HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN VOLUME
(Rp)
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Mobilisasi & Demobilisasi Ls 1.00 10,000,000.00
2 Pengukuran dan Penggambaran Ls 1.00 1,500,000.00
3 Dokumentasi Ls 1.00 750,000.00
JUMLAH I
II. PEKERJAAN TANAH
1 Hamparan Sirtu M3 768.86 205,767.10
JUMLAH II
A REAL COAST
B PAJAK PERTAMBAHAN NILAI (PPN) = 10% X A
C JUMLAH TOTAL HARGA PENAWARAN (A + B)
D DIBULATKAN
JUMLAH HARGA
(Rp)
6
10,000,000.00
1,500,000.00
750,000.00
12,250,000.00
158,205,187.01
158,205,187.01
170,455,187.01
17,045,518.70
187,500,705.71
187,500,000.00
Harga Satuan
No Uraian KODE Satuan Keterangan
(Rp)
1 2 3 4 5 6
I. UPAH KERJA
1.1 Pekerja Jam 9,571.43 67,000.00
1.2 Tukang Jam 11,000.00 77,000.00
1.3 Kepala Tukang Jam 12,571.43 88,000.00
1.4 Mandor Jam 13,571.43 95,000.00
1.5 Operator Jam 12,928.57 90,500.00
1.6 Pembantu Operator Jam 3,142.86 22,000.00
1.7 Sopir / Driver Jam 15,714.29 110,000.00
1.8 Pembantu Sopir / Kernet Jam 10,214.29 71,500.00
1.9 Juru Ukur Jam 25,142.86 176,000.00
1.10 Pembantu Juru Ukur Jam 10,214.29 71,500.00
DAFTAR HARGA SATUAN BAHAN
Harga Satuan
No Uraian KODE Satuan Keterangan
(Rp)
1 2 3 4 5 6
Harga Satuan
No Uraian KODE Satuan Keterangan
(Rp)
1 2 3 4 5 6
A. URAIAN PERALATAN
1 Jenis Peralatan MOTOR GRADER >100 HP
2 Tenaga Pw 135.0 HP
3 Kapasitas Cp 10,800.0 -
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B ### Rupiah
E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Upah Operator / Sopir U1 12,928.57 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 3,142.86 Rp./Jam
4 Bahan Bakar Bensin Mb 11,565.82 Liter
5 Bahan Bakar Solar Ms 7,600.00 Liter
6 Minyak Pelumas Mp 18,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1 Jenis Peralatan TRACK LOADER 75-100 HP E14
2 Tenaga Pw 70.0 HP
3 Kapasitas Cp 0.8 M3
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 542,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 542,000,000 Rupiah Alat Baru
E. LAIN - LAIN
1 Tingkat Suku Bunga i 11.50 % / Tahun
2 Upah Operator / Sopir U1 28,600.00 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 8,600.00 Rp./Jam
4 Bahan Bakar Bensin Mb 12,285.00 Liter
5 Bahan Bakar Solar Ms 13,056.80 Liter
6 Minyak Pelumas Mp 30,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
ANALISA HARGA SATUAN
A. TENAGA KERJA
1 Pekerja OH 0.0238 67,000.00 1,594.60
2 Mandor OH 0.0119 95,000.00 1,130.50
B. BAHAN
1 Tanah / Sirtu (Quary) M³ 1.200 57,500.00 69,000.00
C. PERALATAN
1 Dump Truck Jam 0.133 328,790.85
2 Stamper Jam 0.300 8,630.51
3 Alat Bantu Ls 1.000 2,000.00
A. TENAGA KERJA
1 Pekerja OH 0.0357 67,000.00 2,391.90
2 Mandor OH 0.0119 95,000.00 1,130.50
B. BAHAN
1 Sirtu M³ 1.200 140,000.00 168,000.00
C. PERALATAN
1 TRACK LOADER 75-100 HP Jam 0.0167 324,330.77 5,405.51
2 Tandem Roller Jam - - -
3 Alat Bantu Ls 1.000 2,000.00 2,000.00
A. TENAGA KERJA
1 Pekerja OH 1.650 67,000.00 110,550.00
2 Tukang Batu OH 0.275 77,000.00 21,175.00
3 Kepala Tukang OH 0.028 88,000.00 2,464.00
4 Mandor OH 0.165 95,000.00 15,675.00
B. BAHAN
1 PC / Portland Cement Zak 6.52 75,000.00 489,000.00
2 PB / Pasir Beton M³ 0.54 113,636.36 61,688.31
3 Kr / Kerikil M³ 0.76 142,000.00 108,235.56
4 Air Ltr 215.00 -
C. PERALATAN
A. TENAGA KERJA
1 Pekerja OH 0.300 67,000.00 20,100.00
2 Tukang Batu OH 0.150 77,000.00 11,550.00
3 Kepala Tukang OH 0.015 88,000.00 1,320.00
4 Mandor OH 0.030 95,000.00 2,850.00
B. BAHAN
1 Pasir Pasang M³ 0.012 113,636.36 1,363.64
2 Portland Cement Zak 0.127 75,000.00 9,510.00
C. PERALATAN
A. TENAGA KERJA
1 Pekerja OH 0.300 67,000.00 20,100.00
2 Tukang Batu OH 0.150 77,000.00 11,550.00
3 Kepala Tukang OH 0.015 88,000.00 1,320.00
4 Mandor OH 0.030 95,000.00 2,850.00
B. BAHAN
1 Pasir Pasang M³ 0.016 113,636.36 1,818.18
2 Portland Cement Zak 0.117 75,000.00 8,760.00
C. PERALATAN
A. TENAGA KERJA
1 Pekerja OH 2.700 67,000.00 180,900.00
2 Tukang Batu OH 0.900 77,000.00 69,300.00
3 Kepala Tukang OH 0.090 88,000.00 7,920.00
4 Mandor OH 0.270 95,000.00 25,650.00
B. BAHAN
1 Batu Kali M3 1.200 207,000.00 248,400.00
2 Pasir Pasang M 3
0.520 113,636.36 59,090.91
3 Portland Cement Zak 3.260 75,000.00 244,500.00
C. PERALATAN
A. TENAGA KERJA
1 Pekerja OH 1.800 67,000.00 120,600.00
2 Mandor OH 0.180 95,000.00 17,100.00
B. BAHAN
-
C. PERALATAN
1 Palu/Godam (Baja Keras) Bh 0.006 100,000.00 600.00
2 Pahat Beton (Baja Keras) Bh 0.009 225,000.00 2,025.00
3 Linggis (Baja Keras) Bh 0.020 225,000.00 4,500.00
A. TENAGA
1 Pekerja OH 0.5630 67,000.00 37,721.00
2 Mandor OH 0.0563 77,000.00 4,335.10
B. BAHAN
C. PERALATAN
1 Alat Bantu Ls 1.00 1,000.00 1,000.00
A. TENAGA
1 Pekerja OH 0.3300 67,000.00 22,110.00
2 Mandor OH 0.0330 95,000.00 3,135.00
B. BAHAN
C. PERALATAN
1 Alat Bantu Ls 1.00 1,000.00 1,000.00