Anda di halaman 1dari 59

1

Err:509 25,000,000.00
Err:509 DUA PULUH LIMA JUTA RUPIAH
SE SE
DUA DUA
TIGA TIGA
EMPAT EMPAT
LIMA LIMA
ENAM ENAM
TUJUH TUJUH
DELAPAN DELAPAN
SEMBILAN SEMBILAN

SATU SATU
DUA DUA
TIGA TIGA
EMPAT EMPAT
LIMA LIMA
ENAM ENAM
TUJUH TUJUH
DELAPAN DELAPAN
SEMBILAN SEMBILAN
Err:509
Err:509

Err:509 25,000,000
Err:509 25,000,000
Err:509 25,000,000
Err:509 25,000,000
Err:509 25,000,000
Err:509 25,000,000
Err:509 25,000,000
Err:509 25,000,000
Err:509 25,000,000
Err:509 25,000,000
Err:509 25,000,000
Err:509 5,000,000
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 1
Err:509
Err:509 JUTA
Err:509 0
Err:509 0
Err:509 0
Err:509 0
Err:509 0
Err:509 0
Err:509 0
Err:509 0
Err:509 0
Err:509 0
Err:509 2
Err:509 5
Err:509 0
Err:509 0
Err:509 0
Err:509 0
Err:509 0
Err:509 0
Err:509 0
Err:509 0

Err:509 0
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 DUA PULUH LIMA JUTA
Err:509 LIMA
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
DAFTAR HARGA SATUAN
NO JENIS BAHAN SATUAN
1 2 3
A BAHAN DASAR
1 Batu Kali
Utuh M³
Batu pecah 3 - 5 cm M³
Batu pecah 2 - 3 cm M³
kg
Batu pecah 1 - 2 cm M³
Batu pecah 0.51 - 1 cm M³
2 Batu Merah Buah
3 Batu Gunung M³
4 Tanah Timbunan M³
5 Pasir
Timbunan / Urug M³
kg
Pasangan M³
kg
Beton M³
kg
6 Kerikil M³
Kerikil kg
7 Sirtu M³
8 Kapur Pasangan Bks
9 Semen PC Zak
Ordinary Portland Cement (OPC 50 Kg) Kg
B BAHAN KAYU
1 Kayu Kelas I
Balok Gergaji Sawmil M³
Papan Gergaji Sawmil M³
Balok Gergaji Sansaw M³
Papan Gergaji Sansaw M³
2 Kayu Kelas II
Balok M³
Papan M³
3 Kayu Kelas III
Balok M³
Papan M³
4 Kayu Lokal Setara Jati Putih
Balok M³
Papan M³
C BAHAN KACA
Kaca Bening 5 mm Mtr
D BAHAN BESI
1 Besi Beton
Polos Kg
Ulir Kg
2 PAKU
Paku Biasa Kg
Paku Asbes Kg
Paku Seng (payung) RRT Dos
Paku skrup 3 ½ inci Dos
Paku Skrup 4 Inci Dos
Paku Payung Berulir 75 mm Kg
3 Kawat
Beton Kg
Rang Mtr
Ayakan Kecil mtr
Duri roll
E BAHAN ATAP
Seng Gelombang BJLS 0.20 mm kaki
Seng Gelombang BJLS 0.20 mm lbr
Nok Seng Plat lbr
F BAHAN PENGGANTUNG
1 Kunci Tanam
1 Slag Bh
Double Slag Bh
2 Penggantung
Hak Angin Kecil Bh
Hak Angin Besar Bh
Grendel Kecil Bh
Grendel Besar Bh
Engsel Pintu Bh
Engsel Jendela Bh

NO JENIS BAHAN SATUAN


UPAH KERJA
1 Pekerja Org/hr
2 Tukang Org/hr
3 Kepala Tukang Org/hr
4 Mandor Org/hr

Disetujui; Dibuat Oleh :


PEJABAT PEMBUAT KOMITMEN CV. SENTRA DESAIN KONSULTA

ANDI ARFHAN SYUKRI, ST, MT ZAPARMAN, ST


NIP. 19720406 200212 1 006 Direktur
Mengetahui/Menyetujui;
Plt. KEPALA DINAS PERUMAHAN
PEMUKIMAN DAN PERTANAHAN

Drs. ANDI MUSMAN, MM


NIP. 19660624 199603 1 003
DAFTAR HARGA SATUAN
HARGA DASAR
4

200,000.00
400,000.00
400,000.00
296.30
414,000.00
420,000.00
650.00
197,000.00
100,000

147,000
105
218,000
156
225,000
161
170,000
126
175,000
3,000

1,220

9,500,000
9,500,000
9,500,000
9,500,000

6,000,000
6,000,000

4,270,000
4,270,000

2,300,000
2,300,000

131,700

10,500
10,500
14,000
25,000
25,000
15,700
15,700
27,500

18,700
18,300
17,700
150,000

7,200.00
43,200.00
57,000.00

176,000
326,000

13,000
18,000
16,000
20,500
15,000
10,000

HARGA

75,000.00
85,000.00
100,000.00
-

Dibuat Oleh :
CV. SENTRA DESAIN KONSULTAN

ZAPARMAN, ST
Direktur
Mengetahui/Menyetujui;
Plt. KEPALA DINAS PERUMAHAN
PEMUKIMAN DAN PERTANAHAN

Drs. ANDI MUSMAN, MM


NIP. 19660624 199603 1 003
ANALISA HARGA SATUAN PEKERJAAN
1 m² Pasangan Atap Seng Gelombang

No. Uraian Kode Satuan Koef.


1 2 3 4 5
A. TENAGA KERJA
1 Pekerja L.01 OH 0.120
2 Tukang L.04 OH 0.060
3 Kepala Tukang L.03 OH 0.006
4 Mandor L.04 OH 0.006
Jumlah Harga
B BAHAN
1 Seng Gelombang Lbr 0.700
2 Paku Seng Kg 0.020
Jumlah Harga
C. PERALATAN

Jumlah Harga
D. Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E. Overhead + Profit (10%)
F. Harga Satuan Pekerjaan per - m¹ (D+E)

1 m' Pasang atap nok seng


No. Uraian Kode Satuan Koef.
1 2 3 4 5
A. TENAGA KERJA
1 Pekerja L.01 OH 0.150
2 Tukang L.04 OH 0.070
3 Kepala Tukang L.03 OH 0.007
4 Mandor L.04 OH 0.008
Jumlah Harga
B BAHAN
Seng Plat BJLS 0,3 mm 40x180 Lbr 0.300
Paku Seng Kg 0.020
Jumlah Harga
C. PERALATAN

Jumlah Harga
D. Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E. Overhead + Profit (10%)
F. Harga Satuan Pekerjaan per - m¹ (D+E)

1 m³ pasang Konstruksi Gording setara jati putih


No. Uraian Kode Satuan Koef.
1 2 3 4 5
A. TENAGA KERJA
1 Pekerja L.01 OH 1.000
2 Tukang L.04 OH 4.000
3 Kepala Tukang L.03 OH 0.720
4 Mandor L.04 OH 0.120
Jumlah Harga
B BAHAN
Balok Kayu Kls. III m3 1.100
Besi Strip Tebal 5 mm Kg 15.000
Paku Biasa Kg 3.000
Jumlah Harga
C. PERALATAN

Jumlah Harga
D. Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E. Overhead + Profit (10%)
F. Harga Satuan Pekerjaan per - m¹ (D+E)

Pasang Lisplank Ukuran (2 x 20) cm setara jati putih

No. Uraian Kode Satuan Koef.


1 2 3 4 5
A. TENAGA KERJA
1 Pekerja L.01 OH 0.100
2 Tukang L.04 OH 0.100
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.005
Jumlah Harga
B BAHAN
Papan Kayu Kls. III m3 0.011
Paku Biasa Kg 0.100
Jumlah Harga
C. PERALATAN

Jumlah Harga
D. Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E. Overhead + Profit (10%)
F. Harga Satuan Pekerjaan per - m¹ (D+E)

Memasang dinding Papan (2 x 20 cm) setara jati putih

No. Uraian Kode Satuan Koef.


1 2 3 4 5
A. TENAGA KERJA
1 Pekerja L.01 OH 0.075
2 Tukang L.04 OH 0.225
3 Kepala Tukang L.03 OH 0.023
4 Mandor L.04 OH 0.008
Jumlah Harga
B BAHAN
Papan Kayu Kls. IV m3 0.014
Balok Kayu Kls. III Kg 0.008
Paku Biasa Kg 0.012
Jumlah Harga
C. PERALATAN

Jumlah Harga
D. Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E. Overhead + Profit (10%)
F. Harga Satuan Pekerjaan per - m¹ (D+E)

Memasang Lantai Papan (2 x 20 cm) setara Kayu jati Putih


No. Uraian Kode Satuan Koef.
1 2 3 4 5
A. TENAGA KERJA
1 Pekerja L.01 OH 0.150
2 Tukang L.04 OH 0.150
3 Kepala Tukang L.03 OH 0.015
4 Mandor L.04 OH 0.008
Jumlah Harga
B BAHAN
Papan Kayu Kls. III m3 0.025
Balok Kayu Kls. III m3 0.011
Paku Biasa Kg 0.012
Jumlah Harga
C. PERALATAN

Jumlah Harga
D. Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E. Overhead + Profit (10%)
F. Harga Satuan Pekerjaan per - m¹ (D+E)

1m ² Pasang Konstruksi Kuda-Kuda Konvensional

No. Uraian Kode Satuan Koef.


1 2 3 4 5
A. TENAGA KERJA
1 Pekerja L.01 OH 1.000
2 Tukang L.04 OH 4.000
3 Kepala Tukang L.03 OH 1.200
4 Mandor L.04 OH 0.200
Jumlah Harga
B BAHAN
Balok Kayu Kls. III m3 1.000
Besi Strip Kg 15.000
Paku Biasa Kg 5.600
Jumlah Harga
C. PERALATAN

Jumlah Harga
D. Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E. Overhead + Profit (10%)
F. Harga Satuan Pekerjaan per - m¹ (D+E)

1m ³ Pekerjaan Pasangan Batu Kali 1 : 4


No. Uraian Kode Satuan Koef.
1 2 3 4 5
A. TENAGA KERJA
1 Pekerja L.01 OH 1.500
2 Tukang L.04 OH 0.750
3 Kepala Tukang L.03 OH 0.075
4 Mandor L.04 OH 0.075
Jumlah Harga
B BAHAN
Batu Kali m3 1.200
Semen Portland Kg 163.000
Pasir Pasang m3 0.520
Jumlah Harga
C. PERALATAN

Jumlah Harga
D. Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E. Overhead + Profit (10%)
F. Harga Satuan Pekerjaan per - m¹ (D+E)

1m 2 Pasangan Batu Bata 1 : 5


No. Uraian Kode Satuan Koef.
1 2 3 4 5
A. TENAGA KERJA
1 Pekerja L.01 OH 0.300
2 Tukang L.04 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
Jumlah Harga
B BAHAN
Batu Bata m3 70.000
Semen Portland Kg 9.680
Pasir Pasang m3 0.045
Jumlah Harga
C. PERALATAN

Jumlah Harga
D. Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E. Overhead + Profit (10%)
F. Harga Satuan Pekerjaan per - m¹ (D+E)

1m 2 Lantai Flur
No. Uraian Kode Satuan Koef.
1 2 3 4 5
A. TENAGA KERJA
1 Pekerja L.01 OH 0.400
2 Tukang L.04 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.022
Jumlah Harga
B BAHAN
Semen Portland m3 13.824
Pasir Pasang m3 0.070
Jumlah Harga
C. PERALATAN

Jumlah Harga
D. Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E. Overhead + Profit (10%)
F. Harga Satuan Pekerjaan per - m¹ (D+E)

1m ³ Lantai rabat beton


No. Uraian Kode Satuan Koef.
1 2 3 4 5
A. TENAGA KERJA
1 Pekerja L.01 OH 1.200
2 Tukang L.04 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.060
Jumlah Harga
B BAHAN
Semen Portland kg 230.000
Pasir Pasang Kg 893.000
Kerikil kg 1,027.000
Jumlah Harga
C. PERALATAN

Jumlah Harga
D. Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E. Overhead + Profit (10%)
F. Harga Satuan Pekerjaan per - m¹ (D+E)

1m ³ Urugan Pasir

No. Uraian Kode Satuan Koef.


1 2 3 4 5
A. TENAGA KERJA
1 Pekerja L.01 OH 0.300
2 Tukang L.04 OH -
3 Kepala Tukang L.03 OH -
4 Mandor L.04 OH 0.010
Jumlah Harga
B BAHAN
Pasir Urug m3 1.200
Jumlah Harga
C. PERALATAN

Jumlah Harga
D. Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E. Overhead + Profit (10%)
F. Harga Satuan Pekerjaan per - m¹ (D+E)
1m ³ Pekerjaan Galian Tanah Biasa sedalam 1 m
No. Uraian Kode Satuan Koef.
1 2 3 4 5
A. TENAGA KERJA
1 Pekerja L.01 OH 0.750
2 Tukang Gali L.04 OH -
3 Kepala Tukang L.03 OH -
4 Mandor L.04 OH 0.025
Jumlah Harga
B BAHAN

Jumlah Harga
C. PERALATAN

Jumlah Harga
D. Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E. Overhead + Profit (10%)
F. Harga Satuan Pekerjaan per - m¹ (D+E)
ITEM PEKERJAAN : 1 m² Plesteran camp 1 pc : 4 psr, tebal 15 mm
Bahan -. Semen Portlan 6.240 Kg
-. Pasir Pasang 0.024 M³

Tenaga -. Pekerja 0.300 Oh


-. Tukang Batu 0.150 Oh
-. Kepala Tukang 0.015 Oh
-. Mandor 0.015 Oh

Peralatan

Jumlah harga tenaga, bahan dan peralatan D = (A+B+C)


Overhead & Prof 10%
Harga Satuan Pekerjaan (D+E)

Disetujui; Dibuat Oleh :


PEJABAT PEMBUAT KOMITMEN CV. SENTRA DESAIN KONSU

ANDI ARFHAN SYUKRI, ST, MT ZAPARMAN, ST


NIP. 19720406 200212 1 006 Direktur

Mengetahui/Menyetujui;
Plt. KEPALA DINAS
PERUMAHAN PEMUKIMAN DAN PERTANAHAN

Drs. ANDI MUSMAN, MM


NIP. 19660624 199603 1 003
JAAN

Harga Satuan (Rp) Jumlah (Rp.)


6 7

75,000.00 9,000.00
85,000.00 5,100.00
100,000.00 600.00
- -
14,700.00

43,800.00 30,660.00
25,000.00 500.00
31,160.00

-
45,860.00
4,586.00
50,446.00

Harga Satuan (Rp) Jumlah (Rp.)


6 7

75,000.00 11,250.00
85,000.00 5,950.00
100,000.00 700.00
- -
17,900.00

57,000.00 17,100.00
25,000.00 500.00
17,600.00

-
35,500.00
3,550.00
39,050.00

Harga Satuan (Rp) Jumlah (Rp.)


6 7

75,000.00 75,000.00
85,000.00 340,000.00
100,000.00 72,000.00
- -
487,000.00

4,270,000.00 4,697,000.00
-
14,000.00 42,000.00
4,739,000.00

-
5,226,000.00
522,600.00
5,748,600.00

Harga Satuan (Rp) Jumlah (Rp.)


6 7
75,000.00 7,500.00
85,000.00 8,500.00
100,000.00 2,000.00
- -
18,000.00

4,270,000.00 46,116.00
14,000.00 1,400.00
47,516.00

-
65,516.00
6,551.60
72,067.60

Harga Satuan (Rp) Jumlah (Rp.)


6 7

75,000.00 5,625.00
85,000.00 19,125.00
100,000.00 2,250.00
- -
27,000.00

2,300,000.00 33,120.00
4,270,000.00 32,025.00
14,000.00 168.00
65,313.00

-
92,313.00
13,846.95
106,159.95

Harga Satuan (Rp) Jumlah (Rp.)


6 7

75,000.00 11,250.00
85,000.00 12,750.00
100,000.00 1,500.00
- -
25,500.00
2,300,000.00 57,040.00
4,270,000.00 44,835.00
14,000.00 168.00
102,043.00

-
127,543.00
12,754.30
140,297.30

Harga Satuan (Rp) Jumlah (Rp.)


6 7

75,000.00 75,000.00
85,000.00 340,000.00
100,000.00 120,000.00
- -
535,000.00

4,270,000.00 4,270,000.00
- -
14,000.00 78,400.00
4,348,400.00

-
4,883,400.00
488,340.00
5,371,740.00

Harga Satuan (Rp) Jumlah (Rp.)


6 7

75,000.00 112,500.00
85,000.00 63,750.00
100,000.00 7,500.00
- -
183,750.00

200,000.00 240,000.00
1,220.00 198,860.00
218,000.00 113,360.00
552,220.00

-
735,970.00
73,597.00
809,567.00

Harga Satuan (Rp) Jumlah (Rp.)


6 7

75,000.00 22,500.00
85,000.00 8,500.00
100,000.00 1,000.00
- -
32,000.00

650.00 45,500.00
1,220.00 11,809.60
218,000.00 9,810.00
67,119.60

-
99,119.60
9,911.96
109,031.56

Harga Satuan (Rp) Jumlah (Rp.)


6 7

75,000.00 30,000.00
85,000.00 17,000.00
100,000.00 2,000.00
- -
49,000.00

1,220.00 16,865.28
218,000.00 15,260.00
32,125.28
-
81,125.28
8,112.53
89,237.81

Harga Satuan (Rp) Jumlah (Rp.)


6 7

75,000.00 90,000.00
85,000.00 17,000.00
100,000.00 2,000.00
- -
109,000.00

1,220.00 280,600.00
155.71 139,052.86
125.93 129,325.93
548,978.78

-
657,978.78
65,797.88
723,776.66

Harga Satuan (Rp) Jumlah (Rp.)


6 7

75,000.00 22,500.00
85,000.00 -
100,000.00 -
- -
22,500.00

147,000.00 176,400.00
176,400.00

-
198,900.00
19,890.00
218,790.00
Harga Satuan (Rp) Jumlah (Rp.)
6 7

85,000.00 63,750.00
100,000.00 -
- -

63,750.00

-
-
-
-

-
63,750.00
9,562.50
73,312.50
m² Plesteran camp 1 pc : 4 psr, tebal 15 mm
1,220.00 7,612.80
218,000.00 5,232.00
Jumlah (A) 12,844.80
75,000.00 22,500.00
85,000.00 12,750.00
100,000.00 1,500.00
- -
Jumlah (B) 36,750.00

Jumlah (C) -
ah harga tenaga, bahan dan peralatan D = (A+B+C) 49,594.80
4,959.48
Jumlah 54,554.28

Dibuat Oleh :
CV. SENTRA DESAIN KONSULTAN

ZAPARMAN, ST
Direktur

Mengetahui/Menyetujui;
Plt. KEPALA DINAS
MAHAN PEMUKIMAN DAN PERTANAHAN

Drs. ANDI MUSMAN, MM


NIP. 19660624 199603 1 003
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN : FASILITASI DAN STIMULASI PEMBANGUNAN PERUMAHAN MASYARAKAT KURANG MAMPU
VOLUME : 6 (ENAM) UNIT
LOKASI : KELURAHAN TANETE
KECAMATAN : BULUKUMPA

JML. HRG
NO LOKASI/NAMA MBR KETERANGAN
(Rp.)
1 2 3 4
I. BADI 25,000,000.00

II. CINDE 14,569,000.00


III. BASRI 13,851,000.00

IV. RAHMATIA 11,270,000.00


V. SAMSIAH 11,707,000.00

VI. ST. HADIJAH 28,109,000.00


Real coast 104,506,000.00
Jumlah 104,506,000.00
Dibulatkan 104,506,000.00
Terbilang : #NAME?
Lima Ratus
Juta Rupiah

Bulukumba , Maret 2018

Menyetujui : Dibuat Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PERENCANA
CV. SENTRA DESAIN KONSULTAN

ANDI SYAHRIR, ST ZAPARMAN, ST


NIP. 19750515 200801 1 012 Direktur

Mentahui/Menyetujui; Disetujui;
Plt. KEPALA DINAS PEJABAT PEMBUAT KOMITMEN
PERUMAHAN PEMUKIMAN DAN PERTANAHAN

Drs. ANDI MUSMAN, MM ANDI ARFHAN SYUKRI, ST, MT


NIP. 19660624 199603 1 003 NIP. 19720406 200212 1 006
1 m² Pasangan Atap Seng Gelombang Rp 50,446.00
1 m' Pasang atap nok seng Rp 39,050.00
1 m³ pasang Konstruksi Gording setara jati putih Rp 5,748,600.00
Pasang Lisplank Ukuran (2 x 20) cm setara jati putih Rp 72,067.60
Memasang dinding Papan (2 x 20 cm) setara jati putih Rp 106,159.95
Memasang Lantai Papan (2 x 20 cm) setara Kayu jati Putih Rp 140,297.30
1m ² Pasang Konstruksi Kuda-Kuda Konvensional Rp 5,371,740.00
1m ³ Pekerjaan Pasangan Batu Kali 1 : 4 Rp 809,567.00
1m ³ Lantai rabat beton Rp 723,776.66
1m ³ Urugan Pasir Rp 218,790.00
1m 2 Pasangan Batu Bata 1 : 5 Rp 109,031.56
Timbunan / Urug Rp 147,000.00
1m 2 Lantai Flur Rp 89,237.81
1m ³ Pekerjaan Galian Tanah Biasa sedalam 1 m Rp 73,312.50
: 1 m² Plesteran camp 1 pc : 4 psr, tebal 15 mm Rp 54,554.28
RENCANA ANGGARAN BIAYA
KEGIATAN : PENGADAAN SARANA DAN PRASARANA KELUARGA MISKIN
VOLUME : 1 (SATU) PAKET
LOKASI : DUSUN GALANG BADDONG
KEL/DESA : BONTOLOHE
KECAMATAN : RILAU ALE
NAMA MBR : BADI

VOL. /
NO URAIAN PEKERJAAN
SAT. SPESIFIKASI
1 2 4 5
A PEKERJAAN PERSIAPAN
1 Pekerjaan Pembongkaran 1.00 Ls
B PEKERJAAN STRUKTUR DAN DINDING
Kayu Lokal
1 Pek. Pasangan Dinding Depan 9.76 m2
Setara Jati Putih
Kayu Lokal
2 Pek. Pasangan Dinding Kanan 12.33 m2
Setara Jati Putih
Kayu Lokal
3 Pek. Pasangan Dinding Kiri 9.48 m2
Setara Jati Putih
Kayu Lokal
4 Pek. Pasangan Dinding Belakang 12.92 m2
Setara Jati Putih
Kayu Lokal
5 Pek. Tiang Kayu 12 / 12 cm 0.09 m3
Setara Jati Putih
Kayu Lokal
6 Pek. Pattolo 5 /10 0.13 m3
Setara Jati Putih
C PEKEJAAN KUSEN
Uk. Engsel
Pek. Pasangan Kusen + Pintu Panil + Kuncian 1slaag +
1 1.00 set 4"x2mm, Kuncian
Engsel
1 Slaag
2 Pek. Pasangan Kusen + Daun Jendela + Kaca 5 mm + Uk. Engsel
6.00 set
Engsel + Kait Angin + Grendel 4"x2mm,
D PEKERJAAN ATAP
Kayu Lokal
1 Pek. Pasangan Konstruksi Kuda-Kuda Konvensional 0.65 m2 Setara Jati Putih
2 Pek. Pasangan Atap Seng Gelombang 54.60 m2 BJLS 0,22 mm
3 Pek. Bubungan Seng Plat - m'
Kayu Lokal
4 Pek. Gording Balok 5 / 5 cm m2
0.19 Setara Jati Putih
Kayu Lokal
5 Pek. Lisplank Kayu 12.00 m'
Setara Jati Putih
6 Pek. Pasangan Timpa Laja 5.10 m2
E PEKERJAAN LANTAI
Kayu Lokal
1 Pekerjaan lantai Papan 35.45 m2
Setara Jati Putih
Terbilang : #NAME?
Dua Puluh
Lima Juta
Rupiah Menyetujui :
PPTK

ST. ISNIYAH HATIBU, S.IP


NIP. 19780615 201001 2 020

Mengetahui/Menyetujui;
KEPALA DINAS

SYARIFUDDIN, S.Sos, M.AP


NIP. 19640513 198611 1 050
NA ANGGARAN BIAYA

HRG. SAT. JML. HRG


(Rp.) (Rp.)
6 7

200,000.00 200,000.00

106,159.95 1,036,121.11

106,159.95 1,308,952.18

106,159.95 1,006,396.33

106,159.95 1,371,586.55

2,300,000.00 198,720.00

2,300,000.00 299,000.00

900,000.00 900,000.00

500,000.00 3,000,000.00

3,484,755.17
5,371,740.00
50,446.00 2,754,351.60
39,050.00 -
5,748,600.00
1,086,485.40
72,067.60 864,811.20
50,446.00 257,274.60

140,297.30 4,972,848.31

GRAND TOTAL 22,741,302.46


PPN 10 % 2,274,130.25
JUMLAH 25,015,432.71
DIBULATKAN 25,000,000.00

#NAME?

Dibuat Oleh :
CV. SENTRA DESAIN KONSULTAN

ZAPARMAN, ST
Direktur

Menyetujui :
PEJABAT PEMBUAT KOMITMEN

SYARIFUDDIN, S.Sos, M.AP


NIP. 19640513 198611 1 050
RENCANA ANGGARAN BIAYA
KEGIATAN : FASILITASI DAN STIMULASI PEMBANGUNAN PERUMAHAN MASYARAKAT KURANG MAMPU

VOLUME : 1 (SATU) PAKET


LOKASI : JL. DURIAN (RUMAH PANGGUNG)
KEL/DESA : TANETE
KECAMATAN : BULUKUMPA
NAMA MBR : CINDE

VOL. /
NO URAIAN PEKERJAAN
SAT. SPESIFIKASI
1 2 4 5
A PEKERJAAN PERSIAPAN
1 Pekerjaan Pembongkaran 1.00 Ls
B PEKERJAAN STRUKTUR DAN DINDING
Kayu Lokal
1 Pek. Pasangan Dinding Depan 2.46 m2
Setara Jati Putih
Kayu Lokal
2 Pek. Pasangan Dinding Kanan 13.02 m2
Setara Jati Putih
Kayu Lokal
3 Pek. Pasangan Dinding Kiri 13.02 m2
Setara Jati Putih
4 Pek. Pasangan Batu Bata Tinggi 125 cm - m2
5 Pek. Plesteran (Sisi dalam) - m2
Kayu Lokal
6 Pek. Tiang Kayu 12 / 12 cm 0.43 m3
Setara Jati Putih
Kayu Lokal
7 Pek. Pattolo 5 /10 0.08 m3
Setara Jati Putih
C PEKEJAAN KUSEN
Uk. Engsel
Pek. Pasangan Kusen + Pintu Panil + Kuncian 1slaag +
1 1.00 set 4"x2mm, Kuncian
Engsel
1 Slaag
Uk. Engsel
2 Pek. Pasangan Kusen + Daun Jendela + Kaca 5 mm + 4.00 set
Engsel + Kait Angin + Grendel 4"x2mm,
D PEKERJAAN ATAP
1 Pek. Pasangan Atap Seng Gelombang 89.00 m2 BJLS 0,22 mm
2 Pek. Bubungan Seng Plat 10.00 m'
Kayu Lokal
3 Pek. Gording Balok 5 / 5 cm 0.043 m2
Setara Jati Putih
Kayu Lokal
4 Pek. Lisplank Kayu 12.00 m'
Setara Jati Putih
5 Pek. Pasangan Timpa Laja - m2
E PEKERJAAN LANTAI
Kayu Lokal
1 Pekerjaan lantai Papan - m2
Setara Jati Putih
Terbilang : #NAME?

Menyetujui :
PPTK

ANDI SYAHRIR, ST
NIP. 19750515 200801 1 012

Mengetahui/Menyetujui;
Plt. KEPALA DINAS DP3

Drs. ANDI MUSMAN, MM


NIP. 19660624 199603 1 003
NA ANGGARAN BIAYA
PERUMAHAN MASYARAKAT KURANG MAMPU

HRG. SAT. JML. HRG


(Rp.) (Rp.)
6 7

150,000.00 150,000.00

106,159.95 261,153.48

106,159.95 1,382,202.55

106,159.95 1,382,202.55
109,031.56
54,554.28 -
2,300,000.00 993,600.00

2,300,000.00 184,000.00

900,000.00 900,000.00

500,000.00 2,000,000.00

50,446.00 4,489,694.00
39,050.00 390,500.00
5,748,600.00
247,189.80
72,067.60 864,811.20
50,446.00

140,297.30

GRAND TOTAL 13,245,353.58


PPN 10 % 1,324,535.36
JUMLAH 14,569,888.93
DIBULATKAN 14,569,000.00

#NAME?

Dibuat Oleh :
CV. SENTRA DESAIN KONSULTAN

ZAPARMAN, ST
Direktur

Menyetujui :
PEJABAT PEMBUAT KOMITMEN

ANDI ARFHAN SYUKRI, ST, MT


NIP. 19720406 200212 1 006
RENCANA ANGGARAN BIAYA
KEGIATAN : FASILITASI DAN STIMULASI PEMBANGUNAN PERUMAHAN MASYARAKAT KURANG MAMPU

VOLUME : 1 (SATU) PAKET


LOKASI : KAMPUNG TOA
KEL/DESA : TANETE
KECAMATAN : BULUKUMPA
NAMA MBR : BASRI

VOL. /
NO URAIAN PEKERJAAN
SAT. SPESIFIKASI
1 2 4 5
A PEKERJAAN PERSIAPAN
1 Pekerjaan Pembongkaran 1.00 Ls
B PEKERJAAN STRUKTUR DAN DINDING
Kayu Lokal
1 Pek. Pasangan Dinding Depan 14.65 m2
Setara Jati Putih
Kayu Lokal
2 Pek. Pasangan Dinding Kanan - m2
Setara Jati Putih
Kayu Lokal
3 Pek. Pasangan Dinding Kiri - m2
Setara Jati Putih
4 Pek. Pasangan Batu Bata Tinggi 125 cm 27.92 m2
5 Pek. Plesteran (Sisi luar) 27.92 m2
Kayu Lokal
6 Pek. Tiang Kayu 12 / 12 cm m3
- Setara Jati Putih
Kayu Lokal
7 Pek. Pattolo 5 /10 - m3
Setara Jati Putih
C PEKEJAAN KUSEN
1 Uk. Engsel
Pek. Pasangan Kusen + Pintu Panil + Kuncian 1slaag +
1.00 set 4"x2mm, Kuncian
Engsel
1 Slaag
2 Pek. Pasangan Kusen + Daun Jendela + Kaca 5 mm + Uk. Engsel
4.00 set
Engsel + Kait Angin + Grendel 4"x2mm,
D PEKERJAAN ATAP
1 Pek. Pasangan Atap Seng Gelombang 43.68 m2 BJLS 0,22 mm
2 Pek. Bubungan Seng Plat 10.00 m'
Kayu Lokal
3 Pek. Gording Balok 5 / 5 cm 0.04 m2
Setara Jati Putih
Kayu Lokal
4 Pek. Lisplank Kayu - m'
Setara Jati Putih
5 Pek. Pasangan Timpa Laja 12.38 m2
E PEKERJAAN LANTAI
Kayu Lokal
1 Pekerjaan lantai Papan - m2
Setara Jati Putih
Terbilang : #NAME?

Menyetujui :
PPTK

ANDI SYAHRIR, ST
NIP. 19750515 200801 1 012

Mengetahui/Menyetujui;
Plt. KEPALA DINAS DP3

Drs. ANDI MUSMAN, MM


NIP. 19660624 199603 1 003
NA ANGGARAN BIAYA
PERUMAHAN MASYARAKAT KURANG MAMPU

HRG. SAT. JML. HRG


(Rp.) (Rp.)
6 7

150,000.00 150,000.00

106,159.95 1,555,243.27

106,159.95 -

106,159.95 -
109,031.56 3,044,161.16
54,554.28 1,523,155.50
2,300,000.00 -

2,300,000.00 -

900,000.00 900,000.00

500,000.00 2,000,000.00

50,446.00 2,203,481.28
39,050.00 390,500.00
5,748,600.00
201,201.00
72,067.60 -
50,446.00 624,269.25

140,297.30 -

GRAND TOTAL 12,592,011.45


PPN 10 % 1,259,201.15
JUMLAH 13,851,212.60
DIBULATKAN 13,851,000.00

#NAME?

Dibuat Oleh :
CV. SENTRA DESAIN KONSULTAN

ZAPARMAN, ST
Direktur

Menyetujui :
PEJABAT PEMBUAT KOMITMEN

ANDI ARFHAN SYUKRI, ST, MT


NIP. 19720406 200212 1 006
RENCANA ANGGARAN BIAYA
KEGIATAN : FASILITASI DAN STIMULASI PEMBANGUNAN PERUMAHAN MASYARAKAT KURANG MAMPU

VOLUME : 1 (SATU) PAKET


LOKASI : KAMPUNG BIRORO
KEL/DESA : TANETE
KECAMATAN : BULUKUMPA
NAMA MBR : RAHMATIA

VOL. /
NO URAIAN PEKERJAAN
SAT. SPESIFIKASI
1 2 4 5
A PEKERJAAN PERSIAPAN
1 Pekerjaan Pembongkaran 1.00 Ls
B PEKERJAAN STRUKTUR DAN DINDING
Kayu Lokal
1 Pek. Pasangan Dinding Depan 7.35 m2
Setara Jati Putih
Kayu Lokal
2 Pek. Pasangan Dinding Kanan 11.76 m2
Setara Jati Putih
Kayu Lokal
3 Pek. Pasangan Dinding Kiri m2
Setara Jati Putih
4 Pek. Pasangan Batu Bata Tinggi 125 cm 28.85 m2
5 Pek. Plesteran (Sisi dalam) 28.85 m2
Kayu Lokal
6 Pek. Tiang Kayu 12 / 12 cm m3
Setara Jati Putih
Kayu Lokal
7 Pek. Pattolo 5 /10 m3
Setara Jati Putih
C PEKEJAAN KUSEN
Uk. Engsel
Pek. Pasangan Kusen + Pintu Panil + Kuncian 1slaag +
1 1.00 set 4"x2mm, Kuncian
Engsel
1 Slaag
2 Pek. Pasangan Kusen + Daun Jendela + Kaca 5 mm + Uk. Engsel
2.00 set
Engsel + Kait Angin + Grendel 4"x2mm,
D PEKERJAAN ATAP
1 Pek. Pasangan Atap Seng Gelombang 10.08 m2 BJLS 0,22 mm
2 Pek. Bubungan Seng Plat 10.00 m'
Kayu Lokal
3 Pek. Gording Balok 5 / 5 cm 0.05 m2
Setara Jati Putih
Kayu Lokal
4 Pek. Lisplank Kayu - m'
Setara Jati Putih
5 Pek. Pasangan Timpa Laja 4.90 m2
E PEKERJAAN LANTAI
Kayu Lokal
1 Pekerjaan lantai Papan m2
Setara Jati Putih
Terbilang : #NAME?

Menyetujui :
PPTK

ANDI SYAHRIR, ST
NIP. 19750515 200801 1 012

Mengetahui/Menyetujui;
Plt. KEPALA DINAS DP3

Drs. ANDI MUSMAN, MM


NIP. 19660624 199603 1 003
NA ANGGARAN BIAYA
PERUMAHAN MASYARAKAT KURANG MAMPU

HRG. SAT. JML. HRG


(Rp.) (Rp.)
6 7

150,000.00 150,000.00

106,159.95 780,275.63

106,159.95 1,248,441.01

106,159.95
109,031.56 3,145,560.51
54,554.28 1,573,890.98
2,300,000.00

2,300,000.00

900,000.00 900,000.00

500,000.00 1,000,000.00

50,446.00 508,495.68
39,050.00 390,500.00
5,748,600.00
301,801.50
72,067.60 -
50,446.00 247,185.40

140,297.30

GRAND TOTAL 10,246,150.71


PPN 10 % 1,024,615.07
JUMLAH 11,270,765.78
DIBULATKAN 11,270,000.00

#NAME?

Dibuat Oleh :
CV. SENTRA DESAIN KONSULTAN

ZAPARMAN, ST
Direktur

Menyetujui :
PEJABAT PEMBUAT KOMITMEN

ANDI ARFHAN SYUKRI, ST, MT


NIP. 19720406 200212 1 006
RENCANA ANGGARAN BIAYA
KEGIATAN : FASILITASI DAN STIMULASI PEMBANGUNAN PERUMAHAN MASYARAKAT KURANG MAMPU

VOLUME : 1 (SATU) PAKET


LOKASI : JL. LANGSAT
KEL/DESA : TANETE
KECAMATAN : BULUKUMPA
NAMA MBR : SAMSIAH

VOL. /
NO URAIAN PEKERJAAN
SAT. SPESIFIKASI
1 2 4 5
A PEKERJAAN PERSIAPAN
1 Pekerjaan Pembongkaran 1.00 Ls
B PEKERJAAN STRUKTUR DAN DINDING
Kayu Lokal
1 Pek. Pasangan Dinding Depan 6.58 m2
Setara Jati Putih
Kayu Lokal
2 Pek. Pasangan Dinding Kanan 7.00 m2
Setara Jati Putih
Kayu Lokal
3 Pek. Pasangan Dinding Kiri 13.32 m2
Setara Jati Putih
4 Pek. Pasangan Batu Bata Tinggi 125 cm 20.23 m2
5 Pek. Plesteran (Sisi luar) 20.23 m2
Kayu Lokal
6 Pek. Tiang Kayu 12 / 12 cm - m3
Setara Jati Putih
Kayu Lokal
7 Pek. Pattolo 5 /10 - m3
Setara Jati Putih
C PEKEJAAN KUSEN
1 Uk. Engsel
Pek. Pasangan Kusen + Pintu Panil + Kuncian 1slaag +
1.00 set 4"x2mm, Kuncian
Engsel
1 Slaag
2 Pek. Pasangan Kusen + Daun Jendela + Kaca 5 mm + Uk. Engsel
2.00 set
Engsel + Kait Angin + Grendel 4"x2mm,
D PEKERJAAN ATAP
1 Pek. Pasangan Atap Seng Gelombang 15.00 m2 BJLS 0,22 mm
2 Pek. Bubungan Seng Plat 12.00 m'
Kayu Lokal
3 Pek. Gording Balok 5 / 5 cm 0.0964 m2
Setara Jati Putih
Kayu Lokal
4 Pek. Lisplank Kayu 9.00 m'
Setara Jati Putih
5 Pek. Pasangan Timpa Laja m2
E PEKERJAAN LANTAI
Kayu Lokal
1 Pekerjaan lantai Papan m2
Setara Jati Putih
Terbilang : #NAME?

Menyetujui :
PPTK

ANDI SYAHRIR, ST
NIP. 19750515 200801 1 012

Mengetahui/Menyetujui;
Plt. KEPALA DINAS DP3

Drs. ANDI MUSMAN, MM


NIP. 19660624 199603 1 003
NA ANGGARAN BIAYA
PERUMAHAN MASYARAKAT KURANG MAMPU

HRG. SAT. JML. HRG


(Rp.) (Rp.)
6 7

150,000.00 150,000.00

106,159.95 698,532.47

106,159.95 743,119.65

106,159.95 1,414,050.53
109,031.56 2,205,708.46
54,554.28 1,103,633.08
2,300,000.00 -

2,300,000.00 -

900,000.00 900,000.00

500,000.00 1,000,000.00

50,446.00 756,690.00
39,050.00 468,600.00
5,748,600.00
554,165.04
72,067.60 648,608.40
50,446.00

140,297.30

GRAND TOTAL 10,643,107.64


PPN 10 % 1,064,310.76
JUMLAH 11,707,418.40
DIBULATKAN 11,707,000.00

#NAME?

Dibuat Oleh :
CV. SENTRA DESAIN KONSULTAN

ZAPARMAN, ST
Direktur

Menyetujui :
PEJABAT PEMBUAT KOMITMEN

ANDI ARFHAN SYUKRI, ST, MT


NIP. 19720406 200212 1 006
RENCANA ANGGARAN BIAYA
KEGIATAN : FASILITASI DAN STIMULASI PEMBANGUNAN PERUMAHAN MASYARAKAT KURANG MAMPU

VOLUME : 1 (SATU) PAKET


LOKASI : Jl. K.H. ABD. KARIM
KEL/DESA : TANETE
KECAMATAN : BULUKUMPA
NAMA MBR : ST. HADIJAH

VOL. /
NO URAIAN PEKERJAAN
SAT. SPESIFIKASI
1 2 4 5
A PEKERJAAN PERSIAPAN
1 Pekerjaan Pembongkaran - Ls
B PEKERJAAN GALIAN DAN PONDASI

1 Pek. Galian Tanah 2.64 m3

2 Pek. Pasangan Pondasi 5.72 m3 Batu Kali 1 : 4

C PEKERJAAN STRUKTUR DAN DINDING


Kayu Lokal
1 Pek. Pasangan Dinding Depan 4.71 m2
Setara Jati Putih
Kayu Lokal
2 Pek. Pasangan Dinding Kanan 4.25 m2
Setara Jati Putih
Kayu Lokal
3 Pek. Pasangan Dinding Kiri 14.63 m2
Setara Jati Putih
Kayu Lokal
4 Pek. Pasangan Dinding Belakang 14.63 m2
Setara Jati Putih
5 Pek. Pasangan Batu Bata Tinggi 125 cm 25.25 m2
6 Pek. Plesteran 32.04 m2
Kayu Lokal
7 Pek. Tiang Kayu 12 / 12 cm 0.48 m3
Setara Jati Putih
Kayu Lokal
8 Pek. Pattolo 5 /10 0.35 m3
Setara Jati Putih
D PEKEJAAN KUSEN
Uk. Engsel
Pek. Pasangan Kusen + Pintu Panil + Kuncian 1slaag +
1 2.00 set 4"x2mm, Kuncian
Engsel
1 Slaag
2 Pek. Pasangan Kusen + Daun Jendela + Kaca 5 mm + Uk. Engsel
4.00 set
Engsel + Kait Angin + Grendel 4"x2mm,
E PEKERJAAN ATAP
1 Pek. Pasangan Atap Seng Gelombang 42.17 m2 BJLS 0,22 mm
2 Pek. Bubungan Seng Plat m'
Kayu Lokal
3 Pek. Gording Balok 5 / 5 cm 0.10 m2
Setara Jati Putih
Kayu Lokal
4 Pek. Lisplank Kayu 9.00 m'
Setara Jati Putih
5 Pek. Pasangan Timpa Laja m2
F PEKERJAAN LANTAI
1 Pek. Timbunan 8.99 m3 Tanah Biasa
2 Pek. Pasir Urug Alas Lantai 0.90 m3 Pasir Pasang
3 Pekerjaan lantai Flur 17.98 m2
Kayu Lokal
3 Pekerjaan lantai Papan m2
Setara Jati Putih
Terbilang : #NAME?

Menyetujui :
PPTK

ANDI SYAHRIR, ST
NIP. 19750515 200801 1 012

Mengetahui/Menyetujui;
Plt. KEPALA DINAS DP3

Drs. ANDI MUSMAN, MM


NIP. 19660624 199603 1 003
NA ANGGARAN BIAYA
PERUMAHAN MASYARAKAT KURANG MAMPU

HRG. SAT. JML. HRG


(Rp.) (Rp.)
6 7

150,000.00 -

73,312.50 193,545.00

809,567.00 4,630,723.24

106,159.95 500,013.36

106,159.95 451,179.79

106,159.95 1,553,120.07

106,159.95 1,553,120.07
109,031.56 2,753,046.89
54,554.28 1,748,041.88
2,300,000.00 1,092,960.00

2,300,000.00 805,000.00

900,000.00 1,800,000.00

500,000.00 2,000,000.00

50,446.00 2,127,237.20
39,050.00
5,748,600.00 574,860.00

72,067.60 648,608.40
50,446.00

147,000.00 1,321,677.00
218,790.00 196,714.09
89,237.81 1,604,674.26
140,297.30 -
GRAND TOTAL 25,554,521.25
PPN 10 % 2,555,452.12
JUMLAH 28,109,973.37
DIBULATKAN 28,109,000.00

#NAME?

Dibuat Oleh :
CV. SENTRA DESAIN KONSULTAN

ZAPARMAN, ST
Direktur

Menyetujui :
PEJABAT PEMBUAT KOMITMEN

ANDI ARFHAN SYUKRI, ST, MT


NIP. 19720406 200212 1 006
BACK UP DATA

PEKERJAAN STRUKTUR DAN DINDING

1 Pek. Pasangan Dinding Depan


P x L Jumlah
V 6.8 x 1.9 = 12.92
dikurangi
pintu V 1.8 x 0.9 x 1= 1.62
Jendela V 1.1 x 0.7 x 2= 1.54
9.76

2 Pek. Pasangan Dinding Kanan


P x L Jumlah
v1 4.3 x 1.9 = 8.17
v2 1.5 x 1.9 = 2.85
v3 1.5 x 1.9 = 2.85
dikurangi
Jendela V 1.1 x 0.7 x 2= 1.54
12.33

3 Pek. Pasangan Dinding Kiri


P x L Jumlah
V 5.8 x 1.9 x = 11.02
dikurangi
Jendela V 1.1 x 0.7 x 2= 1.54
9.48

4 Pek. Pasangan Dinding Belakang


P x L Jumlah
V 6.8 x 1.9 x = 12.92

12.92

6 Pek. Tiang Kayu 12 / 12 cm


P x L T
V 0.12 x 0.12 x 2= 0.0288
V JUMLAH
0.0288 x 3= 0.0864

6 Pek. Pattolo
P x L T
V 26 x 0.05 x 0.1 = 0.13
= 0.13
3 PEKERJAAN KUSEN

1 Pek. Pasangan Kusen + Pintu Panil + Kuncian 1slaag + Engsel


2 Pek. Pasangan Kusen + Daun Jendela + Kaca 5 mm + Engsel + Kait Angin + Grendel

4 PEKERJAAN ATAP

1 Pasang Konstruksi Kuda-Kuda Konvensional


P x L T Jumlah
V1 3.6 x 0.06 x 0.07 x 2
V2 0.8 x 0.06 x 0.07 x 2
V3 1.5 x 0.06 x 0.07 x 1

V x TOTAL
0.21624 x 3 = 0.64872

2 Pasangan Gording
P x L x T Jumlah
V1 5.8 x 0.05 x 0.05 x 6
V2 6.8 x 0.05 x 0.05 x 6

3 Pekerjaan Lisplank
P x Jumlah
samping V1 6x 2= 12.00
12.00

4 Pekerjaan Timpal Laja


P x L / 2
V1 6.8 x 1.5 / 2x =

4 Pasangan Atap Seng Gelombang


P x L Jumlah
seng teras V1 7x 1.8 x 1= 12.6
seng rumah v2 7x 6x 1= 42
54.6
1 Pekerjaan Lantai Papan
P x L
teras V1 1.9 x 1.8 = 3.42
dalam V2 7x 6= 42
45.42
= 1 SET
= 6 SET

= 0.03024 4
= 0.096 1.6
= 0.09 2
0.21624

= 0.087
= 0.102
0.189

5.1
1.5
3.3
3.6249138