1 Sumur Bor 1 Depan R. Keuangan/Biarawati 2 Sumur Bor 2 Depan R. RM 3 Penangkal Petir 1 Depan R. Keuangan 4 Penangkal Peter 2 Depan R. tempat Oksigen 5 Penangkal Peter 3 Depan R. Panel/Sentral Oksigen 6 Pengardean (Grounding) 1 Depan R. RM 7 Torn Air 5000 Lt Diatas Laundry 8 Torn Air 1000 Lt Diatas R. Anna 9 Torn Air 1000 Lt Diatas G. Kebersihan 10 Torn Air 1000 Lt Diatas Gedung L.V 11 Torn Air 1000 Lt Diatas Gedung L.V 12 Torn Air 5000 Lt 13 Genset ( Generator) 250 Depan R. Loundry KVA 14 Kwh PLN 82,5 KVA Di Ruang Garasi Mobil 15 Kwh PLN 131 KVA Di Ruang Garasi Mobil 16 UPS 2000 watt R. Laboratorium 17 UPS 2000 watt R. Akuntansi 18 UPS 2000 watt R. Kasir 19 UPS 2000 watt R. SDM 20 UPS 1000 watt Ditiap Ruangan 21 Evalator (Lift) sentral Gedung L. V 22 Sentral Oksigen R. Panel Dpn R. RM 23 IPAL Belakang R. aula Lama 24 Air Tritment (RO) Diatas Laundry 25 PABX `Kantor SDM 26 CCTV Lt.1.2.3.4,UGD Dan R. ANNA 27 Control Alarm Bangunan Lt.,5 28 Sound System R. Informasi 29 Kulkas Obat R. G. Farmasi 30 Sistem Alarm Kebakaran Lt.1,2,3,4, dan 5 31 Semoke detektor asap Lt.1,2,3,4, dan 5