Anda di halaman 1dari 4

6845

Jalan Panjang (m)


Lebar 10 510 5100 2550
lebar 6 471 2826 1413
lebar 11 89 979 534
etc 7 140 980 560
1210 9885
50 6845 200
136 598 544
1942 1396 17328 3465.6 5801 107.4259 214.8519

beton 3465.6
Dobel Wiremesh Roll 54m m6 220 76472

6 50 0.2 60 30
10 100 50
11 110 55
7 70 35
85
1 via Main office, Proses,Mill, tebal 20cm
total 601 m lebar 8m = 260 lebar 11m=53m

2 Cooling Tower to Boiler west


336 m lebar 6m = 336m

3 Keliling Product Ware House lebar 8 m = 555m


555 m

4 Akses power house


55m lebar 6m = 55m

5 akses Coal Storage


184 m lebar 10m = 184 m

6 Raw Sugar
211 m lebar 20m = 71m
lebar 14m = 44 m
lebar 8m = 71 m
lebar 15m = 25 m
lebar 6m = 89 m

7 Akses Jalan Parkir


148 m lebar 8 m = 148 m

8 Akses WTP
74 m lebar 6m = 174 m

9 Main Office
91 m lebar 8m = 91m
Panjang Lebar
lebar 10m = 260m ext= 27.5 lebar 10m 260 10 2600
53 11 583
260 8 2080
27.5 10 275
336 6 2016
555 8 4440
55 6 330
184 10 1840
71 20 1420
44 14 616
71 8 568
25 15 375
89 6 534
148 8 1184
91 8 728
2269.5 19589

kebutuhan wiremesh rol lebar @2,1m x 54m


panjang Lebar Kebutuhan Roll
260 10 5 5 25
53 11 6 1 6
260 8 4 5 20
27.5 10 5 1 5
336 6 3 7 21
555 8 4 11 44
55 6 3 2 6
184 10 5 4 20
71 20 10 2 20
44 14 7 1 7
71 8 4 2 8
25 15 8 1 8
89 6 3 2 6
148 8 4 3 12
91 8 4 2 8
216
23
6
19
3
18
40
3
17
13
6
6
4
5
11
7

3917.8

Kebutuhan Roll

432 150163.2