No Jenis Pekerjaan satuan jumlah harga total harga
Air terminal Thomas R-125 unit 2 7,500,000 15,000,000 Kabel NYY 1x50 mm meter 50 70,000 3,500,000 Kawat BC 50 mm meter 16 36,000 576,000 grounding rod btg 1 980,000 980,000 Box control, schoen 50 mm, baut set 1 700,000 700,000 Pekerjaan bor grounding ls 2 5,000,000 10,000,000 Tower triangle galv 30 cm, asesoris dan pemasangan stage 10 3,500,000 35,000,000 Pondasi tiang dan pondasi skur ls 1 1,500,000 1,500,000 Alat bantu kerja ls 1 4,000,000 4,000,000 Biaya instalasi ls 2 4,000,000 8,000,000 Akomodasi & penginapan ls 1 4,000,000 4,000,000 83,256,000