2017
JADWAL PELAKSANAAN
PEMBANGUNAN WORKSHOP KOMPUTER - BLK KOMUNITAS
DITJEN PEMBINAAN, PELATIHAN & PRODUKTIFITAS
DIREKTORAT BINA KELEMBAGAAN PELATIHAN
KEMENTERIAN KETENAGAKERJAAN RI
MINGGU KE
NO ITEM PEKERJAAN TOTAL % 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
100.00
E PEKERJAAN PASANGAN 61,503,529 12.351% 2.059 2.059 2.059 2.059 2.059 2.059 50. 00
F PEKERJAAN KUSEN PINTU & JENDELA 45,739,800 9.186% 2.296 2.296 2.296 2.296 40. 00
J LAIN - LAIN 19,000,000 3.816% 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 10. 00
ii TERMIN II 0. 00
Bobot Rencana 497,956,238.11 100.000% 1.90 6.41 15.03 8.84 8.84 12.50 5.94 2.28 2.28 2.28 4.58 4.58 6.11 6.92 5.30 5.30 0.91
Bobot Realisasi
Akumulasi Rencana 1.90 8.31 23.34 32.18 41.02 53.52 59.46 61.74 64.03 66.31 70.89 75.47 81.57 88.49 93.79 99.09 100.00
Akumulasi Realisasi
Jakarta, 20
100.00
90. 00
80. 00
70. 00
60. 00
50. 00
40. 00
30. 00
20. 00
10. 00
0. 00
Jakarta, 2018
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018
TOTAL 497,956,238.11
PEMBULATAN 500,000,000.00
TERBILANG
#REF!
BILL OF QUANTITY
PEKERJAAN GALIAN
PEKERJAAN BETON
ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018
2 1 m3 beton mutu f'c = 19.3 Mpa (K225), slump (12 +/- 2), w/c = 0.58 Rp 841,679.60
Bahan
371.000 kg Portland Cement Rp 1,080.00 Rp 400,680.00
0.499 m3 Pasir Beton Rp 220,000.00 Rp 109,685.71
0.776 m3 Kerikil (maks.imum 30 mm) Rp 250,000.00 Rp 193,888.89
215.000 ltr Air Rp 15.00 Rp 3,225.00
Sub total : Rp 707,479.60
Upah
1.650 OH Pekerja Rp 68,000.00 Rp 112,200.00
0.275 OH Tukang batu Rp 80,000.00 Rp 22,000.00
0.028 OH Kepala tukang Rp - Rp -
0.083 OH Mandor Rp - Rp -
Sub total : Rp 134,200.00
Upah
0.520 OH Pekerja Rp 68,000.00 Rp 35,360.00
0.260 OH Tukang Kayu Rp 90,000.00 Rp 23,400.00
0.026 OH Kepala tukang Rp - Rp -
0.026 OH Mandor Rp - Rp -
Sub total : Rp 58,760.00
Upah
0.520 OH Pekerja Rp 68,000.00 Rp 35,360.00
0.260 OH Tukang Kayu Rp 90,000.00 Rp 23,400.00
0.026 OH Kepala tukang Rp - Rp -
0.026 OH Mandor Rp - Rp -
Sub total : Rp 58,760.00
Upah
0.660 OH Pekerja Rp 68,000.00 Rp 44,880.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00
0.033 OH Kepala tukang Rp - Rp -
ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018
Upah
0.660 OH Pekerja Rp 68,000.00 Rp 44,880.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00
0.033 OH Kepala tukang Rp - Rp -
0.033 OH Mandor Rp - Rp -
Sub total : Rp 74,580.00
Upah
0.660 OH Pekerja Rp 68,000.00 Rp 44,880.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00
0.033 OH Kepala tukang Rp - Rp -
0.033 OH Mandor Rp - Rp -
Sub total : Rp 74,580.00
Upah
0.660 OH Pekerja Rp 68,000.00 Rp 44,880.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00
0.033 OH Kepala tukang Rp - Rp -
0.033 OH Mandor Rp - Rp -
Sub total : Rp 74,580.00
ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018
Upah
0.660 OH Pekerja Rp 68,000.00 Rp 44,880.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00
0.033 OH Kepala tukang Rp - Rp -
0.033 OH Mandor Rp - Rp -
Sub total : Rp 74,580.00
PEKERJAAN BAJA
PEKERJAAN ATAP
I. PEKERJAAN PERSIAPAN
jumlah 27,105
dibulatkan 27,100
jumlah 881,850
dibulatkan 881,900
jumlah 5,037,600
dibulatkan 5,037,600
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018
jumlah 938,000
dibulatkan 938,000
II PEKERJAAN PONDASI
jumlah 20,550
dibulatkan 20,600
jumlah 409,500
dibulatkan 409,500
jumlah 647,402
dibulatkan 647,400
jumlah 95,109
dibulatkan 95,100
jumlah 86,312
dibulatkan 86,300
jumlah 43,059
dibulatkan 43,100
jumlah 43,659
dibulatkan 43,700
ACIAN M2
semen PC ( 50 kg ) tiga roda 0.1400 zak 54,000 7,560
alat bantu acian 1.0000 ls 756 756
tukang batu 0.1000 org/hr 80,000 8,000
kepala tukang batu 0.0100 org/hr - -
pekerja 0.0500 org/hr 68,000 3,400
mandor 0.0050 org/hr - -
jumlah 19,716
dibulatkan 19,700
jumlah 12,262
dibulatkan 12,300
IV PEKERJAAN BETON
jumlah 585,300
dibulatkan 585,300
jumlah 185,383
dibulatkan 185,400
jumlah 91,634
dibulatkan 91,600
jumlah 353,570
dibulatkan 353,600
jumlah 141,720
dibulatkan 141,700
jumlah 5,399,047
dibulatkan 5,399,000
jumlah 2,429,720
dibulatkan 2,429,700
jumlah 2,421,348
dibulatkan 2,421,300
jumlah 7,137,330
dibulatkan 7,137,300
7,137,330
MEMASANG KUSEN DAN DAUN JENDELA TYPE J.1 BH
Kusen Alumunium 3" CA 11.0100 m' 91,600 1,008,516
frame jendela allumunium 2.2400 m2 155,000 347,200
Kaca clear 5 mm 2.3680 m2 141,700 335,546
Sealant kaca 11.4400 m' 7,500 85,800
Sealant kusen 5.8200 m' 7,500 43,650
Engsel Casement 24" 2.0000 set 160,000 320,000
rambuncis lokal 2.0000 bh 53,000 106,000
tukang kaca 0.5000 org/hr 90,000 45,000
kepala tukang allumunium 0.0500 org/hr 80,000 4,000
pekerja 0.7500 org/hr 68,000 51,000
mandor 0.0500 org/hr - -
jumlah 2,346,712
dibulatkan 2,346,700
jumlah 244,890
dibulatkan 244,900
jumlah 2,464,645
dibulatkan 2,464,600
jumlah 1,232,791
dibulatkan 1,232,800
VI PEKERJAAN PLAFOND
jumlah 104,886
dibulatkan 104,900
jumlah 13,090
dibulatkan 13,100
jumlah 105,880
dibulatkan 105,850
jumlah 122,380
dibulatkan 122,350
jumlah 138,880
dibulatkan 138,900
jumlah 190,424
dibulatkan 190,400
jumlah 39,820
dibulatkan 39,800
jumlah 230,924
dibulatkan 230,900
jumlah 26,770
dibulatkan 26,750
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018
jumlah 37,270
dibulatkan 37,250
jumlah 32,991
dibulatkan 32,950
jumlah 18,320
dibulatkan 18,300
CAT MINYAK M2
amplas 0.5000 lbr 4,000 2,000
cat besi Glotex 0.2500 kg 58,000 14,500
meni besi 0.1670 kg 27,600 4,609
thinner impala 0.1500 ltr 20,000 3,000
kuas besar 0.0476 bh 13,000 619
tukang cat 0.0667 org/hr 90,000 6,000
kepala tukang cat 0.0333 org/hr - -
pekerja 0.0333 org/hr 68,000 2,267
mandor 0.0167 org/hr - -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018
jumlah 32,995
dibulatkan 33,000
IX PEKERJAAN SANITAIR
WASTAFEL TANAM BH
wastafel gantung + accessories ex.lokal 1.0000 bh 1,200,000 1,200,000
sealant 0.5000 bh 40,000 20,000
tukang plambing 1.2500 org/hr 80,000 100,000
kepala tukang plambing 0.1250 org/hr - -
pekerja 0.2500 org/hr 68,000 17,000
mandor 0.0250 org/hr - -
jumlah 1,337,000
dibulatkan 1,337,000
CLOSED JONGKOK BH
closed jongkok 1.0000 bh 200,000 200,000
semen putih ( 50 kg ) 0.0200 zak 85,000 1,700
pas bata 1.6000 m2 86,300 138,080
plesteran 1:2 1.0000 m2 43,100 43,100
tukang batu 0.3000 org/hr 80,000 24,000
kepala tukang batu 0.0500 org/hr - -
pekerja 0.3000 org/hr 68,000 20,400
mandor 0.0500 org/hr - -
jumlah 427,280
dibulatkan 427,280
jumlah 102,400
dibulatkan 102,400
jumlah 494,400
dibulatkan 494,400
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018
jumlah 2,850,000
dibulatkan 2,850,000
jumlah 154,348
dibulatkan 154,300
jumlah 5,284,568
dibulatkan 5,284,550
ANALISA HARGA PEK. ELEKTRIKAL
HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)
I. MATERIAL ALAM
batu bata merah bh 500
batu kali m3 225,000
split m3 250,000
beton decking bh 250
pasir beton m3 220,000
pasir pasang m3 210,000
pasir urug m3 180,000
tanah urug (lokal) m3 80,000
II. SEMEN
semen PC ( 50 kg ) kg 1,080
semen PC ( 50 kg ) zak 54,000
semen putih ( 50 kg ) zak 85,000
semen isian naat / warna kg 15,000
HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)
jalusi/kisi/krepyak m' 350,000
frame pintu alumunium m' 155,000
kusen alumunium 3" CA m' 75,000
sealant kusen m' 7,500
sealant kaca m' 7,500
sealant kusen/jendela tube 40,000
sekrup fischer bh 2,000
VI. ATAP
nok galvalum m' 55,900
atap spandek galvalum t=0.35 mm m2 50,000
VII. PLAFOND
gypsum board 4x8 ft , t = 9 mm lbr 67,500
penggantung plafond bh 10,000
hollow 20 x 40 x 0.35 mm btg 27,500
hollow 40 x 40 x 0.35 mm btg 35,000
List gypsum 5 x 5 m' 4,000
panel GRC 4x8 ft , t - 4.5 mm lbr 70,000
Lisplang GRC 20 cm m' 30,000
compound zak 66,000
skrup gypsum bh 200
textile tape roll 26,000
IX. CAT
cat dasar alkali Catylac kg 20,000
amplas lbr 4,000
cat besi Glotex kg 58,000
cat besi zinkromate kg 30,000
meni kayu kg 29,200
meni besi kg 27,600
cat tembok dalam Catylac kg 25,000
cat tembok mowilex (interior) kg 60,000
cat tembok catylac (luar) kg 55,000
cat plafond putih vinilex kg 18,500
plamur tembok kg 15,000
thinner impala ltr 20,000
plamur kayu kg 14,000
kuas besar bh 13,000
kuas roll bh 34,000
X. SANITAIR
closet jongkok INA bh 200,000
wastafel tanam + accessories ex.lokal bh 1,200,000
kran air lokal bh 77,000
seal tape bh 12,000
sealant silicon tube 40,000
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018
HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)
XI. JALAN & LANDSCAPE
buis beton ø 30 cm, panj.0.50 m m' 65,000
XV BAHAN PANEL
Box Panel Standard unt 234,000
MCB : 1 P , 6/10/16/25 A unt 51,600
1 Mandor Org / hr Rp -
2 Kepala Tukang Galian Org / hr Rp -
3 Tukang Galian Org / hr Rp 80,000.00
4 Kepala Tukang Batu Org / hr Rp -
5 Tukang Batu Org / hr Rp 80,000.00
6 Kepala Tukang Las Org / hr Rp -
7 Tukang Las Org / hr Rp 90,000.00
8 Kepala Tukang Besi Org / hr Rp -
9 Tukang Besi Org / hr Rp 90,000.00
10 Kepala Tukang Kaca/Aluminium/Gipsum Org / hr Rp 80,000.00
11 Tukang Kaca/Alumunium/Gipsum Org / hr Rp 90,000.00
12 Kepala Tukang Kayu Org / hr Rp -
13 Tukang Kayu Org / hr Rp 90,000.00
14 Kepala Tukang Cat Org / hr Rp -
15 Tukang Cat Org / hr Rp 90,000.00
16 Kepala Tukang Pipa/Plumbing Org / hr Rp -
17 Tukang Plumbing Org / hr Rp 80,000.00
18 Instalator / Kepala Tukang Listrik Org / hr Rp -
19 Pembantu Instalator / Tukang Listrik Org / hr Rp 80,000.00
20 Pekerja / Kenek Org / hr Rp 68,000.00
21 Tukang foto Org / hr Rp 150,000.00
22 Ketua Unit Pengelola Teknis Org / hr Rp 400,000.00
23 Ketua Unit Pengelola Keuangan Org / hr Rp 400,000.00
24 Anggota Pengelola Teknis Org / hr Rp 300,000.00
25 Anggota Pengelola Keuangan Org / hr Rp 300,000.00
VOLUME BAJA & ARSITEKTUR
Jml L A W Tot A
Type
n m m2 kg/m m2
3 Angkur dia 19 64
4 Base Plate t = 16 mm 16 0.06 129.51
5 Stiffner Plate T = 8 mm
K1 3 0.12 64.93
J1 4 0.08 64.93
J2 4 0.04 64.93
K2 1 0.08 64.93
6 Plat Buhul
T = 12 mm
K1 3 0.13 97.22
7 Baut dia 16
K1 60
J1 40
J2 32
K2 20
ATAP n L T
Atap
1 Segitiga 2 12.75 5.54
2 Trapesium Utuh 2 18.60 8.15 7.30
3 Area Trapesium Terpotong 2 2.80 4.20
4 Area K2 2 3.42 4.15
2 3.42 3.15
A Total
Bubung
L atas 1 1 8.00
L atas 2 1 5.60
L jurai 4 7.00
Talang 2 5.76
Listplank
1 Depan 18.89
2 Belakang 18.06
3 Smp Kiri 13.9
4 Smp Kanan 13.9
Plafond
1 Gipsum 3.00 4.00
(1.95) 1.80
Plester + Aci
483.00
455.00
145.60
63.73
67.20
179.20
1,393.73
121.26
107.33
61.92
31.65
137.60
459.76
64.00
129.51
23.38
20.78
10.39
5.19
59.74
36.46
152.00
822.80
393.36
32.47
41.49
1,290.13
42.80
8.532
70.64 1.319047619
195.28
(23.52)
28.39
10.77
281.55
8.00
5.60
28.00
41.60
11.52
64.75
12.00
-
12.00
3.51
25.42
18.86
1.64
7.00
3.08
59.51
14.00
8.00
-
-
-
-
22.00
7.46
28.00
20.00
12.00
67.46
169.00
13.00
9.75
8.61
6.01
(4.31)
(2.06)
(1.81)
(3.27)
(43.73)
(2.32)
(8.33)
140.55
281.09
19.80
12.00
55.60
3.04
1.77
5.29
-
VOLUME PONDASI PLAT DAN BATU BELAH
4 PONDASI AANSTAMPING
Panjang 74.80
Lebar -
Tinggi -
Volume - m3
2 URUGAN
Urugan Kembali : 1/3 x 75.48 = 25.16053 m3
4 3 2 2 4
0.9
m3
m
m3
m3
m3
VOLUME TIE BEAM/SLOOF
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 472.26 kg
c) Bekisting : 2.4 m2
10 m2/m3
Jml Vol bekisting = 26.4 m2
2 SLOOF S1 20/30 AS F
Jumlah : 1.00
Dimensi : 0.20 x 0.3 m
Panjang : 1.80 m
T. Plat : 0 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.108 m3
Jml Volume Beton = 0.11 m3
b) Tulangan : Jml D As s
Tul n m m2 m
Bj. Besi Beton Tumpuan (kiri) 3 0.0130 0.0001327
= 7850 kg/m3 Tumpuan (kiri) 3 0.0130 0.0001327
Sk 4 0.0080 5.027E-05 0.15
Lapangan (tengah) 2 0.0130 0.0001327
Lapangan (tengah) 3 0.0130 0.0001327
Sk 7 0.0080 5.027E-05 0.15
Tumpuan (kanan) 3 0.0130 0.0001327
Tumpuan (kanan) 3 0.0130 0.0001327
Sk 4 0.0080 5.027E-05 0.15
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 25.07 kg
c) Bekisting : 1.08 m2
10 m2/m3
Jml Vol bekisting = 1.08 m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 171.73 kg
c) Bekisting : 2.4 m2
10 m2/m3
Jml Vol bekisting = 9.60 m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 135.90 kg
c) Bekisting : 1.2 m2
10 m2/m3
Jml Vol bekisting = 6 m2
5 SLOOF S1 20/30 AS 4
Jumlah : 1.00
Dimensi : 0.20 x 0.3 m
Panjang : 3.00 m
T. Plat : 0 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.18 m3
Jml Volume Beton = 0.18 m3
b) Tulangan : Jml D As s
Tul n m m2 m
Bj. Besi Beton Tumpuan (kiri) 3 0.0130 0.0001327
= 7850 kg/m3 Tumpuan (kiri) 3 0.0130 0.0001327
Sk 6 0.0080 5.027E-05 0.15
Lapangan (tengah) 2 0.0130 0.0001327
Lapangan (tengah) 3 0.0130 0.0001327
Sk 11 0.0080 5.027E-05 0.15
Tumpuan (kanan) 3 0.0130 0.0001327
Tumpuan (kanan) 3 0.0130 0.0001327
Sk 6 0.0080 5.027E-05 0.15
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 34.59 kg
c) Bekisting : 1.8 m2
10 m2/m3
Jml Vol bekisting = 1.8 m2
Beton 4.49 m3
Besi 839.54 kg
Bekisting 44.88 m2
Berat Pnjg Hak Ovrlap T.Pnjg Vol Vol
kg/m m m m m kg kg
1.04195 1.00 0.156 0.39 4.638 4.8326
1.04195 1.00 0.156 0.39 4.638 4.8326
0.39458 0.68 0.096 0.00 6.208 2.4496
1.04195 2.00 0.156 0.39 5.092 5.3056
1.04195 2.00 0.156 0.39 7.638 7.9584
0.39458 0.68 0.096 0.00 11.640 4.5930
1.04195 1.00 0.156 0.39 4.638 4.8326
1.04195 1.00 0.156 0.39 4.638 4.8326
0.39458 0.68 0.096 0.00 6.208 2.4496
Jumlah 32.5942 9.4921
0.3259 0.0949
32.9202 9.5870
0.3292 0.0959
33.2494 9.6829
138.5391 40.3454
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = ### kg
c) Bekisting : ### m2
### m2/m3
Jml Vol bekisting = ### m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = ### kg
c) Bekisting : ### m2
### m2/m3
Jml Vol bekisting = ### m2
###
###
D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
m m2 m kg/m m m m m kg
0.013 0.000133 1.04195 1.2 0.156 0 13.56 14.13
0.008 5.03E-05 0.15 0.39458 1 0.096 0 9.86 3.89
0.013 0.000133 1.04195 2.4 0.156 0 25.56 26.63
0.008 5.03E-05 0.15 0.39458 1 0.096 0 18.63 7.35
0.013 0.000133 1.04195 1.2 0.156 0 13.56 14.13
0.008 5.03E-05 0.15 0.39458 1 0.096 0 9.86 3.89
Jumlah 70.03
0.70
70.73
0.71
71.43
165.36
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 590 kg
c) Bekisting : 3.2 m2
13.33 m2/m3
Jml Vol bekisting = 41.6 m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 113 kg
c) Bekisting : 1.6 m2
13.33 m2/m3
Jml Vol bekisting = 6.4 m2
TOTAL
Beton = 3.6
Besi = 704
Bekisting = 48
VOLUME BALOK RB
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 16.85
c) Bekisting : 1.95 m2
17.3333 m2/m3
Jml Vol bekisting = 1.95
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 11.31
c) Bekisting : 0.99 m2
18.3333 m2/m3
Jml Vol bekisting = 0.99
TOTAL
Beton = 2.64
Besi = 387.51
Bekisting = 45.84
4 M ; 14 UNIT
0.25 m
m
m3
Jml D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
Tul n m m2 m kg/m m m m m kg
4 0.0100 8E-05 0.61654 1 0.12 0.3 5.68 3.502
8 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 5.568 2.197
ngan (tengah) 4 0.0100 8E-05 0.61654 2 0.12 0.4 10.08 6.215
11 0.0080 5E-05 0.20 0.39458 0.6 0.096 0 7.656 3.021
puan (kanan) 4 0.0100 8E-05 0.61654 1 0.12 0.3 5.68 3.502
8 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 5.568 2.197
0 0.0100 8E-05 0.61654 4 0 0 0 0.000
Jumlah 20.634
0.206
20.840
0.208
21.048
140.322
kg
m2/m3
m2
2,00 M ; 5 UNIT
0.25 m
m
m3
Jml D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
Tul n m m2 m kg/m m m m m kg
4 0.0100 8E-05 0.61654 0.5 0.12 0.3 3.68 2.269
5 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 3.48 1.373
ngan (tengah) 4 0.0100 8E-05 0.61654 1 0.12 0.4 6.08 3.749
6 0.0080 5E-05 0.20 0.39458 0.6 0.096 0 4.176 1.648
puan (kanan) 4 0.0100 8E-05 0.61654 0.5 0.12 0.3 3.68 2.269
5 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 3.48 1.373
0 0.0100 8E-05 0.61654 2 0 0 0 0.000
Jumlah 12.680
0.127
12.807
0.128
12.935
172.470
kg
m2/m3
m2
3,00 M ; 1 UNIT
0.25 m
m
m3
Jml D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
Tul n m m2 m kg/m m m m m kg
4 0.0100 8E-05 0.61654 0.75 0.12 0.3 4.68 2.885
6 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 4.176 1.648
ngan (tengah) 4 0.0100 8E-05 0.61654 1.5 0.12 0.4 8.08 4.982
9 0.0080 5E-05 0.20 0.39458 0.6 0.096 0 6.264 2.472
puan (kanan) 4 0.0100 8E-05 0.61654 0.75 0.12 0.3 4.68 2.885
6 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 4.176 1.648
0 0.0100 8E-05 0.61654 3 0 0 0 0.000
Jumlah 16.520
0.165
16.685
0.167
16.852
149.793
kg
m2/m3
m2
1,80 M ; 1 UNIT
0.20 m
m
m3
Jml D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
Tul n m m2 m kg/m m m m m kg
4 0.0100 8E-05 0.61654 0.45 0.12 0.3 3.48 2.146
4 0.0080 5E-05 0.15 0.39458 0.5 0.096 0 2.384 0.941
ngan (tengah) 4 0.0100 8E-05 0.61654 0.9 0.12 0.4 5.68 3.502
6 0.0080 5E-05 0.20 0.39458 0.5 0.096 0 3.576 1.411
puan (kanan) 4 0.0100 8E-05 0.61654 0.45 0.12 0.3 3.48 2.146
4 0.0080 5E-05 0.15 0.39458 0.5 0.096 0 2.384 0.941
0 0.0100 8E-05 0.61654 1.8 0 0 0 0.000
Jumlah 11.085
0.111
11.196
0.112
11.308
209.412
kg
m2/m3
m2