LAPORAN INTERIM
12 Juli 2018
Bangunan
Free Intake
B
Survey Topografi
Areal Irigasi
Existing &
Pengembangan
PETA IKHTISAR
DAERAH IRIGASI GUNUNG PUDUNG
RENCANA + DESA
EXISTING
A
A
A
A
B Bendung = 150 – 180 m
Plotting data hasil pengolahan curah hujan harian TRMM di Plotting data hasil curah hujan R24 tahunan maksimum di
daerah kajian daerah kajian
DATA TERPAKAI (KLIMATOLOGI DAN AWLR)
DEBIT HARIAN AWLR GUNUNG PUDUNG
1. KLIMATOLOGI : Stasiun Klimatologi Cut Nyak Dien, Meulaboh
tahun 1990 – 2017
2. POS DUGA AIR : AWLR Gunung Pudung tahun 1981 – 1987
AWLR GN PUDUNG
SURVEI HIDROLOGI / HIDROMETRI
I KONDISI HIDROLOGI
1 Consumtive Use Factor (Eto) mm/day 3.51 3.51 3.56 3.56 3.95 3.95 3.96 3.96 3.96 3.96 3.72 3.72 3.76 3.76 3.69 3.69 3.88 3.88 3.57 3.57 3.57 3.57 3.41 3.41
2 Hujan Effective (Re) mm/day 4.74 4.21 4.26 4.39 3.28 4.65 3.74 6.54 6.64 8.05 3.29 2.23 2.36 1.29 2.08 1.23 2.11 5.19 5.32 4.32 6.13 5.27 6.78 5.49
PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PLW PLW PLW PLW PLW PLW PLW
II POLA TANAM PADI = 90 hari PADI = 90 hari PADI = 90 hari
Koef. Tanaman C3 0.95 LP LP LP 1.10 1.10 1.05 1.05 0.95 LP LP LP 1.10 1.10 1.05 1.05 0.95 LP LP LP 1.10 1.10 1.05 1.05
Koef. Tanaman C2 0.00 LP LP 1.10 1.10 1.05 1.05 0.95 0.00 LP LP 1.10 1.10 1.05 1.05 0.95 0.00 LP LP 1.10 1.10 1.05 1.05 0.95
Koef. Tanaman C1 0.00 LP 1.10 1.10 1.05 1.05 0.95 0.00 0.00 LP 1.10 1.10 1.05 1.05 0.95 0.00 0.00 LP 1.10 1.10 1.05 1.05 0.95 0.00
3 Koef. Tanaman rata-rata 0.32 LP LP LP 1.08 1.07 1.02 0.67 0.32 LP LP LP 1.08 1.07 1.02 0.67 0.32 LP LP LP 1.08 1.07 1.02 0.67
I KONDISI HIDROLOGI
1 Consumtive Use Factor (Eto) mm/day 3.56 3.56 3.95 3.95 3.96 3.96 3.96 3.96 3.72 3.72 3.76 3.76 3.69 3.69 3.88 3.88 3.57 3.57 3.57 3.57 3.41 3.41 3.51 3.51
2 Hujan Effective (Re) mm/day 4.26 4.39 3.28 4.65 3.74 6.54 6.64 8.05 3.29 2.23 2.36 1.29 2.08 1.23 2.11 5.19 5.32 4.32 6.13 5.27 6.78 5.49 4.74 4.21
PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PADI PLW PLW PLW PLW PLW PLW PLW
II POLA TANAM PADI = 90 hari PADI = 90 hari PADI = 90 hari
Koef. Tanaman C3 LP LP LP 1.10 1.10 1.05 1.05 0.95 LP LP LP 1.10 1.10 1.05 1.05 0.95 LP LP LP 1.10 1.10 1.05 1.05 0.95
Koef. Tanaman C2 LP LP 1.10 1.10 1.05 1.05 0.95 0.00 LP LP 1.10 1.10 1.05 1.05 0.95 0.00 LP LP 1.10 1.10 1.05 1.05 0.95 0.00
Koef. Tanaman C1 LP 1.10 1.10 1.05 1.05 0.95 0.00 0.00 LP 1.10 1.10 1.05 1.05 0.95 0.00 0.00 LP 1.10 1.10 1.05 1.05 0.95 0.00 0.00
3 Koef. Tanaman rata-rata LP LP LP 1.08 1.07 1.02 0.67 0.32 LP LP LP 1.08 1.07 1.02 0.67 0.32 LP LP LP 1.08 1.07 1.02 0.67 0.32
ELEVASI DASAR SUNGAI ALT.1 = (+) 19.37 ELEVASI DASAR INTAKE EKSISTING= (+) 20.32
ELEVASI AMBANG INTAKE EKSISTING =/ MENDEKATI ELEVASI RENCANA DASAR HILIR AMBANG INTAKE
HEAD YANG TERSEDIA DARI BANGUNAN INTAKE EKSISTING – BANGUNAN B.BG.1 = 2.51 METER
SEHINGGA
HEAD RENCANA < HEAD TERSEDIA
JIKA HEAD RENCANA > HEAD TERSEDIA MAKA OPSI ELEV. CREST MENYESUAKAN
BANGUNAN UKUR TERLETAK 100 METER DARI HILIR BANGUNAN PENGAMBILAN ( AKHIR SANDTRAP)
RESUME PERHITUNGAN HIDROLIS
BERDASARKAN ANALISA HIDROLIS DAPAT DI DAPAT SBB :
➢ SANDTRAP
MAKA,
➢ RENCANA PANJANG INTAKE KE B.UKUR = 487.50 METER ATAU BILA DI PLOT PADA POT.
MEMANJANG HASIL PENGUKURAN UPDATING BERADA PADA PATOK GP.10
➢ PANJANG SALURAN GP.10 ( RENCANA B.UKUR ) KE PATOK CP.BGP.1 ( BANGUNAN B.GP.1 ) ADALAH
1460.50 METER
SEHINGGA, ELEVASI MAR DI BANGUNAN B.GP.1 = (+) 21.56 – 0.53 METER = (+) 21.03 ---- AMAN
KEBUTUHAN TARAF MAR DI BANGUNAN SADAP PERTAMA ( B.GP.1 ) = ( + ) 19.33
PERHITUNGAN HIDROLIS
ANALISA HIDROLIS INTAKE
2 Kantong Lumpur
Dimensi Saluran
Saluran Penguras
Vs = 2.00 m/detik
hs = Qd / b / Vs = 0.53 m
As = b . hs = 4.36 m2
p = b + 2.hs = 9.25 m
R = As / p = 0.47 m
k = 60
Is = ( Qd / k / As / R0.667 )2 = 0.003
Fr = Vs / ( g . hs )0.5 = 0.87 <1 Sub kritis
INTAKE KIRI
+27.50
0.533 CEK !!
KESIMPULAN :
KONSEP PERENCANAAN ,
UPDATING PENGUKURAN DI PEROLEH DATA SBB :
➢ KEBUTUHAN ELEVASI SAWAH TERTINGGI B.BG.1 = (+) 18.71 + 0.20 M = (+) 18.91
➢ KEBUTUHAN ELEVASI SAWAH TERTINGGI AREAL LAYANAN = (+) 0.20
➢ ELEVASI DASAR B.BG.1 = (+) 17.81
➢ ELEVASI DZ B.BG.1 = (+) 20.01
➢ ELEVASI DASAR BM.GPPD.01 ( SESUAI PENGUKURAN ) DI INTAKE = ( + ) 20.32
➢ JADI SELISIH HEAD YANG TERSEDIA = ELV DSR INTAKE – ELV. DSR B.BG.1 = 2.51
METER
TINJAUAN KEMAMPUAN PENAMPANG SALURAN
DATA PERENCANAAN : ANALISA KEMAMPUAN PENAMPANG SALURAN
18.00
16.00
15.00
BIDANG PERSAMAAN
REFERENCE LEVEL : +14.00
19.47
19.55
0.50 19.04
19.52
19.63
0.20 19.16
0.60 19.16
0.20 19.65
19.52
0.56 19.19
0.30 19.19
17.69
17.64
19.20
0.30 19.20
0.35 19.46
19.47
19.58
19.11
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK / DISTANCE (m) 2.39 6.80 2.40 1.56 4.39 1.53 0.80 3.20 7.20
1. I RATA2 DI ASUMSIKAN DARI EL.DASAR HILIR PINTU PENGURAS (PATOK .GP.22) – BANGUNAN
B.BG1 (PATOK B.BGP.1 ) / PANJANG
= (18.13 - 17.83) / 825.630 = 0.000363
2. LEBAR RATA2 = 4.5 METER
3. KEMIRINGAN SALURAN m = 1
4. H SALURAN RATA2 = 1.5 METER
5. K = 60
TINJAUAN KEMAMPUAN PENAMPANG SALURAN
KAPASITAS MAKSIMUM PENAMPANG EKSISTING
Q B Rata2 h maks
NAMA RUAS m n so A P (A/P)^2/3 s^1/2 v (m/s) Q (m3/s) KONTROL
MAKS (m) (m)
RUAS.1 10.49 4.50 1.500 1.00 0.017 0.000363 9.000 8.743 1.020 0.019 1.166 10.49 0.00
RUAS.1 1.50 4277.06 4.50 1.216 1.000 0.017 0.000363 6.948 1.046 7.27 0.00 0.28 0.300 0.303 0.300
KESIMPULAN :
1. KAMAMPUAN PENAMPANG MAKSIMUM SALURAN INDUK GUNUNG PUDUNG (EKSISTING) ADALAH
Qmaks = 10.49 m3/dt
2. DENGAN DEBIT RENCANA Qn = 7.27 m3/dt SALURAN INDUK GUNUNG PUDUNG (EKSISTING) DI
DAPAT FREEBOARD 0.28 METER
3. JIKA MENYESUAIKAN KRITERIA PERENCANAAN 03 BAGIAN SALURAN TABEL 4.3 , RUJUKAN UNTUK
DEBIT 7.27 m3/dt DENGAN PASANGAN = 0.30 METER , MAKA LEBAR SALURAN DI PERLEBAR 0.16
METER ATAU PENINGGIAN TANGGUL 0.02 METER
4. KEBUTUHAN ELEVASI MAR DI BANGUNAN SADAP PERTAMA ( B.GP.1 ) = ( + ) 19.33
ANALISA SANDTRAP
KANTONG LUMPUR DIHITUNG DENGAN MEMPERHATIKAN BEBERAPA TINJAUAN. DARI TINJAUAN-
TINJAUAN TERSEBUT KEMUDIAN DIAMBIL NILAI BERASARKAN :
DATA ANALISA :
Qn = 4200 ha x 1.7 lt/dt/ha = 7140 lt/dt
Qd = 120 % x 7.14 m3/dt = 8.568 3/dt
DATA ANALISA :
Qn = 4200 ha x 1.7 lt/dt/ha = 7140 lt/dt
Qd = 120 % x 7.14 m3/dt = 8.568 3/dt
DATA ANALISA :
Qn = 4200 ha x 1.7 lt/dt/ha = 7140 lt/dt
Qd = 120 % x 7.14 m3/dt = 8.568 3/dt
DATA ANALISA :
Qn = 4200 ha x 1.7 lt/dt/ha = 7140 lt/dt
Qd = 120 % x 7.14 m3/dt = 8.568 3/dt