Anda di halaman 1dari 67

RENCANA ANGGARAN BIAYA

PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS


DITJEN PEMBINAAN, PELATIHAN & PRODUKTIFITAS
DIREKTORAT BINA KELEMBAGAAN PELATIHAN

2017
JADWAL PELAKSANAAN
PEMBANGUNAN WORKSHOP KOMPUTER - BLK KOMUNITAS
DITJEN PEMBINAAN, PELATIHAN & PRODUKTIFITAS
DIREKTORAT BINA KELEMBAGAAN PELATIHAN
KEMENTERIAN KETENAGAKERJAAN RI
MINGGU KE
NO ITEM PEKERJAAN TOTAL % 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
100.00

i START / KONTRAK / TERMIN I


90. 00

A PEKERJAAN PERSIAPAN 8,320,900 1.671% 1.671 80. 00

B PEKERJAAN PONDASI & TANAH 61,618,435 12.374% 6.187 6.187 70. 00

C PEKERJAAN STRUKTUR 171,649,082 34.471% 8.618 8.618 8.618 8.618


D PEKERJAAN ATAP & PLAFOND 36,427,367 7.315% 3.658 3.658
60. 00

E PEKERJAAN PASANGAN 61,503,529 12.351% 2.059 2.059 2.059 2.059 2.059 2.059 50. 00

F PEKERJAAN KUSEN PINTU & JENDELA 45,739,800 9.186% 2.296 2.296 2.296 2.296 40. 00

G PEKERJAAN PENGECATAN 10,200,695 2.049% 0.683 0.683 0.683 30. 00

H PEKERJAAN PLUMBING & SANITAIR 12,097,327 2.429% 0.810 0.810 0.810


I PEKERJAAN LISTRIK 71,399,102 14.338% 3.585 3.585 3.585 3.585
20. 00

J LAIN - LAIN 19,000,000 3.816% 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 10. 00

ii TERMIN II 0. 00

Bobot Rencana 497,956,238.11 100.000% 1.90 6.41 15.03 8.84 8.84 12.50 5.94 2.28 2.28 2.28 4.58 4.58 6.11 6.92 5.30 5.30 0.91
Bobot Realisasi
Akumulasi Rencana 1.90 8.31 23.34 32.18 41.02 53.52 59.46 61.74 64.03 66.31 70.89 75.47 81.57 88.49 93.79 99.09 100.00
Akumulasi Realisasi
Jakarta, 20
100.00

90. 00

80. 00

70. 00

60. 00

50. 00

40. 00

30. 00

20. 00

10. 00

0. 00

Jakarta, 2018
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

NO ITEM PEKERJAAN TOTAL

A PEKERJAAN PERSIAPAN 8,320,900.00


B PEKERJAAN PONDASI & TANAH 61,618,435.10
C PEKERJAAN STRUKTUR 171,649,081.83
D PEKERJAAN ATAP & PLAFOND 36,427,367.41
E PEKERJAAN PASANGAN 61,503,529.25
F PEKERJAAN KUSEN PINTU & JENDELA 45,739,800.00
G PEKERJAAN PENGECATAN 10,200,695.37
H PEKERJAAN PLUMBING & SANITAIR 12,097,327.00
I PEKERJAAN LISTRIK 71,399,102.15
J LAIN - LAIN 19,000,000.00

TOTAL 497,956,238.11
PEMBULATAN 500,000,000.00
TERBILANG

#REF!
BILL OF QUANTITY

PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS


PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME SAT.
( Rp. ) ( Rp. )

A PEKERJAAN PERSIAPAN 8,320,900.00


1 Papan Proyek 1.00 unit 881,900.00 881,900.00
2 Pek. Pengukuran dan Bowplank 54.00 m' 27,100.00 1,463,400.00
3 Pek. Listrik & Air Kerja 1.00 ls 5,037,600.00 5,037,600.00
4 Pek. Laporan & Dokumentasi 1.00 ls 938,000.00 938,000.00
B PEKERJAAN PONDASI & TANAH 61,618,435.10
1 Pek. Galian Tanah Pondasi 75.48 m3 81,600.00 6,159,298.56
2 Pek. Urug Tanah Kembali 25.16 m3 17,000.00 427,729.07
3 Pek. Urug Tanah Peninggian Peil Lantai (t = 10 cm) 16.83 m3 113,000.00 1,902,016.00
4 Pek. Pasir Urug
- Bawah Pondasi 5.67 m3 232,000.00 1,315,440.00
- Bawah Lantai 22.36 m3 232,000.00 5,187,520.00
5 Pek. Pondasi Tapak P1 (100x100x20-40)
- Beton K-225 4.48 m3 841,679.60 3,770,724.62
- Pembesian 640.93 kg 10,406.00 6,669,540.06
- Bekisting 24.32 m2 97,160.00 2,362,931.20
6 Pek. Pondasi Batu Belah P2 26.18 m3 647,400.00 16,948,932.00
7 Pek. Sloof Beton (20/30)
- Beton K-225 4.49 m3 841,679.60 3,777,458.06
- Pembesian 839.54 kg 10,406.00 8,736,304.72
- Bekisting 44.88 m2 97,160.00 4,360,540.80
C PEKERJAAN STRUKTUR 171,649,081.83
C.1 STRUKTUR BETON
1 Pek. Kolom Beton K1 (30/30)
- Beton K-225 6.91 m3 841,679.60 5,817,689.42
- Pembesian 1,142.94 kg 10,406.00 11,893,410.94
- Bekisting 92.16 m2 180,930.00 16,674,508.80
2 Pek. Kolom Praktis KP (12/12)
- Beton K-175 0.55 m3 799,489.13 437,120.68
- Pembesian 118.52 kg 10,406.00 1,233,281.32
- Bekisting 14.58 m2 185,400.00 2,703,132.00
3 Pek. Balok Beton B1 (20/30)
- Beton K-225 3.60 m3 841,679.60 3,030,046.57
- Pembesian 703.74 kg 10,406.00 7,323,135.98
- Bekisting 48.00 m2 184,230.00 8,843,040.00
4 Pek. Balok Beton Lintel RB (12/15)
- Beton K-175 2.64 m3 799,489.13 2,111,850.53
- Pembesian 387.51 kg 10,406.00 4,032,456.44
- Bekisting 45.84 m2 184,230.00 8,445,103.20
5 Pek. Lantai Beton T=15 cm
- Beton K-225 21.66 m3 841,679.60 18,230,780.20
- Pembesian Wiremesh M-8 1 lapis 144.40 m2 63,824.55 9,216,265.06
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT.
( Rp. ) ( Rp. )

- Bekisting 7.80 m2 235,930.00 1,840,254.00


6 Pek. Ramp Beton T = 10 cm
- Beton K-175 0.35 m3 799,489.13 281,420.17
- Pembesian 42.24 kg 9,881.00 417,373.44
- Bekisting 0.69 m2 97,160.00 67,156.99
C.2 STRUKTUR BAJA
1 WF 150x75x5x7 + zinchromate 1,393.73 kg 18,784.11 26,179,940.06
2 H 100x100x6x8 + zinchromate 459.76 kg 18,784.11 8,636,107.28
3 CNP 125x50x20x2,3 + zinchromate 1,290.13 kg 18,784.11 24,233,955.10
4 Base Plate t = 16 mm 129.51 kg 15,429.40 1,998,321.60
5 Plat Buhul t = 12 mm 36.46 kg 15,429.40 562,530.21
6 Stiffner Plate t = 8 mm 59.74 kg 15,429.40 921,692.35
7 Ikatan Angin besi dia. 12 mm + asesories 42.80 kg 15,000.00 642,000.00
8 Sagrod besi dia. 8 mm 8.53 kg 9,881.00 84,304.69
9 Angkur D 16 64.00 bh 46,803.20 2,995,404.80
10 Baut M16 152.00 bh 18,400.00 2,796,800.00
D PEKERJAAN ATAP & PLAFOND 36,427,367.41
1 Atap Spandek t = 0.35 mm 281.55 m2 75,790.00 21,338,598.71
2 Atap Bubungan & Jurai 41.60 m' 82,445.00 3,429,712.00
3 Listplank GRC 64.75 m' 59,930.00 3,880,467.50
4 Plafond Gipsum 9 mm + Rangka Hollow 4/4 ; t = 0.35 12.00 m2 104,000.00 1,248,000.00
5 Plafond Calsiboard 4,5 mm + Rangka 59.51 m2 104,900.00 6,242,389.20
6 Lis Gipsum 5 cm 22.00 m' 13,100.00 288,200.00
E PEKERJAAN PASANGAN 61,503,529.25
1 Pasangan Dinding Bata 140.55 m2 86,300.00 12,129,085.28
2 Plester + Acian 275.80 m2 62,800.00 17,320,064.16
3 Pasangan Rolaag Bata 19.80 m' 81,400.00 1,611,720.00
4 Pasangan Saluran Terbuka 40.00 m' 154,300.00 6,172,000.00
5 Pekerjaan Rabat Beton t = 5 cm keliling bang lbr = 60 cm 2.04 m3 799,489.13 1,630,957.82
6 Pekerjaan Meja Beton Wastafel t = 8 cm 0.10 m3 799,489.13 76,750.96
7 Pasangan Keramik Lantai 40/40 Polished 12.00 m2 138,900.00 1,666,800.00
8 Pasangan Keramik Lantai 30/30 UnPolished 55.60 m2 122,350.00 6,802,660.00
9 Pasangan Keramik Lantai 20/20 Unpolished 3.04 m2 105,850.00 321,519.38
10 Pasangan Plint Keramik Lantai 40/10 polished 13.00 m' 39,800.00 517,400.00
11 Acian Lantai 144.40 m2 19,700.00 2,844,680.00
12 Cat minyak 144.40 m2 33,000.00 4,765,200.00
13 Pengecatan Jalur lantai 8.23 m2 37,250.00 306,716.50
14 Pasangan Keramik Bak & Meja Wastafel 20/20 Polished 1.77 m2 105,850.00 186,957.56
15 Pasangan Keramik Dinding 30/60 Polished 5.29 m2 190,400.00 1,007,977.60
16 Pasangan Batu Alam Candi Kolom Entrace 5.60 m2 230,900.00 1,293,040.00
17 Pek. Logo & Tulisan 1.00 ls 2,850,000.00 2,850,000.00
F PEKERJAAN KUSEN PINTU & JENDELA 45,739,800.00
1 Kusen/Pintu type P1 1.00 unit 5,399,000.00 5,399,000.00
2 Kusen/Pintu type P2 1.00 unit 2,429,700.00 2,429,700.00
3 Kusen/Pintu type P3 (Spandrel) 1.00 unit 2,421,300.00 2,421,300.00
4 Kusen/Jendela type J1 2.00 unit 2,346,700.00 4,693,400.00
5 Kusen/Jendela type J2 9.00 unit 2,464,600.00 22,181,400.00
6 Kusen/Jendela type J3 1.00 unit 1,232,800.00 1,232,800.00
7 Kusen/Jendela type BV 1.00 unit 244,900.00 244,900.00
8 Rolling Door T=0.8 Galvalume 1.00 unit 7,137,300.00 7,137,300.00
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT.
( Rp. ) ( Rp. )

G PEKERJAAN PENGECATAN 10,200,695.37


1 Pek. Pengecatan Dinding Interior 165.48 m2 26,750.00 4,426,545.06
2 Pek. Pengecatan Dinding Exterior 116.07 m2 32,950.00 3,824,528.91
3 Pek. Pengecatan Plafond 71.51 m2 18,300.00 1,308,596.40
4 Pek. Pengecatan Listplank 19.43 m2 33,000.00 641,025.00
H PEKERJAAN PLUMBING & SANITAIR 12,097,327.00
1 Instalasi Pipa PVC AW 4" 16.00 m' 97,308.00 1,556,928.00
2 Instalasi Pipa PVC AW 2" 12.00 m' 51,372.00 616,464.00
3 Instalasi Pipa PVC AW 3/4" 20.00 m' 26,485.50 529,710.00
4 Instalasi Pipa PVC AW 1/2" 15.00 m' 20,613.00 309,195.00
5 Septic Tank dan Rembesan 1.00 unit 5,284,550.00 5,284,550.00
6 Pemasangan Closed Jongkok 1.00 bh 427,280.00 427,280.00
7 Pemasangan Kran Air 2.00 bh 102,400.00 204,800.00
8 Pemasangan Wastafel + Kran 2.00 bh 1,337,000.00 2,674,000.00
9 Pemasangan Cermin Wastafel 100x200 1.00 unit 494,400.00 494,400.00
I PEKERJAAN LISTRIK 71,399,102.15
1 Penyambungan Daya Listrik 11,000.00 VA 1,700.00 18,700,000.00
2 Perijinan Sertifikat Layak Operasi (SLO) 11,000.00 VA 400.00 4,400,000.00
3 Panel Listrik 1.00 unit 1,345,860.00 1,345,860.00
4 Pek. Instalasi Kabel Feeder NYY 4x10 mm2 2.00 m' 102,550.00 205,100.00
5 Pek. Instalasi Penerangan & Power NYM 3x2,5 mm2 + conduit 38.00 ttk 183,400.00 6,969,200.00
6 Pek. Instalasi Exhaust Fan 4.00 ttk 183,400.00 733,600.00
6 Pek. Instalasi kipas angin 2.00 ttk 183,400.00 366,800.00
7 Pemasangan Lampu TKO 2x36W dengan Penggantung 18.00 bh 560,068.00 10,081,224.00
8 Pemasangan Lampu Baret Kotak 22W 7.00 bh 176,818.00 1,237,726.00
9 Pemasangan Lampu E27ESS 8 Watt + Fitting 2.00 bh 185,008.00 370,016.00
10 Pemasangan Saklar Engkle 2.00 bh 56,301.20 112,602.40
11 Pemasangan Saklar Double 5.00 bh 63,500.00 317,500.00
12 Pemasangan Stop Kontak 13.00 bh 49,301.20 640,915.60
12 Pemasangan Exhaust Fan + ducting 4.00 unit 5,379,568.00 21,518,272.00
13 Pemasangan Kipas angin + ducting 2.00 unit 1,284,568.00 2,569,136.00
14 Grounding (max 2 Ohm) 1.00 lot 1,831,150.15 1,831,150.15
L LAIN - LAIN 19,000,000.00
1 IMB 1.00 dok 6,000,000.00 6,000,000.00
2 Transportasi 2.00 paket 2,500,000.00 5,000,000.00
3 Ketua Unit Pengelola Teknis 4.00 OB 400,000.00 1,600,000.00
4 Ketua Unit Pengelola Keuangan 4.00 OB 400,000.00 1,600,000.00
5 Anggota Pengelola Teknis 8.00 OB 300,000.00 2,400,000.00
6 Anggota Pengelola Keuangan 8.00 OB 300,000.00 2,400,000.00
ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

No Uraian Harga Satuan Jumlah Harga

PEKERJAAN GALIAN

1 1 m3 Galian Untuk Tanah Biasa sedalam maks. 2 m Rp 81,600.00


Upah An. SNI ( Revisi ) 6.2.1
1.2000 OH Pekerja Rp 68,000.00 Rp 81,600.00
0.0450 OH Mandor Rp - Rp -
Sub total : Rp 81,600.00

2 1 m3 Urugan kembali Rp 17,000.00


Bahan - m3 Tanah Urug Rp 80,000.00 Rp -
Sub total : Rp -
Upah An. SNI ( Revisi ) 6.9.1
0.2500 OH Pekerja Rp 68,000.00 Rp 17,000.00
0.0083 OH Mandor Rp - Rp -
Sub total : Rp 17,000.00

3 1 m3 Urugan pasir dengan pasir urug Rp 232,000


Bahan An. SNI ( Revisi ) 6.11.1
1.1000 m3 Pasir urug Rp 180,000.00 Rp 198,000.00
Sub total : Rp 198,000.00
Upah An. SNI ( Revisi ) 6.11.2
0.5000 OH Pekerja Rp 68,000.00 Rp 34,000.00
0.0250 OH Mandor Rp - Rp -
Sub total : Rp 34,000.00

4 1 m3 Urugan dengan kerikil Rp 309,000.00


Bahan An. SNI ( Revisi ) 6.11.1
1.1000 m3 Split Rp 250,000.00 Rp 275,000.00
Sub total : Rp 275,000.00
Upah An. SNI ( Revisi ) 6.11.2
0.5000 OH Pekerja Rp 68,000.00 Rp 34,000.00
0.0250 OH Mandor Rp - Rp -
Sub total : Rp 34,000.00

5 1 m3 Urugan tanah pilihan Rp 113,000.00


Bahan An. SNI ( Revisi ) 6.11.1
1.2000 m3 Tanah campur Rp 80,000.00 Rp 96,000.00
Sub total : Rp 96,000.00
Upah An. SNI ( Revisi ) 6.11.2
0.2500 OH Pekerja Rp 68,000.00 Rp 17,000.00
0.0100 OH Mandor Rp - Rp -
Sub total : Rp 17,000.00

6 1 m3 Pemadatan tanah Rp 19,100.00


Upah An. SNI ( Revisi ) 6.11.2
0.2500 OH Pekerja Rp 68,000.00 Rp 17,000.00
0.0080 OH Mandor Rp - Rp -
Sub total : Rp 17,000.00
Alat
0.0210 jam Sewa Stamper Rp 100,000.00 Rp 2,100.00
Sub total : Rp 2,100.00
1 m2 Pemadatan tanah 20 cm Rp 3,820.00

PEKERJAAN BETON
ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

No Uraian Harga Satuan Jumlah Harga


1 1 m3 beton mutu f'c = 14.5 Mpa (K175), slump (12 +/- 2), w/c = 0.66 sitemix Rp 799,489.13
Bahan
326.000 kg Portland Cement Rp 1,080.00 Rp 352,080.00
0.543 m3 Pasir Beton Rp 220,000.00 Rp 119,428.57
0.762 m3 Kerikil (maks.imum 30 mm) Rp 250,000.00 Rp 190,555.56
215.000 ltr Air Rp 15.00 Rp 3,225.00
Sub total : Rp 665,289.13
Upah
1.650 OH Pekerja Rp 68,000.00 Rp 112,200.00
0.275 OH Tukang batu Rp 80,000.00 Rp 22,000.00
0.028 OH Kepala tukang Rp - Rp -
0.083 OH Mandor Rp - Rp -
Sub total : Rp 134,200.00

2 1 m3 beton mutu f'c = 19.3 Mpa (K225), slump (12 +/- 2), w/c = 0.58 Rp 841,679.60
Bahan
371.000 kg Portland Cement Rp 1,080.00 Rp 400,680.00
0.499 m3 Pasir Beton Rp 220,000.00 Rp 109,685.71
0.776 m3 Kerikil (maks.imum 30 mm) Rp 250,000.00 Rp 193,888.89
215.000 ltr Air Rp 15.00 Rp 3,225.00
Sub total : Rp 707,479.60
Upah
1.650 OH Pekerja Rp 68,000.00 Rp 112,200.00
0.275 OH Tukang batu Rp 80,000.00 Rp 22,000.00
0.028 OH Kepala tukang Rp - Rp -
0.083 OH Mandor Rp - Rp -
Sub total : Rp 134,200.00

3 Pembesian 10 kg dengan besi ulir Rp 104,060.00


Pembesian 1 kg Rp 10,406.00
Bahan
10.500 kg Besi Ulir Rp 8,500.00 Rp 89,250.00
0.150 kg Kawat Beton Rp 25,000.00 Rp 3,750.00
Sub total : Rp 93,000.00
Upah
0.070 OH Pekerja Rp 68,000.00 Rp 4,760.00
0.070 OH Tukang besi Rp 90,000.00 Rp 6,300.00
0.007 OH Kepala tukang Rp - Rp -
0.004 OH Mandor Rp - Rp -
Sub total : Rp 11,060.00

4 Pembesian 10 kg dengan besi polos Rp 98,810.00


Pembesian 1 kg Rp 9,881.00
Bahan
10.500 kg Besi Polos Rp 8,000.00 Rp 84,000.00
0.150 kg Kawat Beton Rp 25,000.00 Rp 3,750.00
Sub total : Rp 87,750.00
Upah
0.070 OH Pekerja Rp 68,000.00 Rp 4,760.00
0.070 OH Tukang besi Rp 90,000.00 Rp 6,300.00
0.007 OH Kepala tukang Rp - Rp -
0.004 OH Mandor Rp - Rp -
Sub total : Rp 11,060.00

5 1 M2 Pembesian Wiremesh M8-150 1 lapis Rp 63,824.55


ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

No Uraian Harga Satuan Jumlah Harga


Bahan
0.088 Lbr Wiremesh M8 Rp 570,000.00 Rp 50,264.55
10.000 bh Beton decking Rp 250.00 Rp 2,500.00
Sub total : Rp 52,764.55
Upah
0.070 OH Pekerja Rp 68,000.00 Rp 4,760.00
0.070 OH Tukang besi Rp 90,000.00 Rp 6,300.00
0.007 OH Kepala tukang Rp - Rp -
0.004 OH Mandor Rp - Rp -
Sub total : Rp 11,060.00

6 Memasang 1 m2 bekisting untuk pondasi Rp 97,160.00


Bahan
0.040 m3 Kayu kelas III Rp 1,800,000.00 Rp 72,000.00
0.100 kg Paku 5 cm - 10 cm Rp 23,000.00 Rp 2,300.00
0.100 ltr Minyak Bekisting Rp 25,000.00 Rp 2,500.00
Sub total : Rp 76,800.00
Penggunaan Bekisting dipakai 2x Rp 38,400.00

Upah
0.520 OH Pekerja Rp 68,000.00 Rp 35,360.00
0.260 OH Tukang Kayu Rp 90,000.00 Rp 23,400.00
0.026 OH Kepala tukang Rp - Rp -
0.026 OH Mandor Rp - Rp -
Sub total : Rp 58,760.00

7 Memasang 1 m2 bekisting untuk Sloof Rp 88,893.33


Bahan
0.045 m3 Kayu kelas III Rp 1,800,000.00 Rp 81,000.00
0.300 kg Paku 5 cm - 10 cm Rp 23,000.00 Rp 6,900.00
0.100 ltr Minyak Bekisting Rp 25,000.00 Rp 2,500.00
Sub total : Rp 90,400.00
Penggunaan Bekisting dipakai3x Rp 30,133.33

Upah
0.520 OH Pekerja Rp 68,000.00 Rp 35,360.00
0.260 OH Tukang Kayu Rp 90,000.00 Rp 23,400.00
0.026 OH Kepala tukang Rp - Rp -
0.026 OH Mandor Rp - Rp -
Sub total : Rp 58,760.00

8 Memasang 1 m2 bekisting untuk Kolom Rp 180,930.00


Bahan
0.040 m3 Kayu kelas III Rp 1,800,000.00 Rp 72,000.00
0.400 kg Paku 5 cm - 10 cm Rp 23,000.00 Rp 9,200.00
0.200 ltr Minyak Bekisting Rp 25,000.00 Rp 5,000.00
0.015 m3 Balok Kayu Kelas II Rp 2,200,000.00 Rp 33,000.00
0.350 lbr Plywood tebal 9 mm Rp 110,000.00 Rp 38,500.00
2.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp 27,500.00 Rp 55,000.00
Sub total : Rp 212,700.00
Penggunaan Bekisting dipakai 2x Rp 106,350.00

Upah
0.660 OH Pekerja Rp 68,000.00 Rp 44,880.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00
0.033 OH Kepala tukang Rp - Rp -
ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

No Uraian Harga Satuan Jumlah Harga


0.033 OH Mandor Rp - Rp -
Sub total : Rp 74,580.00

9 Memasang 1 m2 bekisting untuk Balok Rp 184,230.00


Bahan
0.040 m3 Kayu kelas III Rp 1,800,000.00 Rp 72,000.00
0.400 kg Paku 5 cm - 10 cm Rp 23,000.00 Rp 9,200.00
0.200 ltr Minyak Bekisting Rp 25,000.00 Rp 5,000.00
0.018 m3 Balok Kayu Kelas II Rp 2,200,000.00 Rp 39,600.00
0.350 lbr Plywood tebal 9 mm Rp 110,000.00 Rp 38,500.00
2.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp 27,500.00 Rp 55,000.00
Sub total : Rp 219,300.00
Penggunaan Bekisting dipakai 2x Rp 109,650.00

Upah
0.660 OH Pekerja Rp 68,000.00 Rp 44,880.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00
0.033 OH Kepala tukang Rp - Rp -
0.033 OH Mandor Rp - Rp -
Sub total : Rp 74,580.00

10 Memasang 1 m2 bekisting untuk Lantai Rp 235,930.00


Bahan
0.040 m3 Kayu kelas III Rp 1,800,000.00 Rp 72,000.00
0.400 kg Paku 5 cm - 10 cm Rp 23,000.00 Rp 9,200.00
0.200 ltr Minyak Bekisting Rp 25,000.00 Rp 5,000.00
0.015 m3 Balok Kayu Kelas II Rp 2,200,000.00 Rp 33,000.00
0.350 lbr Plywood tebal 9 mm Rp 110,000.00 Rp 38,500.00
6.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp 27,500.00 Rp 165,000.00
Sub total : Rp 322,700.00
Penggunaan Bekisting dipakai 2x Rp 161,350.00

Upah
0.660 OH Pekerja Rp 68,000.00 Rp 44,880.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00
0.033 OH Kepala tukang Rp - Rp -
0.033 OH Mandor Rp - Rp -
Sub total : Rp 74,580.00

11 Memasang 1 m2 bekisting untuk Dinding / Lisplang Rp 152,313.33


Bahan
0.030 m3 Kayu kelas III Rp 1,800,000.00 Rp 54,000.00
0.400 kg Paku 5 cm - 10 cm Rp 23,000.00 Rp 9,200.00
0.200 ltr Minyak Bekisting Rp 25,000.00 Rp 5,000.00
0.020 m3 Balok Kayu Kelas II Rp 2,200,000.00 Rp 44,000.00
0.350 lbr Plywood tebal 9 mm Rp 110,000.00 Rp 38,500.00
3.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp 27,500.00 Rp 82,500.00
Sub total : Rp 233,200.00
Penggunaan Bekisting dipakai 3x Rp 77,733.33

Upah
0.660 OH Pekerja Rp 68,000.00 Rp 44,880.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00
0.033 OH Kepala tukang Rp - Rp -
0.033 OH Mandor Rp - Rp -
Sub total : Rp 74,580.00
ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

No Uraian Harga Satuan Jumlah Harga

12 Memasang 1 m2 bekisting untuk Tangga Rp 139,063.33


Bahan
0.030 m3 Kayu kelas III Rp 1,800,000.00 Rp 54,000.00
0.400 kg Paku 5 cm - 10 cm Rp 23,000.00 Rp 9,200.00
0.150 ltr Minyak Bekisting Rp 25,000.00 Rp 3,750.00
0.015 m3 Balok Kayu Kelas II Rp 2,200,000.00 Rp 33,000.00
0.350 lbr Plywood tebal 9 mm Rp 110,000.00 Rp 38,500.00
2.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp 27,500.00 Rp 55,000.00
Sub total : Rp 193,450.00
Penggunaan Bekisting dipakai 3x Rp 64,483.33

Upah
0.660 OH Pekerja Rp 68,000.00 Rp 44,880.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00
0.033 OH Kepala tukang Rp - Rp -
0.033 OH Mandor Rp - Rp -
Sub total : Rp 74,580.00

13 Memasang 1 m' Kolom Praktis Beton Bertulang (11x11) cm Rp 61,960.00


Bahan
0.002 m3 Kayu kelas III Rp 1,800,000.00 Rp 3,600.00
0.010 kg Paku 5 cm - 10 cm Rp 23,000.00 Rp 230.00
3.000 kg Besi Beton Polos Rp 8,000.00 Rp 24,000.00
0.450 kg Kawat Beton Rp 25,000.00 Rp 11,250.00
4.000 kg Portland Cement Rp 1,080.00 Rp 4,320.00
0.006 m3 Pasir Beton Rp 220,000.00 Rp 1,320.00
0.009 m3 Kerikil Rp 250,000.00 Rp 2,250.00
Sub total : Rp 44,720.00
Upah
0.180 OH Pekerja Rp 68,000.00 Rp 12,240.00
0.020 OH Tukang Kayu Rp 90,000.00 Rp 1,800.00
0.020 OH Tukang Batu Rp 80,000.00 Rp 1,600.00
0.020 OH Tukang Besi Rp 80,000.00 Rp 1,600.00
0.006 OH Kepala tukang Rp - Rp -
0.009 OH Mandor Rp - Rp -
Sub total : Rp 17,240.00

PEKERJAAN BAJA

1 1 Kg Fabrikasi Baja Profil WF , H Beam Rp 18,784.11


Bahan
1.000 kg Baja profil Rp 7,800.00 Rp 7,800.00
0.050 m2 Pengecatan zincromate Rp 19,140.00 Rp 957.00
Sub total : Rp 8,757.00
Upah
0.060 OH Pekerja Rp 68,000.00 Rp 4,080.00
0.060 OH Tukang Las Rp 90,000.00 Rp 5,400.00
0.006 OH Kepala tukang Rp - Rp -
0.003 OH Mandor Rp - Rp -
Sub total : Rp 9,480.00
Alat
1.000 Ls Sewa Alat Rp 547.11 Rp 547.11
Sub total : Rp 547.11

2 1 kg Base Plate/Stiffner Rp 15,429.40


ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

No Uraian Harga Satuan Jumlah Harga


Bahan
1.000 kg Base Plate, Stiffner Rp 5,500.00 Rp 5,500.00
Sub total : Rp 5,500.00
Upah
0.060 OH Pekerja Rp 68,000.00 Rp 4,080.00
0.060 OH Tukang Baja/Las Rp 90,000.00 Rp 5,400.00
0.006 OH Kepala tukang Rp - Rp -
0.003 OH Mandor Rp - Rp -
Sub total : Rp 9,480.00
Alat
1.000 ls Sewa alat Rp 449.40 Rp 449.40
Sub total : Rp 449.40

3 1 m2 Zincromate Baja Rp 19,140.00


Pengecatan Zincromate /kg Baja 0.05 Rp 957.00
Bahan
0.150 kg Cat Zincromate Rp 30,000.00 Rp 4,500.00
0.100 lt Thinner Rp 20,000.00 Rp 2,000.00
0.400 lmb Amplas Rp 4,000.00 Rp 1,600.00
Sub total : Rp 6,500.00
Upah
0.080 OH Pekerja Rp 68,000.00 Rp 5,440.00
0.080 OH Tukang besi Rp 90,000.00 Rp 7,200.00
0.040 OH Kepala tukang Rp - Rp -
0.004 OH Mandor Rp - Rp -
Sub total : Rp 12,640.00

4 1 bh Angkur Besi 19 mm Rp 46,803.20


Bahan
1.000 bh Angkur dia 19 mm L=80 cm Rp 40,000.00 Rp 40,000.00
Sub total : Rp 40,000.00
Upah
0.080 OH Pekerja Rp 68,000.00 Rp 5,440.00
0.008 OH Mandor Rp - Rp -
Sub total : Rp 5,440.00
Alat
1.000 ls Alat Bantu Rp 1,363.20 Rp 1,363.20
Sub total : Rp 1,363.20

5 1 bh Baut Baja dia 16 mm Rp 18,400.00


Bahan
1.000 bh Baut HTB dia 16 mm Rp 15,000.00 Rp 15,000.00
Sub total : Rp 15,000.00
Upah
0.050 OH Pekerja Rp 68,000.00 Rp 3,400.00
0.005 OH Mandor Rp - Rp -
Sub total : Rp 3,400.00

PEKERJAAN ATAP

1 1 M^1 Nok Genteng Metal Zincalume Rp 82,445.00


Bahan
1.05 m' Nok genteng zincalume Rp 55,900.00 Rp 58,695.00
0.05 Kg Paku biasa 2" - 5" Rp 23,000.00 Rp 1,150.00
Sub Total Rp 59,845.00
Upah
ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

No Uraian Harga Satuan Jumlah Harga


0.2 OH Pekerja Rp 68,000.00 Rp 13,600.00
0.1 OH Tukang Kayu Rp 90,000.00 Rp 9,000.00
0.01 OH Kepala Tukang Kayu Rp - Rp -
0.01 OH Mandor Rp - Rp -
Sub Total Rp 22,600.00

2 1 M2 Atap Corrugated Metal Rp 75,790.00


Bahan
1.05 m2 Atap corrugated metal Rp 50,000.00 Rp 52,500.00
0.03 Kg Paku biasa 2" - 5" Rp 23,000.00 Rp 690.00
Sub Total Rp 53,190.00
Upah
0.2 OH Pekerja Rp 68,000.00 Rp 13,600.00
0.1 OH Tukang Kayu Rp 90,000.00 Rp 9,000.00
0.01 OH Kepala Tukang Kayu Rp - Rp -
0.01 OH Mandor Rp - Rp -
Sub Total Rp 22,600.00

3 1 M^1 Papan Lisplang GRC Rp 59,930.00


Bahan An. SNI ( Revisi ) 6.50.1
1.050 m Lisplank GRC Rp 30,000.00 Rp 31,500.00
0.05 Kg Paku biasa 2" - 5" Rp 23,000.00 Rp 1,150.00
Sub Total Rp 32,650.00
Upah An. SNI ( Revisi ) 6.50.2
0.11 OH Pekerja Rp 68,000.00 Rp 7,480.00
0.22 OH Tukang kayu Rp 90,000.00 Rp 19,800.00
0.022 OH Kepala tukang Rp - Rp -
0.005 OH Mandor Rp - Rp -
Sub Total Rp 27,280.00
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH

I. PEKERJAAN PERSIAPAN

MEMASANG BOWPLANK M'


Kayu kaso 5x7x400 Meranti campur 0.0050 m3 1,800,000 9,000
Kayu papan 3x20x400 meranti 0.0050 m3 2,100,000 10,500
paku rata-rata 0.0350 kg 23,000 805
pekerja 0.1000 org/hr 68,000 6,800
mandor 0.0200 org/hr - -

jumlah 27,105
dibulatkan 27,100

MEMASANG PAPAN NAMA PROYEK unit


Papan Kamper Samarinda 3/30 0.0250 m3 2,250,000 56,250
Balok kamper 0.0900 m3 2,200,000 198,000
Paku biasa 2" - 5 " 0.6000 kg 23,000 13,800
Meni kayu 0.7500 kg 29,200 21,900
Dempul kayu 1.0000 kg 14,000 14,000
Amplas 2.0000 lbr 4,000 8,000
Kuas 0.5000 bh 13,000 6,500
Cat kayu 3.0000 kg 58,000 174,000
Semen Portland 0.5000 sak 54,000 27,000
Pasir beton 0.0600 m3 220,000 13,200
Koral beton 0.1000 m3 250,000 25,000
Pekerja 2.1000 org/hr 68,000 142,800
Tukang Batu 0.0175 org/hr 80,000 1,400
Tukang Kayu 1.0000 org/hr 90,000 90,000
Tukang Cat 1.0000 org/hr 90,000 90,000

jumlah 881,850
dibulatkan 881,900

PENGADAAN LISTRIK DAN AIR KERJA LS


Air kerja 4.0000 bulan 81,000 324,000
Listrik kerja 4.0000 bulan 1,178,400 4,713,600

jumlah 5,037,600
dibulatkan 5,037,600
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH

PENYUSUNAN LAPORAN & DOKUMENTASI LS


Kamera SLR (Digital) 4.0000 sewa/hr 25,000 100,000
CD copy soft file foto image 2.0000 bh 2,000 4,000
Foto printing uk.3R 40.0000 lbr 1,500 60,000
Foto album 6.0000 bh 29,000 174,000
Tukang foto 4.0000 OH 150,000 600,000

jumlah 938,000
dibulatkan 938,000

II PEKERJAAN PONDASI

CERUCUK DOLKEN TTK


dolken 0.5000 btg 27,500 13,750
pekerja 0.1000 org/hr 68,000 6,800
mandor 0.0100 org/hr - -

jumlah 20,550
dibulatkan 20,600

MEMASANG PONDASI AANSTAMPING M3


batu kali 1.1000 m3 225,000 247,500
pasir urug 0.4320 m3 180,000 77,760
tukang batu 0.3900 org/hr 80,000 31,200
kepala tukang batu 0.3900 org/hr - -
pekerja 0.7800 org/hr 68,000 53,040
mandor 0.3900 org/hr - -

jumlah 409,500
dibulatkan 409,500

MEMASANG PONDASI BATU KALI 1:4 M3


batu kali 1.1000 m3 225,000 247,500
semen PC ( 50 kg ) tiga roda 2.6056 zak 54,000 140,702
pasir pasang 0.5200 m3 210,000 109,200
tukang batu 0.6000 org/hr 80,000 48,000
kepala tukang batu 0.0600 org/hr - -
pekerja 1.5000 org/hr 68,000 102,000
mandor 0.0750 org/hr - -

jumlah 647,402
dibulatkan 647,400

MEMASANG ROLAG BATA t=20 CM M'


batu bata merah (press) 24.7934 m3 500 12,397
semen PC ( 50 kg ) tiga roda 0.6000 zak 54,000 32,400
pasir pasang 0.1040 m3 210,000 21,840
tukang batu 0.1000 org/hr 80,000 8,000
kepala tukang batu 0.0100 org/hr - -
pekerja 0.1000 org/hr 68,000 6,800
mandor 0.0050 org/hr - -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


jumlah 81,437
dibulatkan 81,400

III PEKERJAAN PASANGAN

DINDING 1/2 BATU BATA 1:2 M2


(BATA PRESS)
batu bata merah 70.0000 bh 500 35,000
semen PC ( 50 kg ) tiga roda 0.3790 zak 54,000 20,466
pasir pasang 0.0380 m3 210,000 7,980
alat bantu pas bata 1.0000 ls 1,903 1,903
tukang batu 0.1000 org/hr 80,000 8,000
kepala tukang batu 0.0100 org/hr - -
pekerja 0.3200 org/hr 68,000 21,760
mandor 0.0150 org/hr - -

jumlah 95,109
dibulatkan 95,100

DINDING 1/2 BATU BATA 1:4 M2


(bata press)
batu bata merah 70.0000 bh 500 35,000
semen PC ( 50 kg ) tiga roda 0.1936 zak 54,000 10,454
pasir pasang 0.0450 m3 210,000 9,450
alat bantu pas bata 1.0000 ls 1,647 1,647
tukang batu 0.1000 org/hr 80,000 8,000
kepala tukang batu 0.0100 org/hr - -
pekerja 0.3200 org/hr 68,000 21,760
mandor 0.0150 org/hr - -

jumlah 86,312
dibulatkan 86,300

PLESTERAN DINDING 1:5 M2


tebal 15 mm
semen PC ( 50 kg ) tiga roda 0.2400 zak 54,000 12,960
pasir pasang 0.0190 m3 210,000 3,990
alat bantu plester ddg 1.0000 ls 509 509
tukang batu 0.1500 org/hr 80,000 12,000
kepala tukang batu 0.0150 org/hr - -
pekerja 0.2000 org/hr 68,000 13,600
mandor 0.0100 org/hr - -

jumlah 43,059
dibulatkan 43,100

PLESTERAN BETON ad 1:3 tebal 15 mm M2


semen PC ( 50 kg ) tiga roda 0.2400 zak 54,000 12,960
pasir pasang 0.0190 m3 210,000 3,990
alat bantu plester ddg 1.0000 ls 509 509
tukang batu 0.2000 org/hr 80,000 16,000
kepala tukang batu 0.0200 org/hr - -
pekerja 0.1500 org/hr 68,000 10,200
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


mandor 0.0150 org/hr - -

jumlah 43,659
dibulatkan 43,700

ACIAN M2
semen PC ( 50 kg ) tiga roda 0.1400 zak 54,000 7,560
alat bantu acian 1.0000 ls 756 756
tukang batu 0.1000 org/hr 80,000 8,000
kepala tukang batu 0.0100 org/hr - -
pekerja 0.0500 org/hr 68,000 3,400
mandor 0.0050 org/hr - -

jumlah 19,716
dibulatkan 19,700

TALI AIR, SIKUAN, SKONENGAN, BENANGAN M'


semen PC ( 50 kg ) tiga roda 0.0300 zak 54,000 1,620
alat bantu tali air 1.0000 ls 162 162
tukang batu 0.0800 org/hr 80,000 6,400
kepala tukang batu 0.0080 org/hr - -
pekerja 0.0600 org/hr 68,000 4,080
mandor 0.0060 org/hr - -

jumlah 12,262
dibulatkan 12,300

IV PEKERJAAN BETON

MEMBUAT LANTAI KERJA ad 1:3:5 M3


semen PC ( 50 kg ) tiga roda 2.5000 zak 54,000 135,000
pasir beton 0.5200 m3 220,000 114,400
split 0.8700 m3 250,000 217,500
tukang batu 0.8000 org/hr 80,000 64,000
kepala tukang batu 0.5000 org/hr - -
pekerja 0.8000 org/hr 68,000 54,400
mandor 0.5000 org/hr - -

jumlah 585,300
dibulatkan 585,300

Lantai kerja 1:3:5 , t 5 cm ; 1 M2 0.0500 m3 585,300 29,265


dibulatkan 29,300

BEKISTING BETON PRAKTIS M2


triplek 4x8 ft, 9 mm 0.2333 lbr 110,000 25,667
paku rata-rata 0.4000 kg 23,000 9,200
Kayu kaso 5x7x400 Meranti campur 0.0204 m3 1,800,000 36,667
kayu balok 8x12x400 Meranti campur 0.0300 m3 2,200,000 66,000
form tie type B 0.2500 bh 25,000 6,250
beton decking 4.0000 bh 250 1,000
tukang kayu 0.3000 org/hr 90,000 27,000
kepala tukang kayu 0.0300 org/hr - -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


pekerja 0.2000 org/hr 68,000 13,600
mandor 0.0100 org/hr - -

jumlah 185,383
dibulatkan 185,400

V PEKERJAAN PINTU DAN JENDELA

MEMASANG KUSEN ALUMUNIUM 3 INCH M'


alumunium profil 3" 1.0000 m' 75,000 75,000
sekrup fixer 2.0000 bh 2,000 4,000
sealant 0.0600 tube 40,000 2,400
pekerja 0.0430 org/hr 68,000 2,924
tukang alumunium 0.0430 org/hr 90,000 3,870
kepala tukang allumunium 0.0430 org/hr 80,000 3,440
mandor 0.0021 org/hr - -

jumlah 91,634
dibulatkan 91,600

MEMASANG ALUMUNIUM KISI KREPYAK M2


profil alumunium kisi /krepyak 1.0000 m' 350,000 350,000
pekerja 0.0150 org/hr 68,000 1,020
tukang kaca/alumunium 0.0150 org/hr 90,000 1,350
kepala tukang kaca/alumunium 0.0150 org/hr 80,000 1,200
mandor 0.0080 org/hr - -

jumlah 353,570
dibulatkan 353,600

MEMASANG KACA CLEAR 5 MM M2


kaca clear 5 mm ; asahimas, mulia setara 1.0500 m2 120,000 126,000
sealant - tube 40,000 -
pekerja 0.0150 org/hr 68,000 1,020
tukang kaca/alumunium 0.1500 org/hr 90,000 13,500
kepala tukang kaca/alumunium 0.0150 org/hr 80,000 1,200
mandor 0.0080 org/hr - -

jumlah 141,720
dibulatkan 141,700

MEMASANG KUSEN DAN DAUN PINTU TYPE P1 BH


Daun pintu double teakwood finish HPL - unit - -
Kusen Alumunium 3" CA 9.1200 m' 91,600 835,392
Jalusi Alumunium Krepyak 1.2600 m2 353,600 445,536
Frame pintu aluminium 11.2000 m' 155,000 1,736,000
Kaca clear 5 mm 2.1808 m2 141,700 309,019
Sealant kaca 9.8400 m' 7,500 73,800
Sealant kusen 7.6400 m' 7,500 57,300
Lever Handle pintu ex.lokal 2.0000 psg 400,000 800,000
Engsel pintu 4" S/S 2BB ex.lokal 2.0000 psg 86,000 172,000
Kunci pintu ex.lokal 1.0000 bh 120,000 120,000
tukang kaca/aluminium 4.2500 org/hr 90,000 382,500
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


kepala tukang allumunium 0.4250 org/hr 80,000 34,000
pekerja 6.3750 org/hr 68,000 433,500
mandor 0.0425 org/hr - -

jumlah 5,399,047
dibulatkan 5,399,000

MEMASANG KUSEN DAN DAUN PINTU TYPE P2 BH


Daun pintu double triplek 6mm finish duco - unit - -
Kusen Alumunium 3" CA 6.9200 m' 91,600 633,872
frame pintu allumunium 2.0640 m2 155,000 319,920
Kaca clear 5 mm 1.4448 m2 141,700 204,728
Sealant kaca 10.1200 m' 7,500 75,900
Sealant kusen 6.0400 m' 7,500 45,300
Lever Handle pintu ex.lokal 1.0000 psg 400,000 400,000
Engsel pintu 4" S/S 2BB ex.lokal 1.0000 psg 86,000 86,000
Engsel jendela 3" S/S 2BB ex.lokal 1.0000 psg 66,000 66,000
Kunci pintu ex.lokal 1.0000 bh 120,000 120,000
Rambuncis ex.dekson 1.0000 bh 53,000 53,000
tukang kaca 2.1250 org/hr 90,000 191,250
kepala tukang allumunium 0.2125 org/hr 80,000 17,000
pekerja 3.1875 org/hr 68,000 216,750
mandor 0.0213 org/hr - -

jumlah 2,429,720
dibulatkan 2,429,700

MEMASANG KUSEN DAN DAUN PINTU TYPE P3 (Spandr BH


Daun pintu alumunium spandrel 1.0000 unit 1,500,000 1,500,000
Kusen Alumunium 3" CA 6.9200 m' 91,600 633,872
frame pintu allumunium - m2 155,000 -
Kaca clear 5 mm 0.2800 m2 141,700 39,676
Sealant kaca 2.2000 m' 7,500 16,500
Sealant kusen 6.0400 m' 7,500 45,300
Lever Handle pintu ex.lokal - psg 400,000 -
Engsel pintu 4" S/S 2BB ex.lokal 1.0000 psg 86,000 86,000
Engsel jendela 3" S/S 2BB ex.lokal - psg 66,000 -
Kunci pintu ex.lokal - bh 120,000 -
tukang kaca 0.5000 org/hr 90,000 45,000
kepala tukang allumunium 0.0500 org/hr 80,000 4,000
pekerja 0.7500 org/hr 68,000 51,000
mandor 0.0050 org/hr - -

jumlah 2,421,348
dibulatkan 2,421,300

MEMASANG ROLLING DOOR T=0.8 Galvalume BH


Daun pintu alumunium spandrel 1.0000 unit 1,500,000 1,500,000
Kusen Alumunium 3" CA 8.5000 m' 91,600 778,600
frame pintu allumunium 12.0000 m2 155,000 1,860,000
Kaca clear 5 mm 8.0000 m2 141,700 1,133,600
Sealant kaca 11.4000 m' 141,700 1,615,380
Sealant kusen 8.5000 m' 7,500 63,750
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


Lever Handle pintu ex.lokal - psg 400,000 -
Engsel pintu 4" S/S 2BB ex.lokal 1.0000 psg 86,000 86,000
Engsel jendela 3" S/S 2BB ex.lokal - psg 66,000 -
Kunci pintu ex.lokal - bh 120,000 -
tukang kaca 0.5000 org/hr 90,000 45,000
kepala tukang allumunium 0.0500 org/hr 80,000 4,000
pekerja 0.7500 org/hr 68,000 51,000
mandor 0.0050 org/hr - -

jumlah 7,137,330
dibulatkan 7,137,300
7,137,330
MEMASANG KUSEN DAN DAUN JENDELA TYPE J.1 BH
Kusen Alumunium 3" CA 11.0100 m' 91,600 1,008,516
frame jendela allumunium 2.2400 m2 155,000 347,200
Kaca clear 5 mm 2.3680 m2 141,700 335,546
Sealant kaca 11.4400 m' 7,500 85,800
Sealant kusen 5.8200 m' 7,500 43,650
Engsel Casement 24" 2.0000 set 160,000 320,000
rambuncis lokal 2.0000 bh 53,000 106,000
tukang kaca 0.5000 org/hr 90,000 45,000
kepala tukang allumunium 0.0500 org/hr 80,000 4,000
pekerja 0.7500 org/hr 68,000 51,000
mandor 0.0500 org/hr - -

jumlah 2,346,712
dibulatkan 2,346,700

MEMASANG JENDELA BOUVENLIGH B1 1BH


alumunium 3" 2.1600 m' 91,600 197,856
kaca clear 5 mm 0.2176 m2 141,700 30,834
sealant kaca 2.1600 m' 7,500 16,200

jumlah 244,890
dibulatkan 244,900

MEMASANG KUSEN DAN DAUN JENDELA TYPE J.2 BH


Kusen Alumunium 3" CA 13.2300 m' 91,600 1,211,868
frame jendela allumunium 1.1200 m2 155,000 173,600
Kaca clear 5 mm 4.2194 m2 141,700 597,892
Sealant kaca 14.8720 m' 7,500 111,540
Sealant kusen 7.5660 m' 7,500 56,745
Engsel Casement 24" 1.0000 set 160,000 160,000
rambuncis lokal 1.0000 bh 53,000 53,000
tukang kaca 0.5000 org/hr 90,000 45,000
kepala tukang allumunium 0.0500 org/hr 80,000 4,000
pekerja 0.7500 org/hr 68,000 51,000
mandor 0.0500 org/hr - -

jumlah 2,464,645
dibulatkan 2,464,600

MEMASANG KUSEN DAN DAUN JENDELA TYPE J.3 BH


ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


Kusen Alumunium 3" CA 7.5400 m' 91,600 690,664
frame jendela allumunium - m2 155,000 -
Kaca clear 5 mm 2.3220 m2 141,700 329,027
Sealant kaca 8.6200 m' 7,500 64,650
Sealant kusen 6.4600 m' 7,500 48,450
Engsel Casement 24" - set 160,000 -
rambuncis lokal - bh 53,000 -
tukang kaca 0.5000 org/hr 90,000 45,000
kepala tukang allumunium 0.0500 org/hr 80,000 4,000
pekerja 0.7500 org/hr 68,000 51,000
mandor 0.0500 org/hr - -

jumlah 1,232,791
dibulatkan 1,232,800

VI PEKERJAAN PLAFOND

MEMASANG PLAFOND GYPSUM TILE M2


gypsum board 4x8 ft , t = 9 mm 0.3472 lbr 67,500 23,438
hollow 20 x 40 x 0.35 mm 0.8000 btg 27,500 22,000
hollow 40 x 40 x 0.35 mm 0.5000 btg 35,000 17,500
penggantung plafond 1.0000 bh 10,000 10,000
compound 0.1000 sak 66,000 6,600
textile tape 0.2000 rol 26,000 5,200
skrup gypsum 15.0000 bh 200 3,000
tukang gypsum 0.1000 org/hr 90,000 9,000
kepala tukang 0.0060 org/hr 80,000 480
pekerja 0.1000 org/hr 68,000 6,800
mandor 0.0230 org/hr - -
jumlah 104,018
dibulatkan 104,000

PLAFOND GRC + RANGKA HOLLOW GALVALUM M2


panel GRC 4x8 ft , t - 4.5 mm 0.3472 lbr 70,000 24,306
hollow 20 x 40 x 0.4 mm 0.8000 btg 27,500 22,000
hollow 40 x 40 x 0.4 mm 0.5000 btg 35,000 17,500
penggantung plafond 1.0000 bh 10,000 10,000
compound 0.1000 kg 66,000 6,600
textile tape 0.2000 rol 26,000 5,200
skrup gypsum 15.0000 bh 200 3,000
tukang gypsum 0.1000 org/hr 90,000 9,000
kepala tukang 0.0060 org/hr 80,000 480
pekerja 0.1000 org/hr 68,000 6,800
mandor 0.0230 org/hr - -

jumlah 104,886
dibulatkan 104,900

LIST GYPSUM UK. 5x5 CM M'


List gypsum 5 x 5 1.0500 m' 4,000 4,200
compound 0.0250 kg 66,000 1,650
tukang gypsum 0.0600 org/hr 90,000 5,400
kepala tukang 0.0060 org/hr 80,000 480
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


pekerja 0.0200 org/hr 68,000 1,360
mandor 0.0010 org/hr - -

jumlah 13,090
dibulatkan 13,100

VII PEKERJAAN PELAPIS LANTAI DAN DINDING

MEMASANG LANTAI KERAMIK 20x20 m2


adukan 1:5, tebal 5 cm
lantai keramik 20x20 1.1000 m2 50,000 55,000
pasir pasang 0.0300 m3 210,000 6,300
semen PC ( 50 kg ) tiga roda 0.2300 zak 54,000 12,420
semen isian naat 0.2000 kg 15,000 3,000
tukang batu 0.1350 org/hr 80,000 10,800
kepala tukang batu 0.0135 org/hr - -
pekerja 0.2700 org/hr 68,000 18,360
mandor 0.0135 org/hr - -

jumlah 105,880
dibulatkan 105,850

MEMASANG LANTAI KERAMIK 30x30 m2


adukan 1:5, tebal 5 cm
lantai keramik 30x30 1.1000 m2 65,000 71,500
pasir pasang 0.0300 m3 210,000 6,300
semen PC ( 50 kg ) tiga roda 0.2300 zak 54,000 12,420
semen isian naat 0.2000 kg 15,000 3,000
tukang batu 0.1350 org/hr 80,000 10,800
kepala tukang batu 0.0135 org/hr - -
pekerja 0.2700 org/hr 68,000 18,360
mandor 0.0135 org/hr - -

jumlah 122,380
dibulatkan 122,350

MEMASANG KERAMIK LANTAI UK. 40x40 M2


adukan 1:5, tebal 5 cm
lantai keramik 40x40 1.1000 m2 80,000 88,000
pasir pasang 0.0300 m3 210,000 6,300
semen PC ( 50 kg ) tiga roda 0.2300 zak 54,000 12,420
semen isian naat 0.2000 kg 15,000 3,000
tukang batu 0.1350 org/hr 80,000 10,800
kepala tukang batu 0.0135 org/hr - -
pekerja 0.2700 org/hr 68,000 18,360
mandor 0.0135 org/hr - -

jumlah 138,880
dibulatkan 138,900

MEMASANG DINDING KERAMIK 30 x 60 M2


adukan 1:5, tebal 5 cm
dinding keramik 20 x 40 1.0500 m2 110,000 115,500
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


pasir pasang 0.0180 m3 210,000 3,780
semen PC ( 50 kg ) tiga roda 0.1860 zak 54,000 10,044
semen isian naat 0.1000 kg 15,000 1,500
tukang batu 0.3200 org/hr 80,000 25,600
kepala tukang batu 0.0300 org/hr - -
pekerja 0.5000 org/hr 68,000 34,000
mandor 0.0300 org/hr - -

jumlah 190,424
dibulatkan 190,400

MEMASANG PLINT KERAMIK UK. 10x40 M'


lantai keramik 10x40 2.5000 bh 10,000 25,000
pasir pasang 0.0020 m3 210,000 420
semen PC ( 50 kg ) tiga roda 0.0200 zak 54,000 1,080
tukang batu 0.0900 org/hr 80,000 7,200
kepala tukang batu 0.0090 org/hr - -
pekerja 0.0900 org/hr 68,000 6,120
mandor 0.0050 org/hr - -

jumlah 39,820
dibulatkan 39,800

MEMASANG BATU ALAM M2


adukan 1:5, tebal 5 cm
batu alam candi 1.0500 m2 150,000 157,500
pasir pasang 0.0180 m3 210,000 3,780
semen PC ( 50 kg ) tiga roda 0.1860 zak 54,000 10,044
tukang batu 0.3200 org/hr 80,000 25,600
kepala tukang batu 0.0300 org/hr - -
pekerja 0.5000 org/hr 68,000 34,000
mandor 0.0300 org/hr - -

jumlah 230,924
dibulatkan 230,900

VIII PEKERJAAN PENGECATAN

CAT DINDING DALAM CATYLAC M2


(dinding baru , 3 lapis)
plamur tembok 0.3000 kg 15,000 4,500
amplas 0.5000 lbr 4,000 2,000
cat dasar alkali 0.1000 kg 20,000 2,000
cat tembok dalam Catylac 0.3000 kg 25,000 7,500
kuas roll 0.0250 bh 34,000 850
tukang cat 0.0800 org/hr 90,000 7,200
kepala tukang cat 0.0080 org/hr - -
pekerja 0.0400 org/hr 68,000 2,720
mandor 0.0040 org/hr - -

jumlah 26,770
dibulatkan 26,750
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


CAT DINDING DALAM MOWILEX M2
(dinding baru , 3 lapis)
plamur tembok 0.3000 kg 15,000 4,500
amplas 0.5000 lbr 4,000 2,000
cat dasar 0.1000 kg 20,000 2,000
cat tembok mowilex interior 0.3000 kg 60,000 18,000
kuas roll 0.0250 bh 34,000 850
tukang cat 0.0800 org/hr 90,000 7,200
kepala tukang cat 0.0080 org/hr - -
pekerja 0.0400 org/hr 68,000 2,720
mandor 0.0040 org/hr - -

jumlah 37,270
dibulatkan 37,250

CAT DINDING LUAR MOWILEX M2


(dinding baru , 3 lapis)
plamur tembok 0.1905 kg 15,000 2,857
amplas 0.2500 lbr 4,000 1,000
cat dasar alkali 0.0952 kg 20,000 1,905
cat tembok mowilex 0.3000 kg 55,000 16,500
kuas roll 0.0238 bh 34,000 810
tukang cat 0.0800 org/hr 90,000 7,200
kepala tukang cat 0.0080 org/hr - -
pekerja 0.0400 org/hr 68,000 2,720
mandor 0.0040 org/hr - -

jumlah 32,991
dibulatkan 32,950

CAT PLAFOND VINILEX M2


(dinding baru , 3 lapis)
amplas 0.5000 lbr 4,000 2,000
cat vililex putih 0.3000 kg 18,500 5,550
kuas roll 0.0250 bh 34,000 850
tukang cat 0.0800 org/hr 90,000 7,200
kepala tukang cat 0.0080 org/hr - -
pekerja 0.0400 org/hr 68,000 2,720
mandor 0.0040 org/hr - -

jumlah 18,320
dibulatkan 18,300

CAT MINYAK M2
amplas 0.5000 lbr 4,000 2,000
cat besi Glotex 0.2500 kg 58,000 14,500
meni besi 0.1670 kg 27,600 4,609
thinner impala 0.1500 ltr 20,000 3,000
kuas besar 0.0476 bh 13,000 619
tukang cat 0.0667 org/hr 90,000 6,000
kepala tukang cat 0.0333 org/hr - -
pekerja 0.0333 org/hr 68,000 2,267
mandor 0.0167 org/hr - -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH

jumlah 32,995
dibulatkan 33,000

IX PEKERJAAN SANITAIR

WASTAFEL TANAM BH
wastafel gantung + accessories ex.lokal 1.0000 bh 1,200,000 1,200,000
sealant 0.5000 bh 40,000 20,000
tukang plambing 1.2500 org/hr 80,000 100,000
kepala tukang plambing 0.1250 org/hr - -
pekerja 0.2500 org/hr 68,000 17,000
mandor 0.0250 org/hr - -

jumlah 1,337,000
dibulatkan 1,337,000

CLOSED JONGKOK BH
closed jongkok 1.0000 bh 200,000 200,000
semen putih ( 50 kg ) 0.0200 zak 85,000 1,700
pas bata 1.6000 m2 86,300 138,080
plesteran 1:2 1.0000 m2 43,100 43,100
tukang batu 0.3000 org/hr 80,000 24,000
kepala tukang batu 0.0500 org/hr - -
pekerja 0.3000 org/hr 68,000 20,400
mandor 0.0500 org/hr - -

jumlah 427,280
dibulatkan 427,280

MEMASANG KRAN AIR LOKAL BH


kran air lokal 1.0000 bh 77,000 77,000
seal tape 0.5000 bh 12,000 6,000
tukang plambing 0.0300 org/hr 80,000 2,400
kepala tukang plambing 0.0300 org/hr - -
pekerja 0.2500 org/hr 68,000 17,000
mandor 0.0250 org/hr - -

jumlah 102,400
dibulatkan 102,400

MEMASANG CERMIN WASTAFEL (Uk. 100x200) BH


kaca cermin 5 mm 1.0000 m2 370,000 370,000
sekrup fisher 6.0000 bh 2,000 12,000
bevel kaca 3.0000 m' 20,000 60,000
tukang plambing 0.4000 org/hr 80,000 32,000
kepala tukang plambing 0.0400 org/hr - -
pekerja 0.3000 org/hr 68,000 20,400
mandor 0.0300 org/hr - -

jumlah 494,400
dibulatkan 494,400
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BA : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGG : 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


X PEKERJAAN LAIN-LAIN

LOGO DAN TULISAN unit


Logo (tampak muka gedung) 1.0000 set 2,850,000 2,850,000

jumlah 2,850,000
dibulatkan 2,850,000

MEMASANG BUIS BETON 30 M'


galian tanah 0.6400 m3 81,600 52,224
urug tanah kembali 0.1850 m3 17,000 3,145
urug pasir 0.0650 m3 232,000 15,080
buis beton ø 30 cm, panj.0.50 m 0.8333 m' 65,000 54,167
pasir pasang 0.0200 m3 210,000 4,200
semen PC ( 50 kg ) tiga roda 0.1000 zak 54,000 5,400
upah pas saluran 1.0000 m' 20,132 20,132

jumlah 154,348
dibulatkan 154,300

SEPTIC TANK DAN REMBESAN unit


Galian tanah Septictank & rembesan 7.5000 m3 81,600 612,000
Pasir urug 0.2100 m3 232,000 48,720
Lantai kerja 2.2500 m3 29,300 65,925
Pasang bata 1 Pc : 2 Psr 15.0000 m2 95,100 1,426,500
Pelat beton penutup dan balok 0.3000 m3 799,489 239,847
Pipa PVC 3" AW & perlengkapannya 7.5000 m' 75,033 562,748
Plesteran 1 Pc : 3 Psr 30.0000 m2 43,700 1,311,000
Pasangan ijuk 5.0000 ikat 5,000 25,000
Urugan kerikil 3,5 cm 1.0500 m3 309,000 324,450
Pipa PVC 1½" AW di lubang 3.0000 m' 45,723 137,169
Urugan kembali 1.1300 m3 17,000 19,210
Pembantu Tukang 4.0000 org 68,000 272,000
Tukang batu 3.0000 org 80,000 240,000

jumlah 5,284,568
dibulatkan 5,284,550
ANALISA HARGA PEK. ELEKTRIKAL

PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS


Lokasi :
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

1 Memasang 1 buah instalasi titik lampu / penerangan


Bahan An. SNI ( Revisi ) 6.1.1
8.000 m Kabel NYM 3x2,5 mm2 @ Rp. 12,500.00 = Rp 100,000.00
8.000 m Conduit pipa dia. 20 @ Rp. 6,000.00 = Rp 48,000.00
5.000 % Perlengkapan instalasi = Rp 7,400.00
Sub total : = Rp 155,400.00
Upah An. SNI ( Revisi ) 6.1.2
0.200 OH Pekerja @ Rp. 68,000.00 = Rp 13,600.00
0.180 OH Tukang listrik @ Rp. 80,000.00 = Rp 14,400.00
0.050 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.040 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 28,000.00
Total upah+bahan : = Rp 183,400.00

2 Memasang 1 buah instalasi titik AC


Bahan An. SNI ( Revisi ) 6.1.1
8.000 m Kabel NYM 3x2,5 mm2 @ Rp. 12,500.00 = Rp 100,000.00
8.000 m Conduit pipa dia. 20 @ Rp. 6,000.00 = Rp 48,000.00
5.000 % Perlengkapan instalasi = Rp 7,400.00
Sub total : = Rp 155,400.00
Upah An. SNI ( Revisi ) 6.1.2
0.200 OH Pekerja @ Rp. 68,000.00 = Rp 13,600.00
0.180 OH Tukang listrik @ Rp. 80,000.00 = Rp 14,400.00
0.050 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.040 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 28,000.00
Total upah+bahan : = Rp 183,400.00

3 Memasang 1 m' instalasi kabel feeder NYY 4x10 mm2


Bahan An. SNI ( Revisi ) 6.1.1
1.000 m Kabel NYY 4x10 mm2 @ Rp. 65,000.00 = Rp 65,000.00
1.000 m Conduit pipa dia. 20 @ Rp. 6,000.00 = Rp 6,000.00
5.000 % Perlengkapan instalasi = Rp 3,550.00
Sub total : = Rp 74,550.00
Upah An. SNI ( Revisi ) 6.1.2
0.200 OH Pekerja @ Rp. 68,000.00 = Rp 13,600.00
0.180 OH Tukang listrik @ Rp. 80,000.00 = Rp 14,400.00
0.050 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.040 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 28,000.00
Total upah+bahan : = Rp 102,550.00

4 Memasang Stop Kontak daya


Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak 6 A @ Rp. 35,144.00 = Rp 35,144.00
5.000 % Perlengkapan instalasi = Rp 1,757.20
Sub total : = Rp 36,901.20
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. 68,000.00 = Rp 6,800.00
0.070 OH Tukang listrik @ Rp. 80,000.00 = Rp 5,600.00
0.020 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.015 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 12,400.00
Total upah+bahan : = Rp 49,301.20

5 Memasang Stop Kontak Ganda


Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak Ganda @ Rp. 65,500.00 = Rp 65,500.00
5.000 % Perlengkapan instalasi = Rp 3,275.00
Sub total : = Rp 68,775.00
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. 68,000.00 = Rp 6,800.00
0.070 OH Tukang listrik @ Rp. 80,000.00 = Rp 5,600.00
0.020 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.015 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 12,400.00
Total upah+bahan : = Rp 81,175.00

6 Memasang Stop Kontak AC


Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak AC @ Rp. 68,700.00 = Rp 68,700.00
5.000 % Perlengkapan instalasi = Rp 3,435.00
Sub total : = Rp 72,135.00
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. 68,000.00 = Rp 6,800.00
0.070 OH Tukang listrik @ Rp. 80,000.00 = Rp 5,600.00
0.020 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.015 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 12,400.00
Total upah+bahan : = Rp 84,535.00

7 Memasang Grounding (max 2 Ohm)


Bahan An. SNI ( Revisi ) 6.18.1
10.000 m' NYA 1 x 50 mm2 @ Rp. 68,214.30 = Rp 682,143.00
3.000 m' Pipa galvanis ø 1 1/2" @ Rp. 83,333.33 = Rp 250,000.00
2.000 bh Split tembaga @ Rp. 250,000.00 = Rp 500,000.00
4.000 bh Klem tembaga @ Rp. 75,000.00 = Rp 300,000.00
5.000 % Perlengkapan instalasi = Rp 86,607.15
Sub total : = Rp 1,818,750.15
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. 68,000.00 = Rp 6,800.00
0.070 OH Tukang listrik @ Rp. 80,000.00 = Rp 5,600.00
0.020 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.015 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 12,400.00
Total upah+bahan : = Rp 1,831,150.15

8 Memasang Saklar Tunggal


Bahan An. SNI ( Revisi ) 6.21.1
1.000 bh Saklar Tunggal @ Rp. 35,144.00 = Rp 35,144.00
5.000 % Perlengkapan instalasi = Rp 1,757.20
Sub total : = Rp 36,901.20
Upah An. SNI ( Revisi ) 6.21.2
0.150 OH Pekerja @ Rp. 68,000.00 = Rp 10,200.00
0.115 OH Tukang listrik @ Rp. 80,000.00 = Rp 9,200.00
0.030 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.020 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 19,400.00
Total upah+bahan : = Rp 56,301.20

9 Memasang Saklar Ganda


Bahan An. SNI ( Revisi ) 6.22.1
1.000 bh Saklar ganda @ Rp. 42,000.00 = Rp 42,000.00
5.000 % Perlengkapan instalasi = Rp 2,100.00
Sub total : = Rp 44,100.00
Upah An. SNI ( Revisi ) 6.22.2
0.150 OH Pekerja @ Rp. 68,000.00 = Rp 10,200.00
0.115 OH Tukang listrik @ Rp. 80,000.00 = Rp 9,200.00
0.030 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.020 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 19,400.00
Total upah+bahan : = Rp 63,500.00

10 Memasang Lampu TKO 2x36 W


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Lampu TKO 2 x 36 W @ Rp. 510,000.00 = Rp 510,000.00
5.000 % Perlengkapan instalasi = Rp 25,500.00
Sub total : = Rp 535,500.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 68,000.00 = Rp 11,288.00
0.166 OH Tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.033 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.017 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 24,568.00
Total upah+bahan : = Rp 560,068.00

11 Memasang Lampu Baret 18 W


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Lampu Baret 18 W @ Rp. 145,000.00 = Rp 145,000.00
5.000 % Perlengkapan instalasi = Rp 7,250.00
Sub total : = Rp 152,250.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 68,000.00 = Rp 11,288.00
0.166 OH Tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.033 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.017 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 24,568.00
Total upah+bahan : = Rp 176,818.00

12 Memasang Downlight E27ESS 8 Watt + Fitting


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Downlight E27ESS 8 Watt @ Rp. 86,900.00 = Rp 86,900.00
1.000 bh Fitting @ Rp. 65,900.00 = Rp 65,900.00
5.000 % Perlengkapan instalasi @ Rp. = Rp 7,640.00
Sub total : = Rp 160,440.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 68,000.00 = Rp 11,288.00
0.166 OH Tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.033 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.017 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 24,568.00
Total upah+bahan : = Rp 185,008.00
13 Memasang Exhaust Fan + ducting
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Exhaust Fan + ducting @ Rp. 5,100,000.00 = Rp 5,100,000.00
5.000 % Perlengkapan instalasi = Rp 255,000.00
Sub total : = Rp 5,355,000.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 68,000.00 = Rp 11,288.00
0.166 OH Tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.033 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.017 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 24,568.00
Total upah+bahan : = Rp 5,379,568.00

14 Memasang Kipas angin + ducting


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Kipas angin + ducting @ Rp. 1,200,000.00 = Rp 1,200,000.00
5.000 % Perlengkapan instalasi = Rp 60,000.00
Sub total : = Rp 1,260,000.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 68,000.00 = Rp 11,288.00
0.166 OH Tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.033 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.017 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 24,568.00
Total upah+bahan : = Rp 1,284,568.00

15 Memasang Panel Distribusi


Bahan An. SNI ( Revisi ) 6.55.1
1.000 bh Panel Distribusi @ Rp. 853,200.00 = Rp 853,200.00
5.000 % Perlengkapan instalasi = Rp 42,660.00
Sub total : = Rp 895,860.00
Upah An. SNI ( Revisi ) 6.55.2
2.500 OH Pekerja @ Rp. 68,000.00 = Rp 170,000.00
3.500 OH Tukang listrik @ Rp. 80,000.00 = Rp 280,000.00
1.500 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.800 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 450,000.00
Total upah+bahan : = Rp 1,345,860.00

ANALISA HARGA PEK. PLUMBING

Pekerjaan : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS


Lokasi :
ANALISA HARGA PEK. PLUMBING

Pekerjaan : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS


Lokasi :
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
Tahun Anggaran : 2017
35.000 % Perlengkapan instalasi = Rp 10,500.00
Sub total : = Rp 40,500.00
Upah An. SNI RSNIT-15-2002
0.054 OH Pekerja @ Rp. 68,000.00 = Rp 3,672.00
0.090 OH Tukang Plumbing @ Rp. 80,000.00 = Rp 7,200.00
0.009 OH Kep. Tkg Plumbing @ Rp. 0.00 = Rp 0.00
0.0027 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 10,872.00
Total upah+bahan : = Rp 51,372.00

5 Memasang 1 m' Pipa PVC tipe AW dia 3"


Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 3" @ Rp. 36,250.00 = Rp 43,500.00
35.000 % Perlengkapan instalasi = Rp 15,225.00
Sub total : = Rp 58,725.00
Upah An. SNI RSNIT-15-2002
0.081 OH Pekerja @ Rp. 68,000.00 = Rp 5,508.00
0.135 OH Tukang Plumbing @ Rp. 80,000.00 = Rp 10,800.00
0.0135 OH Kep. Tkg Plumbing @ Rp. 0.00 = Rp 0.00
0.0041 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 16,308.00
Total upah+bahan : = Rp 75,033.00

6 Memasang 1 m' Pipa PVC tipe AW dia 4"


Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 4" @ Rp. 50,000.00 = Rp 60,000.00
35.000 % Perlengkapan instalasi = Rp 21,000.00
Sub total : = Rp 81,000.00
Upah An. SNI RSNIT-15-2002
0.081 OH Pekerja @ Rp. 68,000.00 = Rp 5,508.00
0.135 OH Tukang Plumbing @ Rp. 80,000.00 = Rp 10,800.00
0.0135 OH Kep. Tkg Plumbing @ Rp. 0.00 = Rp 0.00
0.0041 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 16,308.00
Total upah+bahan : = Rp 97,308.00
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)

I. MATERIAL ALAM
batu bata merah bh 500
batu kali m3 225,000
split m3 250,000
beton decking bh 250
pasir beton m3 220,000
pasir pasang m3 210,000
pasir urug m3 180,000
tanah urug (lokal) m3 80,000

II. SEMEN
semen PC ( 50 kg ) kg 1,080
semen PC ( 50 kg ) zak 54,000
semen putih ( 50 kg ) zak 85,000
semen isian naat / warna kg 15,000

III. BESI , BAJA & ASESORIES


wiremesh M8 (2.1 x 5.4 m) lmbr 570,000
besi beton polos rata2 kg 8,000
besi beton ulir rata2 kg 8,500
form tie type B bh 25,000
baut HTB dia.16 mm bh 15,000
ikatan gording dia.12 mm + turnbuckle kg 15,000
angkur dia. 19 mm L = 80 cm bh 40,000
plat besi 8,10, 12, 16 mm kg 5,500
baja WF, H Beam kg 7,800
kawat beton kg 25,000
paku rata-rata kg 23,000

IV. KAYU & MULTIPLEKS


dolken btg 27,500
kayu balok 8x12x400 Meranti klas II campur m3 2,200,000
kayu kaso 5x7x400 Meranti klas II campur m3 1,800,000
kayu papan 3x20x400 Meranti campur m3 2,100,000
kayu papan 3x30x400 Meranti campur m3 2,250,000
triplek 122x244, 9 mm lbr 110,000

V. PINTU DAN JENDELA


Pintu :
Daun pintu double teakwood finish HPL bh
Daun pintu double triplek 6mm finish duco bh
Daun pintu alumunium spandrel bh 1,500,000
Asesories :
engsel casement 24" psg 160,000
engsel pintu 4" S/S 2BB ex.lokal psg 86,000
engsel jendela 3" S/S 2BB ex.lokal psg 66,000
lever handle pintu ex.lokal psg 400,000
kunci pintu ex.lokal set 120,000
kunci pintu keet bh 100,000
rambuncis ex.dekson bh 53,000
Kaca :
bevel kaca m' 20,000
kaca clear 5 mm m2 120,000
kaca cermin 5 mm m2 370,000
Alumunium / Frame :
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)
jalusi/kisi/krepyak m' 350,000
frame pintu alumunium m' 155,000
kusen alumunium 3" CA m' 75,000
sealant kusen m' 7,500
sealant kaca m' 7,500
sealant kusen/jendela tube 40,000
sekrup fischer bh 2,000

VI. ATAP
nok galvalum m' 55,900
atap spandek galvalum t=0.35 mm m2 50,000

VII. PLAFOND
gypsum board 4x8 ft , t = 9 mm lbr 67,500
penggantung plafond bh 10,000
hollow 20 x 40 x 0.35 mm btg 27,500
hollow 40 x 40 x 0.35 mm btg 35,000
List gypsum 5 x 5 m' 4,000
panel GRC 4x8 ft , t - 4.5 mm lbr 70,000
Lisplang GRC 20 cm m' 30,000
compound zak 66,000
skrup gypsum bh 200
textile tape roll 26,000

VIII. MATERIAL LANTAI


dinding keramik 20 x 20 unpolished m2 50,000
dinding keramik 30 x 60, Asia Tile/KIA/Mulia m2 110,000
lantai keramik 30x30, Asia Tile/KIA/Mulia m2 65,000
lantai keramik 40x40, Asia Tile/KIA/Setara m2 80,000
plint keramik uk.10x40 bh 10,000
batu alam candi m2 150,000

IX. CAT
cat dasar alkali Catylac kg 20,000
amplas lbr 4,000
cat besi Glotex kg 58,000
cat besi zinkromate kg 30,000
meni kayu kg 29,200
meni besi kg 27,600
cat tembok dalam Catylac kg 25,000
cat tembok mowilex (interior) kg 60,000
cat tembok catylac (luar) kg 55,000
cat plafond putih vinilex kg 18,500
plamur tembok kg 15,000
thinner impala ltr 20,000
plamur kayu kg 14,000
kuas besar bh 13,000
kuas roll bh 34,000

X. SANITAIR
closet jongkok INA bh 200,000
wastafel tanam + accessories ex.lokal bh 1,200,000
kran air lokal bh 77,000
seal tape bh 12,000
sealant silicon tube 40,000
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)
XI. JALAN & LANDSCAPE
buis beton ø 30 cm, panj.0.50 m m' 65,000

XII. BBM & LISTRIK


Oli / Pelumas ltr 25,000
Penyambungan Daya Listrik VA 1,700
Perijinan Sertifikat Layak Operasi (SLO) VA 400
Air kerja m3 15,000
Air kerja ltr 15
Listrik kerja W 1,473

XIII BAHAN KABEL


Kabel NYY 3 x 2,5 mm2 m' 12,500
Kabel NYY 4 x 10 mm2 m' 65,000
Kabel NYA 1 x 50 mm2 m' 68,214

XIV BAHAN LAMPU, SAKLAR & STOP KONTAK


Lampu TL TKO 2 x 36 watt + rumah bh 510,000
Lampu Baret 18W Philip bh 145,000
Downlight E27ESS 8 Watt bh 86,900
Fitting bh 65,900
Stop kontak bh 35,144
Saklar Seri/Ganda bh 42,000
Stop kontak Ganda bh 65,500
Stop kontak AC bh 68,700
Exhaust Fan 1000 CFM + ducting bh 5,100,000
Kipas angin + ducting bh 1,200,000

XV BAHAN PANEL
Box Panel Standard unt 234,000
MCB : 1 P , 6/10/16/25 A unt 51,600

XVI ASESORIES & LAIN-LAIN


Logo (tampak muka gedung) set 2,850,000
Flexible conduit 20 mm m' 6,000
Splitzen 3/4" bh 250,000
Klem Penyambung Kabel BC bh 75,000
Kamera SLR (Digital) sewa/hr 25,000
CD copy soft file foto image bh 2,000
Foto printing uk.3R lbr 1,500
Foto album bh 29,000
Ijuk ikat 5,000
IMB dok 6,000,000
Transportasi paket 2,500,000
Stamper jam 100,000

XVII BAHAN PIPA


Pipa PVC tipe AW diameter 1/2" @4m btg 33,000
Pipa PVC tipe AW diameter 3/4" @4m btg 47,500
Pipa PVC tipe AW diameter 1 1/2" @4m btg 95,000
Pipa PVC tipe AW diameter 2" @4m btg 100,000
Pipa PVC tipe AW diameter 3" @4m btg 145,000
Pipa PVC tipe AW diameter 4" @4m btg 200,000
Pipa GIP Medium diameter 1 1/2" @6m btg 500,000
HARGA SATUAN UPAH
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

NO. PEKERJA SATUAN HARGA UPAH

1 Mandor Org / hr Rp -
2 Kepala Tukang Galian Org / hr Rp -
3 Tukang Galian Org / hr Rp 80,000.00
4 Kepala Tukang Batu Org / hr Rp -
5 Tukang Batu Org / hr Rp 80,000.00
6 Kepala Tukang Las Org / hr Rp -
7 Tukang Las Org / hr Rp 90,000.00
8 Kepala Tukang Besi Org / hr Rp -
9 Tukang Besi Org / hr Rp 90,000.00
10 Kepala Tukang Kaca/Aluminium/Gipsum Org / hr Rp 80,000.00
11 Tukang Kaca/Alumunium/Gipsum Org / hr Rp 90,000.00
12 Kepala Tukang Kayu Org / hr Rp -
13 Tukang Kayu Org / hr Rp 90,000.00
14 Kepala Tukang Cat Org / hr Rp -
15 Tukang Cat Org / hr Rp 90,000.00
16 Kepala Tukang Pipa/Plumbing Org / hr Rp -
17 Tukang Plumbing Org / hr Rp 80,000.00
18 Instalator / Kepala Tukang Listrik Org / hr Rp -
19 Pembantu Instalator / Tukang Listrik Org / hr Rp 80,000.00
20 Pekerja / Kenek Org / hr Rp 68,000.00
21 Tukang foto Org / hr Rp 150,000.00
22 Ketua Unit Pengelola Teknis Org / hr Rp 400,000.00
23 Ketua Unit Pengelola Keuangan Org / hr Rp 400,000.00
24 Anggota Pengelola Teknis Org / hr Rp 300,000.00
25 Anggota Pengelola Keuangan Org / hr Rp 300,000.00
VOLUME BAJA & ARSITEKTUR

Jml L A W Tot A
Type
n m m2 kg/m m2

1 WF 150.75.5.7 K1 3 11.50 14.00


WF 150.75.5.7 J1 4 8.13 14.00
WF 150.75.5.7 J2 4 2.60 14.00
WF 150.75.5.7 K2 1 4.55 14.00
WF 150.75.5.7 Pedestal 16 0.30 14.00
WF 150.75.5.7 stiffner 16 0.80 14.00

2 H 100.100.6.8 K1 3 2.35 17.20


H 100.100.6.8 J1 4 1.56 17.20
H 100.100.6.8 J2 4 0.90 17.20
H 100.100.6.8 K2 1 1.84 17.20
H 100.100.6.8 stiffner 16 0.50 17.20

3 Angkur dia 19 64
4 Base Plate t = 16 mm 16 0.06 129.51
5 Stiffner Plate T = 8 mm
K1 3 0.12 64.93
J1 4 0.08 64.93
J2 4 0.04 64.93
K2 1 0.08 64.93

6 Plat Buhul
T = 12 mm
K1 3 0.13 97.22
7 Baut dia 16
K1 60
J1 40
J2 32
K2 20

8 CNP 125.50.20.2,3 2 91.22 4.51


2 43.61 4.51
2 3.60 4.51
2 4.60 4.51

9 Ikatan Angin dia 12 4 12.00 0.892


10 Sagrod dia 8 6 3.60 0.395

ATAP n L T
Atap
1 Segitiga 2 12.75 5.54
2 Trapesium Utuh 2 18.60 8.15 7.30
3 Area Trapesium Terpotong 2 2.80 4.20
4 Area K2 2 3.42 4.15
2 3.42 3.15
A Total

Bubung
L atas 1 1 8.00
L atas 2 1 5.60
L jurai 4 7.00

Talang 2 5.76

Listplank
1 Depan 18.89
2 Belakang 18.06
3 Smp Kiri 13.9
4 Smp Kanan 13.9

Plafond
1 Gipsum 3.00 4.00
(1.95) 1.80

2 Calsiboard 1.95 1.80


2 15.50 0.82
2 11.50 0.82
2 2.00 0.82
1 3.50 2.00
2 0.90 3.42

3 List Gipsum 2 3.00 4


4 2.00 1.8
0 7.00
0 3.00
0 0.70
0 5.45

3 List Kayu 2 1.95 1.78


2 14.00
2 10.00
1 12.00

Dinding 2 16.00 10.00 3.25


1 4.00 3.25
1 3.00 3.25
1 2.65 3.25
1 1.85 3.25
P1 1 1.40 3.08
P2 1 0.80 2.58
P3 1 0.70 2.58
J1 1 1.52 2.15
J2 9 2.26 2.15
J3 1 1.08 2.15
BV&RD 1 0.68 0.48 3.2 2.5

Plester + Aci

Rollag 2 14.00 0.90 2.00


Keramik
Lantai 40x40 3.00 4.00 - -
Lantai 30x30 12 16.00 0.90 1.30 4.00
Lantai 20x20 unpolish 2.00 1.80 (0.75) 0.75
Lantai 20x20 polish 2.00 0.70 0.75 0.75
Dinding 30x60 2 1.85 1.70 (0.70) 2.58
Partisi - - - -
Total W
kg

483.00
455.00
145.60
63.73
67.20
179.20
1,393.73
121.26
107.33
61.92
31.65
137.60
459.76
64.00
129.51

23.38
20.78
10.39
5.19
59.74

36.46

152.00
822.80
393.36
32.47
41.49
1,290.13
42.80
8.532

70.64 1.319047619
195.28
(23.52)
28.39
10.77
281.55

8.00
5.60
28.00
41.60
11.52

64.75

12.00
-
12.00
3.51
25.42
18.86
1.64
7.00
3.08
59.51
14.00
8.00
-
-
-
-
22.00
7.46
28.00
20.00
12.00
67.46

169.00
13.00
9.75
8.61
6.01
(4.31)
(2.06)
(1.81)
(3.27)
(43.73)
(2.32)
(8.33)
140.55
281.09

19.80
12.00
55.60
3.04
1.77
5.29
-
VOLUME PONDASI PLAT DAN BATU BELAH

1 PONDASI PLAT P1 (1.2X1.2X0,30)M


Jumlah : 16.00
Dimensi : 1.00 x 1.00 m
Tebal : 0.28 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.28 m3
Jml Volume Beton = 4.48 m3
b) Tulangan : Jml D As s
Tul
n m m2 m
Bj. Besi Beton atas 7 0.013 0.000133 0.17
= 7850 kg/m3 7 0.013 0.000133 0.17
bawah 7 0.013 0.000133 0.17
7 0.013 0.000133 0.17
Pinggang 0 0.013 0.000133
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 640.93 kg
c) Bekisting : 1.52 m2
5.4286 m2/m3
Jml Vol bekisting = 24.32 m2

2 PONDASI BATU BELAH (80/30X80)CM


Panjang : 74.8 10 10 16 16 2 1.8 4
A : 0.3 + 0.7 x 0.35 = 0.35
Tinggi : 0.7 m
Volume : 26.18 m3

3 PONDASI ROLAAG BATA


Panjang : 65.8 18 18 12 12 2 2 0.9

4 PONDASI AANSTAMPING
Panjang 74.80
Lebar -
Tinggi -
Volume - m3

5 PASIR URUG BAWAH PONDASI


Panjang 74.80
Lebar 0.90
Tinggi 0.05
Volume 3.37 m3
A 1.2 x 1.2 x 16.00 = 23.04 m2
Tinggi 0.10
Volume 2.304 m3
Vol. Total 5.67 m3
VOLUME GALIAN TANAH

1 GALIAN PONDASI PLAT


Jumlah : 16.00
Dimensi : 1.20 x 1.20 x 1.15 = 1.656
Volume-1 : 26.496 m3
Panjang : 74.80 - 19.20 x 0.90 = 50.04
Volume-2 : 50.04 x 0.95 = 47.54
L Rolag : 65.80
Volume-3 : 65.80 x 0.10 x 0.22 = 1.4476

Vol Total 75.48

2 URUGAN
Urugan Kembali : 1/3 x 75.48 = 25.16053 m3

Urugan Peninggian : 10 x 16 = 160


56 x 0.9 = 50.4
210.4
210.4 x 0.08 = 16.832 m3

3 PASIR URUG BAWAH LANTAI


Panjang 18.00 1.00 0.90
Lebar 12.00 4.00 4.00
Tebal 0.10 0.10 0.10
Volume 21.60 0.40 0.36 22.36 m3

4 RABAT BETON BWH LANTAI 11.18 m3


Berat Pnjg Hak Ovrlap T.Pnjg Vol
kg/m m m m m kg
1.0419 1.4 0.156 0 10.892 11.349
1.0419 1.12 0.156 0 8.932 9.3067
1.0419 1.12 0.156 0 8.932 9.3067
1.0419 1.12 0.156 0 8.932 9.3067
1.0419 4.3 0.156 0 0 0
0.3927
39.662
0.3966
40.058
143.07

4 3 2 2 4

0.9
m3

m
m3

m3

m3
VOLUME TIE BEAM/SLOOF

1 SLOOF S1 20/30 AS A,B,C,E,G


Jumlah : 11.00
Dimensi : 0.20 x 0.3 m
Panjang : 4.00 m
T. Plat : 0 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.24 m3
Jml Volume Beton = 2.64 m3
b) Tulangan : Jml D As s
Tul n m m2 m
Bj. Besi Beton Tumpuan (kiri) 3 0.0130 0.0001327
= 7850 kg/m3 Tumpuan (kiri) 3 0.0130 0.0001327
Sk 8 0.0080 5.027E-05 0.15
Lapangan (tengah) 2 0.0130 0.0001327
Lapangan (tengah) 3 0.0130 0.0001327
Sk 15 0.0080 5.027E-05 0.15
Tumpuan (kanan) 3 0.0130 0.0001327
Tumpuan (kanan) 3 0.0130 0.0001327
Sk 8 0.0080 5.027E-05 0.15

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 472.26 kg
c) Bekisting : 2.4 m2
10 m2/m3
Jml Vol bekisting = 26.4 m2

2 SLOOF S1 20/30 AS F
Jumlah : 1.00
Dimensi : 0.20 x 0.3 m
Panjang : 1.80 m
T. Plat : 0 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.108 m3
Jml Volume Beton = 0.11 m3
b) Tulangan : Jml D As s
Tul n m m2 m
Bj. Besi Beton Tumpuan (kiri) 3 0.0130 0.0001327
= 7850 kg/m3 Tumpuan (kiri) 3 0.0130 0.0001327
Sk 4 0.0080 5.027E-05 0.15
Lapangan (tengah) 2 0.0130 0.0001327
Lapangan (tengah) 3 0.0130 0.0001327
Sk 7 0.0080 5.027E-05 0.15
Tumpuan (kanan) 3 0.0130 0.0001327
Tumpuan (kanan) 3 0.0130 0.0001327
Sk 4 0.0080 5.027E-05 0.15

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 25.07 kg
c) Bekisting : 1.08 m2
10 m2/m3
Jml Vol bekisting = 1.08 m2

3 SLOOF S1 20/30 AS 1.6


Jumlah : 4.00
Dimensi : 0.20 x 0.30 m
Panjang : 4.00 m 53.333
T. Plat : 0.00 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.24 m3
Jml Volume Beton = 0.96 m3
b) Tulangan : Jml D As s
Tul n m m2 m
Bj. Besi Beton Tumpuan (kiri) 3 0.0130 0.0001327
= 7850 kg/m3 Tumpuan (kiri) 3 0.0130 0.0001327
Sk 8 0.0080 5.027E-05 0.15
Lapangan (tengah) 2 0.0130 0.0001327
Lapangan (tengah) 3 0.0130 0.0001327
Sk 15 0.0080 5.027E-05 0.15
Tumpuan (kanan) 3 0.0130 0.0001327
Tumpuan (kanan) 3 0.0130 0.0001327
Sk 8 0.0080 5.027E-05 0.15

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 171.73 kg
c) Bekisting : 2.4 m2
10 m2/m3
Jml Vol bekisting = 9.60 m2

4 SLOOF S1 20/30 AS 1,3,4,5,6


Jumlah : 5.00
Dimensi : 0.20 x 0.3 m
Panjang : 2.00 m
T. Plat : 0 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.12 m3
Jml Volume Beton = 0.60 m3
b) Tulangan : Jml D As s
Tul n m m2 m
Bj. Besi Beton Tumpuan (kiri) 3 0.0130 0.0001327
= 7850 kg/m3 Tumpuan (kiri) 3 0.0130 0.0001327
Sk 5 0.0080 5.027E-05 0.15
Lapangan (tengah) 2 0.0130 0.0001327
Lapangan (tengah) 3 0.0130 0.0001327
Sk 8 0.0080 5.027E-05 0.15
Tumpuan (kanan) 3 0.0130 0.0001327
Tumpuan (kanan) 3 0.0130 0.0001327
Sk 5 0.0080 5.027E-05 0.15

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 135.90 kg
c) Bekisting : 1.2 m2
10 m2/m3
Jml Vol bekisting = 6 m2

5 SLOOF S1 20/30 AS 4
Jumlah : 1.00
Dimensi : 0.20 x 0.3 m
Panjang : 3.00 m
T. Plat : 0 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.18 m3
Jml Volume Beton = 0.18 m3
b) Tulangan : Jml D As s
Tul n m m2 m
Bj. Besi Beton Tumpuan (kiri) 3 0.0130 0.0001327
= 7850 kg/m3 Tumpuan (kiri) 3 0.0130 0.0001327
Sk 6 0.0080 5.027E-05 0.15
Lapangan (tengah) 2 0.0130 0.0001327
Lapangan (tengah) 3 0.0130 0.0001327
Sk 11 0.0080 5.027E-05 0.15
Tumpuan (kanan) 3 0.0130 0.0001327
Tumpuan (kanan) 3 0.0130 0.0001327
Sk 6 0.0080 5.027E-05 0.15

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 34.59 kg
c) Bekisting : 1.8 m2
10 m2/m3
Jml Vol bekisting = 1.8 m2

Beton 4.49 m3
Besi 839.54 kg
Bekisting 44.88 m2
Berat Pnjg Hak Ovrlap T.Pnjg Vol Vol
kg/m m m m m kg kg
1.04195 1.00 0.156 0.39 4.638 4.8326
1.04195 1.00 0.156 0.39 4.638 4.8326
0.39458 0.68 0.096 0.00 6.208 2.4496
1.04195 2.00 0.156 0.39 5.092 5.3056
1.04195 2.00 0.156 0.39 7.638 7.9584
0.39458 0.68 0.096 0.00 11.640 4.5930
1.04195 1.00 0.156 0.39 4.638 4.8326
1.04195 1.00 0.156 0.39 4.638 4.8326
0.39458 0.68 0.096 0.00 6.208 2.4496
Jumlah 32.5942 9.4921
0.3259 0.0949
32.9202 9.5870
0.3292 0.0959
33.2494 9.6829
138.5391 40.3454

Berat Pnjg Hak Ovrlap T.Pnjg Vol Vol


kg/m m m m m kg kg
1.04195 0.45 0.156 0.39 2.988 3.1133
1.04195 0.45 0.156 0.39 2.988 3.1133
0.39458 0.68 0.096 0.00 3.104 1.2248
1.04195 0.90 0.156 0.39 2.892 3.0133
1.04195 0.90 0.156 0.39 4.338 4.5200
0.39458 0.68 0.096 0.00 5.432 2.1434
1.04195 0.45 0.156 0.39 2.988 3.1133
1.04195 0.45 0.156 0.39 2.988 3.1133
0.39458 0.68 0.096 0.00 3.104 1.2248
Jumlah 19.9867 4.5930
0.1999 0.0459
20.1865 4.6389
0.2019 0.0464
20.3884 4.6853
188.7814 43.3822

Berat Pnjg Hak Ovrlap T.Pnjg Vol Vol


kg/m m m m m kg kg
1.04195 1.00 0.156 0.39 4.638 4.83256
1.04195 1.00 0.156 0.39 4.638 4.83256
0.39458 0.68 0.096 0.00 6.208 2.4496
1.04195 2.00 0.156 0.39 5.092 5.30560
1.04195 2.00 0.156 0.39 7.638 7.95840
0.39458 0.68 0.096 0.00 11.640 4.5930
1.04195 1.00 0.156 0.39 4.638 4.83256
1.04195 1.00 0.156 0.39 4.638 4.83256
0.39458 0.68 0.096 0.00 6.208 2.4496
Jumlah 32.59423 9.4921
0.32594 0.0949
32.92017 9.5870
0.32920 0.0959
33.24938 9.6829
138.53907 40.3454

Berat Pnjg Hak Ovrlap T.Pnjg Vol Vol


kg/m m m m m kg kg
1.04195 0.50 0.156 0.39 3.138 3.2696
1.04195 0.50 0.156 0.39 3.138 3.2696
0.39458 0.68 0.096 0.00 3.880 1.5310
1.04195 1.00 0.156 0.39 3.092 3.2217
1.04195 1.00 0.156 0.39 4.638 4.8326
0.39458 0.68 0.096 0.00 6.208 2.4496
1.04195 0.50 0.156 0.39 3.138 3.2696
1.04195 0.50 0.156 0.39 3.138 3.2696
0.39458 0.68 0.096 0.00 3.880 1.5310
Jumlah 21.1328 5.5115
0.2113 0.0551
21.3441 5.5667
0.2134 0.0557
21.5576 5.6223
179.6464 46.8528

Berat Pnjg Hak Ovrlap T.Pnjg Vol Vol


kg/m m m m m kg kg
1.04195 0.75 0.156 0.39 3.888 4.0511
1.04195 0.75 0.156 0.39 3.888 4.0511
0.39458 0.68 0.096 0.00 4.656 1.8372
1.04195 1.50 0.156 0.39 4.092 4.2637
1.04195 1.50 0.156 0.39 6.138 6.3955
0.39458 0.68 0.096 0.00 8.536 3.3682
1.04195 0.75 0.156 0.39 3.888 4.0511
1.04195 0.75 0.156 0.39 3.888 4.0511
0.39458 0.68 0.096 0.00 4.656 1.8372
Jumlah 26.8635 7.0425
0.2686 0.0704
27.1322 7.1130
0.2713 0.0711
27.4035 7.1841
152.2415 39.9116
VOLUME KOLOM LANTAI SATU

1 KOLOM K1 (30x45) ; 24 UNIT


Jumlah : 24
Dimensi : ### x ### m
Tinggi : 4 m
Cover beton : 0.025 m
Volume :
a) Beton : ### m3
Jml Volume Beton = ### m3
b) Tulangan : Jml D As s Berat Pnjg Hak
Tul n m m2 m kg/m m m
Bj. Besi Beton Tumpuan (bawah) ### 0.016 0 1.578 1 0.192
= 7850 kg/m3 Sk 8 0.01 8E-05 0.15 0.617 ### 0.12
Lapangan (tengah) ### 0.016 0 1.578 2 0.192
Sk 15 0.01 8E-05 0.15 0.617 ### 0.12
Tumpuan (atas) ### 0.016 0 1.578 1 0.192
Sk 8 0.01 8E-05 0.15 0.617 ### 0.12

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = ### kg
c) Bekisting : ### m2
### m2/m3
Jml Vol bekisting = ### m2

2 KOLOM K1A (30x45) ; 8 UNIT


Jumlah : ###
Dimensi : ### x ### m
Tinggi : 4 m
Cover beton : 0.025 m
Volume :
a) Beton : ### m3
Jml Volume Beton = ### m3
b) Tulangan : Jml D As s Berat Pnjg Hak
Tul n m m2 m kg/m m m
Bj. Besi Beton Tumpuan (bawah) ### 0.016 0 1.578 1 0.192
= 7850 kg/m3 Sk 11 0.01 8E-05 0.1 0.617 ### 0.12
Lapangan (tengah) ### 0.016 0 1.578 2 0.192
Sk 15 0.01 8E-05 0.15 0.617 ### 0.12
Tumpuan (atas) ### 0.016 0 1.578 1 0.192
Sk 11 0.01 8E-05 0.1 0.617 ### 0.12

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = ### kg
c) Bekisting : ### m2
### m2/m3
Jml Vol bekisting = ### m2

Grand Tot. Vol


Vol (kg/m3)
Jml Volume Besi = ### kg
c) Bekisting : ### m2
### m2/m3
Jml Vol bekisting = ### m2
VOLUME KOLOM

1 KOLOM K1 (30x30) ; 16 UNIT


Jumlah : 16.00
Dimensi : 0.30 x 0.30 m
Tinggi : 4.80 m
Cover beton : 0.03 m
Volume :
a) Beton : 0.43 m3
Jml Volume Beton = 6.912 m3
Ovrlap T.Pnjg Vol b) Tulangan : Jml
m m kg Tul n
0 #REF! ### Bj. Besi Beton Tumpuan (bawah) 10
0 #REF! ### = 7850 kg/m3 Sk 9
0 #REF! ### Lapangan (tengah) 10
0 #REF! ### Sk 17
0.64 #REF! ### Tumpuan (atas) 10
0 #REF! ### Sk 9
Jumlah ###
### Bendrat (1%)
### Tot. Vol
### Waste (1%)
### Grand Tot. Vol
### Vol (kg/m3)
Jml Volume Besi = 1143 kg
c) Bekisting : 5.76 m2
13.33 m2/m3
Jml Vol bekisting = 92.16 m2

2 KOLOM PRAKTIS KP (15x15) ; 6 UNIT


Jumlah : 6
Dimensi : 0.15 x 0.15 m
Tinggi : 4.05 m
Cover beton : 0.025 m
Volume :
a) Beton : 0.091 m3
Jml Volume Beton = 0.547 m3
Ovrlap T.Pnjg Vol b) Tulangan : Jml
m m kg Tul n
0 #REF! ### Bj. Besi Beton Tumpuan (bawah) 4
0 #REF! ### = 7850 kg/m3 Sk 7
0 #REF! ### Lapangan (tengah) 4
0 #REF! ### Sk 12
0.64 #REF! ### Tumpuan (atas) 4
0 #REF! ### Sk 7
Jumlah ###
### Bendrat (1%)
### Tot. Vol
### Waste (1%)
### Grand Tot. Vol
### Vol (kg/m3)
Jml Volume Besi = 119 kg
c) Bekisting : 2.43 m2
26.67 m2/m3
Jml Vol bekisting = 14.58 m2

###
###
D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
m m2 m kg/m m m m m kg
0.013 0.000133 1.04195 1.2 0.156 0 13.56 14.13
0.008 5.03E-05 0.15 0.39458 1 0.096 0 9.86 3.89
0.013 0.000133 1.04195 2.4 0.156 0 25.56 26.63
0.008 5.03E-05 0.15 0.39458 1 0.096 0 18.63 7.35
0.013 0.000133 1.04195 1.2 0.156 0 13.56 14.13
0.008 5.03E-05 0.15 0.39458 1 0.096 0 9.86 3.89
Jumlah 70.03
0.70
70.73
0.71
71.43
165.36

D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol


m m2 m kg/m m m m m kg
0.01 7.85E-05 0.61654 1.0125 0.12 0 4.53 2.7929151
0.008 5.03E-05 0.2 0.39458 0.4 0.096 0 3.472 1.3699958
0.012 0.000113 0.88781 2.025 0.144 0 8.676 7.702675
0.008 5.03E-05 0.2 0.39458 0.4 0.096 0 5.952 2.3485642
0.01 7.85E-05 0.61654 1.0125 0.12 0.4 6.13 3.7793752
0.008 5.03E-05 0.2 0.39458 0.4 0.096 0 3.472 1.3699958
Jumlah 19.363521
0.1936352
19.557156
0.1955716
19.752728
216.76519
VOLUME BALOK B1

1 BALOK B1 (20X30) ; L= 4 M ; 13 UNIT


Jumlah : 13.00
Dimensi : 0.20 x 0.30 m
Panjang : 4.00 m
T. Plat : 0.00 m
Cover beton : 0.025 m
Volume :
a) Beton : 0.24 m3
Jml Volume Beton = 3.12 m3
b) Tulangan : Jml D As s Berat Pnjg
Tul n m m2 m kg/m m
Bj. Besi Beton Tumpuan (kiri) 5 0.0130 0 1.042 1
= 7850 kg/m3 Sk 8 0.0080 5E-05 0.15 0.395 0.8
Lapangan (tengah) 5 0.0130 0 1.042 2
Sk 11 0.0080 5E-05 0.20 0.395 0.8
Tumpuan (kanan) 5 0.0130 0 1.042 1
Sk 8 0.0080 5E-05 0.15 0.395 0.8
Pinggang 2 0.0100 8E-05 0.617 4

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 590 kg
c) Bekisting : 3.2 m2
13.33 m2/m3
Jml Vol bekisting = 41.6 m2

2 BALOK B1 (20X30) ; L= 2,00 M ; 4 UNIT


Jumlah : 4.00
Dimensi : 0.20 x 0.30 m
Panjang : 2.00 m
T. Plat : 0.00 m
Cover beton : 0.025 m
Volume :
a) Beton : 0.12 m3
Jml Volume Beton = 0.48 m3
b) Tulangan : Jml D As s Berat Pnjg
Tul n m m2 m kg/m m
Bj. Besi Beton Tumpuan (kiri) 5 0.0130 0 1.042 0.5
= 7850 kg/m3 Sk 5 0.0080 5E-05 0.15 0.395 0.8
Lapangan (tengah) 5 0.0130 0 1.042 1
Sk 6 0.0080 5E-05 0.20 0.395 0.8
Tumpuan (kanan) 5 0.0130 0 1.042 0.5
Sk 5 0.0080 5E-05 0.15 0.395 0.8
Pinggang 2 0.0100 8E-05 0.617 2

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 113 kg
c) Bekisting : 1.6 m2
13.33 m2/m3
Jml Vol bekisting = 6.4 m2
TOTAL
Beton = 3.6
Besi = 704
Bekisting = 48
VOLUME BALOK RB

1 BALOK RB (15X25) ; L= 4 M ; 14 UNIT


Jumlah : 14.00
Dimensi : 0.15 x
Panjang : 4.00
T. Plat : 0.00 m
Cover beton : 0.025 m
Volume :
a) Beton : 0.15 m3
Jml Volume Beton = 2.1
Hak Ovrlap T.Pnjg Vol b) Tulangan :
m m m kg Tul
0.156 0.39 7.73 8.054 Bj. Besi Beton Tumpuan (kiri)
0.096 0 7.168 2.828 = 7850 kg/m3 Sk
0.156 0.52 13.38 13.941 Lapangan (tengah)
0.096 0 9.856 3.889 Sk
0.156 0.39 7.73 8.054 Tumpuan (kanan)
0.096 0 7.168 2.828 Sk
0 0 8 4.932 Pinggang
Jumlah 44.528
0.445 Bendrat (1%)
44.973 Tot. Vol
0.450 Waste (1%)
45.423 Grand Tot. Vol
189.262 Vol (kg/m3)
Jml Volume Besi = 295
c) Bekisting : 2.6 m2
17.3333 m2/m3
Jml Vol bekisting = 36.4

2 BALOK RB (15X25) ; L= 2,00 M ; 5 UNIT


Jumlah : 5.00
Dimensi : 0.15 x
Panjang : 2.00
T. Plat : 0.00 m
Cover beton : 0.025 m
Volume :
a) Beton : 0.075 m3
Jml Volume Beton = 0.375
b) Tulangan :
Hak Ovrlap T.Pnjg Vol Tul
m m m kg Bj. Besi Beton Tumpuan (kiri)
0.156 0.39 5.23 5.449 = 7850 kg/m3 Sk
0.096 0 4.48 1.768 Lapangan (tengah)
0.156 0.52 8.38 8.732 Sk
0.096 0 5.376 2.121 Tumpuan (kanan)
0.156 0.39 5.23 5.449 Sk
0.096 0 4.48 1.768 Pinggang
0 0 4 2.466
Jumlah 27.753 Bendrat (1%)
0.278 Tot. Vol
28.031 Waste (1%)
0.280 Grand Tot. Vol
28.311 Vol (kg/m3)
235.925 Jml Volume Besi = 64.68
c) Bekisting : 1.3 m2
17.3333 m2/m3
Jml Vol bekisting = 6.5

3 BALOK RB (15X25) ; L= 3,00 M ; 1 UNIT


Jumlah : 1.00
Dimensi : 0.15 x
Panjang : 3.00
T. Plat : 0.00 m
Cover beton : 0.025 m
Volume :
a) Beton : 0.1125 m3
Jml Volume Beton = 0.113
b) Tulangan :
Tul
Bj. Besi Beton Tumpuan (kiri)
= 7850 kg/m3 Sk
Lapangan (tengah)
Sk
Tumpuan (kanan)
Sk
Pinggang

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 16.85
c) Bekisting : 1.95 m2
17.3333 m2/m3
Jml Vol bekisting = 1.95

4 BALOK RB (15X25) ; L= 1,80 M ; 1 UNIT


Jumlah : 1.00
Dimensi : 0.15 x
Panjang : 1.80
T. Plat : 0.00 m
Cover beton : 0.025 m
Volume :
a) Beton : 0.054 m3
Jml Volume Beton = 0.054
b) Tulangan :
Tul
Bj. Besi Beton Tumpuan (kiri)
= 7850 kg/m3 Sk
Lapangan (tengah)
Sk
Tumpuan (kanan)
Sk
Pinggang

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 11.31
c) Bekisting : 0.99 m2
18.3333 m2/m3
Jml Vol bekisting = 0.99

TOTAL
Beton = 2.64
Besi = 387.51
Bekisting = 45.84
4 M ; 14 UNIT

0.25 m
m

m3
Jml D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
Tul n m m2 m kg/m m m m m kg
4 0.0100 8E-05 0.61654 1 0.12 0.3 5.68 3.502
8 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 5.568 2.197
ngan (tengah) 4 0.0100 8E-05 0.61654 2 0.12 0.4 10.08 6.215
11 0.0080 5E-05 0.20 0.39458 0.6 0.096 0 7.656 3.021
puan (kanan) 4 0.0100 8E-05 0.61654 1 0.12 0.3 5.68 3.502
8 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 5.568 2.197
0 0.0100 8E-05 0.61654 4 0 0 0 0.000
Jumlah 20.634
0.206
20.840
0.208
21.048
140.322
kg

m2/m3
m2

2,00 M ; 5 UNIT

0.25 m
m

m3
Jml D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
Tul n m m2 m kg/m m m m m kg
4 0.0100 8E-05 0.61654 0.5 0.12 0.3 3.68 2.269
5 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 3.48 1.373
ngan (tengah) 4 0.0100 8E-05 0.61654 1 0.12 0.4 6.08 3.749
6 0.0080 5E-05 0.20 0.39458 0.6 0.096 0 4.176 1.648
puan (kanan) 4 0.0100 8E-05 0.61654 0.5 0.12 0.3 3.68 2.269
5 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 3.48 1.373
0 0.0100 8E-05 0.61654 2 0 0 0 0.000
Jumlah 12.680
0.127
12.807
0.128
12.935
172.470
kg

m2/m3
m2

3,00 M ; 1 UNIT

0.25 m
m

m3
Jml D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
Tul n m m2 m kg/m m m m m kg
4 0.0100 8E-05 0.61654 0.75 0.12 0.3 4.68 2.885
6 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 4.176 1.648
ngan (tengah) 4 0.0100 8E-05 0.61654 1.5 0.12 0.4 8.08 4.982
9 0.0080 5E-05 0.20 0.39458 0.6 0.096 0 6.264 2.472
puan (kanan) 4 0.0100 8E-05 0.61654 0.75 0.12 0.3 4.68 2.885
6 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 4.176 1.648
0 0.0100 8E-05 0.61654 3 0 0 0 0.000
Jumlah 16.520
0.165
16.685
0.167
16.852
149.793
kg

m2/m3
m2

1,80 M ; 1 UNIT

0.20 m
m

m3
Jml D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
Tul n m m2 m kg/m m m m m kg
4 0.0100 8E-05 0.61654 0.45 0.12 0.3 3.48 2.146
4 0.0080 5E-05 0.15 0.39458 0.5 0.096 0 2.384 0.941
ngan (tengah) 4 0.0100 8E-05 0.61654 0.9 0.12 0.4 5.68 3.502
6 0.0080 5E-05 0.20 0.39458 0.5 0.096 0 3.576 1.411
puan (kanan) 4 0.0100 8E-05 0.61654 0.45 0.12 0.3 3.48 2.146
4 0.0080 5E-05 0.15 0.39458 0.5 0.096 0 2.384 0.941
0 0.0100 8E-05 0.61654 1.8 0 0 0 0.000
Jumlah 11.085
0.111
11.196
0.112
11.308
209.412
kg

m2/m3
m2

Anda mungkin juga menyukai