00
9,100.00
9,000.00
9,000.00
2,800.00
2,400.00
5,100.00
2,500.00
56,250.00
50,000.00
5,125.00
1,100.00
432,375.00
240,000.00
48,000.00
9,100.00
9,000.00
9,000.00
2,800.00
7,200.00
5,100.00
2,500.00
56,250.00
50,000.00
5,125.00
1,100.00
445,175.00
870,000.00
120,000.00
9,000.00
24,000.00
21,000.00
56,250.00
50,000.00
5,125.00
1,100.00
1,156,475.00
1,290,000.00
120,000.00
9,000.00
24,000.00
21,000.00
56,250.00
50,000.00
5,125.00
1,100.00
1,576,475.00
240,000.00
48,000.00
13,000.00
9,000.00
9,000.00
8,400.00
7,200.00
5,100.00
2,500.00
56,250.00
50,000.00
5,125.00
1,100.00
454,675.00
105,000.00
140,000.00
13,000.00
4,500.00
13,500.00
8,400.00
24,000.00
56,250.00
50,000.00
5,125.00
1,100.00
420,875.00
255,000.00
60,000.00
4,500.00
9,000.00
4,900.00
12,000.00
3,400.00
2,500.00
56,250.00
50,000.00
5,125.00
1,100.00
463,775.00
345,000.00
40,000.00
225,000.00
250,000.00
350,000.00
1,210,000.00
59,000.00
71,880.00
12,665.33
143,545.33
367,500.00
17,625.00
8,750.00
54,000.00
38,000.00
3,675.00
3,300.00
492,850.00
393,750.00
17,625.00
8,750.00
54,000.00
38,000.00
3,675.00
3,300.00
519,100.00
770,000.00
20,250.00
66,500.00
53,300.00
6,000.00
42,000.00
56,000.00
5,740.00
913.00
1,020,703.00
29,346,216.12
446,111.24
9,395,875.31
2,522,070.00
6,453,813.15
4,272,191.42
6,674,561.77
3,693,176.42
49,599,434.65
15,111,460.13
36,189,452.57
163,704,362.78
367,500.00
17,625.00
8,750.00
54,000.00
38,000.00
3,587.50
3,300.00
492,762.50
341,250.00
17,625.00
8,750.00
54,000.00
38,000.00
3,587.50
3,300.00
466,512.50
393,750.00
17,625.00
8,750.00
54,000.00
38,000.00
3,587.50
3,300.00
519,012.50
399,000.00
17,625.00
8,750.00
54,000.00
38,000.00
3,587.50
3,300.00
524,262.50
189,000.00
17,625.00
8,750.00
37,500.00
38,000.00
3,587.50
3,300.00
297,762.50
86,400.00
9,000.00
12,000.00
1,230.00
660.00
109,290.00
44,140.95
42,969.98
23,776.20
110,887.13
294,273.00
127,748.59
70,686.00
492,707.59
4,927,075.88
185,283.00
127,748.59
70,686.00
383,717.59
3,837,175.88
19,250.00
25,000.00
3,008.00
56,250.00
100,000.00
51,250.00
11,000.00
265,758.00
398,637.00
531,516.00
797,274.00
216,310.89
96,638.56
20,000.00
688,446.10
917,928.13
1,084,824.16
1,627,236.23
4,651,384.08
690,000.00
80,666.67
45,000.00
64,400.00
2,722.50
30,000.00
11,607.20
56,250.00
100,000.00
51,250.00
8,250.00
1,140,146.37
76,455.99
69,946.85
36,000.00
522.32
134,235.94
20,410.00
337,571.10
420,000.00
20,160.00
8,000.00
50,000.00
100,000.00
598,160.00
1 2 3 4
11 1 M3 URUGAN KERIKIL
1.2000 M3 Kerikil 250,000.00 300,000.00
0.3000 o/h Pekerja 75,000.00 22,500.00
0.0100 o/h Mandor 110,000.00 1,100.00
Jumlah 323,600.00
12 1 M3 MEMASANG LAPISAN BATU KOSONG (AAMSTAMPING)
1.2000 m3 Batu gunung 500,000.00 600,000.00
0.4320 M3 Pasir Urug 180,000.00 77,760.00
0.7800 Oh Pekerja 75,000.00 58,500.00
0.3900 o/h Tukang batu 100,000.00 39,000.00
0.0390 o/h Kepala tukang 102,500.00 3,997.50
0.0390 Oh Mandor 110,000.00 4,290.00
Jumlah 783,547.50
13 1 M3 MEMASANG PONDASI BATU GUNUNG
(campuran 1 pc : 4 psr)
1.2000 M3 Batu gunung 500,000.00 600,000.00
163.0000 Kg Semen 1,540.00 251,020.00
0.5200 M3 Pasir 235,000.00 122,200.00
1.5000 o/h Pekerja 75,000.00 112,500.00
0.7500 o/h Tukang batu 100,000.00 75,000.00
0.0750 o/h Kepala tukang 102,500.00 7,687.50
0.0750 o/h Mandor 110,000.00 8,250.00
Jumlah 1,176,657.50
14 1 M2 PASANGAN BATAKO 1 PC : 2 PSR
23.0000 Bh Batako 10 x 18 x 24 cm 2,000.00 46,000.00
18.9500 Kg Semen 1,540.00 29,183.00
0.0380 M3 Pasir pasang 235,000.00 8,930.00
0.3000 o/h Pekerja 75,000.00 22,500.00
0.1000 o/h Tukang batu 100,000.00 10,000.00
0.0100 o/h Kepala Tukang 102,500.00 1,025.00
0.0150 o/h Mandor 110,000.00 1,650.00
Jumlah 119,288.00
Untuk 1 M3 1,192,880.00
15 1 M2 PASANGAN BATAKO 1 PC : 4 PSR
23.0000 Bh Batako 10 x 18 x 24 cm 2,000.00 46,000.00
11.5000 Kg Semen Pc 1,540.00 17,710.00
0.0430 M3 Pasir Pasang 235,000.00 10,105.00
0.3000 o/h Pekerja 75,000.00 22,500.00
0.1000 o/h Tukang 100,000.00 10,000.00
0.0100 o/h Kepala Tukang 102,500.00 1,025.00
0.0150 o/h Mandor 110,000.00 1,650.00
Jumlah 108,990.00
Untuk 1 M3 1,089,900.00
16 1 M3 LANTAI BETON TUMBUK K.100
230.0000 Kg Semen PC 1,540.00 354,200.00
893.0000 Kg Pasir Cor 175.00 156,275.00
1,027.0000 Kg Kerikil 185.19 190,185.19
200.0000 Ltr Air 50.00 10,000.00
1.2000 o/h Pekerja 75,000.00 90,000.00
0.2000 o/h Tukang 100,000.00 20,000.00
0.0200 o/h Kepala Tukang 102,500.00 2,050.00
0.0600 o/h Mandor 110,000.00 6,600.00
Jumlah 829,310.19
17 1 M3 LANTAI BETON TUMBUK K.100 (BERTULANG)
1.0000 M3 Beton Tumbuk K. 100 829,310.19 829,310.19
49.3300 Kg Besi Beton 21,575.75 1,064,331.75
Jumlah 1,893,641.93
18 1 M3 CAMPURAN BETON K. 225
371.0000 Kg Semen Pc 1,540.00 571,340.00
698.0000 Kg Pasir cor 175.00 122,150.00
1,047.0000 Kg Batu Pecah 2/3 648.15 678,611.11
215.0000 Ltr Air 50.00 10,750.00
1.6500 o/h Pekerja 75,000.00 123,750.00
0.2750 o/h Tukang 100,000.00 27,500.00
0.0280 o/h Kepala Tukang 102,500.00 2,870.00
0.0830 o/h Mandor 110,000.00 9,130.00
Jumlah 1,546,101.11
19 1 M3 CAMPURAN BETON K. 175
326.0000 Kg Semen Pc 1,540.00 502,040.00
760.0000 Kg Pasir cor 175.00 133,000.00
1,029.0000 Kg Batu Pecah 2/3 648.15 666,944.44
215.0000 Ltr Air 50.00 10,750.00
1.6500 o/h Pekerja 75,000.00 123,750.00
0.2750 o/h Tukang 100,000.00 27,500.00
0.0280 o/h Kepala Tukang 102,500.00 2,870.00
0.0830 o/h Mandor 110,000.00 9,130.00
Jumlah 1,475,984.44
1 2 3 4
20 1 M3 CAMPURAN BETON K. 125
(Beton Kolom, Sloof Praktis)
276.0000 Kg Semen Pc 1,540.00 425,040.00
829.0000 Kg Pasir cor 175.00 145,075.00
1,012.0000 Kg Kerikil 185.19 187,407.41
215.0000 Ltr Air 50.00 10,750.00
1.6500 o/h Pekerja 75,000.00 123,750.00
0.2750 o/h Tukang 100,000.00 27,500.00
0.0280 o/h Kepala Tukang 102,500.00 2,870.00
0.0830 o/h Mandor 110,000.00 9,130.00
Jumlah 931,522.41
21 10 KG PEMBESIAN (BESI POLOS / ULIR)
10.5000 Kg Besi beton 19,000.00 199,500.00
0.1500 Kg Kawat pengikat 19,000.00 2,850.00
0.0700 o/h Pekerja 75,000.00 5,250.00
0.0700 o/h Tukang besi 100,000.00 7,000.00
0.0070 o/h Kepala Tukang 102,500.00 717.50
0.0040 o/h Mandor 110,000.00 440.00
Jumlah 215,757.50
Untuk 1 Kg 21,575.75
22 1 M2 BEKISTING untuk PONDASI
0.0400 M3 Balok / Papan Kayu Matoa 2,180,000.00 87,200.00
0.3000 Kg Paku campur 21,000.00 6,300.00
0.1000 Ltr Minyak Bekisting 12,000.00 1,200.00
0.5200 o/h Pekerja 75,000.00 39,000.00
0.2600 o/h Tukang 100,000.00 26,000.00
0.0260 o/h Kepala tukang 102,500.00 2,665.00
0.0260 o/h Mandor 110,000.00 2,860.00
Jumlah 165,225.00
23 1 M2 BEKISTING untuk SLOOF
0.0450 M3 Balok / Papan Kayu Matoa 2,180,000.00 98,100.00
0.3000 Kg Paku campur 21,000.00 6,300.00
0.1000 Ltr Minyak Bekisting 12,000.00 1,200.00
0.5200 o/h Pekerja 75,000.00 39,000.00
0.2600 o/h Tukang 100,000.00 26,000.00
0.0260 o/h Kepala tukang 102,500.00 2,665.00
0.0260 o/h Mandor 110,000.00 2,860.00
Jumlah 176,125.00
24 1 M2 BEKISTING untuk KOLOM
0.0400 M3 Balok Kayu kelas III 2,180,000.00 87,200.00
0.4000 Kg Paku campur 21,000.00 8,400.00
0.2000 Ltr Minyak Bekisting 12,000.00 2,400.00
2.0000 Btg Dolken Kayu - 4 mtr 40,000.00 80,000.00
0.3500 Lbr Tripleks 9 mm 165,000.00 57,750.00
0.0150 M3 Balok Kayu kelas II Err:509 Err:509
0.6600 o/h Pekerja 75,000.00 49,500.00
0.3300 o/h Tukang 100,000.00 33,000.00
0.0330 o/h Kepala tukang 102,500.00 3,382.50
0.0330 o/h Mandor 110,000.00 3,630.00
Jumlah Err:509
25 1 M2 BEKISTING untuk BALOK
0.0400 M3 Balok Kayu kelas III 2,180,000.00 87,200.00
0.4000 Kg Paku campur 21,000.00 8,400.00
0.2000 Ltr Minyak Bekisting 12,000.00 2,400.00
2.0000 Btg Dolken Kayu - 4 mtr 40,000.00 80,000.00
0.3500 Lbr Tripleks 9 mm 165,000.00 57,750.00
0.0180 M3 Balok Kayu kelas II Err:509 Err:509
0.6600 o/h Pekerja 75,000.00 49,500.00
0.3300 o/h Tukang 100,000.00 33,000.00
0.0330 o/h Kepala tukang 102,500.00 3,382.50
0.0330 o/h Mandor 110,000.00 3,630.00
Jumlah Err:509
26 1 M2 BEKISTING untuk PLAT LANTAI
0.0400 M3 Balok Kayu kelas III 2,180,000.00 87,200.00
0.4000 Kg Paku campur 21,000.00 8,400.00
0.2000 Ltr Minyak Bekisting 12,000.00 2,400.00
0.0150 M3 Balok Kayu kelas II Err:509 Err:509
0.3500 Lbr Tripleks 9 mm 165,000.00 57,750.00
6.0000 Btg Dolken Kayu - 4 mtr 40,000.00 240,000.00
0.6600 o/h Pekerja 75,000.00 49,500.00
0.3300 o/h Tukang 100,000.00 33,000.00
0.0330 o/h Kepala tukang 102,500.00 3,382.50
0.0330 o/h Mandor 110,000.00 3,630.00
Jumlah Err:509
1 2 3 4
28 1 M2 BEKISTING untuk DINDING
0.0300 M3 Balok Kayu kelas III 2,180,000.00 65,400.00
0.4000 Kg Paku campur 21,000.00 8,400.00
0.2000 Ltr Minyak Bekisting 12,000.00 2,400.00
0.0200 M3 Balok Kayu kelas II Err:509 Err:509
0.3500 Lbr Tripleks 9 mm 165,000.00 57,750.00
3.0000 Btg Dolken Kayu - 4 mtr 40,000.00 120,000.00
0.6600 o/h Pekerja 75,000.00 49,500.00
0.3300 o/h Tukang 100,000.00 33,000.00
0.0330 o/h Kepala tukang 102,500.00 3,382.50
0.0330 o/h Mandor 110,000.00 3,630.00
Jumlah Err:509
29 1 M' KOLOM PRAKTIS BETON BERTULANG (11 x 11) cm
0.0020 M3 Balok Kayu kelas III 2,180,000.00 4,360.00
0.0100 Kg Paku campur 21,000.00 210.00
3.0000 Kg Besi Beton Polos 19,000.00 57,000.00
0.0450 Kg Kawat Beton 19,000.00 855.00
4.0000 Kg Semen 1,540.00 6,160.00
0.0060 M3 Pasir Cor 245,000.00 1,470.00
0.0090 M3 Kerikil 250,000.00 2,250.00
0.1800 o/h Pekerja 75,000.00 13,500.00
0.0200 o/h Tukang Batu 100,000.00 2,000.00
0.0200 o/h Tukang Kayu 100,000.00 2,000.00
0.0200 o/h Tukang Besi 100,000.00 2,000.00
0.0060 o/h Kepala tukang 102,500.00 615.00
0.0090 o/h Mandor 110,000.00 990.00
Jumlah 93,410.00
30 1 M' RINGBALK BETON BERTULANG (10 x 15) cm
0.0030 M3 Balok Kayu kelas III 2,180,000.00 6,540.00
0.0200 Kg Paku campur 21,000.00 420.00
3.6000 Kg Besi Beton Polos 19,000.00 68,400.00
0.0500 Kg Kawat Beton 19,000.00 950.00
5.5000 Kg Semen 1,540.00 8,470.00
0.0090 M3 Pasir Cor 245,000.00 2,205.00
0.0150 M3 Kerikil 250,000.00 3,750.00
0.2970 o/h Pekerja 75,000.00 22,275.00
0.0330 o/h Tukang Batu 100,000.00 3,300.00
0.0330 o/h Tukang Kayu 100,000.00 3,300.00
0.0330 o/h Tukang Besi 100,000.00 3,300.00
0.0100 o/h Kepala tukang 102,500.00 1,025.00
0.0150 o/h Mandor 110,000.00 1,650.00
Jumlah 125,585.00
31 1 M3 DINDING BETON BERTULANG
(150 Kg Besi + Bekisting)
0.2400 M3 Balok Kayu kelas III 2,180,000.00 523,200.00
3.2000 Kg Paku campur 21,000.00 67,200.00
1.6000 Ltr Minyak Bekisting 12,000.00 19,200.00
157.5000 Kg Besi Beton Polos 19,000.00 2,992,500.00
2.2500 Kg Kawat Beton 19,000.00 42,750.00
336.0000 Kg Semen 1,540.00 517,440.00
0.5400 M3 Pasir Cor 245,000.00 132,300.00
0.8100 M3 Kerikil 250,000.00 202,500.00
0.1600 M3 Balok Kayu kelas II Err:509 Err:509
2.8000 Lbr Tripleks 9 mm 165,000.00 462,000.00
24.0000 Btg Dolken Kayu - 4 mtr 40,000.00 960,000.00
5.3000 o/h Pekerja 75,000.00 397,500.00
0.2750 o/h Tukang Batu 100,000.00 27,500.00
1.3000 o/h Tukang Kayu 100,000.00 130,000.00
1.0500 o/h Tukang Besi 100,000.00 105,000.00
0.2620 o/h Kepala tukang 102,500.00 26,855.00
0.2650 o/h Mandor 110,000.00 29,150.00
Jumlah Err:509
32 1 M3 SLOOF PRAKTIS
0.9800 M3 Beton K.175 1,475,984.44 1,446,464.76
110.0000 Kg Besi beton 21,575.75 2,373,332.50
13.3330 M2 Bekisting 176,125.00 2,348,274.63
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah 6,205,571.88
33 1 M3 BETON PENUTUP SEPTICTANK
1.0000 M3 Beton K.225 1,546,101.11 1,546,101.11
150.0000 Kg Besi beton 21,575.75 3,236,362.50
8.3330 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
1 2 3 4
53 1 M3 BETON POER PLAT (GSG)
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
124.6835 Kg Besi beton 21,575.75 2,690,140.03
2.0000 M2 Bekisting 165,225.00 330,450.00
Jumlah 4,566,691.14
54 1 M3 BETON KOLOM 40/60 (GSG)
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
147.6828 Kg Besi beton 21,575.75 3,186,367.17
8.3332 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
55 1 M3 BETON KOLOM BULAT Ø 50 (GSG)
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
97.4316 Kg Besi beton 21,575.75 2,102,159.84
7.9999 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
56 1 M3 BETON SLOOF 30/50 (GSG)
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
119.0728 Kg Besi beton 21,575.75 2,569,084.96
6.6666 M2 Bekisting 176,125.00 1,174,154.93
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah 5,326,841.00
57 1 M3 BETON SLOOF 15/20 (GSG)
1.0000 M3 Beton K. 175 1,475,984.44 1,475,984.44
162.7757 Kg Besi beton 21,575.75 3,512,007.81
13.3332 M2 Bekisting 176,125.00 2,348,309.85
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah 7,373,802.10
58 1 M3 PLAT LANTAI (GSG)
1.0000 M3 Beton K. 175 1,475,984.44 1,475,984.44
152.4300 Kg Besi beton 21,575.75 3,288,791.57
8.3300 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
59 1 M3 BETON RINGBALK 30/50 (GSG)
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
119.0733 Kg Besi beton 21,575.75 2,569,095.75
8.6665 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
60 1 M3 BETON RINGBALK 20/30 (GSG)
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
179.0949 Kg Besi beton 21,575.75 3,864,106.79
13.3280 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
61 1 M3 BETON RINGBALK KONSOL 30/50 (GSG)
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
119.0733 Kg Besi beton 21,575.75 2,569,095.75
8.6665 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
62 1 M3 BETON BALOK UTAMA 30/50 (GSG)
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
119.0733 Kg Besi beton 21,575.75 2,569,095.75
8.6665 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
63 1 M3 BETON BALOK ANAK 20/30 (GSG)
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
157.6782 Kg Besi beton 21,575.75 3,402,025.42
13.3328 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
64 1 M3 BETON KONSOL (GSG)
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
119.0733 Kg Besi beton 21,575.75 2,569,095.75
8.6665 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
1 2 3 4
65 1 M3 PLAT ATAP BETON (GSG)
1.0000 M3 Beton K. 175 1,475,984.44 1,475,984.44
142.6700 Kg Besi beton 21,575.75 3,078,212.25
10.0000 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
66 1 M3 PLAT LANTAI (SERVICE)
1.0000 M3 Beton K. 175 1,475,984.44 1,475,984.44
152.4300 Kg Besi beton 21,575.75 3,288,791.57
8.3300 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
67 1 M3 BETON KOLOM 25/25 (SERVICE)
1.0000 M3 Beton K. 175 1,475,984.44 1,475,984.44
211.1999 Kg Besi beton 21,575.75 4,556,796.24
16.0000 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
68 1 M3 BETON SLOOF 20/30 (SERVICE)
1.0000 M3 Beton K. 175 1,475,984.44 1,475,984.44
179.0949 Kg Besi beton 21,575.75 3,864,106.79
13.3280 M2 Bekisting 176,125.00 2,347,394.00
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah 7,724,985.23
69 1 M3 BETON POER PLAT type 1 (SERVICE)
1.0000 M3 Beton K. 175 1,475,984.44 1,475,984.44
130.4378 Kg Besi beton 21,575.75 2,814,293.36
3.3333 M2 Bekisting 165,225.00 550,744.49
Jumlah 4,841,022.30
70 1 M3 BETON POER PLAT type 2 (SERVICE)
1.0000 M3 Beton K. 175 1,475,984.44 1,475,984.44
126.6660 Kg Besi beton 21,575.75 2,732,913.95
2.6666 M2 Bekisting 165,225.00 440,588.99
Jumlah 4,649,487.38
71 1 M3 BETON RINGBALK 20/30 (SERVICE)
1.0000 M3 Beton K. 175 1,475,984.44 1,475,984.44
179.0949 Kg Besi beton 21,575.75 3,864,106.79
13.3280 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
72 1 M3 BETON KOLOM 12/25 (POS)
1.0000 M3 Beton K. 175 1,475,984.44 1,475,984.44
239.7539 Kg Besi beton 21,575.75 5,172,870.21
24.6642 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
73 1 M3 BETON SLOOF 15/20 (POS)
1.0000 M3 Beton K. 175 1,475,984.44 1,475,984.44
162.7757 Kg Besi beton 21,575.75 3,512,007.81
13.3332 M2 Bekisting 176,125.00 2,348,309.85
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah 7,373,802.10
74 1 M3 BETON RINGBALK 15/20 (POS)
1.0000 M3 Beton K. 175 1,475,984.44 1,475,984.44
162.7757 Kg Besi beton 21,575.75 3,512,007.81
13.3332 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
75 1 M3 BETON POER PLAT (P)
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
167.8573 Kg Besi beton 21,575.75 3,621,647.14
2.2222 M2 Bekisting 165,225.00 367,163.00
Jumlah 5,534,911.25
76 1 M3 BETON POER PLAT P.1
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
201.1738 Kg Besi beton 21,575.75 4,340,475.62
3.0000 M2 Bekisting 165,225.00 495,675.00
Jumlah 6,382,251.73
77 1 M3 BETON POER PLAT P.2
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
159.3944 Kg Besi beton 21,575.75 3,439,053.73
2.9682 M2 Bekisting 165,225.00 490,420.85
Jumlah 5,475,575.68
1 2 3 4
133 1 M3 COR SPESIE 1 : 5
190.0000 Kg Semen Pc 1,540.00 292,600.00
0.8500 M3 Pasir cor 245,000.00 208,250.00
6.0000 o/h Pekerja 75,000.00 450,000.00
0.5000 o/h Tukang 100,000.00 50,000.00
0.0500 o/h Kepala tukang 102,500.00 5,125.00
0.3000 o/h Mandor 110,000.00 33,000.00
Jumlah 1,038,975.00
134 1 M3 LISTPLANK BETON
1.0000 M3 Beton K.175 1,475,984.44 1,475,984.44
102.3660 Kg Besi beton 21,575.75 2,208,623.22
10.0000 M2 Bekisting Err:509 Err:509
0.7500 o/h Tukang bongkar 75,000.00 56,250.00
Jumlah Err:509
137 1 M3 PLAT LANTAI
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
152.4300 Kg Besi beton 21,575.75 3,288,791.57
8.3300 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
138 1 M3 PLAT ATAP BETON
1.0000 M3 Beton K. 225 1,546,101.11 1,546,101.11
142.6700 Kg Besi beton 21,575.75 3,078,212.25
10.0000 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
139 1 M' PEKERJAAN CANSTIN
0.1000 m3 Beton tumbuk K.100 829,310.19 82,931.02
0.8000 m2 Plesteran 58,067.54 46,454.03
0.8000 m2 Acian 32,130.00 25,704.00
0.8000 m2 Cat Minyak 80,442.50 64,354.00
Jumlah 219,443.05
140 1 M3 MEJA BETON (WASHTAFEL)
1.0000 M3 Beton K. 125 931,522.41 931,522.41
35.5500 Kg Besi beton 21,575.75 767,017.91
10.0000 M2 Bekisting Err:509 Err:509
0.5000 o/h Tukang bongkar/siram 75,000.00 37,500.00
Jumlah Err:509
141 1 M2 PLESTERAN 1 PC : 2 PSR (Tebal 1,5 cm)
10.2240 Kg Semen 1,540.00 15,744.96
0.0200 m3 Pasir 235,000.00 4,700.00
0.3000 o/h Pekerja 75,000.00 22,500.00
0.1500 o/h Tukang batu 100,000.00 15,000.00
0.0150 o/h Kepala tukang 102,500.00 1,537.50
0.0150 o/h Mandor 110,000.00 1,650.00
Jumlah 61,132.46
142 1 M2 PLESTERAN 1 PC : 3 PSR (Tebal 1,5 cm)
7.7760 Kg Semen 1,540.00 11,975.04
0.0230 m3 Pasir 235,000.00 5,405.00
0.3000 o/h Pekerja 75,000.00 22,500.00
0.1500 o/h Tukang batu 100,000.00 15,000.00
0.0150 o/h Kepala tukang 102,500.00 1,537.50
0.0150 o/h Mandor 110,000.00 1,650.00
Jumlah 58,067.54
143 1 M2 ACIAN
3.2500 Kg Semen Pc 1,540.00 5,005.00
0.2000 o/h Pekerja 75,000.00 15,000.00
0.1000 o/h Tukang 100,000.00 10,000.00
0.0100 o/h Kepala tukang 102,500.00 1,025.00
0.0100 o/h Mandor 110,000.00 1,100.00
Jumlah 32,130.00
144 1 M2 PLESTERAN 1 PC : 4 PSR (Tebal 1,5 cm)
6.2400 Kg Semen 1,540.00 9,609.60
0.0240 m3 Pasir 235,000.00 5,640.00
0.3000 o/h Pekerja 75,000.00 22,500.00
0.1500 o/h Tukang batu 100,000.00 15,000.00
0.0150 o/h Kepala tukang 102,500.00 1,537.50
0.0150 o/h Mandor 110,000.00 1,650.00
Jumlah 55,937.10
145 1 M2 WATER PROOFING
2.9000 kg Water proofing 30,000.00 87,000.00
0.3000 o/h Pekerja 75,000.00 22,500.00
0.2000 o/h Tukang batu 100,000.00 20,000.00
0.0200 o/h Kepala tukang 102,500.00 2,050.00
0.0150 o/h Mandor 110,000.00 1,650.00
Jumlah 133,200.00
1 2 3 4
146 1 M' PASANGAN PLINT KERAMIK 10/40
5.3000 Bh List Plint Keramik 10/40 cm 5,800.00 30,740.00
1.1400 Kg Semen 1,540.00 1,755.60
0.0030 M3 Pasir 235,000.00 705.00
0.1000 Kg Semen Warna 7,500.00 750.00
0.0900 o/h Pekerja 75,000.00 6,750.00
0.0900 o/h Tukang batu 100,000.00 9,000.00
0.0090 o/h Kepala tukang 102,500.00 922.50
0.0050 o/h Mandor 110,000.00 550.00
Jumlah 51,173.10
147 1 M' PASANGAN BORDER KERAMIK 6/20
5.3000 Bh List Keramik 6/20 cm 15,000.00 79,500.00
1.1400 Kg Semen 1,540.00 1,755.60
0.0030 M3 Pasir 235,000.00 705.00
0.1000 Kg Semen Warna 7,500.00 750.00
0.0900 o/h Pekerja 75,000.00 6,750.00
0.0900 o/h Tukang batu 100,000.00 9,000.00
0.0090 o/h Kepala tukang 102,500.00 922.50
0.0050 o/h Mandor 110,000.00 550.00
Jumlah 99,933.10
148 1 M2 PASANGAN DINDING KERAMIK 20/25
21.6000 Bh Tegel keramik 20/25 cm 4,700.00 101,520.00
9.3000 Kg Semen 1,540.00 14,322.00
0.0180 M3 Pasir 235,000.00 4,230.00
1.9400 Kg Semen Warna 7,500.00 14,550.00
0.9000 o/h Pekerja 75,000.00 67,500.00
0.4500 o/h Tukang batu 100,000.00 45,000.00
0.0450 o/h Kepala tukang 102,500.00 4,612.50
0.0450 o/h Mandor 110,000.00 4,950.00
Jumlah 256,684.50
149 1 M2 PASANGAN LANTAI KERAMIK 60/60
3.1000 Bh Keramik 60/60 cm 76,000.00 235,600.00
0.0450 M3 Pasir 235,000.00 10,575.00
8.1900 Kg Semen 1,540.00 12,612.60
1.6200 Kg Semen Warna 7,500.00 12,150.00
0.7000 o/h Pekerja 75,000.00 52,500.00
0.3500 o/h Tukang batu 100,000.00 35,000.00
0.0350 o/h Kepala tukang 102,500.00 3,587.50
0.0350 o/h Mandor 110,000.00 3,850.00
Jumlah 365,875.10
150 1 M2 PASANG DINDING GRANIT 30/60
1.0600 M2 Granit 2,050,000.00 2,173,000.00
3.0030 Bh Paku 12 1,200.00 3,603.60
0.0250 M3 Pasir 235,000.00 5,875.00
12.4400 Kg Semen 1,540.00 19,157.60
0.6500 Kg Semen Warna 7,500.00 4,875.00
1.3000 o/h Pekerja 75,000.00 97,500.00
0.6500 o/h Tukang batu 100,000.00 65,000.00
0.0650 o/h Kepala tukang 102,500.00 6,662.50
0.0650 o/h Mandor 110,000.00 7,150.00
Jumlah 2,382,823.70
151 1 M2 PASANGAN LANTAI KERAMIK 40/40
6.6300 Bh Keramik 40/40 cm 17,000.00 112,710.00
0.0450 M3 Pasir 235,000.00 10,575.00
8.1900 Kg Semen 1,540.00 12,612.60
1.6200 Kg Semen Warna 7,500.00 12,150.00
0.7000 o/h Pekerja 75,000.00 52,500.00
0.3500 o/h Tukang batu 100,000.00 35,000.00
0.0350 o/h Kepala tukang 102,500.00 3,587.50
0.0350 o/h Mandor 110,000.00 3,850.00
Jumlah 242,985.10
152 1 M2 PASANGAN LANTAI KERAMIK 30/30
11.8700 Bh Keramik 30/30 cm 8,000.00 94,960.00
0.0450 M3 Pasir 235,000.00 10,575.00
10.0000 Kg Semen 1,540.00 15,400.00
1.5000 Kg Semen Warna 7,500.00 11,250.00
0.7000 o/h Pekerja 75,000.00 52,500.00
0.3500 o/h Tukang batu 100,000.00 35,000.00
0.0350 o/h Kepala tukang 102,500.00 3,587.50
0.0350 o/h Mandor 110,000.00 3,850.00
Jumlah 227,122.50
1 2 3 4
153 1 M2 PASANGAN LANTAI KERAMIK 20/20
26.5000 Bh Keramik 20/20 cm 3,500.00 92,750.00
0.0450 M3 Pasir 235,000.00 10,575.00
10.4000 Kg Semen 1,540.00 16,016.00
1.6200 Kg Semen Warna 7,500.00 12,150.00
0.7000 o/h Pekerja 75,000.00 52,500.00
0.3500 o/h Tukang batu 100,000.00 35,000.00
0.0350 o/h Kepala tukang 102,500.00 3,587.50
0.0350 o/h Mandor 110,000.00 3,850.00
Jumlah 226,428.50
154 1 M2 PASANG DINDING LOSTER KERAMIK 30/30
25.0000 Bh Loster Keramik 30/30 50,000.00 1,250,000.00
9.3000 Kg Semen Pc 1,540.00 14,322.00
0.0180 M3 Pasir Pasang 235,000.00 4,230.00
0.6000 o/h Pekerja 75,000.00 45,000.00
0.1000 o/h Tukang 100,000.00 10,000.00
0.0450 o/h Kepala Tukang 102,500.00 4,612.50
0.0300 o/h Mandor 110,000.00 3,300.00
Jumlah 1,331,464.50
155 1 M2 PASANG STIKER SAND BLASTING
1.2000 M2 Stiker Sand Blasting 230,000.00 276,000.00
1.0000 Scht Perekat (sampo 250 mg) 1,200.00 1,200.00
0.0200 o/h Pekerja 75,000.00 1,500.00
0.2000 o/h Tukang 100,000.00 20,000.00
0.0200 o/h Kepala Tukang 102,500.00 2,050.00
0.0025 o/h Mandor 110,000.00 275.00
Jumlah 301,025.00
156 1 M2 PASANG WALLPAPER lebar 50 cm
2.2000 M' Wallpaper 90,000.00 198,000.00
0.2500 Kg Lem Wallpaper (perekat) 40,000.00 10,000.00
0.3500 o/h Pekerja 75,000.00 26,250.00
0.1750 o/h Tukang 100,000.00 17,500.00
0.0170 o/h Kepala Tukang 102,500.00 1,742.50
0.0020 o/h Mandor 110,000.00 220.00
Jumlah 253,712.50
157 1 M' PASANG BORDER WALLPAPER
1.2000 M' Border Wallpaper 45,000.00 54,000.00
0.1000 Kg Lem Wallpaper 40,000.00 4,000.00
0.2500 o/h Pekerja 75,000.00 18,750.00
0.2500 o/h Tukang 100,000.00 25,000.00
0.0250 o/h Kepala tukang 102,500.00 2,562.50
Jumlah 104,312.50
158 1 M2 PEKERJAAN PASANG LANTAI KARPET
1.1000 m2 Karpet 220,000.00 242,000.00
0.2500 Kg Lem Fox Kuning 42,000.00 10,500.00
0.2000 o/h Pekerja 75,000.00 15,000.00
0.5000 o/h Tukang kayu 100,000.00 50,000.00
0.0500 o/h Kepala tukang 102,500.00 5,125.00
0.0100 o/h Mandor 110,000.00 1,100.00
Jumlah 323,725.00
160 1 M' PEKERJAAN COMPOUND
1.2000 M' Plester "Cotton Tape" 700.00 840.00
0.4500 Kg Compound (2 x Lari ) 9,500.00 4,275.00
0.0200 o/h Pekerja 75,000.00 1,500.00
0.0630 o/h Tukang 100,000.00 6,300.00
0.0063 o/h Kepala Tukang 102,500.00 645.75
0.0025 o/h Mandor 110,000.00 275.00
Jumlah 13,835.75
161 1 M2 CAT MINYAK (1 x Lapis Plamur Kayu, 1 x Cat
Dasar, 3 x Cat Penutup)
0.2000 Kg Cat Meny 25,000.00 5,000.00
0.1500 Kg Plamur 34,000.00 5,100.00
0.1700 Kg Cat Dasar (Minyak) 46,000.00 7,820.00
0.3500 kg Cat minyak / Cat Penutup 46,000.00 16,100.00
0.2500 o/h Pekerja 75,000.00 18,750.00
0.2500 o/h Tukang cat 100,000.00 25,000.00
0.0250 o/h Kepala tukang 102,500.00 2,562.50
0.0010 o/h Mandor 110,000.00 110.00
Jumlah 80,442.50
162 1 M2 CAT PLAFON
0.1100 Kg Cat Plafon 35,000.00 3,850.00
0.0800 o/h Pekerja 75,000.00 6,000.00
0.1100 o/h Tukang cat 100,000.00 11,000.00
0.0110 o/h Kepala tukang 102,500.00 1,127.50
0.0050 o/h Mandor 110,000.00 550.00
Jumlah 22,527.50
1 2 3 4
163 1 M2 CAT DINDING TEMBOK BARU / DINDING DALAM
(1 Lapis Plamir, 1 Lapis Cat Dasar, dan 2 lapis cat penutup)
(SNI 2002)
0.1000 Kg Plamur 34,000.00 3,400.00
0.1000 Kg Cat Tembok Dasar 35,000.00 3,500.00
0.2600 Kg Cat Penutup 2 x 35,000.00 9,100.00
0.0200 o/h Pekerja 75,000.00 1,500.00
0.0630 o/h Tukang cat 100,000.00 6,300.00
0.0063 o/h Kepala tukang 102,500.00 645.75
0.0025 o/h Mandor 110,000.00 275.00
1.0000 Ls Alat Bantu (kuas, amplas, lem, 3,000.00 3,000.00
scafolding)
Jumlah 27,720.75
1 2 3 4
1 2 3 4
1 2 3 4
182 1 M3 KUSEN, PINTU DAN JENDELA (Kayu Besi)
1.1000 M3 Balok kayu besi 5/10 3,250,000.00 3,575,000.00
1.2500 Kg Paku campur 21,000.00 26,250.00
1.0000 Kg Lem Kayu (Lem Fox Putih) 40,000.00 40,000.00
7.0000 o/h Pekerja 75,000.00 525,000.00
21.0000 o/h Tukang 100,000.00 2,100,000.00
2.1000 o/h Kepala tukang 102,500.00 215,250.00
0.3500 o/h Mandor 110,000.00 38,500.00
Jumlah 6,520,000.00
183 1 M2 RANGKA KAYU PINTU / JENDELA KACA
0.0240 M3 Papan kayu linggua Err:509 Err:509
0.3000 Kg Lem Kayu (Lem Fox Putih) 40,000.00 12,000.00
0.8000 o/h Pekerja 75,000.00 60,000.00
2.4000 o/h Tukang 100,000.00 240,000.00
0.2400 o/h Kepala tukang 102,500.00 24,600.00
0.0400 o/h Mandor 110,000.00 4,400.00
Jumlah Err:509
184 1 M2 RANGKA DAUN JENDELA + KACA POLOS
1.0000 M3 Rangka kayu Err:509 Err:509
1.0000 M2 Kaca polos 5 mm 232,245.00 232,245.00
Jumlah Err:509
185 1 M2 JENDELA KACA MATI
1.1000 M2 Kaca polos 5 mm 195,000.00 214,500.00
0.0150 o/h Pekerja 75,000.00 1,125.00
0.1500 o/h Tukang 100,000.00 15,000.00
0.0150 o/h Kepala tukang 102,500.00 1,537.50
0.00075 o/h Mandor 110,000.00 82.50
Jumlah 232,245.00
186 1 M2 PASANG PINTU PANIL KACA (BENING)
0.0240 M3 Papan Kayu Linggua Err:509 Err:509
1.1000 M2 Kaca bening 5 mm 195,000.00 214,500.00
0.3000 o/h Pekerja 75,000.00 22,500.00
2.4000 o/h Tukang 100,000.00 240,000.00
0.2400 o/h Kepala tukang 102,500.00 24,600.00
0.0400 o/h Mandor 110,000.00 4,400.00
Jumlah Err:509
187 1 M2 DAUN PINTU PANIL KAYU
0.0400 M3 Papan Kayu Besi 3,500,000.00 140,000.00
0.5000 Kg Lem Kayu (Lem Fox Putih) 40,000.00 20,000.00
1.0000 o/h Pekerja 75,000.00 75,000.00
3.0000 o/h Tukang 100,000.00 300,000.00
0.3000 o/h Kepala tukang 102,500.00 30,750.00
0.0500 o/h Mandor 110,000.00 5,500.00
Jumlah 571,250.00
188 1 M2 PINTU dan JENDELA JALUSI
0.0640 M3 Papan Kayu Besi 3,500,000.00 224,000.00
0.5000 Kg Lem Kayu (Lem Fox Putih) 40,000.00 20,000.00
1.0000 o/h Pekerja 75,000.00 75,000.00
3.0000 o/h Tukang 100,000.00 300,000.00
0.3000 o/h Kepala tukang 102,500.00 30,750.00
0.0500 o/h Mandor 110,000.00 5,500.00
Jumlah 655,250.00
189 1 Daun PINTU KACA tebal 12 mm
1.7850 m2 Kaca Polos 112,000.00 199,920.00
1.0000 o/h Pekerja 75,000.00 75,000.00
3.0000 o/h Tukang 100,000.00 300,000.00
0.3000 o/h Kepala Tukang 102,500.00 30,750.00
0.0500 o/h Mandor 110,000.00 5,500.00
Jumlah 611,170.00
190 1 M' PASANG KUSEN ALUMUNIUM
1.1000 m' Profil Alumunium 223,000.00 245,300.00
2.0000 bh Sekrup Fixer 2,400.00 4,800.00
0.0600 Tbg Sealant - -
0.0430 o/h Pekerja 75,000.00 3,225.00
0.0430 o/h Tukang Khusus Alumunium 100,000.00 4,300.00
0.0043 o/h Kepala tukang 102,500.00 440.75
0.0021 o/h Mandor 110,000.00 231.00
Jumlah 258,296.75
191 1 M2 PASANG KACA tebal 6 mm
1.1000 m2 Kaca Polos 540,000.00 594,000.00
0.0430 o/h Pekerja 75,000.00 3,225.00
0.0430 o/h Tukang 100,000.00 4,300.00
0.0043 o/h Kepala Tukang 102,500.00 440.75
0.0021 o/h Mandor 110,000.00 231.00
Jumlah 602,196.75
1 2 3 4
1 2 3 4
199 1 M2 PASANG TERALIS BESI STRIP 2 x 3 mm
6.1770 Kg Besi Strip 19,000.00 117,363.00
27.0280 Cm Pengelasan 4,025.00 108,787.70
1.6700 o/h Pekerja 75,000.00 125,250.00
1.6700 o/h Tukang 100,000.00 167,000.00
0.0167 o/h Kepala tukang 102,500.00 1,711.75
0.0830 o/h Mandor 110,000.00 9,130.00
Jumlah 529,242.45
200 1 Unit PINTU BESI pada RUANG PANEL
1.5000 Btg Besi Kotak 4 cm 135,000.00 202,500.00
1.2000 Btg Besi Kotak 2 cm 110,000.00 132,000.00
0.2750 Lbr Besi Plat 3 mm 800,000.00 220,000.00
1.1000 Btg Besi Beton Ø 12 mm 128,000.00 140,800.00
1.0000 Set Kunci + Gembok 100,000.00 100,000.00
368.0000 Cm Pengelasan 4,025.00 1,481,200.00
1.6700 o/h Pekerja 75,000.00 125,250.00
1.6700 o/h Tukang 100,000.00 167,000.00
0.0167 o/h Kepala tukang 102,500.00 1,711.75
0.0830 o/h Mandor 110,000.00 9,130.00
Jumlah 2,579,591.75
201 1 M3 MEMASANG KONSTRUKSI KUDA-KUDA KONVENSIONAL
(Bentangan lebih 6 m')
1.1000 m3 Balok kayu besi 5/10 3,250,000.00 3,575,000.00
15.0000 Kg Besi Strip tebal 5 mm 19,000.00 285,000.00
5.6000 Kg Paku campur 21,000.00 117,600.00
4.0000 o/h Pekerja 75,000.00 300,000.00
12.0000 o/h Tukang 100,000.00 1,200,000.00
1.2000 o/h Kepala Tukang 102,500.00 123,000.00
0.2000 o/h Mandor 110,000.00 22,000.00
Jumlah 5,622,600.00
202 1 M3 MEMASANG KONSTRUKSI KUDA-KUDA EXPOSE
1.2000 m3 Balok kayu besi 5/10 3,250,000.00 3,900,000.00
15.0000 Kg Besi Strip tebal 5 mm 19,000.00 285,000.00
5.6000 Kg Paku campur 21,000.00 117,600.00
6.7000 o/h Pekerja 75,000.00 502,500.00
20.1000 o/h Tukang 100,000.00 2,010,000.00
2.0100 o/h Kepala Tukang 102,500.00 206,025.00
0.3350 o/h Mandor 110,000.00 36,850.00
Jumlah 7,057,975.00
203 1 M3 MEMASANG KONSTRUKSI GORDING
1.1000 m3 Balok kayu besi 3,250,000.00 3,575,000.00
15.0000 Kg Besi Strip tebal 5 mm 19,000.00 285,000.00
3.0000 Kg Paku campur 21,000.00 63,000.00
2.4000 o/h Pekerja 75,000.00 180,000.00
7.2000 o/h Tukang 100,000.00 720,000.00
0.7200 o/h Kepala Tukang 102,500.00 73,800.00
0.1200 o/h Mandor 110,000.00 13,200.00
Jumlah 4,910,000.00
204 1 M3 MEMASANG KONSTRUKSI GORDING
1.1000 m3 Balok Kayu Matoa 2,180,000.00 2,398,000.00
15.0000 Kg Besi Strip tebal 5 mm 19,000.00 285,000.00
3.0000 Kg Paku campur 21,000.00 63,000.00
2.4000 o/h Pekerja 75,000.00 180,000.00
7.2000 o/h Tukang 100,000.00 720,000.00
0.7200 o/h Kepala Tukang 102,500.00 73,800.00
0.1200 o/h Mandor 110,000.00 13,200.00
Jumlah 3,733,000.00
205 1 M2 PASANG ATAP ALUMUNIUM (SPANDEK/SUPER DEK)
1.3125 Lbr Atap Super Deck (type lebar 80 cm) 135,000.00 177,187.50
0.0200 Kg Paku Atap 27,500.00 550.00
0.1500 o/h Pekerja 75,000.00 11,250.00
0.7500 o/h Tukang 100,000.00 75,000.00
0.0080 o/h Kepala tukang 102,500.00 820.00
0.0060 o/h Mandor 110,000.00 660.00
Jumlah 265,467.50
206 1 M' PASANG NOK ATAP ALUMUNIUM (SPANDEK/SUPER DEK
1.2000 M' Nok Atap 65,000.00 78,000.00
0.0400 Kg Paku Atap 27,500.00 1,100.00
0.1000 o/h Pekerja 75,000.00 7,500.00
1.0000 o/h Tukang 100,000.00 100,000.00
0.0100 o/h Kepala Tukang 102,500.00 1,025.00
0.0100 o/h Mandor 110,000.00 1,100.00
Jumlah 188,725.00
1 2 3 4
207 1 M2 PASANG PELAPIS ALUMUNIUM FOIL
1.0500 M2 Alumunium Foil 15,000.00 15,750.00
0.1500 o/h Pekerja 75,000.00 11,250.00
0.0500 o/h Tukang 100,000.00 5,000.00
0.0050 o/h Kepala Tukang 102,500.00 512.50
0.0080 o/h Mandor 110,000.00 880.00
Jumlah 33,392.50
208 1 M2 PEKERJAAN GLASS WALL + KAWAT RAM
1.0500 M2 Glass Wall 25,000.00 26,250.00
1.0500 M2 Kawat Ram 17,000.00 17,850.00
0.1500 o/h Pekerja 75,000.00 11,250.00
0.0500 o/h Tukang 100,000.00 5,000.00
0.0050 o/h Kepala Tukang 102,500.00 512.50
0.0080 o/h Mandor 110,000.00 880.00
Jumlah 61,742.50
209 1 Kg RANGKA KUDA-KUDA BAJA IWF
1.1500 Kg Besi Baja IWF 19,000.00 21,850.00
0.0600 o/h Pekerja 75,000.00 4,500.00
0.0600 o/h Tukang besi 100,000.00 6,000.00
0.0060 o/h Kepala Tukang 102,500.00 615.00
0.0030 o/h Mandor 110,000.00 330.00
Jumlah 33,295.00
210 1 Kg PEKERJAAN GORDING CANAL
1.1500 Kg Gording Canal 19,000.00 21,850.00
0.0600 o/h Pekerja 75,000.00 4,500.00
0.0600 o/h Tukang 100,000.00 6,000.00
0.0060 o/h Kepala Tukang 102,500.00 615.00
0.0030 o/h Mandor 110,000.00 330.00
Jumlah 33,295.00
211 100 Kg PEKERJAAN PERAKITAN KUDA-KUDA BAJA
1.0000 Ltr Solar 7,000.00 7,000.00
0.1000 Ltr Minyak Pelumas 35,000.00 3,500.00
0.1000 o/h Pekerja 75,000.00 7,500.00
0.1000 o/h Tukang 100,000.00 10,000.00
0.0010 o/h Kepala Tukang 102,500.00 102.50
0.0050 o/h Mandor 110,000.00 550.00
0.8000 Jam Sewa Alat 6,250.00 5,000.00
Jumlah 33,652.50
Untuk 1 Kg 336.53
212 1 Kg PEKERJAAN KUDA-KUDA BAJA
1.0000 Kg Besi Baja (IWF/Siku) 33,295.00 33,295.00
1.0000 Kg Perakitan 336.53 336.53
Jumlah 33,631.53
1 2 3 4
216 10 CM PENGELASAN DENGAN LAS LISTRIK
0.4000 Dos Kawat Las Listrik 75,000.00 30,000.00
0.3000 Ltr Solar 6,000.00 1,800.00
0.0400 Ltr Minyak Pelumas 22,500.00 900.00
0.0400 o/h Pekerja 75,000.00 3,000.00
0.0200 o/h Tukang 100,000.00 2,000.00
0.0020 o/h Kepala tukang 102,500.00 205.00
0.0020 o/h Mandor 110,000.00 220.00
0.1700 Jam Sewa Alat 12,500.00 2,125.00
Jumlah 40,250.00
Untuk 1 cm 4,025.00
217 1 M' PEKERJAAN TRUNKING CABLE
4.0000 Kg Besi Siku 40.40.3 19,000.00 76,000.00
1.9000 Kg Besi Beton dia. 10 19,000.00 36,100.00
8.0000 Cm Pengelasan 4,025.00 32,200.00
0.5600 o/h Pekerja 75,000.00 42,000.00
0.5600 o/h Tukang 100,000.00 56,000.00
0.0560 o/h Kepala tukang 102,500.00 5,740.00
0.0083 o/h Mandor 110,000.00 913.00
Jumlah 248,953.00
218 1 M' PASANG RAILING TANGGA STAINLESS
0.3990 m' Pipa Stainless Ø 3 " 434,000.00 173,166.00
1.0000 m' Pipa Stainless Ø 2 ½ " 292,000.00 292,000.00
11.7500 m' Pipa Stainless Ø 1 " 100,000.00 1,175,000.00
0.1570 bh Ring Kaki Ø 3 " 20,000.00 3,140.00
10.0000 bh Ring Kaki Ø 1 " 12,000.00 120,000.00
0.1578 bh Bola Ø 4 " 360,000.00 56,808.00
0.3157 bh Cincin Ø 3 " 40,000.00 12,628.00
15.0000 bh Cincin Ø 1 " 12,000.00 180,000.00
10.0000 bh Dina Bolt 7,500.00 75,000.00
279.7500 cm Pengelasan 4,025.00 1,125,993.75
1.2000 o/h Pekerja 75,000.00 90,000.00
1.2000 o/h Tukang 100,000.00 120,000.00
0.1200 o/h Kepala tukang 102,500.00 12,300.00
0.0060 o/h Mandor 110,000.00 660.00
Jumlah 3,436,695.75
219 1 M' PASANG RAILING BALKON STAINLESS
1.1000 m' Pipa Stainless Ø 2 ½ " 292,000.00 321,200.00
0.5000 m' Pipa Stainless Ø 2 " 200,000.00 100,000.00
0.1570 bh Ring Kaki Ø 2 " 20,000.00 3,140.00
2.0000 bh Dina Bolt 7,500.00 15,000.00
39.5000 cm Pengelasan 4,025.00 158,987.50
1.2000 o/h Pekerja 75,000.00 90,000.00
1.2000 o/h Tukang 100,000.00 120,000.00
0.1200 o/h Kepala tukang 102,500.00 12,300.00
0.0060 o/h Mandor 110,000.00 660.00
Jumlah 821,287.50
220 1 M' PAGAR STAINLESS STEEL
2.4000 m' Pipa Stainless Ø 2 " 200,000.00 480,000.00
6.3000 m' Pipa Stainless Ø 1 ½ " 166,000.00 1,045,800.00
1.2000 m' Pipa Stainless Ø ½ " 133,000.00 159,600.00
171.3000 cm Pengelasan 4,025.00 689,482.50
1.6700 o/h Pekerja 75,000.00 125,250.00
1.6700 o/h Tukang 100,000.00 167,000.00
0.1670 o/h Kepala tukang 102,500.00 17,117.50
0.0830 o/h Mandor 110,000.00 9,130.00
Jumlah 2,693,380.00
221 1 Unit PINTU GERBANG STAINLESS STEEL (Panjang 4,25 m)
8.9250 m' Pipa Stainless Ø 2 " 200,000.00 1,785,000.00
26.7750 m' Pipa Stainless Ø 1 ½ " 166,000.00 4,444,650.00
5.1000 m' Pipa Stainless Ø ½ " 133,000.00 678,300.00
1.0000 lbr Plat Stainless (Double) 2,650,000.00 2,650,000.00
3.0000 bh Roda 100,000.00 300,000.00
928.0000 cm Pengelasan 4,025.00 3,735,200.00
7.0975 o/h Pekerja 75,000.00 532,312.50
7.0975 o/h Tukang 100,000.00 709,750.00
0.7097 o/h Kepala tukang 102,500.00 72,744.25
0.3527 o/h Mandor 110,000.00 38,797.00
Jumlah 14,946,753.75
222 1 M' SALURAN Type 1 (Tepi Pagar)
0.4095 m3 Galian Tanah 59,000.00 24,160.50
0.1023 m3 Urugan Tanah kembali 19,666.67 2,011.90
0.0300 m3 Pasir Urug 239,600.00 7,188.00
0.0900 m3 Pondasi Batu Kali 1,176,657.50 105,899.18
0.0400 m3 Cor Lantai Rabat 829,310.19 33,172.41
1.6000 m2 Plesteran 1 : 3 58,067.54 92,908.06
1.0000 m2 Acian 32,130.00 32,130.00
Jumlah 297,470.05
1 2 3 4
223 1 M' SALURAN Type 2 (dari Halaman ke Saluran type 1)
0.2500 m3 Galian Tanah 59,000.00 14,750.00
0.0625 m3 Urugan Tanah kembali 19,666.67 1,229.17
0.0250 m3 Pasir Urug 239,600.00 5,990.00
0.2250 m3 Cor Rabat Bertulang 1,893,641.93 426,069.43
0.8000 m2 Bekisting Dinding Cor Err:509 Err:509
1.2000 m2 Plesteran 1 : 3 58,067.54 69,681.05
1.2000 m2 Plesteran Beton 61,132.46 73,358.95
48.9780 kg Besi Grill (Penutup saluran) 33,295.00 1,630,722.51
Jumlah Err:509
224 1 M' SALURAN DITEPI JALAN Type 3
0.9600 m3 Galian Tanah 59,000.00 56,640.00
0.2400 m3 Urugan Tanah kembali 19,666.67 4,720.00
0.1200 m3 Pasir Urug 239,600.00 28,752.00
0.2400 m3 Lapisan Batu Kosong 783,547.50 188,051.40
0.4800 m3 Pondasi Batu Gunung 1,176,657.50 564,795.60
0.1200 m3 Cor Lantai Rabat 829,310.19 99,517.22
3.0000 m2 Plesteran 1 : 3 58,067.54 174,202.62
3.0000 m2 Acian 32,130.00 96,390.00
Jumlah 1,213,068.84
225 1 M' PASANG KAWAT DURI pada PAGAR KELILING
1.2000 m' Besi Siku 50.50.5 50,000.00 60,000.00
7.7000 m' Kawat Duri 10,000.00 77,000.00
0.4000 m2 Cat Minyak pada Besi Siku 80,442.50 32,177.00
Jumlah 169,177.00
226 1 M' PROFIL BETON
12.50000 Kg Semen PC 1,540.00 19,250.00
25.0000 Bh Paku beton 1,000.00 25,000.00
0.0010 M3 Pasir pasang 235,000.00 235.00
0.7500 o/h Pekerja 75,000.00 56,250.00
1.0000 o/h Tukang 100,000.00 100,000.00
0.5000 o/h Kepala tukang 102,500.00 51,250.00
0.1000 o/h Mandor 110,000.00 11,000.00
Jumlah 262,985.00
227 1 M' PEKERJAAN SALURAN KELILING BANGUNAN
0.1000 m3 Cor Rabat 1 Pc : 3 Psr : 5 Krl 829,310.19 82,931.02
2.2000 m2 Plesteran 1 Pc : 3 Psr 58,067.54 127,748.59
2.2000 m2 Acian 32,130.00 70,686.00
Jumlah 281,365.61
228 1 M' PEK. SALURAN PEMBUANGAN KE RIOL KOTA
0.2500 m3 Beton bertulang Err:509 Err:509
1.7000 m2 Plesteran 1 Pc : 3 Psr 58,067.54 98,714.82
Jumlah Err:509
229 1 Unit PEKERJAAN SEPTICTANK & REMBESAN
21.3650 M3 Galian tanah 59,000.00 1,260,535.00
6.4095 M3 Urugan tanah kembali 19,666.67 126,053.50
0.3800 M3 Urugan Pasir 239,600.00 91,048.00
1.2190 M3 Pasangan Pondasi Batu Kali 1 : 4 1,176,657.50 1,434,345.49
2.2240 M3 Pasangan Tembok 1 pc : 4 psr 1,089,900.00 2,423,937.60
0.2180 M3 Cor rabat 1 pc : 3 psr : 5 krl 829,310.19 180,789.62
0.5780 M3 Sloof, Kolom, Ringbalk 6,205,571.88 3,586,820.55
0.4240 M3 Beton Plat Penutup Err:509 Err:509
30.8970 M2 Plesteran 1 pc : 2 psr 58,067.54 1,794,112.78
0.4480 M3 Urugan Kerikil 323,600.00 144,972.80
0.5220 M3 Pekerjaan Ijuk 1,250,000.00 652,500.00
4.0000 M' Pipa PVC Ø 4 " 71,009.75 284,039.00
1.0000 Bh Pipa Udara Gip. Ø 2 " 206,789.00 206,789.00
Jumlah Err:509
230 1 M2 PEKERJAAN LAPISAN BATU PECAH 5/7
0.0600 M3 Batu Pecah 5/7 875,000.00 52,500.00
0.2000 o/h Pekerja 75,000.00 15,000.00
0.0190 o/h Mandor 110,000.00 2,090.00
0.0045 hari Mesin Gilas (Wales) 4,700,000.00 21,150.00
Jumlah 90,740.00
231 1 M3 PEKERJAAN LAPISAN SIRTU
1.2000 M3 Sirtu 175,000.00 210,000.00
0.3000 o/h Pekerja 75,000.00 22,500.00
0.0100 o/h Mandor 110,000.00 1,100.00
0.0045 hari Mesin Gilas (Wales) 4,700,000.00 21,150.00
Jumlah 254,750.00
1 2 3 4
232 100 M2 PEKERJAAN LAPISAN PENETRASI (LAPEN)
tebal 6 cm
3.6000 M3 Batu Pecah 3/5 850,000.00 3,060,000.00
2.4000 M3 Batu Pecah 2/3 875,000.00 2,100,000.00
1.2000 M3 Batu Pecah 1/2 900,000.00 1,080,000.00
2.0000 M3 Pasir Pasang 235,000.00 470,000.00
120.0000 Kg Aspal 12,000.00 1,440,000.00
1.0000 M3 Kayu Bakar 450,000.00 450,000.00
7.5000 o/h Pekerja 75,000.00 562,500.00
0.3750 o/h Mandor 110,000.00 41,250.00
0.6600 hari Mesin Gilas (Wales) 4,700,000.00 3,102,000.00
Jumlah 12,305,750.00
Untuk 1 M2 123,057.50
233 1 UNIT GROUND RESERVOAR BAWAH WING KANAN BANGUNAN
16.0000 M3 Galian Tanah Pondasi / Bak 119,100.00 1,905,600.00
1.6000 M3 Urugan Tanah kembali 19,666.67 31,466.67
2.5200 M3 Pondasi Poer Plat 6,205,571.88 15,638,041.14
0.3600 M3 Sloof Beton Bertulang 15/20 6,205,571.88 2,234,005.88
0.2160 M3 Kolom Beton Bertulang 25/25 6,205,571.88 1,340,403.53
3.6800 M3 Plat Dinding & Lantai tebal 10 cm 6,205,571.88 22,836,504.52
0.8000 M3 Plat Penutup tebal 12 cm 6,205,571.88 4,964,457.50
0.2880 M3 Balok Beton 20/30 6,205,571.88 1,787,204.70
0.8000 M3 Lantai Cor 1 : 3 : 5 tebal 10 cm 829,310.19 663,448.15
8.0000 M2 Plester pada Plat Lantai 61,132.46 489,059.68
36.8000 M2 Plesteran Bak Air 58,067.54 2,136,885.47
32.0000 M2 Pasang Keramik 20/20 226,428.50 7,245,712.00
1.0000 Unit Tangga Besi turun ke Reservoar 1,500,000.00 1,500,000.00
1.0000 Unit Pintu Besi Bak Kontrol 50/50 + Acc 750,000.00 750,000.00
Jumlah 63,522,789.24
234 100 M2 LAPISAN ASPAL GORENG tebal 3 cm (LATASIR)
0.8000 M3 Abu Batu / Filter 500,000.00 400,000.00
2.4000 M3 Batu Pecah 2/3 875,000.00 2,100,000.00
1.2000 M3 Batu Pecah 1/2 900,000.00 1,080,000.00
2.0000 M3 Pasir Kasar 245,000.00 490,000.00
120.0000 Kg Aspal 12,000.00 1,440,000.00
1.0000 M3 Kayu Bakar 450,000.00 450,000.00
7.5000 o/h Pekerja 75,000.00 562,500.00
0.3750 o/h Mandor 110,000.00 41,250.00
0.6600 hari Mesin Gilas (Wales) 4,700,000.00 3,102,000.00
Jumlah 9,665,750.00
Untuk 1 M2 96,657.50
235 1 Unit KUDA-KUDA PIPA dia. 3 " (K. 5)
18.0000 M' Pipa Gip dia. 3 " 165,000.00 2,970,000.00
2.0000 Bh Besi Plat Dudukan Kuda-kuda 230,000.00 460,000.00
0.4000 Bh Besi Plat Penghubung Dudukan 330,000.00 132,000.00
8.0000 Bh Baut Anker Dudukan Kuda-kuda 18,000.00 144,000.00
1.0000 Dos Kawat Las 75,000.00 75,000.00
8.0000 Jam Sewa Mesin Las 15,000.00 120,000.00
3.0000 o/h Pekerja 75,000.00 225,000.00
4.0000 o/h Tukang 100,000.00 400,000.00
0.4000 o/h Kepala Tukang 102,500.00 41,000.00
0.1000 o/h Mandor 110,000.00 11,000.00
Jumlah 4,578,000.00
236 1 Unit KUDA-KUDA PIPA dia. 2 " (K. 4)
15.0000 M' Pipa Gip dia. 2 " 115,000.00 1,725,000.00
2.0000 Bh Besi Plat Dudukan Kuda-kuda 150,000.00 300,000.00
4.0000 Bh Baut Anker Dudukan Kuda-kuda 18,000.00 72,000.00
0.7500 Dos Kawat Las 75,000.00 56,250.00
6.0000 Jam Sewa Mesin Las 15,000.00 90,000.00
2.5000 o/h Pekerja 75,000.00 187,500.00
3.0000 o/h Tukang 100,000.00 300,000.00
0.3000 o/h Kepala Tukang 102,500.00 30,750.00
0.1000 o/h Mandor 110,000.00 11,000.00
Jumlah 2,772,500.00
237 1 M' GORDING PIPA MEDIUM dia. 1 ½ "
1.0500 M' Pipa Gip dia. 1 ½ " 83,000.00 87,150.00
0.2000 o/h Pekerja 75,000.00 15,000.00
0.2000 o/h Tukang 100,000.00 20,000.00
0.0200 o/h Kepala Tukang 102,500.00 2,050.00
0.0010 o/h Mandor 110,000.00 110.00
Jumlah 124,310.00
1 2 3 4
238 1 M2 PASANG ATAP POLYCARBONAT
1.1000 M' Atap Polycarbonat 375,000.00 412,500.00
0.2500 Tbg Silent 45,000.00 11,250.00
12.0000 Bh Sekrup 300.00 3,600.00
0.1500 o/h Pekerja 75,000.00 11,250.00
0.2000 o/h Tukang 100,000.00 20,000.00
0.0250 o/h Kepala tukang 102,500.00 2,562.50
0.0050 o/h Mandor 110,000.00 550.00
Jumlah 461,712.50
239 1 M' PEKERJAAN PIPA GIP Ø ½ "
1.2000 M' Pipa Gip Ø ½ " 33,000.00 39,600.00
% Perlengkapan (35 % Harga Pipa) 11,550.00 11,550.00
0.0540 o/h Pekerja 75,000.00 4,050.00
0.0900 o/h Tukang 100,000.00 9,000.00
0.0090 o/h Kepala Tukang 102,500.00 922.50
0.0270 o/h Mandor 110,000.00 2,970.00
Jumlah 68,092.50
1 2 3 4
246 1 M' PEKERJAAN PIPA GIP Ø 4 "
1.2000 M' Pipa Gip Ø 4 " 190,000.00 228,000.00
% Perlengkapan (35 % Harga Pipa) 66,500.00 66,500.00
0.1350 o/h Pekerja 75,000.00 10,125.00
0.2250 o/h Tukang 100,000.00 22,500.00
0.0225 o/h Kepala Tukang 102,500.00 2,306.25
0.0068 o/h Mandor 110,000.00 748.00
Jumlah 330,179.25
247 1 M' PEKERJAAN PIPA PVC Ø 6 "
1.2000 M' Pipa PVC Ø 6 " 135,000.00 162,000.00
% Perlengkapan (35 % Harga Pipa) 47,250.00 47,250.00
0.0810 o/h Pekerja 75,000.00 6,075.00
0.1350 o/h Tukang 100,000.00 13,500.00
0.0135 o/h Kepala Tukang 102,500.00 1,383.75
0.0041 o/h Mandor 110,000.00 451.00
Jumlah 230,659.75
248 1 M' PEKERJAAN PIPA PVC Ø 4 "
1.2000 M' Pipa PVC Ø 4 " 32,000.00 38,400.00
% Perlengkapan (35 % Harga Pipa) 11,200.00 11,200.00
0.0810 o/h Pekerja 75,000.00 6,075.00
0.1350 o/h Tukang 100,000.00 13,500.00
0.0135 o/h Kepala Tukang 102,500.00 1,383.75
0.0041 o/h Mandor 110,000.00 451.00
Jumlah 71,009.75
249 1 M' PEKERJAAN PIPA PVC Ø 3 "
1.2000 M' Pipa PVC Ø 3 " 18,500.00 22,200.00
% Perlengkapan (35 % Harga Pipa) 6,475.00 6,475.00
0.0810 o/h Pekerja 75,000.00 6,075.00
0.1350 o/h Tukang 100,000.00 13,500.00
0.0135 o/h Kepala Tukang 102,500.00 1,383.75
0.0041 o/h Mandor 110,000.00 451.00
Jumlah 50,084.75
250 1 M' PEKERJAAN PIPA PVC Ø 2 "
1.2000 M' Pipa PVC Ø 2 " 19,500.00 23,400.00
% Perlengkapan (35 % Harga Pipa) 6,825.00 6,825.00
0.0540 o/h Pekerja 75,000.00 4,050.00
0.0900 o/h Tukang 100,000.00 9,000.00
0.0090 o/h Kepala Tukang 102,500.00 922.50
0.0027 o/h Mandor 110,000.00 297.00
Jumlah 44,494.50
251 1 M' PEKERJAAN PIPA PVC Ø 1 ½ "
1.2000 M' Pipa PVC Ø 1 ½ " 18,500.00 22,200.00
% Perlengkapan (35 % Harga Pipa) 6,475.00 6,475.00
0.0360 o/h Pekerja 75,000.00 2,700.00
0.0660 o/h Tukang 100,000.00 6,600.00
0.0060 o/h Kepala Tukang 102,500.00 615.00
0.0018 o/h Mandor 110,000.00 198.00
Jumlah 38,788.00
252 1 M' PEKERJAAN PIPA PVC Ø 1 "
1.2000 M' Pipa PVC Ø 1 " 11,000.00 13,200.00
% Perlengkapan (35 % Harga Pipa) 3,850.00 3,850.00
0.0360 o/h Pekerja 75,000.00 2,700.00
0.0600 o/h Tukang 100,000.00 6,000.00
0.0060 o/h Kepala Tukang 102,500.00 615.00
0.0018 o/h Mandor 110,000.00 198.00
Jumlah 26,563.00
All IN PEK. INSTALASI PIPA AIR BERSIH Lantai 1 (Total 210 m)
18.00 m Pipa GIP medium Ø1¼" 126,189.00 2,271,402.00
12.00 m Pipa GIP medium Ø2" 206,789.00 2,481,468.00
25.00 m Pipa GIP medium Ø1" 91,342.50 2,283,562.50
35.00 m Pipa GIP medium ؾ" 88,242.50 3,088,487.50
120.00 m Pipa GIP medium ؽ" 68,092.50 8,171,100.00
12.00 bh Knie GIP Ø1½" 11,000.00 132,000.00
15.00 bh Knie GIP Ø1" 8,500.00 127,500.00
90.00 bh Knie GIP ؽ" 5,000.00 450,000.00
2.00 bh Testik GIP Ø2" 15,000.00 30,000.00
5.00 bh Testik GIP Ø1½" 13,000.00 65,000.00
7.00 bh Testik GIP Ø1½" x ¾" 13,000.00 91,000.00
10.00 bh Testik GIP Ø1" x ½" 8,000.00 80,000.00
35.00 bh Testik GIP ؽ" 5,000.00 175,000.00
7.00 bh Sock GIP Ø1½" 12,000.00 84,000.00
10.00 bh Sock GIP Ø1" 7,000.00 70,000.00
20.00 bh Sock GIP ؽ" 5,000.00 100,000.00
5.00 bh Double Nepple Ø1½" 12,000.00 60,000.00
7.00 bh Double Nepple Ø1" 7,500.00 52,500.00
50.00 bh Double Nepple ؽ" 4,000.00 200,000.00
3.00 bh Over sock GIP Ø1½" x 1" 12,000.00 36,000.00
5.00 bh Over sock GIP Ø1" x ½" 10,000.00 50,000.00
2.00 bh Over sock GIP Ø2" x 1½" 17,500.00 35,000.00
4.00 bh Water Mor Ø2" 45,000.00 180,000.00
4.00 bh Water Mor Ø1½" 32,000.00 128,000.00
5.00 bh Water Mor Ø1" 20,000.00 100,000.00
25.00 bh Water Mor ؽ" 12,000.00 300,000.00
2.00 bh Boult Valve Ø1½" 350,000.00 700,000.00
1.00 bh Boult Valve Ø2" 450,000.00 450,000.00
Jumlah 21,992,020.00
1 2 3 4
All IN PEK. INSTALASI PIPA AIR BERSIH Lantai 2
45.00 m Pipa GIP medium Ø1¼" 126,189.00 5,678,505.00
75.00 m Pipa GIP medium Ø1" 91,342.50 6,850,687.50
315.00 m Pipa GIP medium ؽ" 68,092.50 21,449,137.50
10.00 bh Knie GIP Ø1¼" 11,000.00 110,000.00
17.00 bh Knie GIP Ø1" 8,500.00 144,500.00
200.00 bh Knie GIP ؽ" 5,000.00 1,000,000.00
7.00 bh Testik GIP Ø1¼" x 1" 13,000.00 91,000.00
12.00 bh Testik GIP Ø1" x ½" 8,000.00 96,000.00
30.00 bh Testik GIP ؽ" 5,000.00 150,000.00
10.00 bh Sock GIP Ø1¼" 12,000.00 120,000.00
20.00 bh Sock GIP Ø1" 7,000.00 140,000.00
40.00 bh Sock GIP ؽ" 5,000.00 200,000.00
10.00 bh Double Nepple Ø1¼" 12,000.00 120,000.00
15.00 bh Double Nepple Ø1" 7,500.00 112,500.00
30.00 bh Double Nepple ؽ" 4,000.00 120,000.00
3.00 bh Over sock GIP Ø1½" x 1" 12,000.00 36,000.00
2.00 bh Over sock GIP Ø1" x ½" 10,000.00 20,000.00
4.00 bh Water Mor Ø1¼" 32,000.00 128,000.00
6.00 bh Water Mor Ø1" 20,000.00 120,000.00
30.00 bh Water Mor ؽ" 12,000.00 360,000.00
2.00 bh Boult Valve Ø1¼" 350,000.00 700,000.00
70.00 dos Seal tape 17,000.00 1,190,000.00
Jumlah 38,936,330.00
All IN PEK. INSTALASI PIPA AIR BERSIH Lantai 3
25.00 m Pipa GIP medium Ø3" 284,289.00 7,107,225.00
6.00 m Pipa GIP medium Ø1¼" 126,189.00 757,134.00
12.00 m Pipa GIP medium Ø1" 91,342.50 1,096,110.00
70.00 m Pipa GIP medium ؽ" 68,092.50 4,766,475.00
6.00 bh Knie GIP Ø1¼" x ½" 11,000.00 66,000.00
10.00 bh Knie GIP Ø1" 8,500.00 85,000.00
35.00 bh Knie GIP ؽ" 5,000.00 175,000.00
2.00 bh Testik GIP Ø2" 13,000.00 26,000.00
10.00 bh Testik GIP Ø1" x ½" 8,000.00 80,000.00
15.00 bh Testik GIP ؽ" 5,000.00 75,000.00
2.00 bh Sock GIP Ø1¼" 12,000.00 24,000.00
3.00 bh Sock GIP Ø1" 7,000.00 21,000.00
15.00 bh Sock GIP ؽ" 5,000.00 75,000.00
5.00 bh Double Nepple Ø1¼" 12,000.00 60,000.00
7.00 bh Double Nepple Ø1" 7,500.00 52,500.00
12.00 bh Double Nepple ؽ" 4,000.00 48,000.00
3.00 bh Over sock GIP Ø1¼" x 1" 12,000.00 36,000.00
4.00 bh Over sock GIP Ø1" x ½" 10,000.00 40,000.00
2.00 bh Water Mor Ø2" 32,000.00 64,000.00
4.00 bh Water Mor Ø1" 20,000.00 80,000.00
15.00 bh Water Mor ؽ" 12,000.00 180,000.00
2.00 bh Boult Valve Ø3" 1,750,000.00 3,500,000.00
1.00 bh Boult Valve Ø1¼" 350,000.00 350,000.00
50.00 dos Seal tape 17,000.00 850,000.00
19,614,444.00
All IN PEK. INSTALASI PIPA AIR KOTOR Lantai 1
80.00 m Pipa PVC AW Ø4" 71,009.75 5,680,780.00
70.00 m Pipa PVC AW Ø3" 50,084.75 3,505,932.50
30.00 m Pipa PVC AW Ø2" 44,494.50 1,334,835.00
12.00 m Pipa PVC AW Ø1½" 38,788.00 465,456.00
12.00 m Pipa PVC AW Ø1" 26,563.00 318,756.00
35.00 bh Knie PVC Ø4" 30,000.00 1,050,000.00
20.00 bh Knie PVC Ø2" 15,000.00 300,000.00
10.00 bh Knie PVC Ø1½" 10,000.00 100,000.00
40.00 bh Knie PVC Ø1" 7,000.00 280,000.00
10.00 bh Testik PVC Ø4" x 2" 30,000.00 300,000.00
8.00 bh Ty 90 º Ø4" 75,000.00 600,000.00
12.00 bh Ty 90 º Ø2" 30,000.00 360,000.00
8.00 bh Ty 90 º Ø4" x 2" 90,000.00 720,000.00
5.00 bh Over sock PVC Ø4" x 2" 30,000.00 150,000.00
5.00 bh Over sock PVC Ø2" x 1½" 20,000.00 100,000.00
6.00 bh Over sock PVC Ø2" x 1" 15,000.00 90,000.00
15.00 bh Knie PVC 45 º Ø4" 35,000.00 525,000.00
20.00 bh Knie PVC 45 º Ø2" 10,000.00 200,000.00
30.00 bh Knie PVC type D Ø3" 30,000.00 900,000.00
10.00 bh Testik PVC type D Ø 3 " 12,000.00 120,000.00
3.00 klg Lem Pipa PVC merk Wavin 500 Gram 40,000.00 120,000.00
Jumlah 17,220,759.50
1 2 3 4
1 2 3 4
256 1 Bh PASANG KUNCI CYLINDER
1.0000 Bh Kunci Cylinder 148,000.00 148,000.00
0.0050 o/h Pekerja 75,000.00 375.00
0.5000 o/h Tukang Kayu 100,000.00 50,000.00
0.0050 o/h Kepala tukang 102,500.00 512.50
0.00025 o/h Mandor 110,000.00 27.50
Jumlah 198,915.00
257 1 Bh HAK ANGIN
1.0000 Bh Hak Angin 28,000.00 28,000.00
0.0150 o/h Pekerja 75,000.00 1,125.00
0.1500 o/h Tukang 100,000.00 15,000.00
0.0150 o/h Kepala Tukang 102,500.00 1,537.50
0.00075 o/h Mandor 110,000.00 82.50
Jumlah 45,745.00
258 1 Bh ENGSEL PINTU
1.0000 Bh Engsel Pintu 60,000.00 60,000.00
0.0150 o/h Pekerja 75,000.00 1,125.00
0.1500 o/h Tukang 100,000.00 15,000.00
0.0150 o/h Kepala Tukang 102,500.00 1,537.50
0.00075 o/h Mandor 110,000.00 82.50
Jumlah 77,745.00
259 1 Bh ENGSEL PINTU
1.0000 Bh Engsel Pintu 15,000.00 15,000.00
0.0150 o/h Pekerja 75,000.00 1,125.00
0.1500 o/h Tukang 100,000.00 15,000.00
0.0150 o/h Kepala Tukang 102,500.00 1,537.50
0.00075 o/h Mandor 110,000.00 82.50
Jumlah 32,745.00
260 1 Psg GRENDEL + GEMBOK PINTU
1.0000 Bh Grendel 9,800.00 9,800.00
1.0000 Bh Gembok 32,000.00 32,000.00
0.0150 Oh Pakerja 75,000.00 1,125.00
0.1500 Oh Tukang Kayu 100,000.00 15,000.00
0.0150 Oh Kepala Tukang Kayu 102,500.00 1,537.50
0.00075 Oh Mandor 110,000.00 82.50
Jumlah 59,545.00
261 1 Bh ENGSEL JENDELA
1.0000 Bh Engsel Jendela 40,000.00 40,000.00
0.0100 o/h Pekerja 75,000.00 750.00
0.1000 o/h Tukang 100,000.00 10,000.00
0.0100 o/h Kepala Tukang 102,500.00 1,025.00
0.0005 o/h Mandor 110,000.00 55.00
Jumlah 51,830.00
262 1 Bh GRENDEL JENDELA
1.0000 Bh Grendel Jendela 9,800.00 9,800.00
0.0150 Oh Pakerja 75,000.00 1,125.00
0.1500 Oh Tukang Kayu 100,000.00 15,000.00
0.0150 Oh Kepala Tukang Kayu 102,500.00 1,537.50
0.00075 Oh Mandor 110,000.00 82.50
Jumlah 27,545.00
263 1 Psg PASANG GRENDEL PINTU DOUBLE
1.0000 Psg Grendel Pintu Double 120,000.00 120,000.00
0.0100 o/h Pekerja 75,000.00 750.00
0.5000 o/h Tukang Kayu 100,000.00 50,000.00
0.1000 o/h Kepala tukang 102,500.00 10,250.00
0.0050 o/h Mandor 110,000.00 550.00
Jumlah 181,550.00
264 1 Psg PASANG HANDLE PINTU DOUBLE
1.0000 Psg Handle Pintu Double 275,000.00 275,000.00
0.0150 o/h Pekerja 75,000.00 1,125.00
0.1500 o/h Tukang Kayu 100,000.00 15,000.00
0.0150 o/h Kepala tukang 102,500.00 1,537.50
0.00075 o/h Mandor 110,000.00 82.50
Jumlah 292,745.00
265 1 Bh PASANG DOOR CLOSER
1.0000 Bh Door Closer 540,000.00 540,000.00
0.0500 o/h Pekerja 75,000.00 3,750.00
0.5000 o/h Tukang Kayu 100,000.00 50,000.00
0.0500 o/h Kepala tukang 102,500.00 5,125.00
0.00250 o/h Mandor 110,000.00 275.00
Jumlah 599,150.00
1 2 3 4
266 1 Bh PASANG DOOR STOP
1.0000 Bh Door Stop 82,000.00 82,000.00
0.0100 o/h Pekerja 75,000.00 750.00
0.1000 o/h Tukang Kayu 100,000.00 10,000.00
0.0100 o/h Kepala tukang 102,500.00 1,025.00
0.0005 o/h Mandor 110,000.00 55.00
Jumlah 93,830.00
267 1 Bh PASANG CLOSED DUDUK
1.0000 Bh Closed Duduk 2,325,000.00 2,325,000.00
% Perlengkapan (6 % Harga Closed) 139,500.00 139,500.00
3.3000 o/h Pekerja 75,000.00 247,500.00
1.1000 o/h Tukang 100,000.00 110,000.00
0.0010 o/h Kepala Tukang 102,500.00 102.50
0.1600 o/h Mandor 110,000.00 17,600.00
Jumlah 2,839,702.50
268 1 Bh KLOSET JONGKOK
1.0000 Bh Kloset Jongkok 55,000.00 55,000.00
7.0000 Bh Batu Tela 2,000.00 14,000.00
6.0000 Kg Semen 1,540.00 9,240.00
0.0100 M3 Pasir Pasang 235,000.00 2,350.00
1.0000 o/h Pekerja 75,000.00 75,000.00
1.5000 o/h Tukang 100,000.00 150,000.00
0.3000 o/h Kepala Tukang 102,500.00 30,750.00
0.1100 o/h Mandor 110,000.00 12,100.00
Jumlah 348,440.00
269 1 Bh PASANG BATH TUB
1.0000 Bh Bath Tub 5,200,000.00 5,200,000.00
% Perlengkapan (20 % Harga Bak Tub) 1,040,000.00 1,040,000.00
- o/h Pekerja 75,000.00 -
0.0750 o/h Tukang 100,000.00 7,500.00
0.7500 o/h Kepala Tukang 102,500.00 76,875.00
0.2500 o/h Mandor 110,000.00 27,500.00
Jumlah 6,351,875.00
270 1 Bh PASANG WASHTAFEL MEJA
1.0000 Bh Washatfel Meja 2,300,000.00 2,300,000.00
% Perlengkapan (12 % Harga Washtafel 276,000.00 276,000.00
6.0000 Kg Semen 1,540.00 9,240.00
0.0100 M3 Pasir Pasang 235,000.00 2,350.00
1.2000 o/h Pekerja 75,000.00 90,000.00
1.4500 o/h Tukang 100,000.00 145,000.00
0.1500 o/h Kepala Tukang 102,500.00 15,375.00
0.1000 o/h Mandor 110,000.00 11,000.00
Jumlah 2,848,965.00
271 1 Bh PASANG WASHTAFEL GANTUNG
1.0000 Bh Washatfel Gantung 2,675,000.00 2,675,000.00
% Perlengkapan (12 % Harga Washtafel 321,000.00 321,000.00
6.0000 Kg Semen 1,540.00 9,240.00
0.0100 M3 Pasir Pasang 235,000.00 2,350.00
1.2000 o/h Pekerja 75,000.00 90,000.00
1.4500 o/h Tukang 100,000.00 145,000.00
0.1500 o/h Kepala Tukang 102,500.00 15,375.00
0.1000 o/h Mandor 110,000.00 11,000.00
Jumlah 3,268,965.00
272 1 Set PASANG WATER HEATER
1.0000 Set Water Heater 3,550,000.00 3,550,000.00
% Perlengkapan (6 % Harga Heater) 213,000.00 213,000.00
- o/h Pekerja 75,000.00 -
0.0750 o/h Tukang 100,000.00 7,500.00
0.7500 o/h Kepala Tukang 102,500.00 76,875.00
0.2500 o/h Mandor 110,000.00 27,500.00
Jumlah 3,874,875.00
273 1 Unit PASANG TANGKI FIBER GLASS cap 1.5 M3
1.0000 Unit Fiber Glass 4,750,000.00 4,750,000.00
% Perlengkapan (12 % Harga Heater) 570,000.00 570,000.00
1.8000 o/h Pekerja 75,000.00 135,000.00
2.7000 o/h Tukang 100,000.00 270,000.00
0.5400 o/h Kepala Tukang 102,500.00 55,350.00
0.1100 o/h Mandor 110,000.00 12,100.00
Jumlah 5,792,450.00
1 2 3 4
274 1 Bh PASANG FLOOR DRAIN
1.0000 Bh Floor Drain 300,000.00 300,000.00
% Perlengkapan (12 % Harga F.Drain) 36,000.00 36,000.00
1.6500 o/h Pekerja 75,000.00 123,750.00
0.5500 o/h Tukang 100,000.00 55,000.00
0.0055 o/h Kepala Tukang 102,500.00 563.75
0.0800 o/h Mandor 110,000.00 8,800.00
Jumlah 524,113.75
275 1 Bh PASANG URINOIR
1.0000 Bh Urinoir 2,400,000.00 2,400,000.00
% Perlengkapan (30 % Harga Urinoir) 720,000.00 720,000.00
6.0000 Kg Semen 1,540.00 9,240.00
0.0100 M3 Pasir Pasang 235,000.00 2,350.00
1.0000 o/h Pekerja 75,000.00 75,000.00
1.0000 o/h Tukang 100,000.00 100,000.00
0.1000 o/h Kepala Tukang 102,500.00 10,250.00
0.1000 o/h Mandor 110,000.00 11,000.00
Jumlah 3,327,840.00
276 1 Unit PASANG POMPA HISAP
1.0000 Set Pompa Hisap 7,750,000.00 7,750,000.00
% Perlengkapan (6 % Harga Pompa) 465,000.00 465,000.00
1.8000 o/h Pekerja 75,000.00 135,000.00
2.7000 o/h Tukang 100,000.00 270,000.00
0.5400 o/h Kepala Tukang 102,500.00 55,350.00
0.1100 o/h Mandor 110,000.00 12,100.00
Jumlah 8,687,450.00
277 1 Unit PASANG POMPA TEKAN
1.0000 Set Pompa Tekan 5,250,000.00 5,250,000.00
% Perlengkapan (6 % Harga Pompa) 315,000.00 315,000.00
1.8000 o/h Pekerja 75,000.00 135,000.00
2.7000 o/h Tukang 100,000.00 270,000.00
0.5400 o/h Kepala Tukang 102,500.00 55,350.00
0.1100 o/h Mandor 110,000.00 12,100.00
Jumlah 6,037,450.00
278 1 TITIK INSTALASI LAMPU / PENERANGAN
4.5000 m Kabel NYM 3 X 2,5 mm2 20,000.00 90,000.00
10.0000 m Kabel NYM 2 X 2,5 mm2 17,000.00 170,000.00
5.0000 m Pipa PVC Clipsal 3/4" 4,000.00 20,000.00
3.5000 m Pipa PVC Maspion 5/8" 2,600.00 9,100.00
2.0000 bh T.Doos PVC 3/4 4,500.00 9,000.00
2.0000 bh Elbo PVC Clipsal 4,500.00 9,000.00
4.0000 bh Klem PVC Clipsal 700.00 2,800.00
1.0000 bh Sock PVC Clipsal 3/4 2,400.00 2,400.00
3.0000 bh Las Dop Legrand 4 mm2 1,700.00 5,100.00
0.2500 Rol Isolasi Unibel 10,000.00 2,500.00
0.7500 o/h Pekerja 75,000.00 56,250.00
0.5000 o/h Tukang Listrik 100,000.00 50,000.00
0.0500 o/h Kepala Tukang 102,500.00 5,125.00
0.0100 o/h Mandor 110,000.00 1,100.00
Jumlah 432,375.00
279 1 TITIK INSTALASI STOP KONTAK / POWER OUTLET
12.0000 m Kabel NYM 3 x 2,5 mm2 20,000.00 240,000.00
12.0000 m Pipa PVC Clipsal 3/4" 4,000.00 48,000.00
3.5000 m Pipa PVC Maspion 5/8 2,600.00 9,100.00
2.0000 bh T.Doos PVC 3/4 4,500.00 9,000.00
2.0000 bh Elbo PVC Clipsal 4,500.00 9,000.00
4.0000 bh Klem PVC Clipsal 700.00 2,800.00
3.0000 bh Sock PVC Clipsal 3/4 2,400.00 7,200.00
3.0000 bh Las Dop Legrand 4 mm2 1,700.00 5,100.00
0.2500 Rol Isolasi Unibel 10,000.00 2,500.00
0.7500 o/h Pekerja 75,000.00 56,250.00
0.5000 o/h Tukang Listrik 100,000.00 50,000.00
0.0500 o/h Kepala Tukang 102,500.00 5,125.00
0.0100 o/h Mandor 110,000.00 1,100.00
Jumlah 445,175.00
280 1 TITIK INSTALASI AC 1 PHASE
30.0000 m Kabel NYM 3 x 4 mm2 29,000.00 870,000.00
30.0000 m Pipa Clipsal PVC 3/4 4,000.00 120,000.00
2.0000 bh Elbo Clipsal PVC 3/4 4,500.00 9,000.00
10.0000 bh Sock PVC Clipsal 3/4 2,400.00 24,000.00
30.0000 bh Klem Clipsal PVC 3/4 700.00 21,000.00
0.7500 o/h Pekerja 75,000.00 56,250.00
0.5000 o/h Tukang Listrik 100,000.00 50,000.00
0.0500 o/h Kepala Tukang 102,500.00 5,125.00
0.0100 o/h Mandor 110,000.00 1,100.00
Jumlah 1,156,475.00
1 2 3 4
281 1 TITIK INSTALASI AC 3 PHASE
30.0000 m Kabel NYM 4 x 4 mm2 43,000.00 1,290,000.00
30.0000 m Pipa Clipsal PVC 3/4 4,000.00 120,000.00
2.0000 bh Elbo Clipsal PVC 3/4 4,500.00 9,000.00
10.0000 bh Sock PVC Clipsal 3/4 2,400.00 24,000.00
30.0000 bh Klem Clipsal PVC 3/4 700.00 21,000.00
0.7500 o/h Pekerja 75,000.00 56,250.00
0.5000 o/h Tukang Listrik 100,000.00 50,000.00
0.0500 o/h Kepala Tukang 102,500.00 5,125.00
0.0100 o/h Mandor 110,000.00 1,100.00
Jumlah 1,576,475.00
282 1 TITIK INSTALASI SOUND SYSTEM
12.0000 m Kabel NYM HY 3 X 2,5 mm2 20,000.00 240,000.00
12.0000 m Pipa PVC Clipsal 3/4" 4,000.00 48,000.00
5.0000 m Pipa PVC Maspion 5/8" 2,600.00 13,000.00
2.0000 bh T.Doos PVC 3/4 4,500.00 9,000.00
2.0000 bh Elbo PVC Clipsal 3/4 4,500.00 9,000.00
12.0000 bh Klem PVC Clipsal 3/4 700.00 8,400.00
3.0000 bh Sock PVC Clipsal 3/4 2,400.00 7,200.00
3.0000 bh Las Dop Legrand 4 mm2 1,700.00 5,100.00
0.2500 Rol Isolasi Unibel 10,000.00 2,500.00
0.7500 o/h Pekerja 75,000.00 56,250.00
0.5000 o/h Tukang Listrik 100,000.00 50,000.00
0.0500 o/h Kepala Tukang 102,500.00 5,125.00
0.0100 o/h Mandor 110,000.00 1,100.00
Jumlah 454,675.00
283 1 TITIK INSTALASI TELEPHONE
35.0000 m Kabel ITC 2 x 2 x 0.6 mm2 3,000.00 105,000.00
35.0000 m Pipa PVC Clipsal 3/4" 4,000.00 140,000.00
5.0000 m Pipa PVC Maspion 5/8 2,600.00 13,000.00
1.0000 bh T.Doos PVC 3/4 4,500.00 4,500.00
3.0000 bh Elbo PVC Clipsal 4,500.00 13,500.00
12.0000 bh Klem PVC Clipsal 700.00 8,400.00
10.0000 bh Sock PVC Clipsal 3/4 2,400.00 24,000.00
0.7500 o/h Pekerja 75,000.00 56,250.00
0.5000 o/h Tukang Listrik 100,000.00 50,000.00
0.0500 o/h Kepala Tukang 102,500.00 5,125.00
0.0100 o/h Mandor 110,000.00 1,100.00
Jumlah 420,875.00
284 1 TITIK INSTALASI FIRE ALARM
15.0000 m Kabel NYM 2 X 2,5 mm2 17,000.00 255,000.00
15.0000 m Pipa PVC Clipsal 3/4" 4,000.00 60,000.00
1.0000 bh T.Doos PVC 3/4 4,500.00 4,500.00
2.0000 bh Elbo PVC Clipsal 4,500.00 9,000.00
7.0000 bh Klem PVC Clipsal 700.00 4,900.00
5.0000 bh Sock PVC Clipsal 3/4 2,400.00 12,000.00
2.0000 bh Las Dop Legrand 4 mm2 1,700.00 3,400.00
0.2500 Rol Isolasi Unibel 10,000.00 2,500.00
0.7500 o/h Pekerja 75,000.00 56,250.00
0.5000 o/h Tukang Listrik 100,000.00 50,000.00
0.0500 o/h Kepala Tukang 102,500.00 5,125.00
0.0100 o/h Mandor 110,000.00 1,100.00
Jumlah 463,775.00
285 1 Set GROUNDING PENTANAHAN
3.0000 m' Pipa Gip Ø 2 " 115,000.00 345,000.00
2.0000 o/h Kawat BC 2,5 mm 20,000.00 40,000.00
3.0000 o/h Kabel BC 50 mm 75,000.00 225,000.00
1.0000 o/h Box Pengaman Pasangan Batu Tela 250,000.00 250,000.00
1.0000 o/h Upah Kerja 350,000.00 350,000.00
Jumlah 1,210,000.00
286 1 M3 GALIAN TANAH dan URUGAN PASIR pada KABEL
FEEDER / INSTALASI LAMPU JALAN
1.0000 m3 Galian Tanah 59,000.00 59,000.00
0.3000 m3 Pasir Urug 239,600.00 71,880.00
0.6440 m3 Urugan Tanah kembali 19,666.67 12,665.33
Jumlah 143,545.33
287 1 M3 URUGAN TANAH SUBUR
1.2000 M3 Tanah Subur 300,000.00 360,000.00
0.3000 o/h Pekerja 75,000.00 22,500.00
0.0100 o/h Mandor 110,000.00 1,100.00
Jumlah 383,600.00
1 2 3 4
1 2 3 4
A. PEKERJAAN CIVIL
I PEKERJAAN KAP (ATAP)
a. PEKERJAAN ATAP LANTAI 02 (AULA)
1 Pek. Listplank Kayu Besi M' 106.52
b. PEKERJAAN LANTAI 02
1 Pek. Water Proofing Lantai KM/WC M2 82.21
2 Pek. Urugan Pasir dibawah Lantai M3 133.78365
3 Pek. Cor Spesie Tebal = 3 cm M3 70.73
4 Pek. Pasang Keramik 60/60 cm (KW1) M2 2,357.69
5 Pek. Pasang Keramik 20/20 (KM/WC) M2 74.74
6 Pek. Pasang Dinding Keramik 20/25 (KM/WC) M2 308.57
7 Pek. Pasang Keramik Tangga M2 67.20
8 Pek. List Border Keramik 10/20 cm M' 119.27
Pek. Finishing Kolom Ø45cm (Pembesaran ) m 42.00
c. PEKERJAAN LANTAI 03
1 Pek. Water Proofing Lantai KM/WC M2 29.78
2 Pek. Urugan Pasir dibawah Lantai M3 56.21
3 Pek. Cor Spesie Tebal = 3 cm M3 30.6627
4 Pek. Pasang Keramik 60/60 cm (KW1) M2 995.02
5 Pek. Pasang Keramik 20/20 (KM/WC) M2 27.07
6 Pek. Pasang Dinding Keramik 20/25 (KM/WC) M2 93.76
7 Pek. List Border Keramik 10/20 cm M' 53.35
d. PEKERJAAN LANTAI 04
1 Pek. Dinding Tembok 1 : 4 M3 11.87
2 Pek. Plesteran 1 : 4 M2 237.44
3 Pek. Pembuatan Garfus atap Keliling m 108.84
4 Pek. Acian Dinding M2 237.44
NO URAIAN SAT VOLUME
b. PEKERJAAN LANTAI 02
Pek. Pintu, Jendela
1 Pek. Pintu Utama (ukiran) Lapis Granit Set 1.00
2 Pek. Pintu Panil Kaca M2 35.83
3 Pek. Pintu Panil Kayu M2 62.49
4 Pek. Pintu Double Teakwood + Kaca M2 13.61
5 Pek. Jendela Kaca Buka 5 mm M2 83.81
6 Pek. Jendela Kaca Mati M2 45.98
29 Pek. Pintu Panil + Jalusi M2 3.40
30 Pek. Jendela Kaca Bovenlight M2 6.80
Pek. Dinding
7 Pek. Rangka Dinding Partisi Gipsum (Kayu Besi) M2 156.18
8 Pek. Rangka Dinding Triplex M2 151.68
9 Pek. Rangka Dinding Hias (DH) M2 151.68
13 Pek. Dinding Gypsum M2 312.36
14 Pek. Dinding Tripleks 6 mm M2 151.68
15 Pek. Dinding Hias Lapis Sungkai M2 151.68
16 Pek. Stiker Sand Blasting M2 52.08
NO URAIAN SAT VOLUME
Pek. Plafon
11 Pek. Rangka Plapon Triplex (kayu Matoa) M2 80.83
Pek. Rangka Plafon Hias Lapis Sungkai M2 341.60
12 Pek. Rangka Plapon Lambersering (kayu Matoa) M2 21.14
17 Pek. Plafon Gypsum + Rangka M2 1,334.54
18 Pek. Plafon Tripleks 6 mm M2 80.83
19 Pek. Plafon Hias Lapis Sungkai M2 341.60
Pek. Plafon Hias Lapis Sungkai + Rangka (DOMB) M2 1,196.78
20 Pek. Plapfon Lambersering M2 21.14
21 Pek. List Profil Plafon M' 275.48
22 Pek. List Plint Kayu M' 1,275.48
23 Pek. List Plafon 8 cm M' 1,075.48
24 Pek. List Profil Dinding 5 cm M' 1,275.48
25 Pek. List Papan pada Dinding dibawah Plafon M' 1,275.48
Pek. Reling
26 Pek. Railing Stainless Tangga Utama type 2 M' 14.00
27 Pek. Railing Stainless Tangga Samping 2 Unit type 3 M' 19.70
28 Pek. Railing Balkon Depan (pada Entrance) M' 12.00
c. PEKERJAAN LANTAI 03
Pek. Pintu, Jendela
2 Pek. Pintu Panil Kaca M2 34.02
3 Pek. Pintu Panil Kayu M2 16.59
4 Pek. Pintu Double Teakwood + Kaca M2 4.54
5 Pek. Jendela Kaca Buka 5 mm M2 79.77
6 Pek. Jendela Kaca Mati M2 18.60
21 Pek. Jendela Kaca Bovenlight M2 2.00
23 Pek. Jendela Kaca Mati Lt 4 M2 33.12
Pek. Dinding
7 Pek. Rangka Dinding Partisi Gipsum (Kayu Besi) M2 165.25
9 Pek. Rangka Plapon Triplex M2 32.42
Pek. Rangka Plapfon Lambersering M4 28.06
11 Pek. Dinding Gypsum M2 330.50
12 Pek. Stiker Sand Blasting M2 18.60
Pek. Plafon
13 Pek. Plafon Gypsum + Rangka M2 1,055.53
14 Pek. Plafon Tripleks 6 mm M2 32.42
15 Pek. Plapfon Lambersering M2 28.06
16 Pek. List Plint Kayu M' 302.91
17 Pek. List Plafon 8 cm M' 352.91
18 Pek. List Profil Dinding 5 cm M' 302.91
19 Pek. List Papan pada Dinding dibawah Plafon M' 302.91
Pek. Reling
20 Pek. Railing Stainless Tangga Utama type 4 M' 5.50
IV PEKERJAAN PENGGANTUNG dan PENGUNCI
a. PEKERJAAN LANTAI 01
1 Pek. Kunci Pintu Kayu (Ruangan) Set 35.00
2 Pek. Kunci Cylinder (KM/WC) Set 10.00
3 Pek. Kunci Pintu Double Set 13.00
4 Pek. Handle Pintu Double Psg 13.00
5 Pek. Door Closer Psg 51.00
6 Pek. Door Stop Psg 43.00
7 Pek. Engsel Pintu Stainless 4 " Bh 219.00
8 Pek. Grendel Tanam Pintu Double Psg 15.00
9 Pek. Engsel Jendela Stainless 3 " Psg 218.00
10 Pek. Grendel Jendela Bh 218.00
11 Pek. Hak Angin Psg 218.00
NO URAIAN SAT VOLUME
b. PEKERJAAN LANTAI 02
1 Pek. Kunci Pintu Kayu (Ruangan) Set 34.00
2 Pek. Kunci Cylinder (KM/WC) Set 14.00
3 Pek. Kunci Pintu Double Set 10.00
4 Pek. Handle Pintu Double Psg 10.00
5 Pek. Door Closer Psg 48.00
6 Pek. Door Stop Psg 32.00
7 Pek. Engsel Pintu Stainless 4 " Bh 207.00
8 Pek. Grendel Tanam Pintu Double Psg 11.00
9 Pek. Engsel Jendela Stainless 3 " Psg 141.00
10 Pek. Grendel Jendela Bh 141.00
11 Pek. Hak Angin Psg 141.00
c. PEKERJAAN LANTAI 03
1 Pek. Kunci Pintu Kayu (Ruangan) Set 10.00
2 Pek. Kunci Cylinder (KM/WC) Set 3.00
3 Pek. Door Closer Psg 20.00
4 Pek. Door Stop Psg 17.00
5 Pek. Engsel Pintu Stainless 4 " Bh 99.00
6 Pek. Engsel Jendela Stainless 3 " Psg 124.00
7 Pek. Grendel Jendela Bh 124.00
8 Pek. Hak Angin Psg 124.00
9 Pek. Kunci Pintu Double Set 10.00
10 Pek. Handle Pintu Double Psg 10.00
V PEKERJAAN PENGECATAN
a. PEKERJAAN LANTAI 01
Cat Tembok Bagian Dalam
1 Pek. Cat Dinding Tembok bagian Dalam M2 3,793.89
2 Pek. Cat Kolom M2 262.93
3 Pek. Cat Lisplng Pembatas Plafon M2 532.01
4 Pek. Cat Plat Tangga M2 85.66
5 Pek. Cat Balok Exphose M2 989.26
Cat Tembok Bagian Luar
6 Pek. Cat Dinding Tembok bagian Luar (Dulux) M2 344.87
7 Pek. Cat Kolom M2 354.00
8 Pek. Cat Lisplng dan talang beton M2 303.21
9 Pek. Cat Plat Kanopy M2 193.86
10 Pek. Cat Gapura M2 138.13
11 Pek. Cat Duco Kusen Pintu dan Jendela Kayu M2 271.02
12 Pek. Cat Plafon Gypsum dan Tripleks M2 1,799.66
13 Pek. Cat Meny Rangka Plafon M2 2,128.74
14 Pek. Cat Compound Dinding Gypsum M' 938.07
15 Pek. Cat Compound Plafon Gypsum M' 2,034.93
16 Pek. Cat Melamin Dinding Hias Lapis Sungkai M2 237.15
17 Pek. Cat Melamin List Papan dibawah Dinding M2 340.19
18 Pek. Cat Duco Pintu Panil + Jalusi M2 13.61
19 Pek. Cat Duco Pintu Panil Kaca M2 22.97
20 Pek. Cat Duco Pintu Panil M2 130.12
21 Pek. Cat Duco Pintu Double Teakwood + Kaca M2 4.63
22 Pek. Cat Duco Jendela Kaca Buka M2 69.38
23 Pek. Cat Duco Pintu Lambersering M2 56.98
24 Pek. Cat Dinding Gypsum M2 750.22
25 Pek. Cat Plafon Dak Beton (Plat Exphose) M2 771.88
NO URAIAN SAT VOLUME
b. PEKERJAAN LANTAI 02
Cat Tembok Bagian Dalam
1 Pek. Cat Dinding Tembok bagian Dalam M2 3,092.46
2 Pek. Cat Kolom M2 426.00
3 Pek. Cat Lisplng Pembatas Plafon M2 314.22
4 Pek. Cat Plat Tangga M2 85.66
5 Pek. Cat Balok Exphose M2 142.20
Cat Tembok Bagian Luar
6 Pek. Cat Dinding Tembok bagian Luar (Dulux) M2 470.62
7 Pek. Cat Kolom M2 262.93
8 Pek. Cat Lisplng dan talang beton M2 417.81
9 Pek. Cat Plat Kanopy M2 295.27
10 Pek. Cat Sirip Beton M2 175.76
11 Pek. Cat Duco Kusen Pintu dan Jendela Kayu M2 207.90
12 Pek. Cat Plafon Gypsum dan Tripleks M2 1,414.29
13 Pek. Cat Meny Rangka Plafon M2 1,435.43
14 Pek. Cat Compound Dinding Gypsum M' 195.59
15 Pek. Cat Compound Plafon Gypsum M' 1,761.59
16 Pek. Cat Melamin Dinding Hias Lapis Sungkai M2 151.68
17 Pek. Cat Melamin Plafon Hias M2 907.46
18 Pek. Cat Melamin List Papan dibawah Dinding M2 255.10
19 Pek. Cat Duco Pintu Panil + Jalusi M2 6.80
20 Pek. Cat Duco Pintu Panil Kaca M2 17.91
21 Pek. Cat Duco Pintu Panil M2 124.97
22 Pek. Cat Duco Pintu Double Teakwood + Kaca M2 13.90
23 Pek. Cat Duco Jendela Kaca Buka M2 41.91
24 Pek. Cat Duco Pintu Lambersering M2 38.42
25 Pek. Cat Dinding Gypsum M2 464.04
26 Pek. Cat Lisplank kayu M2 70.60
c. PEKERJAAN LANTAI 03
1 Pek. Cat Dinding Tembok bagian Dalam M2 2,243.76
2 Pek. Cat Dinding Tembok bagian Luar (Dulux) M2 2,154.53
3 Pek. Cat Duco Kusen Pintu dan Jendela Kayu M2 118.74
4 Pek. Cat Plafon M2 1,021.94
5 Pek. Cat Meny Rangka Plafon M2 1,021.94
6 Pek. Cat Compound Plafon Gypsum M' 1,278.00
7 Pek. Cat Melamin List Papan dibawah Dinding M2 60.58
8 Pek. Cat Duco Pintu Panil Kaca M2 17.01
9 Pek. Cat Duco Pintu Panil M2 33.18
10 Pek. Cat Duco Pintu Double Teakwood + Kaca M2 4.63
11 Pek. Cat Duco Jendela Kaca Buka M2 39.89
12 Pek. Cat Duco Pintu Lambersering M2 28.06
13 Pek. Cat Duco Kusen Lt. 04 M 40.00
Pek. Cat Lisplank kayu M2 25.41
Pek. Ca Dinding Gypsum M2 330.50
VI PEKERJAAN INTERIOR
a. PEKERJAAN LANTAI 01
1 Pek. Ornamen Ukiran pada Dinding Border M' 243.60
2 Pek. Ornamen Ukiran pada Papan Nama Ruangan Unit 48.00
3 Pek. Ornamen Ukiran pada Pintu Kayu Unit 58.00
4 Pek. Ornamen Ukiran pada Kolom Unit 124.00
5 Pek. Pasang Papan Penunjuk Ruangan Unit 34.00
6 Pek. Pasang Wallpaper M2 987.80
7 Pek. Pasang Border Wallpaper M' 212.60
NO URAIAN SAT VOLUME
b. PEKERJAAN LANTAI 02
1 Pek. Ornamen Ukiran pada Dinding Border M' 284.24
2 Pek. Ornamen Ukiran pada Papan Nama Ruangan Unit 56.00
3 Pek. Ornamen Ukiran pada Pintu Kayu Unit 54.00
4 Pek. Ornamen Ukiran pada Kolom Unit 124.00
5 Pek. Pasang Papan Penunjuk Ruangan Unit 36.00
6 Pek. Pasang Wallpaper M2 1,180.24
7 Pek. Pasang Border Wallpaper M' 234.00
Pek. Stage Ruang Sidang Unit 1.00
c. PEKERJAAN LANTAI 03
1 Pek. Ornamen Ukiran pada Dinding Border M' 120.72
2 Pek. Ornamen Ukiran pada Papan Nama Ruangan Unit 24.00
3 Pek. Ornamen Ukiran pada Pintu Kayu Unit 26.00
4 Pek. Ornamen Ukiran pada Kolom Unit 36.00
5 Pek. Pasang Papan Penunjuk Ruangan Unit 29.00
6 Pek. Pasang Wallpaper M2 686.74
7 Pek. Pasang Border Wallpaper M' 76.20
PEKERJAAN SANITAIR
PEKERJAAN LANTAI 1
1 Pek. Closet duduk (lengkap) set 9.00
2 Pek. Urinoir bh 4.00
3 Pek. Washtafel Meja bh 6.00
4 Pek. Shower Spray bh 9.00
5 Pek. Soap Holder bh 9.00
6 Pek. Double Robe Hock bh 9.00
7 Pek. Cermin Toilet bh 6.00
8 Pek. Kran dinding bh 9.00
9 Pek. Floor drain bh 9.00
10 Pek. Partition Plate bh 3.00
PEKERJAAN LANTAI 2
1 Pek. Closet duduk (lengkap) set 15.00
2 Pek. Urinoir bh 9.00
3 Pek. Washtafel Meja bh 10.00
4 Pek. Shower Spray bh 15.00
5 Pek. Soap Holder bh 15.00
6 Pek. Double Robe Hock bh 15.00
7 Pek. Cermin Toilet bh 10.00
8 Pek. Kran dinding bh 15.00
9 Pek. Floor drain bh 15.00
10 Pek. Partition Plate bh 7.00
PEKERJAAN LANTAI 3
1 Pek. Closet duduk (lengkap) set 3.00
2 Pek. Urinoir bh 4.00
3 Pek. Washtafel Meja bh 2.00
4 Pek. Shower Spray bh 3.00
5 Pek. Soap Holder bh 3.00
6 Pek. Double Robe Hock bh 3.00
7 Pek. Cermin Toilet bh 2.00
8 Pek. Kran dinding bh 3.00
9 Pek. Floor drain bh 5.00
10 Pek. Partition Plate bh 3.00
PEKERJAAN PLUMBING
1 PEKERJAAN PIPA AIR BERSIH DAN AIR KOTOR
PEKERJAAN LANTAI 01
a. PEK. INSTALASI PIPA AIR BERSIH (ALL IN) Set 1.00
b. PEK. PIPA AIR KOTOR BEKAS Set 1.00
PEKERJAAN LANTAI 02
a. PEK. INSTALASI PIPA AIR BERSIH Set 1.00
b. PEK. PIPA AIR KOTOR BEKAS Set 1.00
PEKERJAAN LANTAI 03
a. PEK. INSTALASI PIPA AIR BERSIH Set 1.00
b. PEK. PIPA AIR KOTOR BEKAS Set 1.00
3 PEKERJAAN HYDRANT
1 Pek. Fleksible joint dia 4" Bh 2.00
2 Pek. Air relief valve Bh 1.00
3 Pek. Jocky Pump unit 1.00
4 Pek. Electric Pump unit 1.00
5 Pek. Pressure Switch Bh 2.00
6 Pressure Tank Bh 2.00
7 Gate Valve dia. 4" Flens 10 K bh 7.00
8 Pek. Straner 4" merk Kitz Flens 10 K bh 1.00
9 Pek. Fot Valve 4" merk Socla PN 16 bh 1.00
10 Pek. Check Valve 4 " merk KitzFlens 10 K bh 1.00
11 Pek. Hydrant Pilar 3 " One Way bh 10.00
12 Pek. Pressure Gauge dia. 3 " bh 1.00
13 Pek. Knee Las 4 " (Elbow GIP 90° 4 ") bh 35.00
14 Pek. Flange Buta 8 " bh 2.00
15 Pek. Flange 8 " bh 2.00
16 Pek. Flange 4 " bh 26.00
17 Pek. Fire Hose Box (komplit) untuk Hydrant Pilar Roll 10.00
18 Pek. Hydrant Box (komplit) Fire Hose 35 m unit 5.00
19 Pipa GØ 4 " m 340.00
Ø3" m 250.00
Ø2" m 170.00
20 Knee Las Ø4" bh 70.00
Ø3" bh 60.00
Ø2" bh 100.00
21 Testik Las Ø4"x 3" bh 10.00
Ø3"x 2" bh 27.00
Ø2" bh 15.00
22 Over Shock LØ 3 " x 2 " bh 15.00
23 Shock Gip Ø 2 " bh 50.00
c. PEKERJAAN INSTALASI
1 Pek. Instalasi Titik Cahaya Lampu Titik 243.00
2 Pek. Instalasi Titik Exhaust Fan Titik 5.00
3 Pek. Instalasi Titik Stop Kontak Titik 90.00
4 Pek. Instalasi Power AC 1 Phase Titik 38.00
5 Pek. Instalasi Power AC 3 Phase Titik 4.00
6 Pek. Armatur :
- Lampu TL 1 x 36 Watt Balok Outbow Unit 15.00
- Lampu TL 2 x 36 Watt Inbow Unit 27.00
- Lampu Down Light Silver 150 PLC 18 Watt Unit 119.00
- Lampu Down Light Gold 150 Unit 4.00
- Lampu Baret 32 Watt Kap Kaca (LB 2) Unit 30.00
- Lampu Baret 40 Watt Kap Kaca (LB 1) Unit 30.00
- Lampu Sorot 500 Watt Unit 2.00
- Lampu Dinding Unit 4.00
- Lampu Hias (LH 1) Bh 4.00
- Lampu Hias (LH 2) Bh 4.00
- Lampu Fitting PLC Bh 21.00
- Saklar Tunggal Bh 27.00
- Saklar Tunggal Tukar Bh 2.00
- Saklar Seri Tukar Bh 2.00
- Saklar Seri Bh 25.00
- Saklar Triple Bh 8.00
- Stop Kontak Arde Bh 82.00
- Stop Kontak Lantai Bh 10.00
- Stop Kontak AC Bh 38.00
7 Exhaust Fan Bh 5.00
8 Pek. Tranking Cable M 150.00
9 Pek. Kabel Tee 20 x 20 x 300 cm Pcs 2,000.00
10 Pek. Grounding Pentanahan Panel Unit 2.00
11 Unimax Klem (Kuku Macan) Bh 3.00
d. PEKERJAAN FIRE ALARM
1 Pek. Master Control Fire Alarm kapasitas 6 Zone Unit 1.00
2 Pek. Panel Kontrol Lantai Unit 1.00
3 Pek. Head Detector Unit 68.00
4 Pek. Smoke Detector Unit 1.00
5 Pek. Indicator Lamp Unit 2.00
6 Pek. Bell Alarm Unit 2.00
7 Pek. Push Button Unit 2.00
8 Pek. Extinghauser 3,5 Kg Unit 7.00
9 Pek. Instalasi Head Detector Titik 88.00
10 Pek. Instalasi Smoke Detector Titik 1.00
11 Pek. Instalasi Indicator Lamp Titik 2.00
12 Pek. Instalasi Bell Alarm Titik 2.00
13 Instalasi Push Button Titik 2.00
NO URAIAN SAT VOLUME
e. PEKERJAAN TATA SUARA
1 Pek. Power Amplifier Unit 3.00
2 Pek. Equalizer Unit 1.00
3 Pek. DVD / VCD 3 Disc Unit 1.00
4 Pek. Chime Mic SC Unit 1.00
5 Pek. AM / SW / FM / Tunner Unit 1.00
6 Pek. Speaker Selector 10 Channel Unit 1.00
7 Pek. Stabilizer 1000 VA 220 V 50 Hz Unit 1.00
8 Pek. Ceiling Speaker 6 Watt Bh 42.00
9 Pek. Level Control (Attenuator) 6 Watt Bh 36.00
10 Pek. Level Control (Attenuator) 30 Watt Bh 3.00
11 Pek. Rak Equipment Unit 1.00
12 Pek. Instalasi Ceiling Speaker Titik 42.00
13 Pek. Instalasi Level Control (Attenuator) Titik 39.00
14 Pek. Speaker Car Calling Unit 4.00
15 Instalasi Car Calling Titik 4.00
f. PEKERJAAN TELEPHONE
1 Pek. Pengadaan PABX 80 Extension dan Aksesorisnya Unit 1.00
2 Pek. Main Dsitribution Board kapasitas 100 Extension Unit 1.00
3 Pek. Panel Telephone kapasitas 80 Ext. Unit 1.00
4 Pek. Kabel Feeder 2 x 30 x 0,6 mm M 50.00
5 Pek. Kabel Feeder 2 x 80 x 0,6 mm M 30.00
6 Pek. Outlet Telephone Unit 55.00
7 Pek. Single Line Telephone Unit 55.00
8 Pek. Instalasi Outlet Telephone Jack Titik 55.00
PEKERJAAN LANTAI 02
a. PEKERJAAN INSTALASI
1 Pek. Instalasi Titik Cahaya Lampu Titik 272.00
2 Pek. Instalasi Titik Exhaust Fan Titik 11.00
3 Pek. Instalasi Titik Stop Kontak Titik 85.00
4 Pek. Instalasi Power AC 1 Phase Titik 36.00
5 Pek. Instalasi Power AC 3 Phase Titik 6.00
6 Pek. Armatur :
- Lampu Fitting PLC 18 Watt Bh 27.00
- Lampu DLH 1 Unit 27.00
- Lampu Down Light Silver 150 PLC 14 Watt Unit 102.00
- Lampu Down Light Gold Hologen 25 Watt Unit 44.00
- Lampu Hias (LH 1) Unit 4.00
- Lampu Dinding Unit 18.00
- Lampu Baret 32 Watt (LB 2) Unit 18.00
- Lampu Baret 40 Watt (LB 1) Unit 31.00
- Lampu Gantung Unit 1.00
- Saklar Tunggal Bh 22.00
- Saklar Seri Bh 35.00
- Saklar Triple Bh 4.00
- Stop Kontak Arde Bh 74.00
- Stop Kontak Lantai Bh 11.00
- Stop Kontak AC Bh 36.00
7 Exhaust Fan Bh 11.00
8 Pek. Tranking Cable M 130.00
9 Pek. Kabel Tee 20 x 20 x 300 cm Pcs 2,000.00
10 Pek. Grounding Panel (Tembaga) 50 mm M 20.00
11 Unimax Klem (Kuku Macan) Bh 2.00
d. PEKERJAAN TELEPHONE
1 Pek. Panel Telephone kapasitas 50 Ext. Unit 1.00
2 Pek. Kabel Feeder 2 x 50 x 0,6 mm M 30.00
3 Pek. Outlet Telephone Jack Unit 34.00
4 Pek. Single Line Telephone Unit 34.00
5 Instalasi Outlet Telephone Jack Titik 34.00
PEKERJAAN LANTAI 03
a. PEKERJAAN INSTALASI
1 Pek. Instalasi Titik Cahaya Lampu Titik 74.00
2 Pek. Instalasi Titik Stop Kontak Titik 48.00
3 Pek. Instalasi Power AC 1 Phase Titik 15.00
4 Pek. Armatur :
- Lampu Hias (LH 1) Unit 3.00
- Lampu Down Light Silver 150 PLC 18 Watt Unit 29.00
- Lampu Down Light Silver 150 Sorot 80 Watt Unit 3.00
- Lampu Baret 40 Watt (LB 1) Unit 2.00
- Lampu Baret 32 Watt (LB 2) Unit 15.00
- Lampu Fitting PLC 18 Watt Bh 12.00
- Lampu Sorot 250 Watt Unit 9.00
- Handle ON/OFF Bh 1.00
- Saklar Tunggal Bh 8.00
- Saklar Tunggal Tukar Bh 1.00
- Saklar Seri Bh 11.00
- Saklar Triple Bh 2.00
- Stop Kontak Arde Bh 48.00
- Stop Kontak AC Bh 15.00
5 Pek. Tranking Cable M 60.00
6 Pek. Kabel Tee 20 x 20 x 300 cm Pcs 1,000.00
7 Pek. Grounding Panel (Tembaga) 50 mm M 40.00
8 Pek. Unimax Klem (Kuku Macan) Bh 2.00
d. PEKERJAAN TELEPHONE
1 Pek. Panel Telephone kapasitas 30 Ext. Unit 1.00
2 Pek. Kabel Feeder 2 x 40 x 0,6 mm M 40.00
3 Pek. Outlet Telephone Jack Unit 13.00
4 Pek. Single Line Telephone Unit 13.00
5 Pek. Instalasi Outlet Telephone Jack Titik 13.00
-
e. PEKERJAAN INSTALASI LAMPU JALAN dan HALAMAN
1 Pek. Instalasi Titik Cahaya Lampu Titik 51.00
2 Pek. Armatur :
- Lampu TL 1 x 36 Watt Balok Outbow Unit 10.00
- Lampu Jalan Sodium (SON) 250 Watt lengkap,
Trafo, Capasitor Unit 36.00
- Lampu Sorot Kolam Unit 5.00
- Saklar Tunggal Bh 1.00
- Saklar Seri Unit 2.00
3 Pek. Kabel NYFGBY 4 x 4 mm Mtr 750.00
4 Pek. Grounding Panel Ls 1.00
5 Pek. Unimax Klem Bh 4.00
6 Pek. Tiang Lampu Jalan Tunggal lengkap dengan
MCB 6 A Unit 4.00
7 Pek. Tiang Lampu Jalan Cabang (Dobel) lengkap
dengan MCB 2 x 6 A Unit 16.00
8 Pek. Lampu Taman + Tiang Bh 27.00
9 Pek. Galian Tanah dan Urugan Pasir pada Kabel
Feeder dan Lampu Jalan m3 30.00
A. PEKERJAAN CIVIL
I PEKERJAAN KAP (ATAP)
II PEKERJAAN DINDING dan LANTAI
III PEKERJAAN DINDING PARTISI, KUSEN, JENDELA, dan PLAFON
IV PEKERJAAN PENGGANTUNG dan PENGUNCI
V PEKERJAAN PENGECATAN
VI PEKERJAAN INTERIOR
VII PEKERJAAN EXTERIOR
VIII PEKERJAAN PENUNJANG BANGUNAN
IX PEKERJAAN SANITAIR
X PEKERJAAN PLUMBING
LANTAI 2
a. PEKERJAAN INSTALASI
b. PEKERJAAN FIRE ALARM
c. PEKERJAAN TATA SUARA
d. PEKERJAAN TELEPHONE
LANTAI 3
a. PEKERJAAN INSTALASI
b. PEKERJAAN FIRE ALARM
c. PEKERJAAN TATA SUARA
d. PEKERJAAN TELEPHONE
e. PEKERJAAN INSTALASI LAMPU JALAN dan HALAMAN
f. PEKERJAAN PENANGKAL PETIR
REAL COST
PPN 10%
TOTAL
PEMBULATAN
CANA ANGGARAN BIAYA
HARGA SATUAN
JUMLAH
(Rp)
69,650.00 7,419,118.00
Jumlah (a) 7,419,118.00
###
69,650.00 6,630,680.00
Jumlah (b) 6,630,680.00
###
69,650.00 5,056,590.00
Jumlah (c) 5,056,590.00
###
124,310.00 3,729,300.00
60,000.00 1,800,000.00
461,712.50 11,007,226.00
69,650.00 522,375.00
Jumlah (d) 17,058,901.00
JUMLAH I 36,165,289.00
###
###
43,000.00 9,909,049.00
492,707.59 16,366,651.17
383,717.59 21,273,303.08
239,600.00 57,981,522.80
829,310.19 140,481,828.13
368,046.50 789,941,883.42
227,122.50 26,232,648.75
226,428.50 11,082,542.93
256,684.50 38,914,653.62
227,122.50 25,789,305.63
99,933.10 8,429,356.99
Jumlah (a) 1,146,402,745.51
###
133,200.00 10,950,904.80
239,600.00 32,054,562.54
1,038,975.00 73,487,429.03
368,046.50 867,739,552.59
226,428.50 16,923,266.09
256,684.50 79,203,852.74
227,122.50 15,262,632.00
99,933.10 11,919,020.84
383,717.59 16,116,138.70
Jumlah (b) 1,107,541,220.63
###
133,200.00 3,966,296.40
239,600.00 13,469,102.02
1,038,975.00 31,857,778.73
368,046.50 366,213,628.43
226,428.50 6,129,419.50
256,684.50 24,066,097.01
99,933.10 5,331,430.89
Jumlah (c) 451,033,752.97
###
1,089,900.00 12,939,292.80
55,937.10 13,281,705.02
110,887.13 12,068,955.19
32,130.00 7,628,947.20
Jumlah (d) 45,918,900.21
JUMLAH II 2,750,896,619.32
HARGA SATUAN JUMLAH
###
###
47,326,146.78 47,326,146.78
602,000.00 27,660,696.00
2,579,591.75 2,579,591.75
571,250.00 37,164,382.50
535,750.00 2,430,162.00
657,245.00 91,192,743.75
232,245.00 14,189,008.28
7,500,000.00 7,500,000.00
655,250.00 4,458,321.00
232,245.00 1,021,878.00
155,892.50 58,476,523.89
68,496.60 16,244,105.11
68,496.60 16,244,105.11
87,314.50 65,504,734.93
60,166.50 14,268,605.81
226,592.00 53,736,745.98
301,025.00 11,125,884.00
89,959.00 7,382,035.54
-
89,959.00 26,345,302.78
195,184.50 335,248,897.20
51,634.50 4,237,127.07
226,592.00 8,208,295.20
98,615.00 28,880,290.29
30,802.50 52,393,820.40
33,802.50 29,490,653.10
30,892.50 52,546,906.80
33,802.50 29,490,653.10
42,000.00 71,440,320.00
3,436,695.75 73,888,958.63
3,436,695.75 67,702,906.28
Jumlah (a) 1,258,379,801.26
###
97,011,171.36 97,011,171.36
602,000.00 21,567,252.00
571,250.00 35,695,127.50
535,750.00 7,290,486.00
657,245.00 55,086,332.43
232,245.00 10,677,463.88
655,250.00 2,229,160.50
232,245.00 1,579,266.00
155,892.50 24,347,290.65
68,496.60 10,389,563.92
68,496.60 10,389,563.92
87,314.50 27,273,557.22
51,634.50 7,831,920.96
226,592.00 34,369,474.56
301,025.00 15,677,382.00
HARGA SATUAN JUMLAH
89,959.00 7,270,936.18
- -
89,959.00 1,901,985.15
195,184.50 260,482,147.25
51,634.50 4,173,358.46
226,592.00 77,402,920.83
403,831.25 483,297,163.38
98,615.00 2,084,997.22
33,802.50 9,311,912.70
30,802.50 39,287,972.70
33,802.50 36,353,912.70
30,892.50 39,402,765.90
42,000.00 53,570,160.00
3,436,695.75 48,113,740.50
3,436,695.75 67,702,906.28
821,287.50 9,855,450.00
Jumlah (b) 1,501,627,342.13
###
602,000.00 20,480,040.00
571,250.00 9,477,037.50
535,750.00 2,430,162.00
657,245.00 52,428,433.65
232,245.00 4,319,757.00
232,245.00 464,490.00
232,245.00 7,691,954.40
155,892.50 25,761,235.63
68,496.60 2,220,659.69
68,496.60 1,922,014.53
87,314.50 28,857,442.25
301,025.00 5,599,065.00
195,184.50 206,023,095.29
51,634.50 1,673,990.49
98,615.00 2,767,136.90
30,802.50 9,330,231.26
33,802.50 11,929,071.26
30,892.50 9,357,492.71
42,000.00 12,722,010.00
3,436,695.75 18,901,826.63
Jumlah (c) 434,357,146.18
JUMLAH III 3,194,364,289.58
###
###
315,980.00 11,059,300.00
198,915.00 1,989,150.00
252,325.00 3,280,225.00
292,745.00 3,805,685.00
599,150.00 30,556,650.00
93,830.00 4,034,690.00
77,745.00 17,026,155.00
181,550.00 2,723,250.00
51,830.00 11,298,940.00
27,545.00 6,004,810.00
45,745.00 9,972,410.00
Jumlah (a) 101,751,265.00
HARGA SATUAN JUMLAH
###
315,980.00 10,743,320.00
198,915.00 2,784,810.00
252,325.00 2,523,250.00
292,745.00 2,927,450.00
599,150.00 28,759,200.00
93,830.00 3,002,560.00
77,745.00 16,093,215.00
181,550.00 1,997,050.00
51,830.00 7,308,030.00
27,545.00 3,883,845.00
45,745.00 6,450,045.00
Jumlah (b) 86,472,775.00
###
315,980.00 3,159,800.00
198,915.00 596,745.00
599,150.00 11,983,000.00
93,830.00 1,595,110.00
77,745.00 7,696,755.00
51,830.00 6,426,920.00
27,545.00 3,415,580.00
45,745.00 5,672,380.00
181,550.00 1,815,500.00
292,745.00 2,927,450.00
Jumlah (c) 45,289,240.00
JUMLAH IV 233,513,280.00
###
###
###
29,020.75 110,101,675.42
29,020.75 7,630,385.17
29,020.75 15,439,230.54
29,020.75 2,485,789.75
29,020.75 28,709,012.01
###
43,220.75 14,905,397.42
43,220.75 15,300,067.70
43,220.75 13,104,877.17
43,220.75 8,378,774.60
43,220.75 5,970,082.20
180,800.50 49,000,336.08
22,527.50 40,541,840.65
32,975.00 70,195,333.40
13,835.75 12,978,852.74
13,835.75 28,154,757.95
161,642.50 38,333,842.16
161,642.50 54,989,485.36
180,800.50 2,460,333.20
180,800.50 4,153,710.69
180,800.50 23,525,037.86
180,800.50 837,467.92
180,800.50 12,543,034.69
180,800.50 10,302,012.49
29,020.75 21,771,830.98
29,020.75 22,400,536.51
Jumlah (a) 614,213,704.64
HARGA SATUAN JUMLAH
###
###
29,020.75 89,745,544.82
29,020.75 12,362,839.50
29,020.75 9,118,975.52
29,020.75 2,485,789.75
29,020.75 4,126,622.96
###
43,220.75 20,340,354.87
43,220.75 11,363,971.29
43,220.75 18,058,044.27
43,220.75 12,761,877.29
43,220.75 7,596,617.33
180,800.50 37,588,326.80
22,527.50 31,860,305.34
32,975.00 47,333,231.71
13,835.75 2,706,107.83
13,835.75 24,372,953.60
161,642.50 24,517,934.40
161,642.50 146,684,103.05
161,642.50 41,234,355.18
180,800.50 1,230,166.60
180,800.50 3,238,679.36
180,800.50 22,595,000.09
180,800.50 2,512,403.75
180,800.50 7,576,806.55
180,800.50 6,946,355.21
29,020.75 13,466,788.83
80,442.50 5,679,401.39
Jumlah (b) 607,503,557.27
###
29,020.75 65,115,714.10
43,220.75 93,120,532.16
180,800.50 21,468,251.37
22,527.50 23,021,640.71
32,975.00 33,698,306.63
13,835.75 17,682,088.50
161,642.50 9,792,464.29
180,800.50 3,075,416.51
180,800.50 5,998,960.59
180,800.50 837,467.92
180,800.50 7,211,227.94
180,800.50 5,073,262.03
180,800.50 7,232,020.00
80,442.50 2,044,043.93
29,020.75 9,591,357.88
Jumlah (c) 304,962,754.55
JUMLAH V 1,526,680,016.46
###
###
225,000.00 54,810,000.00
450,000.00 21,600,000.00
250,000.00 14,500,000.00
375,000.00 46,500,000.00
275,000.00 9,350,000.00
253,712.50 250,617,207.50
104,312.50 22,176,837.50
Jumlah (a) 419,554,045.00
###
HARGA SATUAN JUMLAH HARGA (Rp)
###
225,000.00 63,954,000.00
450,000.00 25,200,000.00
250,000.00 13,500,000.00
375,000.00 46,500,000.00
275,000.00 9,900,000.00
253,712.50 299,441,641.00
104,312.50 24,409,125.00
163,704,362.78 163,704,362.78
Jumlah (b) 646,609,128.78
###
225,000.00 27,162,000.00
450,000.00 10,800,000.00
250,000.00 6,500,000.00
375,000.00 13,500,000.00
275,000.00 7,975,000.00
253,712.50 174,234,522.25
104,312.50 7,948,612.50
Jumlah (c) 248,120,134.75
JUMLAH VI 1,314,283,308.53
###
600,000.00 55,200,000.00
262,985.00 227,219,040.00
5,000,000.00 170,000,000.00
492,850.00 130,353,896.50
519,100.00 100,409,513.00
875,000.00 1,750,000.00
1,089,402.40 88,372,322.69
1,020,703.00 68,958,694.68
1,020,703.00 128,847,218.36
262,985.00 19,723,875.00
JUMLAH VII 990,834,560.23
###
16,059,669 96,358,013.25
63,522,789 63,522,789.24
21,000,000 42,000,000.00
281,366 76,317,607.11
1,928,835 312,471,348.61
-
297,762.50 132,507,885.65
JUMLAH VII 723,177,643.86
###
2,839,702.50 25,557,322.50
3,327,840.00 13,311,360.00
2,848,965.00 17,093,790.00
600,000.00 5,400,000.00
150,000.00 1,350,000.00
150,000.00 1,350,000.00
600,000.00 3,600,000.00
90,000.00 810,000.00
524,113.75 4,717,023.75
750,000.00 2,250,000.00
Jumlah (c) 75,439,496.25
###
2,839,702.50 42,595,537.50
3,327,840.00 29,950,560.00
2,848,965.00 28,489,650.00
600,000.00 9,000,000.00
150,000.00 2,250,000.00
150,000.00 2,250,000.00
600,000.00 6,000,000.00
90,000.00 1,350,000.00
524,113.75 7,861,706.25
750,000.00 5,250,000.00
Jumlah (c) 134,997,453.75
###
###
###
21,992,020.00 21,992,020.00
17,220,759.50 17,220,759.50
JUMLAH Lt. 01 39,212,779.50
###
38,936,330.00 38,936,330.00
51,758,342.50 51,758,342.50
JUMLAH Lt. 02 90,694,672.50
###
19,614,444.00 19,614,444.00
6,954,482.25 6,954,482.25
JUMLAH Lt. 03 26,568,926.25
Jumlah (1) 156,476,378.25
###
230,659.75 11,532,987.50
71,009.75 17,752,437.50
250,000.00 1,500,000.00
75,000.00 1,875,000.00
150,000.00 1,200,000.00
75,000.00 6,000,000.00
35,000.00 1,050,000.00
45,000.00 675,000.00
Jumlah (4) 41,585,425.00
JUMLAH X 198,061,803.25
###
###
###
454,675.00 454,675.00
105,000.00 3,360,000.00
175,000.00 4,725,000.00
250,000.00 500,000.00
454,675.00 14,549,600.00
454,675.00 13,185,575.00
Jumlah (c) 36,774,850.00
###
750,000.00 750,000.00
60,000.00 1,800,000.00
65,000.00 2,210,000.00
250,000.00 8,500,000.00
420,875.00 14,309,750.00
Jumlah (d) 27,569,750.00
TOTAL Lt. 02 474,028,490.00
###
###
432,375.00 31,995,750.00
445,175.00 21,368,400.00
1,156,475.00 17,347,125.00
###
6,000,000.00 18,000,000.00
95,000.00 2,755,000.00
145,000.00 435,000.00
450,000.00 900,000.00
375,000.00 5,625,000.00
95,000.00 1,140,000.00
750,000.00 6,750,000.00
500,000.00 500,000.00
48,000.00 384,000.00
50,000.00 50,000.00
55,000.00 605,000.00
60,000.00 120,000.00
65,000.00 3,120,000.00
125,000.00 1,875,000.00
248,953.00 14,937,180.00
1,500.00 1,500,000.00
75,000.00 3,000,000.00
45,000.00 90,000.00
Jumlah (a) 132,497,455.00
###
500,000.00 500,000.00
463,775.00 1,855,100.00
95,000.00 1,995,000.00
275,000.00 275,000.00
75,000.00 75,000.00
250,000.00 250,000.00
350,000.00 350,000.00
1,500,000.00 6,000,000.00
463,775.00 9,739,275.00
463,775.00 463,775.00
463,775.00 463,775.00
463,775.00 463,775.00
463,775.00 463,775.00
Jumlah (b) 22,894,475.00
###
###
###
454,675.00 454,675.00
105,000.00 1,575,000.00
175,000.00 1,750,000.00
250,000.00 500,000.00
454,675.00 6,820,125.00
454,675.00 5,456,100.00
Jumlah (c) 16,555,900.00
###
1,250,000.00 1,250,000.00
75,000.00 3,000,000.00
65,000.00 845,000.00
250,000.00 3,250,000.00
420,875.00 5,471,375.00
Jumlah (d) 13,816,375.00
-
###
432,375.00 22,051,125.00
###
125,000.00 1,250,000.00
###
1,500,000.00 54,000,000.00
550,000.00 2,750,000.00
48,000.00 48,000.00
55,000.00 110,000.00
15,000.00 11,250,000.00
550,000.00 550,000.00
45,000.00 180,000.00
###
2,500,000.00 10,000,000.00
###
3,500,000.00 56,000,000.00
750,000.00 20,250,000.00
###
143,545.33 4,306,360.00
Jumlah (e) 182,745,485.00
###
35,000,000.00 35,000,000.00
175,000.00 14,000,000.00
1,210,000.00 1,210,000.00
5,000.00 600,000.00
2,000,000.00 2,000,000.00
3,500,000.00 3,500,000.00
Jumlah (f) 56,310,000.00
TOTAL Lt. 03 424,819,690.00
JUMLAH II 2,819,694,955.00
REKAPITULASI
CANA ANGGRAN BIAYA
T GEDUNG UTAMA
DPRD - KABUPATEN MIMIKA (TAHAP III)
36,165,289.00
2,750,896,619.32
3,194,364,289.58
233,513,280.00
1,526,680,016.46
1,314,283,308.53
990,834,560.23
723,177,643.86
247,005,916.25
198,061,803.25
11,214,982,726.48
###
18,654,570.00
34,165,377.00
474,662,325.00
TOTAL B.I 527,482,272.00
###
846,000,000.00
421,150,000.00
362,772,650.00
72,943,625.00
73,457,375.00
144,523,125.00
TOTAL LT 1 1,920,846,775.00
364,779,840.00
44,904,050.00
36,774,850.00
27,569,750.00
TOTAL LT 2 474,028,490.00
132,497,455.00
22,894,475.00
16,555,900.00
13,816,375.00
182,745,485.00
56,310,000.00
TOTAL LT 3 424,819,690.00
TOTAL B.II 2,819,694,955.00
TOTAL BI + B.II 3,347,177,227.00
-
REAL COST 14,562,159,953.48
1,456,215,995.35
16,018,375,948.82
PEMBULATAN 16,018,375,000.00
RENCANA ANGGARAN BIAYA
A. PEKERJAAN PENDAHULUAN
1 Pek. Mobilisasi Ls 1.00
2 Pek. Pembuatan Soft Drawing Ls 1.00
3 Pek. Pengukuran dan Pemasangan Bowplank Ls 1.00
B. PEKERJAAN CIVIL
a. PEKERJAAN LANTAI 01
1 Pek Perataan dan Pembenahan Tanah bawah lantai m3 250.16
2 Pek. Finishing Kolom Ø 30cm (Pembesaran) m 33.22
3 Pek. Finishing Kolom Ø45cm (Pembesaran ) m 55.44
4 Pek. Urugan Pasir dibawah Lantai M3 241.99
b. PEKERJAAN LANTAI 02
1 Pek. Water Proofing Lantai KM/WC M2 82.21
2 Pek. Urugan Pasir dibawah Lantai M3 133.78365
3 Pek. Cor Spesie Tebal = 3 cm M3 70.73
4 Pek. Pasang Keramik 60/60 cm (Granitto) M2 2,357.69
5 Pek. Pasang Keramik 20/20 (KM/WC) M2 74.74
6 Pek. Pasang Dinding Keramik 20/25 (KM/WC) M2 308.57
7 Pek. Pasang Keramik Tangga (Granitto) M2 67.20
8 Pek. List Border Keramik 10/20 cm M' 119.27
Pek. Finishing Kolom Ø45cm (Pembesaran ) m 42.00
c. PEKERJAAN LANTAI 03
1 Pek. Water Proofing Lantai KM/WC M2 29.78
2 Pek. Urugan Pasir dibawah Lantai M3 56.21
3 Pek. Cor Spesie Tebal = 3 cm M3 30.6627
4 Pek. Pasang Keramik 60/60 cm (Granitto) M2 995.02
5 Pek. Pasang Keramik 20/20 (KM/WC) M2 27.07
6 Pek. Pasang Dinding Keramik 20/25 (KM/WC) M2 93.76
7 Pek. List Border Keramik 10/20 cm M' 53.35
d. PEKERJAAN LANTAI 04
1 Pek. Dinding Tembok 1 : 4 M3 11.87
2 Pek. Plesteran 1 : 4 M2 237.44
3 Pek. Pembuatan Garfus atap Keliling m 108.84
4 Pek. Acian Dinding M2 237.44
a. PEKERJAAN LANTAI 01
Pek. Pintu, Jendela
1 Pek. Pintu Utama Lapis Granit (Kaca tebal 12 cm) Unit 1.00
2 Pek. Pintu Panil Kaca M2 45.95
3 Pek. Pintu Besi pada Ruang Panel Unit 1.00
5 Pek. Pintu Panil Kayu M2 65.06
b. PEKERJAAN LANTAI 02
Pek. Pintu, Jendela
1 Pek. Pintu Utama (ukiran) Lapis Granit Set 1.00
2 Pek. Pintu Panil Kaca M2 35.83
3 Pek. Pintu Panil Kayu M2 62.49
4 Pek. Pintu Double Teakwood + Kaca M2 13.61
5 Pek. Jendela Kaca Buka 5 mm M2 83.81
6 Pek. Jendela Kaca Mati M2 45.98
7 Pek. Pintu Panil + Jalusi M2 3.40
8 Pek. Jendela Kaca Bovenlight M2 6.80
Pek. Dinding
9 Pek. Rangka Dinding Partisi Gipsum (Kayu Besi) M2 156.18
10 Pek. Rangka Dinding Triplex M2 151.68
Pek. Plafon
13 Pek. Rangka Plapon Triplex (kayu Matoa) M2 80.83
14 Pek. Rangka Plafon Hias Lapis Sungkai M2 6.67
15 Pek. Besi Hollow pada Plafond Dome Kg 4,530.00
16 Pek. Rangka Plafon Hias Lapis Sungkai Dome M2 1,531.71
17 Pek. Rangka Plapon Lambersering (kayu Matoa) M2 21.14
18 Pek. Plafon Gypsum + Rangka M2 1,334.54
19 Pek. Plafon Gypsum + Rangka (DOME) M2 62.68
20 Pek. Plafon Tripleks 6 mm M2 80.83
21 Pek. Plafon Hias Lapis Sungkai M2 6.67
22 Pek. Plafon Hias Lapis Sungkai (Dome) M2 1,531.71
23 Pek. Plapfon Lambersering M2 21.14
24 Pek. List Profil Plafon M' 275.48
25 Pek. List Plint Kayu M' 1,275.48
26 Pek. List Plafon 8 cm M' 1,075.48
27 Pek. List Profil Dinding 5 cm M' 1,275.48
28 Pek. List Papan pada Dinding dibawah Plafon M' 1,275.48
Pek. Reling
29 Pek. Railing Stainless Tangga Utama type 2 M' 14.00
30 Pek. Railing Stainless Tangga Samping 2 Unit type 3 M' 19.70
31 Pek. Railing Balkon Depan (pada Entrance) M' 12.00
c. PEKERJAAN LANTAI 03
Pek. Pintu, Jendela
1 Pek. Pintu Panil Kaca M2 34.02
2 Pek. Pintu Panil Kayu M2 16.59
3 Pek. Pintu Double Teakwood + Kaca M2 4.54
4 Pek. Jendela Kaca Buka 5 mm M2 79.77
5 Pek. Jendela Kaca Mati M2 18.60
6 Pek. Jendela Kaca Bovenlight M2 2.00
7 Pek. Jendela Kaca Mati Lt 4 M2 33.12
Pek. Dinding
8 Pek. Rangka Dinding Partisi Gipsum (Kayu Besi) M2 165.25
9 Pek. Rangka Plapon Triplex M2 32.42
10 Pek. Rangka Plapfon Lambersering M4 28.06
Pek. Plafon
13 Pek. Plafon Gypsum + Rangka M2 1,055.53
14 Pek. Plafon Tripleks 6 mm M2 32.42
15 Pek. Plapfon Lambersering M2 28.06
16 Pek. List Plint Kayu M' 302.91
17 Pek. List Plafon 8 cm M' 352.91
18 Pek. List Profil Dinding 5 cm M' 302.91
19 Pek. List Papan pada Dinding dibawah Plafon M' 302.91
Pek. Reling
20 Pek. Railing Stainless Tangga Utama type 4 M' 5.50
b. PEKERJAAN LANTAI 02
1 Pek. Kunci Pintu Kayu (Ruangan) Set 34.00
2 Pek. Kunci Cylinder (KM/WC) Set 14.00
3 Pek. Kunci Pintu Double Set 10.00
4 Pek. Handle Pintu Double Psg 10.00
5 Pek. Door Closer Psg 48.00
6 Pek. Door Stop Psg 32.00
7 Pek. Engsel Pintu Stainless 4 " Bh 207.00
8 Pek. Grendel Tanam Pintu Double Psg 11.00
9 Pek. Engsel Jendela Stainless 3 " Psg 141.00
c. PEKERJAAN LANTAI 03
1 Pek. Kunci Pintu Kayu (Ruangan) Set 10.00
2 Pek. Kunci Cylinder (KM/WC) Set 3.00
3 Pek. Door Closer Psg 20.00
4 Pek. Door Stop Psg 17.00
5 Pek. Engsel Pintu Stainless 4 " Bh 99.00
6 Pek. Engsel Jendela Stainless 3 " Psg 124.00
7 Pek. Grendel Jendela Bh 124.00
8 Pek. Hak Angin Psg 124.00
9 Pek. Kunci Pintu Double Set 10.00
10 Pek. Handle Pintu Double Psg 10.00
V PEKERJAAN PENGECATAN
a. PEKERJAAN LANTAI 01
Cat Tembok Bagian Dalam
1 Pek. Cat Dinding Tembok bagian Dalam M2 3,793.89
2 Pek. Cat Kolom M2 262.93
3 Pek. Cat Lisplng Pembatas Plafon M2 532.01
4 Pek. Cat Plat Tangga M2 85.66
5 Pek. Cat Balok Exphose M2 989.26
b. PEKERJAAN LANTAI 02
c. PEKERJAAN LANTAI 03
1 Pek. Cat Dinding Tembok bagian Dalam M2 2,243.76
2 Pek. Cat Dinding Tembok bagian Luar (Dulux) M2 2,154.53
3 Pek. Cat Duco Kusen Pintu dan Jendela Kayu M2 118.74
4 Pek. Cat Plafon M2 1,021.94
VI PEKERJAAN INTERIOR
a PEKERJAAN LANTAI 01
1 Pek. Ornamen Ukiran pada Dinding Border M' 243.60
2 Pek. Ornamen Ukiran pada Papan Nama Ruangan Unit 48.00
3 Pek. Ornamen Ukiran pada Pintu Kayu Unit 58.00
4 Pek. Ornamen Ukiran pada Kolom Unit 124.00
5 Pek. Pasang Papan Penunjuk Ruangan Unit 34.00
6 Pek. Pasang Wallpaper M2 987.80
7 Pek. Pasang Border Wallpaper M' 212.60
b PEKERJAAN LANTAI 02
1 Pek. Ornamen Ukiran pada Dinding Border M' 284.24
2 Pek. Ornamen Ukiran pada Papan Nama Ruangan Unit 56.00
3 Pek. Ornamen Ukiran pada Pintu Kayu Unit 54.00
c PEKERJAAN LANTAI 03
1 Pek. Ornamen Ukiran pada Dinding Border M' 120.72
2 Pek. Ornamen Ukiran pada Papan Nama Ruangan Unit 24.00
3 Pek. Ornamen Ukiran pada Pintu Kayu Unit 26.00
4 Pek. Ornamen Ukiran pada Kolom Unit 36.00
5 Pek. Pasang Papan Penunjuk Ruangan Unit 29.00
6 Pek. Pasang Wallpaper M2 686.74
7 Pek. Pasang Border Wallpaper M' 76.20
IX PEKERJAAN SANITAIR
a PEKERJAAN LANTAI 1
1 Pek. Closet duduk (lengkap) set 9.00
b PEKERJAAN LANTAI 2
1 Pek. Closet duduk (lengkap) set 15.00
2 Pek. Urinoir bh 9.00
3 Pek. Washtafel Meja bh 10.00
4 Pek. Shower Spray bh 15.00
5 Pek. Soap Holder bh 15.00
6 Pek. Double Robe Hock bh 15.00
7 Pek. Cermin Toilet bh 10.00
8 Pek. Kran dinding bh 15.00
9 Pek. Floor drain bh 15.00
10 Pek. Partition Plate bh 7.00
c PEKERJAAN LANTAI 3
1 Pek. Closet duduk (lengkap) set 3.00
2 Pek. Urinoir bh 4.00
3 Pek. Washtafel Meja bh 2.00
4 Pek. Shower Spray bh 3.00
5 Pek. Soap Holder bh 3.00
6 Pek. Double Robe Hock bh 3.00
7 Pek. Cermin Toilet bh 2.00
8 Pek. Kran dinding bh 3.00
9 Pek. Floor drain bh 5.00
10 Pek. Partition Plate bh 3.00
X PEKERJAAN PLUMBING
1 PEKERJAAN PIPA AIR BERSIH DAN AIR KOTOR
a PEKERJAAN LANTAI 01
(1) PEK. INSTALASI PIPA AIR BERSIH (ALL IN) Set 1.00
(2) PEK. PIPA AIR KOTOR BEKAS Set 1.00
b PEKERJAAN LANTAI 02
(1) PEK. INSTALASI PIPA AIR BERSIH Set 1.00
(2) PEK. PIPA AIR KOTOR BEKAS Set 1.00
c PEKERJAAN LANTAI 03
(1) PEK. INSTALASI PIPA AIR BERSIH Set 1.00
(2) PEK. PIPA AIR KOTOR BEKAS Set 1.00
C. PEKERJAAN MEKANIKAL
D. PEKERJAAN AKHIR
7,500,000.00 7,500,000.00
4,500,000.00 4,500,000.00
4,500,000.00 4,500,000.00
JUMLAH 12,000,000.00
69,650.00 7,419,118.00
Jumlah (a) 7,419,118.00
###
69,650.00 6,630,680.00
Jumlah (b) 6,630,680.00
###
69,650.00 5,056,590.00
Jumlah (c) 5,056,590.00
###
124,310.00 3,729,300.00
0.00 -
461,712.50 11,007,226.00
69,650.00 522,375.00
Jumlah (d) 15,258,901.00
JUMLAH I 34,365,289.00
###
###
43,000.00 10,757,009.00
492,707.59 16,366,651.17
383,717.59 21,273,303.08
239,600.00 57,981,522.80
829,310.19 140,481,828.13
528,835.00 1,135,043,848.85
227,122.50 26,232,648.75
226,428.50 11,082,542.93
256,684.50 38,914,653.62
528,835.00 60,048,156.58
99,933.10 8,429,356.99
Jumlah (a) 1,526,611,521.90
###
133,200.00 10,950,904.80
239,600.00 32,054,562.54
1,038,975.00 73,487,429.03
528,835.00 1,246,828,991.15
226,428.50 16,923,266.09
256,684.50 79,203,852.74
528,835.00 35,537,712.00
99,933.10 11,919,020.84
383,717.59
Jumlah (b) 1,506,905,739.19
###
133,200.00 3,966,296.40
239,600.00 13,469,102.02
1,038,975.00 31,857,778.73
528,835.00 526,201,401.70
226,428.50 6,129,419.50
256,684.50 24,066,097.01
99,933.10 5,331,430.89
Jumlah (c) 611,021,526.24
1,089,900.00 12,939,292.80
55,937.10 13,281,705.02
110,887.13 12,068,955.19
32,130.00 7,628,947.20
Jumlah (d) 45,918,900.21
JUMLAH II 3,690,457,687.54
###
47,326,146.78 47,326,146.78
602,000.00 27,660,696.00
2,579,591.75 2,579,591.75
571,250.00 37,164,382.50
535,750.00 2,430,162.00
657,245.00 91,192,743.75
232,245.00 14,189,008.28
7,500,000.00 7,500,000.00
655,250.00 4,458,321.00
232,245.00 1,021,878.00
155,892.50 58,476,523.89
68,496.60 16,244,105.11
68,496.60 16,244,105.11
87,314.50 65,504,734.93
60,166.50 14,268,605.81
226,592.00 53,736,745.98
301,025.00 11,125,884.00
89,959.00 7,382,035.54
89,959.00 3,258,764.78
89,959.00 26,345,302.78
195,184.50 335,248,897.20
51,634.50 4,237,127.07
226,592.00 8,208,295.20
98,615.00 28,880,290.29
30,802.50 52,393,820.40
33,802.50 29,490,653.10
30,892.50 52,546,906.80
33,802.50 29,490,653.10
42,000.00 71,440,320.00
3,436,695.75 73,888,958.63
3,436,695.75 67,702,906.28
Jumlah (a) 1,261,638,566.04
###
97,011,171.36 97,011,171.36
602,000.00 21,567,252.00
571,250.00 35,695,127.50
535,750.00 7,290,486.00
657,245.00 55,086,332.43
232,245.00 10,677,463.88
655,250.00 2,229,160.50
232,245.00 1,579,266.00
155,892.50 24,347,290.65
68,496.60 10,389,563.92
68,496.60 10,389,563.92
87,314.50 27,273,557.22
51,634.50 7,831,920.96
226,592.00 34,369,474.56
301,025.00 15,677,382.00
89,959.00 7,270,936.18
89,959.00 599,666.69
39,745.00 180,044,850.00
137,480.25 210,579,873.73
89,959.00 1,901,985.15
195,184.50 260,481,522.63
215,750.75 13,523,257.01
51,634.50 4,173,358.46
226,592.00 1,510,462.27
266,351.00 407,972,490.21
98,615.00 2,084,997.22
33,802.50 9,311,912.70
30,802.50 39,287,972.70
33,802.50 36,353,912.70
30,892.50 39,402,765.90
42,000.00 53,570,160.00
3,436,695.75 48,113,740.50
3,436,695.75 67,702,906.28
821,287.50 9,855,450.00
Jumlah (b) 1,755,157,233.22
###
602,000.00 20,480,040.00
571,250.00 9,477,037.50
535,750.00 2,430,162.00
657,245.00 52,428,433.65
232,245.00 4,319,757.00
232,245.00 464,490.00
232,245.00 7,691,954.40
155,892.50 25,761,235.63
68,496.60 2,220,659.69
68,496.60 1,922,014.53
87,314.50 28,857,442.25
301,025.00 5,599,065.00
195,184.50 206,023,095.29
51,634.50 1,673,990.49
98,615.00 2,767,136.90
30,802.50 9,330,231.26
33,802.50 11,929,071.26
30,892.50 9,357,492.71
42,000.00 12,722,010.00
821,287.50 4,517,081.25
Jumlah (c) 419,972,400.81
JUMLAH III 3,436,768,200.07
###
###
315,980.00 11,059,300.00
198,915.00 1,989,150.00
252,325.00 3,280,225.00
292,745.00 3,805,685.00
599,150.00 30,556,650.00
93,830.00 4,034,690.00
77,745.00 17,026,155.00
181,550.00 2,723,250.00
51,830.00 11,298,940.00
27,545.00 6,004,810.00
45,745.00 9,972,410.00
Jumlah (a) 101,751,265.00
###
315,980.00 10,743,320.00
198,915.00 2,784,810.00
252,325.00 2,523,250.00
292,745.00 2,927,450.00
599,150.00 28,759,200.00
93,830.00 3,002,560.00
77,745.00 16,093,215.00
181,550.00 1,997,050.00
51,830.00 7,308,030.00
27,545.00 3,883,845.00
45,745.00 6,450,045.00
Jumlah (b) 86,472,775.00
###
315,980.00 3,159,800.00
198,915.00 596,745.00
599,150.00 11,983,000.00
93,830.00 1,595,110.00
77,745.00 7,696,755.00
51,830.00 6,426,920.00
27,545.00 3,415,580.00
45,745.00 5,672,380.00
181,550.00 1,815,500.00
292,745.00 2,927,450.00
Jumlah (c) 45,289,240.00
JUMLAH IV 233,513,280.00
###
###
###
29,020.75 110,101,675.42
29,020.75 7,630,385.17
29,020.75 15,439,230.54
29,020.75 2,485,789.75
29,020.75 28,709,012.01
###
43,220.75 14,905,397.42
43,220.75 15,300,067.70
43,220.75 13,104,877.17
43,220.75 8,378,774.60
43,220.75 5,970,082.20
180,800.50 49,000,336.08
###
22,527.50 40,541,840.65
32,975.00 70,195,333.40
13,835.75 12,978,852.74
13,835.75 28,154,757.95
161,642.50 38,333,842.16
38,185.00 1,383,251.63
38,185.00 11,182,820.92
161,642.50 54,989,485.36
180,800.50 2,460,333.20
180,800.50 4,153,710.69
180,800.50 23,525,037.86
180,800.50 837,467.92
180,800.50 12,543,034.69
29,020.75 21,771,830.98
29,020.75 22,400,536.51
Jumlah (a) 616,477,764.69
###
###
29,020.75 89,745,544.82
29,020.75 12,362,839.50
29,020.75 9,118,975.52
29,020.75 2,485,789.75
29,020.75 4,126,622.96
###
43,220.75 20,340,354.87
43,220.75 11,363,971.29
43,220.75 18,058,044.27
43,220.75 12,761,877.29
43,220.75 7,596,479.02
180,800.50 37,588,423.95
22,527.50 33,296,658.74
32,975.00 48,738,533.88
13,835.75 2,706,134.34
13,835.75 24,372,918.84
161,642.50 24,517,934.40
38,185.00 58,488,346.35
38,185.00 807,337.82
161,642.50 146,684,103.05
161,642.50 41,234,355.18
180,800.50 1,230,166.60
180,800.50 3,238,679.36
180,800.50 22,595,000.09
180,800.50 2,512,403.75
180,800.50 7,576,806.55
180,800.50 6,946,355.21
29,020.75 13,466,788.83
80,442.50 5,679,401.39
Jumlah (b) 669,640,847.61
###
29,020.75 65,115,714.10
43,220.75 93,120,532.16
180,800.50 21,468,251.37
22,527.50 23,021,640.71
32,975.00 33,698,306.63
13,835.75 17,682,088.50
161,642.50 9,792,464.29
180,800.50 3,075,416.51
180,800.50 5,998,960.59
180,800.50 837,467.92
180,800.50 7,211,227.94
180,800.50 5,073,262.03
180,800.50 7,232,020.00
80,442.50 2,044,043.93
29,020.75 9,591,357.88
Jumlah (c) 304,962,754.55
JUMLAH V 1,591,081,366.85
###
###
225,000.00 54,810,000.00
450,000.00 21,600,000.00
250,000.00 14,500,000.00
375,000.00 46,500,000.00
275,000.00 9,350,000.00
253,712.50 250,617,207.50
104,312.50 22,176,837.50
Jumlah (a) 419,554,045.00
###
225,000.00 63,954,000.00
450,000.00 25,200,000.00
250,000.00 13,500,000.00
375,000.00 46,500,000.00
275,000.00 9,900,000.00
253,712.50 299,441,641.00
104,312.50 24,409,125.00
163,704,362.78 163,704,362.78
Jumlah (b) 646,609,128.78
###
225,000.00 27,162,000.00
450,000.00 10,800,000.00
250,000.00 6,500,000.00
375,000.00 13,500,000.00
275,000.00 7,975,000.00
253,712.50 174,234,522.25
104,312.50 7,948,612.50
Jumlah (c) 248,120,134.75
JUMLAH VI 1,314,283,308.53
###
598,160.00 55,030,720.00
262,985.00 114,401,104.85
4,651,384.08 158,147,058.61
492,850.00 130,353,896.50
519,100.00 100,409,513.00
2,000,000.00 2,000,000.00
1,089,402.40 88,372,322.69
1,020,703.00 68,958,694.68
1,140,146.37 143,925,008.42
337,571.10 25,317,832.55
JUMLAH VII 886,916,151.31
###
16,059,669 96,358,013.25
63,522,789 63,522,789.24
21,000,000 42,000,000.00
281,366 76,317,607.11
297,762.50 132,507,885.65
JUMLAH VII 410,706,295.25
###
2,839,702.50 25,557,322.50
3,327,840.00 13,311,360.00
2,848,965.00 17,093,790.00
600,000.00 5,400,000.00
150,000.00 1,350,000.00
150,000.00 1,350,000.00
600,000.00 3,600,000.00
90,000.00 810,000.00
524,113.75 4,717,023.75
750,000.00 2,250,000.00
Jumlah (a) 75,439,496.25
###
2,839,702.50 42,595,537.50
3,327,840.00 29,950,560.00
2,848,965.00 28,489,650.00
600,000.00 9,000,000.00
150,000.00 2,250,000.00
150,000.00 2,250,000.00
600,000.00 6,000,000.00
90,000.00 1,350,000.00
524,113.75 7,861,706.25
750,000.00 5,250,000.00
Jumlah (b) 134,997,453.75
###
###
2,839,702.50 8,519,107.50
3,327,840.00 13,311,360.00
2,848,965.00 5,697,930.00
600,000.00 1,800,000.00
150,000.00 450,000.00
150,000.00 450,000.00
600,000.00 1,200,000.00
90,000.00 270,000.00
524,113.75 2,620,568.75
750,000.00 2,250,000.00
Jumlah (c) 36,568,966.25
JUMLAH IX 247,005,916.25
###
21,992,020.00 21,992,020.00
17,220,759.50 17,220,759.50
###
38,936,330.00 38,936,330.00
51,758,342.50 51,758,342.50
Jumlah (b) 90,694,672.50
###
19,614,444.00 19,614,444.00
6,954,482.25 6,954,482.25
Jumlah (c) 26,568,926.25
Jumlah (1) 156,476,378.25
###
230,659.75 11,532,987.50
71,009.75 17,752,437.50
250,000.00 1,500,000.00
75,000.00 1,875,000.00
150,000.00 1,200,000.00
75,000.00 6,000,000.00
35,000.00 1,050,000.00
45,000.00 675,000.00
Jumlah (2) 41,585,425.00
JUMLAH X 198,061,803.25
###
###
720,000.00 -
1,950,000.00 1,950,000.00
13,500,000.00 -
70,000,000.00 -
500,000.00 -
3,500,000.00 -
3,350,000.00 3,350,000.00
3,388,000.00 -
7,020,000.00 -
2,300,000.00 2,300,000.00
4,685,000.00 -
120,000.00 -
96,000.00 -
420,000.00 -
420,000.00 -
75,000.00 450,000.00
2,350,000.00 -
6,000,000.00 30,000,000.00
330,179.25 11,886,453.00
284,289.00 -
206,789.00 24,814,680.00
40,000.00 160,000.00
30,000.00 -
17,500.00 420,000.00
45,000.00 270,000.00
40,000.00 280,000.00
20,000.00 160,000.00
40,000.00 280,000.00
15,000.00 330,000.00
Jumlah (4) 76,651,133.00
JUMLAH TOTAL 76,651,133.00
2,000,000.00 6,000,000.00
7,500,000.00 7,500,000.00
15,000,000.00 15,000,000.00
JUMLAH 28,500,000.00
###
NO URAIAN
B PEKERJAAN CIVIL
I PEKERJAAN KAP (ATAP)
II PEKERJAAN DINDING dan LANTAI
III PEKERJAAN DINDING PARTISI, KUSEN, JENDELA, dan PLAFON
IV PEKERJAAN PENGGANTUNG dan PENGUNCI
V PEKERJAAN PENGECATAN
VI PEKERJAAN INTERIOR
VII PEKERJAAN EXTERIOR
VIII PEKERJAAN PENUNJANG BANGUNAN
IX PEKERJAAN SANITAIR
X PEKERJAAN PLUMBING
TOTAL B
C PEKERJAAN MEKANIKAL
I PEKERJAAN PIPA SUPPLY DARI PDAM
III PEKERJAAN TRNSFER PUMP
III PEKERJAAN HYDRANT
TOTAL C
REAL COST
PPN 10%
TOTAL
PEMBULATAN
Terbilang :
Tiga Belas Milyar Tiga Ratus Tujuh Puluh Enam Juta Tiga Ratus Empat
Puluh Satu Ribu Rupiah
JUMLAH HARGA
(Rp)
12,000,000.00
34,365,289.00
3,690,457,687.54
3,436,768,200.07
233,513,280.00
1,591,081,366.85
1,314,283,308.53
886,916,151.31
410,706,295.25
247,005,916.25
198,061,803.25
12,043,159,298.04
-
-
76,651,133.00
76,651,133.00
28,500,000.00
12,160,310,431.04
1,216,031,043.10
13,376,341,474.15
13,376,341,000.00
HARGA SATUAN
NO JENIS PEKERJAAN SAT VOLUME
(Rp)
A PEKERJAAN PENDAHULUAN
1 Pek. Mobilisasi Ls 1.00 1,000,000.00
2 Pek. Pembuatan Soft Drawing Ls 1.00 2,000,000.00
JUMLAH
JUMLAH VI
X PEKERJAAN AKHIR
. Pek. Demobilisasi Ls 1.00 850,000.00
. Pek. Administrasi dan Asbuilt Drawing Ls 1.00 3,000,000.00
. Pek. Pembersihan Akhir Ls 1.00 1,000,000.00
JUMLAH X
JUMLAH HARGA
1,000,000.00
2,000,000.00
3,000,000.00
33,883,713.03
4,385,880.00
2,015,145.00
4,299,510.00
7,581,618.00
1,729,099.89
23,871,576.96
3,014,647.20
2,289,977.00
7,298,744.96
33,490,614.09
4,761,028.80
128,621,554.94
2,855,314.97
7,304,066.53
13,866,571.78
2,166,572.86
32,676,900.53
18,830,423.88
51,855,420.38
9,089,481.28
38,455,099.56
40,787,922.03
7,616,400.19
72,998,149.25
51,013,696.24
7,101,831.75
1,255,430.40
357,873,281.62
18,854,180.10
76,745,613.78
20,120,328.75
3,912,477.44
13,613,339.63
8,106,164.20
4,260,438.00
5,251,072.20
929,303.50
20,902,180.91
12,296,025.00
5,643,290.21
190,634,413.71
6,353,538.00
6,943,380.00
5,572,000.00
74,065,432.50
6,794,100.00
18,923,520.00
40,988,745.00
2,265,496.00
6,226,420.50
168,132,632.00
1,766,920.00
8,683,000.00
30,587,995.24
15,242,182.56
2,744,655.12
59,024,752.92
1,261,625.00
726,200.00
300,000.00
2,099,115.00
414,640.00
182,980.00
110,180.00
5,094,740.00
12,650,870.44
4,730,775.00
3,465,855.38
1,959,877.42
6,176,868.28
621,953.72
5,207,054.40
34,813,254.64
5,620,875.00
2,225,875.00
2,312,950.00
4,729,425.00
###
1,125,000.00
380,000.00
96,000.00
165,000.00
325,000.00
550,000.00
180,000.00
500,000.00
18,210,125.00
1,058,910.00
817,110.00
177,978.00
568,078.00
348,440.00
150,000.00
90,000.00
524,113.75
3,734,629.75
850,000.00
3,000,000.00
1,000,000.00
4,850,000.00
NO JENIS PEKERJAAN
A. PEKERJAAN PENDAHULUAN
II PEKERJAAN BETON
IX PEKERJAAN MEKANIKAL
C. PEKERJAAN AKHIR
REAL COST
PPN 10%
TOTAL
PEMBULATAN
Terbilang :
Satu Milyar Tujuh Puluh Satu Juta Tiga Ratus Delapan Puluh Delapan Ribu Rupiah
Timika, April 2011
KEPALA DINAS PEKERJAAN UMUM,
KABUPATEN MIMIKA,
JUMLAH HARGA
(Rp)
3,000,000.00
128,621,554.94
357,873,281.62
190,634,413.71
168,132,632.00
59,024,752.92
5,094,740.00
34,813,254.64
18,210,125.00
3,734,629.75
4,850,000.00
973,989,384.58
97,398,938.46
1,071,388,323.04
1,071,388,000.00
Timika, April 2011
KEPALA DINAS PEKERJAAN UMUM,
A. PEKERJAAN PENDAHULUAN
1 Pek. Mobilisasi Ls 1.00
2 Pek. Pembuatan Soft Drawing Ls 1.00
c. PEKERJAAN INSTALASI
1 Pek. Instalasi Titik Cahaya Lampu Titik 243.00
2 Pek. Instalasi Titik Exhaust Fan Titik 5.00
3 Pek. Instalasi Titik Stop Kontak Titik 90.00
4 Pek. Instalasi Power AC 1 Phase Titik 38.00
5 Pek. Instalasi Power AC 3 Phase Titik 4.00
6 Pek. Armatur :
- Lampu TL 1 x 36 Watt Balok Outbow Unit 15.00
- Lampu TL 2 x 36 Watt Inbow Unit 27.00
- Lampu Down Light Silver 150 PLC 18 Watt Unit 119.00
- Lampu Down Light Gold 150 Unit 4.00
- Lampu Baret 32 Watt Kap Kaca (LB 2) Unit 30.00
- Lampu Baret 40 Watt Kap Kaca (LB 1) Unit 30.00
- Lampu Sorot 500 Watt Unit 2.00
- Lampu Dinding Unit 4.00
- Lampu Hias (LH 1) Bh 4.00
- Lampu Hias (LH 2) Bh 4.00
- Lampu Fitting PLC Bh 21.00
- Saklar Tunggal Bh 27.00
- Saklar Tunggal Tukar Bh 2.00
- Saklar Seri Tukar Bh 2.00
- Saklar Seri Bh 25.00
- Saklar Triple Bh 8.00
- Stop Kontak Arde Bh 82.00
- Stop Kontak Lantai Bh 10.00
- Stop Kontak AC Bh 38.00
7 Exhaust Fan Bh 5.00
8 Pek. Tranking Cable M 150.00
9 Pek. Kabel Tee 20 x 20 x 300 cm Pcs 2,000.00
10 Pek. Grounding Pentanahan Panel Unit 2.00
11 Unimax Klem (Kuku Macan) Bh 3.00
f. PEKERJAAN TELEPHONE
1 Pek. Pengadaan PABX 80 Extension dan Aksesorisnya Unit 1.00
2 Pek. Main Dsitribution Board kapasitas 100 Extension Unit 1.00
3 Pek. Panel Telephone kapasitas 80 Ext. Unit 1.00
4 Pek. Kabel Feeder 2 x 30 x 0,6 mm M 50.00
5 Pek. Kabel Feeder 2 x 80 x 0,6 mm M 30.00
6 Pek. Outlet Telephone Unit 55.00
7 Pek. Single Line Telephone Unit 55.00
8 Pek. Instalasi Outlet Telephone Jack Titik 55.00
d. PEKERJAAN TELEPHONE
1 Pek. Panel Telephone kapasitas 50 Ext. Unit 1.00
2 Pek. Kabel Feeder 2 x 50 x 0,6 mm M 30.00
3 Pek. Outlet Telephone Jack Unit 34.00
4 Pek. Single Line Telephone Unit 34.00
5 Instalasi Outlet Telephone Jack Titik 34.00
a. PEKERJAAN INSTALASI
1 Pek. Instalasi Titik Cahaya Lampu Titik 74.00
2 Pek. Instalasi Titik Stop Kontak Titik 48.00
3 Pek. Instalasi Power AC 1 Phase Titik 15.00
4 Pek. Armatur :
- Lampu Hias (LH 1) Unit 3.00
- Lampu Down Light Silver 150 PLC 18 Watt Unit 29.00
- Lampu Down Light Silver 150 Sorot 80 Watt Unit 3.00
- Lampu Baret 40 Watt (LB 1) Unit 2.00
- Lampu Baret 32 Watt (LB 2) Unit 15.00
- Lampu Fitting PLC 18 Watt Bh 12.00
- Lampu Sorot 250 Watt Unit 9.00
- Handle ON/OFF Bh 1.00
- Saklar Tunggal Bh 8.00
- Saklar Tunggal Tukar Bh 1.00
- Saklar Seri Bh 11.00
- Saklar Triple Bh 2.00
- Stop Kontak Arde Bh 48.00
- Stop Kontak AC Bh 15.00
5 Pek. Tranking Cable M 60.00
6 Pek. Kabel Tee 20 x 20 x 300 cm Pcs 1,000.00
7 Pek. Grounding Panel (Tembaga) 50 mm M 40.00
8 Pek. Unimax Klem (Kuku Macan) Bh 2.00
d. PEKERJAAN TELEPHONE
1 Pek. Panel Telephone kapasitas 30 Ext. Unit 1.00
2 Pek. Kabel Feeder 2 x 40 x 0,6 mm M 40.00
3 Pek. Outlet Telephone Jack Unit 13.00
4 Pek. Single Line Telephone Unit 13.00
5 Pek. Instalasi Outlet Telephone Jack Titik 13.00
C. PEKERJAAN MEKANIKAL
D PEKERJAAN AKHIR
003401632000
000000000000
#REF!
003 0
0
3
401 4
0
1
632 6
3
2
000 0
0
0
Tiga Milyar Empat Ratus Satu Juta Enam Ratus Tiga Puluh Dua Ribu Rupiah
2,000,000.00 2,000,000.00
3,000,000.00 3,000,000.00
JUMLAH 5,000,000.00
350,000,000.00 350,000,000.00
200,000,000.00 200,000,000.00
85,000,000.00 85,000,000.00
45,000,000.00 45,000,000.00
15,000,000.00 15,000,000.00
16,000,000.00 16,000,000.00
15,000,000.00 15,000,000.00
16,000,000.00 16,000,000.00
13,000,000.00 13,000,000.00
14,000,000.00 14,000,000.00
15,000,000.00 15,000,000.00
12,000,000.00 12,000,000.00
10,000,000.00 10,000,000.00
35,000,000.00 35,000,000.00
5,000,000.00 5,000,000.00
Jumlah (a) 846,000,000.00
275,000.00 22,000,000.00
650,000.00 97,500,000.00
325,000.00 21,125,000.00
325,000.00 21,125,000.00
325,000.00 24,375,000.00
425,000.00 31,875,000.00
325,000.00 27,625,000.00
325,000.00 27,625,000.00
350,000.00 7,000,000.00
200,000.00 51,000,000.00
325,000.00 32,500,000.00
200,000.00 51,200,000.00
35,000.00 2,240,000.00
50,000.00 500,000.00
75,000.00 600,000.00
85,000.00 1,360,000.00
1,500.00 1,500,000.00
Jumlah (b) 421,150,000.00
432,375.00 105,067,125.00
432,375.00 2,161,875.00
445,175.00 40,065,750.00
1,156,475.00 43,946,050.00
1,576,475.00 6,305,900.00
125,000.00 1,875,000.00
400,000.00 10,800,000.00
123,000.00 14,637,000.00
110,000.00 440,000.00
375,000.00 11,250,000.00
450,000.00 13,500,000.00
1,200,000.00 2,400,000.00
550,000.00 2,200,000.00
6,000,000.00 24,000,000.00
5,000,000.00 20,000,000.00
95,000.00 1,995,000.00
48,000.00 1,296,000.00
50,000.00 100,000.00
75,000.00 150,000.00
55,000.00 1,375,000.00
60,000.00 480,000.00
65,000.00 5,330,000.00
450,000.00 4,500,000.00
125,000.00 4,750,000.00
250,000.00 1,250,000.00
248,953.00 37,342,950.00
1,500.00 3,000,000.00
1,210,000.00 2,420,000.00
45,000.00 135,000.00
Jumlah (c) 362,772,650.00
9,800,000.00 9,800,000.00
500,000.00 500,000.00
95,000.00 6,460,000.00
275,000.00 275,000.00
75,000.00 150,000.00
250,000.00 500,000.00
350,000.00 700,000.00
1,500,000.00 10,500,000.00
463,775.00 40,812,200.00
463,775.00 463,775.00
463,775.00 927,550.00
463,775.00 927,550.00
463,775.00 927,550.00
Jumlah (d) 72,943,625.00
3,750,000.00 11,250,000.00
3,500,000.00 3,500,000.00
1,250,000.00 1,250,000.00
1,500,000.00 1,500,000.00
1,500,000.00 1,500,000.00
650,000.00 650,000.00
750,000.00 750,000.00
105,000.00 4,410,000.00
175,000.00 6,300,000.00
250,000.00 750,000.00
950,000.00 950,000.00
454,675.00 19,096,350.00
454,675.00 17,732,325.00
500,000.00 2,000,000.00
454,675.00 1,818,700.00
Jumlah (e) 73,457,375.00
95,000,000.00 95,000,000.00
4,500,000.00 4,500,000.00
750,000.00 750,000.00
40,000.00 2,000,000.00
60,000.00 1,800,000.00
65,000.00 3,575,000.00
250,000.00 13,750,000.00
420,875.00 23,148,125.00
Jumlah (f) 144,523,125.00
Jumlah (I) 1,920,846,775.00
432,375.00 117,606,000.00
432,375.00 4,756,125.00
445,175.00 37,839,875.00
1,156,475.00 41,633,100.00
1,576,475.00 9,458,850.00
95,000.00 2,565,000.00
250,000.00 6,750,000.00
123,000.00 12,546,000.00
110,000.00 4,840,000.00
6,000,000.00 24,000,000.00
550,000.00 9,900,000.00
375,000.00 6,750,000.00
450,000.00 13,950,000.00
15,000,000.00 15,000,000.00
48,000.00 1,056,000.00
55,000.00 1,925,000.00
60,000.00 240,000.00
65,000.00 4,810,000.00
450,000.00 4,950,000.00
125,000.00 4,500,000.00
250,000.00 2,750,000.00
248,953.00 32,363,890.00
1,500.00 3,000,000.00
75,000.00 1,500,000.00
45,000.00 90,000.00
Jumlah (a) 364,779,840.00
500,000.00 500,000.00
463,775.00 1,855,100.00
95,000.00 4,750,000.00
275,000.00 550,000.00
75,000.00 150,000.00
250,000.00 500,000.00
350,000.00 700,000.00
1,500,000.00 9,000,000.00
463,775.00 23,188,750.00
463,775.00 927,550.00
463,775.00 927,550.00
463,775.00 927,550.00
463,775.00 927,550.00
Jumlah (b) 44,904,050.00
454,675.00 454,675.00
105,000.00 3,360,000.00
175,000.00 4,725,000.00
250,000.00 500,000.00
454,675.00 14,549,600.00
454,675.00 13,185,575.00
Jumlah (c) 36,774,850.00
750,000.00 750,000.00
60,000.00 1,800,000.00
65,000.00 2,210,000.00
250,000.00 8,500,000.00
420,875.00 14,309,750.00
Jumlah (d) 27,569,750.00
Jumlah (II) 474,028,490.00
432,375.00 31,995,750.00
445,175.00 21,368,400.00
1,156,475.00 17,347,125.00
6,000,000.00 18,000,000.00
95,000.00 2,755,000.00
145,000.00 435,000.00
450,000.00 900,000.00
375,000.00 5,625,000.00
95,000.00 1,140,000.00
750,000.00 6,750,000.00
500,000.00 500,000.00
48,000.00 384,000.00
50,000.00 50,000.00
55,000.00 605,000.00
60,000.00 120,000.00
65,000.00 3,120,000.00
125,000.00 1,875,000.00
248,953.00 14,937,180.00
1,500.00 1,500,000.00
75,000.00 3,000,000.00
45,000.00 90,000.00
Jumlah (a) 132,497,455.00
500,000.00 500,000.00
463,775.00 1,855,100.00
95,000.00 1,995,000.00
275,000.00 275,000.00
75,000.00 75,000.00
250,000.00 250,000.00
350,000.00 350,000.00
1,500,000.00 6,000,000.00
463,775.00 9,739,275.00
463,775.00 463,775.00
463,775.00 463,775.00
463,775.00 463,775.00
463,775.00 463,775.00
Jumlah (b) 22,894,475.00
454,675.00 454,675.00
105,000.00 1,575,000.00
175,000.00 1,750,000.00
250,000.00 500,000.00
454,675.00 6,820,125.00
454,675.00 5,456,100.00
Jumlah (c) 16,555,900.00
1,250,000.00 1,250,000.00
75,000.00 3,000,000.00
65,000.00 845,000.00
250,000.00 3,250,000.00
420,875.00 5,471,375.00
Jumlah (d) 13,816,375.00
Jumlah (III) 185,764,205.00
35,000,000.00 35,000,000.00
175,000.00 14,000,000.00
1,210,000.00 1,210,000.00
5,000.00 600,000.00
2,000,000.00 2,000,000.00
3,500,000.00 3,500,000.00
JUMLAH D 56,310,000.00
126,189.00 16,404,570.00
750,000.00 750,000.00
500,000.00 1,500,000.00
JUMLAH I 18,654,570.00
9,000,000.00 18,000,000.00
350,000.00 1,400,000.00
350,000.00 1,400,000.00
400,000.00 3,200,000.00
126,189.00 2,271,402.00
91,342.50 6,393,975.00
1,500,000.00 1,500,000.00
JUMLAH II 34,165,377.00
720,000.00 1,440,000.00
1,950,000.00 - oke
13,500,000.00 13,500,000.00
70,000,000.00 70,000,000.00
500,000.00 1,000,000.00
3,500,000.00 7,000,000.00
3,350,000.00 20,100,000.00 oke seharusnya 9
3,388,000.00 3,388,000.00
7,020,000.00 7,020,000.00
2,300,000.00 - oke seharusnya banyak
4,685,000.00 46,850,000.00
120,000.00 120,000.00
96,000.00 3,360,000.00
420,000.00 840,000.00
420,000.00 840,000.00
75,000.00 1,500,000.00
2,350,000.00 23,500,000.00
6,000,000.00 -
330,179.25 100,374,492.00 37.2
284,289.00 71,072,250.00 6.6666667
206,789.00 10,339,450.00
40,000.00 2,640,000.00
30,000.00 1,800,000.00
17,500.00 1,330,000.00
45,000.00 180,000.00 oke hilang sabgian
40,000.00 800,000.00 oke hilang sabgian
20,000.00 140,000.00
40,000.00 320,000.00
750,000.00 2,250,000.00
4,500,000.00 4,500,000.00
1,000,000.00 1,000,000.00
JUMLAH E 7,750,000.00
19,859,967,000.00
17,559,967,000.00
4,183,626,000.00
781,994,000.00
34,165,377.00
NO URAIAN
A. PEKERJAAN PENDAHULUAN
B PEKERJAAN ELEKTRIKAL
I PEK. ELERKTRIKAL LANTAI-01
a. PEKERJAAN PANEL dan DAYA
b. PEKERJAAN KABEL FEEDER
c. PEKERJAAN INSTALASI
d. PEKERJAAN FIRE ALARM
e. PEKERJAAN TATA SUARA
f. PEKERJAAN TELEPHONE
D PEKERJAAN AKHIR
REAL COST
PPN 10%
TOTAL
PEMBULATAN
Terbilang :
Tiga Milyar Empat Ratus Satu Juta Enam Ratus Tiga Puluh Dua Ribu Rupiah
WANSUDIN PURBA, S
NIP. 19580103 198703
SI
BIAYA
ELEKTRIKAL
JUMLAH HARGA
(Rp)
TOTAL A 5,000,000.00
846,000,000.00
421,150,000.00
362,772,650.00
72,943,625.00
73,457,375.00
144,523,125.00
1,920,846,775.00
364,779,840.00
44,904,050.00
36,774,850.00
27,569,750.00
474,028,490.00
132,497,455.00
22,894,475.00
16,555,900.00
13,816,375.00
185,764,205.00
56,310,000.00
TOTAL B 2,636,949,470.00
TOTAL C 442,694,139.00
TOTAL D 7,750,000.00
AL COST 3,092,393,609.00
309,239,360.90
3,401,632,969.90
MBULATAN 3,401,632,000.00
I PEKERJAAN PENDAHULUAN
. Pek. Mobilisai Ls 1.00
Pek. Soft Drawing Ls 1.00
Pek. Pasang Papan Bouwplank M' 136.50
II PEKERJAAN TANAH
. Pek. Galian Tanah Pondasi Batu Gunung M3 40.95
. Pek. Urugan Tanah kembali M3 10.23
. Pek. Urugan Pasir dibawah Pondasi M3 8.19
V PEKERJAAN AKHIR
. Pek. Demobilisasi Ls 1.00
. Pek. Administrasi dan Asbuilt Drawing Ls 1.00
. Pek. Pembersihan Akhir Ls 1.0000
REKAPITULASI
RENCANA ANGGARAN BIAYA
UNIT PAGAR DEPAN
NO JENIS PEKERJAAN
I PEKERJAAN PENDAHULUAN
II PEKERJAAN TANAH
REAL COS
PPN 10
TOTA
PEMBULATA
Terbilang :
Enam Ratus Empat Puluh Sembilan Juta Delapan Ratus Tujuh Puluh Tujuh Ribu Rupiah
WANSUDIN PURBA,
NIP. 19580103 1987
NCANA ANGGARAN BIAYA
UNIT PAGAR DEPAN
HARGA
JUMLAH HARGA
SATUAN (Rp)
1,500,000.00 1,500,000.00
2,000,000.00 2,000,000.00
60,915.00 8,314,897.50
11,814,897.50
###
59,000.00 2,416,050.00
19,666.67 201,190.00
239,600.00 1,962,324.00
4,579,564.00
783,547.50 12,834,508.05
1,176,657.50 48,184,124.63
7,373,802.10 30,158,850.60
58,067.54 10,520,096.22
32,130.00 5,820,992.10
6,205,571.88 65,592,894.78
1,476,113.96 54,616,216.48
227,727,682.85
2,693,380.00 312,782,219.40
14,946,753.75 29,893,507.50
342,675,726.90
500,000.00 500,000.00
2,500,000.00 2,500,000.00
1,000,000.00 1,000,000.00
4,000,000.00
###
###
590,797,871.25
###
###
###
###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
UNIT PAGAR DEPAN
11,814,897.50
4,579,564.00
227,727,682.85
342,675,726.90
4,000,000.00
REAL COST
NO JENIS PEKERJAAN
(Rp)
1 2 3
Terbilang : Delapan Belas Milyar Empat Ratus Sembilan Puluh Sembilan Juta Dua Ratus Empat Puluh
APITULASI TOTAL
WNER ESTIMATE (OE)
RAN BIAYA KONSTRUKSI
DELTA PRATAMA
UNG DPRD - KABUPATEN MIMIKA (TAHAP III)
A
Jln
###
r
Sa
.
nt
c
PPN 10%
(Rp) PEKEKRJAAN (Rp) os
h
PAGU
JUMLAH BIAYA ###ar
i
###a
N
4 5
o.
76
###
Te
t
13,376,341,474.15e
lp.
1,216,031,043.10 ###(0
96
7)
52 c
3,401,632,969.90t
16
26
309,239,360.90
Fa
x –
(0
1,071,388,323.04E
96
97,398,938.46 ###
7
53
72
###
n
16
59,079,787.13 649,877,658.38
-
Ja
g
ya
pu i
ra
2,808,476,603.70 18,499,240,425.46
###
n
2,808,476,000.00
e
18,499,240,000.00
###
e
uluh Sembilan Juta Dua Ratus Empat Puluh Ribu Rupiah r
-
P
l
r
-
Timika, April 2011 P
KEPALA DINAS PEKERJAAN UMUM, ###
KABUPATEN MIMIKA, ###l
a
###
###
n
WANSUDIN PURBA, ST, MMT.
n
###
NIP. 19580103 198703 1 004
e
###
r
RENCANA ANGGARAN BIAYA
UNIT GEDUNG SERBA GUNA
KEGIATAN : REVIEW DESIGN PERENCANAAN GEDUNG DPRD - KABUPATEN MIMIKA
PEKERJAA : PEMBANGUNAN GEDUNG DPRD - KABUPATEN MIMIKA (TAHAP IV)
LOKASI : KOTA TIMIKA
TAHUN AN : 2012
1 2 3
1 2 3
. Pek. Balok Anak 20/30 M3 0.9000
. Pek. Balok Konsol M3
. Pek. Meja Beton M3 2.4960
1 2 3
IV. PEKERJAAN DINDING dan LANTAI
. Pek. Dinding Tembok 1 : 4 M3 58.2490
. Pek. Plesteran Dinding Tembok 1 : 4 M2 1,203.6240
. Pek. Plesteran Kolom 1 : 2 M2 148.1200
. Pek. Acian Dinding Tembok, Kolom, dan Listplank M2 1,624.3600
. Pek. Water Proofing Kolam M2 762.9400
. Pek. Pasang Lantai Keramik 40/40 M2 1,019.1260
. Pek. Pasang Lantai Keramik 20/20 M2 56.4000
. Pek. Pasang Dinding Keramik 20/25 M2 152.4800
. Pek. List Border Keramik M' 77.0000
. Pek. List Plint Keramik 10/40 M' 421.5700
. Pek. Keramik Lantai Meja dan Dinding M2 28.6200
. Pek. Dinding Tembok untuk Meja Beton M3 1.9320
. Pek. Pasang Dinding Keramik Kolam M2 202.1900
. Pek. Lantai Keramik Kolam M2 560.7500
. Pek. Plesteran Listplank Beton M2 272.6160
. Pek. Water Proofing Atap Dak Beton M2 426.8510
. Pek. Pasang Granit Meja Washtafel M2 7.3200
1 2 3
. Pek. Door Closer Set 10.0000
1 2 3
IX. PEKERJAAN PERLENGKAPAN BANGUNAN
. Pek. Ground Reservoar Lapis Keramik (3 x 4 x 2) Unit 1.0000
. Pek. Septictank Unit 1.0000
. Pek. Saluran Keliling M' 120.3000
. Pek. Profil Beton pada Listplank M' 180.0000
. Pek. Profil Kolom Unit 14.0000
c. PEKERJAAN SANITAIR
1 Closet duduk (lengkap) set 6.0000
2 Urinoir bh 10.0000
3 Washtafel Meja bh 8.0000
4 Shower Spray bh 6.0000
5 Soap Holder bh 6.0000
6 Double Robe Hock bh 6.0000
7 Cermin Toilet bh 8.0000
8 Kran dinding bh 2.0000
9 Floor drain bh 10.0000
10 Partition Plate bh 12.0000
1 2 3
2 Pek. Instalasi Stop Kontak Titik 12.0000
3 Pek. Instalasi AC Split Titik 5.0000
4 Pek. Armatur :
- Lampu TL 1 x 36 Watt Unit 8.0000
- Lampu TL 2 x 36 Watt Unit 28.0000
- Lampu Down Light Silver Unit 53.0000
- Lampu Down Light Hologen Unit 10.0000
- Lampu Baret 32 Watt (LB 2) Unit 7.0000
- Lampu Fitting PLC 18 Watt Bh 32.0000
- Lampu Gantung Unit 1.0000
- Lampu T4 kecil Bh 40.0000
- Lampu Hias (LH 1) Unit 3.0000
- Saklar Tunggal Bh 12.0000
- Saklar Seri Unit 10.0000
- Saklar Triple Bh 4.0000
- Stop Kontak Arde Unit 12.0000
- Stop Kontak AC Bh 5.0000
5 Exhaust Fan Bh 11.0000
6 Pek. Grounding Panel Unit 1.0000
NO JENIS PEKERJAAN SAT VOLUME
1 2 3
REKAPITULASI
RENCANA ANGGARAN BIAYA
UNIT GEDUNG SERBA GUNA
NO JENIS PEKERJAAN
REAL CO
PPN 1
TOT
PEMBULAT
Terbilang :
NO JENIS PEKERJAAN SAT VOLUME
1 2 3
Enam Milyar Enam Ratus Empat Puluh Juta Dua Ratus Delapan Puluh Satu
WANSUDIN PURBA, S
NIP. 19580103 198703
PATEN MIMIKA
HARGA SATUAN
JUMLAH HARGA
(Rp)
4 6
60,915.00 10,058,893.95
119,100.00 31,642,488.00
59,000.00 8,875,370.00
59,000.00 46,480,937.50
19,666.67 1,192,429.33
239,600.00 6,278,238.80
783,547.50 23,573,810.09
1,176,657.50 71,686,858.03
215,600.00 78,809,130.40
239,600.00 19,242,276.00
239,600.00 15,100,790.00
JUMLAH I 312,941,222.10
829,310.19 3,897,757.87
829,310.19 3,655,765.16
829,310.19 53,670,467.25
829,310.19 26,133,637.21
1,893,641.93 143,216,139.37
6,983,895.00 113,239,667.09
4,566,691.14 76,720,411.09
5,326,841.00 201,074,930.67
7,373,802.10 17,181,696.28
93,410.00 19,429,280.00
7,752,941.39 126,528,003.46
6,549,425.16 139,878,954.86
7,752,941.39 39,465,572.84
7,311,657.78 275,996,802.04
10,305,797.22 14,634,232.05
125,585.00 15,173,179.70
9,771,321.70 559,765,406.67
7,320,482.67 144,220,536.24
7,311,657.78 39,058,875.86
9,116,903.64 171,744,084.94
7,311,657.78 29,100,397.96
HARGA SATUAN
JUMLAH HARGA
(Rp)
4 6
9,845,465.47 8,860,918.92
7,311,657.78 -
6,915,665.32 17,261,500.64
JUMLAH II 2,239,908,218.18
33,631.53 193,502,342.24
33,295.00 66,469,139.15
5,622,600.00 24,711,327.00
4,910,000.00 17,047,520.00
69,650.00 13,693,190.00
265,467.50 230,096,610.30
188,725.00 37,971,470.00
61,742.50 53,515,929.30
61,742.50 53,515,929.30
33,392.50 28,943,283.30
JUMLAH III 719,466,740.59
HARGA SATUAN
JUMLAH HARGA
(Rp)
4 6
1,089,900.00 63,485,585.10
55,937.10 67,327,236.05
61,132.46 9,054,939.98
32,130.00 52,190,686.80
133,200.00 101,623,608.00
242,985.10 247,632,433.02
226,428.50 12,770,567.40
256,684.50 39,139,252.56
99,933.10 7,694,848.70
51,173.10 21,573,043.77
227,122.50 6,500,245.95
1,089,900.00 2,105,686.80
256,684.50 51,899,039.06
227,122.50 127,358,941.88
61,132.46 16,665,686.72
133,200.00 56,856,553.20
2,382,823.70 17,442,269.48
JUMLAH IV 901,320,624.45
6,520,000.00 9,271,440.00
571,250.00 24,019,920.00
657,245.00 15,222,451.45
232,245.00 5,155,839.00
89,959.00 127,469,654.03
195,184.50 234,602,985.70
51,634.50 2,667,438.27
226,592.00 37,016,069.12
33,802.50 36,807,204.23
27,802.50 11,354,541.00
3,436,695.75 525,230,211.47
456,153.95 5,473,847.40
JUMLAH V 1,034,291,601.66
315,980.00 1,263,920.00
252,325.00 4,541,850.00
198,915.00 1,193,490.00
181,550.00 726,200.00
292,745.00 1,170,980.00
77,745.00 7,463,520.00
51,830.00 4,768,360.00
45,745.00 4,208,540.00
27,545.00 1,267,070.00
HARGA SATUAN
JUMLAH HARGA
(Rp)
4 6
599,150.00 5,991,500.00
JUMLAH VI 32,595,430.00
43,220.75 12,832,759.32
29,020.75 25,824,752.84
13,835.75 21,694,456.00
22,527.50 28,240,811.91
80,442.50 8,223,797.66
180,800.50 10,283,932.44
180,800.50 15,217,616.48
180,800.50 2,093,850.59
161,642.50 26,405,918.80
43,220.75 11,782,667.98
JUMLAH VII 162,600,564.04
1,250,000.00 40,525,000.00
226,592.00 21,630,925.50
155,892.50 14,881,809.84
30,892.50 2,627,098.20
30,892.50 1,650,895.20
253,712.50 15,736,264.10
104,312.50 5,574,460.00
161,642.50 15,430,716.34
275.00 10,070.50
30,802.50 1,646,085.60
161,642.50 2,257,984.08
JUMLAH VIII 121,971,309.36
HARGA SATUAN
JUMLAH HARGA
(Rp)
4 6
63,522,789.24 63,522,789.24
16,059,668.88 16,059,668.88
281,365.61 33,848,282.46
262,985.00 47,337,300.00
2,750,000.00 38,500,000.00
JUMLAH IX 199,268,040.58
157,189.00 1,886,268.00
91,342.50 2,283,562.50
68,092.50 6,128,325.00
1,500,000.00 1,500,000.00
Jumlah (a) 11,798,155.50
71,009.75 2,130,292.50
50,084.75 751,271.25
44,494.50 1,112,362.50
38,788.00 310,304.00
26,563.00 106,252.00
1,000,000.00 1,000,000.00
Jumlah (b) 5,410,482.25
2,839,702.50 17,038,215.00
3,327,840.00 33,278,400.00
2,848,965.00 22,791,720.00
600,000.00 3,600,000.00
150,000.00 900,000.00
150,000.00 900,000.00
600,000.00 4,800,000.00
90,000.00 180,000.00
524,113.75 5,241,137.50
750,000.00 9,000,000.00
Jumlah (c) 97,729,472.50
6,000,000.00 12,000,000.00
12,000,000.00 24,000,000.00
500,000.00 2,500,000.00
400,000.00 3,200,000.00
1,000,000.00 1,000,000.00
26,563.00 478,134.00
Jumlah (d) 43,178,134.00
JUMLAH X 158,116,244.25
432,375.00 80,421,750.00
HARGA SATUAN
JUMLAH HARGA
(Rp)
4 6
65,000.00 780,000.00
1,156,475.00 5,782,375.00
125,000.00 1,000,000.00
400,000.00 11,200,000.00
123,000.00 6,519,000.00
110,000.00 1,100,000.00
375,000.00 2,625,000.00
95,000.00 3,040,000.00
15,000,000.00 15,000,000.00
65,000.00 2,600,000.00
6,000,000.00 18,000,000.00
48,000.00 576,000.00
55,000.00 550,000.00
60,000.00 240,000.00
65,000.00 780,000.00
125,000.00 625,000.00
250,000.00 2,750,000.00
550,000.00 550,000.00
JUMLAH XI 154,139,125.00
HARGA SATUAN
JUMLAH HARGA
(Rp)
4 6
- KABUPATEN MIMIKA
KA (TAHAP IV)
JUMLAH
312,941,222.10
2,239,908,218.18
719,466,740.59
901,320,624.45
1,034,291,601.66
32,595,430.00
162,600,564.04
121,971,309.36
199,268,040.58
158,116,244.25
154,139,125.00
NO JENIS PEKERJAAN
Terbilang :
Empat Ratus Delapan Juta Enam Ratus Lima Puluh Tiga Ribu Rupiah
WANSUDIN PURBA, S
NIP. 19580103 198703
RENCANA ANGGARAN BIAYA
UNIT POS JAGA 2 UNIT
JUMLAH ANGGARAN
HARGA JUMLAH HARGA
SATUAN (Rp) (Rp) REALISASI (8+9)
###
###
60,915.00 1,528,636.29
###
59,000.00 941,846.40
###
19,666.67 78,487.20
###
215,600.00 1,426,900.52
###
43,000.00 284,585.91
###
239,600.00 344,725.91
###
239,600.00 457,924.27
###
783,547.50 2,995,036.89
###
1,176,657.50 12,619,952.68
###
16,059,668.88 13,433,687.69
###
JUMLAH I ###
34,111,783.76
###
7,373,802.10 2,847,772.76
###
15,515,213.34 17,574,293.64
###
9,885,476.99 5,098,342.80
###
9,841,438.36 33,049,351.70
###
7,320,482.67 26,701,221.47
###
829,310.19 1,231,023.26
###
6,915,665.32 2,248,876.86
###
JUMLAH II ###
88,750,882.49
1,089,900.00 2,482,727.95
###
55,937.10 2,548,428.33
###
61,132.46 878,429.53
###
61,132.46 2,052,939.92
###
61,132.46 4,459,573.03
###
133,200.00 4,473,099.85
###
32,130.00 1,925,489.93
###
32,130.00 1,078,984.22
###
32,130.00 2,343,862.51
###
227,122.50 2,783,359.60
###
226,428.50 586,236.91
###
256,684.50 3,116,840.34
###
99,933.10 534,714.38
###
368,046.50 1,196,835.33
###
JUMLAH III ###
30,461,521.83
6,520,000.00 818,712.47
###
571,250.00 1,594,362.40
###
657,245.00 2,382,305.18
###
JUMLAH IV ###
4,795,380.05
252,325.00 504,650.00
###
77,745.00 466,470.00
###
51,830.00 518,300.00
###
27,545.00 137,725.00
###
45,745.00 457,450.00
###
JUMLAH V ###
2,084,595.00
43,220.75 6,209,765.22
###
29,020.75 1,195,846.77
###
180,800.50 908,120.39
###
180,800.50 1,009,230.70
###
180,800.50 324,551.62
###
JUMLAH VI ###
9,647,514.70
JUMLAH ANGGARAN
HARGA JUMLAH HARGA
SATUAN (Rp) (Rp) REALISASI (8+9)
432,375.00 5,188,500.00
###
445,175.00 890,350.00
###
###
95,000.00 1,140,000.00
###
48,000.00 48,000.00
###
55,000.00 110,000.00
###
65,000.00 130,000.00
###
JUMLAH VII ###
7,506,850.00
88,242.50 5,711,627.57
###
68,092.50 822,712.56
###
44,494.50 177,978.00
###
71,009.75 568,078.00
###
348,440.00 348,440.00
###
150,000.00 150,000.00
###
90,000.00 90,000.00
###
524,113.75 524,113.75
###
JUMLAH VIII ###
8,392,949.89
###
REKAPITULASI
RENCANA ANGGARAN BIAYA
UNIT POS JAGA 2 UNIT
JUMLAH HARGA
ENIS PEKERJAAN (Rp)
34,111,783.76
###
88,750,882.49
###
30,461,521.83
###
4,795,380.05
###
2,084,595.00
###
9,647,514.70
###
7,506,850.00
###
8,392,949.89
###
REAL COST UNTUK 1 UNIT 185,751,477.71###
REAL COST UNTUK 2 UNIT 371,502,955.43###
PPN 10% 37,150,295.54###
TOTAL 408,653,250.97###
PEMBULATAN 408,653,000.00
###
HARGA SATUAN
NO JENIS PEKERJAAN SAT VOLUME
(Rp)
B SALURAN KOMPLEK
. Pek. Mobilisai dan Soft Drawing Ls 1.00 1,500,000.00
1 Pek. Saluran Keliling dekat Pagar (type-1) M' 591.64 297,470.05
2 Pek. Saluran Depan (Tepi Jalan) type 2 M' 152.80 2,531,451.11
3 Pek. Saluran Tertutup Tepi Jalan Kompleks (Type-3) M' 190.00 1,213,068.84
4 Pek. Saluran Pembuangan ke Riol Kota M' 162.00 1,928,835.49
5 Pek. Kolam Air Mancur di depan Gedung Unit 1.00 271,989,203.90
JUMLAH (c)
REKAPITULASI
RENCANA ANGGARAN BIAYA
HALAMAN PARKIR/JALAN, dan SALURAN
NO JENIS PEKERJAAN
REAL COST
PPN 10%
TOTAL
PEMBULATAN
Terbilang :
Dua Belas Milyar Lima Ratus Juta Delapan Ratus Delapan Puluh Dua Ribu
JUMLAH HARGA
66,228,263.00
3,374,329,999.85
1,629,976,894.82
1,280,291,666.18
281,685,877.37
527,754,334.63
252,679,806.57
722,827,530.32
929,549,013.75
126,531,300.00
144,738,225.00
52,034,625.00
9,388,627,536.49
1,500,000.00
175,995,178.26
386,805,729.84
230,483,080.02
312,471,348.61
271,989,203.90
1,379,244,540.62
227,171,650.00
3,729,536.28
10,000,000.00
5,000,000.00
30,000,000.00
37,750,000.00
313,651,186.28
22,051,125.00
1,250,000.00
54,000,000.00
2,750,000.00
48,000.00
110,000.00
11,250,000.00
550,000.00
180,000.00
10,000,000.00
56,000,000.00
20,250,000.00
4,306,360.00
100,170,074.40
282,915,559.40
###
###
###
###
###
KAPITULASI
A ANGGARAN BIAYA
KIR/JALAN, dan SALURAN
JUMLAH HARGA
9,388,627,536.49
1,379,244,540.62
313,651,186.28
282,915,559.40
11,364,438,822.79
1,136,443,882.28
12,500,882,705.07
12,500,882,000.00
1 2 3 4
JUMLAH BIAYA
PEKEKRJAAN (Rp)
6,640,281,032.22
408,653,250.97
12,500,882,705.07
1,669,800,000.00
21,219,616,988.26
636,588,509.65
21,856,205,497.91
21,856,200,000.00
Timika, Agustus 2011
KEPALA DINAS PEKERJAAN UMUM,
KABUPATEN MIMIKA,
Ukuran Luas
elev
p l J m2
KERAMIK TANGGA
Lt1
Tannga Sapm
Anak Tangga 5.50 1.55 4 34.10
Bordes 1.00 5.03 2 10.06
44.16
Tangga Utama
Kusen Pegurang
P1.p 0.90 2.15 15 29.03
P1B.p 0.90 2.85 8 20.52
P2A.p 1.75 2.85 6 29.93
J1.p 0.90 1.30 16 18.72
J1M.p 0.90 2.00 1 1.80
J2M.p 1.75 2.00 6 21.00
52 120.99
Kusen Pegurang
P1.p 0.90 2.15 14 27.09
P1B.p 0.90 2.85 2 5.13
J1.p 0.90 1.30 14 16.38
30 48.60
Kusen Pegurang
P1.p 0.90 2.15 5 9.68
J2.p 1.75 1.30 5 11.38
10 21.05
Lantai 02 DH4
3 Lisplang/talang
303.21 1.00 1.00
Gapura 138.13 1.00 1.00
3 kanopi 193.86 1.00 1.00
PEKERJAAN LANTAI 02
Pek. Cat Dinding Tembok bagian Dalam
1 dinding 3,092.46 1.00 1.00
2 Kolom 426.00 1.00 1.00
Lisplang 314.22 1.00 1.00
4 Plat Tangga 85.66 1.00 1.00
Balok Exphose 142.20 1.00 1.00
PEKERJAAN LANTAI 03
Pek. Cat Dinding Tembok bagian Dalam
1 dinding 2,071.97 1.00 1.00
2 Kolom 278.96 1.00 1.00
Lisplang 1.00 1.00
4 Plat Tangga 0.00 1.00 1.00
Balok Exphose 59.40 1.00 1.00
Rabat Beton
Lantai 126.00 1 0.07
Dinding 49.50 1 0.50
teras 56.00 1 0.50
Keramik
Lantai 126.00 1 1.00
Dinding 49.50 1 0.80
Pembungkus Tengah
1 9.40 1 0.55
2 6.20 1 0.50
3 4.65 1 0.50
4 3.15 1 0.50
5 1.60 1 0.50
Terap Rata 4.70 1 1.00
Klm Prktis
1.20 15 1.00
0.60 15 1.00
Lantai Parket
Keramik Tangga 0.60 9.95 1
0.60 10.60 1
0.60 11.20 1
Pegurang :
Ploding Rool 3.75 2.4 1.00
p2 1.70 2.15 1.00
p1j2 0.90 2.15 1.00
1.35 1.7 1.00
P2J2 1.70 2.15 1.00
0.85 1.35 2.00
J1 1.75 1.95 1.00
Loster 2.20 2.8 1.00
2.20 1 1.00
Rb 2.8 1 1.00
1.00 1 1.00
3.75 1 1.00
1.70 1 1.00
2.60 1 1.00
3.75 1 1.00
2.25 1 2.00
Total Pengurang
Pas. Bata Netto
8 bh
SALURAN KOMPLEK
592 Saluran Keliling dekat Pagar (type 1)
153 Saluran Depan (Tepi Jalan) type 2
Saluran Tertutup dari Bangunan ke Saluran
190 Komplek (type 3
a. PAGAR DEPAN
152.80 Pasang Papan Bouwplank
45.84 Galian Tanah Pondasi Batu Gunung 0.80 1 143.08
11.46 Urugan Tanah kembali
9.17 Urugan Pasir dibawah Pondasi 0.10 1 143.08
18.34 Lapisan Batu Kosong 0.20 1 143.08
45.84 Pondasi Batu Gunung 0.24 2 143.08
4.58 Sloof 15/20 0.15 0.2 143.08
202.80 Plesteran 1 : 3 pada Sloof dan Kolom
slop 0.55 1 143.08
kolom 1.60 1.4 51.00
202.80 Acian
SALURAN KOMPLEK
250.00 Saluran Keliling dekat Pagar (type 1)
- Saluran Depan (Tepi Jalan) type 2
- Saluran Tertutup dari Bangunan ke Saluran
190.00 Komplek (type 3
RSERVOAR G. Utama
119,100.00 4*3*2 16.0000 M3 Galian Tanah Pondasi / Bak 4.75 5.75
19,666.67 1.6000 M3 Urugan Tanah kembali 33.40 1.00
6,365,139.07 2.5200 M3 Pondasi Poer Plat 4.6 0.15
6,365,139.07 0.3600 M3 Sloof Beton Bertulang 15/20
6,365,139.07 0.2160 M3 Kolom Beton Bertulang 25/25 0.0625 1.32
6,365,139.07 3.6800 M3 Plat Dinding & Lantai tebal 10 cm 0.1 13.00
6,365,139.07 0.8000 M3 Plat Penutup tebal 12 cm 0.12 1.00
6,365,139.07 0.2880 M3 Balok Beton 20/30 0.2 0.30
819,919.84 0.8000 M3 Lantai Cor 1 : 3 : 5 tebal 10 cm 0.05 4.75
62,083.40 8.0000 M2 Plester pada Plat Lantai 3 4.00
58,916.60 36.8000 M2 Plesteran Bak Air
231,275.00 32.0000 M2 Pasang Keramik 20/20 23.9725 1.60
1,500,000.00 1.0000 Unit Tangga Besi turun ke Reservoar
750,000.00 1.0000 Unit Pintu Besi Bak Kontrol 50/50 + Acc
7.8640 m3
Pek. Plapon
Uk.
Kode Luas
Lantai Dalam Pj Lbr Jml
Lantai Teras Kelilin Depan Lantai 1
Bordes T utama 1 1 30.11 1 30.11
Bordes T, Samping 2 1 538.83 1 538.83
2,189.24 3 1 15.64 1 15.64
4 1 15.64 1 15.64
Lantai Dalam 5 1 31.96 1 31.96
Bordes T, Samping 6 1 37.52 1 37.52
Bordes T utama 7 1 22.93 1 22.93
2,428.42 8 1 31.83 1 31.83
9 1 31.99 1 31.99
10 1 209.09 1 209.09
11 1 231.27 1 231.27
12 1 4.60 1 4.60
13 1 15.76 1 15.76
15 1 44.30 1 44.30
16 1 47.75 1 47.75
17 1 121.27 1 121.27
18 1 50.21 1 50.21
19 1 65.57 1 65.57
20 1 49.05 1 49.05
21 1 37.88 1 37.88
22 1 36.96 1 36.96
23 1 47.44 1 47.44
1,717.60
14 1 2.90 1 2.90
24 1 2.86 1 2.86
25 1 2.74 1 2.74
26 1 2.73 1 2.73
27 1 2.73 1 2.73
28 1 2.58 1 2.58
29 1 2.83 1 2.83
30 1 2.87 1 2.87
31 1 3.22 1 3.22
32 1 4.62 1 4.62
33 1 2.36 1 2.36
34 1 2.71 1 2.71
35 1 1.70 1 1.70
36 1 8.21 1 8.21
37 1 37.00 1 37.00
82.06
38 1 35.31 1 35.31
39 1 143.08 1 143.08
40 1 9.88 1 9.88
33.96 0.30 1 10.19
31.57 0.50 1 15.79
41 1 9.88 1 9.88
33.96 0.30 1 10.19
31.57 0.50 1 15.79
42 1 11.58 1 11.58
39.8 0.30 1 11.94
37.4 0.50 1 18.70
41 1 9.88 1 9.88
33.96 0.30 1 10.19
31.57 0.50 1 15.79
292.86
Lantai 2
1 1 60.64 1 60.64
2 1 138.81 1 138.81
3 1 20.46 1 20.46
4 1 250.22 1 250.22
5 1 44.39 1 44.39
6 1 5.04 1 5.04
7 1 8.51 1 8.51
8 1 143.33 1 143.33
9 1 5.04 1 5.04
10 1 89.19 1 89.19
11 1 89.19 1 89.19
12 1 250.22 1 250.22
13 1 20.46 1 20.46
14 1 8.51 1 8.51
15 1 138.81 1 138.81
16 1 60.64 1 60.64
1,333.46
17 1 1.84 1 1.84
18 1 6.27 1 6.27
19 1 2.08 1 2.08
20 1 2.08 1 2.08
21 1 3.93 1 3.93
22 1 1.84 1 1.84
23 1 1.84 1 1.84
24 1 6.28 1 6.28
25 1 2.08 1 2.08
26 1 3.93 1 3.93
27 1 2.08 1 2.08
28 1 2.84 1 2.84
29 1 2.79 1 2.79
30 1 2.79 1 2.79
31 1 5.11 1 5.11
32 1 1.67 1 1.67
33 1 13.90 1 13.90
34 1 2.09 1 2.09
35 1 4.06 1 4.06
36 1 2.84 1 2.84
37 1 2.84 1 2.84
38 1 2.84 1 2.84
39 1 2.84 1 2.84
80.83
40 1 71.58 1 71.58
41 1 135.01 1 135.01
42 1 135.01 1 135.01
341.60
43 1 2.98 1 2.98
44 1 3.92 1 3.92
45 1 0.61 6 3.67
46 1 0.61 6 3.67
47 1 3.92 1 3.92
48 1 2.98 1 2.98
21.14
DOMS
1 161.92 1.00 1 161.92
2 3.815 12.60 16 769.10
3 62.52 2.00 2 250.08
4 26.12 0.60 1 15.67
1,196.78
1,220.71
11.87 Lantai 3
1 1 29.43 1 29.43
2 1 304.75 1 304.75
3 1 150.25 1 150.25
4 1 304.75 1 304.75
5 1 29.43 1 29.43
6 1 187.55 1 187.55
7 1 49.37 1 49.37
1,055.53
8 1 4.06 1 4.06
9 1 2.09 1 2.09
10 1 13.91 1 13.91
11 1 2.79 2 5.58
12 1 5.11 1 5.11
13 1 1.67 1 1.67
32.42
M1
27.09
27.75
6.06
6.00
7.34
2.27
14.40
90.91
20.72
11.10
12.15
7.70
3.78
55.45
13.95
4.55
2.68
16.44
37.62
183.98 Bruto
750.22
Bruto
312.36
Bruto
330.50
25.10
21.98
21.70
68.78
3,793.89
262.93
532.01
85.66
989.26
5,663.74
344.87
8.27
56.98
4.54
7.87
41.74
86.72
147.88
354.00
303.21
138.13
193.86
635.20 1,334.06
3,092.46
426.00
314.22
85.66
142.20
4,060.54
470.62
175.76
417.81
92.18
295.27
175.76
1,627.41
2,071.97
278.96
-
-
59.40
2,410.33
479.74
-
-
-
295.27
-
775.01
106.19
8.40
114.59
3.36
13.27
16.63
26.55
24.75
5.04
56.34
11.41
67.75
8.82
24.75
28.00
61.57
Lantai Dinding
126.00 126.00
39.60 39.60
5.17 5.17
3.10 3.10
2.33 2.33
1.58 1.58
0.80 0.80
4.70 4.70
183.27 130.70 52.57
39.60
57.00
1.49
33.67
12.36
5.27
3.92
2.24
57.47
18.00
9.00
27.00
51.39
114.94
114.94
67.39
20.49
1.36
0.95
0.49
90.69
0.61
0.33
0.29
0.31
0.33
1.86
3.06
1.63
0.15
0.15
0.16
5.15
61.26
32.53
93.79
5.97
6.36
6.72
19.05
241.39
203.63
445.01 m2
96.42
78.99
89.08
264.49
59.46
23.48
34.14
23.48
13.68
13.80
8.25
17.15
193.43
70.00
9.98 55.44 m
7.56 42.00 m
-
11.55
8.09
115.50
81.12
1.00 34.155
10.00 36.1
1.00 128.502
1.00 11.385
1.00 12.033333
1.00 64.502
87.920333
1.00 110.7216
1.00 12.582
1 4.6575
16 4.9
9.5575
1.00 9.315
1.00 28.4625
1.00 110.7216
16.00 2.888
8.00 0.45
4.00 0.105
3.443
1.00 8.8074
1.00 3.936
1.00 3.3867
7.3227
1.00 2.6125
10.00 6.75
6.00 4.05
6.00 7.425
1.00 4.8
2.00 2.052
1.00 2.166
4.218
22.00 4.95
6.00 0.3168
1.00 0.6036
1.00 0.1125
1.0329
6.00 1.125
10.00 1.063
16.00 4.000 64
6.188
22.00 4.950
1.00 56.550
4.00 5.840
2.00 7.600
13.440
19.00 270.750
1.00 3.600
274.350
1.00 9.000
2.00 7.310
1.00 1.935
1.00 2.295
2.00 7.31
2.00 4.59
1.00 3.4125
9.00 55.44
1.00 2.2
93.493
9.00 25.20
1.00 1.00
1.00 3.75
2.00 3.40
1.00 2.60
2.00 7.50
2.00 9.00
52.45 0.15 7.87
Total Pengurang 101.360
Pas. Bata Netto 172.990 m2 17.299 m3
1.00 57.64
2.00 345.98
1.00 10.49
2.00 3.23
359.70 m2
1.00 64.00 m2
1.00 423.70 m2
1.00 132.60
1.00 132.60
1.00 23.12
1.00 18.16
1.00 29.06
2.00 20.625
2.00 42.625
92.31 m2
1.00 92.31 m2
1.00 92.31 m2
1.00 5
1.00 3.5
2.00 2.12
1.00 1.01
1.00 1.35
2.00 6
1.00 0.75
2.00 4
23.73 m
189.84 m 0.9492
2,666.79
674.10
2,666.79
2,666.79
234.80
413.30 92.14 1,966.29 2,058
10.00
-
-
-
-
-
-
-
-
250.00
-
-
190.00
136.50
40.95
10.24
8.19
16.38
40.95
4.10
181.17
181.17
10.58
116.14
2.00
33.05
1.00 114.464
28.616
1.00 14.308
1.00 28.616
1.00 68.6784
1.00 4.2924
1.00 78.694
1.00 114.24
192.934
192.934
52.00 2.912
1.00 140.02
51
2.00 5.4312
2.00 0.918
2.00 1.836
8.1852
2.18 59.54 1,905,600 7,091,363 5,185,763
1.00 33.40 31,467 656,793 625,326
3.60 2.48 16,040,150 15,811,005 (229,145)
2,291,450 - (2,291,450)
4.00 0.33 1,374,870 2,100,496 725,626
1.60 2.08 23,423,712 13,239,489 (10,184,223)
10.40 1.25 5,092,111 7,945,603 2,853,492
13.00 0.78 1,833,160 4,964,808 3,131,648
3.75 0.89 655,936 730,241 74,305
1.00 12.00 496,667 745,001 248,334
- 2,168,131 - (2,168,131)
1.00 38.36 7,400,800 8,870,784 1,469,984
1 1,500,000 1,500,000 -
1 750,000 750,000 -
64,964,054 64,405,584 (558,470)
6.9223 (0.9417)
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
1,769.13 1,839.94 122.34
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Sungkai
Lm.Sering
Lm.Sering
Lm.Sering
Lm.Sering
Lm.Sering
Lm.Sering
Lm.Sering
Lm.Sering
Lm.Sering
Lm.Sering
Lm.Sering
Lm.Sering
Lm.Sering
301.64
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
1,373.46
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
Sungkai
Sungkai
Sungkai
Luar
Luar
Luar
Luar
Luar
Luar
LAMBERSERING
Sungkai
Sungkai
Sungkai
Sungkai
1,538.38 m2
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
Gipsum
1,087.20
Triplex
Triplex
Triplex
Triplex
Triplex
Triplex
REKAPITULASI TOTAL
OWNER ESTIMATE (OE)
ANGGARAN BIAYA KONSTRUKSI
TOTAL................ (1)
PEMBULATAN,.......................
###
Terbilang :
DUA PULUH SATU MILYAR DELAPAN RATUS LIMA PULUH ENAM JUTA DUA RATUS RIBU
RUPIAH
JUMLAH HARGA
6,036,619,120.20
371,502,955.43
11,364,438,822.79
1,518,000,000.00
19,290,560,898.42
578,716,826.95
19,869,277,725.37
1,986,927,772.54
21,856,205,497.91
21,856,200,000.00