Anda di halaman 1dari 3

RENCANA ANGGARAN BIAYA

JEMBATAN KM. 54

2018

No ITEM BIAYA (Rp.)

A PEKERJAAN PENDAHULUAN -
TOTAL A -

B PEKERJAAN STRUKTUR JEMBATAN


B.1 PEKERJAAN PROFIL BAJA -
B.2 PEKERJAAN PLAT INJAK -
B.3 PEKERJAAN ABUTMENT -
B.4 PEKERJAAN BORE PILE -
TOTAL B -
TOTAL -
PPN (10 %) -
TOTAL KESELURUHAN -
CODE ITEM Volume

A PEKERJAAN PENDAHULUAN
Papan Nama Proyek 80x120 cm (buah) 2.00
Gambar Shop Drawing & As Built Drawing 3.00
Mobilisasi dan Demobilisasi alat kerja 1.00
Static Test 2.00
PDA Test 2.00
Pengadaan Air kerja dan Listrik 1.00
TOTAL A

CODE ITEM Volume

B PEKERJAAN STRUKTUR JEMBATAN


B.1 PEKERJAAN PROFIL BAJA
Main Beam IWF 700.300.13.24 16,650.00
Secondary Beam IWF 300.150.6,5.9 1,981.80
Baut dan Plat Buhul (7% berat total profil baja) 1,304.23
Bearing Pad 20.00
TOTAL B.1
B.2 PEKERJAAN PLAT INJAK
Pekerjaan Beton Mutu K-250 69.36
Pekerjaan Baja Tulangan (Ulir - fy = 410 Mpa-Min) 16,334.28
Pasir 9.25
TOTAL B.2
B.3 PEKERJAAN ABUTMENT
Pekerjaan Galian & Timbunan 40
Pekerjaan Beton Mutu K-250 24.80
Pekerjaan Baja Tulangan (Ulir - fy = 410 Mpa-Min) 4,283
Lean Concrete 2
TOTAL B.3
B.4 PEKERJAAN BORE PILE
Pekerjaan Bor (D 500) 96
Pekerjaan Beton Bore Pile (D-500) 19
Baja Tulangan (1.4%) -Ulir, fy = 410 Mpa-Min 2,071
TOTAL B.4
TOTAL B.1, B.2, B.3 & B.4

TOTAL KESELURUHAN
Harga Satuan
Satuan Biaya (Rp)
(Rp.)

Buah -
Copi -
Ls -
titik -
titik -
Ls -
-

Harga Satuan
Satuan Biaya (Rp)
(Rp.)

kg -
kg -
kg -
bh -
-

m3 -
kg -
m3 -
-

m3 -
m3 -
kg -
m3 -
-

m' -
m3 -
kg -
-
-

Anda mungkin juga menyukai