Anda di halaman 1dari 7

PEMBANGUNAN TERMINAL LPG

PRESSURIZED KAPASITAS 3000 MT


(2X1500 MT)
PT. INTIMARINDO
PRIMACON
Document No: Rev.1
MOTOR OPERATED VALVE
sheet
DATA SHEET
MGS-IP-60-DS-012-A4 1 of 7

PEMBERI KERJA : PT. PERTAMINA PERSERO


KONTRAKTOR : PT.INTIMARINDO PRIMACON
NAMA PROYEK : PEMBANGUNAN TERMINAL LPG PRESSURIZED
KAPASITAS 3000 MT(2X1500 MT)
LOKASI : MANGGIS-BALI
NOMER SPMP : 040/F00000/2016-S0

1 01-09-2016 Diajukan untuk disetujui


0 07-06-2016 Diajukan untuk review
Rev. Tgl Deskripsi Dibuat Diperiksa Disetujui Diperiksa Disetujui
PEMBANGUNAN TERMINAL LPG
PRESSURIZED KAPASITAS 3000 MT
(2X1500 MT)
PT. INTIMARINDO
PRIMACON
Document No: Rev.1
MOTOR OPERATED VALVE
sheet
DATA SHEET
MGS-IP-60-DS-012-A4 2 of 7

PT. INTIMARINDO PRIMACON PERTAMINA

General Notes:

1. All electrical component shall suitable for Class 1 Div 1 Gr. C,D Hazardous Areas with Explosion Proof-
Eex'd' certification from certifying authorities like UL/FM/BASEEFA/CSA.
2. All component of actuators shall certified for NEMA 4X weather proof requirements.
3. All instrument shall be tagged with 316 SS name plate tag. no
4. MOV shall be supplied completely assembled with all accessories.
5. Vendor shall complete Model No.
6. Vendor shall advise / conform the safety factor, which requirement specified in respective valve
datasheets.
7. Local control, indication & set up valve Open/Close shall be provided on the Actuator.
8. Remote control & indication On/Off shall be provided on the Actuator.
9. Valve size more then or equal to 250 kg/6" size shall be provide with suitable size of LIFTING
LUGS/LIFTING EYES & also provide with RESTING SUPPORTS.
10. Antistatic device shall be provided on Stem/ ball & Stem/body.
11. Test : Hydro Test, ANSI/ FCI Leakage Class ANSI V & Functional Test.
12. Valve Material :
a. Trim Material - Ball : A-182 F 316
b. Trim Material - Stem : A-182 F 316
c. Trunnion Material: A-182 F 316
13. Certificate Calibration & Material shall be submitted by vendor.
PEMBANGUNAN TERMINAL LPG
PRESSURIZED KAPASITAS 3000 MT
(2X1500 MT)
PT. INTIMARINDO
PRIMACON
Document No: Rev.1
MOTOR OPERATED VALVE
sheet
DATA SHEET
MGS-IP-60-DS-012-A4 3 of 7

SERVICE
NO TAG NO SERVICE LINE NUMBER DRAWING NO.
FLUID
LPG
1 MOV-201 LPG Liquid from Metering to LPG Tank T-26 12”-LPG-300 #-A2A-001 MGS-IP-10-DW-002-A3 (Sheet 1 of 2)
Liquid

LPG
2 MOV-202 LPG Liquid from Metering to LPG Tank T-27 12”-LPG-300 #-A2A-003 MGS-IP-10-DW-002-A3 (Sheet 1 of 2)
Liquid

LPG
3 MOV-701 LPG Liquid from Metering to LPG Tank T-26 10”-LPG-300 #-A2A-035 MGS-IP-10-DW-002-A3 (Sheet 2 of 2)
Liquid
LPG
4 MOV-405 LPG Liquid from Metering to LPG Tank T-27 10”-LPG-300 #-A2A-037 MGS-IP-10-DW-002-A3 (Sheet 2 of 2)
Liquid

LPG
5 MOV-402 LPG Liquid from T-26 to Truck Filling Pump 10”-LPG-300 #-A2A-036 MGS-IP-10-DW-002-A3 (Sheet 2 of 2)
Liquid

LPG
6 MOV-406 LPG Liquid from T-27 to Truck Filling Pump 10”-LPG-300 #-A2A-038 MGS-IP-10-DW-002-A3 (Sheet 2 of 2)
Liquid

7 MOV-403 LPG Vapour from Truck Filling Pump to T-26 4”-PV-300 #-A2A-080 MGS-IP-10-DW-002-A3 (Sheet 2 of 2) Vapour

8 MOV-407 LPG Vapour from Truck Filling Pump to T-27 4”-PV-300 #-A2A-081 MGS-IP-10-DW-002-A3 (Sheet 2 of 2) Vapour

9 MOV-404 LPG Vapour from LPG Tank T-26 to Metering 4”-PV-300 #-A2A -082 MGS-IP-10-DW-002-A3 (Sheet 2 of 2) Vapour

10 MOV-408 LPG Vapour from LPG Tank T-27 to Metering 4”-PV-300 #-A2A-083 MGS-IP-10-DW-002-A3 (Sheet 2 of 2) Vapour
PEMBANGUNAN TERMINAL LPG
PRESSURIZED KAPASITAS 3000 MT
(2X1500 MT)
PT. INTIMARINDO PRIMACON
Document No: Rev.1
MOTOR OPERATED VALVE
sheet
DATASHEET
MGS-DS-IN-010-A4 4 of 7

1 Tag No.
1 Tag No. MOV-402
MOV-701 // MOV-406
MOV-405
2 Contract
2 Contract No.
No.
3 Location
3 Location LPG
LPG T- 26 / T-27 PACKAGE
MATERING to LPG TRUCK FILLING
to TANK T-26 / PUPMS
T-27
4 P&ID No.
4 P&ID No. MGS-IP-10-DW-002-A3 (( Sheet
MGS-IP-10-DW-002-A3 Sheet 2
2 of
of 2
2 ))
GENERAL
GENERAL
5 Service
5 Service LPG
LPG
6 Line
6 Line No.
No. 10"-LPG-300#-A2A-036
10"-LPG-300#-A2A-035 // 10"-LPG-300#-A2A-038
10”-LPG-300#-A2A-037
7 AMB.
7 AMB. Temperature
Temperature Humidity
Humidity 23
23 -35
-55 °C
°C 85%
85%
8
8
9 Fluid
9 Fluid Phase
Phase LPG
LPG Liquid
Liquid
10
10 Density
Density Viscosity
Viscosity 546.5
546.5 kg/m
³
kg/m³ 0.13
0.13 cPcP
11
11 Operating
Operating Pressure
Pressure Design
Design Pressure
Pressure 7-10 // 10,23
7-10 10,23 Bar
Bar g/Psig
g/Psig 18
18 // 26,46
26,46 Bar
Bar g/Psig
g/Psig
12
12 Operating
Operating Temperature
Temperature Design
Design Temperature
Temperature 20-35 // 68-95
20-35 68-95 °C/°F
°C/°F -20/60
-20/60 68/140
68/140 °C/°F
°C/°F
PROCESS
PROCESS DATA
DATA 13 Max. Shut
Shut Off
Off Diff.
Diff. Pressure
Pressure
13 Max.
14 Max.
14 Max. Flowrate
Flow rate 500
500 MT/h
MT/h
15 Line Size
15 Line Size and
and Sch.
Sch. Inlet
Inlet Outlet
Outlet 10 in
10 in sch
sch 40
40 10
10 in
in sch
sch 40
40
16 Hazardous
16 Hazardous Area
Area Classification
Classification CLASS
CLASS 1
1 DIV
DIV 1
1 GROUP
GROUP C,
C, D/Eexd
D/E exdIIIIBBT4
T4
17
17
18 Manufacturer
18 Manufacturer Model
Model
TRUNION MOUNTED,
TRUNION SOLID
MOUNTED, BALL,3
SOLID BALL, 3
19 Valve
19 Valve Type
Type Ball
Ball PIECES BODY
PIECES BODY
20 Body Size
20 Body Size Port
Port Size
Size 10
10 inin FULL BORE
FULL BORE
21 Body
21 Material
Body Material Trim Material
Trim Material ASTM
ASTM A A 216
216 WCB Body& BonnetTRIM
WCB Body& NONO
A TRIM 10 10
Bonnet
105 A 105
22
22 Bolt
Bolt and
and Nut
Nut Material
Material Packing
Packing ASTM
ASTM A193
A193 B7/CW7Hex
B7/CW7Hex NutNut VTAVTA
VALVE
VALVE BODY
BODY ASTM
ASTM A
A 194
194 Gr
Gr 2
2 H,
H, Zinc
Zinc Plated
Plated
23
23 Seat
Seat Material
Material Bonnet
Bonnet RPTFE
RPTFE A105N
A 105
24
24 Connections
Connections Rating
Rating RF
RF ANSI CLASS
ANSI 300300
CLASS
25 Fire Safe
25 Fire Safe Requirement
Requirement YES (API
YES (API 6
6 FA)
FA)
26 Valve
26 Break Torque
Valve Break Torque Valve
Valve Run
Run Torque
Torque VTA
VTA VTA
VTA
27 Valve
27 Valve Orientation
Orientation Stem
Stem Orientation
Orientation HORIZONTAL
HORIZONTAL VERTICAL
VERTICAL
28 Surface
28 Surface Finish
Finish Painting
Painting YES
YES MGS-PR-GN-010-A4
MGS-PR-GN-010-A4
29 Test
29 Test API 6
API 6D,
D
30 Valve Torque
30 Valve Torque Calc. By
Calc. By Vendor
Vendor
31
31
32 Manufacturer
32 Manufacturer Model
Model VTA
VTA By
By Vendor
Vendor
33 Actuator Type
33 Actuator Type Motor
Motor Rated
Rated Voltage
Voltage ELECTRIC
ELECTRIC 400V, 50Hz,
400V, 50Hz, 3Ph
3Ph
34
34 Required
Required Power
Power Starting
Starting Current
Current Calc.
Calc. By
By Vendor
Vendor VTA
VTA
35
35 Speed
Speed (RPM)
(RPM) Opening/Closing
Opening/Closing Time
Time VTA
VTA Max.
Max. 20
20 seconds
seconds
36
36 Action
Action Failure
Failure LAST POSITION
LAST POSITION
ACTUATOR
ACTUATOR
37 Actuator Position
37 Actuator Position HORIZONTAL
HORIZONTAL
38 Insulation
38 Insulation CLASS
CLASS F
F
39 Certification
39 Certification Enclosure
Enclosure Certification
Certification NEMA
NEMA 4X
4X EXPLOSSION
EXPLOSSION PROOF
PROOF Eexd
Eexd IIB
IIB T4
T4
40 Painting
40 Painting VTA
VTA
41 Safety
41 Safety Factor
Factor 130% of
130% of ends
ends torque
torque

ELECTRICAL 42 Power
42 Power Cable
Cable Control
Control Cable
Cable 1
1XX M32
M32 (VTA)
(VTA) RS
RS 485
485
ELECTRICAL Conduit Cable
CONNECTIONS
43
43 Conduit Cable Gland
Gland YES
YES YES
YES
CONNECTIONS
44
44
45 Integral
45 Integral Starter/Circuit
Starter/Circuit Control
Control REQUIRED
REQUIRED
46 Gearbox
46 Gearbox RTU
RTU Module
Module YES
YES YES
YES
47 Hand
47 Hand Wheel
Wheel YES
YES
48 Limit Switch
48 Limit Switch Local
Local Switch
Switch Yes, DPDT
Yes, DPDT (Open/Close)
(Open/Close) OPEN,CLOSE,
OPEN,CLOSE, STOP
STOP
ACCESSORIES Local
ACCESSORIES 49
49 Local Indicator
Indicator OPEN,
OPEN, CLOSE,
CLOSE, TRAVELLING
TRAVELLING
50
50 Remote
Remote Position
Position Indicator
Indicator Yes
Yes (On/Off)
(On/Off)
51 Remote Operation
51 Remote Operation Yes
Yes (On/Off)
(On/Off)
52 Mechanical
52 Mechanical Position
Position Indicator
Indicator Yes (Open/Close)
Yes (Open/Close)
53 Setting
53 Setting Tool
Tool Infra
Infra Red
Red
Notes:
Notes: */
*/ VTA
VTA =
= Vendor
Vendor to
to Advice
Advice
1.
1. For technical
For technical requirements
requirements refer
refer to
to General
General notes
notes sheets
sheets of
of this
this document.
document.
2.
2. Vendor
Vendor Shall
Shall calculate
calculate torque
torque actuator
actuator on
on 100%
100% Full
Full ANSI
ANSI RATING
RATING CLASS
CLASS 300
300 lb
lb with
with safety
safety factor
factor 130%
130% of
of ends
ends torque.
torque.

1 Tag No. MOV-403 / MOV-407


PEMBANGUNAN TERMINAL LPG
PRESSURIZED KAPASITAS 3000 MT
(2X1500 MT)
PT. INTIMARINDO PRIMACON
Document No: Rev.1
MOTOR OPERATED VALVE
sheet
DATASHEET
MGS-DS-IN-010-A4 5 of 7

27 Valve Orientation Stem Orientation HORIZONTAL VERTICAL


28 Surface Finish Painting YES MGS-PR-GN-010-A4
29 Test API 6D
30 Valve Torque Calc. By Vendor
31
32 Manufacturer Model VTA By Vendor
33 Actuator Type Motor Rated Voltage ELECTRIC 400V, 50Hz, 3Ph
34 Required Power Starting Current Calc. By Vendor VTA
35 Speed (RPM) Opening/Closing Time VTA Max. 20 seconds
36 Action Failure LAST POSITION
ACTUATOR
37 Actuator Position HORIZONTAL
38 Insulation CLASS F
39 Certification Enclosure Certification NEMA 4X EXPLOSSION PROOF Eexd IIB T4
40 Painting VTA
41 Safety Factor 130% of ends torque
42 Power Cable Control Cable 1 X M32 (VTA) RS 485
ELECTRICAL
43 Conduit Cable Gland YES YES
CONNECTIONS
44
45 Integral Starter/Circuit Control REQUIRED
46 Gearbox RTU Module YES YES
47 Hand Wheel YES
48 Limit Switch Local Switch Yes, DPDT (Open/Close) OPEN,CLOSE, STOP
ACCESSORIES 49 Local Indicator OPEN, CLOSE, TRAVELLING
50 Remote Position Indicator Yes (On/Off)
51 Remote Operation Yes (On/Off)
52 Mechanical Position Indicator Yes (Open/Close)
53 Setting Tool Infra Red
Notes: */ VTA = Vendor to Advice
1. For technical requirements refer to General notes sheets of this document.
2. Vendor Shall calculate torque actuator on 100% Full ANSI RATING CLASS 300 lb with safety factor 130% of ends torque.

1 Tag No. MOV-404 / MOV-408


2 Contract No.
3 Location TANK T-26 / T-27 to LPG MATERING PACKAGE
4 P&ID No. MGS-IP-10-DW-002-A3 ( Sheet 2 of 2 )
GENERAL
5 Service VAPOUR LPG
6 Line No. 4"-LPG-300#-A2A-082 / 4”-LPG-300#-A2A-083
7 AMB. Temperature Humidity 23 -35 °C 85%
8
9 Fluid Phase LPG Liquid
10 Density Viscosity 546.5 kg/m³ 0.13 cP
11 Operating Pressure Design Pressure 7-10 / 10,23 Bar g/Psig 18 / 26,46 Bar g/Psig
12 Operating Temperature Design Temperature 20-35 / 68-95 °C/°F -20/60 68/140 °C/°F
PROCESS DATA 13 Max. Shut Off Diff. Pressure
14 Max. Flowrate 500 MT/h
15 Line Size and Sch. Inlet Outlet 4 in sch 40 4 in sch 40
16 Hazardous Area Classification CLASS 1 DIV 1 GROUP C, D/Eexd II B T4
17
18 Manufacturer Model
TRUNION MOUNTED, SOLID BALL,3
19 Valve Type Ball
PIECES BODY
20 Body Size Port Size 4 in FULL BORE
21 Body Material Trim Material ASTM A 216 WCB Body& TRIM NO 10
Bonnet A 105
22 Bolt and Nut Material Packing ASTM A193 B7/CW7Hex Nut VTA
VALVE BODY ASTM A 194 Gr 2 H, Zinc Plated
23 Seat Material Bonnet RPTFE A105N
24 Connections Rating RF ANSI CLASS 300
25 Fire Safe Requirement YES (API 6 FA)
26 Valve Break Torque Valve Run Torque VTA VTA
PEMBANGUNAN TERMINAL LPG
PRESSURIZED KAPASITAS 3000 MT
(2X1500 MT)
PT. INTIMARINDO PRIMACON
Document No: Rev.1
MOTOR OPERATED VALVE
sheet
DATASHEET
MGS-DS-IN-010-A4 6 of 7

27 Valve Orientation Stem Orientation HORIZONTAL VERTICAL


28 Surface Finish Painting YES MGS-PR-GN-010-A4
29 Test API 6D
30 Valve Torque Calc. By Vendor
31
32 Manufacturer Model VTA By Vendor
33 Actuator Type Motor Rated Voltage ELECTRIC 400V, 50Hz, 3Ph
34 Required Power Starting Current Calc. By Vendor VTA
35 Speed (RPM) Opening/Closing Time VTA Max. 20 seconds
36 Action Failure LAST POSITION
ACTUATOR
37 Actuator Position HORIZONTAL
38 Insulation CLASS F
39 Certification Enclosure Certification NEMA 4X EXPLOSSION PROOF Eexd IIB T4
40 Painting VTA
41 Safety Factor 130% of ends torque
42 Power Cable Control Cable 1 X M32 (VTA) RS 485
ELECTRICAL
43 Conduit Cable Gland YES YES
CONNECTIONS
44
45 Integral Starter/Circuit Control REQUIRED
46 Gearbox RTU Module YES YES
47 Hand Wheel YES
48 Limit Switch Local Switch Yes, DPDT (Open/Close) OPEN,CLOSE, STOP
ACCESSORIES 49 Local Indicator OPEN, CLOSE, TRAVELLING
50 Remote Position Indicator Yes (On/Off)
51 Remote Operation Yes (On/Off)
52 Mechanical Position Indicator Yes (Open/Close)
53 Setting Tool Infra Red
Notes: */ VTA = Vendor to Advice
1. For technical requirements refer to General notes sheets of this document.
2. Vendor Shall calculate torque actuator on 100% Full ANSI RATING CLASS 300 lb with safety factor 130% of ends torque.

1 Tag No. MOV-201 / MOV-202


2 Contract No.
3 Location TANK T-26 / T-27 to LPG MATERING PACKAGE
4 P&ID No. MGS-IP-10-DW-002-A3 ( Sheet 2 of 2 )
GENERAL
5 Service VAPOUR LPG
6 Line No. 12"-LPG-300#-A2A-001 / 10”-LPG-300#-A2A-003
7 AMB. Temperature Humidity 23 -35 °C 85%
8
9 Fluid Phase LPG Liquid
10 Density Viscosity 546.5 kg/m³ 0.13 cP
11 Operating Pressure Design Pressure 7-10 / 10,23 Bar g/Psig 18 / 26,46 Bar g/Psig
12 Operating Temperature Design Temperature 20-35 / 68-95 °C/°F -20/60 68/140 °C/°F
PROCESS DATA 13 Max. Shut Off Diff. Pressure
14 Max. Flowrate 500 MT/h
15 Line Size and Sch. Inlet Outlet 10 in sch 40 10 in sch 40
16 Hazardous Area Classification CLASS 1 DIV 1 GROUP C, D/Eexd II B T4
17
18 Manufacturer Model
TRUNION MOUNTED, SOLID BALL,3
19 Valve Type Ball
PIECES BODY
20 Body Size Port Size 10 in FULL BORE
21 Body Material Trim Material ASTM A 216 WCB Body& TRIM NO 10
Bonnet A 105
22 Bolt and Nut Material Packing ASTM A193 B7/CW7Hex Nut VTA
VALVE BODY ASTM A 194 Gr 2 H, Zinc Plated
23 Seat Material Bonnet RPTFE A105N
24 Connections Rating RF ANSI CLASS 300
25 Fire Safe Requirement YES (API 6 FA)
26 Valve Break Torque Valve Run Torque VTA VTA
PEMBANGUNAN TERMINAL LPG
PRESSURIZED KAPASITAS 3000 MT
(2X1500 MT)
PT. INTIMARINDO PRIMACON
Document No: Rev.1
MOTOR OPERATED VALVE
sheet
DATASHEET
MGS-DS-IN-010-A4 7 of 7

27 Valve Orientation Stem Orientation HORIZONTAL VERTICAL


28 Surface Finish Painting YES MGS-PR-GN-010-A4
29 Test API 6D
30 Valve Torque Calc. By Vendor
31
32 Manufacturer Model VTA By Vendor
33 Actuator Type Motor Rated Voltage ELECTRIC 400V, 50Hz, 3Ph
34 Required Power Starting Current Calc. By Vendor VTA
35 Speed (RPM) Opening/Closing Time VTA Max. 20 seconds
36 Action Failure LAST POSITION
ACTUATOR
37 Actuator Position HORIZONTAL
38 Insulation CLASS F
39 Certification Enclosure Certification NEMA 4X EXPLOSSION PROOF Eexd IIB T4
40 Painting VTA
41 Safety Factor 130% of ends torque
42 Power Cable Control Cable 1 X M32 (VTA) RS 485
ELECTRICAL
43 Conduit Cable Gland YES YES
CONNECTIONS
44
45 Integral Starter/Circuit Control REQUIRED
46 Gearbox RTU Module YES YES
47 Hand Wheel YES
48 Limit Switch Local Switch Yes, DPDT (Open/Close) OPEN,CLOSE, STOP
ACCESSORIES 49 Local Indicator OPEN, CLOSE, TRAVELLING
50 Remote Position Indicator Yes (On/Off)
51 Remote Operation Yes (On/Off)
52 Mechanical Position Indicator Yes (Open/Close)
53 Setting Tool Infra Red
Notes: */ VTA = Vendor to Advice
1. For technical requirements refer to General notes sheets of this document.
2. Vendor Shall calculate torque actuator on 100% Full ANSI RATING CLASS 300 lb with safety factor 130% of ends torque.